Project Communications Management
|
|
- Ashley Todd
- 6 years ago
- Views:
Transcription
1 Project Communications Management Unit 10
2 Project Communication Management Includes the processes required to insure timely and appropriate generation, collection, distribution, storage, retrieval, and ultimate disposition of project information Plan Communications Management The process of determining the project stakeholder information needs Manage Communications The process of making relevant information available to project stakeholders Control Communications The process of monitoring and controlling communications throughout the entire project life cycle to ensure the information needs of the project stakeholders are met. 2
3 Knowledge Area Integratio n Process Group Initiating Planning Executing Monitoring & Controlling Closing Develop Direct & Manage Close Project or Project Develop Project Management Plan Monitor & Control Project Work Project Execution Phase Charter Scope Plan Scope Management Collect Requirements Define Scope Create WBS Time Plan Schedule Management Define Activities Sequence Activities Estimate Activity Resource Estimate Activity Duration Develop Schedule Plan Cost Management Cost Estimate Costs Determine Budget Perform Quality Quality Plan Quality Management Assurance HR Develop HR Plan Acquire Project Team Develop Project Team Manage Project Team Comm. Plan Communication management Manage Communications Perform Integrated Change Control Validate Scope Control Scope Control Schedule Control Costs Control Quality Control Communication Risk Plan Risk Management Control Risks Identify Risks Perform Qualitative Analysis Procurem ent Stakehold 3 er Identify Stakeholders Perform Quantitative Analysis Plan Risk Responses Plan Procurements Conduct Procurements Control Procurements Plan Stakeholder Management Manage Stakeholder Engagement Control Stakeholder Management Close Procurements
4 What is Project Communication Management? Project communications management processes provide the critical links among people and information that are necessary for successful communications. Everyone involved in the project should understand how communications affect the project as a whole. 90% of a Project Manager's job is spent acquiring and communicating information. Project Manager must keep the customer and top management informed of project status. 4
5 5
6 Basic Model of Communication Key components of a basic model of communication include: Encode - to translate thoughts or ideas into a language that is understood by others Message - output of encoding Medium - method used to convey the message Noise - anything that interferes with the transmission and understanding of the message Decode - translate the message back into meaningful thoughts or ideas Encode Massage Noise decode sender Noise medium receiver decode encode 6 Feedback- massage
7 Plan Communications (10.1) The process of determining the project stakeholder information needs and defining a communication approach. Who needs what information, when they will need it, how it will be given to them, and by whom. A communication plan allows the project manager to document the approach to communicate most efficiently and effectively with stakeholders. Effective communication means that the information is provided in the right format, at the right time, and with the right impact. Efficient communication means providing only the information that is needed. 7
8 Plan Communications Management (10.1) Stakeholder Register (Input) Project management plan(input) Enterprise Environmental Factors (Input) Organizational Process Assets (Input) 8
9 Plan Communications (10.1) Communication Requirements Analysis (Tools & Techniques) All project stakeholders have some form of communications requirements. Communications scope, effort and complexity increases substantially with the number of Stakeholders. As the number of people involved in the communications increases the number of communications channels increases geometrically. Formula to compute the number of communication channels: No. of channels = n(n-1)/2 n = number of stakeholders 9
10 Plan Communications (10.1) Communication Methods (Tools & Techniques) Interactive communications Push communications Pull communications The project manager decides what, how, and when Communication methods are to be used in the project 10
11 Plan Communications (10.1) Communication Technology (Tools & Techniques) The methods used to transfer information among project stakeholders can vary significantly. Factors that can affect the project include: Urgency of the need for information. Is project success dependent upon having frequently updated information? Availability of technology. Are appropriate systems already in place or do project needs warrant change? Expected project staffing. Are the proposed communication systems compatible with the participants? Duration of the project. Is the available technology likely to change before the project is over? Project environment. Does the team meet on a face-to-face basis or in a virtual environment? 11
12 Plan Communications (10.1) Communications Management Plan (Outputs) 1. Stakeholder communication requirements; 2. Information to be communicated, including language, format, content, and level of detail; 3. Reason for the distribution of that information; 4. Time frame and frequency for the distribution of required information; 5. Person responsible for communicating the information; 6. Person or groups who will receive the information; 7. Methods or technologies used to convey the information, such as memos, , and/or press releases; 8. Resources allocated for communication activities, including time and budget; 12
13 Plan Communications (10.1) inputs 1. Stakeholder register 2. Project management plan 3. Enterprise environmental factors 4. Organizational process assets Tools & techniques 1. Communication requirements analysis 2. Communication technology 3. Communication models 4. Communication methods 5. Meeting outputs 1. Communication management plan 2. Project document updates 13
14 Plan Communications (10.2) 14
15 Manage Communications(10.2) Manage Communications is the process of creating, collecting, distributing, storing, retrieving, and the ultimate disposition of project information in accordance to the communications management plan. Sender-receiver models. Feedback loops and barriers to communication. Choice of media. Situation specifics of when to communicate in writing versus orally, when to write an informal memo versus a formal report. Writing style. Active versus passive voice, sentence structure, and word choice. Meeting management techniques. Preparing an agenda and dealing with conflicts. Presentation techniques. Body language and design of visual aids. 15
16 Manage Communications(10.2) Communications Management Plan(Input) Work Performance Reports (Input) Enterprise Environmental Factors (Input) Organizational Process Assets (Input) 16
17 Manage Communications(10.2) Communication Technology (Tools& Techniques) Communication Models (Tools& Techniques) Communication Methods (Tools& Techniques) Information Management Systems (Tools& Techniques) 17
18 Report Performance (Tools& Techniques) (10.2) The process of collecting and distributing performance information, including status reports, progress measurements, and forecasts. Analysis of past performance Current status of risk and issues Work completed during the period Work to be completed next Summary of change approved in the period 18
19 Manage Communications(10.2) Organizational Process Assets updates (Outputs) The organizational process assets which may be updated include, but are not limited to: Stakeholder notifications. Information may be provided to stakeholders about resolved issues, approved changes, and general project status Project reports. Include lessons learned, issues logs, project closure reports, and outputs from other Knowledge Areas Project records. Include correspondence, memos, meeting minutes, and other documents describing the project. Project presentations. Feedback from stakeholders. Lessons learned documentation. 19
20 Manage Communications(10.2) inputs 1. Project management plan 2. Performance reports 3. Organizational process assets 4. Enterprise environmental factors Tools & techniques 1. Communication Technology 2. Communication models 3. Information management systems 4.communication methods 5.Performance reporting outputs 1. Project Communications 2. Project management plan Updates 3. Project documents updates 4.Organizational process assets updates 20
21 Control Communications (10.3) Control Communications is the process of monitoring and controlling communications throughout the entire project life cycle to ensure the information needs of the project stakeholders are met. 21
22 Control Communications (10.3) inputs 1. Project management plan 2. Project communications 3. Issue log 4. Work performance data 5. Organizational process assets Tools & techniques 1. Information management systems 2. Expert judgment 3. Meetings outputs 1. Work performance information 2. Change requests 3. Project management plan updates 4. Project document updates 5- Organizational process assets updates 22
23 . Questions 23
24 1 ) Originally the project had four team members. Now the scope has expanded, and there are a total of six people in the project team. How many communication channels does the project have? A ) 6 B ) 9 C ) 12 D ) 15 24
25 1 ) Originally the project had four team members. Now the scope has expanded, and there are a total of six people in the project team. How many communication channels does the project have? A ) 6 B ) 9 C ) 12 D ) 15 25
26 2 ) All of the following are part of the communication management plan EXCEPT? A ) names of the stakeholders who can talk to the project manager B ) Names of those receiving a telephone call when the system crashes C ) Methods used to collect and store information D ) Names of the stakeholders and instructions on sending project status to them 26
27 2 ) All of the following are part of the communication management plan EXCEPT? A ) names of the stakeholders who can talk to the project manager B ) Names of those receiving a telephone call when the system crashes C ) Methods used to collect and store information D ) Names of the stakeholders and instructions on sending project status to them 27
28 3 ) If a project manager wants to report on the actual project results vs. planned results, he would use a : A ) trend report B ) forecasting report C ) status report D ) variance report 28
29 3 ) If a project manager wants to report on the actual project results vs. planned results, he would use a : A ) trend report B ) forecasting report C ) status report D ) variance report 29
30 4 ) Project A has had ineffective project meetings since its inception. There have been complaints that information does not get to the right people, some people are talking too much during the meeting, and the right people are not there to resolve issues. What is MOST likely missing from this project? A ) A project scope management plan B ) A staffing management plan C ) A communication management plan D ) A process improvement plan 30
31 4 ) Project A has had ineffective project meetings since its inception. There have been complaints that information does not get to the right people, some people are talking too much during the meeting, and the right people are not there to resolve issues. What is MOST likely missing from this project? A ) A project scope management plan B ) A staffing management plan C ) A communication management plan D ) A process improvement plan 31
32 5 ) When a project manager is engaged in negotiations, nonverbal communication skills are of : A ) Little importance. B ) Major importance C ) important only when cost and schedule objectives are involved. D ) Important only to ensure you win the negotiation 32
33 5 ) When a project manager is engaged in negotiations, nonverbal communication skills are of : A ) Little importance. B ) Major importance C ) important only when cost and schedule objectives are involved. D ) Important only to ensure you win the negotiation 33
34 6 ) Inputs to plan communications include all the following EXCEPT? A ) Stakeholder register B ) project scope statement C ) Organizational process assets D ) forecasts 34
35 6 ) Inputs to plan communications include all the following EXCEPT? A ) Stakeholder register B ) project scope statement C ) Organizational process assets D ) forecasts 35
36 7 ) The major reason why a project manager should use written instead of oral communication is : A ) documentation B ) feedback C ) cost D ) barrier elimination 36
37 7 ) The major reason why a project manager should use written instead of oral communication is : A ) documentation B ) feedback C ) cost D ) barrier elimination 37
38 8 ) Which of the following is NOT a type of performance reporting? A ) progress report B ) status report C ) benchmark reporting D ) forecasting 38
39 8 ) Which of the following is NOT a type of performance reporting? A ) progress report B ) status report C ) benchmark reporting D ) forecasting 39
40 40 Thank you
For the PMP Exam using PMBOK. PMI, PMP, PMBOK Guide are registered trade marks of Project Management Institute, Inc.
For the PMP Exam using PMBOK For the PMP Guide Exam 5 th Edition using PMBOK Guide 5 th Edition PMI, PMP, PMBOK Guide are registered trade marks of Project Management Institute, Inc. 1 Contacts Name: Khaled
More informationPMP Exam Preparation Workshop Project Communications Management
PMP Exam Preparation Workshop 1 Learning Objectives By the end of this session you will understand: The importance of communication for the success of a project; The communication processes as described
More informationProject Stakeholders Management. Unit 13
Project Stakeholders Management Unit 13 Project Communication Management Project Stakeholder Management includes the processes required to identify the people, groups, or organizations that could impact
More informationUnit 8: Communications Management (PMBOK Guide, Chapter 10)
Unit 8: Communications Management (PMBOK Guide, Chapter 10) The questions on this topic are very straightforward and you can rely on common sense for many of the questions. The PMI Director of Certification
More informationGuten Tag. (good day)
Guten Tag (good day) What is the #1 problem many people have on a project? What is the #1 problem many people have on a project? Communication Project Management Process Groups Project 4. Integration Management
More informationProject Communications Management
Project Communications Management Study Notes PMI, PMP, CAPM, PMBOK, PM Network and the PMI Registered Education Provider logo are registered marks of the Project Management Institute, Inc. 2013 PMstudy.com.
More informationSummary of 47 project management processes (PMBOK Guide, 5 th edition, 2013)
Summary of 47 project management processes (PMBOK Guide, 5 th edition, 2013) Integration Management: processes & activities needed to properly coordinate all aspects of the project to meet stakeholder
More informationPRINCESS NOURA UNIVESRSITY. Project Management BUS 302. Reem Al-Qahtani
PRINCESS NOURA UNIVESRSITY Project BUS 302 Reem Al-Qahtani This is only for helping reading the PMBOK it has our notes for focusing on the book Project Framework What is PMBOK? o PMBOK= Project Body of
More informationTable of Contents. Introduction xxv. Assessment Test xxxvi. Chapter 1 What Is a Project? 1. Is It a Project? 2. Projects versus Operations 3
Table of Contents Introduction xxv Assessment Test xxxvi Chapter 1 What Is a Project? 1 Is It a Project? 2 Projects versus Operations 3 Stakeholders 5 Project Characteristics 7 What Is Project Management?
More informationProject Management Professional (PMP) Certification Exam Preparation Program Course Outline with Outcomes
Module i: Overview of the PMP Certification Gain an understanding of the PMP preparation process. 1. The qualifications required for the PMP 2. How to best study for the PMP 3. General truisms of project
More informationIntegration Knowledge Area
Integration Knowledge Area Develop Project Charter Project statement of work Expert judgment Project charter Business case Contract (if third party project) EEF: government/industry standards, organizational
More informationInitiation Group Process. Planning Group Process
Initiation Group Process Develop Project Charter Project statement of work Expert judgment Project charter Business case Contract (if third party project) EEF: government/industry standards, organizational
More informationThe 9 knowledge Areas and the 42 Processes Based on the PMBoK 4th
The 9 knowledge Areas and the 42 Processes Based on the PMBoK 4th www.pmlead.net PMI, PMP, CAPM and PMBOK Guide are trademarks of the Project Management Institute, Inc. PMI has not endorsed and did not
More informationAppendix. Process Inputs and Outputs
3601cA.fm Page 493 Wednesday, October 26, 2005 12:47 AM Appendix A Process and Throughout this book, PMP: Management Professional Study Guide, 3rd Edition, I ve discussed the inputs and outputs to the
More informationProject vs Operation. Project Constraints. Pankaj Sharma, Pankaj Sharma,
Project vs Operation PROJECTS OPERATIONS Temporary Ongoing Unique Repetitive Closes after attaining the objectives Objective is to sustain business Prototyping the new car model Assembly line production
More informationCompiled by Rajan Humagai
Compiled by Rajan Humagai www.pavementengineering.com.au Project Processes Inputs, Tools & Techniques and Outputs. (Based on PMBOK 5 th Edition) 1. Project Integration 1. Develop 1. Project Statement Of
More informationProject Management Process Groups. PMP Study Group Based on the PMBOK Guide 4 th Edition
Project Management Process Groups PMP Study Group Based on the PMBOK Guide 4 th Edition Introduction PM Process Groups In order for a project to be successful, the project team must: Select appropriate
More informationFor the PMP Exam using PMBOK Guide 5 th Edition. PMI, PMP, PMBOK Guide are registered trade marks of Project Management Institute, Inc.
For the PMP Exam using PMBOK Guide 5 th Edition PMI, PMP, PMBOK Guide are registered trade marks of Project Management Institute, Inc. 1 Contacts Name: Khaled El-Nakib, MSc, PMP, PMI-RMP URL: http://www.khaledelnakib.com
More informationProject Management Professional(PMP ) Course
and Program Professional(PMP ) Course CERTIFICATE: Professional (PMP ) DURATION: 4 Days COURSE DELIVERY: Classroom PDUs: 35 LANGUAGE: English With a charter to enable and enhance the industry's competency
More informationExam Questions PMI-001
Exam Questions PMI-001 Project Management Professional https://www.2passeasy.com/dumps/pmi-001/ 1. A reward can only be effective if it is: A. Given immediately after the project is completed. B. Something
More informationStakeholder Strategies with Successful Solutions
Risk Methodology 7 th Annual Symposium Strategies with Successful Solutions By Dwight Davis, MBA, CPT, PMP dwight@dwightdavis.org August 1, 01 create your future www.utdallas.edu Introduction Dwight Davis
More informationPMP MOCK EXAMS BASED ON PMBOK 5TH EDITION
PMP MOCK EXAMS http://www.tutorialspoint.com/pmp-exams/pmp_mock_exams_set4.htm Copyright tutorialspoint.com BASED ON PMBOK 5TH EDITION Here are 200 objective type sample questions and their answers are
More informationUnit 11: Stakeholder Management (PMBOK Guide, Chapter 13)
(PMBOK Guide, Chapter 13) Stakeholder management identifies people, groups, and organizations that could impact or be impacted by the project. The topic has increased in importance with each new edition
More informationSoftware Project & Risk Management Courses Offered by The Westfall Team
Software Project & Risk Management is a 5-day course designed to provide a knowledge base and practical skills for anyone interested in implementing or improving Software Project and Risk Management techniques
More informationProject Management Body of Knowledge (PMBoK)
Project Management Body of Knowledge (PMBoK) Knowledge & Practice Areas Project Management PMBoK Prince 2 ISO 10006 General Management Application high performance sport 2 Theory vs. Practice: A Disclaimer
More informationProject Management Framework
Project Management Framework What s Project? - Why Project? What s Project Management? - Why Project Management? What s Project Management Professionals? - Why Project Management Professionals? Project
More informationInternational Diploma in Project Management. (Level 4) Course Structure & Contents
Brentwood Open Learning College (Level 4) Page 1 Unit 1 Overview of Project Management The unit 1 covers the following topics: What is A Project? What is Project Management? Project Constraints Tools and
More informationProject Quality Management
1 Project Quality Management Unit 8 Eng.elsaka09@gmail.com Project Quality Management Includes the processes and activities of the performing organization that determine quality policies, objectives, and
More informationWhat is PMP Certification exam? PMP stands for Project Management Professional certification exam. PMP, is one of the most respected and globally recognized certification is offered by the Project Management
More informationProject Human Resource and Communication Management. Prof. Dr. Daning Hu Department of Informatics University of Zurich
Project Human Resource and Communication Management Prof. Dr. Daning Hu Department of Informatics University of Zurich Now you tell me.. n What are the things a Project Manager needs to do regarding Human
More informationREQUIREMENTS DOCUMENTATION
REQUIREMENTS DOCUMENTATION Project Title: Date Prepared: Stakeholder Requirement Category Priority Acceptance Criteria REQUIREMENTS DOCUMENTATION Project Title: Date Prepared: Stakeholder Requirement Category
More informationObjectives of Project Management Framework. What are the Characteristics Of Project. Activities involved Project Management
PMP Training Training Topics Chapter 1 Introduction to PMP Objectives of PMP Requirements for PMP Exam About PMP Exam PMP Exam Syllabus Chapter 2 Objectives of Project Management Framework What is Project
More informationIntegration Mgmt / Initiating Process Group 4.1 Develop Project Charter
1 Mgmt / Initiating Process Group 4.1 Develop Project Charter Project statement of work Business Case Contract Enterprise environmental factors Project charter Expert judgement 26/02/2013 18:22:56 1 2
More informationProject Management Processes A process is a set of interrelated actions and activities performed to create a product, service, or result
HOLA Project Processes A process is a set of interrelated actions and activities performed to create a product, service, or result Each process is characterized by its inputs, the tools and techniques
More informationExpert Reference Series of White Papers. Changes to the. PMBOK Guide, 4th Edition, and What You Should Know
Expert Reference Series of White Papers Changes to the PMBOK Guide, 4th Edition, and What You Should Know 1-800-COURSES www.globalknowledge.com Changes to the PMBOK Guide, 4th Edition, and What You Should
More informationLookingGlass - Project Management Professional Exam Prep (PMP01)
LookingGlass - Project Management Professional Exam Prep (PMP01) Course Overview This course has been designed to prepare participants to take the Project Management Institute's Project Management Professional
More informationProject Management Processes
What is a project? Webster's Dictionary defines the word project as "That which is projected or designed; something intended or devised; a scheme; a design; a plan." The Project Management Institute defines
More informationKnowledge Areas According to the PMBOK edition 5. Chapter 4 - Integration
Knowledge Areas According to the PMBOK edition 5 Chapter 4 - Integration 4.1 - Develop Project Charter Process Project statement of work Expert Judgment Project charter Business case Facilitation techniques
More informationPMP PMBOK Guide Sixth Edition Training Course Agenda
PMP PMBOK Guide Sixth Edition Training Course Agenda 1. Introduction What are PMI and PMP Certification Application Requirements for the PMP Exam Guidelines to Complete the PMP Application About the PMP
More informationPMP PMBOK 5 th Edition Course Agenda
PMP PMBOK 5 th Edition Course Agenda 1. Introduction to PMP Course Certification What are PMI and PMP Application Requirements for the PMP Exam Guidelines to Fill Up the PMP Application About the PMP Exam
More informationSuccessful Project Management. Overview Houston Community College Fall, 2017
Successful Project Management Overview Houston Community College Fall, 2017 Agenda Introduction Project Management Processes What Is a Process? Inputs, Tools and Techniques, Outputs Process Groups Overview
More informationPMP Exam Prep Coaching Program
PMP Exam Prep Coaching Program Project Management 1 Project Management Develop Project Charter Develop Project Management Plan Direct and Manage Project Work Monitor and Control Project Work Close Project
More informationAgenda. PMBOK Guide Third Edition. PMI Standards Background. PMI Life Cycle Plan for Standards. Presented by Kevin Chui, PMP. How Did We Get Here?
Agenda PMBOK Guide Third Edition Presented by Kevin Chui, PMP Vice President, PMI Hong Kong Chapter Background PMBOK Guide 2004 Update Project Structural Changes to the Standard Process Group Changes Knowledge
More informationGUIDE TO FEEDBACK POLICY TEMPLATE
GUIDE TO FEEDBACK POLICY TEMPLATE ABOUT THIS POLICY AREA This policy guides how the organisation encourages and manages feedback from clients who use its services. A written feedback policy is required
More informationProject Integration Management
Project Integration Management Presented by Project Masters Inc. *Throughout this presentation, we reference and recognize the following trademarks, service marks, and copyrights of the Project Management
More informationIT Certification Exams Provider! Weofferfreeupdateserviceforoneyear! h ps://
IT Certification Exams Provider! Weofferfreeupdateserviceforoneyear! h ps://www.certqueen.com Exam : PMI-001 Title : Project Management Professional Version : Demo 1 / 5 1.Which document defines how a
More informationProject Management Framework with reference to PMBOK (PMI) July 01, 2009
Project Management Framework with reference to PMBOK (PMI) July 01, 2009 Introduction Context Agenda Introduction to Methodologies What is a Methodology? Benefits of an Effective Methodology Methodology
More informationPMP Exam Preparation Course Project HR Management
Project HR Management 1 Keys to Managing People Psychologists and management theorists have devoted much research and thought to the field of managing people at work Important areas related to project
More informationConstruction Project Management Training Curriculum Integration Map
Construction Project Management Training Curriculum Integration Map Value of the Project Management is being recognized all over the world. Most businesses manage their business by successfully implementing
More informationManaging Project Politics and Personalities Scott Bailey, MBA, PMP, SSGB
Managing Project Politics and Personalities Scott Bailey, MBA, PMP, SSGB Project Politics Webinar purpose To identify ways politics impact our projects. To realize we must evaluate our own perspectives
More informationPMP MOCK EXAMS BASED ON PMBOK 5TH EDITION
PMP MOCK EXAMS http://www.tutorialspoint.com/pmp-exams/pmp_mock_exams_set2.htm Copyright tutorialspoint.com BASED ON PMBOK 5TH EDITION Here are 200 objective type sample questions and their answers are
More informationProject Management International Organization for Standardization ISO 21500:2012(E) v.2
Project Management International Organization for Standardization v.2 William H. Dannenmaier CEO BlackBox Partners, LLC www.blackboxknowledge.com 1 Standards Standards provide project managers with common
More informationInternational Project Management. prof.dr MILOŠ D. MILOVANČEVIĆ
International Project Management prof.dr MILOŠ D. MILOVANČEVIĆ Project Communications Management Contents Importance of Good Communications Project Communications Management Processes Communications planning
More informationProject Management Context Outline
Project Management Context Outline Project Phases and the Project Life Cycle Product Life Cycles Project Stakeholders Understanding Organizational Influences Suggested Skills for a Project Manager 1 Project
More informationNEW HORIZONS ONLINE LIVE. Certified Associate of Project Management (CAPM ) PMBOK Guide, 5th Edition DAY 3
NEW HORIZONS ONLINE LIVE Certified Associate of Project Management (CAPM ) PMBOK Guide, 5th Edition DAY 3 Plan Quality Management 1. Project mgt. 2. Stakeholder register 3. Risk register 4. Requirements
More informationPMP Course Content. Chapter 1. Introduction to PMP Objectives of PMP Requirements for PMP Exam About PMP Exam PMP Exam Syllabus.
PMP Course Content Chapter 1 Introduction to PMP Objectives of PMP Requirements for PMP Exam About PMP Exam PMP Exam Syllabus Chapter 2 Objectives of Project Management Framework What is Project What are
More informationPMP Exam Prep Study Group Input-Output-Tools #3a
PMP Exam Prep Study Group Input-Output-Tools #3a Presented by Project Masters Inc. *Throughout this presentation, we reference and recognize the following trademarks, service marks, and copyrights of the
More informationBorderlink Resources Limited.
Borderlink Resources Limited. TRAINING & CONSULTANCY Phone: 1-868-222-8959 E-mail: admin@borderlink.net Website: www.borderlink.net PMP Course Blueprint Introduction: Overview and Purpose of this Guide
More informationThe Agile PMP Teaching an Old Dog New Tricks
The Agile PMP Teaching an Old Dog New Tricks Why are we here today? What is Project Management? When will the project be done? How much will it cost? Do we all agree on what done looks like? What are the
More informationLCS International, Inc. PMP Review. Chapter 9 Conducting Procurements and Sharing Information. Presented by David J.
PMP Review Chapter 9 Conducting Procurements and Sharing Information Presented by David J. Lanners, MBA, PMP These slides are intended to be used only in settings where each viewer has an original copy
More informationPMP Exam Preparation Workshop. Chapter # 5 Project Scope Management
PMP Exam Preparation Workshop Chapter # 5 Copyright PMI SOC 2013 1 Learning Objectives By the end of this session you will understand: How scope management processes relate to the process groups Project
More informationKnowledge, Certification, Networking
www.iacpe.com Knowledge, Certification, Networking Page :1 of 76 Rev 01 Oct 2016 IACPE No 19, Jalan Bilal Mahmood 80100 Johor Bahru Malaysia The International of is providing the introduction to the Training
More informationJapanCert 専門 IT 認証試験問題集提供者
JapanCert 専門 IT 認証試験問題集提供者 http://www.japancert.com 1 年で無料進級することに提供する Exam : PMP Title : Project Management Professional Vendor : PMI Version : DEMO Get Latest & Valid PMP Exam's Question and Answers from
More informationProject Cost Management
PMBOK Overview A Guide to the Body of Knowledge (PMBOK), created by the Institute (PMI), is the sum of knowledge within the profession of project management. The complete Body of Knowledge includes proven
More informationPMI EXAM - PMI-001. Project Management Professional v5. Buy Full Product.
PMI EXAM - PMI-001 Project Management Professional v5 Buy Full Product http://www.examskey.com/pmi-001.html Examskey PMI PMI-001 exam demo product is here for you to test the quality of the product. This
More informationH U M A N R E S O U R C E S M A N A G E R
DESCRIPTION OF WORK: H U M A N R E S O U R C E S M A N A G E R Employees in this banded class provide leadership and supervision to professional/technical staff in the delivery of a contemporary human
More informationPMP TRAINING COURSE CONTENT
PMP TRAINING COURSE CONTENT SECTION1: INTRODUCTION PMI, PMP AND PMBOK What is PMI, PMP, and PMBOK? What do I get out of PMP? How do I get certified? Exam qualifications and PM experience Guidelines to
More informationPMP Exam Prep Coaching Program
PMP Exam Prep Coaching Program Project Management 1 Project Management Develop Project Charter Develop Project Management Plan Monitor and Control Perform Integrated Change Control Close Project or Phase
More informationManagement Consulting and Project Management: Hand in Glove
Service. Accountability. Better Government. Consulting and Project : Hand in Glove J. Kendall Lott President, M Squared Strategies The Task: Rock the PMBOK The Charge Why is PM important for you? It is
More informationPART 1: THE CONTEXT OF MARKETING COMMUNICATION
MARK2053: Marketing Communications and Promotions Study Notes PART 1: THE CONTEXT OF MARKETING COMMUNICATION HOW MARKETING COMMUNICATION EVOLVED Marketing (AMA): the activity, set of institutions, and
More information2. Ofqual level 6 descriptors
Learning Outcomes and Assessment Criteria The learning outcomes and assessment criteria for the Chartered Manager Degree Apprenticeship have been based upon the following: 1. DfEdefinition - level 6 descriptor
More informationPART 1: THE CONTEXT OF MARKETING COMMUNICATION
MARK2053: Marketing Communications and Promotions Study Notes PART 1: THE CONTEXT OF MARKETING COMMUNICATION HOW MARKETING COMMUNICATION EVOLVED Marketing (AMA): the activity, set of institutions, and
More informationPMBOK 2012 FIFTH EDITION CHANGES
PMBOK 2012 FIFTH EDITION CHANGES 1 Scope of Update Alignment with ISO 21500 Ensure harmonization with any other relevant PMI standards. Reposition Section 3 (The Standard for Project Management) as a stand-alone,
More informationContrasting CMMI and the PMBOK. Systems Engineering Conference October 2005
Contrasting CMMI and the PMBOK Systems Engineering Conference October 2005 Wayne Sherer U.S. Army ARDEC Sandy Thrasher, PMP Anteon Corporation Overview Purpose Considerations for Comparison Similarities
More informationSelf-Assessment for the CoSN Certified Education Technology Leader (CETL ) Certification Exam
Self-Assessment for the CoSN Certified Education Technology Leader (CETL ) Certification Exam COSN s Self-Assessment will help you determine your readiness for the CETL certification exam. It can also
More informationProject Management Concepts, Tools & Techniques
Project Management Concepts, Tools & Techniques Course ISI-1438 5 Days Instructor-led, Hands on Introduction This highly interactive 5 day, instructor-led workshop is designed to give participants a solid
More informationCommunication. Raquel Sanchez Nadia Kapri Julie Maestas Gilbert Ramirez Cesar Romero
Communication Raquel Sanchez Nadia Kapri Julie Maestas Gilbert Ramirez Cesar Romero Communication is a skill that is essential for success. It is one of the most important skills to have when working in
More informationCAPM Exam Preparation Training - Online
CAPM Exam Preparation Training - Online Description The Certified Associate in Project Management [CAPM] is a globally recognized certification for Young Project Managers. This certification is provided
More informationProject Management Professional (PMP) Boot Camp
Project Management Professional (PMP) Boot Camp According to the Project Management Institute, the world's leading association for the project management profession: "PMP Certification is the profession's
More informationOverview of Project Management Process
What is a project? Webster's Dictionary defines the word project as "That which is projected or designed; something intended or devised; a scheme; a design; a plan." In the Information Technology arena,
More informationPROJECT STAKEHOLDER MANAGEMENT. 1 Powered by POeT Solvers Limited
PROJECT STAKEHOLDER MANAGEMENT 1 www.pmtutor.org Powered by POeT Solvers Limited PROCESSES BY PROCESS GROUP Initiating Planning Executing Monitoring and controlling 13.1 13.2 13.3 13.4 Identify Plan Manage
More informationProject Management Professionals
A COLLECTION OF INTERVIEW QUESTIONS FOR Project Management Professionals When interviewing a Project Manager, it s important to set up the discussion for the first couple of minutes in an open dialogue.
More informationChapter 6: Project Human Resource Management and Communication. Information Technology Project Management
Chapter 6: Project Human Resource Management and Communication Information Technology Learning Objectives Explain the importance of good human resource management on projects, including the current state
More informationActualTests.CAPM.660Questions. Certified Associate in Project Management (CAPM)
ActualTests.CAPM.660Questions Number: CAPM Passing Score: 800 Time Limit: 120 min File Version: 4.1 http://www.gratisexam.com/ Certified Associate in Project Management (CAPM) I have corrected few questions
More informationI N V E S T M E N T AN AL Y S T Schematic Code ( )
I. DESCRIPTION OF WORK I N V E S T M E N T AN AL Y S T Schematic Code 10735 (31000046) Positions in this banded class analyze financial or credit information to forecast business industry and economic
More informationProject Management Institute (PMI) Practice Standard for Configuration Management
Project Configuration Management Project Management Institute (PMI) Practice Standard for Configuration Management Project Configuration Management What we will cover: Introduction Relationship with other
More informationProject Management CSC 310 Spring 2018 Howard Rosenthal
Project Management CSC 310 Spring 2018 Howard Rosenthal 1 Notice This course is based on and includes material from the text: A User s Manual To the PMBOK Guide Authors: Cynthia Stackpole Snyder Publisher:
More information8. Assess strategies to manage organizational change. 8.1 Identify the role of knowledge management process in a project.
UNIT II STUDY GUIDE Project Governance and Team Course Learning Outcomes for Unit II Upon completion of this unit, students should be able to: 5. Describe the process of leadership when leading project
More information[Project Name] Project Communications Management Plan. [Sub-Project, phase, etc.] [Company] [Company Address] Marc Arnecke, PMP
This template is downloaded from project-management.magt.biz [Company] [Company Address] Tel: Fax: [Company Phone] [Company Fax] [Company E-mail] May 16, 2015 [Ref. number] Marc Arnecke, PMP [Project Name]
More informationInformation Technology Project Management, Seventh Edition
Management, Seventh Edition Many people joke about the poor quality of IT products (see cars and computers joke on pages 312-313) People seem to accept systems being down occasionally or needing to reboot
More information1 For definition of a suitable project refer to the competency standards outlined in this document.
3 1 For definition of a suitable project refer to the competency standards outlined in this document. . . . Getting started . In the table below read the evidence required for each unit of competence
More informationProject Stakeholder Management
Jambo (Swahili) Project Management Process Groups Project 4. Integration Management Initiating Planning Executing 5. Scope Monitoring & Controlling Closing Knowledge Areas 6. Time 7. Cost 8. Quality 9.
More informationhello sä-läm Salâm good-bye kh -dä hä -f z
Salâm s Project Management Process Groups Project Integration Management Knowledge Areas Stakeholders Initiating Planning Executing Scope Time Cost Quality Human Resources Communications Risk Procurement
More informationPMBOK Guide 6 th Edition: What s in it for Me??? Cheryl C Allen, MS, PMP C Allen Associates
PMBOK Guide 6 th Edition: What s in it for Me??? Cheryl C Allen, MS, PMP C Allen Associates Questions??? Why a new edition? What is the general focus? What is new? What is no longer? What is the same?
More informationPass4sure.CAPM.675Questions. Certified Associate in Project Management (CAPM)
Pass4sure.CAPM.675Questions Number: CAPM Passing Score: 800 Time Limit: 120 min File Version: 4.1 http://www.gratisexam.com/ Certified Associate in Project Management (CAPM) I have corrected few questions
More informationIncorporating Family and Youth Voice in Evaluation
Incorporating Family and Youth Voice in Evaluation Sireyia Ratliff, FREDLA Zach Lang, Consultant- Youth M.o.v.e. National Kristin Thorp, Youth M.O.V.e National Goal To provide an overview of the basic
More informationCOMPETENCY MODEL FOR RATES MANAGER CLASS CODE 5601
COMPETENCY MODEL FOR RATES MANAGER CLASS CODE 5601 The following competencies have been identified as those that best separate superior from satisfactory job performance in the class of RATES MANAGER.
More informationTASK LIST - UTILITY ADMINISTRATOR I (CLASS CODE )
., Policies, Laws, & Procedures TASK LIST - UTILITY ADMINISTRATOR I (CLASS CODE 9105-1) 1. Prepares procedure or policy manuals, guidelines, statements, and contracts by performing activities such as reading
More informationFalcon Training PMP & CAPM Exam Preparation Course
Falcon Training PMP & CAPM Exam Preparation Course Chapter 1-3: Project Framework Review Questions 1. What is the primary role of the portfolio manager? A. To deliver the unique product, service, or result
More informationBSBPMG521 Manage project integration
BSBPMG521 Manage project integration Release: 1 BSBPMG521 Manage project integration Modification History Release Release 1 Comments This version first released with BSB Business Services Training Package
More information