Minimum Average Fraction Inspected for Combined Continuous Lot by Lot Acceptance Sampling Plan
|
|
- Benjamin Allen
- 6 years ago
- Views:
Transcription
1 c Heldermann Verlag Economic Quality Control ISSN Vol 19 (2004), No. 1, Minimum Average Fraction Inspected for Combined Continuous Lot by Lot Acceptance Sampling Plan Chung-Ho Chen Abstract: This article investigates the problem of minimizing the average fraction inspected (AFI) for a combined continuous lot by lot acceptance sampling plan. A solution procedure is developed to find sub-optimal sampling plan parameters that will meet the average outgoing quality limit (AOQL) requirement, while guaranteeing a small AFI when the process average (>AOQL) is known. Key Words: Continuous Sampling Plan, Average Outgoing Quality (AOQ), Average Outgoing Quality Limit (AOQL), Average Fraction Inspected (AFI), Lot by Lot Inspection Plan. 1 Introduction Type I continuous sampling plans (CSP-1) were introduced by Dodge in The operating procedure of a CSP-1 plan is as follows: Inspect every item until i successive units are found to be free of defects, then inspect at a frequency f. When a defective item is found, revert to 100% inspection and continue again until i successive items are found free of defects. The average outgoing quality limit (AOQL) is widely used as primary performance inde for CSP-1 plans and other types of continuous sampling plans. Hence, the sampling plan parameters are determined so as to meet the AOQL requirement and at the same time guarantee minimum inspection cost. The last aim is generally met by minimizing the long run inspection cost given by the average fraction inspected (AFI). Govindaraju (1989) and Wasserman (1990) matched CSP-1 plans and single sampling plans with respect to their properties of outgoing quality and long-run proportion accepted, respectively. Pesotchinsky (1987), Bebbington and Govindaraju (1998), and Govindaraju and Bebbington (2000) proposed the combined continuous lot by lot inspection plan. From Govindaraju and Bebbington (2000, p. 725), the operating procedure of the combined continuous lot by lot inspection plan is outlined below: Step 1: Inspect 100% of the units consecutively until i units in succession are found to be clear of defects.
2 116 Chung-Ho Chen Step 2: Once clearance takes place as in Step 1, start forming lots of desired size. Apply any lot by lot sampling inspection plan, such as a single sampling plan and inspect the lots at a frequency of f. Step 3: If a lot is rejected, go to Step 1; otherwise, continue with lot by lot inspection. Previously researchers (Resnikoff (1960) and Ghosh (1988)) addressed the problems of achieving the minimum AFI for the CSP-1 plan. In this paper, we investigate the problem of minimizing the AFI for a combined continuous lot by lot acceptance sampling plan. A procedure is developed to find a sub-optimal solution that will meet the AOQL requirement, while come close to the minimum AFI when the process average (>AOQL) is known. 2 Average Outgoing Quality and Average Fraction Inspected for Combined Continuous Lot by Lot Acceptance Sampling Plans In Govindaraju and Bebbington (2000, p. 728), the average outgoing quality (AOQ) and AFI functions for the combined continuous lot by lot acceptance sampling plan are given. AOQ = p 2 q i (1 f) (1 P a )(1 q i )+pq i (1) AFI = (1 P a)(1 q i )+fpq i (1 P a )(1 q i )+pq i (2) where i = clearance number f = lot inspection frequency p = process defective probability q = 1 p P a = probability of accepting an inspected lot with fraction defective p The problem investigated here is to determine a single sampling plan (n, c) and an continuous sampling plan (i, f) so that a prescribed AOQL is guaranteed with minimum AFI. 3 Minimum AFI for a Combined Continuous Lot by Lot Acceptance Sampling Plan Dodge (1943, p. 271) presented the AOQ and AFI functions for a CSP-1 plan given by (i, f).
3 Minimum Average Fraction Inspected for Acceptance Sampling Plan 117 AOQ = AFI = (1 f)pq i f +(1 f)q i f f +(1 f)q i (3) (4) Ghosh (1988, p. 419) showed that the minimum AFI for a CSP-1 plan occurs when the quality level that yields the specified AOQL is equal to process average p. By means of a comparison we notice that by setting 1 P a = pf (5) the epressions on the right hand side of (1) and (2) are transformed into the right hand sides of (3) and (4). Hence, we assume (5) which allows the development of a recursive minimization procedure. Of course, the result will be only sub-optimal, but it is to be epected that it is close to the optimum. Assuming (5) allows to adopt Ghosh s (1988) method for minimizing the AFI for a CSP-1 plan and obtain the parameters (i,f ). Net we use (5) to determine the corresponding optimal parameters (n,c ) for a single sampling plan. The detailed solution procedure of minimizing AFI for the combined continuous lot by lot acceptance sampling plan under the specified AOQL, p L, is as follows: Step 1: Estimate the process average p. Step 2: Determine the optimum continuous sampling plan (i,f ). From Ghosh (1988, p. 419), the optimal clearance number is given by 1 p i = p p L (6) and the corresponding optimal sampling frequency by f = (1 p) i+1 ip L +(1 p) i+1 (7) Step 3: Determine the optimum lot by lot sampling plan (n,c ). From (5) we have for a single sampling plan (n, c) with sufficiently large lot size, and the optimum sampling frequency f : P a = c =0 ( ) n p (1 p) n =1 pf (8) For a given acceptance number c, P a is a decreasing function in the sample size n and for given n an increasing function of c. Ifc is too small, then there is no solution of (8). Hence we search for the minimum sample size for which (8) is met.
4 118 Chung-Ho Chen The above algorithm has one major drawback. Because of the discrete character of the acceptance number and sample size and hence of P a, it is generally not possible to find (n, c) being a solution of (8). In order to overcome this difficulty, we replace the equality (8) by the following requirement for (n,c ): c ( ) n 1 p (1 p) n 1 > 1 pf (9) =0 c ( ) n p (1 p) n 1 pf (10) =0 n minimum (11) With (9), (10) and (11) there is always a unique solution (i,f,n,c ) of the problem with c =1. 4 Numerical eample Assume the situation of a given process with defective probability of p = 400 PPM 4 and a requited outgoing quality level of AOQL = 200 PPM. A combined continuous lot by lot acceptance sampling plan with minimum AFI shall be used for meeting the AOQL-requirement. The above given algorithm yields the following values: i = = (12) f ( ) 4998 = = ( ) 4998 (13) pf = (14) For c = 1, the desired sample size is found to be n = 25. Hence the sub-optimal combined continuous lot by lot sampling plan is given by: (i = 4998,f = ,c =1,n = 25) (15) 5 Conclusions Govindaraju and Bebbington (2000, p. 728) pointed out that the combined continuous lot by lot acceptance sampling plan is particularly useful for high quality production 4 parts per million
5 Minimum Average Fraction Inspected for Acceptance Sampling Plan 119 processes, where the fraction non-conforming is very low, of the order of 100 PPM. In this paper, we present an easy solution procedure for determining a continuous lot by lot single sampling plan under a specified AOQL value yielding a solution which has an AFI close to the minimum. Further investigations aim at quantified statements about the quality of the obtained solutions with respect to the closeness to the optimal ones. References [1] Bebbinton, M. and Govindaraju, K. (1998): On Pesotchinsky s Scheme for very low fraction nonconforming. Journal of Quality Technology 30, [2] Dodge, H.F.,(1943): A sampling inspection plan for continuous production, Annals of Mathematical Statistics 14, [3] Ghosh, D.T. (1988): The continuous sampling plan that minimises the amount of inspection. Sankhya 50, B, [4] Govindaraju, K. (1989): Procedures and tables for the selection of CSP-1 plans. Journal of Quality Technology 21, [5] Govindaraju, K. and Bebbington, M. (2000): Combined continuous lot by lot acceptance sampling plan. Journal of Applied Statistics 27, [6] Pesotchinsky, L. (1987): Plans for low fraction nonconforming. Journal of Quality Technology 19, [7] Resnikoff, G.J. (1960): Minimum average fraction inspected for a continuous sampling plan. Journal of Industrial Engineering 11, [8] Wasserman, G.S. (1990): Matching performance of continuous sampling plans with single sampling plans. Communications in Statistics-Simulation and Computation 19, Chung-Ho Chen Department of Industrial Management Southern Taiwan University of Technology 1 Nan-Tai Street, Yung-Kang City Tainan 710 Taiwan
Joint Design of Economic Manufacturing Quantity, Sampling Plan and Specification Limits
c Heldermann Verlag Economic Quality Control ISSN 0940-5151 Vol 17 (2002), No. 2, 145 153 Joint Design of Economic Manufacturing Quantity, Sampling Plan and Specification Limits Chung-Ho Chen and Chao-Yu
More informationA New System of SkSP-T Plan with Single Sampling Plan as
Research Journal of Mathematical and Statistical Sciences E-ISSN 67 Vol. (), -6, May (6) A New System of Plan with Single Sampling Plan as Reference Plan Abstract K. Pradeepa Veerakumari * and S. Suganya
More informationSession XVII. Sampling Statistical Aspects
Session XVII Sampling Statistical Aspects Outline Fundamental Aspects Statistical Aspects Sampling Plan Design Sampling Plan System Statistical Aspects The Operating Characteristic Curve (OCC): Measures
More informationSTUDIES ON DESIGNING CERTAIN CONTINUOUS SAMPLING PLANS
STUDIES ON DESIGNING CERTAIN CONTINUOUS SAMPLING PLANS CHAPTER I INTRODUCTION Certain concepts, terminologies and symbols of acceptance sampling relevant to the thesis are explained in Section l. A review
More informationQuality Control. Chapter 9- Lot-by-Lot Acceptance Sampling By Attributes. PowerPoint presentation to accompany Besterfield Quality Control, 8e
Quality Control Chapter 9- Lot-by-Lot Acceptance Sampling By Attributes PowerPoint presentation to accompany Besterfield Quality Control, 8e PowerPoints created by Rosida Coowar Outline Fundamental Aspects
More informationA REVIEW PAPER ON OFFLINE INSPECTION OF FINISHED AND SEMI-FINISHED PRODUCTS AND EMERGING RESEARCH DIRECTIONS
Yugoslav Journal of Operations Research 26 (2016), Number 4, 395-422 DOI: 10.2298/YJOR150815006R A REVIEW PAPER ON OFFLINE INSPECTION OF FINISHED AND SEMI-FINISHED PRODUCTS AND EMERGING RESEARCH DIRECTIONS
More informationConstruction of Continuous Sampling Plan of the Type Tightened CSP-3 Indexed Through. the Convex Combination of AOQL and MAAOQ.
International Journal of Mathematical Sciences and Applications Vol. 1 No. 2 (May, 2011) Copyright Mind Reader Publications www.ijmsa.yolasite.com Construction of Continuous Sampling Plan of the Type Tightened
More informationStatistical Thinking Session 2 of 4 10:15 to Noon
Statistical Thinking Session 2 of 4 10:15 to Noon ACCEPTANCE SAMPLING 2014 ConteSolutions Acceptance Sampling Notebook pages 31 to 40 SAMPLING CONCEPTS BY JOHN A. CONTE, P.E. The ASQ CQE BoK IV Product
More informationOptimal Determination of Purchaser s Order Quantity and Producer s Process Mean
Journal of Applied cience and Engineering, Vol. 15, No. 1, pp. 4148 (2012) 41 Optimal Determination of Purchaser s Order Quantity and Producer s Process Mean Chung-Ho Chen 1 * and Chao-Yu Chou 2 1 Department
More informationDesign and development of relational chain sampling plans [RChSP(0, i)] for attribute quality characteristics
STATISTICS RESEARCH ARTICLE Design and development of relational chain sampling plans [RChSP(0, i)] for attribute quality characteristics Received: 22 March 2017 Accepted: 18 November 2017 First Published:
More informationQuality Control and Reliability Inspection and Sampling
Quality Control and Reliability Inspection and Sampling Prepared by Dr. M. S. Memon Dept. of Industrial Engineering & Management Mehran UET, Jamshoro, Sindh, Pakistan 1 Chapter Objectives Introduction
More information3. ACCEPTANCE SAMPLING
3. ACCEPTANCE SAMPLING 3.1 Introduction Acceptance sampling is the process of evaluating a portion of the product/material in a lot for the purpose of accepting or rejecting the lot as either confirming
More informationPackage LTPDvar. February 15, 2013
Package LTPDvar February 15, 2013 Type Package Title LTPD and AOQL plans for acceptance sampling inspection by variables Version 1.1 Date 2012-11-18 Author Nikola Kasprikova Maintainer Nikola Kasprikova
More informationIMPROVE. Chapter 3-2. Acceptance Sampling Institute of Industrial Engineers 3-2-1
Chapter 3-2 Acceptance Sampling 2011 Institute of Industrial Engineers 3-2-1 Acceptance Sampling Inspection: Process of comparing actual measurable characteristics with predetermined standard characteristics.
More informationOverview of Statistics used in QbD Throughout the Product Lifecycle
Overview of Statistics used in QbD Throughout the Product Lifecycle August 2014 The Windshire Group, LLC Comprehensive CMC Consulting Presentation format and purpose Method name What it is used for and/or
More informationBAYESIAN MODELS AND STOCHASTIC PROCESSES APPLIED TO CSP SAMPLING PLANS FOR QUALITY CONTROL IN PRODUCTION IN SERIES AND BY LOTS
Proceedings o the 2009 Winter Simulation Conerence M. D. Rossetti, R. R. Hill, B. Johansson, A. Dunkin and R. G. Ingalls, eds. BAYESIAN MODELS AND STOCHASTIC PROCESSES APPLIED TO CSP SAMPLING PLANS FOR
More informationAcceptance Sampling Using Statgraphics Centurion. Presented by Dr. Neil W. Polhemus
Acceptance Sampling Using Statgraphics Centurion Presented by Dr. Neil W. Polhemus Acceptance Sampling Given a lot or batch containing N items, a decision to accept or reject the lot is made based on statistical
More informationDelivering Engineered Solutions
Quality Terms Term Description Accept / Reject Criteria This refers to the measurement and decision of whether or not the quality and performance of a product or service is acceptable. These criteria can
More informationTools for Any Production to Control Quality of Product
Tools for Any Production to Control Quality of Product Dr. S. Qaim Akbar Department of Statistics Shia P.G. College, Lucknow University, Lucknow, India-226020. Abstract The Statistical quality control
More informationCh.8 Quality Management.
Part 1 : System Management. Ch.8 Quality Management. Edited by Dr. Seung Hyun Lee (Ph.D., CPL) IEMS Research Center, E-mail : lkangsan@iems.co.kr - 1 - Definition of Quality. [APICS Dictionary] Fitness
More informationStatistical Quality Control at Statistics Canada. Washington, D.C. (U.S.A.) August 31 to September 2, 1987
1 Index Number: 020203 Title: Author: Statistical Quality Control at Statistics Canada J. Booth and W. Mudryk Date: 1985 Country: Round Table: Canada 2nd Round Table Washington, D.C. (U.S.A.) August 31
More informationGeneralized Modified Group Chain Sampling Plan based on Non-symmetrical Data
Generalized Modified Group Chain Sampling Plan based on Non-symmetrical Data 1 Nazrina Aziz, 2 Abdur Razzaque Mughal, 3 Zakiyah Zain, 4 Nor Hisham Haron 1,2,3,4 Department of Mathematics and Statistics,
More informationTHE INSPECTION OPERATION
Journal of Applied Mathematics & Decision Sciences, 2(2), 159-176 (1998) Reprints Available directly from the Editor. Printed in New Zealand. MULTI-CLASS DECISION PROCEDURES FOR THE INSPECTION OPERATION
More informationMULTI-LEVEL INVENTORY MANAGEMENT CONSIDERING TRANSPORTATION COST AND QUANTITY DISCOUNT
ISSN : 1978-774X Proceeding 7 th International Seminar on Industrial Engineering and Management MULTI-LEVEL INVENTORY MANAGEMENT CONSIDERING TRANSPORTATION COST AND QUANTITY DISCOUNT 1 Eko Pratomo 1, Hui
More informationIntroduction. Statistical Product Acceptance Requirements 9138 Questions & Answers Page 1 Revision Date: 06-NOVEMBER-2017
Questions & Answers Page 1 Introduction The 9138 standard is used in aviation, space, and defense industry organizations to establish requirements for any method of statistical product acceptance to reduce
More information2. TEST RECORDS - All records of tests, inspection and calibration shall be kept in suitable forms approved by the Bureau.
SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF ACCORDING TO IS 15884: 2010 1. LABORATORY A laboratory shall be maintained which shall be suitably equipped and staffed where different tests given
More informationDesigning an economical acceptance sampling plan in the presence of inspection errors based on maxima nomination sampling method
Scientia Iranica E (2018) 25(3), 1701{1711 Sharif University of Technology Scientia Iranica Transactions E: Industrial Engineering http://scientiairanica.sharif.edu Designing an economical acceptance sampling
More informationNZ Government Industry Primary Growth Partnership (PGP) programme
NZ Government Industry Primary Growth Partnership (PGP) programme Roger Kissling March 2014 IAM Seminar 2 March 2014 Outline 1. PGP programme overview Use of industrial statistics stream of work 2. Background
More informationThe Joint Determination of Optimum Process Mean and Economic Order Quantity
Tamkang Journal of cience and Engineering, Vol. 14, No. 4, pp. 303 312 (2011) 303 The Joint Determination of Optimum Process Mean and Economic Order Quantit Chung-Ho Chen Department of Management and Information
More informationChapter 03 Control Charts. Process Variations and Quality
University of Hail College of Engineering QEM 511 - Total Quality Management Chapter 03 Control Charts Prof. Mohamed Aichouni Lectures notes adapted from: PowerPoint presentation to accompany Besterfield,
More informationDesign of Economic Optimal Double Sampling Design with Zero Acceptance Numbers
Journal of Quality Engineering and Production Optimization Vol. 1, No., PP. 45-56, July Dec. 015 Design of Economic Optimal Double Sampling Design with Zero Acceptance Numbers Mohammad Saber FallahNezhad
More information❹ Select a single-sampling plan with a given acceptable. ❺ Compute the average outgoing quality for a singlesampling
Supplement G Acceptance Sampling Plans Acceptance sampling is an inspection procedure used to determine whether to accept or reject a specific quantity of material. As more firms initiate total quality
More informationISO INTERNATIONAL STANDARD
INTERNATIONAL STANDARD ISO 2859-1 Second edition 1999-11-15 Sampling procedures for inspection by attributes Part 1: Sampling schemes indexed by acceptance quality limit (AQL) for lot-by-lot inspection
More informationSCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF SILVERED GLASS MIRRORS FOR GENERAL PURPOSES ACCORDING TO IS :
Doc. STI 3438/4 December 1995 SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF SILVERED GLASS MIRRORS FOR GENERAL PURPOSES ACCORDING TO IS : 3438-1994 1. Laboratory A laboratory shall be maintained,
More informationAcceptance sampling is an inspection procedure used to
SUPPLEMENT Acceptance Sampling Plans I LEARNING GOALS After reading this supplement, you should be able to: 1. Distinguish between singlesampling, double-sampling, and sequential-sampling plans and describe
More informationMSTE-001 : INDUSTRIAL STATISTICS I
No. of Printed Pages : 7 POST GRADUATE DIPLOMA IN APPLIED STATISTICS (PGDAST) Term-End Examination December, 2017 riper? 1_ MSTE-001 : INDUSTRIAL STATISTICS I I MSTE-001 I Time : 3 hours Maximum Marks
More informationISO/TR TECHNICAL REPORT
TECHNICAL REPORT ISO/TR 8550-1 First edition 2007-06-01 Guidance on the selection and usage of acceptance sampling systems for inspection of discrete items in lots Part 1: Acceptance sampling Lignes directrices
More informationTex-719-I, Sampling High Strength Bolts, Nuts, and Washers
Contents: Section 1 Overview...2 Section 2 Sampling Information...3 Section 3 Procedures...4 Section 4 Documentation...6 Section 5 Tagging/Labeling, Documenting, and Shipping...7 Texas Department of Transportation
More informationOPW Engineered Systems
1 of 5 1.0 Purpose 1.1 The purpose of this manual is to promote a clear understanding of OPW Engineered Systems (OPW-ES) expectations and requirements for suppliers. This manual explains the process OPW-
More informationFlorida Department of Transportation Office of Freight, Logistics and Passenger Operations Part 4 QUALITY ASSURANCE PROVISIONS #TRIPS-17-CA-RFP
QUALITY ASSURANCE PROVISIONS #TRIPS-17-CA-RFP 4.1.0 CONTRACTORS IN-PLANT QUALITY ASSURANCE REQUIREMENTS 4.1.1 QUALITY ASSURANCE ORGANIZATION Manufacturer shall establish and maintain an effective in-plant
More informationOur Ref. April 28, 2005 Page 1/9. 1. Introduction References Certification... 4
April 28, 2005 Page 1/9 Table of Contents 1. Introduction... 2 2. References... 3 3. Certification... 4 4. Procedures... 5 4.1 Management responsibility... 5 4.1.1 Quality Policy... 5 4.1.2 Responsibility...
More informationISO INTERNATIONAL STANDARD. Random sampling and randomization procedures. Modes opératoires d'échantillonnage et de répartition aléatoires
INTERNATIONAL STANDARD ISO 24153 First edition 2009-12-01 Random sampling and randomization procedures Modes opératoires d'échantillonnage et de répartition aléatoires Reference number ISO 24153:2009(E)
More informationThis document is a preview generated by EVS
TECHNICAL REPORT RAPPORT TECHNIQUE TECHNISCHER BERICHT CEN/TR 16369 October 2012 ICS 91.100.30; 03.120.30 English Version Use of control charts in the production of concrete Utilisation des cartes de contrôle
More informationOptimal Ordering Policy Under Acceptance Sampling Plan and Trade Credit Financing
ransaction E: Industrial Engineering Vol. 17, No. 2, pp. 120{128 c Sharif University of echnology, December 2010 Optimal Ordering Policy Under Acceptance Sampling Plan and rade Credit Financing Abstract.
More informationSampling procedures for inspection by variables. Part 1:
Provläsningsexemplar / Preview INTERNATIONAL STANDARD ISO 3951-1 Second edition 2013-09-01 Corrected version 2016-12-15 Sampling procedures for inspection by variables Part 1: Specification for single
More informationBRC Global Standard for Consumer Products CP429: Position Statement BRC GS Unannounced audits
BRC Global Standard for Consumer Products CP429: Position Statement BRC GS Unannounced audits Document Scope Position Statement on Unannounced audits for the BRC Global Standard for Consumer Products.
More informationConfidence Critical to Batch Release
Confidence Critical to Batch Release Application of ASTM E2709 Standard Practice for Demonstrating Capability to Comply with a Lot Acceptance Procedure and Its Relationship to USP Standards 1 Product Research
More informationCD Supplier Handbook. * Marine Canada Acquisition Limited Partnership DBA Teleflex Canada
* 2 / 8 TABLE OF CONTENTS 1. Section One Introduction 1.1. Objective 1.2. Scope 2. Section Two Quality Expectations 2.1 Change Notification 2.2 Quality Data & Records 2.3 Verification of Supplier's Products
More informationJIEMS Journal of Industrial Engineering and Management Studies
JIEMS Journal of Industrial Engineering and Management Studies Vol. 3, No. 2, pp. 1-16 www.jiems.icms.ac.ir Effects of inspection errors on economically design of CCC-r control chart M.S. Fallahnezhad
More informationVelvac, Inc. SUPPLIER QUALITY MANUAL
Velvac, Inc. SUPPLIER QUALITY MANUAL Velvac Supplier Quality Manual Rev. 007 2/05/2018 1 TABLE OF CONTENTS 1. DEFINITIONS... 3 2. INTRODUCTION... 3 3. SUPPLIER RESPONSIBILITIES... 4 4. ENGINEERING CHANGE
More informationProcedures. Model Procedure for Sampling Inspection of Isolated Lots. Procedure based on S-S-04
Procedures Category: STATISTICAL METHODS Procedure: P-S-04-A (rev. 1) Page: i of ii Model Procedure for Sampling Inspection of Isolated Lots Procedure based on S-S-04 Category: STATISTICAL METHODS Procedure:
More informationthat Result in Statistical Confidence
Statistics in Validation Sampling Plans that Result in Statistical Confidence Raul Soto, MSc, CQE IVT Conference - March 2017 Amsterdam, Netherlands The contents of this presentation represent the opinion
More information-SQA- SCOTTISH QUALIFICATIONS AUTHORITY NATIONAL CERTIFICATE MODULE: UNIT SPECIFICATION GENERAL INFORMATION. -Module Number Session
-SQA- SCOTTISH QUALIFICATIONS AUTHORITY NATIONAL CERTIFICATE MODULE: UNIT SPECIFICATION GENERAL INFORMATION -Module Number- 4260173 -Session- 1993-94 -Superclass- TK -Title- PROVIDING TEMPORARY SUPPORT
More informationNo. of Printed Pages : 7 POST GRADUATE DIPLOMA IN APPLIED STATISTICS (PGDAST) Term-End Examination June, 2016 MSTE-001 : INDUSTRIAL STATISTICS I
No. of Printed Pages : 7 POST GRADUATE DIPLOMA IN APPLIED STATISTICS (PGDAST) Term-End Examination June, 2016 MSTE-001 : INDUSTRIAL STATISTICS I I MSTE-001 I Time : 3 hours Maximum Marks : 50 Note : (i)
More information1.1 INTRODUCTION TO STATISTICAL QUALITY CONTROL
1.1 INTRODUCTION TO STATISTICAL QUALITY CONTROL The term Quality is mostly used by industrialists. Quality means fit for use. Quality is the most important consumer - decision factor in selecting products
More informationUNHCR/HCP/2016/xx High Commissioner s Policy on Quality Management in the Supply of Goods and Services to Persons of Concern
UNHCR/HCP/2016/xx on Quality Management in the Supply of Goods and Services to Persons of Concern Approved by: Filippo Grandi, High Commissioner Signature: Approval date: Contact: Date of entry into force:
More informationReal-time measurement of temperature for control of laser surface modification process
Real-time measurement of temperature for control of laser surface modification process S. Ahn, J. Murphy, J. A. Ramos, K. Wood, J. J. Beaman Laboratory for Freeform Fabrication Department of Mechanical
More informationSupersedes: S-01 (rev.2) The copy of this document located on Measurement Canada s website is considered to be the controlled copy.
Bulletin Category: STATISTICAL METHODS Bulletin: S-01 (rev. 3) Page: 1 of 36 Document(s): S-S-01; S-S-02; S-S-03; S-S-04 Issue Date: 2016-06-16 Effective Date: 2016-07-01 Supersedes: S-01 (rev.2) The copy
More informationAAQG 9013 (SAE ARP9013
IAQG 9138 Statistical Product Acceptance (SAE AS9138, ASD-STAN pren9138, SJAC9138) Planned Update to AAQG 9013 (SAE ARP9013 series) 9138 Summary 2018 Management Summary 9138 gives methods for statistical
More informationESTM Associates, Inc. Excellence in Science, Technology and Management. Applying Six Sigma to Software Development: A Practical Guide
Applying Si Sigma to Software Development: A Practical Guide Dr. Bill Eventoff 8 Morningside Drive Toms River, NJ 08755 (72) 4-295 bille@estm.biz Motivation Software Development Large Opportunity for Improvement
More informationOptimum Target Value for Two Processes in Series: Case of Hybrid Tubular Expansion
nternational Journal o ngineering and Technology Volume No. February Optimum Target Value or Two rocesses in Series: ase o Hybrid Tubular pansion bdulai l-boodi Mechanical ngineering Department Qassim
More informationNon Conforming Product Management
Page: 1 of 5 PURPOSE: The control of Non-Conforming Material procedure is designed to ensure all materials are inspected at specific points of the process in order to identify nonconforming product. Where
More informationGlobal Supplier Scorecard Quality Bid List rules 2017
Global Supplier Scorecard Quality Bid List rules 2017 SUPPLIERS CNH Industrial Suppliers play a key role in achieving our challenging business goals. They form our worldwide supply base on whom we rely
More informationCertain Studies on Acceptance Sampling Plans for Percentiles Based on the Modified Weibull Distribution
International Journal of Statistics and Systems ISSN 973-2675 Volume 12, Number 2 (217), pp. 343-354 Research India Publications http://www.ripublication.com Certain Studies on Acceptance Sampling Plans
More information2. Test Records - All records of analysis and tests shall be kept in suitable forms approved by the Bureau of Indian Standards.
Doc. STI 1848/6 January 1995 SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF WRITING AND PRINTING PAPERS ACCORDING TO IS : 1848-1991 (Third Revision) (Amendment No.1 OF September 1993) 1. Laboratory
More informationStochastic Gradient Approach for Energy and Supply Optimisation in Water Systems Management
22nd International Congress on Modelling and Simulation, Hobart, Tasmania, Australia, 3 to 8 December 217 mssanz.org.au/modsim217 Stochastic Gradient Approach for Energy and Supply Optimisation in Water
More informationRequest For Proposals
Request For Proposals Watauga County seeks Proposals from individuals or firms interested in providing services for the demolition and removal of a 237,000 square foot building located in Boone, NC. The
More informationA Solution of GM(1,1) based on EXCEL
A Solution of GM(,) based on EXCEL Cheng Li & Jiiang Li Shanghai niversity of Engineering Science, Shanghai, China Correspondence: Cheng Li, College of Air Transportation, Shanghai niversity of engineering
More informationHOT WATER TREATMENT OF GRAPEVINES. Manager, Plant Product Integrity & Standards. Primary Industries, Biosecurity & Food Safety
Ref: INT17/90320 Procedure PRIMARY INDUSTRIES Biosecurity & Food Safety NSW PO Box 232, Taree NSW 2430 Tel: 02 6552 3000 Fax: 02 6552 7239 Email: ica.scheme@dpi.nsw.gov.au ICA-37 HOT WATER TREATMENT OF
More informationIndependent Multiple Samples in Supply Chain Management
Independent Multiple Samples in Supply Chain Management Applies to: SAP PLM /QM Consultants, SAP ECC 6.0. For more information, visit the Supply Chain Management homepage. Summry The user wants to create
More informationCERTIFICATION OF MATURE GREEN CONDITION OF BANANAS
CERTIFICATION OF MATURE GREEN CONDITION OF BANANAS REVISION REGISTER Revision No. Date of Issue Amendment Details 0 8/04/97 All pages Controlled Copy No: Controlled: Authorised :... Uncontrolled: Manager
More informationSCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF SWITCHES FOR DOMESTIC & SIMILAR PURPOSE ACCORDING TO IS 3854:1997
SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF SWITCHES FOR DOMESTIC & SIMILAR PURPOSE ACCORDING TO IS 3854:1997 Doc: STI/3854/9 1. LABORATORY A laboratory shall be maintained which shall be suitably
More informationCE 191: Civil and Environmental Engineering Systems Analysis. LEC 06 : Integer Programming
CE 191: Civil and Environmental Engineering Systems Analysis LEC 06 : Integer Programming Professor Scott Moura Civil & Environmental Engineering University of California, Berkeley Fall 2014 Prof. Moura
More informationSCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF TOOTH PASTE ACCORDING TO IS 6356: 2001 (Third Revision)
SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF TOOTH PASTE ACCORDING TO IS 6356: 2001 (Third Revision) Doc:STI/6356/4 1. LABORATORY- A laboratory shall be maintained, which shall be suitably equipped
More informationThermomechanical Response of Anisotropically Conductive Film
Thermomechanical Response of Anisotropically Conductive Film Yung Neng Cheng, Shyong Lee and Fuang Yuan Huang Department of Mechanical Engineering National Central University, Chung-li, Taiwan shyong@cc.ncu.edu.tw
More informationA periodic review integrated inventory model with controllable setup cost, imperfect items, and inspection errors under service level constraint
IO Conference Series: Materials Science and Engineering AER OEN ACCESS A periodic review integrated inventory model with controllable setup cost, imperfect items, and inspection errors under service level
More informationSECTION CRUSHED CONCRETE FOR PAVEMENT SUBBASE AND LIGHT DUTY BASE
SECTION 820 - CRUSHED CONCRETE FOR PAVEMENT SUBBASE AND LIGHT DUTY BASE ##This section cross-references Sections 175 and 812. If any of the above sections are relevant, they should be included in the specification.
More informationNON CONFORMITIES REPORTING
CERN CH-1211 Geneva 23 Switzerland the Large Hadron Collider project LHC Project Document No. CERN Div./Group or Supplier/Contractor Document No. - EDMS Document No. 351098 Date: 2002-09-09 Quality Assurance
More informationQuality assurance of automated measuring systems
InfoMil Factsheet L40-7C AIR Quality assurance of automated measuring systems Continuous measurements This factsheet is part of the L40 series Measurement of air emissions. L40 consists of a manual that
More informationProduct quality evaluation system based on AHP fuzzy comprehensive evaluation
Journal of Industrial Engineering and Management JIEM, 2013 6(1):356-366 Online ISSN: 2013-0953 Print ISSN: 2013-8423 http://dx.doi.org/10.3926/jiem.685 Product quality evaluation system based on AHP fuzzy
More informationCork Regional Technical College
Cork Regional Technical College Bachelor of Engineering in Chemical and Process Engineering - Stage 4 Summer 1996 CE 4.8 - DECISION ANALYSIS AND OPERATIONS RESEARCH (Time: 3 Hours) Answer FOUR Questions.
More informationSupplier Rating System (SRS)
Supplier Rating System (SRS) Aerojet Rocketdyne March 2017 1 Supplier Rating System As a supplier to Aerojet Rocketdyne, you should know and understand our supplier rating system. Aerojet Rocketdyne uses
More informationTime Truncated Group Chain Sampling Plans for Rayleigh Distribution
Global Journal of Pure and Applied Mathematics. ISSN 0973-1768 Volume 12, Number 4 (2016), pp. 3693 3699 Research India Publications http://www.ripublication.com/gjpam.htm Time Truncated Group Chain Sampling
More informationENVIRONMENTAL MANUAL Page 1 of 7. Section 4 - General Requirements of System (4.1)
ENVIRONMENTAL MANUAL Page 1 of 7 Contents Section 1 - Introduction Section 2 - Company Details Section 3 - Scope of System Section 4 - General Requirements of System (4.1) 4.1 Interaction of the EMS 4.2
More informationSERDAR AKSOY FEDERAL GOVERNMENT OF THE SOMALI REPUBLIC GLOBAL HEAD OF FOREIGN TRADE & TRADE FACILITATION
SERDAR AKSOY GLOBAL HEAD OF FOREIGN TRADE & TRADE FACILITATION FEDERAL GOVERNMENT OF THE SOMALI REPUBLIC 01.07.2015 New regulations Pre-Importation Inspection, Testing and Certification Program of Goods
More informationSupplier Quality Advanced Controls Program
* Supplier Quality Advanced Controls Program * Marine Canada Acquisition Inc. DBA SeaStar Solutions 2 / 9 1 Objective....3 2 Scope....3 3 Supplier s Process Requirements...3 3.1 Advanced Product Quality
More informationTex-704-I, Making, Curing, and Testing Compression Test Specimens for Precast Concrete
Compression Test Specimens for Precast Concrete Contents: Section 1 Overview...2 Section 2 Definitions...3 Section 3 Strength Test Cylinder Information...4 Section 4 Apparatus...5 Section 5 Procedures...6
More informationAppendix A Area under the normal distribution curve Tabulated values represent the area under the curve from ± a to the value of Xj- pia where Xj is any value of the variable X, 11 is the mean value and
More informationSQR-009 QUALITY ASSURANCE ACCEPTANCE SAMPLING REQUIREMENTS FOR SUPPLIERS
SQR-009 QUALITY ASSURANCE ACCEPTANCE SAMPLING REQUIREMENTS FOR SUPPLIERS Revision: A VOUGHT SUPPLIER QUALITY REQUIREMENTS SQR-009 Table of Contents Section Page Revision Record 3 Introduction 4 General
More informationCENTRAL MARKS DEPARTMENT (FCT) Ref: CMD-II/16:
CENTRAL MARKS DEPARTMENT (FCT) Ref: CMD-II/16:15489 20 03 2014 Subject: Implementation of revised STI for IS 15489 :2013 for Paint Plastic Emulsion - Specification 1. Indian Standard Specification for
More informationSupplier Rating System (SRS)
Supplier Rating System (SRS) Aerojet Rocketdyne July 2015 1 Supplier Rating System As a supplier to Aerojet Rocketdyne, you should know and understand our supplier rating system. To provide you with a
More informationEnwon (Australia) Pty Ltd
PROJECT QUALITY MANAGEMENT PLAN Project: Client: QUALITY STATEMENT The Management of Enwon is committed to the delivery of works and services in compliance with quality requirements for all of the company
More information2.2. The Seller shall be responsible for achieving and maintaining a quality performance level of either:
2.0. Supplier Quality Performance: 2.1. When requested by Boeing, Seller agrees to work with Boeing to develop and implement processes designed at improving Seller s quality performance. Process will include
More informationQuality Honeycomb Supplier Quality Requirements
1 Surveillance and Auditing 1.1 The Supplier s Quality System is subject to initial and annual audits/surveys and acceptance by, its customers, and government regulatory agencies (e.g. The Department of
More informationEconomic production quantity (EPQ) model for three type imperfect items with rework and learning in setup
An International Journal of Optimization and Control: Theories & Applications Vol.4, No.1, pp.57-65 (2014) c IJOCTA ISSN:2146-0957 eissn:2146-5703 DOI:10.11121/ijocta.01.2014.00170 http://www.ijocta.com
More informationPage 1 / 11. Version 0 June 2014
Page 1 / 11 CORRESPONDENCE MATRIX NQSA NSQ-100 version 0 NUCLEAR SAFETY AND QUALITY MANAGEMENT SYSTEM REQUIREMENTS Model for quality management in design & development, manufacturing, erection, commissioning
More informationAcceptance Sampling. CD Tutorial. Tutorial Outline
Acceptance Sampling CD Tutorial 2 Tutorial Outline SAMLING LANS Single Sampling Double Sampling Sequential Sampling OERATING CHARACTERISTIC (OC) CURVES RODUCER S AND CONSUMER S RISK AVERAGE OUTGOING QUALITY
More informationCategory. Procedure. Date Replaces
d by 1/10 PURPOSE The purpose of this document is to define the Haldex Supply Chain Improvement Program (SCIP) and associated requirements. SCIP is a tool to monitor and improve the quality of the Haldex
More informationISSUE: 5. OWNER: Gary Clarke
DATE 1 of 6 1 PURPOSE 1.1 To ensure that processes, products and services that do not conform to specify requirements are identified, prevented from unintentional use, kept under review and that corrective
More informationSCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF COPPER SULPHATE ACCORDING TO IS :
Doc. STI 261/2 February 1984 SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF COPPER SULPHATE ACCORDING TO IS : 261-1982 1 Laboratory A laboratory shall be maintained, which shall be suitably equipped
More information