PJM Capacity Market. October 5, 2011 OPSI Seventh Annual Meeting Andrew L. Ott, Senior Vice President, Market Services
|
|
- Juliet Moore
- 5 years ago
- Views:
Transcription
1 PJM Capacity Market October 5, 2011 OPSI Seventh Annual Meeting Andrew L. Ott, Senior Vice President, Market Services
2 Capacity vs. Energy Capacity A commitment of a resource to provide energy during PJM emergency. Capacity revenues paid to committed resource whether or not energy is produced by resource. Long-term commitment Daily product Energy Generation of electric power over a period of time Energy revenues paid to resource based on participation in Day-Ahead or Real-Time energy market Daily / hourly commitment Hourly or real-time product $1000 / MWh offer cap Capacity, energy & ancillary services revenues are expected, in the long term, to meet the fixed and variable costs of generation resources to ensure that adequate generation is maintained for reliability of the electric grid. 2
3 Counterintuitive results - prices falling but reliability violations increasing One price does not fit all Not coupled to locational value Not coupled to operational reliability Not coupled to value provided Insufficient information to drive investment Short-term market / limited forward certainty Pre 2005 Capacity Market Issues 3
4 Decreasing Prices / Increasing Generation Retirement Pre-2005 Capacity Market : Significant Concerns 2004/2005 Assessment Decreasing Reserve Margin / Increasing Reliability Violations 4
5 Why is a Resource Adequacy Construct Necessary? Prevents Load Serving Entities from leaning on the system Provides a metric to quantify adequate generation supply Provides demand customers with capability to ensure long-term generation adequacy and short term generation availability to serve load. Provides RTO with call on energy from capacity resources during generation shortage condition. Purpose of resource adequacy is to quantify reliability standards and equitably distribute reliability obligation. 5
6 Why Develop Forward Capacity Market? Provide transparent price signal to quantify cost of reliability requirement in time for actionable response Obtain resource commitments to meet system peak loads three years in the future Align pricing with reliability requirements and promote competition between resource alternatives Provide longer-term price signal and stable revenue stream for generation resources to incent investment where needed. PJM Capacity Market is explicitly designed to provide revenue adequacy and the resultant reliability. 6
7 Stakeholder Consensus for Moving to Forward Capacity Market was Difficult and Required Board / Regulatory Intervention 2004 PJM identified significant projected shortfall in resource adequacy Stakeholders agreed with problem statement Two-year stakeholder debate on solution Lack of consensus PJM Board filed forward capacity solution with Federal Regulator FERC ordered settlement process to finalize solution Forward Capacity Market implemented in
8 PJM Capacity Market PJM Capacity Market 80% 20% Reliability Pricing Model (RPM) PJM secures capacity on behalf of Load Servers to satisfy capacity obligations not satisfied through self-supply. Fixed Resource Requirement Alternative (FRR) (self-supply) Load Server secures capacity to satisfy their load obligation. PJM Capacity Market is designed to ensure adequate availability of resources that can be called upon to ensure the reliability of the electric grid. 8
9 Foundation for RPM Structure RPM Structure Auction Structure Market Power Mitigation Performance Requirements Self-Supply Alternative (FRR Option) Resource Adequacy Requirement Locational Constraints Forward Procurement 9
10 3 Years RPM Structure May Base Residual Auction Sept July 20 months EFORd Fixed 10 months Feb. 3 months June Delivery Year May First Incremental Auction Second Incremental Auction Third Incremental Auction Ongoing Bilateral Market 10
11 Locational Constraints Resources in the unconstrained area can help meet the Reliability Requirement of the constrained area Unconstrained Locational Delivery Area (LDA) RCP = $16.46/MW-day Import Constrained Area RCP = $198.42/ MW-day In the event the import limit is reached, more expensive capacity located within the constrained area needs to be committed to meet the local Reliability Requirement The amount of resources in the unconstrained area that can help meet the constrained area is limited by the actual transfer limit as calculated by PJM Planning Engineers. 11
12 Price = UCAP Price ($/MW-day) 1.5 Net Cone Net Cone 0.2 Net Cone Variable Resource Requirement (VRR) Curve (a) (b) Example Target Level = Reliability Requirement Short Term Resource Procurement Target (c) (IRM 3%) IRM (IRM + 1%) (IRM + 5%) Quantity = UCAP MW A VRR Curve is defined for the PJM Region. Individual VRR Curves are defined for each Constrained LDA. 12
13 Graphical Illustration of Auction Clearing 2012/13 Base Auction VRR Curve Clearing determined by the intersection of the supply and the demand (VRR) curves. 13
14 What Has RPM Done for PJM Region? What has does capacity cost? Prior to RPM, Default capacity rate was $160 per MW-day Prior to market issues identified in , capacity prices annual product were about $100 per MW-day Net Cost of new entry is between $240 - $340 per MW-day Over the eight RPM auctions, the weighted average payment for capacity in PJM was $ per MW-day For comparison purpose, $ $100 * 149,000 MW *365 = $1.23 Billion Incremental Analysis = $1.23 Billion / 31,365 MW = $39,328 per MW Market Monitor reports the 20-year levelized cost of New Resources are*: $131,044 per MW for Gas-fired Combustion Turbine $175,250 per MW for Gas-fired Combined Cycle $ 465,455 per MW for Coal Plant * Source: 2010 State of Market Report issued by independent Market Monitor Incremental Capacity Benefit in PJM region resulting from RPM Source: 2011 Brattle Report Resource Demand Response New Generation Uprated Generation Canceled Retirement Increased Imports Total Amount Cleared 11,799 MW 4,750 MW 4,929 MW 3,262 MW 6,896 MW 31,365 MW RPM has been a lower cost alternative to building new generation to keep the lights on in PJM 14
15 RPM Base Residual Auction Resource Clearing Prices (RCP) 15
16 RPM Performance Assessment Independent Consultant (Brattle Group) - Primary Findings RPM has achieved resource adequacy RPM has attracted and retained sufficient capacity to meet or exceed reliability requirements in the RTO and every LDA Moderate capacity deficits occurred in some LDAs in early years due to pre-rpm conditions, but no shortages anywhere in the last 4 Base Auctions Prices have been consistent with market conditions Lower prices (below Net CONE) under excess supply conditions Higher prices under tighter supply conditions, but still below Net CONE in recent auctions RPM has reduced costs by fostering competition Generally level playing field has reduced costs by attracting investments in lowcost supplies from demand response, efficiency and uprates RPM has enabled cost-effective response to environmental rules Facilitated economically efficient tradeoffs among investment in environmental retrofits, retirement and replacement with lower-cost alternative supplies 16
17 PJM Capacity Market Thank You More information: 17
What is a Capacity Market?
What is a Capacity Market? Mechanism that ensures sufficient generation to meet reliability and peak load needs. Additional potential benefit of capacity markets is the incentive to build new generation.
More informationKey Issues and Consideration in Market Design, Operational and Oversight
Key Issues and Consideration in Market Design, Operational and Oversight Patrick Donlon Amanda Gordon Kathryn Sophy Kenneth Villwock Public Utilities Commission of Ohio & Pennsylvania Public Utilities
More informationPJM Wholesale Markets. Hisham Choueiki, Ph.D., P.E. Ohio PUC Staff October 20-24, 2014 Tbilisi, Georgia
PJM Wholesale Markets Hisham Choueiki, Ph.D., P.E. Ohio PUC Staff October 20-24, 2014 Tbilisi, Georgia PJM RTO Functions Grid Operation Non-discriminatory treatment Monitoring transmission system Reliability
More informationMarket Settlements - Advanced
Market Settlements - Advanced RPM Module PJM State & Member Training Dept. PJM 2017 Capacity vs. Energy Capacity A commitment of a resource to provide energy during PJM emergency under the capped energy
More informationReliability Pricing Model (RPM) Overview. April 11, 2005
Reliability Pricing Model (RPM) Overview April 11, 2005 Drivers for Capacity Market Reform Generation Net Revenue Shortfall Inconsistency between capacity pricing and reliability requirements Result has
More information2011/2012 RPM Base Residual Auction Results
Executive Summary The 2011/12 Reliability Pricing Model (RPM) Base Residual Auction (BRA) cleared 132,221.5 MW of unforced capacity in the RTO at a uniform Resource Clearing Price of $110.00/MW-day. This
More informationPJM Organization and Markets. Saudi Delegation Columbus Ohio May 22, 2012
PJM Organization and Markets Saudi Delegation Columbus Ohio May 22, 2012 Agenda Introduction & Governance Energy Markets LMP FTRs/ARRs Two Settlement Virtual Bids Ancillary Capacity - Reliability Pricing
More information2013/2014 RPM Base Residual Auction Results
Executive Summary The 2013/2014 Reliability Pricing Model (RPM) Base Residual Auction (BRA) cleared 152,743.3 MW of unforced capacity in the RTO at a Resource Clearing Price of $27.73/MW-day. This MW and
More informationThe 2017/2018 RPM Base Residual Auction: Sensitivity Analyses Revised
The 2017/2018 RPM Base Residual Auction: Sensitivity Analyses Revised The Independent Market Monitor for PJM August 26, 2014 Monitoring Analytics 2014 www.monitoringanalytics.com This page intentionally
More information2008/ 2009 RPM Base Residual Auction Results
Introduction The purpose of this document is to provide additional information for PJM stakeholders regarding the 2008/2009 Reliability Pricing Model (RPM) Base Residual Auction results. The discussion
More informationCompetitive Markets 1
Competitive Markets 1 Why Regulation? Electric service has historically been considered a monopoly service The provision of electric service traditionally required huge investments in infrastructure Electricity
More informationPJM s Experience with the RPM Capacity Market
PJM s Experience with the RPM Capacity Market 2013 Austin Electricity Conference Panel 1: Are Capacity Market Necessary to Ensure Adequate Generating Reserve Paul M. Sotkiewicz, Ph.D. Chief Economist PJM
More informationAnalysis of the 2012/2013 RPM Base Residual Auction
Analysis of the 2012/2013 RPM Base Residual Auction The Independent Market Monitor for PJM August 6, 2009 Monitoring Analytics 2009 www.monitoringanalytics.com Introduction This report, prepared by the
More information2013/2014 RPM Base Residual Auction Planning Period Parameters
Introduction The RPM Base Residual Auction (BRA) for the 2013/2014 Delivery Year is scheduled to be conducted in May of 2010. The planning period parameters to be used as input into the 2013/2014 BRA are
More informationCapacity Performance FAQ Response
PJM Interconnection September 15, 2014 This page is intentionally left blank. PJM 2014 www.pjm.com 2 P age Contents FAQ Response Introduction... 4 Capacity Products... 4 Methodology for Establishing Maximum
More informationCompetitive Markets. Facilitated Dialogue: Market Restructuring & Renewable Energy. June 10-12, 2013 Mexico City, Mexico. Hisham Choueiki, Ph.D., P.E.
Competitive Markets Facilitated Dialogue: Market Restructuring & Renewable Energy June 10-12, 2013 Mexico City, Mexico Hisham Choueiki, Ph.D., P.E. Department of Energy and Environment Public Utilities
More informationComparison Matrix of Existing Capacity Market Attributes: RPM & FCM
Comparison Matrix of Existing Capacity Market Attributes: RPM & FCM RPM / PJM FCM / ISO-NE Qualification for Existing Resources Qualification for New Resources Procurement cycle Commitment Term Base Auction
More informationModifications to RPM to Accommodate State Public Policy Initiatives. July 17-18, 2017 PJM CCPPSTF
Modifications to RPM to Accommodate State Public Policy Initiatives July 17-18, 2017 PJM CCPPSTF Background Load interests have consistently expressed a high level of concern about RPM Proposed alternative
More informationCapacity Market. Overview. RPM Capacity Market. Market Design
Section 5 Capacity Capacity Market Each organization serving PJM load must meet its capacity obligations through the PJM Capacity Market, where load serving entities (LSEs) must pay the locational capacity
More informationCAPACITY MARKETS 5. Overview. RPM Capacity Market Market Design. Market Structure
2009 Quarterly State of the Market Report for PJM: January through September Section 5 - Capacity Markets Each organization serving PJM load must meet its capacity obligations by acquiring capacity resources
More information2017/2018 RPM Base Residual Auction Planning Period Parameters
Introduction The RPM Base Residual Auction (BRA) for the 2017/2018 Delivery Year is scheduled to be conducted in May of 2014. This document describes the 2017/2018 BRA planning period parameters and also
More informationAnalysis of the 2020/2021 RPM Base Residual Auction
Analysis of the 2020/2021 RPM Base Residual Auction The Independent Market Monitor for PJM November 17, 2017 Monitoring Analytics 2017 www.monitoringanalytics.com Introduction This report, prepared by
More informationDesign Considerations for an Alberta Capacity Market
Design Considerations for an Alberta Capacity Market Monitoring Analytics September 21, 2016 Monitoring Analytics 2016 www.monitoringanalytics.com This page intentionally left blank. Monitoring Analytics
More informationGeneration Capacity Mechanisms and Resource Adequacy Planning
Generation Capacity Mechanisms and Resource Adequacy Planning Jennifer Heintz Public Service Commission of the State of Missouri February 7, 2013 Abu Dhabi, UAE Electricity Markets in the U.S. and Canada
More informationCapacity Performance Proposal. Summary of Key Design Elements
December 3, 2014 This page is intentionally left blank. PJM 2014 1 P a g e Capacity Product Synopsis PJM Interconnection is proposing a single capacity product called Capacity Performance, similar to the
More information2018/2019 RPM Base Residual Auction Planning Period Parameters
Introduction The planning parameters for the 2018/2019 RPM Base Residual Auction (BRA) that is to be conducted in May of 2015 were posted on the PJM RPM website on January 30, 2015. Two versions of the
More informationAnalysis of the 2017/2018 RPM Base Residual Auction
Analysis of the 2017/2018 RPM Base Residual Auction The Independent Market Monitor for PJM October 6, 2014 Monitoring Analytics 2014 www.monitoringanalytics.com Introduction This report, prepared by the
More informationPJM Manual 18: PJM Capacity Market. Revision: 14 Effective Date: February 23, Prepared by PJM Capacity Market Operations PJM 2012
PJM Manual 18: PJM Capacity Market Revision: 14 Effective Date: February 23, 2012 Prepared by PJM Capacity Market Operations PJM 2012 PJM 2012 i Table of Contents PJM Manual 18: PJM Capacity Market Table
More informationCapacity Market. Overview RPM Capacity Market. Market Design
Section 4 Capacity Capacity Market Each organization serving PJM load must meet its capacity obligations through the PJM Capacity Market, where load serving entities (LSEs) must pay the locational capacity
More information2020/2021 RPM Base Residual Auction Planning Period Parameters
Introduction The planning parameters for the 2020/2021 RPM Base Residual Auction (BRA) that is to be conducted in May of 2017 were posted on the PJM RPM website on February 1, 2017. This document describes
More information3.3.1 Cost of New Entry
Section 3: Demand in Reliability Price Model 3.3.1 Cost of New Entry The value for Cost of New Entry (CONE) (in ICAP terms) is determined in accordance with Attachment DD of the Open Access Transmission
More informationCapacity Performance Training. June 24, 2015
Capacity Performance Training June 24, 2015 Training Objectives Provide Capacity Market Sellers with information necessary to participate in the Reliability Pricing Model (RPM) under a Capacity Performance
More informationReliability Pricing Model (RPM) DRAFT Business Rules
Definition and Purpose of Reliability Pricing Model (RPM) 1. The purpose of the RPM is to develop a long term pricing signal for capacity resources and LSE obligations that is consistent with the PJM Regional
More informationPJM Manual 18: PJM Capacity Market Revision: 38 Effective Date: July 27, Prepared by Capacity Market Operations
PJM Manual 18: PJM Capacity Market Revision: 38 Effective Date: July 27, 2017 Prepared by Capacity Market Operations PJM 2017 Table of Contents Table of Contents Table of Exhibits...9 Approval...10 Current
More informationAmerican Municipal Power Proposal to the Capacity Construct/Public Power Senior Task Force Executive Summary
American Municipal Power Proposal to the Capacity Construct/Public Power Senior Task Force Executive Summary I. Introduction The genesis of the AMP proposal was in part due to AMP s strong belief that
More informationPJM Manual 18: PJM Capacity Market. Revision: 287 Effective Date: January 22, Prepared by PJM Capacity Market Operations
Style Definition: PJM_Normal PJM Manual 18: PJM Capacity Market Revision: 287 Effective Date: January 22, 2015 Prepared by PJM Capacity Market Operations PJM 2015 PJM 2015 i PJM Manual 18: PJM Capacity
More informationThe Year to Date in PJM: Operations and Markets
The Year to Date in PJM: Operations and Markets Kerry Stroup Manager, State Government Policy PJM Interconnection OMA Energy Committee July 30, 2014 OMA Energy Committee Presentation Outline PJM s mission:
More informationRecent Development in Reliable Energy Market in the US and Singapore
Recent Development in Reliable Energy Market in the US and Singapore 18-19 th June 2008 Electrical Engineering and Maintenance Forum World Engineering Congress, Bangkok, Thailand Dr. Panida Jirutitijaroen
More informationATTACHMENT DD. Reliability Pricing Model
OF NEW SERVICE REQUESTS; R - OATT ATTACHMENT DD ATTACHMENT DD Reliability Pricing Model References to section numbers in this Attachment DD refer to sections of this Attachment DD, unless otherwise specified.
More informationState of the Market Report 2006
State of the Market Report 2006 PIEOUG March 12, 2007 Joseph Bowring Market Monitor www.pjm.com PJM Market Monitoring Unit Independent Internal Market Monitoring Independent System Operator ISO/RTO has
More informationExperiences of PJM and Other US Markets in a Deregulated Environment
Experiences of PJM and Other US Markets in a Deregulated Environment What has worked and what are the challenges? Andrew Ott Executive Vice President, Markets, PJM May 27, 2014 Market Evolution Day-Ahead
More informationCapacity Performance Training. March 16, 2015
Capacity Performance Training March 16, 2015 Training Objectives Provide Capacity Market Sellers with information necessary to participate in the Reliability Pricing Model (RPM) under a Capacity Performance
More informationRPM 101 Overview of Reliability Pricing Model
RPM 101 Overview of Reliability Pricing Model PJM 2017 Agenda Introduction Resource Adequacy Demand in RPM Supply in RPM Auction Structure Auction Clearing Resource Clearing Prices CTRs & ICTRs/CTR & ICTR
More informationAncillary Service Markets
Section 9 Ancillary Services Ancillary Service Markets The United States Federal Energy Regulatory Commission (FERC) defined six ancillary services in Order No. 888: 1) scheduling, system control and dispatch;
More information2019/2020 RPM Second Incremental Auction Results
2019/2020 RPM Second Incremental Auction Results Introduction The 2019/2020 Second Incremental Auction opened on July 9, 2018 and the results were posted on July 20, 2018. This document provides information
More informationEnergy Efficiency in RPM. Adam Keech Director, Market Operations PJM January 13, 2015
Energy Efficiency in RPM Adam Keech Director, Market Operations PJM January 13, 2015 PJM Capacity Market PJM Capacity Market Reliability Pricing Model (RPM) PJM secures capacity on behalf of LSEs to satisfy
More informationPJM Sell Back Price Status Quo and Proposed Alternatives
PJM Sell Back Price Status Quo and Proposed Alternatives IASTF Meeting October 19, 2017 www.pjm.com Contents Example of Status Quo use of the Updated VRR Curve Decrement in determining the PJM Sell Offer
More informationOverview of PJM: Looking Back to Look Forward Tokyo Power Market Summit
Overview of PJM: Looking Back to Look Forward Tokyo Power Market Summit Craig Glazer Vice President, Federal Government Policy PJM Interconnection June, 2018 Topics 1. PJM Overview 2. Evolution of PJM
More information2014/2015 RPM Third Incremental Auction Results
Introduction This document provides information for PJM stakeholders regarding the results of the 2014/2015 Reliability Pricing Model (RPM) Third Incremental Auction. Incremental Auctions provide both
More informationEPA s Clean Power Plan Proposal Review of PJM Analyses Preliminary Results
EPA s Clean Power Plan Proposal Review of PJM Analyses Preliminary Results Paul Sotkiewicz Chief Economist Muhsin Abdur-Rahman Senior Engineer, Market Simulation Members Committee Webinar November 17,
More informationPJM Manual 18: PJM Capacity Market
PJM Manual 18: PJM Capacity Market Revision: 23 Effective Date: June 1, 2014 Prepared by PJM Capacity Market Operations PJM 2014 PJM 2014 i PJM Manual 18: PJM Capacity Market Manual 18: PJM Capacity Market
More informationCalculation of Demand Curve Parameters
Calculation of Demand Curve Parameters Rationale 4.1 Resource adequacy standard 4.1.1 The resource adequacy standard announced by the Government of Alberta prescribes the minimum level of reliability to
More informationFourth Review of PJM s Variable Resource Requirement Curve
Fourth Review of PJM s Variable Resource Requirement Curve PREPARED FOR PREPARED BY Samuel A. Newell David Luke Oates Johannes P. Pfeifenberger Kathleen Spees J. Michael Hagerty John Imon Pedtke Matthew
More informationOverview. Net Revenue
2009 Quarterly State of the Market Report for PJM: January through June Section 3 Energy Market, Part 2 The Market Monitoring Unit (MMU) analyzed measures of PJM Energy Market structure, participant conduct
More informationPJM Proposal: Reserve Market Enhancements
PJM Proposal: Reserve Market Enhancements Adam Keech Executive Director, Market Operations Markets & Reliability Committee Meeting January 24, 2019 PJM 2019 Comprehensive Reserve Pricing Reform The PJM
More informationReliability Based Capacity Release Sell Back Curve
Reliability Based Capacity Release Sell Back Curve When PJM held the Transitional Auction for the 2017/2018 Delivery Year, it procured 10,017 MWs of capacity not previously committed. PJM intends to release
More informationEnergy Uplift (Operating Reserves)
Section 4 Energy Uplift Energy Uplift (Operating Reserves) Energy uplift is paid to market participants under specified conditions in order to ensure that resources are not required to operate for the
More informationICA Demand Curve Analysis
ICA Demand Curve Analysis Preliminary Findings Regarding the Demand Curve for a Two-Season Auction PREPARED FOR Independent Electricity System Operator Market Renewal Incremental Capacity Auction Stakeholders
More informationAn Introduction to PJM: Focus on its Markets and Opportunities for Demand Resources OHA Annual Energy & Sustainability Conference
An Introduction to PJM: Focus on its Markets and Opportunities for Demand Resources OHA Annual Energy & Sustainability Conference Andrew Ott Sr. Vice President, Markets March 5, 2013 26% of power generation
More informationSECTION 6 - ANCILLARY SERVICE MARKETS
2010 Quarterly State of the Market Report for PJM: January through March ANCILLARY SERVICES 6 SECTION SECTION 6 - ANCILLARY SERVICE MARKETS The United States Federal Energy Regulatory Commission (FERC)
More informationPJM Proposal for Incremental Auction Redesign
PJM Proposal for Incremental Auction Redesign Jeff Bastian Manager, Capacity Market Operations Incremental Auction Senior Task Force May 31, 2017 www.pjm.com RPM Depends on Physical Resources RPM is designed
More informationPJM s Clean Power Plan Modeling Reference Model and Sensitivities
PJM s Clean Power Plan Modeling Reference Model and Sensitivities Muhsin K. Abdur-Rahman Senior Market Strategist MC Webinar April 25, 2016 What it is Reference Model Robust modeling representation of
More information2015/2016 RPM Second Incremental Auction Results
Introduction This document provides information for PJM stakeholders regarding the results of the 2015/2016 Reliability Pricing Model (RPM) Second Incremental Auction. Incremental Auctions provide both
More informationAncillary Service Markets
Section 9 Ancillary Services Ancillary Service Markets The United States Federal Energy Regulatory Commission (FERC) defined six ancillary services in Order No. 888: 1) scheduling, system control and dispatch;
More informationRecent Trends and Experience in US Capacity Markets
Recent Trends and Experience in US Capacity Markets PRESENTED TO Solar Ontario Canadian Solar Industries Association PRESENTED BY Walter Graf November 14, 2018 Copyright 2018 The Brattle Group, Inc. Why
More informationCalculation of Demand Curve Parameters
Calculation of Demand Curve Parameters Rationale 4.1 Resource adequacy standard 4.1.1 The resource adequacy standard announced by the Government of Alberta prescribes a minimum level of reliability as
More information2015/2016 RPM First Incremental Auction Results
Introduction This document provides information for PJM stakeholders regarding the results of the 2015/2016 Reliability Pricing Model (RPM) First Incremental Auction. Incremental Auctions provide both
More informationPJM. erpm Users Guide. May 20, Version PJM Interconnection
PJM erpm Users Guide May 20, 2010 Version 1.4 2010 PJM Interconnection erpm Users Guide Page i Disclaimer - The PJM erpm User Guide is intended to provide Market Participants and other interested parties
More informationThe Missouri Public Service Commission
National Association of Regulatory Utility Commissioners Energy Regulatory Partnership Program between The National Agency for Energy Regulation of Moldova and The Missouri Public Service Commission May
More informationMOPR Self-Supply Exemption Review of Net-Short & Net-Long Thresholds
MOPR Self-Supply Exemption Review of Net-Short & Net-Long Thresholds Jeff Bastian Manager, Capacity Market Operations Markets & Reliability Committee June 27, 2016 Minimum Offer Price Rule (MOPR) MOPR
More informationCSTF Poll Feedback. 02 June 2014
Prioritization and degree of support feedback: CSTF Poll Feedback 02 June 2014 Discuss SWMAAC specific CONE determination issues. May Disagree with PJM/Brattle position once have had opportunity to review
More informationEconomics & Markets: Capacity Markets (Presentation to the CIAC) April 17 th, 2018
Economics & Markets: Capacity Markets (Presentation to the CIAC) April 17 th, 2018 The information contained in this document is for information purposes only, and the AESO is not responsible for any errors
More informationCapacity Market Technical Design Stakeholder Update Session
Capacity Market Technical Design Stakeholder Update Session Straw Alberta Market (SAM 3.0) Dec. 11, 2017 Session outline Time Agenda Item 1:30 1:35 p.m. Welcome and session overview: Matt Gray, AESO 1:35
More informationCURRENT FEDERAL AND REGIONAL ELECTRIC POLICY ISSUES FOR THE ILLINOIS COMMERCE COMMISSION
CURRENT FEDERAL AND REGIONAL ELECTRIC POLICY ISSUES FOR THE ILLINOIS COMMERCE COMMISSION Randy Rismiller Manager, Federal Energy Program Illinois Commerce Commission 1 THE FEDERAL ENERGY REGULATORY COMMISSION
More informationCurrent Approach to FERC Order on Capacity Markets and Public Policies
Current Approach to FERC Order on Capacity Markets and Public Policies Special MRC August 15, 2018 Other Approaches PJM not pursuing an ISO-NE CASPR-Like approach at this time Too many details to resolve
More informationAlberta Capacity Market
Alberta Capacity Market Comprehensive Market Design (CMD 1) Design Rationale Document Section 3: Calculation of Capacity Market Demand Parameters Prepared by: Alberta Electric System Operator Date: January
More informationAnalysis of the 2019/2020 RPM Base Residual Auction
Analysis of the 2019/2020 RPM Base Residual Auction The Independent Market Monitor for PJM August 31, 2016 Monitoring Analytics 2016 www.monitoringanalytics.com Introduction This report, prepared by the
More informationTwo Settlement PJM /06/2016
Two Settlement PJM 2016 Objectives Describe Two-Settlement process Day-Ahead Market Balancing Market Explain Virtual Transactions and their settlement Inc Offers Dec Bids Up-to Congestion Transactions
More informationPJM. erpm Users Guide. December 4, Version PJM Interconnection
PJM erpm Users Guide December 4, 2008 Version 0.7 2008 PJM Interconnection erpm Users Guide Page i Disclaimer - The PJM erpm User Guide is intended to provide Market Participants and other interested parties
More information2010 State of the Market Report for PJM: Technical Reference for PJM Markets
200 State of the Market Report for PJM: Technical Reference for PJM Markets The Independent Market Monitor for PJM March 0, 20 Monitoring Analytics 20 www.monitoringanalytics.com This page intentionally
More informationCapacity Resource Performance in NYISO Markets
Capacity Resource Performance in NYISO Markets An Assessment of Wholesale Market Options Paul Hibbard Todd Schatzki Sarah Bolthrunis Analysis Group Inc. October 2017 Acknowledgments This report reviews
More informationACKNOWLEDGEMENT. The following members of the Department of Market Monitoring contributed to this report:
ACKNOWLEDGEMENT The following members of the Department of Market Monitoring contributed to this report: Eric Hildebrandt Keith Collins Jeffrey McDonald Brad Cooper Amol Deshmukh Erdal Kara Serhiy Kotsan
More informationMarket Monitoring Dr. Robert Sinclair Georgian Energy Policy Delegation
Market Monitoring Presented by: Dr. Robert Sinclair Presented to: Georgian Energy Policy Delegation April 30, 2012 Kentucky Public Service Commission Potomac Economics Potomac Economics is a leading provider
More informationNYISO Management Response to FTI Consulting Report Evaluation of the New York Capacity Market
NYISO Management Response to FTI Consulting Report Evaluation of the New York Capacity Market March 2013 Evaluation of the New York Capacity Market Introduction In an effort to evaluate and, where appropriate,
More informationCUSTOMER GUIDE TO PJM BILLING
CUSTOMER GUIDE TO PJM BILLING Billing Line Items include PJM Open Access Tariff (OATT) references, PJM Operating Agreement (OpAgr) references, and PJM Manual references. Reports are available for viewing,
More informationPrice Responsive Demand education. DRS May 11 th, 2017
Price Responsive Demand education DRS May 11 th, 2017 PRD Rules became effective 2012, no participation to date Peak Load, MW 1,020 1,000 980 960 940 920 900 PRD vs. Real Time LMP Commit to consume < 900
More informationISO-NE FCM Capacity Market Design Scott M. Harvey. October 9, 2007
ISO-NE FCM Capacity Market Design Scott M. Harvey October 9, 2007 Summary The ISO-NE FCM capacity market design embodies many improvements over the prior ISO-NE capacity market. Five of these improvements
More informationElectricity market design with thoughts for New Zealand. Peter Cramton University of Cologne and University of Maryland 12 February 2018
Electricity market design with thoughts for New Zealand Peter Cramton University of Cologne and University of Maryland 12 February 2018 Goal of electricity markets: Reliable electricity at least cost Short-run
More informationFirstEnergy Solutions Energy Market Update AEE Meeting March 20, John Ogurchak PE/CEM Manager, Commercial/Industrial Energy Sales
FirstEnergy Solutions Energy Market Update AEE Meeting John Ogurchak PE/CEM Manager, Commercial/Industrial Energy Sales FirstEnergy Solutions Corp. (FES) Retail subsidiary of FirstEnergy Corp. and headquartered
More informationAlberta Capacity Market
Alberta Capacity Market Comprehensive Market Design (CMD 1) Design Rationale Document Section 7: Capacity Auction Monitoring and Mitigation Prepared by: Alberta Electric System Operator Date: January 26,
More informationEnergy Uplift (Operating Reserves)
Section 4 Energy Uplift Energy Uplift (Operating Reserves) Energy uplift is paid to market participants under specified conditions in order to ensure that resources are not required to operate for the
More informationICA Demand Curve Development:
ICA Demand Curve Development: Proposed Approach for Ontario PRESENTED TO Market Renewal Incremental Capacity Auction Stakeholder Group PRESENTED BY Kathleen Spees Johannes Pfeifenberger Yingxia Yang John
More informationThe Integration of Price Responsive Demand into PJM. Wholesale Power Markets and System Operations. Paul Centolella and Andrew Ott 1.
The Integration of Price Responsive Demand into PJM Wholesale Power Markets and System Operations Paul Centolella and Andrew Ott 1 March 9, 2009 I. Introduction A number of states and utilities are pursuing
More informationRPM 301 Performance in Reliability Pricing Model
RPM 301 Performance in Reliability Pricing Model PJM State & Member Training Dept. PJM 2017 Disclaimer: PJM has made all efforts possible to accurately document all information in this presentation. The
More informationQuantifying the Amount and Economic Impacts of Missing Energy Efficiency in PJM s Load Forecast
Quantifying the Amount and Economic Impacts of Missing Energy Efficiency in PJM s Load Forecast PREPARED FOR The Sustainable FERC Project PREPARED BY Ahmad Faruqui, Ph.D. Sanem Sergici, Ph.D. Kathleen
More informationGas-Electric Coordination in PJM: Trends, Issues, Interactions, and Looking Ahead
Gas-Electric Coordination in PJM: Trends, Issues, Interactions, and Looking Ahead Harvard Electricity Policy Group 68 th Plenary Session Paul M. Sotkiewicz, Ph.D. Chief Economist PJM Interconnection October
More informationMaintaining Baseload Generation Capacity
Maintaining Baseload Generation Capacity Frank A. Wolak Director, Program on Energy Sustainable Development Professor, Department of Economics Stanford University wolak@stanford.edu http://www.stanford.edu/~wolak
More information2007 State of the Market Report
Volume 2: Detailed Analysis Market Monitoring Unit March 11, 2008 printed: 04/24/08 Preface The Market Monitoring Unit of PJM Interconnection publishes an annual state of the market report that assesses
More informationAlberta Capacity Market
Alberta Capacity Market Comprehensive Market Design (CMD 1) Design Proposal Document Section 1: Overview of the Alberta Capacity Market Prepared by: Alberta Electric System Operator Date: January 26, 2018
More informationIMM Reserve Market Proposal
IMM Reserve Market Proposal MRC January 24, 2019 Joe Bowring Catherine Tyler Consolidated Synchronized Reserve Market PJM and IMM share most aspects of the proposal to consolidate the synchronized reserve
More information