1 Page 1 of 11 CONTENT OF THE TECHNICAL FILE TITLE ORIGINATOR SUBJECT RELATED TO NB-RAIL STRATEGY SG Directive 2008/57/EC (incl. all amendments esp. 2014/106/EU), Recommendation 2014/897/EU, Decision 2010/713/EU and all TSIs AMENDMENT RECORD: ISSUE 07: ADJUSTMENT OF SECTION 3 OF TF IN LINE WITH RFU-STR-001 ISSUE 10. ALSO SMALL CHANGES TO INCREASE REDABILITY. INCLUDING OF WKD-STR-007 ISSUE 01 AS ANNEX TO THIS DOCUMENT. DESCRIPTION AND BACKGROUND EXPLANATION Based on 2008/57/EC as modified by 2014/106/EU (applicable from ) and supported by recommendation 2014/897/EU the previous concept of the Technical File (TF) was re-defined and the associated tasks have been re-allocated between Applicant and NoBo: The Applicant prepares and manages a Technical file accompanying the EC declaration of verification (in the following abbreviated as ECDV-TF) and the NoBo a Technical File accompanying the EC Certificate of Verification (in the following abbreviated as NoBo- TF). One or several individual NoBo-TF(s) form a part of the overall ECDV-TF. ECDV-TF ( Technical File accompanying the EC declaration of verification ) According to 2008/57/EC and 2014/897/EU to be prepared by the Applicant for Authorisation for Placing in Service (APIS), either for a Structural Subsystem, or a Vehicle, or a Network Project) 1. Technical Characteristics (=Design evidence documentation) 2. List of ICs 3. NoBo-TF (may be a collection of several NoBo- TFs) 4. DeBo-TF-xx (xx= MS abbreviation, may be a collection of several DeBo-TFs) 5. Certificates relating to other legislation derived from the Treaty 6. AsBo Report (on the verification of safe integration) 7. Information required for the relevant registers (e.g. ERATV/ RINF/ NVR) 8. Other information as required by IOD 2008/57/EC 9. Other information as recommended by 2014/897/EU Annex to ECDV-TF containing all referenced documents NoBo-TF (Technical File accompanying the EC Certificate of Verification) According to 2008/57/EC to be prepared by the NoBo for : a Structural Subsystem 1. Actors 2. NoBo Certificates 3. Conditions and Limits of use 4. Project scope and definition 5. Project documentation 6. EC verification process information

2 Page 2 of 11 Note: This RFU is only intending to define the required Content for the NoBo-TF. Any contents of the ECDV-TF are only listed for general information and are not intended to be complete. An advantage of having a standardised layout of the NoBo-TF is that any interested stakeholders will become able to locate information easily at the same section across any TF prepared in accordance with this RFU. The project-specific content of each section will vary according to the nature of the project, the subsystems involved and the assessment modules used. For IC certification Modules and for Modules SB and SH1 (design examination) a different situation applies: Instead of a Technical File, in these cases 2010/713/EC defines a concept of annexes to the certificate, which shall contain all relevant information to allow the conformity of interoperability constituents or manufactured subsystems with the product type examined to be evaluated. This annex is required to provide the relevant information from the NoBo which has performed a certification to another NoBo performing the final subsystem certification or quality management system approval. Despite the different names, the content of information required for the NoBo-TF and for the annexes to the certificates is identical, so the same document structure as given in the annex of this RFU should be used and the term NoBo-Technical File should be used instead of annexes to the certificates. For Information: Unless other (e.g. national) requirements apply, the DeBos are invited to use for a DeBo-TF the same structure as defined in this RFU, in order to achieve a systematic structure across all NoBo and DeBo sections of the ECDV-TF. Further references on the overall relevant legislative background to this RFU are contained in the annex to this document. RFU PROPOSAL Structure for the Technical File accompanying the EC Certificate of Verification (in the following abbreviated as NoBo-TF) The content and format shown in this RFU are combining the minimum requirements only. Any further specific requirements as may be defined for certain types of products by the Interoperability Directive, the individual TSIs and by contractual obligations must be observed in addition. The language(s) of the NoBo-TF shall be defined by In relation to document control aspects, the NoBo-TF shall have:

3 Page 3 of 11 A Cover Page identifying the Project/ Product/ Installation and Certificate to which it relates A Unique document ID A Version Control (incl. short description of changes in the respective version) A Table of Contents Page Numbers in the format x of y (to permit quick verification of completeness). In the event that a certain project does not need to use any particular section, this section should be retained and marked as not used (or similar) so as to keep section numbers identical across all NoBo-TFs. In many cases the information in the subheadings may be provided in the format of references to relevant documents which have been supplied by section Title of section Explanation 1 Actors (Heading only) 1.1 Notified Body(s) Identification of NoBo(s) involved in the assessment and their respective scope of assessment (including ISVs). 1.2 Applicant Identification of Applicant. 2 Notified Body Certificate(s) 3 Conditions and Limits of use 4 Project Scope and Definition 4.1 General Project information This shall contain copies of all subsystem certificates issued by the NoBo(s) (including any ISV(s), if used). This shall contain references to the Conditions and Limits of use as declared by the Applicant to the NoBo. If necessary, the NoBo must state also any further Conditions and Limits of use, if these were identified during the EC verification. Individual TSIs may require further specific information to be provided by the Applicant (e.g. choice of environmental condition parameters in TSI CCS or L&P). Where defined in a TSI this shall include the Area of Use information as far as this is to be evaluated by the NoBo. (Heading only) Precise definition of the Product/ Installation under certification. Where relevant, this shall reference the precise Variant/Version of a type, line locations, etc.

4 Page 4 of Technical scope and interfaces Individual TSIs may require further specific information to be provided by the Applicant (e.g. e.g. choice of optional functions in TSI CCS). Additionally: in case of application for an ISV, detailed description of the part/stage under assessment is required. This shall define the scope of the verification clearly, e.g. the geographic and technical scope of assessment, interfaces to other subsystems, and special considerations. 4.3 Project History Overview of relevant aspects of the project history and any phasing of activities. In particular for long lasting projects which started before a current TSI became applicable, this information of project history (e. g. date of application and amendments, date of derogations, start of construction works etc.) is indispensable to explain which TSI version is used for the project. This shall justify why a particular TSI version is used or why certain TSI s are not applied or are applied only in parts and resulting in requirements or test methods to be different from a current TSI. 4.4 Derogations/ Limitation of TSI Application Reference to documented evidence on any Derogations enjoyed or expected under 2008/57/EC Art 9 or Limitations to TSI application under Art 20 as agreed between the Applicant and the NSA(s). 4.5 List of specific cases Reference listing on the Specific Cases declared by the Applicant to be present at this project (refer to ch.7 of the relevant TSIs). 5 Project documentation 5.1 Applied Standards/ Technical Specification/ Alternative Solutions (Heading only) The following sub-headings shall refer to all of the technical documentation supplied to the NoBo by the Applicant and used during verification activities. It is good practice to provide the information for 5.1 / 5.2 within a combined matrix. This shall contain for each applicable TSI Parameter/ Requirement the harmonised standards and/or other relevant technical specifications applied in full or in part, and

5 Page 5 of 11 descriptions of the alternative solutions adopted where those have not been applied. In the event of partly applied harmonised standards or technical specifications, state also which parts have been applied. This section also lists the applied RFUs and ERA TOs/TAs. 5.2 Design evidence This shall contain for each applicable TSI Parameter/ Requirement the references for the design evidence documents used during the EC verification. Documents which do not relate to the final EC certification should be avoided. Depending on the individual TSI Parameter/ Requirement, this may be one or several of the following: drawings, parts lists, functional/ technical descriptions, simulations, test procedures, test reports, etc. Individual TSIs/ Standards/ Technical Specifications may require further specific information to be provided by the Applicant (e.g. choice on specific tests in operational conditions in TSI CCS or L&P). 5.3 Evidence related to quality management system(s) or on production (depending on the modules used) References to information on the applied quality management system. This may include references to: an ISO 9001 quality management system or other relevant certificates on specific quality management systems (e.g. to EN15085) quality management approvals from notified bodies, information on relevant QM documents (e.g. procedures, quality planning, production related testing and inspection, etc.) These References have typically been identified during the QMS audit activities. If no quality management system is used during the project (e. g. where Module SG or SF has been applied), then the production evidence required to demonstrate conformance of the installation or

6 Page 6 of List of manufacturers and main subcontractors 5.5 Provisions for operation 5.6 Provisions for maintenance 5.7 Interoperability Constituents 6 EC verification process information and results conformance of the product with the type shall be included. This may include installation or product inspections, test reports and other documentation as required by the module(s) used. In complex situations this shall also include an overview on roles and responsibilities. This shall contain in accordance to the relevant TSIs the references to the Applicant documents which contain those provisions for operation which must be assessed by the NoBo. (e.g. operation manual) This shall contain in accordance to the relevant TSIs the references to the Applicant documents which contain those provisions for maintenance which must be assessed by the NoBo. (e.g. maintenance file) This shall include the reference to the Applicant s list of ICs and to the associated EC Declarations of Conformity or Suitability for Use, associated Certificates and NoBo-TFs and the Applicant s Technical Documentation. This shall include at least all information required to assure the correct integration of the IC into the subsystem e.g. - interface definitions - conditions for use - maintenance & operation information. This section includes the documents prepared by the NoBo(s). This shall include the reference to the NoBo Report(s) (and where existing, further supporting documentation) related to the applied Modules. (Note: If a NoBo does not issue separate reports, the respective information shall be provided in this section.)

7 Page 7 of 11 THIS RFU WAS AGREED ON PLENARY MEETING 53 DATE OF PUBLICATION: 14/06/ /09/2018 THIS RFU ENTERS INTO FORCE ON RFU APPLICATION IS MANDATORY STARTING FROM AT THIS DATE ANY PREVIOUS VERSIONS (OR, ALTERNATIVELY, VERSION XX) OF THIS RFU WILL BE WITHDRAWN. PLE053-23/05/2018: NO COMMENTS ERA COMMENTS

8 Page 8 of 11 ANNEX 1: The list below has been established to provide an overview of the legal framework dealing with the topic of technical file extended to the notion of technical file accompanying the EC declaration. This list is intended for the general information of Applicants and NoBos and is not intended to be complete. I. Requirements for Content of NoBo-TF: VI.2.4.c-1.1 VI.2.4.c-1.2 VI.2.4.c-2.1 VI.2.4.c-2.2 VI.2.4.c-3.1 VI.2.4.c /897/EU 56 copies of the EC declarations of conformity and, where applicable, EC declarations of suitability for use established for interoperability constituents referred to in Article 5(3)(d) where appropriate [as defined in the TSIs] the corresponding calculation notes and a copy of the records of the tests and examinations carried out by the notified bodies on the basis of the common technical specifications where available, the [relevant] ISV[s] that accompany the [Subsystem] certificate of verification, Including the result of verification by the notified body[s] of the ISV[s] validity [=is/are the ISV(s) presented actually valid and applicable for this subsystem] the [EC] certificate of verification signed by the notified body responsible for the verification stating that the subsystem complies with the requirements of the relevant TSI(s) and mentioning any reservations recorded during performance of the activities and not withdrawn certificate of verification should also be accompanied by the inspection and audit reports drawn up by the same body in connection with its task, as specified in points (surveillance audits) and (unexpected visits) This implies that the notified body has a role in checking technical compatibility with other subsystems, which is consistent with the fact that technical compatibility is covered by TSIs. The scope of these checks is limited to the relevant TSIs. Each notified body compiles a technical file in respect of the verifications they have carried out. section5.7 section6 section2 section6 section2. EC Certificates according to RFU-STR-001 will satisfy this. section6. It is considered that this relates only to those surveillance audits/ unexpected visits performed up to the date of EC certification. >General Requirement for NoBo-TF. All content of the NoBo-TF shall be limited to the relevant TSIs and the verifications the NoBo has carried out.

9 Page 9 of 11 II. Requirements for Content of ECDV-TF VI.2.4.a VI.2.4.b VI.2.4.d VI.2.4.e VI /57/EC 23.3.b 2008/57/EC 25.2.a [set of documents on] technical characteristics linked to the design including general and detailed drawings with respect to execution, electrical and hydraulic diagrams, control-circuit diagrams, description of data-processing and automatic systems to the level of detail sufficient for documenting the verification of conformity carried out, documentation on operation and maintenance, etc., relevant for the subsystem concerned; a list of interoperability constituents, referred to in Article 5(3)(d), incorporated into the subsystem; certificates of verification issued in accordance with other legislation deriving from the Treaty; when verification of safe integration is required pursuant to Article 15, the relevant technical file shall include the assessors' report(s) on the common safety methods (CSM) on risk assessment referred to in Article 6(3) of Directive 2004/49/EC. Language The files and correspondence relating to the EC verification procedure must be written in a Union official language of the Member State in which the contracting entity or manufacturers (i.e. the applicant in the meaning of Article 18) is established or in a Union official language accepted by the contracting entity or manufacturers (i.e. the applicant in the meaning of Article 18). This shall include, in the case of vehicles equipped with data recorders, information on the data collection procedure, permitting read out and evaluation, as long as this information is not harmonised by the corresponding TSI; In case of Additional authorisations for placing in service of non- TSI conform vehicles: documentary evidence that the placing in service of the vehicle has been authorised in another Member State together with documentation on the procedure followed in order to show that the vehicle complied with the safety requirements in force, including, where applicable, information on May be combined or separate for all Member States, where operation is intended. >It is a requirement for the Applicant to agree on the primary and any secondary languages/ translations with the related NSA(s). >The NoBo may accept and will prepare documents in any languages they have contractually agreed upon with the Applicant. derogations enjoyed or granted in accordance with Article 9; 2008/57/EC 25.2.b-1 the technical data, 2008/57/EC 25.2.b-2 the maintenance programme 2008/57/EC 25.2.b-3 the operational characteristics 2008/57/EC 25.2.b-4 This shall include, in the case of vehicles equipped with data recorders, information on the data collection procedure, permitting read out and evaluation as provided for in Article 20(2)(c) of Directive 2004/49/EC; 2008/57/EC 25.2.c-1 records showing the vehicle's history of operation, maintenance 2008/57/EC 25.2.c-2 where applicable, technical modifications undertaken after the authorisation; 2008/57/EC 25.2.d evidence on technical and operational characteristics that shows

10 Page 10 of /897/EU 2(m) 2014/897/EU /897/EU /897/EU /897/EU 40bis that the vehicle is compatible with the infrastructures and fixed installations, including climate conditions, energy supply system, control- command and signalling system, track gauge and infrastructure gauges, maximum permitted axle load and other constraints of the network. technical file accompanying the EC declaration of verification means the combination of all files and documentation gathered by the applicant as required by all applicable EU legislation for a subsystem; (Vehicles) technical characteristics of the vehicles' design operating state, including limits and conditions of use and indicate the network(s) of the Member State(s) for which the vehicles of that type are authorised. The technical characteristics referred to in the authorisation should be: declared by the manufacturers or contracting entities, in their role as applicant for authorisation of the vehicle or vehicle type, verified and certified by the assessment bodies, and documented in the technical file accompanying the EC declaration of verification. (fixed installation Subsystem) fixed installation subsystems should refer to its technical characteristics, including limits and conditions of use. The technical characteristics referred to in the authorisation for placing in service should be: declared by the applicant, verified and certified by the assessment bodies, and documented in the technical file accompanying the EC declaration of verification. (VEHICLES) points (a), (b), and (c) of recommendation 39 ((a) safe integration between the elements composing a subsystem; (b) safe integration between subsystems that constitute a vehicle or a network project; and, for vehicles: (c) safe integration of a vehicle with the network characteristics; ) should be carried out before authorisation for placing in service. Any condition and limits of use derived from them (e.g. any limitations for train composition including operation in multiple units or operation of the locomotives together with the vehicles forming the train) should be stated in the technical file accompanying the EC declaration of verification referred to in Article 18(3) of Directive 2008/57/EC in such a way that the user of the authorised subsystem or vehicle can apply these conditions and limits of use according to its SMS, (fixed installation Subsystems/ Network Projects) points (a), (b), (f) and (g)( (a) safe integration between the elements composing a subsystem; (b) safe integration between subsystems that constitute a vehicle or a network project; (f) safe integration of a network project with the vehicle characteristics defined in TSIs and national rules; (g) safe integration with adjacent parts of the network (line sections); ) of recommendation 39 should be carried out before authorisation for placing in service. Any condition and limits of use derived from them should be stated in the technical file accompanying the EC declaration of verification referred to in Article 18(3) of Directive 2008/57/EC in such a way that the user of the authorised subsystem or network project can apply these conditions and limits of use according to its SMS, 2014/897/EU 90-1 According to Article 18 and Annex VI to Directive 2008/57/EC, an

11 Page 11 of 11 EC declaration of verification for a subsystem should be accompanied by a technical file 2014/897/EU 90-2 including the documentation describing the subsystem, 2014/897/EU 90-3 the documentation resulting from the verifications carried out by different assessment bodies 2014/897/EU 90-4 and the documentation of the elements relating to the conditions and limits of use 2014/897/EU 90-5 and to the instructions concerning servicing, constant or routine monitoring, adjustment and maintenance. 2014/897/EU 90-6 the technical file accompanying the EC declaration of verification includes all supporting documents needed for the authorisation for placing in service. 2014/897/EU 99 Each manufacturer, maintenance supplier, wagon keeper, service provider and procurement entity must ensure that rolling stock, installations, accessories and equipment and services supplied by them comply with the essential requirements and that the conditions for use are specified in the technical file accompanying the EC declaration of verification so that they can be safely put into operation by the railway undertaking and/or infrastructure manager. >It is a requirement for the Applicant to agree these aspects with the relevant stakeholders.

Guide for the application of Technical Specifications for Interoperability (TSIs) Annex 2 Conformity assessment and EC verification

Guide for the application of Technical Specifications for Interoperability (TSIs) Annex 2 Conformity assessment and EC verification European Railway Agency Guide for the application of TSIs European Railway Agency Guide for the application of Technical Specifications for Interoperability (TSIs) Annex 2 Conformity assessment and EC

More information

1 Introduction. 2 Abbreviations and Definitions

1 Introduction. 2 Abbreviations and Definitions 1 Introduction This Guideline is intended to give guidance and explanation on the related European legal provisions for the Certification of ECMs. It cannot replace additional self study of the applicable

More information

RECOMMENDATION FOR USE

RECOMMENDATION FOR USE Page 1 of 10 TITLE ACCEPTANCE OF ASSESSMENT REPORTS ON SAFETY PREPARED BY OTHER PARTIES ORIGINATOR SG STR, SG CCS, SG RST SUBJECT RELATED TO ANY TSI CCS, ANY TSI RST DESCRIPTION AND BACKGROUND EXPLANATION

More information

Assurance provided by a second pair eyes (RASBO) of the correct Safe integration by the proposer of a new or modified Rolling Stock

Assurance provided by a second pair eyes (RASBO) of the correct Safe integration by the proposer of a new or modified Rolling Stock Quality & Safety for Systems & Software Railway Engineering Assurance provided by a second pair eyes (RASBO) of the correct Safe integration by the proposer of a new or modified Rolling Stock Ir. Marc

More information

Working Document ON THE INTEROPERABILITY OF THE RAIL SYSTEM WITHIN THE UNION

Working Document ON THE INTEROPERABILITY OF THE RAIL SYSTEM WITHIN THE UNION Page 1 of 18 TITLE CORE ELEMENTS FOR THE APPROVAL OF QUALITY MANAGEMENT SYSTEMS TO 2008/57/EC ORIGINATOR SG STRATEGY (WORKING PARTY: ARSENAL RACE BELGORAIL, LUXCONTROL, RINA) SUBJECT RELATED TO APPLIES

More information

Rolling stock approval process

Rolling stock approval process Rolling stock approval process Presentation to SEETO Working Group by Frank Walenberg Skopje 9 November 2010 1 Overview Need for the approval process RST approval process in the past Interoperability:

More information

RSC-G-009-E Guideline for the Process of Authorisation for Placing in Service of Railway Sub Systems

RSC-G-009-E Guideline for the Process of Authorisation for Placing in Service of Railway Sub Systems RSC-G-009-E Guideline for the Process of Authorisation for Placing in Service of Railway Sub Systems Guidance for RSC Inspectors, Railway Undertakings/ Infrastructure Managers and Applicants for APIS Prepared

More information

RECOMMENDATIONS. (Text with EEA relevance) (2014/897/EU)

RECOMMENDATIONS. (Text with EEA relevance) (2014/897/EU) 12.12.2014 L 355/59 RECOMMDATIONS COMMISSION RECOMMDATION of 5 December 2014 on matters related to the placing in service and use of structural subsystems and vehicles under Directives 2008/57/EC and 2004/49/EC

More information

Explanatory Note on the CSM Assessment Body in Regulation (EU) N 402/2013 and in OTIF UTP GEN- G of on the CSM for risk assessment

Explanatory Note on the CSM Assessment Body in Regulation (EU) N 402/2013 and in OTIF UTP GEN- G of on the CSM for risk assessment Regulation (EU) N 402/2013 and in UTP GEN- Explanatory note on the CSM Assessment Body referred to in Regulation (EU) N 402/2013 (1) and in UTP GEN-G of 1.1.2016 (2) on the Common Safety Method (CSM) for

More information

RECOMMENDATION FOR USE RFU-CCS-077

RECOMMENDATION FOR USE RFU-CCS-077 Page 1 of 9 TITLE CERTIFICATES WITH RESTRICTIONS AND CONDITIONS FOR USE ORIGINATOR ALTRAN, CERTIFER, SINTEF, VŮŽ SUBJECT RELATED TO SUBSYSTEM CCO AND CCT DESCRIPTION AND BACKGROUND EXPLANATION Introduction

More information

Explanatory Note on the CSM Assessment Body in Regulation (EU) N 402/2013 and in OTIF UTP GEN- G of on the CSM for risk assessment

Explanatory Note on the CSM Assessment Body in Regulation (EU) N 402/2013 and in OTIF UTP GEN- G of on the CSM for risk assessment Explanatory note on the CSM Assessment Body referred to in Regulation (EU) N 402/2013 (1) and in UTP GEN-G of 1.1.2016 (2) on the Common Safety Method (CSM) for risk assessment Author : Dragan JOVICIC

More information

Explanatory Note on the CSM Assessment Body in Regulation (EU) N 402/2013 and in OTIF UTP GEN- G of on the CSM for risk assessment

Explanatory Note on the CSM Assessment Body in Regulation (EU) N 402/2013 and in OTIF UTP GEN- G of on the CSM for risk assessment Regulation (EU) N 402/2013 and in UTP GEN- Explanatory note on the CSM Assessment Body referred to in Regulation (EU) N 402/2013 (1) and in UTP GEN-G of 1.1.2016 (2) on the Common Safety Method (CSM) for

More information

RECOMMENDATION FOR USE

RECOMMENDATION FOR USE Page 1 of 5 TITLE Scope of Assessment Requirements for Conformity Assessment by NoBos ORIGINATOR Luxcontrol Nederland B.V 2008/57/EC 2010/713/EU 765/2008 768/2008 SUBJECT RELATED TO DESCRIPTION AND BACKGROUND

More information

Technical document EUROPEAN UNION AGENCY FOR RAILWAYS REQUIREMENTS FOR CONFORMITY ASSESSMENT BODIES SEEKING NOTIFICA TION

Technical document EUROPEAN UNION AGENCY FOR RAILWAYS REQUIREMENTS FOR CONFORMITY ASSESSMENT BODIES SEEKING NOTIFICA TION Assessment EUROPEAN UNION AGENCY FOR RAILWAYS MNB - scheme 000MRA1O44 ver 1.1 Making the raflway system work better for society. F REQUIREMENTS FOR CONFORMITY ASSESSMENT BODIES SEEKING NOTIFICA TION Drafted

More information

Report. Sectorial scheme for accreditation of notified bodies under Directive 2008/57/EC HARMONISED REQUIREMENTS

Report. Sectorial scheme for accreditation of notified bodies under Directive 2008/57/EC HARMONISED REQUIREMENTS European Railway Agency Report Report Sectorial scheme for accreditation of notified bodies under Directive 2008/57/EC HARMONISED REQUIREMENTS Elaborated by Validated by Approved by Name Luca TRINCA, Irugo

More information

Application Guide for the CSM Assessment Body in Regulation (EU) N 402/2013 and in OTIF UTP GEN-G of on the CSM for risk assessment

Application Guide for the CSM Assessment Body in Regulation (EU) N 402/2013 and in OTIF UTP GEN-G of on the CSM for risk assessment Regulation (EU) N 402/2013 and in UTP GEN-G 1 2 Application guide for the CSM Assessment Body referred to in Regulation (EU) N 402/2013 and in UTP GEN-G of 1.1.2014 on the Common Safety Method (CSM) for

More information

Further information on the legislation can be found in all EU languages on EUR-LEX website:

Further information on the legislation can be found in all EU languages on EUR-LEX website: Making the railway system work better for society. 4 th Railway Package What is the 4 th Railway Package and its technical pillar? The 4 th Railway Package is a set of legislative texts designed to complete

More information

M1 DIRECTIVE 2001/16/EC OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 19 March 2001 on the interoperability of the conventional rail system

M1 DIRECTIVE 2001/16/EC OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 19 March 2001 on the interoperability of the conventional rail system 2001L0016 EN 30.04.2004 001.001 1 This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents B M1 DIRECTIVE 2001/16/EC OF THE EUROPEAN PARLIAMENT

More information

Explanatory Note on the CSM Assessment Body in Regulation (EU) N 402/2013 and in OTIF UTP GEN-G of on the CSM for risk assessment

Explanatory Note on the CSM Assessment Body in Regulation (EU) N 402/2013 and in OTIF UTP GEN-G of on the CSM for risk assessment Regulation (EU) N 402/2013 and in UTP GEN-G Explanatory note on the CSM Assessment Body referred to in Regulation (EU) N 402/2013 and in UTP GEN-G of 1.1.2014 on the Common Safety Method (CSM) for risk

More information

RSC-G-009D-Annex1 (SP) Checklist for evaluation of a Project Safety Plan

RSC-G-009D-Annex1 (SP) Checklist for evaluation of a Project Safety Plan RSC-G-009D-Annex1 (SP) Checklist for evaluation of a Project Safety Plan Prepared by: Maik Wuttke 22.02.2012 Reviewed by: Mary Molloy 22.02.2012 1 Introduction This checklist will be employed by the RSC

More information

European Railway Agency. Application Guide. Rue Marc Lefrancq, 120 BP F Valenciennes Cedex France Application guide Published

European Railway Agency. Application Guide. Rue Marc Lefrancq, 120 BP F Valenciennes Cedex France Application guide Published European Railway Agency Part 1 of the Reference Document envisaged by Article 27 of the Railway Interoperability Directive Application Guide Reference in ERA: ERA/GUI/XA Version in ERA: 3.0 Date: 30/10/2015

More information

Catalogue of examples

Catalogue of examples Making the railway system work better for society. Examples for the practical arrangements for the vehicle authorisation process Name E. DEL RIO G.TURNER S. YOUNG Drafted by Validated by Approved by H.

More information

NSA Monitoring. Making the railway system work better for society. Annex III bis: Referential Compliance Audit NSA Monitoring

NSA Monitoring. Making the railway system work better for society. Annex III bis: Referential Compliance Audit NSA Monitoring NSA Monitoring Making the railway system work better for society. NSA Monitoring 120 Rue Marc Lefrancq BP 20392 FR-59307 Valenciennes Cedex 1 / 23 Making the railway system work better for society. This

More information

Guidance for CRR Inspectors, Railway Undertakings, Infrastructure Managers and Applicants for ECM Certification. Issue Date.

Guidance for CRR Inspectors, Railway Undertakings, Infrastructure Managers and Applicants for ECM Certification. Issue Date. CRR-G-027-B Guidance for CRR Inspectors, Railway Undertakings, Infrastructure Managers and Applicants for ECM Certification Issue Prepared by Reviewed by 2.0 Michael Neale Liam Logan Approved by Issue

More information

The 3 sheets: Back Info-General, Back Info - Roles and Resps, and Back Info - Timeframe shall be filled in with the relevant information.

The 3 sheets: Back Info-General, Back Info - Roles and Resps, and Back Info - Timeframe shall be filled in with the relevant information. Background information The 3 sheets: Back Info-General, Back Info - Roles and Resps, and Back Info - Timeframe shall be filled in with the relevant information. The cells coloured in: are those to be filled

More information

Background information

Background information Background information The 3 sheets: Back Info-General, Back Info - Roles and Resps, and Back Info - Timeframe shall be filled in with the relevant information. The cells coloured in: are those to be filled

More information

COMMISSION OF THE EUROPEAN COMMUNITIES. Proposal for a DIRECTIVE OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL

COMMISSION OF THE EUROPEAN COMMUNITIES. Proposal for a DIRECTIVE OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL COMMISSION OF THE EUROPEAN COMMUNITIES Proposal for a Brussels, 13.12.2006 COM(2006) 783 final 2006/0273 (COD) DIRECTIVE OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL on the interoperability of the Community

More information

"RAILWAY SAFETY: THE WAY FORWARD"

RAILWAY SAFETY: THE WAY FORWARD EUROPEAN RAILWAY AGENCY CONFERENCE ON "RAILWAY SAFETY: THE WAY FORWARD" BRUSSELS, 8 SEPTEMBER 2009 Draft action plan Author: European Railway Agency INTRODUCTION This document has been prepared by, in

More information

Uncovering the technical specifications for interoperability as determined by the ERA to harmonise European safety standards

Uncovering the technical specifications for interoperability as determined by the ERA to harmonise European safety standards Uncovering the technical specifications for interoperability as determined by the ERA to harmonise European safety standards München, 12.09.2012, 4 th annual Fire Protection and Safety in Tunnels Content

More information

The European Framework for Vehicle Authorisation

The European Framework for Vehicle Authorisation The European Framework for Vehicle Authorisation Torben Holvad 13th Annual Fire Protection of Rolling Stock Conference, 1-2 nd March 2017, Berlin, Germany Content of presentation Brief background about

More information

Vehicle Authorisation after political investigation & safe integration in the Netherlands

Vehicle Authorisation after political investigation & safe integration in the Netherlands Vehicle Authorisation after political investigation & safe integration in the Netherlands Conference /Training Budapest 28th June 2017 ing. Krijn van Herwaarden NSA NL (National Safety Authority) Vehicle

More information

DIRECTIVES. (Text with EEA relevance)

DIRECTIVES. (Text with EEA relevance) L 138/44 26.5.2016 DIRECTIVES DIRECTIVE (EU) 2016/797 OF THE EUROPEAN PARLIAMT AND OF THE COUNCIL of 11 May 2016 on the interoperability of the rail system within the European Union (recast) (Text with

More information

GE/GN8640. Risk Evaluation and Assessment. Guidance on Planning an Application of the Common Safety Method on. Rail Industry Guidance Note

GE/GN8640. Risk Evaluation and Assessment. Guidance on Planning an Application of the Common Safety Method on. Rail Industry Guidance Note GN Published by: Block 2 Angel Square 1 Torrens Street London EC1V 1NY Copyright 2014 Rail Safety and Standards Board Limited GE/GN8640 Method on Risk Evaluation and Assessment Issue One; June 2014 Rail

More information

The 3 sheets: Back Info-General, Back Info - Roles and Resps, and Back Info - Timeframe shall be filled in with the relevant information.

The 3 sheets: Back Info-General, Back Info - Roles and Resps, and Back Info - Timeframe shall be filled in with the relevant information. Background information The 3 sheets: Back Info-General, Back Info - Roles and Resps, and Back Info - Timeframe shall be filled in with the relevant information. The cells coloured in: are those to be filled

More information

COMMISSION REGULATION (EU)

COMMISSION REGULATION (EU) L 320/8 Official Journal of the European Union 17.11.2012 COMMISSION REGULATION (EU) No 1078/2012 of 16 November 2012 on a common safety method for monitoring to be applied by railway undertakings, infrastructure

More information

The 3 sheets: Back Info-General, Back Info - Roles and Resps, and Back Info - Timeframe shall be filled in with the relevant information.

The 3 sheets: Back Info-General, Back Info - Roles and Resps, and Back Info - Timeframe shall be filled in with the relevant information. Background information The 3 sheets: Back Info-General, Back Info - Roles and Resps, and Back Info - Timeframe shall be filled in with the relevant information. The cells coloured in: are those to be filled

More information

Guide for the application of Technical Specifications for Interoperability (TSIs)

Guide for the application of Technical Specifications for Interoperability (TSIs) European Railway Agency Guide for the application of Technical Specifications for Interoperability (TSIs) According to Framework Mandate C(2007)3371 final of 13/07/2007 Reference in ERA: ERA/GUI/07-2011/INT

More information

QUESTION / CLARIFICATION

QUESTION / CLARIFICATION QUESTION / CLARIFICATION CO-ORDINATION BETWEEN NOTIFIED BODIES INTEROPERABILITY DIRECTIVE AND SUBSEQUENT AMENDMENTS ON THE INTEROPERABILITY OF THE RAIL SYSTEM WITHIN THE UNION QC-RST-015 Issue 02 Date:

More information

ATOC. Approved Code of Practice Approvals process for GSM-R Cab Mobile Fitment. Issue 2-8 th November Uncontrolled When Printed

ATOC. Approved Code of Practice Approvals process for GSM-R Cab Mobile Fitment. Issue 2-8 th November Uncontrolled When Printed ATOC ATOC Approved Code of Practice ACOP/EC/01009 Association of Train Operating Companies Issue 2-8 th November 2010 Approved Code of Practice Approvals process for GSM-R Cab Mobile Fitment Synopsis To

More information

Business Briefing: Interoperability. Peter Knight 2013

Business Briefing: Interoperability. Peter Knight 2013 Business Briefing: Interoperability Peter Knight 2013 1 Purpose of this briefing To bring the recipients to a level of understanding of the Railways (Interoperability) Regulations 2011 such they can: Understand

More information

Guide for the application of the TSI for the Subsystems Control-Command and Signalling Track-side and On-board

Guide for the application of the TSI for the Subsystems Control-Command and Signalling Track-side and On-board CCS TSI Application Making the railway system work better for society. European Union Agency for Railways for the application of the TSI for the Subsystems Control-Command and Signalling Track-side and

More information

ERTMS vehicle statistics Roadmap implementation. Vojtech EKSLER 15 June 2017

ERTMS vehicle statistics Roadmap implementation. Vojtech EKSLER 15 June 2017 ERTMS vehicle statistics Roadmap implementation Vojtech EKSLER 15 June 2017 Context Administrative arrangement on the Cooperation in Rail Transport Statistics between EUAR and Eurostat signed by both sides

More information

INTEROPERABILITY UNIT COMPLEMENTARY STUDY INTERCHANGEABLE SPARE PARTS

INTEROPERABILITY UNIT COMPLEMENTARY STUDY INTERCHANGEABLE SPARE PARTS INTEROPERABILITY UNIT COMPLEMENTARY STUDY INTERCHANGEABLE SPARE PARTS Reference: ERA/REP/10-2011/INT Document type: Final Report Version: 3 Date: 26 September 2011 Edited by Checked by Approved by Name

More information

This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents

This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents 2004L0049 EN 30.07.2014 003.002 1 This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents B C1 DIRECTIVE 2004/49/EC OF THE EUROPEAN PARLIAMENT

More information

Evaluation of the implementation of Regulation (EC) No 881/2004 of 29 April 2004 establishing the European Railway Agency

Evaluation of the implementation of Regulation (EC) No 881/2004 of 29 April 2004 establishing the European Railway Agency Evaluation of the implementation of Regulation (EC) No 881/2004 of 29 April 2004 establishing the European Railway Agency Results of the stakeholder analysis Public seminar Friday, 10 th December 2010

More information

Safety Regulation for Rail Sector in Europe

Safety Regulation for Rail Sector in Europe Safety Regulation for Rail Sector in Europe Roberto Piazza Safety Unit Moscow, 21 June 2007 1 Content 1. The legal basis and the main principles of safety regulation in the EU 2. The role of the European

More information

RIS RIS-2700-RST. Rail Industry Standard for Verification of Conformity of Engineering. Change to Rail Vehicles. Rail Industry Standard

RIS RIS-2700-RST. Rail Industry Standard for Verification of Conformity of Engineering. Change to Rail Vehicles. Rail Industry Standard RIS This document contains one or more pages which contain colour Published by: Copyright 2016 Rail Safety and Standards Board Limited RIS-2700-RST Engineering Change to Rail Vehicles Issue One: March

More information

3. OBJECTIVES AND PRIORITIES:

3. OBJECTIVES AND PRIORITIES: 3. OBJECTIVES AND PRIORITIES: 3.1. Priorities related to bridging missing links, removing bottlenecks, enhancing rail interoperability, and, in particular, improving cross-border sections 3.1.4. European

More information

Dissemination on CSM on monitoring, CSM on risk assessment and certification of ECMs

Dissemination on CSM on monitoring, CSM on risk assessment and certification of ECMs Dissemination on CSM on monitoring, CSM on risk assessment and certification of ECMs Day 2 Borlänge 12th and 13th November 2013 Agenda 2 nd day: 08:30 to 16:00 08:30 09:00: Registration and coffee 09:00

More information

COMMISSION REGULATION (EU)

COMMISSION REGULATION (EU) 17.11.2012 Official Journal of the European Union L 320/3 COMMISSION REGULATION (EU) No 1077/2012 of 16 November 2012 on a common safety method for supervision by national safety authorities after issuing

More information

Getting new trains on track

Getting new trains on track Fourth railway package Getting new trains on track Dr. Josef Doppelbauer, Executive Director, European Union Agency for Railways (ERA), Valenciennes, France At the end of the three-year implementation

More information

The 3 sheets: Back Info-General, Back Info - Roles and Resps, and Back Info - Timeframe shall be filled in with the relevant information.

The 3 sheets: Back Info-General, Back Info - Roles and Resps, and Back Info - Timeframe shall be filled in with the relevant information. Background information The 3 sheets: Back Info-General, Back Info - Roles and Resps, and Back Info - Timeframe shall be filled in with the relevant information. The cells coloured in: are those to be filled

More information

The 3 sheets: Back Info-General, Back Info - Roles and Resps, and Back Info - Timeframe shall be filled in with the relevant information.

The 3 sheets: Back Info-General, Back Info - Roles and Resps, and Back Info - Timeframe shall be filled in with the relevant information. Background information The 3 sheets: Back Info-General, Back Info - Roles and Resps, and Back Info - Timeframe shall be filled in with the relevant information. The cells coloured in: are those to be filled

More information

The 3 sheets: Back Info-General, Back Info - Roles and Resps, and Back Info - Timeframe shall be filled in with the relevant information.

The 3 sheets: Back Info-General, Back Info - Roles and Resps, and Back Info - Timeframe shall be filled in with the relevant information. Background information The 3 sheets: Back Info-General, Back Info - Roles and Resps, and Back Info - Timeframe shall be filled in with the relevant information. The cells coloured in: are those to be filled

More information

Railway Safety Directive 2004/49/EC & Role of European Railway Agency (ERA)

Railway Safety Directive 2004/49/EC & Role of European Railway Agency (ERA) Railway Safety Directive 2004/49/EC & Role of European Railway Agency (ERA) Dragan JOVICIC Safety Assessment Sector (Safety Unit) Slide n 1 Content of the presentation 1. Role of European Railway Agency

More information

Draft working document

Draft working document EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT DIRECTORATE B EUROPEAN MOBILITY NETWORK Single European Rail Area Draft working document Communication of draft technical regulations

More information

Rules for the EC Certification of Railway Interoperability Subsystems

Rules for the EC Certification of Railway Interoperability Subsystems Rules for the EC Certification of Railway Interoperability Subsystems In force since June 25th, 2014 RINA Services Società per Azioni Via Corsica, 12-16128 GENOVA Tel. +39 010 53851 - Fax: +39 010 5351237

More information

Technical considerations and business needs of 1520 mm rail in the EU

Technical considerations and business needs of 1520 mm rail in the EU Technical considerations and business needs of 1520 mm rail in the EU Libor Lochman CER Seminar on 1435/1520 mm border questions Gdansk, 09 th October 2007 1 CER The Community of European Railway and Infrastructure

More information

SIS Directory Accreditation number: SIS 0130

SIS Directory Accreditation number: SIS 0130 International standard: ISO/IEC 17020:2012 Swiss standard: SN EN ISO/IEC 17020:2012 SCONRAIL AG Zürcherstrasse 41 8400 Winterthur Head: Heiko Germroth Responsible for MS: Heiko Germroth Telephone: +41

More information

RIS-2708-RST. Rail Industry Standard Freight Technical Committee Audit Protocol. Rail Industry Standard. Issue One: March 2015

RIS-2708-RST. Rail Industry Standard Freight Technical Committee Audit Protocol. Rail Industry Standard. Issue One: March 2015 RIS Published by: Block 2 Angel Square 1 Torrens Street London EC1V 1NY Copyright [2015] Rail Safety and Standards Board Limited RIS-2708-RST Issue One: March 2015 Issue record Issue Date Comments One

More information

Using the CENELEC standard EN50126 in connection with the approval of new light rail vehicles

Using the CENELEC standard EN50126 in connection with the approval of new light rail vehicles Translation of TBST memo, dated 08-02-2017 Edvard Thomsens Vej 14 2300 København S Telephone +45 7221 8800 Fax +45 7262 6790 info@tbst.dk tbst.dk Note TS10503-00055 Using the CENELEC standard EN50126 in

More information

WELMEC Application of module D Quality assurance Under directive 2014/32/EU (MID) or directive 2014/31/EU (NAWID)

WELMEC Application of module D Quality assurance Under directive 2014/32/EU (MID) or directive 2014/31/EU (NAWID) WELMEC 8.4 2017 Application of module D Quality assurance Under directive 2014/32/EU (MID) or directive 2014/31/EU (NAWID) WELMEC is a cooperation between the legal metrology authorities of the Member

More information

Light Impact Assessment

Light Impact Assessment EUROPEAN UNION AGENCY FOR RAILWAYS O11REC1O28 V1.O Making the railway system work better for society. Light Impact Assessment 4th Railway Package Revision of CCS TSI 120 Rue Marc Lefrancq I BP 20392 ER-59307

More information

Eurailspeed Parallel Session D.1. Carlo Carganico Director Approval and Certification, RFI

Eurailspeed Parallel Session D.1. Carlo Carganico Director Approval and Certification, RFI Eurailspeed Parallel Session D.1 Carlo Carganico Director Approval and Certification, RFI 1 Approval process of the Italian High Speed Railway System Eurailspeed, November 8th 2005 Carlo Carganico Issues

More information

Annex IV: Competency Framework

Annex IV: Competency Framework Making the railway system work better for society. NSA Monitoring 120 Rue Marc Lefrancq BP 20392 FR-59307 Valenciennes Cedex 1 / 11 Contents 1. Introduction... 3 2. Roles and responsibilities... 3 2.1.

More information

DIRECTIVE (EU) 2016/798 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 11 May 2016 on railway safety (recast) (OJ L 138, , p.

DIRECTIVE (EU) 2016/798 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 11 May 2016 on railway safety (recast) (OJ L 138, , p. 02016L0798 EN 26.05.2016 000.001 1 This text is meant purely as a documentation tool and has no legal effect. The Union's institutions do not assume any liability for its contents. The authentic versions

More information

WELMEC European cooperation in legal metrology

WELMEC European cooperation in legal metrology WELMEC 8.6 Issue 1 WELMEC European cooperation in legal metrology Measuring Instruments Directive 2004/22/EC Presumption of Conformity of the Quality System of Manufacturers with Module D or H 1 when EN

More information

Application note 5 Relationship of Yellow Book with European Directives

Application note 5 Relationship of Yellow Book with European Directives Railway Safety Management Yellow Book 4 Application note 5 Relationship of Yellow Book with European Directives Published by RSSB on behalf of the UK rail industry C:\Documents and Settings\djohnson\Desktop\KJWYBrelationshipwithEUDirectives.doc

More information

The 3 sheets: Back Info-General, Back Info - Roles and Resps, and Back Info - Timeframe shall be filled in with the relevant information.

The 3 sheets: Back Info-General, Back Info - Roles and Resps, and Back Info - Timeframe shall be filled in with the relevant information. Background information The 3 sheets: Back Info-General, Back Info - Roles and Resps, and Back Info - Timeframe shall be filled in with the relevant information. The cells coloured in: are those to be filled

More information

QUESTION / CLARIFICATION

QUESTION / CLARIFICATION QUESTION / CLARIFICATION CO-ORDINATION BETWEEN NOTIFIED BODIES INTEROPERABILITY DIRECTIVE AND SUBSEQUENT AMENDMENTS ON THE INTEROPERABILITY OF THE RAIL SYSTEM WITHIN THE UNION QC-STR-007 Issue 02 Date:

More information

3. OBJECTIVES PURSUED BY THIS WORK PROGRAMME AND THE FUNDING PRIORITIES:

3. OBJECTIVES PURSUED BY THIS WORK PROGRAMME AND THE FUNDING PRIORITIES: 3. OBJECTIVES PURSUED BY THIS WORK PROGRAMME AND THE FUNDING PRIORITIES: 3.1.3. Rail interoperability including interoperability of the Rail Freight Corridors Priority open only to the Cohesion Member

More information

***I POSITION OF THE EUROPEAN PARLIAMENT

***I POSITION OF THE EUROPEAN PARLIAMENT EUROPEAN PARLIAMENT 2004 2009 Consolidated legislative document 23.4.2009 EP-PE_TC1-COD(2008)0247 ***I POSITION OF THE EUROPEAN PARLIAMENT adopted at first reading on 23 April 2009 with a view to the adoption

More information

ERTMS UNIT TRANS-EUROPEAN RAIL SYSTEM SUBSYSTEM CONTROL-COMMAND AND SIGNALLING

ERTMS UNIT TRANS-EUROPEAN RAIL SYSTEM SUBSYSTEM CONTROL-COMMAND AND SIGNALLING EUROPEAN RAILWAY AGENCY ERTMS UNIT Reference: ERA/ERTMS/034171 Document type: Technical Specification for Interoperability Version : final draft 1.1 Date : 13/01/2011 Edited by Quality review Approved

More information

Guide for the application of the CR INF TSI

Guide for the application of the CR INF TSI European Railway Agency According to Framework Mandate C(2007)3371 final of 13/07/2007 Reference in ERA: ERA/GUI/07-2011/INT Version in ERA: 1. 00 Date: 26 August 2011 Document elaborated by Document Type:

More information

RSRD² Rolling Stock Reference Database

RSRD² Rolling Stock Reference Database RSRD² Rolling Stock Reference Database ERA approved tool to fulfil the TAF TSI RSRD message obligations as wagon keeper Adam Butryn, Warsaw, September 2017 UIP International Union of Wagon Keepers UIP

More information

Schedule of Accreditation issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK

Schedule of Accreditation issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK 17065:2012 to provide product conformity certification Gee House Holborn Hill Birmingham West Midlands B7 5PA United Kingdom Contact: Mr Chris

More information

CE marking is regarded as a passport for products to enter and circulate freely within the 30 counties forming part of the EEA.

CE marking is regarded as a passport for products to enter and circulate freely within the 30 counties forming part of the EEA. CE Marking Services What is CE Marking? Many products that are placed on the single market in the European Economic Area (EEA) (28 EU countries, together with Iceland, Liechtenstein and Norway) contain

More information

Impact Assessment for Changes to Railway Group Standards

Impact Assessment for Changes to Railway Group Standards Impact Assessment for Changes to Railway Group Standards Version: Final Date: 27 January 2011 Relevant Railway Group Standard Title: Rail Vehicle Maintenance Number: GM/RT2004 Issue: Four Synopsis: This

More information

Benefits of harmonized regulations for placing in service of railway equipment - European experiences. Peter Mihm Head of Technical Cooperation

Benefits of harmonized regulations for placing in service of railway equipment - European experiences. Peter Mihm Head of Technical Cooperation Benefits of harmonized regulations for placing in service of railway equipment - European experiences Peter Mihm Head of Technical Cooperation General presentation Railway Safety Interoperability ERTMS

More information

L 96/26 EN Official Journal of the European Union. REGULATION (EC) No 552/2004 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL.

L 96/26 EN Official Journal of the European Union. REGULATION (EC) No 552/2004 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL. L 96/26 EN Official Journal of the European Union REGULATION (EC) No 552/2004 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 10 March 2004 on the interoperability of the European Air Traffic Management

More information

Assessment of Route Compatibility of Vehicles and Infrastructure

Assessment of Route Compatibility of Vehicles and Infrastructure Compatibility of Vehicles and Synopsis This document sets out requirements and responsibilities for the assessment of route compatibility of vehicles and infrastructure. Copyright in the s is owned by

More information

Schedule of Accreditation issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK

Schedule of Accreditation issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK Derwent House RTC London Road Derby DE24 8UP Contact: Mr Robert Dale Tel: +44 (0)1332 483811 E-Mail: louise.maw@railwayapprovals.com Website:

More information

Guidance on Independent Assessment. Rail Industry Guidance Note. Published by: RSSB Block 2 Angel Square 1 Torrens Street London EC1V 1NY

Guidance on Independent Assessment. Rail Industry Guidance Note. Published by: RSSB Block 2 Angel Square 1 Torrens Street London EC1V 1NY GN Published by: Block 2 Angel Square 1 Torrens Street London EC1V 1NY Copyright 2014 Rail Safety and Standards Board Limited GE/GN8645 Issue One: June 2014 Rail Industry Guidance Note Issue record Issue

More information

CENELEC - SC9XA WGA15: Maintenance of EN 50129

CENELEC - SC9XA WGA15: Maintenance of EN 50129 CENELEC - SC9XA WGA15: Maintenance of EN 50129 Attilio Ciancabilla SiT Workshop - Braunschweig, 16/17 November 2015 WGA15 maintenance of EN 50129 EU 402 50129 similarities 50126 AsBo and ISA targets and

More information

ORR guidance on the application of the common safety method (CSM) on risk evaluation and assessment

ORR guidance on the application of the common safety method (CSM) on risk evaluation and assessment ORR guidance on the application of the common safety method (CSM) on risk evaluation and assessment December 2012 1. 1 2. Second edition published by the Office of Rail Regulation, December 2012 This guidance

More information

OPINION OF THE EUROPEAN RAILWAY AGENCY ERA/OPI/ QC-RST-015. European Railway Agency. Executive Director FOR

OPINION OF THE EUROPEAN RAILWAY AGENCY ERA/OPI/ QC-RST-015. European Railway Agency. Executive Director FOR 61 59307 European Railway Agency Executive Director OPINION ERA/OPI/2014-1 OF THE EUROPEAN RAILWAY AGENCY FOR EUROPEAN COMMISSION REGARDING QUESTION AND CLARIFICATION NB RAIL - QC-RST-015 Disclaimer: The

More information

UKAS Supplement for the Accreditation of Environmental Verifiers for EMAS (the EU Eco Management and Audit Scheme Regulation 1221/2009)

UKAS Supplement for the Accreditation of Environmental Verifiers for EMAS (the EU Eco Management and Audit Scheme Regulation 1221/2009) CIS 11 Edition 1 September 2016 UKAS Supplement for the Accreditation of Environmental Verifiers for EMAS (the EU Eco Management and Audit Scheme Regulation 1221/2009) CIS 11 / Edition: 1 Page 1 of 7 Contents

More information

(Legislative acts) DIRECTIVE 2014/55/EU OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 16 April 2014 on electronic invoicing in public procurement

(Legislative acts) DIRECTIVE 2014/55/EU OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 16 April 2014 on electronic invoicing in public procurement 6.5.2014 L 133/1 I (Legislative acts) DIRECTIVES DIRECTIVE 2014/55/EU OF THE EUROPEAN PARLIAMT AND OF THE COUNCIL of 16 April 2014 on electronic invoicing in public procurement (Text with EEA relevance)

More information

1 Introduction. 1.1 Purpose of the guide. 1.2 Who is this guide for?

1 Introduction. 1.1 Purpose of the guide. 1.2 Who is this guide for? 1 Introduction Railway undertakings and infrastructure managers bear the full responsibility for the safe operation of the railway system and the control of risks associated with it, each in relation to

More information

(Non-legislative acts) REGULATIONS

(Non-legislative acts) REGULATIONS 11.12.2010 Official Journal of the European Union L 327/13 II (Non-legislative acts) REGULATIONS COMMISSION REGULATION (EU) No 1169/2010 of 10 December 2010 on a common safety method for assessing conformity

More information

The Pressure Equipment Directive 2014/68/EU. Photo: nostal6ie/ Shutterstock

The Pressure Equipment Directive 2014/68/EU. Photo: nostal6ie/ Shutterstock The Pressure Equipment Directive 2014/68/EU Photo: nostal6ie/ Shutterstock Information for our Customers and Partners. One objective of the EU single market is to ensure the smooth technical transfer of

More information

ERA TSI OPE Working document

ERA TSI OPE Working document EN EN EN ERA TSI OPE 2013 Working document concerning the technical specification for interoperability relating to the 'operation and traffic management' subsystem of the rail system in the European Union..

More information

4 th Railway Package Implementation of the Technical Pillar

4 th Railway Package Implementation of the Technical Pillar 4 th Railway Package Implementation of the Technical Pillar 10 th PRIME Plenary Meeting, Sopron, 12 June 2017 Josef Doppelbauer, ERA Executive Director Is There a Future for Rail? 2 Key Elements of the

More information

TSI OPERATION AND TRAFFIC MANAGEMENT FINAL REPORT ON THE MERGING OF CONVENTIONAL RAIL AND HIGH SPEED TSIS

TSI OPERATION AND TRAFFIC MANAGEMENT FINAL REPORT ON THE MERGING OF CONVENTIONAL RAIL AND HIGH SPEED TSIS INTEROPERABILITY UNIT RATION AND TRAFFIC MANAGEMENT FINAL REPORT ON THE MERGING OF CONVENTIONAL RAIL AND HIGH SPEED TSIS Reference: ERA/CON/2011-02/INT Document type: Final report Version : 0.8 Date :

More information

Railway interoperability. Academic perspective

Railway interoperability. Academic perspective Railway interoperability. Academic perspective Ernesto García Vadillo (Prof) Department of Mechanical Engineering University of The Basque Country (UPV/EHU) Brussels, 7th May 2013 1 Contents 1. Directive

More information

COMMISSION RECOMMENDATION. of XXX. on the audits and assessments performed by notified bodies in the field of medical devices

COMMISSION RECOMMENDATION. of XXX. on the audits and assessments performed by notified bodies in the field of medical devices EUROPEAN COMMISSION Brussels, XXX [ ](2013) XXX draft COMMISSION RECOMMENDATION of XXX on the audits and assessments performed by notified bodies in the field of medical devices (Text with EEA relevance)

More information

ANNEX C2 Assessment Procedures

ANNEX C2 Assessment Procedures Memorandum of Understanding establishing the basic principles of a common system of certification of entities in charge of maintenance for freight wagons 14 May 2009 ANNEX C2 Assessment Procedures 1 /

More information

Boosting International Rail Freight. Sector Statement on Rail Freight Corridors

Boosting International Rail Freight. Sector Statement on Rail Freight Corridors Boosting International Rail Freight Sector Statement on Rail Freight Corridors Brussels, 20 May 2016 1 Sector Statement on Rail Freight Corridors: Boosting International Rail Freight 20 May 2016 - final

More information

ERA conference Safety and Interoperability registers

ERA conference Safety and Interoperability registers ERA conference Safety and Interoperability registers 08 th Mai 2014, Lille (FR) Gilles Peterhans Secretary General Table of contents UIP: International Union of Wagon Keepers Register landscape 2011-2014

More information

Dissemination on CSM on monitoring, CSM on risk assessment and certification of ECMs

Dissemination on CSM on monitoring, CSM on risk assessment and certification of ECMs Dissemination on CSM on monitoring, CSM on risk assessment and certification of ECMs Day 1 Borlänge 12th and 13th November 2013 Safety Unit team involved in dissemination: Agency team Nathalie DUQUENNE

More information