July 2015 Product Certification Body under BDS EN ISO/IEC 17065:2012. January 2010 Registration of the company
|
|
- Tyler Garrison
- 6 years ago
- Views:
Transcription
1
2 January 2010 Registration of the company November 2011 Starting aproval and registartion in NANDO September 2013 Designated Body for conformity assessment of the rail subsystems or a part thereof with the requirements of the National Safety Rules and the National Technical Rules July 2015 Product Certification Body under BDS EN ISO/IEC 17065:2012 September 2010 Application to the Railway Executive Agency to be registered as a NoBo July 2012 Registration in NANDO per NB 2387 as per Directive 2008/57 ЕC of the European Parliament and of the Council of 17 June 2008 on the interoperability of the rail system within the Community May2015 Inspection body under BDS EN ISO/IEC 17020:2012 May 2015 Full member of NB RAIL Association November 2015 Assessment Body for Independent Safety assessment, according to Commission Implementing Regulation (EU) No 402/
3 ISO 9001:2008 Certificate. OHSAS 18001:2007 Certificate. BDS EN ISO/IEC 17065:2012 Certificate of Accreditation as Product Certification Body issued by the Bulgarian Accreditation Service Executive Agency. BDS EN ISO/IEC 17020:2012 Certificate of Accreditation as Type A Inspection Body issued by the Bulgarian Accreditation Service Executive Agency. Permit No.1/ for Notified body. Permit No.002-1/ for Designated body. Certificate of Assessment Body for Independent Safety assessment, according to Commission Implementing Regulation (EU) No 402/2013. NANDO Notification. 3
4 Our European position! NB 2387
5 EO Assessment and verification of the interoperability and issuing of EC Certificate of Verification of the Trans- European rail system Conformity assessment and issuing of Certificate of verification to the Notified National Rules, in accordance with Article 17, Para.3 of Directive 2008/57/EC Infrastructure Subsystem (INF CR) Safety of Railway Tunnels Aspect (SRT) Persons with Reduced Mobility Aspect (PRM) Energy Subsystem (ENE CR) Control-Command and Signaling On-board and Track-side Subsystem (CCS CR) Independent safety and risk assessment under the Regulation 352 and Regulation 402 Infrastructure Energy CCS Rolling Stocks Infrastructure Subsystem (INF CR) Safety of Railway Tunnels Aspect (SRT) Persons with Reduced Mobility Aspect (PRM) Energy Subsystem (ENE CR) Control-Command and Signaling On-board and Track-side Subsystem (CCS CR) Locomotives and Self-Propelled Rail Vehicles Wagons (in process of the application) Railway products certification BDS EN ISO/IEC 17065:2012 5
6 Track inspection and measuring of geometrical parameters of the railway track and video surveillance Accredited Inspection Body, type A Certificate of Accreditation No. 182 OKA, issued by the Bulgarian Accreditation Service Executive Agency. Track measuring car PLASSER & THEURER ЕМ-120 6
7 Rolling stock Break tests Electromagnetic compatibility Train construction Production Monitoring Maintenance optimization Workshops optimization Independent risk and safety assessment under the Regulation 352 and Regulation 402 7
8 Human Resource Management Trainings Human resources analysis and audits Strategic framework for human capital management and development Strategic planning Organizational framework Technical and operational railway trainings Management trainings 8
9 NB-RAIL Coordination Group of Notified Bodies for Directive 2008/57/EC on Railway Interoperability 9
10 NB-RAIL Coordination Group of Notified Bodies for Directive 2008/57/EC on Railway Interoperability - according to Article 44 of IOD, the Commission shall ensure appropriate coordination and cooperation between bodies notified under this Directive through the establishment of a sectoral group of notified bodies. - the European coordination group set up by the Commission according to Article 44 of the Interoperability Directive (EU) 2016/797 to discuss any questions concerning the evaluation s procedure for IC and Subsystems, including the application of TSIs 10
11 Four Subgroups: ERTMS (six meetings year) RST (three meetings year) ENE (three meetings year) INF (three meetings year) One group to coordinate all the documents drafted by the subgroups: Strategy group (three meetings year) One decision group: Plenary meeting (three meetings year) 11
12 ERA is represented in all our NBRail coordination groups: Technical groups Strategy group Plenary meeting Other representation in Plenary meetings of NBRail: Member State representatives DG MOVE CEN/CENELEC 12
13 Infrastructure Energy CCS-OB CCS-TS Rolling Stocks Telematic applications Maintenance Operation and traffic management 13
14 Independent Safety Assessment in compliance with CENELEC EN 50129, EN and EN
15 Testing under static and dynamic load. Determining the actual stress and strain state of the design in constructing and operating state and under the influence of test load. Conformity assessment of bridges to the calculations in the design for live action testing, and conformity with the requirements of the "Methodology for live action test of railway bridges for normal (1435 mm) tracks" NRIC. 15
16 Control measurements of the railway gauge with laser laboratory Chevrolet. 16
17 Measuring dynamic impact between pantograph and new catenary, according to the requirements of the TSI Energy 2011/274/EC and the standard EN50317:
18 Provide electromagnetic compatibility tests regarding the asessment of electromagnetic impact of traction and nontraction roling stock over the track-side signaling equipment (axle counters and track circuits). 18
19 Static and dynamic break tests of rolling stock Static strength and dynamic shock tests of freight wagons Testing of interoperability constituent of the break system of rolling stock including stands and installations for quality control of the repair and maintenance Testing of the interoperability constituent of wagons- freight and passenger Testing of systems and components for fixing goods. Check rigs and equipment for quality control in the production and repair of elements of railway wagons. Train construction inspections Checks on the fire systems. Checks on power systems, lighting, heating and ventilation, bathrooms, etc. 19
20 Railway Components Tests European Vital Computer (EVC) according to the requirements of Subset-026, Subset076 and Subset-094, Eurobalises and Balise Transmission Module (BTM), according to Subset-036 and Subset-085 Track/Train Compatibility Validation: provide for early detection of problems in the validation of track/train compatibility based on design data, operational and technical rules, etc. Maintenance solutions: provide software and hardware tools for analysing signal quality of balises; services and testing options to upgrade railway infrastructure to newer version standards (baselines). 20
21 ERTMS Railway Laboratory - Sofia Tech Park
22 ERTMS Railway Laboratory - Sofia Tech Park I_loop [dbma] An example of measurements done and how they are reported: Balise I/O characteristics to measure the overall UPLINK signal level versus TELEPOWERING FLUX INTENSITY: Hysteresis sometime occurs like in the figure at the right alerting over possible excessive capacitive load which might impact on other tests like the BALISE START-UP TIME. BALISE I/O CHARACTERISTIC (db) Flux [dbnvs] UPLINK1 UPLINK2 LOWER LIMIT UPPER LIMIT
23 ERTMS Railway Laboratory - Sofia Tech Park
24 ERTMS Railway Laboratory - Sofia Tech Park
25 ERTMS Railway Laboratory - Sofia Tech Park
26 ERTMS Railway Laboratory - Sofia Tech Park According to Subset-036 all bits of a telegram must be valid. This test is not present in Subset-085, but are verified in the present lab: - Previous bits - Succeeding bits validity are checked. Slow TP slope represent a problem for most suppliers. This test is not present in Subset-085, but are verified in the present lab.
27 ERTMS Railway Laboratory - Sofia Tech Park
28 ERTMS Railway Laboratory - Sofia Tech Park
29 ERTMS Railway Laboratory - Sofia Tech Park
30 ERTMS Railway Laboratory - Sofia Tech Park The turnout is in the wrong direction. The train will stop. Safety issue : Anomaly on the track. Route supervision with linking.
31 ERTMS Railway Laboratory - Sofia Tech Park The driver does not brake when reaching turnout. EVC applies automatically Service/Emergency brakes. Safety issue : Good configuration of messages in balises
32 ERTMS Railway Laboratory - Sofia Tech Park
33 ERTMS Railway Laboratory - Sofia Tech Park
34 ERTMS Railway Laboratory - Sofia Tech Park
35 35 PROJECTS REFERENCE LIST Verification and assessment of the interoperability of the railway infrastructure, built during the implementation of the project Construction of a new combined (road and railway) bridge over Danube river at Vidin Calafat. EC verification and assessment for the site Rehabilitation of the railway infrastructure along sections of the Plovdiv Burgas railway line, Lot 1: Rehabilitation of the railway section Mihaylovo Kaloyanovets, including the main tracks in the stations of Mihaylovo Kaloyanovets with approximate track length 21 km. EC verification and conformity assessment for interoperability for the site Design and build of signalling systems in the Septemvri Plovdiv railway section and telecommunications in the Sofia Plovdiv railway section. Verification and assessment to be also performed against the National Safety Rules and the National Technical Rules.
36 36 EC verification and conformity assessment for interoperability for the site Design and build of signalling systems in the Septemvri Plovdiv railway section and telecommunications in the Sofia Plovdiv railway section. Verification and assessment to be also performed against the National Safety Rules and the National Technical Rules. EC verification and conformity assessment for interoperability for the site Design and build of signalling systems in the Septemvri Plovdiv railway section and telecommunications in the Sofia Plovdiv railway section. Verification and assessment to be also performed against the National Safety Rules and the National Technical Rules. EC verification and conformity assessment for interoperability for Modernization of the railway section Septemvri-Plovdiv part of the trans-european Rail Network part Lot 3 Modernization of the Railway Section Stamboliyski - Plovdiv.
37 ЕО verification and conformity assessment of railway infrastructure in execution of Project Reconstruction and electrification of railway Plovdiv Svilengrad: rail line from km between stations Yabalkovo-Dimitrovgrad to km ; between stations Svilengrad Turkish border; and from Svilengrad station to the Greek border, with approximate total railway length of 74 km, as well as the signaling and telecommunication systems for the entire rail line Plovdiv-Svilengrad-Turkish/Greek border"". Verification and assessment to be also performed against the National Safety Rules and National Technical Rules. 37 ЕО verification and conformity assessment of the project "Construction of the intermodal terminal in Sought-Central planning region in Bulgaria- Plovdiv. Verification and assessment to be also performed against the National Safety Rules and National Technical Rules. EC verification and assessment for the site Rehabilitation of the railway infrastructure along sections of the Plovdiv Burgas railway line, Lot 2: Stara Zagora-Zavoj (to km ) and Zavoj Zimnitca (from km to input switch of Zimnitsa), including main lines in stations Stara Zagora and Yambol and all stations and stops with approximately length of 120 km
38 38 ЕC verification and conformity assessment for interoperability for the Project in Alexandroupoli, Greece Contract implementation Employer: SIDERODROMIKA ERGA S.A., Greece Contractor: TINSA Ltd. Assessed subsystems: Energy, Infrastructure Module: SH1
39 39 EC verification tasks in connection with the project «EARTHWORKS AND STRUCTURES OF THE RAILWAY LINK OF THE PORT OF N. IKONIO WITH THE RAILWAY NETWORK. SECTION FROM CH (ENTRANCE OF CUT & COVER NATO) UNTIL THE END INCLUDING: THE SECTION FROM CH TO CH (ALIGNMENT DEVIATION AT LANDSLIDE AREA), DAFNI BRIDGE, THE SUPERSTRUCTURE-SIGNALLING- TELECOMMAND, E/M WORKS OF TUNNELS AND INSTALLATIONS AT THE PORT» (A.D. 463) EC verification and conformity assessment of the Thriasio rail freight terminal in Greece Employer: AKTOR S.A. Contractors: RINA Services S.p.A ТINSA Ltd THALES CONSULTANTS Assessed subsystems: Energy, Infrastructure,CCS Module: SH1
40 40
41 41 THANK YOU!
SIS Directory Accreditation number: SIS 0130
International standard: ISO/IEC 17020:2012 Swiss standard: SN EN ISO/IEC 17020:2012 SCONRAIL AG Zürcherstrasse 41 8400 Winterthur Head: Heiko Germroth Responsible for MS: Heiko Germroth Telephone: +41
More information1 Introduction. 2 Abbreviations and Definitions
1 Introduction This Guideline is intended to give guidance and explanation on the related European legal provisions for the Certification of ECMs. It cannot replace additional self study of the applicable
More informationRailway interoperability. Academic perspective
Railway interoperability. Academic perspective Ernesto García Vadillo (Prof) Department of Mechanical Engineering University of The Basque Country (UPV/EHU) Brussels, 7th May 2013 1 Contents 1. Directive
More informationUncovering the technical specifications for interoperability as determined by the ERA to harmonise European safety standards
Uncovering the technical specifications for interoperability as determined by the ERA to harmonise European safety standards München, 12.09.2012, 4 th annual Fire Protection and Safety in Tunnels Content
More informationRECOMMENDATION FOR USE RFU-CCS-077
Page 1 of 9 TITLE CERTIFICATES WITH RESTRICTIONS AND CONDITIONS FOR USE ORIGINATOR ALTRAN, CERTIFER, SINTEF, VŮŽ SUBJECT RELATED TO SUBSYSTEM CCO AND CCT DESCRIPTION AND BACKGROUND EXPLANATION Introduction
More informationThe European Framework for Vehicle Authorisation
The European Framework for Vehicle Authorisation Torben Holvad 13th Annual Fire Protection of Rolling Stock Conference, 1-2 nd March 2017, Berlin, Germany Content of presentation Brief background about
More informationGuide for the application of Technical Specifications for Interoperability (TSIs) Annex 2 Conformity assessment and EC verification
European Railway Agency Guide for the application of TSIs European Railway Agency Guide for the application of Technical Specifications for Interoperability (TSIs) Annex 2 Conformity assessment and EC
More informationRECOMMENDATION FOR USE
Page 1 of 11 CONTENT OF THE TECHNICAL FILE TITLE ORIGINATOR SUBJECT RELATED TO NB-RAIL STRATEGY SG Directive 2008/57/EC (incl. all amendments esp. 2014/106/EU), Recommendation 2014/897/EU, Decision 2010/713/EU
More informationRolling stock approval process
Rolling stock approval process Presentation to SEETO Working Group by Frank Walenberg Skopje 9 November 2010 1 Overview Need for the approval process RST approval process in the past Interoperability:
More informationPublication reference: EuropeAid/124429/D/WKS/BG. CORRIGENDUM No. 1
Publication reference: EuropeAid/124429/D/WKS/BG CORRIGENDUM No. 1 TO THE TENDER DOCUMENTS Plovdiv Svilengrad Railway Electrification & Upgrading of Corridors IV and IX Signalling, Telecommunication and
More informationQUESTION / CLARIFICATION
QUESTION / CLARIFICATION CO-ORDINATION BETWEEN NOTIFIED BODIES INTEROPERABILITY DIRECTIVE AND SUBSEQUENT AMENDMENTS ON THE INTEROPERABILITY OF THE RAIL SYSTEM WITHIN THE UNION QC-RST-015 Issue 02 Date:
More informationAssurance provided by a second pair eyes (RASBO) of the correct Safe integration by the proposer of a new or modified Rolling Stock
Quality & Safety for Systems & Software Railway Engineering Assurance provided by a second pair eyes (RASBO) of the correct Safe integration by the proposer of a new or modified Rolling Stock Ir. Marc
More informationRECOMMENDATION FOR USE
Page 1 of 10 TITLE ACCEPTANCE OF ASSESSMENT REPORTS ON SAFETY PREPARED BY OTHER PARTIES ORIGINATOR SG STR, SG CCS, SG RST SUBJECT RELATED TO ANY TSI CCS, ANY TSI RST DESCRIPTION AND BACKGROUND EXPLANATION
More information3. OBJECTIVES AND PRIORITIES:
3. OBJECTIVES AND PRIORITIES: 3.1. Priorities related to bridging missing links, removing bottlenecks, enhancing rail interoperability, and, in particular, improving cross-border sections 3.1.4. European
More informationTowards an integrated European Railway Area
Towards an integrated European Railway Area Anders Lundström Oslo, 17 October 2007 Organisation chart of the Agency n 2 The legal basis for the Agency s work The Agency s tasks and, hence, its organisational
More informationERTMS UNIT TRANS-EUROPEAN RAIL SYSTEM SUBSYSTEM CONTROL-COMMAND AND SIGNALLING
EUROPEAN RAILWAY AGENCY ERTMS UNIT Reference: ERA/ERTMS/034171 Document type: Technical Specification for Interoperability Version : final draft 1.1 Date : 13/01/2011 Edited by Quality review Approved
More information3. OBJECTIVES PURSUED BY THIS WORK PROGRAMME AND THE FUNDING PRIORITIES:
3. OBJECTIVES PURSUED BY THIS WORK PROGRAMME AND THE FUNDING PRIORITIES: 3.1.3. Rail interoperability including interoperability of the Rail Freight Corridors Priority open only to the Cohesion Member
More informationFurther information on the legislation can be found in all EU languages on EUR-LEX website:
Making the railway system work better for society. 4 th Railway Package What is the 4 th Railway Package and its technical pillar? The 4 th Railway Package is a set of legislative texts designed to complete
More informationSchedule of Accreditation issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK
2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK 17065:2012 to provide product conformity certification Gee House Holborn Hill Birmingham West Midlands B7 5PA United Kingdom Contact: Mr Chris
More informationGuide for the application of the TSI for the Subsystems Control-Command and Signalling Track-side and On-board
CCS TSI Application Making the railway system work better for society. European Union Agency for Railways for the application of the TSI for the Subsystems Control-Command and Signalling Track-side and
More informationA holistic approach for analysing the interoperability of a railway system
Sustainable Development and Planning VII 399 A holistic approach for analysing the interoperability of a railway system M. Jacyna & J. Szkopiński Faculty of Transport, Warsaw University of Technology,
More informationCatalogue of examples
Making the railway system work better for society. Examples for the practical arrangements for the vehicle authorisation process Name E. DEL RIO G.TURNER S. YOUNG Drafted by Validated by Approved by H.
More informationEurailspeed Parallel Session D.1. Carlo Carganico Director Approval and Certification, RFI
Eurailspeed Parallel Session D.1 Carlo Carganico Director Approval and Certification, RFI 1 Approval process of the Italian High Speed Railway System Eurailspeed, November 8th 2005 Carlo Carganico Issues
More informationREPUBLIC OF BULGARIA
REPUBLIC OF BULGARIA MINISTRY OF TRANSPORT, INFORMATION TECHNOLOGY AND COMMUNICATIONS AIRCRAFT, MARITIME AND RAILWAY ACCIDENT INVESTIGATION UNIT DIRECTORATE SPECIALIZED RAILWAY ACCIDENTS AND INCIDENTS
More informationGuidance for CRR Inspectors, Railway Undertakings, Infrastructure Managers and Applicants for ECM Certification. Issue Date.
CRR-G-027-B Guidance for CRR Inspectors, Railway Undertakings, Infrastructure Managers and Applicants for ECM Certification Issue Prepared by Reviewed by 2.0 Michael Neale Liam Logan Approved by Issue
More informationSWEDISH TRANSPORT AGENCY Railway Department. Approval TS JV 2009: Doc. No.: Version: Date: Approval Guidelines
SWEDISH TRANSPORT AGENCY Railway Department Approval Doc. No.: Version: Date: TS JV 2009:002 06 30.11.2010 Approval Guidelines 2 (57) REVISION INFORMATION Version Date Description of revision Created/revised
More informationTechnical considerations and business needs of 1520 mm rail in the EU
Technical considerations and business needs of 1520 mm rail in the EU Libor Lochman CER Seminar on 1435/1520 mm border questions Gdansk, 09 th October 2007 1 CER The Community of European Railway and Infrastructure
More informationTechnical document EUROPEAN UNION AGENCY FOR RAILWAYS REQUIREMENTS FOR CONFORMITY ASSESSMENT BODIES SEEKING NOTIFICA TION
Assessment EUROPEAN UNION AGENCY FOR RAILWAYS MNB - scheme 000MRA1O44 ver 1.1 Making the raflway system work better for society. F REQUIREMENTS FOR CONFORMITY ASSESSMENT BODIES SEEKING NOTIFICA TION Drafted
More informationDraft delegated act for the TSI revision
Brussels, 07 October 2016 Draft delegated act for the TSI revision 1 CER aisbl - COMMUNITY OF EUROPEAN RAILWAY AND INFRASTRUCTURE COMPANIES Avenue des Arts, 53-1000 Bruxelles T: +32 (0)2 213 08 70 F: +32
More informationGuide for the application of the CR INF TSI
European Railway Agency According to Framework Mandate C(2007)3371 final of 13/07/2007 Reference in ERA: ERA/GUI/07-2011/INT Version in ERA: 1. 00 Date: 26 August 2011 Document elaborated by Document Type:
More informationInformation on Rail Baltica Planned Procurements for the Global Project (indicative)
Information on Planned Procurements for the Global Project (indicative) 21.04.2017 No Procurement Title (English) Procurement Title (original language) Short Description of the Procurement Subject (in
More informationBiennial Report on the Progress with Railway Interoperability in the European Union
29 Biennial Report on the Progress with Railway Interoperability in the European Union Foreword This is the first report on the progress with railway interoperability in the European Union which the
More informationOPINION OF THE EUROPEAN RAILWAY AGENCY ERA/OPI/ QC-RST-015. European Railway Agency. Executive Director FOR
61 59307 European Railway Agency Executive Director OPINION ERA/OPI/2014-1 OF THE EUROPEAN RAILWAY AGENCY FOR EUROPEAN COMMISSION REGARDING QUESTION AND CLARIFICATION NB RAIL - QC-RST-015 Disclaimer: The
More informationDEPARTMENT OF NATIONAL SAFETY AUTHORITY OF GREECE ANNUAL SAFETY REPORT FOR THE YEAR 2006
DEPARTMENT OF NATIONAL SAFETY AUTHORITY OF GREECE ANNUAL SAFETY REPORT FOR THE YEAR 006 Athens April 008 1 Content A. SCOPE OF THE REPORT... 3 B. INTRODUCTORY SECTION... 3 B.1. INTRODUCTION TO THE REPORT...
More informationWorking Document ON THE INTEROPERABILITY OF THE RAIL SYSTEM WITHIN THE UNION
Page 1 of 18 TITLE CORE ELEMENTS FOR THE APPROVAL OF QUALITY MANAGEMENT SYSTEMS TO 2008/57/EC ORIGINATOR SG STRATEGY (WORKING PARTY: ARSENAL RACE BELGORAIL, LUXCONTROL, RINA) SUBJECT RELATED TO APPLIES
More informationBusiness Briefing: Interoperability. Peter Knight 2013
Business Briefing: Interoperability Peter Knight 2013 1 Purpose of this briefing To bring the recipients to a level of understanding of the Railways (Interoperability) Regulations 2011 such they can: Understand
More informationSchedule of Accreditation issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK
2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK 17065:2012 to provide product conformity certification One Cranmore Drive Shirley Solihull B90 4RZ United Kingdom Contact: Mr Jens Wolff Tel:
More informationRSC-G-009-E Guideline for the Process of Authorisation for Placing in Service of Railway Sub Systems
RSC-G-009-E Guideline for the Process of Authorisation for Placing in Service of Railway Sub Systems Guidance for RSC Inspectors, Railway Undertakings/ Infrastructure Managers and Applicants for APIS Prepared
More informationDEKRA Rail Company brochure Committed to Safety & improving Performance
DEKRA Rail Company brochure Committed to Safety & improving Performance DEKRA Rail in brief Questions we like to answer Safe assets with the required performance Do you want to use and maintain your rail
More informationERTMS the right investment for the future. EU Railway Conference Lille, 8 May 2014 Pio GUIDO, Head of ERTMS Unit
ERTMS the right investment for the future EU Railway Conference Lille, 8 May 2014 Pio GUIDO, Head of ERTMS Unit ERTMS - European determination ERTMS is a major European industrial project EU Political
More informationSchedule of Accreditation issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK
2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK Derwent House RTC London Road Derby DE24 8UP Contact: Mr Robert Dale Tel: +44 (0)1332 483811 E-Mail: louise.maw@railwayapprovals.com Website:
More informationGuide for the application of the INF TSI
European Railway Agency According to Framework Mandate C(2010)2576 final of 29/04/2010 Reference in ERA: ERA/GUI/07-2011/INT Version in ERA: 3.00 Date: 14 December 2015 Document elaborated by Document
More informationApplication note 5 Relationship of Yellow Book with European Directives
Railway Safety Management Yellow Book 4 Application note 5 Relationship of Yellow Book with European Directives Published by RSSB on behalf of the UK rail industry C:\Documents and Settings\djohnson\Desktop\KJWYBrelationshipwithEUDirectives.doc
More informationStrategic Direction for revised Infrastructure TSI. Issue 1.0
Strategic Direction for revised Infrastructure TSI Issue 1.0 Approved by the Industry Standards Coordination Committee 22 July 2011 ISCC/012 Copyright 2011 Rail Safety and Standards Board Limited Issue
More informationApplication Guide for the CSM Assessment Body in Regulation (EU) N 402/2013 and in OTIF UTP GEN-G of on the CSM for risk assessment
Regulation (EU) N 402/2013 and in UTP GEN-G 1 2 Application guide for the CSM Assessment Body referred to in Regulation (EU) N 402/2013 and in UTP GEN-G of 1.1.2014 on the Common Safety Method (CSM) for
More informationMemorandum of Understanding (MoU)
EUROPEAN COMMISSION Memorandum of Understanding (MoU) Between the European Commission and the European Railway Associations (CER UIC UNIFE EIM GSM-R Industry Group ERFA) concerning the strengthening of
More informationThis document is meant purely as a documentation tool and the institutions do not assume any liability for its contents
2008D0163 EN 24.01.2013 002.001 1 This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents B COMMISSION DECISION of 20 December 2007 concerning
More informationCEF Transport Info day 2016 Greece
Calls for proposal CEF-T 2016 CEF Transport Info day 2016 Greece Athens- 02 December 2016 Gaspare L'Episcopia- Innovation and Networks Executive Agency (INEA) Summary - - - - CEF Transport Priorities CEF
More informationKey developments in the Channel Tunnel safety rules and the wider EU framework
Key developments in the Channel Tunnel safety rules and the wider EU framework Caroline Wake Head of UK Delegation, Channel Tunnel Safety Authority September 2012 1 Channel Tunnel content of presentation
More information11 th UIC Railway Noise Workshop
11 th UIC Railway Noise Workshop NOI TSI Revision Kamil Pravdík, Project Officer NOI TSI in general Directive (EU) 2016/797 (Interoperability Directive): technical specification for interoperability (TSI)
More informationImpact of interoperability on the global railway network. L. Tordai, UIC, Paris, France
Impact of interoperability on the global railway network L. Tordai, UIC, Paris, France Introduction There are big changes happening in Europe s railways. Interoperability is already becoming a reality.
More informationINTEROPERABILITY UNIT
INTEROPERABILITY UNIT STUDIES: 1) MERGING OF HS AND CR TSIS AND 2) SPLITTING OF THE Reference: ERA/REP/13-2011/INT Document type: Report Annex 3 Version of Annex 3: Date of Annex 3: 0.2 24 November 2010
More informationWork programme of the Committee of Technical Experts for 2011 and 2012
OTIF ORGANISATION INTERGOUVERNEMENTALE POUR LES TRANSPORTS INTERNATIONAUX FERROVIAIRES ZWISCHENSTAATLICHE ORGANISATION FÜR DEN INTERNATIONALEN EISENBAHNVERKEHR INTERGOVERNMENTAL ORGANISATION FOR INTER-
More informationINTEROPERABILITY UNIT COMPLEMENTARY STUDY INTERCHANGEABLE SPARE PARTS
INTEROPERABILITY UNIT COMPLEMENTARY STUDY INTERCHANGEABLE SPARE PARTS Reference: ERA/REP/10-2011/INT Document type: Final Report Version: 3 Date: 26 September 2011 Edited by Checked by Approved by Name
More informationEuropean Railway Agency SIAFI
European Railway Agency SIAFI 2007 23.04.2007 At the beginning Establishment of the Agency The first proposal for establishment of the European Railway Agency was made by the Commission on 23 January 2002
More informationThis document is meant purely as a documentation tool and the institutions do not assume any liability for its contents
2004L0049 EN 30.07.2014 003.002 1 This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents B C1 DIRECTIVE 2004/49/EC OF THE EUROPEAN PARLIAMENT
More informationEURAILSCOUT Inspection & Analysis
EURAILSCOUT Inspection & Analysis Your reliable partner to monitor the condition of the railway infrastructure INTRODUCTION To be able to ensure rail traffic safety and reliability, it is absolutely necessary
More informationGuide for the application of Technical Specifications for Interoperability (TSIs)
European Railway Agency Guide for the application of Technical Specifications for Interoperability (TSIs) According to Framework Mandate C(2007)3371 final of 13/07/2007 Reference in ERA: ERA/GUI/07-2011/INT
More informationDirective 96/48/EC - Interoperability of the trans- European high speed rail system
EN Directive 96/48/EC - Interoperability of the trans- European high speed rail system Technical Specification for Interoperability "Operations and traffic management" Sub-System - 1 / 155 - 1. INTRODUCTION
More informationEvaluation of the implementation of Regulation (EC) No 881/2004 of 29 April 2004 establishing the European Railway Agency
Evaluation of the implementation of Regulation (EC) No 881/2004 of 29 April 2004 establishing the European Railway Agency Results of the stakeholder analysis Public seminar Friday, 10 th December 2010
More informationMember State Ireland. Account of the Planned Implementation. Command and Control Systems for the Irish Rail (Iarnród Éireann) Network
Member State Ireland Account of the Planned Implementation Command and Control Systems for the Irish Rail (Iarnród Éireann) Network 22 December 2017 Account of the Planned Implementation of the Command
More information13/12/2012 Page 1 Rule Management Tool ver 1
13/12/2012 Page 1 Rule Management Tool ver 1 1 type 1-rule 2 type 1-rule 3 type 1-rule concerning existing national safety targets concerning existing national safety methods concerning existing national
More informationTSI OPERATION AND TRAFFIC MANAGEMENT, CONVENTIONAL RAIL SYSTEM FINAL REPORT ON THE REVISION
INTEROPERABILITY UNIT TSI OPERATION AND TRAFFIC MANAGEMENT, CONVENTIONAL RAIL SYSTEM FINAL REPORT ON THE REVISION Reference: IU-OPE_final report Document type: Final report Version : 1.5 Date : 06.05.2010
More informationReport. Sectorial scheme for accreditation of notified bodies under Directive 2008/57/EC HARMONISED REQUIREMENTS
European Railway Agency Report Report Sectorial scheme for accreditation of notified bodies under Directive 2008/57/EC HARMONISED REQUIREMENTS Elaborated by Validated by Approved by Name Luca TRINCA, Irugo
More informationCOMMISSION REGULATION (EU) No /.. of XXX
EUROPEAN COMMISSION Brussels, XXX [ ](2013) XXX draft COMMISSION REGULATION (EU) No /.. of XXX concerning the technical specification for interoperability relating to "safety in railway tunnels" of the
More informationBenefits of harmonized regulations for placing in service of railway equipment - European experiences. Peter Mihm Head of Technical Cooperation
Benefits of harmonized regulations for placing in service of railway equipment - European experiences Peter Mihm Head of Technical Cooperation General presentation Railway Safety Interoperability ERTMS
More informationERTMS: EXPERIENCE WITH DIGITAL SYSTEMINTEGRATION A FRONTRUNNER S EXPERIENCE
ERTMS: EXPERIENCE WITH DIGITAL SYSTEMINTEGRATION A FRONTRUNNER S EXPERIENCE RAMBOLL IN BRIEF Independent engineering and design consultancy and provider of management consultancy Founded 1945 in Denmark
More information3: ETCS Specifications: SRS Catalog of requirements. ERTMS Platform, 14th March 2007; UIC HQ Paris
3: ETCS Specifications: SRS 3.0.0 Catalog of requirements PREAMBLE & CONSIDERATIONS The aim of the ERTMS Platform is to share information from running processes The list of functional changes following
More informationRailways. CEF Blending Info Day 27 February Francesco Buscaglia INEA Frederic Versini DG MOVE
Railways CEF Blending Info Day 27 February 2017 Francesco Buscaglia INEA Frederic Versini DG MOVE Railways Funding Objective FO1 Bridging missing links, removing bottlenecks, enhancing rail interoperability,
More informationPolicy context & Projects on the comprehensive network
10.05-10.30 Policy context & Projects on the comprehensive network 2019 CEF Transport call Virtual Information Day 17 January 2019 João Ferreira Policy officer in the Unit for 'Transport 'investment' Directorate-General
More informationSHIFT²RAIL Stakeholder meeting Innovations Programs - IP4 & IP5
SHIFT²RAIL Stakeholder meeting Innovations Programs - IP4 & IP5 Understanding the needs of users and customers, Introduce IT technologies to make railways more attractive Y. Perréal, Thales Transportation
More informationExplanatory Note on the CSM Assessment Body in Regulation (EU) N 402/2013 and in OTIF UTP GEN-G of on the CSM for risk assessment
Regulation (EU) N 402/2013 and in UTP GEN-G Explanatory note on the CSM Assessment Body referred to in Regulation (EU) N 402/2013 and in UTP GEN-G of 1.1.2014 on the Common Safety Method (CSM) for risk
More informationSimulation of the railways control and protection ERTMS / ETCS; levels 0,l and 2
Simulation of the railways control and protection ERTMS / ETCS; levels 0,l and 2 J.M. Mera', L.M. GutiCrrez', A. G6mez-Rey', S. Tapia', A. Arribas', C. Vera', J.M. Cabanellas2, G. Romero2, J. Maroto2,
More informationExplanatory Note on the CSM Assessment Body in Regulation (EU) N 402/2013 and in OTIF UTP GEN- G of on the CSM for risk assessment
Regulation (EU) N 402/2013 and in UTP GEN- Explanatory note on the CSM Assessment Body referred to in Regulation (EU) N 402/2013 (1) and in UTP GEN-G of 1.1.2016 (2) on the Common Safety Method (CSM) for
More informationExplanatory Note on the CSM Assessment Body in Regulation (EU) N 402/2013 and in OTIF UTP GEN- G of on the CSM for risk assessment
Explanatory note on the CSM Assessment Body referred to in Regulation (EU) N 402/2013 (1) and in UTP GEN-G of 1.1.2016 (2) on the Common Safety Method (CSM) for risk assessment Author : Dragan JOVICIC
More informationExplanatory Note on the CSM Assessment Body in Regulation (EU) N 402/2013 and in OTIF UTP GEN- G of on the CSM for risk assessment
Regulation (EU) N 402/2013 and in UTP GEN- Explanatory note on the CSM Assessment Body referred to in Regulation (EU) N 402/2013 (1) and in UTP GEN-G of 1.1.2016 (2) on the Common Safety Method (CSM) for
More informationERA TSI OPE Working document
EN EN EN ERA TSI OPE 2013 Working document concerning the technical specification for interoperability relating to the 'operation and traffic management' subsystem of the rail system in the European Union..
More informationETCS Migration and the Impacts on Railway Transport Markets
ETCS Migration and the Impacts on Railway Transport Markets Dipl.-Wirtsch.-Ing. Miroslav Obrenovic ETCS Migration > 06 October 2006 > 1 Content Railway research at the German Aerospace Center (DLR) Initial
More informationChecked by Belgorail years of Belgorail. Technology? Checked. Safety? Checked. The train? Checked. Railway Infrastructure? Checked.
Checked by Belgorail 10 years of Belgorail 2004-2014 Technology? Checked. Safety? Checked. The train? Checked. Railway Infrastructure? Checked. belgorail Belgorail, a legal entity established in Europe
More informationGetting new trains on track
Fourth railway package Getting new trains on track Dr. Josef Doppelbauer, Executive Director, European Union Agency for Railways (ERA), Valenciennes, France At the end of the three-year implementation
More informationSymposium Competition & Regulation in the Rail Sector
Symposium Competition & Regulation in the Rail Sector Deutsche Bahn AG Herald Ruijters, Director European Commission, DG MOVE Berlin, 25 January 2018 Mobility and Transport The trans-european transport
More informationINTEROPERABILITY UNIT
EUROPEAN RAILWAY AGENCY INTEROPERABILITY UNIT TAF TSI - ANNEX D.2 : APPENDIX B - WAGON AND INTERMODAL UNIT OPERATING DATABASE (WIMO) REFERENCE: ERA-TD-102 DOCUMENT TYPE: TECHNICAL DOCUMENT VERSION: 2.0
More informationStrategic Direction for revised Locomotive and Passenger Rolling Stock (LOC&PAS) TSI. Issue 1.0
Strategic Direction for revised Locomotive and Passenger Rolling Stock (LOC&PAS) TSI Issue 1.0 Approved by the Industry Standards Coordination Committee 22 July 2011 ISCC/010 Copyright 2011 Rail Safety
More informationThe Content of TAF TSI: RU/IM Communication and Legal Obligations
7th ERA TAF TSI Regional Workshop (Romania, Bulgaria, Greece) The Content of TAF TSI: RU/IM Communication and Legal Obligations ERA Telematics Team Bucharest, 7-8 March 2018 TAF TSI Regulation - Communication
More informationDIRECTIVES. (Text with EEA relevance)
L 138/44 26.5.2016 DIRECTIVES DIRECTIVE (EU) 2016/797 OF THE EUROPEAN PARLIAMT AND OF THE COUNCIL of 11 May 2016 on the interoperability of the rail system within the European Union (recast) (Text with
More informationSchedule of Accreditation issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK
Schedule of ccreditation United Kingdom ccreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK Issue No: 003 Issue date: 09 ugust 2017 ccredited to ISO/IEC 17065:2012 to provide
More informationInfrastructure Based Train Detection Interface Requirements
Uncontrolled When Printed Railway Group Standard Infrastructure Based Train Detection Interface Synopsis This document specifies the interface requirements for infrastructure based train detection systems
More informationTrade & Transport Corridors. European Projects & Initiatives
Trade & Transport Corridors European Projects & Initiatives Trade Corridors A concept in evolution WORLD BANK Assisting land-locked countries which depend on overland routes to access sea-ports for international
More information4 th Railway Package Implementation of the Technical Pillar
4 th Railway Package Implementation of the Technical Pillar 10 th PRIME Plenary Meeting, Sopron, 12 June 2017 Josef Doppelbauer, ERA Executive Director Is There a Future for Rail? 2 Key Elements of the
More informationRoadmaps to 2050 FFE (Madrid, Spain) 21 September 2017
Capacity for Rail Roadmaps to 2050 FFE (Madrid, Spain) 21 September 2017 Vijay Ramdas SP5 Task Leader European Rail Journey 2020 Framework for multi-modal transport information management & payment system
More informationGENERAL RAMS PLAN FOR THE RAILWAY LINES
GENERAL RAMS PLAN FOR THE RAILWAY LINES AKKO CARMIEL, HAIFA - BET SHEAN AND HERZELYA- KEFAR SABA General Rams Plan 1 Version Date Author Approve Reference Line Observation V.1 19/07/2012 Elena Laura López
More informationERTMS Solutions ERTMS SOLUTI NS. The Fast Track to ERTMS. Stanislas Pinte
ERTMS Solutions The Fast Track to ERTMS Stanislas Pinte History Founded in 2003 ERTMS Solutions Privately owned Track record in high-tech software products 2010: ERTMS Solutions Group Brussels Stockholm
More informationThe SUSTRAIL Project: an Integrated Approach for an Increased Performance of the Freight Rail System
The SUSTRAIL Project: an Integrated Approach for an Increased Performance of the Freight Rail System General Presentation Clemente Fuggini, Deputy Project Coordinator clemente.fuggini@dappolonia.it Motivations
More informationM1 DIRECTIVE 2001/16/EC OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 19 March 2001 on the interoperability of the conventional rail system
2001L0016 EN 30.04.2004 001.001 1 This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents B M1 DIRECTIVE 2001/16/EC OF THE EUROPEAN PARLIAMENT
More informationAchieving a Single European Railway Area and reinforcing the attractiveness of the rail sector: The vision of the European Rail Supply Industry
Achieving a Single European Railway Area and reinforcing the attractiveness of the rail sector: The vision of the European Rail Supply Industry Philippe Citroën, UNIFE Director General APTA Rail Conference,
More informationGSM-R Network Verification
Experiences from obtaining an EC Certificate of Verification for the Austrian and for the German GSM-R network Roman Herunter Austrian Federal Railways (ÖBB) Christian Bose German Railways (DB) Gerhard
More informationSatellite services for a modern EU railway system. Roma, April 18 th 2013 Angelo Chiappini
Satellite services for a modern EU railway system Roma, April 18 th 2013 Angelo Chiappini Overview What is the European Railway Agency Main objectives for a modern railway system Opportunities for space
More informationImpact Assessment for Changes to Railway Group Standards
Impact Assessment for Changes to Railway Group Standards Version: Final Date: 27 January 2011 Relevant Railway Group Standard Title: Rail Vehicle Maintenance Number: GM/RT2004 Issue: Four Synopsis: This
More informationEuropean Rail Traffic Management System An Overview
Proc. 1st International Conf. Energy, Power and Control Basrah University, Basrah, Iraq 30 Nov. to 2 Dec. 2010 European Rail Traffic Management System An Overview Dr Sajed K Abed DeltaRail Group Limited
More informationEUROPEAN RAILWAY AGENCY
EUROPEAN RAILWAY AGENCY INTEROPERABILITY UNIT TECHNICAL OPINION ON GERMAN MINISTRY NOTIFICATION REF. 41351 REFERENCE: IU-WAG- TO3 DOCUMENT TYPE: TECHNICAL OPINION VERSION: 1.0 DATE: 19/10/2009 Edited by
More information