1 PJM erpm Users Guide December 4, 2008 Version PJM Interconnection

2 erpm Users Guide Page i Disclaimer - The PJM erpm User Guide is intended to provide Market Participants and other interested parties with introductory information about the PJM Reliability Pricing Model. The User Guide is an instructional tool and it not intended to be a complete source of information about PJM s bidding and administrative processes. The PJM ISO provides no warranties of any kind with respect to the correctness of completeness of the information set forth in this Users Guide, and, therefore, bears no responsibility for any damages resulting from a Market Participant s reliance on any error or omission in this guide. The PJM erpm User Guide is not designed, nor is it intended to provide, advise, or guidance with respect to strategies for bidding into the PJM Reliability Pricing Model s Auctions. In no event will the PJM ISO or its agents, employees, or suppliers be liable under contract warranty, tort, or any other legal theory for any damages, including incidental, consequential, special, or indirect damages arising from or related to this User Guide or its contents. Revision History Revision 0 (03/15/07) Created for the implementation of the Reliability Pricing Model Revision 0.1 (03/21/07) Added Non Unit Specific Capacity Transactions and Resource Offer XML upload section Revision 0.2 (8/31/2007) Added Replacement Transaction, Ownership Change Transaction, FRR Section, and updated XML descriptions. Revision 0.3 (11/19/2007) Added Capacity Posting and Load Management Event Compliance screen descriptions Revision 0.4 (1/23/2008) Added Buy Bid Process for Incremental Auctions Revision 0.5 (3/6/2008) Added Buy Bid Position Report, Generator Characteristic Report, Updated Replacement Functionality to use Cleared Buy Bids Revision 0.6 (5/27/2008) Added Cleared Buy Bid Transfer Transaction description, Zone/Area Report description, and Peak Load Summary screen updates. Revision 0.7 (12/4/2008) Added EDC PLC Allocation Screen description and summary. PJM 2007 i

3 erpm Users Guide Page ii Table of Contents erpm Users Guide... 1 Disclaimer... i Revision History... i Table of Contents... ii List of Figures and Tables... iv Introduction... 5 What is the Reliability Pricing Model?... 5 What is the Purpose of the Reliability Pricing Model?... 5 Typical uses of erpm... 6 Interfacing with erpm... 6 Knowledge it s assumed you have... 7 PJM erpm Overview... 8 Overview... 8 PJM erpm Web Site... 9 erpm User Qualification... 9 Accessing PJM erpm Application PJM erpm Navigation Load and Obligation Peak Load Overview Task 1: View the Zonal Load and Obligation Task 2: View Daily Load and Obligation by LSE Task 3: View Uploaded Peak Load Summary Data Task 4: View Network Service Peak Load Data Task 5: View Capacity Transfer Right (CTR) Data Task 6: View RPM Zone/Areas Task 7: Update Zone Area Peak Load Allocation Resource Position Overview Task 1: View Resource Position Summary Task 2: View Resource Position Detail: Generation Resources Task 3: View Resource Position Detail: Demand Resources Task 4: View Resource Position Detail: ILR Resources Task 5: View Resource Position Detail: Buy Bid Position Task 6: View Generation Characteristics: Summer and Winter ICAP Rating Task 7: View FRR Capacity Plans PJM 2007 ii

4 erpm Users Guide Page iii Task 8: Update Existing FRR Resource Commitments Task 9: Create a New FRR Resource Commitment Task 10: Copy an Existing FRR Capacity Plan Transactions Transactions Overview Task 1: View Existing Transactions Task 2: Create a Capacity Modification (CAP MOD) Task 3: Create a Demand Resource Modification (DR MOD) Task 4: Create a Unit Specific Bilateral Transaction Task 5: Create a Non Unit Specific Transaction Task 6: Create a Unit Ownership Change Transaction Task 7: Create a Replacement Transaction Task 8: Create a Buy Bid Transfer Transaction Task 9: Create a Capacity Posting Task 8: View Capacity Postings Performance Performance Overview Task 1: View Peak Hour Period Availability Task 2: View Deficiency Summary Task 3: View Load Management Event Compliance Data Auctions Auctions Overview Task 1: Enter Resource Offers Task 2: Specify Flexible Self Schedule Parameters Task 3: View Auction Results: Resource Offers Task 4: View Participant Auction Results Task 5: Enter Capacity Buy Bids into an Incremental Auction Task 6: View Auction Results: Capacity Bid Results XML Uploads XML Overview Task 1: Create Resource Offer XML Document Task 2: Upload Resource Offer XML Document Task 3: Create Load Contributions and Network Service Load Upload XML Document 56 Task 4: Upload Load Contribution XML Document Common Errors: PJM 2007 iii

5 erpm Users Guide Page iv List of Figures and Tables Timing of the RPM Auctions... 6 PJM 2007 iv

6 Introduction The PJM erpm Users Guide provides Market Participants with the information needed to participate in the PJM Reliability Pricing Model (RPM) and Fixed Resource Requirement (FRR) Alternative programs. It describes the erpm auction software and the tasks that Market Participants can perform, as well as the expected system responses. What is the Reliability Pricing Model? The RPM includes a Base Residual Auction that is held during the month of May three (3) years prior to the start of the Delivery Year. After the Transition Period is completed, the RPM includes three Incremental Auctions for each Delivery Year. The RPM also includes a bilateral market that is facilitated through the erpm system. The Base Residual Auction (BRA) allows for the procurement of resource commitments to satisfy the region s unforced capacity obligation and allocates the cost of those commitments among the Load Serving Entities (LSEs) through a Locational Reliability Charge. Incremental Auctions allow for an incremental procurement of resource commitments to satisfy an increase in the region s unforced capacity obligation due to a load forecast increase or a decrease in the amount of committed resources due to a resource cancellation, delay, derating, EFORd increase, or decrease in the nominated value of a Planned Demand Resource. The cost of procurement is allocated to LSEs through a Locational Reliability Charge in the case of an increase in the region s unforced capacity obligation or to resource providers that caused additional resources to be procured. The bilateral market provides LSEs the opportunity to hedge against the Locational Reliability Charge determined through the BRA and Second Incremental Auction. The bilateral market also provides resource providers an opportunity to cover any auction commitment shortages What is the Purpose of the Reliability Pricing Model? The purpose of the RPM is to develop a long term pricing signal for capacity resources and LSE obligations that is consistent with the PJM Regional Transmission Expansion Planning Process (RTEPP). Version 1.0 PJM

7 erpm Users Guide Page 6 Timing of the RPM Auctions 3 Years 23 months 13 months 4 months June May Base Residual Auction EFORd Fixed Interruptible Load for Reliability (ILR) Delivery Year First Incremental Auction Second Incremental Auction Third Incremental Auction Ongoing Bilateral Market (shorter-term reconfiguration) Typical uses of erpm PJM erpm is the system that PJM is using to implement its Reliability Pricing Model and Fixed Resource Requirement programs. Market Participants can use the PJM erpm to: Manage capacity resources View Load and Obligation data View/Manage Company s resource position summary and resource details Participate in PJM RPM Auctions View/Manage Capacity Transactions Interfacing with erpm Market Participants have two primary methods of interacting with the PJM erpm. The methods are: Web based Interactions access is provided through a series of worldwide, web based interactive displays, which are accessible in the Internet. Further sections of this Users Guide describe the displays. PJM

8 erpm Users Guide Page 7 XML formatted File Exchange input and output files that are posted or downloaded, using the market user interface (MUI) or another participant created application. The XML Upload Section of this Users Guide describes how to use the MUI to perform these tasks. Knowledge it s assumed you have The PJM erpm Users Guide is written under the assumption that you: Understand PJM s Reliability Pricing Model market rules Understand PJM s Fixed Resource Requirement alternative market rules If you would like additional information about any of these topics, consider referencing the following information sources: PJM Manuals PJM Training Courses & Material PJM s Internet site ( PJM

9 erpm Users Guide Page 8 PJM erpm Overview Overview PJM erpm is designed to make it easy for you to participate in PJM s Reliability Pricing Model. Market Participants use PJM s erpm to submit capacity offers and bids, demand resource offers, transmission upgrade offers in the RPM Auctions, review their resulting resource position, create bilateral transactions, and view load obligations. PJM

10 erpm Users Guide Page 9 PJM erpm Web Site Market Participants interface with PJM erpm via the Market User Interface, or MUI. The PJM erpm application is integrated into PJM esuite environment which allows the user to access various PJM web based applications via a single username and password. The esuite environment is accessed via Internet facilities, using the following Web Browser: Microsoft Internet Explorer Version 5.5 or later erpm User Qualification To access erpm, Market Participants must have a valid esuite user account. Prior to accessing you must be a ʺqualifiedʹ erpm user. There are two types of erpm qualifications for registered esuite users: Read Only Read/Write You must identify the type of user you want to be at the time you register to become an erpm user. These qualifications can be set by an individual company s Company Account Manager (CAM). PJM

11 erpm Users Guide Page 10 These qualifications may be requested by the individual user by selecting the appropriate qualification on the User Change Form after the user logs into esuite. Accessing PJM erpm Application Navigate to the esuite Production URL: Select the erpm link using the navigation buttons on the left side of the esuite screen. Type in Username and Password. You must login as a qualified user of erpm. In addition to the production environment, a sandbox environment is available for participants to test transactions, etc. Note: User accounts need to be separately requested for the sandbox. Sandbox URL: PJM

12 erpm Users Guide Page 11 PJM erpm Navigation The Navigation Buttons on the lower left side of the erpm site provide links to the following pages within the erpm System: Load and Obligation Resource Position Transactions Performance Auctions Upload PJM

13 erpm Users Guide Page 12 Load and Obligation Peak Load Overview Task 1: View the Zonal Load and Obligation The Zonal Load and Obligation is displayed via this page for a selected Planning Year. The values will be populated as the Planning Year gets closer and the Base Residual and Incremental Auctions are cleared and posted. To view the Zonal Load and Obligation follow the steps below: Log into erpm Click on the Load and Obligation Navigation Button Click on the Peak Load Tab In order to refine the list of zones or zone/areas listed at the bottom of the screen, you may use the following filter criteria: Zone/Area drop down list contains the zone/area combinations that are modeled in RPM, as well as an All option that will display the Zonal Load & Obligation data for each Zone. The Daily Load & Obligation data for each Zone/Area you serve load or act as the EDC is displayed at the bottom of the screen. Date Select a date for which to view your UCAP Obligation Based on the filter criteria selected, a list of zones will be displayed in a table format where the data relevant to the date selected can be viewed. The following columns will be displayed: Zone an area within the PJM Region or such areas that may be combined as a result of mergers and acquisitions; or added as a result of the expansion of the boundaries of the PJM Region. A Zone will include any Non Zone Network Load located outside the PJM Region that is served from inside a particular Zone. Preliminary Zonal Peak Load Forecast displays the Annual PJM Load Forecast published in February prior to the Base Residual Auction by Zone. Base Zonal Weather Normalized Summer Peak displays the Zonal Weather Normalized Summer Peak value 4 years prior to the Delivery Year. Final Zonal Weather Normalized Summer Peak displays the Zonal Weather Normalized Summer Peak value 1 year prior to the Delivery Year Base Zonal RPM Scaling Factor is determined for each zone and is equal to the [(Preliminary Zonal Peak Load Forecast for the Delivery Year divided by the Zonal Weather Normalized Summer Peak for the summer four years prior to the Delivery Years) * ((RTO Unforced Capacity Obligation Satisfied in Base Residual Auction divided by the (RTO Preliminary Peak Load Forecast * the PJM

14 erpm Users Guide Page 13 Forecast Pool Requirement))]. Base Zonal RPM Scaling Factors are posted with the Base Residual Auction results. Base Zonal UCAP Obligation is determined for each zone and is equal to the (Zonal Weather Normalized Summer Peak for the summer four years prior to the Delivery Year * Base Zonal RPM Scaling Factor * the Forecast Pool Requirement) + Forecast Zonal ILR Obligation. Base Zonal Unforced Capacity Obligations are posted with the Base Residual Auction clearing results. 2 nd Incremental Auction Zonal UCAP Obligation is determined for each zone and is equal to the ((Zonal Weather Normalized Summer Peak for the summer four years prior to the Delivery Year adjusted + Zonal Peak Load Forecast Increase)* Base Zonal RPM Scaling Factor * the Forecast Pool Requirement) + Forecast Zonal ILR Obligation. 2 nd Incremental Auction Zonal UCAP Obligations are posted with the 2 nd Incremental Auction clearing results. Zonal Peak Load Forecast Increase is determined for each zone and is equal to the increase in Peak Load Forecast prior to the 2 nd Incremental Auction. Final Zonal UCAP Obligation is determined for each zone and is equal to the Base Zonal Unforced Capacity Obligation plus the RTO UCAP obligation satisfied in the 2 nd Incremental Auction * zone s percentage allocation of the obligation satisfied in the 2 nd Incremental Auction. The Final Zonal UCAP Obligations are posted with the 2 nd Incremental Auction Results. Final Zonal RPM Scaling Factor is determined for each zone and is equal to the Final Zonal UCAP Obligation divided by the (Forecast Pool Requirement * Zonal Weather Normalized Summer Peak for the Prior Year Summer). Final Zonal RPM Scaling Factors are used in determining an LSE s Daily UCAP Obligation and are posted by October 31 prior to the start of the Delivery Year. Final Zonal Peak Load Forecast displays the Annual PJM Load Forecast published by February 28 prior to its use in the 2 nd Incremental Auction by Zone Zonal Capacity Price the price ($/MW day) of UCAP in a Zone that an LSE that has not elected the FRR Alternative is obligated to pay for a Delivery Year. Task 2: View Daily Load and Obligation by LSE The Daily Load and Obligation for an LSE is displayed in erpm for 5 days from the selected date. The Daily Peak Load Obligation and UCAP Obligations are also visible to the user. To view the Daily Load and Obligation by LSE follow the steps below: Log into erpm Click on the Load and Obligation Navigation Button Click on the Peak Load Tab PJM

15 erpm Users Guide Page 14 In order to refine the list of zones listed at the bottom of the screen, you may use the following filter criteria: Zone/Area drop down list contains the zone/area combinations that are modeled in RPM Date Select a date in which you would like to see your Peak Load Contribution Based on the filter criteria selected, a list of zone/areas will be displayed in a table format where the data relevant to the date selected can be viewed. The following columns will be displayed for 5 consecutive days based on the selected date: LSE list includes all LSEs that the logged in user in entitled to view the Peak Load Contribution Zone/Area displays the Zone/Area combination for that LSE for which the Peak Load Contribution is displayed Obligation Peak Load Peak load obligation in MW Daily UCAP Obligation Obligation in UCAP terms. Is equal to the Peak Load Obligation * Final Zonal RPM Scaling Factor * Forecast Pool Requirement Note: Obligation data is subject to change until 36 hours prior to the start of the operating day. Task 3: View Uploaded Peak Load Summary Data EDCs are responsible for uploading Obligation Peak Load data into erpm for every LSE serving load in their retail choice zone/areas during the Delivery Year. The file upload must be performed in accordance to the file specifications specified in XML Upload section of this document and must be submitted by the file upload deadline (36 hours prior to the start of the operating day). The Peak Load Summary screen was developed to give EDCs a summarized view of the data uploaded via XML files and to give LSEs a view of any Daily Scaling Factors that are applied to the EDC uploaded value. To access the screen, follow the steps below: Log into erpm Click on the Load and Obligation Navigation Button Click on the Peak Load Summary Sub Tab In order to refine the list of zones and areas listed at the bottom of the screen, you may use the following filter criteria: Zone/Area drop down list contains the zone/area combinations that are modeled in RPM Date Select a date in which you would like to see your Peak Load Contribution Summary data PJM

16 erpm Users Guide Page 15 Based on the filter criteria selected, a list of zone/areas will be displayed. The following columns will be displayed for the selected date: LSE list includes all LSEs with assigned MW for the date selected. Note: If you are an LSE, only your PJM short name will appear. Zone displays the Zone for which the Peak Load Contribution is displayed Area displays the Area for which the Peak Load Contribution is displayed Uploaded MW value of MW uploaded in the XML file Scaling Factor Daily Load Scaling Factor used to scale the uploaded LSE Obligation Peak Load values to the fixed Obligation Peak Load Allocation of the zone/area in the event that the Obligation Peak Load values uploaded by the EDC do not exactly sum to the Annual Peak Load Allocation for the zone/area. Daily Obligation Peak Load Scaling Factor = Annual Zone/Area Obligation Peak Load Allocation / Sum(Uploaded Zone/Area Daily MW Values) Obligation Peak Load MW Value of MW uploaded in the XML file * the Daily Load Scaling Factor. Task 4: View Network Service Peak Load Data The EDC is responsible for uploading Network Service Peak Load (NSPL) data into erpm for every LSE serving load in their zone/area during the Delivery Year. The file upload must be performed in accordance to the file specifications specified in XML Upload section of this document as well as be submitted by the file upload deadline (36 hours prior to the start of the operating day). To view the NSPL data follow the steps below: Log into erpm Click on the Load and Obligation Navigation Button Click on the NSPL Sub Tab In order to refine the list of zones and areas listed at the bottom of the screen, you may use the following filter criteria: Zone/Area drop down list contains the zone/area combinations that are modeled in RPM Date Select a date in which you would like to see your Peak Load Contribution Summary data PJM

17 erpm Users Guide Page 16 Based on the filter criteria selected, a list of zone/areas will be displayed. The following columns will be displayed for the selected date and the following 4 consecutive days: LSE list includes all LSEs with assigned MW for the date selected Zone/Area displays the Zone/Area combination for that LSE for which the NSPL MW is displayed NSPL displays the NSPL MW value for the date specified in the column heading Task 5: View Capacity Transfer Right (CTR) Data The purpose of Capacity Transfer Rights is to allocate the economic value of transmission import capability that exists into a constrained LDA to holders of Capacity Transfer Rights. Therefore, Capacity Transfer Rights serve to offset a portion of the Locational Price Adder charged to load in constrained LDAs. erpm provides a screen to view the CTR Allocations by Zone, in order to access follow the steps below: Log into erpm Click on the Load and Obligation Navigation Button Click on the CTR Tab This screen shows CTR data by zone. In order to modify the zone displayed, you may use the following filter criteria: Zone drop down list contains the zone/area combinations that are modeled in RPM Date Select a date in which you would like to see the CTR data. Note: CTR data is constant for a Delivery Year (June 1 May 31) Based on the filter criteria selected, four tables will be displayed: Zonal CTR MW displays the factors that amount of CTRs awarded on an LDA basis. Final UCAP Obligation (MW) displays the Obligation MW on an LDA basis Cleared Internal Capacity (MW) displays the total amount of cleared capacity cleared within each LDA. ILR Forecast Obligation (MW) displays the total amount of ILR Obligation that was forecasted in each LDA by the PJM Planning Department. Incremental CTRs (MW) displays the total amount of Incremental CTR MWs awarded to each LDA for the given Delivery Year PJM

18 erpm Users Guide Page 17 Qualifying Transmission Upgrade Cleared MW displays the total amount of Qualifying Transmission Upgrade megawatts that cleared in the LDA for the given Delivery Year Total CTR MW Allocated to LSEs in LDA displays the total amount of CTR MWs that were awarded to the LDA for the given delivery year. LDA Obligation Ratio Share displays the percentage of contribution that the zone selected in the filter criteria has on the given LDA. Calculated as the Zonal Obligation divided by the LDA Obligation. Total CTR MWs Allocated to LSEs in Zone displays the total number of CTR MWs that will be allocated to LSEs in the particular zone selected. Calculated as the Total CTR MW allocated to LSEs in the LDA * the LDA Obligation Ratio Share. Zonal CTR Values Source LDA Name of the LDA where the capacity was imported from Sink LDA Name of the LDA where the capacity was imported to Total CTR MW to LDA displays the total amount of CTR MWs that were awarded to the LDA for the given delivery year. Import Marginal Cost $/MW day displays the difference between the Sink LDA Resource Clearing Price and the Source Resource Clearing Price. Zonal Share of CTRs (Sink LDA) displays the percentage of contribution that the zone selected in the filter criteria has on the given LDA. Calculated as the Zone Obligation divided by the LDA Obligation. Total Value of CTRs in Sink LDA ($/day) displays the total dollar value tied to the CTRs that will be allocated across the LSEs that serve load in the given LDA. Calculated as the Total CTR MW to LDA multiplied by the Import Marginal Cost. Zonal Value of CTRs allocated to Load displays the total dollar value tied to the CTRs that will be allocated across the LSEs that serve load in the given Zone. Calculated as the Total Value of CTRs in Sink LDA * Zonal Share of CTRs. Zonal CTR Rates Base Zonal UCAP Obligation (MW/day) displays the Base Zonal UCAP Obligation of the Zone as determined by the clearing of the Base Residual Auction. Final Zonal UCAP Obligation (MW/day) displays the Final Zonal UCAP Obligation of the Zone as determined by the clearing of the Base Residual Auction and Second Incremental Auction. If a PJM

19 erpm Users Guide Page 18 Second Incremental Auction is not held, the Final Zonal UCAP Obligation will equal the Base Zonal UCAP Obligation. Base Zonal CTR Credit Rate ($/UCAP MW) displays the Base Zonal CTR Credit Rate. Calculated as the Zonal Value of CTRs Allocated to Load divided by the Base Zonal UCAP obligation. Final Zonal CTR Credit Rate ($/UCAP MW) displays the Final Zonal CTR Credit Rate. Calculated as the Zonal Value of CTRs Allocated to Load divided by the Final Zonal UCAP obligation. CTR Settlement Rate ($/CTR MW) displays the CTR Settlement Rate for the given delivery year. Calculated as the Total Value of CTRs in Sink LDA divided by Total CTR MW to LDA amount. Daily CTR Values UCAP Obligation Displays the total UCAP obligation being served by the participant on a daily basis. For more information on UCAP Obligation assessments, please refer to the Peak Load Summary section of this document. CTR MWs Displays the amount of CTR MWs awarded as a result of the Load Obligation. Calculated as the Participant Daily UCAP Obligation divided by the Final Zonal UCAP Obligation multiplied by the Total CTR MWs allocated to LSEs in Zone. Zone displays the Zone for which the Peak Load Contribution is displayed Area displays the Area for which the Peak Load Contribution is displayed Uploaded MW value of MW uploaded in the XML file Scaling Factor Daily Load Scaling Factor used to scale the uploaded LSE Obligation Peak Load values to the fixed Obligation Peak Load Allocation of the zone/area in the event that the Obligation Peak Load values uploaded by the EDC do not exactly sum to the Annual Peak Load Allocation for the zone/area. Daily Obligation Peak Load Scaling Factor = Annual Zone/Area Obligation Peak Load Allocation / Sum(Uploaded Zone/Area Daily MW Values) Obligation Peak Load MW Value of MW uploaded in the XML file * the Daily Load Scaling Factor. PJM

20 erpm Users Guide Page 19 Task 6: View RPM Zone/Areas The purpose of the Zone/Area screen is to provide a complete list of all modeled RPM Zone/Areas for a given date. Log into erpm Click on the Load and Obligation Navigation Button Click on the Zone/Area Tab This screen shows Zone/Area data by date. In order to modify the list of areas displayed, you may use the following filter criteria: Date Select a date in which you would like to see the zone/area list Zone drop down list contains the zone/area combinations that are modeled in RPM Based on the filter criteria selected, all zone/areas will be displayed that are modeled for the given date. Task 7: Update Zone Area Peak Load Allocation The purpose of the Zone/Area screen is to simplify reporting of the allocation of the Capacity Peaks (PLC or OPL or 5CP) by EDCs. PLC allocations for wholesale load must be calculated by January 1 each year, in accordance with Schedule 8 Section D.1 of the Reliability Assurance Agreement. Obligation Peak Load for retail LSEs will not be uploaded into erpm until 36 hours prior to the delivery day. This is a security enabled screen. Only EDC accounts will be granted access and permission to update data for their specific zone. Allocations may only be entered in the month of December. Log into erpm Click on the Load and Obligation Navigation Button Click on the Wholesale Load Tab Click on the Zone Area Peak Load Allocation sub tab This screen shows Zone/Area Peak Load Allocation data by Delivery Year. In order to modify the list of areas displayed, you may use the following filter criteria: Delivery Year Select the applicable delivery year in which you would like to allocate the PLC. Please note, allocations may only be made in December prior to the start of the Delivery Year. The screen will be locked from edits all other times. Zone drop down list contains the zones that are assigned to the customer account. PJM

21 erpm Users Guide Page 20 Based on the filter criteria selected, all zone/areas will be displayed for the given zone. By default, the retail area (where Zone Name is the same as Area Name) will be allocated the full Zonal PLC. For each area, select the LSE responsible for load and enter the applicable MWs. Upon clicking submit, the residual area MW allocation will decrease by the MW sum of the wholesale areas. If you have any questions regarding this screen, please contact PJM at PJM

22 erpm Users Guide Page 21 Resource Position Overview Task 1: View Resource Position Summary The Resource Position Summary page displays the actual position by LDA for a desired date. The position by LDA can be viewed for the Generation Resources and the Demand Resources. On the date selected in the filter criteria the Owned, Available, Committed, Unoffered and Position can be seen for the LDAs modeled in the Auction for the specified Planning Year. Log into erpm Click on the Resource Position Navigation Button In order to refine the data listed at the bottom of the screen, you may use the following filter criteria: Capacity Type data can viewed in terms of ICAP(Installed Capacity) or UCAP (Unforced Capacity) Date data is viewed daily based on the selected date. Default date will be the current date. Based on the filter criteria selected, a list of zone/areas will be displayed in a table format where the data relevant to the date selected can be viewed. The following columns will be displayed for the selected date: LDA will list all the LDAs that were modeled in RPM for that delivery year Generation Resource Section Owned the capacity rights that you have on that unit for that day Available the capacity rights you have available to offer into an Auction based on that delivery year Committed number of MW that were committed to the Auctions or FRR capacity plans for that particular delivery year based on the selected date Unoffered number of MW that was not offered into the Base Residual Auction or subsequent Incremental Auctions for a given delivery year. This value can not be offered into any subsequent Auctions that are run for that delivery year. Position the available ICAP for the selected day Demand Resource Section PJM

23 erpm Users Guide Page 22 Owned the capacity rights that you have on that unit for that day Available the capacity rights you have available to offer into an Auction based on that delivery year Committed number of MW that were committed via the Auctions ran for that particular delivery year based on the selected date Unoffered number of MW that was not offered into the Base Residual Auction or subsequent Incremental Auctions for a given delivery year. This value can not be offered into any subsequent Auctions that are run for that delivery year. Position the available ICAP for the selected day Task 2: View Resource Position Detail: Generation Resources The Resource Position Detail page for Generation Resources displays the actual position by Generation Resource for a desired date. On the date selected the Owned, Available, Committed, Unoffered and Position can be seen for the Generation Resources that were in the Auction for that Planning Year. Log into erpm Click on the Resource Position Navigation Button Click on the Resource Detail Tab Click on the Generation Resource tab In order to refine the data listed at the bottom of the screen, you may use the following filter criteria: Capacity Type data can viewed in terms of ICAP(Installed Capacity) or UCAP (Unforced Capacity) Date data is viewed daily based on the selected date. Default date will be the current date. Resource lists the Generation Resources in the portfolio for the selected date LDA lists the LDAs that the resources in the portfolio are located for the selected date Based on the filter criteria selected, a list of Generation Resources will be displayed in a table format where the data relevant to the date selected can be viewed. The following columns will be displayed for the selected date: Resource ID lists the unique identifier for the Generation Resource PJM

24 erpm Users Guide Page 23 Resource Name lists the name of the Generation Resource LDA lists the LDA the Generation Resource is located in for the selected date Current EFORd the EFORd that is available for the selected date 5 Year EFORd the average EFORd for the past 5 years for the Generation Resource EFORd Limit the maximum MW amount that that can be offered into an Auction for the EFORd Risk Segment. Calculated as the positive difference of the (5 Year EFORd Current EFORd) * Owned MW Owned the capacity rights that you have on that unit for that day Available the capacity rights you have available to offer into an Auction based on that delivery year RPM Committed number of MW committed to the RPM Auctions for the particular delivery year based on the selected date FRR Committed number of MW committed to a FRR Capacity Plan for the particular delivery year based on the selected date Unoffered number of MW that was not offered into the Base Residual Auction or subsequent Incremental Auctions for a given delivery year. This value can not be offered into any subsequent Auctions that are run for that delivery year. RPM Position the available ICAP for the selected day Task 3: View Resource Position Detail: Demand Resources The Resource Position Detail page for Demand Resources displays the actual position by Resource for a desired date. On the date selected the Owned, Available, Committed, Unoffered and Position can be seen for the Demand Resources that were in the Auction for that Planning Year. Log into erpm Click on the Resource Position Navigation Button Click on the Resource Detail Tab Click on the Demand Resource tab In order to refine the data listed at the bottom of the screen, you may use the following filter criteria: PJM

25 erpm Users Guide Page 24 Capacity Type data can viewed in terms of ICAP (Installed Capacity) or UCAP (Unforced Capacity) Date data is viewed daily based on the selected date. Default date will be the current date. Resource lists the Demand Resources in the portfolio for the selected date LDA lists the LDAs in which the resources in the portfolio are located for the selected date Based on the filter criteria selected, a list of Demand Resources will be displayed in a table format where the data relevant to the date selected can be viewed. The following columns will be displayed for the selected date: Resource ID lists the unique identifier for the Demand Resource Resource Name lists the name of the Demand Resource LDA lists the LDAs in which the Demand Resources in the portfolio are located for the selected date Owned the capacity rights that you have on that unit for that day Available the capacity rights you have available to offer into an Auction based on that delivery year RPM Committed number of MW that were committed to the Auctions or FRR Capacity Plans for that particular delivery year based on the selected date FRR Committed number of MW committed to a FRR Capacity Plan for the particular delivery year based on the selected date Unoffered number of MW that was not offered into the Base Residual Auction or subsequent Incremental Auctions for a given delivery year. This value can not be offered into any subsequent Auctions that are run for that delivery year. RPM Position the available ICAP for the selected day Task 4: View Resource Position Detail: ILR Resources The Resource Position Detail page for ILR Resources displays the Nominated Value of ILR resources by Resource and Zone for a selected delivery year. Log into erpm Click on the Resource Position Navigation Button Click on the Resource Detail Tab PJM

26 erpm Users Guide Page 25 Click on the ILR Resource tab In order to refine the data listed at the bottom of the screen, you may use the following filter criteria: Planning Period data is viewed by Delivery Year based on the period selected in the drop down menu. Resource lists the ILR Resources in the portfolio for the selected delivery year Zone lists the zones in which the resources in the portfolio are located for the selected delivery year Type data can viewed in terms of ICAP (Installed Capacity) or UCAP (Unforced Capacity) Based on the filter criteria selected, a list of ILR Resources will be displayed in a table format where the data relevant to the selected delivery year. The following columns will be displayed for the selected date: Resource Name lists the name of the ILR Resource Zone Name lists the zone where the ILR Resources in the portfolio are located Nominated MW the MW value of the ILR Resource Task 5: View Resource Position Detail: Buy Bid Position The Resource Position Detail page for Buy Bids shows the actual position by LDA for the selected date. The Owned, Available, and Committed MW values can be seen for the cleared buy bids that were cleared in the Incremental Auctions for that Planning Year. Log into erpm Click on the Resource Position Navigation Button Click on the Resource Detail Tab Click on the Buy Bid Position tab In order to refine the data listed at the bottom of the screen, you may use the following filter criteria: Date data is viewed daily based on the selected date. Default date will be the current date. LDA lists the LDAs in which the buy bids were cleared for the selected date Auction lists all auction types for a given year (Base, First, Second, Third) PJM

27 erpm Users Guide Page 26 Based on the filter criteria selected, a list of LDAs will be displayed in a table format where the data relevant to the date selected can be viewed. The following columns will be displayed for the selected date: LDA lists the LDAs in which the cleared buy bids in the portfolio are located for the selected date Auction lists the Auction where the cleared buy bids were purchased Owned Buy Bid MW the amount of cleared buy bids that you have for that day Committed Buy Bid MW number of MW committed for the particular delivery year based on the selected date Available the amount of MW you have available to use as replacement capacity. Task 6: View Generation Characteristics: Summer and Winter ICAP Rating The Generation Characteristics page displays the Summer and Winter Rating for a desired date. All approved Capacity Mods will be summed that have a start date less than or equal to the date selected. Log into erpm Click on the Resource Position Navigation Button Click on the Resource Detail Tab Click on the Generation Characteristics tab In order to refine the data listed at the bottom of the screen, you may use the following filter criteria: Date data is viewed daily based on the selected date. Default date will be the current date. Resource lists the Generation Resources in the portfolio for the selected date Based on the filter criteria selected, a list of Generation Resources will be displayed in a table format where the data relevant to the date selected can be viewed. The following columns will be displayed for the selected date: Resource ID lists the unique identifier for the Generation Resource Resource Name lists the name of the Generation Resource Summer Rating lists the Summer Rating for the selected date Winter Rating lists the Winter Rating for the selected date PJM

28 erpm Users Guide Page 27 Task 7: View FRR Capacity Plans The FRR Capacity Plan screen allows any FRR entity to view their current FRR plan details, resource commitments, edit future commitments, and create new resource commitments. New resource commitments can be created on a resource by resource basis or FRR plans for future planning periods can be copied from existing years. Log into erpm Click on the Resource Position Navigation Button Click on the FRR Capacity Plan tab In order to refine the data listed at the bottom of the screen, you may use the following filter criteria: Resource Name lists the name of all resources with FRR commitments for your company Start Day Allows you to filter the data returned in the FRR Plan Details and FRR Resource Commitments sections based on the start date. Stop Day Allows you to filter the data returned in the FRR Plan Details and FRR Resource Commitments sections based on the stop date. The first section of the screen lists the FRR Plan Details for a given delivery year. The FRR Capacity Plan is the long-term plan for the commitment of Capacity Resources to satisfy the daily zonal unforced capacity obligations of an LSE that has elected the FRR Alternative in an FRR Service Area and any applicable Percentage of Internal Resources Required in a Locational Deliverability Area (LDA). Start Day The start date of the FRR Capacity Plan for a given delivery year Stop Day The stop date of the FRR Capacity Plan for a given delivery year. Obligation MW The amount of MW required to be covered by FRR resource commitments. Threshold Quantity- The amount of MW required in excess of the obligation MW value. The Threshold Quantity is equal to the Preliminary Daily Unforced Capacity Obligation plus the lesser of (a) 0.03 * Preliminary Daily Unforced Capacity Obligation or (b) 450 MW. Sales Cap MW The maximum amount of MW permitted to be offered into the RPM Auctions. Self Schedule Cap MW The maximum amount of MW permitted to be self scheduled into the RPM Auctions. PJM

29 erpm Users Guide Page 28 The second section of the screen lists the FRR Resource Commitments for a given delivery year. The FRR Resource Commitments are able to be changed throughout the delivery year provided the change is submitted at least one business day in advance. Resource ID displays the unique identification number of the resource in the portfolio Resource Name displays the name of the FRR resource Resource Type displays the resource type of the FRR Resource. Generation and Demand resources can be included in FRR capacity plans. Start Day The start date of the FRR Capacity Plan for a given delivery year Stop Day The stop date of the FRR Capacity Plan for a given delivery year. EFORd the EFORd that is available for the selected date Designated ICAP Value Amount of ICAP committed to the FRR capacity plan for the given start and end dates Calculated UCAP Value Amount of UCAP MW committed to the FRR capacity plan for the given start and end dates. Note: Calculated UCAP = Designated ICAP * (1 EFORd) Task 8: Update Existing FRR Resource Commitments Existing FRR resource commitments are able to be modified provided the transaction is not in the past or does not span days in the past. If a transaction spans a period already in progress, the end date should be modified to today and a new transaction should be created effective tomorrow with the updated data. Log into erpm Click on the Resource Position Navigation Button Click on the FRR Capacity Plan tab Click on the Resource Name of the record to update Edit the Start Date, Stop Date, or Designated MW as appropriate. Task 9: Create a New FRR Resource Commitment New FRR Resource Commitments can be created on a one off basis as needed. Commitments can be created with a start date of today and can span one day to the entire delivery year, however cannot span planning periods. Log into erpm PJM

30 erpm Users Guide Page 29 Click on the Resource Position Navigation Button Click on the FRR Capacity Plan tab Choose Create New FRR Commitment from the drop down below the Refresh button, and click the Create button. Fill in the information below as appropriate: Start Day Enter the start date of the new FRR Resource Commitment Stop Day Enter the stop date of the new FRR Resource Commitment Company displays the name of your company (non editable) Resource Name Choose the name of the FRR resource Designated MW (ICAP) Enter the number of MW to commit to your FRR Capacity Plan. For your convenience, the maximum amount of MW available to be assigned to the FRR Resource Commitment will be displayed for the resource and dates chosen. The designated ICAP specified in the Resource Commitment cannot exceed the minimum available amount throughout the length of the selected period. Once all information has been entered, click the Create button to save the FRR Resource Commitment. Task 10: Copy an Existing FRR Capacity Plan FRR Resource Commitments can be copied from one year to another to avoid manually entering FRR Resource Commitments on an individual basis. Any Planning Period with an existing FRR Capacity Plan can be copied to a future year provided an RPM Auction for that year has not yet been conducted. Log into erpm Click on the Resource Position Navigation Button Click on the FRR Capacity Plan tab Choose Copy Existing FRR Plan from the drop down below the Refresh button, and click the Create button. Fill in the information below as appropriate: From Planning Period Choose the year to copy PJM

31 erpm Users Guide Page 30 To Planning Period Choose the year to populate with FRR Resource Commitments Note: All FRR Resource Commitments will be copied provided the resource has the same or greater amount of capacity available to support the Resource Commitment. If a resource s available capacity is less than the FRR Resource Commitment, the record will not be transferred. Individual FRR Resource Commitments can then be updated or created by following the steps in Task 4 and Task 5. PJM

32 erpm Users Guide Page 31 Transactions Transactions Overview There are several transaction types available in erpm. Capacity Modification use this transaction to add a new unit, remove an existing unit, or to request a MW increase or decrease in the summer or winter installed capacity rating of an existing unit. Demand Resource Modification use this transaction to add a new Demand Resource, remove an existing Demand Resource, or to increase or decrease the nominated value of a DR resource in your portfolio. Bilateral Unit Specific Transaction use this transaction to transfer the capacity rights of a specified amount of installed capacity from one party to another. Non Unit Specific Transaction use this transaction to create financial only transaction between two parties. Non unit specific transactions do not change the resource position or load obligation of an entity. Unit Ownership Change Transaction use this transaction to create submit a change in ownership. This transaction replaces the Cap Mod process in use for ecapacity. Replacement Transaction use this transaction to transfer the RPM commitment from one resource to another or use buy bids cleared in an Incremental Auction to offset an existing RPM Commitment. Buy Bid Transfer Transaction use this transaction to transfer the Cleared Buy Bids procured in an Auction from one party to another. Task 1: View Existing Transactions Existing transactions will be able to be viewed in the Transactions Organizer. Selectable parameters are available at the top of the screen to filter the results listed in the lower section of the screen. Several parameters can be used at once to further refine the returned transaction list. Filter Criteria: Start Day Will list all transactions that start on or after the entered date. End Day Will list all transactions that end on or before the entered date Transaction Type Filters one or more of the available transaction types (UNIT, CAPMOD, DRMOD, NONUNIT, REPLACEMENT, OWNERSHIP). PJM

33 erpm Users Guide Page 32 Transaction Status Filters one or more of the available transaction statuses Transaction ID Returns only the transaction matching the entered transaction id. Task 2: Create a Capacity Modification (CAP MOD) Capacity Modifications are used to request the addition of a new unit or the removal of an existing unit from your resource portfolio in erpm, or to request a MW increase or decrease in the summer or winter installed capacity rating of an existing unit. Cap Mods will not be approved by PJM during an open auction window. 1) Select the Transactions button. 2) Select Capacity Modification from the drop down list on the lower right corner of the filter criteria section on the Transactions Organizer screen. 3) Click Create 4) A pop up window will open where the data necessary to create the CAP MOD will be entered. 5) Enter the required data as described below. Required Data: The following data is required to create a Capacity Modification: Resource Name Choose the name of your resource from the Resource Name drop down list. If the name is not listed in the list, contact PJM to initiate the unit creation. Start Date Enter the start date of capacity increase or decrease. Note: All Cap Mods must be submitted a minimum of 2 business days prior to the start date. Summer MW Value Enter the amount of MW that should be increased or decreased from the current value of the unit to the nearest tenth of a decimal place. Note: Do not enter the final value of the unit, CAP MODs work on an incremental basis. Summer MW Increase/Decrease Radio Button: Select the appropriate button depending on whether the capacity was increased or decreased. Winter MW Value Enter the amount of MW that should be increased or decreased from the current value of the unit to the nearest tenth of a decimal place. Note: Do not enter the final value of the unit, CAP MODs work on an incremental basis. Winter MW Increase/Decrease Radio Button: Select the appropriate button depending on whether the capacity was increased or decreased. PJM

34 erpm Users Guide Page 33 Comments: Enter comments where appropriate. 6) Click Submit 7) Verify the transaction is now in Pending PJM status. 8) Close the window to return to the Transactions Organizer. Cap Mods will be reviewed by PJM and will then move to one of four possible statuses: Denied If the data submitted is not approved by PJM. Once the transaction is denied, a new transaction can be created to fix any data errors. PJM Withdrawn If the start date of the transaction passes the current date, the transaction status will be automatically changed. Provisionally Approved If the capacity modification is not yet physically implemented, however PJM considers it to be likely to be in service by the stated start date. Provisionally approved transactions will be considered in your Generation Resource Portfolio. Approved If the capacity modification is fully implemented and on line. Task 3: Create a Demand Resource Modification (DR MOD) Demand Resource Modifications are used to add a new DR, remove an existing DR, or to increase or decrease the nominated value of a DR resource in your portfolio. DR Mods will not be approved by PJM during an open Auction window. 1) Select the Transactions button. 2) Select Demand Resource Modification from the drop down list on the lower right corner of the filter criteria section on the Transactions Organizer screen. 3) Click Create 4) A pop up window will open where the data necessary to create the DR MOD will be entered 5) Enter the required data as described below. Required Data: The following data is required to create a Demand Resource Modification: PJM

PJM. erpm Users Guide. May 20, Version PJM Interconnection

PJM. erpm Users Guide. May 20, Version PJM Interconnection PJM erpm Users Guide May 20, 2010 Version 1.4 2010 PJM Interconnection erpm Users Guide Page i Disclaimer - The PJM erpm User Guide is intended to provide Market Participants and other interested parties

More information

Reliability Pricing Model (RPM) DRAFT Business Rules

Reliability Pricing Model (RPM) DRAFT Business Rules Definition and Purpose of Reliability Pricing Model (RPM) 1. The purpose of the RPM is to develop a long term pricing signal for capacity resources and LSE obligations that is consistent with the PJM Regional

More information

PJM Manual 18: PJM Capacity Market. Revision: 14 Effective Date: February 23, Prepared by PJM Capacity Market Operations PJM 2012

PJM Manual 18: PJM Capacity Market. Revision: 14 Effective Date: February 23, Prepared by PJM Capacity Market Operations PJM 2012 PJM Manual 18: PJM Capacity Market Revision: 14 Effective Date: February 23, 2012 Prepared by PJM Capacity Market Operations PJM 2012 PJM 2012 i Table of Contents PJM Manual 18: PJM Capacity Market Table

More information

PJM Manual 18: PJM Capacity Market Revision: 38 Effective Date: July 27, Prepared by Capacity Market Operations

PJM Manual 18: PJM Capacity Market Revision: 38 Effective Date: July 27, Prepared by Capacity Market Operations PJM Manual 18: PJM Capacity Market Revision: 38 Effective Date: July 27, 2017 Prepared by Capacity Market Operations PJM 2017 Table of Contents Table of Contents Table of Exhibits...9 Approval...10 Current

More information

Market Settlements - Advanced

Market Settlements - Advanced Market Settlements - Advanced RPM Module PJM State & Member Training Dept. PJM 2017 Capacity vs. Energy Capacity A commitment of a resource to provide energy during PJM emergency under the capped energy

More information

ATTACHMENT DD. Reliability Pricing Model

ATTACHMENT DD. Reliability Pricing Model OF NEW SERVICE REQUESTS; R - OATT ATTACHMENT DD ATTACHMENT DD Reliability Pricing Model References to section numbers in this Attachment DD refer to sections of this Attachment DD, unless otherwise specified.

More information

Price Responsive Demand education. DRS May 11 th, 2017

Price Responsive Demand education. DRS May 11 th, 2017 Price Responsive Demand education DRS May 11 th, 2017 PRD Rules became effective 2012, no participation to date Peak Load, MW 1,020 1,000 980 960 940 920 900 PRD vs. Real Time LMP Commit to consume < 900

More information

PJM Manual 18: PJM Capacity Market. Revision: 287 Effective Date: January 22, Prepared by PJM Capacity Market Operations

PJM Manual 18: PJM Capacity Market. Revision: 287 Effective Date: January 22, Prepared by PJM Capacity Market Operations Style Definition: PJM_Normal PJM Manual 18: PJM Capacity Market Revision: 287 Effective Date: January 22, 2015 Prepared by PJM Capacity Market Operations PJM 2015 PJM 2015 i PJM Manual 18: PJM Capacity

More information

RPM 101 Overview of Reliability Pricing Model

RPM 101 Overview of Reliability Pricing Model RPM 101 Overview of Reliability Pricing Model PJM 2017 Agenda Introduction Resource Adequacy Demand in RPM Supply in RPM Auction Structure Auction Clearing Resource Clearing Prices CTRs & ICTRs/CTR & ICTR

More information

2013/2014 RPM Base Residual Auction Results

2013/2014 RPM Base Residual Auction Results Executive Summary The 2013/2014 Reliability Pricing Model (RPM) Base Residual Auction (BRA) cleared 152,743.3 MW of unforced capacity in the RTO at a Resource Clearing Price of $27.73/MW-day. This MW and

More information

Capacity Market. Overview RPM Capacity Market. Market Design

Capacity Market. Overview RPM Capacity Market. Market Design Section 4 Capacity Capacity Market Each organization serving PJM load must meet its capacity obligations through the PJM Capacity Market, where load serving entities (LSEs) must pay the locational capacity

More information

PJM Manual 18: PJM Capacity Market

PJM Manual 18: PJM Capacity Market PJM Manual 18: PJM Capacity Market Revision: 23 Effective Date: June 1, 2014 Prepared by PJM Capacity Market Operations PJM 2014 PJM 2014 i PJM Manual 18: PJM Capacity Market Manual 18: PJM Capacity Market

More information

2008/ 2009 RPM Base Residual Auction Results

2008/ 2009 RPM Base Residual Auction Results Introduction The purpose of this document is to provide additional information for PJM stakeholders regarding the 2008/2009 Reliability Pricing Model (RPM) Base Residual Auction results. The discussion

More information

Reliability Pricing Model (RPM) Overview. April 11, 2005

Reliability Pricing Model (RPM) Overview. April 11, 2005 Reliability Pricing Model (RPM) Overview April 11, 2005 Drivers for Capacity Market Reform Generation Net Revenue Shortfall Inconsistency between capacity pricing and reliability requirements Result has

More information

2017/2018 RPM Base Residual Auction Planning Period Parameters

2017/2018 RPM Base Residual Auction Planning Period Parameters Introduction The RPM Base Residual Auction (BRA) for the 2017/2018 Delivery Year is scheduled to be conducted in May of 2014. This document describes the 2017/2018 BRA planning period parameters and also

More information

2011/2012 RPM Base Residual Auction Results

2011/2012 RPM Base Residual Auction Results Executive Summary The 2011/12 Reliability Pricing Model (RPM) Base Residual Auction (BRA) cleared 132,221.5 MW of unforced capacity in the RTO at a uniform Resource Clearing Price of $110.00/MW-day. This

More information

Analysis of the 2012/2013 RPM Base Residual Auction

Analysis of the 2012/2013 RPM Base Residual Auction Analysis of the 2012/2013 RPM Base Residual Auction The Independent Market Monitor for PJM August 6, 2009 Monitoring Analytics 2009 www.monitoringanalytics.com Introduction This report, prepared by the

More information

Capacity Performance Training. March 16, 2015

Capacity Performance Training. March 16, 2015 Capacity Performance Training March 16, 2015 Training Objectives Provide Capacity Market Sellers with information necessary to participate in the Reliability Pricing Model (RPM) under a Capacity Performance

More information

Capacity Performance Training. June 24, 2015

Capacity Performance Training. June 24, 2015 Capacity Performance Training June 24, 2015 Training Objectives Provide Capacity Market Sellers with information necessary to participate in the Reliability Pricing Model (RPM) under a Capacity Performance

More information

Current Language Proposed Revisions Rationale

Current Language Proposed Revisions Rationale 1. RAA, Schedule 8.1, Paragraph H (Annexation of service territory by Public Power Entity) 2. In the event a Public Power Entity that is an FRR Entity annexes service territory to include load from a Party

More information

Capacity Performance FAQ Response

Capacity Performance FAQ Response PJM Interconnection September 15, 2014 This page is intentionally left blank. PJM 2014 www.pjm.com 2 P age Contents FAQ Response Introduction... 4 Capacity Products... 4 Methodology for Establishing Maximum

More information

Energy Efficiency in RPM. Adam Keech Director, Market Operations PJM January 13, 2015

Energy Efficiency in RPM. Adam Keech Director, Market Operations PJM January 13, 2015 Energy Efficiency in RPM Adam Keech Director, Market Operations PJM January 13, 2015 PJM Capacity Market PJM Capacity Market Reliability Pricing Model (RPM) PJM secures capacity on behalf of LSEs to satisfy

More information

PJM Organization and Markets. Saudi Delegation Columbus Ohio May 22, 2012

PJM Organization and Markets. Saudi Delegation Columbus Ohio May 22, 2012 PJM Organization and Markets Saudi Delegation Columbus Ohio May 22, 2012 Agenda Introduction & Governance Energy Markets LMP FTRs/ARRs Two Settlement Virtual Bids Ancillary Capacity - Reliability Pricing

More information

RPM 201 Resource Participation in PJM Capacity Market

RPM 201 Resource Participation in PJM Capacity Market RPM 201 Resource Participation in PJM Capacity Market PJM 2017 Agenda Auction structure and key activity timelines Must offer, Offer Caps, MOPR Demand Response Energy Efficiency Commercial Aggregation

More information

PJM Manual 18B: Energy Efficiency Measurement & Verification Revision: 03 Effective Date: November 17, Prepared by PJM Forward Market Operations

PJM Manual 18B: Energy Efficiency Measurement & Verification Revision: 03 Effective Date: November 17, Prepared by PJM Forward Market Operations PJM Manual 18B: Energy Efficiency Measurement & Verification Revision: 03 Effective Date: November 17, 2016 Prepared by PJM Forward Market Operations PJM 2016 Table of Contents Table of Contents Approval...5

More information

Financial Transmission Rights

Financial Transmission Rights PJM Manual 06 Financial Transmission Rights Revision: 12 Effective Date: July 1, 2009 Prepared by Market Simulation Department PJM 2009 PJM Revision 05, Effective Date: 12/30/03 iii Table of Contents PJM

More information

Capacity Market. Overview. RPM Capacity Market. Market Design

Capacity Market. Overview. RPM Capacity Market. Market Design Section 5 Capacity Capacity Market Each organization serving PJM load must meet its capacity obligations through the PJM Capacity Market, where load serving entities (LSEs) must pay the locational capacity

More information

2013/2014 RPM Base Residual Auction Planning Period Parameters

2013/2014 RPM Base Residual Auction Planning Period Parameters Introduction The RPM Base Residual Auction (BRA) for the 2013/2014 Delivery Year is scheduled to be conducted in May of 2010. The planning period parameters to be used as input into the 2013/2014 BRA are

More information

What is a Capacity Market?

What is a Capacity Market? What is a Capacity Market? Mechanism that ensures sufficient generation to meet reliability and peak load needs. Additional potential benefit of capacity markets is the incentive to build new generation.

More information

CUSTOMER GUIDE TO PJM BILLING

CUSTOMER GUIDE TO PJM BILLING CUSTOMER GUIDE TO PJM BILLING Billing Line Items include PJM Open Access Tariff (OATT) references, PJM Operating Agreement (OpAgr) references, and PJM Manual references. Reports are available for viewing,

More information

CAPACITY MARKETS 5. Overview. RPM Capacity Market Market Design. Market Structure

CAPACITY MARKETS 5. Overview. RPM Capacity Market Market Design. Market Structure 2009 Quarterly State of the Market Report for PJM: January through September Section 5 - Capacity Markets Each organization serving PJM load must meet its capacity obligations by acquiring capacity resources

More information

RPM 301 Performance in Reliability Pricing Model

RPM 301 Performance in Reliability Pricing Model RPM 301 Performance in Reliability Pricing Model PJM State & Member Training Dept. PJM 2017 Disclaimer: PJM has made all efforts possible to accurately document all information in this presentation. The

More information

2020/2021 RPM Base Residual Auction Planning Period Parameters

2020/2021 RPM Base Residual Auction Planning Period Parameters Introduction The planning parameters for the 2020/2021 RPM Base Residual Auction (BRA) that is to be conducted in May of 2017 were posted on the PJM RPM website on February 1, 2017. This document describes

More information

Capacity Performance Proposal. Summary of Key Design Elements

Capacity Performance Proposal. Summary of Key Design Elements December 3, 2014 This page is intentionally left blank. PJM 2014 1 P a g e Capacity Product Synopsis PJM Interconnection is proposing a single capacity product called Capacity Performance, similar to the

More information

2018/2019 RPM Base Residual Auction Planning Period Parameters

2018/2019 RPM Base Residual Auction Planning Period Parameters Introduction The planning parameters for the 2018/2019 RPM Base Residual Auction (BRA) that is to be conducted in May of 2015 were posted on the PJM RPM website on January 30, 2015. Two versions of the

More information

PJM InSchedule User Guide

PJM InSchedule User Guide PJM InSchedule User Guide Revision: 01 Effective Date: June 1, 2015 Prepared by Markets Applications PJM 2015 PJM 2015 Revision 7, Effective Date: 6/1/2015 i PJM eschedules User Guide Approval and Revision

More information

Recent Development in Reliable Energy Market in the US and Singapore

Recent Development in Reliable Energy Market in the US and Singapore Recent Development in Reliable Energy Market in the US and Singapore 18-19 th June 2008 Electrical Engineering and Maintenance Forum World Engineering Congress, Bangkok, Thailand Dr. Panida Jirutitijaroen

More information

PJM Emergency DR (Load Management) PJM State & Member Training Dept.

PJM Emergency DR (Load Management) PJM State & Member Training Dept. PJM Emergency DR (Load Management) PJM State & Member Training Dept. PJM 2014 Disclaimer: PJM has made all efforts possible to accurately document all information in this presentation. The information

More information

LOAD SERVING ENTITIES PJM REGION

LOAD SERVING ENTITIES PJM REGION Intra-PJM Tariffs --> RELIABILITY ASSURANCE AGREEMENT PJM Interconnection, L.L.C. Rate Schedule FERC No. 44 RELIABILITY ASSURANCE AGREEMENT Among LOAD SERVING ENTITIES in the PJM REGION Effective Date:

More information

Load Management Performance Report 2017/2018. (mid Delivery Year update)

Load Management Performance Report 2017/2018. (mid Delivery Year update) Load Management Performance Report 2017/2018 (mid Delivery Year update) January 2018 PJM has made all efforts possible to accurately document all information in this report. However, PJM cannot warrant

More information

Comparison Matrix of Existing Capacity Market Attributes: RPM & FCM

Comparison Matrix of Existing Capacity Market Attributes: RPM & FCM Comparison Matrix of Existing Capacity Market Attributes: RPM & FCM RPM / PJM FCM / ISO-NE Qualification for Existing Resources Qualification for New Resources Procurement cycle Commitment Term Base Auction

More information

Load Management Performance Report 2015/2016

Load Management Performance Report 2015/2016 Load Management Performance Report 2015/2016 August 2016 PJM has made all efforts possible to accurately document all information in this report. However, PJM cannot warrant or guarantee that the information

More information

PC Recommendations for Summer Capability Verification Tests

PC Recommendations for Summer Capability Verification Tests PC Recommendations for Summer Capability Verification Tests MRC January 30, 2014 www.pjm.com www.pjm.com PC Recommendations Manual 21: Rules and Procedures for Determination of Generating Capability M21

More information

PECO Default Service Program - RFP Data Room Data Series Overview: General Descriptions and Assumptions March 27, 2013

PECO Default Service Program - RFP Data Room Data Series Overview: General Descriptions and Assumptions March 27, 2013 PECO Default Service Program - RFP Data Room Data Series Overview: General Descriptions and Assumptions March 27, 2013 TABLE OF CONTENTS I. DESCRIPTION OF SUPPLY TO BE PROCURED IN PECO RFP...2 II. GENERAL

More information

Reliability Based Capacity Release Sell Back Curve

Reliability Based Capacity Release Sell Back Curve Reliability Based Capacity Release Sell Back Curve When PJM held the Transitional Auction for the 2017/2018 Delivery Year, it procured 10,017 MWs of capacity not previously committed. PJM intends to release

More information

PJM Manual 27: Open Access Transmission Tariff Accounting Revision: 88 Effective Date: November 16, 2017

PJM Manual 27: Open Access Transmission Tariff Accounting Revision: 88 Effective Date: November 16, 2017 PJM Manual 27: Open Access Transmission Tariff Accounting Revision: 88 Effective Date: November 16, 2017 Prepared by Market Settlements Development Department PJM 2017 Table of Contents Table of Contents

More information

Schedule 9 and 10 PJM /23/2017

Schedule 9 and 10 PJM /23/2017 Schedule 9 and 10 PJM 2017 Schedule 9 PJM Scheduling, System Control and Dispatch Service How PJM pays its bills Unbundled Those who use the service, pay for it 6 categories plus FERC, NERC, RFC, OPSI,

More information

PJM ExSchedule User Guide

PJM ExSchedule User Guide PJM ExSchedule User Guide Revision: 07 Effective Date: July 13, 2017 Prepared by Transmission Service Department PJM 2017 i Approval and Revision History PJM User Guide: ExSchedule Table of Contents Table

More information

2010 State of the Market Report for PJM: Technical Reference for PJM Markets

2010 State of the Market Report for PJM: Technical Reference for PJM Markets 200 State of the Market Report for PJM: Technical Reference for PJM Markets The Independent Market Monitor for PJM March 0, 20 Monitoring Analytics 20 www.monitoringanalytics.com This page intentionally

More information

Contracts and Communication

Contracts and Communication Contracts and Communication PJM State & Member Training Dept. Disclaimer: PJM has made all efforts possible to accurately document all information in this presentation. The information seen here does not

More information

Virtual Workshop on PJM ARR and FTR Market 2017/2018

Virtual Workshop on PJM ARR and FTR Market 2017/2018 Virtual Workshop on PJM ARR and FTR Market 2017/2018 PJM State & Member Training Dept. Webex February 10, 2017 PJM 2017 Disclaimer: PJM has made all efforts possible to accurately document all information

More information

Module E-1 Capacity Tracking Tool

Module E-1 Capacity Tracking Tool Module E-1 Capacity Tracking Tool Page 1 of 82 I. Disclaimer... 4 II. Document Change History... 5 1. INTRODUCTION... 6 1.1. Purpose... 6 1.2. Scope... 7 2. OVERVIEW... 7 3. RELATED DOCUMENTS AND REQUIREMENTS...

More information

MARYLAND PUBLIC SERVICE COMMISSION POSITION PAPER CONCERNING PJM S RPM PROPOSAL

MARYLAND PUBLIC SERVICE COMMISSION POSITION PAPER CONCERNING PJM S RPM PROPOSAL STATE OF MARYLAND PUBLIC SERVICE COMMISSION MARYLAND PUBLIC SERVICE COMMISSION POSITION PAPER CONCERNING PJM S RPM PROPOSAL DECEMBER 2004 TABLE OF CONTENTS BACKGROUND...2 RPM AND EXPERIMENTATION...3 LOCATIONAL

More information

The 2017/2018 RPM Base Residual Auction: Sensitivity Analyses Revised

The 2017/2018 RPM Base Residual Auction: Sensitivity Analyses Revised The 2017/2018 RPM Base Residual Auction: Sensitivity Analyses Revised The Independent Market Monitor for PJM August 26, 2014 Monitoring Analytics 2014 www.monitoringanalytics.com This page intentionally

More information

Planning Committee Recommendations for Summer Capability Verification Tests

Planning Committee Recommendations for Summer Capability Verification Tests Planning Committee Recommendations for Summer Capability Verification Tests Markets and Reliability Committee February 27, 2014 PC Recommendations Manual 21: Rules and Procedures for Determination of Generating

More information

GUIDE 11. Demand Response Information System User s Guide

GUIDE 11. Demand Response Information System User s Guide GUIDE 11 Demand Response Information System User s Guide November 2016 Version: 2.3 Effective Date: 11/21/2016 This document was prepared by: NYISO Demand Response Operations New York Independent System

More information

RPM DR Auction Setup

RPM DR Auction Setup RPM DR Auction Setup Capacity Markets Operations March 2016 2019/20 BRA DR Setup Timeline 3/30/2016 1. 2016/17 Registrations must be confirmed in elrs to be included in DR Pre-Registration 2. CSP switches

More information

PJM Capacity Market. October 5, 2011 OPSI Seventh Annual Meeting Andrew L. Ott, Senior Vice President, Market Services

PJM Capacity Market. October 5, 2011 OPSI Seventh Annual Meeting Andrew L. Ott, Senior Vice President, Market Services PJM Capacity Market October 5, 2011 OPSI Seventh Annual Meeting Andrew L. Ott, Senior Vice President, Market Services Capacity vs. Energy Capacity A commitment of a resource to provide energy during PJM

More information

PJM Resource Adequacy Analysis

PJM Resource Adequacy Analysis PJM Manual 20: PJM Resource Adequacy Analysis Revision: 05 Effective Date: February 1, 2013 Prepared by Resource Adequacy Planning PJM 2013 1 PJM Manual 20: Manual 20: PJM Resource Adequacy Analysis Table

More information

Billing Line Items PJM /23/2017

Billing Line Items PJM /23/2017 Billing Line Items PJM 2017 Billing Line Items (BLI) PJM 2017 2 Billing Line Items (BLI) ID # Weekly BLI CHARGES ID # 1000 Amount Due for Interest on Past Due Charges Weekly BLI 1100 1 Network Integration

More information

ATTACHMENT M-2 (PECO) Determination of Capacity Peak Load Contributions, Network Service Peak Load and Hourly Load Obligations PURPOSE

ATTACHMENT M-2 (PECO) Determination of Capacity Peak Load Contributions, Network Service Peak Load and Hourly Load Obligations PURPOSE ATTACHMENT M-2 (PECO) Determination of Capacity Peak Load Contributions, Network Service Peak Load and Hourly Load Obligations PURPOSE This document outlines the process by which PECO determines Capacity

More information

UCAP Calculation Comparison

UCAP Calculation Comparison UCAP Calculation Comparison Dispatchable resources within PJM, NYISO, & MISO September 2017 Draft for Discussion Overview map British Columbia Alberta Manitoba Newfoundland Labrador Ontario Quebec PEI

More information

I. DESCRIPTION OF SUPPLY TO BE PROCURED IN THE PA DEFAULT SERVICE PROGRAM SOLICITATIONS

I. DESCRIPTION OF SUPPLY TO BE PROCURED IN THE PA DEFAULT SERVICE PROGRAM SOLICITATIONS Met-Ed, Penelec, Penn Power and West Penn Power Pennsylvania Default Service Programs Data Series Overview: General Descriptions As of November 26, 2012 I. DESCRIPTION OF SUPPLY TO BE PROCURED IN THE PA

More information

COMMENTS OF THE PJM INDUSTRIAL CUSTOMER COALITION ON PJM'S CAPACITY PERFORMANCE PROPOSAL. September 17, 2014

COMMENTS OF THE PJM INDUSTRIAL CUSTOMER COALITION ON PJM'S CAPACITY PERFORMANCE PROPOSAL. September 17, 2014 COMMENTS OF THE PJM INDUSTRIAL CUSTOMER COALITION ON PJM'S CAPACITY PERFORMANCE PROPOSAL September 17, 2014 The PJM Industrial Customer Coalition ("PJMICC") appreciates the opportunity to submit these

More information

Third Incremental Auction shall mean an Incremental Auction conducted three months before the Delivery Year to which it relates.

Third Incremental Auction shall mean an Incremental Auction conducted three months before the Delivery Year to which it relates. Definitions T U - V Tangible Net Worth: Tangible Net Worth shall mean all assets (not including any intangible assets such as goodwill) less all liabilities. Any such calculation may be reduced by PJMSettlement

More information

LOLE is expressed as hours per year with the usual target criteria being (0.1 days/year) or 1- day in 10-years MISO Tariff: Module E-1 - The

LOLE is expressed as hours per year with the usual target criteria being (0.1 days/year) or 1- day in 10-years MISO Tariff: Module E-1 - The 1 2 3 4 LOLE is expressed as hours per year with the usual target criteria being (0.1 days/year) or 1- day in 10-years MISO Tariff: Module E-1 - The Transmission Provider will calculate and post the Planning

More information

Summer-Only Demand Response Senior Task Force

Summer-Only Demand Response Senior Task Force Summer-Only Demand Response Senior Task Force Rebecca Carroll Facilitator, SODRSTF Markets & Reliability Committee October 25, 2018 Document Changes Since First Read Manual 19 Clarifying language added

More information

Intermittent Resources in RPM. Sept 21, 2015

Intermittent Resources in RPM. Sept 21, 2015 Intermittent Resources in RPM Sept 21, 2015 Capacity Resource Capacity Resources must be capable of sustained, predictable operation that allows resource to be available to provide energy and reserves

More information

PJM Proposal for Incremental Auction Redesign

PJM Proposal for Incremental Auction Redesign PJM Proposal for Incremental Auction Redesign Jeff Bastian Manager, Capacity Market Operations Incremental Auction Senior Task Force May 31, 2017 www.pjm.com RPM Depends on Physical Resources RPM is designed

More information

ISO-NE FCM Capacity Market Design Scott M. Harvey. October 9, 2007

ISO-NE FCM Capacity Market Design Scott M. Harvey. October 9, 2007 ISO-NE FCM Capacity Market Design Scott M. Harvey October 9, 2007 Summary The ISO-NE FCM capacity market design embodies many improvements over the prior ISO-NE capacity market. Five of these improvements

More information

ATTACHMENT M-2 (BGE) Determination of Capacity Peak Load Contributions, Network Service Peak Load and Hourly Load Obligations PURPOSE

ATTACHMENT M-2 (BGE) Determination of Capacity Peak Load Contributions, Network Service Peak Load and Hourly Load Obligations PURPOSE ATTACHMENT M-2 (BGE) Determination of Capacity Peak Load Contributions, Network Service Peak Load and Hourly Load Obligations PURPOSE This document outlines the process by which BGE determines Capacity

More information

5.1 Transmission Congestion Charge Calculation Calculation by Office of the Interconnection.

5.1 Transmission Congestion Charge Calculation Calculation by Office of the Interconnection. 5.1 Transmission Congestion Calculation. 5.1.1 Calculation by Office of the Interconnection. When the transmission system is operating under constrained conditions, or as necessary to provide third-party

More information

Outage Types and Entering Tickets PJM State & Member Training Dept.

Outage Types and Entering Tickets PJM State & Member Training Dept. Outage Types and Entering Tickets PJM State & Member Training Dept. Objectives Students will be able to: Describe the outage reporting process and requirements 2 edart edart stands for Dispatcher Applications

More information

Analysis of the 2017/2018 RPM Base Residual Auction

Analysis of the 2017/2018 RPM Base Residual Auction Analysis of the 2017/2018 RPM Base Residual Auction The Independent Market Monitor for PJM October 6, 2014 Monitoring Analytics 2014 www.monitoringanalytics.com Introduction This report, prepared by the

More information

Proposed ICAP Manual Revisions Regarding Deliverability Requirements for Capacity Imports from PJM

Proposed ICAP Manual Revisions Regarding Deliverability Requirements for Capacity Imports from PJM Proposed ICAP Manual Revisions Regarding Deliverability Requirements for Capacity Imports from PJM Zachary T. Smith Manager, Capacity Market Design Business Issues Committee January 17, 2018, Rensselaer,

More information

PJM ARR and FTR Market

PJM ARR and FTR Market PJM ARR and FTR Market PJM State & Member Training Dept. PJM 2017 Objectives At the completion of this training, you should be able to describe the concepts and principles of Auction Revenue Rights and

More information

Deliverability Requirements for Capacity Imports

Deliverability Requirements for Capacity Imports Deliverability Requirements for Capacity Imports Zachary T. Smith Supervisor, ICAP Market Operations ICAPWG October 11, 2017, Rensselaer, NY Minimum deliverability requirements for External Capacity in

More information

NEW YORK INDEPENDENT SYSTEM OPERATOR

NEW YORK INDEPENDENT SYSTEM OPERATOR Rate Schedule 1 Study Status Update Review of Other ISO/RTO s March 2011 TABLE OF CONTENTS 1.0 RATE STRUCTURES AT OTHER ISO S/RTO S...1 1.1 PJM...1 1.2 ISO-New England...3 1.3 California ISO...6 1.4 Midwest

More information

3.2 Market Settlements.

3.2 Market Settlements. 3.2 Market Settlements. If a dollar-per-mw-hour value is applied in a calculation under this section 3.2 where the interval of the value produced in that calculation is less than an hour, then for purposes

More information

3.2 Market Buyers Spot Market Energy Charges.

3.2 Market Buyers Spot Market Energy Charges. 3.2 Market Buyers. 3.2.1 Spot Market Energy Charges. (a) The Office of the Interconnection shall calculate System Energy Prices in the form of Day-ahead System Energy Prices and Real-time System Energy

More information

Analysis of the 2020/2021 RPM Base Residual Auction

Analysis of the 2020/2021 RPM Base Residual Auction Analysis of the 2020/2021 RPM Base Residual Auction The Independent Market Monitor for PJM November 17, 2017 Monitoring Analytics 2017 www.monitoringanalytics.com Introduction This report, prepared by

More information

2018/2019 NYSRC RELIABILITY RULE A.2 REQUIREMENTS R1, R2, R3 COMPLIANCE SUBMITTAL

2018/2019 NYSRC RELIABILITY RULE A.2 REQUIREMENTS R1, R2, R3 COMPLIANCE SUBMITTAL 2018/2019 NYSRC RELIABILITY RULE A.2 REQUIREMENTS R1, R2, R3 COMPLIANCE SUBMITTAL COVERING THE NEW YORK CONTROL AREA For the 2018 2019 Capability Year Presented to the Reliability Compliance Monitoring

More information

Expanding Capacity Eligibility

Expanding Capacity Eligibility Expanding Capacity Eligibility Zachary T. Smith Manager, Capacity Market Design ICAPWG/MIWG March 7 th, 2019 Agenda Background Installed Capacity Supplier Payment Structure Peak Load Windows Counting MWs

More information

Design Considerations for an Alberta Capacity Market

Design Considerations for an Alberta Capacity Market Design Considerations for an Alberta Capacity Market Monitoring Analytics September 21, 2016 Monitoring Analytics 2016 www.monitoringanalytics.com This page intentionally left blank. Monitoring Analytics

More information

Rules and Procedures for Determination of Generating Capability

Rules and Procedures for Determination of Generating Capability PJM Manual 21 Rules and Procedures for Determination of Generating Capability Revision: 11 Effective Date: March 5, 2014 Prepared by System Planning Department PJM 2014 PJM 2007 Revision 05, Effective

More information

Demand Response Participation in PJM Markets

Demand Response Participation in PJM Markets Demand Response Participation in PJM Markets Review of PJM Independent Market Monitor s Criticisms and Responses PREPARED FOR Alberta Electric System Operator PREPARED BY Kathleen Spees Hannes Pfeifenberger

More information

Energy Efficiency Resource Requirements

Energy Efficiency Resource Requirements Energy Efficiency Resource Requirements Theresa Esterly Sr. Lead Engineer, Capacity Market Operations Market Implementation Committee July 12, 2017 www.pjm.com Energy Efficiency (EE) Resource Definition

More information

Concepts for Behind-the- Meter Net Generation

Concepts for Behind-the- Meter Net Generation Concepts for Behind-the- Meter Net Generation Pradip Ganesan Donna Pratt New York Independent System Operator Joint Meeting of Installed Capacity, Market Issues and Price Responsive Load Working Groups

More information

Analysis of the 2019/2020 RPM Base Residual Auction

Analysis of the 2019/2020 RPM Base Residual Auction Analysis of the 2019/2020 RPM Base Residual Auction The Independent Market Monitor for PJM August 31, 2016 Monitoring Analytics 2016 www.monitoringanalytics.com Introduction This report, prepared by the

More information

Introduction to the Demand Response Auction. IESO Training

Introduction to the Demand Response Auction. IESO Training Introduction to the Demand Response Auction IESO Training May 2017 Introduction to the Demand Response Auction AN IESO TRAINING PUBLICATION This guide has been prepared to assist in the IESO training of

More information

Ariba Network Invoice Guide

Ariba Network Invoice Guide Ariba Network Invoice Guide Content 1. Introduction 2. Invoice Practices 3. Before you Begin Invoicing I. Viewing Customer Invoice Rules II. Electronic Invoice Routing and notifications III. Account Configuration

More information

Alberta Capacity Market

Alberta Capacity Market Alberta Capacity Market Comprehensive Market Design (CMD 1) Design Proposal Document Section 1: Overview of the Alberta Capacity Market Prepared by: Alberta Electric System Operator Date: January 26, 2018

More information

Installed Capacity Manual. August 2017

Installed Capacity Manual. August 2017 MANUAL 4 Installed Capacity Manual August 2017 Version: 6.37 Effective Date: 08/25/2017 Committee Acceptance: 08/09/2017 BIC This document was prepared by: NYISO Capacity Market Products New York Independent

More information

Workshop H. PJM Basics: An Introduction to PJM Interconnection and How its Energy and Capacity Markets Operate

Workshop H. PJM Basics: An Introduction to PJM Interconnection and How its Energy and Capacity Markets Operate Workshop H PJM Basics: An Introduction to PJM Interconnection and How its Energy and Capacity Markets Operate Tuesday, February 19, 2019 1:45 p.m. to 3 p.m. Biographical Information Adam J. Keech, Executive

More information

PJM Wholesale Markets. Hisham Choueiki, Ph.D., P.E. Ohio PUC Staff October 20-24, 2014 Tbilisi, Georgia

PJM Wholesale Markets. Hisham Choueiki, Ph.D., P.E. Ohio PUC Staff October 20-24, 2014 Tbilisi, Georgia PJM Wholesale Markets Hisham Choueiki, Ph.D., P.E. Ohio PUC Staff October 20-24, 2014 Tbilisi, Georgia PJM RTO Functions Grid Operation Non-discriminatory treatment Monitoring transmission system Reliability

More information

NPCC 2009 New England Interim Review of Resource Adequacy. NPCC 2009 New England Annual Interim Review of Resource Adequacy

NPCC 2009 New England Interim Review of Resource Adequacy. NPCC 2009 New England Annual Interim Review of Resource Adequacy NPCC 2009 New England Annual Interim Review of Resource Adequacy ISO New England Inc. October, 2009 Approved by RCC on November 18, 2009 1 1.0 EXECUTIVE SUMMARY This report is ISO New England s (ISO-NE)

More information

Ariba Network Invoice Guide

Ariba Network Invoice Guide Ariba Network Invoice Guide Content Introduction Invoice Practices Before you Begin Invoicing Viewing Customer Invoice Rules Electronic Invoice Routing and notifications Account Configuration and Invoice

More information

Participation in the monthly auction and the capability period auction shall consist of:

Participation in the monthly auction and the capability period auction shall consist of: New York Capacity Market (NYISO Installed Capacity Market) The term Installed Capacity in the ICAP Manual and the NYISO Services Tariff Manual describes the market as opposed to the product. For example,

More information

PJM Markets. Energy and Ancillary Services. PJM State & Member Training Dept. PJM /29/2014

PJM Markets. Energy and Ancillary Services. PJM State & Member Training Dept. PJM /29/2014 PJM Markets Energy and Ancillary Services PJM State & Member Training Dept. LMP Basics 2 7/17/2013 What is LMP? Locational Marginal Price Pricing method PJM uses to: price energy purchases and sales in