1 Understanding Some Unexpected Failures of the Theory of Constraints Product Mixes utoria: lexandre Linhares bstract: The theory of constraints proposes that, when production is bounded by a single bottleneck, the best product mix heuristic is to select products based on their ratio of throughput per constraint use. This is not true for cases when production is limited to integer quantities of final products. We demonstrate four facts, all of which go directly against current thought in the TOC literature. For example, there are cases on which the optimum product mix includes products with lowest product margin and lowest ratio of throughput per constraint time, simultaneously violating the margin heuristic and the TOC-derived heuristic. We start with a simple product mix example previously analyzed in the literature and introduce a new product which dramatically alters the results obtainable from a theory of constraints perspective. It is thus crucial to understand the nature of these unexpected failures to obtain optimum product mixes. Such failures are due to the combinatorial complexity (NP- Hardness) of the product mix decision problem, a fact that is demonstrated here. 1. Introduction The theory of constraints is a remarkably successful operations management philosophy, centered on the idea of focusing managerial attention to the local constraints which inhibit the global performance of an entire system (Goldratt and Cox 1984; Goldratt and Fox 1986; Goldratt 1990a; Goldratt 1990b). Over the last two decades it has gathered much momentum, with the creation of organizations such as the Goldratt Institute and the TOC Center in Dayton, Ohio. It has also spawned a host of products, such as the OPT software and an innovative bestselling management novel. Blackstone (2001) reviews some of its core ideas and fields of application. The focus of our study will be on the problem of selecting the optimum product mix under the theory of constraints, which is deemed as an improvement over traditional practices (Gupta et al 2002; Kee and Schmidt 2000; Wahlers and Cox 1994). Consider a facility with a set of products to build, but without the capacity (i.e., a fixed time horizon) required to meet the demand for all of them. Let us suppose that this facility must deal with integer quantities of final products. In this case a product mix decision must be made, with the obvious tradeoff of prioritizing some product lines at the expense of others. traditional method for selection of the product mix is given by selecting the products with highest individual product margin with higher priority, regardless of the time spent on the bottleneck(s). Let us name this method as the margin heuristic. The theory of constraints, however, proposes that product lines be selected according to their ratio of throughput per time spent on the system constraint(s). Let us refer to this approach as the TOC-derived heuristic. The heuristic has been formally stated in numerous TOC publications (e.g., Goldratt 1990a); for the convenience of the reader let us follow from Fredendall and Lea (1997): TOC-derived Product Mix Heuristic Step 1: Identify the system s constraint(s): (a) Calculate the required load on each resource to produce all the products. The constraint or bottleneck (BN) is the resource whose market demand exceeds its capacity. Step 2: Decide how to exploit the system s constraint(s):

2 (a) Calculate the contribution margin (CM) of each product as the sales price minus the raw material (RM) costs; (b) Calculate the ratio of the CM to the products processing time on the bottleneck resource (CM/BN); (c) In descending order of the products CM/BN, reserve the BN capacity to build the product until the BN resource s capacity is exhausted; (d) Plan to produce all the products that do not require processing time on the bottleneck (i.e., the free product) in descending order of their CM. (Fredendall and Lea 1997, p ) It was believed, when originally suggested, that this TOC-derived heuristic would obtain the best combination of products for all cases. In fact, it does obtain optimum solutions when production is allowed to be fragmented. However, studies by Plenert (1993) and by Lee and Plenert (1993) clearly demonstrated by comparing the product mixes obtained with the TOC-derived heuristic with those obtained with integer linear programming that when production must be done over integer quantities the TOC-derived heuristic could fail to find the optimum product mix in the case of multiple constraining resources. These rather interesting results launched an increasing series of studies for improved policies (Fredendall and Lea 1997; Hsu and Chung 1998) and for advanced heuristics such as genetic algorithms (Onwubolu and Mutingi 2001a; Onwubolu and Mutingi 2001b) and tabu search (Onwubolu 2001), providing new product mix methods for the case of multiple constrained resources. fter all, this multiple constraining resources scenario framed the original context on which Plenert (1993) demonstrated the shortcomings of the TOC-derived heuristic. The situation, however, is in fact more complex than it seems. In this paper, we demonstrate the following facts, all of which go directly against current thought in the theory of constraints literature: FCT 1. There are cases on which the TOC-derived heuristic fails even with a single bottleneck. FCT 2. There are cases on which the TOC-derived heuristic fails to obtain a higher profit than the traditional product margin heuristic. FCT 3. There are cases on which the optimum product mix includes products with lowest product margin and lowest ratio of throughput per constraint time, violating both the traditional heuristic and the TOC-derived heuristic. FCT 4. There are strong reasons to believe that an efficient and optimum heuristic is simply impossible. 2. Review of the Blackstone (2001) example Let us start the discussion with an example from Blackstone (2001). Figure 1 presents an hypothetical facility capable of producing three products: product X, product Y, and product Z. Product X sells for $90 and has a weekly demand of 50 units; product Y sells for and has a weekly demand of 75 units, and product Z sells for $70 and has a weekly demand of 100. The facility has five work stations (, B, C, D, ) and the products are devised from four types of raw materials (, RM2, RM3, and RM4). 2

3 Production of X is started with two units of RM2 processed at station for utes each. One of them is taken to station C for 1utes of processing while the other is taken to station D also for 1utes. These materials are then joined, along with a new unit of, at station, in a ute process. Hence X has $40 of material cost. X $90 50/Week Y 75/Week Z $70 100/Week $10 D 1 D C 1 C B RM2 RM2 RM3 RM4 $10 Figure 1. fter Blackstone (2001): a hypothetical facility. Production of Y is started with a unit of RM2 processed at station for utes, and a unit of RM3 processed at station B also for utes. fter station is finished, the resulting material flows to station D for 1utes and then to station for an additional 10 minutes. fter station B processes RM3, the resulting material is taken to stations C (5 minutes), D (utes), and finally it is joined with the material resulting originally from RM2, in station, in a ute process. Material costs for Y equal $30. Capacity requirements per unit Station Load (minutes) Product X Product Y Product Z Product X Product Y Product Z Total requirement Station B Station C Station D Station Demand Selling price Raw materials Labor Overhead Product cost Product margin Table 1. Summary data of the Blackstone (2001) example 3

4 Product Z is made out of one unit of RM3 and one unit of RM4. RM3 is initially processed at B for utes, then followed by utes at C, utes at D, and 5 minutes at, where it will be joined with the unit of RM4 processed for utes at. The material costs for Z are $25. word of caution: the reader might have noticed that there are some incorrect data in Blackstone s paper. For example, in that paper, figure 6 reveals that product Z requires 15 minutes of processing at station C, while the next figure will place that number at only 5 minutes. It is impossible to tell from that text which numbers were the correct ones, but this does not affect the arguments in either way. In here we are thus referring to the data from the matrix in Blackstone (2001) s figure 7, and not from the facility scheme of Blackstone (2001) s figure 6. We thus have on table 1 a summary of the load on the stations where it may be concluded that there is not enough capacity in station D, which clearly makes it the only system constraint. Now a decision must be made: which products should be produced? This is the product mix problem under a bottleneck. Operating costs of the system are given by $10 of labor per hour and $30 of overhead per hour, which brings a total of $8000 per week, given 5 stations operating for 40 hours. However, if we break these costs per product, different product margins emerge. Table 1 gives Blackstone s (2001) labor costs and overhead costs per product, which, when added to raw material costs, let us obtain the product margin of products X, Y, and Z. Product mix by product margin Product X Product Y Product Z Selling price $90 $70 Raw material $40 $30 $25 Throughput/unit $50 $70 $45 Totals Production Throughput/product $0 $5.250 $2.340 $7.590 Operating expense $8.000 Plant profit -$410 minutes of D per unit minutes of D per product Table 2. Product mix decision following the product margin heuristic. Under the traditional viewpoint, Blackstone argues, companies tend to view products as either dogs which have low profit margins, or as stars with great margins. This view is compatible with that of determining a product mix by selecting the products with highest margins first. Under this product margin heuristic, a company should prefer to produce all demand of 75 units of product Y (margin: $30), followed by 52 units of the product with the next best margin, which is Z (margin: $25). Its production of only 52 units of Z, instead of its whole demand of 100 units, is due to the constraints of the bottleneck. The bottleneck, station D, should still have utes left of available capacity, but we may assume that no products can be produced in this timeframe, and so this product mix based on margins leads to a profit of -$410 (Table 2). 4

5 Now, this decision (and its associated profit) does not consider the actual time that products spend on the constraint. In this case the product with highest margin is also the product with highest utilization of the bottleneck. This shortcoming leads us to the proposal of the theory of constraints: to include products based on their comparative ratio of throughput per constraint minute. This is done in table 3, where product Z, with a ratio of $4,50/minute, is produced to meet its total demand of 100 units. This decision consumes 1000 minutes of the bottleneck. The next product, product X with a ratio of $3,33, is also produced to meet its total demand of 50 units, consuming 750 minutes of the bottleneck. With the remaining minutes, the heuristic then allocates the bottleneck to work on product Y, and there is capacity to produce 26 units. This new product mix generates $8.820, raising profit to $820 per week. Product mix from a theory of constraints standpoint Product X Product Y Product Z Selling price $90 $70 Raw material $40 $30 $25 Throughput/unit $50 $70 $45 Constraint minutes Throughput/constrnt.min. $3,33 $2,80 $4,50 Totals Production Throughput/product $2.500 $1.820 $4.500 $8.820 Operating expense $8.000 Plant profit $820 minutes of D per unit minutes of D per product Table 3. Product mix decision following the throughput per constraint time (TOC) heuristic generates greater profit than selection by product margin. On the words of Blackstone (2001): this example proves emphatically that products do not have profits, companies do. Making decisions based on product profit while ignoring the impact of the product on the constraint is clearly suboptimal. The correct decision variable for determining product mix is Throughput per Constraint Minute. (Blackstone 2001, p.1062) In the next section, a new product is introduced into Blackstone s example. It will let us look closer at this heuristic of throughput per constraint time. 3. Introducing pathological product lpha Let us now introduce a new product into Blackstone s (2001) example, product lpha. On a first reading, product lpha will seem very different from the products already offered. Its parameters are very distinct from those of products X, Y, and Z. But this is precisely intended to be the case, in order to show the limitations of the heuristic in this new special case. Product lpha is expensive and sells for $6630. It is created from 2 units of raw material 3, i.e., it has $30 of material cost, and it demands 1650 minutes of processing time in station D. This means that it adds further burdens on the system constraint, and only on the system constraint. The weekly demand for lpha is a single unit. Thus as we can see in table 4, the load on bottleneck station D skyrockets to 527utes. 5

6 Now, how does the heuristic of selecting products based on their ratio of throughput per constraint time fare in this case? Product Z still leads this parameter, with a ratio of $4,50 per constraint minute. It is followed by the new offering, product lpha, with a ratio of $4,00; and then by products X (ratio of $3,33) and finally Y (ratio of $2,80). So the heuristic tells us to start production by fulfilling all demand for product Z. This will in turn require the bottleneck to work for 1000 minutes. fter demand for Z is fulfilled, the bottleneck will have 1400 minutes remaining. But this is not enough time to produce the product with the next best ratio of throughput per constraint time, as product lpha requires 1650 minutes of bottleneck time. So the TOC-derived heuristic would either lead to an unfeasible solution which exceeds the bottleneck availability, or it would have to skip production of lpha and produce the same mix as that one before the introduction of lpha, which, as we have just seen, leads to a profit of $820. X $90 50/Week Y 75/Week Z $70 100/Week lpha $6630 1/Week D 1650 min $10 D 1 D C 1 C B RM2 RM2 RM3 RM4 $10 RM3 RM3 Figure 2. Introduction of product lpha. If, however, one does not produce the item with best ratio of throughput per constraint minute at all, and instead resorts to producing only product lpha and the demand for product X, the total throughput would grow, turning the higher profit of $1100. (Notice also that this higher profit assumes that operating expenses are held fixed at $8000, but according to Blackstone (2001), operating expenses are based on $1600 per station per week, and this work schedule does not require station B to be active at all. So if operating costs under this schedule drop to $6400, total profit would grow from the $820 seen above to $2700, only by selecting a different product mix than that pointed out by the TOC-derived heuristic.) This goes against current thought in the TOC literature and demonstrates FCT 1 given in the introduction: There are cases on which the TOC-derived heuristic fails even with a single constrained resource. So there seems clearly to be a problem with the TOC-derived heuristic. The skeptical reader may not be convinced and argue that the introduction of product lpha is too unconventional, that its parameters are much too distinct from those of the previous 6

7 products, and that it is the inadequacy and unrealistic nature of these numbers that somehow make up for this failure of the TOC-derived heuristic. This is not the case (though the numbers of product lpha really do seem quite artificial). The TOC-derived heuristic does not lead to optimum product mixes in a much larger number of cases. Capacity requirements per unit Station Load (minutes) Product X Product Y Product Z Product lpha Product X Product Y Product Z Product lpha Total Requirement Station B Station C Station D Station Demand Selling price Raw materials Labor Overhead Product cost Product margin Table 4. Introduction of product lpha places additional pressure on the system constraint. Product lpha: a pathological case for the theory of constraints Product X Product Y Product Z Product lfa Selling price $90 $70 $6.630 Raw material $40 $30 $25 $30 Throughput/unit $50 $70 $45 $6.600 Constraint minutes Throughput/constrnt.min. $3,33 $2,80 $4,50 $4,00 Totals Production Throughput/product $2.500 $0 $0 $6.600 $9.100 Operating expense $8.000 Plant profit $1.100 minutes of D per unit minutes of D per product Table 5. Profit rises to $1100 (or to $2700 if station B is allowed to shut down), violating the TOC-derived heuristic in a single constrained resource case. In order to clarify this issue, let us consider in the following section the simplest possible case of catastrophic failure of the TOC-derived heuristic. This will help us in isolating the problem and in making the underlying reason clear. 4. Isolating the phenomenon Figure 3(a) presents an extremely simple case of a set of products {#1,#2,#3,#4}, a single work station and a single raw material (worth ). Our planning period, and the capacity of station, is a single work day, or 8 hours. The selling price of each final product is a direct function of the time spent on station, and the demand for the day is one product #1, one product #2, one product #3, and one product #4. Since the production of these items would require 19 hours, station is clearly a system constraint and is obviously the only one. Now what is the best product mix? Let us see how the product margin heuristic and the TOCderived heuristic fare in this peculiar case. Let us first consider the classic method of product mix, by selecting the products with highest margins first (Fig 3(b)). In this case, since all products are derived from raw material 1, we need only to select the product with highest selling price, which is product #1. This product would thus consume 6 hours of station, and the remaining hours would not be 7

8 sufficient time to produce any of the remaining demanded items. Thus, total throughput would equal $500 under this heuristic. Product 1 $600 Product 2 $550 Product 3 Product 4 Product 1 $600 Product 2 $550 Product 3 Product 4 6 hours 5 hours 6 hours 5 hours (a) a simple case with one bottleneck (b) result of the product margin heuristic: $500 Product 1 $600 Product 2 $550 Product 3 Product 4 Product 1 $600 Product 2 $550 Product 3 Product 4 6 hours 5 hours 6 hours 5 hours (c) result of the TOC-derived heuristic:$450 Figure 3 (a-d). The simplest case of such failure. (d) optimum solution violates both policies:$600 Now, by using the TOC-derived heuristic in figure 3(c), we would start by selecting the products with highest relation of throughput/constraint time, which turns out in this case to be product 2, with a $110/hour ratio (a ratio larger than, the ratio of all the remaining items). This product would consume 5 hours of station time, and there would not be sufficient time for the production of any remaining items, leading to a total throughput of $450. This demonstrates FCT 2: There are cases on which the TOC-derived heuristic fails to obtain a higher profit than the traditional product margin heuristic. Now, the optimum heuristic for this case is exactly to violate both the traditional product margin heuristic and the theory of constraints heuristic and to produce the items with lowest product margin and lowest ratio of throughput per constraint time! The simultaneous violation of both policies leads to a total throughput of $600. This demonstrates FCT 3: There are cases on which the optimum product mix includes products with lowest product margin and lowest ratio of throughput per constraint time, violating both the traditional heuristic and the TOC-derived heuristic. The reason for such unanticipated results is given in the following section. 8

9 5. The reason for these failures The simple case presented in the previous section may have led the reader to the following obvious conclusion: Proposition 1. Selection of a product mix in a constrained facility is NP-Hard. Proof. Reduction from the knapsack problem. To demonstrate that selection of a product mix in a constrained facility is NP-hard, we must demonstrate how a particular polynomial-time method for its optimum solution would also be capable of solving a known NP-hard problem (e.g., Garey and Johnson 1979). Consider the following optimization problem: we are given a sack and a set of N items of value V i and weight W i. The knapsack problem asks us to select a subset of items which maximizes the sum value of items placed in the sack, while the weighted sum of these items lies at most at a particular threshold T (Garey and Johnson 1979). This famous problem is NP-hard to solve, which means that there is no known method that will produce an optimum solution under an efficient (polynomial) time frame, as a function of N. It is easy to see that any exact method the product mix problem under TOC can be used to solve the knapsack problem. Let us consider a production setting with a single bottleneck (i.e., station ) and N possible products. The products correspond to the items to be (or not to be) placed on the sack; so, for each item, let us create a corresponding product. s in the previous example, each product consists of raw material processed in station, the bottleneck. Let each product have a raw material price of $0. The selling price of each product is given by the value of each item V i. The load required (time in minutes) for each product in the bottleneck is given by weight W i of each corresponding item. Let the capacity of station (i.e. available time for processing) equal the sack s maximum weight allowed, T. If we make these straightforward mappings then an optimum solution of the product mix problem is also an optimum solution to the original knapsack problem. Thus any exact algorithm for optimum product mix under TOC can also be used for the solution of the NPhard knapsack problem. This demonstrates that selection of a product mix in a constrained facility is also in itself an NP-hard problem. In the above example and proof, we have considered the 0-1 knapsack problem, where a binary decision either withdrawn or placed a specific item on the sack. The situation with the product mix decision under a constraint is closer, however, to the traditional knapsack problem that asks for the number of each specific type of item to be placed on the sack. This change in perspective does not change the major proposition that the problem is NP-Hard and it may be unpractical to attempt to obtain optimal solutions to all cases. The reader should have noticed that this result obviously implies that the corresponding problem under multiple constraints is also NP-Hard. The reasoning is the following. Suppose we have an optimum product mix algorithm for the case of multiple constraints. This algorithm can be used to solve the case of a single constraint, as for example by adding a new constrained resource and a new product. Let the value of the product be zero and the new constrained resource only be used to produce the new product (and be the only one so). solution to the transformed multiple constraint problem is a direct solution to the single constraint one. So an algorithm for the multiple constrained problem would solve 9

10 optimally an NP-Hard problem, which immediately demonstrates that the multiple constraints case is also obviously NP-Hard. Since an exact method for selection of a product mix in a constrained facility would imply that P=NP launching a revolution in science and mathematics, this result demonstrates FCT 4: There are strong reasons to believe that an efficient and optimum heuristic for the product mix decision under the theory of constraints is simply impossible. It also explains Plenert s (1993) results and illustrates why researchers have not been able to find a simple optimum heuristic for product mix under multiple constrained resources as we have seen here, the TOC-derived heuristic fails even on facilities with a single constrained resource. It seems thus more reasonable to expect that the best possible that may be obtained for large instances are high quality approximations given by the advanced heuristics (such as genetic algorithms) that have been under study recently (see, for instance, Fredendall and Lea 1997; Hsu and Chung 1998; Onwubolu 2001; Onwubolu and Mutingi 2001a; Onwubolu and Mutingi 2001b). There are two obvious limitations on this result: First, we are dealing with cases where we have perfect information. This supposition does not reflect numerous industrial environments that exhibit rapidly shifting bottlenecks, major deviations in processing time for each station, etc. While these suppositions are shared with a large part of the literature (e.g., Goldratt 1990a, Fox 1987), there is still a clear need for further research of cases with imperfect and non-deterministic information. nother limitation is that even if items are allowed to be completed in part over days and weeks (instead of in whole numbers during the planning period), then the TOC-derived heuristic is in fact optimal. This last point is worth developing. It is crucial to distinguish the TOC philosophy from the TOC-derived product mix heuristic. This paper is in no way a criticism of the theory of constraints. TOC is a management philosophy that does not require, never mentions, and is completely independent of the integer assumption. The results presented here only demonstrate that the straightforward extension of the heuristic for the integer case may be problematic. This does not imply anything for the theory of constraints as a management philosophy (Mabin and Balderstone 2003; Mabin and Gibson 1998; Mabin and Davies 2003). It does, however, gives us a new important research problem: since TOC is based on breaking constraints, how to properly use the TOC philosophy to deal with the combinatorial complexity demanded in the integer production case. fter all, we do not want to turn the product mix decision itself into a bottleneck. 6. References BLCKSTON, J.H., Theory of constraints a status report. International Journal of Production Research, v.39, p , FOX, R., Theory of constraints. N Conference proceedings, p.41 52, FRDNDLL, L.D. and L, B.R., Improving the product mix heuristic in the theory of constraints. International Journal of Production Research, v. 35, p , GRY, M. and JOHNSON, D., Computers and Intractability: a guide to the theory of NPcompleteness, W.H. Freeman & Co., San Francisco,

11 GOLDRTT,.M., and COX, J., The goal: a process of ongoing improvement, Croton-on- Hudson, NY: North river press, GOLDRTT,.M. and Fox, R.., The race, Croton-on-Hudson, NY: North river press, GOLDRTT,.M., Sifting information out of the data ocean: the haystack syndrome, Croton-on-Hudson, NY: North river press, 1990a. GOLDRTT,.M., What is this thing called the theory of constraints and how should it be implemented? Croton-on-Hudson, NY: North river press, 1990b. GUPT, M.C., BXNDL, S.J. and P.S. RJU, Integrating BM/TOC approaches for performance improvement: a framework and application. International Journal of Production Research, v. 40, p , HSU, T.C., and S.H. CHUNG, The TOC-based algorithm for solving product mix problems. Production Planning & Control, v. 9, p.36-46, K, R., and C. Schmidt, comparative analysis of utilizing activity-based costing and the theory of constraints for making product-mix decisions. International Journal of Production conomics, v. 63, p.1-17, L, T.N., and G. PLNRT, Optimizing theory of constraints when new product alternatives exist. Production and Inventory Management Journal, v. 34, p.51-57, MBIN, V., and BLDRSTON, S., The performance of the theory of constraints methodology: analysis and discussion of successful TOC applications. International Journal of Operations & Production Management, v. 23, p , MBIN, V., and DVIS, J., Framework for understanding the complementary nature of TOC frames: insights from the product mix dilemma. International Journal of Production Research, v. 41, p , MBIN, V., and GIBSON, J., Synergies from spreadsheet LP used with the theory of constraints a case study. Journal of the Operational Research Society, v. 49, p , ONWUBOLU, G. C., Tabu search-based algorithm for the TOC product mix decision. International Journal of Production Research, v. 39, p , ONWUBOLU, G.C., and M. MUTINGI, genetic algorithm approach to the theory of constraints product mix problems. Production Planning & Control, v. 12, p.21-27, 2001a. ONWUBOLU, G. C. and M. MUTINGI, Optimizing the multiple constrained resources product mix problem using genetic algorithms, International Journal of Production Research, v. 39, p , 2001b. PLNRT, G., Optimizing theory of constraints when multiple constrained resources exist. uropean Journal of Operational Research, v. 70, p , WHLRS, J.L., and J.F. Cox, III, Competitive factors and performance measurement: applying the theory of constraints to meet customer needs. International Journal of Production conomics, v. 37, p ,

The decision to produce multiple products on. Incorporating the Opportunity Cost of Setups into Production-Related Decisions. Fall

The decision to produce multiple products on. Incorporating the Opportunity Cost of Setups into Production-Related Decisions. Fall VOL.6 NO.1 Fall 2004 Incorporating the Opportunity Cost of Setups into Production-Related Decisions B Y D A VID P ERKINS, PH.D., CMA, CPA FINDING THE REAL OPPORTUNITY COST OF SETUP ACTIVITIES CAN HELP

More information

CHAPTER 4.0 SYNCHRONOUS MANUFACTURING SYSTEM

CHAPTER 4.0 SYNCHRONOUS MANUFACTURING SYSTEM CHAPTER 4.0 SYNCHRONOUS MANUFACTURING SYSTEM 4.1 Introduction Synchronous manufacturing is an all-encompassing manufacturing management philosophy that includes a consistent set of principles, procedures

More information

Revisiting local TOC measures in an internal supply chain: a note

Revisiting local TOC measures in an internal supply chain: a note International Journal of Production Research ISSN: 0020-7543 (Print) 1366-588X (Online) Journal homepage: http://www.tandfonline.com/loi/tprs20 Revisiting local TOC measures in an internal supply chain:

More information

Simultaneous Perspective-Based Mixed-Model Assembly Line Balancing Problem

Simultaneous Perspective-Based Mixed-Model Assembly Line Balancing Problem Tamkang Journal of Science and Engineering, Vol. 13, No. 3, pp. 327 336 (2010) 327 Simultaneous Perspective-Based Mixed-Model Assembly Line Balancing Problem Horng-Jinh Chang 1 and Tung-Meng Chang 1,2

More information

THE ANALYSIS OF PRODUCTION LINES BOTTLENECKS IDENTIFICATION AND WAYS OF MANAGEMENT

THE ANALYSIS OF PRODUCTION LINES BOTTLENECKS IDENTIFICATION AND WAYS OF MANAGEMENT THE ANALYSIS OF PRODUCTION LINES BOTTLENECKS IDENTIFICATION AND WAYS OF MANAGEMENT Poznan School of Logistics, Chair of Logistics Systems, Poland E-mail: joanna.kolinska@wsl.com.pl Abstract Poznan School

More information

By Eli Schragenheim Supporting TOC implementations worldwide

By Eli Schragenheim Supporting TOC implementations worldwide By Eli Schragenheim Supporting TOC implementations worldwide The need How decisions regarding new opportunities in the market are made today? Fully based on the intuition of Sales and top management? Based

More information

Back to Basics TOC: Throughput Accounting

Back to Basics TOC: Throughput Accounting Back to Basics TOC: Throughput Accounting Presented by: Dr. Lisa Lang and Beau S. Ganas Date: March 17, 2018 2018 TOCICO. All Rights Reserved. Cost Accounting History Cost Accounting: The Number One Enemy

More information

Integrating Cost, Capacity, and Simulation Analysis

Integrating Cost, Capacity, and Simulation Analysis Integrating Cost, Capacity, and Simulation Analysis Dr. Frank Chance Dr. Jennifer Robinson FabTime Inc. 325M Sharon Park Drive #219, Menlo Park, CA 94025 www.fabtime.com 1. Introduction In this article,

More information

We all know that what you measure gets done. But what if you are. measuring the wrong things and doing the wrong things as a result?

We all know that what you measure gets done. But what if you are. measuring the wrong things and doing the wrong things as a result? We all know that what you measure gets done. But what if you are measuring the wrong things and doing the wrong things as a result? Michaela Rebbeck talks to Alex Knight about operational measures that

More information

New Results for Lazy Bureaucrat Scheduling Problem. fa Sharif University of Technology. Oct. 10, 2001.

New Results for Lazy Bureaucrat Scheduling Problem. fa  Sharif University of Technology. Oct. 10, 2001. New Results for Lazy Bureaucrat Scheduling Problem Arash Farzan Mohammad Ghodsi fa farzan@ce., ghodsi@gsharif.edu Computer Engineering Department Sharif University of Technology Oct. 10, 2001 Abstract

More information

An Analytical Upper Bound on the Minimum Number of. Recombinations in the History of SNP Sequences in Populations

An Analytical Upper Bound on the Minimum Number of. Recombinations in the History of SNP Sequences in Populations An Analytical Upper Bound on the Minimum Number of Recombinations in the History of SNP Sequences in Populations Yufeng Wu Department of Computer Science and Engineering University of Connecticut Storrs,

More information

The Concept of Bottleneck

The Concept of Bottleneck The Concept of Bottleneck Saral Mukherjee (Speaker) A. K. Chatterjee Abstract The paper provides a classification of bottleneck definitions available in literature and discusses several myths associated

More information

Minimizing Makespan for Machine Scheduling and Worker Assignment Problem in Identical Parallel Machine Models Using GA

Minimizing Makespan for Machine Scheduling and Worker Assignment Problem in Identical Parallel Machine Models Using GA , June 30 - July 2, 2010, London, U.K. Minimizing Makespan for Machine Scheduling and Worker Assignment Problem in Identical Parallel Machine Models Using GA Imran Ali Chaudhry, Sultan Mahmood and Riaz

More information

Optimizing Inplant Supply Chain in Steel Plants by Integrating Lean Manufacturing and Theory of Constrains through Dynamic Simulation

Optimizing Inplant Supply Chain in Steel Plants by Integrating Lean Manufacturing and Theory of Constrains through Dynamic Simulation Optimizing Inplant Supply Chain in Steel Plants by Integrating Lean Manufacturing and Theory of Constrains through Dynamic Simulation Atanu Mukherjee, President, Dastur Business and Technology Consulting,

More information

P rofit t (1 + i) t. V alue = t=0

P rofit t (1 + i) t. V alue = t=0 These notes correspond to Chapter 2 of the text. 1 Optimization A key concept in economics is that of optimization. It s a tool that can be used for many applications, but for now we will use it for pro

More information

Theory of Constraints. Activity-Based

Theory of Constraints. Activity-Based 66 Theory of Constraints Activity-Based and Costing: Can we get the best of both worlds? By Annabella Fu C ost accounting is enemy number one of productivity, claims Eliyahu Goldratt, creator of the Theory

More information

Simulation approaches for optimization in business and service systems

Simulation approaches for optimization in business and service systems Simulation approaches for optimization in business and service systems Imed Kacem kacem@univ-metz.fr Professor - Université Paul Verlaine Metz http://kacem.imed.perso.neuf.fr/site/ FUBUTEC 2, Future Business

More information

By: Adrian Chu, Department of Industrial & Systems Engineering, University of Washington, Seattle, Washington November 12, 2009.

By: Adrian Chu, Department of Industrial & Systems Engineering, University of Washington, Seattle, Washington November 12, 2009. OPT Report By: Adrian Chu, Department of Industrial & Systems Engineering, University of Washington, Seattle, Washington 98195. November 12, 2009. The Goal Every manufacturing company has one goal to make

More information

Utilizing Optimization Techniques to Enhance Cost and Schedule Risk Analysis

Utilizing Optimization Techniques to Enhance Cost and Schedule Risk Analysis 1 Utilizing Optimization Techniques to Enhance Cost and Schedule Risk Analysis Colin Smith, Brandon Herzog SCEA 2012 2 Table of Contents Introduction to Optimization Optimization and Uncertainty Analysis

More information

By Eli Schragenheim Supporting TOC implementations worldwide

By Eli Schragenheim Supporting TOC implementations worldwide By Eli Schragenheim Supporting TOC implementations worldwide The idea of value-days The idea of using value-days is common in the banking systems But not much elsewhere For Eli Goldratt the idea came from

More information

A Walrasian Theory of Commodity Money: Paradoxical Results *

A Walrasian Theory of Commodity Money: Paradoxical Results * Walrasian Theory of Commodity Money: Paradoxical Results * Xavier Cuadras-Morató Department of Economics Universitat Pompeu Fabra Ramon Trias Fargas, 25-27 08005 BRCELON e-mail: xavier.cuadras@econ.upf.es

More information

A comparative analysis of utilizing activity-based costing and the theory of constraints for making product-mix decisions

A comparative analysis of utilizing activity-based costing and the theory of constraints for making product-mix decisions Int. J. Production Economics 63 (2000) 1}17 A comparative analysis of utilizing activity-based costing and the theory of constraints for making product-mix decisions Robert Kee*, Charles Schmidt University

More information

Instructions. AIRBUS A3XX: Developing the World s Largest Commercial Aircraft

Instructions. AIRBUS A3XX: Developing the World s Largest Commercial Aircraft Instructions AIRBUS A3XX: Developing the World s Largest Commercial Aircraft In this case, you will be analyzing the strategic interaction between Airbus and Boeing, the two leading producers of large

More information

Profit Center Planning & Analysis

Profit Center Planning & Analysis Profit Center Planning & Analysis Theory of constraints, maximizing profitability, and capacity utilization Hierarchy of Resource Consumption Unit-level resources resources consumed on activities proportionally

More information

LOADING AND SEQUENCING JOBS WITH A FASTEST MACHINE AMONG OTHERS

LOADING AND SEQUENCING JOBS WITH A FASTEST MACHINE AMONG OTHERS Advances in Production Engineering & Management 4 (2009) 3, 127-138 ISSN 1854-6250 Scientific paper LOADING AND SEQUENCING JOBS WITH A FASTEST MACHINE AMONG OTHERS Ahmad, I. * & Al-aney, K.I.M. ** *Department

More information

Operations and Supply Chain Management Prof. G. Srinivasan Department of Management Studies Indian Institute of Technology, Madras

Operations and Supply Chain Management Prof. G. Srinivasan Department of Management Studies Indian Institute of Technology, Madras Operations and Supply Chain Management Prof. G. Srinivasan Department of Management Studies Indian Institute of Technology, Madras Module - 1 Lecture - 7 Aggregate Planning, Dynamic Programming, Backordering

More information

Introduction to Artificial Intelligence. Prof. Inkyu Moon Dept. of Robotics Engineering, DGIST

Introduction to Artificial Intelligence. Prof. Inkyu Moon Dept. of Robotics Engineering, DGIST Introduction to Artificial Intelligence Prof. Inkyu Moon Dept. of Robotics Engineering, DGIST Chapter 9 Evolutionary Computation Introduction Intelligence can be defined as the capability of a system to

More information

Analysis and Modelling of Flexible Manufacturing System

Analysis and Modelling of Flexible Manufacturing System Analysis and Modelling of Flexible Manufacturing System Swetapadma Mishra 1, Biswabihari Rath 2, Aravind Tripathy 3 1,2,3Gandhi Institute For Technology,Bhubaneswar, Odisha, India --------------------------------------------------------------------***----------------------------------------------------------------------

More information

Metaheuristics. Approximate. Metaheuristics used for. Math programming LP, IP, NLP, DP. Heuristics

Metaheuristics. Approximate. Metaheuristics used for. Math programming LP, IP, NLP, DP. Heuristics Metaheuristics Meta Greek word for upper level methods Heuristics Greek word heuriskein art of discovering new strategies to solve problems. Exact and Approximate methods Exact Math programming LP, IP,

More information

Supplimentary material for Research at the Auction Block: Problems for the Fair Benefits Approach to International Research

Supplimentary material for Research at the Auction Block: Problems for the Fair Benefits Approach to International Research Supplimentary material for Research at the Auction Block: Problems for the Fair Benefits Approach to International Research Alex John London Carnegie Mellon University Kevin J.S. Zollman Carnegie Mellon

More information

SHA544: Displacement and Negotiated Pricing

SHA544: Displacement and Negotiated Pricing SHA544: Displacement and Negotiated Pricing MODULE OVERVIEW Module 1: Introduction to Displacement It's critical to create the right mix of negotiated group rate customers and transient customers. Generally,

More information

Time-Constrained Restless Bandits and the Knapsack Problem for Perishable Items (Extended Abstract) 1

Time-Constrained Restless Bandits and the Knapsack Problem for Perishable Items (Extended Abstract) 1 NOTICE: This is the author s version of the work that was accepted for publication in Electronic Notes in Discrete Mathematics. Changes resulting from the publishing process, such as peer review, editing,

More information

Operation and supply chain management Prof. G. Srinivasan Department of Management Studies Indian Institute of Technology Madras

Operation and supply chain management Prof. G. Srinivasan Department of Management Studies Indian Institute of Technology Madras Operation and supply chain management Prof. G. Srinivasan Department of Management Studies Indian Institute of Technology Madras Lecture - 37 Transportation and Distribution Models In this lecture, we

More information

Optimal, Efficient Reconstruction of Phylogenetic Networks with Constrained Recombination

Optimal, Efficient Reconstruction of Phylogenetic Networks with Constrained Recombination UC Davis Computer Science Technical Report CSE-2003-29 1 Optimal, Efficient Reconstruction of Phylogenetic Networks with Constrained Recombination Dan Gusfield, Satish Eddhu, Charles Langley November 24,

More information

A Sequencing Heuristic to Minimize Weighted Flowtime in the Open Shop

A Sequencing Heuristic to Minimize Weighted Flowtime in the Open Shop A Sequencing Heuristic to Minimize Weighted Flowtime in the Open Shop Eric A. Siy Department of Industrial Engineering email : eric.siy@dlsu.edu.ph Abstract: The open shop is a job shop with no precedence

More information

541: Economics for Public Administration Lecture 8 Short-Run Costs & Supply

541: Economics for Public Administration Lecture 8 Short-Run Costs & Supply I. Introduction 541: Economics for Public Administration Lecture 8 Short-Run s & Supply We have presented how a business finds the least cost way of providing a given level of public good or service. In

More information

MBF1413 Quantitative Methods

MBF1413 Quantitative Methods MBF1413 Quantitative Methods Prepared by Dr Khairul Anuar 1: Introduction to Quantitative Methods www.notes638.wordpress.com Assessment Two assignments Assignment 1 -individual 30% Assignment 2 -individual

More information

Modeling of competition in revenue management Petr Fiala 1

Modeling of competition in revenue management Petr Fiala 1 Modeling of competition in revenue management Petr Fiala 1 Abstract. Revenue management (RM) is the art and science of predicting consumer behavior and optimizing price and product availability to maximize

More information

Inventory Lot Sizing with Supplier Selection

Inventory Lot Sizing with Supplier Selection Inventory Lot Sizing with Supplier Selection Chuda Basnet Department of Management Systems The University of Waikato, Private Bag 315 Hamilton, New Zealand chuda@waikato.ac.nz Janny M.Y. Leung Department

More information

IT 470a Six Sigma Chapter X

IT 470a Six Sigma Chapter X Chapter X Lean Enterprise IT 470a Six Sigma Chapter X Definitions Raw Materials component items purchased and received from suppliers WIP work in process, items that are in production on the factory floor

More information

Using Theory of Constraints and ABC to Enhance Cost Calculations at DuoGraphic B.V. - a Case Study -

Using Theory of Constraints and ABC to Enhance Cost Calculations at DuoGraphic B.V. - a Case Study - Using Theory of Constraints and ABC to Enhance Cost Calculations at DuoGraphic B.V. - a Case Study - Dr. Philip Vergauwen Universiteit Maastricht Faculty of Economics & Business Administration MARC, Accounting

More information

Procedia - Social and Behavioral Sciences 150 ( 2014 ) Azar Izmailov a

Procedia - Social and Behavioral Sciences 150 ( 2014 ) Azar Izmailov a Available online at www.sciencedirect.com ScienceDirect Procedia - Social and Behavioral Sciences 150 ( 2014 ) 925 929 10 th International Strategic Management Conference If your company is considering

More information

Generational and steady state genetic algorithms for generator maintenance scheduling problems

Generational and steady state genetic algorithms for generator maintenance scheduling problems Generational and steady state genetic algorithms for generator maintenance scheduling problems Item Type Conference paper Authors Dahal, Keshav P.; McDonald, J.R. Citation Dahal, K. P. and McDonald, J.

More information

M. Luptáčik: Mathematical Optimization and Economic Analysis

M. Luptáčik: Mathematical Optimization and Economic Analysis M. Luptáčik: Mathematical Optimization and Economic Analysis 2009, Springer, New York-Dordrecht-Heidelberg-London, ISBN 978-0-387-89551-2 Pavel Doležel Economic theory is sometimes defined as a theory

More information

PRODUCT-MIX ANALYSIS WITH DISCRETE EVENT SIMULATION. Raid Al-Aomar. Classic Advanced Development Systems, Inc. Troy, MI 48083, U.S.A.

PRODUCT-MIX ANALYSIS WITH DISCRETE EVENT SIMULATION. Raid Al-Aomar. Classic Advanced Development Systems, Inc. Troy, MI 48083, U.S.A. Proceedings of the 2000 Winter Simulation Conference J. A. Joines, R. R. Barton, K. Kang, and P. A. Fishwick, eds. PRODUCT-MIX ANALYSIS WITH DISCRETE EVENT SIMULATION Raid Al-Aomar Classic Advanced Development

More information

Metaheuristics for scheduling production in large-scale open-pit mines accounting for metal uncertainty - Tabu search as an example.

Metaheuristics for scheduling production in large-scale open-pit mines accounting for metal uncertainty - Tabu search as an example. Metaheuristics for scheduling production in large-scale open-pit mines accounting for metal uncertainty - Tabu search as an example Amina Lamghari COSMO Stochastic Mine Planning Laboratory! Department

More information

A Case Study of Capacitated Scheduling

A Case Study of Capacitated Scheduling A Case Study of Capacitated Scheduling Rosana Beatriz Baptista Haddad rosana.haddad@cenpra.gov.br; Marcius Fabius Henriques de Carvalho marcius.carvalho@cenpra.gov.br Department of Production Management

More information

Supply Chain Management: Supplier Selection Problem with multi-objective Considering Incremental Discount

Supply Chain Management: Supplier Selection Problem with multi-objective Considering Incremental Discount Asia Pacific Industrial Engineering and Management System Supply Chain Management: Supplier Selection Problem with multi-objective Considering Incremental Discount Soroush Avakh Darestani a, Samane Ghavami

More information

7 Scheduling with Positional Effects Scheduling Independent Jobs Under Job-Dependent Positional Effect Scheduling Independent

7 Scheduling with Positional Effects Scheduling Independent Jobs Under Job-Dependent Positional Effect Scheduling Independent Contents Part I Models and Methods of Classical Scheduling 1 Models and Concepts of Classical Scheduling... 3 1.1 Classical Scheduling Models......................... 4 1.1.1 Machine Environment........................

More information

Price Tests for Entry into Markets in the Presence of Non-Convexities

Price Tests for Entry into Markets in the Presence of Non-Convexities Price Tests for Entry into Markets in the Presence of Non-Convexities Michael H. Rothkopf a Richard P. O Neill b Benjamin J. Hobbs c Paul M. Sotkiewicz d William R. Stewart, Jr. e March 27, 2004 Abstract

More information

Section 1: Introduction

Section 1: Introduction Multitask Principal-Agent Analyses: Incentive Contracts, Asset Ownership, and Job Design (1991) By Bengt Holmstrom and Paul Milgrom Presented by Group von Neumann Morgenstern Anita Chen, Salama Freed,

More information

Strategic Design of Robust Global Supply Chains: Two Case Studies from the Paper Industry

Strategic Design of Robust Global Supply Chains: Two Case Studies from the Paper Industry Strategic Design of Robust Global Supply Chains: Two Case Studies from the Paper Industry T. Santoso, M. Goetschalckx, S. Ahmed, A. Shapiro Abstract To remain competitive in today's competitive global

More information

Multiagent Systems: Spring 2006

Multiagent Systems: Spring 2006 Multiagent Systems: Spring 2006 Ulle Endriss Institute for Logic, Language and Computation University of Amsterdam Ulle Endriss (ulle@illc.uva.nl) 1 Combinatorial Auctions In a combinatorial auction, the

More information

This is a refereed journal and all articles are professionally screened and reviewed

This is a refereed journal and all articles are professionally screened and reviewed Advances in Environmental Biology, 6(4): 1400-1411, 2012 ISSN 1995-0756 1400 This is a refereed journal and all articles are professionally screened and reviewed ORIGINAL ARTICLE Joint Production and Economic

More information

Production Planning under Uncertainty with Multiple Customer Classes

Production Planning under Uncertainty with Multiple Customer Classes Proceedings of the 211 International Conference on Industrial Engineering and Operations Management Kuala Lumpur, Malaysia, January 22 24, 211 Production Planning under Uncertainty with Multiple Customer

More information

Product-mix decision from the perspective of time-driven activitybased

Product-mix decision from the perspective of time-driven activitybased ABSTRACT NUMBER: 015-0458 Product-mix decision from the perspective of time-driven activitybased costing ABRAÃO FREIRES SARAIVA JÚNIOR - Polytechnic School - University of São Paulo Address: Av. Prof.

More information

Price Discrimination: Exercises Part 2

Price Discrimination: Exercises Part 2 Price Discrimination: Exercises Part Sotiris Georganas Royal Holloway University of London Problem 1 An economics journal is considering offering a new service which will send articles to readers by email.

More information

TRIAGE: PRIORITIZING SPECIES AND HABITATS

TRIAGE: PRIORITIZING SPECIES AND HABITATS 32 TRIAGE: PRIORITIZING SPECIES AND HABITATS In collaboration with Jon Conrad Objectives Develop a prioritization scheme for species conservation. Develop habitat suitability indexes for parcels of habitat.

More information

TIMETABLING EXPERIMENTS USING GENETIC ALGORITHMS. Liviu Lalescu, Costin Badica

TIMETABLING EXPERIMENTS USING GENETIC ALGORITHMS. Liviu Lalescu, Costin Badica TIMETABLING EXPERIMENTS USING GENETIC ALGORITHMS Liviu Lalescu, Costin Badica University of Craiova, Faculty of Control, Computers and Electronics Software Engineering Department, str.tehnicii, 5, Craiova,

More information

THE GOAL. Dr. Eliyahu Goldratt. Theory of Constraints

THE GOAL. Dr. Eliyahu Goldratt. Theory of Constraints THE GOAL Dr. Eliyahu Goldratt Theory of Constraints Israeli physicist turned business consultant, Originator of the Theory of Constraints DR. ELIYAHU GOLDRATT His famous books are: The Goal, Its Not Luck,

More information

Drum-Buffer-Rope in PlanetTogether Galaxy

Drum-Buffer-Rope in PlanetTogether Galaxy Drum-Buffer-Rope in PlanetTogether Galaxy This document provides background on Theory of Constraints and Drum-Buffer-Rope scheduling. It describes how to assess whether the DBR approach is appropriate

More information

Practice Exam 3: S201 Walker Fall 2004

Practice Exam 3: S201 Walker Fall 2004 Practice Exam 3: S201 Walker Fall 2004 I. Multiple Choice (3 points each) 1. Which of the following statements about the short-run is false? A. The marginal product of labor may increase or decrease. B.

More information

COORDINATING DEMAND FORECASTING AND OPERATIONAL DECISION-MAKING WITH ASYMMETRIC COSTS: THE TREND CASE

COORDINATING DEMAND FORECASTING AND OPERATIONAL DECISION-MAKING WITH ASYMMETRIC COSTS: THE TREND CASE COORDINATING DEMAND FORECASTING AND OPERATIONAL DECISION-MAKING WITH ASYMMETRIC COSTS: THE TREND CASE ABSTRACT Robert M. Saltzman, San Francisco State University This article presents two methods for coordinating

More information

Management science can be used in a variety of organizations to solve many different types of problems; such as manufacturing and service

Management science can be used in a variety of organizations to solve many different types of problems; such as manufacturing and service 1 2 Management science can be used in a variety of organizations to solve many different types of problems; such as manufacturing and service organizations, government, military, health care, etc. Management

More information

1 Applying the Competitive Model. 2 Consumer welfare. These notes essentially correspond to chapter 9 of the text.

1 Applying the Competitive Model. 2 Consumer welfare. These notes essentially correspond to chapter 9 of the text. These notes essentially correspond to chapter 9 of the text. 1 Applying the Competitive Model The focus of this chapter is welfare economics. Note that "welfare" has a much di erent meaning in economics

More information

An Inventory Model with Demand Dependent Replenishment Rate for Damageable Item and Shortage

An Inventory Model with Demand Dependent Replenishment Rate for Damageable Item and Shortage Proceedings of the 2014 International Conference on Industrial Engineering and Operations Management Bali, Indonesia, January 7 9, 2014 An Inventory Model with Demand Dependent Replenishment Rate for Damageable

More information

LINEAR PROGRAMMING APPROACHES TO AGGREGATE PLANNING. Linear programming is suitable to determine the best aggregate plan.

LINEAR PROGRAMMING APPROACHES TO AGGREGATE PLANNING. Linear programming is suitable to determine the best aggregate plan. LINEAR PROGRAMMING APPROACHES TO AGGREGATE PLANNING Linear programming is suitable to determine the best aggregate plan. Recall that linear programming assumes all variables are continuously divisible.

More information

Digital Media Mix Optimization Model: A Case Study of a Digital Agency promoting its E-Training Services

Digital Media Mix Optimization Model: A Case Study of a Digital Agency promoting its E-Training Services Available online at: http://euroasiapub.org, pp. 127~137 Thomson Reuters Researcher ID: L-5236-2015 Digital Media Mix Optimization Model: A Case Study of a Digital Agency promoting its E-Training Services

More information

Fundamental Concepts of Theory of Constraints: An Emerging Philosophy

Fundamental Concepts of Theory of Constraints: An Emerging Philosophy Fundamental Concepts of Theory of Constraints: An Emerging Philosophy Ajay Gupta, Arvind Bhardwaj and Arun Kanda International Science Index, Economics and Management Engineering waset.org/publication/83

More information

Maximizing and satisficing in a choice model based on time allocation Raúl G. Sanchis 3,4, José-Manuel Rey 2, and Francisco Álvarez1

Maximizing and satisficing in a choice model based on time allocation Raúl G. Sanchis 3,4, José-Manuel Rey 2, and Francisco Álvarez1 Int. J. Complex Systems in Science vol. 4(1) (2014), pp. 1 6 Maximizing and satisficing in a choice model based on time allocation Raúl G. Sanchis 3,4, José-Manuel Rey 2, and Francisco Álvarez1 1 Department

More information

Water Resource Economics C H A P T E R A W A T E R D E M A N D, S U P P L Y, A N D A L L O C A T I O N

Water Resource Economics C H A P T E R A W A T E R D E M A N D, S U P P L Y, A N D A L L O C A T I O N Water Resource Economics C H A P T E R A W A T E R D E M A N D, S U P P L Y, A N D A L L O C A T I O N Reader, based on Griffin (2006), 2.1-2.6 Text Organization 1. Costs of water supply 2. Efficiency

More information

The five focusing steps of the Theory of Constraints have been successfully applied to the improvement

The five focusing steps of the Theory of Constraints have been successfully applied to the improvement TOC and the 5 focusing steps by Philip Viljoen Abstract The five focusing steps of the Theory of Constraints have been successfully applied to the improvement of the Throughput of many operations, delivering

More information

CHAPTER 5 SUPPLIER SELECTION BY LEXICOGRAPHIC METHOD USING INTEGER LINEAR PROGRAMMING

CHAPTER 5 SUPPLIER SELECTION BY LEXICOGRAPHIC METHOD USING INTEGER LINEAR PROGRAMMING 93 CHAPTER 5 SUPPLIER SELECTION BY LEXICOGRAPHIC METHOD USING INTEGER LINEAR PROGRAMMING 5.1 INTRODUCTION The SCMS model is solved using Lexicographic method by using LINGO software. Here the objectives

More information

GUIDELINE FOR WRITING A BUSINESS PLAN

GUIDELINE FOR WRITING A BUSINESS PLAN GUIDELINE FOR WRITING A BUSINESS PLAN Copyright CERIM This project is implemented through the CENTRAL EUROPE Programme co-financed by the ERDF. DIRECTORY WRITING A BUSINESS PLAN 3 1. Why you need to write

More information

A COMPARISON OF JOHNSON S RULE AND TOC BASED SCHEDULING METHODOLOGIES

A COMPARISON OF JOHNSON S RULE AND TOC BASED SCHEDULING METHODOLOGIES A COMPARISON OF JOHNSON S RULE AND TOC BASED SCHEDULING METHODOLOGIES Jirarat Teeravaraprug and Thassaporn Sakulpipat Faculty of Engineering, Thammasat University, Rangsit Campus, Pathumthani 12121 THAILAND

More information

Theory of Constraints (TOC)

Theory of Constraints (TOC) Theory of Constraints (TOC) The Theory of Constraints thinking process is a minimalist approach: it helps you to solve the problem with the least investment in time and resources that will do the job effectively.

More information

Operations and Supply Chain Management Prof. G. Srinivasan Department of Management Studies Indian Institute of Technology, Madras

Operations and Supply Chain Management Prof. G. Srinivasan Department of Management Studies Indian Institute of Technology, Madras Operations and Supply Chain Management Prof. G. Srinivasan Department of Management Studies Indian Institute of Technology, Madras Lecture - 24 Sequencing and Scheduling - Assumptions, Objectives and Shop

More information

Lot Sizing for Individual Items with Time-varying Demand

Lot Sizing for Individual Items with Time-varying Demand Chapter 6 Lot Sizing for Individual Items with Time-varying Demand 6.1 The Complexity of Time-Varying Demand In the basic inventory models, deterministic and level demand rates are assumed. Here we allow

More information

Autonomous Agents and Multi-Agent Systems* 2015/2016. Lecture Reaching Agreements

Autonomous Agents and Multi-Agent Systems* 2015/2016. Lecture Reaching Agreements Autonomous Agents and Multi-Agent Systems* 2015/2016 Lecture Reaching Agreements Manuel LOPES * These slides are based on the book by Prof. M. Wooldridge An Introduction to Multiagent Systems and the online

More information

Using Analytical Marketing Optimization to Achieve Exceptional Results WHITE PAPER

Using Analytical Marketing Optimization to Achieve Exceptional Results WHITE PAPER Using Analytical Marketing Optimization to Achieve Exceptional Results WHITE PAPER SAS White Paper Table of Contents Optimization Defined... 1 Prioritization, Rules and Optimization a Method Comparison...

More information

In Chapter 3 we pointed out that there are two reasons why countries

In Chapter 3 we pointed out that there are two reasons why countries Economies of Scale, Imperfect Competition, and International Trade 6 Chapter In Chapter 3 we pointed out that there are two reasons why countries specialize and trade. First, countries differ either in

More information

Product Scheduling in a Multi-Product Colour Processing Facility - Case Study at TN Textiles (Pvt) Ltd

Product Scheduling in a Multi-Product Colour Processing Facility - Case Study at TN Textiles (Pvt) Ltd Proceedings of the 2012 International Conference on Industrial Engineering and Operations Management Istanbul, Turkey, July 3 6, 2012 Product Scheduling in a Multi-Product Colour Processing Facility -

More information

Chapter 8: Exchange. 8.1: Introduction. 8.2: Exchange. 8.3: Individual A s Preferences and Endowments

Chapter 8: Exchange. 8.1: Introduction. 8.2: Exchange. 8.3: Individual A s Preferences and Endowments Chapter 8: Exchange 8.1: Introduction In many ways this chapter is the most important in the book. If you have time to study just one, this is the one that you should study (even though it might be a bit

More information

Simulation and Implementation Study of Robust Drum-Buffer-Rope Management System to Improve Shop Performance

Simulation and Implementation Study of Robust Drum-Buffer-Rope Management System to Improve Shop Performance International Journal of Humanities and Social Science Vol.. ; January 20 Simulation and Implementation Study of Robust Drum-Buffer-Rope Management System to Improve Shop Performance Horng-Huei Wu, 2 Ching-Piao

More information

APPLIED A NEW METHOD FOR MULTI-MODE PROJECT SCHEDULING

APPLIED A NEW METHOD FOR MULTI-MODE PROJECT SCHEDULING project, project scheduling, resource-constrained project scheduling, project-driven manufacturing, multi-mode, heuristic, branch and bound scheme, make-to-order Iwona PISZ Zbigniew BANASZAK APPLIED A

More information

Software Helps You Manage the Project Portfolio

Software Helps You Manage the Project Portfolio Software Helps You Manage the Project Portfolio As illustrated in the previous section, you can practice project portfolio management (PPM) without software. However, software makes it much easier and

More information

Single machine scheduling with two agents for total completion time objectives

Single machine scheduling with two agents for total completion time objectives Lecture Notes in Management Science (2016) Vol. 8, 106 112 ISSN 2008-0050 (Print), ISSN 1927-0097 (Online) Single machine scheduling with two agents for total completion time objectives Yuvraj Gajpal 1

More information

Short-Run Costs and Output Decisions

Short-Run Costs and Output Decisions Semester-I Course: 01 (Introductory Microeconomics) Unit IV - The Firm and Perfect Market Structure Lesson: Short-Run Costs and Output Decisions Lesson Developer: Jasmin Jawaharlal Nehru University Institute

More information

Understanding UPP. Alternative to Market Definition, B.E. Journal of Theoretical Economics, forthcoming.

Understanding UPP. Alternative to Market Definition, B.E. Journal of Theoretical Economics, forthcoming. Understanding UPP Roy J. Epstein and Daniel L. Rubinfeld Published Version, B.E. Journal of Theoretical Economics: Policies and Perspectives, Volume 10, Issue 1, 2010 Introduction The standard economic

More information

Business case studies. (Logistic and production models)

Business case studies. (Logistic and production models) Business case studies (Logistic and production models) 1. Logistics planning in the food industry The logistic system of the food manufacturing company consists of a network whose nodes represent suppliers

More information

Planning. Dr. Richard Jerz rjerz.com

Planning. Dr. Richard Jerz rjerz.com Planning Dr. Richard Jerz 1 Planning Horizon Aggregate planning: Intermediate range capacity planning, usually covering 2 to 12 months. Long range Short range Intermediate range Now 2 months 1 Year 2 Stages

More information

Microeconomic Theory -1- Introduction and maximization

Microeconomic Theory -1- Introduction and maximization Microeconomic Theory -- Introduction and maximization Introduction Maximization. Profit maximizing firm with monopoly power 6. General results on maximizing with two variables 3. Non-negativity constraints

More information

Sabbatical Marine, Inc.: Utilizing Constrained Resources Additional Information Boating Industry Background The boat building industry s North America

Sabbatical Marine, Inc.: Utilizing Constrained Resources Additional Information Boating Industry Background The boat building industry s North America Sabbatical Marine, Inc.: Utilizing Constrained Resources Additional Information Boating Industry Background The boat building industry s North American Industry Classification System (NAICS) number is

More information

Tutorial Resource Allocation

Tutorial Resource Allocation MARKETING ENGINEERING FOR EXCEL TUTORIAL VERSION 160728 Tutorial Resource Allocation Marketing Engineering for Excel is a Microsoft Excel add-in. The software runs from within Microsoft Excel and only

More information

Economics 335 Price Discrimination Answer Key. (a) (page 1) You have to show with the aid of graphs that the monopolist s total demand is given by

Economics 335 Price Discrimination Answer Key. (a) (page 1) You have to show with the aid of graphs that the monopolist s total demand is given by conomics 335 Price iscrimination Answer Key # (a) (page ) You have to show with the aid of graphs that the monopolist s total demand is given by 0 if P 00 Q= Q+ Q = 00 P if 00 P 00 50.5P if 0 P 00 The

More information

Planning. Planning Horizon. Stages of Planning. Dr. Richard Jerz

Planning. Planning Horizon. Stages of Planning. Dr. Richard Jerz Planning Dr. Richard Jerz 1 Planning Horizon Aggregate planning: Intermediate range capacity planning, usually covering 2 to 12 months. Long range Short range Intermediate range Now 2 months 1 Year 2 Stages

More information

Practice Exam 3: S201 Walker Fall with answers to MC

Practice Exam 3: S201 Walker Fall with answers to MC Practice Exam 3: S201 Walker Fall 2007 - with answers to MC Print Your Name: I. Multiple Choice (3 points each) 1. If marginal utility is falling then A. total utility must be falling. B. marginal utility

More information

AFRREV STECH An International Journal of Science and Technology Bahir Dar, Ethiopia Vol.1 (3) August-December, 2012:54-65

AFRREV STECH An International Journal of Science and Technology Bahir Dar, Ethiopia Vol.1 (3) August-December, 2012:54-65 AFRREV STECH An International Journal of Science and Technology Bahir Dar, Ethiopia Vol.1 (3) August-December, 2012:54-65 ISSN 2225-8612 (Print) ISSN 2227-5444 (Online) Optimization Modelling for Multi-Objective

More information

Resource Critical Path Approach to Project Schedule Management

Resource Critical Path Approach to Project Schedule Management 1 Resource Critical Path Approach to Project Schedule Management Vladimir Liberzon Spider Management Technologies, spider@mail.cnt.ru RCP definition A Guide to the Project Management Body of Knowledge

More information

Lecture 17 - Externalities, the Coase Theorem and Market Remedies

Lecture 17 - Externalities, the Coase Theorem and Market Remedies Lecture 17 - Externalities, the Coase Theorem and Market Remedies 14.03 Spring 2003 1 Externalities: The Coase Theorem and Market Remedies 1.1 Introduction You have seen externalities in 14.01. An externality

More information