Optimal control of a remanufacturing system

Size: px
Start display at page:

Download "Optimal control of a remanufacturing system"

Transcription

1 int. j. prod. res., 1 september 2004, vol. 42, no. 17, Optimal control of a remanufacturing system K. NAKASHIMAy*, H. ARIMITSUy, T. NOSEy and S. KURIYAMAz An optimal control problem of a remanufacturing system under stochastic demand is studied. The system is formulated by a Markov decision process, which is a class of stochastic sequential processes in which the reward and transition probability depend only on the current state of the system and the current action. The models have gained recognition in such diverse fields as engineering, economics, communications, etc. Each model consists of states, actions, rewards and transition probabilities. The paper considers two types of inventories: the actual product inventory in a factory and the virtual inventory used by a customer. The state of the remanufacturing system is defined by both inventory levels. One can obtain the optimal production policy that minimizes the expected average cost per period. The paper also considers some scenarios under various conditions and shows the example of controlling the remanufacturing system. 1. Introduction The escalating growth in consumer waste in recent years has started to threaten the environment. Currently, product recovery is practised in part because of the escalating deterioration of the environment and in part because of profit motives. Product recovery aims to minimize the amount of waste sent to landfill sites by recovering materials and parts from old or outdated products by means of recycling and remanufacturing. Product recovery includes collection, disassembly, cleaning, sorting, repairing, reconditioning, reassembling and testing (Gupta and Taleb 1991, Brennan et al. 1994). The present paper deals with an optimal control problem of a remanufacturing system under stochastic variability such as demand. The system is formulated into a Markov decision process (MDP) (Howard 1960, Puterman 1994). The MDP is a class of stochastic sequential processes in which the reward and transition probability depends only on the current state of the system and the current action. MDP models have gained recognition in such diverse fields as economics, communications, transportation, etc. Each model consists of states, actions, rewards and transition probability. In the engineering field, for example, the approach is used for controlling the production system (Ohno and Ichiki 1987, Ohno and Nakashima 1995). Choosing an action as a production quantity in a state generates rewards and/or costs and determines the state at the next decision epoch through a transition Revision received May ydepartment of Industrial Management, Osaka Institute of Technology, Omiya, Asahi-ku, Osaka, Japan. zsetsunan University, Faculty of Business Administration and Information, 17-8, Ikedanakamachi, Neyagawa, Osaka, Japan. *To whom correspondence should be addressed. nakasima@dim.oit.ac.jp International Journal of Production Research ISSN print/issn X online # 2004 Taylor & Francis Ltd DOI: /

2 3620 K. Nakashima et al. probability function. One can then obtain the optimal production policy that minimizes the expected average cost per period in the optimal production control problem. The paper considers two types of inventories: the actual product inventory in a factory and the virtual inventory used by customers. It defines the state of the remanufacturing system by considering both inventory levels. It then obtains the optimal production policy that minimizes the expected average cost per period. The paper also considers some scenarios under various conditions and optimizes the remanufacturing system. Section 2 briefly summarizes remanufacturing environments and the relevant literature. Section 3 considers a single-item remanufacturing system under stochastic demand. The system is formulated into an undiscounted MDP to determine the optimal control policy that minimizes the expected average cost per period. Finally, the numerical results of controlling the remanufacturing system under various conditions are shown. 2. Remanufacturing environments and a literature review The paper focuses on the operational aspect of product recovery in the remanufacturing environment with stochastic variability. Remanufacturing systems have to make operational, manufacturing, inventory, distribution and marketing-related decisions (Stock 1992, Kopicky et al. 1993). In general, the existing methods for traditional production systems cannot be used for remanufacturing systems directly. Remanufacturing environments are characterized by their highly flexible structures. Flexibility is required to handle the uncertainties, e.g. collection and discard, that are likely to arise. In addition, note that the products used by consumers will be collected and recovered and used as parts for remanufacuring. Gungor and Gupta (1999) and Moyer and Gupta (1997) review the literature in the area of environmentally conscious manufacturing and product recovery. They summarize much of the area including industrial examples, modelling and solutions. Minner (2001) notes there are the two well-known streams in product recovery research area: stochastic inventory control (SIC) and material requirement planning (MRP). The present paper restricts itself to SIC. As for the periodic review models, Cohen et al. (1980) develop the product recovery model in which the collected products are used directly. Inderfurth (1997) discusses the effect of non-zero lead times for orders and recovery in the different model. As for continuous review models, Muckstadt and Isaac (1981) deal with a model for a remanufacturing system with non-zero lead times and a control policy with the traditional (Q, r) rule. Van der Laan and Salomon (1997) suggest push and pull strategies for the remanufacturing system. Guide and Gupta (1999) present a queuing model to study a remanufacturing system. Kiesmuller (2003) discusses optimal policy for a one-product recovery system with lead times. The policy was composed of the optimal manufacturing rate, remanufacturing rate and disposal rate over a finite-planning horizon. All the above studies, however, considered demand and procurement as independent being in the systems. Nakashima et al. (2002) deal with a product recovery system with a single class of product life cycle. They propose a new analytical approach to evaluate the system using a Markov chain and give numerical examples for various conditions.

3 Optimal control of a remanufacturing system Optimization of the system We formulate a remanufacturing system with stochastic variability such as demand using a discrete time Markov decision model. Consider a single process that produces a single-item product. The finished products are stocked in the factory and faced according to customer demand. Traditional inventory management focuses on only the inventory in the factory. The remanufacturing system, however, should focus on the outdated products collected from customers. That is, the remanufacturing producers have to consider the products in use as part of the future inventory. The products used by consumers are taken here to be the virtual inventory. It is important to manage the virtual inventory until products are collected and used in remanufacturing as well as controlling the inventory on hand The model Figure 1 shows a remanufacturing production system. Remanufacturing preserves the product s or the part s identity, and performs the required disassembly and refurbishing operations to bring the product to a desired level of quality with remanufacturing cost. On the other hand, we define normal manufacturing as producing the products using new resources. The number of products by normal manufacturing at period t, P(t), is chosen as an action, k, i.e. k ¼ P(t). Products are produced by normal manufacturing and/or remanufacturing with the parts taken back from customers. All production begins at the start of the period and all products are completed by the end of the period. All the products bought by consumers are new. It is assumed that the number of finished products and that of the products bought by consumers are I(t) and J(t), respectively. If the backlog occurs, I(t) is negative. Demand in successive periods, D(t), is composed of independent random variables with a known identical distribution. When sold, products are remanufactured at the remanufacturing rate, l, with the remanufacturing cost including the collecting cost, and products in use are discarded at the discarded rate,, with an out-of-date cost. It is supposed that l þ Formulation The state of the system is denoted by: sðtþ ¼ðIðtÞ, JðtÞÞ: ð1þ P(t) Inventory on hand I(t) Factory λ o oo D(t) Customer Virtual Inventory J(t) µ Figure 1. Remanufacturing system.

4 3622 K. Nakashima et al. The transition of the each inventory is given by: Iðt þ 1Þ ¼IðtÞþkþlJðtÞ DðtÞ Jðt þ 1Þ ¼JðtÞ ljðtþ JðtÞþDðtÞ ð2þ ð3þ The action space in s(t), K(s(t)) is defined by: KðsðtÞÞ ¼ f0,..., maxf0, Imax IðtÞ ljðtþgg: The transition probability is defined as: 8 >< PrfDðtÞ ¼dg if sðt þ 1Þ ¼ðIðtÞþkþlJðtÞ d, P sðtþsðtþ1þ ¼ JðtÞ ljðtþ JðtÞþdÞ, >: 0 otherwise: The expected cost per period in state s(t) under k, r(s(t),k) is given by: where C H C N C R C B C O rðsðtþ, kþ ¼C N k þ C R ljðtþþc H ½IðtÞŠ þ þ C B ½ IðtÞŠ þ þ C O JðtÞ, holding cost per unit, normal manufacturing cost of a new product, remanufacturing cost of a product, backlog cost per unit, out-of-date cost per unit. S and S are a set of all possible states and the total number of states, respectively. Let us number the state, s n as s (¼ 1,..., S ). An undiscounted MDP that minimizes the expected average cost per period, g, is formulated as the following optimality equation: ( ) g þ v s ¼ min k2kðsþ rðs, kþþ X s 0 2S P ss 0ðkÞv s 0 ð4þ ð5þ ð6þ ðs 2 SÞ; ð7þ where v s is the relative value when the production system starts from state s (Howard 1960). An optimal production policy is determined as a set of k that minimizes the right-hand side of equation (7) for each state s using a policy iteration method (Howard 1960, Puterman 1994). 4. Numerical results This section shows the numerical example of controlling the remanufacturing system described in section 3. It is assumed that the maximum number of products inventory, Imax, is 5 and that of backlog demand, Imin, is set as 5. The maximum number of the virtual inventory is 10. The cost parameters are as follows: C H ¼ 1, C N ¼ 2, C R ¼ 3, C B ¼ 10 and C O ¼ 10: The distribution of the demand is given by: Pr D n ¼ D 1 2 Q þ j ¼ Q 1 Q, ð0 j QÞ, j 2 where D ¼ 2 and Q is an even number and variance ( 2 )isq/4. ð8þ

5 Optimal control of a remanufacturing system Optimal control policy One can obtain an optimal control policy that minimizes the expected average cost per period using a policy iteration method. It is assumed that the remanufacturing rate, l, is 0.2 and the discarded rate,, is 0.5. Table 1 shows the optimal control policy in case variance of demand is 0.5. Note that the optimal number of normal production is restricted to the number of remanufacturing production. The minimum expected cost per period, g, is 11.5 under this optimal control policy Effect of the remanufacturing rate and of the variance of the demand Figure 2 shows the behaviour of the minimum costs under two types of variance, i.e. 2 ¼ 0.5 and 1.0. As the remanufacturing rate increases, the minimum cost State (I, J ) Action, k (I, J ) k (I, J ) (I, J ) k (I, J ) k (I, J ) k (I, J ) k ( 5, 0) 7 ( 4, 7) 2 ( 2, 3) 3 ( 1, 10) 0 (1, 6) 0 (3, 2) 0 (4, 9) 0 ( 5, 1) 6 ( 4, 8) 2 ( 2, 4) 3 (0, 0) 3 (1, 7) 0 (3, 3) 0 (4, 10) 0 ( 5, 2) 6 ( 4, 9) 1 ( 2, 5) 2 (0, 1) 2 (1, 8) 0 (3, 4) 0 (5, 0) 0 ( 5, 3) 5 ( 4, 10) 1 ( 2, 6) 1 (0, 2) 2 (1, 9) 0 (3, 5) 0 (5, 1) 0 ( 5, 4) 5 ( 3, 0) 6 ( 2, 7) 0 (0, 3) 1 (1, 10) 0 (3, 6) 0 (5, 2) 0 ( 5, 5) 4 ( 3, 1) 5 ( 2, 8) 0 (0, 4) 1 (2, 0) 1 (3, 7) 0 (5, 3) 0 ( 5, 6) 4 ( 3, 2) 4 ( 2, 9) 0 (0, 5) 0 (2, 1) 0 (3, 8) 0 (5, 4) 0 ( 5, 7) 3 ( 3, 3) 4 ( 2, 10) 0 (0, 6) 0 (2, 2) 0 (3, 9) 0 (5, 5) 0 ( 5, 8) 3 ( 3, 4) 3 ( 1, 0) 4 (0, 7) 0 (2, 3) 0 (3, 10) 0 (5, 6) 0 ( 5, 9) 2 ( 3, 5) 2 ( 1, 1) 3 (0, 8) 0 (2, 4) 0 (4, 0) 0 (5, 7) 0 ( 5, 10) 2 ( 3, 6) 2 ( 1, 2) 3 (0, 9) 0 (2, 5) 0 (4, 1) 0 (5, 8) 0 ( 4, 0) 6 ( 3, 7) 1 ( 1, 3) 2 (0, 10) 0 (2, 6) 0 (4, 2) 0 (5, 9) 0 ( 4, 1) 5 ( 3, 8) 1 ( 1, 4) 2 (1, 0) 2 (2, 7) 0 (4, 3) 0 (5, 10) 0 ( 4, 2) 5 ( 3, 9) 0 ( 1, 5) 1 (1, 1) 1 (2, 8) 0 (4, 4) 0 ( 4, 3) 4 ( 3, 10) 0 ( 1, 6) 1 (1, 2) 1 (2, 9) 0 (4, 5) 0 ( 4, 4) 4 ( 2, 0) 5 ( 1, 7) 0 (1, 3) 0 (2, 10) 0 (4, 6) 0 ( 4, 5) 3 ( 2, 1) 4 ( 1, 8) 0 (1, 4) 0 (3, 0) 0 (4, 7) 0 ( 4, 6) 3 ( 2, 2) 4 ( 1, 9) 0 (1, 5) 0 (3, 1) 0 (4, 8) 0 Table 1. Optimal control policy Variance=0.5 Variance=1.0 Minimum cost Remanufacturing rate 9 Figure 2. Behaviour of minimum cost.

6 3624 K. Nakashima et al. decreases in each variance case. All the minimum costs in the case 2 ¼ 0.5 are less than those in the case 2 ¼ 1.0. This also illustrates the importance of the smoothing production. 5. Conclusions This paper has dealt with the optimal control problem of the remanufacturing system under stochastic variability. It considered two types of inventories: the actual product inventory in the factory and the virtual inventory used by consumers. The system was formulated into the undiscounted MDP. It obtained the optimal production policy that minimized the expected average cost per period using the policy iteration method. Finally, it showed the examples of controlling the remanufacturing system optimally under various conditions. Numerical results illustrated the property of the optimal control of the remanufacturing system. This means that the proposed approach is applicable to various systems by choosing the parameters according to their conditions. For future research, we suggest that the product lifetime should be considered to model the remanufacturing systems more precisely. Acknowledgement The authors thank anonymous referees for valuable comments and helpful suggestions. References BRENNAN, L., GUPTA, S. M. and TALEB, K. N., 1994, Operations planning issues in an assembly/disassembly environment. International Journal of Operations and Production Management, 14, COHEN, M. A., NAHMIAS, S. and PIERSKALLA, W. P., 1980, A dynamic inventory system with recycling. Naval Research Logistics Quarterly, 27, GUIDE, JR, V. D. R. and GUPTA, S. M., 1999, A queueing network model for remanufacturing production systems. In Proceedings of the Second International Seminar on Reuse, Eindhoven, the Netherlands, 1 3 March, pp GUNGOR, A. and GUPTA, S. M., 1999, Issues in environmentally conscious manufacturing and product recovery: a survey. Computers and Industrial Engineering, 36, GUPTA, S. M. and TALEB, K. N., 1994, Scheduling disassembly. International Journal of Production Research, 32, HOWARD, R. A., 1960, Dynamic Programming and Markov Processes (Cambridge, MA: MIT Press). INDERFURTH, K., 1997, Simple optimal replenishment and disposal policies for a product recovery system with lead-times. OR Spektrum, 19, KIESMULLER, G. P., 2003, Optimal control of a product recovery system with lead time. International Journal of Production Economics, 81 82, KOPICKY, R. J., BERG, M. J., LEGG, L., DASAPPA, V. and MAGGIONI, C., 1993, Reuse and Recycling: Reverse Logistics Opportunities (Oak Brook: Council of Logistics Management). MINNER, S., 2001, Strategic safety stocks in reverse logistics supply chains. International Journal of Production economics, 71, MOYER, L. and GUPTA, S. M., 1997, Environmental concerns and recycling/disassembly efforts in the electronics industry. Journal of Electronics Manufacturing, 7, MUCKSTADT, J. A. and ISAAC, M. H., 1981, An analysis of single item inventory systems with returns. Naval Research Logistics Quarterly, 28, NAKASHIMA, K., ARIMITSU, H., NOSE, T. and KURIYAMA, S., 2002, Analysis of a product recovery system. International Journal of Production Research, 40, OHNO, K. and ICHIKI, K., 1987, Computing optimal policies for controlled tandem queueing systems. Operations Research, 35,

7 Optimal control of a remanufacturing system 3625 OHNO, K. and NAKASHIMA, K., 1995, Optimality of a Just-in-Time production system. In Proceedings of APORS 94 (Singapore: World Scientific), pp PUTERMAN, M. L., 1994, Markov Decision Processes (New York: Wiley). STOCK, J. R., 1992, Reverse Logistics (Oak Brook: Council of Logistics Management). VAN DER LAAN, E. A. and SALOMON, M., 1997, Production planning and inventory control with remanufacturing and disposal. European Journal of Operational Research, 102,

Cost Analysis of a Remanufacturing System

Cost Analysis of a Remanufacturing System Asia Pacific Management Review (2004) 9(4), 595-602 Cost Analysis of a Remanufacturing System Kenichi Nakashima, Hiroyuki Arimitsu *, Toyokazu Nose * and Sennosuke Kuriyama Abstract This paper deals with

More information

About optimal remanufacturing policies and secondary markets supplying

About optimal remanufacturing policies and secondary markets supplying About optimal remanufacturing policies and secondary markets supplying M. GALLO, G.GUIZZI, G. NAVIGLIO Department of Materials Engineering and Operations Management University of Naples Federico II Piazzale

More information

Components Rejuvenation in Production with Reused Elements

Components Rejuvenation in Production with Reused Elements International Journal of Performability Engineering, Vol. 10, No. 6, September 2014, pp. 567-575. RAMS Consultants Printed in India Components Rejuvenation in Production with Reused Elements ANNA JODEJKO-PIETRUCZUK,

More information

A SYSTEM DYNAMICS MODEL FOR REDUCING UNCERTAINTY IN REMANUFACTURING SYSTEMS

A SYSTEM DYNAMICS MODEL FOR REDUCING UNCERTAINTY IN REMANUFACTURING SYSTEMS Pacific Asia Conference on Information Systems (PACIS) PACIS 2009 Proceedings Association for Information Systems Year 2009 A SYSTEM DYNAMICS MODEL FOR REDUCING UNCERTAINTY IN REMANUFACTURING SYSTEMS Roberto

More information

Cost performance and bullwhip effect in a hybrid manufacturing and remanufacturing system with different control policies

Cost performance and bullwhip effect in a hybrid manufacturing and remanufacturing system with different control policies International Journal of Production Research, Vol. 44, Nos. 18 19, 15 September 1 October 26, 3847 3862 Cost performance and bullwhip effect in a hybrid manufacturing and remanufacturing system with different

More information

CONCEPTUAL ISSUES REGARDING REVERSE LOGISTICS

CONCEPTUAL ISSUES REGARDING REVERSE LOGISTICS Studies and Scientific Researches. Economics Edition, No 18, 2013 http://sceco.ub.ro CONCEPTUAL ISSUES REGARDING REVERSE LOGISTICS Ioana Olariu Vasile Alecsandri University of Bacau ioana_barin_olariu@yahoo.com

More information

Design of Supply Chain Damage Recovery Systems

Design of Supply Chain Damage Recovery Systems Samir Alsobhi Yanbu University College, Yanbu Al-Sinaiyah, Saudi Arabia Krishna K Krishnan* Wichita State University, Wichita, Kansas, USA Mukund Dhuttargaon Wichita State University, Wichita, Kansas,

More information

Performance Analysis of Reverse Supply Chain Systems by Using Simulation

Performance Analysis of Reverse Supply Chain Systems by Using Simulation Performance Analysis of Reverse Supply Chain Systems by Using Simulation Shigeki Umeda Musashi University, 1-26 Toyotama-kami Nerima Tokyo 176-8534, Japan shigeki@cc.musashi.ac.jp Abstract. This paper

More information

THEORETICAL FRAMES FOR DESIGNING REVERSE LOGISTICS PROCESSES

THEORETICAL FRAMES FOR DESIGNING REVERSE LOGISTICS PROCESSES THEORETICAL FRAMES FOR DESIGNING REVERSE LOGISTICS PROCESSES Prof. Ph.D. Janusz K. Grabara Technical University of Czestochowa, Faculty of Management, Poland E-mail: grabara@czestochowa.net.pl Prof. Ph.D.

More information

Inventory management in a manufacturing/ remanufacturing hybrid system with condition monitoring

Inventory management in a manufacturing/ remanufacturing hybrid system with condition monitoring Graduate Theses and Dissertations Graduate College 28 Inventory management in a manufacturing/ remanufacturing hybrid system with condition monitoring Bhavana Padakala Iowa State University Follow this

More information

Methodology for Study of Characteristics and Time Reduction in Reverse Supply Chain Using System Dynamics

Methodology for Study of Characteristics and Time Reduction in Reverse Supply Chain Using System Dynamics 2011 International Conference on Sociality and Economics Development IPEDR vol.10 (2011) (2011) IACSIT Press, Singapore Methodology for Study of Characteristics and Time Reduction in Reverse Supply Chain

More information

Decomposed versus integrated control of a one-stage production system Sierksma, Gerardus; Wijngaard, Jacob

Decomposed versus integrated control of a one-stage production system Sierksma, Gerardus; Wijngaard, Jacob University of Groningen Decomposed versus integrated control of a one-stage production system Sierksma, Gerardus; Wijngaard, Jacob IMPORTANT NOTE: You are advised to consult the publisher's version (publisher's

More information

AN ADVANCED FRAMEWORK FOR INVENTORY MANAGEMENT IN REVERSE LOGISTICS

AN ADVANCED FRAMEWORK FOR INVENTORY MANAGEMENT IN REVERSE LOGISTICS AN ADVANCED FRAMEWORK FOR INVENTORY MANAGEMENT IN REVERSE LOGISTICS Francesco Longo MSC-LES, Mechanical Department, University of Calabria, Via P. Bucci 44C, 87036 Rende, Italy f.longo@unical.it ABSTRACT

More information

Proceedings of the 2010 Winter Simulation Conference B. Johansson, S. Jain, J. Montoya-Torres, J. Hugan, and E. Yücesan, eds.

Proceedings of the 2010 Winter Simulation Conference B. Johansson, S. Jain, J. Montoya-Torres, J. Hugan, and E. Yücesan, eds. Proceedings of the 2010 Winter Simulation Conference B. Johansson, S. Jain, J. Montoya-Torres, J. Hugan, and E. Yücesan, eds. A SIMULATION MODEL TO JUSTIFY REMANUFACTURING POLICIES Farhad Azadivar Department

More information

Reuse Issues in Reverse Logistics: A Disposable Camera Operation

Reuse Issues in Reverse Logistics: A Disposable Camera Operation Reuse Issues in Reverse Logistics: A Disposable Camera Operation Environmental Issues track This paper models the relationships in reverse logistics. It explores reuse issues in a disposable camera operation.

More information

Assessing Sustainability in Manufacturing using a Fuzzy Expert System

Assessing Sustainability in Manufacturing using a Fuzzy Expert System 2012 Third International Conference on Innovations in Bio-Inspired Computing and Applications Assessing Sustainability in Manufacturing using a Fuzzy Expert System Swee S. Kuik, Sev V. Nagalingam & Yousef

More information

Title: Heuristics On Reverse Logistics

Title: Heuristics On Reverse Logistics Forwarded for submission to the following track: Global Supply Chain Management Rico Wojanowski wojanowski@iff.fhg.de POM-2001 ORLANDO Chair(s) Prof. Aleda Roth UNC Chapel Hill aleda_roth@unc.edu Fraunhofer

More information

This is a refereed journal and all articles are professionally screened and reviewed

This is a refereed journal and all articles are professionally screened and reviewed Advances in Environmental Biology, 6(4): 1400-1411, 2012 ISSN 1995-0756 1400 This is a refereed journal and all articles are professionally screened and reviewed ORIGINAL ARTICLE Joint Production and Economic

More information

L R m. Bibliographic Information. Copyright Information. Contact Information

L R m. Bibliographic Information. Copyright Information. Contact Information L R m Laboratory for Responsible Manufacturing Bibliographic Information Ilgin, M. A. and Gupta, S. M., "The Effect of Disassembly Process on Spare Parts Inventory Management in Post Product Life Cycle",

More information

Refuse or Reuse: Managing the Quality of Returns in Product Recovery Systems. Sarah Elizabeth Marshall

Refuse or Reuse: Managing the Quality of Returns in Product Recovery Systems. Sarah Elizabeth Marshall This thesis has been submitted in fulfilment of the requirements for a postgraduate degree (e.g. PhD, MPhil, DClinPsychol) at the University of Edinburgh. Please note the following terms and conditions

More information

OPTIMIZATION AND OPERATIONS RESEARCH Vol. IV - Inventory Models - Waldmann K.-H

OPTIMIZATION AND OPERATIONS RESEARCH Vol. IV - Inventory Models - Waldmann K.-H INVENTORY MODELS Waldmann K.-H. Universität Karlsruhe, Germany Keywords: inventory control, periodic review, continuous review, economic order quantity, (s, S) policy, multi-level inventory systems, Markov

More information

Performance Analysis of Reverse Supply Chain Systems by Using Simulation

Performance Analysis of Reverse Supply Chain Systems by Using Simulation Performance Analysis of Reverse Supply Chain Systems by Using Simulation Shigeki Umeda To cite this version: Shigeki Umeda. Performance Analysis of Reverse Supply Chain Systems by Using Simulation. Vittal

More information

RESEARCH ARTICLE A machine learning approach to optimise the usage of recycled material in a remanufacturing environment

RESEARCH ARTICLE A machine learning approach to optimise the usage of recycled material in a remanufacturing environment International Journal of Production Research Vol. 48, No. 4, 15 February 2010, 933 955 RESEARCH ARTICLE A machine learning approach to optimise the usage of recycled material in a remanufacturing environment

More information

Research Article The Government s Environment Policy Index Impact on Recycler Behavior in Electronic Products Closed-Loop Supply Chain

Research Article The Government s Environment Policy Index Impact on Recycler Behavior in Electronic Products Closed-Loop Supply Chain Discrete Dynamics in Nature and Society Volume 216, Article ID 7646248, 8 pages http://dx.doi.org/1.1155/216/7646248 Research Article The Government s Environment Policy Index Impact on Recycler Behavior

More information

L R m. Bibliographic Information. Copyright Information. Contact Information

L R m. Bibliographic Information. Copyright Information. Contact Information L R m Laboratory for Responsible Manufacturing Bibliographic Information Ilgin, M. A. and Gupta, S. M., "Analysis of a Kanban Controlled Disassembly Line with Sensor Embedded Products", Proceedings of

More information

Use of Sensors for Cell Phones Recovery

Use of Sensors for Cell Phones Recovery Use of Sensors for Cell Phones Recovery Mehmet Talha Dulman and Surendra M. Gupta* (s.gupta@neu.edu) Department of Mechanical and Industrial Engineering College of Engineering, Northeastern University

More information

Management of End of Life Products with Design Alternatives

Management of End of Life Products with Design Alternatives 119 Innovation and Supply Chain Management, Vol. 9, No. 4, pp. 119 126, December 2015 Management of End of Life Products with Design Alternatives Aditi D. JOSHI 1, Surendra M. GUPTA 1, and Kenichi NAKASHIMA

More information

Proceedings of the 2012 Winter Simulation Conference C. Laroque, J. Himmelspach, R. Pasupathy, O. Rose, and A.M. Uhrmacher, eds

Proceedings of the 2012 Winter Simulation Conference C. Laroque, J. Himmelspach, R. Pasupathy, O. Rose, and A.M. Uhrmacher, eds Proceedings of the 0 Winter Simulation Conference C. Laroque, J. Himmelspach, R. Pasupathy, O. Rose, and A.M. Uhrmacher, eds OPTIMAL BATCH PROCESS ADMISSION CONTROL IN TANDEM QUEUEING SYSTEMS WITH QUEUE

More information

End-of-Life Product Warranty

End-of-Life Product Warranty End-of-Life Product Warranty Ammar Y. Alqahtani 1 and Surendra M. Gupta 2 *, 1 King Abdulaziz University, Department of Industrial Engineering, Faculty of Engineering, Jeddah, 22254 SAUDI ARABIA, 2 Northeastern

More information

A Decision Support Model for Spare Parts Inventory in a Multi-Echelon Closed Loop Supply Chain

A Decision Support Model for Spare Parts Inventory in a Multi-Echelon Closed Loop Supply Chain Kuala Lumpur Malaysia March 8-10 2016 A Decision Support Model for Spare Parts Inventory in a Multi-Echelon Closed Loop Supply Chain Charlle Lee Sy Department of Industrial Engineering De La Salle University

More information

Mathematical Modelling for Reverse Supply Chain in Manufacturing System

Mathematical Modelling for Reverse Supply Chain in Manufacturing System Research Journal of Engineering Sciences E- ISSN 2278 9472 Mathematical Modelling for Reverse Supply Chain in Manufacturing System Abstract Shiena Shekhar 1* and Ankur Malviya 2 1 Department of Mechanical

More information

Aerospace Manufacturing-Remanufacturing System Modeling and Optimization

Aerospace Manufacturing-Remanufacturing System Modeling and Optimization Aerospace Manufacturing-Remanufacturing System Modeling and Optimization Vesra Hashemi A Thesis In the Department Of Mechanical and Industrial Engineering Presented in Partial Fulfillment of the Requirements

More information

LRm Laboratory for Responsible Manufacturing

LRm Laboratory for Responsible Manufacturing LRm Laboratory for Responsible Manufacturing Bibliographic Information Udomsawat, G. and Gupta, S. M., Multi-Kanban Mechanism for Appliance Disassembly, Proceedings of the SPIE International Conference

More information

A replenishment control system with uncertain returns and random opportunities for disposal

A replenishment control system with uncertain returns and random opportunities for disposal University of Windsor Scholarship at UWindsor Odette School of Business Publications Odette School of Business 2011 A replenishment control system with uncertain returns and random opportunities for disposal

More information

and type II customers arrive in batches of size k with probability d k

and type II customers arrive in batches of size k with probability d k xv Preface Decision making is an important task of any industry. Operations research is a discipline that helps to solve decision making problems to make viable decision one needs exact and reliable information

More information

Optimisation of perishable inventory items with geometric return rate of used product

Optimisation of perishable inventory items with geometric return rate of used product 22nd International Congress on Modelling and Simulation, Hobart, Tasmania, Australia, 3 to 8 December 2017 mssanz.org.au/modsim2017 Optimisation of perishable inventory items with geometric return rate

More information

Title: Competition to Acquire and Sell Between Two Product Recovery Facilities

Title: Competition to Acquire and Sell Between Two Product Recovery Facilities Abstract No: 007-0336 Conference Title: 18 th Annual Conference of POMS, May 4-7, 2007, Dallas, TX Title: Competition to Acquire and Sell Between Two Product Recovery Facilities Authors: Srikanth Vadde,

More information

Proceedings of the 2015 Winter Simulation Conference L. Yilmaz, W. K. V. Chan, I. Moon, T. M. K. Roeder, C. Macal, and M. D. Rossetti, eds.

Proceedings of the 2015 Winter Simulation Conference L. Yilmaz, W. K. V. Chan, I. Moon, T. M. K. Roeder, C. Macal, and M. D. Rossetti, eds. Proceedings of the 2015 Winter Simulation Conference L. Yilmaz, W. K. V. Chan, I. Moon, T. M. K. Roeder, C. Macal, and M. D. Rossetti, eds. A SIMULATION FRAMEWORK FOR THE COMPARISON OF REVERSE LOGISTIC

More information

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY ENVIRONMENTAL ASSISTANCE DIVISION Pollution Prevention: What You Can Do At Your Facility

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY ENVIRONMENTAL ASSISTANCE DIVISION Pollution Prevention: What You Can Do At Your Facility MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY ENVIRONMENTAL ASSISTANCE DIVISION 1-800-662-9278 Pollution Prevention: What You Can Do At Your Facility WHAT IS POLLUTION PREVENTION? Pollution prevention means

More information

The role of ICT in the reverse logistics. A hypothesis of RFID implementation to manage the recovery process.

The role of ICT in the reverse logistics. A hypothesis of RFID implementation to manage the recovery process. The role of ICT in the reverse logistics. A hypothesis of RFID implementation to manage the recovery process. Andrea PAYARO 1 University of Padova, Via Venezia 1, Padova, 35131, Italy Tel: +39 049 827

More information

Multi-kanban mechanism for personal computer disassembly

Multi-kanban mechanism for personal computer disassembly Northeastern University Department of Mechanical and Industrial Engineering January 01, 2004 Multi-kanban mechanism for personal computer disassembly Surendra M. Gupta Northeastern University Kamarthi

More information

Electronic version of an article published as [Computers & Industrial Engineering, 2008, Vol. 55, No. 1, p ] [DOI:

Electronic version of an article published as [Computers & Industrial Engineering, 2008, Vol. 55, No. 1, p ] [DOI: Electronic version of an article published as [Computers & Industrial Engineering, 2008, Vol. 55, No. 1, p. 234-242] [DOI: http://dx.doi.org/10.1016/j.cie.2007.12.009] [copyright Elsevier] Optimal manufacturing

More information

Towards circular economy implementation in manufacturing systems using a multi-method simulation approach to link design and business strategy

Towards circular economy implementation in manufacturing systems using a multi-method simulation approach to link design and business strategy Int J Adv Manuf Technol (2017) 93:1953 1970 DOI 10.1007/s00170-017-0610-9 ORIGINAL ARTICLE Towards circular economy implementation in manufacturing systems using a multi-method simulation approach to link

More information

A System Dynamics Framework for an Integrated Forward-Reverse Supply Chain with Fuzzy Demand and Fuzzy Collection Rate under Possibility Constraints

A System Dynamics Framework for an Integrated Forward-Reverse Supply Chain with Fuzzy Demand and Fuzzy Collection Rate under Possibility Constraints A System Dynamics Framework for an Integrated ForwardReverse Supply Chain with Fuzzy and Fuzzy Collection Rate under Possibility Constraints Debabrata Das and Pankaj Dutta Abstract Reverse supply chain

More information

When can advance notice be most beneficial for closed loop supply chains?

When can advance notice be most beneficial for closed loop supply chains? When can advance notice be most beneficial for closed loop supply chains? Takamichi Hosoda, Stephen M. Disney 2, Nagesh Gavirneni 3 Graduate School of International Management, Aoyama Gakuin University,

More information

A production and repair model under a time-varying demand process

A production and repair model under a time-varying demand process A production and repair model under a time-varying demand process a Mohd Omar, b Ivan Yeo a Institute of Mathematical Sciences, University of Malaya, 50603, Kuala Lumpur, Malaysia b Department of Mathematical

More information

GREEN FRAMEWORK DEVELOPMENT FOR USED INDUSTRIAL EQUIPMENT

GREEN FRAMEWORK DEVELOPMENT FOR USED INDUSTRIAL EQUIPMENT 9th International DAAAM Baltic Conference INDUSTRIAL ENGINEERING 24-26 April 2014, Tallinn, Estonia GREEN FRAMEWORK DEVELOPMENT FOR USED INDUSTRIAL EQUIPMENT Bashkite, V. & Karaulova, T. Abstract: Current

More information

David Simchi-Levi M.I.T. November 2000

David Simchi-Levi M.I.T. November 2000 Dynamic Pricing to improve Supply Chain Performance David Simchi-Levi M.I.T. November 2000 Presentation Outline The Direct-to-Consumer Model Motivation Opportunities suggested by DTC Flexible Pricing Strategies

More information

A Production and Repair Model under a Time-Varying Demand Process

A Production and Repair Model under a Time-Varying Demand Process BULLETIN of the Malaysian Mathematical Sciences Society http://math.usm.my/bulletin Bull. Malays. Math. Sci. Soc. (2) 35(1) (2012), 85 100 A Production and Repair Model under a Time-Varying Demand Process

More information

Asheesh Shrivastava* Yogita Khare

Asheesh Shrivastava* Yogita Khare Asheesh Shrivastava* Yogita Khare Recycling of Products Causing Pollution: A Suggestive Reverse Supply Chain Model for India Introduction The concept of reuse of metal scrap, waste paper, packing materials,

More information

A Simple EOQ-like Solution to an Inventory System with Compound Poisson and Deterministic Demand

A Simple EOQ-like Solution to an Inventory System with Compound Poisson and Deterministic Demand A Simple EOQ-like Solution to an Inventory System with Compound Poisson and Deterministic Demand Katy S. Azoury San Francisco State University, San Francisco, California, USA Julia Miyaoka* San Francisco

More information

Reverse Logistics in Supply Networks: State-of-the-art and Challenges

Reverse Logistics in Supply Networks: State-of-the-art and Challenges Reverse Logistics in Supply Networks: State-of-the-art and Challenges Anand Kulkarni, Ajith Parlikad and Duncan McFarlane ak426@cam.ac.uk Cambridge Auto-ID Labs University of Cambridge UK Overview Background

More information

ACCOUNTING FOR REVERSE FLOWS. Gyöngyi Kovács* and Páll Ríkharðsson**

ACCOUNTING FOR REVERSE FLOWS. Gyöngyi Kovács* and Páll Ríkharðsson** ACCOUNTING FOR REVERSE FLOWS Gyöngyi Kovács* and Páll Ríkharðsson** *HANKEN, Swedish School of Economics and Business Administration, Helsinki Department of Marketing Supply Chain Management and Corporate

More information

Remanufacturing planning under uncertainty: a two-stage stochastic programming approach

Remanufacturing planning under uncertainty: a two-stage stochastic programming approach Remanufacturing planning under uncertainty: a two-stage stochastic programming approach Céline Gicquel 1, Safia Kedad-Sidhoum 2, Dominique Quadri 1 1 Université Paris Saclay, LRI, Campus d Orsay, 91405

More information

Overview Day One. Introduction & background. Goal & objectives. System Model. Reinforcement Learning at Service Provider

Overview Day One. Introduction & background. Goal & objectives. System Model. Reinforcement Learning at Service Provider Overview Day One Introduction & background Goal & objectives System Model Reinforcement Learning at Service Provider Energy Consumption-Based Approximated Virtual Experience for Accelerating Learning Overview

More information

Ricardo L. Machado, Dr. PUC Goiás, Brazil

Ricardo L. Machado, Dr. PUC Goiás, Brazil Ricardo L. Machado, Dr. PUC Goiás, Brazil rmachado@pucgoias.edu.br The research was guided by the following general question: How do pharmaceutical companies in Brazil (in the state of Goiás) manage their

More information

Optimization of Inventory for Two Level Multiple Retailers-Single Manufacturer Reverse Supply Chain

Optimization of Inventory for Two Level Multiple Retailers-Single Manufacturer Reverse Supply Chain OPERATIONS AND SUPPLY CHAIN MANAGEMENT Vol. 7, No. 1, 2014, pp. 32-37 ISSN 1979-3561 EISSN 1979-3871 Optimization of Inventory for Two Level Multiple Retailers-Single Manufacturer Reverse Supply Chain

More information

A COLLABORATIVE APPLICATION OF AHP TO ENHANCE A ROUTING MODEL FOR LOGISTICS AND REVERSE LOGISTICS

A COLLABORATIVE APPLICATION OF AHP TO ENHANCE A ROUTING MODEL FOR LOGISTICS AND REVERSE LOGISTICS A COLLABORATIVE APPLICATION OF AHP TO ENHANCE A ROUTING MODEL FOR LOGISTICS AND REVERSE LOGISTICS Arun Raja A., Arjun M. and Anishkumar M. Department of Mechanical Engineering, Sri Krishna College of Engineering

More information

International Journal of Industrial Engineering Computations

International Journal of Industrial Engineering Computations International Journal of Industrial Engineering Computations 4 (213 437 446 Contents lists available at GrowingScience International Journal of Industrial Engineering Computations homepage: www.growingscience.com/ijiec

More information

On the exact calculation of the mean stock level in the base stock periodic review policy

On the exact calculation of the mean stock level in the base stock periodic review policy On the exact calculation of the mean stock level in the base stock periodic review policy Eugenia Babiloni, Manuel Cardós, Ester Guijarro Universitat Politècnica de València (SPAIN) mabagri@doe.upv.es;

More information

Circular economy in reverse logistics: formulation and potential design in product refurbish

Circular economy in reverse logistics: formulation and potential design in product refurbish Circular economy in reverse logistics: formulation and potential design in refurbish Eva Faja Ripanti School of Aerospace, Transport and Manufacturing, Cranfield University e.ripanti@cranfield.ac.uk Benny

More information

Of Finite Stage Markov Decision Process In Policy Determination For Employees Motivation

Of Finite Stage Markov Decision Process In Policy Determination For Employees Motivation 0 Application 8 МЕЖДУНАРОДНА КОНФЕРЕНЦИЯ 8 INTERNATIONAL CONFERENCE АВАНГАРДНИ МАШИНОСТРОИТЕЛНИ ОБРАБОТКИ ADVANCED MANUFACTURING OPERATIONS Of Finite Stage Markov Decision Process In Policy Determination

More information

Building contingency planning for closed-loop supply chains with product recovery

Building contingency planning for closed-loop supply chains with product recovery Journal of Operations Management 21 (2003) 259 279 Building contingency planning for closed-loop supply chains with product recovery V. Daniel R. Guide Jr. a,, Vaidy Jayaraman b, Jonathan D. Linton c,1

More information

A Simulation-based Methodology to Compare Reverse Logistics System Configuration Considering Uncertainty

A Simulation-based Methodology to Compare Reverse Logistics System Configuration Considering Uncertainty Rochester Institute of Technology RIT Scholar Works Theses Thesis/Dissertation Collections 4-20-2016 A Simulation-based Methodology to Compare Reverse Logistics System Configuration Considering Uncertainty

More information

The optimal frozen period in a dynamic production model

The optimal frozen period in a dynamic production model Int. J. Production Economics 103 (2006) 648 655 www.elsevier.com/locate/ijpe The optimal frozen period in a dynamic production model Zhaotong Lian a,, Abhijit Deshmukh b, Jin Wang c a Faculty of Business

More information

Int. J. Production Economics

Int. J. Production Economics Int. J. Production Economics 133 (011) 119 16 Contents lists available at ScienceDirect Int. J. Production Economics journal homepage: www.elsevier.com/locate/ijpe A production/remanufacture model with

More information

Modelling and Analysis of Compliment Inventory System in Supply Chain with Partial Backlogging

Modelling and Analysis of Compliment Inventory System in Supply Chain with Partial Backlogging Intern. J. Fuzzy Mathematical Archive Vol. 15, No. 2, 2018, 157-166 ISSN: 2320 3242 (P), 2320 3250 (online) Published on 30 April 2018 www.researchmathsci.org DOI: http://dx.doi.org/10.22457/ijfma.v15n2a6

More information

Optimal Ordering Policies for Inventory Problems in Supermarkets under Stochastic Demand: A Case Study of Milk Powder Product

Optimal Ordering Policies for Inventory Problems in Supermarkets under Stochastic Demand: A Case Study of Milk Powder Product Proceedings of the 24 International Conference on Industrial Engineering and Operations Management Bali, Indonesia, January 7 9, 24 Optimal Ordering Policies for Inventory Problems in Supermarkets under

More information

On Optimal Bidding in Concurrent Auctions

On Optimal Bidding in Concurrent Auctions On Optimal Bidding in Concurrent Auctions Michael N. Katehakis Rutgers University Management Science and Information Systems 100 Rockafeller Road, Piscataway, NJ 08854 USA mnk@rutgers.edu Kartikeya S.

More information

Advertising and Competition for Market Share between a New Good Producer and a Remanufacturer

Advertising and Competition for Market Share between a New Good Producer and a Remanufacturer German Economic Review 19(1): 113 118 doi: 10.1111/geer.12121 Advertising and Competition for Market Share between a New Good Producer and a Remanufacturer Amitrajeet A. Batabyal Rochester Institute of

More information

Sharing Information to Manage Perishables

Sharing Information to Manage Perishables Sharing Information to Manage Perishables Michael E. Ketzenberg* College of Business Colorado State University 222 Rockwell Hall Fort Collins, CO 80523 Tel: (970) 491 7154 Fax: (970) 491 3522 Email:Michael.Ketzenberg@mail.biz.colostate.edu

More information

The impact of stochastic lead times on the bullwhip effect a theoretical insight

The impact of stochastic lead times on the bullwhip effect a theoretical insight Production & Manufacturing Research An Open Access Journal ISSN: (Print) 2169-3277 (Online) Journal homepage: https://tandfonline.com/loi/tpmr20 The impact of stochastic lead times on the bullwhip effect

More information

International Journal of Supply and Operations Management. A collocation-based approach to designing remanufacturing closed loop supply chain network

International Journal of Supply and Operations Management. A collocation-based approach to designing remanufacturing closed loop supply chain network International Journal of Supply and Operations Management IJSOM November 2015, Volume 2, Issue 3, pp. 820-832 ISSN-Print: 2383-1359 ISSN-Online: 2383-2525 www.ijsom.com A collocation-based approach to

More information

MULTIPLE CHOICE. Choose the one alternative that best completes the statement or answers the question.

MULTIPLE CHOICE. Choose the one alternative that best completes the statement or answers the question. MULTIPLE CHOICE. Choose the one alternative that best completes the statement or answers the question. 1) The ability of manufacturing to produce goods and services is called: A) production planning. B)

More information

L R m. Bibliographic Information. Copyright Information. Contact Information

L R m. Bibliographic Information. Copyright Information. Contact Information L R m Laboratory for Responsible Manufacturing Bibliographic Information Pochampally, K. K., Dhakar, T. S. and Gupta, S. M., "Use of Crystal Ball to Predict Profitability of a Reverse Supply Chain", Proceedings

More information

The Non-Standard Lifecycle Pattern Effect on Capacity Planning of Reverse Logistics

The Non-Standard Lifecycle Pattern Effect on Capacity Planning of Reverse Logistics The Non-Standard Lifecycle Pattern Effect on Capacity Planning of Reverse Logistics Athanasiou Efstratios Industrial Management Division, Department of Mechanical Engineering Aristotle University of Thessaloniki

More information

MANAGING PRODUCT RETURNS FOR REMANUFACTURING

MANAGING PRODUCT RETURNS FOR REMANUFACTURING R & D MANAGING PRODUCT RETURNS FOR REMANUFACTURING by D. GUIDE* and L. N. VAN WASSENHOVE** 2000/35/TM/CIMSO 13 * Professor, Duquesne University, 600 Forbes Ave, Pittsburgh, PA 15282, USA. ** The Henry

More information

EUROCITIES response to the circular economy package. February 2016

EUROCITIES response to the circular economy package. February 2016 EUROCITIES response to the circular economy package February 2016 Contents Executive summary:... 3 Introduction... 3 Production... 4 Product design... 4 New business models... 5 Consumption... 5 A resource

More information

Assignment 10 (Solution) Six Sigma in Supply Chain, Taguchi Method and Robust Design

Assignment 10 (Solution) Six Sigma in Supply Chain, Taguchi Method and Robust Design Assignment 10 (Solution) Six Sigma in Supply Chain, Taguchi Method and Robust Design Dr. Jitesh J. Thakkar Department of Industrial and Systems Engineering Indian Institute of Technology Kharagpur Instruction

More information

ACCOUNTING FOR REVERSE LOGISTICS ACTIVITIES

ACCOUNTING FOR REVERSE LOGISTICS ACTIVITIES ACCOUNTING FOR REVERSE LOGISTICS ACTIVITIES Gyöngyi Kovács*, Pall Rikhardsson** Abstract Traditional logistics systems aim at minimising total (logistics) costs. At the same time, these systems focus on

More information

Case Study: Plastic Panel Remanufacture or Recycling

Case Study: Plastic Panel Remanufacture or Recycling Case Study: Plastic Panel Remanufacture or Recycling Executive Summary: GnoSys Ecometrics, under the guise of the Polymer Research Centre, was commissioned by a consortium lead by Xerox to put undertake

More information

MOVING TOWARDS CIRCULARITY IN THE EU FURNITURE MARKET. A study on policy scenarios and their potential impacts

MOVING TOWARDS CIRCULARITY IN THE EU FURNITURE MARKET. A study on policy scenarios and their potential impacts MOVING TOWARDS CIRCULARITY IN THE EU FURNITURE MARKET A study on policy scenarios and their potential impacts p.2 Moving towards circularity in the EU furniture market OBJECTIVES OF THE STUDY commissioned

More information

Mathematical Modeling and Analysis of Finite Queueing System with Unreliable Single Server

Mathematical Modeling and Analysis of Finite Queueing System with Unreliable Single Server IOSR Journal of Mathematics (IOSR-JM) e-issn: 2278-5728, p-issn: 2319-765X. Volume 12, Issue 3 Ver. VII (May. - Jun. 2016), PP 08-14 www.iosrjournals.org Mathematical Modeling and Analysis of Finite Queueing

More information

Last time buy versus repair

Last time buy versus repair Last time buy versus repair Harold Krikke CentER Applied Research Herman Groot Beumer Contell Asset Support 1 The problem defined: Plant control systems Shortening life cycles The phase out of systems

More information

ON THE OPTIMALITY OF ORDER BASE-STOCK POLICIES WITH ADVANCE DEMAND INFORMATION AND RESTRICTED PRODUCTION CAPACITY

ON THE OPTIMALITY OF ORDER BASE-STOCK POLICIES WITH ADVANCE DEMAND INFORMATION AND RESTRICTED PRODUCTION CAPACITY ON THE OPTIMALITY OF ORDER BASE-STOCK POLICIES WITH ADVANCE DEMAND INFORMATION AND RESTRICTED PRODUCTION CAPACITY J. Wijngaard/F. Karaesmen Jacob Wijngaard (corresponding author) Faculty of Management

More information

European Journal of Operational Research

European Journal of Operational Research European Journal of Operational Research 203 (2010) 526 531 Contents lists available at Scienceirect European Journal of Operational Research journal homepage: www.elsevier.com/locate/ejor Short Communication

More information

Linköping University Electronic Press

Linköping University Electronic Press Linköping University Electronic Press Book Chapter Concepts and definitions for product recovery: analysis and clarification of the terminology used in academia and industry Mattias Lindahl, Erik Sundin,

More information

Design and Control of Agile Automated CONWIP Production Lines

Design and Control of Agile Automated CONWIP Production Lines Design and Control of Agile Automated CONWIP Production Lines Wallace J. Hopp, 1 Seyed M.R. Iravani, 2 Biying Shou, 3 Robert Lien 2 1 Ross School of Business, University of Michigan, Ann Arbor, Michigan

More information

Implementation of Just-In-Time Policies in Supply Chain Management

Implementation of Just-In-Time Policies in Supply Chain Management Implementation of Just-In-Time Policies in Supply Chain Management AYDIN M. TORKABADI RENE V. MAYORGA Industrial Systems Engineering University of Regina 3737 Wascana Parkway, Regina, SK, S4S 0A2 CANADA

More information

THE IMPROVEMENT OF LINE EFFICIENCY ON DISASSEMBLY LINE BALANCING PROBLEM: AN HRRCD S HEURISTIC RULE

THE IMPROVEMENT OF LINE EFFICIENCY ON DISASSEMBLY LINE BALANCING PROBLEM: AN HRRCD S HEURISTIC RULE THE IMPROVEMENT OF LINE EFFICIENCY ON DISASSEMBLY LINE BALANCING PROBLEM: AN HRRCD S HEURISTIC RULE Yeoh Kim Hao and Sulaiman Hasan Department of Manufacturing and Industrial Engineering, Universiti Tun

More information

Simulation-Based Analysis and Optimisation of Planning Policies over the Product Life Cycle within the Entire Supply Chain

Simulation-Based Analysis and Optimisation of Planning Policies over the Product Life Cycle within the Entire Supply Chain From the SelectedWorks of Liana Napalkova June, 2009 Simulation-Based Analysis and Optimisation of Planning Policies over the Product Life Cycle within the Entire Supply Chain Galina Merkuryeva Liana Napalkova

More information

Pricing and Return Policy Decision for Close Loop Dual Channel Supply Chain

Pricing and Return Policy Decision for Close Loop Dual Channel Supply Chain Pricing and Return Policy Decision for Close Loop Dual Channel Supply Chain MIHIR SOLANKI 1, JAINAV SHAH 2, 1 Assistant Professor, Department of Mechanical Engineering, G H Patel College of Engineering

More information

SUPPLY CHAINS & THE CIRCULAR ECONOMY. David Gonsalvez Presentation at Edge Forum for SMEs, July 7, 2018

SUPPLY CHAINS & THE CIRCULAR ECONOMY. David Gonsalvez Presentation at Edge Forum for SMEs, July 7, 2018 SUPPLY CHAINS & THE CIRCULAR ECONOMY David Gonsalvez Presentation at Edge Forum for SMEs, July 7, 2018 The Economy NON- RENEWABLE RESOURCES RENEWABLE RESOURCES THE ECONOMY RECYCLED REUSED REMANUF RESOURCES

More information

Genetic Algorithm for Supply Planning Optimization under Uncertain Demand

Genetic Algorithm for Supply Planning Optimization under Uncertain Demand Genetic Algorithm for Supply Planning Optimization under Uncertain Demand Tezuka Masaru and Hiji Masahiro Hitachi Tohoku Software, Ltd. 2-16-10, Honcho, Aoba ward, Sendai City, 980-0014, Japan {tezuka,hiji}@hitachi-to.co.jp

More information

Reverse Logistics. Moving forward in Reverse. Brian Mantel Sprint Tim Long Clover Wireless

Reverse Logistics. Moving forward in Reverse. Brian Mantel Sprint Tim Long Clover Wireless Reverse Logistics Moving forward in Reverse Brian Mantel Sprint Tim Long Clover Wireless What is Logistics? Forward Logistics: the process that controls the efficient, effective flow and storage of goods

More information

Development of an Optimal Decision Policy for MTS-MTO System. Reno, Nevada, U.S.A. April 29 to May 2, 2011

Development of an Optimal Decision Policy for MTS-MTO System. Reno, Nevada, U.S.A. April 29 to May 2, 2011 020-0427 Development of an Optimal Decision Policy for MTS-MTO System Feng-Yu Wang 1,2, Rajesh Piplani 2, Yan-Guan Lim Roland 1, Eng-Wah Lee 1 1 Singapore Institute of Manufacturing Technology, Singapore

More information

Optimizing the supply chain configuration with supply disruptions

Optimizing the supply chain configuration with supply disruptions Lecture Notes in Management Science (2014) Vol. 6: 176 184 6 th International Conference on Applied Operational Research, Proceedings Tadbir Operational Research Group Ltd. All rights reserved. www.tadbir.ca

More information

Investor Presentation April 2018

Investor Presentation April 2018 Investor Presentation April 2018 INTRODUCTION TO CLOSE THE LOOP Close the Loop - who we are Australian-owned company aiming to be the global leader in sustainability solutions in complex waste streams

More information

RIC2015. Specifications for the Process of Remanufacturing

RIC2015. Specifications for the Process of Remanufacturing RIC2015 Specifications for the Process of Remanufacturing Disclaimer This standard was developed by the Remanufacturing Industries Council (RIC) and is being submitted to ANSI for public comment. Compliance

More information

ASIAN NETWORK WORKSHOP 2014

ASIAN NETWORK WORKSHOP 2014 ASIAN NETWORK WORKSHOP 2014 POLICY/PRACTICE FOR ENSURING REPAIR AND REFURBISHMENT OF EEEs IN ESM : DISTINGUISHING REUSABLE UEEEs FROM E-WASTE IN MALAYSIA Hazardous Substances Division Department of Environment

More information