INLAND RAIL OVERVIEW PROGRAMME DIRECTOR, SIMON THOMAS 27 OCTOBER 2016

Size: px
Start display at page:

Download "INLAND RAIL OVERVIEW PROGRAMME DIRECTOR, SIMON THOMAS 27 OCTOBER 2016"

Transcription

1 INLAND RAIL OVERVIEW PROGRAMME DIRECTOR, SIMON THOMAS 27 OCTOBER 2016

2 BACKGROUND INLAND RAIL A new ~1700km freight rail line from Melbourne to Brisbane via regional VIC, NSW and QLD A road-competitive rail service based on transit time, reliability and cost (<24 hours Melb-Bris) Completes the backbone of Australia s freight rail network, Inland Rail is the safe, sustainable solution to Australia s freight challenge and will transform the way we move freight around the country. Utilises more than 1200km of the existing network reducing community impacts and land costs 2 Inland rail Overview

3 INLAND RAIL SERVICE OFFERING 3

4 PROPOSED SCOPE 4

5 FACTS AND FIGURES 5

6 PROGRAMME OVERVIEW COMMITTED FUNDING November 2013 Former Deputy Prime Minister The Hon. Warren Truss MP charged ARTC with developing a 10 year delivery plan for Inland Rail. The Australian Government committed $300 million over 4 years to finaliseplanning, engineering design and environmental assessments for Inland Rail. Work included: The development of the 10 year Programme Early design work and approvals The commencement of early works and land acquisition (where required) Development of a detailed ProgrammeBusiness Case (completed). May 2016 In the Federal Budget, Australian Government announced: $594 million equity injection to ARTC to progress pre-construction activities and land acquisition This will bring the Government s total commitment to the Programme to $894 million Inland Rail to be delivered by ARTC in partnership with the private sector. 6

7 TIMELINE TO DATE 7

8 CURRENT STATUS Concept Design completed for 11 projects as at July 2016 Currently finalising EIS documents and Feasibility Design for Parkes to Narromine(P2N) and Narrabri to North Star (N2NS) projects (both in NSW) Undertaking further field studies across the alignment, in preparation for the Technical and Approvals Consultancy Services Working with the community to refine the preferred alignment in greenfield sections (in conjunction with field studies) Project Offices established in Brisbane and Sydney, with an office opening in Toowoomba in the coming months More than 75 full-time staff working on the Programme 8

9 INLAND RAIL MARKET TESTING Being progressed by Department of Finance and their advisors (Macquarie Capital and Herbert Smith Freehills) Objectives are to identify and assess opportunities to optimise private sector participation in Inland Rail 9

10 TOOWOOMBA TUNNEL SINGLE LARGEST CAPITAL ITEM The Toowoomba Tunnel is on critical path for the entire Programme 10

11 Toowoomba Range Crossing TOOWOOMBA TUNNEL 1:60 grade for 22km s

12 12

13 STRUCTURES Toowoomba Range is not just about tunnels, there are three significant structures with the longest 600m in length and 40m in height. Example of Large viaduct 13

14 PRECONSTRUCTION ACTIVITIES As part of ARTC s remit we need to consider how to deliver in sometimes remote and rugged environments. That will include: Construction water bore holes and licenses Power and telecommunications Construction access / road / rail Construction logistics / constraints Fabrication and storage yards Precast yards Quarries and material supplies Construction permits and approvals Accommodation and potential camps Concrete batching plants 14

15 PROGRAMME DELIVERY INNOVATIONS Huge scope for innovation including: Contracting strategies Track Laying technology Procurement of materials Mass procurement Free issue Lessons learned from other mega projects worldwide 15

16 INNOVATIONS & INITIATIVES Big Data Big Data initiative, to provide data which will assist in the delivery of a functioning, maintainable railway. This includes: BIM is a process for creating and managing all of the information on a project before, during and after construction. The output of this process is a digital description of every aspect of the built asset. Use of GIS to collate and report data consistent across the programme and throughout the programme lifecycle including maintenance and operations - IRMap Value Management Procurement initiatives for and standardisation of components. For example: Drainage structures Sleepers and other track components Consistency in viaduct and bridge structure types. Consideration to new materials or non-traditional approaches to material use, focused on lower maintenance outcomes. 16

17 INNOVATIONS & INITIATIVES Technical Programme wide impact assessment of hydrological flood modelling to inform train reliability requirements and operational strategy. Focused geotechnical investigation, use of local materials, and efficient rail formation design using latest material technologies. Adoption of consistent treatments for road and rail interfaces based on policy, road hierarchy and alignment. System Engineering Operational modelling for development of a flexible timetable that can respond to market. Implementation of an Availability Reliability Maintainability (ARM) model to inform decision making, for achieving the Programme Service Offering. Rail Systems ATMS supports ARTC s objectives of improving train service availability, transit times, rail safety and system reliability. Primarily ATMS will eliminate the requirement for ARTC to replace its aging conventional signalling systems throughout much of its national network. 17

18 SUMMARY To Summarise: $894m Funding to be Construction Ready 1700km across three States Upgrade Works/ Enhancement Works/Missing Link Works Expression of Interest for Designs and Environmental approvals Over 85 staff in three offices Complex challenges particularly in QLD Land Acquisition 18

Enterprise Asset Management. Enterprise Asset Management 1

Enterprise Asset Management. Enterprise Asset Management 1 Enterprise Asset Management 1 Introduction Managing assets effectively is critical to the success of organisations that depend on complex physical assets to deliver services. Increasingly, operators and

More information

TUNNEL BORING MACHINE & AUXILIARY EQUIPMENT ELECTRICAL CAPABILITY EPS AUSTRALIA. Suite 1702, Tower 2, 101 Grafton St, Bondi Junction NSW 2022

TUNNEL BORING MACHINE & AUXILIARY EQUIPMENT ELECTRICAL CAPABILITY EPS AUSTRALIA. Suite 1702, Tower 2, 101 Grafton St, Bondi Junction NSW 2022 Suite 1702, Tower 2, 101 Grafton St, EPS AUSTRALIA TUNNEL BORING MACHINE & AUXILIARY EQUIPMENT ELECTRICAL CAPABILITY Suite 1702, Tower 2, 101 Grafton St, EPS is a recognised company specialising in Electrical,

More information

Asset Management Policy

Asset Management Policy Asset Management Policy January 2018 Introduction Our Asset Management Policy was last published in 2014. It is being updated to reflect our commitment to regularly review and improve all of our Asset

More information

Track Possession Guidelines

Track Possession Guidelines Division / Business Unit: Function: Document Type: Delivery and Maintenance Possession Management Guideline Track Possession Guidelines Applicability Hunter Valley Publication Requirement Internal / External

More information

The fresh approach to engineering and project management.» Rich in experience» Responsive & flexible» Delivery certainty

The fresh approach to engineering and project management.» Rich in experience» Responsive & flexible» Delivery certainty The fresh approach to engineering and project management» Rich in experience» Responsive & flexible» Delivery certainty 01 AE Projects has a strong... in-house engineering capability that covers all disciplines

More information

Inland Rail: Infrastructure Leads Industry

Inland Rail: Infrastructure Leads Industry Cities Into Action Inland Rail: Infrastructure Leads Industry Australia 20/07/2017 Contents Introduction 2 Project details 2 Commercial property impacts 2 Case study 2 Conclusion 4 Inland Rail Details

More information

Rail. Capability and Experience

Rail. Capability and Experience Rail Capability and Experience There is no task so important or so urgent in our business, or our customers businesses, that it overrides the need to work safely... John Grill, WorleyParsons CEO Zero Harm

More information

Country Bridge Solutions

Country Bridge Solutions Country Bridge Solutions David K. Andrews, Senior Project Development Manager, Freight and Regional Program Office Roads and Maritime Services, NSW, Australia Adj Prof Wije Ariyaratne, Principal Engineer

More information

Trevor Moore ARTC Signals Standards Engineer ASPECT, London 2012

Trevor Moore ARTC Signals Standards Engineer ASPECT, London 2012 Trevor Moore ARTC Signals Standards Engineer ASPECT, London 2012 Safety and Railways The opening of the Manchester to Liverpool Railway in 1830 was marred by the untimely death of William Huskisson. Since

More information

LEADING SOLUTION PROVIDER FOR OVERFILLED PRECAST ARCH BRIDGES

LEADING SOLUTION PROVIDER FOR OVERFILLED PRECAST ARCH BRIDGES LEADING SOLUTION PROVIDER FOR OVERFILLED PRECAST ARCH BRIDGES Suppliers Number: 221198 4900092 FS 606596 0086 BEBO Arch System Leading Solution Providers The BEBO Arch System is a standardised patented

More information

Local Vendor Opportunities. Gannawarra Solar Farm. Engineering Intelligence

Local Vendor Opportunities. Gannawarra Solar Farm. Engineering Intelligence Local Vendor Gannawarra Solar Farm Engineering Intelligence Community Focused The Project RCR is fully committed to supporting the local community when delivering infrastructure projects in regional areas.

More information

HS2 s approach to BIM and Beyond

HS2 s approach to BIM and Beyond HS2 s approach to BIM and Beyond Britain s New High Speed Railway HS2: the new backbone of Britain s rail network HS2 s Timeline Fast, Frequent & Reliable National College for High Speed Rail Birmingham

More information

NEW SOUTH WALES INTERMODAL FORUM. August 2017

NEW SOUTH WALES INTERMODAL FORUM. August 2017 NEW SOUTH WALES INTERMODAL FORUM August 2017 1 PACIFIC NATIONAL AT A GLANCE A summary of Pacific National s performance from the last financial year: TEUs HANDLED 0.8m (INTERMODAL) 57 BILLION NTKs REVENUE

More information

MELBOURNE UNIVERSITY CASE STUDY. Super 123 Shelving System High density storage system for University book library

MELBOURNE UNIVERSITY CASE STUDY. Super 123 Shelving System High density storage system for University book library MELBOURNE UNIVERSITY CASE STUDY Super 123 Shelving System High density storage system for University book library BOW13548_Case Study_MELBUNI_FNL.indd 1 Some elements of this design are subject to copyright.

More information

Allens FY 2013/14. Page 1/8

Allens FY 2013/14. Page 1/8 Allens FY 2013/14 Page 1/8 Organisation and Product Information Table 1: Organisation and Product Information Organisation Name Allens Name of the subject of certification Allens Type of certification

More information

Chartered Institute of Management Accountants Public Private Partnerships

Chartered Institute of Management Accountants Public Private Partnerships Chartered Institute of Management Accountants Public Private Partnerships Peter Murray Executive Director, Infrastructure Finance and Advisory 22 October 2014 1 Agenda Overview of Public Private Partnerships

More information

Building Information Modelling draft policy and principles for Queensland

Building Information Modelling draft policy and principles for Queensland Building Information Modelling draft policy and principles for Queensland February 2017 The State of Queensland, February 2017. Published by the Department of Infrastructure, Local Government and Planning,

More information

Creating access for regional communities to efficient and effective aviation logistics infrastructure

Creating access for regional communities to efficient and effective aviation logistics infrastructure PRODUCTIVITY & COLLABORATION Creating access for regional communities to efficient and effective aviation logistics infrastructure Phil Gregory, General Manager, Brisbane West Wellcamp Airport Toowoomba

More information

I n t r o d u c t i o n. C h o i c e b e t w e e n P u b l i c Tr a n s p o r t a t i o n M o d e s

I n t r o d u c t i o n. C h o i c e b e t w e e n P u b l i c Tr a n s p o r t a t i o n M o d e s I n t r o d u c t i o n 1. C h o i c e b e t w e e n P u b l i c Tr a n s p o r t a t i o n M o d e s 2. I n n o v a t i o n s a n d O p t i m i s a t i o n s 3. 1. Introduction Christophe Chassagnette

More information

VALUE OF RAIL The Contribution of Rail in Australia

VALUE OF RAIL The Contribution of Rail in Australia VALUE OF RAIL The Contribution of Rail in Australia Summary of Report by Deloitte Access Economics November 2017 2 CONTENTS SUMMARY REPORT 4 THE VALUE OF RAIL TO THE ECONOMY 5 THE VALUE OF RAIL TO SOCIETY

More information

Trimble Alignment Planning Solutions. Between vision and viability there are important decisions to make

Trimble Alignment Planning Solutions. Between vision and viability there are important decisions to make Trimble Alignment Planning Solutions Between vision and viability there are important decisions to make Trimble applies technology to make businesses and government significantly more productive. Solutions

More information

For personal use only

For personal use only 27 April 2017 ASX Announcement March 2017 Quarterly Activities Report Summary Chelkar - Assay High Grade Potash Mineralisation Present Bankable Feasibility Study Advances for Satimola Project JV with Chongqing

More information

ASX / MEDIA ANNOUNCEMENT 5 March 2018

ASX / MEDIA ANNOUNCEMENT 5 March 2018 ASX / MEDIA ANNOUNCEMENT ASX: NCZ 5 March 2018 NEW CENTURY EXECUTES A$40M EPC CONTRACT WITH SEDGMAN FOR RESTART OF MINE & PORT AND SELECTS AUSENCO AS PREFERRED BIDDER FOR A$1.7M PIPELINE REFURBISHMENT

More information

Building and operating the UK s infrastructure. Establishing your roadmap to success

Building and operating the UK s infrastructure. Establishing your roadmap to success Building and operating the UK s infrastructure Establishing your roadmap to success Building for the future The UK government has issued a challenge to the sector to remedy a 50 year backlog in investment

More information

INFRASTRUCTURE PROCUREMENT IN A RESOURCE CONSTRAINED MARKET

INFRASTRUCTURE PROCUREMENT IN A RESOURCE CONSTRAINED MARKET INFRASTRUCTURE PROCUREMENT IN A RESOURCE CONSTRAINED MARKET EXECUTIVE SUMMARY INFRASTRUCTURE PROCUREMENT IN A RESOURCE CONSTRAINED MARKET Urbanization is driving strong infrastructure investment, but for

More information

A Review of Cost-Benefit Analysis for Freight Projects. Sae Chi, Tom Frost and Ben Ellis NineSquared

A Review of Cost-Benefit Analysis for Freight Projects. Sae Chi, Tom Frost and Ben Ellis NineSquared A Review of Cost-Benefit Analysis for Freight Projects Sae Chi, Tom Frost and Ben Ellis NineSquared A Review of Cost- Benefit Analysis for Freight Projects Sae Chi, Tom Frost and Ben Ellis 27-29 November,

More information

Crossrail and our international tunnelling expertise

Crossrail and our international tunnelling expertise Crossrail and our international tunnelling expertise Analyst briefing Thursday 1 October 2015 Neil Thomas Managing director Water, Ground and Environment Crossrail Crossrail Crossrail has one purpose to

More information

Project 24 Rail Transport Energy Efficiency and Sustainability. Project background Commenced July Completed December 2006

Project 24 Rail Transport Energy Efficiency and Sustainability. Project background Commenced July Completed December 2006 Rail Research Industry Report Project 24 Rail Transport Energy Efficiency and Sustainability Project background Commenced July 2002 - Completed December 2006 Results and Outcomes: 1. Energy efficiency

More information

Slope Stabilisation and the Beauty Of Shotcrete AN OVERVIEW

Slope Stabilisation and the Beauty Of Shotcrete AN OVERVIEW Slope Stabilisation and the Beauty Of Shotcrete AN OVERVIEW Matthew Hicks Managing Director The RIX Group EAGCG Shotcrete Seminar May 2017 1 OVERVIEW History Types of Shotcrete Equipment Specifications

More information

IPSOS INNOVATE RECONCILIATION ACTION PLAN

IPSOS INNOVATE RECONCILIATION ACTION PLAN IPSOS INNOVATE RECONCILIATION ACTION PLAN OCT 2017 - OCT 2019 OUR VISION FOR RECONCILIATION Our vision for reconciliation is to contribute towards an Australia where Aboriginal and Torres Strait Islander

More information

Engineering Management Manual

Engineering Management Manual Engineering Management Manual Configuration Management ED0014 Document Category: DMS: Document Control: Procedure CRN-EPR-ENG-014 Version Date Author/discipline Reviewer Approver Remarks 1.0 13/12/2011

More information

Global Infrastructure practice in East Africa

Global Infrastructure practice in East Africa Global Infrastructure practice in East Africa KPMG East Africa kpmg.com/eastafrica/infrastructure Our purpose: To inspire confidence and empower change KPMG s Global Infrastructure practice has over 3,000

More information

International Experience with PPP Programs: Success, Failure and Key Lessons. 22 February 2012

International Experience with PPP Programs: Success, Failure and Key Lessons. 22 February 2012 International Experience with PPP Programs: Success, Failure and Key Lessons Delivering Public-Private Private Partnerships in PNG 22 February 2012 Why PPPs? Value for Money Synergies between design, construction,

More information

AUSTRALIA S INTELLIGENT ACCESS PROGRAM (IAP): ENABLING IMPROVED ROAD SAFETY OUTCOMES

AUSTRALIA S INTELLIGENT ACCESS PROGRAM (IAP): ENABLING IMPROVED ROAD SAFETY OUTCOMES AUSTRALIA S INTELLIGENT ACCESS PROGRAM (IAP): ENABLING IMPROVED ROAD SAFETY OUTCOMES Cai, D., Dang, J., Karl, C. A., Koniditsiotis, C. Transport Certification Australia Ltd; Melbourne, Victoria Level 12,

More information

Case Study: Eraring Power Station

Case Study: Eraring Power Station Case Study: Eraring Power Station Evidence based asset planning Background: The Eraring Power Station (EPS) was constructed in the late 1970s and is located on the western shore of Lake Macquarie. While

More information

GENEX WELCOMES QLD STATE GOVERNMENT ANNOUNCEMENT OF STRATEGIC TRANSMISSION INFRASTRUCTURE FOR NORTH QUEENSLAND

GENEX WELCOMES QLD STATE GOVERNMENT ANNOUNCEMENT OF STRATEGIC TRANSMISSION INFRASTRUCTURE FOR NORTH QUEENSLAND 5 June 2017 Level 6, 28 O Connell Street Sydney NSW 2000 GPO Box 4626, Sydney NSW 2001 t. + 61 2 9048 8850 e. info@genexpower.com.au w. www.genexpower.com.au ASX Announcement GENEX WELCOMES QLD STATE GOVERNMENT

More information

Experience at Hinkley Point C: building Information Modelling (bim) and Enterprise Lifecycle Management Solutions Presented By: Sue Hewish & Jason

Experience at Hinkley Point C: building Information Modelling (bim) and Enterprise Lifecycle Management Solutions Presented By: Sue Hewish & Jason Experience at Hinkley Point C: building Information Modelling (bim) and Enterprise Lifecycle Management Solutions Presented By: Sue Hewish & Jason Walker Agenda: Introductions Section 1: Introduction to

More information

THE SLAB TRACK SOLUTION FOR THE REQUIREMENTS OF TOMORROW LOW VIBRATION TRACK (LVT)

THE SLAB TRACK SOLUTION FOR THE REQUIREMENTS OF TOMORROW LOW VIBRATION TRACK (LVT) THE SLAB TRACK SOLUTION FOR THE REQUIREMENTS OF TOMORROW LOW VIBRATION TRACK (LVT) LOW VIBRATION TRACK (LVT) THE SLAB TRACK SOLUTION FOR THE REQUIREMENTS OF TOMORROW BLS Netz AG LVT, one of the first non-ballasted

More information

GLOBE LINK CONNECTING SOUTH AUSTRALIA TO THE WORLD

GLOBE LINK CONNECTING SOUTH AUSTRALIA TO THE WORLD GLOBE LINK CONNECTING SOUTH AUSTRALIA TO THE WORLD 2036 WILL MARK OUR STATE S BICENTENARY By the time our State turns 200 years old, I want South Australia to be a place of prosperity. Planning and delivering

More information

GRP System FX. The «all in one» railway surveying solution

GRP System FX. The «all in one» railway surveying solution GRP System FX The «all in one» railway surveying solution Rail traffic without limits New challenges for railway construction and operation Borders open, centres of economic activity spread, people and

More information

THEFUTURERAILWAY THE INDUSTRY S RAIL TECHNICAL STRATEGY 2012 INFRASTRUCTURE

THEFUTURERAILWAY THE INDUSTRY S RAIL TECHNICAL STRATEGY 2012 INFRASTRUCTURE 33 INFRASTRUCTURE Automated maintenance is quicker, safer and more cost-effective Well-targeted maintenance enables more train paths to be available at night Advanced suspension system minimises noise

More information

Sheet Pile Retaining Walls Design and Construction in Brown Fields Environment

Sheet Pile Retaining Walls Design and Construction in Brown Fields Environment 8th Australian Small Bridges Conference 2017 Sheet Pile Retaining Walls Design and Construction in Brown Fields Environment Level Crossing Removal Project 1 Burke Road, North Road, McKinnon Road and Centre

More information

Crossrail UK. Enabling Quality Asset Information. for maintenance reliability and asset management professionals. oct/nov 14. uptimemagazine.

Crossrail UK. Enabling Quality Asset Information. for maintenance reliability and asset management professionals. oct/nov 14. uptimemagazine. UPTIME MAGAZINE OCTOBER/NOVEMBER 2014 for maintenance reliability and asset management professionals Crossrail UK Enabling Quality Asset Information uptimemagazine.com AM Asset Management Enabling Quality

More information

Guidelines for the Application of Asset Management in Railway Infrastructure Organisations

Guidelines for the Application of Asset Management in Railway Infrastructure Organisations Guidelines for the Application of Asset Management in Railway Infrastructure Organisations INTERNATIONAL UNION OF RAILWAYS (UIC) 16 rue Jean Rey - F-75015 PARIS Tel: +33 (0)1 44 49 20 20 Fax: +33 (0)1

More information

Innovation Programme 3:

Innovation Programme 3: Innovation Programme 3: COST EFFICIENT - HIGH CAPACITY INFRASTRUCTURE Entreprise commune européenne Shift2Rail Information sur les appels à projets 2017 2 décembre 2016 2 Objectives High level objectives

More information

National Rail Safety Regulation

National Rail Safety Regulation National Rail Safety Regulation CQU Rail Safety Course Rob Andrews National Rail Safety Regulator 22 January 2014 Presentation overview Transport Reform Agenda intent Current state of implementation Establishing

More information

Common Safety Methodology on Risk Evaluation and Assessment. Andrew Petrie Head of Safety & Assurance

Common Safety Methodology on Risk Evaluation and Assessment. Andrew Petrie Head of Safety & Assurance Common Safety Methodology on Risk Evaluation and Assessment Andrew Petrie Head of Safety & Assurance andrew.petrie@networkrailconsulting.com Network Rail The image cannot be displayed. Your computer may

More information

Assessment Plan Civil Engineer Non-Integrated Degree Apprenticeship Level 6

Assessment Plan Civil Engineer Non-Integrated Degree Apprenticeship Level 6 Assessment Plan Civil Engineer Non-Integrated Degree Apprenticeship Level 6 Introduction This End Point Assessment Plan (EPA) is to accompany the Civil Engineer Level 6 Degree Apprenticeship Standard.

More information

Wholesale electricity an uncertain outlook

Wholesale electricity an uncertain outlook Wholesale electricity an uncertain outlook Mark Collette Group Executive Manager, Energy Markets UBS Australian Resources, Energy & Utilities Conference, Sydney Agenda About EnergyAustralia Key market

More information

9 ENVIRONMENTAL MANAGEMENT PLAN 9.1 OVERVIEW AND SCOPE Introduction

9 ENVIRONMENTAL MANAGEMENT PLAN 9.1 OVERVIEW AND SCOPE Introduction 9 ENVIRONMENTAL MANAGEMENT PLAN 9.1 OVERVIEW AND SCOPE 9.1.1 Introduction This chapter is the provisional Environmental Management Plan (EMP) for the Jubilee Phase 1 Development project. The elements of

More information

Ports of Africa (Pty) Ltd

Ports of Africa (Pty) Ltd Ports of Africa (Pty) Ltd Capability Statement March 2016 Copyright 2016 by Ports of Africa (Pty) Ltd All rights reserved. No part of this document may be reproduced, stored in a retrievable system or

More information

Intermodal Terminal Developments - Benefits to the South East Region

Intermodal Terminal Developments - Benefits to the South East Region Intermodal Terminal Developments - Benefits to the South East Region Presented by Sam Tarascio A brief background of Salta Properties Privately owned business started 43 years ago. Completed $2 billion

More information

This paper outlines the carbon footprint and greenhouse gas assessment for HS2 Phase One.

This paper outlines the carbon footprint and greenhouse gas assessment for HS2 Phase One. HIGH SPEED TWO INFORMATION PAPER E10: CARBON This paper outlines the carbon footprint and greenhouse gas assessment for HS2 Phase One. It will be of particular interest to those potentially affected by

More information

Scheduled maintenance and rectification works. Systems integration and comprehensive reporting

Scheduled maintenance and rectification works. Systems integration and comprehensive reporting Distribution We have significant experience in asset management, maintenance and construction for overhead and underground electricity distribution networks. This enables us to consistently add-value,

More information

Rail Safety Management Procedure General Engineering and Operational Systems Railway Track Signals - Detonators

Rail Safety Management Procedure General Engineering and Operational Systems Railway Track Signals - Detonators 1/12 General Engineering and Operational Systems Railway Track Signals - Detonators Revision Date Comments 1 January 2007 Initial Document 2 May 2007 Review and Update to incorporate associated forms 3

More information

7. Value Management Workshop

7. Value Management Workshop 7. Value Management Workshop 7.1 Introduction A two day Value Management Workshop (VMW) was held on 12 and 13 December 2005. The value management workshop was used to review and assess the four route options

More information

US Army Corps of Engineers

US Army Corps of Engineers I I I ' A I US Army Corps of Engineers LA River Ecosystem Restoration, CA Preconstruction Engineering and Design Phase 104791 LOS ANGELES DISTRICT SOUTH PACIFIC DIVISION August 15, 2017 1 Table of Contents

More information

Climate change adaptation and rail. Dr Kate Avery Sustainability Specialist (Climate Change Adaptation) 23 rd January 2013

Climate change adaptation and rail. Dr Kate Avery Sustainability Specialist (Climate Change Adaptation) 23 rd January 2013 Climate change adaptation and rail Dr Kate Avery Sustainability Specialist (Climate Change Adaptation) 23 rd January 2013 1 Contents The challenge Our approach Opportunities and hurdles The Challenge Asset

More information

La Nouvelle Route du Littoral Metro stations Rennes DOHA Express Way Qatar Rail L2 in Marseille FFR stadium EOLE express train

La Nouvelle Route du Littoral Metro stations Rennes DOHA Express Way Qatar Rail L2 in Marseille FFR stadium EOLE express train La Nouvelle Route du Littoral Metro stations Rennes DOHA Express Way Qatar Rail L2 in Marseille FFR stadium EOLE express train 07.10.2013 C.CASTAING INFRA ROOM session n 2 Munich - 1 - Around 15 billions

More information

NSW Regional Infrastructure Coordination. Local Government NSW Finance Summit 12 Sep 17

NSW Regional Infrastructure Coordination. Local Government NSW Finance Summit 12 Sep 17 NSW Regional Infrastructure Coordination Local Government NSW Finance Summit 12 Sep 17 Background Commenced Review 20 Feb 17 Appointment publically announced by Premier and Deputy Premier 9 Mar 17 Independent

More information

CAREERS IN AGRICULTURE FOR RETURNING VETERANS AGRI VETERANS AGRI LABOUR AUSTRALIA PARTNERING WITH

CAREERS IN AGRICULTURE FOR RETURNING VETERANS AGRI VETERANS AGRI LABOUR AUSTRALIA PARTNERING WITH CAREERS IN AGRICULTURE FOR RETURNING VETERANS AGRI VETERANS AGRI LABOUR AUSTRALIA PARTNERING WITH From Deployment to Employment: Agricultural Jobs for Veterans A New Initiative After serving in the military,

More information

HS2. Beth West Commercial Director, HS2 Ltd

HS2. Beth West Commercial Director, HS2 Ltd HS2 Beth West Commercial Director, HS2 Ltd What is HS2? 2 Addressing the capacity crunch In 2011/12 passengers made around 1.5 billion journeys, almost doubled since 1994/95 125 million long distance journeys

More information

Driving value for your business

Driving value for your business Asset Asset owners worldwide are continually required to optimise asset performance to meet their stakeholders expectations. Effective asset management is moving from a task-focused discipline to a long-term,

More information

AGENDA. HS1 Overview. Construction ti & Engineering i Overview. Funding. Procurement & Delivery. Operating Railway

AGENDA. HS1 Overview. Construction ti & Engineering i Overview. Funding. Procurement & Delivery. Operating Railway Tim Smart Director Engineering & Assets HS1 AGENDA HS1 Overview Construction ti & Engineering i Overview. Funding Procurement & Delivery Operating Railway HS1 Overview: Infrastucture Domestic main lines

More information

Draft Newell Highway Corridor Strategy SUBMISSION June 2014

Draft Newell Highway Corridor Strategy SUBMISSION June 2014 Draft Newell Highway Corridor Strategy SUBMISSION June 2014 1 This Regional Organisation of Councils speaks for over 236,000 people covering an area of more than 70,000sq kms comprising Bathurst Regional,

More information

Streamlining. forecasting, planning and Reserves management for. oil and gas. corporations

Streamlining. forecasting, planning and Reserves management for. oil and gas. corporations Streamlining forecasting, planning and management for oil and gas corporations Optimise PRODUCTION MANAGEMENT process With demand for natural resources increasing worldwide, oil and gas companies must

More information

PIA NSW SUBMISSION SYDNEY METRO NETWORK STAGE 1 (CBD METRO) ENVIRONMENTAL ASSESSMENT

PIA NSW SUBMISSION SYDNEY METRO NETWORK STAGE 1 (CBD METRO) ENVIRONMENTAL ASSESSMENT PO Box 484 North Sydney NSW 2059 PIA NSW SUBMISSION SYDNEY METRO NETWORK STAGE 1 (CBD METRO) ENVIRONMENTAL ASSESSMENT T: 02 8904 1011 F: 02 8904 1133 E: nswmanager@planning.org.au About PIA The Planning

More information

Railway Interface Planning Scheme Rules (RIPS Rules)

Railway Interface Planning Scheme Rules (RIPS Rules) Contents 1. Purpose.. 1 2. Scope... 2 3. Scheme Rules.... 3 4. Roles and Responsibilities... 4 5. Management System Requirements... 7 6. Investigating Breaches of the Railway Interface Planning Scheme

More information

SCHIAVELLO CONSTRUCTION 2 PETER. Managing Director

SCHIAVELLO CONSTRUCTION 2 PETER. Managing Director construction SCHIAVELLO CONSTRUCTION 2 3 PETER SCHIAVELLO Managing Director We are driven by the desire to assist our clients, collaborators + employees achieve their own journey of success, whilst forging

More information

B. Stakeholder Guide: Infrastructure and utility providers

B. Stakeholder Guide: Infrastructure and utility providers B. Stakeholder Guide: Infrastructure and utility providers Why is the Government proposing new legislation? As our population grows, the Government wants to accelerate the building of new communities and

More information

White Paper April 23, 2018

White Paper April 23, 2018 White Paper April 23, 2018 BEST PRACTICES: COORDINATING WITH UNION PACIFIC IN ALTERNATIVE DELIVERY PROJECTS PURPOSE The purpose of this document is to recommend best practices for how public entities can

More information

Project Planning and Development Process

Project Planning and Development Process Project Planning and Development Process The project development process (PDP) involves hundreds of tasks. Many of these are internal agency activities that help an agency follow a methodical process of

More information

Oracle Presentation. August 2017

Oracle Presentation. August 2017 Oracle Presentation August 2017 Agenda M-Power Overview Solutions Overview Customers Case Studies, videos and references. Questions 2 About M-Power M-Power is a specialist consulting firm delivering Oracle

More information

Development of port Infrastructure: Bangladesh Perspective FAHMIDA AKHTAR DEPUTY SECRETARY MINISTRY OF SHIPPING

Development of port Infrastructure: Bangladesh Perspective FAHMIDA AKHTAR DEPUTY SECRETARY MINISTRY OF SHIPPING Development of port Infrastructure: Bangladesh Perspective FAHMIDA AKHTAR DEPUTY SECRETARY MINISTRY OF SHIPPING Contents Introduction Major export & import of Bangladesh Development of Chittagong Port

More information

introduction Introduction.1 contents Irrigation Warehouse Group Pty Ltd Ph

introduction Introduction.1 contents Irrigation Warehouse Group Pty Ltd  Ph contents Vinidex the Company 3 Quality Policy 3 Product Background 4 Worldwide Use 4 Australian Use 4 Pipe Extrusion 5 Fittings 6 End Treatments 6 Product Standards 7 Relevant Australian Standards 7 Introduction.1

More information

Canada: World Leader in Hydrail

Canada: World Leader in Hydrail Canada: World Leader in Hydrail Presented on behalf of: at the 3rd Annual National Railway Day Conference Innovation and Investment Building for the Future Electrified rail is in demand... Major investments

More information

PUBLIC DISCLOSURE OF PHASE II ENVIRONMENTAL AND SOCIAL MANAGEMENT PROGRAMME. 2 Objective of the Phase II Environmental and Social Programme

PUBLIC DISCLOSURE OF PHASE II ENVIRONMENTAL AND SOCIAL MANAGEMENT PROGRAMME. 2 Objective of the Phase II Environmental and Social Programme PUBLIC DISCLOSURE OF PHASE II ENVIRONMENTAL AND SOCIAL MANAGEMENT PROGRAMME 1 Introduction and Background To meet its environmental and social obligations and commitments, the Lesotho Highlands Development

More information

UIC Railway Application Guide

UIC Railway Application Guide UIC ASSET MANAGEMENT WORKING GROUP UIC Railway Application Guide Practical implementation of Asset Management through ISO 55001 November 2016 ISBN 978-2-7461-2521-6 Warning No part of this publication

More information

Smart+Connected Railways. Smart+Connected Railways. Punctuality CRIS SYMPOSIUM JULY 6, 2009

Smart+Connected Railways. Smart+Connected Railways. Punctuality CRIS SYMPOSIUM JULY 6, 2009 Smart+Connected Railways CRIS SYMPOSIUM JULY 6, 2009 Aravind Sitaraman Vice President & Managing Director Cisco Development Organisation, India 1 Smart+Connected Railways Intelligent Trains and Stations

More information

ARTC Melbourne Brisbane Inland Rail Alignment Study. Working Paper No. 8 Preliminary Land Assessment

ARTC Melbourne Brisbane Inland Rail Alignment Study. Working Paper No. 8 Preliminary Land Assessment Melbourne Brisbane Inland Rail Alignment Study Working Paper No. 8 Preliminary Land Assessment Important note This working paper is based on the outcome of Stage 1 of the study as reported in Working

More information

APPLICATION OF THE NAMAF (NATIONAL ASSET MANAGEMENT ASSESSMENT FRAMEWORK) TO IMPROVE ASSET MANAGEMENT IN DUBBO, NSW

APPLICATION OF THE NAMAF (NATIONAL ASSET MANAGEMENT ASSESSMENT FRAMEWORK) TO IMPROVE ASSET MANAGEMENT IN DUBBO, NSW APPLICATION OF THE NAMAF (NATIONAL ASSET MANAGEMENT ASSESSMENT FRAMEWORK) TO IMPROVE ASSET MANAGEMENT IN DUBBO, NSW Abstract Stewart McLeod Director Technical Services, Dubbo City Council, NSW Mark Loaney

More information

LAMPSON-MEGALIFT.

LAMPSON-MEGALIFT. LAMPSON-MEGALIFT www.lampson.com.au Contact Lampson Megalift NSW, Newcastle: 02 4959 6222 NSW, Sydney: 02 9821 2225 VIC, Melbourne: 03 9857 0356 QLD, Gladstone: 07 4975 6400 WA, Perth: 08 9279 2405 WA,

More information

BIM for infrastructure, Paul King Bentley Systems 2016 Bentley Systems, Incorporated

BIM for infrastructure, Paul King Bentley Systems 2016 Bentley Systems, Incorporated BIM for infrastructure, Paul King 1 WWW.BENTLEY.COM 2016 Bentley Systems 2016 Bentley Systems, Incorporated 3D infrastructure pic Bentley one! - green Role of the owner Defining better business outcomes

More information

Super Cheap Auto Group

Super Cheap Auto Group Super Cheap Auto Group Presentation to Macquarie Securities 2007 Australian Emerging Leaders Conference Peter Birtles Managing Director 3 May 2007 Agenda 2006/07 Trading Update Group Strategy Update 2

More information

7. Community Consultation

7. Community Consultation 7. Community Consultation This section provides a summary of the public consultation process implemented for the Project, incorporating the Mine and Rail aspects. The consultation process has been undertaken

More information

ADVANCED PLANNING AND SCHEDULING

ADVANCED PLANNING AND SCHEDULING ADVANCED PLANNING AND SCHEDULING INTRODUCTION Planning is at the heart of most companies supply chain activities and is critical to meet business objectives on customer service, asset utilisation, operations

More information

Supervisory Control and Data Acquisition (SCADA) Guideline WSA

Supervisory Control and Data Acquisition (SCADA) Guideline WSA Supervisory Control and Data Acquisition (SCADA) Guideline 2 ACKNOWLEDGMENTS The WSAA Board would like to express its appreciation to WSAA Members and staff for their contributions to the first edition

More information

STRATEGY UPDATE. Scott Cummins 28 September 2017

STRATEGY UPDATE. Scott Cummins 28 September 2017 Scott Cummins 28 September 2017 STRATEGIC HIGHLIGHTS Transformational Growth Strategy Reset, Stabilise, Consolidate, Grow New operating model and turnaround in performance Pursuit of operational excellence

More information

Information Guide for Suppliers

Information Guide for Suppliers Information Guide for Suppliers Copyright Queensland Rail, 2014. This publication is copyright and contains information which is the property of Queensland Rail Limited. No part of this document may be

More information

This part of the Works Information sets out the obligations of the Contractor with regards to:

This part of the Works Information sets out the obligations of the Contractor with regards to: Works Information Volume 2B Part 13 Assurance, Records and Certification Part 13 Assurance, Records and Certification 13.1 Introduction The Contractor self-certifies the quality of the works. This part

More information

Infrastructure and Capital Projects

Infrastructure and Capital Projects Infrastructure and Capital Projects Contents Deloitte s Capabilities in Infrastructure and Capital Projects 1 Strategy and Planning 3 Financing and Procurement 4 Project Organisation, Execution and Construction

More information

VICTRACK S MANAGEMENT OF DYNON RAIL FREIGHT TERMINAL

VICTRACK S MANAGEMENT OF DYNON RAIL FREIGHT TERMINAL s management of Dynon Rail Freight Terminal VICTRACK S MANAGEMENT OF DYNON RAIL FREIGHT TERMINAL AUSRAIL 2015 Ben Needham General Manager, Property Group,, Victoria s second largest land owner, discusses

More information

SEARs project justification and conclusion

SEARs project justification and conclusion 31 Project justification and conclusion This chapter presents a justification for the project and a conclusion to the environmental impact statement (EIS). The justification is based on the strategic need

More information

Bioprocess & Controlled Environments: Australia and South East Asia overview

Bioprocess & Controlled Environments: Australia and South East Asia overview Environments: Australia and South East Asia overview AMEC is a focused supplier of consultancy, engineering and project management services to its customers in the world s oil and gas, mining, clean energy,

More information

METRO TRAINS MELBOURNE ACCESSIBILITY ACTION PLAN

METRO TRAINS MELBOURNE ACCESSIBILITY ACTION PLAN METRO TRAINS MELBOURNE ACCESSIBILITY ACTION PLAN 2015 2018 CEO FOREWORD A proud railway for everyone, every day At Metro, we strive hard to deliver our vision of a proud railway for everyone, every day.

More information

LOGISTICS AVAILABILITY REPORT APRIL 2018

LOGISTICS AVAILABILITY REPORT APRIL 2018 LOGISTICS RE APRIL 2018 FOLIO OVERVIEW 151 PROPERTY Logistics Availability Report STATE ADDRESS AVAILABLE GLA (SQM) PAGE 140-160 Robinson Road East, Geebung Up to 9,310 3 QLD 131 Beenleigh Road, Acacia

More information

Virgin Australia Australian Packaging Covenant Action Plan 1 July June 2021

Virgin Australia Australian Packaging Covenant Action Plan 1 July June 2021 Virgin Australia Australian Packaging Covenant Action Plan 1 July 2016 30 June 2021 Company Name: Virgin Australia Airlines Prepared By: Jodi Litzenberger Company Address 1: 56 Edmonstone Road, Bowen Hills

More information

Chapter 4 Planning and statutory requirements. Chapter 4 Planning and statutory requirements

Chapter 4 Planning and statutory requirements. Chapter 4 Planning and statutory requirements Chapter 4 Planning and statutory requirements Chapter 4 Planning and statutory requirements Contents Page number 4. Planning and statutory requirements 4-1 4.1 Approval under the EPBC Act 4-1 4.1.1 Controlled

More information

CONCEPTUAL DESIGN OF AN AUTOMATED REAL-TIME DATA COLLECTION SYSTEM FOR LABOR-INTENSIVE CONSTRUCTION ACTIVITIES

CONCEPTUAL DESIGN OF AN AUTOMATED REAL-TIME DATA COLLECTION SYSTEM FOR LABOR-INTENSIVE CONSTRUCTION ACTIVITIES CONCEPTUAL DESIGN OF AN AUTOMATED REAL-TIME DATA COLLECTION SYSTEM FOR LABOR-INTENSIVE CONSTRUCTION ACTIVITIES H. Randolph Thomas The Pennsylvania State University Research Building B University Park,

More information