Replacing an Existing Elevated Storage Tank on the Same Site
|
|
- Lucinda Waters
- 6 years ago
- Views:
Transcription
1 Replacing an Existing Elevated Storage Tank on the Same Site 2015 North Carolina Spring Conference NC AWWA-WEA April 13, 2015 Eric Williams, PE
2 Existing Facilities Maintenance Issues Tank Alternatives Challenges
3 Bid Challenges Tank Construction Tank Demolition Construction Costs
4 Project Location
5 Project Location
6 01 Existing Facilities
7 Existing Facilities 2 Inch -12 Inch Water Lines Materials Including PVC, Ductile Iron and Asbestos Cement 3 Master Meters 2 Elevated Storage Tanks
8 West End Elevated Storage Tank Constructed in 1998 Capacity 250,000 Gallons Style Single Pedestal Contractor Brown Steel Contractors
9 East End Elevated Storage Tank Constructed in 1973 Capacity 200,000 Gallons Style Leg Overflow Elevation Approximately 2.2 Feet Lower than West End Tank Contractor Brown Steel Contractors
10 02 Maintenance Issues
11 East End Storage Tank Maintenance Issues Tank in Need of Painting Repainting would Require Complete Shrouding Drip Line of Tank Extended Over 2 Adjacent Properties
12 03 Tank Alternatives
13 East End Storage Tank Alternatives Repaint and Repair Existing Tank o Costs were Estimated at $500,000-$600,000 (Lead Based Paint) o Tank Would Still Be 40+ Years Old Build a New Tank o Can Increase Capacity o Can Match West End Overflow Elevation o Can Match Tank Style o Future Maintenance Less Costly
14 04 Challenges
15 Challenges New Tank Construction Close Proximity of Homes Pile Installation Painting Telecommunications Facilities Demolition of Existing Tank Resort/Vacation Destination Construction Schedule Restrictions
16 Challenges - Tank Site
17 05 Bid Challenges
18 Bid Challenges Planned to Bid Tank Construction and Tank Demolition Separately Only One Bid Received on Bid Day Only One Bid Received on the Rescheduled Bid Day Bid not Submitted by a Tank Contractor A. C. Schultes Bid Received Exceeded Budget Able to Negotiate a Lower Price Negotiations Included Adding Tank Demolition
19 06 Tank Construction
20 Tank Construction Water Line Installation 12-Inch Water Line Design was to Cut In New Tee Existing Isolation Valve Would not Hold
21 Tank Construction Foundation Installation Driven 12-Inch Steel H Piles Minimum Depth Required - 40 Feet Monitored Vibration at Adjacent Homes Noise Restrictions (8:00 am 8:00 pm) Pile Cap 4 Feet Thick by 2.5 Feet Wide 24 2 Anchor Bolts by 3 Feet 4 Inches Long (To Extend 7 Inches Above Concrete)
22 Tank Construction Structure by Caldwell Tanks Challenges o Close Proximity of Homes o Total Site Less than ½ Acre o Storage Space for Steel Components o Existing Tank o Telecommunications Structures
23 Tank Construction Structure Single Pedestal Complaints/Damage to Private Property
24 Tank Construction Painting Shrouding Required Tightly Woven Nylon Windy Conditions 15 mph Maximum Summer Season Restrictions
25 Tank Construction Shrouding Outriggers Extensive Cabling Equipment at Base of Tank for Raising and Lowering Shroud
26 Tank Construction Paint by Tnemec Interior (Dry) 2 Coat System o Shop Prime 5.0 mils Series N-140 Epoxy o Stripe Coat 5.0 mils Series N-140 Epoxy For all Seams and Abraded Areas o Finish Coat 5.0 mils Series N-140 Epoxy Stripe Coat then Full Coat Interior (Wet) 3 Coat System o Shop Prime 3.0 mils Series 94 Hydro-Zinc o Stripe Coat 3.0 mils Series 94 Hydro-Zinc For all Seams and Abraded Areas o Finish Coat 5.0 mils Series N-140 Epoxy Stripe Coat to all Weld Seams, Edges, Corners, Bolts and Nuts Tank White 5.0 mils Series N140 Epoxy Beige Color 5.0 mils Series N140 Epoxy Tank White
27 Tank Construction Paint by Tnemec Exterior 4 Coat System o Shop Prime 3.0 mils Series 94 Zinc Rich Polyurethane o Stripe Coat 3.0 mils Series 94 For all Seams and Abraded Areas o Finish Coat 3 Separate Coats 3.0 mils Series N69 Hi-Build Epoxy 2.0 mils Series 73 Endura Shield (Polyurethane Enamel) 2.5 mils Series 700 Hydroflon
28 Tank Construction Tank Components Standby Generator for SCADA Electrical and SCADA Equipment Discharge Headwall Structure Altitude Valve
29 Tank Construction Telecommunication Vendors ATMC/AT&T Verizon Town Communication Antenna SCADA Antenna Verizon ATMC/AT&T
30 Tank Construction Telecommunications Cabling in Tank Cabling Continues Through Access Tube
31 07 Tank Demolition
32 Tank Demolition Protect Telecommunications Structures Protect Brand New Tank Loading of Steel Components
33 Tank Demolition No Complaints or Damage During Demolition Three Days from Start to Finish
34 Tank Demolition Valve Vault Other Structures
35 08 Construction Costs
36 Construction Costs Original Budget - $1,400,000 As Bid Without Demolition - $1,574,618 After Negotiations with Demolition - $1,498,600 Final Cost after Change Orders - $1,475, Approximately $35,000 Paid by Telecommunications Vendors
37 QUESTIONS Eric Williams, PE 910/
SECTION 2 DIVISION 05 METALS
SECTION 2 DIVISION 05 METALS DIVISION 5 - METALS Note: This is a guide for Designers only. Contents shall not be used in lieu of specifications as part of the Designer s Contract Documents. GENERAL DESIGN:
More informationKENT COUNTY WATER AUTHORITY. ERRATUM to Rules and Regulations of the Kent County Water Authority
KENT COUNTY WATER AUTHORITY ERRATUM to Rules and Regulations of the Kent County Water Authority Section 4.9.1.1 Resilient Seat Gate 4 inch to 12 inch: Replace with the attached. Section 4.9.1.3 Tapping
More informationExtend the Service Life of Water Storage Tanks using the revised ANSI/AWWA D102 Standard
Extend the Service Life of Water Storage Tanks using the revised ANSI/AWWA D102 Standard BTW AWWA D102 Revision Task Group: Revises and Updates Existing Edition. Discusses changes to improve the Standard.
More information2. A preconstruction meeting with the TWA s staff is required prior to initiating construction.
General: 1. Construct utilities in accordance to TWA approved plans and shop drawings. Any deviation from the approved plans shall be approved by the DEVELOPER S ENGINEER and TWA 2. A preconstruction meeting
More informationSection FLUSHING HYDRANTS
STANDARD SPECIFICATION Section 02520 PART 1 GENERAL 1.01 SUMMARY This Section includes: A. Flushing hydrants. B. Adjustment of flushing hydrants and gate valves. 1.02 MEASUREMENT AND PAYMENT A. Unit Prices.
More informationPART 7 COMMUNICATIONS, LIGHTING, TRAFFIC CONTROL, POWER
PART 7 COMMUNICATIONS, LIGHTING, TRAFFIC CONTROL, POWER COMMUNICATIONS LIGHTING Street Lighting Plan 710 Riser... 287 730 Collar for street light pole... 289 731 Pull box... 291 732 Trench for street light
More information1. Temperature Change: 120 deg F (67 deg C), ambient; 180 deg F (100 deg C), material surfaces.
SECTION 05500- METAL FABRICATIONS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationSECTION C1 DUCTILE IRON PIPE AND FITTINGS GENERAL
SECTION C1 DUCTILE IRON PIPE AND FITTINGS GENERAL This section covers the furnishing and installation of ductile iron water pipe, fittings, thrust restraint and pipe disinfection. Ductile Iron Pipe MATERIALS
More informationFOR STEEL POTABLE WATER TANKS INTERIOR AND EXTERIOR CORROSION PROTECTION. Hydro-Zinc
FOR STEEL POTABLE WATER TANKS INTERIOR AND EXTERIOR CORROSION PROTECTION Hydro-Zinc KEY BENEFITS TENACIOUS ADHESION EASY APPLICATION FAST CURE GALVANIC PROTECTION NSF/ANSI STD. 61 CERTIFIED LOW TEMPERATURE
More informationA NEW PRE-K BUILDING FOR BIG SPRING LAKE KINDERGARTEN SCHOOL FOR THE ALBERTVILLE CITY BOARD OF EDUCATION ALBERTVILLE, ALABAMA
McKee and Associates Architecture and Interior Design Addendum No. FOUR Date: 09.24.18 Project: A NEW PRE-K BUILDING FOR BIG SPRING LAKE KINDERGARTEN SCHOOL FOR THE ALBERTVILLE CITY BOARD OF EDUCATION
More informationADDENDUM NO. 3 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO.
ADDENDUM NO. 3 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO. PS 061 SEVEN SPRINGS WASTEWATER TREATMENT FACILITY IMPROVEMENTS PASCO COUNTY,
More informationSERIES STB30 STEEL FIXED THERMAL BREAK DETENTION WINDOWS SECTION 08651
SERIES STB30 STEEL FIXED THERMAL BREAK DETENTION WINDOWS SECTION 08651 PART 1 GENERAL 1.1 DESCRIPTION A. Work Included: 1. Furnish all labor and materials to complete the fabrication of detention windows
More informationEast Central College
SECTION 230529 HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 WORK INCLUDES A. Base Bid and Alternate Bids: 1. Contractor provide the following hangers and supports for HVAC system
More informationSECTION VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND EQUIPMENT
SECTION 230548 - VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary
More information3. Roof Expansion Joints between New Building and Existing Building.
SECTION 077200 - ROOF ACCESSORIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Amendments to General Conditions and Division 01 Specification
More informationNORTH HARRIS COUNTY REGIONAL WATER AUTHORITY GROUND STORAGE. Section GROUND STORAGE TANK (GST) MODIFICATIONS, CLEANING AND DISINFECTION
Section 13207 GROUND STORAGE PART 1 GENERAL 1.01 SUMMARY This Section includes the furnishing and installation of surface water inlet piping, appurtenances, cleaning and disinfection of existing ground
More informationSECTION GROUND STORAGE TANK
SECTION 13210 GROUND STORAGE TANK PART 1 GENERAL 1.01 Summary A. Section Includes: Provision for welded steel storage tank design, fabrication, construction and erection, including tank accessories. B.
More informationSECTION WELDED STEEL WATER STORAGE TANKS
SECTION 33 16 20 WELDED STEEL WATER STORAGE TANKS PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Elevated tanks. 2. Appurtenances and accessories. B. Related Sections: 1. Section 03 31 20 - Concrete
More informationSECTION MISCELLANEOUS METALS THIS SECTION TO BE INCLUDED IN SUB BID FOR SECTION MISCELLANEOUS AND ORNAMENTAL IRON
SECTION 055000 THIS SECTION TO BE INCLUDED IN SUB BID FOR SECTION 050001 MISCELLANEOUS AND ORNAMENTAL IRON PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a
More informationExtend the Service Life of Water Storage Tanks using the revised ANSI/AWWA D102 Standard
PAINT A TANK IN A DAY! Presented by Tony Ippoliti, Water Storage Business Development Manager The Sherwin-Williams Company, Protective & Marine Division, 6535 E. 82 nd Street, Suite 206, Indianapolis,
More informationSECTION MISCELLANEOUS METALS
PART 1 GENERAL 1.1 WORK OF THIS SECTION A. Contractor shall provide all labor, materials, equipment and incidentals as shown, specified and required to furnish and install all miscellaneous metal fabrications
More informationB. Shop Drawings: Include plans, elevations, sections, details, and attachments.
SECTION 055119 - METAL GRATING STAIRS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More information4. Section 01170, Special Construction Permits, Page : Part 1; ADD the following paragraph 1.5 after paragraph 1.4:
1700 East Iron Ave. Salina, KS 67401 785-827-0433 phone 785-827-5949 fax Arizona California Colorado Kansas Missouri Nebraska New Mexico Oklahoma Texas Utah 1 December 2017 ADDENDUM NO. 2 RE: City of Conway
More informationCITY OF PLACERVILLE, CALIFORNIA DEVELOPMENT SERVICES DEPARTMENT ENGINEERING DIVISION
CITY OF PLACERVILLE, CALIFORNIA DEVELOPMENT SERVICES DEPARTMENT ENGINEERING DIVISION ADDENDUM #4 DATE: 02/08/2016 PROJECT: CONTRACT No: 40604 BID DATE, TIME: 02/11/2016, 2:00PM NOTICE TO ALL CONTRACTORS
More informationCITY OF GLENDORA COUNTRY CLUB RESERVOIR IMPROVEMENTS PLAN NO REQUEST FOR INFORMATION (RFI) LOG RFI # DATE SHEET # RFI RESPONSE DATE
CITY OF GLENDORA COUNTRY CLUB RESERVOIR IMPROVEMENTS PLAN NO. 1124 REQUEST FOR INFORMATION (RFI) LOG RFI # DATE SHEET # RFI RESPONSE DATE 1 4/13/2016 Questions below pertain to note 4 per drawing, which
More informationSERIES SA30 STEEL/ALUMINUM FIXED DETENTION WINDOWS SECTION 08651
SERIES SA30 STEEL/ALUMINUM FIXED DETENTION WINDOWS SECTION 08651 PART 1 GENERAL 1.1 DESCRIPTION A. Work Included: 1. Furnish all labor and materials to complete the fabrication of detention windows as
More informationExtending Tank Life Water Storage Tank Construction & Rehab OTCO Columbus
Extending Tank Life Water Storage Tank Construction & Rehab 2017 OTCO Columbus AWWA Standards & Manuals D100 Welded Carbon Steel Tanks for Water Storage D101 Inspection of Water Tanks and Related Facilities
More informationELEVATED WATER TANK REHABILITATION GETTING IT RIGHT WHEN THINGS GO WRONG
ELEVATED WATER TANK REHABILITATION GETTING IT RIGHT WHEN THINGS GO WRONG ABSTRACT Jeremy Allen PE, Project Engineer, Highfill Infrastructure Engineering, PC Tim Greene, Coating Service Manager, S&ME, Inc.
More informationSECTION FIRE HYDRANTS
SECTION 21 11 10 PART 1. GENERAL 1.1 SUMMARY: A. Work consists of furnishing and installing new fire hydrants, (boot with ductile iron retainer gland, standpipe and hydrant complete) plus constructing
More informationSECTION GROUND WATER STORAGE TANKS
SECTION 33 16 13 GROUND WATER STORAGE TANKS PART 1: GENERAL 1.01 SCOPE A. Section includes requirements for designing, fabricating, and erecting a welded steel ground storage tank. 1.02 SYSTEM DESCRIPTION
More informationSection Page 2 Specification No. PG F
The contractor shall also be required to spot prime and apply a full intermediate and top coat to the outside surfaces and all related steel appurtenances of the tank as directed by this specification.
More informationMETALS Commissioning of Metals Structural Steel Framing Steel Studs... 2
~ 05-1 ~ 05 00 00 Metals 05 00 00 METALS... 2 05 08 00 Commissioning of Metals... 2 05 12 00 Structural Steel Framing... 2 05 12 30 Steel Studs... 2 05 45 00 METAL SUPPORT ASSEMBLIES... 2 05 50 00 METAL
More informationStandard Specifications Water Storage Tank Painting
SECTION 09 97 00 WATER STORAGE TANK PAINTING PART 1: GENERAL 1.01 SCOPE A. Section includes surface preparation, priming, and field coating for interior wet, interior dry, and exterior surfaces of steel
More informationSECTION 8 SEPARATION OF LINES
SECTION 8 SEPARATION OF LINES 8.01 INDEX 8.01 INDEX 8.02 PURPOSE 8.03 DEFINITIONS 8.04 SEWER SEPARATION 8.05 NON-POTABLE SEPARATION 8.06 REFERENCES 8.02 PURPOSE This section states the requirements and
More informationCorrosion Control for Water/Wastewater Industry
Corrosion Control for Water/Wastewater Industry Presenter: Mongkol Mahavongtrakul, P.E. Corrosion Engineer San Francisco Public Utilities Commission LOCATION: Brown & Caldwell, Walnut Creek June 14, 2016
More informationSTRUCTURAL STEEL FRAMING
SECTION 05 12 00 - STRUCTURAL STEEL FRAMING PART 1 - GENERAL 1.1 SUMMARY A. Section includes 1. Structural steel framing 2. Structural steel framing required for support and framing of rooftop mechanical
More informationSIERRA MODEL 12 X 24 SPECIFICATIONS
SIERRA MODEL 12 X 24 SPECIFICATIONS Dimensions: Roof Dimensions 12-0 x 24-0 Column Dimensions (center to center) 9-0 x 21-0 Minimum Clearance 8-0 Shed Roof 1:12 pitch Square Feet Under Roof 288 Columns
More information1. Seismic Loads: Reference structural drawings.
SECTION 102213 ~WIRE MESH PARTITIONS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general prov1s1ons of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationUniversity of Central Florida Main Campus. Domestic Water. Service and Meter Installations Requirements. Issued January 26 th, 2017.
University of Central Florida Main Campus Domestic Water Service and Meter Installations Requirements Issued January 26 th, 2017 1 P a g e Table of Contents 1. GENERAL INFORMATION... 3 2. DEFINITIONS...
More informationSTEEL WATER STORAGE TANKS/SINGLE PEDESTAL
PART 1 - GENERAL 1.1 SUMMARY 33 16 19.13 A. Provide steel water storage tank(s) as shown on the Drawings, as specified herein, and as needed for a complete and proper installation. B. Related work: 1.
More informationSECTION FENCING. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.
SECTION 323100 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting
More informationADDENDUM TO THE CONTRACT. for the. East Valley Reservoir Exterior and Lemon Creek Reservoir Interior Repainting. Contract No.
ADDENDUM TO THE CONTRACT for the ENGINEERING DEPARTMENT East Valley Reservoir Exterior and Lemon Creek Reservoir Interior Repainting Contract No. E12-210 ADDENDUM NO.: ONE CURRENT DEADLINE FOR BIDS: May
More informationSECTION 1043 FENCE MATERIAL
SECTION 1043 FENCE MATERIAL 1043.1 Scope. This specification covers the material required in the construction of chainlink fence and woven wire fence. 1043.2 Basis of Acceptance. The basis of acceptance
More informationB. Shop Drawings: Include plans, elevations, sections, details, and attachments to other work.
SECTION 055116 - METAL FLOOR PLATE STAIRS PART 1- GENERAL 1.1 RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationEast Central College HANSEN HALL LEVEL 300/400 RENOVATIONS CONSTRUCTION PACKAGE
SECTION 220529 - HANGERS AND SUPPORTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationARTICLE 26 UTILITY LINE INSTALLATION REQUIREMENTS
UTILITY LINE INSTALLATION REQUIREMENTS Index 26.01 JACK AND BORE OPERATIONS 26.02 PRESSURE PIPE RESTRAINT 26.03 PRESSURE CONNECTION BACK TO TABLE OF CONTENTS Section 26.01 JACK AND BORE OPERATIONS 26.01.01
More informationWater & Industrial Products Catalog
Water & Industrial Products Catalog www.smith-blair.com info@smith-blair.com Phone: 800..9705 or 870.77.527 After Hours Number: 90.277.998 Fax: 800.8.792 or 870.77.52 EMERGENCY PHONE 90.277.998 In the
More informationThis section includes materials and installation of ductile-iron pipe and fittings for potable and recycled water systems.
NORTH MARIN WATER DISTRICT STANDARD SPECIFICATIONS SECTION 15056 DUCTILE-IRON PIPE AND FITTINGS PART 1 GENERAL 1.01 DESCRIPTION This section includes materials and installation of ductile-iron pipe and
More informationSECTION DECORATIVE METAL FENCES AND GATES
SECTION 32 31 19 SPEC WRITER NOTE: Use this section only for NCA projects. Delete text between // // not applicable to project. Edit remaining text to suit project. PART 1 - GENERAL 1.1 SUMMARY A. Section
More informationPort of Lake Charles RE: 3501 Bayou D Inde Road 200,000 Gallon EWT
P.O. Box 3753 Lake Charles, LA 70602 July 21, 2016 Mr. Nick Pestello Assistant Director of Engineering (337) 794-3687 Job No. 316288 If you would like to speak with Patrick Heltsley concerning this report,
More informationTnemec 394 Proprietary Long Form Coatings Schedule
1.1 PRIMER Tnemec 394 Proprietary Long Form Coatings Schedule A. Primer: Tnemec Series 394 PerimePrime Aromatic Polyurethane Mio/Zinc filled Primer applied @ 2.5-3.5 mils DFT and conforming to the following
More informationSECTION COMMON WORK RESULTS FOR FIRE SUPPRESSION
SECTION 21 05 00 COMMON WORK RESULTS FOR FIRE SUPPRESSION PART 1 - GENERAL 1.1 SUMMARY A. This section supplements all sections in this division, including pipe, fittings, valves, and connections for sprinkler
More informationMore than Just Paint TEXAS PUBLIC WORKS ASSOCIATION AUSTIN, TEXAS
More than Just Paint TEXAS PUBLIC WORKS ASSOCIATION AUSTIN, TEXAS Charles Kucherka, P.E. June 25, 2015 Tank Rehabilitation Pre Design 30% Submittal 90% Submittal Bid and Construction Phases Pre Design
More informationSECTION STEEL WINDOWS UL Labeled Fire-Rated Fixed Lite (950) Use Tools / Options / View / Hidden Text to view hidden notes and edit.
SECTION 08510 STEEL WINDOWS UL Labeled Fire-Rated Fixed Lite (950) Use Tools / Options / View / Hidden Text to view hidden notes and edit. PART 1 GENERAL 1.1 SECTION INCLUDES A. Fire Rated Steel Windows
More informationSECTION STRUCTURAL METAL FRAMING
SECTION 05100 STRUCTURAL METAL FRAMING PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Structural steel framing including lintels, shelf angles, bearing plates, anchor bolts and other items as shown on
More informationService Saddles/ Brass Alloy/ Stainless Steel Straps for Cast, Ductile & PVC Pipe
F 1 F 1.1 F 1.2 F 2 F 2.1 F 3 Service Saddles/ Hinged Type for 2 PVC Service Saddles/ Brass Alloy/ Stainless Steel Straps for Cast, Ductile & PVC Pipe Service Saddles/ Ductile Iron/ Stainless Steel Straps
More information05510: TAPERED STEEL TROLLEY POLES AND ACCESSORIES
PART 1 GENERAL 1.01 DESCRIPTION A. The Vendor shall fabricate, furnish, test and deliver tapered steel trolley poles, including base plates, reinforced hand holes, anchor bolts, nuts and washers, and accessories
More informationUniversity of Colorado Colorado Springs. National Cybersecurity Center Roof Replacement Package CSNA Project Number
ADDENDUM NUMBER 0 TO PROJECT MANUAL AND DRAWINGS August 9, 6 OWNER: ARCHITECT: University of Colorado Colorado Springs CSNA Architects PROJECT: National Cybersecurity Center Roof Replacement Package CSNA
More informationCURRENT NORTH LAS VEGAS ADDENDA
SECTION 1 Section 1.01.73 Fire Service Meter ADD: Type I is not approved for installation in the City of North Las Vegas service area. Section 1.01.107 Pressure Reducing Valve (PRV) or Pressure Regulator
More informationRust-Oleum Industrial Brands Specification
Rust-Oleum Industrial Brands Specification Coating Specification for Rust-Oleum Virtual Solutions Coating Solution 44 A solvent based coating system High Performance 7400 System 450 VOC DTM Alkyd Enamel
More informationSECTION STEEL WINDOWS UL Labeled Fire-Rated Fixed Lite (950) Use Tools / Options / View / Hidden Text to view hidden notes and edit.
SECTION 08510 STEEL WINDOWS UL Labeled Fire-Rated Fixed Lite (950) Use Tools / Options / View / Hidden Text to view hidden notes and edit. PART 1 GENERAL 1.1 SECTION INCLUDES A. Fire Rated Steel Windows
More informationMODELS: SM & SMSS
Most Dependable Fountains, Inc. OPERATIONS MANUAL MODELS: 410-18 SM & 410-18 SMSS Most Dependable Fountains, Inc 5705 Commander Drive Arlington, TN 38002 800-552-6331 FOUNTAINS, MOST DEPENDABLE FOUNTAINS,
More informationP.E. 4-1,000,000 12, 2014 (270) C
111 Fifth Street Henderson, KY 42420 March 12, 2014 Mr. Tom Williams, P.E. General Manager (270) 869-6621 Job No. 314031- C If you would like to speak with Patrick Heltsley concerning this report, call
More information1. Hangers and supports for electrical equipment and systems. 2. Construction requirements for concrete bases.
SECTION 260529 - HANGERS AND SUPPORTS PART 1 - GENERAL 1.1 SUMMARY A. Section includes: 1. Hangers and supports for electrical equipment and systems. 2. Construction requirements for concrete bases. 1.2
More informationITEM 442 METALS FOR STRUCTURES
AFTER NOVEMBER 1, 2008 ITEM 442 METALS FOR STRUCTURES 442.1 Description. These specifications shall govern for materials such as structural steel, wrought iron, bronze, and other metals used in structures,
More informationDiffused Aeration Piping Equipment
1.0 General 1.1. The specifications in this section include all components of the Diffused Aeration System with the exception of the individual diffuser units. Refer to additional specification sections
More information1. Division 23 Section "Hangers and Supports for HVAC Piping and Equipment" for pipe insulation shields and protection saddles.
SECTION 23 07 19 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply
More informationPublic Works Department 305 West Third Street, East Wing, Third Floor Oxnard, California Tel
Public Works Department 305 West Third Street, East Wing, Third Floor Oxnard, California 93030 Tel 805.385.8280 October 24, 2018 ADDENDUM NO. 2 Vineyard Avenue Street Resurfacing Project PW 16-12 SCHEDULED
More informationNORTH HARRIS COUNTY REGIONAL WATER AUTHORITY CAST-IN-PLACE. Section CAST-IN-PLACE CONCRETE MANHOLES
PART 1 GENERAL 1.01 SUMMARY This Section includes: Section 02081 CAST-IN-PLACE A. Cast-in-place concrete manholes for sanitary sewers and storm sewers, including box sewers. B. Pile-supported concrete
More informationSECTION CROSS CONNECTION CONTROL AND BACKFLOW PREVENTION
SECTION 22 11 16.13 CROSS CONNECTION CONTROL AND BACKFLOW PREVENTION PART 1: GENERAL 1.01 SUMMARY A. This Section includes water-distribution backflow prevention products and installation specifications.
More informationTCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II
SECTION 052100 - STEEL JOISTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. Drawings and General Provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections
More informationInvitation to Bid # CC Project Title: High Zone 5.0 Million Gallon Reinforced Concrete Culinary Water Tank Project No.
Riverton City Purchasing Department 12830 South 1700 West Riverton, UT 84065 801-208-3175 Fax: 801-254-1810 May 5, 2017 ADDENDUM #3 Invitation to Bid # CC17-332 Project Title: High Zone 5.0 Million Gallon
More informationDUGOUT MODEL (4 POST) 10 x 24 SPECIFICATIONS
DUGOUT MODEL (4 POST) 10 x 24 SPECIFICATIONS Dimensions: Roof Dimensions 10-0 x 24 Column Dimensions (center to center) 6-7 x 22-9 Minimum Clearance 7-6 Minimum Clearance @ Front ±9-2 Roof Pitch 2:12 pitch
More informationNC State University Design and Construction Guidelines Division 33 Utilities
1.0 Purpose A. These guidelines provide methods and requirements to ensure that the connections, attachments, extensions, or other site utility modifications meet NC State standards. B. NC State is responsible
More informationNORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017
SECTION 22 0548 - PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationSECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT
SECTION 220529 HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions
More informationCW 3550 Chain Link and Drift Control Fence TABLE OF CONTENTS
January 2014 SPECIFICATION CW 3550 R3 CW 3550 Chain Link and Drift Control Fence TABLE OF CONTENTS 1. GENERAL CONDITIONS... 1 3. DESCRIPTION... 1 5. MATERIALS... 1 5.1 Drift Control Fence... 1 5.1.1 Approved
More information. SECTION HANGERS AND SUPPORTS
. SECTION 230529 - HANGERS AND SUPPORTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division I Specification
More information1. Hangers and supports for electrical equipment and systems.
PART 1 - GENERAL... 1 1.1 RELATED DOCUMENTS... 1 1.2 SUMMARY... 1 1.3 DEFINITIONS... 1 1.4 PERFORMANCE REQUIREMENTS... 1 1.5 SUBMITTALS... 2 1.6 QUALITY ASSURANCE... 2 1.7 COORDINATION... 2 PART 2 - PRODUCTS...
More informationSECTION VIBRATION CONTROLS FOR HVAC PIPING AND EQUIPMENT
Page 230548-1 SECTION 230548 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More informationNorth Harris County Regional Water Authority TABLE OF CONTENTS. CONTRACT DOCUMENTS Section No. Title
TABLE OF CONTENTS CONTRACT DOCUMENTS 00001 Inside Title Page 00003 Table of Contents 00004 List of Drawings 00020 Invitation to Bid 00100 Instructions to Bidders 00300 Bid 00500 Agreement 00610 Construction
More informationInvitation For Sealed Bids
Invitation For Sealed Bids ISSUE DATE: February 11, 2016 CONTACT: Caryl Ann Giles PHONE NUMBER: (931) 489-5791 EMAIL: cgiles@springhilltn.org SUBMIT PROPOSAL/OFFER PRIOR TO: CLOSING DATE: Wednesday March
More informationFORT MONMOUTH PLANNING, ENGINEERING, ARCHITECTURAL & ENVIRONMENTAL CONSULTING SERVICES OVERVIEW
FORT MONMOUTH PLANNING, ENGINEERING, ARCHITECTURAL & ENVIRONMENTAL CONSULTING SERVICES OVERVIEW D A N S C H N E P F, P R I N C I P A L F R A N K T Y B O R O S K I, D I R E C T O R, F E D E R A L P R A
More informationSECTION AWNINGS
SECTION 10 73 13 AWNINGS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Fixed metal awnings. 1.2 DEFINITIONS A. Awning: An architectural projection that provides weather protection,
More informationComing and Going An Overview of Infrastructure Common to Water Distribution and Wastewater Collection Systems
Coming and Going An Overview of Infrastructure Common to Water Distribution and Wastewater Collection Systems Eric A. Smith, P.E. November 14, 2016 Raleigh, NC Agenda Introduction Importance of Distribution/Collection
More informationSECTION HOLLOW METALWORK. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.
SECTION 081113 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting
More informationSECTION STEEL DOORS AND FRAMES PART 1 - GENERAL 1.1 RELATED DOCUMENTS
SECTION 08110 - STEEL DOORS AND FRAMES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General, Supplementary, and Special Conditions and Division 1 Specification
More informationEngineering Design Center. Standard Drawings. 1st Edition -January 2016
Engineering Design Center Standard Drawings 1st Edition -January 2016 Golden State Water Company Standard Drawings 1/11/2016 Table of Contents PART A STANDARD DRAWINGS Section I Pipeline Construction P-1
More informationItem 2.3 Unit pricing GC to provide a square foot unit cost for material and labor to replace plywood decking beneath new concrete walkway slab.
Willow Glen Housing Repairs Project #9-59 Addendum Item. Change to bid date The bid date will be extended to March 8, 09, :00pm at the Housing Authority of Columbus Central Office,000 Wynnton Road Columbus,
More informationBIDDING SCHEDULE SEWER LIFT STATION NO. 2 REPLACEMENT PROJECT CITY OF ALHAMBRA City s Project No. N2M17-83
Item No. BIDDING SCHEDULE SEWER LIFT STATION NO. 2 REPLACEMENT PROJECT CITY OF ALHAMBRA City s Project No. N2M17-83 DESCRIPTION EST. QTY. UNIT UNIT PRICE TOTAL PRICE GENERAL BID ITEMS 1 Per Plans and Specifications
More informationCONCRETE STEPS, HANDRAILS, AND SAFETY RAIL
CONCRETE STEPS, HANDRAILS, AND SAFETY RAIL PART 1 - GENERAL 1.01 SECTION INCLUDES A. Concrete Steps B. Handrails C. Safety Rail 1.02 DESCRIPTION OF WORK A. Construction of concrete steps. B. Furnishing
More informationTHE WORLD LOOKS UP TO COMPOSITE ELEVATED TANK
THE WORLD LOOKS UP TO COMPOSITE ELEVATED TANK or our breadth of capability. Of all the storage tank manufacturers doing business today, no other offers Caldwell s range of capability. We are the only manufacturer
More informationDECORATIVE METAL RAILINGS
SECTION 057300 - DECORATIVE METAL RAILINGS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Steel and iron decorative railings. 1.2 PERFORMANCE REQUIREMENTS A. Delegated Design: Design railings, including
More information7. New railings for existing buildings shall be designed to match any existing railings unless there is a compelling reason for change.
Division 05. Metals 05 50 00. Metal Fabrications 05 50 00. Roof - Fall Protection The contractor shall provide a horizontal cable lifeline system on steel posts complying with applicable regulatory requirements.
More informationMETAL HANDRAILS AND RAILINGS. A. Properly identified manufacturer's literature, including shop and erection drawings before starting work.
SECTION 05520 METAL HANDRAILS AND RAILINGS PART 1 GENERAL 1.01 SUBMITTALS A. Properly identified manufacturer's literature, including shop and erection drawings before starting work. B. Railing Assemblies
More informationSECTION STRUCTURAL STEEL
PART 1 GENERAL 1.01 SCOPE OF WORK A. The Contractor shall furnish and install all materials, labor, equipment and incidentals required to provide structural steel shown on the Contract Drawings and as
More informationHigh Priority: Force Main Condition Evaluation in Chapel Hill
2014 NC AWWA-WEA Spring Conference High Priority: Force Main Condition Evaluation in Chapel Hill Jim Perotti, PE Brown and Caldwell Vishnu Gangadharan, PE OWASA April 7 2014 Presentation Agenda Project
More informationSpecial Provision No. 911F04 March 1997
COATING STEEL RAILING SYSTEM(S) - Item No. Special Provision No. 911F04 March 1997 Definitions, Elimination of Pre-Start Material Sample, Material Requirements, Operational Constraints, Time Between Surface
More informationNORTHWESTERN UNIVERSITY PROJECT NAME JOB #
SECTION 26 0529 - HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and
More informationCONTENTS. B. System Design and Performance Requirements
16060 Grounding and Bonding This document provides design standards only, and is not intended for use, in whole or in part, as a specification. Do not copy this information verbatim in specifications or
More information