1 HIGHLIGHTS Ngualla Rare Earth Project (Southern Tanzania) Rare Earths, Phosphate, Niobium Tantalum Ngualla is one of the largest and better grade new rare earth discoveries of recent years. The Company is on track to complete the maiden JORC compliant rare earth resource estimate for the Southern Rare Earth and South West Alluvial Zones before the end of the March 2012 quarter. Drilling is completed and 87% of assay results received. Rare Earth Resource Drilling Program The 19,046m resource definition drilling program was completed on 30th November Wide intersections of encouraging grade continue to be received from the program. Intersections this quarter include: NRC077: 170m at 4.18% REO NRC136: 128m at 4.17% REO to EOH NRC101: 120m at 3.54% REO to EOH including NDD004: 75.7m at 5.82% REO including 46m at 6.17% REO 10.74m at 10.1% REO from 38.1m Mineralisation in the Southern Rare Earth Zone now extends over an area of 850m x 470m to vertical depths of 155m, indicating the potential for a large resource. It still remains open to the north and south and further drilling is planned for after the rains in May 2012 to extend the initial resource further. A series of metallurgical and beneficiation laboratory studies, which include gravity, magnetic separation, flotation and direct acid leach, are well advanced on bulk samples of mineralised diamond core. Initial results on some of this work are expected in early February. Niobium Tantalum and Phosphate Potential Significant intersections of niobium tantalum, phosphate and rare earth mineralisation have also been returned from the initial holes of the Northern Zone reconnaissance drilling and peripheral holes of the Southern Rare Earth Zone resource drilling program. Results include: NRC121: 52m at 1.33% REO from 20m and 64m at 19.7% phosphate from 10m and 74m at 0.56% Nb 2O 5 and 171ppm Ta 2O 5 NRC125: 24m at 1.12% Nb 2O 5 and 226ppm Ta 2O 5 from 4m and 28m at 20.4% phosphate Assay results from a further 19 completed holes are still awaited. With only a small portion of the 1,400m x 1,300m target area tested by reconnaissance drilling to date, there is potential for a large tonnage deposit of this second style of mineralisation and further drilling will be planned in Move to gain 100% ownership of Ngualla Project On 26th August 2011 Peak announced it had entered into a conditional agreement to take 100% ownership of the Ngualla Project through the acquisition of current JV partner Zari Exploration Ltd. Peak anticipates being in a position to complete the Zari acquisition on or before mid-february The Company had $5.7million cash on hand at the end of the quarter. An additional share placement raised $2,240,000 before costs and was settled on 6th January 2012, after quarter end. Peak Resources Ltd Level 1, 11 Ogilvie Road Mount Pleasant, Western Australia 6153 PO Box 1271, Canning Bridge Western Australia 6153 Directors: Alastair Hunter, Chairman Richard Beazley, Managing Director Dave Hammond, Technical Director Jonathan Murray, Non-Executive Director Linda Paini, Company Secretary ASX Symbol: PEK Telephone: info@peakresources.com.au ACN

2 Ngualla Rare Earth Project, Tanzania Rare Earths, Phosphate, Niobium Tantalum Peak Resources Operator Manager earning 80% (Conditional offer made to acquire 100%) Summary Overview Ngualla in southern Tanzania is a large virgin discovery made by Peak, with the first holes completed in June Rare earth mineralisation occurs and is similar in style to Mt Weld (Lynas Corporation) in Western Australia, being rare earth enrichment in the deeply weathered regolith profile of a large carbonatite. The Quarter was a significant one for the Company, with the successful completion of a major resource definition drilling program at Ngualla. A series of encouraging rare earth mineralised intersections from this program continued to be released and 87% of assays have now been received. Results demonstrate the potential for Ngualla to be one of the largest and better grade new rare earth discoveries of recent years. A maiden JORC compliant resource estimate for the Southern Rare Earth and South West Alluvial Zone rare earth mineralisation will be completed by the end of the March 2012 Quarter. RWANDA Geita BURUNDI West (Imweru) Nkerege Lake Victoria Bunda Ikoma Mwanza Sheba Shinyanga Arusha Nairobi KENYA Moshi Rare earth mineralisation remains open to the north and south, leading to the potential to expand this initial resource by further drilling. Mineralogical studies show that rare earths in the Southern Rare Earth Zone are in the form of carbonate minerals with very low uranium and thorium levels. Metallurgical work is well underway on bulk samples of mineralised diamond core to determine optimum processing routes to concentrate and extract the rare earths. Initial results from some of these tests are also expected are expected in early February Kigoma DCR Lake Tanganyika ZAMBIA Singida Tabora Tanga Dodoma T A N Z A N I A Lake Rukwa Igunga Ngualla Mbeya Figure 1: Location of Peaks Projects in Tanzania Iringa Morogoro N Indian Ocean Zanzibar Dar Es Salaam 400km Currently, Peak as operator and manager is earning 80% equity in the Ngualla Project by carrying Joint Venture partner Zari Exploration Ltd (Zari) through to completion of a bankable feasibility study. On 26th August 2011 Peak announced it had entered into a conditional agreement to take 100% ownership of the Ngualla Project through the acquisition of Zari. Peak anticipates being in a position to complete the Zari acquisition on or before mid-february In addition to rare earths, the Ngualla Carbonatite is also highly prospective for niobium tantalum and phosphate. Two exploration reconnaissance drill traverses were completed as an initial test of a large target area the Northern Zone located one kilometre to the north of the Southern Rare Earth Zone. Encouraging grades of niobium tantalum, phosphate and rare earths have been returned from the first few holes for which assays have been received to date. Above: Maiden resource drilling program 2011, Ngualla Hill, Southern Rare Earth Zone. 2

3 NGUALLA PROJECT 3D Projection REO % For personal use only Northern Niobium Tantalum, Phosphate Zone Max REO % <1 1 to 2 2 to 3 3 to 5 Southern Rare Earth Zone >5 SW Alluvials Figure 2: Location of areas of drilling, surface REO% contours and drill holes coloured by maximum down hole REO% on satellite image draped over topography, Ngualla Carbonatite. Rare Earth Resource Drilling Program The resource drilling program of over 19,000m of reverse circulation (RC), aircore and diamond drilling commenced on 24th May 2011 and was completed on 30th November A steady flow of assay results have continued to be received from this program over the December Quarter. Intersection highlights received from the Southern Rare Earth Zone (Figure 2) during the period include: Drill Hole Intersection NRC077: 170m at 4.18% REO NRC079: 81m at 4.04% REO from 84m to EOH NRC080: 26m at 5.44% REO NRC097: 52m at 4.61% REO from 32m NRC100: 24m at 5.55% REO NRC101: 120m at 3.54% REO to EOH including 46m at 6.17% REO NRC114: 110m at 3.70% REO NRC136*: 128m at 4.17% REO to EOH NDD004*: 75.7m at 5.82% REO including 10.74m at 10.1% REO from 38.1m REO = total rare earth oxide including yttrium. See Table 2 for drill hole details and additional intersections received this Quarter from the Southern Rare Earth Zone. * = results received after the end of the December Quarter. These new results continue to illustrate the high grade, thick and consistent nature of the rare earth mineralisation in the Southern Rare Earth Zone (SREZ), which extends over an area of 850m north south and up to 740m east west (Figures 3 and 4). Mineralisation remains open to the north and south, indicating the potential to further expand the initial JORC resource with additional drilling after the rains this year. 3

4 ( Intersection labels REO %: A Current highlights A Previous highlights Drill holes max REO %: 0 to 1 1 to 2 2 to 3 3 to 5 >5 Completed holes, results awaited Max DH REO %: A 1-2 A 2-3 A 3-4 A >5 3.20% 3.27% 4.06 from surface to EOH 4.18% incl. 7.40% from 22m SW Alluvials NAC082 NAC % from 12m to EOH 4.48% NAC % from 36m Fig. 5 Fig. 4 ( ( ( ( NRC075 NRC102 NRC % to EOH NRC053 NRC089 NRC136 Results awaited 2.74% from 44m 6.37% NRC077 NRC027 NRC094 NRC015 Mt. Ngualla NRC080 ( Fig. 7 Southern Rare Earth Zone NRC % to EOH NRC129 Results awaited NRC125 NRC % from 26m mn mn mn mn % to EOH 2.43% to EOH 5.14% to EOH 3.19% from 24m 6.56% from 24m 3.07% N m me me me me me Figure 3: Plan of Southern Rare Earth Zone showing new results this Quarter and previous intersection highlights over maximum down hole REO % contours. Rare earth mineralisation also occurs over a large area within unconsolidated gravel and soil that has been eroded and transported to the South West Alluvial Zone from the bedrock source of the Southern Rare Earth Zone (Figures 2 and 3). All assay results from this 1,980m, 107 hole portion of the resource drilling program within the South West Alluvial Zone were received during the Quarter and include: Drill Hole NAC476: NAC477: NAC479: NAC480: NAC566: NAC567: intersection 24m at 3.27% REO to EOH 28m at 3.20% REO 10m at 3.01% REO 16m at 3.30% REO 17m at 3.72% REO to EOH 25m at 3.50% REO to EOH REO = total rare earth oxide including yttrium. See Table 3 for drill hole details and further REO intersections from the SW Alluvial Zone. 4

5 180m 127m 165m 180m WEST 2.68% from 30m including 5.78% from 38m 31m 4.48% 1.59% from 42m H NRC072 H NRC % H NRC075 Weathered 3.79% from 22m H NRC % 3.29% to EOH H NRC079 H NRC001 40m 2.43% to EOH including 5.44% H NRC080 Colluvium Weathered 3.02% to EOH including 4.85% from 68m H NRC082 H NRC084 EAST 1600mRL 1.37% from 92m Fresh 1.66% from 150m to EOH 1.57% from 60m 4.04% from 84m to EOH Fresh 2.05% from 74m 120m 120m 120m 180m 20m Primary mineralisation over 425m open down dip Ultramafic Ultramafic Carbonatite 1400mRL m mE mE mE SECTION 9,148,100mN NGUALLA PROJECT SOUTHERN RARE EARTH ZONE JAN Drill Holes Completed H Results received Intersection labels REO %: A Dec 2011 Qtr results (weathered) A Dec 2011 Qtr results (fresh) A Previously reported % REO A 1 to 2% A >2% A No Sample Recovered Figure 4: Drill hole cross section 9,148,100mN, Southern Rare Earth Zone, with new drill results and geology. Intersections confirm +3% REO mineralisation over a 770m x 280m area, correlate with results from 2010 drilling (Figure 5), and infill to the 100m spaced traverse spacing required for resource definition. The South West Alluvial rare earth mineralisation will form a part of the maiden rare earth JORC resource estimate that is scheduled for completion before the end of the current March 2012 Quarter. 1.81% WEST 13m H NAC359 19m H NAC % 18m H NAC360 H NAC % 18m H NAC080 Alluvial 2.73% 22m H NAC % 22m H NAC % H NAC % 3.26% NAC477 H H NAC082 24m H NAC363 17m H NAC % 10m 30m H NAC364 H NAC % 9m H NAC % 30m H NAC479 13m H NAC % 12m NAC366 34m H H NAC480 Bedrock Carbonatite 3.66% 27m H NAC086 Alluvial NAC367 NAC481 H 18m 38m H NAC087 EAST 11m 1500mRL 30m Bedrock Carbonatite 32m 30m 25m m 49m 200m mE mE mE SECTION 9,147,600mN NGUALLA PROJECT SW ALLUVIAL ZONE JAN Drill Holes Completed H Results received H Results pending H 2010 Drill Holes Completed Intersection labels REO %: A Dec 2011 Qtr results A Previously reported % REO A 1 to 2% A >2% 1400mRL A No Sample Recovered Figure 5: Drill hole cross section 9,147,600mN, South West Alluvial Zone, showing geology and new drill results received this quarter compared to previous drilling. 5

6 Metallurgy Mineralogical, including scanning electron microscope (SEM), work has shown that rare earths in both weathered and fresh rock in the Southern Rare Earth Zone occur as the carbonate minerals synchysite and bastnaesite. This is considered preferable to monazite, a phosphate rich rare earth mineral which can contain deleterious levels of thorium and uranium. Very low levels of uranium and thorium are present in the Southern Rare Earth Zone, with mineralisation above 1% REO averaging 17ppm uranium and 37ppm thorium in drilling to date. SEM work has identified coarse grained rare earth minerals in fresh rock (see Photo opposite) which is potentially favourable in terms of early liberation of these minerals during crushing. Beneficiation and metallurgical test work is in progress on bulk samples of diamond core at Amdel mineral laboratories in Perth, Western Australia, under the management of appointed metallurgical consultants Bateman Engineering Ltd, to determine optimal processing routes to produce a commercially viable rare earth concentrate product. Direct acid leach test work is in progress on samples of the iron oxide rich, carbonate poor weathered REO mineralisation, which is generally of higher grade and occurs. Other concentration processes including screening, gravity methods, magnetic separation and flotation are also in progress on these and a range of other fresh, weathered, mixed and alluvial bulk core samples (Figure 6). Photo: SEM photograph of a sample from NRC058, 59 to 60m showing coarse bastnasite crystals (light grey), barite (white) and ankerite (dark grey groundmass). Heavy Liquid Separation Crushing & Grinding 100kg bulk sample Gravity Separation Sizing Magnetic Separation Mineralogy Flotation Acid Leaching Figure 6: Simplified beneficiation test work diagram, Ngualla rare earth mineralisation Initial preliminary test work results on some samples are expected in early February Northern Niobium Tantalum Phosphate Zone Early results received this Quarter from wide spaced reconnaissance exploration drilling in the Northern Niobium Tantalum Phosphate Zone (Figure 3 and 7) confirm widespread (though at present lower grade) rare earth mineralisation in addition to these other metals, one kilometre to the north of the main SREZ. There is no drilling in the intervening area and mineralisation is currently open to the north, south and west. Rare earth intersections returned from the first seven (of 26) drill holes completed include: Drill Hole NRC121: intersection 52m at 1.33% REO from 20m NRC124*: 20m at 1.21% REO from 44m and 22m at 1.62% REO from 84m NRC125*: NRC127*: 24m at 1.72% REO from 26m 34m at 1.52% REO NRC129*: 22m at 1.77% REO and 10m at 2.74% REO from 44m and 24m at 1.46% REO from 78m REO = total rare earth oxide including yttrium. See Table 4 for drill hole details and additional intersections received this Quarter. * = results received after the end of the December Quarter 6

7 WEST 1600mRL 1.77% H NRC % H NRC127 Weathered 1.72% from 26m H NRC125 H NRC124 Fresh H NRC123 H NRC % 2.74% from 44m 1.21% 1.51% 1.20% 1.33% 1.37% from 44m from 6m from 20m from 42m H NRC121 H NRC021 H NRC003 H NDD003 EAST H NRC020 80m 22m 30m 96m 120m 1.29% from 58m Fresh 120m 80m Colluvium 74m 70m 1.46% from 78m 1.62% from 84m 85m 1.42% from 42m 90m 1.48% from 44.3m mE mE mE mE 200m SECTION 9,149,200mN NGUALLA PROJECT NORTHERN NIOBIUM-TANTALUM & PHOSPHATE ZONE JAN 2012 Drill Holes Completed H Results received Intersection labels REO %: A Dec 2011 Qtr results A Previously reported Figure 7: Cross section 9,149,200mN Northern Niobium Tantalum - Phosphate Zone, with rare earth drill results received this Quarter and geology % REO A 1 to 2% A >2% A No Sample Recovered Niobium tantalum and phosphate mineralisation associated with these rare earth intersections is detailed in the following pages of this report. With large areas not yet drill tested (Figure 3) and results received from only seven of the 26 wide spaced RC holes completed in the Northern Zone, there is considerable potential to extend the rare earth mineralisation significantly in most directions, and also to locate higher grade zones of rare earth mineralisation than have been identified in this area to date. Further drilling planned for this year after the rainy season has ended (April 2012), will investigate the potential for the SREZ and Northern Zone +1% rare earth mineralisation to join and be continuous over a north south distance of some 2.2km. The Northern Zone rare earth mineralisation contains a higher proportion of more valuable heavy and critical rare earths than the Southern Rare Earth Zone. Table 1 below compares the relative distribution of individual rare earths in the two zones at Ngualla and also to some other large rare earth deposits. Table 1: Relative components of individual REO s (including scandium and yttrium) as a percentage of total REO for some large rare earth deposits and the Ngualla Southern Rare Earth and Northern Zones (>1% REO). Rare Earths Content (% of total REO) Light RE Heavy RE Ngualla SREZ % Ngualla North Zone % Nolans Bore % Mountain Pass % Baiyunebo % Mt Weld % Lanthanum Cerium Praseodymium Neodymium Samarium Europium Gadolinium Terbium Dysprosium Other Yttrium Total % (Sources: Arafura Ltd and Lynas Corp Ltd websites) 7

8 The rare earth potential at Ngualla remains the Company s primary focus. However, assay results received during the December 2011 Quarter from reconnaissance exploration drilling in the Northern Niobium Tantalum Phosphate Zone confirm that the Ngualla Carbonatite is also highly prospective for niobium tantalum and phosphate. Results from seven of the 26 hole reconnaissance exploration drilling program in the Northern Zone, (Figure 1) received to date returned wide intersections of niobium tantalum and phosphate in addition to the rare earth mineralisation described above and including: Drill Hole NRC121: NRC122: NRC125*: NRC127*: intersection (niobium tantalum) 74m at 0.56% Nb 2O 5 and 171ppm Ta 2O 5 including: 26m at 0.91% Nb 2O 5 and 239ppm Ta 2O 5 22m at 0.55% Nb 2O 5 and 210ppm Ta 2O 5 including: 6m at 1.06% Nb 2O 5 and 403ppm Ta 2O 5 from 10m 8m at 0.41% Nb 2O 5 and 130ppm Ta 2O 5 from 24m 14m at 0.56% Nb 2O 5 and 161ppm Ta 2O 5 from 40m 24m at 1.12% Nb 2O 5 and 226ppm Ta 2O 5 from 4m 52m at 0.48% Nb 2O 5 and 108ppm Ta 2O 5 20m at 0.45% Nb 2O 5 and 103ppm Ta 2O 5 from 56m See Table 7 for drill hole details and additional niobium - tantalum intersections received this Quarter from the Northern Zone. * = results received after the end of the December Quarter Drill Hole NRC121: NRC122: NRC124*: NRC125*: NRC129*: intersection (phosphate) 64m at 19.7% phosphate from 10m 14m at 22.4% phosphate 8m at 15.6% phosphate from 24m 20m at 17.8% phosphate from 40m 43m at 18.0% phosphate from 33m 28m at 20.4% phosphate 28m at 19.7% phosphate from 92m to EOH See Table 8 for drill hole details and additional phosphate intersections received this Quarter from the Northern Zone. * = results received after the end of the December Quarter As the plans in Figures 8 and 9 illustrate, niobium tantalum and phosphate mineralisation are broadly coincident, surrounding the Southern Rare Earth Zone mineralisation on Ngualla Hill and extending northwards into the Northern Zone within karstic infill sediments and deeply weathered carbonatite bedrock. Drill hole NRC125 returned the highest grade niobium mineralisation intersected to date, from a depth of just 4m and accompanied by 20% phosphate (see Figure 10). This second style of mineralisation at Ngualla remains open to the north, south and west and is currently untested by drilling over a distance of 720m between the Southern Rare Earth and Northern Zones. Assay results from a further 19 RC holes completed in the Northern Niobium Tantalum Phosphate Zone are still awaited (Figures 8 and 9). Mineralogical studies have shown that phosphate occurs as apatite. Marketable rock phosphate concentrate grades range from approximately 30 to 40% but their value also depends on impurity levels. Some beneficiation and processing of the extensive 15 to 20% phosphate mineralisation at Ngualla would therefore be required to achieve a saleable phosphate product. Ferrocolumbite and pyrochlore have been identified as the niobium minerals. A bulk sample of mineralised diamond core is currently at Amdel laboratory in Perth undergoing initial beneficiation test work to determine the potential for the production of a commercially viable concentrate of niobium tantalum, phosphate and / or rare earths. 8

9 Intersection labels Nb2O5 %: A Dec 2011 Qtr results A Previous highlights Drill holes max Nb2O5 %: 0 to to to 0.75 >0.75 Completed holes, results awaited Max DH Nb2O5 %: A 0 to 0.25 A 0.25 to 0.50 A 0.50 to 0.75 A > % Nb2O5 and 214ppm Ta2O5 from 51m 0.47% Nb2O5 and 116ppm Ta2O5 from 20m 0.58% Nb2O5 and 87ppm Ta2O5 ( ( ( ( ( NDD0002 Fig. 10 Results awaited 0.48% Nb2O5 and 108ppm Ta2O5 and 0.45% Nb2O5 and 103ppm Ta2O5 from 56m NRC139 NRC141 NDD005 Southern Rare Earth Zone NRC143 Mt. Ngualla Results awaited NDD004 Northern Niobium Tantalum Phosphate Zone NRC129 NRC084 NRC127 NRC125 NRC110 NRC097 NRC124 NRC121 ( NDD % Nb2O5 and 226ppm Ta2O5 from 4m and 20.4% phosphate 0.56% Nb2O5 and 171ppm Ta2O5 and 20.6% Phosphate from 8m 0.56% Nb2O5 and 173ppm Ta2O5 from 20m 0.58% Nb2O5 and 11ppm Ta2O5 from 56m 0.62% Nb2O5 and 165ppm Ta2O5 from 12m 0.70% Nb2O5 and 245ppm Ta2O5 and 21.0% Phosphate from 1.45m mn mn mn mn me me me me me me NRC136 ( Results awaited Figure 9: Plan view of contoured maximum down hole phosphate in the Southern Rare Earth and Northern Zones of the Ngualla Carbonatite showing drill intersection highlights. Mineralisation remains open to the north, south and west me ( ( ( ( me Figure 8: Plan view of contoured maximum down hole Niobium in the Southern Rare Earth and Northern Zones of the Ngualla Carbonatite showing drill intersection highlights. Mineralisation remains open to the north, south and west. Intersection labels Phosphate %: A Dec 2011 Qtr results A Previously reported Drill holes max Phosphate %: 0 to 5 5 to to to 20 >20 Completed holes, results awaited Max DH Phosphate %: A 5 to 10 A 10 to 15 A 15 to 20 A > % from 51m NDD0002 Results awaited 19.7% from 92m to EOH 20.4% NRC139 Southern Rare Earth Zone NRC136 NRC141 Results awaited Northern Niobium Tantalum Phosphate Zone NDD005 NRC143 NDD004 Mt. Ngualla NRC129 NRC127 NRC110 NRC043 NRC125 NRC me me 500 N 18.0% from 33m NRC121 NDD me 19.7% from 10m 21.0% from 1.45m me 1000m 19.1% from 8m 22.6% from 2m Fig. 10 mn mn mn mn mn 500 N 1000m

10 120m WEST EAST 19.7% from 92m to EOH H NRC % Nb2O5 and 70ppm Ta2O5 H NRC127 Weathered 20.4% H NRC % Nb2O5 and 121ppm Ta2O5 from 33m 18.0% from 33m 17.4% H NRC124 Fresh H NRC % from 10m H NRC122 H NRC % from 1.45m H NRC021 H NRC003 H NDD003 H NRC020 80m 22m 30m 96m 120m 80m Colluvium 74m 70m 1500mRL 0.34% Nb2O5 and 121ppm Ta2O5 from 42m mE 0.45% Nb2O5 and 103ppm Ta2O5 from 56m 0.48% Nb2O5 and 108ppm Ta2O mE 1.12% Nb2O5 and 226ppm Ta2O5 from 4m 0.43% Nb2O5 and 120ppm Ta2O5 from 54m mE 85m 90m 0.56% Nb2O5 and 171ppm Ta2O % Nb2O5 and 245ppm Ta2O mE 200m SECTION 9,149,200mN NGUALLA PROJECT NORTHERN NIOBIUM-TANTALUM & PHOSPHATE ZONE JAN 2012 Nb-Ta intersection labels & Nb-Ta %: A Dec 2011 Qtr results A Previously reported A 0.25 to 0.5% A >0.5% A No Sample Recovered Phosphate intersection labels & Phosphate%: A Dec 2011 Qtr results A Previously reported A 10 to 20% A >20% A No Sample Recovered Figure 10: Reconnaissance drill cross section 9,149,200mN, Northern Niobium Tantalum Phosphate Zone, showing niobium tantalum and phosphate intersections within colluvial sediments and the weathered portion of the carbonatite. The large extent of this style of niobium tantalum, phosphate and rare earth mineralisation suggests potential for a large tonnage deposit immediately north of the Southern Rare Earth Zone and further drilling will be planned for Acquisition of 100% of Zari Exploration Ltd On 26th August 2011 Peak announced it had entered into a conditional agreement to acquire all the issued capital of Tanzanian joint venture partner Zari Exploration Ltd (Zari). The acquisition will give Peak 100% ownership of the Ngualla Rare Earth Project and offer the Company a greater flexibility of options in taking the project forward for the benefit of current Peak shareholders. Currently, Peak as operator and manager is earning 80% equity in the Ngualla Project by carrying Zari through to the completion of a bankable feasibility study. Peak anticipates being in a position to complete the Zari acquisition on or before mid-february Shareholder approval was granted on 23rd for the issue of shares as part of the payment required for the acquisition of Zari. Peak has, over the past 18 months, developed Ngualla into a significant new rare earth discovery, with a maiden resource estimate scheduled for completion in the first quarter of Ngualla is also highly prospective for niobium tantalum and phosphate. The Company s Directors believe that the acquisition of 100% of the project at this stage in its development will secure for Peak and its shareholders absolute control of the project and the value of its further upside potential. 10

11 Tanzanian Gold Projects (Lake Victoria Gold Field) Peak maintains an exploration base and dedicated gold exploration team at Mwanza in the Lake Victoria Gold Fields region of northern Tanzania to progress the Company s strategy of expanding the current portfolio of gold properties and adding value to these projects through early stage exploration. Location of Lake Victoria Goldfield TANZANIA Dar Es Salaam NORTH Lake Victoria Bunda Nkerege Musoma Ikoma KENYA North Mara 2.8g/t Au Soil sampling programs were completed during the Quarter at the Bunda, Nkerege and Sheba Projects (Figure 11). Assay results from these follow-up sampling programs at Nkerege and Sheba are awaited. Results from Bunda identify moderate gold, arsenic and copper anomalies that require field investigation and follow-up (see below). Results from recently completed surface sampling programs in the Igunga and Fort Ikoma Projects were received. The low level gold responses do not warrant further work and Peak has now formally handed these licences back to the joint venture partner. A number of potential new gold properties g/t Au Sheba Geita West (Imweru) Tulawaka 9.7g/t Au 1.4g/t Au Mwanza 1.15g/t Au Geita Nyanzaga 10.34g/t Au Bulyanhulu Buckreef Golden Ridge Nyakafura Shinyanga Buzwagi 1.7g/t Au Peak Resources Gold Project Location Igurubi Mine or Resource > 1 Moz Au Golden Pride Mine or Resource < 1Moz Au Gold Prospect (Barth) Igunga Major Population Centre DCW Major Internal Roads Archaen Greenstone km Figure 11: Peak s gold projects (yellow) and major mines in the Lake Victoria Gold Field, Tanzania were identified during the Quarter and negotiations are advancing on several of these properties. Singida Bunda Project Peak Resources option to acquire 100% The Bunda Project is located in the northern Lake Victoria Gold Fields 50km north east of Mwanza (Figure 11). Bunda is a new project acquired through an option agreement in August The licence, with an area of approximately 24km 2, surrounds a small excised lease containing old gold workings in sheared, highly silicified pyritic basalts. A program of soil sampling was completed during the December quarter to evaluate the potential for extensions to the known mineralisation and for new occurrences of this encouraging bulk tonnage style of gold mineralisation. Results from this wide spaced, first pass sampling identify moderate gold, arsenic and copper anomalies that will be followed up by further fieldwork in the coming Quarter. Australian Projects (Western Australia) Gold and copper The Company divested its remaining Australian projects at Three Rivers and Menzies during the Quarter in order to focus on the main value driver the Ngualla Rare Earth Project in southern Tanzania. Soil and rock sampling completed at Three Rivers by Peak last year, together with a ground geophysical survey did not identify any immediate targets for follow-up and the tenement was relinquished to avoid further costs. Peak retains an interest in the Menzies Project (M29/189) through a two year Option agreement with Riqo Pty Ltd, a private mining and exploration company at an exercise price of 1 million 20c shares or equivalent. Riqo must keep the tenement in good standing during this period. 11

12 CORPORATE Managing Director On 20th the Company announced the appointment of Mr. Richard Beazley as its Managing Director, effective as of 16 January Mr. Beazley is a mining engineer with more than 25 years experience in the resource sector and holds a Bachelor of Engineering from the University of New South Wales and a Master of Business Administration. He has a strong operational background in a diverse range of minerals from bulk commodities of iron ore through to gold, manganese, copper and tantalum to boutique and market specific minerals of spodumene and kaolinite. His previous appointment was as the General Manager, Technical Services & Corporate Development for Consolidated Minerals. This role oversaw the development of Consolidated Minerals infrastructure capital projects and mine planning and engineering requirements of the Australian and Ghanaian operations, and directed a specialised team dedicated to the Pilbara Manganese Development Project. Mr. Beazley s technical and managerial expertise in mining and project development will prove invaluable as the Company moves the Ngualla Project forward from exploration discovery through scoping and feasibility studies and into development. Chairman As a result of the appointment of Richard Beazley as Managing Director, the Executive Chairman Alastair Hunter has moved to the position of Non-Executive Chairman. Equity Issues On 18 November 2011 the Company announced a placement to institutional shareholders for 11,337,349 shares at $0.28 raising $3,174,458 before costs. The company also announced on 29 a share placement of 8,000,000 shares at $0.28 to sophisticated investors. The placement raised $2,240,000 before costs and was settled on 6 January 2012 after quarter end. Cash on Hand Peak retained $5.7million cash at the end of the quarter. Alastair Hunter Chairman The information in this report that relates to Exploration Results is based on information compiled and/or reviewed by Dave Hammond who is a Member of The Australasian Institute of Mining and Metallurgy. Dave Hammond is the Technical Director of the Company. He has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Dave Hammond consents to the inclusion in the report of the matters based on his information in the form and context in which it appears. 12

13 Hole Table 2 Ngualla Project Southern Rare Earth Zone REO Intersections, December Quarter 2011 RC and diamond drill results - Intersections +1% REO and minimum 4m intersected width. Selected intersections +2% REO in italics IDEast North Hole Depth (m) From (m) To (m) Interval (m) REO % NRC ,023 9,148, * 1.66 NRC ,080 9,148, NRC ,160 9,148, NRC ,240 9,148, * 4.04 NRC ,321 9,148, * 2.43 (Incl ) NRC ,955 9,148, * 2.09 NRC ,398 9,148, * 3.02 (Incl ) NRC ,880 9,148, NRC ,482 9,148, NRC ,797 9,148, NRC ,751 9,148, NRC ,402 9,147, NRC ,320 9,147, * 3.20 NRC ,489 9,147, * 1.50 NRC ,558 9,147, * 1.90 NRC ,634 9,147, (incl ) NRC ,723 9,147, NRC ,320 9,148, (Incl ) * 1.49 NRC ,401 9,148, (incl ) NRC ,076 9,147, * 3.54 (incl ) 13

14 Table 2 Ngualla Project Southern Rare Earth Zone REO Intersections, December Quarter 2011 (continued) Hole ID East North Hole Depth (m) From (m) To (m) Interval (m) REO % NRC ,001 9,147, * 4.06 NRC ,921 9,148, NRC ,000 9,148, * 1.84 NRC ,092 9,148, * 1.93 NRC ,135 9,148, * 1.72 NRC ,125 9,148, * 1.50 NRC ,480 9,148, (Incl ) NRC ,560 9,148, NRC ,641 9,148, NRC ,720 9,148, NRC ,037 9,148, * 1.43 NRC ,122 9,148, (Incl (Incl ) NRC ,168 9,148, (Incl and ) NRC ,202 9,148, (Incl and ) NRC ,239 9,148, * 3.65 (incl ) NRC ,239 9,148, * 3.38 (incl and ) 14

15 Table 2 Ngualla Project Southern Rare Earth Zone REO Intersections, December Quarter 2011 (continued) Hole ID East North Hole Depth (m) From (m) To (m) Interval (m) REO % NRC ,199 9,148, * 4.23 NRC ,160 9,148, NRC ,116 9,148, * 3.07 (incl * 6.04) NRC ,160 9,147, * 4.17 NRC ,160 9,148, * 1.86 NRC ,240 9,148, * 1.05 NRC ,318 9,148, NDD ,402 9,148, and ^ NDD ,276 9,148, (Incl ) Note: REO = Total Rare Earth Oxides including yttrium. See Table 1 for relative distribution of individual rare earth oxides. Samples are 2m composites from angled -60 west RC drilling. Intersections calculated using 1% REO lower cut and a maximum of 2m internal dilution. Analysis by SGS laboratory, Perth, by 4 acid digest and ICP or XRF. Co-ordinate system is Arc 1960 UTM zone 36S. * = hole ended in mineralisation. 15

16 Hole Table 3 Ngualla Project South West Alluvial Zone REO Intersections, December Quarter 2011 Aircore drill results - Intersections +1% REO and minimum 4m intersected width. Selected intersections +2% REO in italics IDEast North Hole Depth (m) From (m) To (m) Interval (m) REO % NAC ,380 9,148, NAC ,456 9,147, NAC ,524 9,147, NAC ,300 9,147, NAC ,219 9,147, NAC ,904 9,147, NAC ,103 9,147, NAC ,293 9,147, * 3.27 NAC ,294 9,147, (incl ) NAC ,426 9,147, (incl ) NAC ,500 9,147, (incl ) NAC ,584 9,147, NAC ,663 9,147, NAC ,663 9,147, NAC ,580 9,147, NAC ,499 9,147, NAC ,419 9,147, NAC ,344 9,147, NAC ,270 9,147, NAC ,062 9,147, NAC ,862 9,147, NAC ,702 9,147, NAC ,903 9,147, NAC ,099 9,147, NAC ,303 9,147, NAC ,497 9,147, NAC ,705 9,147, NAC ,658 9,147, NAC ,864 9,147, NAC ,824 9,146, NAC ,580 9,146, NAC ,661 9,146, NAC ,742 9,146, NAC ,903 9,146, NAC ,862 9,147, NAC ,941 9,147, NAC ,022 9,147, NAC ,105 9,147, NAC ,183 9,147, NAC ,261 9,147, NAC ,339 9,147, NAC ,421 9,147, NAC ,502 9,147, * 1.21 NAC ,584 9,147, * 1.45 NAC ,021 9,147, * 1.59 NAC ,021 9,147,

17 Table 3 Ngualla Project South West Alluvial Zone REO Intersections, December Quarter 2011 (continued) Hole ID East North Hole Depth (m) From (m) To (m) Interval (m) REO % NAC ,100 9,147, NAC ,622 9,147, NAC ,542 9,147, NAC ,460 9,147, NAC ,382 9,147, * 2.25 NAC ,302 9,147, * 1.95 NAC ,222 9,147, NAC ,138 9,147, NAC ,062 9,147, NAC ,980 9,147, NAC ,902 9,147, NAC ,824 9,147, NAC ,742 9,147, NAC ,981 9,147, NAC ,061 9,147, NAC ,142 9,147, NAC ,303 9,147, NAC ,383 9,147, NAC ,463 9,147, * 2.01 NAC ,543 9,147, NAC ,621 9,147, * 3.72 NAC ,704 9,147, * 3.50 NAC ,782 9,147, * 2.44 NAC ,620 9,147, * 3.14 NAC ,362 9,147, NAC ,525 9,148, * 2.21 NAC ,445 9,148, Note: REO = Total Rare Earth Oxides including yttrium. See Table 1 for relative distribution of individual rare earth oxides. Samples are 2m composites from vertical aircore or tricone drilling. Intersections calculated using 1% REO lower cut and a maximum of 2m internal dilution. Analysis by SGS laboratory, Perth, by 4 acid digest and ICP or XRF. Co-ordinate system is Arc 1960 UTM zone 36S. * = hole ended in mineralisation. 17

18 Hole Table 4 Ngualla Project Northern Zone REO Intersections, December Quarter 2011 RC drill results, Central Bedrock Zone - Intersections +1% REO and minimum 4m intersected width. IDEast North Hole Depth (m) From (m) To (m) Interval (m) REO % NRC ,957 9,149, NRC ,884 9,149, NRC ,796 9,149, NRC ,720 9,149, NRC ,642 9,149, NRC ,558 9,149, NRC ,480 9,149, Note: REO = Total Rare Earth Oxides including yttrium. See Table 1 for relative distribution of individual rare earth oxides. Samples are 2m composites from angled -60 west RC drilling. Intersections calculated using 1% REO lower cut and a maximum of 2m internal dilution. Analysis by SGS laboratory, Perth, by 4 acid digest and ICP or XRF. Co-ordinate system is Arc 1960 UTM zone 36S. 18

19 Table 5 Ngualla Project Southern Rare Earth Zone Niobium Tantalum Intersections, December Quarter 2011 Intersections with a minimum width of 8m at > 0.25% niobium oxide are reported. Hole ID East North Hole Depth (m) From (m) To (m) Interval (m) NRC ,160 9, NRC ,028 9, NRC ,481 9, * NRC ,797 9, NRC ,634 9, NRC ,402 9,148, NRC ,076 9,147, NRC ,001 9,147, NRC ,001 9,148, NRC ,480 9,148, NRC ,560 9,148, NRC ,641 9,148, NRC ,720 9,148, NRC ,037 9,148, NRC ,202 9,148, NRC ,239 9,148, NRC ,239 9,148, NRC ,116 9,148, NRC ,160 9,147, * NRC ,160 9,148, NRC ,240 9,148, * NRC ,318 9,148, Note: Samples are 2m composites from angled -60º west RC drilling. Intersections calculated using 0.25% Nb 2O 5% lower cut and a maximum of 2m internal dilution. Analysis by SGS laboratory, Perth, by XRF fusion for Nb and pressed powder for Ta. Co-ordinate system is Arc 1960 UTM zone 36S. * = hole ended in mineralisation. Nb2O3 % Ta2O3 ppm 19

20 Table 6 Ngualla Project Southern Rare Earth Zone Phosphate Intersections, December Quarter 2011 Intersections with a minimum width of 8m at > 10% phosphate are reported. Hole ID East North Hole Depth (m) From (m) To (m) Interval (m) P2O5 % NRC ,634 9,147, NRC ,641 9,148, NRC ,720 9,148, NRC ,160 9,148, NRC ,240 9,148, NRC ,318 9,148, Note: Samples are 2m composites from angled -60º west RC drilling. Intersections calculated using 10% phosphate lower cut and a maximum of 2m internal dilution. Analysis by SGS laboratory, Perth, by XRF. Co-ordinate system is Arc 1960 UTM zone 36S. Table 7 Ngualla Project Northern Zone Niobium Tantalum Intersections, December Quarter 2011 Intersections with a minimum width of 8m at > 0.25% niobium oxide are reported (selected intersections + 0.5% Nb 2O 5 in italics). Hole ID East North Hole Depth (m) From (m) To (m) Interval (m) NRC ,957 9,149, Nb2O3 % Ta2O3 ppm (incl ) NRC ,884 9,149, (incl ) (incl ) NRC ,720 9,149, NRC ,642 9,149, NRC ,558 9,149, NRC ,480 9,149, Note: Samples are 2m composites from angled -60º west RC drilling. Intersections calculated using 0.25% Nb2O5% lower cut and a maximum of 2m internal dilution. Analysis by SGS laboratory, Perth, by XRF fusion for Nb and pressed powder for Ta. Co-ordinate system is Arc 1960 UTM zone 36S. Table 8 Ngualla Project Northern Zone Phosphate Intersections, December Quarter 2011 Intersections with a minimum width of 8m at > 10% phosphate are reported. Hole ID East North Hole Depth (m) From (m) To (m) Interval (m) P2O5 % NRC ,957 9,149, NRC ,884 9,149, NRC ,796 9,149, NRC ,720 9,149, NRC ,642 9,149, NRC ,480 9,149, * 19.7 Note: Samples are 2m composites from angled -60º west RC drilling. Intersections calculated using 10% phosphate lower cut and a maximum of 2m internal dilution. Analysis by SGS laboratory, Perth, by XRF. Co-ordinate system is Arc 1960 UTM zone 36S. 20

Maiden Inferred Iron Ore Resources for Gum Flat

Maiden Inferred Iron Ore Resources for Gum Flat 30 April 2009 The Manager ASX Announcements Maiden Inferred Iron Ore s for Gum Flat Lincoln Minerals Limited ( LML ) is pleased to announce Inferred s for its Gum Flat Iron Ore Project on southern Eyre

More information

NOLANS RARE EARTHS PROJECT: MAIDEN JORC ORE RESERVE

NOLANS RARE EARTHS PROJECT: MAIDEN JORC ORE RESERVE ASX RELEASE 11 December 2012 NOLANS RARE EARTHS PROJECT: MAIDEN JORC ORE RESERVE Independently prepared JORC Ore Reserve for Nolans Bore to support a 22 year mine life; 95% of Measured and Indicated Resources

More information

Commerce Resources Corp. Reports Significant Increase in Resources and Grade at the Ashram Rare Earth Element Deposit, Northern, Quebec

Commerce Resources Corp. Reports Significant Increase in Resources and Grade at the Ashram Rare Earth Element Deposit, Northern, Quebec Commerce Resources Corp. Reports Significant Increase in Resources and Grade at the Ashram Rare Earth Element Deposit, Northern, Quebec Highlights SGS Geostat has determined a base case Inferred mineral

More information

Georgian Mining Corporation / EPIC: GEO / Sector: Natural Resources

Georgian Mining Corporation / EPIC: GEO / Sector: Natural Resources 24 October 2017 Georgian Mining Corporation / EPIC: GEO / Sector: Natural Resources Georgian Mining Corporation Drilling Update from KB Gold Zone 2 and New Gold Discovery Georgian Mining Corporation (

More information

Peak Resources Ngualla Rare Earth Project

Peak Resources Ngualla Rare Earth Project Peak Resources Ngualla Rare Earth Project Investor Update April 2016 Disclaimer The information in this document has been prepared as at April 2016. The document is for information purposes only and has

More information

209 million 36.1% Fe

209 million 36.1% Fe ASX ANNOUNCEMENT 29 August 2011 ASX Code: BDR MAIDEN IRON ORE RESOURCE ON BEADELL S MINING CONCESSION - BRAZIL 209 million tonnes @ 36.1 Fe Beadell Resources Limited ( Beadell ) is pleased to announce

More information

Awak Mas DFS Optimisation - Metallurgical Breakthrough

Awak Mas DFS Optimisation - Metallurgical Breakthrough 10 October 2017 Awak Mas DFS Optimisation - Metallurgical Breakthrough Whole of Ore leach testwork delivers improved metallurgical recoveries. Gold recoveries range from 92% - 98% vs previous flotation-leach

More information

For personal use only. Cummins Range Rare Earths Project

For personal use only. Cummins Range Rare Earths Project Cummins Range Rare Earths Project December 2011 DISCLAIMER The information contained in this presentation is not financial product advice. The presentation is for information purposes and is of a general

More information

Critical Rare Earths A Strategic Investment Opportunity Investor Presentation November 2014

Critical Rare Earths A Strategic Investment Opportunity Investor Presentation November 2014 Critical Rare Earths A Strategic Investment Opportunity Investor Presentation November 2014 May 13 Hastings Rare Metals (ASX: HAS) 1 Disclaimer All currency amounts are in AUD$ unless stated otherwise.

More information

For personal use only

For personal use only ASX Code: MRP MacPhersons Resources Ltd ABN 98 139 357 967 ACN 139 357 967 Contact Details PO Box 10977 109 Maritana Street Kalgoorlie WA 6430 T +61 (0) 8 9091 7515 F +61 (0) 8 9091 7610 E info@mrpresources.com.au

More information

For personal use only

For personal use only CROSSLAND URANIUM MINES LTD (ASX: CUX) Featuring Charley Creek, Northern Territory - a rapidly developing strategic Rare Earth Resource The following presentation briefly outlines: The Rare Earth industry,

More information

Outlook for Zirconium and Rare Earth Materials until 2020

Outlook for Zirconium and Rare Earth Materials until 2020 Outlook for Zirconium and Rare Earth Materials until 2020 Hong Kong November 2013 Alister MacDonald -Technical Ceramic Marketing Services Ian Chalmers Alkane Resources Ltd Rare Metals - Rare Earths Rare

More information

For personal use only

For personal use only ACN 097 088 689 01 DEFINITIVE FEASIBILITY STUDY SUPPORTS A MAJOR EXPANSION OF THE SYAMA GOLD MINE Definitive Feasibility Study completed for multifaceted expansion of Syama operation confirms its technical

More information

The Challenges of Meeting Rare Earths Demand in 2015

The Challenges of Meeting Rare Earths Demand in 2015 The Challenges of Meeting Rare Earths Demand in 2015 by Dudley J Kingsnorth Industrial Minerals Company of Australia Pty Ltd TREM 10 (Technology and Rare Earth Metals Policy Conference) Washington, 17

More information

MAIDEN RESOURCE STATEMENT FOR TCM COAL PROJECT, INDONESIA

MAIDEN RESOURCE STATEMENT FOR TCM COAL PROJECT, INDONESIA 311 313 Hay Street SUBIACO WA 6008 P: + 61 8 9381 5819 F: + 61 8 9388 3701 ABN: 45 098 448 269 www.panasiacorp.com.au 11 May 2010 The Manager Company Announcements Platform Australian Securities Exchange

More information

For personal use only

For personal use only 27 April 2017 ASX Announcement March 2017 Quarterly Activities Report Summary Chelkar - Assay High Grade Potash Mineralisation Present Bankable Feasibility Study Advances for Satimola Project JV with Chongqing

More information

Ngualla Rare Earth Project - Updated Ore Reserve

Ngualla Rare Earth Project - Updated Ore Reserve ASX Announcement 12 April 2017 Ngualla Rare Earth Project - Updated Ore Reserve Peak Resources Limited (ASX: PEK) ( Peak or the Company ) is pleased to provide a revised Ore Reserve estimate for the Ngualla

More information

Forward Looking Statements. Forward looking statements in these materials speak only at the date of issue. Subject to any

Forward Looking Statements. Forward looking statements in these materials speak only at the date of issue. Subject to any South Australian Explorers Conference 2008 Forward Looking Statements These materials include forward looking statements. Forward looking statements inherently involve subjective judgement and analysis

More information

Azure Minerals Ltd ASX Code:

Azure Minerals Ltd ASX Code: Azure Minerals Ltd ASX Code: AZS @AzureMinerals www.azureminerals.com.au Tony Rovira Managing Director Azure Minerals Ltd Objective To be a low cost, high margin copper producer Strategy Developing our

More information

For personal use only

For personal use only ` 28 September 2011 ASX ANNOUNCEMENT CAZALY RESOURCES LIMITED COMPANY PRESENTATION Mr Clive Jones joint Managing Director of Cazaly Resources Limited (ASX: CAZ) ( Cazaly ) will be presenting the attached

More information

Presentation and Company Update 7 July 2016 Dr Chris Giles, Managing Director. Cash flow from gold sales New project developments Exploration success

Presentation and Company Update 7 July 2016 Dr Chris Giles, Managing Director. Cash flow from gold sales New project developments Exploration success Presentation and Company Update 7 July 2016 Dr Chris Giles, Managing Director Cash flow from gold sales New project developments Exploration success The information in this presentation that relates to

More information

Sewa Bay Nickel Exploration Project, PNG

Sewa Bay Nickel Exploration Project, PNG 9 August 2013 Sewa Bay Nickel Exploration Project, PNG Encouraging nickel laterite reconnaissance sampling programme Similar ocean arc nickel laterite mineralisation to Ramu project Exploration and joint

More information

COAL RESOURCES INCREASE TO 79Mt AT KATINGAN RIA, INDONESIA

COAL RESOURCES INCREASE TO 79Mt AT KATINGAN RIA, INDONESIA ASX/Media Release 18 January 2012 COAL RESOURCES INCREASE TO 79Mt AT KATINGAN RIA, INDONESIA Highlights Phase 2 drilling work commenced and will continue through to mid February Inferred Resources estimate

More information

For personal use only

For personal use only HAMMER METALS LIMITED PRESENTATION June 2016 ABN. 87 095 092 158 Mining 2015 Resources Convention 2015 Queensland Explorer of the Year CORPORATE SUMMARY Russell Davis Chairman Alex Hewlett Executive Director

More information

ABM Hits 3000 Ounce Target from Trial Mining

ABM Hits 3000 Ounce Target from Trial Mining ASX ANNOUNCEMENT / MEDIA RELEASE ASX:ABU 12 th December 2013 ABM Hits 3000 Ounce Target from Trial Mining ABM Resources NL ( ABM or The Company ) presents an update on the Trial Mining and Processing at

More information

Sconi and Flemington: Two near-production cobalt-nickel-scandium deposits. ASX: AUZ October 2017

Sconi and Flemington: Two near-production cobalt-nickel-scandium deposits. ASX: AUZ October 2017 Sconi and Flemington: Two near-production cobalt-nickel-scandium deposits ASX: AUZ October 2017 www.australianmines.com.au Important notes on these slides This document is a visual aid accompanying a presentation

More information

Economics of Rare Earth Projects. Ian Chalmers Technical Director Alister MacDonald General Manager - Marketing

Economics of Rare Earth Projects. Ian Chalmers Technical Director Alister MacDonald General Manager - Marketing Economics of Rare Earth Projects Ian Chalmers Technical Director Alister MacDonald General Manager - Marketing Why rare earths? Oil is the blood; steel is the body; but rare earth elements are the vitamins

More information

Second drill rig to accelerate major drilling program at Productora

Second drill rig to accelerate major drilling program at Productora DRAFT ASX ANNOUNCEMENT Thursday 11th September 2014 Second drill rig to accelerate major drilling program at Productora Expanded resource-reserve base will underpin completion of Productora Pre-feasibility

More information

For personal use only. Minerals Explorer in South Korea

For personal use only. Minerals Explorer in South Korea Minerals Explorer in South Korea Forward-looking and Competent Person Statement Certain statements contained in this presentation constitute forward looking statements. Such forward-looking statements

More information

ASX ANNOUNCEMENT. Maiden Reserve for Catho Well Channel Iron Deposit, West Pilbara WA. Mt Stuart Joint Venture MAIDEN ORE RESERVE STATEMENT

ASX ANNOUNCEMENT. Maiden Reserve for Catho Well Channel Iron Deposit, West Pilbara WA. Mt Stuart Joint Venture MAIDEN ORE RESERVE STATEMENT ABN 46 006 045 790 14 th December 2010 ASX ANNOUNCEMENT Maiden Reserve for Catho Well Channel Iron Deposit, West Pilbara WA Cullen Resources Limited (ASX:CUL) (Cullen) is pleased to report the maiden JORC

More information

For personal use only

For personal use only ASX Market Update/Media release Monday 22 August 2016 Metals of Africa Reports Further Exceptional Metallurgical Results High grade chemical-free Flotation Testwork at Montepuez Project delivers >98% TGC

More information

RESULTS OF XSTRATA EXPLORATION AT ROSEBY IN 2011

RESULTS OF XSTRATA EXPLORATION AT ROSEBY IN 2011 15 February 2012 ASX: AOH, FSE: A2O RESULTS OF XSTRATA EXPLORATION AT ROSEBY IN 2011 Emerging copper producer, Altona Mining Limited ( Altona ) (ASX: AOH) today announced that Mount Isa Mines Limited (

More information

Activities Report Quarter Ended 31 st March 2015

Activities Report Quarter Ended 31 st March 2015 ASX & Media Release ASX Code AZM 30 th April 2015 www.azumahresources.com.au Investment Highlights: Wa Project: 2.0Moz Mineral Resource including 1.3Moz Measured & Indicated 624,000oz Ore Reserves at 2.14

More information

ASX Release ASX Code: YTC

ASX Release ASX Code: YTC HERA DEFINITIVE FEASIBILITY STUDY TO BE EXPANDED Hera DFS scope to be expanded to include the assessment of mining and treatment of high grade copper ores from the Nymagee Copper Mine together with additional

More information

TTICUS RESOURCES LIMITED ABN

TTICUS RESOURCES LIMITED ABN TTICUS RESOURCES LIMITED ABN 34 124 782 038 ASX Release 27 October 2011 ATTICUS PROPOSES TO ACQUIRE ZAMBIAN MANGANESE COMPANY Atticus Resources Limited (ASX: ACZ; Company ) is pleased to announce that

More information

For personal use only

For personal use only ASX ANNOUNCEMENT / MEDIA RELEASE ASX: ABU 30th September, 2014 ABM s Development Plan & Production Guidance for Old Pirate High-Grade Gold Deposit Highlights: 50,000 to 60,000 ounces of gold production

More information

OMITIOMIRE OXIDE COPPER FEASIBILITY STUDY

OMITIOMIRE OXIDE COPPER FEASIBILITY STUDY INTERNATIONAL BASE METALS LIMITED OMITIOMIRE OXIDE COPPER FEASIBILITY STUDY 21 NOVEMBER 2013 Frank Bethune Ken Maiden Andre Genis Karl Hartmann PRESENTED BY FRANK BETHUNE AND KEN MAIDEN Disclaimer 2 This

More information

Australian Tailings Group Pty Ltd Synergy (SNR) Investor Presentation

Australian Tailings Group Pty Ltd Synergy (SNR) Investor Presentation Australian Tailings Group Pty Ltd Synergy (SNR) Investor Presentation Disclaimer Forward-Looking Statements This presentation contains forward looking statements concerning the projects owned by Australian

More information

PRELIMINARY OXIDE HEAP LEACH TESTWORK DELIVERS EXCELLENT RESULTS AT THE SOUTH HOUNDÉ PROJECT

PRELIMINARY OXIDE HEAP LEACH TESTWORK DELIVERS EXCELLENT RESULTS AT THE SOUTH HOUNDÉ PROJECT NEWS RELEASE APRIL 7, 2014 PRELIMINARY OXIDE HEAP LEACH TESTWORK DELIVERS EXCELLENT RESULTS AT THE SOUTH HOUNDÉ PROJECT VANCOUVER, CANADA. Sarama Resources Ltd. ( Sarama or the Company ) is pleased to

More information

BROKEN HILL MINERAL RESOURCES AND ORE RESERVES UPDATE

BROKEN HILL MINERAL RESOURCES AND ORE RESERVES UPDATE 28 December 2011 BROKEN HILL MINERAL RESOURCES AND ORE RESERVES UPDATE Highlights The Ore Reserve has been established and a new Life of Mine plan for Southern Operations has been developed with economic

More information

Ore Reserves and Mineral Resources Statements 30 June 2013

Ore Reserves and Mineral Resources Statements 30 June 2013 ASX Release / 22 August 2013 Ore Reserves and Mineral Resources Statements 30 June 2013 Ore Reserves at 30 June 2013: 77.8 Mt @ 2.1 g/t Au for 5.24 million ounces of contained gold The acquisition of Gold

More information

Significant cobalt and manganese mineralisation identified at Ketchowla

Significant cobalt and manganese mineralisation identified at Ketchowla ABN 64 123 993 233 ASX Announcement 17 January ABN 64 123 2017 993 233 Significant cobalt and manganese mineralisation identified at Ketchowla Highlights Ketchowla Cobalt Manganese Project exploration

More information

The Next Big Thing: Rare Metals. September 20, 2007

The Next Big Thing: Rare Metals. September 20, 2007 The Next Big Thing: Rare Metals September 20, 2007 AVALON S RARE METALS FOCUS: Leveraged to advances in high-technology and clean energy generation Materials science is increasingly exploiting the unique

More information

Geology and mineral resources of the Kylylahti Mine

Geology and mineral resources of the Kylylahti Mine Geology and mineral resources of the Kylylahti Mine asenteella - tuurilla törmäillen; harkiten harmitta Jari Juurela Altona Mining Ltd Geology Manager - Finland 24.04.2014 Disclaimer and JORC Compliance

More information

MCINTOSH STAGE 1 PRE-FEASIBILITY STUDY UPDATE

MCINTOSH STAGE 1 PRE-FEASIBILITY STUDY UPDATE ASX ANNOUNCEMENT 8 June 2016 MCINTOSH STAGE 1 PRE-FEASIBILITY STUDY UPDATE Open pit mining optimisation results demonstrate the potential for multiple low strip ratio, open pit operations across a range

More information

For personal use only

For personal use only 4 APRIL 2013 D Zone Mineral Resource Increases by 34% to 20.7 million tonnes with a significant increase in contained Cu and Fe Highlights Overall D Zone Mineral Resource tonnage has increased by 5.2 million

More information

For personal use only

For personal use only ASX Release 22 December 2016 BLACK ROCK MINING TO EXPAND PFS TO 120,000 TPA IN TWO STAGES WITH INITIAL 60,000 TPA PRODUCTION Highlights PFS being upgraded to incorporate high grade Cascades Mineral Resource

More information

For personal use only

For personal use only INVESTOR UPDATE May 2016 Disclaimer Statements & material contained in this presentation, particularly those regarding possible or assumed future performance, production levels or rates, metal prices,

More information

For personal use only

For personal use only QUARTERLY REPORT FOR THE PERIOD ENDING 30 JUNE 2011 ASX RELEASE 21Jul11 The company continued exploration activities during the quarter at the Barlee Gold Project, located 200km north of Southern Cross

More information

For personal use only

For personal use only BUILDING A COPPER COMPANY IN BRAZIL Investor Update Feb 2013 1 Disclaimer The announcement may contain certain forward-looking statements. Words anticipate, believe, expect, forecast, estimate, likely,

More information

DRILLING INTERSECTS SIGNIFICANT COAL SEAMS AT TCM COAL PROJECT, KALIMANTAN, INDONESIA

DRILLING INTERSECTS SIGNIFICANT COAL SEAMS AT TCM COAL PROJECT, KALIMANTAN, INDONESIA 311 313 Hay Street SUBIACO WA 6008 P: + 61 8 9381 5819 F: + 61 8 9388 3701 ABN: 45 098 448 269 www.panasiacorp.com.au 1 February 2010 The Manager Company Announcements Platform Australian Securities Exchange

More information

TURKEY CREEK PIT OPTIMISATION STUDY ADDS 2 YEARS MINE LIFE TO THE LITTLE EVA PROJECT AT CLONCURRY

TURKEY CREEK PIT OPTIMISATION STUDY ADDS 2 YEARS MINE LIFE TO THE LITTLE EVA PROJECT AT CLONCURRY 10 August 2015 ASX: AOH, FSE: A2O TURKEY CREEK PIT OPTIMISATION STUDY ADDS 2 YEARS MINE LIFE TO THE LITTLE EVA PROJECT AT CLONCURRY Estimated oxide and sulphide resources within the optimum pit is 17.3

More information

Drilling, metallurgical test work and a new resource model add 21% to oxide gold reserves

Drilling, metallurgical test work and a new resource model add 21% to oxide gold reserves LA ARENA GOLD OXIDE RESERVES INCREASED TO 1.28MM OZ AT AU PRICE OF $1,200 COMPLETION OF THE PRE-FEASIBILITY STUDY FOR THE PHASE II SULPHIDE Cu-Au PROJECT Drilling, metallurgical test work and a new resource

More information

For personal use only

For personal use only Report to shareholders 16 July 2012 Intrepid Mines Limited ASX and TSX : IAU Inquiries regarding this report and Company business may be directed to: Brad Gordon Managing Director Chief Executive Officer,

More information

Rob Bills, Managing Director & CEO

Rob Bills, Managing Director & CEO 19 May 2016 - High Grade Gold at Edna Beryl West 5m at 27g/t gold incl. 2m at 51g/t gold 13m at 8.7g/t gold incl. 7m at 15g/t gold 5 July 2016 -.. High Grade Gold at Edna Beryl West 13.2g/t gold incl.

More information

RIO PARDO IRON ORE PROJECT, BRAZIL TECHNICAL PRESENTATION

RIO PARDO IRON ORE PROJECT, BRAZIL TECHNICAL PRESENTATION RIO PARDO IRON ORE PROJECT, BRAZIL TECHNICAL PRESENTATION January 2011 1 PROJECT LOCATION BRAZIL RIO PARDO PROJECT NORTH MINAS GERAIS IRON ORE PROVINCE MINAS RIO ANGLO AMERICAN US$5.5 Billion FERROUS RESOURCES

More information

Commerce Resources Corp. Updates Metallurgical Advancements on the Ashram Rare Earth Element Deposit, Northern Quebec

Commerce Resources Corp. Updates Metallurgical Advancements on the Ashram Rare Earth Element Deposit, Northern Quebec Commerce Resources Corp. Updates Metallurgical Advancements on the Ashram Rare Earth Element Deposit, Northern Quebec August 13, 2013 Commerce Resources Corp. (TSXv: CCE, FSE: D7H, OTCQX: CMRZF) (the Company

More information

THE FUTURE OF TANTALUM FEBRUARY 2009

THE FUTURE OF TANTALUM FEBRUARY 2009 THE FUTURE OF TANTALUM FEBRUARY 2009 FORWARD LOOKING STATEMENTS Except for historical information contained herein, this presentation may contain forward looking statements including but not limited to

More information

Interim Results. for the six months ended 30 June 2012

Interim Results. for the six months ended 30 June 2012 24 September 2012 Rare Earth Minerals plc Interim Results for the six months ended 30 June 2012 Rare Earth Minerals plc (AIM: REM.L), announces its interim results for the six months ended 30 June 2012.

More information

MINDORO DRILLS 16.9 METERS OF 1.81% NICKEL AT AGATA

MINDORO DRILLS 16.9 METERS OF 1.81% NICKEL AT AGATA MINDORO DRILLS 16.9 METERS OF 1.81% NICKEL AT AGATA EDMONTON, ALBERTA, July 2, 2010 - Mindoro Resources Ltd. (TSXV: MIO; Frankfurt: WKN 906167) today announced further infill drilling results from the

More information

Building a Resource Company Factory. Brisbane Mining 2013 Resources Convention

Building a Resource Company Factory. Brisbane Mining 2013 Resources Convention Building a Resource Company Factory Brisbane Mining 2013 Resources Convention Disclaimer VALUE OF SHAREHOLDING IN LISTED ASSETS post rights issue: $50.5m Market Cap @ 4.3 cents $17.6 m DIVERSIFIED PORTFOLIO

More information

WEATHERED BIF TESTWORK AT KAURING EXHIBITS POTENTIAL FOR COARSE GRAINED HEMATITE PRODUCT

WEATHERED BIF TESTWORK AT KAURING EXHIBITS POTENTIAL FOR COARSE GRAINED HEMATITE PRODUCT ASX Release 7 April 2014 ASX code: MAU 22 Delhi Street West Perth WA 6005 PO Box 1388 West Perth WA 6872 Telephone 08 9226 1777 Facsimile 08 9485 2840 info@magres.com.au www.magres.com.au WEATHERED BIF

More information

For personal use only

For personal use only Dysprosium still key in delivering optimal performance and efficiency Highlights Dysprosium remains a key component in the manufacture of NdDyFeB permanent magnets which power high performance, clean energy

More information

Australia s leading explorer in Mexico

Australia s leading explorer in Mexico Australia s leading explorer in Mexico ASX: AZS @AzureMinerals www.azureminerals.com.au Tony Rovira Managing Director Corporate Overview ASX Code Share Price AZS A$0.013 Shares 1,672M Market Cap Cash A$24M

More information

Hudson Resources Inc.

Hudson Resources Inc. Hudson Resources Inc. Specialty and Rare Earth Metals Sarfartoq Carbonatite Complex West Greenland This presentation contains forward-looking statements regarding ongoing and upcoming exploration work

More information

Developing High Grade Projects in Mexico

Developing High Grade Projects in Mexico Developing High Grade Projects in Mexico ASX: AZS @AzureMinerals www.azureminerals.com.au Tony Rovira Managing Director Azure Minerals Ltd 20 February 2018 Exciting High Quality Projects Sara Alicia: 100%

More information

For personal use only

For personal use only Aus Tin Mining Limited (ASX:ANW) World scale Tin Project with JORC Reserves located in New South Wales Tin Seminars (Brisbane 3 rd November, Melbourne 5 th November, Sydney 6 th November) Important Information

More information

For personal use only

For personal use only ASX: GGG December 2015 Quarterly Report January 29 th, 2016 Highlights: Government of Greenland approve Kvanefjeld pre-hearing White Paper and Terms of Reference, which set an agreed initial development

More information

PROUDLY POSITIONED AS AN AUSTRALIAN MINER ASX:MLX. November 2017 AGM Presentation

PROUDLY POSITIONED AS AN AUSTRALIAN MINER ASX:MLX. November 2017 AGM Presentation PROUDLY POSITIONED AS AN AUSTRALIAN MINER ASX:MLX November 2017 AGM Presentation DISCLAIMER General Disclaimer This presentation has been prepared by Metals X Limited ( Metals X or the Company ) for the

More information

Northern Minerals Ltd is

Northern Minerals Ltd is Northern s dysprosium hopes with Brown Northern Minerals Ltd is focussed on becoming a globally significant producer of the heavy rare earth (HRE) dysprosium 1. Northern has large landholdings in Western

More information

For personal use only

For personal use only Australian Securities Exchange Code: FEL Ordinary Shares: 115,521,575 Unlisted Options: 18,000,000 ($0.12 exp. 31 Dec 2012) 375,000 ($0.15 exp. 23 Mar 2014) Board of Directors: Tony Sage Non-Executive

More information

Mount Weld Mineral Resource and Ore Reserve Update 2015

Mount Weld Mineral Resource and Ore Reserve Update 2015 5 October 2015 Mount Weld Mineral Resource and Ore Reserve Update 2015 Lynas Corporation Limited (ASX:LYC, OTC:LYSDY) announces that the Mount Weld Mineral Resource and Ore Reserves have been updated as

More information

For personal use only

For personal use only For personal use only QUARTERLY ACTIVITIES REPORT September 2016 Sales and coal prices adversely affected by the importation of coal into Tanzania from South Africa during the last financial year Government

More information

Market Update for Rare Earths USGS Congressional Briefing Series December 13, 2013

Market Update for Rare Earths USGS Congressional Briefing Series December 13, 2013 Market Update for Rare Earths 2013 USGS Congressional Briefing Series December 13, 2013 Joseph Gambogi Rare Earth Commodity Specialist USGS National Minerals Information Center U.S. Department of the Interior

More information

Kibali Mine Development

Kibali Mine Development Kibali Mine Development The Kibali mine development in the Democratic Republic of Congo is the largest project undertaken to date by Randgold. With a reserve base at plus 10 million ounces and still growing,

More information

THE NOLANS RARE EARTHS PROJECT

THE NOLANS RARE EARTHS PROJECT THE NOLANS RARE EARTHS PROJECT Gavin Lockyer Managing Director August 2015 DISCLAIMER Important Notice This presentation contains certain statements which may constitute forward-looking statements. Such

More information

For personal use only

For personal use only Binding Joint Venture Agreement for Cobalt Mining and Tailings Processing Operations Highlights Agreement to form 50/50 JV to develop cobalt and copper projects in the DRC including near production asset

More information

Papua New Guinea Mineral resources and ore reserves

Papua New Guinea Mineral resources and ore reserves Harmony Annual Report 2009 139 Papua New Guinea and ore reserves Geology: Papua New Guinea (PNG) lies at the northern end of the Australian Plate and has three major components: a continental cratonic

More information

For personal use only

For personal use only ASX/Media Announcement 12 May 2017 NEW METALLURGICAL TESTWORK RESULTS DELIVER PROCESS IMPROVEMENTS AND OPERATING COST SAVINGS Outstanding results from flotation testwork and pilot program demonstrates

More information

1Q SPECIAL EDITION Molibdenos y Metales S.A. February 1st, 2012

1Q SPECIAL EDITION Molibdenos y Metales S.A. February 1st, 2012 1Q 2012 SPECIAL EDITION Molibdenos y Metales S.A. February 1st, 2012 Contact information: Nicolás Donoso Investor Relations Tel: (56 2) 937 6660 nicolas.donoso@molymet.cl Molymet takes a new and historical

More information

Tri-K feasibility study update

Tri-K feasibility study update Tri-K feasibility study update Feasibility study work to date confirms technical viability of low cash cost operation Mining licence application process commenced, based on technical information submitted

More information

For personal use only

For personal use only ASX: GGG March 2016 Quarterly Report April 29 th, 2016 Highlights: Governments of Greenland and Denmark reach landmark agreement on uranium exports A new joint Denmark-Greenland structure within Greenland

More information

BUCHANS MINERALS SUCCESSFULLY PRODUCES HIGH PURITY MANGANESE ELECTROLYTE FOR THE PRODUCTION OF ELECTROLYTIC MANGANESE METAL

BUCHANS MINERALS SUCCESSFULLY PRODUCES HIGH PURITY MANGANESE ELECTROLYTE FOR THE PRODUCTION OF ELECTROLYTIC MANGANESE METAL Head Office 247 Dill Road, RR 1 Windsor, NS, Canada, B0N 2T0 Trading Symbol: TSXV: BMC News Release No. 10-12 Shares Outstanding: 150,898,545 May 3 rd, 2012 T (902) 472 3520 F (902) 472 3521 www.buchansminerals.com

More information

For personal use only

For personal use only HARVEST MINERALS Developing Fertiliser Projects EST MINE DEVELOPING FERTILISER PROJECTS TO MEET THE GROWING DEMAND IN BRAZIL AND THE WORLD Corporate advisor: Investor Presentation April 2015 ASX: HMI www.harvestminerals.net

More information

Drill Discover Develop

Drill Discover Develop 2017 Annual General Meeting 30 November 2017 Managing Director s presentation 1 12 Month Summary Commodity focus on gold, with copper and other metals secondary targets Successful recapitalisation of the

More information

SARAMA RESOURCES DECLARES MAIDEN INFERRED MINERAL RESOURCE OF 1.5 MILLION OUNCES GOLD AT THE SOUTH HOUNDÉ PROJECT

SARAMA RESOURCES DECLARES MAIDEN INFERRED MINERAL RESOURCE OF 1.5 MILLION OUNCES GOLD AT THE SOUTH HOUNDÉ PROJECT NEWS RELEASE SEPTEMBER 16, 2013 SARAMA RESOURCES DECLARES MAIDEN INFERRED MINERAL RESOURCE OF 1.5 MILLION OUNCES GOLD AT THE SOUTH HOUNDÉ PROJECT VANCOUVER, CANADA. Sarama Resources Ltd. ( Sarama or the

More information

Developing the +1.2Moz Pilbara Gold Project. Investor Presentation November Pilbara Gold Project Unlocking Shareholder Value

Developing the +1.2Moz Pilbara Gold Project. Investor Presentation November Pilbara Gold Project Unlocking Shareholder Value Developing the +1.2Moz Pilbara Gold Project ASX Announcement 2 November 2017 ASX Code DEG FRA Code WKN 633879 Investor Presentation November 2017 ABN 65 094 206 292 DIRECTORS/MANAGEMENT Simon Lill Executive

More information

On The Road To Silver & Gold Mining In Mexico

On The Road To Silver & Gold Mining In Mexico On The Road To Silver & Gold Mining In Mexico ASX: AZS @AzureMinerals www.azureminerals.com.au Tony Rovira Managing Director & CEO Mines & Money - London Corporate Overview KEY STATISTICS TOP SHAREHOLDERS

More information

EXCELLENT NICKEL LEACHING TESTWORK RESULTS

EXCELLENT NICKEL LEACHING TESTWORK RESULTS ASX AND MEDIA RELEASE - 22 FEBRUARY 2007 EXCELLENT NICKEL LEACHING TESTWORK RESULTS Metallica is pleased to report that excellent results have been received from ongoing nickel leaching testwork on NORNICO

More information

RESOURCE GOLD PTY. LTD.

RESOURCE GOLD PTY. LTD. Copyright RESOURCE GOLD PTY. LTD. Gold Recovery From Processing Of - Mill Site Materials - Alluvial Gold Deposits - Hard Rock Resources NOVEMBER, 2009 REVISION 3 1 Disclaimer! This presentation contains

More information

Maiden Ore Reserve for Anglo Saxon Gold Project

Maiden Ore Reserve for Anglo Saxon Gold Project ABN 44 009 157 439 Company Announcement 20 June 2017 Level 2, 90 William St Melbourne Victoria 3000 Australia Telephone: +61 3 9605 5950 Facsimile: +61 3 9605 5999 Email: info@hawthornresources.com Maiden

More information

GLOBAL RARE-EARTH PRODUCTION: HISTORY AND OUTLOOK

GLOBAL RARE-EARTH PRODUCTION: HISTORY AND OUTLOOK Center for Strategic and International Studies Rare Earth Elements: Geology, Geography, and Geopolitics James B. Hedrick Hedrick Consultants, Inc. U.S. Rare Earths, Inc. Burke, Virginia December 15, 2010

More information

Why Rare Earth Prices are Likely to Continue Their Upward Trend

Why Rare Earth Prices are Likely to Continue Their Upward Trend Why Rare Earth Prices are Likely to Continue Their Upward Trend Magnetics 2007 Conference April 4-5, 2007 Chicago, Illinois Presented by Walter T. Benecki Consultant to the Worldwide Magnetics Industry

More information

New focus and new opportunities in Canadian graphite and coal

New focus and new opportunities in Canadian graphite and coal Ltd ACN: 110 884 252 New focus and new opportunities in Canadian graphite and coal Investor Presentation: December 2014 ASX: ADV 1 Disclaimer Competent Person Statement The information in this presentation

More information

For personal use only

For personal use only KEY POINTS Reserves and Resources Update For further information, please contact: Peter Bird Managing Director Heemskirk Consolidated Limited ABN 18 106 720 138 Level 5 303 Collins Street Melbourne Victoria

More information

A MAJOR NEODYMIUM RESOURCE IN EUROPE

A MAJOR NEODYMIUM RESOURCE IN EUROPE A MAJOR NEODYMIUM RESOURCE IN EUROPE SARFARTOQ RARE EARTH PROJECT PRESENTATION January - 2013 Forward Looking Statements! Forward-looking Statements " This presentation includes certain forward-looking

More information

Quality, Diverse Group of Mining Assets. February 2018

Quality, Diverse Group of Mining Assets. February 2018 Quality, Diverse Group of Mining Assets February 2018 1 Forward Looking Statements Some of the statements contained in the following material are "forward looking statements". All statements in this release,

More information

For personal use only

For personal use only 29 April 2016 ASX Release Iron Mountain Mining Limited (ASX Code: IRM) SOLOMON ISLANDS (Bauxite) Quarterly Report: 31 March 2016 HIGHLIGHTS Option secured to acquire 50% equity in a private company that

More information

For personal use only

For personal use only Lamboo Resources Limited ABN 27 099 098 192 ASX: LMB Corporate Office Level 5, 10 Market Street Brisbane QLD 4000 Telephone: +61 7 3212 6203 Facsimilie: +61 7 3212 6250 Contact Richard Trevillion - Managing

More information

Frontier announces positive Preliminary Economic Assessment for its Zandkopsdrift Rare Earth Project in South Africa

Frontier announces positive Preliminary Economic Assessment for its Zandkopsdrift Rare Earth Project in South Africa Frontier announces positive Preliminary Economic Assessment for its Zandkopsdrift Rare Earth Project in South Africa February 21, 2012 Toronto, Ontario: Frontier Rare Earths Limited (TSX: FRO) (TSX: FRO.WT)