1 Page 1/8 Project Title: CSU Brewery Automation Date: 9/16/2016 Team Members: Mechanical Engineers Julia Tucker and Andrew Ross Chemical and Biological Engineers Briana Chamberlain and Keaton Sloan Computer Engineer Dustin Tauxe Independent Study Electrical Engineer: Nicolas Wells Supervising Professors: Anthony Maciejewski Department Head, Electrical and Computer Engineering Olivera Notaros Senior Design Head Industry Sponsor: Dan Malyszko Director of Operations at Malisko Engineering : Jeffrey Callaway Associate Director of Fermentation Science and Technology Project Summary: The Colorado State University Fermentation Science and Technology Department, along with Malisko Engineering, seeks to utilize a team of undergraduate engineering students to design and commission the department s brewing operations in the Lory Student Center and the Gifford Building. The initial focus of the project will be on the Gifford Building to help the College of Health and Human Sciences in implementing a hands on learning tool for the Fermentation Science and Technology (FST) program. The CSU Brewery Automation team will be working with Malisko Engineering to create a fully automated brewery to replace the current brewing set up. The team will also be working with the FST program to optimize the brewing process and to create a new class about starting up a brewery. Due to the varying of tasks that this project, the team will be a multi-disciplinary team comprised of two Mechanical engineering students, two Chemical & Biological engineering students, a Computer engineering student, and two Independent Study students from the Electrical engineering department. Project Importance: The Brewing Automation Project is a unique way to contribute to the advancement of Colorado State University, particularly in the Fermentation Science and Technology Department (FST). Upon completion of the project, students enrolled in the FST program will have access to a new, state of the art brewing system which will allow for increased degree development through experiential learning. Project importance also reaches beyond the FST program to community and industry partners. Upon completion, the system is to be utilized as a test and pilot brewery for industry partners as well as a testing ground for new equipment or processes. This project is also valuable to the CSU Brewery Automation Senior Design Team because it will provide large scale, team focused, engineering experience to the student members. Revision History: Revision Comments Date By New 9/16/2016 Julia Tucker
2 Page 2/8 1. Problem Statement a) The Colorado State University Fermentation Science and Technology Department (hereafter referred to as FST or the department ), along with Malisko Engineering (hereafter referred to as Malisko ), seeks to utilize a team of undergraduate engineering students (hereafter referred to as the team ) to design--with the possibility of commissioning--the department s brewing operations in the Gifford Building. i) The Gifford Building Brewery (the Gifford Brewery ) will need to be designed and specified according to Malisko and FST requirements for the purpose of serving as an academic or otherwise research facility. 2) Objectives a) With regards to this, the team will at the close of the project provide FST with: 1. appropriate plant documentation, 2. functional code, and 3. a working brewery. i) Appropriate documentation includes: (1) and Instrumentation Diagrams (P&ID) (2) Functional Design Specifications (FDS) (3) Standard Operating Procedure Documents (SOP) (4) Electrical Drawings and I/O Configuration Information (a) This includes both drawings generated by the team, and cabinet design work developed in relation with Malisko. (5) Network Topology Drawings (6) Architectural Diagrams (7) (optional) Plant Efficiency Evaluations (8) Any other pertinent documentation which may arise over the course of this project ii) Specifications for operational code include: (1) Individual unit operations fully composed in Allen-Bradley RSLogix5000 (2) Debugged to the fullest extent of the team s capabilities (3) Functional in a manner sufficient to operate the brewery s processes and clean-in-place (CIP) procedures when started manually by an operator iii) A working brewery will be one that adheres to the following requirements: (1) All equipment is operational, tested, and working to specification (a) Equipment includes vessels, motors, instrumentation (analog and digital), valves, electrical cabinets, etc. (2) Equipment will be responsive to PLC/SCADA-originated commands (3) (optional) A minimum of one (1) full-strength brew successfully brewed, fermented, and packaged to specification. (4) (optional) Fully and wholly automated 3) Final Design Information a) The conclusion of this project should see the establishment of, and successful brewing in, the Gifford Brewery and the successful completion of all agreed-upon deliverables at budget, to specification, and on time. i) Agreed upon deliverables includes: (1) All expectations set forth in this charter (2) The Gifford Brewery as currently defined: (a) One (1) Malt Crusher and one (1) Flex Auger (b) One (1) Grist Hopper and one (1) Flex Auger (c) One (1) Cereal Cooker
3 Page 3/8 (d) One (1) Mash Tun (e) One (1) Lauter Tun and one (1) Rake Assembly (f) One (1) Wort Holding Vessel (g) One (1) Wort Kettle (h) One (1) Whirlpool (i) One (1) Trub Tank 4) Design and Implementation Constraints a) Design constraints are relevant issues that the team is aware of, that may or currently do pose a constraint on free design and implementation of the brewery. These constraints include--but are not limited to--customer specifications, contractor specifications, and spatial constraint. i) Foreseeable constraints on design of the Gifford Brewery include the following: (1) Spatial Limitations (a) Relative equipment size to current process equipment and location (b) Overhead building space availability (limited by the piping network) (c) Multiple contractors estimating space utilization (i) Coordination of contractor work estimates (ii) Reality of what contractors install given space constraints and limitations (d) Maintenance feasibility constraints (i) Measurement/Control equipment access ease and availability after installation (2) Security/Access (a) Team having necessary access to FST lab in Gifford (b) Contractor coordination with Malisko (e.g. location access, installation scheduling) (3) Financial Constraints (a) The given budget from Malisko and FST program (i) What this budget allows for equipment purchasing/contractor services (ii) Coordination of financial obligation between parties (b) Utilizing Malisko and outside companies to draft P&IDs and process flow diagrams (c) Equipment/Controls order processing downtime based on finance (4) Equipment Capacity (a) Accurate and judicious equipment specifications based on system capacity (b) Matching equipment operating specifications with coexistent equipment (5) Time Constraints (a) Contractor scheduling (b) Task and deliverable timeline (i) Also include time it takes contractors to complete tasks (can fluctuate based on circumstances) 5) Estimated Budget a) Project budget will include costs involved with supplying team with necessary stationery and logistic/organizational equipment, mechanical and electrical equipment for physical installation and commissioning, and any necessary personal protective equipment (PPE). Budget may also include third party drafting fees/engineering hours. i) Categories of budget can be seen in listed points. These points are areas of consideration to be included in the project budget. NOTE : Estimated monetary values shall be assigned as beginning phases of the project begin to take form. (1) Necessary equipment (a) Stationery supplies (i) Binders, paper, pens/pencils, paper (Arch E, 11 x 17 ),
4 Page 4/8 (ii) Plotter paper/ink (b) Personal Protective Equipment (PPE) (i) Safety glasses (ii) Ear protection (iii) Electrical grounding gloves/footwear (c) Tooling (i) Multi-meters (ii) Analog transmitter calibration devices (iii) Electrical extension equipment (iv) Temporary workspace equipment (portable tables, chairs, carts) (2) Potential Required Services (a) Drafting Services (i) Hourly Drafting Fees from third party drafting firm or Malisko (ii) Malisko consultation fees 6) Risk Analysis a) To the best ability and foresight of the team, the following are points noted as pertinent to account for as they may impact project completion or installation goals and/or timeline. Appropriate FMEA tables are attached below. i) Points of note include: individual equipment functionality, shipment times, equipment installation scheduling delays, process functionality, and software. Each is listed with a foreseeable potential problem, followed by If-so action. (1) Equipment Functionality (a) Equipment Malfunction (instrumentation, motors, transmitters, pumps, etc) (i) Diagnose and repair in house with team (ii) Diagnose with supplier and necessary supplier engineering support (iii) Diagnose with Malisko engineering team. (b) Support System Infrastructure Malfunction (Steam, Water, etc.) (i) Diagnose and repair in house with team (ii) Diagnose and repair with CSU facilities maintenance or appropriate contractor (2) Scheduling Delays (Downtime) (a) Downtime due to shipment (i) Move team to non critical path assignments (b) Downtime due to contractor estimation (i) Work continuously on other equipment commissioning (ii) Move team to any other non-critical path assignments (3) Software (a) Software Malfunction, Coding Issues (i) Work with team and CSU programming services to run diagnostics (ii) Work alongside Malisko team to diagnose/overcome any encountered problems
5 Page 5/8 Step Which Step in the Installatio n Testing Design Mode Effects Analysis: Potential Mode Ways in which it goes wrong. Downtime while waiting for parts Equipment Automation Control Incorrect Instrumenta tion Potential Effect How the failure impacts the Installatio n delays testing process Delays ability to brew on finished system Lack of Control Cannot Brew with standalone system (requires additions) SEV Severity to the customer Potential Causes Probable Causes of the failure Lack of Understandin g about correct equipment Order delay Delay from Supplier in production. Incorrect equipment, incorrect installation, incorrect automation control method Incorrect Virtual Set up System communicatio n failure Lack of understanding customer requirements Missed necessary requirement OCC Estimated Occurrenc e of failure DET Detection Probability Current Controls Current preventative measures against failures Equipment Double checks w/ approval before ordering Installation by contractors Installation checkouts w/ team and customer Approval of Virtual Setup. Batch Breakdown testing Approval of P&ID and instrumentatio n list RPN Severity x Occurrenc e x Detection Recommende d Action Recommende d action for team Communicate problem w/. Quickly contact supplier. Trouble Shoot to root cause Contact Equipment supplier for technical support Work w/ Malisko for virtual setup assistance Acquire needed equipment as soon as possible Project Timeline: See charts below.
6 Project Charter Page 6/8
CSU Brewery Design & Automation
COLLEGE OF HEALTH & HUMAN SCIENCES CSU Brewery Design & Automation CSU Brewery Design & Automation ECE 401: Mid-Project Presentation Introductions Multidisciplinary Team CBE ME Briana Chamberlain Keaton
More informationCSU BREWERY DESIGN AND AUTOMATION. Fall Semester Presentation December 6th, 2017
CSU BREWERY DESIGN AND AUTOMATION Fall Semester Presentation December 6th, 2017 WHO WE ARE A vertically integrated project spanning several years, with the intention of designing, implementing and automating
More informationPerformance Challenges Business Impact Areas Improvement Opportunities. Increased Production Costs. Brand Repeatability. Reduced Plant Availability
FOOD & BEVERAGE BREWERY Application Solutions Guide THE CHALLENGE In today s highly competitive brewery industry there is a need to strive continually to improve production efficiency. Feedback from a
More informationProcess Instrumentation
Process Instrumentation Precise process monitoring for hygienic environments Brewery siemens.com/sensors/industries 2 Reliability and product safety in hygienic environments Siemens is your partner for
More informationTrouble-Shooting Asphalt Content Problems
Trouble-Shooting Asphalt Content Problems Page 1 of 6 Trouble-Shooting Asphalt Content Problems Asphalt content is controlled differently in a drum-mix type plant and a batch type plant. Therefore, trouble-shooting
More informationWhite paper. Author: Michael Green managing director at integrated packaging and processing solutions provider tna
White paper Project management, controls & integration, training: three ways to get the most out of your turnkey solutions provider Author: Michael Green managing director at integrated packaging and processing
More informationProcess Risk through Application of FMEA. A Case Study. INTERPHEX March 17, 2009
Managing Process Risk through Application of FMEA to Batch Records A Case Study INTERPHEX March 17, 2009 Jon Hardy Lonza Head of Operations Hopkinton, MA Fred Greulich Maxiom Consulting Group, Inc. Director
More informationCity of San Mateo Clean Water Program Programmable Logic Controller (PLC) and Human Machine Interface (HMI) Programming Services
ATTACHMENT A SAMPLE SCOPE OF SERVICES PLC & HMI PROGRAMMING City of San Mateo Clean Water Program Programmable Logic Controller (PLC) and Human Machine Interface (HMI) Programming Services December, 2017
More informationProcess Line Control Solutions. Rockwell Automation Drive Systems
Process Line Control Solutions Rockwell Automation Drive Systems Global Technical Services No matter where in the world you need technical, service and parts support, you can count on the Rockwell Automation
More informationBest Project Competition
Best Project Competition 2007-2009 Automatic Control System of an ash removal pilot unit in Eesti Power Plant EKTACO AS Akadeemia tee 21E 12618 Tallinn, ESTONIA Phone +372 654 2150 ektaco@ektaco.ee www.ektaco.ee
More informationAdvanced Automation Lowers Labor Cost and Improves Performance at the Las Palmas, California Wastewater Treatment Plant
Advanced Automation Lowers Labor Cost and Improves Performance at the Las Palmas, California Wastewater Treatment Plant By Nate Ventress, Process Automation Specialist, Western Region, Festo The Salinas
More informationTABLE OF CONTENTS II. MISSION VISION & OBJECTIVES... 4 III. SERVICES ) INDUSTRIAL AUTOMATION SOLUTIONS... 5 I.
COMPANY PROFILE TABLE OF CONTENTS... 2... 3 II. MISSION VISION & OBJECTIVES... 4 III. SERVICES... 5 1) INDUSTRIAL AUTOMATION SOLUTIONS... 5 A) TURNKEY PLC/SCADA SOLUTIONS... 5 B) FIELD SERVICES... 6 C)
More informationProject Status Update. P09701 Corning Tropel LightGage Metrology System
Project Status Update P09701 Corning Tropel LightGage Metrology System Matthew Bradley (ME) Images Courtesy of Corning Tropel Project Status Update Project Name Corning Tropel LightGage Metrology System
More informationProduction Part Approval Process Supplier Information. - Version 1.0
Supplier Information Quality@Suppliers - Version 1.0 Navigation What s PPAP? meaning Benefits & Targets What does it mean for you as the supplier? origin past today PPAP PPAP Content PPAP Timeline Additional
More informationCorn Analysis Modeling and Control
Corn Analysis Modeling and Control For Ethanol Yield Optimization Standards Certification Education & Training Publishing Conferences & Exhibits Presenter Greg is a retired Senior Fellow from Solutia/Monsanto
More informationSix Sigma Project - KPI Process Improvement Project Kickoff Meeting. Maximizing and Advancing Performance ( MAAP) Office May 21, 2015 May 22, 2015
Six Sigma Project - KPI Process Improvement Project Kickoff Meeting Maximizing and Advancing Performance ( MAAP) Office May 21, 2015 May 22, 2015 About Six Sigma Lean/Six Sigma Set of techniques and tools
More informationFACTS ABOUT EQUIPMENT LEASE-FINANCING
FACTS ABOUT EQUIPMENT LEASE-FINANCING 1. Purchasing Power. Equipment lease financing allows the lessee to acquire more and/or higher-end equipment. 2. Balance Sheet Management. Certain types of leases
More informationBioBundle Systems COMPLETE FERMENTATION SYSTEMS FOR MICROBIAL AND CELL CULTURE APPLICATIONS
Systems COMPLETE FERMENTATION SYSTEMS FOR MICROBIAL AND CELL CULTURE APPLICATIONS COMPLETE A U T OFERMENTATION C L A V A B L E SSYSTEMS Y S T E M SFOR MICROBIAL AND CELL CULTURE APPLICATIONS Laboratory
More informationSCHEDULE 20 SERVICE DOCUMENTATION
Schedule 20: Service Documentation 1 Introduction 1.1 This Schedule sets out the types of documentation relating to the provision of the Services (whether originally developed by the Contractor or on its
More informationIMPROVE. Chapter 3-6 FMEA Institute of Industrial Engineers 3-6-1
Chapter 3-6 FMEA 3-6-1 FMEA Definition A procedure by which each potential failure mode in a system is analyzed to determine the results of effects thereof on the system and to classify each potential
More informationHAZARD COMMUNICATION PROGRAM
HAZARD COMMUNICATION PROGRAM January 8, 2016 2 Hazard Communication Plan Table of Contents 1.0 INTRODUCTION... 4 1.1 The Hazard Communication Standard (29 CFR 1910.1200)... 4 1.2 Scope and Application...
More informationOwner has determined that this project is a Major Capital Renovation project as that term is defined herein.
BUILDING INFORMATION MODELING REQUIREMENTS Owner has determined that this project is a Major Capital Renovation project as that term is defined herein. PART 1 GENERAL 1.1. RELATED DOCUMENTS 1.1.1. Attention
More informationThis under-utilized approach can enhance operations and the bottom line.
This under-utilized approach can enhance operations and the bottom line. By David Huffman, ABB Inc. Plants often overlook their automation system as a resource for improving overall equipment effectiveness
More informationIntegrated Pump Monitoring. The Smart Choice for Optimal System Performance
Integrated Pump Monitoring The Smart Choice for Optimal System Performance Integrated Pump Monitoring The Smart Choice for Optimal System Performance The integrity of your pumps is essential to the operation
More informationDocumenta tion and Records
Documenta tion and Records Page 1 of 30 Training Outcome of the Module: After completing this module, you will be able to: Recognize the importance of procedures Recognize the importance of record keeping
More informationHydraulic Modeling and System Optimization
DRINKING WATER ENERGY MANAGEMENT WORKSHOP SERIES TAKING ENERGY IMPROVEMENTS TO THE NEXT LEVEL: Hydraulic Modeling and System Optimization Steven Jones, M.S., P.E. September 4, 2013 What is a Water System
More informationBiotech Pharmaceutical Cosmeceutical Food. Modular System Design Valves, Pumps, Fittings Heat Exchangers
Biotech Pharmaceutical Cosmeceutical Food Modular System Design Valves, Pumps, Fittings Heat Exchangers CIP Systems Bio Waste Kill Systems Purification Systems Utility Process Modules Formulation Systems
More informationBREWERY PROJECTS REVIEW 28KM
www.lehui.com BREWERY PROJECTS REVIEW 2011 5 28KM Huangpu District Guang Zhou 315722 0574-6583 3333 0574-6583 6111 6583 6222 ntl@lehui.c om nbm@lehui.com http :/ / www.lehui.c om NINGBO LEHUI FOOD MACHINERY
More informationOffice of Human Resources. IT Systems Analyst Senior
Office of Human Resources IT Systems Analyst Senior General Statement of Duties Performs full performance level professional work analyzing, refining and documenting the business requirements of City department
More informationCOLORADO OIL & GAS CONSERVATION COMMISSION POLICY ON THE USE OF MODULAR LARGE VOLUME TANKS IN COLORADO. January 3, 2014
COLORADO OIL & GAS CONSERVATION COMMISSION POLICY ON THE USE OF MODULAR LARGE VOLUME TANKS IN COLORADO January 3, 2014 This policy was developed in response to the recent and increasing temporary use of
More informationBeVerage systems FooD & BeVerage
BEVERAGE SYSTEMS BMF-18 FOOD & BEVERAGE product brochure sustainable BEER Membrane FILTRATION The brewing industry has passed the sustainability point of no return. Having reached its maximum potential,
More informationPure Process Latinoamerica S.A. de C.V. Distribuidor Exclusivo.
AUTOMATIC AND FLEXIBLE TANGENTIAL FLOW FILTRATION SYSTEM 1 KRONOS is a standalone, benchtop, automatic Tangential Flow Filtration (TFF) system offering up to 0.5 m2 total filtration area. Utilizing state
More information201 S. Anaheim Blvd. Page No Anaheim, CA RULE NO. 16 SERVICE CONNECTIONS, METERS, AND CUSTOMERS FACILITIES
201 S. Anaheim Blvd. Page No. 3.16.1 A. GENERAL 1. When an Application for Service is made that requires only a small domestic Service (2 inch or smaller), the Utility shall furnish and install the Service
More informationMulti-Family Load Requirements Form
Multi-Family Load Requirements Form Date: Project Street Address Project/Business Name Property Legal Description: Lot: Block: Subdivision: Owner Information Email Site Engineer Information Email Electrical
More informationM800 Transmitter. Touch the Future of Multi-parameter Analytics. Multi-parameter Transmitter. Intuitive, Intelligent, Flexible
INGOLD Leading Process Analytics M800 Multi-parameter Transmitter Intuitive, Intelligent, Flexible M800 Multi-parameter / Multi-channel Transmitter Overview Details Documentation M800 Multi-parameter /
More informationCase study of the use of Simatic Batch at Ursus Breweries, Timisoara
NJ Walker Systems Automation and Management (SAM) Summary: A new control system based on PCS7 was to be implemented in a brewery in Timisoara, Romania. Due to the client s requirements Simatic Batch was
More informationProcess Optimisation of Brewery Plant with Biogas fired CHP/Trigeneration
Process Optimisation of Brewery Plant with Biogas fired CHP/Trigeneration Dawei Wu a, Barbara Sturm a, Stephan Hugenschmidt b, Anthony P. Roskilly a a Newcastle Institute for Research on Sustainability,
More informationTECHNOLOGY SUPPORT SPECIALIST (12264)( )
GENERAL DESCRIPTION OF WORK This is advanced work in providing consultation, support and/or training for technology-based systems. Employees may provide support of hardware, applications, operating systems,
More informationControl systems Modernizations and upgrades
Control systems Modernizations and upgrades www.lahtiprecision.com 1 Lahti Precision is a batch house solution provider YOUR PARTNER IN RAW MATERIALS TECHNOLOGIES For decades, companies all around the
More informationTouch the Future of Multi-parameter Analytics INGOLD THORNTON
INGOLD Leading Process Analytics Multi-parameter Transmitter THORNTON Leading Pure Water Analytics M800 Transmitter Intuitive Touchscreen Menus Intelligent Diagnostics Multi-parameter/Multi-channel Touch
More informationCHEESECAKE WATER DOSING AUTOMATION
Multi-Disciplinary Senior Design Conference Kate Gleason College of Engineering Rochester Institute of Technology Rochester, New York 14623 Project Number: P11712 CHEESECAKE WATER DOSING AUTOMATION Noah
More informationLEWA EcoPrime LPLC. With integrated buffer in-line dilution.
LEW EcoPrime LPLC With integrated buffer in-line dilution. LEW EcoPrime LPLC Complete solution LEW EcoPrime LPLC Complete solution 01 LEW EcoPrime LPLC. With integrated buffer in-line dilution option.
More informationHow To s and How Not To s for Data Integrity Governance Programs
How To s and How Not To s for Data Integrity Governance Programs A Case Study Cathlin Shapiro August 17, 2017 Data Integrity Governance Programs Covering all the Bases 2 Current Environment Risk Factors
More informationSECTION OPERATION AND MAINTENANCE DATA
SECTION 017823 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply
More informationInformation Technology Audit & Cyber Security
Information Technology Audit & Cyber Security Managing Information System Projects Systems & Infrastructure Lifecycle Management Introduction Definitions INTRODUCTION Governance Roles and Responsibilities
More informationTouch the Future of Multi-parameter Analytics INGOLD THORNTON
INGOLD Leading Process Analytics Multi-parameter Transmitter THORNTON Leading Pure Water Analytics M800 Transmitter Intuitive Touchscreen Menu Intelligent Diagnostics Multi-parameter/Multi-channel Touch
More informationMini-Plant Malt/Beer/Soda Production Plant LT-PPB-01. Production Process. Learn all the necessary to produce malt/beer/soda and then try your product.
LT-PPB-01 Production Process Learn all the necessary to produce malt/beer/soda and then try your product. General. This mini-plant is one of the first real processes. It was developed to provide training,
More information6 Steps to Designing a Flexible Control System with ISA-88. Quality, Experience, and Peace of Mind: Cross Company Process Control Integration
6 Steps to Designing a Flexible Control System with ISA-88 Quality, Experience, and Peace of Mind: Cross Company Process Control Integration 6 Steps to Designing a Flexible Control System with ISA-88 US
More informationBetter Maintenance Strategies Improve Operations and Maintenance
Table of Contents teaser: Combining smart instruments, analyzers and valves with a modern asset management system can provide faster response to incidents, enable proactive maintenance and reduce downtime.
More informationInnovative testing of advanced PLCs of sewage water pumping stations
Innovative testing of advanced PLCs of sewage water pumping stations Ivo Pothof, Kees Kooij Industrial Flow Technology, WL Delft Hydraulics P.O. Box 177 2600 MH Delft, The Netherlands ivo.pothof@wldelft.nl,
More informationNew Brunswick fermentors and bioreactors for research through production
Culture success New Brunswick fermentors and bioreactors for research through production New Brunswick fermentors & bioreactors for all your culture needs New Brunswick fermentors and bioreactors by Eppendorf
More informationWORKING PROCEDURE ACCORDING TO THE REQUIREMENTS OF REFERENCE QUALITY STANDARDS - CASE STUDY FOR A BOILING DEPARTMENT FROM A BEER FACTORY
WORKING PROCEDURE ACCORDING TO THE REQUIREMENTS OF REFERENCE QUALITY STANDARDS - CASE STUDY FOR A BOILING DEPARTMENT FROM A BEER FACTORY communication MARIANA-LILIANA PĂCALĂ *1, LUCICA BRUDIU **, CARMEN-
More informationSeparators for the beverage industry
Separators for the beverage industry www.andritz.com 2 Clarifiers for the beverage industry Every day, ANDRITZ SEPARATION clarifiers are satisfactorily operated in food and beverages processing plants
More informationHelping you grow your business. Engineering solutions
Helping you grow your business Engineering solutions ENGINEERING IS THE ART OF MAKING YOUR PRODUCTION STRATEGY A REALITY. IT PLAYS A ROLE IN ALL STAGES OF YOUR PROJECT, FROM DESIGN TO EXECUTION AND LONG-TERM
More informationTHE CALIFORNIA STATE UNIVERSITY Office of the Chancellor 401 Golden Shore Long Beach, CA (562) Date: May 3, 2005 Code: HR
THE CALIFORNIA STATE UNIVERSITY Office of the Chancellor 401 Golden Shore Long Beach, CA 90802-4210 (562) 951-4425 Date: May 3, 2005 Code: HR 2005-20 To: From: Subject: CSU Presidents Jackie R. McClain
More informationProject Charter Date 4/16/08
! " " # $% &''( ) " I. Project Charter II. III. IV. Scope Statement Team Contract MS Project Gantt chart V. Cost Estimate VI. VII. VIII. IX. Quality Management Plan Project Organizational Chart Communications
More informationQualification and Delivery of All Things Pharmaceutical. Blaik C Jensen Associate Quality Engineering Consultant
Qualification and Delivery of All Things Pharmaceutical Blaik C Jensen Associate Quality Engineering Consultant Commissioning and Qualification Sequence Design Follows the methodology found in the ISPE
More informationImprovement of the robustness of the purification process of the intravenous immunoglobulin product (10%) Gammagard Liquid/Kiovig
Improvement of the robustness of the purification process of the intravenous immunoglobulin product (10%) Gammagard Liquid/Kiovig Baxter BioScience F. Hupet, E. Felix, J. Van Malleghem, D. Delplace, C.
More informationCONSTRUCTION REQUIREMENTS
CONSTRUCTION REQUIREMENTS Note: The buildings on the UCCS campus are divided into two categories: General Fund and Auxiliaries. General Fund Buildings include academic and administrative functions. Auxiliary
More informationWork Based Learning Guide
Apprenticeship Standard Science Manufacturing Process Operative (ST0422) Work Based Learning Guide December 2017 Purpose of document This work based learning guide contains the detailed specification of
More informationSECTION : OPERATION & MAINTENANCE MANUALS
SECTION 01 17 73: OPERATION & MAINTENANCE MANUALS 1. GENERAL: A. This section includes requirements for Contract Record - Operations and Maintenance manuals required prior to project closeout including,
More informationTECHNOLOGY SUPPORT SPECIALIST (12264)( )
GENERAL DESCRIPTION OF WORK This is advanced work in providing consultation, support and/or training for technology-based systems. Employees may provide support of hardware, applications, operating systems,
More informationSuccessful Project Management. Overview Houston Community College Fall, 2017
Successful Project Management Overview Houston Community College Fall, 2017 Agenda Introduction Project Management Processes What Is a Process? Inputs, Tools and Techniques, Outputs Process Groups Overview
More informationIntroduction to Project Management (PM101) Course 6 Scope and Requirements
Introduction to Project Management (PM101) Course 6 Scope and Requirements Slide 1 Slide 2 The Importance of Scope & Requirements Definition Approximately 56% of software defects can be traced to scope
More informationThe Integrator s Guide to Controller Replacement: Plan Your Strategy
Digital Factory The Integrator s Guide to Controller Replacement: Plan Your Strategy usa.siemens.com/modernize The Integrator s Guide to Controller Replacement: Plan Your Strategy Digital Factory As an
More informationFlexible Manufacturing Systems
Flexible Manufacturing Systems FMS is: Machine Cell used to implement the Group Technology Composed of Multiple automated stations Capable of Variable Routings (Type IIA) Integrate CNC, Computer Control,
More informationOffice of Human Resources. IT Systems Analyst Senior - LI2373
Office of Human Resources IT Systems Analyst Senior - LI2373 General Statement of Duties Performs full performance level professional work analyzing, refining and documenting the business requirements
More informationAPM Health Classic from GE Digital Part of our On-Premise Asset Performance Management Classic Solution Suite
Drives rapid situational adjustments with decision-quality information based on comprehensive knowledge of asset conditions Asset-intensive companies often struggle with a lack of visibility into physical
More informationInformation Technology Services (ITS)
Information Technology Services (ITS) District ITS staff is responsible for centralized information systems and services that provide technology solutions for the College and District operations. The services
More informationHazard Analysis at Critical Control Points (HACCP) is a legal requirement
HACCP - Practical HACCP Hazard Analysis at Critical Control Points (HACCP) is a legal requirement It is a system that helps food business operators look at how they handle food and introduces procedures
More informationEngineering Installation Service. Innovation in process solutions for today s leading FOOD & BEVERAGE COMPANIES
Engineering Installation Service Innovation in process solutions for today s leading FOOD & BEVERAGE COMPANIES Wright Process Systems: Your Partner in Total Process Improvement For more than 20 years,
More informationIntelligent Production Cost Allocation System
Session 2259 Intelligent Production Cost Allocation System Michael L. Rioux, Dr. Bruce E. Segee University of Maine Department of Electrical and Computer Engineering Instrumentation Research Laboratory
More informationInstrument technology moves into process development laboratories
Instrument technology moves into process development laboratories The same instruments can be used in process development laboratories, clinical trials, pilot plants and large scale manufacturing thus
More informationSAN FRANCISCO PUBLIC UTILITIES COMMISSION INFRASTRUCTURE CONSTRUCTION MANAGEMENT PROCEDURES
SAN FRANCISCO PUBLIC UTILITIES COMMISSION INFRASTRUCTURE CONSTRUCTION MANAGEMENT PROCEDURES SECTION: SFPUC INFRASTRUCTURE CONSTRUCTION MANAGEMENT PROCEDURE NO: 018 TITLE: SYSTEM TESTING AND START-UP APPROVED:
More informationData Integrity Compliance Project
Data Integrity Compliance Project RISK FACTORS FOR DI ISSUES Outsourcing Supply Chain Data Review Practices Increasing use of electronic systems Economic Stressors 2 Fully Integrated into QMS DATA INTEGRITY
More informationPerformance Learning Platform
Product Data Sheet Scenario-based, hands-on, flexible learning platform Portable live process controlled by DeltaV Includes Rosemount, Micro Motion, Fisher, and ASCO technologies Can be customized to meet
More informationMaking Changes to Boiler Plant
RCR Energy New Zealand Making Changes to Boiler Plant September 2016 20MW Gas-Fired Boiler 2 Making Changes to Boiler Plant - What You Need To Know The Code of Practice for Boilers ( COPB ) places responsibilities
More informationContents of the Failure Mode Effects Analysis the Plant Wellness Way Distance Education Course FMEA Training Online
Contents of the Failure Mode Effects Analysis the Plant Wellness Way Distance Education Course FMEA Training Online Use the FMEA process in your plant and equipment design, and for root cause analysis
More informationChip Card Products. Testing and Approval Requirements. Version 1.0. Effective: September 2007 Security Classification: Visa Public
Chip Card Products Testing and Approval Requirements Version 1.0 Effective: September 2007 Security Classification: Visa Public September 2007 Visa Public i Visa Test Laboratory Process - Chip Card Testing
More informationExperience the peace of mind that our solutions bring!
www.vista-automation-me.com Experience the peace of mind that our solutions bring! Head Office Dubai Dubiotech Research Park, Block D23 Umm Suqeim Road P.O. Box 34797, Dubai, UAE Tel: +971 4 421 4960 Fax:
More informationSimulation in the Milk Industry: Method and Tools - Not Only for the Planning and Decision Phase
DMW 07/2000 Home KSI Services KSI news References KSI Feedback Simulation in the Milk Industry: Method and Tools - Not Only for the Planning and Decision Phase I. Status Quo / Motivation In planning processing
More informationCustom Systems Built to Exacting Client Specification
Custom Systems Built to Exacting Client Specification Laboratory Reactor Systems Parr Instrument Company is pleased to work with customers in the design and assembly of complete laboratory or pilot plant
More informationInternational Journal of Industrial Engineering Research and Development (IJIERD), ISSN 0976 INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING
INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING RESEARCH AND DEVELOPMENT (IJIERD) ISSN 0976 6979 (Print) ISSN 0976 6987 (Online) Volume 4, Issue 3, September - December (2013), pp. 61-72 IAEME: www.iaeme.com/ijierd.asp
More informationCITY OF LYNWOOD. Specification for Correlator-Based Leak Detection Study
CITY OF LYNWOOD Request for Proposals (RFP) for Specification for Correlator-Based Leak Detection Study Date: November 16, 2011 Department: Project Name: Public Works Specification for Correlator-Based
More informationDaniel Offers Custody Transfer Measurement and Control in Standardized Package
ARC VIEW SEPTEMBER 16, 2010 Daniel Offers Custody Transfer Measurement and Control in Standardized Package By Allen Avery Summary Representatives from Emerson Process Management s Daniel Measurement and
More informationWATER PLANT TECHNICIAN Series Specification
WATER PLANT TECHNICIAN Series Specification DEFINITION: This series specification describes two classes which, under supervision, to perform a variety of skilled, semi-skilled, and unskilled duties in
More informationJanuary 2008 No. 700
January 2008 No. 700 INDEX FOR SPECIFICATIONS FOR GRANULAR BASE COURSE Page 700. 1 SCOPE...1 1.1 Pre-Construction Meeting...1 1.2 Mobilization of Equipment...1 700. 3 MATERIALS 3.1 Granular Base Course
More informationHow single-use connections advance aseptic processing: Increased process flexibility and reliability, reduced costs
WHITE PAPER 7004 How single-use connections advance aseptic processing: Increased process flexibility and reliability, reduced costs By John Boehm Business Unit Manager Colder Products Company Today s
More informationNews. Power Generation 11. ph Control Reduces Acid Consumption in Neutralization Process up to 90 % Perspectives in Pure Water Analytics THORNTON
Power Generation 11 Perspectives in Pure Water Analytics News THORNTON Leading Pure Water Analytics ph Control Reduces Acid Consumption in Neutralization Process up to 90 % THORNTON new instrumentation
More informationi-control Complete Process Control
icontrol icontrol TOTAL TOTAL CONTROL CONTROL MAKE MAKE SELECTION SELECTION SELECT CONTROL OPTION FOR I-CONTROL i-control Complete Process Control Applikon Biotechnology T H E B I O P R O C E S S I N G
More informationThere will be a technical and financial evaluation. Technical evaluation will be 70% and 30% for financial.
ANNEX H (EVALUATION CRITERIA & FINANCIAL PROPOSAL TEMPLATE) There will be a technical and financial evaluation. Technical evaluation will be 70% and 30% for financial. Technical evaluation The returned
More informationCHAPTER 2: IMPLEMENTATION PHASES AND OFFERINGS
CHAPTER 2: IMPLEMENTATION PHASES AND OFFERINGS Objectives Introduction The objectives are: Describe the purpose of the phase planning activity, preconditions, and deliverables in the implementation methodology.
More informationOil & Gas Industry. Smart Remote Automation. An Extension of PlantWeb Digital Architecture. PlantWeb
Oil & Gas Industry Smart Remote Automation An Extension of PlantWeb Digital Architecture PlantWeb 1 Improve Your Profitability Today s oil and gas companies face a formidable array of challenges: Achieve
More informationGreen Data Center CRYOGEL Ice Ball Thermal Storage
Green Data Center CRYOGEL Ice Ball Thermal Storage Victor J. Ott, P.E. CRYOGEL, San Diego, CA Tuesday, March 1, 2011 4:30 5:30 PM, ACC, Room 207B Copyright Cryogel 2001 Telephone (858) 457-1837 Email:
More informationService plans enhance the benefits of preventive maintenance programs
Service plans enhance the benefits of preventive maintenance programs White Paper Document 1910DB1612 by Charles Alvis Executive summary Companies are continually being tasked by management to increase
More informationData Collection and Audit Preparation. Lecture 10
Data Collection and Audit Preparation Lecture 10 Operations personnel should be asked for input as they are close to how processes actually run (not necessarily how they can and should run) and can provide
More informationLG SOURCING VENDOR QUALITY MANAGEMENT SYSTEM REQUIREMENTS
LG SOURCING VENDOR QUALITY MANAGEMENT SYSTEM REQUIREMENTS LG Sourcing QMS ver01 03.29.2010 Page 1 of 16 PAGE INTENTIONALLY LEFT BLANK Copyright 2010, LF Corporation - All rights reserved No part of this
More informationSonicScan Fault Isolation System
SonicScan Fault Isolation System Uncovers commonly missed equipment faults Accurately characterizes faults using multiple isolated analysis ranges Performs in-field application-specific diagnostics Delivers
More informationCost of downtime Loss of production Manufacturing scrappage. Why motors fail The most common causes of motor failure are:
Smart Motor Control Increase productivity across the automation lifecycle Increase intelligence for better decision making Help enable safe operations Secure your environment Efficient motors drive industrial
More informationMOISTURE CONTENT MEASUREMENT CASE STUDY
MOISTURE CONTENT MEASUREMENT CASE STUDY This case study is based on a large research-focused health care company with a long tradition in pharmaceutical production and diagnostics. The company was founded