Integration Mgmt / Initiating Process Group 4.1 Develop Project Charter
|
|
- Elijah Small
- 6 years ago
- Views:
Transcription
1 1 Mgmt / Initiating Process Group 4.1 Develop Project Charter Project statement of work Business Case Contract Enterprise environmental factors Project charter Expert judgement 26/02/ :22:56 1
2 2 Mgmt / Planning Process Group 4.2 Develop Project Management Plan Project Charter Outputs from planning processes Enterprise environmental factors Expert judgement 26/02/ :22:58 2
3 3 Mgmt / Executing Process Group 4.3 Direct and Manage Project Execution Approved change requests Enterprise environmental factors Deliverables Work performance information Change requests updates Expert judgement Project management information system 26/02/ :22:58 3
4 4 Mgmt / Monitoring & Controlling 4.4 Monitor and Control Project Work Performance reports Enterprise environmental factors Change requests updates Expert judgement 26/02/ :22:58 4
5 5 Mgmt / Monitoring & Controlling 4.5 Perform Integrated Change Control Work performance information Change requests Enterprise environmental factors Change request status updates updates Expert judgement Change control meetings 26/02/ :22:58 The 44 PMBOK(R) processes 5
6 6 Mgmt / Closing Process Group 4.6 Close Project Accepted deliverables Final product, service or result updates Expert judgement 26/02/ :22:58 6
7 7 Mgmt / Planning Process Group 5.1 Collect Requirements Project charter Stakeholder register Requirements documentation Requirements management plan Requirements traceability matrix Interviews Focus groups Facilitated workshops Group creativity techniques Group decision making techniques Questionnaires and surveys Observations Prototypes 26/02/ :22:58 7
8 8 Mgmt / Planning Process Group 5.2 Define scope Project charter Requirements documentation Project scope statement Expert judgement Product analysis Alternatives identification Facilitated workshops 26/02/ :22:58 8
9 9 Mgmt / Planning Process Group 5.3 Create Work Breakdown Structure Project scope statement Requirements documentation Work breakdown structure (WBS) WBS dictionary baseline Decomposition 26/02/ :22:58 9
10 10 Mgmt / Monitoring and Controlling 5.4 Verify Requirements documentation Requirements traceability matrix Validated deliverables Accepted deliverables Change requests Inspection 26/02/ :22:58 10
11 11 Mgmt / Monitoring and Controlling 5.5 Control Work performance information Requirements documentation Requirements traceability matrix Organisation process assets Work performance measurements updates Change requests updates Variance analysis 11 26/02/ :22:58
12 12 Mgmt / Planning Process Group 6.1 Define Activities baseline Enterprise environmental factors Organization process assets Activity list Activity attributes Milestone list Decomposition Rolling wave planning Templates Expert judgement 26/02/ :22:58 12
13 13 Mgmt / Planning Process Group 6.2 Sequence Activities Activity list Activity attributes Milestone list Project scope statement Project schedule network diagrams Precedence Diagramming Method (PDM) Dependency determination Applying leads and lags Schedule network templates 26/02/ :22:58 13
14 14 Mgmt / Planning Process Group 6.3 Estimate Activity Resources Activity list Activity attributes Resource calendars Enterprise environmental factors Activity resource requirements Resource breakdown structure Expert judgement Alternative analysis Published estimating data Bottom-up estimating Project management software 26/02/ :22:58 14
15 15 Mgmt / Planning Process Group 6.4 Estimate Activity Durations Activity list Activity attributes Activity resource requirements Resource calendars Project scope statement Enterprise environmental factors Activity duration estimates Expert judgement Analogous estimating Parametric estimating Three-point estimate Reserve analysis 26/02/ :22:58 15
16 16 Mgmt / Planning Process Group 6.5 Develop Schedule Activity list Activity attributes Project schedule network diagrams Activity resource requirements Resource calendars Activity duration estimates Project scope statement Enterprise environmental factors Project schedule Schedule baseline Schedule data Schedule network analysis Critical path method Critical chain method Resource levelling What-if scenario analysis Applying leads and lags Schedule compression Scheduling tool 26/02/ :22:58 16
17 17 Mgmt / Monitoring and Controlling 6.6 Control schedule Project schedule Work performance information Work performance measurements updates Change requests updates Performance reviews Variance analysis Project management software Resource levelling What-if scenario analysis Adjusting leads and legs Schedule compression Scheduling tool 26/02/ :22:58 17
18 18 Mgmt / Planning Process Group 7.1 Estimate s baseline Project schedule Human resource plan register Enterprise environmental factors Activity cost estimates Basis of estimates Expert judgement Analogous estimating Parametric estimating Bottom-up estimating Three-point estimates Reserve analysis of quality Project management estimating software Vendor bid analysis 26/02/ :22:58 18
19 19 Mgmt / Planning Process Group 7.2 Determine Budget Activity cost estimates Basis of estimates baseline Project schedule Resource calendars Contracts Organization process assets performance baseline Project funding requirements aggregation Reserve analysis Expert judgement Historical relationships Funding limit reconciliation 26/02/ :22:59 19
20 20 Mgmt / Monitoring and Controlling 7.3 Control s Project funding requirements Work performance information Work performance measurements Budget forecasts Organization process assets updates Change requests updates Earned value management Forecasting To-complete performance index (TCPI) Performance reviews Variance analysis Project management software 26/02/ :22:59 20
21 21 Mgmt / Planning Process Group 8.1 Plan baseline Stakeholder register performance baseline Schedule baseline register Enterprise environmental factors management plan metrics checklists Process improvement plan -benefit analysis of quality Control charts Benchmarking Design of experiments Statistical sampling Flowcharting Proprietary quality management methodologies Additional quality planning tools 26/02/ :22:59 21
22 22 Mgmt / Executing Process Group 8.2 Perform Assurance management plan metrics Work performance information control measurements Organisational process assets updates Change requests updates Plan and Perform Control tools and techniques audits Process analyses 26/02/ :22:59 22
23 23 Mgmt / Monitoring & Controlling 8.3 Perform Control metrics checklists Work performance measurements Approved change requests Deliverables control measurements Validated changes Validated deliverables updates Change requests updates Cause and effect diagrams Control charts Flowcharting Histogram Pareto chart Scatter diagram Statistical sampling Inspection Approved change requests review 26/02/ :22:59 The 44 PMBOK(R) processes 23
24 24 Mgmt / Planning 9.1 Develop Human Resource Plan Activity resource requirements Enterprise environmental factors Human resource plan Organisational charts and position descriptions Networking Organizational theory 26/02/ :22:59 24
25 25 Mgmt / Planning 9.2 Acquire Project Team Enterprise environmental factors Project staff assignments Resource calendars updates Pre-assignment Negotiation Acquisition Virtual Teams 26/02/ :22:59 25
26 26 Mgmt / Executing 9.3 Develop Project Team Project staff assignments Resource calendars Team performance assessment Enterprise environmental factors updates Interpersonal skills Training Team-building activities Ground rules Co-location Recognition and rewards 26/02/ :22:59 26
27 27 Mgmt / Monitoring & Controlling 9.4 Manage Project Team Project staff assignments Team performance assessments Performance reports Enterprise environmental factors update updates Change requests updates Observation and conversation Project performance appraisals Conflict management Issues log Interpersonal skills 26/02/ :22:59 27
28 28 Communication Mgmt / Initiating Process Group 10.1 Identify Stakeholders Project charter documents Enterprise environmental factors Stakeholder register Stakeholder management strategy Stakeholder analysis Expert judgement 26/02/ :22:59 28
29 29 Communication Mgmt / Planning Process Group 10.2 Plan Stakeholder register Stakeholder management strategy Enterprise environmental factors management plan requirement analysis technology Communication models Communication methods 26/02/ :22:59 29
30 30 Mgmt / Executing 10.3 Distribute Information Performance reports updates Communication methods Information distribution methods 26/02/ :22:59 30
31 31 Mgmt / Monitoring & Controlling 10.4 Manage Stakeholders Expectations Stakeholder register Stakeholder management plan Issue log Change log updates Change requests updates Communication methods Interpersonal skills Management skills 26/02/ :22:59 31
32 32 Mgmt / Monitoring & Controlling 10.5 Report Performance Work performance information Work performance measurements Budget forecasts Performance reports updates Change requests Variance analysis Forecasting methods Communication methods Reporting systems 26/02/ :22:59 32
33 33 Mgmt / Planning Process Group 11.1 Plan Management Project scope statement management plan Schedule management plan Communication management plan Enterprise environmental factors management plan Planning meetings and analysis 26/02/ :22:59 33
34 34 Mgmt / Planning Process Group 11.2 Identify risks management plan Activity cost estimates Activity duration estimates baseline Stakeholder register management plan Schedule management plan management plan Project documents Enterprise environmental factors register Documentation reviews Information gathering techniques Checklist analysis Assumptions analysis Diagramming techniques SWOT analysis Expert judgement 26/02/ :22:59 34
35 35 Mgmt / Planning Process Group 11.3 Perform Qualitative Analysis register management plan Project scope statement Work performance information register updates probability and impact assessment Probability and impact matrix data quality assessment categorization urgency assessment Expert judgement 26/02/ :22:59 35
36 36 Mgmt / Planning Process Group 11.4 Perform Quantitative Analysis register management plan management plan Schedule management plan register updates Data gathering and representation techniques Quantitative risk analysis and modelling techniques Expert judgement 26/02/ :22:59 36
37 37 Mgmt / Planning Process Group 11.5 Plan Response register management plan register updates -related contract decisions updates Strategies for negative risks or threats Strategies for positive risks or opportunities Contingent response strategy Expert judgement 26/02/ :22:59 37
38 38 Mgmt / Monitoring and Controlling 11.6 Monitor and Control s register Work performance information Performance reports register updates updates Change requests updates reassessment audits Variance and trend analysis Technical performance measurement Reserve analysis Status meetings 26/02/ :22:59 38
39 39 Mgmt / Planning Process Group 12.1 Plan s baseline Requirement documentation Teaming agreements register -related contract decisions Activity resource requirements Project schedule Activity cost estimates performance baseline Enterprise environmental factors management plan statements of work Make-or-buy decisions documents Source selection criteria Change requests Make-or-buy analysis Expert judgement Contract types 26/02/ :22:59 39
40 40 Mgmt / Executing Process Group 12.2 Conduct s documents Source selection criteria Qualified sellers list Seller proposals Project documents Make-or-buy decisions Teaming agreements Selected sellers contract award Resource calendars Change requests updates Bidder conferences Proposal evaluation techniques Independent estimates Expert judgement Advertising Internet search negotiations 26/02/ :22:59 40
41 41 Mgmt / Monitoring & Controlling 12.3 Administer documents Contract Performance reports Approved change requests Work performance information documentation Organizational process assets updates Change requests updates Contract change control system performance reviews Inspections and audits Performance reporting Payment systems Claims administration Records management system 26/02/ :22:59 41
42 42 Mgmt / Closing Process Group 12.4 Close s documentation Closed procurements updates audits Negotiated settlements Records management system 26/02/ :22:59 42
43 Knowledge 43 Area How to read the slides Process Group Section of PMBOK Process Name The Inputs are often Outputs of other processes. These are the Tools and Techniques that are to be used to generate Outputs from Inputs. 2/26/
Compiled by Rajan Humagai
Compiled by Rajan Humagai www.pavementengineering.com.au Project Processes Inputs, Tools & Techniques and Outputs. (Based on PMBOK 5 th Edition) 1. Project Integration 1. Develop 1. Project Statement Of
More informationThe 9 knowledge Areas and the 42 Processes Based on the PMBoK 4th
The 9 knowledge Areas and the 42 Processes Based on the PMBoK 4th www.pmlead.net PMI, PMP, CAPM and PMBOK Guide are trademarks of the Project Management Institute, Inc. PMI has not endorsed and did not
More informationKnowledge Areas According to the PMBOK edition 5. Chapter 4 - Integration
Knowledge Areas According to the PMBOK edition 5 Chapter 4 - Integration 4.1 - Develop Project Charter Process Project statement of work Expert Judgment Project charter Business case Facilitation techniques
More informationSummary of 47 project management processes (PMBOK Guide, 5 th edition, 2013)
Summary of 47 project management processes (PMBOK Guide, 5 th edition, 2013) Integration Management: processes & activities needed to properly coordinate all aspects of the project to meet stakeholder
More informationInitiation Group Process. Planning Group Process
Initiation Group Process Develop Project Charter Project statement of work Expert judgment Project charter Business case Contract (if third party project) EEF: government/industry standards, organizational
More informationAppendix. Process Inputs and Outputs
3601cA.fm Page 493 Wednesday, October 26, 2005 12:47 AM Appendix A Process and Throughout this book, PMP: Management Professional Study Guide, 3rd Edition, I ve discussed the inputs and outputs to the
More informationIntegration Knowledge Area
Integration Knowledge Area Develop Project Charter Project statement of work Expert judgment Project charter Business case Contract (if third party project) EEF: government/industry standards, organizational
More informationPMP TRAINING COURSE CONTENT
PMP TRAINING COURSE CONTENT SECTION1: INTRODUCTION PMI, PMP AND PMBOK What is PMI, PMP, and PMBOK? What do I get out of PMP? How do I get certified? Exam qualifications and PM experience Guidelines to
More informationProject Management Framework
Project Management Framework What s Project? - Why Project? What s Project Management? - Why Project Management? What s Project Management Professionals? - Why Project Management Professionals? Project
More informationNEW HORIZONS ONLINE LIVE. Certified Associate of Project Management (CAPM ) PMBOK Guide, 5th Edition DAY 3
NEW HORIZONS ONLINE LIVE Certified Associate of Project Management (CAPM ) PMBOK Guide, 5th Edition DAY 3 Plan Quality Management 1. Project mgt. 2. Stakeholder register 3. Risk register 4. Requirements
More informationInternational Association of Certified Practicing Engineers
www.iacpe.com Knowledge, Certification, Networking Page: 1 71 IACPE No 19, Jalan Bilal Mahmood 80100 Johor Bahru Malaysia The International is providing the introduction to the Training Module for your
More informationProject Management Professional (PMP) Certification Exam Preparation Program Course Outline with Outcomes
Module i: Overview of the PMP Certification Gain an understanding of the PMP preparation process. 1. The qualifications required for the PMP 2. How to best study for the PMP 3. General truisms of project
More informationTestkings PMP 705q. PMI PMP. Project Management Professional v5
Testkings PMP 705q Number: PMP Passing Score: 800 Time Limit: 120 min File Version: 14.5 PMI PMP Project Management Professional v5 This is my first share of braindumps questions. Very helpful study center
More informationA Guide to the Project Management Body of Knowledge (PMBOK Guide) Sixth Edition Errata 3 rd Printing
A Guide to the Body of Knowledge (PMBOK Guide) Sixth Edition Errata 3 rd Printing NOTE: The following errata only pertain to the first and second printing of the PMBOK Guide Sixth Edition. In order to
More informationPMP Exam Prep Study Group Input-Output-Tools #3a
PMP Exam Prep Study Group Input-Output-Tools #3a Presented by Project Masters Inc. *Throughout this presentation, we reference and recognize the following trademarks, service marks, and copyrights of the
More informationInternational Diploma in Project Management. (Level 4) Course Structure & Contents
Brentwood Open Learning College (Level 4) Page 1 Unit 1 Overview of Project Management The unit 1 covers the following topics: What is A Project? What is Project Management? Project Constraints Tools and
More informationProject vs Operation. Project Constraints. Pankaj Sharma, Pankaj Sharma,
Project vs Operation PROJECTS OPERATIONS Temporary Ongoing Unique Repetitive Closes after attaining the objectives Objective is to sustain business Prototyping the new car model Assembly line production
More informationProject Management Professional(PMP ) Course
and Program Professional(PMP ) Course CERTIFICATE: Professional (PMP ) DURATION: 4 Days COURSE DELIVERY: Classroom PDUs: 35 LANGUAGE: English With a charter to enable and enhance the industry's competency
More informationTHE PMP EXAM PREP COURSE
THE PMP EXAM PREP COURSE Session 2 PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc. www.falconppm.com Agenda 9:00 10:15 Practice the PMP Questions 10:15 10:30 Break 10:30
More informationProject Management Concepts, Tools & Techniques
Project Management Concepts, Tools & Techniques Course ISI-1438 5 Days Instructor-led, Hands on Introduction This highly interactive 5 day, instructor-led workshop is designed to give participants a solid
More informationWhat is PMP Certification exam? PMP stands for Project Management Professional certification exam. PMP, is one of the most respected and globally recognized certification is offered by the Project Management
More informationPMP PMBOK Guide Sixth Edition Training Course Agenda
PMP PMBOK Guide Sixth Edition Training Course Agenda 1. Introduction What are PMI and PMP Certification Application Requirements for the PMP Exam Guidelines to Complete the PMP Application About the PMP
More information17/12/1437. Lecture. Project Scope Management. Lecture 4. Project Management Knowledge Areas Section 3 Chapter 5. Project Scope Management.
17/12/137 Project Management Knowledge Areas Section 3 Chapter 5 Project Scope Management 2 of 33 1 17/12/137 Quick Re-cab Plan Scope Management Collect Requirement Define Scope Create WBS Validate Scope
More informationLCS International, Inc. PMP Review. Chapter 7 Planning Project Resources. Presented by David J. Lanners, MBA, PMP
PMP Review Chapter 7 Planning Project Resources Presented by David J. Lanners, MBA, PMP These slides are intended to be used only in settings where each viewer has an original copy of the Sybex PMP Study
More informationSoftware Project & Risk Management Courses Offered by The Westfall Team
Software Project & Risk Management is a 5-day course designed to provide a knowledge base and practical skills for anyone interested in implementing or improving Software Project and Risk Management techniques
More informationProject Scope Management
Project Scope Management Understand the importance of good project scope management. Discuss methods for collecting and documenting requirements in order to meet stakeholder needs and expectations. Explain
More informationREQUIREMENTS DOCUMENTATION
REQUIREMENTS DOCUMENTATION Project Title: Date Prepared: Stakeholder Requirement Category Priority Acceptance Criteria REQUIREMENTS DOCUMENTATION Project Title: Date Prepared: Stakeholder Requirement Category
More informationPROJECT SCOPE MANAGEMENT. 1 Powered by POeT Solvers Limited
PROJECT SCOPE MANAGEMENT 1 www.pmtutor.org Powered by POeT Solvers Limited At the end of this training, our goal is for you to: Be able to define the term scope Be able to identify primary sources who
More informationPlanning Process Group P2- Develop Project Management Plan. P7- Plan Scope. Management
Project Process Groups I See The Costs are Quite High Consider Reassigning Plan Knowledge Areas Project Integration Project Scope Project Time Project Cost Project Quality Project Human Resource Project
More informationProject Management CSC 310 Spring 2017 Howard Rosenthal
Project Management CSC 310 Spring 2017 Howard Rosenthal 1 No?ce This course is based on and includes material from the text: Effective Project Management - Traditional, Agile, Extreme 7TH Edition Authors:
More informationPMP Exam Preparation Workshop. Chapter # 5 Project Scope Management
PMP Exam Preparation Workshop Chapter # 5 Copyright PMI SOC 2013 1 Learning Objectives By the end of this session you will understand: How scope management processes relate to the process groups Project
More informationObjectives of Project Management Framework. What are the Characteristics Of Project. Activities involved Project Management
PMP Training Training Topics Chapter 1 Introduction to PMP Objectives of PMP Requirements for PMP Exam About PMP Exam PMP Exam Syllabus Chapter 2 Objectives of Project Management Framework What is Project
More informationExam Questions PMI-001
Exam Questions PMI-001 Project Management Professional https://www.2passeasy.com/dumps/pmi-001/ 1. A reward can only be effective if it is: A. Given immediately after the project is completed. B. Something
More informationSuccessful Project Management. Overview Houston Community College Fall, 2017
Successful Project Management Overview Houston Community College Fall, 2017 Agenda Introduction Project Management Processes What Is a Process? Inputs, Tools and Techniques, Outputs Process Groups Overview
More informationBraindumps PMP 918q. PMI PMP. Project Management Professional v5
Braindumps PMP 918q Number: PMP Passing Score: 800 Time Limit: 120 min File Version: 26.5 http://www.gratisexam.com/ PMI PMP Project Management Professional v5 This is my first share of braindumps questions.
More informationProject Integration Management
Project Integration Management Presented by Project Masters Inc. *Throughout this presentation, we reference and recognize the following trademarks, service marks, and copyrights of the Project Management
More informationConnoisseur Solutions Project Scope Management
Project Scope Management Project Scope Management Project Scope Management includes the processes required to ensure that the project includes all the work required, and only the work required, to complete
More informationPMBOK Guide Fifth Edition Pre Release Version October 10, 2012
5.3.1 Define Scope: Inputs PMBOK Guide Fifth Edition 5.3.1.1 Scope Management Plan Described in Section 5.1.3.1.The scope management plan is a component of the project management plan that establishes
More informationProject Management Professional
Course Durations: 32 Hours About Company: Course Mode: Online/Offline EduNextgen extended arm of Product Innovation Academy is a growing entity in education and career transformation, specializing in today
More informationNinth Edition. Rita Mulcahy, PMP, etai. Rita Mulcahy s. Inside this book:
Rita s Course in a Book for Passing the Project Management Professional (PMP) Exam Rita Mulcahy s Ninth Edition Inside this book: Tricks of the Trade What you really need to know to pass the exam Straightforward
More informationActualTests.CAPM.660Questions. Certified Associate in Project Management (CAPM)
ActualTests.CAPM.660Questions Number: CAPM Passing Score: 800 Time Limit: 120 min File Version: 4.1 http://www.gratisexam.com/ Certified Associate in Project Management (CAPM) I have corrected few questions
More informationJapanCert 専門 IT 認証試験問題集提供者
JapanCert 専門 IT 認証試験問題集提供者 http://www.japancert.com 1 年で無料進級することに提供する Exam : PMP Title : Project Management Professional Vendor : PMI Version : DEMO Get Latest & Valid PMP Exam's Question and Answers from
More informationProject Stakeholder Management
Jambo (Swahili) Project Management Process Groups Project 4. Integration Management Initiating Planning Executing 5. Scope Monitoring & Controlling Closing Knowledge Areas 6. Time 7. Cost 8. Quality 9.
More informationCertKiller.PMP.735q PMP. Project Management Professional v5
CertKiller.PMP.735q Number: PMP Passing Score: 800 Time Limit: 120 min File Version: 36.7 http://www.gratisexam.com/ PMP Project Management Professional v5 Thanks for help VCE,and my 93% marks! This dump
More informationSampler For the PMBOK Guide 5 th Edition. Summary Edition For the PMBOK Guide Fourth Edition
Sampler For the PMBOK Guide 5 th Edition Summary Edition For the PMBOK Guide Fourth Edition SamplerBy Projerra Management Inc. For the PMBOK Fourth Edition THANK YOU Thank you for downloading the VisuAL
More informationS O Seminar Objective
Introduction to Project Management Welcome! Presenter: Bob Hull CalACT Conference September 202 S O Seminar Objective To provide an overview of project management processes and provide some skills, tools
More informationPMBOK 2012 FIFTH EDITION CHANGES
PMBOK 2012 FIFTH EDITION CHANGES 1 Scope of Update Alignment with ISO 21500 Ensure harmonization with any other relevant PMI standards. Reposition Section 3 (The Standard for Project Management) as a stand-alone,
More informationConstruction Project Management Training Curriculum Integration Map
Construction Project Management Training Curriculum Integration Map Value of the Project Management is being recognized all over the world. Most businesses manage their business by successfully implementing
More informationProject Scope. Management. module 3. pmbok-105
pmbok-105 module 3. Project Scope Management PMI is abbreviation for Project Management Institute as well as trade and service mark registered in the United States and other nations; PMBOK, is trademarks
More informationComparing PMBOK Guide 4 th Edition, PMBOK Guide 5 th Edition, and ISO 21500
Comparing PMBOK Guide 4 th Edition, PMBOK Guide 5 th Edition, and ISO 21500 Thierry Labriet, STS STS SA, Lausanne, Switzerland +41 21 510 11 50 office@sts.ch www.sts.ch 1 Contents 1 Foreword... 3 2 Executive
More informationLookingGlass - Project Management Professional Exam Prep (PMP01)
LookingGlass - Project Management Professional Exam Prep (PMP01) Course Overview This course has been designed to prepare participants to take the Project Management Institute's Project Management Professional
More informationPMP Sample Questions Click here for PMP Questions. Question No : 1 Which of the following is an output of Define Scope?
PMP Sample Questions www.techfaq360.com Click here for 1600+ PMP Questions Question No : 1 Which of the following is an output of Define Scope? A. Accepted deliverables B. Change Requests C. Project document
More informationMASTERING PROJECT MANAGEMENT - PROJECT MANAGEMENT PROFESSIONAL ( PMP ) CERTIFICATION SEMINAR
MASTERING PROJECT MANAGEMENT - PROJECT MANAGEMENT PROFESSIONAL ( PMP ) CERTIFICATION SEMINAR Monday - Friday June 25-29, 2018 Book and pay before 4 June 2018 and get a discount per delegate. i This course
More informationProject Management Framework with reference to PMBOK (PMI) July 01, 2009
Project Management Framework with reference to PMBOK (PMI) July 01, 2009 Introduction Context Agenda Introduction to Methodologies What is a Methodology? Benefits of an Effective Methodology Methodology
More informationPass4sure.CAPM.675Questions. Certified Associate in Project Management (CAPM)
Pass4sure.CAPM.675Questions Number: CAPM Passing Score: 800 Time Limit: 120 min File Version: 4.1 http://www.gratisexam.com/ Certified Associate in Project Management (CAPM) I have corrected few questions
More informationProject Time Management
Project Time Management Project Time Management Project Time Management includes the processes required to manage timely completion of the project. Plan schedule management The process of establishing
More informationLCS International, Inc. PMP Review. Chapter 9 Conducting Procurements and Sharing Information. Presented by David J.
PMP Review Chapter 9 Conducting Procurements and Sharing Information Presented by David J. Lanners, MBA, PMP These slides are intended to be used only in settings where each viewer has an original copy
More informationPMI Scheduling Professional (PMI-SP)
PMI Scheduling Professional (PMI-SP) E X A M I N AT I O N CO N T E N T O U T L I N E Project Management Institute PMI Scheduling Professional (PMI-SP) Exam Content Outline Published by: Project Management
More informationNEW HORIZONS ONLINE LIVE
NEW HORIZONS ONLINE LIVE WELCOME TO Certified Associate of Project Management (CAPM ) Fifth Edition PMBOK Guide - Please configure your audio: Meeting Audio Setup Wizard The Project Life Cycle Overview
More informationPMP Q&As. Project Management Professional. Pass PMI PMP Exam with 100% Guarantee. Free Download Real Questions & Answers PDF and VCE file from:
PMP Q&As Project Management Professional Pass PMI PMP Exam with 100% Guarantee Free Download Real Questions & Answers PDF and VCE file from: 100% Passing Guarantee 100% Money Back Assurance Following Questions
More informationProject Management Professional (PMP) Boot Camp
Project Management Professional (PMP) Boot Camp According to the Project Management Institute, the world's leading association for the project management profession: "PMP Certification is the profession's
More informationPMP Exam Preparation Course Project Time Management
Project Time Management 1 Project Time Management Processes Define Activities Sequence Activities Estimate Activity Resources Estimate Activity duration Develop Schedule Control Schedule In some projects,
More informationLCS International, Inc. PMP Review. Chapter 3 Developing the Project Scope Statement. Presented by David J. Lanners, MBA, PMP
PMP Review Chapter 3 Developing the Project Scope Statement Presented by David J. Lanners, MBA, PMP These slides are intended to be used only in settings where each viewer has an original copy of the Sybex
More informationPMP Course Content. Chapter 1. Introduction to PMP Objectives of PMP Requirements for PMP Exam About PMP Exam PMP Exam Syllabus.
PMP Course Content Chapter 1 Introduction to PMP Objectives of PMP Requirements for PMP Exam About PMP Exam PMP Exam Syllabus Chapter 2 Objectives of Project Management Framework What is Project What are
More informationPMP MOCK EXAMS BASED ON PMBOK 5TH EDITION
PMP MOCK EXAMS http://www.tutorialspoint.com/pmp-exams/pmp_mock_exams_set4.htm Copyright tutorialspoint.com BASED ON PMBOK 5TH EDITION Here are 200 objective type sample questions and their answers are
More informationWhy does the PMBOK change? Ensures standards are up-to to-date and reflect ever-evolving evolving knowledge in the profession Standards are aligned, i
PMBOK 4 th Edition Overview Colleen A. McGraw 16 October 2009 Why does the PMBOK change? Ensures standards are up-to to-date and reflect ever-evolving evolving knowledge in the profession Standards are
More informationProject Management Professionals
A COLLECTION OF INTERVIEW QUESTIONS FOR Project Management Professionals When interviewing a Project Manager, it s important to set up the discussion for the first couple of minutes in an open dialogue.
More informationEffective Project Coordination and Management
Effective Project Coordination and Management PROGRAMME SUMMARY Projects frequently fail, not because of a lack of technical skills on the part of those executing the project, but because of inadequate
More informationProject Management based on the Project Management book of knowledge
Project Management based on the Project Management book of knowledge Integration Check parts of your plan are co-ordinated. Make trade off between competing objectives Scope Ensure the project includes
More informationCPET 545 SOA and Enterprise Applications
SOA Project Planning & Management CPET 545 SOA and Enterprise Applications SOA Project Planning & Management 11-18-2008 SOA Project Phases [1] Requirement engineering Business domain analysis Solution
More informationComparing PMBOK Guide 4 th Edition, PMBOK Guide 5 th Edition and ISO 21500
Project Training Company Comparing PMBOK Guide 4 th Edition, Edition and STS Sauter Training & Simulation S.A. Avenue de la Gare 10 1003 Lausanne Switzerland Web: www.sts.ch E-mail: office@sts.ch Phone:
More informationContrasting CMMI and the PMBOK. Systems Engineering Conference October 2005
Contrasting CMMI and the PMBOK Systems Engineering Conference October 2005 Wayne Sherer U.S. Army ARDEC Sandy Thrasher, PMP Anteon Corporation Overview Purpose Considerations for Comparison Similarities
More information4. Which of the following statements are true regarding The Project Scope Statement based on the PMBOK 5h Edition?
1. Which of the following is true regarding the project charter? A. The project charter is a document that formally authorize a project or phase.. B. The project charter represent a high level planning
More informationIndex. Symbols. 80/20 Rule, /15 Rule, 306
Index Symbols 80/20 Rule, 318 85/15 Rule, 306 A accelerated depreciation, 287 acceptance, formal acceptance:and scope verification, 211 accuracy versus precision, 303 action items in status meetings, 55
More informationProject Quality Management
1 Project Quality Management Unit 8 Eng.elsaka09@gmail.com Project Quality Management Includes the processes and activities of the performing organization that determine quality policies, objectives, and
More informationPlanning and Scheduling Training Program Course Brochure and Competency Matrix
Planning and Scheduling Training Program Course Brochure and Competency Matrix INDEX: 1. Company Introduction 2. Training Programme Description 3. Training Delivery Options 4. Course Syllabus 5. Programme
More informationInformation Technology Project Management, Sixth Edition
Management, Sixth Edition Scope refers to all the work involved in creating the products of the project and the processes used to create them A deliverable is a product produced as part of a project, such
More informationNCITW 113 Working in a Projectized Environment
NCITW 113 Working in a Projectized Environment Stephanie Lachman-Doucet Projerra Management stephanie@projerra.ca Objectives of This Course An introduction to project management and different approaches
More informationPMP Exam Preparation Course Project Scope Management
Project Scope Management 1 Product Scope Product scope The features and functions that are to be included in your products or service or result of the project. Completion is measured against the product
More informationProject Quality Management
Project Quality Introduction Unit 1 Unit 2 Unit 3 PMP Exam Preparation Project Integration Project Scope Project Time Unit 4 Unit 5 Unit 6 Unit 7 Project Cost Project Quality Project Human Resource Project
More informationProject Management Institute (PMI) Practice Standard for Configuration Management
Project Configuration Management Project Management Institute (PMI) Practice Standard for Configuration Management Project Configuration Management What we will cover: Introduction Relationship with other
More informationGLOSSARY. 1. Inclusions and Exclusions. 2. Common Acronyms
GLOSSARY 1. Inclusions and Exclusions This glossary includes terms that are: Unique or nearly unique to project management (e.g., project scope statement, work package, work breakdown structure, critical
More informationCourse ID October 2015 COURSE OUTLINE. Business Administration 210 Foundations of Project Management
Page 1 of 5 Degree Applicable Glendale Community College Course ID 010247 October 2015 I. Catalog Statement COURSE OUTLINE Business Administration 210 Foundations of Project Management BUSAD 210 covers
More informationContent Break-up & Methodology for awarding Contact Hours / PDUs
N.I.T.E - Project Management Professional (PMP) Exam Prep Course Content Break-up & Methodology for awarding Contact Hours / PDUs This course is based on Project Management Book of Knowledge PMBOK Guide
More informationThe Planning Process Group
Assalam-o-alaikum Project Management Process Groups Project Integration Management Knowledge Areas Initiating Planning Executing Scope Time Cost Quality Human Resources Communications Monitoring & Controlling
More informationChoice 1 Only positive aspects of the project which can be used by others in the company
Question No. 1 You are working on a project in Skydine International Ltd. as a Project Manager. In the closure stage of your project, you are interacting with your team to create lessons learned documentation,
More information7.11b: Quality in Project Management: A Comparison of PRINCE2 Against PMBOK
by Peter Whitelaw, Rational Management Pty Ltd, Melbourne Introduction This comparison takes each part of the PMBOK and provides comments on what match there is with elements of the PRINCE2 method. It's
More informationProject Management Process Groups. PMP Study Group Based on the PMBOK Guide 4 th Edition
Project Management Process Groups PMP Study Group Based on the PMBOK Guide 4 th Edition Introduction PM Process Groups In order for a project to be successful, the project team must: Select appropriate
More informationTotal Questions: 370 MODULE QUIZ ANSWER KEY. Fundamentals 1 & 2
Fundamentals 1 & 2 1. Answer: B Process Group. Each project management knowledge area is subdivided into specific process group, each of which is characterized by their inputs, tools and techniques, and
More informationProject Quality Management. For the PMP Exam using PMBOK
Project Quality Management For the PMP Exam using PMBOK Guide 5 th Edition PMI, PMP, PMBOK Guide are registered trade marks of Project Management Institute, Inc. Contacts Name: Khaled El-Nakib, PMP, PMI-RMP
More informationProject Management Processes
What is a project? Webster's Dictionary defines the word project as "That which is projected or designed; something intended or devised; a scheme; a design; a plan." The Project Management Institute defines
More informationPROJECT PROCUREMENT MANAGEMENT. 1 Powered by POeT Solvers Limited
PROJECT PROCUREMENT MANAGEMENT 1 www.pmtutor.org Powered by POeT Solvers Limited CONDUCT PROCUREMENT PROCESSES BY PROCESS GROUP Planning Executing Monitoring and controlling Closing 12.1 12.2 12.3 12.4
More informationFor the PMP Exam using PMBOK Guide 5 th Edition. PMI, PMP, PMBOK Guide are registered trade marks of Project Management Institute, Inc.
For the PMP Exam using PMBOK Guide 5 th Edition PMI, PMP, PMBOK Guide are registered trade marks of Project Management Institute, Inc. 1 Contacts Name: Khaled El-Nakib, MSc, PMP, PMI-RMP URL: http://www.khaledelnakib.com
More informationFundamentals of Project Management for the Acting PM Presented by the NYS Forum Project Management Workgroup. Session 2.
Fundamentals of Project Management for the Acting PM Presented by the NYS Forum Session 2 Scope Management Dan Miller Project Manager, Revenue and Transportation Cluster, NYSOITS Biography 24 years as
More informationProject Management Professional Training
Training Course Course Language Course Duration Project Management Professional Training PMP Project Management Professional Exam Preparation based on PMBOK 6 th Edition ( 40 PDUs) English Total Number
More informationPMBOK on Steroids: The Integrated Project Delivery. Development of a Continuing Care Retirement Community
PMBOK on Steroids: The Integrated Project Delivery Development of a Continuing Care Retirement Community The Product: Ashby Ponds 3NHD 1,500 Unit Campus The Product: Ashby Ponds 3NHD 1,500 Unit Campus
More informationGuten Tag. (good day)
Guten Tag (good day) What is the #1 problem many people have on a project? What is the #1 problem many people have on a project? Communication Project Management Process Groups Project 4. Integration Management
More informationAgenda. PMBOK Guide Third Edition. PMI Standards Background. PMI Life Cycle Plan for Standards. Presented by Kevin Chui, PMP. How Did We Get Here?
Agenda PMBOK Guide Third Edition Presented by Kevin Chui, PMP Vice President, PMI Hong Kong Chapter Background PMBOK Guide 2004 Update Project Structural Changes to the Standard Process Group Changes Knowledge
More informationFor the PMP Exam using PMBOK. PMI, PMP, PMBOK Guide are registered trade marks of Project Management Institute, Inc.
For the PMP Exam using PMBOK Guide 5 th Edition PMI, PMP, PMBOK Guide are registered trade marks of Project Management Institute, Inc. 1 Contacts Name: Khaled El-Nakib, MSc, PMP, PMI-RMP URL: http://www.khaledelnakib.com
More informationCopyright 2013 Pearson Education, Inc. Publishing as Prentice Hall 5-1
Copyright 2013 Pearson Education, Inc. Publishing as Prentice Hall -1 Learning objectives Manage the planning process of a project Understand the work breakdown structure of a project Understand different
More information