Network Rail Romford Rail Operating Centre and Maintenance Delivery Unit Volume I: Environmental Statement Non-Technical Summary

Size: px
Start display at page:

Download "Network Rail Romford Rail Operating Centre and Maintenance Delivery Unit Volume I: Environmental Statement Non-Technical Summary"

Transcription

1 Romford Rail Operating Centre and Maintenance Delivery Unit Volume I: Environmental Statement Non-Technical Summary Issue 22 August 2012 This report takes into account the particular instructions and requirements of our client. It is not intended for and should not be relied upon by any third party and no responsibility is undertaken to any third party. Job number Ove Arup & Partners Ltd 13 Fitzroy Street London W1T 4BQ United Kingdom

2

3 Contents 1 Introduction 1 2 The Environmental Impact Assessment Process 2 3 The Site and Surroundings 5 4 The Proposed Scheme 7 5 Transport 12 6 Air Quality 14 7 Contaminated Land 16 8 Cultural Heritage 18 9 Ecology Townscape and Visual Effects Noise Socioeconomic Effects Water Resources Waste Sunlight, Daylight and Shadow 32 Page

4

5 1 Introduction This document is the Non-Technical Summary of the Environmental Statement that has been prepared to accompany a planning application by Network Rail (NR) for a proposed new Rail Operating Centre (ROC) and relocated Maintenance Delivery Unit (MDU) at Romford. The site is located on a tract of railway land next to the London to Southend mainline railway adjacent to Romford Station in Romford, Essex. Network Rail (NR) is undertaking a programme of modernising its signalling and control operations, required for the operation of the railway network. As part of this, NR is implementing a programme of new integrated operating centres which will improve the efficiency of the railway network. NR s aim is to develop a high quality, contemporary facility that will achieve the highest architectural, environmental and operational standards. The following sections of this Non-technical Summary (NTS) describe: the approach to undertaking the environmental impact assessment for the proposed development (section 2); the development of the site over time and the proposed ROC and MDU details (section 3 and 4); and non-technical summaries of each of the environmental topic areas that have been assessed in the main Environmental Statement, (sections 5-15). Information on obtaining copies or viewing the full Environmental Statement is given at the end of this document. Page 1

6 2 The Environmental Impact Assessment Process Introduction The Environmental Impact Assessment (EIA) process seeks to minimise the impacts of development on the environment and to ensure that the effects of planned new development are fully understood and taken into account by decision making bodies before the granting of planning permission. An environmental impact assessment has been undertaken in accordance with UK legislation, which requires that an environmental statement be submitted to the Local Authority for certain projects. The main stages in the assessment process have been: requesting a Screening Opinion from the Local Authority (the London Borough of Havering); preparing a Scoping Report and agreeing the scope of the environmental impact assessment with the Local Authority; gathering information about existing environmental conditions; assessment of the likely effects of the proposed scheme on the environment, during site preparation, and when in operation; recommending measures to prevent or reduce adverse environmental effects; reporting on the above stages within the Environmental Statement; and summarising the Environmental Statement in this Non-Technical Summary. Screening, Scoping and Consultation The first stage in the EIA process involved a request from the London Borough of Havering (LB Havering) as to the need for an Environmental Impact Assessment. This was formally confirmed by LB Havering by its issue of a Screening Opinion which explained that the size and nature of the development was such that an EIA should be carried out. Once the need for EIA was confirmed by LB Havering the process of scoping was carried out. The purpose of scoping in Environmental Impact Assessment is to identify the environmental topics that have the potential to be significantly affected by the proposed scheme and to describe how these will be assessed. In accordance with best practice, the Local Authority and other relevant public bodies have been consulted throughout the scoping process. A Scoping Report was submitted to the London Borough of Havering in December The Scoping Report proposed the following list of topics to be assessed in the Environmental Statement. Transport Air Quality Cultural Heritage Ecology Contaminated Land Page 2

7 Landscape and Visual Effects Noise and Vibration Socio-Economic Effects Sunlight and Daylight Waste Water Resources and Flood Risk A response from the Local Authority was received in January 2011 which generally confirmed its agreement with the content of topics to be covered as listed above in the Environmental Statement. Summaries of these topics are given in Sections Baseline Information In order to understand how the environment is likely to be affected, information about existing conditions has been obtained for each of the environmental topics listed above. Sources of baseline information have included: maps of both historical and contemporary features; existing sources of information relevant to the area, for example, previous environmental studies such as ground contamination assessments; documents obtained through consultation with relevant organisations, such as London Borough of Havering, Natural England, and the Environment Agency; and walkover surveys of the site. Impact Assessment The assessment considers the likely significant environmental effects during construction and operation of the proposed ROC and MDU. The methodologies for the different assessments vary from topic to topic and are set out in detail in the topic sections of the main Environmental Statement document. Assessment criteria The topic assessments provide details of significance criteria, with reference to relevant topic-specific assessment guidance where relevant. The definitions of significance are expressed as: significant (minor) / significant (moderate) / significant (major) ; and beneficial / adverse ; or not significant (negligible). Given the range of guidance applicable to the assessment topics and the different approaches required, alternative terms have been used where necessary to follow best practice. Page 3

8 Cumulative and Interactive Effects Cumulative effects may arise from the combination of the proposed scheme and other permitted developments not yet constructed or currently under construction in the vicinity, acting together to generate elevated levels of impacts. Two schemes have been considered in this EIA, namely the Crossrail project, and the current housing development directly south of the site on the former Oldchurch Hospital site. Crossrail will be a new high-frequency railway from Maidenhead and Heathrow in the west, through central London to Shenfield and Abbey Wood in the east. The development of Crossrail will include the upgrading of Romford Station, so potential issues associated its construction have been considered where relevant. An area directly south of the proposed ROC and MDU scheme is also in the process of undergoing development. This scheme is referred to as the Oldchurch Hospital redevelopment and is made up of residential apartments, a local park, and an energy centre. Given that it has not yet been fully built out, the cumulative effect of the proposed scheme with the completed Oldchurch Hospital redevelopment has also been considered. Interactive effects arise when an environmental impact occurs which has a knockon effect on impacts in other topic areas. An example of this is an effect on ground contamination or water quality, which may result in additional ecological effects. Interactive effects have been assessed and described within the individual topic assessments in the main ES document. Mitigation Where likely significant adverse effects have been identified in the assessment, measures have been proposed to avoid or reduce effects where possible. Where adverse effects cannot be avoided, measures to compensate for the adverse effects are proposed. Collectively these are known as mitigation measures. Enhancement measures to improve the environmental performance of the scheme are also proposed where opportunities to implement such measures within the design of the scheme are identified. Residual Effects Residual effects are those that remain once mitigation measures have been applied, and are identified in each topic section as appropriate. Page 4

9 3 The Site and Surroundings Existing Site The Rail Operating Centre (ROC) and Maintenance Delivery Unit (MDU) sites are located in Romford in the London Borough of Havering in Essex, at National Grid Reference [TQ507881]. A description of the sites is given in turn below. The site location plan for the proposed ROC and MDU is shown in Figure 1. Proposed ROC Site The proposed ROC site is located on 1.85ha of land west of Romford Station and Waterloo Road and is currently used as an existing Maintenance Delivery Unit (MDU) and for other rail-related operations. The site is covered mainly by tarmac and a large number of two-storey portacabins, with existing maintenance and delivery vehicles accessing the site via Waterloo Road to the east. The northern portion of the ROC site is occupied by operational railway track used by Network Rail. In the eastern portion of the ROC site close to the junction with the A126 there is an area of trees and vegetation. Land uses surrounding the ROC site include operational rail land directly to the north. Waterloo Road (A126) underpass is present directly to the east, beyond which lie commercial and industrial buildings. A series of multi-storey residential (mainly key worker housing) apartment blocks associated with the redevelopment of the Oldchurch Hospital site are present directly to the south. Nursery Walk is present in a cutting directly to the west of the site, beyond which lies the proposed MDU site, whilst Romford Gas Works is present to the south-west. Proposed MDU Site The proposed MDU site is located on 3.89ha of land adjacent to the proposed ROC site. The site is occupied by a largely undisturbed tract of rail-side land that is predominantly greenfield in nature Grade II Borough Site of Nature Conservation Importance. The MDU site is inaccessible to the general public and there is a small path occasionally used by railway workers which runs parallel to the site boundary. The site has a reasonably diverse range of ecological habitats which include badgers, breeding birds, invertebrates, amphibians and reptiles. The site contains various trees, such as broadleaved woodland, mature and semi-mature oaks, areas of scrub and open woodland glade. Surroundings Surrounding land uses comprise a mixture of commercial, industrial and residential buildings. Page 5

10 Residential properties are present directly to the south-west in the area of Beechfield Gardens, beyond which lie further commercial and industrial premises. The mainline railway tracks lie directly north of the site, with residences of Sheringham Avenue present on the opposite side of the tracks. The MDU site itself is slightly elevated by a few meters in comparison with the surrounding land albeit to a lesser degree than the ROC site. The MDU site is therefore relatively more visible from the nearby surrounding land uses. Page 6

11 A3! Legend Red line boundary National Rail Stations 24/04/ :06:14 Contains Bing Maps aerial imagery and labels 2010 Microsoft Corporation and its data suppliers. FP KC OP OC Issue Date By Chkd Appd Metres Fitzroy Street, London, W1T 4BQ, United Kingdom. Client Network Rail Job Title Romford Rail Operating Centre and Maintenance Delivery Unit Site Location Plan Scale at A3 Job No :10,000 Drawing Status For Planning Drawing No Figure 1 Issue FP1 \\GLOBAL.ARUP.COM\LONDON\PTG\ICL-JOBS\218000\ Basingstoke Campus\ ROC - PLANNING APPLICATION\Transport Planning\4 Internal Project Data\4-09 GIS\05_ArcGIS\A3LV_Planning.mxd Arup

12

13 4 The Proposed Scheme Overview The planning application for the proposed scheme comprises the provision of: A new Rail Operating Centre (ROC); Associated access, parking, landscaping, and security provision; and A new Maintenance Delivery Unit (MDU) to replace the existing MDU currently on site. A general description of the proposed MDU and ROC scheme are provided below, including proposed infrastructure and operational assumptions. Images of what the scheme buildings would look like are shown in Figures 3-5. Proposed Maintenance Delivery Unit (MDU) The proposed relocated MDU will be sited approximately 250m to the west of the existing MDU. The proposed MDU is envisaged to comprise a two-storey building for use by Network Rail maintenance operatives. The MDU is responsible for a geographical area of railway covering London, Essex, and other areas of Anglia. Other facilities at the MDU site would include a weighbridge, a scrap metal storage delivery area and space for maintenance vehicles used by Network Rail operatives. The external facades of the proposed scheme will comprise a panelling system of transparent glass, opaque glass with insulation backing, and solid panels of reinforced concrete. Proposed Rail Operating Centre (ROC) The proposed ROC building will be three storeys in height, comprising a ground floor equipment room and first and second floor operating rooms, with space available for future operatives for the Crossrail scheme when completed. The Romford ROC will be the first of a new generation of operating centre, encompassing both sustainable design features and fit-for-purpose technical and operational functions. Traffic and Transport Vehicular Access Vehicular access to the proposed ROC will be gained from the A126 Waterloo Road, to the east of the site, via the existing priority junction. The junction will provide vehicle access to the development s at-grade car parking as well as for deliveries, emergency vehicles and refuse collection. The site will be secure and not open to the general public. Page 7

14 Figure 3 The Proposed Scheme, Viewed from the North-East (Note: Oldchurch Hospital redevelopment is not part of the proposed scheme) Figure 4 The Proposed ROC Building Page 8

15 Figure 5 The Proposed MDU Building Vehicular access to the relocated MDU will be gained from Jutsums Lane, to the west of the site, via an existing priority junction. There will be vehicular routes within the ROC site and MDU site which will provide access for maintenance vehicles. Cycle and Pedestrian Access Pedestrian access to the site will be via an existing controlled pedestrian route to the north of the site that links to Romford Railway Station. The existing pedestrian route will be extended further to the west to connect to the proposed new MDU site. The pedestrian route will provide an easy route for staff and registered visitors using public transport from Romford Station to access the site. Cycle access to the ROC site will be via the main vehicle access from the A126 Waterloo Road. Secure. Sheltered cycle parking is to be provided in the south western corner of the car park. The scheme proposals also include the provision of changing and shower facilities for use by cyclists. Parking A car parking area is proposed to the west side of the proposed MDU building. The MDU would provide parking to Network Rail staff and visitors as follows: 50 Van spaces; Page 9

16 10 Car/van conversion spaces; 30 Car Parking spaces; 3 Disabled parking spaces; 4 Motor cycle spaces; and 16 Cycle spaces. A car parking area is proposed to the east of the proposed ROC building. The ROC would offer associated parking for 101 vehicles including seven spaces for disabled users, and 16 cycle spaces. Landscaping The proposed landscape design retains as much existing vegetation as possible and will comprise replanting where existing vegetation is to be removed. Landscape provision includes the planting of trees and shrubs. Earth berms located to the north, east and south elevations form part of the proposed soft landscaping proposals. SUDS Drainage and Attenuation The proposed scheme, in particular the MDU site, will incorporate sustainable drainage systems for surface water run-off in order to replicate as closely as possible the existing natural drainage from the site. Below ground attenuation and a green roof system is therefore to be provided for the site in order to assist in reducing the surface water discharge rates and reduce the risk of flooding. Lighting An external lighting strategy for the proposed scheme is set out below and covers the buildings, areas of car parking, access roads and footpaths. Lighting would be required during the day and night. External lighting will be situated in roads and car parking, footpaths and architectural lighting. The external lighting will be designed to minimise the cost in operation by choosing the most efficient light sources. Construction Programme and Phases Construction of the proposed scheme is planned for January 2013 and is expected to take approximately 18 months. The general phases involved in the construction works would include the following: Demolition works and site clearance; Excavation and foundation works; Superstructure and cladding; and Fit out. Page 10

17 ROC scheme is due to be completed in summer of The MDU activities are to remain operational throughout the construction period. Page 11

18 5 Transport Introduction This section summarises the assessment of the effects of the construction and operation of the proposed scheme on the surrounding transport network. The scheme assessment year selected for the Transport Assessment (TA) is The transport assessment examines the effect of the scheme on public transport and highway networks. As a whole the project seeks to reduce car mileage and promote sustainable modes of transport (see below under Mitigation ). Baseline Access to the site overall is very good. Pedestrian access is currently gained from a walkway from the western end of Platform 2 at adjacent Romford Station. The route runs alongside the railway and over Waterloo Road Bridge. The pedestrian route is only accessible by Network Rail staff of the existing MDU. There is good access by public transport due to the proximity of Romford mainline train station and more than 20 bus routes exist in the local area. Road access to the ROC site is from Waterloo Way A126 to the east, while access to the MDU site is from a private road Jutsums Lane to the west. Assessment The transport assessment has considered the effects of construction traffic on local roads. The delivery of building materials for the construction of the proposed scheme is not assessed to have a significant effect on traffic. No significant earthworks are proposed, and therefore lorry movements associated with the transport of excavated material will be minimal. The effect of additional vehicles on the local road network during operation of the proposed scheme site has been assessed to be negligible since the shift patterns do not overlap with peak times for local traffic. Mitigation A Construction Travel Plan would be developed in consultation with Havering Borough Council to reduce the effect of the construction phase on the local road network. Measures would be put in place to enforce the use of defined construction traffic routes. As the effect of the operational scheme on the local road network is negligible, no mitigation in terms of highway improvements is planned. An operational Travel Plan has been prepared and this has a number of strategies included within it to reduce the number of single occupancy vehicle trips out of the proposed ROC and encourage employees to use more sustainable modes of transport. Page 12

19 Residual Effects Overall, the residual effect of the proposed scheme in transport terms is not significant. Both construction and operational effects are negligible in terms of traffic flows on the network. Page 13

20 6 Air Quality Introduction This section summarises the assessment of the effects of the construction and operation of the proposed scheme on air quality. Baseline Havering Borough Council carries out continuous local air quality monitoring of specific air pollutants such as oxides of nitrogen and fine particulate matter. The results of data from local monitoring stations show that recorded concentrations of these air pollutants are locally above national targets, although their annual average concentrations are generally acceptable when compared with UK standards. Assessment In general, there are two sources of emissions that would need to be controlled to minimise the potential for adverse environmental effects during construction: exhaust emissions containing oxides of nitrogen from site plant, equipment and vehicles; and dust emissions from site activities such as earthworks. The proposed Operating Centre would not affect local air quality during construction as construction traffic vehicle numbers are not expected to be significant. Air quality modelling has shown the there would be barely noticeable changes in key air pollutants when the development is in operation. Mitigation Construction activities would be controlled to reduce as far as possible the potential environmental effects such as dust blow from earthworks by using spoil tarpaulins, water sprays, and wheel washing of vehicles to remove mud before leaving the site. Best Practice guidance on the control of construction dust has been published by the Greater London Authority and will be applied during the construction phase. A Travel Plan has been included in the transport assessment which aims to reduce traffic generated by the proposed scheme which would impact on air quality. Since operational effects are expected to be negligible, no mitigation measures have been proposed with regard to operational effects on air quality. Residual Effects The residual effects of construction activities following application of mitigation measures are significant moderate to minor adverse but would occur on a short to medium term basis only. During operation the assessment shows air quality to be Page 14

21 a low priority consideration in the case of the proposed scheme (i.e. no significant effects identified). Page 15

22 7 Contaminated Land Introduction This section summarises the likely environmental effects of the proposed scheme on ground conditions and contamination at the site. Mitigation measures are proposed where significant effects are considered likely. Baseline Based on the historical development of the site, there are potential sources of contamination from the use of the land for railway activities. Much of the site is on a raised embankment containing fill material of an unknown source. There are some contaminative land uses in the immediate area, such as the Romford Gas Works and lighter industrial uses nearby. A limited ground investigation of the site was undertaken in 2012 and included soil samples from the fill material, as well as some samples for ground gas. Water samples were not analysed, but soil samples from the investigation indicate low levels of contamination and that there is a low to moderate likelihood of significant contamination present beneath the site. Potentially flammable ground gases were detected at low levels. Further investigation works would however be required to confirm this. Assessment The results of the ground investigation suggest that without mitigation measures in place, there is some risk of harm to human health during construction. During the construction phase, there is potential for some dust-borne or liquid contaminants to be mobilised. This effect is therefore assessed to be minor adverse. There is a some potential for ground gas to accumulate within the proposed scheme buildings. Effects on human health as a result of ground gas or vapour generation would be of minor adverse significance, prior to the application of mitigation measures. Mitigation There is a potential for contamination to be present in the areas of the site that have not been subject to previous ground investigation. Further investigation should be undertaken before construction works commence, given the previous historic uses and size of the site. Good working practices would be implemented to control the risk of harm to construction workers, site visitors and site neighbours. In addition to the mitigation measures for the construction phase of the development, gas monitoring reports suggest that designs should be reviewed to incorporate ground gas protection measures. Page 16

23 Residual Effects If the mitigation measures outlined above are applied there are likely to be negligible (non-significant) residual environmental effects resulting from contamination during the construction and operation of the scheme. Page 17

24 8 Cultural Heritage Introduction This section summarises the assessment of the effects of the construction and operation of the proposed scheme on the archaeological and built heritage resource collectively known as cultural heritage. Baseline Information from historical records indicates that there is limited potential for the discovery of archaeological assets. Although there is evidence of earlier periods of occupation within the study area, the construction of the railway line (including excavation of material for the embankment platform on which the site lies) is likely to have removed any earlier deposits. This could include the discovery of railway related features and infrastructure. Any remains relating to this period are however likely to be of low value. Assessment The construction of the proposed scheme has the potential to directly impact upon any remaining archaeological assets through ground works and piling operations. The operation of the proposed scheme is considered to have negligible effects on built heritage (i.e. not significant), as there are no identified sensitive built heritage assets in close proximity to the site. Mitigation To mitigate the effects of the scheme on cultural heritage assets, a programme of recording of cultural heritage assets during excavations is proposed. No mitigation is considered necessary whilst the scheme is in operation. Residual Effects With the incorporation of recommended mitigation measures, residual effects upon any cultural heritage assets as a whole are assessed to be of low significance. Page 18

25 9 Ecology Introduction This section summarises the effects of the construction and operation of the proposed scheme on ecological resources including habitats and protected species on the site and surrounding area. Baseline Habitat The site is occupied by a mixture of broadleaved woodland and scrub, with the area proposed for the relocated MDU acting as a wildlife corridor which enables animals to move between other habitats in the wider area. Other areas of vegetation provide a locally important habitat for invertebrates and birds. Site surveys found protected species such as slow worms, common lizards, house sparrow, song thrush and starling to be present on site. Reptiles Common lizards were recorded from scrub, semi-natural broad-leaved woodland, and grassland habitats. In line with best practice guidelines, survey counts of between five and 20 individuals on any single survey visit can be taken as indicative of a medium-sized population. A survey count of above 20 individuals is indicative of a large population. Counts of over 20 individuals were recorded during one of the survey visits whilst the majority of other surveys visits recorded between five and 20 individuals. Consequently, the results suggest that a medium to large population of common lizard exists on site. Common lizard is a species of priority, and a medium to large population of common lizard is considered to be of high value to the area. Badgers There were signs of badger activity on the southern embankment of the site including formerly used setts. The badger population using the site is considered to relate to a small number of individuals and is not considered be significant, although of value at a local level. Bats A bat survey was undertaken and focused on mature oak trees which showed initial signs of use by bats. Surveys undertaken showed signs of two species of bats using the site and surrounding area for feeding. However, no actual bat roosts were discovered on site. The evidence suggests that overall the bat population present on site is not significant but of value at a local level. Breeding Birds The site is frequented by breeding birds although no specifically rare species were recorded during site visits. Based upon the species present and the number of Page 19

26 breeding territories present, the population of breeding birds is considered to be of value at the local level. Great Crested Newts No great crested newts were been recorded at the site and there is no suitable connecting habitat. The site therefore represents no value as habitat for great crested newts. Assessment Construction activities that could give rise to ecological effects include removal of vegetation to make way for buildings, construction plant noise and visual disturbance, and dust deposition. Vegetation clearance will result in the removal of all habitat features except for the southern embankment which is to be retained, and which comprises a combination of scattered scrub, grassland and semi-natural woodland. Part of the woodland in the western half of the site will also be retained. This will help preserve much of the wildlife corridor function of this particular habitat type. The removal of vegetation along the embankment during construction would result in slight adverse effects. disturbance to nocturnal species as a result of additional lighting during construction and operation; permanent loss of all vegetated reptile habitat on site; and loss of bird nesting habitat as a result of vegetation removal. However, given the low populations of rare breeding birds and bats likely to be present on site, these construction effects would not be considered to be significant, and in any event species would relocate to similar habitats present in the immediate surrounding area. When in operation, the new road running up the proposed MDU facility will pass directly adjacent to the main area of retained reptile habitat on site. This will involve vehicle movements on site where currently there are none. The presence of vehicle traffic is anticipated to potentially result in mortality to a small number of common lizards. Mitigation The majority of species surveys indicated a lack of significant populations on the site with the exception of reptiles. If protected species are found during the course of vegetation clearance, then works would stop immediately and the advice of a suitably qualified ecologist would be sought, in addition to notifying the relevant authority responsible for the species protection. In addition, the following measures will be taken: all of mature trees at the application site will be retained and protected. all trees with bat roost potential at the application site will be retained and protected. low-level and directed lighting will be used to minimise light spill at night and to offer unlit corridors along rows of native trees and shrubs. This will Page 20

27 facilitate bat feeding and commuting between the site and adjacent off-site areas. The following measures are proposed to reduce effects on reptiles during construction. A belt of habitat encompassing much of the southern embankment of the proposed site will be retained for enhancement and on-going management for the long-term benefit of common lizards. This area of habitat will be further supplemented by the enhancement of additional smaller areas of habitat either within or immediately adjacent to the site. The inclusion of these additional habitats increases the total area of retained and enhanced habitats on and immediately adjacent to the site. Collectively, these areas have the potential to afford a network and habitats of significant value to common lizards, and which would form an integrated landscape design. Residual Effects Following the implementation of mitigation measures the majority of effects on ecological resources during construction and operation of the proposed scheme would be low. Page 21

28 10 Townscape and Visual Effects Introduction An assessment has been undertaken of the townscape and visual effects of the construction and operation of the Rail Operating Centre (ROC) and Maintenance Delivery Unit (MDU). The impact assessment focused on changes to the character of the area and to specific viewpoint locations around the site. Townscape includes buildings and related infrastructure that makes up the predominant character, but will also includes green and open spaces found in urban areas. Baseline The townscape and visual baseline has been established through desk based research and field survey to establish the character of the site and surrounding townscape character areas, and the nature of existing views. The site is located in the London Borough of Havering, to the west of Romford town centre and immediately to the south of the mainline railway line. The site is located on a narrow, raised embankment adjacent to the main line railway. The surrounding assessment area contains no notable topographic features. The assessment area is a mixture of land uses including residential buildings, shops, offices and light industrial buildings and notably a gas storage facility which lies within view of the site. There are a number of open spaces within the assessment area including parks, playing fields and a cemetery. Jutsums Park borders with the western extent of the site, however there are no other open spaces within close vicinity. Gardens, street trees, parkland planting, and regenerating woodland scrub exist within the assessment area. The assessment area includes a number of roads, cycleways, footpaths and Public Right of Ways. The condition of the townscape within the site is poor with potential for enhancement due to the fair condition of townscape components. Assessment During the construction phase, the magnitude of change on site character is considered to be high due to the removal of buildings, vegetation and road surfacing and the level of activity during construction. However, due to the low sensitivity of the site it would result in minor adverse effects. During the construction phase, effects on Old Church Hospital Townscape Character Area, Romford Residential West Townscape Character Area and Queens Hospital Townscape Character Area would be negligible in most instances. Page 22

29 There would be adverse effects arising from the visibility of the scheme from nearby residential, transport, employment and recreational viewpoints. During the operational phase, the magnitude of change is likely to be medium. Assessing this alongside the medium sensitivity of the site means the effect of the proposed development would be of minor beneficial significance. The operational scheme would have a number of different activities associated with it. However, it is considered that the proposed development would have a negligible effect on all townscape character areas. The operational scheme on nearby residential, transport, employment and recreational viewpoints would result in mostly negligible effects. Mitigation No further mitigation is possible for residual effects due to the visible nature of the construction activities. No mitigation is required to mitigate visual effects of scheme in operation as effects are assessed to be minor beneficial, negligible or minor adverse. Residual Effects It is considered that the overall significance of the residual effects of the proposed scheme would be negligible. Page 23

30 11 Noise Introduction This section summarises the assessment of the effects of the construction and operation of the Rail Operating Centre (ROC) and Maintenance Delivery Unit (MDU) on noise and vibration. There is potential for permanent noise and vibration effects from road vehicles. There is also the potential for temporary noise and vibration effects during construction activity. Baseline The scheme is on an operational railway and it is located adjacent to a mixed industrial and residential area with sensitive receptors in close proximity to the south of the site, and to the north beyond the railway line. As such the existing noise environment is relatively quiet, as is typical for a suburban setting. Noise measurements were taken around the site of the proposed Romford ROC and MDU. Assessment There is the potential that construction noise effects could occur during the ground works and demolition activities. It is unlikely that activities involving plant such as cranes and hand tools would result in any significant adverse effects. No daytime or night-time noise effects are predicted as a result of road vehicles. It is important to ensure that the noise from the building services equipment serving the Operations building does not result in a cumulative impact with the main depot operation. Mitigation During construction, best practice measures for the reduction of noise would be implemented through a Construction Environmental Management Plan. During operation, in order to achieve the limiting plant noise levels the scheme may include selection of low noise equipment, screening the equipment using existing features and the ROC itself and acoustic louvers. Residual Effects The qualitative assessment has identified a potential for adverse construction noise and vibration impacts during ground works. Mitigation would aim to minimise any adverse residual impacts by selecting the quietest practicable processes. During the operational phase, no residual significant effects from changes in road traffic noise are predicted. Page 24

31 The application of plant noise limits to the required standard will ensure that there are no residual noise effects. There are no residual effects identified as a result of the additional vehicle movements on the access road into the site. Page 25

32 12 Socioeconomic Effects Introduction This section summarises the assessment of the construction and operation effects on the proposed Rail Operating Centre (ROC) and Maintenance Delivery Unit (MDU) at identified sites located in Romford on socio-economic conditions in the study area, including economics, employment and incomes, and local community facilities. Baseline In order to examine baseline data relevant to the development, data was collected and analysed focussed on two local geographies; Scheme Area - Comprising the Middle Super Output Areas (MSOAs) immediately adjacent to the site; Havering 017, Havering 016 and Havering 013; and the Local authority level - The site is in the London Borough of Havering. The focus of the socio-economic baseline is on the population, employment and the labour market dynamics. Significant socio-economic differences exist between the London Borough of Havering where the proposed development site is located, and the neighbouring London Borough of Barking and Dagenham which sits in close proximity. Both Havering (63.6%) and Barking and Dagenham (64.0%) have a lower proportion of people at working age in comparison to London as a whole (68.9%). Both could benefit from attracting more people of working age in order to balance the demands of the dependant population. Employment data shows that the level of total employment contracted by 2.7% in 2006 and 2008, and by 1.6% in 2009 to The area will therefore have to create more jobs than previously in order to balance against its projected population growth. Assessment During the construction phase, the MDU facility will remain operational throughout the construction phase and existing employment will therefore be unaffected by the proposals. Employment will be generated through the construction phase, however these will be temporary in nature, and it remains a boost to the local economy. The operational phase of the proposed development will create additional permanent employment opportunities from 2014 onwards. Page 26

33 Mitigation No mitigation measures are identified. Residual Effects No mitigation measures are identified and therefore residual effects remain unchanged from the impact analysis. Page 27

34 13 Water Resources Introduction This section summarises the assessment of the effects of the construction and operation of proposed ROC and MDU developments on water quality, ground water, water use, foul water and flood risk. The assessment of water use involves identification of water consuming activities and an assessment of possible water reduction strategies. A Flood Risk Assessment was also undertaken. Baseline At the proposed ROC site, an existing surface water network collects the storm water from the existing MDU building and surrounding hard landscaping. Survey records indicate that surface and waste water outfall into a combined sewer in Nursery Walk to the south of the site. The proposed MDU site is occupied largely by undisturbed rail side land that is mostly Greenfield in nature with no positive drainage connections present. The proposed ROC site has a connection to a foul network however the proposed MDU site has no existing buildings therefore no foul drainage exists on the site. The two closest discharge consents are 398m in a south eastern direction from the site to the River Rom. The water supply to the existing building is assumed to be supplied by the distribution mains in Waterloo Road. Records indicate there is no water supply present on the proposed MDU site. The site is situated in a low risk flood zone. The site is encompassed by permeable layers capable of supporting water supplies at a local rather than strategic scale, and in some cases forming an important source of base flow to rivers. There are no watercourses within the site. There is one surface water abstraction license 985m to the west of the site used for direct irrigation. Assessment During the construction phase, there will not be a significant increase in surface water discharge volume in comparison to the existing sites; therefore the effect on surface water is not significant. The foul discharges during construction would be small in comparison to those during operation and would not be a significant increase in comparison to the existing sites. There will be a need to provide water supply during the construction phase. Page 28

35 The existing site is at low risk of fluvial and drainage flooding, construction works will not alter the flood risk from these sources. There is a potential to impact upon the groundwater during piling works. As a result the groundwater may be affected by construction activities, therefore the effect is significant (minor) adverse. During the construction phase, the effect on water quality would be not significant. Operational activities will mostly have a significant (minor) adverse impact on surface water, foul and water supply. The effects of operational activities on ground conditions and water quality are not significant. Mitigation The development has been designed to ensure there is no flood risk to the buildings on-site and that there is no risk posed to the buildings off-site. A Construction Environmental Management Plan will be implemented during construction to prevent sediment entering watercourses. Flood risk during construction would be mitigated through the provision of a temporary drainage system, designed to minimise the risk of flooding. During operation, mitigation for water quality issues would be provided through the provision of a suitable drainage system. Petrol interceptors would be provided for all locations where significant vehicle movements would take place. Mitigation measures for water usage during operation include fitting low water use appliances, the use of rainwater harvesting and recycling of grey water. Residual Effects It is anticipated that the effect on groundwater due to construction of the development will be not significant. Implementation of other mitigation measures would result in a negligible effect (not significant) on water resources during the construction and operational phases of the development. Page 29

36 14 Waste Introduction This section summarises the assessment of the likely environmental effects of solid waste generation associated with the construction and operation of the proposed ROC and MDU developments. The principle objectives of sustainable resource and waste management are to: Use material resource more efficiently; Reduce waste at source; and Reduce the quantity of waste that requires final disposal to landfill. Baseline Baseline conditions are with respect to waste generation and management methods at the site and within the local and regional areas. This assessment also considers the capacity of existing waste infrastructure in the local and regional areas. At the RCO the baseline operational waste generation rate for the office use of the site has been estimated at 19.9 tonnes per annum. In addition, a single skip of hazardous waste is removed, 6 times per year, and a truck load of steel is collected every 5-6 weeks. At the MDU site there are currently no operational or construction-related activities being undertaken at the site that would give rise to waste of any kind. Assessment Solid waste would be generated on a temporary basis during the construction of the proposed MDU and RCO building and associated development. The construction phase of the development is likely to generate mostly inert and nonhazardous waste materials. Both sites would produce excavated material which is likely to comprise of a mixture of inert (e.g. concrete, topsoil), non-hazardous (e.g. timber, vegetation) and hazardous (e.g. contaminated ballast) material. During the construction phase, due to the predicted quantity of construction material requiring landfill disposal, the likely significant environmental effects of material requiring landfill disposal in the period 2013 to 2014 would be minor adverse. During the operation phase, due to the predicted quantity of operational waste requiring landfill disposal,, the likely significant environmental effects of operational waste requiring landfill disposal in 2014 would be permanent (due to the ongoing nature of operational waste generation by the proposed development) and minor adverse. Page 30

37 Mitigation During the construction phase, there are various mitigation measures which will reduce, reuse, recover and recycle construction materials, for instance recycling and recovery schemes would be used to assist in achieving the target of 80% for excavation and construction waste. During the operation phase, sustainability aspects will be incorporated into the design of the buildings which will help to reduce, reuse and recycle materials and waste. This would include a dedicated space to cater for the segregation and storage of waste and recyclables within both buildings. Residual The committed mitigation measures identified would reduce the quantity of material requiring off-site disposal to landfill. On this basis, the residual environmental effects of construction would be minor adverse. Whilst the exact quantity of operational waste generated cannot be quantified with certainty at this time, it is considered that the residual environmental effects of operation would be negligible. Page 31

38 15 Sunlight, Daylight and Shadow Introduction This section summarises the assessment of the impact of the proposed Rail Operating Centre (ROC) and Maintenance Delivery Unit (MDU) on sunlight and daylight availability to properties surrounding the site. Sunlight and daylight availability and shadow studies have been carried out for the proposed development in accordance with UK established guidance in order to: assess the impact on the surrounding existing (residential) properties, focusing on properties on Union Way directly south of the site; and verify that any amenity areas that may exist have appropriate access to sunlight. The effects of the proposed scheme on sunlight and daylight availability focused on the proposed ROC site, given that it has the potential to affect a number of properties along Union Way. The proposed MDU building is of a small enough scale and sufficiently distant from properties to its south along Beechfield Garden to not adversely affect them and was therefore excluded from the assessment. Daylighting effects were assessed at te properties most likely to be affected, which were the ground floor residences of properties on Union Way directly south of the site. The effect of the proposed scheme on sunlight availability to surrounding properties is not considered to represent a potential issue. Given that the path of the sun rising in the east through south and setting in the west means that the proposed scheme could only affect properties directly north of it. The potential for sunlight effects of the proposed scheme on properties to the south on Union Way is therefore zero. Properties north of the proposed scheme on the opposite side of the mainline railway are too far away to be affected. Sunlight impacts on surrounding buildings was therefore not considered to be of any significance in the assessment. Baseline The effects of the surrounding buildings for the daylight were simulated in a computer model. Most of the residences located on Union Way included in the assessment meet the recommended target values for daylight, in line with UK industry guidance. It should be noted that with the existing situation, there are some reductions in daylight that are currently experienced as a result of the existing MDU two-storey portacabins on the proposed ROC site. Assessment When modelled with the proposed scheme in place, overall daylight availability to the ground floor properties on Union Way were slightly reduced but within acceptable limits when compared with UK daylighting standards. The impact of the proposed scheme on sunlight availability on surrounding amenity areas was also found to be negligible. Page 32

Viridor Waste Management. Proposed Development of an In-Vessel Composting Facility. Land at Exide Batteries, Salford Road, Bolton

Viridor Waste Management. Proposed Development of an In-Vessel Composting Facility. Land at Exide Batteries, Salford Road, Bolton Viridor Waste Management Proposed Development of an In-Vessel Composting Facility Land at Exide Batteries, Salford Road, Bolton Non-Technical Summary January 2009 Introduction Viridor Waste Management

More information

Longbridge Town Centre Planning Application

Longbridge Town Centre Planning Application Longbridge Town Centre Planning Application Non-Technical Summary of the Environmental Statement January 2011 Introduction An application for Planning Permission has been submitted to Birmingham City Council

More information

Environmental Statement Non-Technical Summary Rectory Farm, Hounslow

Environmental Statement Non-Technical Summary Rectory Farm, Hounslow Environmental Statement Non-Technical Summary Rectory Farm, Hounslow Introduction This document is the Non-Technical Summary (NTS) of the Environmental Statement (ES) for a proposed development at the

More information

Clifton Marsh Landfill Variation of planning permission 05/09/0376 & 06/09/0395 for the continuation of landfilling until Non Technical Summary

Clifton Marsh Landfill Variation of planning permission 05/09/0376 & 06/09/0395 for the continuation of landfilling until Non Technical Summary Clifton Marsh Landfill Variation of planning permission 05/09/0376 & 06/09/0395 for the continuation of landfilling until 2035 Non Technical Summary SLR Consulting Limited Project Ref: 403.00079.00474

More information

18 Cumulative Impacts and Interaction of Effects

18 Cumulative Impacts and Interaction of Effects 18 Cumulative Impacts and Interaction of Effects 18.1 Introduction This chapter addresses the cumulative impacts and main interactions between different aspects of the environment likely to be significantly

More information

BSkyB Site Levelling and Remediation Works. Environmental Statement Volume 3. Planning Application June 2013 Non-Technical Summary

BSkyB Site Levelling and Remediation Works. Environmental Statement Volume 3. Planning Application June 2013 Non-Technical Summary BSkyB Site Levelling and Remediation Works Environmental Statement Volume 3 Planning Application June 2013 Non-Technical Summary BSkyB Site Levelling and Remediation Works Environmental Statement Volume

More information

06/01851/MIN CONSTRUCTION OF A NOISE ATTENUATION BUND AT Hermitage Farm, Newport Road, Moulsoe FOR NGW and EF Richards

06/01851/MIN CONSTRUCTION OF A NOISE ATTENUATION BUND AT Hermitage Farm, Newport Road, Moulsoe FOR NGW and EF Richards 06/01851/MIN CONSTRUCTION OF A NOISE ATTENUATION BUND AT Hermitage Farm, Newport Road, Moulsoe FOR NGW and EF Richards THE APPLICATION Planning permission is sought for the construction of a noise attenuation

More information

Factor Potential Effects Mitigation Measures

Factor Potential Effects Mitigation Measures Natural Environment No impacts of provincial significance to the natural environment are anticipated for the rapid transit project. Other impacts and how they will be mitigated are outlined in the table

More information

Marlow Flood Alleviation Scheme Environmental Statement Non-Technical Summary. Final. WNGLDC Environment Agency Title

Marlow Flood Alleviation Scheme Environmental Statement Non-Technical Summary. Final. WNGLDC Environment Agency Title Marlow Flood Alleviation Scheme Environmental Statement Non-Technical Summary Final WNGLDC Environment Agency Title We are The Environment Agency. It's our job to look after your environment and make it

More information

Cottonmount Landfill Stable Non Reactive (SNR) Asbestos Cell. Volume 2 NON TECHNICAL SUMMARY. December 2012 SLR Ref:

Cottonmount Landfill Stable Non Reactive (SNR) Asbestos Cell. Volume 2 NON TECHNICAL SUMMARY. December 2012 SLR Ref: Cottonmount Landfill Stable Non Reactive (SNR) Asbestos Cell Volume 2 NON TECHNICAL SUMMARY December 2012 SLR Ref: 419.00034.00473 INTRODUCTION 1. This Non Technical Summary (NTS) has been produced by

More information

Environmental Impact Assessment Non-Technical Summary. June 2015

Environmental Impact Assessment Non-Technical Summary. June 2015 Environmental Impact Assessment Non-Technical Summary June 2015 Contents 1. Introduction 3 2. Site and Surrounding Area, Proposed Development and Policy 6 3. Summary of Topics 9 4. Further Information

More information

The movement of construction vehicles is predicted to: give rise to some measurable increases in the early morning and evening;

The movement of construction vehicles is predicted to: give rise to some measurable increases in the early morning and evening; 5 TRAFFIC AND TRANSPORT 5.1 SUMMARY OF RESIDUAL IMPACTS The movement of construction vehicles is predicted to: give rise to some measurable increases in the early morning and evening; be outside of the

More information

Portbury Dock Renewable Energy Plant. Cumulative Impact Assessment Non-Technical Summary September 2009

Portbury Dock Renewable Energy Plant. Cumulative Impact Assessment Non-Technical Summary September 2009 Portbury Dock Renewable Energy Plant Cumulative Impact Assessment Non-Technical Summary September 2009 INTRODUCTION On 28 th August 2009 E.ON Climate & Renewables UK Developments Limited (EC&R) submitted

More information

BUT001: Land to the east of Benington Road, Butterwick Sustainability Objective

BUT001: Land to the east of Benington Road, Butterwick Sustainability Objective BUT001: Land to the east of Benington Road, Butterwick Sustainability Objective 1. Provide a miture of sustainably designed new housing to provide everybody in South East Lincolnshire with the opportunity

More information

Chapter 17 Cumulative Impacts

Chapter 17 Cumulative Impacts Chapter 17 Cumulative Impacts CONTENTS 17. Cumulative Effects... 2 17.1 Introduction... 2 17.2 Summary of Relevant Legislation, Planning Policy and Guidance... 2 17.3 Methods... 5 17.4 Consultation...

More information

Former MOD Site Hempsted Lane, Gloucester

Former MOD Site Hempsted Lane, Gloucester FORMER MOD SITE, HEMPSTED LANE, GLOUCESTER NON-TECHNICAL SUMMARY Introduction Bovale Ltd proposes to undertake the redevelopment of the former MOD site, Hempsted Lane, Gloucester. The redevelopment will

More information

Arcow Quarry, North Yorkshire

Arcow Quarry, North Yorkshire Arcow Quarry, North Yorkshire Non Technical Summary Planning applications for a railhead and associated development REVISION SCHEDULE Rev Date Details Prepared by Reviewed by Approved by 0 December 2013

More information

introduction 1 On behalf of db symmetry we are pleased to welcome you to view our emerging plans for a new logistics park at Rugby.

introduction 1 On behalf of db symmetry we are pleased to welcome you to view our emerging plans for a new logistics park at Rugby. introduction 1 On behalf of db symmetry we are pleased to welcome you to view our emerging plans for a new logistics park at Rugby. The site comprises the employment element of the South West Rugby allocation

More information

Thorn Turn Winter Maintenance and Highways Depot

Thorn Turn Winter Maintenance and Highways Depot Thorn Turn Winter Maintenance and Highways Depot Non-Technical Summary Central Bedfordshire Council 12 May 2015 1 Notice This document and its contents have been prepared and are intended solely for Central

More information

Works, services and infrastructure code

Works, services and infrastructure code 9.4.11 Works, services infrastructure code 9.4.11.1 Application (1) This code applies to assessable development identified as requiring assessment against the Works, services infrastructure code by the

More information

Renewable and Low Carbon Energy Facility. Environmental Statement Non Technical Summary

Renewable and Low Carbon Energy Facility. Environmental Statement Non Technical Summary Renewable and Low Carbon Energy Facility Environmental Statement Non Technical Summary February 2010 Ltd Renewable and Low Carbon Energy Facility, Dorset Green Technology Park, Winfrith, Dorset Environmental

More information

Rising Sun. Scaffold Hill. Flood Risk Assessment

Rising Sun. Scaffold Hill. Flood Risk Assessment Rising Sun Scaffold Hill Flood Risk Assessment August 2010 Contents 1.0 Introduction... 4 2.0 Site Description... 5 3.0 Legislative Framework... 6 4.0 Flood Risk... 10 5.0 Surface Water Drainage... 11

More information

Western Rail Link To Heathrow

Western Rail Link To Heathrow Non-T echnical Summar y - Initi al Envir onmental Infor mati on R eport Networ k R ail Western Rail Link To Heathrow Network Rail Non-Technical Summary - Initial Environmental 129088-JAC-REP-HEN-000014

More information

South Bristol Link Sustainability Statement. May 2013

South Bristol Link Sustainability Statement. May 2013 May 2013 1 2 Notice This document and its contents have been prepared and are intended solely for West of England Partnership s information and use in relation to the of South Bristol Link. It may not

More information

9.3.9 Industry uses code

9.3.9 Industry uses code 9.3.9 Industry uses code 9.3.9.1 Application (1) This code applies to accepted development and assessable development identified as requiring assessment against the Industry uses code by the tables of

More information

Annex F Scoping Checklist

Annex F Scoping Checklist Scoping Checklist Table F1: Scoping Checklist Table. Questions to be considered in Scoping /? Which Characteristics of the Project 1. Will construction, operation or decommissioning of the Project involve

More information

(1) Site Suitability PURPOSE

(1) Site Suitability PURPOSE 3.3 Code for Development and Use of Rural Service Industries PURPOSE This purpose of this code is to encourage the development and use of suitable rural service industries on rural, industrial or suitable

More information

505 Ipswich Road (Betts Factory), Colchester Planning Application Environmental Statement: Volume 3: Non-Technical Summary

505 Ipswich Road (Betts Factory), Colchester Planning Application Environmental Statement: Volume 3: Non-Technical Summary Lands Improvement Holdings Colchester S.á.r.l 505 Ipswich Road (Betts Factory), Colchester Planning Application Environmental Statement: Volume 3: Non-Technical Summary COLC-DOC-GLB-ACC-ES-001 QUALITY

More information

6.0 CONSTRUCTION PROGRAMME

6.0 CONSTRUCTION PROGRAMME 6.0 CONSTRUCTION PROGRAMME Introduction 6.1 This chapter of the ES describes the expected construction works programme and the key activities that will be undertaken. Detailed consideration of potential

More information

Port of Hull Local Development Order

Port of Hull Local Development Order Port of Hull Local Development Order Integrated Environmental Assessment Non Technical Summary March 2012 Final Prepared for: Hull City Council UNITED KINGDOM & IRELAND REVISION SCHEDULE Rev Date Details

More information

Town & Country Planning Act 1990

Town & Country Planning Act 1990 Town & Country Planning Act 1990 Your Ref: 17/0411/OUT Proposed Development at Gwern y Domen by PMG Ltd and Persimmon Homes Ltd I of am against the proposed development for a number of reasons which are

More information

Western Rail Link to Heathrow (WRLtH) Environmental Impact Assessment: Preliminary Environmental Information Report Non Technical Summary March 2018

Western Rail Link to Heathrow (WRLtH) Environmental Impact Assessment: Preliminary Environmental Information Report Non Technical Summary March 2018 March 1.11 Cumulative effects...19 1.12 Summary of next steps...20 References...22 List of abbreviations...23 Glossary...24 List of Figures Figure 1.1A Proposed Scheme...4 List of Tables Table NTS1.1:

More information

B1: THE MAIN PROVISIONS OF THE PLANNING REGIME

B1: THE MAIN PROVISIONS OF THE PLANNING REGIME HIGH SPEED TWO INFORMATION PAPER B1: THE MAIN PROVISIONS OF THE PLANNING REGIME This paper outlines the main provisions of the planning regime proposed for Phase One of the HS2 project. It will be of particular

More information

This summary and the Report subsequently inform the recommended mitigation contained in Section 28 and will inform the Project conditions.

This summary and the Report subsequently inform the recommended mitigation contained in Section 28 and will inform the Project conditions. 18. Air The Project Air quality team prepared an Air Quality Assessment Report for the Project, which is included in Volume 3 (Part 1). The Report provides an assessment of air quality effects associated

More information

Draft Noise Abatement Guidelines

Draft Noise Abatement Guidelines Document under Separate Cover refer to IMLC01-13 Draft Noise Abatement Guidelines April 2013 Legislative & Planning Services Table of Contents 1.0 Introduction...1 1.1 Key Definitions...1 2.0 Existing

More information

Leaside to Main Infrastructure Refurbishment Project Strengthening the transmission system in your neighbourhood

Leaside to Main Infrastructure Refurbishment Project Strengthening the transmission system in your neighbourhood Leaside to Main Infrastructure Refurbishment Project Strengthening the transmission system in your neighbourhood Purpose of this Public Information Centre Provide you with an update on Hydro One s infrastructure

More information

Rural Living Environment

Rural Living Environment 1 RLE.1 Rural Living Environment RLE.1.1 Description & Expectations The Rural Living Environment (RLE) covers rural areas within the District that are either already characterised by lifestyle activities

More information

Working on flood embankments: Essential environmental considerations

Working on flood embankments: Essential environmental considerations Working on flood embankments: Essential environmental considerations Information for project managers, engineers and contractors When undertaking any work on or adjacent to coastal and estuarine flood

More information

Park Place, Canary Wharf Canary Wharf Investments Limited PP-OPA.07. Environmental Statement BDP. September 2013

Park Place, Canary Wharf Canary Wharf Investments Limited PP-OPA.07. Environmental Statement BDP. September 2013 PP-OPA.07. September 2013 Environmental Statement Non-Technical Summary (Outline Planning Application) BDP Park Place, Canary Wharf Canary Wharf Investments Limited ES NON TECHNICAL SUMMARY INTRODUCTION

More information

ENVIRONMENTAL IMPACT STATEMENT METRO NORTH BELINSTOWN TO SWORDS STOP AREA MN101 VOLUME 2 BOOK 1 OF 7

ENVIRONMENTAL IMPACT STATEMENT METRO NORTH BELINSTOWN TO SWORDS STOP AREA MN101 VOLUME 2 BOOK 1 OF 7 ENVIRONMENTAL IMPACT STATEMENT METRO NORTH BELINSTOWN TO SWORDS STOP AREA MN101 VOLUME 2 BOOK 1 OF 7 ENVIRONMENTAL IMPACT STATEMENT For ease of local identification this Environmental Impact Statement

More information

It will be of particular interest to those potentially affected by the Government s proposals for high speed rail.

It will be of particular interest to those potentially affected by the Government s proposals for high speed rail. HIGH SPEED TWO INFORMATION PAPER E8: ARCHAEOLOGY This paper outlines HS2 Ltd's approach to assess and reduce as far as reasonably practicable the impact on archaeological remains that could result from

More information

store for Buckshaw Village and Euxton

store for Buckshaw Village and Euxton A new Aldi food store for Buckshaw Village Aldi, the premium discount food retailer, with local developer Primrose Holdings, is proposing to develop land off Ordnance Road,. The site is currently vacant

More information

Environmental Statement Non Technical Summary. Liverpool Waters September 2010

Environmental Statement Non Technical Summary. Liverpool Waters September 2010 Environmental Statement Non Technical Summary Liverpool Waters September 2010 Contents Section A Introduction Part 1 Background Part 2 Environmental Assessment Part 3 Site Description Section B The Proposals

More information

High Speed Rail (London- West Midlands)

High Speed Rail (London- West Midlands) High Speed Rail (London- West Midlands) Draft Environmental Minimum Requirements Annex 4: Draft Environmental Memorandum November 2013 ESA 4.2 High Speed Rail (London- West Midlands) Draft Environmental

More information

Sustainable design and construction

Sustainable design and construction Sustainable design and construction efficiency Waste Water Materials Ecology & biodiversity Health & wellbeing Extensive green roof for habitat diversity Accessible private outdoor space - balconies, wintergardens

More information

Environmental Assessment Matrix

Environmental Assessment Matrix For FCC Use Only Date: Customer Name: Environmental Assessment Matrix Loan Number: Please complete each question. Some answers may require additional information. Attach additional documentation where

More information

Assessment of Landfill Footprint Alternatives West Carleton Environmental Centre. Option #4 Impact on Agriculture

Assessment of Landfill Footprint Alternatives West Carleton Environmental Centre. Option #4 Impact on Agriculture Assessment of Landfill Footprint Alternatives Figure 422 99 Option #4 Impact on Agriculture The net effects with respect to continued service to customers, the optimized site life/ capacity is 65 million

More information

Ibsa House, The Ridgeway, London, NW7 1RN

Ibsa House, The Ridgeway, London, NW7 1RN LOCATION: Ibsa House, The Ridgeway, London, NW7 1RN REFERENCE: H/00807/14 Received: 17 February 2014 Accepted: 27 February 2014 WARD: Mill Hill Expiry: 29 May 2014 APPLICANT: IBSA Final Revisions: PROPOSAL:

More information

SEARs project justification and conclusion

SEARs project justification and conclusion 31 Project justification and conclusion This chapter presents a justification for the project and a conclusion to the environmental impact statement (EIS). The justification is based on the strategic need

More information

M6 J16-19 Smart Motorway. Kate Beirne Highways England Michael Robinson Jacobs Julian Wilson Carillion Kier JV

M6 J16-19 Smart Motorway. Kate Beirne Highways England Michael Robinson Jacobs Julian Wilson Carillion Kier JV M6 J16-19 Smart Motorway Kate Beirne Highways England Michael Robinson Jacobs Julian Wilson Carillion Kier JV Introduction Scheme Update Progress Current Status Delivery timescales Environment Construction

More information

9. NOISE AND VIBRATION

9. NOISE AND VIBRATION 9. NOISE AND VIBRATION 9.1 Introduction 9.1.1 This Chapter details the existing baseline noise and vibration levels together with assessments of the suitability of the site for residential and commercial

More information

Air Quality. Executive Summary

Air Quality. Executive Summary Air Quality Executive Summary Air quality adjacent to the Scheme is currently good with low background concentrations of air pollutants. However, there are areas within Cambridge city centre which currently

More information

Rossington Mixed Use Development Harworth Estates. Environmental Statement Non Technical Summary

Rossington Mixed Use Development Harworth Estates. Environmental Statement Non Technical Summary Rossington Mixed Use Development Harworth Estates Environmental Statement Non Technical Summary ReportAuthor...JennyRay/JenAshworth ReportDate...April2012 ProjectNumber...3389 DocumentReference...P0TPSPARPP33890018A

More information

ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS. Beaver Bank Bypass

ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS. Beaver Bank Bypass ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS Beaver Bank Bypass Highway 101 to the Beaver Bank Road Halifax County, NS NOVA SCOTIA DEPARTMENT OF THE ENVIRONMENT

More information

Design and Access Statement

Design and Access Statement Design and Access Statement Environmentally responsible housing Queens Road, Stourbridge Black Country Housing Association Kier Partnership Homes Axis Design Collective January 2007 The following design

More information

6 Risk assessment methodology

6 Risk assessment methodology Risk assessment methodology 6 Risk assessment methodology 6.1 Introduction INPEX has committed to a systematic risk assessment process as a means of achieving best practice in environmental management

More information

Environment Agency. Title. POI / Status: For File Storage / Archive Doc Title: Exeter Phase 1 NTS

Environment Agency. Title. POI / Status: For File Storage / Archive Doc Title: Exeter Phase 1 NTS Doc Ref: Exeter_FDS_Non_Technical_Summary_Phase_1_Final_Volume_1[1] Exeter Flood Defence Scheme, Phase 1 Volume 1: Non-technical Summary Reference number/code Environment Agency [Sector Code] Title We

More information

Environmental Policy and Guide December 2010

Environmental Policy and Guide December 2010 Environmental Policy and Guide December 2010 Page 1 of 11 ENVIRONMENTAL POLICY A responsible and forward-looking approach to environmental issues is an important factor in Intu Properties plc s continuing

More information

28 JULY 2015 PLANNING COMMITTEE. 5i 14/1315 Reg d: Expires: Ward: OW. of Weeks on Cttee Day:

28 JULY 2015 PLANNING COMMITTEE. 5i 14/1315 Reg d: Expires: Ward: OW. of Weeks on Cttee Day: 5i 14/1315 Reg d: 25.11.2014 Expires: 29.04.15 Ward: OW Nei. Con. Exp: 14.01.15 BVPI Target Minor (13) Number of Weeks on Cttee Day: 21/8 On Target? No LOCATION: PROPOSAL: TYPE: London House, 134 High

More information

Report for Agenda Item: 2

Report for Agenda Item: 2 QLDC Council 28 September 2017 Department: Planning & Development Report for Agenda Item: 2 Stage 2 Proposed District Plan Notification Purpose The purpose of this paper is to present those parts of Stage

More information

LINCOLNSHIRE LAKES. Environmental Statement Volume 3 - Non-Technical Summary

LINCOLNSHIRE LAKES. Environmental Statement Volume 3 - Non-Technical Summary LINCOLNSHIRE LAKES Environmental Statement Volume 3 - Non-Technical Summary August 2013 Quality Management Issue/revision Issue 1 Revision 1 Revision 2 Revision 3 Remarks Ver_1 Final Date August 2013 August

More information

22 SPECIAL ACTIVITY ZONE RULES

22 SPECIAL ACTIVITY ZONE RULES 22 SPECIAL ACTIVITY ZONE RULES Activities Tables Policies 3.4.1, 8.4.1, 8.4.4, 16.4.3 22.1 Subdivision Activities Subdivision excluding unit title subdivision Subdivision which complies with the standards

More information

Rural-Residential Rural-Residential Explanatory Statement Significant Issues Objectives and Policies...

Rural-Residential Rural-Residential Explanatory Statement Significant Issues Objectives and Policies... Section Contents Rural-Residential... 2 16. Rural-Residential... 2 Explanatory Statement... 2 16.1 Significant Issues... 2 16.2 Objectives and Policies... 3 16.3 Activity Lists... 3 16.4 Activity Performance

More information

407 TRANSITWAY. Planning & Preliminary Design

407 TRANSITWAY. Planning & Preliminary Design FROM EAST OF HIGHWAY 400 TO KENNEDY ROAD GWP #252-96-00 Public Information Centre #2 June 24 th and 29 th, 2010 Purpose of Public Information Centre #2 The first Public Information Centre (PIC #1) was

More information

Newhurst Energy Recovery Facility, Shepshed, Leicestershire. Proposed modifications to the approved design. Volume 3 NON TECHNICAL SUMMARY

Newhurst Energy Recovery Facility, Shepshed, Leicestershire. Proposed modifications to the approved design. Volume 3 NON TECHNICAL SUMMARY Newhurst Energy Recovery Facility, Shepshed, Leicestershire Proposed modifications to the approved design Volume 3 NON TECHNICAL SUMMARY July 2014 SLR Ref: 403.04097.00005 Biffa Waste Services Limited

More information

Guardbridge Energy Centre. Environmental Statement Volume 1: Non-Technical Summary (NTS)

Guardbridge Energy Centre. Environmental Statement Volume 1: Non-Technical Summary (NTS) Volume 1: Non-Technical Summary (NTS) July 2014 University of St. Andrews Contents 1 Introduction 1 1.1 Purpose of the NTS 1 1.2 Viewing the NTS 1 1.3 Commenting on the Application 1 1.4 About the Applicant

More information

SUTTON ESTATE, CHELSEA ENVIRONMENTAL STATEMENT JULY 2015 Volume I - Non-Technical Summary

SUTTON ESTATE, CHELSEA ENVIRONMENTAL STATEMENT JULY 2015 Volume I - Non-Technical Summary SUTTON ESTATE, CHELSEA ENVIRONMENTAL STATEMENT JULY 2015 Volume I - Environmental Statement Volume 1 Sutton Estate, Chelsea Project no: KU048600 Document title: Environmental Statement Volume 1 - Revision:

More information

Introduction. The Need for Wind Energy. Consultation. The Applicant

Introduction. The Need for Wind Energy. Consultation. The Applicant Introduction Peel Wind Farms (UKC) Ltd (Peel) propose to construct a wind farm on an area of land that forms part of the former Asfordby mine and tip site and part of the existing Asfordby Business Park

More information

12 Oct Virama Karya presentation on South Coast Highway. Therefore require a new route expressway

12 Oct Virama Karya presentation on South Coast Highway. Therefore require a new route expressway in association with Design 151.66 Km (Existing Road Apr. 180 km) 2 OBJECTIVE: The Government of Timor Lestewishes to Engage Consultant to carry out the Preliminary, Detailed Engineering Design and Environment

More information

4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES. Negative or adverse impacts during the construction phase are:

4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES. Negative or adverse impacts during the construction phase are: 4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES 4.1 POTENTIAL ENVIRONMENTAL IMPACTS 4.1.1 Impacts during Construction Phase Negative or adverse impacts during the construction phase are: Land environment:

More information

We re going to look at why earlier consideration is better.

We re going to look at why earlier consideration is better. 1 2 3 4 We re going to look at why earlier consideration is better. Another way to think of this is exploiting the comparison of analysis and goals to find synergies, but nobody wants to think like that.

More information

Environmental Guideline on Stone crushing plant set up temporarily for the purpose of a project by a public department

Environmental Guideline on Stone crushing plant set up temporarily for the purpose of a project by a public department 2017 [Type a quote from the document or the summary of an interesting point. You can position the text box anywhere in the document. Use the Drawing Tools tab to change the formatting of the pull quote

More information

Welcome To Our Exhibition

Welcome To Our Exhibition Welcome To Our Exhibition Welcome to the exhibition of our proposals for a Waste Recycling and Renewable Energy Facility Distributed Renewable Energy Networks Ltd (DRENL) propose to develop a 10MW Waste

More information

Division 8 Intensive Animal Husbandry Code

Division 8 Intensive Animal Husbandry Code Division 8 Intensive Animal Husbry Code 12.8.1 Intensive Animal Husbry Code (1) The provisions in this division comprise the Intensive Animal Husbry Code. (2) They are compliance with the Intensive Animal

More information

USE OF LONG TERM MONITORING DATA FOR DEFINING BASELINE SOUND LEVELS

USE OF LONG TERM MONITORING DATA FOR DEFINING BASELINE SOUND LEVELS 23 rd International Congress on Sound & Vibration Athens, Greece 10-14 July 2016 ICSV23 USE OF LONG TERM MONITORING DATA FOR DEFINING BASELINE SOUND LEVELS Chris Skinner, Paul Shields and Yuyou Liu AECOM,

More information

B-2 COMMUNITY COMMERCIAL BUSINESS DISTRICT. Uses allowed in the B-2 Community Commercial Business District are subject to the following conditions:

B-2 COMMUNITY COMMERCIAL BUSINESS DISTRICT. Uses allowed in the B-2 Community Commercial Business District are subject to the following conditions: SECTION 46-53.1 B-2 COMMUNITY COMMERCIAL BUSINESS DISTRICT A. PURPOSE The B-2 Community Commercial Business District is oriented toward retail, service businesses and multi-family residential development.

More information

H2. Residential Rural and Coastal Settlement Zone

H2. Residential Rural and Coastal Settlement Zone H2. Residential Rural and Coastal Settlement Zone H2.1. Zone description The Residential Rural and Coastal Settlement Zone applies to rural and coastal settlements in a variety of environments including

More information

13 Section 32 Summary for the Residential Chapter

13 Section 32 Summary for the Residential Chapter 13 Section 32 Summary for the Residential Chapter The purpose of this section is to present a summary of the evaluation of the objectives, policies and methods of the Residential Zone Chapter of the Proposed

More information

Screening for Appropriate Assessment Proposed residential development at Slievekeale, Waterford City. 13 April 2018

Screening for Appropriate Assessment Proposed residential development at Slievekeale, Waterford City. 13 April 2018 Proposed residential development at City 13 April 2018 NM Ecology Ltd Consultant Ecologists 276 Harold s Grange Road, Dublin 16 Website: www.nmecology.com Email: info@nmecology.com Tel: 087 6839771 Executive

More information

Babergh & Mid Suffolk Joint Local Plan: Sustainability Appraisal. August 2017

Babergh & Mid Suffolk Joint Local Plan: Sustainability Appraisal. August 2017 Babergh & Mid Suffolk Joint Local Plan: Sustainability Appraisal August 2017 Contents NON TECHNICAL SUMMARY... 1 CHAPTER 1 INTRODUCTION... 2 Table 1: Stages of SA/SEA production... 2 Table 2: Statutory

More information

VIRIDOR WASTE MANAGEMENT ARDLEY EFW PLANT EP APPLICATION - NON TECHNICAL SUMMARY

VIRIDOR WASTE MANAGEMENT ARDLEY EFW PLANT EP APPLICATION - NON TECHNICAL SUMMARY VIRIDOR WASTE MANAGEMENT ARDLEY EFW PLANT EP APPLICATION - NON TECHNICAL SUMMARY S1014-0340-0008MPW NTS Rev1.doc Print Date 19 February 2009 ISSUE NUMBER 1 DATE 19/02/09 AUTHOR CHECKED MPW SMO Title Page

More information

SOUTH EAST LINCOLNSHIRE LOCAL PLAN: HOUSING PAPER OLD LEAKE (JUNE 2016)

SOUTH EAST LINCOLNSHIRE LOCAL PLAN: HOUSING PAPER OLD LEAKE (JUNE 2016) SOUTH EAST LINCOLNSHIRE LOCAL PLAN: HOUSING PAPER OLD LEAKE (JUNE 2016) 1 OLD LEAKE S PLACE IN THE SPATIAL STRATEGY 1.1 Policy 2 of the South East Lincolnshire Local Plan 2011-2036 Draft for Public Consultation

More information

Final Revisions : Retention of Trommel in existing position and raising height of acoustic fence on western side of site.

Final Revisions : Retention of Trommel in existing position and raising height of acoustic fence on western side of site. LOCATION: GBN Services Ltd, The Railway Sidings, Oakleigh Road South, London, N11 1HJ REFERENCE: B/03582/12 Received: 20 September 2012 Accepted: 27 September 2012 WARD(S): Brunswick Park Expiry: 27 December

More information

IMPORTANT (Please read this before using the checklist).

IMPORTANT (Please read this before using the checklist). PRE-ASSESSMENT ESTIMAT IMPTANT (Please read this before using the checklist). This pre-assessment checklist allows a quick evaluation of the rating, that could be achieved, under a formal BREEAM Offices

More information

Where is the Proposal?

Where is the Proposal? Where is the Proposal? Hapsford Solar Farm Proposed Layout The Hapsford Solar Farm is located on land south of Junction 14 of the M56 near Hapsford and lies to the west of the A5117. The site is located

More information

Non-Technical Summary

Non-Technical Summary RIVERSIDE RESOURCE RECOVERY FACILITY, BEXLEY SECTION 36C VARIATION APPLICATION PROPOSED OPERATIONAL EFFICIENCY IMPROVEMENTS NON-TECHNICAL SUMMARY RIVERSIDE RESOURCE RECOVERY LIMITED SEPTEMBER 2014 Introduction

More information

Auckland Transport Code of Practice 2013

Auckland Transport Code of Practice 2013 26 Corridor Access Management 26.1 Background Auckland Transport is the Road Controlling Authority and Corridor Manager for all public roads within the Auckland Region (except motorways and state highways

More information

DISTRICT OF NORTH VANCOUVER GUIDELINES FOR THE DEVELOPMENT OF CONSTRUCTION TRAFFIC MANAGEMENT PLANS

DISTRICT OF NORTH VANCOUVER GUIDELINES FOR THE DEVELOPMENT OF CONSTRUCTION TRAFFIC MANAGEMENT PLANS DISTRICT OF NORTH VANCOUVER GUIDELINES FOR THE DEVELOPMENT OF CONSTRUCTION TRAFFIC MANAGEMENT PLANS Construction Impact Mitigation Strategy Guidelines for Major Developments The District of North Vancouver

More information

North Terminal Development Projects. Environmental Statement. Non-Technical Summary July London. BAA Gatwick

North Terminal Development Projects. Environmental Statement. Non-Technical Summary July London. BAA Gatwick North Terminal Development Projects Environmental Statement Non-Technical Summary July 2009 London BAA Gatwick Gatwick Airport North Terminal Development Projects Non-Technical Summary Date: July 2009

More information

Ardersier Wastewater Treatment Works

Ardersier Wastewater Treatment Works Ardersier Wastewater Treatment Works Environmental Statement: Non-Technical Summary March 2010 Scottish Water Ardersier Wastewater Treatment Works 251886 SNI INV ES 021 10 March 2010 Environmental Statement:

More information

OPERATION PHASE: ENVIRONMENTAL MANAGEMENT PROGRAMME

OPERATION PHASE: ENVIRONMENTAL MANAGEMENT PROGRAMME OPERA PHASE: ENVIRONMENTAL MANAGENT PROGRAMME 1. OBJECTIVE The overall goal for the Environmental Programme (O) is to ensure that the operation of the wind energy facility (WEF) does not have unforeseen

More information

H3. Residential Single House Zone

H3. Residential Single House Zone H3. Residential Single House Zone H3.1. Zone description The purpose of the Residential Single House Zone is to maintain and enhance the amenity values of established residential neighbourhoods in number

More information

WELCOME & PURPOSE. Overford Farm, Wytham - Conversion of Outbuildings to Form Dwellings. Welcome - we are delighted you are attending the event today.

WELCOME & PURPOSE. Overford Farm, Wytham - Conversion of Outbuildings to Form Dwellings. Welcome - we are delighted you are attending the event today. WELCOME & PURPOSE 1 Welcome - we are delighted you are attending the event today. The property at Overford Farm has been within the ownership of the University of Oxford since 1943 when it was acquired

More information

RMB Chivenor Flood Defence Scheme. Non-Technical Summary FINAL. Version 3.0

RMB Chivenor Flood Defence Scheme. Non-Technical Summary FINAL. Version 3.0 RMB Chivenor Flood Defence Scheme Non-Technical Summary FINAL Version 3.0 RMB CHIVENOR FLOOD DEFENCE SCHEME ENVIRONMENTAL STATEMENT CONTENTS 1 INTRODUCTION AND BACKGROUND II 2 THE PROPOSED PROJECT III

More information

Appendix H Mitigation Monitoring Plan

Appendix H Mitigation Monitoring Plan Appendix H Mitigation Monitoring Plan Appendix H No. Impact/Mitigation Measure Implementation & Monitoring 1. Traffic and Transportation Impacts All traffic control plans and mitigation measures, prepared

More information

APPENDIX: GLOSSARY OF TERMS

APPENDIX: GLOSSARY OF TERMS Affordable Housing Amenity Zone Area Source Best Management Practices (BMPs) Biodiversity Brownfield Business Improvement District (BID) Certified Local Government Community Activity Area Community Development

More information

TES Industrial Development SW ¼ SEC Lacombe County Outline Plan

TES Industrial Development SW ¼ SEC Lacombe County Outline Plan TES Industrial Development Lacombe County Outline Plan 112849297 June 2012 am v:\1128\active\112849297\07_reports_studies\rpt_tes_20120508.doc i Table of Contents 1.0 INTRODUCTION... 1 1.1 PURPOSE... 1

More information

RURAL LIVING AREAS Rural Living Areas Rural Lifestyle and Rural Residential 8.1 Issues, Objectives and Policies

RURAL LIVING AREAS Rural Living Areas Rural Lifestyle and Rural Residential 8.1 Issues, Objectives and Policies . Rural Living Areas Rural Lifestyle and Rural Residential.1 Issues, Objectives and Policies.1.1 Resource Management Issues Discussion of additional relevant issues is found in the following Parts of the

More information

D2: SELECTION OF THE LOCATION OF CONSTRUCTION COMPOUNDS

D2: SELECTION OF THE LOCATION OF CONSTRUCTION COMPOUNDS HIGH SPEED TWO INFORMATION PAPER D2: SELECTION OF THE LOCATION OF CONSTRUCTION COMPOUNDS This paper outlines the range of construction compounds and the criteria used to select them for Phase One of HS2.

More information

Bechstein s Bat. An introduction for woodland owners 2nd edition Bat Conservation Trust

Bechstein s Bat. An introduction for woodland owners 2nd edition Bat Conservation Trust Bat Conservation Trust Bechstein s Bat An introduction for woodland owners 2nd edition 2013 1 2 3 4 5 Introduction Bechstein s bat Roosting behaviour Habitat requirements Key issues to consider 6 Can I

More information