1 Negatively Geared Ore Reserves - A Major Peril of the Break-Even Cut Off Grade Julian Poniewierski March 2016 AusIMM Project Evaluation 2016, Adelaide.

2 Hands Up - What would you prefer: Of following Ore Reserve options: (both profitable) (a) % Cu (900 Mlb copper) (b) % Cu (600 Mlb copper) It appears that most CEOs choose (a) 2

3 Hands Up - What would you prefer: Of following Project options: NPV = 152 M$ or 77 M$ 3

4 Hands Up - What would you prefer: Of following Ore Reserve/Project options: (a) % Cu NPV = 77 M$ (b) % Cu NPV = 152 M$ Same project, different cut-off grade. 250 Mt total material, $3/lb Cu, typical OP costs, i=8%, pre-tax 4

5 My Proposition: Significant negative value tonnages in Ore Reserves have compounded Mining Company financial problems. Like a negatively geared investment house, in a falling property market, negatively geared ore reserves have magnified the loss when commodity prices have dropped. 5

6 Introduction Break-even Cut-Off Grade Usually excludes costs NOT associated with processing decision ( ore not rock costs) Excluded costs have to be covered by difference between break-even grade and actual value of a mined grade. If accepted definition is material that pays for itself, then it should pay for itself when it is by itself 6

7 Introduction Break-even Cut-Off Grade Inherent Risk in break-even COG Ore Reserves Risk magnified when negative value tonnages included Ken Lane s theories of COG selection for NPV maximisation, now 52 years old (published 1964 ). Brian Hall s Hill of Value now 13 years old. (2003) Industry still stuck on BE-COG; so let s - at least - get it right 7

8 Distribution of Value In a typical ore reserve using a break-even cut-off grade, a lot of ore is marginal. Data from real example open pit. Typical. 8

9 Distribution of Value Real Tonnage Distribution by $/t Value (typical): 9

10 Distribution of Value Value Proportion Distribution by $/t Value: 10

11 Distribution of Value Cumulative Tonnage vs. Cumulative Value: Bottom 27% of tonnes only 6% value Top 27% of tonnes 60% Value Same Tonnage, Same Work, 10 times the value A lot of material is mined & milled for Practice Bin Cum % Tonnes Cum % Value <0 0% 0% % 6% % 22% % 40% % 52% % 63% % 73% % 82% % 87% % 91% % 94% 11

12 Implication of an Error Tonnage Distribution Change in with a 5$/t Error: 55% of material ΣValue = 0 Non break-even calculation costs to still be paid for 12

13 What a $5/t Error Looks Like Gold: 1600 A$/oz: 0.10 g Au recovered /tonne (1150 US$/ oz and 0.72 USD:AUD) Copper: 2.40 US$/lb: 0.10 % (recovered Cu) 4.50 US$/lb: 0.05 % (recovered Cu) Rounding Error 13

14 The Leverage Effect of an Error Consider following two ore reserves: A: -5 $/t COV B: +5 $/t COV 100 Mt 735 M$ 7.35 $/t 45 Mt 735 M$ 16.3 $/t NPV of A: 77 M$ NPV of B: 152 M$ Pre-tax; 8%; 250 Mt TMM; 5 Mtpa Mill, Typical OP mining, processing & treatment costs

15 The Leverage Effect of an Error After a 15$/t equivalent price fall: A: -5 $/t COV B: +5 $/t COV 100 Mt -765 M$ $/t 45 Mt 60 M$ 1.34 $/t A fell 2.2 times more in value than B M$ 1500 vs M$ 634

16 Types of $5/t Errors Recovery Errors Fixed Recovery Lab Data vs. Real Data. Ignoring Data Median vs. the Mean Cost Omissions & Errors 16

17 Fixed Recovery Error Fixed Recovery = Using Project Average Recovery for Average Head Grade for all Tonnes down to BEG: e.g. 1.5 g/t & 0.3 g/t Example Gold Mine #1 (real): Reserve Head Grade = 2.2 g/t Au Mill Recovery = 94.0% COG = 0.9 g/t (controlled by a physical limit) 17

18 Fixed Recovery Error Example Gold Mine #1 (real): Recovery varies by Head Grade Fixed Tails Grade often a better Estimate of Recovery 94.0% of 2.2 g/t Au tails grade = 0.13 g/t JV partner wanted to Increase Ore Reserves (market value perception) 18

19 Fixed Recovery Error Example Gold Mine #1 (real): New Ore Reserve with 0.4 g/t & 94% recovery: 94% 0.4 g/t Tails grade = 0.02 g/t (Note world s best gold plant has a tails grade around g/t) [NB: implies 0.38 g/t recovered] 0.13 g/t Tails grade for 0.4 g/t 67% Recovery. If Require 0.38 g/t recovered gold for break-even then at 0.13 g/t tails grade, break-even COG = 0.5 g/t (not 0.4) Remember: 0.1 g/t; $5/t maybe 20-30% of Ore Reserve with negative value 19

20 Fixed Recovery Error OK Fixed Tail may underestimate true recovery. Nobody goes broke making more money than they thought 20

21 Reality Bites (Laboratory vs. Real Mill Performance) Example Gold Mine #1 again: 21

22 Reality Bites (Laboratory vs. Real Mill Performance) Example Gold Mine #1 again: Actual average = 0.25 g/t break-even of 0.6 g/t 0.2 g/t error: Now maybe 40-60% of Ore Reserve negative value 22

23 Ignoring Data Error More common than you would (should) think: 23

24 Ignoring Data Error Gold Mine #2: Using 0.11 g/t Fixed Tail for Ore Reserves No-one had analysed the available data: Remember: 0.1 g/t; $5/t maybe 20-30% of Ore Reserve with negative value 24

25 Means, Medians & Modes The FLAW of Averages : 25

26 Means, Medians & Modes Common Error: Assuming Modal or Median Value as the Correct value; rather than the Mean value Distributions of Values are usually Skewed 26

27 Chapter navigator (to add Insert, Header & Footer, Footer and apply) Means, Medians & Modes Example Raisebore drill & move time data (Kidd Creek) Median = 11.5 Mean = 13.6 (18% ) so fixed costs (labour) 18% higher & stope turn over slower. 27

28 Means, Medians & Modes Common Error is Assuming Modal or Median Value as the Correct value; rather than the Mean value Distributions of Values are usually Skewed Imagine a project made up of dozens (hundreds?) of such errors? Skewed distributions: Mean of Sum Sum of Means 28

29 Simple Cost Errors & Omissions More common than you would (should) think: Real Data OP Gold mine #3: Reasons for increase included: Logistics: Access Road Mill Parts Cyanide underestimated Power cost increases Year X Year X+1 G&A 5$Mpa 12$Mpa % Increase 1.28 $/t 3.56 $/t 178% Mining 2.24 $/t 2.28 $/t 2% Milling 8.92 $/t $/t 33% Total: $/t $/t 43% Remember: $5/t, maybe 20-30% of Ore Reserve with negative value 29

30 Simple Cost Errors & Omissions Nothing is ever wrong in the design is it? 30

31 Simple Cost Errors & Omissions And some-times things can get worse: 31

32 Clues to Look For Discussed issues. Things don t gel: Historical Quarterly Total Costs vs. Head Grade 32

33 Clues to Look For Discussed issues. Things don t gel: Historical Trend 33

34 Clues to Look For Discussed issues. Things don t gel: Ore Reserve Grade 34

35 Clues to Look For Discussed issues. Things don t gel: Most Likely Total Costs from Historical Trends 35

36 Clues to Look For Discussed issues. Things don t gel: Ore Reserve Price 36

37 Clues to Look For Discussed issues. Things don t gel: Historical Trend Total Costs for Ore Reserve Grade >> Ore Reserve Price 37

38 Other Clues to Look For Misaligned Executive KPIs e.g. Size of Reserves Management Strong on spin Low on technical detail 38

39 Other Clues to Look For Corners Cut: 39

40 Conclusions Errors/Omissions in Break-Even COG calculation Negative geared ore reserves Increased project/company risk profile Experience can avoid some of errors: Benchmarking of Data Don t ignore data; Don t ignore experience "A conclusion is the place where you got tired of thinking." Steven Wright 40

41 Thank you

Underground Ore Reserve growth at Prominent Hill extends mine life to 2030

Underground Ore Reserve growth at Prominent Hill extends mine life to 2030 12 NOVEMBER 2018 Underground Ore Reserve growth at Prominent Hill extends mine life to 2030 Prominent Hill underground Ore Reserve increased to 40Mt @ 1.7% copper equivalent i with a 50% increase in Proved

More information

MINERAL RESOURCES & MINERAL RESERVES STATUS AS AT 31 DECEMBER 2015 Tim Rowland Group Competent Person 11 th April 2016 Market Presentation

MINERAL RESOURCES & MINERAL RESERVES STATUS AS AT 31 DECEMBER 2015 Tim Rowland Group Competent Person 11 th April 2016 Market Presentation MINERAL RESOURCES & MINERAL RESERVES STATUS AS AT 31 DECEMBER 2015 Tim Rowland Group Competent Person 11 th April 2016 Market Presentation Forward looking statements Certain statements in this document

More information

Copper Silver Gold. TSX-V, Nasdaq First North: FIL filo-mining.com. Corporate Presentation July, 2017

Copper Silver Gold. TSX-V, Nasdaq First North: FIL filo-mining.com. Corporate Presentation July, 2017 Copper Silver Gold TSX-V, Nasdaq First North: FIL filo-mining.com Corporate Presentation July, 2017 CAUTIONARY STATEMENT All information included in this presentation, including any information as to the

More information

QUARTERLY PRODUCTION REPORT: KANMANTOO PRODUCTION AHEAD OF YTD GUIDANCE

QUARTERLY PRODUCTION REPORT: KANMANTOO PRODUCTION AHEAD OF YTD GUIDANCE Monday, 12 May 2014 QUARTERLY PRODUCTION REPORT: KANMANTOO PRODUCTION AHEAD OF YTD GUIDANCE Hillgrove Resources Limited (ASX: HGO) is pleased to report further consolidation of production at its Kanmantoo

More information

Copper Silver Gold. TSX-V, Nasdaq First North: FIL filo-mining.com. Corporate Presentation October, 2017

Copper Silver Gold. TSX-V, Nasdaq First North: FIL filo-mining.com. Corporate Presentation October, 2017 Copper Silver Gold TSX-V, Nasdaq First North: FIL filo-mining.com Corporate Presentation October, 2017 CAUTIONARY STATEMENT All information included in this presentation, including any information as to

More information

Ravenswood Expansion Project Update

Ravenswood Expansion Project Update 11 July 2018 Ravenswood Expansion Project Update Highlights AISC down, mine life extended, all required approvals received Significant enhancements have been made to Ravenswood Expansion Project All required

More information

OZ MINERALS. JP Morgan Melbourne Mining Day. Terry Burgess, Managing Director and CEO. Melbourne 16 October 2009 OZMINERALS.COM

OZ MINERALS. JP Morgan Melbourne Mining Day. Terry Burgess, Managing Director and CEO. Melbourne 16 October 2009 OZMINERALS.COM OZ MINERALS JP Morgan Melbourne Mining Day Terry Burgess, Managing Director and CEO Melbourne 16 October 2009 OZMINERALS.COM OZ MINERALS: CURRENT STATUS 2 Prominent Hill ramping-up to name-plate capacity

More information

Confidence in Carrapateena project grows

Confidence in Carrapateena project grows 7 NOVEMBER 2016 Confidence in Carrapateena project grows Carrapateena Pre-Feasibility Study released - project competitive with, or better than comparable long-life copper assets globally Project metrics

More information

Australia s leading explorer in Mexico

Australia s leading explorer in Mexico Australia s leading explorer in Mexico ASX: AZS @AzureMinerals www.azureminerals.com.au Tony Rovira Managing Director & CEO VRIC January 2017 Corporate Overview KEY STATISTICS ASX Code Share Price AZS

More information

Quality, Diverse Group of Mining Assets. February 2018

Quality, Diverse Group of Mining Assets. February 2018 Quality, Diverse Group of Mining Assets February 2018 1 Forward Looking Statements Some of the statements contained in the following material are "forward looking statements". All statements in this release,

More information

EXCO S PROJECT PIPELINE

EXCO S PROJECT PIPELINE EXCO S PROJECT PIPELINE INVESTOR UPDATE EXCO RESOURCES N.L. MAY 2010 Presented by Michael Anderson Managing Director DISCLAIMER This presentation contains forward looking statements that are subject to

More information

Copper Mountain Announces Robust Preliminary Economic Assessment Results for New Ingerbelle

Copper Mountain Announces Robust Preliminary Economic Assessment Results for New Ingerbelle Mountain Announces Robust Preliminary Economic Assessment Results for New Ingerbelle Vancouver, B.C., September 27, 2018 Mountain Mining Corporation ( Mountain or the Company) is pleased to announce that

More information

Drilling, metallurgical test work and a new resource model add 21% to oxide gold reserves

Drilling, metallurgical test work and a new resource model add 21% to oxide gold reserves LA ARENA GOLD OXIDE RESERVES INCREASED TO 1.28MM OZ AT AU PRICE OF $1,200 COMPLETION OF THE PRE-FEASIBILITY STUDY FOR THE PHASE II SULPHIDE Cu-Au PROJECT Drilling, metallurgical test work and a new resource

More information

Sierra Metals Exploration Update Call

Sierra Metals Exploration Update Call Sierra Metals Exploration Update Call October 5, 2017 TSX SMT NYSE AMERICAN: SMTS BVL SMT Forward Looking Statements Disclaimer Certain statements in this presentation constitute forward-looking information

More information

QUARTERLY REPORT IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII PERIOD ENDING 31 MARCH 2016

QUARTERLY REPORT IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII PERIOD ENDING 31 MARCH 2016 QUARTERLY REPORT IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII PERIOD ENDING 31 MARCH 2016 Hillgrove Resources Limited (ASX: HGO) reports for the quarter ended 31 March 2016 HIGHLIGHTS While conditions remain

More information

Evaluation of Grade Engineering using Enterprise Optimization. Michael Scott, Nick Redwood

Evaluation of Grade Engineering using Enterprise Optimization. Michael Scott, Nick Redwood Evaluation of Grade Engineering using Enterprise Optimization Michael Scott, Nick Redwood Who we are Not for Profit Research Organization Site implementation of stepchange innovation Grade Engineering

More information

Sierra Metals Updates Mineral Resource and Reserve Estimate for Bolivar Mine, Mexico

Sierra Metals Updates Mineral Resource and Reserve Estimate for Bolivar Mine, Mexico NEWS RELEASE Sierra Metals Updates Mineral Resource and Reserve Estimate for Bolivar Mine, Mexico 4/11/2017 TORONTO, April 11, 2017 /PRNewswire/ - Sierra Metals Inc. (TSX: SMT) (BVL: SMT) ("Sierra Metals"

More information

Maiden Ore Reserve for Camel Creek JV

Maiden Ore Reserve for Camel Creek JV 10 September 2013 Manager Company Announcements Company Announcements Office Australian Securities Exchange Limited Level 4, 20 Bridge Street SYDNEY NSW 2000 ABN 85 003 257 556 Maiden Ore Reserve for Camel

More information

For personal use only

For personal use only Pre-Feasibility Study Highlights World Class Potential of Mt Lindsay Tin/Tungsten Project ASX Announcement Tuesday, 1 March 2011 Ref: /VMS/606/VMS/0249 Highlights: Project generates substantial revenue

More information

Malachite Resources AGM. November For personal use only. Malachite Resources Limited

Malachite Resources AGM. November For personal use only. Malachite Resources Limited Malachite Resources AGM November 2013 1 Malachite Resources Limited Disclaimer and Competent Person Statement Disclaimer This presentation may contain forward looking statements that are subject to risk

More information

EXCO S PROJECT PIPELINE. Unlocking the Value

EXCO S PROJECT PIPELINE. Unlocking the Value EXCO S PROJECT PIPELINE Unlocking the Value EXCO RESOURCES N.L. 20 AUGUST 2010 Wholesale Investors Forum Presented by Michael Anderson Managing Director DISCLAIMER This presentation contains forward looking

More information

Hot Chili and CMP sign Non-Binding Letter of Intent on Second Copper Project

Hot Chili and CMP sign Non-Binding Letter of Intent on Second Copper Project ASX ANNOUNCEMENT 16th October 2015 Hot Chili and CMP sign Non-Binding Letter of Intent on Second Copper Project Hot Chili and its partner in the Productora Project, Compañía Minera del Pacífico S.A. (CMP)

More information

AGM - Lorena Gold Project

AGM - Lorena Gold Project AGM - Lorena Gold Project For personal use onlynovember 2015 Disclaimer and Competent Person Statement Disclaimer This presentation may contain forward looking statements that are subject to risk factors

More information

SECOND QUARTER REPORT 15 JULY 2014

SECOND QUARTER REPORT 15 JULY 2014 SECOND QUARTER REPORT 15 JULY 2014 DISCLAIMER This presentation has been prepared by OZ Minerals Limited ( OZ Minerals ) and consists of written materials/slides for a presentation concerning OZ Minerals.

More information

MEDIA RELEASE OCEANAGOLD ANNOUNCES COMMENCEMENT OF CONSTRUCTION AT THE DIDIPIO PROJECT IN THE PHILIPPINES

MEDIA RELEASE OCEANAGOLD ANNOUNCES COMMENCEMENT OF CONSTRUCTION AT THE DIDIPIO PROJECT IN THE PHILIPPINES 15 June 2011 MEDIA RELEASE OCEANAGOLD ANNOUNCES COMMENCEMENT OF CONSTRUCTION AT THE DIDIPIO PROJECT IN THE PHILIPPINES (MELBOURNE) OceanaGold Corporation (ASX: OGC, TSX: OGC, NZX: OGC) ( the Company )

More information

PRESENTATION MINING 2010 RESOURCES CONVENTION - BRISBANE

PRESENTATION MINING 2010 RESOURCES CONVENTION - BRISBANE 27 October 2010 ASX: AOH, FSE: A2O PRESENTATION MINING 2010 RESOURCES CONVENTION - BRISBANE Please find attached the presentation to be made by Managing Director, Dr Alistair Cowden, at 4.40pm on Wednesday

More information

Diversified Australian Producer

Diversified Australian Producer ASX:MLX OTCQX:MLXEF GR:FG5 Diversified Australian Producer August 2016 Our Philosophy We work for our shareholders. Our share price is the only measure of our success. If we make profit we must share it

More information

RESOURCE GOLD PTY. LTD.

RESOURCE GOLD PTY. LTD. Copyright RESOURCE GOLD PTY. LTD. Gold Recovery From Processing Of - Mill Site Materials - Alluvial Gold Deposits - Hard Rock Resources NOVEMBER, 2009 REVISION 3 1 Disclaimer! This presentation contains

More information

Increasing Net Present Value by a Third at an Operating Sublevel Cave Mine Using Draw Strategy Optimisation. Presented by Alex Campbell

Increasing Net Present Value by a Third at an Operating Sublevel Cave Mine Using Draw Strategy Optimisation. Presented by Alex Campbell Increasing Net Present Value by a Third at an Operating Sublevel Cave Mine Using Draw Strategy Optimisation Presented by Alex Campbell Presentation Overview Three year project to optimise the draw strategy

More information

KANMANTOO COPPER MINE: STRATEGY AND OPPORTUNITY SA GOVERNMENT COPPER SUMMIT GREG HALL IIIII CEO & MANAGING DIRECTOR 6 MAY 2015

KANMANTOO COPPER MINE: STRATEGY AND OPPORTUNITY SA GOVERNMENT COPPER SUMMIT GREG HALL IIIII CEO & MANAGING DIRECTOR 6 MAY 2015 KANMANTOO COPPER MINE: STRATEGY AND OPPORTUNITY SA GOVERNMENT COPPER SUMMIT GREG HALL IIIII CEO & MANAGING DIRECTOR 6 MAY 2015 STRATEGY ENHANCING SHAREHOLDER VALUE THREE PILLARS FOR ENHANCING SHAREHOLDER

More information

Azure Minerals Ltd ASX Code:

Azure Minerals Ltd ASX Code: Azure Minerals Ltd ASX Code: AZS @AzureMinerals www.azureminerals.com.au Tony Rovira Managing Director Azure Minerals Ltd Objective To be a low cost, high margin copper producer Strategy Developing our

More information

SA Mining and Exploration Conference Adelaide Convention Centre 11 DECEMBER 2015

SA Mining and Exploration Conference Adelaide Convention Centre 11 DECEMBER 2015 SA Mining and Exploration Conference Adelaide Convention Centre 11 DECEMBER 2015 Disclaimer This presentation has been prepared by OZ Minerals Limited ( OZ Minerals ) and consists of written materials/slides

More information

SIERRA METALS REPORTS A 53.5% INCREASE IN NI COMPLIANT MINERAL RESERVES AT ITS YAURICOCHA MINE, PERU

SIERRA METALS REPORTS A 53.5% INCREASE IN NI COMPLIANT MINERAL RESERVES AT ITS YAURICOCHA MINE, PERU No. 41-2013 SIERRA METALS REPORTS A 53.5% INCREASE IN NI 43-101 COMPLIANT MINERAL RESERVES AT ITS YAURICOCHA MINE, PERU Vancouver, BC November 19, 2013 Sierra Metals Inc. (TSX:SMT)(BVL:SMT) ( Sierra Metals

More information

ALACER GOLD ANNOUNCES FOURTH QUARTER MINE PRODUCTION AND 2012 GUIDANCE

ALACER GOLD ANNOUNCES FOURTH QUARTER MINE PRODUCTION AND 2012 GUIDANCE ALACER GOLD ANNOUNCES FOURTH QUARTER MINE PRODUCTION AND 2012 GUIDANCE Quarterly Gold Production Increases to 113,861 ounces and 421,204 Ounces Achieved for January 24, 2012 Alacer Gold Corp ( Alacer or

More information

Boliden to acquire Kevitsa Finnish nickel-copper-gold-pgm mine from First Quantum. 10 March 2016

Boliden to acquire Kevitsa Finnish nickel-copper-gold-pgm mine from First Quantum. 10 March 2016 Finnish nickel-copper-gold-pgm mine from First Quantum 10 March 2016 1 2016-03-10 Kevitsa strengthens Boliden s position in nickel and copper Excellent operational and geographical fit Consistent with

More information

SUITE WEST HASTINGS STREET VANCOUVER, BC V6C 2W2 CANADA TEL: FAX:

SUITE WEST HASTINGS STREET VANCOUVER, BC V6C 2W2 CANADA TEL: FAX: SUITE 900-999 WEST HASTINGS STREET VANCOUVER, BC V6C 2W2 CANADA TEL: 604.684.8894 FAX: 604.688.2180 March 14, 2011 #11-06 Capstone Completes Prefeasibility Study on Phase V Expansion of Minto Copper-Gold

More information

PROUDLY POSITIONED AS AN AUSTRALIAN MINER ASX:MLX. November 2017 AGM Presentation

PROUDLY POSITIONED AS AN AUSTRALIAN MINER ASX:MLX. November 2017 AGM Presentation PROUDLY POSITIONED AS AN AUSTRALIAN MINER ASX:MLX November 2017 AGM Presentation DISCLAIMER General Disclaimer This presentation has been prepared by Metals X Limited ( Metals X or the Company ) for the

More information

Thalanga Project Ore Reserve and Mineral Resource Statement (as at 1 December 2017)

Thalanga Project Ore Reserve and Mineral Resource Statement (as at 1 December 2017) Thalanga Project Ore Reserve and Mineral Resource Statement (as at 1 December 2017) Thalanga Project Ore Reserves Ore Reserves Classification Tonnage (Kt) Cu (%) Pb (%) Zn (%) Au (g/t) Ag (g/t) Zn Eq.

More information

Seizing Opportunity and Building Value

Seizing Opportunity and Building Value Hanson Lake District Seizing Opportunity and Building Value December 2017 www.foranmining.com Opportunity is meaningless unless one takes action. TSX-V FOM 2 The Parties Committed to value creation 100%

More information

AVINO SILVER & GOLD MINES LTD.

AVINO SILVER & GOLD MINES LTD. April 13, AVINO SILVER & GOLD MINES LTD. T 604.682.3701 Suite 900, 570 Granville Street ir@avino.com F 604.682.3600 Vancouver, BC V6C 3P1 www.avino.com NYSE-MKT: ASM TSX-V: ASM FSE: GV6 AVINO ANNOUNCES

More information

CMZ. Advancing The Zafranal Project. Bruce L. Turner Executive Director, Compañía Minera Zafranal 6 March 2017 Peru Day PDAC 2017

CMZ. Advancing The Zafranal Project. Bruce L. Turner Executive Director, Compañía Minera Zafranal 6 March 2017 Peru Day PDAC 2017 Advancing The Zafranal Project Bruce L. Turner Executive Director, Compañía Minera Zafranal 6 March 2017 Peru Day PDAC 2017 Forward-Looking Information These slides contain certain forward-looking statements

More information

Health and Safety. Update: No LTI at Prestea Open Pits. 5.65M man hours worked with no LTI

Health and Safety. Update: No LTI at Prestea Open Pits. 5.65M man hours worked with no LTI SIMPLE Expanding Production & LEAN and Reducing PRODUCER Costs Health and Safety Update: No LTI at Prestea Open Pits 5.65M man hours worked with no LTI 510 Days as at 31 st Oct without LTI. Last LTI on

More information

For personal use only

For personal use only ASX Release 20 March 2012 PANTON REVIEW STUDY RESULTS (ASX:PLA) is pleased to advise that the results from the recently completed Panton Review Study ( PRS ) showed that the Project could achieve and Internal

More information

For personal use only

For personal use only Mutiny makes substantial metallurgical performance gains Forecast copper recoveries increased from 58.5% to 64% in the oxide zone and copper concentrate grade increased from 21.5% Cu to 35% Cu Forecast

More information

TRANS-SIBERIAN GOLD PLC

TRANS-SIBERIAN GOLD PLC TRANS-SIBERIAN GOLD PLC 29 June 2017 Annual General Meeting TRANS-SIBERIAN GOLD TSG Company history Established in 2000 Listed on LSE (AIM) in November 2003 UFG acquired 25% in 2006, now 79.69% Veduga

More information

For personal use only

For personal use only 7 August 2012 ASX: PAN Gidgee Gold Project Scoping Study Key Highlights Gold Production estimated at 606,000oz of gold over an initial seven years, average annual production of 87,000oz Operating Cash

More information

TRANS-SIBERIAN GOLD PLC

TRANS-SIBERIAN GOLD PLC PLC June 2011 Asacha Gold Project ASACHA Project Status Construction Mine development proceeds steadily and stoping started in June 2011 Plant building construction is complete, plant equipment is installed

More information

Updated Investor Presentation

Updated Investor Presentation Havilah Resources Limited plans to sequentially develop its portfolio of gold, copper, iron, cobalt, tin and other mineral resources in South Australia. Our vision is to become a new mining force, delivering

More information

For personal use only KANMANTOO MINE: MINING WITHIN OUR COMMUNITY GREG HALL IIIII CEO & MANAGING DIRECTOR 13 APRIL 2015

For personal use only KANMANTOO MINE: MINING WITHIN OUR COMMUNITY GREG HALL IIIII CEO & MANAGING DIRECTOR 13 APRIL 2015 KANMANTOO MINE: MINING WITHIN OUR COMMUNITY GREG HALL IIIII CEO & MANAGING DIRECTOR 13 APRIL 2015 CORPORATE SNAPSHOT AS AT 31 DECEMBER 2014 ASX listed: HGO Shares on issue: 147.8 million Share price: $0.37

More information

Commenting on the approval of the development of the Mt Carlton Project Conquest Executive Chairman, Jake Klein commented:

Commenting on the approval of the development of the Mt Carlton Project Conquest Executive Chairman, Jake Klein commented: ABN 33 009 232 277 ASX RELEASE 15 DECEMBER 2010 Conquest Approves Mt Carlton Mine Development The Board of Conquest Mining Limited ( Conquest or the Company ) has approved the development of the Mt Carlton

More information

Q PRODUCTION REPORT

Q PRODUCTION REPORT Q2 2018 PRODUCTION REPORT PRODUCTION AND COSTS AS EXPECTED NEWS RELEASE, 25 JULY 2018 Antofagasta plc CEO, Iván Arriagada said: Our performance in terms of copper production and controlling costs during

More information

N E W S R E L E A S E

N E W S R E L E A S E ASM: TSX/NYSE American January 17, 2019 AVINO ANNOUNCES AND FULL YEAR PRODUCTION RESULTS Avino Silver & Gold Mines Ltd. (ASM: TSX/NYSE American, GV6: FSE, Avino or the Company ) is pleased to announce

More information

N E W S R E L E A S E

N E W S R E L E A S E ASM: TSX/NYSE American Avino Silver & Gold Mines Ltd. T (604) 682 3701 Suite 900-570 Granville Street F (604) 682 3600 Vancouver, BC V6C 3P1 www.avino.com N E W S R E L E A S E April 17, AVINO ANNOUNCES

More information

White Dam Gold Project Dump Leach

White Dam Gold Project Dump Leach ALTA 2015 White Dam Gold Project Dump Leach A division of Midas Engineering Group Mineral Engineering Technical Services PO Box 5778 St Georges Tce WA 6831 P: (+61 8) 9421 9000 F: (+61 8) 9325 8311 ABN

More information

For personal use only

For personal use only 11 June 2015 ASX Limited Marked Announcements Platform Exchange Centre 20 Bridge Street Sydney NSW 2000 Preliminary Economic Assessment Delivers Excellent Results at the Fair Bride Deposit Study confirms

More information

2013 Ore Reserve estimates Increased Ore Reserves at Ban Houayxai

2013 Ore Reserve estimates Increased Ore Reserves at Ban Houayxai PANAUST LIMITED ABN 17 011 065 160 Level 1, 15 James Street, Fortitude Valley, Brisbane QLD 4006 Australia PO Box 2297, Fortitude Valley Business Centre QLD 4006 T: +61 (0)7 3117 2000 F: +61 (0)7 3846

More information

For personal use only

For personal use only Thankyou For additional information contact: Grant Davey Managing Director E: admin@cradleresources.com.au T +61 8 9389 2000 Cradle Definitive Feasibility Study Panda Hill Panda Hill Niobium Investor Update

More information

ARM COPPER. Thando Mkatshana Chief Executive: ARM Copper and ARM Coal. Vale/ARM joint venture 50% 50% Refining. Flash/ Isa smelt smelting

ARM COPPER. Thando Mkatshana Chief Executive: ARM Copper and ARM Coal. Vale/ARM joint venture 50% 50% Refining. Flash/ Isa smelt smelting 110 INTEGRATED ANNUAL REPORT 2016 ARM COPPER Thando Mkatshana Chief Executive: ARM Copper and ARM Coal ZCCM-IH 80% 50% 100% 20% Lubambe Copper Mine and Extension Area Vale/ARM joint venture 50% Vale S.A.

More information

OMITIOMIRE OXIDE COPPER FEASIBILITY STUDY

OMITIOMIRE OXIDE COPPER FEASIBILITY STUDY INTERNATIONAL BASE METALS LIMITED OMITIOMIRE OXIDE COPPER FEASIBILITY STUDY 21 NOVEMBER 2013 Frank Bethune Ken Maiden Andre Genis Karl Hartmann PRESENTED BY FRANK BETHUNE AND KEN MAIDEN Disclaimer 2 This

More information

Hot Chili Commences Scoping Study on Productora Copper Project, Chile

Hot Chili Commences Scoping Study on Productora Copper Project, Chile ASX ANNOUNCEMENT Thursday 12th January 2012 Hot Chili Commences Scoping Study on Productora Copper Project, Chile Leading engineering and project development group AUSENCO appointed to undertake study

More information

INV METALS ANNOUNCES ROBUST PRELIMINARY FEASIBILITY STUDY AT LOMA LARGA

INV METALS ANNOUNCES ROBUST PRELIMINARY FEASIBILITY STUDY AT LOMA LARGA INV METALS ANNOUNCES ROBUST PRELIMINARY FEASIBILITY STUDY AT LOMA LARGA TORONTO, ON July 14, 2016 INV Metals Inc. ( INV Metals or the Company ) (TSX:INV) is pleased to announce the positive results of

More information

For personal use only

For personal use only 9 December 2011 Bass Metals Confirms Commercial Robustness of Hellyer Gold Project (HGP) HIGHLIGHTS: A study on tailings treatment options confirms HGP as a robust project utilising the Albion Process

More information

Whittle Integrated Strategic Planning. Service Offering. Optimising open pit & underground mining businesses.

Whittle Integrated Strategic Planning. Service Offering. Optimising open pit & underground mining businesses. Whittle Integrated Strategic Planning Improve cash flow profile Increase NPV Guide investment decisions Raise finance Harness innovation Achieve sustainable operations Optimising open pit & underground

More information

FIRST MAJESTIC SILVER CORP.

FIRST MAJESTIC SILVER CORP. FIRST MAJESTIC SILVER CORP. Suite 1805 925 West Georgia Street Vancouver, B.C., Canada V6C 3L2 Telephone: (604) 688-3033 Fax: (604) 639-8873 Toll Free: 1-866-529-2807 Web site: www.firstmajestic.com; E-mail:

More information

Niblack Project Poised For Development

Niblack Project Poised For Development Niblack Project Poised For Development AIDEA Board of Directors Meeting 38% 30% 22% 9% July 31, 2014 Forward-Looking Statements Except for statements of historical fact, this presentation contains certain

More information

Thalanga Operations Ore Reserve and Mineral Resource Statement

Thalanga Operations Ore Reserve and Mineral Resource Statement Thalanga Operations Ore Reserve and Mineral Resource Statement Ore Reserves Classification Tonnage (Kt) Cu (%) Pb (%) Zn (%) Au (g/t) Ag (g/t) Zn Eq. (%) West 45 (1) Proved 101 0.3 2.0 4.6 0.3 38 8.4 Probable

More information

Sandspring Resources Positive Pre Feasibility Study for Toroparu demonstrates 2.6 year payback on initial 1.32 g/t gold grade

Sandspring Resources Positive Pre Feasibility Study for Toroparu demonstrates 2.6 year payback on initial 1.32 g/t gold grade Sandspring Resources Positive Pre Feasibility Study for Toroparu demonstrates 2.6 year payback on initial 1.32 g/t gold grade Toronto, Ontario 9 th April, 2013 Sandspring Resources Ltd. (TSX Venture: SSP)

More information

June 2017 Quarterly Report Presentation and Webcast 28 July 2017

June 2017 Quarterly Report Presentation and Webcast 28 July 2017 June 2017 Quarterly Report Presentation and Webcast 28 July 2017 Access this presentation at: http://webcasting.boardroom.media/broadcast/5962ded2c8d9977c 89ce70f3 or http://www.sandfire.com.au Earthworks

More information

TEMBANG PRE-FEASIBILITY STUDY DELIVERS POSITIVE OUTCOME

TEMBANG PRE-FEASIBILITY STUDY DELIVERS POSITIVE OUTCOME ASX ANNOUNCEMENT 23 February 2012 (8 pages by email) TEMBANG PRE-FEASIBILITY STUDY DELIVERS POSITIVE OUTCOME Sumatra Copper & Gold plc ( Sumatra or the Company ) is pleased to announce that the Prefeasibility

More information

Gum Creek Gold Project Free Milling Scoping Study

Gum Creek Gold Project Free Milling Scoping Study 18 March 2016 ASX: PAN Highlights Gum Creek Gold Project Free Milling Scoping Study Mining Inventory of 4.9Mt at 1.94g/t Au for 309koz gold based on material from Swan, Swift and Howards Resources Average

More information

For personal use only

For personal use only June 2013 Quarterly Report 30 July 2013 Highlights Total gold production was 5,767 ounces for the quarter. Cash operating profit was A$628,000 for the quarter. Gold production at Lily was 4,641 ounces

More information

Fourth Quarter Production Report. for the three months ended 31 December 2017

Fourth Quarter Production Report. for the three months ended 31 December 2017 Fresnillo plc 21 Upper Brook Street London W1K 7PY United Kingdom www.fresnilloplc.com 24 January 2018 Fourth Quarter Production Report for the three months ended 31 December 2017 Overview Record annual

More information

Hidden Valley PNG s Newest Mine Briefing for Analysts

Hidden Valley PNG s Newest Mine Briefing for Analysts Hidden Valley PNG s Newest Mine Briefing for Analysts 30 March 2011 Harmony Gold Disclosure Statement This presentation contains "forward-looking statements" within the meaning of Section 27A of the Securities

More information

Q PRODUCTION REPORT GUIDANCE MET FOR 2017

Q PRODUCTION REPORT GUIDANCE MET FOR 2017 Q4 2017 PRODUCTION REPORT GUIDANCE MET FOR 2017 NEWS RELEASE, 24 JANUARY 2018 Antofagasta plc CEO, Iván Arriagada said: Antofagasta had a strong year operationally. Copper production at 704,300 tonnes

More information

Second drill rig to accelerate major drilling program at Productora

Second drill rig to accelerate major drilling program at Productora DRAFT ASX ANNOUNCEMENT Thursday 11th September 2014 Second drill rig to accelerate major drilling program at Productora Expanded resource-reserve base will underpin completion of Productora Pre-feasibility

More information

On The Road To Silver & Gold Mining In Mexico

On The Road To Silver & Gold Mining In Mexico On The Road To Silver & Gold Mining In Mexico ASX: AZS @AzureMinerals www.azureminerals.com.au Tony Rovira Managing Director & CEO Mines & Money - London Corporate Overview KEY STATISTICS TOP SHAREHOLDERS

More information

Orezone Announces Updated Feasibility Study to Incorporate a Phase II High-Grade Sulphide Expansion

Orezone Announces Updated Feasibility Study to Incorporate a Phase II High-Grade Sulphide Expansion Orezone Announces Updated Feasibility Study to Incorporate a Phase II High-Grade Sulphide Expansion November 19, 2018, Orezone Gold Corporation (TSXV: ORE) ( Orezone or the Company ) is pleased to provide

More information

VALUE THROUGH GOLD BRUCEJACK PROJECT PREMIER S NATURAL RESOURCE CONFERENCE

VALUE THROUGH GOLD BRUCEJACK PROJECT PREMIER S NATURAL RESOURCE CONFERENCE VALUE THROUGH GOLD BRUCEJACK PROJECT PREMIER S NATURAL RESOURCE CONFERENCE January 2016 CAUTIONARY STATEMENT Forward Looking Information This Presentation contains forward-looking information and forward

More information

Newmont Reports 2017 Reserves and Resources; Reserve additions replace depletion, Resources increase

Newmont Reports 2017 Reserves and Resources; Reserve additions replace depletion, Resources increase NEWS RELEASE NYSE: NEM newmont.com Newmont Reports 2017 Reserves and Resources; Reserve additions replace depletion, Resources increase DENVER, February 21, 2018 Newmont Mining Corporation (NYSE: NEM)

More information

Bank of America Merrill Lynch 2017 Global Metals, Mining & Steel Conference. Andrew Cole Managing Director & CEO

Bank of America Merrill Lynch 2017 Global Metals, Mining & Steel Conference. Andrew Cole Managing Director & CEO Bank of America Merrill Lynch 2017 Global Metals, Mining & Steel Conference Andrew Cole Managing Director & CEO Disclaimer Forward looking statements This presentation has been prepared by OZ Minerals

More information

FEASIBILITY STUDY CONFIRMS KALKAROO COPPER-GOLD PROJECT. Highlights

FEASIBILITY STUDY CONFIRMS KALKAROO COPPER-GOLD PROJECT. Highlights FEASIBILITY STUDY CONFIRMS KALKAROO COPPER-GOLD PROJECT Havilah Resources Havilah Resources NL aims to become a significant producer of copper, gold, cobalt and molybdenum from its 100% owned Kalkaroo,

More information

For personal use only

For personal use only 6th March 2019 has potential to optimise value and further unlock the province OZ Minerals Limited (ASX: OZL) is pleased to report it has completed a scoping study on the Carrapateena Block Cave Expansion.

More information

For personal use only

For personal use only Highlights March 2014 Quarterly Report 30 April 2014 Record tonnes milled of 131,950 tonnes for the quarter. Gold production of 7,786 oz for the quarter. Average gold price received of A$1,447/oz (US$1,300

More information

ASX ANNOUNCEMENT. CMP to Purchase Additional Stake in Productora for US$1.5 Million. Sprott Loan to be Reduced and Extended by 12 Months

ASX ANNOUNCEMENT. CMP to Purchase Additional Stake in Productora for US$1.5 Million. Sprott Loan to be Reduced and Extended by 12 Months ASX ANNOUNCEMENT Wednesday 18 th May 2016 CMP to Purchase Additional Stake in Productora for US$1.5 Million Sprott Loan to be Reduced and Extended by 12 Months Hot Chili Limited (ASX Code: HCH) is pleased

More information

Whittle Integrated Strategic Planning. Services. From mineral resource to cash flow. Improve cash flow profile

Whittle Integrated Strategic Planning. Services. From mineral resource to cash flow.   Improve cash flow profile Whittle Integrated Strategic Planning Improve cash flow profile Increase NPV Achieve sustainable operations Guide investment decisions Raise finance Identify bottlenecks From mineral resource to cash flow

More information

The global Mineral Resource estimate now stands at Mt grading at 1.19 g/t Au for 1,328,500 contained gold ounces.

The global Mineral Resource estimate now stands at Mt grading at 1.19 g/t Au for 1,328,500 contained gold ounces. 15 December 2011 Manager Company Announcements Company Announcements Office Australian Securities Exchange Limited Level 4, 20 Bridge Street SYDNEY NSW 2000 ABN 85 003 257 556 Dear Sir/Madam Via Electronic

More information

HORSESHOE LIGHTS PROJECT ASX/MEDIA ANNOUNCEMENT

HORSESHOE LIGHTS PROJECT ASX/MEDIA ANNOUNCEMENT OXIDE COPPER STUDY UNDERWAY AT 8 HORSESHOE LIGHTS PROJECT ASX/MEDIA ANNOUNCEMENT 20 AUGUST 2015 ASX Code: HOR Management Mr Neil Marston Managing Director/Company Secretary Mr Michael Fotios Non-Executive

More information

QUADRA ANNOUNCES THIRD QUARTER 2009 PRODUCTION RESULTS

QUADRA ANNOUNCES THIRD QUARTER 2009 PRODUCTION RESULTS QUADRA ANNOUNCES THIRD QUARTER 2009 PRODUCTION RESULTS Vancouver, Canada October 13 th, 2009 Quadra Mining Ltd. ( Quadra or the Company ) (QUA:TSX) announces the production results for the third quarter

More information

TEPAL PROJECT MEXICO Corporate update

TEPAL PROJECT MEXICO Corporate update Corporate update September, 2018 Cautionary Statement on Forward-Looking Information & Statements This presentation may contain statements which constitute 'forward-looking statements, including statements

More information

Dittmer G r old P roject

Dittmer G r old P roject Dittmer Gold Project Dittmer Gold Project - Disclaimer This presentation may contain forward looking statements that are subject to risk factors associated with the resource industry. It is believed that

More information

AVINO ANNOUNCES FOURTH QUARTER AND FULL YEAR 2017 PRODUCTION RESULTS FROM ITS AVINO PROPERTY

AVINO ANNOUNCES FOURTH QUARTER AND FULL YEAR 2017 PRODUCTION RESULTS FROM ITS AVINO PROPERTY ASM: TSX/NYSE American Avino Silver & Gold Mines Ltd. T (604 682 3701 Suite 900-570 Granville Street F (604) 682 3600 Vancouver, BC V6C 3P1 avino.com January 16, 2018 AVINO ANNOUNCES FOURTH QUARTER AND

More information

Transitioning from Explorer to Miner

Transitioning from Explorer to Miner Transitioning from Explorer to Miner ASX: AZS @AzureMinerals www.azureminerals.com.au RIU Resources Investor Roadshow Sydney & Melbourne 25-27 September 2018 Tony Rovira Managing Director Azure Minerals

More information

CORPORATE PRESENTATION JULY 2017

CORPORATE PRESENTATION JULY 2017 CMX GOLD & SILVER CORP. CORPORATE PRESENTATION JULY 2017 www.cmxgoldandsilver.com 1 2 This presentation includes certain forward-looking statements within the meaning of Canadian securities legislation.

More information

For personal use only

For personal use only 12 July 2011 ASX RELEASE (ASX: SRQ) Exploration and resource update of the Mt Muro epithermal gold and silver project Resources Limited (SRQ) is pleased to present the following exploration update on the

More information

Southern Cross Goldfields Ltd

Southern Cross Goldfields Ltd Southern Cross Goldfields Ltd ASX Announcement - 20 December 2013 Marda Gold Project: Feasibility Study Review Additional Information On 10 December 2013, Southern Cross Goldfields (ASX: SXG SXG or the

More information

Prominent Hill 2011 Annual Mineral Resource and Ore Reserve Statement

Prominent Hill 2011 Annual Mineral Resource and Ore Reserve Statement 16 DECEMBER 2011 ASX Release Prominent Hill 2011 Annual Mineral Resource and Ore Reserve Statement OZ Minerals has today released its annual Prominent Hill Mineral Resource and Ore Reserve Statement for

More information

MINING DILUTION: VARIABLE VERSUS FIXED FACTOR

MINING DILUTION: VARIABLE VERSUS FIXED FACTOR MINING DILUTION: VARIABLE VERSUS FIXED FACTOR 2018 SME Annual Conference & Expo Minneapolis, 26 February 2018 Anoush Ebrahimi, P.Eng, Ph.D. Input Parameters for Mine Design and Evaluation Resource model

More information

CU-RIVER MINING AUSTRALIA

CU-RIVER MINING AUSTRALIA CU-RIVER MINING AUSTRALIA 澳大利亚铜河矿业 Presented at the SA Exploration & Mining Conference 11 th December 2015 Mr Ashley Van Kruyssen Chief Operating Officer DISCLAIMER This presentation has been prepared

More information

For personal use only

For personal use only September 2013 Quarterly Report 24 October 2013 Highlights Record gold production of 7,733 oz (34% increase on the previous quarter) Average gold price received of A$1,465/oz (US$1,335/oz) Cash costs reduced

More information

PROUDLY POSITIONED AS AN AUSTRALIAN MINER ASX:MLX. Corporate Update

PROUDLY POSITIONED AS AN AUSTRALIAN MINER ASX:MLX. Corporate Update PROUDLY POSITIONED AS AN AUSTRALIAN MINER ASX:MLX Corporate Update March 2018 DISCLAIMER General Disclaimer This presentation has been prepared by Metals X Limited ( Metals X or the Company ) for the purpose

More information