1 Case Study: Eraring Power Station Evidence based asset planning Background: The Eraring Power Station (EPS) was constructed in the late 1970s and is located on the western shore of Lake Macquarie. While the asset management planning for the operational plant has been very good over time, the asset planning for the civil supporting assets needed to improve. SPM Assets was engaged by EPS in early 2012 to assist with the project of improving the civil infrastructure asset management using the IPWEA/NAMS planning principles. This was enabled by the SPM Assets software linking to the current asset management system, Ellipse. The goal has been to move from a reactive maintenance approach to a planned programme based on component level evidence and using the science to forecast a programme of works over the next 20 years. The Eraring Power Station has numerous civil and building related assets that includes 24 bridges - pedestrian, services and vehicular 178 buildings large industrial plant housing, workshops and administration 136 culverts and 126 km of roads - sealed, unsealed, paved areas and fire trails 6 km of high volume cannels, 1500 drainage pits, 5 dams, a tunnel and caissons Two chimney stack 200m high and Four conveyors - total about 9kms
2 Page 2 Requirements To develop a strategic plan for their program of works, EPS needed to understand the condition of those assets, when they should be renewed or replaced, how they should be maintained, and an accurate financial forecast of what is needed to maintain the assets at EPS s specific standards. SPM Assets was to: 1. Design and implement an asset management planning process for all civil assets that is aligned with the IPWEA/NAMS Practice Note #3 for Building Condition & Performance. 2. Provide the tools and process for EPS to continue the asset information management and analytical planning process with scarce internal resources. 3. Implement the SPM Assets software as the primary asset management planning tool for civil assets 4. Conduct building condition assessments across the building portfolio and implement the assessment approach across all other civil assets. 5. Implement a web services linkage to the Ellipse asset management system to provide a complete asset management system, i.e. planning is undertaken in SPM Assets software, works are managed in Ellipse, and the completed works information is feed back into the software to update the asset information. Process SPM Assets used its sevenpoint framework (based on NAMS IIMM principles) to ensure that the asset information collected would enable both current and future condition shortfalls to be determined against the building Quality Standards. Condition Assessment of Buildings The process started with a condition survey of buildings to collect data so that EPS better understood the condition of the assets. The SPM Assets software was configured using templates and asset references from SPM Assets knowledge library and as a result, the software was fully available for the surveys within days of the design being signed off.
3 Page 3 The screen image below shows the Mobile module of the SPM Assets software that was accessed through ipads in the field. It shows how the data was structured for the survey of building assets: Each building is separately identified to a room or location level where components are assessed. Components are categorised in a three tier hierarchical structure (group, type, and component) using the default names from the SPM Assets libraries and then localised to EPS s specific naming conventions where needed. Each component is identified, described and assessed (condition grades 1 to 5) by a Generalist Surveyor. Where needed, component age, capacity, make and model of component is also recorded. Each component is measured based on a predefined unit of measure so that unit replacement costs can be assigned for the works programming. Once the surveyor identifies the component, the Asset Reference library within the SPM Assets software automatically assigns other parameters such as base life range, unit rates, level of service and criticality. The surveyor also identified any defects and immediate repairs. Condition Assessment of Bridges SPM Assets software was also configured to allow for the specialist assessment of bridges and progressively all other structures using the same ipads. The PQS module was used to record the commentaries provided by the bridge surveyors aligned with the standard proforma required by the local and state authorities such as Roads and Maritime Services (RMS, formerly RTA).
4 Page 4 These RMS reports are embedded alongside the bridge condition assessments, and are completed on a regular basis following specific criteria. The RMS report was compiled and reviewed in the SPM Assets software so that each bridge report is stored with the assessments. Condition of bridges and buildings The evidence from the condition surveys confirmed that the bridges were mainly in a good to very good condition. Only 0.5% of the bridge components assessed were in a poor to very poor condition, which is being addressed based on risk rating. Due to their critical nature, it was expected that the bridges have been well maintained. The process has now provided a tool that will minimise the ongoing inspection effort and in many ways, automate the reporting requirements. As expected, the buildings were assessed to be in a poorer condition compared to bridges. About 24.7% of the total assessed building components are in a poor to very poor condition. However, about 45% were assessed to be in a very good to good condition.
5 Page 5 EPS s planning process now has the evidence to determine the immediate works-programme. It s likely that the programme will focus on high risk building components associated with the more important operational buildings and this may only need to be a fraction of the identified costs EPS s Quality Standards are currently being considered by management. Results from the Predictive Model The collected data was analysed to produce the profile of forecasted expenditure for both the bridges and buildings using the condition, condition-age, and age based risk analysis predictive models embedded within SPM Assets software. The following figure illustrates how the remaining life is determined based on condition grading, a deterioration model and the expected useful life. As shown by the grey curve (depending on the component), it is possible that the expenditure required to continually maintain and operate can be more costly than replacing with a modern equivalent asset. Applying this model to the data, the forecasted expenditure over the next 20 years can be assessed in terms of an approximate total expected outlay and an annualised average. Where this model determines longer term needs, the immediate backlog can also be determined. Adopting an assumed quality standard (still to be approved by EPS), a slightly higher works expenditure program may be needed than the annualised average within the next 2 years to address the risks associated with critical assets that are in either a poor or very poor condition. EPS budget forecasts have taken the backlog into account.
6 Page 6 Web Services Linkage with Ellipse One of the key requirements of the project was to develop an interface between SPM Assets software and Ellipse. The interface allows SPM Assets to capture, analyse and report on the assessed components. SPM Assets software is then used to create works-programmes for cyclic maintenance schedules and renewal or replacement projects. The Ellipse application is used to manage the resulting programme of works through the generation of work orders. The following flow diagram shows how this interface is working for the work-order and planning functions. Within SPM Assets software the Project Planning module is used to generate projects from assessed components as either renewal or cyclic maintenance programmes. Upon the generation of a project, the relevant information is transferred to the Ellipse system as a work order. Once the work has been completed, the information in Ellipse is updated prior to the transfer of the information to SPM Assets, where the associated assets are updated for both condition and age. The web interface design allows asset information to be transferred between applications as planned projects, completed work orders and ongoing maintenance, maintains up-to-date asset information and enables a transition from a reactive renewal/maintenance program to a planned approach.
7 Page 7 Recognised Benefits The noticeable benefits resulting from the project so far include: An increased knowledge of EPS s building and bridge assets. This means decisions associated with future work are based on evidence rather than judgment. Decisions are generally better informed; Data improvement activities are now targeted and data are being updated progressively; Ongoing alignment and expansion of the database to include other asset categories such as roads, culverts, canals, conveyor structures, chimney stacks etc., increasing knowledge of the assets; The risk of any unexpected future expenditure requirements is reduced, and allows funding applications to be developed well in advance; Interface between SPM Assets and Ellipse applications allows for the production of works within SPM to be undertaken within EPS s works programme (Ellipse), and relevant information to be updated in SPM Assets software upon completion; Boosted reporting capabilities and process, with further reporting requirements to be scoped for system generation. Future outlook: Eraring Power Station EPS delivered a half hour presentation to the Sydney user group meeting in March 2013 and summarised the future outlook for the project as follows: Continued use of SPM Assets software for inspections, lifecycle analysis, planning projects, maintenance and reporting. Inclusion of chimney stacks, roads, drainage, canals, dams and miscellaneous civil assets into SPM Assets software through future timetabled inspections. Further application of condition assessments in conjunction with measuring performance and quality criteria against all civil assets. Continual development of the Asset Management Strategy, Asset Management Plan and Asset Management Policy for civil assets at Eraring Power Station.
10.0 ASSET MANAGEMENT PRACTICES. Table of Contents
10.0 ASSET MANAGEMENT PRACTICES Table of Contents 10.0 ASSET MANAGEMENT PRACTICES... 1 10.1 Current Asset Management Practices... 2 10.2 Asset Management Processes... 3 10.2.1 Attribute data collection
More informationIntegrated Property Management Solution
Integrated Property Management Solution 30 minutes to discuss: Value proposition why Vision and SPM Best of Breed there is an alternative The concept incorporating good practice The process working with
More informationStrategic Decision Making Tool for Renewals
Case Study Strategic Decision Making Tool for Renewals Initiative number 2014_07 August 2014 Version No Date Item Affected Description of Change 1 01/08/2014 1 st Draft of Report Completed 2 20/10/2014
More informationManager Asset Management
Position Description Manager Asset Management Position Title: Occupant: Reports To: Grade: Division: Department: Manager Asset Management TBC Director Community Development Manager Community Development
More informationA BOOST FOR BRIDGE ASSET MANAGEMENT
A BOOST FOR BRIDGE ASSET MANAGEMENT Anthony Rooke, Principal Engineer Asset Management, ARRB Group Ltd., QLD Andrew Volpato, Senior Engineer Asset Management, Toowoomba Regional Council, QLD Justin Welligamage,
More informationDRAFT Transportation Asset Management Plan. December 2010
December 2010 Version Control This Document is a live Council document and is subject to periodic review. The validity and currency of the document is critical in applying its content as it contains significant
More informationNATIONAL SUSTAINABILITY FRAMEWORK - Financial Planning & Reporting + Asset Planning & Management
National Competency Status Assessment Opinion Competency - Self Improvement Questionnaire NATIONAL SUSTAINABILITY FRAMEWORK - Financial Planning & Reporting + Asset Planning & Management Competency - Self
More informationEnterprise Asset Management. Enterprise Asset Management 1
Enterprise Asset Management 1 Introduction Managing assets effectively is critical to the success of organisations that depend on complex physical assets to deliver services. Increasingly, operators and
More informationIntelligent Asset Management of Buildings. Professor Sujeeva Setunge Deputy Dean, Research and Innovation School of Engineering
Intelligent Asset Management of Buildings Professor Sujeeva Setunge Deputy Dean, Research and Innovation School of Engineering 1 Outline Building life cycle Current practice Intelligent Asset Management
More informationCommunicating an Evidence Based Asset Management Program By Daryush Esmaili
Communicating an Evidence Based Asset Management Program By Daryush Esmaili December 1, 2017 Agenda Communicating Asset Management 2 Introduction Challenges Service-Supporting Assets Governance and Strategic
More informationEnterprise Asset Management for Power System Protection. Enterprise Protection Information System
IPS-EPIS Enterprise Asset Management for Power System Protection IPS-EPIS Enterprise Protection Information System IPS-EPIS is a comprehensive part of IPS-Advanced Enterprise Asset Management solution
More informationAsset Data Capture. Successful Implementation for Day-to-day Maintenance Management and Long-term Asset Management Planning
Asset Data Capture Successful Implementation for Day-to-day Maintenance Management and Long-term Asset Management Planning Presenters: Steph Forrest, Associate Director FM, Victoria University of Wellington
More informationAPPLICATION OF THE NAMAF (NATIONAL ASSET MANAGEMENT ASSESSMENT FRAMEWORK) TO IMPROVE ASSET MANAGEMENT IN DUBBO, NSW
APPLICATION OF THE NAMAF (NATIONAL ASSET MANAGEMENT ASSESSMENT FRAMEWORK) TO IMPROVE ASSET MANAGEMENT IN DUBBO, NSW Abstract Stewart McLeod Director Technical Services, Dubbo City Council, NSW Mark Loaney
More informationContractors Best Practice for Maintenance Intervention Strategies for Unsealed Roads
Contractors Best Practice for Maintenance Intervention Strategies for Unsealed Roads Craig Stewart Maintenance Divisional Manager Fulton Hogan Canterbury Abstract This paper describes and discusses a contractor
More informationASSET LIFECYCLE MANAGEMENT OPTIMISE ASSET PERFORMANCE
ASSET LIFECYCLE MANAGEMENT OPTIMISE ASSET PERFORMANCE A LIFECYCLE APPROACH TO ASSET MANAGEMENT Achieve alignment to asset management best practice, with a holistic approach to managing assets throughout
More informationApprenticeship Standard for High Speed Rail and Infrastructure (HSRI) Advanced Technician
Context Health and Safety Apprenticeship Standard for High Speed Rail and Infrastructure (HSRI) Advanced Technician Occupational Profile: High speed rail is a specialist occupational area of work. High
More informationMaintaining & Renewing Sealed Pavements under the ONRC
Case Study Maintaining & Renewing Sealed Pavements under the ONRC Initiative number 2015_04 May 2015 Maintaining & Renewing Sealed Pavements under the ONRC May 2015 Version No Date Item Affected Description
More informationManagement Plan
Rivers & Drainage Asset Heading/title Management Plan 2018-2068 Subheading Month Year Prepared by Bay of Plenty Regional Council 5 Quay Street P O Box 364 Whakatāne NEW ZEALAND Contents Document control
More informationDISTRIBUTION SYSTEM ASSET MANAGEMENT APPROACH
EB-0-0 Exhibit D Schedule Page of DISTRIBUTION SYSTEM ASSET MANAGEMENT APPROACH This document provides a summary of THESL s asset management approach. The first two sections introduce the scope of asset
More informationCondition assessment of corrugated steel underpasses including threedimensional. terrestrial laser scanning
Condition assessment of corrugated steel underpasses including threedimensional terrestrial laser scanning Nathan Roberts 1, Alan Michie 1, and Lindsay Brown 2 1 Aurecon, 2 Roads and Maritime 9 th Australian
More informationGuidelines for the Application of Asset Management in Railway Infrastructure Organisations
Guidelines for the Application of Asset Management in Railway Infrastructure Organisations INTERNATIONAL UNION OF RAILWAYS (UIC) 16 rue Jean Rey - F-75015 PARIS Tel: +33 (0)1 44 49 20 20 Fax: +33 (0)1
More informationONEWATER ENTERPRISE SOFTWARE FOR WATER UTILITIES
ONEWATER ENTERPRISE SOFTWARE FOR WATER UTILITIES Transforming Business, Making Life Simple. TechnologyOne supports over 100 customers in the water business, every day. Our commitment to innovation ensures
More informationPavement Management s Role in an Asset Management World
Pavement Management s Role in an Asset Management World Kathryn A. Zimmerman, P.E. (Corresponding Author) Prashant Ram, E.I.T. Applied Pavement Technology, Inc. W. Main Street, Suite 00 Urbana, IL 0 Paper
More informationBrochure. Asset integrity solutions Improve integrity and reduce costs through more effective asset management
Brochure Asset integrity solutions Improve integrity and reduce costs through more effective asset management Asset integrity solutions Companies need a cost effective way of maintaining production capability,
More informationTAY ROAD BRIDGE JOINT BOARD
TAY ROAD BRIDGE JOINT BOARD Asset Management Plan Prepared by: Alan Hutchison Document Reference: TRB 19 rev 2 Reviewed by: Bill Angus Approved for Issue: F Wilson (Engineer to Board) Date: 27 November
More informationQuick Guide: Meeting ISO Requirements for Asset Management
Please visit the NAMS.org.nz website for downloading the digital version of this quick guide. Supplement to the IIMM 2011 Quick Guide: Meeting ISO 55001 Requirements for Asset Management Using the International
More informationABB Ability Ellipse APM
CONNECTED ASSET LIFECYCLE MANAGEMENT ABB Ability Ellipse APM Asset performance management, from field data to fleet optimization. 2 ABB ABILITY ELLIPSE APM CONNECTED ASSET LIFECYCLE MANAGEMENT Utilities
More information2014/2015 Rivers and Drainage Asset Management Plan
2014/2015 Rivers and Drainage Asset Management Plan Executive Summary Title Title part 2 Bay of Plenty Regional Council 5 Quay Street PO Box 364 Whakatāne 3158 NEW ZEALAND Document control Document information
More informationEngineering Standards Framework Risk Based Construction Monitoring
Engineering Standards Framework Risk Based Construction Monitoring Version. 0.5 Date: 22 June 2017 i Version Description Released By Date 0.5 Working draft David Ward 20/06/2017 The latest version of this
More informationDesign and Implementation of a New Bridge Management System for the Ministry of Transport of Québec
Design and Implementation of a New Bridge Management System for the Ministry of Transport of Québec Reed M. Ellis Stantec Consulting Ltd. Paul D. Thompson Consultant Rene Gagnon Ministère des Transports,
More informationC5B Technical Annex 10 Leakage Investment Case: Technical Approach and Business Case
C5B Technical Annex 10 Leakage Investment Case: NTPBP-INV-LEA-0535 Contents 1 FOREWORD... 1 2 EXECUTIVE SUMMARY... 2 3 BACKGROUND TO OUR INVESTMENT CASE... 5 3.1 CONTEXT... 5 3.2 STRATEGY... 5 3.3 CUSTOMER
More informationEngineering Standards Framework Risk Based Construction Monitoring
Engineering Standards Framework Risk Based Construction Monitoring Version. 1 Date: 20 June 2018 i Version Description Released By Date 0.5 Working draft David Ward 20/06/2017 1 First release no changes
More informationin the master planning process BACKGROUND South Africa faces the challenge of operating and maintaining world classinfrastructure,
Integrating pipe replacement prioritisation in the master planning process BACKGROUND South Africa faces the challenge of operating and maintaining world classinfrastructure, while at the same time experiencing
More informationThe New Challenges Facing Local Government Procurement
The New Challenges Facing Local Government Procurement 08 August 2016 Chris Newman Director Chris.newman@arcblue.com.au 0412 318 384 The value curve of procurement Value Time Spent Stages of Procurement
More informationOFFICIAL. Magnox Swarf Storage Silo (MSSS) Risk and Hazard Reduction Programme
Title of document Magnox Swarf Storage Silo (MSSS) Risk and Hazard Reduction Programme Application for Agreement to Commence Installation and Inactive Commissioning of SEP2 and 1 Mobile Caves in MSSS Project
More informationCorporate Asset Management Plan 2016
Corporate Asset Management Plan 206 Town of Orangeville GHD Allstate Parkway Suite 30 Markham, Ontario L3R 9T8 T 905 752 4300 F 905 752 430 6925 Phase 6 Table of Contents. Executive Summary.... Background....2
More information6.1 CORPORATE ASSET MANAGEMENT POLICY
6.1 CORPORATE ASSET MANAGEMENT POLICY Date Adopted Next Review Officer Responsible 3 February 2011 30 June 2015 Manager, Performance & Delivery Group Policy Purpose: The intent of this policy is to set
More informationCheckMate s Collections Datasheet
CheckMate s Collections Datasheet 2015 ComSys. All Rights Reserved. Page 0 CheckMate Collections Key Customer Challenges In today s business environment collections managers are confronted with the task
More informationActivity: Roads and Footpaths. How this Activity Contributes to Related Community. Outcome
Activity: Roads and Footpaths How this Activity Contributes to Related Community Outcomes This Activity contributes to the Community Outcomes of Environment, Economy, People, Mobility and Living by: Outcome
More informationAsset Management Fundamentals
Asset Management Fundamentals Work Management includes all of the scheduling and activities involved in maintaining assets at a predefined condition level, including: Work Orders Work Requests Maintenance
More informationMining & Metals - EPCM
www.beca.com Mining & Metals - EPCM We make things happen. Problem-solvers with a passion for transforming our world. Beca Mining & Metals Beca is a leading provider in the mining and metals market across
More informationAlinta Energy Transmission (Roy Hill) Pty Ltd
Alinta Energy Transmission (Roy Hill) Pty Ltd Electricity Integrated Regional Licence (EIRL6) 2016 Asset Management System Review December 2016 report Deloitte Risk Advisory Pty Ltd ACN 611 748 184 Tower
More informationInfor EAM for Life Sciences
Infor EAM Infor EAM for Life Sciences Protect your bottom line The stringent regulations imposed on life sciences companies are in place for a good reason to reduce the health, safety, and security risks
More informationReal Estate Lifecycle
Real Estate Lifecycle AND FACILITY MANAGEMENT Companies often use anywhere from 10 to 15 different point solutions to run their day-to-day business, addressing only a single functional activity at a time.
More informationNETWORK OPERATOR RESPONSIBILITIES
NETWORK OPERATOR RESPONSIBILITIES A: Introduction This paper considers what makes up the role of the operators (as Highway Authorities) of the Major Road Network (MRN), be they a county or unitary authority,
More informationABB Ability Ellipse EAM
CONNECTED ASSET LIFECYCLE MANAGEMENT ABB Ability Ellipse EAM Enterprise asset management and enterprise resource planning for the transportation industry. 2 ABB ABILITY ELLIPSE EAM CONNECTED ASSET LIFECYCLE
More informationSIMATIC PCS 7 Lifecycle Services
SIMATIC PCS 7 Lifecycle Industry Frei verwendbar Siemens AG 2014. Alle Rechte vorbehalten. Answers for industry. SIMATIC PCS 7 Lifecycle Ensuring serviceability and optimizing plant availabiliy Optimizing
More informationPOSITION DESCRIPTION POSITION : ASSET SYSTEMS COORDINATOR DEPARTMENT : TECHNICAL AND DEVELOPMENT SERVICES
POSITION DESCRIPTION POSITION : ASSET SYSTEMS COORDINATOR CLASSIFICATION : BAND 7 DEPARTMENT : TECHNICAL AND DEVELOPMENT SERVICES BUSINESS UNIT : DAMS OCCUPANT : VACANT DATE : DECEMBER 2006 REVISED : SEPTEMBER
More informationRe-defining Energy Management
Re-defining Energy Management Our Approach Partnership is the cornerstone of the BMSI approach, to all of our clients. We aim to thoroughly understand specific service needs so we can tailor our offerings
More informationMANAGING AND MAINTAINING SEWER RISING MAINS LESSONS LEARNT. Julian Vivoli. Gold Coast Water
MANAGING AND MAINTAINING SEWER RISING MAINS LESSONS LEARNT Paper Presented by: Julian Vivoli Author: Julian Vivoli, Asset Project Officer, Gold Coast Water 41st Annual WIOA Queensland Water Industry Operations
More informationINLAND RAIL OVERVIEW PROGRAMME DIRECTOR, SIMON THOMAS 27 OCTOBER 2016
INLAND RAIL OVERVIEW PROGRAMME DIRECTOR, SIMON THOMAS 27 OCTOBER 2016 BACKGROUND INLAND RAIL A new ~1700km freight rail line from Melbourne to Brisbane via regional VIC, NSW and QLD A road-competitive
More informationAn Introduction to An Introduction to. BIRST Infor EAM
An Introduction to An Introduction to BIRST Infor EAM Introduction In any asset-intensive business, there is no room for poor performance. The smallest problem can lead to costly downtime or even pose
More informationIntroduction. Background
Example Transportation Asset Management Plan Outline This outline was created using the Transportation Asset Management Plan (TAMP) Builder ( www.tamptemplate.org ), a product of NCHRP Project 8-36/116.
More informationWATER & ROADS Draft Documentation Report for Water from Roads & Roads Damages by Water
WATER & ROADS Draft Documentation Report for Water from Roads & Roads Damages by Water By Eng.Mohamed Al-Abyadh 2013 Introduction Water and Roads is very important issue especially to the road engineers
More informationINVESTOR PRESENTATION
INVESTOR PRESENTATION Asher Levy, CEO January 2016 THE LANGUAGE OF ELECTRONICS Disclaimer Private Securities Litigation Reform Act of 1995 Safe Harbor and Industry Information Except for historical information,
More informationOPERATIONAL INVESTMENTS
EB-00-0 Exhibit D Schedule - Page of OPERATIONAL INVESTMENTS GENERAL PLANT FLEET AND EQUIPMENT SERVICES ( FES ) CAPITAL PROGRAM The objective of the FES Capital Program is to identify fleet assets in need
More informationPavement Asset Management Guidance Section 6: Pavement Asset Management Strategies
Pavement Asset Management Guidance Section 6: Pavement Asset Management Strategies December 2014 Document Information Title Author Description Pavement Asset Management Guidance, Section 6: Pavement Asset
More informationONRSR Guideline. Asset Management
Document control Objective Document ID: A389849 Version number: 2.0 Approved by: Chief Executive Date approved: 26 February 2019 Policy changes to 2.0 Periodic Review Office of the National Rail Safety
More informationAsset integrity solutions. Improve integrity and reduce costs through more effective asset management. prime. Risk. Assessment.
Opportunity Asset integrity solutions Improve integrity and reduce costs through more effective asset management Risk Competency prime Training & Development Value Creation Risk Management 2 ASSET INTEGRITY
More informationPUBLIC DISCLOSURE OF PHASE II ENVIRONMENTAL AND SOCIAL MANAGEMENT PROGRAMME. 2 Objective of the Phase II Environmental and Social Programme
PUBLIC DISCLOSURE OF PHASE II ENVIRONMENTAL AND SOCIAL MANAGEMENT PROGRAMME 1 Introduction and Background To meet its environmental and social obligations and commitments, the Lesotho Highlands Development
More informationNetwork Wide Assessment of Bridge Barrier Safety
Network Wide Assessment of Bridge Barrier Safety Andrew Sonnenberg National Bridge Engineering Manager, pitt&sherry Abstract: The need for higher performance bridge barriers has been reflected in changes
More informationBOROUGH OF POOLE HIGHWAY ASSET MANAGEMENT STRATEGY
Appendix 2 BOROUGH OF POOLE HIGHWAY ASSET MANAGEMENT STRATEGY Version:1.0 Page 1 Contents Introduction Asset Management Objectives Alignment to Corporate Strategy Asset Management framework Asset Management
More informationDoes a strategic approach to asset management make a difference?
Does a strategic approach to asset management make a difference? Warren Bradley CEng MEng MICE DipIS MSc MIAM Highways UK, 9 November 2017 Why a strategic approach worked for BalfourBeattyMottMacDonald
More informationService Factory Automation: maximum equipment availability throughout the entire lifecycle
Service Factory Automation: maximum equipment availability throughout the entire lifecycle 2 Service Factory Automation: your key to higher productivity Maximum equipment availability and ultrahigh eiciency
More informationJOB ADVERT - Details. Property Manager Exeter Area. Internal Reference Number: Closing date: Dependant on Experience
JOB ADVERT - Details Company: Role title: Blenheims SW Ltd Property Manager Exeter Area Internal Reference Number: Closing date: Salary: Working Hours: Temporary / Fixed Term / Permanent contract: Location:
More informationOUR SERVICES CONVEYOR ENGINEERING
SERVICES OVERVIEW C5 With over 30 years experience in the materials handling industry ConvaTech is widely recognised as Australia s leading supplier of conveyor services and products. We offer a Total
More informationPortfolio Analysis using Project Server 2010 (and 2013) Presented by Neall Alcott, Vibrant Fusion
Portfolio Analysis using Project Server 2010 (and 2013) Presented by Neall Alcott, Vibrant Fusion Agenda Introduction Business Drivers Overview Explanation Demonstration Portfolio Analyses Overview Explanation
More information9. Asset Management. 9. Asset Management. 9.2 Asset Management and the Shared Priorities. 9.1 Introduction. Headline Targets
Headline Targets BVPI 223 - Principal Road Condition. BVPI 224a - Non-Principal Classified Road Condition. BVPI 224b - Unclassified Road Condition. BVPI 187 - Footway Condition. How we will tackle Asset
More informationClosed-loop Performance Management
Closed-loop Performance Management for Downstream Operations Management Schneider Electric s enables companies to drive greater collaboration and operational efficiency, enabling better operations insights
More informationAsset Management Policy
Asset Management Policy January 2018 Introduction Our Asset Management Policy was last published in 2014. It is being updated to reflect our commitment to regularly review and improve all of our Asset
More informationOVERVIEW: Treatment Length Segmentation KEY POINTS
OVERVIEW: Treatment Length Segmentation KEY POINTS Treatment Length Segmentation: Should section the network into uniformly performing contiguous sections of road that are performing differently from the
More informationWOLLONGONG CITY COUNCIL CASE STUDY ON STRATEGIC, TACTICAL AND OPERATIONAL SERVICE LEVEL DEVELOPMENT USING NAMS.PLUS TEMPLATES
WOLLONGONG CITY COUNCIL CASE STUDY ON STRATEGIC, TACTICAL AND OPERATIONAL SERVICE LEVEL DEVELOPMENT USING NAMS.PLUS TEMPLATES Mike Dowd, IMF Project Manager, Wollongong City Council. Ross Waugh, Director,
More informationReview of the management of data quality in the My Government of Canada Human Resources system. Office of Audit and Evaluation
Review of the management of data quality in the My Government of Canada Human Resources system Office of Audit and Evaluation Table of Contents Executive summary... i Introduction... 1 Definition of internal
More informationLocational Net Benefits Analysis Working Group Long Term Refinement Topics Scoping Document Prepared for the ICA Working Group by More Than Smart
Locational Net Benefits Analysis Working Group Long Term Refinement Topics Scoping Document Prepared for the ICA Working Group by More Than Smart Background: A June 7, 2017 Assigned Commissioner Ruling
More informationá1058ñ ANALYTICAL INSTRUMENT QUALIFICATION
USP 41 General Information / á1058ñ 1 á1058ñ ANALYTICAL INSTRUMENT QUALIFICATION INTRODUCTION A large variety of analytical instruments, ranging from a simple apparatus to complex computerized systems,
More informationLoad Rating of Timber Bridges in Western Australia
Load Rating of Timber Bridges in Western Australia ABSTRACT Main Roads Western Australia (MRWA) inspects, load rates, and maintains (repairs, upgrades or replaces) all bridges for which it is responsible.
More informationQualification details
Outcome Statement Qualification details Title New Zealand Certificate in Civil Works (Level 4) with strands in Earthworks, Road Construction, Concrete (non-structural), and Road Maintenance Version 2 Qualification
More informationBuilding trust and confidence in our reporting Data Assurance Summary 2017/18
Building trust and confidence in our reporting 1 Contents 1 About this document Statement of risks, strengths and weaknesses Assurance plans Data summary Our 2020-25 business plan reporting risks and 2
More informationProduct-related services for switchgear, transformers, and cables
Product-related services for switchgear, transformers, and cables Making the most of your T&D assets Asset Services/Product-related services Switchgear Services Transformer Services Cable and Line Services
More informationDISTRIBUTION SYSTEM ASSET CONDITION ASSESSMENT UPDATE
EB-0-0 Exhibit D Page of DISTRIBUTION SYSTEM ASSET CONDITION ASSESSMENT UPDATE 0 EXECUTIVE SUMMARY Background Over the past number of years, THESL has put considerable effort into its Asset Management
More informationProfessional services for automation projects
Professional services for automation projects Products Solutions Services Professional services for automation projects 2 Professional services for automation projects Smooth project management based on
More informationMOBILE SURVEYING & INSPECTIONS APPLICATION. Every dollar you defer on capital projects will cost you 4x as much in reactive maintenance.
MOBILE SURVEYING & INSPECTIONS APPLICATION Every dollar you defer on capital projects will cost you 4x as much in reactive maintenance. 1 If you own or manage properties, you need to know the condition
More informationIndustry Briefing Surface and Viaduct Civil Works Contract
Industry Briefing Surface and Viaduct Civil Works Contract 2 North West rail link Introduction The North West Rail Link is one of Australia s largest ever transport infrastructure projects. It is a priority
More informationPOSITION DESCRIPTION ASSET MANAGEMENT ENGINEER
Team Classification Position Objective Key Responsibilities Planning and Capital Delivery Western Water Enterprise Agreement Band 6 Level A Level C To provide sustainable asset management solutions across
More informationDepartment for Transport Consultation: proposals for the creation of a Major Road Network
Department for Transport Consultation: proposals for the creation of a Major Road Network ACE response March 2018 The Association is Registered as a company in England with the number 132142, it is limited
More informationMAINTENANCE ENGINEERING BUREAU USING MAINTENANCE DATA TO DRIVE IMPROVEMENT
MAINTENANCE ENGINEERING BUREAU USING MAINTENANCE DATA TO DRIVE IMPROVEMENT S Safi & B Bigdeli Covaris Pty Ltd Summary: This paper presents an objective methodology for maintenance data analysis. The purposes
More informationFailure Mode Analysis and How It Impacts Your Strategy
Failure Mode Analysis and How It Impacts Your Strategy Helen Ramsey, National Asset Manager Utility Services, Downer, Auckland Abstract Asset owners want to clearly understand what drives reactive expenditure
More informationINVESTOR PRESENTATION
INVESTOR PRESENTATION August 2016 THE LANGUAGE OF ELECTRONICS Disclaimer Private Securities Litigation Reform Act of 1995 Safe Harbor and Industry Information Except for historical information, the matters
More informationTransportation Report to SPC on Transportation and Transit 2017 April 19. ISC: UNRESTRICTED TT Page 1 of 7
Page 1 of 7 EXECUTIVE SUMMARY The City of Calgary owns and maintains over 12,200 km of sidewalks, curbs and gutters with a current replacement value of $5.1 billion. The quality of new concrete and condition
More informationUK Power Networks. Technology Watch (Smart) Networks Context & Innovation. 28 th April, 2015 David Boyer, Smart Networks Policy Lead
UK Power Networks Technology Watch (Smart) Networks Context & Innovation 28 th April, 2015 David Boyer, Smart Networks Policy Lead UK Power Networks Total % of industry End customers (millions) Service
More informationThe African Community Access Programme (AFCAP) AUTHORS: P O Neill (DFID), P A K Greening (TRL) and P R Fouracre (TRL)
SEMINAR: SUSTAINABLE ACCESS AND LOCAL RESOURCE SOLUTIONS Date : 28 30 November 2005 TITLE: The African Community Access Programme (AFCAP) AUTHORS: P O Neill (DFID), P A K Greening (TRL) and P R Fouracre
More informationCENTRE (Common Enterprise Resource)
CENTRE (Common Enterprise Resource) IT Service Management Software designed for ISO 20000 ITSM ISO/IEC 20000 is the international IT Service Management (ITSM) standard that enables IT organizations (whether
More informationDeveloping Your Local Government Asset Management Plan
Developing Your Local Government Asset Management Plan April 19th, 2016 John Murray, Public Sector Digest Gabe Metron, Public Sector Digest Darren Row, City of Miramichi Darlene O Shea, City of Miramichi
More informationSalesforce Governance: A New Hope
The purpose of governance is to provide a framework of policies, procedures & standards to ensure effective execution of projects / programs and provide strategic decision support & alignment bridging
More informationContract Management. Contract Management is an easy-to-use, Cloud-based Contract Management system
Contract Management Contract Management is an easy-to-use, Cloud-based Contract Management system People. Partnerships. Solutions. We re Advanced. We re a leading provider of software solutions and IT
More informationMAP-21 National Highway Performance Program Asset Management Plan
MAP-21 National Highway Performance Program Asset Management Plan Federal Highway Administration March 2015 Webcast MAP-21 FHWA Performance Rulemaking Schedule MAP-21: Asset Management 2 Risk-Based Asset
More informationJOB DESCRIPTION SALARY: 36,004
JOB DESCRIPTION JOB TITLE: Asset Information Manager SALARY: 36,004 RESPONSIBLE TO: Head of Asset Management RESPONSIBLE FOR: Asset Information Officer Asset Information Assistant Customer Involvement
More informationContracts, Rights and Royalties. End-to-end management and monetization of your intellectual property
Contracts, Rights and Royalties End-to-end management and monetization of your intellectual property Your business growth is built on contracts, rights and royalties Digital and global expansion of rights
More informationINVESTOR PRESENTATION
INVESTOR PRESENTATION Ran Bareket, CFO THE LANGUAGE OF ELECTRONICS September 2016 Disclaimer Private Securities Litigation Reform Act of 1995 Safe Harbor and Industry Information Except for historical
More informationAMT Focus: Life Cycle Management. Life Cycle Costing, Budgeting and Strategic Asset Management Software for Mining Equipment
AMT Focus: Life Cycle Management Life Cycle Costing, Budgeting and Strategic Asset Management Software for Mining Equipment AMT asset management software enhances your enterprise resource planning (ERP)
More information