Chapter 20. Tools, Consumables and Spare Parts
|
|
- Logan Powers
- 5 years ago
- Views:
Transcription
1 Standardized Technical Specification PRIIA 305 Next-Generation Equipment Committee Bi-Level Passenger Rail Cars Chapter 20 Tools, Consumables and Spare Parts
2 Table of Contents 20-1 Table of Contents 20.0 Tools, Consumables and Spare Parts Overview Specialized Tools Consumables Spare Parts
3 Tools, Consumables and Spare Parts Tools, Consumables and Spare Parts 20.1 Overview This chapter details the requirements for the Contractor to identify and provide the specialized tools, spare parts and consumables that will be needed to operate, maintain and repair the vehicles to be delivered to the Customer. All information required in this chapter shall also be included in the appropriate operating and maintenance documentation as identified in Chapter 22, including: Operating Manual Running Maintenance Manual Heavy Maintenance Manual Illustrated Parts Catalogue Troubleshooting Guide 20.2 Specialized Tools The Contractor shall provide to the Customer five sets of all specialized tools, gauges, meters, diagnostic equipment (including laptop computers), etc. that will be necessary to operate, maintain, inspect, test, troubleshoot and repair all configurations of the vehicles throughout their design life. These tools and equipment shall be delivered to the Customer at a specified location, and shall be delivered to the Customer prior to the acceptance of the first car. All specialized tools shall be included in the base warranty as specified. CDRL As part of the design review process, the Contractor shall submit a list of specialized tools and diagnostic equipment that will be provided to the Customer. DR This list shall identify the item description, manufacturer, part number and purpose, and shall include a cross-reference to the maintenance manuals as to the tasks that require the use of the tools. This list shall include all specialized tools and diagnostic equipment required to operate, maintain and repair the vehicles throughout their design life, and shall include: Specialized tools for inspecting, repairing, removing, installing, maintaining or measuring components and systems on the cars; Diagnostic equipment to troubleshoot problems, determine component or system status or condition, or interpret diagnostic information; Portable computer equipment required to view, change or monitor the operating parameters, downloadable recorded data, service history or digital programming for computerized or microprocessor controlled components or systems; and All cables, connectors, software, power supplies, carrying cases and peripherals as required for use with the portable computers. All diagnostic, download and programming software shall be provided in Windows operating system format with no use restrictions so that the Customer can install the software on additional computers as needed.
4 Tools, Consumables and Spare Parts 20-3 The Contractor shall provide drawings, schematics, specifications, part numbers and prices for all special tools and maintenance equipment to enable the Customer to purchase additional quantities Consumables The Contractor shall provide a list of all service consumables needed to support the vehicle throughout its service design life. Consumables are identified as those items replaced as a function of normal operation, whether the replacement is on a periodic basis or as they wear out. This list shall be provided as a component of the final design review. DR This list should include items such as: Brake pads Filters - Heating, Ventilation and Air Conditioning (HVAC), air, water Windshield wiper blades Lamps/Light Emitting Diodes (LEDs) Fuses, Diodes and Resistors Air hoses Rubber seals and Gaskets This list shall include the following information as it relates to these parts: Contractor part number Part description Manufacturer name Manufacturer part number Quantity required by car type Frequency of replacement 20.4 Spare Parts As a part of final design review, the Contractor shall provide to the Customer a list of strategic spare parts that the Customer should acquire and maintain to support the fleet of equipment after the end of the warranty period. DR This list shall include, but is not limited to the following: Parts that are critical to the safe operation of the equipment; Parts with a high failure rate, based on the Contractor's reliability analysis (see Chapter 19); Parts located on the vehicle exterior and therefore subject to damage from debris strikes or accidents; Parts installed in a high-wear environment; and
5 Tools, Consumables and Spare Parts 20-4 Parts that require troubleshooting and repair off of the car, such as electronic components. This list shall include the following information as it relates to these parts: Contractor part number Part description Manufacturer name Manufacturer part number Quantity required by car type Shelf life/maximum storage period Recommended quantity to have on hand The Contractor shall be responsible to provide replacement parts for those failing under the terms of the warranty. The Customer shall not be responsible to supply replacement parts to the Contractor for the purposes of fulfilling warranty provisions. * End of Chapter 20 *
6 This Page Intentionally Left Blank
Maintenance Plan Template Outsource
Maintenance Plan Template Outsource It is the goal of Agency to maintain an effective preventative maintenance program by utilizing proper management of parts, equipment and fleet. Agency strives to operate
More informationChapter 23 Customer Variables
Standardized Technical Specification Bi-Level Passenger Rail Cars for Intercity Corridor Service Chapter 23 Customer Variables Revision C Table of Contents 23-1 Table of Contents 23.0 Customer Variables...
More informationIMIHV01 Carry out routine commercial vehicle maintenance
IMIHV01 Carry out routine commercial vehicle maintenance Overview This NOS is about conducting routine examination, adjustment and replacement activities as part of the periodic maintenance of commercial
More informationCHAPTER 7 CONVEYANCE SYSTEMS
CHAPTER 7 CONVEYANCE SYSTEMS 7-1 This Page Left Intentionally Blank 7-2 CHAPTER 7 CONVEYANCE SYSTEMS Section 7.1 Elevators 7.1.1 Compliance with ADA 7.1.2 Information Plate 7.1.3 Controls 7.1.3.1 Control
More informationSUPERVISING FOOD PRODUCTION EQUIPMENT TECHNICIAN
PERSONNEL COMMISSION Class Code: 0499 Salary Range: 38 (S1) JOB SUMMARY SUPERVISING FOOD PRODUCTION EQUIPMENT TECHNICIAN Under general supervision, to organize, supervise and participate in the highly
More informationINSERT PICTURE OF FLEET VEHICLE MAINTENANCE PLAN
INSERT PICTURE OF FLEET VEHICLE MAINTENANCE PLAN VEHICLE PREVENTIVE MAINTENANCE PROGRAM The South Carolina Department of Transportation and The Office of Public Transit in cooperation with the Federal
More informationMTA Metro-North Railroad. Operations Division. Annual Report on Fleet Maintenance 2011
MTA Metro-North Railroad Operations Division Annual Report on Fleet Maintenance 2011 Page 59 Maintenance of Equipment The Maintenance of Equipment (M of E) Department is responsible for providing a safe
More informationMy Career Motor Vehicle Engineering
1 My Career Motor Vehicle Engineering 2 With a Certificate in Motor Vehicle Technology Studies, graduates may have the possible career options of the following: Motor Vehicle Mechanic/Technician Auto electrician
More informationADDENDUM NO. 1 REQUEST FOR PROPOSAL REHABILITATION OF 1999 NEW FLYER BUS. September 5, 2018
ADDENDUM NO. 1 REQUEST FOR PROPOSAL REHABILITATION OF 1999 NEW FLYER BUS September 5, 2018 This Addendum No. 1 is in response to questions received from potential submitters. All responses must be reviewed
More informationDesign Guidelines October 2016: Issue 3. Section 15 Lifts.
Design Guidelines Section 15 Lifts. www.canterbury.ac.nz/learningresources Standards in the Design Guidelines Suite Design Standard Guidelines Index: 01 General 02 Architecture 03 Audio Visual 04 Civil
More information1.0 GENERAL REQUIREMENTS: 1.1 Scope of work:
Page 6 of 20 1.0 GENERAL REQUIREMENTS: 1.1 Scope of work: 1.1.1 Work includes, but is not limited to, providing all labor, consumable materials (rags, etc), tools, equipment, service trucks, man-lifts,
More informationYOUR PARTNER FOR METERING AND MIXING TECHNOLOGY AUTOMOTIVE
YOUR PARTNER FOR METERING AND MIXING TECHNOLOGY AUTOMOTIVE WHO WE ARE AND WHAT WE STAND FOR Joined materials metals, glass, plastics and composites is omnipresent in our world, countless products are manufactured
More informationCertificate of Acceptance
Specific Conditions The following Conditions are specific to the approved product/s contained within this Certificate. These conditions must be adhered to in addition to the Network Rail General Conditions
More informationB. Provide equipment complying with this specification and manufactured by one of the following:
SECTION 230910 PAINT SPRAY BOOTH PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Provide Paint Spray Booth, Prep Booth and Paint Mix Room, and associated ventilation equipment, complying with the
More informationMTM REQUIREMENTS SPARES FOR NEW ASSETS
MTM REQUIREMENTS L1-CHE-STD-006 Version: 1 Effective from: 14 th November 2011 Approval Amendment Record Approval Date Version Description 14/11/2011 1 Initial Version Disclaimer Metro Trains Melbourne
More informationPlan of Training HEAVY DUTY EQUIPMENT TECHNICIAN
Plan of Training HEAVY DUTY EQUIPMENT TECHNICIAN Department of Advanced Education and Skills Apprenticeship and Trades Certification Division March 2009 Preface This Apprenticeship Standard is based on
More informationPreventive Maintenance Policies and Plan for Vehicles and Facilities Northeastern Connecticut Transit District
Preventive Maintenance Policies and Plan for Vehicles and Facilities NECTD subscribes to a philosophy of continuous improvement. The Preventive Maintenance Plan and the procedures detailed in this plan
More informationInspection Report. Prepared for: Tonia Mann. Property Address: 2557 Briar Valley Way Dacula, GA Date: March 01, 2012
Inspection Report Prepared for: Tonia Mann Property Address: Dacula, GA 30019 Date: March 01, 2012 Inspector: Charles Mann (770) 594-2222 www.edificeinspections.com Page 1 INSPECTION CONDITIONS CLIENT
More informationLifetime Extension of Nuclear I&C I & C Obsolescence and PLEX October 27, 2016 Curtiss-Wright Nuclear Division
Lifetime Extension of Nuclear I&C I & C Obsolescence and PLEX October 27, 2016 Curtiss-Wright Nuclear Division 1 November 3, 2016 Proprietary 2014 Curtiss-Wright It all started on the sands of Kitty Hawk
More informationUser s Manual. June 23, 2017 P/N Revision D. TURNER DESIGNS 1995 N. 1 st Street San Jose, CA Phone: (408) FAX: (408)
User s Manual June 23, 2017 P/N 998-2187 Revision D TURNER DESIGNS 1995 N. 1 st Street San Jose, CA 95112 Phone: (408) 749-0994 FAX: (408) 749-0998 Table of Contents 1. Introduction 1.1 Description 4 2.
More informationYOUR PARTNER FOR METERING AND MIXING TECHNOLOGY
YOUR PARTNER FOR METERING AND MIXING TECHNOLOGY AUTOMOTIVE WHO WE ARE AND WHAT WE STAND FOR Joined materials metals, glass, plastics and composites can be found everywhere in our world, countless products
More informationComponents Weigh in Motion (WIM) & Wheel Impact Load Detector (WILD) Generic Product Catalog
Components Weigh in Motion (WIM) & Wheel Impact Load Detector (WILD) Generic Product Catalog Table of Contents Introduction 4 Main Features 4 Application fields 4 System Overview 5 Typical installation
More informationRequest for Proposal Fleet Maintenance Services
Request for Proposal Fleet Maintenance Services Request for Proposals The Southeastern Virginia Areawide Model Program t/a Senior Services of Southeastern Virginia (SSSEVA) is requesting proposals for
More informationAuto Electrical Units (AE01-V31 to AE06MC-V39)
Auto Electrical Units (AE01-V31 to AE06MC-V39) INDEX Version (AE01-V31) Locate and correct simple electrical faults 1.1 (AE01ME-V32) Locate and correct electrical faults 1.1 (AE02-V33) Enhance vehicle
More informationLIGHT CONTROLLER LC 500
LIGHT CONTROLLER LC 500 Manual and User Guide Please read this manual before operating this product PSI, spol. s r. o., Drásov 470, 664 24 Drásov, Czech Republic FAX: +420 511 440 901, TEL: +420 511 440
More informationNEVADA DEPARTMENT OF TRANSPORTATION (NDOT) VEHICLE PREVENTIVE MAINTENANCE PLAN
INTRODUCTION NEVADA DEPARTMENT OF TRANSPORTATION (NDOT) VEHICLE PREVENTIVE MAINTENANCE PLAN Public transit vehicle assets represent a significant investment of public funds. It is the goal of the Federal
More informationRULE 206 MOBILE AND TRANSPORTATION SOURCE EMISSION REDUCTION CREDITS Adopted (Amended ) INDEX
RULE 206 MOBILE AND TRANSPORTATION SOURCE EMISSION REDUCTION CREDITS Adopted 12-15-92 (Amended 12-05-96) 100 GENERAL 101 PURPOSE 102 APPLICABILITY 103 SEVERABILITY INDEX 200 DEFINITIONS 201 ACTUAL EMISSION
More informationMega Macs 42. Hella HIGH-END, POWERFUL DIAGNOSTICS DELIVERED IN A SIMPLE TO USE AND EFFECTIVE WAY. autoclimate
Hella Mega Macs 42 HIGH-END, POWERFUL DIAGNOSTICS DELIVERED IN A SIMPLE TO USE AND EFFECTIVE WAY TM autoclimate Diagnostics a good working practice for the modern accident repair centre Why Should an Accident
More informationCalifornia Department of Transportation Division of Rail Rail Equipment Branch Technical Specification For Food Service Chiller Units
California Department of Transportation Division of Rail Technical Specification For Food Service Chiller Units Specification 14-107 Revision B.1 April 27, 2009 Table of Contents 1.0 Overview...3 2.0 Regulations,
More informationPRIIA Section 305 Executive Committee 10/20/2010. Version 3
Requirements Document Diesel Locomotive Version 3 Introduction The Next-Generation Equipment Committee (NGEC) was established under the provisions of section 305 of the Passenger Rail Investment and Improvement
More informationSECTION MATERIAL AND EQUIPMENT
SECTION 01600 MATERIAL AND EQUIPMENT PART 1 GENERAL 1.01 DESCRIPTION A. Work of this section includes: 1. Products 2. Transportation and handling 3. Storage and protection 4. Repairs and Replacements 5.
More informationFACILITY AND EQUIPMENT MAINTENANCE POLICY. July 2014
FACILITY AND EQUIPMENT MAINTENANCE POLICY July 2014 South Dakota Department of Transportation Office of Air, Rail, and Transit 700 East Broadway Ave. Pierre, SD 57501 605-773-3574 Jeffrey Rutz 605-773-8082
More informationShur-Shot X-Proof Hydrogen Fluoride Alarm Operations Manual
Shur-Shot X-Proof Hydrogen Fluoride Alarm Operations Manual P/N 1000006053 Rev E $7%$QDO\WLFV// //& 733 Dairy Rd. Parkton, Md. 21120 www.atbanalytics.com (410) 733-6365 Table of Contents Chapter 1: Getting
More informationCITY OF MOBILE. Purchasing Department and Package Delivery: Government Plaza 4th Floor, Room S Government St Mobile, Alabama 36644
Typed by: Mailing Address: P. 0. Box 1948 Mobile, Alabama 36633 (251) 208-7434 run Buyer: CITY OF MOBILE Purchasing Department and Package Delivery: Government Plaza 4th Floor, Room S-408 205 Government
More informationSECTION FIELD PANELS
Stanford University Facilities Design Guidelines SECTION 25 14 23 FIELD PANELS PART 1 - GENERAL 1.1 SUMMARY A. This section includes control panel and enclosure requirements for building control systems.
More informationTECHNICAL MANUAL UNIT, DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE INSTRUCTIONS
TECHNICAL MANUAL UNIT, DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE INSTRUCTIONS TABLE OF CONTENTS GENERAL INFORMATION PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS) TROUBLESHOOTING (UNIT) TROUBLESHOOTING
More informationFor all residual and excess material returned to NNS, the following information shall be annotated on a packing slip:
Coded Note Number: M6040 Revision Level: C003 Date: June 28, 2017 Title: GOVERNMENT OWNED SHIPOUT PROPERTY This revision history is provided for convenience and does not alleviate the supplier s responsibility
More informationModel FD 115 Drying and heating chambers Avantgarde.Line with forced convection
Model FD 115 Drying and heating chambers Avantgarde.Line with forced convection A BINDER FD series Avantgarde.Line heating oven is always used when fast drying and sterilization is required. Thanks to
More informationCapital Projects Group Air Terminal Units Specification
Capital Projects Group Air Terminal Units Specification Specification 23 36 00 Revision 0 Date: August 2018 Air Terminal Units Specification Specification 23 36 00 Publication Date: August 2018 COPYRIGHT
More informationKENYA ELECTRICITY GENERATING COMPANY LIMITED KGN-SBP ADDENDUM No 3
KENYA ELECTRICITY GENERATING COMPANY LIMITED KGN-SBP-06-2018 ADDENDUM No 3 TECHNICAL SPECIFICATIONS SCHEDULE 1: SOLAR CARPORT GRID TIE SYSTEM 1.0 REINFORCEMENT The proposed solar carport structure already
More informationJoystick Adapter Cable Omni Easy Rider
User & Installation Manual EN Joystick Adapter Cable Omni Easy Rider M002-90 Contact & Product mo-vis BVBA Biebuyckstraat 15 D 9850 Nevele - Belgium Website: www.mo-vis.com E-mail: contact@mo-vis.com Telephone:
More informationApprenticeship Training Standard. Automotive Painter. Trade Code: 410N. Development Date: 2002
Apprenticeship Training Standard Automotive Painter Trade Code: 410N Development Date: 2002 This document is the property of the apprentice named inside and represents the official record of his/her training.
More informationThe due date for submission of proposals has been rescheduled to Thursday, August 3, 2017 by the close of business (4:30 P.M.).
July 18, 2017 Dear Sir/Madam: Enclosed please find Minutes of the Pre-Proposal Meeting, Questions and Answers and Addendum No. 2 to SEPTA s RFP No. 16-00299-ACAC BIV HVAC System Upgrade. Addendum No. 2
More informationMaximizing Repair Profits in the BHPH market. Lee Fitts Kris DeWolfe
Maximizing Repair Profits in the BHPH market Lee Fitts Kris DeWolfe BHPH Competition Sell more cars to maintain profits Increased acquisition costs Increased repair costs Decrease in average vehicle sale
More informationGuidelines for Transloading Polymeric Methylene Diphenyl Diisocyanate (pmdi)
Guidelines for Transloading Polymeric Methylene Diphenyl Diisocyanate (pmdi) Table of Contents AX-409 July 2015 Introduction... 1 Facility Considerations... 2 Facility Management Considerations... 2 Security
More informationAdjustable Fused Power Supply
User & Installation Manual EN Adjustable Fused Power Supply 7-20V 3A P010-52 Contact & Product mo-vis BVBA Biebuyckstraat 15 D 9850 Nevele - Belgium Website: www.mo-vis.com E-mail: contact@mo-vis.com Telephone:
More informationDesign, Fabrication, Supply, Installation & Commissioning of Scissor Lift for ITMT Building at. CREST, Hosakote. Indian Institute of Astrophysics
Design, Fabrication, Supply, Installation & Commissioning of Scissor Lift for ITMT Building at CREST, Hosakote Indian Institute of Astrophysics Bangalore October 2017 1. Introduction The required scissor
More informationSpecifications For Consolidated Fleet Vehicle Maintenance and Repair Services RFx #7107
Specifications For Consolidated Fleet Vehicle Maintenance and Repair Services RFx #7107 State of Tennessee Department of General Services, Central Procurement Office Table of Contents Section One: General
More informationTechnical Services. Laerdal Services. Consulting. Education. Support.
Technical Services Laerdal Services Consulting Education Support www.laerdal.com Index Product Installation...4 Preventive Maintenance...7 Extended Warranty Coverage Plan...11 Laerdal Technical Services
More informationReplace This With Cover PDF
Replace This With Cover PDF Read this entire manual before operation begins. Record below the following information which is located on the serial number data plate. Serial No. Model No. Date of Installation
More informationTransportation, Distribution & Logistics Skill Standards Checklist
Engine/ ofworkforcedevelopment DivisionofEmploymentandTraining Student Name YA Coordinator School District Transportation, Distribution & Logistics Skill Standards Checklist Certification Areas Completed:
More informationGlobal Water globalw.com. Global Water. Instrumentation, Inc.
Global Water Instrumentation, Inc. 151 Graham Road P.O. Box 9010 College Station, TX 77842-9010 Telephone : 800-876-1172 International : (979) 690-5560, Fax : (979) 690-0440 e-mail : globalw@globalw.com
More informationDelivering Opportunity
Delivering Opportunity How Electric Buses and Trucks Can Create Jobs and Improve Public Health in California www.ucsusa.org/electrictrucks www.greenlining.org/issues/2016/delivering-opportunityelectric-trucks
More information1. Overview, Type of Maintenance
1. Overview, Type of Maintenance Breakdown Maintenance: Waiting until equipment fails before repairing or servicing it Preventive Maintenance (PM): (Time-based or run-based) Periodically inspecting, servicing,
More informationWindham School District. Schools Within the Texas Department of Criminal Justice
Windham School District Schools Within the Texas Department of Criminal Justice The Automotive Fundamentals course includes power and hand tools, safety, vehicle maintenance, fasteners/gaskets/seals and
More informationUK After Sales Information. Scarab Sweepers Ltd expertise in maintenance and repair solutions for environmental cleaning equipment
UK After Sales Information Scarab Sweepers Ltd expertise in maintenance and repair solutions for environmental cleaning equipment Dear customer, We would like to thank you for purchasing a Scarab product.
More informationCONSTRUCTION SPECIFICATION FOR INSTALLATION OF POWER SUPPLY EQUIPMENT
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 614 NOVEMBER 2012 CONSTRUCTION SPECIFICATION FOR INSTALLATION OF POWER SUPPLY EQUIPMENT TABLE OF CONTENTS 614.01 SCOPE 614.02 REFERENCES 614.03 DEFINITIONS
More informationRL SERIES. Two Stage Light Oil Burners FIRING RATES LIGHT OIL
The RL series of burners covers a firing range from 154 to 2700 kw, and it has been designed for use in low or medium temperature hot water boilers, hot air or steam boilers, diathermic oil boilers. Operation
More informationAutomotive and Related Technology. Full Time
Full Time Job Title: Automotive Technician Job Number: 3846 Approximate Location: Irvine, CA Skills High school diploma or equivalent. Capable of meeting the requirements for attaining ASE Certification.
More information8. Recommended Practice for Rail Transit Vehicle Pre-Departure Inspection
8. Recommended Practice for Rail Transit Vehicle Pre-Departure Inspection Approved October 21, 2002 APTA Rail Transit Standards Vehicle Inspection and Maintenance Committee Approved May 23, 2003 APTA Rail
More informationTRANSPORTATION AND TRAFFIC MANAGEMENT PLAN
APPENDIX E TRANSPORTATION AND TRAFFIC MANAGEMENT PLAN FOR THE PROPOSED CONSTRUCTION OF AN ADDITIONAL BIDVEST TANK TERMINAL (BTT) RAIL LINE AT SOUTH DUNES, WITHIN THE PORT OF RICHARDS BAY, KWAZULU-NATAL
More informationInformation Technology Supervisor Class Specification
Information Technology Supervisor Class Specification FLSA Designation: Non-Exempt Effective: 03/2004 Revised: 06/2007 DEFINITION Under general direction, to plan, direct, manage, and oversee the activities
More informationDRAWING NUMBER REVISION TITLE PAGE G Identification and Traceability 1 of 11
90-2000-7.5.3 G Identification and Traceability 1 of 11 WRITTEN BY: DATE: APPROVED BY: DATE: J. Caruso J. Porter PRODUCT RESOURCES NEWBURYPORT, MA USA NOTICE: THIS DOCUMENT IS PROPRIETARY AND ITS CONTENTS
More informationBuilder Guidelines on Using Residential Temporary Heat (Construction and Finishing)
Builder Guidelines on Using Residential Temporary Heat ( and ) In this document you ll find what you need to know about: Using natural gas for residential temporary heat (construction), including: preparing
More informationForm 9: Infection Control Preventive Measures Level 4
Form 9: Infection Control This form is filled out by the construction planning team or designated person(s) to identify the required preventive measures for the activity described in Form 1 Infection Control
More informationPERISTALTIC PUMPS FOR USE IN THE FIELD
The peristaltic pumps presented here, are very reliable sampling apparatus for fluids and gasses, for application in very diverse field circumstances. Specifically where it concerns research for groundwater,
More informationMULTIBRAND DIAGNOSTICS INTELLIGENT DIAGNOSTICS.
MULTIBRAND DIAGNOSTICS INTELLIGENT DIAGNOSTICS www.jaltest.com CONTENTS Introduction What is Jaltest? Who is it for? Diagnostic Functions Diagnostic Errors Outstanding Functions Jaltest Expert Additional
More informationFACILITIES MAINTENANCE WORKER
FACILITIES MAINTENANCE WORKER Summary Statement: Under supervision, is responsible for performing routine building maintenance tasks and assisting Building Maintenance Supervisor with the performance of
More informationChecklist for testing electronic digital indicators with simulated pulses 2/6/08
Appendix E Checklist for Testing Electronic Digital Indicators with Simulated Pulses This checklist is used for Technical Policy U. Evaluating electronic digital indicators submitted separate from a measuring
More informationCertificate of Acceptance
Abtus Switch Wear Gauge Product Description Product Image Scope of Acceptance Full Acceptance Accepted for use in third/fourth rail areas and all other track infrastructure areas Network Rail Acceptance
More informationIntroduction to Automotive Technology
Introduction to Automotive Technology Course Design 2005-2006 Course Information Organization Eastern Arizona College Division ITE Course Number AUT 101 Title Introduction to Automotive Technology Credits
More information10810 W. LITTLE YORK RD. #130 - HOUSTON, TX VOICE (713) FAX (713) web: IMPORTANT!!!
10810 W. LITTLE YORK RD. #130 - HOUSTON, TX 77041-4051 VOICE (713) 973-6905 - FAX (713) 973-9352 web: www.twrlighting.com IMPORTANT!!! PLEASE TAKE THE TIME TO FILL OUT THIS FORM COMPLETELY. FILE IT IN
More informationBharat Heavy Electricals Limited (High Pressure Boiler Plant) Tiruchirappalli , TAMIL NADU, INDIA CAPITAL EQUIPMENT / MATERIALS MANAGEMENT
An ISO 9001 Company Bharat Heavy Electricals Limited (High Pressure Boiler Plant) Tiruchirappalli 620014, TAMIL NADU, INDIA CAPITAL EQUIPMENT / MATERIALS MANAGEMENT ENQUIRY NOTICE INVITING TENDER Phone:
More informationChapter 130. Texas Essential Knowledge and Skills for Career and Technical Education. Subchapter P. Transportation, Distribution, and Logistics
Transportation, Distribution, and Logistics 130.P. Chapter 130. Texas Essential Knowledge and Skills for Career and Technical Education Subchapter P. Transportation, Distribution, and Logistics Statutory
More informationAV Handover Arrangements - Supplement to FMG 42 Management and Operational Procedures
AV Handover Arrangements - Supplement to FMG 42 Management and Operational Procedures ISS Digital Technologies Unit Issue No: 1.1 Issue Date: 01 Aug 2012 Document Prepared By: Phil Morgan ISS Digital Technologies
More informationInspection Report. Prepared for: Gil Turiel. Property Address: 545 Briar Run Court Loganville, GA Date: July 17, 2011
Inspection Report Prepared for: Gil Turiel Property Address: Loganville, GA 30052 Date: July 17, 2011 Inspector: Charles Mann (770) 594-2222 www.edificeinspections.com Page 1 INSPECTION CONDITIONS CLIENT
More informationModel FDL 115 Safety drying chambers for limited quantities of solvent
Model FDL 115 Safety drying chambers for limited quantities of solvent The BINDER FDL 115 with silicone and dust-free inner chamber, as well as symmetric airflow dries specimens containing solvents and
More informationArchitect s Project Number of 5 Decentralized HVAC Equipment District Master Specs 2013 Edition
PART 1 GENERAL 1.1 RELATED DOCUMENTS SECTION 23 81 00 DECENTRALIZED HVAC EQUIPMENT A. The other Contract Documents complement the requirements of this section. The General requirements apply to the work
More informationSECTION LOW-VOLTAGE TRANSFORMERS
PART 1 GENERAL 1.1 DESCRIPTION SECTION 26 22 00 SPEC WRITER NOTE: Use this section only for NCA projects. Delete between // // if not applicable to project. Also, delete any other item or paragraph not
More informationTroubleshooting Guide 9702 Series
Troubleshooting Guide 9702 Series Satellite Solutions for Mobile Markets 11200 Hampshire Avenue South, Bloomington, MN 55438-2453 Phone: (800) 982-9920 Fax: (952) 922-8424 www.kingcontrols.com 1305-AUTO
More informationSECTION A. Manufacturer's data sheets on each product to be used, including:
Page 1 of 7 SECTION 084239 PRESSURE-RESISTANT ENTRANCES **Note to Specifier** This specification contains component and configuration options. Where indicated choose the appropriate choice for your specific
More informationMEET YOUR ENGINE S LIFELINE. OFFSHORE DRILLING BUNDLED REPAIR SOLUTION 3516 Engine Overhaul
MEET YOUR S LIFELINE. OFFSHORE DRILLING BUNDLED REPAIR SOLUTION 3516 Engine Overhaul BUNDLED REPAIR SOLUTIONS Our bundled repair solutions are built on expertise, built for critical applications and with
More informationAir Conditioning. Overview
Air Conditioning Overview Issue 1.1 18-12-2013 ATA Air Conditioning What is ATA? ATA is recognition of the current competence of professionals working in the Retail Motor Industry and their commitment
More informationTurn Your Parts Department into a Profit Center
Turn Your Parts Department into a Profit Center Presented by: Rod Davis Dealers Deserve a Return on Investment Course Objectives Pricing Strategies for Increased Profit Margins Customer Driven Processes
More informationIFE RAILSERVICES RAIL VEHICLE SYSTEMS RAILSERVICES FOR ENTRANCE SYSTEMS
IFE SERVICES SERVICES FOR ENTRANCE SERVICES FOR ENTRANCE SERVICES FOR DEMANDING CUSTOMERS SERVICES FOR ENTRANCE IFE SERVICES OFFER A COMPLETE SERVICE PORTFOLIO including operating and maintenance services,
More informationRecommend to Board. Final Action
MOTION NO. M2018-03 Contract for Sounder Commuter Rail Operations Consulting Services MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Operations and Administration Committee Board 1/4/2018 1/25/2018 Recommend
More informationSECTION STAINLESS STEEL WALL PANELS
SECTION 07400 PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Dry joint, Rainscreen stainless steel wall panel system. 2. Accessories including attachments, clips, sub girts, shims, and fasteners 3.
More informationUniversity of Delaware
SECTION 22 05 00_COMMON WORK FOR PLUMBING SYSTEM University Contact: Energy & Engineering Group (302) 831-1744 Part 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Start up 2. Factory Training 3. Quality
More informationBuilding Operator 5th Class Level 2
Building Operator 5th Class Level 2 Comp. # Competency Type Competency Statement Competency Details 43663 Safety Provide evidence of WHMIS Certification 43670 Safety Discuss the need for company policies
More informationFPU SYSTEMS OPERATION MANUAL BOH OFFICE MODULE (INCLUDING REPAIR PARTS & SPECIAL TOOL LIST) BOH FPU Field Pack-up Units
FPU SYSTEMS OPERATION MANUAL BOH OFFICE MODULE (INCLUDING REPAIR PARTS & SPECIAL TOOL LIST) BOH FPU Field Pack-up Units OFFICE MODULE. BOH ENVIRONMENTAL LLC 14520 Avion Parkway, Suite 220 Chantilly, Va.
More informationCATHODIC PROTECTION SPECIFICATION
CATHODIC PROTECTION SPECIFICATION AUTOMATICALLY CONTROLLED IMPRESSED CURRENT CATHODIC PROTECTION SYSTEM w/vertical ANODE SYSTEM FOR THE INTERIOR OF STEEL WATER TANKS A. SCOPE The cathodic protection design/install
More informationProduct Support Publication Requirements
Product Support Publication Requirements Robin Alexander 06 December 2012 Purpose To discuss requirements set forth by Department of Defense, Department of the Army and Logistics Support Activity (LOGSA)
More informationOutdoor Elevator ODE-500
Planning Guide Outdoor Elevator ODE-500 This planning guide contains general information on the most popular and standard elevator configurations; and NOT all elevator configurations are shown. This guide
More informationAIRWORTHINESS ADVISORY CIRCULAR
AAC NO. 3 of 2000 Date: 3 rd February 2000 GOVERNMENT OF INDIA CIVIL AVIATION DEPARTMENT DIRECTOR GENERAL OF CIVIL AVIATION Subject: GOOD MAINTENANCE PRACTICE AIRWORTHINESS ADVISORY CIRCULAR International
More informationInstalling Solar Water and Pool Heating Systems Objectives and Task Analysis for Solar Water and Pool Heating Systems Installation Contractor
North American Board of Certified Energy Practitioners Technical Committee Document Approved April 11, 2005 Installing Solar Water and Pool Heating Systems Objectives and Task Analysis for Solar Water
More informationEnergy metering is required to comply with the requirements of the Building Regulations.
Sub-Metering Aesthetic Energy metering is required to comply with the requirements of the Building Regulations. All energy usage for water, heat, chilled water, steam, compressed air, electricity and gas
More informationMechatronics Courses by School Period
Mechatronics Courses by School Period Year One P1 P1 P2 P3 P3 P3 P4 P4 P4 Integrated Systems Industrial Math (Geometry, Trig, Algebra,) Blueprint Reading Machine Tool I (Hand tools-measuring-saws & Drill
More informationOperational Policy. Policy Title: Applies to: Reference # Approved by: Dates: Total # of Pages Effective: Dec 13, 2011 Fleet Governance Committee
Operational Policy Policy Title: Applies to: Reference # Fleet Maintenance Policy All City Vehicles 402-FLT-11 Approved by: Dates: Total # of Pages Effective: Dec 13, 2011 Fleet Governance Committee Last
More informationQ45WQ. Water Quality Monitoring System. 6 Iron Bridge Drive Unit 1 & 2 Gatehead Business Park
Q45WQ Water Quality Monitoring System Home Office European Office Analytical Technology, Inc. ATI (UK) Limited 6 Iron Bridge Drive Unit 1 & 2 Gatehead Business Park Collegeville, PA 19426 Delph New Road,
More informationAirBench EX Operation and Maintenance
AIRBENCH LTD AirBench EX Operation and Maintenance This Edition: 10 February 2016 AirBench Ltd, 14 Grange Farm Road, Colchester CO2 8JW www.airbench.com +44 (0) 1206 791191 Copyright AirBench Ltd 2016
More information