1 POSITION PAPER Version 4.0 Revision of the Technical Specification for Interoperability / Safety in Railway Tunnels (SRT) Brussels, September 26 th, 2012

2 1. REFERENCE DOCUMENT UNION RAIL SYSTEM - SUBSYSTEMS INFRASTRUCTURE, ENERGY AND ROLLING STOCK TSI SAFETY IN RAILWAY TUNNELS IU-SRT_TSI Version 2.0 Date 26/06/2012 Edited by : Antoine Defossez 2. INTRODUCTION This Position Paper makes public the official CER beliefs and recommendations on and for the Technical Specification for Interoperability TSI Safety in Railway Tunnels (SRT) - Version 2.0. It recommends changes and amendments to be done, ensuring the deployment of a safe, sustainable, cost-efficient and reliable railway system with all its subsystems included. 3. GENERAL COMMENTS The number of references to other legal documents, the number of references to other parts of the same document, the number of quotations from other legal documents and repeated information in this document will inevitably cause a huge effort for maintaining this document in future. Future revisions of this document will be highly time- and budget consuming. We propose to create general requirements (policy) for creating legal documents leading to simplification. CER disagrees with the transfer of SRT requirements from the SRT TSI to other TSIs. It is contradictory to the ERA report itself named Item 08 - IU-ExtScope-Studies-Merging-and- Splitting FinalReport-V1[1].0.zip presented to the RIS in its meeting of March 2011 and approved by the EC and RISC members in its meeting of June 2011: look at: - The last sentence of page 47 of the final report, not questioned by the EC or the RISC in its March and June 2011 meetings: As a result from the above analysis, the Agency suggests retaining the SRT TSI. - Its 8 Conclusion and table 9 in which it is written: Retaining SRT TSI and nothing about SRT in other RST, INF or ENE TSIs. The version 1.3 of the Loc & Pas TSI of 5/09/2012 introduces the SRT requirements for RST in the Loc & Pas TSI. At the next revision, the system view will be lost and it is very dangerous! All used abbreviations need to be fully explained, allowing a proper and correct understanding of this TSI. With fulfilling the requirements of TSI a huge number of mandatory standards is to be fulfilled accordingly. A new breakthrough approach is needed to make these standards fully public and available free of charge. Consistency with definitions of the Infrastructure and Loc&Pas TSIs needs to be ensured. A cost benefit analysis of the changes to the existing SRT TSI and of the effect of geographic scope extension is not available at the moment of providing these comments. August 2012 Page 2/22

3 4. DETAILED COMMENTS Instruction to the reader: Chapter numbers and headlines are underlined and bold TSI text is shown in inverted commas Comments and justifications are shown in Italics Proposals for amendments are underlined Proposals for deletion are shown using the strikethrough function CHAPTER 1.1 Whereas this TSI contains no direct requirement for the subsystem control-command ( CCS ), it contains requirements applicable to components of the subsystem and is interfaced with it. This sentence means nothing. If a component of the subsystem is concerned, the subsystem is concerned. And CCS, both trackside and on-board, are concerned (for materials at least) Delete this sentence and modify the previous sentence: This TSI contains requirements for the following subsystems infrastructure ( INF ), energy ( ENE ), operation ( OPE ), and rolling stock ( RST ), trackside and on board control-command and signalling ( CCS ) as defined in Directive 2008/57/EC. It shall permit free movement of vehicles which are in compliance with this TSI to run under harmonised safety conditions in railway tunnels, which are in the scope of this TSI. Justification: ensure consistency with of this TSI. This TSI cannot prejudge of such possibility in existing tunnels not taken into account in the SRT TSI to-day in force (tunnels longer than 20km): see its CHAPTER This TSI applies to new, upgraded and renewed rolling stock which is in the scope of the LOC&PAS TSI. Justification: ensure consistency with and of the Loc & Pas TSI and compliance with article nd sentence of Directive 2008/57/EC. CHAPTER This TSI applies to the operation of all new, upgraded and renewed trains which are running in tunnels which are in the scope of this TSI. Justification: ensure compliance with article nd sentence of Directive 2008/57/EC. CHAPTER A freight train is a train composed of one or more locomotive(s) and one or more wagon(s) as defined in the WAG TSI. Justification: make clear that wagons included in OTM definition are not concerned by this. When each vehicle of a freight train complies with the structural TSIs which apply to it (LOC&PAS, WAG, SRT, NOI and CCS) and when Justification: ensure consistency with 1.1 as modified as above. August 2012 Page 3/22

4 the freight train operated according to the requirements of the OPE TSI shall be allowed to circulate in all tunnels defined in Justification: ensure consistency with and compliance with article nd sentence of Directive 2008/57/EC. This TSI cannot prejudge of such possibility in existing tunnels not taken into account in the SRT TSI to-day in force (tunnels longer than 20km): see its CHAPTER BIS: SCOPE RELATED TO CCS ON-BOARD AND TRACKSIDE This TSI applies to new, upgraded and renewed CCS which is in the scope of the CCS TSI. Justification: such a and a sentence shall be added. Look at the modification proposed in 1.1. Ensure consistency with materials requirements (cables for fixed installations for instance). Vehicles are the sum of RST and CCS. CHAPTER 1.2 (c) Other parts of the Union rail network, following as this TSI achieves the extension of scope process as described in Annex I section 4 of Directive 2008/57/EC. Justification: make it clear that the extension of scope is done through this TSI. CHAPTER 2.1 GENERAL A major feature of railways is their inherent ability to prevent accidents through the traffic running on a guide-way and being controlled and regulated using a signalling system. Comment: Please consider that there will be still routes without technical signalling systems (mostly secondary local lines, substantially verbal communication) CHAPTER HOT INCIDENTS: FIRE, EXPLOSION FOLLOWED BY FIRE, EMISSION OF TOXIC SMOKE OR GAS Whenever possible the train should leave the tunnel. If the train comes to a stop at a designated stopping point, passengers are evacuated, directed by the train crew, or by self-rescue, to a safe area. Justification: to emphasize stronger CHAPTER EXCLUSIONS The reference to chapter in chapter is incorrect. This chapter should be referenced to chapter CHAPTER 2.3 THE ROLE OF EMERGENCY RESPONSE SERVICES We recommend amending the text of chapter 2.3 as follows: In a hot incident type [ ] Fight a fire insofar as required to protect themselves and people caught in the incident Justification: The fire fighting in railway tunnels always leads to protect lives. Fire fighting also protects the leaves of infrastructure manager s staff by preventing the damage of tunnel August 2012 Page 4/22

5 structure likely to jeopardize them when inspecting the tunnel after any hot incident. There is no reason to stop the fire fighting when there is no need to protect the emergency response service staff and people caught in the accident. CHAPTER 2.4 DEFINITIONS The following new terms shall be used consistently throughout the TSI: Intervention point replacing fire fighting point Intervention & evacuation point replacing rescue station We consider 2 new definitions to be useful, if consistently applied across the TSI: emergency exits: An emergency exit is a lateral or vertical subsurface structure enabling self rescue. access point: An access point is a designated exit from the tunnel to a safe area and an access to the related emergency exit. The SRT TSI should apply to tunnels longer than 500m instead of 100m. Below this length no theoretical or experimental proofs establish that an event should be important as it happen in a confined space like a tunnel. With a view to the scope extension, an impact assessment has to be carried out if shorter length is proposed by ERA. DB identified an increasing of 260 tunnel segments fallen under this 0,1 km definition we propose to apply the TSI SRT for tunnels beginning from 0,5 km length. Our proposal is in line with the existing TSI. The definition should therefore be changed as follows: Railway tunnel: A railway tunnel is an excavation or a construction around the track provided to allow the railway to pass under, for example higher land, buildings or water. The length of a tunnel is defined as the length of the fully enclosed section, measured at rail level. A tunnel in the context of this TSI is 0.1 0,5km or longer. In case different thresholds apply for certain requirements, they are mentioned in the respective clauses. Remark: SNCF objects that the definition of consecutive tunnels had been deleted. As a consequence chapter Designated stopping points might be misinterpreted and mistranslated. CHAPTER 3 ESSENTIAL REQUIREMENTS Comment: Table numbering is incorrect! Chapter Prevent unauthorised access to emergency exits and technical rooms This specification applies to all tunnels of more than 1 km in length. (a) Unauthorised access to technical rooms shall be prevented. (b) Where emergency exits are locked for security purposes, it shall always be possible to open them from inside. Justification: The scope of requirement is changed. In the previous revision this requirement was for tunnel longer than 1000 m. August 2012 Page 5/22

6 It is not clear the reason for which tunnels shorter than 1000 m have to comply with this requirement. Tunnels shorter than 1000 m usually have no exit and no technical rooms for safety equipment. CHAPTER ESCAPE SIGNAGE (a) The escape signage indicates the emergency exits, the distance and the direction to a safe area. Justification: Marking of distance on the escape signage is not used everywhere and it is not mandatory according to Annex II Chapter 3.4 of Directive 92/58/EC. CHAPTER FIRE RESISTANCE OF TUNNEL STRUCTURES (a) In the event of fire, the integrity of the tunnel lining shall be maintained for a period of time sufficiently long to permit self-rescue, evacuation of passengers and staff and intervention of emergency response services according to 2.3. This objective is attained when it is demonstrated that the tunnel lining satisfies the ultimate limit state integrity of the tunnel lining is maintained under a gas temperature of 450 C at ceiling level during and 250 C for passengers self-rescue the same period of time, which shall be in accordance to the evacuation scenario and reported in the Emergency Plan. Justification: Applying the term integrity may cause uncertainties during project conformity assessment. Integrity may be related with spalling phenomena. Assessing temperature load in the lining needs clear input parameters. Temperature load in the cross section of the lining is different with input gas temperature or temperature at the concrete surface. Fire protection requirement should be assessed coherently with experiences and studies already made in this field. We propose to add the temperature of 250 C at the ceiling for passengers self rescue (unprotect person).(b) In the cases of inundating tunnels (e.g. underwater tunnels) as an effect of failure of tunnel liningimmersed tunnels and tunnels which can cause the collapse of important neighbouring structures, the tunnel main structure shall withstand the temperature of the fire for a period of time allowing evacuation of the endangered tunnel zones and neighbouring buildings and structures. This period of time shall be agreed in the emergency plan. The temperature-time curve for the evaluation of the resistance of the tunnel structure shall be chosen by the IM according to the characteristics of the tunnel, the considered traffic and the neighbourhood. This verification is not needed for rock tunnels without additional support. Justification: The stipulated EUREKA curve can be used for tunnels for passenger traffic only. Freight traffic demands different types of curves. Durations of fires in tunnels for mixed (passenger AND freight traffic) traffic or freight traffic only were observed up to several hours in the past years (e.g. Simplon Tunnel 12 hours). A cooling down phase after 60min in the EUREKA curve is not a realistic input for structural analysis. Therefore fire loads should/shall be derived from open curves such as the HC 1200 curve. For material tests a temperature-range between HC and the HC inc may be proposed. August 2012 Page 6/22

7 Minimising impacts on the environment or minimising the expenditures necessary for the proper maintenance of the tunnel may require pressure-tight tunnel linings. In this case failing linings cause marginal influx to the tunnel. So passengers and train staff are not endangered to drown. According to EUROCODE the ultimate limit state design has to verify that effect of action is smaller or equal to the corresponding resistance E d < R d. Time-temperature-curves as EUREKA curve are first of all necessary to determine the fire load on the construction and the corresponding effect of action (E d ). On the other hand the resistance (R d ) is influenced widely by material properties and less by the timetemperature-curve. A definition of important neighbouring structures would be helpful. Figure 1: Date: CHAPTER FIRE REACTION OF BUILDING MATERIAL This specification applies to all tunnels. (a) Building material and installations inside tunnels shall have low flammability, be nonflammable or be shielded against the effects of fire. (b) Tunnel building material shall fulfil the requirements of classification A2 of EN :2002. Non-structural panels and other equipment shall fulfil the requirements of classification B of EN :2002. In this text passage some problems occur: In the first part of the text passage, characteristics like low flammability and non-flammable are mentioned, which are not clearly defined, neither exists a reference to a standard. Furthermore there do not exist any limits, so it is not assessable in practice. Apparently only the definition to be shielded against the effects of fire is assessable and therefore it is a sufficient description. In the second part of the clause, the European standard EN :2002 is referenced. If this standard is furthermore part of the revised SRT TSI text, it shall be referenced on the latest edition EN :2009. August 2012 Page 7/22

8 Related to fire reaction, the tunnel main structure is regulated in Fire resistance of tunnel structures, consequently just construction products and building elements should be mentioned in this text passage. The European standard EN :2009 deals with all kinds of building materials and construction products, but it does not cover different types of materials (synthetic, liquids or glass), which are used for equipment like power supply, railway switch drives and so on. Further also the amount of these special materials plays an important role related to their fire behaviour. The Austrian Federal Railway, business unit Engineering Services, department Line and Station Design has investigated tunnel equipment, installations and their components and tried to classify them. The results show, that it is very difficult to classify tunnel equipment and installations, because both are always compositions of different materials, so it depends on the producer what kind of materials are used. This leads to a large range of materials which have to be determined. Furthermore Notified Bodies have problems with these materials during the assessment of conformity, because of missing certifications. For better understanding some examples are provided below: Example 1: Switch drives: Switch drives are made of sheet plates, screws, plastic isolators, rubber seals, hydraulic oil and so on. Regarding to the text passage of the SRT TSI draft 2.0 (26 th of June 2012) it would be necessary to classify every single material. Every certification has to fulfil the European regulation EN :2009. A switch drive is therefore a good example for tunnel equipment, which consists of many different materials. Further it begs the question, if small items, like e.g. screws, really affect the fire behaviour of the whole switch drives. This example shows that an irrelevance limit would be helpful for classifying tunnel equipment. Example 2: Power supply (sockets, distributors, fuse boxes ) Power equipment is necessary for fire fighting and maintenance work, but it is not possible to shield all power equipment against direct fire. Control cabinets are also made of several different materials. The detailed composition of all these different materials depends exclusively on the producer. In conclusion also this case shows that an irrelevance limit would be helpful, because power supply equipment consists of many different materials. August 2012 Page 8/22

9 Example 3: Signage: Signs are necessary and essential for self-rescue and technical information. Nearly all signs are made of plastic and dimensioned a few centimetres wide and high and approximately 2 mm thick. According to EN :2009, plastic is classified as class E. Therefore an installation of this kind of materials is not allowed in tunnels. This example also shows that an irrelevance limit would be helpful. Regarding to these arguments a new text passage for TSI SRT is proposed: CER requests to properly define building materials, installations and other equipment. Definition should be in line with the Directive 89/106/EC Fire reaction of material This specification applies to all tunnels. Construction products and building elements shall fulfil the requirements of classification B of EN :2009 or shielded against the effects of fire. No fire resistance of shielded materials is requested. justification: construction products and building elements are defined in EN (= title of EN ) further consideration relating to irrelevance limits would be worthwhile, otherwise it seems better to skip point c) referring to all other items Fire detection in technical rooms This specification applies to all tunnels of more than 1 km in length. (a) Technical rooms (no shelters or technical cabinets) are enclosed spaces with doors for access/egress inside or outside the tunnel with safety installations which are necessary for at least one of the following functions: self-rescue, evacuation, emergency communication, rescue and fire fighting, signalling and communication equipment, and traction power supply. (b) Technical rooms shall be equipped with detectors which alert the infrastructure manager in case of fire. Justification: clarification August 2012 Page 9/22

10 CHAPTER SAFE AREA This specification applies to all tunnels of more than 1 5 km in length. (a) A safe area shall allow for the evacuation of trains that use the tunnel and may be located adjacent to the tunnel. It shall have a capacity corresponding to the maximum capacity of the trains planned to be operated on the line where the tunnel is located. (b) The safe area shall maintain survivable conditions for unprotected persons during the time needed for the complete evacuation from the safe area (away from the accident scene, e.g. to the surface). (c) In case of underground/ undersea safe areas, the provisions shall allow people to move from the safe area to the surface without having to re-enter the affected tunnel tube. Comment: In line with our comment on , we propose to modify the threshold for this requirement. Comparing the area dimension of (e) with the maximum train capacity, operation in tunnels has to be limited to special train types or the capacity of safe areas has to increase to a sizeable amount. In our opinion this conditions for safe areas are not practicable, in economic as well as in operating ways. The explanation in brackets is not needed and confusing Remark: The change request is not supported by SNCF. CHAPTER ACCESS TO THE SAFE AREA This specification applies to all tunnels of more than 1 5 km in length. (a) Safe areas shall be accessible for people who commence self-evacuation from the train as well as for emergency response services. Access to a safe area shall be available at least every 5000 m. This is the distance between the outer edges of the access points measured at walkway level (internal side of the arch). (b) One of the following solutions shall be selected for access points from a train to the safe areas: (1) Lateral and/or vertical emergency exits to the surface, where the surface is a safe area. (2) Cross-passages to an adjacent independent tunnel or to another dedicated safe area. (3) Alternative measures with an equivalent level of safety are allowed; the equivalent level of safety to passengers and staff shall be demonstrated using the Common Safety Methods on risk assessment. (c) An access point to a safe area shall be available at least every 1000m in a multiple track tunnel. In a single track tunnel, an access point shall be available at least every 500m. (d)for points (b) and (c) above, alternative measures with an equivalent level of safety are allowed; the equivalent level of safety to passengers and staff shall be demonstrated using the Common Safety Methods on risk assessment. (e) Doors giving access from the escape walkway to the safe area shall have a minimum clear opening of 1,4m wide and 2,0m high, alternatively it is permitted to use multiple doors next to August 2012 Page 10/22

11 each other which are less wide as long as the flow capacity of people is demonstrated to be equivalent or higher. (f) After passing the doors, the clear width shall continue to be at least 1,5m wide and 2,3m high. (g). The way the emergency response services access the safe area shall be described in the emergency plan. Justification: Measurement of the stated distance has to be clarified. About Access to the safe area requirement clause b), the new SRT TSI sets specific rolling stock and infrastructure requirements for the management of the hot incidents. During a hot incident, that is fire on board, a train haven t to stop inside tunnel as its running capability of 20 km for category B train ( 5 km for category A train) makes the train able to run to an appropriate stopping point ( designated stopping point ) where passengers can swift evacuate (as the train is damaged) and where train can the treated by rescue service. The emergency exits explained at clause (b) are hence set for the cold incidents management (collision and derailment) for which as defined at point , there is no constraint due to the presence of a hostle environment created by a fire ; the confined space is not critical for the passengers evacuation rather for the access of rescue service. For these cases, in consideration of the very expensive investment for the access building (at about 60 M for km), we propose, for one bore tunnel, to set emergency exits at distance of about 5 km or more. At clause f), the high of the clear width is changed. No explanations about this changing are provided. Remark: The change request is not supported by SNCF. CHAPTER EMERGENCY LIGHTING ON ESCAPE ROUTES (b) (2) Double-track tube: on both sides of the tunnel (b)(3) Position of lights: above the walkway, as low as possible, so as not to interfere with the free space for the passage of persons, shall be at a minimum height of 2,50 m or built into the handrails. Justification: B2: clarification B3: Our proposal is in line with EN Escape walkways This specification applies to all tunnels of more than 0,5 km in length. (a) Walkways shall be constructed in a single track tunnel on at least one side of the track and in a multiple track tunnel on both sides of the tunnel. In tunnels with more than two tracks, access to a walkway shall be possible from each track. (1) The width of the walkway shall be at least 0.8 m. August 2012 Page 11/22

12 (2) The minimum vertical clearance above the walkway shall be 2,3 2,0 m. Justification: The high of the clear width is changed. No explanations and justification about this changing are provided by ERA. Some national standards plan the high at 2.00 m Designated stopping points The following paragraphs and apply to tunnels considered individually. Where lines are fitted with several tunnels, it is required that a designated stopping point is available at a maximum distance of 5 km - or 20 km - from the portal of any tunnel, according to the category of rolling stock that is planned to be operated, like is summarized in the table below at point (b). The distribution of designated stopping points on a line shall be justified in the Emergency Plan. Justification: The acceptance of the whole requirement is linked to the adoption of Access to the safe area comments. Clarification of the sentence: it is required that a designated stopping point is available at a maximum distance of 5 km (resp: 20 km) from the portal of any tunnel. CHAPTER FIRE FIGHTING INTERVENTION POINTS This chapter needs to be revised. Emergency communication is needed also in tunnels less than 1 km in length. E.g. stopping of trains on adjacent tracks, isolation of overhead contact line and similar issues Rescue station This specification applies to all tunnels of more than 5 km in length. (a) A rescue station shall be available at a maximum distance of 5 km or 20 km from the entry portal of the tunnel and from any other rescue station, according to the category of rolling stock that is planned to be operated. (b) This is summarized in the table below: Maximum distance from the portals to a rescue station and between rescue stations Rolling stock category according to paragraph km Category A 20 km Category B (c) The intended stopping position of the affected train shall be indicated to the train driver. This shall not require specific on-board equipment (all TSI compliant trains must be able to use the tunnel) (d) A safe area shall be accessible from the stopping position of the train. Dimensions of the evacuation route to the safe area shall take into consideration the evacuation time (as specified in (b) (2)) and the planned capacity of the trains (referred to in (b)) intended to be operated in the tunnel. The adequacy of the sizing of the evacuation route shall be demonstrated in the Emergency Plan. August 2012 Page 12/22

13 e) The safe area that is paired with the rescue station shall offer a standing surface of at least 0,5 0,33 m² per person. Application guide: toilets, water, seats, etc. shall be according to the waiting time derived from the evacuation scenarios defined in the Emergency Plan (f) The rescue station shall be equipped with water supply (minimum 800l/min during 2 hours) close to the intended stopping point of the train. The method of supplying the water to a stopped train shall be described in the emergency plan. (g) It shall be possible to switch off the traction energy supply and earth the electrical installation of rescue stations. (h) The rescue station shall be equipped with access for emergency response services as defined in the emergency plan. (road access or rescue train for example) (i)there shall be an access to the affected train for emergency response services without going through the safe area. (j) The lay-out of an underground rescue station and its equipment shall take into account the control of smoke, in particular to protect people who use the self-evacuation facilities to access the safe area. Justification: The acceptance of the whole requirement is linked to the adoption of Access to the safe area comments. At clause (d) the reference to the dimensions should be erased since they are explained at (f) requirement, At clause (e) the value of 0,5 m² per person should be too expensive for underground rescue station. We propose to fix this value to 0.33 mq/persons. We suggest to erase the clause (i) because in case of double bore tunnels the requirement should not be easily complied There is a mistake in the clause numbering. The point (j) of the rescue station requirement is translated into safe area requirements as it is more appropriate to prevent that smoke can access in the way to safe area. CHAPTER EMERGENCY COMMUNICATION This specification applies to all tunnels of more than 1 km in length. (a) Radio communication between the train and the control centre shall be provided in each tunnel with GSM-R or other communication modes. (b) Radio continuity shall be provided for permitting the emergency response services to communicate with their on-site command facilities. The system shall allow the emergency response services to use their own communication equipment. Comment: There will be still lines without GSM-R and with alternative communication systems (train radio), this should be possible under the conditions of the revised SRT TSI. CHAPTER MATERIAL REQUIREMENTS Section (b) Materials used to construct rolling stock shall comply with EN : 201X August 2012 Page 13/22

14 Justification: References shall be dated (DV44). But nobody knows whether the TSI will be able to refer to such EN now submitted for vote, as there is a critical error in it! Section (c) This requirement seems to be too strict as compliance may also be ensured by implementing an appropriate quality management system. Proposal: An appropriate quality management system shall ensure that all material complies to the requirements set out in this chapter. CHAPTER ELECTRIC FREIGHT LOCOMOTIVES Such a reference would need the year of the standard in the reference to ensure that the correct version/requirement is referred to. Also, see the requirements for transformers and their coolants in EN CHAPTER AUTOMATIC FIRE EXTINGUISHING FOR FREIGHT LOCOMOTIVES Section (a) We object to the limitation of the application to diesel and not electric freight locos only. We further object to running capability not being permitted. We recommend to add unless they are compliant to chapter Running capability Fire spreading protection measures for passenger rolling stock (FPSM) (c) If FSPM are used instead of full cross section partitions, it shall be demonstrated that: (1) They ensure that fire and smoke, toxic gases and high temperature will not extend in dangerous concentrations over a length of more than 30m within the passenger/staff areas inside a unit, for at least 15 minutes after the start of a fire. The assessment of this parameter is an open point*. (2) They are installed in each vehicle of the unit, which is intended to carry passengers and/or staff Comment: A fire is characterized by the production of smoke, toxic gases and high temperatures as a result of heat released by the flame. Then the effluents of a fire are not only smoke but also on other variables reported above * The following is proposed to close the open point about the assessment: The assessment of this parameter following the implementation of active safety methods, such as fire extinguishing systems, shall be applied using the test protocol following below: - ignition source equal to that required by the model of ignition of 5 CEN / TS Annex A - peak of heat release (HRR) at 5 min = 285 kw. The parameters to be detected and their acceptance limits are the following: (1) temperature <= 80 C (2) residual transmittance> = 70% (3) toxic gas expressed by the parameters "Fractional Dose Effect" (FED) and FEC "Fractional Effect Concentration" (FEC) (acceptable limits and their evaluation not yet defined, still under discussion within the TRANSFEU) The time available for evacuation (ASET) shall be greater than the time required for the evacuation (RSET). August 2012 Page 14/22

15 CHAPTER RUNNING CAPABILITY The problem with the statements made here is that electric freight locomotives are not required to have a fire extinguishing system in accordance with and here it is to be read that neither are they required to have running capability. This therefore means that they could be abandoned in the tunnel and left to burn quite freely. It is not understood why running capability is not permitted for freight locos, either electric or diesel. Is it appropriate that the Driver should abandon the train (surely the fire should be out if there is an extinguishing system on board) and shouldn t this be left to the Emergency Plan or the RU s operating rules? Providing Running Capability (or the option of fire extinguishing for electric locos) would be a safer, and cheaper, than allowing a train to burn in the tunnel and expecting emergency services to fight the fire in the tunnel and all the damage that would occur. CHAPTER PASSENGER EMERGENCY EXISTS Section (b) - Requirements Some of the deleted text is useful and should be re-added: (1) Emergency exits shall be provided and indicated. (2) An emergency exit shall be able to be opened by a passenger from inside the train. (5) All external passenger doors shall be equipped with emergency opening devices allowing them to be used as emergency exits. (10) Each vehicle designed to contain up to 40 passengers shall have at least two emergency exits. (11) Each vehicle designed to contain more than 40 passengers shall have at least three emergency exits. (12) Each vehicle intended to carry passengers shall have at least one emergency exit on each vehicle side. CHAPTER 4.4 OPERATING RULES AND 4.5 MAINTENANCE RULES We recommend revising the content of chapters 4.4 and 4.5 to reflect the responsibility of designer and manufacturer supplier for provision of all relevant requirements on the operation and maintenance to be included into operational rules and maintenance rules. Justification: Designer and manufacturer supplier shall be responsible for provision of all relevant design specific requirements on the operation and maintenance to be included into operational rules and maintenance rules of infrastructure manager Emergency rule These rules apply to tunnels of more than 0.5 km length. August 2012 Page 15/22

16 In light of the essential requirements in Chapter 3, the operating rules specific to tunnel safety are: (a) The operational rule is to monitor the train condition before entering a tunnel in order to prevent a defective train from entering a tunnel. This can be done through line side hot axle box detection or other predictive equipment or through on-board equipment. If a hot axle box is detected: The defective train shall stop as soon as possible at an appropriate place ahead of the tunnel(s). The IM shall be informed of the location where the train stops immediately The defective parts shall be checked by the train crew The RU shall have rules to permit safe operation to continue under the resulting degraded conditions. (b) In case of an incident outside the tunnel, the operational rule is to stop the train before entering a tunnel. (c) In case of an incident the operational rule is to drive the train out of the tunnel or to the next rescue station. Justification: In reference to clause a), the requirement of the current TSI seems to be clearer. We propose to adopt it Exercises These rules apply to tunnels of > 1 5km. (a) Prior to opening of a single tunnel or a series of tunnels, an full-scale exercise comprising evacuation and rescue procedures, involving all categories of personnel defined within the emergency plan, shall take place. (b) The emergency plan shall define how all organisations involved can be familiarised with the infrastructure and how often visits to the tunnel and table top or other exercises have to take place. Justification: The experience reached shows that, by reason of emergency response service s busy schedule, prior to opening a tunnel a full scale exercises shall not take place. Moreover, considering the great employment to comply the requirement, it should be applied only for tunnel longer than 5 km Isolation and Earthing procedures: If the emergency response services require disconnection of the traction power supply, they shall receive a guarantee that the relevant sections of catenaries or conductor rails have been disconnected before entering the tunnel or a section of the tunnel. Comment: This requirement should be specified by examples, e.g. verbally by IM or by technical solutions with signal lamps August 2012 Page 16/22

17 4.4.6 Operational rules related to trains in tunnels (4) OTMs shall be deemed to comply with the tunnel safety requirements for rolling stock all lines. Justification: The operational aspect for OTM s is quite different to other vehicles. OTM s are not planned as normal train services. Please delete! Maintenance rule Infrastructure: (4) Necessary periodic checks and servicing activities to ensure the proper functioning of the parts and systems under (3) to ensure permanent compliance with the present TSI in accordance with the maintenance plan. Comment: We need a clear answer on this the maintenance activities of an IM follow the condition of the tunnel that means over the life time the respective concept will apply. We do not want to inform continuously the certification body about our adaptable concepts. Please also have in mind the European tunnel is now defined as 0,1km or longer that means the number of tunnels managed under the TSI SRT will increase => more formalistic work. Please delete (4)!!! Moreover the requirement of the current TSI seems to be clearer. We propose to adopt a text like that: In the maintenance plan the following inspection rules have to be taken into account: annual visual inspections carried out by the IM detailed inspections according to the IM's maintenance plan special inspections after accidents, natural events that may have affected the tunnel condition after and during implementation of renewal and/or upgrading works and before restoring train operation in a tunnel, an inspection has to be undertaken, with appropriate means, to ensure that the stability of the structure is guaranteed and that there are no infringements of the gauge. CHAPTER Maintenance of rolling stock The maintenance requirements for rolling stock are set out in the LOC&PAS TSI. Maintenance activities shall ensure that compliance with the present TSI is permanently maintained. Comment: the first sentence is sufficient! CHAPTER REGISTER OF INFRASTRUCTURE AND ROLLING STOCK REGISTER ERATV We recommend to revise the text of chapter and Justification: There is a reference to non-existing Annexes A and B. Note: The data to be provided for register of infrastructure are those indicated in Commission Implementing Decision 2011/633/EU. August 2012 Page 17/22

18 Fire protection requirements for structures The Notified Body shall assess conformity with the fire protection requirements for structures, defined in , by using the results of calculations made by the applicant. Comment: National rules might allow other equivalent solutions. CHAPTER FACILITIES FOR SELF-RESCUE, RESCUE AND EVACUATION IN THE EVENT OF AN INCIDENT The Notified Body shall check that the solution adopted is clearly identified by a statement in the technical file and is in conformity with the requirements of For assessing the evolution of the conditions in the safe area during an incident, the Notified Body shall verify that tthe doors and structures separating the safe area from the tunnel can shall withstand the elevation of temperature in the closest tube. Conditions in that tube are determined by the temperature-time curve chosen in (b) or, if that clause is not applicable, by a representative temperaturetime curve. Justification: Airtight assessments of conditions in the safe area according to the state of the art are not possible as yet. According to (b) of version 2.0 the time-temperature-curve cannot be chosen. 7 IMPLEMENTATION This section defines the implementation strategy for the SRT TSI. This TSI does not require modifications of subsystems which are already in service unless they are upgraded or renewed. If not defined otherwise in section 7.5 Specific Cases, all new TSI compliant category B rolling stock is deemed to achieve a higher fire and tunnel safety level than non-tsi compliant rolling stock. This assumption is used to justify the safe operation of new TSI-compliant rolling stock in old non-tsi compliant tunnels. Therefore, all TSI compliant category B trains are deemed to be suitable for the safe integration in accordance with Article 15(1) of Directive 2008/57/EC with all non-tsi compliant tunnels within the geographical scope of this TSI. In addition, the checks related to technical compatibility as referred to in Directive 2008/57/EC in Articles 15(1), 22(2)(b) and 23(4), shall not concern basic parameters defined for rolling stock in this TSI. Comment: There is no common European approach existing about what is meant by upgrade or renewal for the tunnel infrastructure. In most cases at national level the decision depends on budgets and this cannot be a criterion to apply the TSI SRT. The whole paragraph after the deleted one is not understood and needs clarification. This TSI completely forgets the transition between the existing SRT, HS RST and Loc & Pas TSIs in force to-day and this draft TSI. This shall be carefully studied and phases A and B of the HS RST and of Loc & Pas TSI shall be introduced for RST in the new SRT TSI. August 2012 Page 18/22

19 CHAPTER PARTICULAR TRANSITIONAL RULES FOR MATERIAL REQUIREMENTS This paragraph is applicable to all units of rolling stock for which a contract is signed during a period of 2 6 years after entry into force of this TSI. For those units, it is permitted to meet the requirements of Section Material Requirements by using materials which are compliant with one of the following sets of standards: Pending publication of EN one of the following sets of standards shall be applied: The British standards BS6853, GM/RT2130 issue 3; The French standards NF F :1988 and NF F /1992; The German standard DIN :2009 including toxicity measurements. The Italian standards UNI CEI :2005 and UNI CEI :2005. The Polish standards PN-K-02511:2000 and PN-K-02502:1992 TS :2009 During this period, it is permitted to substitute individual materials by materials which are compliant with EN 45545, or in case EN is not available TS :2009. After publication of EN , it shall be permitted to use national standards & TS for the transition period defined in EN Comment: The application of EN is generally considered to be a major industry effort as many suppliers are not yet prepared to comply with the new standard. That s why a reasonable transition period shall be defined, probably 36 months. Phase A and B are much better!!! CER states that two transitions are unacceptable; if the EN is not ready, we should not use the TS, as the result would be that when the EN is ready, a second transition would be required. If the EN is not ready, we should persist with the TSI only. CHAPTER NEW INFRASTRUCTURE All tunnel projects, for of which the project approval procedure (public consultation) commences after publication of this TSI, shall be realised in compliance with this TSI. Exceptions can be made for projects whose planning/design stage has reached a point where a change in the technical specification would lead to unacceptable delays and/or costs Comment: The TSI should always be applied to all new tunnel projects. Exceptions should refer on Article 9 of Directive 2008/58/EC. An additional term for exceptions will lead to misunderstandings and will support a free non-application of the TSI SRT. The question if a project is at an advanced stage or not should always be answered in the course of the 2008/57/EC process. Reference to Directive 2008/57 article 2 t) has to be made. The definition of new/upgraded/renewed must be in line with the definition of the Infrastructure TSI! 7.2 General rule for: August 2012 Page 19/22

20 - RST and CCS on board subsystems - INF, ENE and CCS trackside Assemblies and components that are not included in the scope of a particular upgrade or renewal programme do not have to be made compliant at the time of such a programme. In the event that a subsystem relevant to tunnel safety is re-assessed against any other TSI as a result of renewal or upgrading works, it shall only require re-assessment against this TSI in respect of those systems and components directly affected by the works. Justification: very important sentences to be added. Look at 7.2.1, and of the SRT TSI in force! If the ERA does not wish to agree on such a sentence, it shall prove by a CBA it is possible not to write this; and I am sure they cannot prove it! Upgrade and renewal measures for tunnels The requirement of the current TSI seems to be clearer. A new text is proposed. In any case the definition must be in line with the Infrastructure TSI: New text proposal: Upgrade and renewal measures for tunnels Taking into consideration Directive 2008/57/EC, Article 20(1), any modification of the basic parameters of the structural subsystems as set out in this TSI is deemed to affect the overall safety level of the infrastructure subsystem concerned. Therefore, Member States shall decide to which extend this TSI needs to be applied to the project.if the Member State doesn t give instructions about the compliance of a upgrading or renewal project to this TSI, following measures shall be implemented for tunnel longer than 1000 m INS Inspection of tunnel condition (responsible entity: IM) Prevent unauthorised access to emergency exits and equipment rooms (responsible entity: IM) Fire safety requirements for building materials (only for the new material to be installed. Responsible entity: IM, procurement entity) Escape signage (responsible entity: IM) Emergency communication (responsible entity: IM) ENE Requirements for electrical cables in tunnels, when replacing cables (responsible entity: IM) If not defined otherwise in section 7.5 Specific Cases, the result of renewal or upgrade works shall ensure compatibility of the fixed installations with SRT TSI compliant rolling stock. Guidance to Member States: In case of upgrade and renewal of existing tunnels, this TSI shall be implemented as far as feasible within the project constraints. If a TSI requirement cannot be fully met, it is permitted to improve the original situation towards the TSI defined performance. During upgrade or renewal the safety level of the fixed tunnel installations shall be maintained or improved. August 2012 Page 20/22

21 Application guide: a reference will be made to UNECE (TRANS/AC.9/9, ) that says in part E There are a great many tunnels already in service. Many of them were built when safety considerations were less stringent than today. Obviously they cannot be adapted at reasonable cost to the dimensions suggested for new tunnels. But safety in railway tunnels does not depend only on structural measures it can be enhanced also through rolling stock and operational measures. Therefore, the Group recommends that safety plans (2) for existing tunnels should be established, assessing their safety level and proposing to raise this level, if necessary, through measures that could be realized at reasonable costs. The Group expects these measures to be selected among the minimal standard measures for new tunnels, the first priority being given to non-structural measures. August 2012 Page 21/22

22 Disclaimer Community of European Railway and Infrastructure Companies (CER) AISBL Avenue des Arts 53 B-1000 Brussels Belgium Tel Fax contact@cer.be This CER document is for public information. Although every effort is made to ensure the accuracy of the information in this document, CER cannot be held responsible for any information from external sources, technical inaccuracies, typographical errors or other errors herein. Information and links may have changed without notice. August 2012 Page 22/22

COMMISSION REGULATION (EU) No /.. of XXX

COMMISSION REGULATION (EU) No /.. of XXX EUROPEAN COMMISSION Brussels, XXX [ ](2013) XXX draft COMMISSION REGULATION (EU) No /.. of XXX concerning the technical specification for interoperability relating to "safety in railway tunnels" of the

More information

This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents

This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents 2008D0163 EN 24.01.2013 002.001 1 This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents B COMMISSION DECISION of 20 December 2007 concerning

More information

Uncovering the technical specifications for interoperability as determined by the ERA to harmonise European safety standards

Uncovering the technical specifications for interoperability as determined by the ERA to harmonise European safety standards Uncovering the technical specifications for interoperability as determined by the ERA to harmonise European safety standards München, 12.09.2012, 4 th annual Fire Protection and Safety in Tunnels Content

More information

Draft delegated act for the TSI revision

Draft delegated act for the TSI revision Brussels, 07 October 2016 Draft delegated act for the TSI revision 1 CER aisbl - COMMUNITY OF EUROPEAN RAILWAY AND INFRASTRUCTURE COMPANIES Avenue des Arts, 53-1000 Bruxelles T: +32 (0)2 213 08 70 F: +32

More information

Catalogue of examples

Catalogue of examples Making the railway system work better for society. Examples for the practical arrangements for the vehicle authorisation process Name E. DEL RIO G.TURNER S. YOUNG Drafted by Validated by Approved by H.

More information

TSI OPERATION AND TRAFFIC MANAGEMENT FINAL REPORT ON THE MERGING OF CONVENTIONAL RAIL AND HIGH SPEED TSIS

TSI OPERATION AND TRAFFIC MANAGEMENT FINAL REPORT ON THE MERGING OF CONVENTIONAL RAIL AND HIGH SPEED TSIS INTEROPERABILITY UNIT RATION AND TRAFFIC MANAGEMENT FINAL REPORT ON THE MERGING OF CONVENTIONAL RAIL AND HIGH SPEED TSIS Reference: ERA/CON/2011-02/INT Document type: Final report Version : 0.8 Date :

More information

EUROPEAN RAILWAY AGENCY

EUROPEAN RAILWAY AGENCY EUROPEAN RAILWAY AGENCY INTEROPERABILITY UNIT TECHNICAL OPINION ON GERMAN MINISTRY NOTIFICATION REF. 41351 REFERENCE: IU-WAG- TO3 DOCUMENT TYPE: TECHNICAL OPINION VERSION: 1.0 DATE: 19/10/2009 Edited by

More information

The European Framework for Vehicle Authorisation

The European Framework for Vehicle Authorisation The European Framework for Vehicle Authorisation Torben Holvad 13th Annual Fire Protection of Rolling Stock Conference, 1-2 nd March 2017, Berlin, Germany Content of presentation Brief background about

More information

Key developments in the Channel Tunnel safety rules and the wider EU framework

Key developments in the Channel Tunnel safety rules and the wider EU framework Key developments in the Channel Tunnel safety rules and the wider EU framework Caroline Wake Head of UK Delegation, Channel Tunnel Safety Authority September 2012 1 Channel Tunnel content of presentation

More information

Railway interoperability. Academic perspective

Railway interoperability. Academic perspective Railway interoperability. Academic perspective Ernesto García Vadillo (Prof) Department of Mechanical Engineering University of The Basque Country (UPV/EHU) Brussels, 7th May 2013 1 Contents 1. Directive

More information

QUESTION / CLARIFICATION

QUESTION / CLARIFICATION QUESTION / CLARIFICATION CO-ORDINATION BETWEEN NOTIFIED BODIES INTEROPERABILITY DIRECTIVE AND SUBSEQUENT AMENDMENTS ON THE INTEROPERABILITY OF THE RAIL SYSTEM WITHIN THE UNION QC-RST-015 Issue 02 Date:

More information

Strategic Direction for revised Infrastructure TSI. Issue 1.0

Strategic Direction for revised Infrastructure TSI. Issue 1.0 Strategic Direction for revised Infrastructure TSI Issue 1.0 Approved by the Industry Standards Coordination Committee 22 July 2011 ISCC/012 Copyright 2011 Rail Safety and Standards Board Limited Issue

More information

Infrastructure Based Train Detection Systems

Infrastructure Based Train Detection Systems Infrastructure Based Train Detection Synopsis This document sets out requirements and guidance on infrastructure based train detection systems. Copyright in the Railway Group documents is owned by Rail

More information

M1 DIRECTIVE 2001/16/EC OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 19 March 2001 on the interoperability of the conventional rail system

M1 DIRECTIVE 2001/16/EC OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 19 March 2001 on the interoperability of the conventional rail system 2001L0016 EN 30.04.2004 001.001 1 This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents B M1 DIRECTIVE 2001/16/EC OF THE EUROPEAN PARLIAMENT

More information

Guide for the application of the CR INF TSI

Guide for the application of the CR INF TSI European Railway Agency According to Framework Mandate C(2007)3371 final of 13/07/2007 Reference in ERA: ERA/GUI/07-2011/INT Version in ERA: 1. 00 Date: 26 August 2011 Document elaborated by Document Type:

More information

Directive 96/48/EC - Interoperability of the trans- European high speed rail system

Directive 96/48/EC - Interoperability of the trans- European high speed rail system EN Directive 96/48/EC - Interoperability of the trans- European high speed rail system Technical Specification for Interoperability "Operations and traffic management" Sub-System - 1 / 155 - 1. INTRODUCTION

More information

Rolling stock approval process

Rolling stock approval process Rolling stock approval process Presentation to SEETO Working Group by Frank Walenberg Skopje 9 November 2010 1 Overview Need for the approval process RST approval process in the past Interoperability:

More information

ERA TSI OPE Working document

ERA TSI OPE Working document EN EN EN ERA TSI OPE 2013 Working document concerning the technical specification for interoperability relating to the 'operation and traffic management' subsystem of the rail system in the European Union..

More information

RECOMMENDATION FOR USE

RECOMMENDATION FOR USE Page 1 of 11 CONTENT OF THE TECHNICAL FILE TITLE ORIGINATOR SUBJECT RELATED TO NB-RAIL STRATEGY SG Directive 2008/57/EC (incl. all amendments esp. 2014/106/EU), Recommendation 2014/897/EU, Decision 2010/713/EU

More information

OPINION OF THE EUROPEAN RAILWAY AGENCY ERA/OPI/ QC-RST-015. European Railway Agency. Executive Director FOR

OPINION OF THE EUROPEAN RAILWAY AGENCY ERA/OPI/ QC-RST-015. European Railway Agency. Executive Director FOR 61 59307 European Railway Agency Executive Director OPINION ERA/OPI/2014-1 OF THE EUROPEAN RAILWAY AGENCY FOR EUROPEAN COMMISSION REGARDING QUESTION AND CLARIFICATION NB RAIL - QC-RST-015 Disclaimer: The

More information

Guide for the application of the INF TSI

Guide for the application of the INF TSI European Railway Agency According to Framework Mandate C(2010)2576 final of 29/04/2010 Reference in ERA: ERA/GUI/07-2011/INT Version in ERA: 3.00 Date: 14 December 2015 Document elaborated by Document

More information

UITP EU Committee Position on the ERA Draft Final Report. IU-ExtScope FinalReport. on the Extension of field of application of TSIs

UITP EU Committee Position on the ERA Draft Final Report. IU-ExtScope FinalReport. on the Extension of field of application of TSIs Brussels, 22 April 2009 UITP EU Committee Position on the ERA Draft Final Report IU-ExtScope-20090320-FinalReport dated 20th March 2009 on the Extension of field of application of TSIs The UITP European

More information

SIS Directory Accreditation number: SIS 0130

SIS Directory Accreditation number: SIS 0130 International standard: ISO/IEC 17020:2012 Swiss standard: SN EN ISO/IEC 17020:2012 SCONRAIL AG Zürcherstrasse 41 8400 Winterthur Head: Heiko Germroth Responsible for MS: Heiko Germroth Telephone: +41

More information

Assurance provided by a second pair eyes (RASBO) of the correct Safe integration by the proposer of a new or modified Rolling Stock

Assurance provided by a second pair eyes (RASBO) of the correct Safe integration by the proposer of a new or modified Rolling Stock Quality & Safety for Systems & Software Railway Engineering Assurance provided by a second pair eyes (RASBO) of the correct Safe integration by the proposer of a new or modified Rolling Stock Ir. Marc

More information

RECOMMENDATIONS. (Text with EEA relevance) (2014/897/EU)

RECOMMENDATIONS. (Text with EEA relevance) (2014/897/EU) 12.12.2014 L 355/59 RECOMMDATIONS COMMISSION RECOMMDATION of 5 December 2014 on matters related to the placing in service and use of structural subsystems and vehicles under Directives 2008/57/EC and 2004/49/EC

More information

ERTMS UNIT TRANS-EUROPEAN RAIL SYSTEM SUBSYSTEM CONTROL-COMMAND AND SIGNALLING

ERTMS UNIT TRANS-EUROPEAN RAIL SYSTEM SUBSYSTEM CONTROL-COMMAND AND SIGNALLING EUROPEAN RAILWAY AGENCY ERTMS UNIT Reference: ERA/ERTMS/034171 Document type: Technical Specification for Interoperability Version : final draft 1.1 Date : 13/01/2011 Edited by Quality review Approved

More information

TSI OPERATION AND TRAFFIC MANAGEMENT, CONVENTIONAL RAIL SYSTEM FINAL REPORT ON THE REVISION

TSI OPERATION AND TRAFFIC MANAGEMENT, CONVENTIONAL RAIL SYSTEM FINAL REPORT ON THE REVISION INTEROPERABILITY UNIT TSI OPERATION AND TRAFFIC MANAGEMENT, CONVENTIONAL RAIL SYSTEM FINAL REPORT ON THE REVISION Reference: IU-OPE_final report Document type: Final report Version : 1.5 Date : 06.05.2010

More information

1 Introduction. 2 Abbreviations and Definitions

1 Introduction. 2 Abbreviations and Definitions 1 Introduction This Guideline is intended to give guidance and explanation on the related European legal provisions for the Certification of ECMs. It cannot replace additional self study of the applicable

More information

Memorandum of Understanding (MoU)

Memorandum of Understanding (MoU) EUROPEAN COMMISSION Memorandum of Understanding (MoU) Between the European Commission and the European Railway Associations (CER UIC UNIFE EIM GSM-R Industry Group ERFA) concerning the strengthening of

More information

INTEROPERABILITY UNIT

INTEROPERABILITY UNIT INTEROPERABILITY UNIT STUDIES: 1) MERGING OF HS AND CR TSIS AND 2) SPLITTING OF THE Reference: ERA/REP/13-2011/INT Document type: Report Annex 3 Version of Annex 3: Date of Annex 3: 0.2 24 November 2010

More information

Guide for the application of Technical Specifications for Interoperability (TSIs) Annex 2 Conformity assessment and EC verification

Guide for the application of Technical Specifications for Interoperability (TSIs) Annex 2 Conformity assessment and EC verification European Railway Agency Guide for the application of TSIs European Railway Agency Guide for the application of Technical Specifications for Interoperability (TSIs) Annex 2 Conformity assessment and EC

More information

The Voice of European Railways POSITION PAPER DOMESTIC PASSENGER MARKET OPENING IN THE CONTEXT OF THE 4RP. 18 September October 2009 Page 1/9

The Voice of European Railways POSITION PAPER DOMESTIC PASSENGER MARKET OPENING IN THE CONTEXT OF THE 4RP. 18 September October 2009 Page 1/9 The Voice of European Railways POSITION PAPER DOMESTIC PASSENGER MARKET OPENING IN THE CONTEXT OF THE 4RP 18 September 2012 October 2009 Page 1/9 Introduction CER supports market liberalisation measures

More information

DIRECTIVE (EU) 2016/798 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 11 May 2016 on railway safety (recast) (OJ L 138, , p.

DIRECTIVE (EU) 2016/798 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 11 May 2016 on railway safety (recast) (OJ L 138, , p. 02016L0798 EN 26.05.2016 000.001 1 This text is meant purely as a documentation tool and has no legal effect. The Union's institutions do not assume any liability for its contents. The authentic versions

More information

Traincrew Access to and Egress from Railway Vehicles

Traincrew Access to and Egress from Railway Vehicles Traincrew Access to and Egress from Synopsis This document mandates requirements for traincrew access to and egress from railway vehicles. This document contains requirements that are amended under the

More information

Guide for the application of Technical Specifications for Interoperability (TSIs)

Guide for the application of Technical Specifications for Interoperability (TSIs) European Railway Agency Guide for the application of Technical Specifications for Interoperability (TSIs) According to Framework Mandate C(2007)3371 final of 13/07/2007 Reference in ERA: ERA/GUI/07-2011/INT

More information

***I POSITION OF THE EUROPEAN PARLIAMENT

***I POSITION OF THE EUROPEAN PARLIAMENT EUROPEAN PARLIAMENT 2004 2009 Consolidated legislative document 23.4.2009 EP-PE_TC1-COD(2008)0247 ***I POSITION OF THE EUROPEAN PARLIAMENT adopted at first reading on 23 April 2009 with a view to the adoption

More information

Light Impact Assessment

Light Impact Assessment EUROPEAN UNION AGENCY FOR RAILWAYS O11REC1O28 V1.O Making the railway system work better for society. Light Impact Assessment 4th Railway Package Revision of CCS TSI 120 Rue Marc Lefrancq I BP 20392 ER-59307

More information

DISCUSSION PAPER ON ACCESS TO SERVICE FACILITIES AND RAIL RELATED SERVICES. Article 1. Subject matter

DISCUSSION PAPER ON ACCESS TO SERVICE FACILITIES AND RAIL RELATED SERVICES. Article 1. Subject matter DISCUSSION PAPER ON ACCESS TO SERVICE FACILITIES AND RAIL RELATED SERVICES Disclaimer: This discussion paper does not prejudge the existing or future positions of the European Commission and its services

More information

Guide for the application of the TSI for the Subsystems Control-Command and Signalling Track-side and On-board

Guide for the application of the TSI for the Subsystems Control-Command and Signalling Track-side and On-board CCS TSI Application Making the railway system work better for society. European Union Agency for Railways for the application of the TSI for the Subsystems Control-Command and Signalling Track-side and

More information

RECOMMENDATION FOR USE RFU-CCS-077

RECOMMENDATION FOR USE RFU-CCS-077 Page 1 of 9 TITLE CERTIFICATES WITH RESTRICTIONS AND CONDITIONS FOR USE ORIGINATOR ALTRAN, CERTIFER, SINTEF, VŮŽ SUBJECT RELATED TO SUBSYSTEM CCO AND CCT DESCRIPTION AND BACKGROUND EXPLANATION Introduction

More information

Strategic Direction for revised Locomotive and Passenger Rolling Stock (LOC&PAS) TSI. Issue 1.0

Strategic Direction for revised Locomotive and Passenger Rolling Stock (LOC&PAS) TSI. Issue 1.0 Strategic Direction for revised Locomotive and Passenger Rolling Stock (LOC&PAS) TSI Issue 1.0 Approved by the Industry Standards Coordination Committee 22 July 2011 ISCC/010 Copyright 2011 Rail Safety

More information

Getting new trains on track

Getting new trains on track Fourth railway package Getting new trains on track Dr. Josef Doppelbauer, Executive Director, European Union Agency for Railways (ERA), Valenciennes, France At the end of the three-year implementation

More information

Impact Assessment for Changes to Railway Group Standards

Impact Assessment for Changes to Railway Group Standards Impact Assessment for Changes to Railway Group Standards Version: Final Date: 27 January 2011 Relevant Railway Group Standard Title: Rail Vehicle Maintenance Number: GM/RT2004 Issue: Four Synopsis: This

More information

DISCUSSION PAPER ON ACCESS TO SERVICE FACILITIES AND RAIL RELATED SERVICES

DISCUSSION PAPER ON ACCESS TO SERVICE FACILITIES AND RAIL RELATED SERVICES DISCUSSION PAPER ON ACCESS TO SERVICE FACILITIES AND RAIL RELATED SERVICES Disclaimer: This discussion paper does not prejudge the existing or future positions of the European Commission and its services

More information

Your Power Traction energy

Your Power Traction energy Your Power Traction energy Table of content 1. What is traction energy? 3 1.1 From producer to train 1.2 Advantages 1.3 Energy, voltage or current 1.4 Transport and distribution 1.5 Supply of traction

More information

DIRECTIVES. (Text with EEA relevance)

DIRECTIVES. (Text with EEA relevance) L 138/44 26.5.2016 DIRECTIVES DIRECTIVE (EU) 2016/797 OF THE EUROPEAN PARLIAMT AND OF THE COUNCIL of 11 May 2016 on the interoperability of the rail system within the European Union (recast) (Text with

More information

Application note 5 Relationship of Yellow Book with European Directives

Application note 5 Relationship of Yellow Book with European Directives Railway Safety Management Yellow Book 4 Application note 5 Relationship of Yellow Book with European Directives Published by RSSB on behalf of the UK rail industry C:\Documents and Settings\djohnson\Desktop\KJWYBrelationshipwithEUDirectives.doc

More information

DIRECTIVES. (Text with EEA relevance)

DIRECTIVES. (Text with EEA relevance) 25.6.2014 L 184/11 DIRECTIVES COMMISSION DIRECTIVE 2014/82/EU of 24 June 2014 amending Directive 2007/59/EC of the European Parliament and of the Council as regards general professional knowledge and medical

More information

3. OBJECTIVES AND PRIORITIES:

3. OBJECTIVES AND PRIORITIES: 3. OBJECTIVES AND PRIORITIES: 3.1. Priorities related to bridging missing links, removing bottlenecks, enhancing rail interoperability, and, in particular, improving cross-border sections 3.1.4. European

More information

GE/GN8640. Risk Evaluation and Assessment. Guidance on Planning an Application of the Common Safety Method on. Rail Industry Guidance Note

GE/GN8640. Risk Evaluation and Assessment. Guidance on Planning an Application of the Common Safety Method on. Rail Industry Guidance Note GN Published by: Block 2 Angel Square 1 Torrens Street London EC1V 1NY Copyright 2014 Rail Safety and Standards Board Limited GE/GN8640 Method on Risk Evaluation and Assessment Issue One; June 2014 Rail

More information

Railway Safety Directive 2004/49/EC & Role of European Railway Agency (ERA)

Railway Safety Directive 2004/49/EC & Role of European Railway Agency (ERA) Railway Safety Directive 2004/49/EC & Role of European Railway Agency (ERA) Dragan JOVICIC Safety Assessment Sector (Safety Unit) Slide n 1 Content of the presentation 1. Role of European Railway Agency

More information

Infrastructure Based Train Detection Interface Requirements

Infrastructure Based Train Detection Interface Requirements Uncontrolled When Printed Railway Group Standard Infrastructure Based Train Detection Interface Synopsis This document specifies the interface requirements for infrastructure based train detection systems

More information

CE marking for Noise Barriers to be installed alongside Road Infrastructures. ENBF Guidelines & Recommendations. Version 1.

CE marking for Noise Barriers to be installed alongside Road Infrastructures. ENBF Guidelines & Recommendations. Version 1. CE marking for Noise Barriers to be installed alongside Road Infrastructures ENBF Guidelines & Recommendations Version 1.0 - June 2014 Drafted by: Giovanni Brero UNICMI Fabrice Albrechts BAYER 1 INDEX

More information

COMMISSION REGULATION (EU)

COMMISSION REGULATION (EU) L 320/8 Official Journal of the European Union 17.11.2012 COMMISSION REGULATION (EU) No 1078/2012 of 16 November 2012 on a common safety method for monitoring to be applied by railway undertakings, infrastructure

More information

CHANNEL TUNNEL SAFETY AUTHORITY WORK PLAN 2016

CHANNEL TUNNEL SAFETY AUTHORITY WORK PLAN 2016 SUPERVISION (INSPECTION AND AUDIT) CHANNEL TUNNEL SAFETY AUTHORITY WORK PLAN 2016 RESCUE & PUBLIC SAFETY WORKING GROUP Fire detection systems ageing equipment infrastructure Emergency response safety Review

More information

RID 2015 Impact for the wagon keepers

RID 2015 Impact for the wagon keepers 1 RID 2015 Impact for the wagon keepers 2 RID 2015 Text of RID 2015 is available on the internet sites of OTIF (F, D, EN) and SPF Mobility (F, NL) : http://www.otif.org/en/publications/rid-2015.html http://www.mobilit.belgium.be/fr/traficferroviaire/ssicf/ma

More information

13/12/2012 Page 1 Rule Management Tool ver 1

13/12/2012 Page 1 Rule Management Tool ver 1 13/12/2012 Page 1 Rule Management Tool ver 1 1 type 1-rule 2 type 1-rule 3 type 1-rule concerning existing national safety targets concerning existing national safety methods concerning existing national

More information

EUROPEAN STANDARDS FOR ROAD TUNNELS AND THEIR IMPLEMENTATION FOR AUSTRIA

EUROPEAN STANDARDS FOR ROAD TUNNELS AND THEIR IMPLEMENTATION FOR AUSTRIA - 1 - EUROPEAN STANDARDS FOR ROAD TUNNELS AND THEIR IMPLEMENTATION FOR AUSTRIA Hoerhan R. Ministry of Transport, Innovation and Technology, Vienna ABSTRACT With the entry into force of the EU-Directive

More information

INTEROPERABILITY UNIT COMPLEMENTARY STUDY INTERCHANGEABLE SPARE PARTS

INTEROPERABILITY UNIT COMPLEMENTARY STUDY INTERCHANGEABLE SPARE PARTS INTEROPERABILITY UNIT COMPLEMENTARY STUDY INTERCHANGEABLE SPARE PARTS Reference: ERA/REP/10-2011/INT Document type: Final Report Version: 3 Date: 26 September 2011 Edited by Checked by Approved by Name

More information

Draft working document

Draft working document EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT DIRECTORATE B EUROPEAN MOBILITY NETWORK Single European Rail Area Draft working document Communication of draft technical regulations

More information

This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents

This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents 2004L0049 EN 30.07.2014 003.002 1 This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents B C1 DIRECTIVE 2004/49/EC OF THE EUROPEAN PARLIAMENT

More information

Assessment of Route Compatibility of Vehicles and Infrastructure

Assessment of Route Compatibility of Vehicles and Infrastructure Compatibility of Vehicles and Synopsis This document sets out requirements and responsibilities for the assessment of route compatibility of vehicles and infrastructure. Copyright in the s is owned by

More information

Draft. COMMISSION REGULATION (EU) No /..

Draft. COMMISSION REGULATION (EU) No /.. EN EN EN EUROPEAN COMMISSION Brussels, C(2010) Draft COMMISSION REGULATION (EU) No /.. of [ ] on the technical specification for interoperability relating to the subsystem 'telematics applications for

More information

11 th UIC Railway Noise Workshop

11 th UIC Railway Noise Workshop 11 th UIC Railway Noise Workshop NOI TSI Revision Kamil Pravdík, Project Officer NOI TSI in general Directive (EU) 2016/797 (Interoperability Directive): technical specification for interoperability (TSI)

More information

(Non-legislative acts) REGULATIONS

(Non-legislative acts) REGULATIONS 11.12.2010 Official Journal of the European Union L 327/13 II (Non-legislative acts) REGULATIONS COMMISSION REGULATION (EU) No 1169/2010 of 10 December 2010 on a common safety method for assessing conformity

More information

Council of the European Union Brussels, 4 February 2019 (OR. en)

Council of the European Union Brussels, 4 February 2019 (OR. en) Council of the European Union Brussels, 4 February 2019 (OR. en) Interinstitutional File: 2017/0294(COD) 5874/19 ER 43 COEST 21 CODEC 239 NOTE From: To: No. Cion doc.: 14204/17 Subject: General Secretariat

More information

Further information on the legislation can be found in all EU languages on EUR-LEX website:

Further information on the legislation can be found in all EU languages on EUR-LEX website: Making the railway system work better for society. 4 th Railway Package What is the 4 th Railway Package and its technical pillar? The 4 th Railway Package is a set of legislative texts designed to complete

More information

European Railway Agency. Impact Assessment Report

European Railway Agency. Impact Assessment Report European Railway Agency ERA studies: STUDIES: 1) MERGING OF HS AND CR TSIS AND 2) SPLITTING OF THE TRANSVERSAL TSIS Impact Assessment Report Reference: (filename) Document type: Final report Version :

More information

Safety Regulation for Rail Sector in Europe

Safety Regulation for Rail Sector in Europe Safety Regulation for Rail Sector in Europe Roberto Piazza Safety Unit Moscow, 21 June 2007 1 Content 1. The legal basis and the main principles of safety regulation in the EU 2. The role of the European

More information

Complete presentation

Complete presentation Complete presentation SUMMARY Presentation of a new European project TRANSFEU Why FSE for railways rolling stock General methodology for FSE Method for fire toxicity evaluation Transfeu consortium 2 Overview

More information

Infrastructure Standards Committee / Industry Standards Coordination Committee DATE: 6 January 2015 / 21 January 2015 SUBJECT:

Infrastructure Standards Committee / Industry Standards Coordination Committee DATE: 6 January 2015 / 21 January 2015 SUBJECT: MEETING: Infrastructure Standards Committee / Industry Standards Coordination Committee DATE: 6 January 2015 / 21 January 2015 SUBJECT: SPONSOR: AUTHOR: Agenda item 2.6 TSI / RGS / Network Rail initial

More information

Benefits of harmonized regulations for placing in service of railway equipment - European experiences. Peter Mihm Head of Technical Cooperation

Benefits of harmonized regulations for placing in service of railway equipment - European experiences. Peter Mihm Head of Technical Cooperation Benefits of harmonized regulations for placing in service of railway equipment - European experiences Peter Mihm Head of Technical Cooperation General presentation Railway Safety Interoperability ERTMS

More information

GB Requirements for Platform Height, Platform Offset and Platform Width

GB Requirements for Platform Height, Platform Offset and Platform Width GB Requirements for Platform Height, Platform Offset and Platform Width Synopsis This document sets out Great Britain (GB) requirements in scope of National Technical Rules for platform height, platform

More information

Reporting High Risk Defects

Reporting High Risk Defects Railway Industry Standard RIS-8250-RST Issue One Date December 2016 Reporting High Risk Defects Synopsis This document defines requirements for recording, analysing and reporting safety-related defects

More information

Appendix E.3 Requirements for on-board Energy Measuring System on traction units running on the Infrabel-network. 1 Purpose and introduction...

Appendix E.3 Requirements for on-board Energy Measuring System on traction units running on the Infrabel-network. 1 Purpose and introduction... NETWORK STATEMENT Appendix E.3 Requirements for on-board Energy Measuring System on traction units running on the Infrabel-network Table of content 1 Purpose and introduction... 2 2 Energy Measuring System

More information

1 Introduction. 1.1 Purpose of the guide. 1.2 Who is this guide for?

1 Introduction. 1.1 Purpose of the guide. 1.2 Who is this guide for? 1 Introduction Railway undertakings and infrastructure managers bear the full responsibility for the safe operation of the railway system and the control of risks associated with it, each in relation to

More information

The 3 sheets: Back Info-General, Back Info - Roles and Resps, and Back Info - Timeframe shall be filled in with the relevant information.

The 3 sheets: Back Info-General, Back Info - Roles and Resps, and Back Info - Timeframe shall be filled in with the relevant information. Background information The 3 sheets: Back Info-General, Back Info - Roles and Resps, and Back Info - Timeframe shall be filled in with the relevant information. The cells coloured in: are those to be filled

More information

Boosting International Rail Freight. Sector Statement on Rail Freight Corridors

Boosting International Rail Freight. Sector Statement on Rail Freight Corridors Boosting International Rail Freight Sector Statement on Rail Freight Corridors Brussels, 20 May 2016 1 Sector Statement on Rail Freight Corridors: Boosting International Rail Freight 20 May 2016 - final

More information

Railway Interoperability and Safety Committee. Working document

Railway Interoperability and Safety Committee. Working document 08/57-ST08 RISC 58 Version 01 Origin 16.09.2010 Status NA Railway Interoperability and Safety Committee Working document Draft Commission Regulation on the technical specification for interoperability

More information

The Voice of European Railways POSITION PAPER

The Voice of European Railways POSITION PAPER POSITION PAPER Commission proposal 2013/0297 (COD) amending Regulation EC 91/2003 of 16 December 2002 on rail transport statistics as regards the collection of data on goods, passenger, and accidents November

More information

3. OBJECTIVES PURSUED BY THIS WORK PROGRAMME AND THE FUNDING PRIORITIES:

3. OBJECTIVES PURSUED BY THIS WORK PROGRAMME AND THE FUNDING PRIORITIES: 3. OBJECTIVES PURSUED BY THIS WORK PROGRAMME AND THE FUNDING PRIORITIES: 3.1.3. Rail interoperability including interoperability of the Rail Freight Corridors Priority open only to the Cohesion Member

More information

DIRECTIVE 2012/34/EU OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 21 November 2012 establishing a single European railway area (recast)

DIRECTIVE 2012/34/EU OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 21 November 2012 establishing a single European railway area (recast) 02012L0034 EN 24.12.2016 001.001 1 This text is meant purely as a documentation tool and has no legal effect. The Union's institutions do not assume any liability for its contents. The authentic versions

More information

COMMISSION OPINION. of

COMMISSION OPINION. of EUROPEAN COMMISSION Brussels, 25.11.2011 C(2011) 8572 final COMMISSION OPINION of 25.11.2011 pursuant to Article 3(1) of Regulation (EC) No 715/2009 and Article 10(6) of Directive 2009/73/EC - France -

More information

Incident Response Planning & Management

Incident Response Planning & Management Incident Response Planning & Synopsis This standard identifies interface requirements for enabling a consistent, comprehensive and structured process for rail incident response planning and management.

More information

THE TRANS-EUROPEAN HIGH-SPEED RAIL SYSTEM Guide for the application of the high-speed TSIs of Council Directive 96/48/EC

THE TRANS-EUROPEAN HIGH-SPEED RAIL SYSTEM Guide for the application of the high-speed TSIs of Council Directive 96/48/EC THE TRANS-EUROPEAN HIGH-SPEED RAIL SYSTEM Guide for the application of the high-speed TSIs of Council Directive 96/48/EC THE TRANS-EUROPEAN HIGH-SPEED RAIL SYSTEM Guide for the application of the high-speed

More information

SUPPLIES REVIEW. This English translation is provided for information only. Only the French original version constitutes a contractual document.

SUPPLIES REVIEW. This English translation is provided for information only. Only the French original version constitutes a contractual document. SQ 908 Indice E Railway Application Quality Specification ENSURING THE QUALITY OF PRODUCTS PURCHASED BY SNCF SUPPLIES REVIEW Issue date November 2009 This English translation is provided for information

More information

Guidance for CRR Inspectors, Railway Undertakings, Infrastructure Managers and Applicants for ECM Certification. Issue Date.

Guidance for CRR Inspectors, Railway Undertakings, Infrastructure Managers and Applicants for ECM Certification. Issue Date. CRR-G-027-B Guidance for CRR Inspectors, Railway Undertakings, Infrastructure Managers and Applicants for ECM Certification Issue Prepared by Reviewed by 2.0 Michael Neale Liam Logan Approved by Issue

More information

Revision of the Energy Efficiency Directive. Position Paper. Brussels, 05 April 2017

Revision of the Energy Efficiency Directive. Position Paper. Brussels, 05 April 2017 Position Paper Brussels, 05 April 2017 Revision of the Energy Efficiency Directive 1 CER aisbl - COMMUNITY OF EUROPEAN RAILWAY AND INFRASTRUCTURE COMPANIES Avenue des Arts, 53-1000 Bruxelles T: +32 (0)2

More information

DRAFT IMPLEMENTING DECREE. of 2016

DRAFT IMPLEMENTING DECREE. of 2016 1. ------IND- 2016 0202 CZ- EN- ------ 20160523 --- --- PROJET II. DRAFT IMPLEMENTING DECREE of 2016 on the requirements for the safe management of radioactive waste and on the decommissioning of nuclear

More information

Vehicle authorisation for broad gauge railways

Vehicle authorisation for broad gauge railways Brussels, 21 December 2016 Vehicle authorisation for broad gauge railways 1 CER aisbl - COMMUNITY OF EUROPEAN RAILWAY AND INFRASTRUCTURE COMPANIES Avenue des Arts 53-1000 Bruxelles T: +32 (0)2 213 08 70

More information

European Railway Agency SIAFI

European Railway Agency SIAFI European Railway Agency SIAFI 2007 23.04.2007 At the beginning Establishment of the Agency The first proposal for establishment of the European Railway Agency was made by the Commission on 23 January 2002

More information

INTEROPERABILITY UNIT

INTEROPERABILITY UNIT EUROPEAN RAILWAY AGENCY INTEROPERABILITY UNIT TAF TSI - ANNEX A.5 :FIGURES AND SEQUENCE DIAGRAMS OF THE TAF TSI REFERENCE: ERA-TD-100 DOCUMENT TYPE: TECHNICAL DOCUMENT VERSION: 2.0 (DRAFT) TAF TSI DATE:

More information

ROSA a computer based safety model for European railways

ROSA a computer based safety model for European railways Computers in Railways XII 771 ROSA a computer based safety model for European railways J. Schütte 1 & M. Geisler 2 1 Dresden University of Technology, Germany 2 Deutsche Bahn AG, Frankfurt, Germany Abstract

More information

EUROPEAN COMMISSION Directorate-General for Internal Market, Industry, Entrepreneurship and SMEs

EUROPEAN COMMISSION Directorate-General for Internal Market, Industry, Entrepreneurship and SMEs EUROPEAN COMMISSION Directorate-General for Internal Market, Industry, Entrepreneurship and SMEs Single Market Policy, Regulation and Implementation Standards for Growth Ref. Ares(2016)6548298-22/11/2016

More information

COMMISSION RECOMMENDATION. of XXX. on the audits and assessments performed by notified bodies in the field of medical devices

COMMISSION RECOMMENDATION. of XXX. on the audits and assessments performed by notified bodies in the field of medical devices EUROPEAN COMMISSION Brussels, XXX [ ](2013) XXX draft COMMISSION RECOMMENDATION of XXX on the audits and assessments performed by notified bodies in the field of medical devices (Text with EEA relevance)

More information

REGULATING RAILWAY SAFETY IN A CHANGING POLITICAL ENVIRONMENT

REGULATING RAILWAY SAFETY IN A CHANGING POLITICAL ENVIRONMENT REGULATING RAILWAY SAFETY IN A CHANGING POLITICAL ENVIRONMENT Caroline Wake Head of UK Delegation Channel Tunnel Safety Authority SUMMARY This paper describes in outline the history of the development

More information

The Voice of European Railways POSITION PAPER. Policy Principles for Rail Freight Noise Mitigation. 12 September 2013

The Voice of European Railways POSITION PAPER. Policy Principles for Rail Freight Noise Mitigation. 12 September 2013 POSITION PAPER Policy Principles for Rail Freight Noise Mitigation 12 September 2013 Contents EXECUTIVE SUMMARY 3 1. INTRODUCTION: THE RAILWAYS AND NOISE 4 2. THE LEGAL BASIS 5 3. CER POLICY PRINCIPLES

More information

TM P Report of the project, including Guidelines for the cooperation and communication between Traffic control centres

TM P Report of the project, including Guidelines for the cooperation and communication between Traffic control centres TM P1 2014 Report of the project, including Guidelines for the cooperation and communication between Traffic control centres RailNetEurope Oelzeltgasse 3/8 AT-1030 Vienna Phone: +43 1 907 62 72 00 Fax:

More information

COMMISSION OF THE EUROPEAN COMMUNITIES. Proposal for a DIRECTIVE OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL

COMMISSION OF THE EUROPEAN COMMUNITIES. Proposal for a DIRECTIVE OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL COMMISSION OF THE EUROPEAN COMMUNITIES Proposal for a Brussels, 13.12.2006 COM(2006) 783 final 2006/0273 (COD) DIRECTIVE OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL on the interoperability of the Community

More information

Assessment of Compatibility of Rolling Stock and Infrastructure Gauging and Stepping Distances

Assessment of Compatibility of Rolling Stock and Infrastructure Gauging and Stepping Distances Uncontrolled When Printed Railway Group Standard Assessment of Compatibility of Rolling Stock and Infrastructure Gauging and Stepping Distances Synopsis This document mandates specific requirements and

More information