1 Revisions SEPTA Specification Change No. Release Date Reason for Change Release Approval 1 7/14/2016 Correct document quantities description 6.0, 7.1 change from one (1) to two (2) test units PJD 7/14/2016

2 6.0 Scope This Specification is intended to provide general, specific, salient features and other attributes and requirements for a high pressure air knife automated Catalyzed Soot Filter and Dual Oxidation Catalyst (CSF/DOC) cleaning system. The CSF/DOC cleaning system shall by incorporation of necessary equipment and facilities services provide a system that measures CSF/DOC pressure differential for filter qualification and verification of process result, provides a chamber based automated fixture that cleans the inlet and outlet of CSF units by programmed mechanical action and removes soot and containments to containers for proper, disposition. This specification shall define the requirements for two (2) operating lineups. The specification shall require both operating lineups at full service in simultaneous operation. Operating line ups are defined by 7.0 herein. The system as delivered and commissioned for operation shall be complete with all interconnecting ducting provided by the Contractor. The Contractor (supplier of equipment) shall support a commissioning procedure as defined herein. No advantage shall be taken by the Contractor where the omission of parts, materials and/or system descriptions as specified herein, shall inhibit the installation and delivery of a fully functioning CSF/DOC cleaning System. The equipment shall comply with all applicable requirements of the CFR Title 49, The Commonwealth of Pennsylvania and FMVSS, NHTSA, ADA and EPA regulations and other codes and conventions affected or specified herein. 7.0 General description and Salient Features Each operating set or line up shall require 460 Volt Alternating Current 3 60 ampere service in operation. Two (2) sets or line ups may be in operation simultaneously thereby imposing a 460 Volt Alternating Current amperes to required electric services. The complete system shall consist of these operating elements. 7.1-Test Unit-Two (2) test units per contract delivered Pneumatic Cleaning/Air Knife System (PC/AFS) Cabinets- Two (2) unit(s) per contract delivered. 7.3-Soot/Ash Handler Cabinet- Two (2) unit(s) per contract delivered. 7.4-Air Compressor and Desiccant Dryer Unit- Two (2) unit(s) per contract delivered. 7.5-Adaptors, Tools and Miscellaneous Equipment-Refer to applicable sections.

3 7.1 Test Unit-The test unit shall support the units under test for the purpose of determining pressure differential required to qualify, validate and document that filters under test have been cleaned as required by return to service criteria Definition- The cabinet shall be fabricated from heavy gauge steel and the unit shall not rack or otherwise deform from regular operation. The test unit shall be a structure arranged to mechanically support the filters under test. The work table area shall permit the filter under test to couple to an aperture as to permit atmosphere to flow into the unit structure at a negative pressure whistle ensuring proper sealing required for accurate and repeatable delta pressure reading and recording Design, Construction and Adaptors-The Test Unit shall be ruggedized and built as required by the inherent nature of the weights and materials utilized in CSF/DOC construction. The Test Unit shall have a steel deck plate and housing. The Test Unit shall be painted safety yellow. The Test unit shall come equipped with two (2) complete sets of adaptors per CSF/DOC type used at SEPTA at a time specified by SEPTA within the first ninety (90) days of the commissioned system operation. The test unit exhaust shall be diffused and distributed in a way that precludes generating particles or dust from interfering with supervising or nearby workers Operator Interface-The Test Unit shall have arranged its operator interface on a post structure so as to enable the controls, indication and E-Stop to be operated with or without the unit under test arranged. The Contractor shall furnish apertures or like fixtures for the purpose of checking and maintaining manometer calibration Space Claim-The Test Unit shall not exceed 44.5 w x 24.5 D of floor space claim Emitted Noise-The unit in all operating modes (CSF/DOC landed) shall not exceed 75dB(a) at 1 meter distant from the test deck height Electrical Service Requirement The electrical requirements are Volts p.f. 7.2 Pneumatic Cleaning/Air Knife System (PC/AFS Cabinet)-The system shall provide simultaneous precision top and bottom air knife based cleaning of CSF/DOC filters. The configured machinery and system shall operate autonomously or semi-autonomously after set up Definition-The PC/AKS system shall support filter cleaning designed to affect each cell by direct admittance of high pressure air from a moveable nozzle operating on both the filter s inlet and exhaust portions simultaneously.

4 7.2.2 Design and Construction and Adaptors- The cabinet shall be fabricated from heavy gauge steel and the unit shall not rack or otherwise deform from regular operation. The CSF/DOC cleaner shall consist of a cabinet, air knifing mechanism, rotating table supporting structure and control system. The cabinet shall provide a rigid and reliable support structure ensuring stable, consistent cleaning results. The air lancing nozzles shall be height (distance from unit ceramic faces) adjustable. The CSF/DOC cleaning unit shall come equipped with two (2) complete sets of adaptors per CSF/DOC type used at SEPTA specified from Table 1. The cleaning cabinet shall be arranged with a door interlock preventing operation with and upon door open condition. The CSF/DOC filter door shall be safety glass equipped and the cabinet shall be lighted for operational inspection. Interior cabinet lighting shall be LED type arranged in environmentally hardened lamp housings. The cabinet shall accommodate filter s sizes to 21 in diameter to 36 in height. The PC/AKS system shall be painted safety yellow Operator Interface-The cleaning cabinet controls shall be arranged in a logical sequence following the basic, alternate and safety steps required to affect safe and efficient machine operation. Emergency Stop (E-Stop) shall operate from the control panel and door circuits. The operator controls shall provide setting, automatic and manual operating modes. All operating controls shall be permanently and conspicuously marked. The nozzle and table shall provide alternate stich coverage nozzle patterns for filter areas requiring additional attention Space Claim- The Pneumatic Cleaning/Air Knife System (PC/AFS) Cabinet shall not exceed 48.5 w x 31.5 D of floor space claim Emitted Noise- The unit in all operating modes (CSF/DOC landed) shall not exceed 78dB(a) at 1 meter distant from the test deck height Electrical Service Requirement The electrical requirements are 120 Volts 1 6 Amperes. 7.3 Soot/Ash Handler Cabinet-The system shall handle, deposit and store the fugitive matter released from the cleaning process Definition The soot/ash handler cabinet shall receive and store all material released from the cleaning stage/process. The system shall be self-cleaning utilizing reverse pulse cleaning designed to ensure maximum filter element life. The system shall incorporate a two (2) stage HEPA filtration means. All soot/ash and like matter shall be deposited to a bucket type receptacle of a standard commercial form. The system shall monitor filter element status and shall indicate

5 when replacement is necessary. The system shall not permit material to escape from the designed containment area Design and Construction-The cabinet shall be fabricated from heavy gauge steel and the unit shall not rack or otherwise deform from regular operation. The operating doors shall be suitably arranged shall provide full access to filters and inspection to handling equipment. All interconnecting ducting shall be heavy gauge high quality steel. All couplings shall be maintain reliability throughout their operating life. The clean filtered air shall discharge from the top of the unit. The soot/ash handler cabinet shall be painted safety yellow Operator Interface-The soot/ash handler cabinet controls shall be arranged in a logical sequence following the basic, alternate and safety steps required to affect safe and efficient machine operation. Emergency Stop (E-Stop) shall operate from the control panel and door circuits Space Claim- The soot/ash handler cabinet shall not exceed 26.5 w x 26.5 D of floor space claim Emitted Noise- The unit in all operating modes shall not exceed 78dB(a) at 1 meter distant from the test deck height Electrical Service Requirement The electrical requirements are 480 Volts 3 5 Amperes. 7.4 Air Compressor and Desiccant Dryer Unit Definition-Each operating system line up shall be supported by a single Palatek 30D7 rotary screw compressor fully enclosed and sound shielded. The air compressor unit shall incorporate an under mounted 120 US gallon air tank. The air compressor shall incorporate an integrated full flow, desiccant type air dryer unit Design, Specifications and Construction-The air compressor unit shall be designed and built compressor over tank, full frame and provided with an integral acoustic damping housing. The air compressor system shall deliver 125 P.S.I., full duty service. The housing shall permit full inspection and maintenance access to all components and devices requiring regular attention. Devices requiring frequent attention shall be arranged to be accessible without the requirements or necessities of removal to or of other devices and/or equipment.

6 7.4.3 Operator Interface-The air compressor and dryer system shall incorporate a microprocessor based (µp) user and maintenance interface. The interface system shall simplify the usual operation start up and shutdown tasks while ensuring that the system operates in fully supervised and protected modes. The µp system shall alert for scheduled maintenance and anomalous conditions including air dryer maintenance tasks Space Claim-The air compressor and integrated dryer dimensions as follows: 40.5 W x 78.5 x 70. Weight 2030Lbs Emitted Noise-Not to exceed 74 db(a) with enclosure applied Electrical Service Requirement- The electrical requirements are 480 Volts Amperes. 7.5 Adaptors, Tools and Miscellaneous Equipment The Contractor shall furnish all adaptors, fixtures and like required equipment necessary to adapt various filter containers to the test and cleaning equipment. The customer shall furnish specimens and/or drawings (as available) for units remediated under this equipment specification The Contractor shall furnish all required consumable items at quantities sufficient for full capacity operation for one (1) year upon delivery of equipment to the customer The Contractor shall furnish complete consumables, maintenance and spare parts catalogs. 8.0 Support & Training The Contractor shall provide instruction and all other documentation required to install and commission equipment for operation. 8.1 The Contractor shall furnish all necessary drawings and instruction required for arrangement and unit assembly in CAD form. 8.2 The Contractor shall provide at least two (2) days of onsite inspection and training for the purpose of ensuring systems as built, installed and deployed will meet the core function and working capacity of equipment in operation. 8.3 The Contractor shall, as specified by 8.2 provide training to operators and equipment maintainers. The Contraction shall furnish a plan specifying Contractor and customer participation at pre-bid. 8.4 The Contractor shall submit a plan for testing and commissioning of equipment at the bidding stage of the procurement process. Said submission shall be evaluated, modified and incorporated as part of the specification and contract upon execution of the contracts pertaining to this specification.

7 9.0 Delivery 9.1 Packaging-All equipment and related parts shall be identified, palletized and crated for shipment. All crates and palletized parts shall be conspicuously marked and electronic copies of invoicing, packing slips and other required documentation shall be sent to parties as defined in the General Contracting parts of this contract. 9.2 Delivery Schedule-All equipment as defined herein shall be delivered FOB. 9.3 Delivery Location- Wyoming Receiving 4675 North 3 rd Street Philadelphia, Pa ATTN: Wyoming Storeroom Receiving Warranty 12.1 The system shall be warranted one (1) year from the date of commissioning as acknowledged and signed by SEPTA and the equipment supplier.

SUGGESTED SPECIFICATIONS Pump Frames through 64132

SUGGESTED SPECIFICATIONS Pump Frames through 64132 TYPE HBB - HORIZONTAL SOLIDS-HANDLING WASTEWATER PUMPS Pump Frames 44081 through 64132 GENERAL Furnish and install Horizontal Flexible Coupled Dry Pit Pumping Units complete with all accessories and appurtenances

More information

FORM HEADWALL. FORM HEADWALL (floor mount) (floor mount) Installation Manual

FORM HEADWALL. FORM HEADWALL (floor mount) (floor mount) Installation Manual FORM HEADWALL (floor mount) Installation Manual FORM HEADWALL (floor mount) OVERVIEW The Form is a UL-listed configurable headwall system. This system includes multiple horizontal equipment channels integrated

More information

SECTION FIELD ERECTED INDUCED DRAFT COOLING TOWER

SECTION FIELD ERECTED INDUCED DRAFT COOLING TOWER PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the contract including general and supplementary conditions and specifications section apply to this section. B. Related Sections:

More information

SOUTHEASTERN PENNSYLVANIA TRANSPORTATION AUTHORITY 1234 MARKET STREET, PHILADELPHIA, PA 19107

SOUTHEASTERN PENNSYLVANIA TRANSPORTATION AUTHORITY 1234 MARKET STREET, PHILADELPHIA, PA 19107 SOUTHEASTERN PENNSYLVANIA TRANSPORTATION AUTHORITY 1234 MARKET STREET, PHILADELPHIA, PA 19107 SPECIFICATION FOR PLATFORM RUBBING EDGE ASSEMBLIES FOR 69 TH ST TC, 40 TH ST, 34 TH ST, 2 ND ST, SPRING GARDEN

More information

FORM HEADWALL. FORM HEADWALL (floating) (floating) Installation Manual

FORM HEADWALL. FORM HEADWALL (floating) (floating) Installation Manual FORM HEADWALL (floating) Installation Manual FORM HEADWALL (floating) OVERVIEW The Form is a UL-listed configurable headwall system. This system includes multiple horizontal equipment channels integrated

More information

SECTION SANITARY WASTE INTERCEPTORS

SECTION SANITARY WASTE INTERCEPTORS SECTION 22 13 23 SANITARY WASTE INTERCEPTORS PART 1 - GENERAL 1.1 DESCRIPTION SPEC WRITER NOTES: 1. Delete between //----// if not applicable to project. Also delete any other item or paragraph not applicable

More information

SECTION RADIO FREQUENCY SHIELDING ENCLOSURE RF Welded System

SECTION RADIO FREQUENCY SHIELDING ENCLOSURE RF Welded System SECTION 13096 RADIO FREQUENCY SHIELDING ENCLOSURE RF Welded System Prepared by: 90 Dayton Avenue, Unit 4B, Suite 13 Passaic, NJ 07055 (973) 574-9077 13096-1 RF WELDED SYSTEM PART 1 GENERAL 1.1 SECTION

More information

MSC Guidelines for Review of Ventilation System Plans

MSC Guidelines for Review of Ventilation System Plans K. B. FERRIE, CDR, Chief, Hull Division Purpose: This Plan Review Guideline (PRG) explains the requirements for seeking plan approval of ventilation systems from the Marine Safety Center (MSC) for most

More information

We fabricate your system

We fabricate your system We fabricate your system Schleicher designs each VZ/VZM heavy duty shredder to fulfil customer-specific needs by using a highly flexible modular system. This concept assures fulfilment of your requirements

More information

A. Submit the following in addition to the standard requirements.

A. Submit the following in addition to the standard requirements. SECTION [13120] OMNIFLEX 300 MODULAR WALL SYSTEM SECTION 1 GENERAL 1.01 SECTION INCLUDES A. This Section specifies all requirements necessary to furnish and install a complete modular wall system including,

More information

MODERNFOLD GWS 100SR-G MOVEABLE GLASS WALLS

MODERNFOLD GWS 100SR-G MOVEABLE GLASS WALLS MODERNFOLD GWS 100SR-G MOVEABLE GLASS WALLS Ideal for applications requiring space division, visibility and security Used in bank lobbies, offices, conference areas, interior storefronts and arena skyboxes

More information

Lubricated Rotary Screw Air Compressors kw 5 50 hp

Lubricated Rotary Screw Air Compressors kw 5 50 hp Lubricated Rotary Screw Air Compressors 4 37 kw 5 50 hp About Sullair For more than 50 years, Sullair has been on the leading edge of compressed air solutions. We were one of the first to execute rotary

More information

BuildingName The Description of the Project P DOCUMENTS

BuildingName The Description of the Project P DOCUMENTS ARCHITECTURE, ENGINEERING AND CONSTRUCTION P00000000 0000 DOCUMENTS ARCHITECTURE & ENGINEERING 326 East Hoover, Mail Stop B Ann Arbor, MI 48109-1002 Phone: 734-764-3414 Fax: 734-936-3334 SPECIFICATION

More information

Diffused Aeration Piping Equipment

Diffused Aeration Piping Equipment 1.0 General 1.1. The specifications in this section include all components of the Diffused Aeration System with the exception of the individual diffuser units. Refer to additional specification sections

More information

Stainless Steel Aeration Equipment Specification

Stainless Steel Aeration Equipment Specification Section 15 Stainless Steel Aeration Equipment Specification Part 1 - General 1.01 Description A. Scope of Work 1. Furnish, install and test aeration system including air mains, drop pipes, valves, expansion

More information

W-P-115C March 14, 1990 SUPERSEDING W-P-115B June 8, 1984 FEDERAL SPECIFICATION PANEL, POWER DISTRIBUTION

W-P-115C March 14, 1990 SUPERSEDING W-P-115B June 8, 1984 FEDERAL SPECIFICATION PANEL, POWER DISTRIBUTION March 14, 1990 SUPERSEDING W-P-115B June 8, 1984 FEDERAL SPECIFICATION PANEL, POWER DISTRIBUTION This specification is approved by the Commissioner, Federal Supply Service, General Services Administration,

More information

SECTION MATERIAL AND EQUIPMENT

SECTION MATERIAL AND EQUIPMENT SECTION 01600 MATERIAL AND EQUIPMENT PART 1 GENERAL 1.01 DESCRIPTION A. Work of this section includes: 1. Products 2. Transportation and handling 3. Storage and protection 4. Repairs and Replacements 5.

More information

SECTION (Master Template Final-05) ELECTRICAL BOXES. A. Provide boxes for electrical equipment and wiring devices as follows:

SECTION (Master Template Final-05) ELECTRICAL BOXES. A. Provide boxes for electrical equipment and wiring devices as follows: SECTION 16130 (Master Template Final-05) ELECTRICAL BOXES PART 1 GENERAL 1.01 SECTION INCLUDES A. Provide boxes for electrical equipment and wiring devices as follows: 1. Wall and ceiling outlet boxes.

More information

Series 3000 Pocket Doors

Series 3000 Pocket Doors Series 3000 Pocket Doors Introduction: The following three (3) part specification offers the Standard and Optional features for the Series 3000 Pocket Doors. The yellow highlighted areas in the specification

More information

SECTION PACKAGE BOOSTER PUMP STATIONS

SECTION PACKAGE BOOSTER PUMP STATIONS SECTION 331223 PACKAGE BOOSTER PUMP STATIONS Scope: The Contractor shall install a pump station at two locations to be determined by the Owner. These pump stations shall be designed to deliver flow to

More information

A. This Section includes acoustical panel ceilings installed with exposed suspension systems.

A. This Section includes acoustical panel ceilings installed with exposed suspension systems. SECTION 09511 ACOUSTICAL PANEL CEILINGS PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 Specification

More information

SPECIFICATIONS - DETAILED PROVISIONS Section Chlorination System (On-site Sodium Hypochlorite Generation System) C O N T E N T S

SPECIFICATIONS - DETAILED PROVISIONS Section Chlorination System (On-site Sodium Hypochlorite Generation System) C O N T E N T S SPECIFICATIONS - DETAILED PROVISIONS Section 11241 - Chlorination System (On-site Sodium Hypochlorite Generation System) C O N T E N T S PART 1 - GENERAL... 1 1.01 Scope... 1 1.02 Scope of Work... 1 1.03

More information

PAINT BOOTHS GENERAL PURPOSE

PAINT BOOTHS GENERAL PURPOSE PAINT BOOTHS GENERAL PURPOSE 1 INDUSTRY-LEADING PRODUCTS With precise contamination control and premium angled ceiling hip lights, General Purpose Paint Booths from Global Finishing Solutions (GFS) enable

More information

INDUSTRIAL FILTRATION EQUIPMENT LWS Filter Series

INDUSTRIAL FILTRATION EQUIPMENT LWS Filter Series INDUSTRIAL FILTRATION EQUIPMENT LWS Filter Series (Single, Twin, Triple or Quadruple Demand Systems) 1 P age filtration equipment can be engineered to solve complex commercial and industrial water treatment

More information

1.02 Related Sections A. Section Heating, Ventilation and Air Conditioning (HVAC). C. Section Pneumatic and Electric Control HVAC.

1.02 Related Sections A. Section Heating, Ventilation and Air Conditioning (HVAC). C. Section Pneumatic and Electric Control HVAC. PART 1: GENERAL 1.01 Section Includes A. Dual duct terminal units. B. Variable volume regulators. C. Integral damper motor operators. D. Integral controls. 1.02 Related Sections A. Section 23 00 00 Heating,

More information

Supplier & manufacturer of abrasive blasting equipment, abrasives, servicing & training. Blast Rooms

Supplier & manufacturer of abrasive blasting equipment, abrasives, servicing & training. Blast Rooms Supplier & manufacturer of abrasive blasting equipment, abrasives, servicing & training Blast Rooms The Hodge Clemco Way Leading the way in surface preparation since 1959, Hodge Clemco has consistently

More information

Dyno Test Rooms Professional Chassis, Engine & Specialty Test Rooms for the PowerSports & Product Testing Market

Dyno Test Rooms Professional Chassis, Engine & Specialty Test Rooms for the PowerSports & Product Testing Market INC s Professional Chassis, Engine & Specialty Test Rooms for the PowerSports & Product Testing Market Proven performance Contains noise and removes exhaust Rugged modular steel panel construction Safe

More information

SECTION 16496A MTS MANUAL TRANSFER SWITCH (MANUAL CONTROL ONLY) Note to Spec Writer: { } Denotes EATON Feature reference number

SECTION 16496A MTS MANUAL TRANSFER SWITCH (MANUAL CONTROL ONLY) Note to Spec Writer: { } Denotes EATON Feature reference number MTS MANUAL TRANSFER SWITCH (MANUAL CONTROL ONLY) Note to Spec Writer: { } Denotes EATON Feature reference number PART 1 GENERAL 01 02 03 04 SCOPE Furnish and install Manual Transfer Switches (MTS) and

More information

SECTION SWIMMING POOLS STAINLESS, FULL TILE, OR TILE TRIM

SECTION SWIMMING POOLS STAINLESS, FULL TILE, OR TILE TRIM SECTION 13 1100 SWIMMING POOLS STAINLESS, FULL TILE, OR TILE TRIM This section includes editing notes to assist the user in editing the section to suit project requirements. These notes are included as

More information

Floor Insulation Underlayment Section Sound Control Matting

Floor Insulation Underlayment Section Sound Control Matting Floor Insulation Underlayment Section 09618 Sound Control Matting Part I General 1.1 Summary A. Section includes a sound control material for achieving an STC and IIC rating in excess of 50 to meet building

More information

Installation and Operation Manual

Installation and Operation Manual Installation and Operation Manual Maintenance Bypass Panel Model: SU2030KMBP Tripp Lite follows a policy of continuous improvement. Product specifications are subject to change without notice. 1111 West

More information

DIVISION 10 SPECIALTIES SECTION OPERABLE PARTITIONS

DIVISION 10 SPECIALTIES SECTION OPERABLE PARTITIONS DIVISION 10 SPECIALTIES SECTION 10 22 26 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

1. Vertical reciprocating conveyor, Hydraulic straddle VRC.

1. Vertical reciprocating conveyor, Hydraulic straddle VRC. PART 1: GENERAL 1.01 Section Includes: 1. Vertical reciprocating conveyor, Hydraulic straddle VRC. a. Machine, controller, platform, structural steel hoist frame. b. Wire mesh enclosure and gates. Related

More information

Compact, Integrated System for Coating Pipe and Tubing

Compact, Integrated System for Coating Pipe and Tubing Dry Filter Continuous Coater Compact, Integrated System for Coating Pipe and Tubing Typical Coating Materials Used With Continuous Coaters Acrylics (clear and pigmented) Asphaltums Oleoresinous varnishes

More information

Pioneer Forced Draft Cooling Tower Specifications

Pioneer Forced Draft Cooling Tower Specifications Delta Cooling Towers, Inc. 41 Pine Street P.O. Box 315 Rockaway, New Jersey 07866-0315 Telephone 973.586.2201 Fax 973.586.2243 www.deltacooling.com sales@deltacooling.com Pioneer Forced Draft Cooling Tower

More information

Imagineering Air-Driven Solutions.

Imagineering Air-Driven Solutions. Imagineering Air-Driven Solutions. Pneumatic Conveying Systems Air-driven solutions. Corporate Profile VAC-U-MAX specializes in design and manufacture of pneumatic systems and support equipment for conveying,

More information

SECTION AIR DUCT CLEANING

SECTION AIR DUCT CLEANING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Specification Sections, apply to this Section. B. Related Sections:

More information

SECTION MODULAR GALVANIZED RF SHIELDING SYSTEM SPECIFICATIONS

SECTION MODULAR GALVANIZED RF SHIELDING SYSTEM SPECIFICATIONS SECTION 13096 MODULAR GALVANIZED RF SHIELDING SYSTEM SPECIFICATIONS Prepared by: NELCO 125 Chenoweth Lane, Ste. 206 Louisville, KY 40207 (502) 899-3726 13096-1 MODULAR GALVANIZED RF SHIELDING SYSTEM PART

More information

Specification for MRL Passenger Elevators

Specification for MRL Passenger Elevators Specification for MRL Passenger Elevators Part 1 General 1.1 Description A. This specification is intended to cover the complete furnishing and installing of one MRL passenger elevator as manufactured

More information

Pratt & Whitney. Power Systems MOBILEPAC. Gas Turbine Package. It s in our power.

Pratt & Whitney. Power Systems MOBILEPAC. Gas Turbine Package. It s in our power. Power Systems Pratt & Whitney Power Systems MOBILEPAC Gas Turbine Package TM It s in our power. Pratt & Whitney FT8 MOBILEPAC Gas Turbine Package The MOBILEPAC gas turbine package requires the smallest

More information

The Contractor is responsible for quality control, including workmanship and materials furnished by his subcontractors and suppliers.

The Contractor is responsible for quality control, including workmanship and materials furnished by his subcontractors and suppliers. SECTION 05 31 13 STEEL FLOOR DECKING PART 1 - GENERAL 1.1 RELATED DOCUMENTS Drawings and general provisions of the contract, including General and Supplementary Conditions and Division 01 - Specification

More information

Specification & Procurement Guide ATG Access VP 50 Hydraulic Bollard

Specification & Procurement Guide ATG Access VP 50 Hydraulic Bollard Specification & Procurement Guide ATG Access VP 50 Hydraulic Bollard Contents 1.0 Scope... 2 2.0 System Configuration... 2 2.1 Bollard(s).. 2 2.1.1 Single Bollard 2 2.1.2 Multiple Bollards. 2 2.2 Bollard

More information

City of High Point Airport Overlay District Noise Level Reduction Design Standards

City of High Point Airport Overlay District Noise Level Reduction Design Standards City of High Point Airport Overlay District Noise Level Reduction Design Standards Part A. Residential Design Standards for Zone 3 I. NOISE LEVEL REDUCTION (NLR) REQUIREMENT FOR ZONE 3. The City of High

More information

I N V I T A T I O N T O B I D City and Borough of Wrangell Premanufactured Restroom

I N V I T A T I O N T O B I D City and Borough of Wrangell Premanufactured Restroom Overview The (CBW) requests sealed bids from interested and qualified firms to provide a, on a one-time basis. Supplier shall furnish all labor, materials, tools, and equipment necessary for supplying

More information

PRE-QUALIFICATION NOTICE FOR INCINERATOR PROJECT

PRE-QUALIFICATION NOTICE FOR INCINERATOR PROJECT PRE-QUALIFICATION NOTICE FOR INCINERATOR PROJECT Page 1 of 9 BACKGROUND: Aga Khan Hospital & Medical College Foundation (AKHMCF) is a Joint Commission International accredited tertiary care hospital. It

More information

Portable Ventilator Product Catalog

Portable Ventilator Product Catalog Portable Ventilator Product Catalog WELCOME For more than 0 years, COPPUS portable ventilators and cooling products have been recognized as leaders in providing reliable, ventilation to meet the demands

More information

Fiberglass Cooling Towers

Fiberglass Cooling Towers Fiberglass Cooling Towers Available in sizes from 100 to 240 tons. FC Series 700 Fiberglass Cooling Tower Available in sizes from 170 to 240 tons. No other fiberglass cooling tower comes with as many high-quality

More information

SECTION LUMINAIRES AND ACCESSORIES

SECTION LUMINAIRES AND ACCESSORIES SECTION 16500 LUMINAIRES AND ACCESSORIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. The general provisions of the contract including General and Special Conditions and General Requirements shall apply to

More information

Bulk Bag Unloader Installation, Operation and Maintenance Manual

Bulk Bag Unloader Installation, Operation and Maintenance Manual Web-Tech Australia Pty Ltd Bulk Bag Unloader Installation, Operation and Maintenance Manual Web-Tech Australia Pty Ltd Manufacturers & Suppliers of Weighing, Level & Batching Equipment 11 Electronics Street

More information

1. Section Steel Doors and Frames. 2. Section Flush Wood Doors 3. Section Aluminum Storefront Doors.

1. Section Steel Doors and Frames. 2. Section Flush Wood Doors 3. Section Aluminum Storefront Doors. PROPOSED ALTERATIONS FOR REIMS PINECREST 124, LLC PINECREST, FLORIDA SECTION 08710 DOOR HARDWARE PART 1 - GENERAL 1.1 SUMMARY A. Section includes: 1. Mechanical door hardware for the following: B. Related

More information

Applied Noise Control. D. W. Herrin, Ph.D., P.E. University of Kentucky Department of Mechanical Engineering

Applied Noise Control. D. W. Herrin, Ph.D., P.E. University of Kentucky Department of Mechanical Engineering D. W. Herrin, Ph.D., P.E. Department of Mechanical Engineering Outline of Topics 1. Introduction 2. Noise Control at Source 3. Noise Control of Transmission Path 4. Protection at Receiver 5. Summary 2

More information

Power Electronics, Inc. Packaged Equipment Center Standard Construction and Design Features

Power Electronics, Inc. Packaged Equipment Center Standard Construction and Design Features DESIGN CRITERIA FOR STANDARD CONSTRUCTION: These standard design elements of the P.E.I. Power Equipment Center are utilized to meet the following design criteria per ASCE 7-05 as adopted by the IBC (International

More information

CITY OF ORANGE BUILDING DIVISION 2016 Green Building Code Requirements For Residential Construction

CITY OF ORANGE BUILDING DIVISION 2016 Green Building Code Requirements For Residential Construction CITY OF ORANGE BUILDING DIVISION 2016 Green Building Code Requirements For Residential Construction In order to facilitate sustainable construction practices, all new projects* must comply with the State

More information

trusted innovative expertise

trusted innovative expertise Ingersoll Rand is well into its second century of building our legacy as a trusted global leader by delivering the innovative solutions and expertise our customers require. We continue to advance compressed

More information

IECC 2015 with Hawaii Amendments COMMERCIAL DESIGN CHECKLIST

IECC 2015 with Hawaii Amendments COMMERCIAL DESIGN CHECKLIST IECC 2015 with Hawaii Amendments COMMERCIAL DESIGN CHECKLIST ENVELOPE REQUIREMENTS Project: Date: Instructions RECOMMENDED: List performance values, note exceptions that were applied, or provide other

More information

FABRICOIL BASIC January 10, 2006

FABRICOIL BASIC January 10, 2006 FABRICOIL BASIC January 10, 2006 General Notes: This guide specification document is provided by Raynor Door for use by design professionals in preparing project specification documents for FABRICOIL BASIC

More information

Establishing Best Practice Compressed Air Flows

Establishing Best Practice Compressed Air Flows Establishing Best Practice Compressed Air Flows Sponsored by Featured Speaker: Hank van Ormer, Air Power USA For your free subscription, please visit http://www.airbestpractices.com/magazine/subscription.

More information

ENKASONIC FLOOR UNDERLAYMENT 9110

ENKASONIC FLOOR UNDERLAYMENT 9110 ENKASONIC FLOOR UNDERLAYMENT 9110 GS1197 Section 13080 SECTION 09618 SOUND CONTROL MATTING Part I General 1.1 Summary A. Section includes a sound control material for achieving an STC and IIC rating in

More information

A. Product Data: For each type of deck, accessory, and product indicated.

A. Product Data: For each type of deck, accessory, and product indicated. SECTION 053100 - PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Roof deck. 2. Composite floor deck. 3. Noncomposite form deck. 1.2 SUBMITTALS A. Product Data: For each type of deck, accessory, and

More information

LTH3700, HOLLOW METAL SLIDING FIRE DOOR

LTH3700, HOLLOW METAL SLIDING FIRE DOOR LTH3700, HOLLOW METAL SLIDING FIRE DOOR Consult Manufacturer for additional options or modifications PART 1-GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General

More information

Model TS-100 Tubing Spider Installation, Operation, Service and Parts Book Manual

Model TS-100 Tubing Spider Installation, Operation, Service and Parts Book Manual Model TS-100 Tubing Spider Installation, Operation, Service and Parts Book Manual WPI WELLKIN Inc. 8401 Industrial Dr. Pearland, TX 77584 PH: (281) 992-2064 FX: (281) 992-2076 E-mail: sales@wpiwellkin.com

More information

AUTOMATIC BALING PRESS MODEL: HRB-CENTURION 200HP; 13/9

AUTOMATIC BALING PRESS MODEL: HRB-CENTURION 200HP; 13/9 Harris Equipment PROPOSAL SPECIFICATION: 20061122-121313 AUTOMATIC BALING PRESS MODEL: HRB-CENTURION 200HP; 13/9 GENERAL LAYOUT DRAWING: APPLICATION: 3A-13873 (LH/RH); 3A-13874 (LH/LH) 3A-13875 (RH/LH);

More information

This Installation Guide uses the following symbols to indicate important information. Always observe the instructions indicated by these symbols.

This Installation Guide uses the following symbols to indicate important information. Always observe the instructions indicated by these symbols. VIGO INDUSTRIES INSTALLATION GUIDE FOR STANDING SHOWER CABIN (MODEL VG06062) SAFETY PRECAUTIONS This Installation Guide uses the following symbols to indicate important information. Always observe the

More information

GENERAL PROVISIONS: Furnish and install one steel platform motor truck scale and associated electronic controls.

GENERAL PROVISIONS: Furnish and install one steel platform motor truck scale and associated electronic controls. GENERAL PROVISIONS: Furnish and install one steel platform motor truck scale and associated electronic controls. The scale shall have a clear and unobstructed weighing surface of not less than 70 feet

More information

SECTION ACOUSTICAL PANEL CEILINGS

SECTION ACOUSTICAL PANEL CEILINGS SECTION 095113 ACOUSTICAL PANEL CEILINGS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and General Provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

1.02 DESCRIPTION A. This Section specifies furnishing and installing Surface Applied Detectable/Tactile Warning Surface Tiles where indicated.

1.02 DESCRIPTION A. This Section specifies furnishing and installing Surface Applied Detectable/Tactile Warning Surface Tiles where indicated. SURFACE APPLIED DETECTABLE/TACTILE WARNING SURFACE TILE PART 1 GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Special Conditions and Division 1 Specifications

More information

SECTION RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection

SECTION RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection SECTION 13090 RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection Prepared by: 90 Dayton Avenue, Unit 4B, Suite 13 Passaic, NJ 07055 (973) 574-9077 13090-1 LOW INTENSITY RADIATION PROTECTION

More information

+ IQ/OQ Protocol Installation Qualification/ Operation Qualification

+ IQ/OQ Protocol Installation Qualification/ Operation Qualification + IQ/OQ Protocol Installation Qualification/ Operation Qualification Purifier Logic Series Biological Safety Cabinets Labconco o: 1058602 Rev. - Available at www.labconco.com or by e-mail in Word 2000

More information

Corium Brick Rainscreen System Specifications

Corium Brick Rainscreen System Specifications CORIUM BRICK RAINSCREEN SYSTEM PART 1 - GENERAL 1.1 SUMMARY A. Work Included: The Work of this Section shall include but not be limited to the following: 1. Corium brick plates 2. Galvanized and coated

More information

Low Voltage Switchgear Construction Checklist (under 500 kva)

Low Voltage Switchgear Construction Checklist (under 500 kva) Low Voltage Switchgear Checklist (under 500 kva) Project: Building: Location: Submittal / Approvals Submittal. The above equipment and systems integral to them are complete and ready for functional testing.

More information

1. Telecommunications mounting elements. 2. Backboards. 3. Telecommunications equipment racks and cabinets. 4. Grounding.

1. Telecommunications mounting elements. 2. Backboards. 3. Telecommunications equipment racks and cabinets. 4. Grounding. ALLIANT ENERGY CENTER PAVILIONS Project No. 2013 027 SECTION 27 11 00 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

1. This Section includes administrative and procedural requirements for contract closeout including, but not limited to, the following:

1. This Section includes administrative and procedural requirements for contract closeout including, but not limited to, the following: SECTION 01700 - CONTRACT CLOSEOUT PART 1 - GENERAL 1.01 RELATED DOCUMENTS 1. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

Price Egg Crate Grille

Price Egg Crate Grille Price Egg Crate Grille Division 23 Heating, Ventilating, and Air Conditioning Section 23 37 13 Diffusers, Registers, and Grilles The following specification is for a defined application. Price would be

More information

F-SERIES: F SPECIFICATIONS Four-Fold Door Systems

F-SERIES: F SPECIFICATIONS Four-Fold Door Systems Version 5.22.13 F-SERIES: F100-600 SPECIFICATIONS Four-Fold Door Systems OPTIONS ARE IN BOLD, PLEASE MODIFY THESE AREAS AS NEEDED BASED ON YOUR PROJECT. CONSULT MANUFACTURER FOR ADDITIONAL OPTIONS OR MODIFICATIONS.

More information

INSPECTION SYSTEM REQUIREMENTS

INSPECTION SYSTEM REQUIREMENTS MILITARY SPECIFICATIONS MIL-I-45208A INSPECTION SYSTEM REQUIREMENTS This specification has been approved by the Department of Defense and is mandatory for use by all Agencies. 1. SCOPE 1.1 Scope. This

More information

Roll Marking Machines

Roll Marking Machines Roll Marking Machines Serving your marking needs since 1895 (800) 323-1332 (847) 647-7117 www.gtschmidt.com Introduction to roll marking The Basics Of Roll Marking Schmidt pioneered roll marking over 65

More information

Lubricated Rotary Screw Air Compressors. Constant Speed Drives and Variable Speed Drives kw hp

Lubricated Rotary Screw Air Compressors. Constant Speed Drives and Variable Speed Drives kw hp Lubricated Rotary Screw Air Compressors Constant Speed Drives and Variable Speed Drives 18 30 kw 25 40 hp About Sullair For more than 50 years, Sullair has been on the leading edge of compressed air solutions.

More information

SECTION INDOOR AIR QUALITY MANAGEMENT PLAN. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION INDOOR AIR QUALITY MANAGEMENT PLAN. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. SECTION 018119 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting

More information

SECTION COOLING TOWER

SECTION COOLING TOWER PART 1 GENERAL 1.1 SECTION INCLUDES A. Mechanical induced draft Cooling Tower B. Controls C. Ladder and handrails 1.2 REFERENCES SECTION 23 65 00 COOLING TOWER A. ANSI/AFBMA 9 - Load Rating and Fatigue

More information

Pneumatic control and on/off valves for thermoelectric plants

Pneumatic control and on/off valves for thermoelectric plants BASIC REQUIREMENTS FOR QUALIFYING SUPPLY AND CONTRACTING COMPANIES Equipment category : FMVA11 Pneumatic control and on/off valves for thermoelectric plants Technical characteristics Page 1 of 8 CONTENTS

More information

Tate Access Floors, Inc. All Steel 1000 Access Floor Panel 600 mm Bolted Stringer Understructure System

Tate Access Floors, Inc. All Steel 1000 Access Floor Panel 600 mm Bolted Stringer Understructure System Tate Access Floors, Inc. All Steel 1000 Access Floor Panel 600 mm Bolted Stringer Understructure System SECTION 10270 PART 1 - GENERAL 1.1 Section Includes A. Work of this section includes, but is not

More information

Gerber M Series Site Requirements

Gerber M Series Site Requirements Gerber M Series Site Requirements Preparing for the arrival of your new machine. P rior to the arrival of your Gerber M Series Cutting System there are certain things you can prepare to facilitate a quick

More information

Evaporative Gas Cooling and Emissions Control Solutions

Evaporative Gas Cooling and Emissions Control Solutions Evaporative Gas Cooling and Emissions Control Solutions for the Iron and Steel Industry MEGTEC ENERGY ENVIRONMENTAL B&W MEGTEC Solutions for the Iron & Steel Industry Our Pedigree Babcock & Wilcox MEGTEC

More information

B. System Design and Performance Requirements

B. System Design and Performance Requirements 15625 Water Chillers This document provides design standards only, and is not intended for use, in whole or in part, as a specification. Do not copy this information verbatim in specifications or in notes

More information

SECTION AUTOMATIC TRANSFER SWITCH

SECTION AUTOMATIC TRANSFER SWITCH SECTION 26 36 23 AUTOMATIC TRANSFER SWITCH PART 1: GENERAL 1.01 SCOPE A. Furnish all labor, materials, equipment and appurtenances, install and test electrically operated, automatic transfer switch (ATS)

More information

PERFORMANCE SPECIFICATION PRINTED CIRCUIT BOARD/PRINTED WIRING BOARD, GENERAL SPECIFICATION FOR

PERFORMANCE SPECIFICATION PRINTED CIRCUIT BOARD/PRINTED WIRING BOARD, GENERAL SPECIFICATION FOR NOT MEASUREMENT SENSITIVE MIL-PRF-31032 1 November 1995 PERFORMANCE SPECIFICATION PRINTED CIRCUIT BOARD/PRINTED WIRING BOARD, GENERAL SPECIFICATION FOR This specification is approved for use by all Departments

More information

Request for Bids. At The Greenville-Spartanburg International Airport

Request for Bids. At The Greenville-Spartanburg International Airport Request for Bids At The Greenville-Spartanburg International Airport Addendum No. 2 June 27, 2011 All Bidders shall include with their bid submittal a signed statement indicating they have reviewed and

More information

329 Boston Post Road Sudbury, Massachusetts TEL: FAX:

329 Boston Post Road Sudbury, Massachusetts TEL: FAX: SECTION 12520 MECHOSHADES AND ELECTROSHADES PART 1 GENERAL 1.1 SUMMARY A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections,

More information

Unit Substation Transformer Construction Checklist (under 500 kva)

Unit Substation Transformer Construction Checklist (under 500 kva) Unit Substation Transformer Checklist (under 500 kva) Building: Location: Submittal / Approvals Submittal. The above equipment and systems integral to them are complete and ready for functional testing.

More information

SUPPLEMENTAL CONTRACT AWARD NOTIFICATION PAGE 14

SUPPLEMENTAL CONTRACT AWARD NOTIFICATION PAGE 14 State of New York Executive Department Office Of General Services Procurement Services Group Corning Tower Building - 38th Floor Empire State Plaza Albany, New York 12242 http://www.ogs.state.ny.us SUPPLEMENTAL

More information

Sprinkler Identification Numbers (SINs)

Sprinkler Identification Numbers (SINs) Worldwide Contacts www.tyco-fire.com Model 2.8 K-factor Combustible Concealed Space Sprinklers Specific Application, Upright General Description The Model Combustible Concealed Sprinklers are fast response,

More information

a difficult challenge when trying to achieve effective coverage within a shallow space. The Model CC1 Combustible

a difficult challenge when trying to achieve effective coverage within a shallow space. The Model CC1 Combustible Worldwide Contacts www.tyco-fire.com Model CC1 2.8 K-factor Combustible Concealed Space Sprinklers Specific Application, Upright General Description The Model CC1 Combustible Concealed Sprinklers are fast

More information

त जप र व व / लय TEZPUR UNIVERSITY

त जप र व व / लय TEZPUR UNIVERSITY SHORT QUOTATION NOTICE TU/11-24/Pur/Qtn/2013/372-A dated 23/04/2013 Sealed quotations are invited for supply of the following items required for the research project of Dr. S.Saha, Department of MBBT,

More information

MET-FAB FABRICATION & MACHINE, INC. P.O. Box 363, Batavia, Ohio Ph. (513) Fax (513)

MET-FAB FABRICATION & MACHINE, INC. P.O. Box 363, Batavia, Ohio Ph. (513) Fax (513) 1 2 MET-FAB FABRICATION & MACHINE, INC. P.O. Box 363, Batavia, Ohio 45103 Ph. (513) 724-3715 Fax (513) 724-1336 The people who can help you with your material handling needs Fact! A note about our references.

More information

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS SECTION 26 05 29 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS PART 1 GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide all labor, materials, equipment, and incidentals as shown, specified, and

More information

BAY INDUSTRIAL GROUP INNOVATIVE TECHNOLOGY FOR INDUSTRY. Bay Design, Inc. Engineered Material Handling Solutions

BAY INDUSTRIAL GROUP INNOVATIVE TECHNOLOGY FOR INDUSTRY. Bay Design, Inc. Engineered Material Handling Solutions Bay Automation, Inc. Products & Services Bay Design, Inc System Integration Mechanical and Electrical Engineering Controls and Programming Custom Industrial Equipment Ergonomic Devices Custom Tooling &

More information

Vertical Cuttings Dryers Overview

Vertical Cuttings Dryers Overview Vertical Cuttings Dryers Overview Maximizing WBM and OBM Drilling Fluid Recovery 2017 Revision Q Full-Service OEM Engineering, Design, Manufacturing, Commissioning and Servicing. Solids Control Waste Management

More information

You get more for less at FSHS!

You get more for less at FSHS! You get more for less at FSHS! www.puromax.com Phone (941)625 4550 Fax (941)625-6635 4210 Whidden Blvd. Port Charlotte, FL 33980 Phone (941)625-4550 Fax (941)625-6635 www.puromax.com Contacts President

More information

SECTION PERSONNEL DUTY LOCKERS. 1. FPPL Series Police Personnel Duty Lockers, including the following:

SECTION PERSONNEL DUTY LOCKERS. 1. FPPL Series Police Personnel Duty Lockers, including the following: SECTION 10501 PERSONNEL DUTY LOCKERS PART 1 GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 specifications

More information

SECTION HVAC INSTRUMENTATION AND CONTROLS INSTALLATION. (Applicable to IUPUI Only)

SECTION HVAC INSTRUMENTATION AND CONTROLS INSTALLATION. (Applicable to IUPUI Only) SECTION 15957 (Applicable to IUPUI Only) I. GENERAL A. NOTES 1. The University has a pre-purchase agreement (PPA) with Johnson Controls (JCI) and Siemens Building Technologies (SBT). The University will

More information