1 4 March 2014 ASX Market Announcements ASX Limited Exchange Centre 20 Bridge Street Sydney NSW 2000 ASX Code: EXG KALGOORLIE NORTH GOLD PROJECT POSITIVE PRE-FEASIBILITY STUDY RESULTS PFS Ore Reserves (optimised at A$1,450/oz Au) Total Gold Production Mine Life Average Annual Gold Production Average C2 Cash Operating Cost 1 Average Cash Margin 2 Cash Flow from Production Pre-Production Capital 3 (new equipment) 7.64 million 2.00g/t Au for 491,600ozs Au 456,200ozs Au ~7.5 years 60,800ozs Au A$1,029/oz Au A$385/oz Au A$ million A$76.73 million 1 C2 costs include operating costs plus Government and project specific royalties 2 Based on gold sell price net of royalties of A$1,413 minus C2 production cost 3 Includes plant, infrastructure, open pit and underground mine capital; excludes deferred infrastructure relocation capital Significant potential for underground Ore Reserve expansion at Zoroastrian Additional open pit Mineral Resources to be incorporated into future studies to extend life of mine Excelsior Gold Limited ( Excelsior or the Company ) is pleased to present a positive result of the Pre-Feasibility Study ( PFS ) into the development of the Kalgoorlie North Gold Project ( KNGP or the Project ). The PFS is based on the development of a multiple open pit and underground mining operation centred on the Zoroastrian gold system located 45 kilometres north of Kalgoorlie in Western Australia. The results of the PFS demonstrate a solid base case gold operation which the Company now expects to be able to enhance through further underground and open pit Ore Reserve conversion and expansion and refinement of capital and operating cost estimates. 1

2 Figure 1: Kalgoorlie North Gold Project Gold Ore Reserve and Resource Location Plan with Geology, Tenements and Neighbouring Significant Gold Deposits. Showing gold ore reserve ounces (red) and resource 0.6g/t and 3.0g/t Au lower cut-offs (black) 2

3 The Company s PFS incorporates the construction of a new standalone 1.0 million tonne per annum conventional carbon in leach ( CIL ) gold treatment plant to process ore sourced from large open pits at the Zoroastrian and Excelsior deposits and seven smaller satellite pits as well as underground ore from mechanised stope designs on a portion of the large Zoroastrian gold system. The final mining phase of the PFS was recast at an increased gold price of A$1,450 per ounce to reflect the current gold price (A$1,507/oz at 2 March 2014), an apparent improving market sentiment and gold price and currency exchange rate forecasts for a potential production term from 2016 to Ore Reserves The PFS Ore Reserves of 7.64 million 2.00g/t Au for 491,600ozs Au are derived from total Project Measured and Indicated gold Mineral Resources of 15.6 million 1.80g/t Au for 899,800ozs Au. The PFS results include the addition of another Mineral Resource at El Dorado, into the Ore Reserves as well as a reduction in processing costs that were previously excluded from the interim PFS Ore Reserves (ASX announcement 19 February 2014). Table 1. Kalgoorlie North Gold Project Ore Reserve Inventory (March 2014) Notes: 1. Numbers may not sum due to rounding. 2. The Zoroastrian Undergrounds consist of the Zoroastrian South and Zoroastrian Central designs. 3. Diluting material in open pits set at 0g/t, and 0.5g/t for underground. 4. Ore Reserves calculated under the 2012 JORC code. 3

4 The new Ore Reserve represents a refinement and extension of the prior interim PFS Ore Reserve open pit and underground mine designs as part of the detailed second pass process to provide optimal results. In the case of Zoroastrian, previously economic material, based on a gold price of A$1,375 per ounce, was omitted due to the selection of the suboptimal revenue factor ( RF ) 0.78 Whittle shell. The new Zoroastrian open pit Ore Reserve has utilised the RF 1.0 shell at a A$1,450/oz gold price, resulting in a larger open pit (refer Figure 2) and subsequent increase of almost 500,000 tonnes of ore and approximately 38,000 ounces of gold. Reserve Expansion Program While the current Ore Reserve position demonstrates a potential 7.5 year life of mine, production scheduling indicates that significant improvements in Project economics can be achieved by the inclusion of additional higher grade underground ore feed into the milling schedule. Current underground mine designs at Zoroastrian South and Zoroastrian Central are based on Ore Reserves of 981, g/t Au. The underground operations contribute in the vicinity of 20,000ozs per annum to the production profile in Years 2 to 5 of the current production schedule. Extension of the underground operations, at least through Years 5 to 8 when the more modest grade Excelsior open pit ore forms the base load for the mill, would have a significant positive impact on gold production towards the back end of the operations. Deeper Inferred Mineral Resources at a 3.0g/t Au cut-off which are outside the Zoroastrian Ore Reserves total 505, g/t Au for 94,300ozs and conversion of this Inferred resource, hence extension of the underground operations, is a priority target for further targeted drilling programs. Figure 2: Zoroastrian Conceptual Mining Plan Long Section showing Resource Block Model at 3.0g/t Au lower cut-off (colour graded), Open Pit Designs (red), Underground Design with Mechanised Stoping (grey) and Gold Ore Reserves contained within the Designs 4

5 Total KNGP Measured, Indicated and Inferred gold Mineral Resource are currently 23.6 million 1.80g/t Au for 1.37 million ounces at 0.6 and 3.0g/t Au cut-offs, and includes Inferred Mineral Resources of 8.09 million 1.80g/t Au (467,700ozs Au). These Inferred Mineral Resources are contained partially within the PFS deposits and in an additional 13 gold Mineral Resources which have not been subject to the current open pit and underground studies. These Inferred Mineral Resources and numerous advanced exploration targets offer immediate scope to increase the Ore Reserves and extend the life of mine. Operating Cost Estimates Open pit and underground mine designs were completed by Auralia Mining Consulting Pty Ltd ( Auralia ) and are based on Measured and Indicated Mineral Resources for the Excelsior deposit and Indicated Mineral Resources at the Zoroastrian and satellite mining projects. Optimisation runs were conducted in Whittle using independently tendered mining operating costs, vendor-sourced mining capital costs, an independent Pre-Feasibility Study covering processing operating and capital costs by Mintrex Pty Ltd ( Mintrex ), independent metallurgical studies, environmental studies, government quoted capital costs and an independent geotechnical review. Studies were carried out on fleet mining operation costs to assess the most cost-effective method (hourly dry hire rates versus full contract volume rates). A detailed pricing submission process carried out with reputable operating fleet hire/contract companies, showed a cost advantage in applying full contract volume rates to the two large open pits of Zoroastrian and Excelsior, while displaying a minimal advantage in applying full contract volume rates to the satellite deposits. As a result the cost model build process was based on the selection of an all-inclusive full contract volume rate mine operating cost, covering site establishment, mobilisation/demobilisation, personnel, maintenance and drill blast operations. This cost model provided the mining costs for the optimisations along with customised mining cost adjustment factors for each operation. A flat 1.0Mtpa mill constraint was applied during the optimisation process and during initial mine scheduling however it is noted that the Excelsior ore can potentially be processed at up to 1.3Mtpa rate due to is metallurgical characteristics. Whittle applied the appropriate economic cut-off grade as required per run (refer Table 2). The final economic cut-off varies depending upon the distance to the treatment location and final processing cost applied which was inclusive of haulage costs. A 5% mining dilution factor, at a grade of 0g/t Au, and a 97% mining recovery factor was applied within Whittle to account for dilution during the course of mining due to the mixing of ore and waste to account for the amount of ore that is lost due to spillage and re-handling. 5

6 Open Pit Economic Cut-Offs (g/t) Deposit Oxide Transitional Fresh Excelsior Zoroastrian Pits Lochinvar N/A Jackorite 0.70 N/A 0.71 Castlereagh N/A Nerrin Nerrin Big Blow South 0.73 N/A 0.74 El Dorado Bulletin Table 2: KNGP Open Pit Economic Cut-off Grades Process plant design and cost estimates by Mintrex were based on metallurgical testwork results from programs formulated by Daniel Schwann Consulting Pty Ltd and carried out by ALS Ammtec. Metallurgical characterisation testwork was conducted using dedicated diamond drill core samples with various ore sources tested separately by weathering type (Oxide, Transitional or Fresh). The comprehensive testwork program included detailed elemental analysis, mineralogy, comminution, gravity gold recovery, leach extraction recovery, leach optimisation, gold deportment and rheology analysis and this information provided the inputs for the process facility design criteria. The metallurgical testwork demonstrated relatively rapid leach extraction rates, low grind size sensitivity and high gold recoveries on all of the individual ore sources and their respective weathering states and that all KNGP ores tested were readily amenable to conventional CIL processing. The test predicted varying overall plant gold recoveries, dependent upon deposit type with an average overall recovery of 92.6% for the Zoroastrian base case blend of 54% oxide/transitional and 46% fresh, at a grind size 80% passing 180 microns for a 24 hour leach residence time, at 44% solids in the leach and soluble gold level of 0.01 g/t in the CIL tail. Individual deposit mill recoveries, as applied during this study, are summarised in Table 3. The processing facility design, engineering, capital cost and operating cost estimation developed by Mintrex included supporting studies by Aquaterra (water supply) Cardno-BEC (electrical) and Western Power (power supply assessment). Process operating costs incorporate a fixed component which ranged from 29% to 34% (32% base case) of total operating cost and consist of labour, laboratory, ROM loader and light vehicle costs. The variable process operating costs range from 66% to 71% (68% base case) and include power, consumables and maintenance costs. The processing facility proposed is a 1.0Mtpa CIL plant specifically designed for the KNGP mineralisation and consists of primary crusher, secondary crusher, ball mill, gravity gold 6

7 recovery, CIL, carbon elution, electrowinning and smelting circuits to produce gold doré. The planned process is robust and conventional utilising established technology suitable for the mineralisation in all the Project deposits tested to date and demonstrated by successful similar historical operations at the site and within the region. ITEM ZOROASTRIAN EXCELSIOR SATELLITES Oxide/Trans Fresh Oxide/Trans Fresh Oxide/Trans Fresh Gold Price A$1,450 State Govt. Royalty 2.5% Milling Rate (Mtpa) Met. Recovery 1 (%) Unit Processing Costs ($/tonne) to to to Pit Wall Angle 45º West 43º; East 44º 55º to Unit Mining Cost to to to to to to 6.85 ($/tonne) Table 3: KNGP Operating Cost Parameters Notes: 1. Satellite deposit recoveries based on limited testwork at 75 to 106 micron grind with 92-96% recovery for 24 hour leach, 93% recovery selected for all satellites at grind size 80% passing 180 microns. 2. Processing costs inclusive of deposit specific royalties and haulage where applicable. 3. Unit Mining Costs inclusive of drill & blast and vary with depth and mining fleet size utilised Zoroastrian and Excelsior 90 tonne fleet Satellites 40 tonne fleet. Underground stope design was undertaken for Zoroastrian using an iterative approach. An initial estimate for the cut-off grade for this project was used to determine the limits of the potential underground stopes both along strike and down dip. Second and third pass stope design/selection was then undertaken using incremental cut-off grades (ore drive development, stoping and processing costs for second pass, stoping and processing costs for third pass). At the conclusion of the stope design/selection, each stoping level was costed to ensure all stopes made a positive contribution to the project economics. UG Costs included Variable costs: o Lateral development- $2600-$3700 per metre o Vertical development- $4000 per metre o Stoping costs- $30-$40 per tonne o Processing costs- $26.04 per tonne Fixed Costs: o Contractor- $650,000 per month o Excelsior UG Mining- $110,000 per month o Power- $132,000 per month o General and Administration- $102,500 per month (33.3% of total G&A costs) 7

8 The C2 cash costs for each deposit are summarised in Table 4 below. Table 4. Kalgoorlie North Gold Project PFS C2 Cash Costs (March 2014) Notes: 1. The above C2 cash costs are displayed on an individual project basis, prior to any pre-strip, stockpile building or other capitalisation that may occur during the scheduling process that may further reduce C2 cash costs by shifting operating costs into capital costs. Capital Cost Estimates The total Project capital cost estimates (refer Table 5) are based on an all-new 1.0Mtpa treatment facility and associated milling and open pit and underground mining infrastructure as well as capital to relocate infrastructure impeding the development of the Excelsior open pit. Current mine scheduling is focussed on the mining of the higher grade Zoroastrian and selected satellite deposits ahead of the large Excelsior open pit which requires relocation of the Kalgoorlie to Leonora rail line and the Goldfields Highway prior to mining. The Excelsior pit does not figure into the base case mining schedule until Year 4 and capital expenditure for the road and rail component of the infrastructure relocation program, totalling approximately $16.06 million, is not required until Year 3. Initial start-up capital for the Project is therefore A$76.73 million with a further $16.06 million in deferred capital. 8

9 Description Estimate Source Process Plant $49.86M Mintrex Processing Infrastructure including tailings, borefield, etc. $12.61M Mintrex/Schwann Other Costs including power $6.23M WPL/BEC Total Processing Capital $68.70M Open Pit Infrastructure $1.33M Auralia/EXG Underground Mine Infrastructure $3.70M Auralia/EXG Total Mine Capital $5.03M Road/Rail Relocation $14.50M SMEC Power/Pipeline/Cable Relocation $4.56M WPL, APA Total Infrastructure Relocation Capital $19.06M TOTAL $92.79M Table 5: KNGP Capital Cost Summary Development Program The PFS Ore Reserve, operating and capital cost estimate is a solid base from which the Company now expects to significantly expand open pit and underground gold Ore Reserves and focus on cost reductions to enhance the project economics. At a time of apparent improving gold price, depreciating exchange rate and more positive investor sentiment, the Company intends to devote its resources to improving the economics of the Project. Subject to available capital the Company will initiate further dedicated drilling programs to expand the Ore Reserves to in excess of 600,000 ounces of gold during 2014 in order to extend the potential mine life and drive improved return on capital investment. Further, the optimisation process for the PFS is restricted to a flat 1.0Mtpa mill constraint. In the subsequent study, the Company will incorporate the potential significant increases in the milling rate of ore sourced from the Excelsior deposit given its favourable metallurgical characteristics and additional mining cost reductions due to the broad ore zones and low waste to ore ratio. These elements have the potential to significantly bring forward the cash flow and also reduce the unit cost of production at Excelsior. The Company continues dialogue with a number of third parties to review alternate development strategies, including with existing mill owners in the region to evaluate toll treatment and joint venture options which could accelerate Project development and lower required capital costs. 9

10 Competent Person Statement Exploration Results and Mineral Resources: Information in this announcement that relates to Mineral Resources and exploration results is based on information compiled by Mr. David Potter who is the Technical Director of Excelsior Gold Limited. Mr. Potter is a Member of The Australian Institute of Geoscientists and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking, to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr. Potter consents to the inclusion in the document of the information in the form and context in which it appears. Competent Persons Statements Ore Reserves The information in this Report which relates to Ore Reserve estimates accurately reflects information prepared by competent persons (as defined by the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves). The information in this public statement that relates to the Ore Reserves at the Excelsior Gold Kalgoorlie North Gold Project is based on information resulting from Pre-Feasibility works carried out by Auralia Mining Consulting. Both Mr. Daniel Tuffin (Open Pits) and Mr Anthony Keers (Underground Workings) completed the Ore Reserve estimate. Mr Daniel Tuffin and Mr Anthony Keers are Members and Chartered Professionals (Mining) of the Australasian Institute of Mining and Metallurgy and have sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity that they are undertaking to qualify them as Competent Persons as defined in accordance with the Australasian Joint Ore Reserves Committee (JORC). Qualifying Statement This release may include forward-looking statements. These forward-looking statements are based on a number of assumptions made by the Company and its consultants in light of experience, current conditions and expectations concerning future events which the Company believes are appropriate in the present circumstances. Forward-looking statements are necessarily subject to risks, uncertainties and other factors, many of which are outside the control of Excelsior Gold, which could cause actual results to differ materially from such statements. The Company makes no undertaking to subsequently update or revise the forward-looking statements made in this release to reflect the circumstances or events after the date of this release. For further information visit or contact Excelsior Gold Limited David Hamlyn David Potter Managing Director Technical Director T: T: E: dhamlyn@excelsiorgold.com.au E: admin@excelsiorgold.com.au 10

11 JORC Code, 2012 Edition Table 1 Section 1 Sampling Techniques and Data refer ASX announcement 19 February 2014 Section 2 Reporting of Exploration Results refer ASX announcement 19 February 2014 Section 3 Estimation and Reporting of Mineral Resources refer ASX announcement 19 February 2014 Section 4 Estimation and Reporting of Ore Reserves (All Deposits) (Criteria listed in section 1, and where relevant in sections 2 and 3 for Zoroastrian, Excelsior and Satellite Resources (above), also apply to this section.) Criteria JORC Code Explanation Commentary Mineral Resource estimate for conversion to Ore Reserves Description of the Mineral Resource estimate used as a basis for the conversion to an Ore Reserve. Clear statement as to whether the Mineral Resources are reported additional to, or inclusive of, the Ore Reserves. MINERAL RESOURCES (December 2013) The Mineral Resources of the Kalgoorlie North Gold Project were estimated by Mr David Potter of Excelsior Gold Limited during the 2013/2014 financial year. The following table comprises the Mineral Resources: The Mineral Resources are reported as wholly inclusive of the Ore Reserves. 11

12 Criteria JORC Code Explanation Commentary ORE RESERVES (March 2014) 1. Numbers may not sum due to rounding. 2. The Zoroastrian Undergrounds consist of the Zoroastrian South and Zoroastrian Central designs. 3. Diluting material in open pits set at 0g/t, and 0.5g/t for underground. 4. Ore Reserves calculated under the 2012 JORC code. Site visits Comment on any site visits undertaken by the Competent Person and the outcome of those visits. Multiple prior site visits have been carried out by both of the competent Persons, Mr Daniel Tuffin and Mr Anthony Keers. If no site visits have been undertaken indicate why this is the case Study status The type and level of study undertaken to enable Mineral Resources to be converted to Ore Reserves. This is a Pre-Feasibility study, and all works relating to this study must be assessed with the appropriate relevant level of accuracy. The Code requires that a study to at least Pre-Feasibility Study level has been undertaken to convert Mineral Resources to Ore Reserves. Such studies will have been carried out and will have determined a mine plan that is technically achievable and economically viable, and that material Modifying Factors have been considered. A mine plan has been scheduled that is technically achievable, and is economically viable to the expected detail of Pre-Feasibility levels. Although individual deposit discounting and global capital costs have been applied to these works, as yet no comprehensive, detailed global project financial review has been carried out as part of these works. Where appropriate and possible, suitable modifying factors have been applied to these Pre-Feasibility works. These modifying factors include, but are not limited to, independently tendered mining operating costs, vendor-sourced mining capital costs, an independent Pre-Feasibility study covering processing and capital costs, independent metallurgical studies, environmental studies, government quoted capital costs and an independent geotechnical review. Cut-off parameters The basis of the cut-off grade(s) or quality parameters applied. Any material classified as an Inferred Mineral Resource was not included for consideration in as an economic driver during any of the optimisation processes and does not influence the final Ore Reserves calculations. Due to ore haulage transit costs (deposit-to-mill) and weathering factors (varying the mill recoveries), multiple economic cut-offs exist per deposit. These economic cut offs are displayed, per weathering zone, in the tables below: 12

13 Criteria JORC Code Explanation Commentary Economic Cut-Offs (g/t), Kalgoorlie North Project (Truncated to 2dp) Deposit Economic Cut-Off Oxide Material Economic Cut-Off Transitional Material Economic Cut-Off Fresh Material Big Blow South 0.73 N/A 0.74 Bulletin Castlereagh N/A El Dorado Excelsior Jackorite 0.70 N/A 0.71 Lochinvar N/A Nerrin Nerrin Zoroastrian Pits Deposit Economic Cut Off Stoping Only (g/t) Economic Cut Off Ore Drives & Stoping (g/t) Economic Cut Off Capital, Ore Drives & Stoping (g/t) Zoroastrian UG Tails material exist in-situ. Air core and reverse circulation in-pit drilling works have displayed grade being carried within the tails material. However, studies to date are not accurate to allow for inclusion in the Pre-Feasibility works as part of the final Ore Reserve, and thus the tails has been treated as waste, with no economic cut-off viable. 2 Displayed incremental cut-offs are back calculated. First pass stope designs were based on an initial estimated economic cut-off of 3.4g/t with subsequent second and third pass stope designs using lower incremental cut-offs. Mining factors or assumptions The method and assumptions used as reported in the Pre-Feasibility or Feasibility Study to convert the Mineral Resource to an Ore Reserve (i.e. either by application of appropriate factors by optimisation or by preliminary or detailed design). Where appropriate and possible, suitable modifying factors have been applied to these Pre-Feasibility works. These modifying factors include, but are not limited to, independently tendered mining operating costs, vendor-sourced mining capital costs, an independent Pre-Feasibility study covering processing and capital costs, independent metallurgical studies, environmental studies, government quoted capital costs and an independent geotechnical review. The choice, nature and appropriateness of the selected mining method(s) and other mining parameters including associated design issues such as pre-strip, access, etc. With regards to fleet mining operation costs, studies were carried out to assess the most cost-effective method (hourly dry hire rates versus full contract volume rates). A detailed pricing submission process was carried out with reputable operating fleet hire/contract companies, during which multiple cost estimates were provided for both cost methods. Using these submissions studies showed a cost advantage in applying full contract volume rates to the two large open pits of Zoroastrian and excelsior, while displaying a minimal advantage in applying full contract volume rates to the satellite deposits. As part of the cost model build process, Auralia Mining Consulting excluded the best and worst confirming cost estimates for each fleet type and upon review selected the second most cost effective option across both fleet types, an all-inclusive full contract volume rate mine operating cost, covering site establishment, mobilisation/demobilisation, personnel, maintenance and drill blast operations. The assumptions made regarding geotechnical parameters (e.g. pit slopes, stope sizes, etc), grade control and preproduction drilling. Underground operating cost submissions were received from several underground contractors, the selected contractor was a reputable group whose overall costs were in the mid-point of all submissions. The contract rates were split into fixed and variable and covered all aspects of operation. The major assumptions made and Mineral Resource model used for pit and stope optimisation (if appropriate). Standard open pit mining methods using an excavator and truck fleet have been are employed, assuming double shifting on a continuous basis. The size of the fleet applied for costing and design works was dependent upon the deposit designation (and thus size) Satellite deposits have had a 85t excavator paired with 40t articulated truck fleet costs and design specifications to them. The excelsior and Zoroastrian deposits have had a 120t excavator paired with 90t truck fleet costs and design specifications to them. The underground method that will primarily be employed at Zoroastrian is longhole open stoping using mechanised equipment. Hand-held/Airleg equipment will supplement the mechanised equipment. 13

14 Criteria JORC Code Explanation Commentary In the case of pre-existing historical pits, designs have been created to take into account minimum mining widths to allow mining access at depth. Three separate geotechnical case studies (comprising three separate reports) were carried out by independent expert geotechnical firm Peter O Bryan & Associates as part of these Pre-Feasibility works. These studies determined the final Pre-Feasibility level design specifications for the open pit satellite deposits, the Excelsior open pit deposit and the Zoroastrian open-pitable and underground sections of the deposit. The mining dilution factors used. The mining recovery factors used. Any minimum mining widths used. The manner in which Inferred Mineral Resources are utilised in mining studies and the sensitivity of the outcome to their inclusion. The infrastructure requirements of the selected mining methods. The underground design explicitly includes sill pillars, rib, half rib or island pillars have been accounted for in the mining recovery. Waste material will be left underground where possible by backfilling completed stopes, no other backfill is currently planned. A 5% mining dilution and 97% mining recovery in the open pits and a 10% mining dilution and 93% mining recovery for underground was applied during these works Pre-Feasibility Works. A minimum pre-goodbye cut mining width of 10m was applied as a constraint to the Satellite pit designs. A minimum pre-goodbye cut mining width of 20m was applied as a constraint to the Excelsior and Zoroastrian pit designs. The minimum stoping width used was 2.5m. Only the Measured and Indicated portions of the Mineral Resource classified material types were used in the Pre-Feasibility Study optimisation works; while the final designs may contain Inferred material as part of the final material inventory, Inferred material was not utilised as an economic driver and thus not included for consideration for any of Ore Reserve calculations. Any mining infrastructure required has been costed for (via study, price submissions, or quotations) to a Pre-Feasibility level and either allocated as appropriate directly to mining operating or fixed costs, mining capital, or accounted for in shared site capital costs (such as administration offices). Metallurgical factors or assumptions The metallurgical process proposed and the appropriateness of that process to the style of mineralisation. The planned Kalgoorlie North Gold Project processing facility is a conventional 1.0Mtpa CIL plant specifically designed for the projects mineralisation and consists of primary crusher, secondary crusher, ball mill, gravity recovery, CIL (carbon-in-leach), carbon elution, electrowinning and smelting to produce gold doré. Whether the metallurgical process is welltested technology or novel in nature. The nature, amount and representativeness of metallurgical test work undertaken, the nature of the metallurgical domaining applied and the corresponding metallurgical recovery factors applied. The planned process is a conventional, robust, well tested technology, and is appropriate for the lode style of mineralisation in all the Project deposits, as demonstrated by successful similar prior plant operation in the area. Metallurgical testwork samples were sourced from diamond drill core holes and RC chip holes (Jackorite and Big Blow South) drilled in all deposits that have Ore Reserves (excluding Nerrin Nerrin and Bulletin which have had no metallurgical testwork conducted to date). The major deposits of Zoroastrian and Excelsior were further separated and tested as distinct weathering types defined as Oxide-Transitional or Primary domains. A comprehensive metallurgical characterisation testwork program on the metallurgical core samples included comminution testwork, detailed elemental head grade analysis, comprehensive mineralogical analysis (QEMScan), size by size gold distribution, gravity and leach recovery testwork, diagnostic leach testwork, CIL optimisation (agitated leach testwork) and rheology testwork. Accordingly, the metallurgical test work is considered representative of the deposits. Any assumptions or allowances made for deleterious elements. The metallurgical characterisation testwork program indicated deleterious elements are sufficiently low in content. Agitated leach testwork of SMP samples of Big Blow South and Jackorite demonstrated high viscosity with 100% blend at 50% solids in leach. Viscosity impacts were reduced by decreasing leach % solids to 35% for 100% blend testwork and operational mitigation would include blending satellite material to reduce leach slurry viscosity. The existence of any bulk sample or pilot scale test work and the degree to which such samples are considered No bulk samples of sufficient quantity for pilot scale test work have been collected or tested. See previous note on metallurgical test work completed to date. 14

15 Criteria JORC Code Explanation Commentary representative of the orebody as a whole. For minerals that are defined by a specification, has the ore reserve estimation been based on the appropriate mineralogy to meet the specifications? Ore Reserves are quoted delivered to mill basis, which excludes metallurgical recovery factors. The test work discussed above, carried out as part of this Pre-Feasibility study predicted varying overall plant gold recoveries, dependent upon deposit type. An average overall recovery of 92.6%, at a grind size 80% passing 180 microns, 24 hour leach residence time, at 44% solids in the leach, and soluble gold level of 0.01 g/t in the CIL tail. Each deposit s mill recovery, as applied during this study, are displayed below: Mill Recoveries, Kalgoorlie North Project Deposit Mill Recovery Oxide Material Mill Recovery Transitional Material Mill Recovery Fresh Material Satellite Deposits % 93.0% 93.0% Excelsior % 94.7% 91.9% Zoroastrian 91.8% 91.8% 90.5% 1 The various Satellite Deposits leach testwork was limited to single leach test at grind sizes ranging from 75 to 106 micron with recoveries ranged from 92 to 96% over a 24 hour leach residence time. A recovery of 93% was selected for all Satellite Deposits at a grind size 80% passing 180 microns and 24 hour leach residence time. 2 Tails material exist in-situ. Air core and reverse circulation in-pit drilling works have displayed grade being carried within the tails material. However, studies to date are not accurate to allow for inclusion in the Pre-Feasibility works as part of the final Ore Reserve, and thus the tails has been treated as waste, with no mill recovery figure viable. Environmental The status of studies of potential environmental impacts of the mining and processing operation. Details of waste rock characterisation and the consideration of potential sites, status of design options considered and, where applicable, the status of approvals for process residue storage and waste dumps should be reported. Environmental studies have been carried out in conjunction with this Pre-Feasibility study to Mining Proposal (MP) reporting levels, with the intention of being able to release an MP to the Department of Mines within quick succession of the release of the maiden Ore Reserves if required. These works include flora and fauna surveys, water testing, existing land disturbance surveys, waste rock and tailings sampling, soil analysis, hydrology and native title and heritage database reviews. Waste Rock Dump designs take into consideration any Potential Acid Forming Material (PAF) and will be designed to meet the license requirements. Any current waste dump designs take into consideration stability and erosion measures; any waste landforms will be rehabilitated as per the license requirements. Infrastructure The existence of appropriate infrastructure: availability of land for plant development, power, water, transportation (particularly for bulk commodities), labour, accommodation; or the ease with which the infrastructure can be provided, or accessed. The large portion of mining activities covered by this Pre-Feasibility study take place on the historical Bardoc Mining Centre, most recently mined by Aberfoyle Gold Pty Ltd between 1987 and Prior cleared land, dumps, open pits and underground workings exist in this area. Prior cleared land exists for plant development. The project s location close to the Goldfield-Menzies Highway, meaning power, water, and site access can be easily obtained and/or accessed. The bulk of the site labour is planned to be sourced from, and commute between, the City of Kalgoorlie-Boulder and the project via this highway. Costs The derivation of, or assumptions made, regarding projected capital costs in the study. The methodology used to estimate operating costs. Project capital costs are based on o Detailed PFS level process plant design and costing study by Mintrex Pty Ltd o Power supply studies and cost estimates by Western Power and Cardno BEC o Infrastructure relocation cost estimates from contractors based on detailed designs developed by SMEC Australia Pty Ltd o Mine start-up capital estimates by Auralia Mining Consulting With regards to fleet mining operation costs, studies were carried out to assess the most cost-effective method (hourly dry hire rates versus full contract volume rates). A detailed pricing submission process was carried out with reputable operating fleet hire/contract companies, during which multiple cost estimates were provided for both cost methods. Using these submissions studies showed a cost advantage in applying full contract volume rates to the two large open pits of Zoroastrian and excelsior, while displaying a minimal advantage in applying full contract volume rates to the satellite deposits. As part of the cost model build process, Auralia Mining Consulting excluded the best and worst confirming cost estimates for each fleet type and upon review selected the second most cost 15

16 Criteria JORC Code Explanation Commentary effective option across both fleet types, an all-inclusive full contract volume rate mine operating cost, covering site establishment, mobilisation/demobilisation, personnel, maintenance and drill blast operations. Underground operating cost submissions were received from several underground contractors, the selected contractor was a reputable group whose overall costs were in the mid-point of all submissions. The contract rates were split into fixed and variable and covered all aspects of operation. Derivation of transportation charges. Ore haulage transportation charges were applied to all satellite mining operations. Based on assumed haulage routes, they utilise an on-road/off-road ctkm figure (contractor quoted), with the costs then being accounted for as $/t ore (additional to the processing operating costs) during the optimisation process. The basis for forecasting or source of treatment and refining charges, penalties for failure to meet specification, etc. With regards to processing operating costs, an independent operating cost estimate was carried out by Mintrex Pty Ltd to Pre- Feasibility levels. Methodologies were based upon a mix of known comparable operating actuals, process design criteria and assumed values. The derivation of assumptions made of metal or commodity price(s), for the principal minerals and co- products. The source of exchange rates used in the study. The allowances made for royalties payable, both Government and private. All costs are in Australian Dollars. An assumed base gold price of A$1,450 per gold ounce was applied to the final PFS works. N/A all costs are in Australian Dollars. Allowances were made for WA State government royalties; 2.5% of the sale price was reduced as a sell cost upfront during the optimisation works. Specific private royalties have also been included in the Pre-Feasibility study. Allowances made for the content of deleterious elements. Elemental analysis and metallurgical characterisation test work carried out as part of this study did not show any deleterious elements that would affect process costs. Any PAF material is planned to be placed within the waste dump and fully encapsulated; this process did not add any additional costs for the mining process under a volume rate mining contract. Revenue factors The derivation of, or assumptions made regarding revenue factors including head grade, metal or commodity price(s) exchange rates, transportation and treatment charges, penalties, net smelter returns, etc. The head grade is derived from each individual Mineral Resource and applied Modifying Factors as described above. An assumed base gold price of A$1,450 per gold ounce was applied to the final Pre-Feasibility study. No doré transport or refining costs were applied. Market assessment The derivation of assumptions made of metal or commodity price(s), for the principal metals, minerals and co-products. The demand, supply and stock situation for the particular commodity, consumption trends and factors likely to affect supply and demand into the future. No revenue is allocated from silver by-product in doré. Gold is a precious metal and thus subject to fluctuations, due principally to market sentiment. A customer and competitor analysis along with the identification of likely market windows for the product. Production from the operating Project processing facility is planned to be sold as a mixture of spot and hedged gold. Price and volume forecasts and the basis for these forecasts. Using the parameters outlined in this section, the Pre-Feasibility lifeof-mine planning indicates that the Kalgoorlie North Gold Project could produce between 55k Oz Au and approximately 85k Oz Au per year, at an average of 70k Oz Au per year, over a 7+ year mine schedule. For industrial minerals the customer specification, testing and acceptance requirements prior to a supply contract. Economic The inputs to the economic analysis to produce the net present value (NPV) in the study, the source and confidence of these economic inputs including estimated inflation, discount rate, etc. N/A A discount rate of 10% was applied to the optimisation works. Inputs to the economic analysis include Modifying Factors as described above. 16

17 Criteria JORC Code Explanation Commentary NPV ranges and sensitivity to variations in the significant assumptions and inputs. Sensitivity studies were carried out. Standard linear deviations were observed. Social The status of agreements with key stakeholders and matters leading to social licence to operate. All key stakeholder agreements, including Native title and Pastoral Lease holder agreements are in place. The Company has close working relationships with communities and key stakeholders surrounding the Project. Other To the extent relevant, the impact of the following on the project and/or on the estimation and classification of the Ore Reserves: Any identified material naturally occurring risks. There are no known significant naturally occurring risks to the project. The status of material legal agreements and marketing arrangements. Certain tenements within the KNGP are subject to the Bardoc South Retained Right Agreement which provides Norton Goldfield Limited with a first right of refusal to treat ore mined from the tenements at the Paddington Mill and a royalty on gold produced. This Agreement covers satellite deposits at Jackorite, Castlereagh, Nerrin Nerrin, Big Blow South and El Dorado which form part of this Ore Reserve statement. The status of governmental agreements and approvals critical to the viability of the project, such as mineral tenement status, and government and statutory approvals. There must be reasonable grounds to expect that all necessary Government approvals will be received within the timeframes anticipated in the Pre- Feasibility or Feasibility study. Highlight and discuss the materiality of any unresolved matter that is dependent on a third party on which extraction of the reserve is contingent. All current deposits are located on granted Mining Leases and mining will be subject to the DMP approval process. There are no currently identified grounds upon which it is likely that mining approvals will be withheld. Access to mining in the Excelsior and Zoroastrian South open pits is restricted by road, rail and gas pipeline infrastructure which will require relocation prior to mining. Studies have been undertaken into the logistics and cost of relocation of this infrastructure which imposes cost and time constraints on the mining of these open pits. Negotiations with relevant government departments and infrastructure operators on the basis of detailed infrastructure relocation designs carried out by SMEC Australia Pty Ltd indicate that the relocation of the infrastructure is feasible and potentially economically viable. Classification The basis for the classification of the Ore Reserves into varying confidence categories. Measured Resources have been converted to Proven Reserves. Indicated Resources have been converted to Probable Reserves. Whether the result appropriately reflects the Competent Person s view of the deposit. The estimated Ore Reserves are, in the opinion of the Competent Person, appropriate for this style of deposit. Audits or reviews The proportion of Probable Ore Reserves that have been derived from Measured Mineral Resources (if any). The results of any audits or reviews of Ore Reserve estimates. No Measured Resources were downgraded to Probable Reserves Auralia Mining Consulting has completed an internal review of the Ore Reserve estimate resulting from this Pre-Feasibility study. Discussion of relative accuracy/ confidence Where appropriate a statement of the relative accuracy and confidence level in the Ore Reserve estimate using an approach or procedure deemed appropriate by the Competent Person. For example, the application of statistical or geostatistical procedures to quantify the relative accuracy of the reserve within stated confidence limits, or, if such an approach is not deemed appropriate, a qualitative discussion of the factors which could affect the relative accuracy and confidence of the estimate. The level of study carried out as part of this maiden Ore Reserve is to a Pre-Feasibility level. As per JORC 2012 definition it s at a lower confidence level than that of a Feasibility study and any risk factors, or areas of uncertainty which may impact on the confidence of the Ore Reserve Statement arising from these works must be taken into account accordingly. The statement should specify whether it relates to global or local estimates, and, if local, state the relevant tonnages, which should be relevant to technical and economic evaluation. Documentation should include assumptions made and the procedures used. Accuracy and confidence discussions should extend to specific discussions of It should be noted that all open pit deposits the optimal cash flow revenue factor (RF1) shell on which to base final pit designs. 17

18 Criteria JORC Code Explanation Commentary any applied Modifying Factors that may have a material impact on Ore Reserve viability, or for which there are remaining areas of uncertainty at the current study stage. Additionally, although the tails material was shown to carry grade in the excelsior pit, it was excluded from this study. It is recognised that this may not be possible or appropriate in all circumstances. These statements of relative accuracy and confidence of the estimate should be compared with production data, where available. Sensitivity studies were carried out. Standard linear deviations were observed. Globally, the project is susceptible to fluctuations in gold price. END 18

ASX Release ASX Code: YTC

ASX Release ASX Code: YTC HERA DEFINITIVE FEASIBILITY STUDY TO BE EXPANDED Hera DFS scope to be expanded to include the assessment of mining and treatment of high grade copper ores from the Nymagee Copper Mine together with additional

More information

Drilling, metallurgical test work and a new resource model add 21% to oxide gold reserves

Drilling, metallurgical test work and a new resource model add 21% to oxide gold reserves LA ARENA GOLD OXIDE RESERVES INCREASED TO 1.28MM OZ AT AU PRICE OF $1,200 COMPLETION OF THE PRE-FEASIBILITY STUDY FOR THE PHASE II SULPHIDE Cu-Au PROJECT Drilling, metallurgical test work and a new resource

More information

Confidence in Carrapateena project grows

Confidence in Carrapateena project grows 7 NOVEMBER 2016 Confidence in Carrapateena project grows Carrapateena Pre-Feasibility Study released - project competitive with, or better than comparable long-life copper assets globally Project metrics

More information

Second drill rig to accelerate major drilling program at Productora

Second drill rig to accelerate major drilling program at Productora DRAFT ASX ANNOUNCEMENT Thursday 11th September 2014 Second drill rig to accelerate major drilling program at Productora Expanded resource-reserve base will underpin completion of Productora Pre-feasibility

More information

For personal use only

For personal use only ASX ANNOUNCEMENT / MEDIA RELEASE ASX: ABU 30th September, 2014 ABM s Development Plan & Production Guidance for Old Pirate High-Grade Gold Deposit Highlights: 50,000 to 60,000 ounces of gold production

More information

TURKEY CREEK PIT OPTIMISATION STUDY ADDS 2 YEARS MINE LIFE TO THE LITTLE EVA PROJECT AT CLONCURRY

TURKEY CREEK PIT OPTIMISATION STUDY ADDS 2 YEARS MINE LIFE TO THE LITTLE EVA PROJECT AT CLONCURRY 10 August 2015 ASX: AOH, FSE: A2O TURKEY CREEK PIT OPTIMISATION STUDY ADDS 2 YEARS MINE LIFE TO THE LITTLE EVA PROJECT AT CLONCURRY Estimated oxide and sulphide resources within the optimum pit is 17.3

More information

NOLANS RARE EARTHS PROJECT: MAIDEN JORC ORE RESERVE

NOLANS RARE EARTHS PROJECT: MAIDEN JORC ORE RESERVE ASX RELEASE 11 December 2012 NOLANS RARE EARTHS PROJECT: MAIDEN JORC ORE RESERVE Independently prepared JORC Ore Reserve for Nolans Bore to support a 22 year mine life; 95% of Measured and Indicated Resources

More information

ASX ANNOUNCEMENT. Maiden Reserve for Catho Well Channel Iron Deposit, West Pilbara WA. Mt Stuart Joint Venture MAIDEN ORE RESERVE STATEMENT

ASX ANNOUNCEMENT. Maiden Reserve for Catho Well Channel Iron Deposit, West Pilbara WA. Mt Stuart Joint Venture MAIDEN ORE RESERVE STATEMENT ABN 46 006 045 790 14 th December 2010 ASX ANNOUNCEMENT Maiden Reserve for Catho Well Channel Iron Deposit, West Pilbara WA Cullen Resources Limited (ASX:CUL) (Cullen) is pleased to report the maiden JORC

More information

For personal use only

For personal use only ACN 097 088 689 01 DEFINITIVE FEASIBILITY STUDY SUPPORTS A MAJOR EXPANSION OF THE SYAMA GOLD MINE Definitive Feasibility Study completed for multifaceted expansion of Syama operation confirms its technical

More information

Azure Minerals Ltd ASX Code:

Azure Minerals Ltd ASX Code: Azure Minerals Ltd ASX Code: AZS @AzureMinerals www.azureminerals.com.au Tony Rovira Managing Director Azure Minerals Ltd Objective To be a low cost, high margin copper producer Strategy Developing our

More information

EXCO S PROJECT PIPELINE

EXCO S PROJECT PIPELINE EXCO S PROJECT PIPELINE INVESTOR UPDATE EXCO RESOURCES N.L. MAY 2010 Presented by Michael Anderson Managing Director DISCLAIMER This presentation contains forward looking statements that are subject to

More information

BROKEN HILL MINERAL RESOURCES AND ORE RESERVES UPDATE

BROKEN HILL MINERAL RESOURCES AND ORE RESERVES UPDATE 28 December 2011 BROKEN HILL MINERAL RESOURCES AND ORE RESERVES UPDATE Highlights The Ore Reserve has been established and a new Life of Mine plan for Southern Operations has been developed with economic

More information

ABM Hits 3000 Ounce Target from Trial Mining

ABM Hits 3000 Ounce Target from Trial Mining ASX ANNOUNCEMENT / MEDIA RELEASE ASX:ABU 12 th December 2013 ABM Hits 3000 Ounce Target from Trial Mining ABM Resources NL ( ABM or The Company ) presents an update on the Trial Mining and Processing at

More information

For personal use only

For personal use only ASX Code: MRP MacPhersons Resources Ltd ABN 98 139 357 967 ACN 139 357 967 Contact Details PO Box 10977 109 Maritana Street Kalgoorlie WA 6430 T +61 (0) 8 9091 7515 F +61 (0) 8 9091 7610 E info@mrpresources.com.au

More information

RE: REVIEW OF THE PRAIRIE CREEK MINE SCOPING STUDY

RE: REVIEW OF THE PRAIRIE CREEK MINE SCOPING STUDY January 29, 2001 Mr. Malcolm Swallow President & CEO Canadian Zinc Corporation Suite 1202-700 Pender Street Vancouver Canada V6C 1G8 By Fax: 604-688-2043 Total Number of Pages: 8 Dear Mr. Swallow: RE:

More information

QUARTERLY REPORT March 2011

QUARTERLY REPORT March 2011 QUARTERLY REPORT March 2011 Australian energy company, Blackham Resources Ltd (Blackham) ( ASX: BLK ) continues to advance the development of the Scaddan and Zanthus Coal to Liquids ( CTL ) projects. The

More information

Maiden Ore Reserve for Anglo Saxon Gold Project

Maiden Ore Reserve for Anglo Saxon Gold Project ABN 44 009 157 439 Company Announcement 20 June 2017 Level 2, 90 William St Melbourne Victoria 3000 Australia Telephone: +61 3 9605 5950 Facsimile: +61 3 9605 5999 Email: info@hawthornresources.com Maiden

More information

MCINTOSH STAGE 1 PRE-FEASIBILITY STUDY UPDATE

MCINTOSH STAGE 1 PRE-FEASIBILITY STUDY UPDATE ASX ANNOUNCEMENT 8 June 2016 MCINTOSH STAGE 1 PRE-FEASIBILITY STUDY UPDATE Open pit mining optimisation results demonstrate the potential for multiple low strip ratio, open pit operations across a range

More information

EXCO S PROJECT PIPELINE. Unlocking the Value

EXCO S PROJECT PIPELINE. Unlocking the Value EXCO S PROJECT PIPELINE Unlocking the Value EXCO RESOURCES N.L. 20 AUGUST 2010 Wholesale Investors Forum Presented by Michael Anderson Managing Director DISCLAIMER This presentation contains forward looking

More information

For personal use only

For personal use only ASX Code: ARH Company overview 19 February 2015 Table 1 2009 Mineral Resource Estimate (Balmoral South) Class Mt MagFe 2 Ore 1 Total Fe DTR 3 Fe Concentrate (80% passing 32µm) SiO 2 Al 2 O 3 P 2 O 5 Density

More information

Awak Mas DFS Optimisation - Metallurgical Breakthrough

Awak Mas DFS Optimisation - Metallurgical Breakthrough 10 October 2017 Awak Mas DFS Optimisation - Metallurgical Breakthrough Whole of Ore leach testwork delivers improved metallurgical recoveries. Gold recoveries range from 92% - 98% vs previous flotation-leach

More information

Australian Tailings Group Pty Ltd Synergy (SNR) Investor Presentation

Australian Tailings Group Pty Ltd Synergy (SNR) Investor Presentation Australian Tailings Group Pty Ltd Synergy (SNR) Investor Presentation Disclaimer Forward-Looking Statements This presentation contains forward looking statements concerning the projects owned by Australian

More information

Forward Looking Statement

Forward Looking Statement Olympias Forward Looking Statement Certain of the statements made in this Presentation may contain forward-looking statements or information within the meaning of the United States Private Securities Litigation

More information

AMUR MINERALS CORPORATION (AIM: AMC) Independent Review of Cost Estimates $1.78 Per Pound Nickel Cost to Deliver to Rail Station

AMUR MINERALS CORPORATION (AIM: AMC) Independent Review of Cost Estimates $1.78 Per Pound Nickel Cost to Deliver to Rail Station 17 July 2017 AMUR MINERALS CORPORATION (AIM: AMC) Independent Review of Cost Estimates $1.78 Per Pound Nickel Cost to Deliver to Rail Station Amur Minerals Corporation ( Amur or the Company ), a mineral

More information

Tri-K feasibility study update

Tri-K feasibility study update Tri-K feasibility study update Feasibility study work to date confirms technical viability of low cash cost operation Mining licence application process commenced, based on technical information submitted

More information

Activities Report Quarter Ended 31 st March 2015

Activities Report Quarter Ended 31 st March 2015 ASX & Media Release ASX Code AZM 30 th April 2015 www.azumahresources.com.au Investment Highlights: Wa Project: 2.0Moz Mineral Resource including 1.3Moz Measured & Indicated 624,000oz Ore Reserves at 2.14

More information

For personal use only

For personal use only ASX ANNOUNCEMENT 31 July 2016 MIRAFLORES UNDERGROUND MINE DEVELOPMENT OPTION TAKES SHAPE Metminco Limited ( Metminco or the Company ) (ASX: MNC; AIM: MNC) announces that it has received a preliminary mine

More information

Presentation and Company Update 7 July 2016 Dr Chris Giles, Managing Director. Cash flow from gold sales New project developments Exploration success

Presentation and Company Update 7 July 2016 Dr Chris Giles, Managing Director. Cash flow from gold sales New project developments Exploration success Presentation and Company Update 7 July 2016 Dr Chris Giles, Managing Director Cash flow from gold sales New project developments Exploration success The information in this presentation that relates to

More information

Strong open pit drilling results boost plan to grow Paulsens' production to 100,000ozpa

Strong open pit drilling results boost plan to grow Paulsens' production to 100,000ozpa ASX ANNOUNCEMENT 21 DECEMBER 2011 Australian Securities Exchange Code: NST Strong open pit drilling results boost plan to grow Paulsens' production to 100,000ozpa Highlights High-grade results of up to

More information

Syerston Nickel & Cobalt Pre-Feasibility Study Completed. Scandium by-product credits provide potential for significant economic upside

Syerston Nickel & Cobalt Pre-Feasibility Study Completed. Scandium by-product credits provide potential for significant economic upside (ASX: CLQ) Syerston Nickel & Cobalt Pre-Feasibility Study Completed 5 October, 2016 PFS demonstrates the potential for Syerston to become a leading global supplier of nickel and cobalt sulphate to the

More information

OMITIOMIRE OXIDE COPPER FEASIBILITY STUDY

OMITIOMIRE OXIDE COPPER FEASIBILITY STUDY INTERNATIONAL BASE METALS LIMITED OMITIOMIRE OXIDE COPPER FEASIBILITY STUDY 21 NOVEMBER 2013 Frank Bethune Ken Maiden Andre Genis Karl Hartmann PRESENTED BY FRANK BETHUNE AND KEN MAIDEN Disclaimer 2 This

More information

Study on Gonka Deposit and Taurus Extension

Study on Gonka Deposit and Taurus Extension Study on Gonka Deposit and Taurus Extension RNS Number : 7037N Hummingbird Resources PLC 02 February 2016 Hummingbird Resources plc ('Hummingbird' or 'the Company') Study on Gonka Deposit and Taurus Extension

More information

RESOURCE GOLD PTY. LTD.

RESOURCE GOLD PTY. LTD. Copyright RESOURCE GOLD PTY. LTD. Gold Recovery From Processing Of - Mill Site Materials - Alluvial Gold Deposits - Hard Rock Resources NOVEMBER, 2009 REVISION 3 1 Disclaimer! This presentation contains

More information

NEWS RELEASE NOT FOR DISSEMINATION IN THE UNITED STATES OR FOR DISTRIBUTION TO U.S. WIRE SERVICES

NEWS RELEASE NOT FOR DISSEMINATION IN THE UNITED STATES OR FOR DISTRIBUTION TO U.S. WIRE SERVICES Suite 250, 1075 West Georgia Street Vancouver, BC, Canada V6E 3C9 Tel: 1.778.373.0102 Fax: 1.604.639.4670 NEWS RELEASE NOT FOR DISSEMINATION IN THE UNITED STATES OR FOR DISTRIBUTION TO U.S. WIRE SERVICES

More information

WPG TO ENTER THE IRON ORE INDUSTRY

WPG TO ENTER THE IRON ORE INDUSTRY Western Plains Gold Ltd ABN 51 109 426 502 PO Box N239, Grosvenor Place NSW 1220, Australia Level 11, Kyle House, 27-31 Macquarie Place, Sydney, NSW Australia Telephone (+612) 9251 1044 Facsimile (+612)

More information

For personal use only

For personal use only ASX Market Update/Media release Monday 22 August 2016 Metals of Africa Reports Further Exceptional Metallurgical Results High grade chemical-free Flotation Testwork at Montepuez Project delivers >98% TGC

More information

209 million 36.1% Fe

209 million 36.1% Fe ASX ANNOUNCEMENT 29 August 2011 ASX Code: BDR MAIDEN IRON ORE RESOURCE ON BEADELL S MINING CONCESSION - BRAZIL 209 million tonnes @ 36.1 Fe Beadell Resources Limited ( Beadell ) is pleased to announce

More information

CNMC Goldmines Holdings Limited Sokor Gold Project Kelantan - Malaysia Reserves Dec 2011 Manson s & New Discovery Mines

CNMC Goldmines Holdings Limited Sokor Gold Project Kelantan - Malaysia Reserves Dec 2011 Manson s & New Discovery Mines CNMC Goldmines Holdings Limited Sokor Gold Project Kelantan - Malaysia Reserves Dec 2011 Manson s & New Discovery Mines ENT_112_NST Principal Authors: Matt Keenan, BEng Hons (Mining), BComm (Man) J-1391-Sokor

More information

Estimation of Open Cut Mining Recovery and Mining Dilution. Summary. Introduction. Estimation Techniques. AusIMM JORC Code Edition.

Estimation of Open Cut Mining Recovery and Mining Dilution. Summary. Introduction. Estimation Techniques. AusIMM JORC Code Edition. Estimation of Open Cut Mining Recovery and Mining Dilution By Kent Bannister, ARMIT, FAusIMM (CP), CEO Kent Bannister Pty Ltd, (KBPL) Summary Loss and dilution of Mineral Resource grade occurs during mining

More information

For personal use only

For personal use only ` 28 September 2011 ASX ANNOUNCEMENT CAZALY RESOURCES LIMITED COMPANY PRESENTATION Mr Clive Jones joint Managing Director of Cazaly Resources Limited (ASX: CAZ) ( Cazaly ) will be presenting the attached

More information

White Dam Gold Project Dump Leach

White Dam Gold Project Dump Leach ALTA 2015 White Dam Gold Project Dump Leach A division of Midas Engineering Group Mineral Engineering Technical Services PO Box 5778 St Georges Tce WA 6831 P: (+61 8) 9421 9000 F: (+61 8) 9325 8311 ABN

More information

For personal use only

For personal use only ASX Announcement Updated Banfora Scoping Study 4 increases NPV by 233% to A$210 Million with an IRR of 42% & AISC of US$800/oz Simple low cost up-scaling through addition of 1mtpa CIL plant with head grade

More information

Kibali Mine Development

Kibali Mine Development Kibali Mine Development The Kibali mine development in the Democratic Republic of Congo is the largest project undertaken to date by Randgold. With a reserve base at plus 10 million ounces and still growing,

More information

Ore Reserves and Mineral Resources Statements 30 June 2013

Ore Reserves and Mineral Resources Statements 30 June 2013 ASX Release / 22 August 2013 Ore Reserves and Mineral Resources Statements 30 June 2013 Ore Reserves at 30 June 2013: 77.8 Mt @ 2.1 g/t Au for 5.24 million ounces of contained gold The acquisition of Gold

More information

23 July Half-Year Trading Update Petropavlovsk PLC ( Petropavlovsk, the Company or, together with its subsidiaries excluding IRC Limited

23 July Half-Year Trading Update Petropavlovsk PLC ( Petropavlovsk, the Company or, together with its subsidiaries excluding IRC Limited 23 July 2013 2013 Half-Year Trading Update Petropavlovsk PLC ( Petropavlovsk, the Company or, together with its subsidiaries excluding IRC Limited ("IRC"), the Group ) today issues its Trading Update for

More information

OCEANAGOLD PROVIDES AN UPDATE TO HAILE COMMISSIONING AND REVISED COMPANY GUIDANCE

OCEANAGOLD PROVIDES AN UPDATE TO HAILE COMMISSIONING AND REVISED COMPANY GUIDANCE MEDIA RELEASE 26 June 2017 OCEANAGOLD PROVIDES AN UPDATE TO HAILE COMMISSIONING AND REVISED COMPANY GUIDANCE (All financial figures in US Dollars unless otherwise stated) (MELBOURNE) OceanaGold Corporation

More information

SILVERCORP REPORTS SILVER PRODUCTION OF 5.0 MILLION OUNCES, CASH FLOWS FROM OPERATIONS OF $31.9 MILLION, OR $0

SILVERCORP REPORTS SILVER PRODUCTION OF 5.0 MILLION OUNCES, CASH FLOWS FROM OPERATIONS OF $31.9 MILLION, OR $0 NEWS RELEASE Trading Symbol: TSX: SVM SILVERCORP REPORTS SILVER PRODUCTION OF 5.0 MILLION OUNCES, CASH FLOWS FROM OPERATIONS OF $31.9 MILLION, OR $0.19 PER SHARE, FOR FISCAL YEAR ENDED MARCH 31, 2016 VANCOUVER,

More information

SILVERCORP REPORTS Q3 RESULTS: NET INCOME OF $12.7 MILLION, $0.08 PER SHARE AND PROVIDES FISCAL 2019 PRODUCTION AND CASH COSTS GUIDANCE

SILVERCORP REPORTS Q3 RESULTS: NET INCOME OF $12.7 MILLION, $0.08 PER SHARE AND PROVIDES FISCAL 2019 PRODUCTION AND CASH COSTS GUIDANCE NEWS RELEASE Trading Symbol: TSX: SVM NYSE AMERICAN: SVM SILVERCORP REPORTS Q3 RESULTS: NET INCOME OF $12.7 MILLION, $0.08 PER SHARE AND PROVIDES FISCAL 2019 PRODUCTION AND CASH COSTS GUIDANCE VANCOUVER,

More information

For personal use only

For personal use only INVESTOR UPDATE May 2016 Disclaimer Statements & material contained in this presentation, particularly those regarding possible or assumed future performance, production levels or rates, metal prices,

More information

Georgian Mining Corporation / EPIC: GEO / Sector: Natural Resources

Georgian Mining Corporation / EPIC: GEO / Sector: Natural Resources 24 October 2017 Georgian Mining Corporation / EPIC: GEO / Sector: Natural Resources Georgian Mining Corporation Drilling Update from KB Gold Zone 2 and New Gold Discovery Georgian Mining Corporation (

More information

THIRD QUARTER REPORT 14 OCTOBER 2014

THIRD QUARTER REPORT 14 OCTOBER 2014 THIRD QUARTER REPORT 14 OCTOBER 2014 DISCLAIMER This presentation has been prepared by OZ Minerals Limited ( OZ Minerals ) and consists of written materials/slides for a presentation concerning OZ Minerals.

More information

For personal use only

For personal use only ASX RELEASE 5 December 2016 Successful beneficiation studies highlight potential for substantial cost reduction for Wiluna Uranium Project Toro Energy Limited (ASX:TOE) announces Beneficiation and Process

More information

Major Capital Cost Reductions Reposition Wa Gold Project, Ghana

Major Capital Cost Reductions Reposition Wa Gold Project, Ghana Major Capital Cost Reductions Reposition Wa Gold Project, Ghana ASX & Media Release ASX Code AZM 9 th May 2016 $54M reduction to $142M establishment cost (US$129M excluding US$13M Ghana VAT 1 ) ~90,000ozpa,

More information

Maiden Inferred Iron Ore Resources for Gum Flat

Maiden Inferred Iron Ore Resources for Gum Flat 30 April 2009 The Manager ASX Announcements Maiden Inferred Iron Ore s for Gum Flat Lincoln Minerals Limited ( LML ) is pleased to announce Inferred s for its Gum Flat Iron Ore Project on southern Eyre

More information

IDM Mining Updates Pre-Development Engineering and Optimization at Red Mountain Gold Project

IDM Mining Updates Pre-Development Engineering and Optimization at Red Mountain Gold Project IDM Mining Updates Pre-Development Engineering and Optimization at Red Mountain Gold Project November 30 th, 2017, Vancouver, BC IDM Mining Ltd. (TSX.V:IDM) (OTCQB:IDMMF) ( IDM or the Company ) is pleased

More information

MAIDEN RESOURCE STATEMENT FOR TCM COAL PROJECT, INDONESIA

MAIDEN RESOURCE STATEMENT FOR TCM COAL PROJECT, INDONESIA 311 313 Hay Street SUBIACO WA 6008 P: + 61 8 9381 5819 F: + 61 8 9388 3701 ABN: 45 098 448 269 www.panasiacorp.com.au 11 May 2010 The Manager Company Announcements Platform Australian Securities Exchange

More information

PRELIMINARY OXIDE HEAP LEACH TESTWORK DELIVERS EXCELLENT RESULTS AT THE SOUTH HOUNDÉ PROJECT

PRELIMINARY OXIDE HEAP LEACH TESTWORK DELIVERS EXCELLENT RESULTS AT THE SOUTH HOUNDÉ PROJECT NEWS RELEASE APRIL 7, 2014 PRELIMINARY OXIDE HEAP LEACH TESTWORK DELIVERS EXCELLENT RESULTS AT THE SOUTH HOUNDÉ PROJECT VANCOUVER, CANADA. Sarama Resources Ltd. ( Sarama or the Company ) is pleased to

More information

Mt Morgans Australia s next 200kozpa gold producer

Mt Morgans Australia s next 200kozpa gold producer Mt Morgans stralia s next 200kozpa gold producer Construction >75% complete On time and on budget Underground mining 750m ahead of schedule Open pit mining to start this month 8 drill rigs on site First

More information

Australasian Code for Reporting of Mineral Resources and Ore Reserves

Australasian Code for Reporting of Mineral Resources and Ore Reserves 1999 Edition Australasian Code for Reporting of Mineral Resources and Ore Reserves (The JORC Code) Prepared by the Joint Ore Reserves Committee of The Australasian Institute of Mining and Metallurgy, Australian

More information

For personal use only

For personal use only KEY POINTS Reserves and Resources Update For further information, please contact: Peter Bird Managing Director Heemskirk Consolidated Limited ABN 18 106 720 138 Level 5 303 Collins Street Melbourne Victoria

More information

Geology and mineral resources of the Kylylahti Mine

Geology and mineral resources of the Kylylahti Mine Geology and mineral resources of the Kylylahti Mine asenteella - tuurilla törmäillen; harkiten harmitta Jari Juurela Altona Mining Ltd Geology Manager - Finland 24.04.2014 Disclaimer and JORC Compliance

More information

Non-IFRS performance measure. Refer to the Non-IFRS Performance Measures contained in the Q Management s Discussion and Analysis.

Non-IFRS performance measure. Refer to the Non-IFRS Performance Measures contained in the Q Management s Discussion and Analysis. PRESS RELEASE TSX NYSE: RIC Richmont Mines Reports Strong Second Quarter Financial Results Driven by Solid Operational and Record Cost Performance from the Island Gold Mine; Reports Net Free Cash Flow

More information

TERRAMIN AUSTRALIA LIMITED. Annual General Meeting

TERRAMIN AUSTRALIA LIMITED. Annual General Meeting TERRAMIN AUSTRALIA LIMITED Annual General Meeting 27 May 2016 Disclaimer & Competent Person Statement Disclaimer This presentation has been prepared by Terramin Australia Limited (Terramin). It is current

More information

North River Resources plc / Ticker: NRRP / Index: AIM / Sector: Mining 30 June 2014 North River Resources plc ( North River or the Company )

North River Resources plc / Ticker: NRRP / Index: AIM / Sector: Mining 30 June 2014 North River Resources plc ( North River or the Company ) North River Resources plc / Ticker: NRRP / Index: AIM / Sector: Mining 30 June 2014 North River Resources plc ( North River or the Company ) Namib Project - Mine Development Plan North River is pleased

More information

AVINO SILVER & GOLD MINES LTD.

AVINO SILVER & GOLD MINES LTD. April 13, AVINO SILVER & GOLD MINES LTD. T 604.682.3701 Suite 900, 570 Granville Street ir@avino.com F 604.682.3600 Vancouver, BC V6C 3P1 www.avino.com NYSE-MKT: ASM TSX-V: ASM FSE: GV6 AVINO ANNOUNCES

More information

Ferrex plc / Index: AIM / Epic: FRX / Sector: Mining

Ferrex plc / Index: AIM / Epic: FRX / Sector: Mining Ferrex plc / Index: AIM / Epic: FRX / Sector: Mining 16 May 2012 Ferrex plc ( Ferrex or the Company ) Positive Scoping Study Results Malelane Iron Ore Project South Africa Ferrex plc, the AIM quoted iron

More information

AuRico Gold Provides Monthly Update on Young-Davidson Ore Processing Underway

AuRico Gold Provides Monthly Update on Young-Davidson Ore Processing Underway AuRico Gold Provides Monthly Update on Young-Davidson Ore Processing Underway Toronto: April 5, 2012: AuRico Gold Inc. (TSX:AUQ) (NYSE:AUQ), ( AuRico, AuRico Gold or the Company ) is pleased to provide

More information

Pit to Port Infrastructure in SA

Pit to Port Infrastructure in SA Pit to Port Infrastructure in SA An Explorer s Perspective Dr A. John Parker Managing Director SA Mining and Energy Infrastructure Conference 2011 12-13 April 2011 Disclaimer & Competent Person s Statement

More information

Olympias: Highlights Q Phase 1 Retreatment. Acquired from European Goldfields in February. EIA approved. Phase 1 Retreatment began

Olympias: Highlights Q Phase 1 Retreatment. Acquired from European Goldfields in February. EIA approved. Phase 1 Retreatment began Olympias Olympias: Highlights 2011 2012 2013 2016 Q3 2017 EIA approved Acquired from European Goldfields in February Phase 1 Retreatment began Phase 1 Retreatment complete Planned Phase 2 Commercial Production

More information

PROUDLY POSITIONED AS AN AUSTRALIAN MINER ASX:MLX. November 2017 AGM Presentation

PROUDLY POSITIONED AS AN AUSTRALIAN MINER ASX:MLX. November 2017 AGM Presentation PROUDLY POSITIONED AS AN AUSTRALIAN MINER ASX:MLX November 2017 AGM Presentation DISCLAIMER General Disclaimer This presentation has been prepared by Metals X Limited ( Metals X or the Company ) for the

More information

Santacruz Silver Reports First Quarter 2017 Production and Financial Results

Santacruz Silver Reports First Quarter 2017 Production and Financial Results TSX.V: SCZ FSE: 1SZ May 31, 2017 Santacruz Silver Reports First Quarter 2017 Production and Financial Results Vancouver, B.C. Santacruz Silver Mining Ltd. (TSX.V:SCZ) (the Company or Santacruz ) reports

More information

For personal use only. Cummins Range Rare Earths Project

For personal use only. Cummins Range Rare Earths Project Cummins Range Rare Earths Project December 2011 DISCLAIMER The information contained in this presentation is not financial product advice. The presentation is for information purposes and is of a general

More information

Copyright in this document is wholly reserved to Ausenco Services Pty Ltd.

Copyright in this document is wholly reserved to Ausenco Services Pty Ltd. DISCLAIMER This document is for the private information and benefit only of the client for whom it was prepared and the particular purpose previously advised to Ausenco Services Pty Ltd. The contents of

More information

Sconi and Flemington: Two near-production cobalt-nickel-scandium deposits. ASX: AUZ October 2017

Sconi and Flemington: Two near-production cobalt-nickel-scandium deposits. ASX: AUZ October 2017 Sconi and Flemington: Two near-production cobalt-nickel-scandium deposits ASX: AUZ October 2017 www.australianmines.com.au Important notes on these slides This document is a visual aid accompanying a presentation

More information

Resource Efficient Mining Processes of Tomorrow

Resource Efficient Mining Processes of Tomorrow Metso Process Technology & Innovation (PTI) Resource Efficient Mining Processes of Tomorrow R&D Project Authors: K Duffy W Valery A Jankovic P Holtham www.metso.com General PTI presentation 2014 2015 A

More information

Atlantic Ltd (ASX: ATI; Atlantic or the Company) is pleased to present its report for the quarter ended 30 June 2011.

Atlantic Ltd (ASX: ATI; Atlantic or the Company) is pleased to present its report for the quarter ended 30 June 2011. 1 2 QUARTERLY REPORT Atlantic Ltd (ASX: ATI; Atlantic or the Company) is pleased to present its report for the quarter ended 30 June 2011. HIGHLIGHTS Windimurra vanadium project remains on track for first

More information

What is Enterprise Optimisation?

What is Enterprise Optimisation? What is Enterprise Optimisation? Enterprise optimisation solves the production schedule challenges of mining and processing operations with multiple pits, mining faces and underground mines, multiple metal

More information

For personal use only

For personal use only BUILDING A COPPER COMPANY IN BRAZIL Investor Update Feb 2013 1 Disclaimer The announcement may contain certain forward-looking statements. Words anticipate, believe, expect, forecast, estimate, likely,

More information

CIP/CIL Modelling. Theory and Application. Tyler Crary, SGS Canada. October 20, Presented By: Chad Czerny, SGS Australia

CIP/CIL Modelling. Theory and Application. Tyler Crary, SGS Canada. October 20, Presented By: Chad Czerny, SGS Australia CIP/CIL Modelling Theory and Application Tyler Crary, SGS Canada Presented By: Chad Czerny, SGS Australia October 20, 2017 SGS Australia Pty. Ltd. SGS Minerals Metallurgy Malaga, Western Australia SGS

More information

Newmont Reports 2017 Reserves and Resources; Reserve additions replace depletion, Resources increase

Newmont Reports 2017 Reserves and Resources; Reserve additions replace depletion, Resources increase NEWS RELEASE NYSE: NEM newmont.com Newmont Reports 2017 Reserves and Resources; Reserve additions replace depletion, Resources increase DENVER, February 21, 2018 Newmont Mining Corporation (NYSE: NEM)

More information

Indonesia s Next World Class Mining Company

Indonesia s Next World Class Mining Company Indonesia s Next World Class Mining Company Tujuh Bukit Oxide Heap Leach Project Update March 2016 1 Disclaimer PT Merdeka Copper Gold Tbk ( PT MCG ) make no representation or warranty (express or implied)

More information

For personal use only. Minerals Explorer in South Korea

For personal use only. Minerals Explorer in South Korea Minerals Explorer in South Korea Forward-looking and Competent Person Statement Certain statements contained in this presentation constitute forward looking statements. Such forward-looking statements

More information

ASX ANNOUNCEMENT RED MOUNTAIN MINING LTD 15 June 2016

ASX ANNOUNCEMENT RED MOUNTAIN MINING LTD 15 June 2016 ASX : RMX COMPANY DIRECTORS Neil Warburton Non-Executive Chairman Michael Wolley Non-Executive Director Jon Dugdale Managing Director Shannon Coates Company Secretary ASX ANNOUNCEMENT RED MOUNTAIN MINING

More information

For personal use only

For personal use only ASX/Media Announcement 12 May 2017 NEW METALLURGICAL TESTWORK RESULTS DELIVER PROCESS IMPROVEMENTS AND OPERATING COST SAVINGS Outstanding results from flotation testwork and pilot program demonstrates

More information

Australia s New Nickel

Australia s New Nickel Australia s New Nickel Proactive Investors Forum, Sydney David Singleton, MD & CEO 9 July 2014 Agenda The Windarra Nickel Mine Black Swan Processing Plant & Mine Nickel Market Boom developing 2 2 Windarra

More information

THE NOLANS RARE EARTHS PROJECT

THE NOLANS RARE EARTHS PROJECT THE NOLANS RARE EARTHS PROJECT Gavin Lockyer Managing Director August 2015 DISCLAIMER Important Notice This presentation contains certain statements which may constitute forward-looking statements. Such

More information

For personal use only

For personal use only CROSSLAND URANIUM MINES LTD (ASX: CUX) Featuring Charley Creek, Northern Territory - a rapidly developing strategic Rare Earth Resource The following presentation briefly outlines: The Rare Earth industry,

More information

For personal use only

For personal use only 19 October 2015 PARINGA CONTRACTS FUTURE COAL SALES TOTALING US$220 MILLION WITH A MAJOR UTILITY HIGHLIGHTS: Paringa has executed its cornerstone coal sales agreement with LG&E and KU, two of the largest

More information

NEW LIFE OF MINE PLAN AT MRC BOOSTS GOLD PRODUCTION ABOVE 200,000 OZS. Canadian dollars unless otherwise noted

NEW LIFE OF MINE PLAN AT MRC BOOSTS GOLD PRODUCTION ABOVE 200,000 OZS. Canadian dollars unless otherwise noted NEW LIFE OF MINE PLAN AT MRC BOOSTS GOLD PRODUCTION ABOVE 200,000 OZS January 29, 2018 Maintains industry lowest quartile AISC over new Life of Mine at CAD$692 / oz. Au (USD$555 / oz. Au) Canadian dollars

More information

EXCELLENT NICKEL LEACHING TESTWORK RESULTS

EXCELLENT NICKEL LEACHING TESTWORK RESULTS ASX AND MEDIA RELEASE - 22 FEBRUARY 2007 EXCELLENT NICKEL LEACHING TESTWORK RESULTS Metallica is pleased to report that excellent results have been received from ongoing nickel leaching testwork on NORNICO

More information

For personal use only

For personal use only NEWS RELEASE DECEMBER 20, 2013 NEW HIGH-GRADE COPPER PROSPECT SECURED IN CHILE Guayacán copper-gold prospect returns surface channel samples grading up to 4.13% Cu Key Points: Option secured over prospective

More information

For personal use only

For personal use only HAMMER METALS LIMITED PRESENTATION June 2016 ABN. 87 095 092 158 Mining 2015 Resources Convention 2015 Queensland Explorer of the Year CORPORATE SUMMARY Russell Davis Chairman Alex Hewlett Executive Director

More information

Mt Thirsty Cobalt Project - Scoping Study

Mt Thirsty Cobalt Project - Scoping Study Mt Thirsty Cobalt Project - Scoping Study The Mt Thirsty Joint Venture (MTJV, 50%, Conico Ltd-ASX: CNJ: 50% Barra Resources Ltd- ASX: BAR) is pleased to announce that the Scoping Study (Study) has returned

More information

For personal use only

For personal use only 27 April 2017 ASX Announcement March 2017 Quarterly Activities Report Summary Chelkar - Assay High Grade Potash Mineralisation Present Bankable Feasibility Study Advances for Satimola Project JV with Chongqing

More information

Developing High Grade Projects in Mexico

Developing High Grade Projects in Mexico Developing High Grade Projects in Mexico ASX: AZS @AzureMinerals www.azureminerals.com.au Tony Rovira Managing Director Azure Minerals Ltd 20 February 2018 Exciting High Quality Projects Sara Alicia: 100%

More information

New Gold Announces Highest Gold Production and Lowest Cash Cost in its History and Provides 2011 Guidance

New Gold Announces Highest Gold Production and Lowest Cash Cost in its History and Provides 2011 Guidance New Announces Highest Production and Lowest Cash Cost in its History and Provides 2011 Guidance (All figures are in US dollars unless otherwise indicated) February 2, 2011 New Inc. ( New ) (TSX and NYSE

More information

For personal use only

For personal use only 20 April 2017 Highlights Production Up, Costs Down, More Treasure FY17 guidance upgraded to 325,000oz @ A$1,150/oz Gold sales of 325,000oz expected for FY17 Major gold discovery confirmed at Nafolo Outstanding

More information

BUCHANS MINERALS SUCCESSFULLY PRODUCES HIGH PURITY MANGANESE ELECTROLYTE FOR THE PRODUCTION OF ELECTROLYTIC MANGANESE METAL

BUCHANS MINERALS SUCCESSFULLY PRODUCES HIGH PURITY MANGANESE ELECTROLYTE FOR THE PRODUCTION OF ELECTROLYTIC MANGANESE METAL Head Office 247 Dill Road, RR 1 Windsor, NS, Canada, B0N 2T0 Trading Symbol: TSXV: BMC News Release No. 10-12 Shares Outstanding: 150,898,545 May 3 rd, 2012 T (902) 472 3520 F (902) 472 3521 www.buchansminerals.com

More information

For personal use only

For personal use only Aus Tin Mining Limited (ASX:ANW) World scale Tin Project with JORC Reserves located in New South Wales Tin Seminars (Brisbane 3 rd November, Melbourne 5 th November, Sydney 6 th November) Important Information