- Views:
Transcription
1 KWANTLEN POLYTECHNIC UNIVERSITY SPAGHETTI BRIDGE REPORT CADD SQUAD November 17,2015 This Document contains a Report on the Project Management of the CADD SQUAD Spaghetti Bridge
2 INTRODUCTION...3 INITIATING...3 Integration Develop Project Charter...3 Communications Identify Stakeholders...4 PLANNING...5 Integration Develop PM Plan...5 Scope Collect Requirements Define Scope Create Work Breakdown Structure (WBS)...8 Time Define Activities Sequence Activities Estimate Activity Resources Estimate Activity Durations Develop Schedule Cost Estimate Costs Determine Budget Quality Plan Quality HR Develop Human Resource Plan Communications Plan Communications Risk Plan Risk Management Identify Risks Perform Qualitative Risk Analysis Perform Quantitative Risk Analysis Plan Risk Responses Procurement Plan Procurement EXECUTING Integration Direct & Manage Project Execution Quality Perform Quality Assurance HR Acquire Project Team Develop Project Team Manage Project Team
3 Communications Distribute Information Manage Stakeholder Expectations Conduct Procurements MONITORING & CONTROLLING Integration Monitor & Control Project Work Perform Integrated Change Control Scope Verify Scope Control Scope Time Control Schedule Cost Control Costs Quality Perform Quality Control Communications Report Performance Risk Monitor & Control Risks Procurement Administer Procurements CLOSING Integration Close Project Procurement Close Procurements References MyKwantlen.ca Bridge Rules: ght_rules_2010.pdf Bridge Designs:
4 INTRODUCTION The purpose of this report is to discuss about the creation of our bridge that was created with spaghetti. INITIATING Integration 4.1 Develop Project Charter PROJECT CHARTER SPAGHETTI BRIDGE This Charter formally authorizes a project to create a bridge formed out of spaghetti. A project plan will be developed and submitted to the Project Sponsor for approval. Commencement of project activities will begin upon approval of the project plan and the resources to execute it by the Project Sponsor. Included in the project plan are to be a scope statement; schedule; cost estimate; budget; and provisions for scope, resource, schedule, communications, quality, risk, procurement, and stakeholder management as well as project control. The purpose of the Spaghetti Building project is to create a spaghetti bridge that is 1 meter in length and has a height of 500 mm. The bridge will be hung by a bucket of weights to test the strength of the bridge. This project meets CADD SQUAD for the purpose to create a bridge that is strong and efficient and has a low cost. The project deliverables shall include a completed bridge and a project management report. The Project Manager, Kabir Gill, is hereby authorized to interface with management as required, negotiate for resources, delegate responsibilities within the framework of the project, and to communicate with all contractors and management, as required, to ensure successful and timely completion of the project. The Project Manager is responsible for developing the project plan, monitoring the schedule, cost, and scope of the project during implementation, and maintaining control over the project by measuring performance and taking corrective action. A completed project plan will be developed and submitted to the Project Sponsor for approval by November 10, Upon approval of the project plan resources will be assigned to the project and work will commence within two days. Once the project commences, work on the project will be performed according to the schedule provided in the approved project plan. The Project Manager will obtain approval from the Project Sponsor for any schedule changes which impact the project completion milestone. The hard date we have for this project is November 10, The budget for the Spaghetti bridging project is $4690. It is to be funded through Gill Productions. 3
5 The Team Members for the Spaghetti Bridging project are Member Name Roles Duties of each Role Kabir Gill Project Manager Justin Maan Technician Solve Problem along the construction of the bridge Jagjot Singh Designer/Fabricator Design and fabricate the bridge Dennis Designer/Fabricator Design and fabricate the bridge Josh Designer/FabricWeator Design and fabricate the bridge We submitted our project charter to Joanne Massey on October 27, 2015 who was also the project sponsor. Joanne gave us consent on weather our project charter was approved or not. Our Project Charter was approved. Communications 10.1 Identify Stakeholders The Team Members for the Spaghetti Bridging project are Member Name Roles Duties of each Role Kabir Gill Project Manager Justin Maan Technician Solve Problem along the construction of the bridge Jagjot Singh Designer/Fabricator Design and fabricate the bridge Dennis Designer/Fabricator Design and fabricate the bridge Josh Designer/Fabricator Design and fabricate the bridge Joanne Massey Project Sponsor Sponsors the Spaghetti bridge costs as well as construction 4
6 PLANNING Integration 4.2 Develop PM Plan In our Project Management plan we went over several designs of bridges. Below is a sketch of our original design of the bridge. However as the Project went along the bridge design changed as we went over several new designs. We informed the sponsor Joanne Massey to ensure that she was kept aware of the changes we made on the design of the spaghetti bridge. Given below are some sketches of our previous design 5
7 6 CADD TECHNOLOGIES
8 Scope 5.1 Collect Requirements Our project Manager Kabir Gill collected all the specified requirement such as the spaghetti, glue sticks, glue guns, labor, engineer of the bridge, and designer. Our group also managed to find a place to store our equipment as well as the bridge, ensuring that the equipment and resources were stored properly on a daily basis. Kabir Gill also used the method of division of labor to divide the tasks ensuring that each person was capable enough to complete their tasks. Jot collected information on the restrictions and limitations of the bridge such as the materials as well size limitations of the bridge. For example Jot examined the document that was made available to us from our sponsor that our bridge height should not exceed 500mm in height and maximum span of the bridge cannot exceed 1m. Also the distance between the top support of the bridge and the bottom of the bridge should be no bigger than 100 mm. 5.2 Define Scope When we were defining the scope we were faced with a lot of bridge designs. We used the internet to look up different designs keeping in mind the amount of material that we had to complete the design to the desired outcome. We searched designs that were fairly simple, modern but strong in the methods that they supported weights. We also looked at the Bridge Design pdf document which Joanne the project sponsor provided us with. We explored all sorts of bridges such as Beam Bridge, Truss Bridge, Arch Bridge, Cantilevered Bridge, Suspension 7
9 Bridge, and Cable Stayed Bridge. We used the combination of Arch Bridge as well as the Suspension Bridge to create our bridge. Below are some concepts of bridges that we used to come up with design of our bridge. We used some of the techniques and bridging styles that would accommodate for the stresses and loads of our spaghetti bridge. 5.3 Create Work Breakdown Structure (WBS) A work breakdown structure (WBS), in project management is a deliverable-oriented breakdown og a project into smaller components. A work breakdown structure is a project deliverable that systamizes the teams project into controlable sections. In the Work Breakdown Structure (WBS) we broke down the time spent on each task by each member of the team. 8
10 9 CADD TECHNOLOGIES
11 10 CADD TECHNOLOGIES
12 Time 6.1 Define Activities The project manager Kabir Gill and Justin Maan defined the activities in the project which included, defining the workers Dennis and Josh. They were assigned to create the combination of ten pieces of spaghettis to create columns and beams. They were instructed to create larger columns and beams made out of 35 pieces of spaghetti. Justin and Jot were assigned to create different designs and sketches of bridges. The final sketch was discussed with the project manager and approved by the sponsor Joanne Massey. The project manager was told how much materials we would be using. Kabir then took the data regarding the information of materials, loads and stresses and finalized which materials and structures would best sit the project. 11
13 Jot and Justin gave step by step instructions on how to build the bridge. 6.2 Sequence Activities First, the project manager Kabir examined the different possible designs that were given by Justin and Jot Kabir then selected the best and efficient spaghetti bridge providing our workers and designers with the requirements (resources, material) needed to design the bridge. Jot and Justin discussed about the design and finalized a location to start the project with their workers. Our sponsor then provided us with a location as we were given specific instructions to keep the room clean Our workers Josh and Dennis were instructed to create specific column and beam widths Justin and Jot started to create the base support of the bridge which was 1m Kabir did regular checks, examining how much time was spent on each activity to find out how long the project would take. 12
14 We confirmed with our sponsor keeping in mind the instructions that were provided to our group through our sponsor We then started the major construction of our bridge. 6.3 Estimate Activity Resources The designs created by Justin and Jot were given to the project manager. The project manager analyzed the different bridges and selected the most suitable one. Then Jot and Justin explained the particular activities, techniques and skills that were required to build the bridge. Then the project manager allocated the resources such as materials and labor that were required to build the bridge. 6.4 Estimate Activity Durations The project manager provided us with the equipment and material to start the bridge. During the construction, Kabir estimated the time that was allocated to each activity and estimated when our project would be completed by. 13
15 6.5 Develop Schedule 14
16 15 CADD TECHNOLOGIES
17 Cost 7.1 Estimate Costs 16
18 7.2 Determine Budget 17
19 Quality 8.1 Plan Quality The project manager ensured that the columns and beams were made with the best quality. He ensured that the thickness of all beams and columns were consistent and accurate. He ensures that the sponsor gave us a good amount of material to support the design of our bridge. 18
20 HR 9.1 Develop Human Resource Plan Communications 10.2 Plan Communications Justin Maan took everyone s contacts from the project manager, workers and designers and created a joint account on WhatsApp and Gmail were the group shared pictures, views on the project as well as information on the progress of our project. Our project manager had to resolve the problems we faced while creating the bridge through online chat. With the help of these online resources were able to better communicate with our group members on a regular basis to ensure that everything was going according to plan. Risk 11.1 Plan Risk Management 11.2 Identify Risks The risks that the group was faced included: The tip of the Glue Gun Blade used to cut the spaghetti (sharp) Melted dripping glue Keeping the room clean to ensure that no one gets hurt or trips over something Ensuring that the project materials and the supplies are kept in a safe secure environment Ensuring that the right amount of glue and spaghetti is used to support the bridge Ensuring that the information and designs regarding our bridge is kept secure and confidential to our group 11.3 Perform Qualitative Risk Analysis 19
21 11.4 Perform Quantitative Risk Analysis 11.5 Plan Risk Responses Train workers on how to handle the glue gun properly Our project manager was able to assist the workers if they got hurt Following the orders of the project sponsor and ensuring that the room is clean for the group and the next class to come and use the room Storing the project and project materials in a safe place Procurement 12.1 Plan Procurement EXECUTING Integration 4.3 Direct & Manage Project Execution Kabir and Justin ensured that the project was being executed on time and that everyone was on the same page. In addition, Kabir did regular checkups to ensure that the project was going smoothly on a regular basis. 20
22 Quality 8.2 Perform Quality Assurance HR 9.2 Acquire Project Team 9.3 Develop Project Team 9.4 Manage Project Team Communications 10.3 Distribute Information Justin Maan took everyone s contacts from the project manager, workers and designers and created a joint account on WhatsApp and Gmail were the group shared pictures, views on the project as well as information on the progress of our project. Our project manager had to resolve the problems we faced while creating the 21
23 bridge through online chat. With the help of these online resources were able to better communicate with our group members on a regular basis to ensure that everything was going according to plan Manage Stakeholder Expectations 12.2 Conduct Procurements MONITORING & CONTROLLING Integration 4.4 Monitor & Control Project Work Through online chat such as WhatsApp and regular project checkups, the project manager Kabir Gill had to manage and solve problems on a regular basis ensuring that everyone was getting their share done and was capable enough to carry out their responsibilities. 4.5 Perform Integrated Change Control Scope 5.4 Verify Scope 5.5 Control Scope 22
24 Time 6.6 Control Schedule The schedule was used to assist our group in ensuring that everyone spent the correct amount of time on each activity and was not goofing around. The schedule helped our group in maximizing the time allotted for the project. Cost 7.3 Control Costs Quality 8.3 Perform Quality Control 23
25 Communications 10.5 Report Performance Risk 11.6 Monitor & Control Risks Procurement 12.3 Administer Procurements CLOSING Integration 4.6 Close Project Our project was tested and the bridge ended up breaking. The bridge had a total weight of 2307 g. Our bridge was one of the heaviest bridges. The bridge held 1800 grams suspended from the center of the bridge. The difference was Our bridge was the bridge that held the least amount of weight compared to other bridges. If our group was able to design the bridge again, we would read through the instructions more carefully and think about designing the bridge through lighter methods. 24
26 25 CADD TECHNOLOGIES
27 Procurement 12.4 Close Procurements References MyKwantlen.ca Bridge Rules: Rules_2010.pdf Bridge Designs: Google 26
Project Management Professional Training
Training Course Course Language Course Duration Project Management Professional Training PMP Project Management Professional Exam Preparation based on PMBOK 6 th Edition ( 40 PDUs) English Total Number
More informationThe Agile PMP Teaching an Old Dog New Tricks
The Agile PMP Teaching an Old Dog New Tricks Why are we here today? What is Project Management? When will the project be done? How much will it cost? Do we all agree on what done looks like? What are the
More informationProject Stakeholders Management. Unit 13
Project Stakeholders Management Unit 13 Project Communication Management Project Stakeholder Management includes the processes required to identify the people, groups, or organizations that could impact
More informationHow Do We Start a Project? Ensuring the Right Sponsorship, Stakeholder Alignment and Thoughtful Preparation for a Project
How Do We Start a Project? Ensuring the Right Sponsorship, Stakeholder Alignment and Thoughtful Preparation for a Project Donald G. Gardner, President, Gardner Project Integration Group, Ltd. Introduction
More informationSpaghetti Bridge Project
Spaghetti Bridge Project Situation Core E. Gated, a local engineering firm, is in the middle of a labor shortage. Engineers at the firm have been overwhelmed by the amount of structures that they must
More informationProject Management Professional (PMP) Boot Camp
Project Management Professional (PMP) Boot Camp According to the Project Management Institute, the world's leading association for the project management profession: "PMP Certification is the profession's
More informationThe 9 knowledge Areas and the 42 Processes Based on the PMBoK 4th
The 9 knowledge Areas and the 42 Processes Based on the PMBoK 4th www.pmlead.net PMI, PMP, CAPM and PMBOK Guide are trademarks of the Project Management Institute, Inc. PMI has not endorsed and did not
More informationProject Communications Management
Project Communications Management Unit 10 Project Communication Management Includes the processes required to insure timely and appropriate generation, collection, distribution, storage, retrieval, and
More informationComparison of ISO and PMBOK Guide 1
Stanisław Gasik, PhD, sgasik@sybena.pl Comparison of and PMBOK Guide 1 Table of Contents HISTORY OF... 2 BASIC CONCEPTS... 2 PROJECT DEFINITION... 2 TYPES OF PROJECTS... 3 PROJECT MANAGEMENT PROCESSES...
More informationTenStep Project Management Process Summary
TenStep Project Management Process Summary Project management refers to the definition and planning, and then the subsequent management, control, and conclusion of a project. It is important to recognize
More informationProject Management Concepts, Tools & Techniques
Project Management Concepts, Tools & Techniques Course ISI-1438 5 Days Instructor-led, Hands on Introduction This highly interactive 5 day, instructor-led workshop is designed to give participants a solid
More informationProject Quality Management
1 Project Quality Management Unit 8 Eng.elsaka09@gmail.com Project Quality Management Includes the processes and activities of the performing organization that determine quality policies, objectives, and
More informationComparison of ISO Draft Version and PMBOK Guide 4 th Edition 1
Comparison of Draft Version and PMBOK Guide 4 th Edition 1 Stanisław Gasik, Ph. D.; sgasik@sybena.pl; www.sybena.pl Table of Contents HISTORY OF... 2 BASIC CONCEPTS... 2 PROJECT DEFINITION... 2 TYPES OF
More informationPMP PMBOK 5 th Edition Course Agenda
PMP PMBOK 5 th Edition Course Agenda 1. Introduction to PMP Course Certification What are PMI and PMP Application Requirements for the PMP Exam Guidelines to Fill Up the PMP Application About the PMP Exam
More informationI-94/I-69 Interchange Bridge Construction
I-94/I-69 Interchange Bridge Construction General Project Information Let in August 2013 Cost of $76 million Prime Contractor Walter Toebe Construction Company Reconstruction of I-94 from Griswold to Lapeer
More informationObjectives of Project Management Framework. What are the Characteristics Of Project. Activities involved Project Management
PMP Training Training Topics Chapter 1 Introduction to PMP Objectives of PMP Requirements for PMP Exam About PMP Exam PMP Exam Syllabus Chapter 2 Objectives of Project Management Framework What is Project
More informationIntegration Mgmt / Initiating Process Group 4.1 Develop Project Charter
1 Mgmt / Initiating Process Group 4.1 Develop Project Charter Project statement of work Business Case Contract Enterprise environmental factors Project charter Expert judgement 26/02/2013 18:22:56 1 2
More informationIntroductions in the group
Project Management in Implementing Best Practice Guidelines Presented by Shaila Aranha RN MScN PMP Long-Term Care Best Practice Coordinator for Waterloo Wellington LHIN Long-Term Care Best Practices Program
More informationTRANSMISSION ENGINEERING & PROJECT SERVICES (April 1, 2013)
TRANSMISSION ENGINEERING & PROJECT SERVICES (April 1, 2013) Vice President Transmission Engineering & Project Services The Vice President Transmission Engineering & Project Services is responsible for
More informationUnit: CPC 421 Manage contracts to achieve outcomes (Commissioning, Procurement and Contracting)
Unit: CPC 421 Manage contracts to achieve outcomes (Commissioning, Procurement and Contracting) Key Purpose The key purpose identified for those working in commissioning, procurement and contracting is
More informationUNIT 9 INSPECTION AND QUALITY CONTROL
UNIT 9 INSPECTION AND QUALITY CONTROL Inspection and Quality Control Structure 9.1 Introduction Objectives 9.2 Need for Inspection and Quality Control 9.3 Principles of Inspection 9.4 Major Items in Construction
More informationInside. Leadership 1) ASSESSMENT
MFR UNIT - LEADERSHI P Highlights Task Leadership Assessing Employees Assigning Tasks Inside Providing Feedback and Coaching Reward and Recognition Developing Employees Leadership No single leadership
More informationP6 Version 8.2 to 8.4 EPPM Web Power Sample Point Slide Show
THIS SLIDE REQUIRES NEW PICTURE Welcome to the Eastwood Harris Pty Ltd Primavera P6 Version 8.4 EPPM Web Tool 2 day training course Enterprise Portfolio Project Management Page 2 Administration Evacuation
More informationSECTION QUALITY REQUIREMENTS
SECTION 014000 - PART 1 - GENERAL 1.1 SUMMARY A. Defines SRP requirements for Contractor Quality Control and Owner Quality Assurance. As an Electric and Water Utility, SRP has many critical facilities.
More informationWelcome to the Eastwood Harris Pty Ltd Primavera P6 Versions 8.2 EPPM Web Tool 2 day training course Enterprise Portfolio Project Management
Welcome to the Eastwood Harris Pty Ltd Primavera P6 Versions 8.2 EPPM Web Tool 2 day training course Enterprise Portfolio Project Management Page 2 Copyright Eastwood Harris Pty Ltd IMPORTANT POINTS FOR
More informationPMBOK Synopsis Contents
PMBOK Synopsis Contents PMBOK Synopsis... 1 PMI Essential Terms ( AC, P8)... 4 Initiating Process- Develop Project Charter ( RM. 97)... 5 ITTO Develop Project Charter... 5 Initiating Process- Identify
More informationFREEMAN installation & dismantle
NAME OF SHOW: COMPANY NAME BOOTH #: CONTACT NAME: PHONE #: E-MAIL ADDRESS For Assistance, please call 714-254-3410 to speak with one of our experts. INSTALLATION LABOR Freeman Supervised Labor - Please
More informationInitiation Group Process. Planning Group Process
Initiation Group Process Develop Project Charter Project statement of work Expert judgment Project charter Business case Contract (if third party project) EEF: government/industry standards, organizational
More informationADMINISTRATION SUPPORT (Reception, Data, Finance): JOB DESCRIPTION
ADMINISTRATION SUPPORT (Reception, Data, Finance): JOB DESCRIPTION Salary Salary is negotiable upon calibre and experience of applicants Line of responsibility The administration support will be directly
More informationDATA ITEM DESCRIPTION
DATA ITEM DESCRIPTION Title: HUMAN SYSTEMS INTEGRATION PROGRAM PLAN Number: Approval Date: 20070404 AMSC Number: N7716 Limitation: N/A DTIC Applicable: N/A GIDEP Applicable: N/A Office of Primary Responsibility:
More informationS O Seminar Objective
Introduction to Project Management Welcome! Presenter: Bob Hull CalACT Conference September 202 S O Seminar Objective To provide an overview of project management processes and provide some skills, tools
More informationFacilities Planning and Construction (FP&C)
Appendix 8.4a Facilities Planning and Construction (FP&C) UAA FP&C Quality Assessment Checklist (A) Project: PM: Project ID: Updated:
More informationThe Finance Ministry at the United Nations in New York
Finance Ministry around the world 10 January 2018 The Finance Ministry at the United Nations in New York The headquarters of the United Nations (UN) is located in New York. The UN s main objectives are
More informationProject Cost Management
PMBOK Overview A Guide to the Body of Knowledge (PMBOK), created by the Institute (PMI), is the sum of knowledge within the profession of project management. The complete Body of Knowledge includes proven
More informationManagers at Bryant University
The Character of Success for Managers at Bryant University Interviewing Guide (Revised 8/25/04) Career Strategies, Inc. Boston, MA A New Approach to Interviewing for Managers at Bryant University An interviewer
More informationstakeholdermap.com Project Management, project planning, templates and advice <PROJECT NAME> RESOURCE PLAN VERSION <1.
Project Management, project planning, templates and advice RESOURCE PLAN VERSION TABLE OF CONTENTS ... 1 Resource Plan... 1 Version ... 1 ...
More informationProject Management Manual Prepared by: Project Support Office, Major Projects Department
Project Management Manual Prepared by: Project Support Office, Major Projects Department Version: 2015 Project Support Office Project Management Manual Version: November 2015 This manual is a living document
More informationA Project Management Approach to Improve on Time Delivery Performance in Manufacturing Industry
A Project Management Approach to Improve on Time Delivery Performance in Manufacturing Industry B. Shyam Sundar 1, Dr. D. Sivakumaran 2 1 Research scholar, Bharathiyar University, Coimbatore, India 2 Research
More informationProject Management Institute (PMI) Practice Standard for Configuration Management
Project Configuration Management Project Management Institute (PMI) Practice Standard for Configuration Management Project Configuration Management What we will cover: Introduction Relationship with other
More informationProject Management Best Practices at LAUSD. July 30, Bill Wherritt
Project Management Best Practices at LAUSD July 30, 2008 Bill Wherritt I have never seen anyone save time by doing the work in the wrong order, or by skipping required steps. If there isn't time to do
More informationBuilding a Transformative Contract Management Practice
December 2015 Building a Transformative Contract Management Practice Building a Transformative Contract Management Practice TIPS AND TRICKS FOR STREAMLINING THE MULTI-FACETED CONTRACTING PROCESS Katie
More informationP6 Instructors Sample Presentation
Welcome to the Eastwood Harris Pty Ltd Primavera P6 Versions 8.1 to 8.4 Professional and Optional Client 3 day training course PMI REP No 3001 Course Number PP6 Page 2 Page 4 Administration Evacuation
More informationSTATE UNIVERSITY CONSTRUCTION FUND. UNIVERSITY CON DIRECTIVE 5-1 Issue date: October 2014
STATE STRUCTION FUND DIRECTIVE 5-1 Issue date: October 2014 STRUCTURAL STEEL 1. General: It is the Fund's policy that the design of the structural steel is the prime responsibility of the project's Structural
More informationManaging Project Portfolios, Programs & Multiple Projects
Managing Project Portfolios, Programs & Multiple Projects Russell D. Archibald, FPMI, FAPM, PMP Archibald Associates Outline of My Presentation 1. The Multi-Project Environment 2. Managing Project Portfolios
More informationProject Management. Objectives 3/17/2015. David Borrill, MT, MBA, PMP
Project Management David Borrill, MT, MBA, PMP Objectives Nobody falls asleep or walks out. Presentation of some of the main points in the management of projects in the healthcare environment. Everybody
More informationMESA DAY CONTEST RULES Civil Structures
MESA DAY CONTEST RULES 2017-2018 Civil Structures LEVEL: Grades 9-12 TYPE OF CONTEST: COMPOSITION OF TEAM: NUMBER OF STUDENTS: SPONSOR: Individual/Team 2-3 students per team Preliminary As determined by
More informationJAPANESE CONCRETE BRIDGES. Alan Burden 1
JAPANESE CONCRETE BRIDGES Alan Burden 1 INTRODUCTION Although less popular than steel, concrete is used extensively in Japanese bridge projects. The seismic loading condition has encouraged designers to
More informationSoftware Engineering II - Exercise
Software Engineering II - Exercise April 29 th 2009 Software Project Management Plan Bernd Bruegge Helmut Naughton Applied Software Engineering Technische Universitaet Muenchen http://wwwbrugge.in.tum.de
More informationLaboratory 2 Topic: Build a Beam for 3-Point Bending
Laboratory 2 Topic: Build a Beam for 3-Point Bending Objectives: 1. To design, construct, and test a maximum strength beam out of foam board to span 30 inches and carry a concentrated load at mid-span.
More informationMESA DAY CONTEST RULES Stick Together
MESA DAY CONTEST RULES 2017-2018 Stick Together LEVEL: Grades 6-8 TYPE OF CONTEST: COMPOSITION OF TEAM: NUMBER OF STUDENTS: SPONSOR: Individual/Team 1-2 students per team Preliminary As determined by your
More informationPMI Scheduling Professional (PMI-SP)
PMI Scheduling Professional (PMI-SP) E X A M I N AT I O N CO N T E N T O U T L I N E Project Management Institute PMI Scheduling Professional (PMI-SP) Exam Content Outline Published by: Project Management
More informationImplement. Control. Integrate. Knowledge Leverage. Course Overview
Conceptualize Plan Plan & Deliver Organize Implement Control Change if Required Integrate Deliver & Closeout Knowledge Leverage Course Overview The Certificate In Project Management (CIPM) exam is administered
More informationCivil Structures. 3 9 th /10 th and 3 11 th /12 th grade TEAMS PER CENTER
MESA DAY CONTEST RULES 2014 2015 Civil Structures LEVEL: Grades 9-12 TYPE OF CONTEST: COMPOSITION OF TEAMS: NUMBER OF TEAMS: SPONSOR: Team 1-2 students per team 3 9 th /10 th and 3 11 th /12 th grade TEAMS
More informationHuman Resource Services, Employee & Management Services
Dealing With Personnel Issues Reference Guide Human Resource Services, Employee & Management Services What is a problem employee? We all have them employees who drain our time and energy. Whether highly
More informationCivil Structures. Individual/Team. 1-2 students per team. MESA Day Rules Committee
LEVEL: Grades 9-12 Civil Structures MESA DAY CONTEST RULES 2016-2017 TYPE OF CONTEST: COMPOSITION OF TEAM: NUMBER OF STUDENTS: SPONSOR: Individual/Team 1-2 students per team Preliminary As determined by
More informationresearch source manage assist a fusion of travel resource
research source manage assist a fusion of travel resource www.expoworldtravel.com research assist manage source Expo World Travel is a specialist provider of co-ordinated travel services for businesses
More informationRisk Analysis (Project Impact Analysis)
Chapter 2 Risk Analysis (Project Impact Analysis) 2.1 Overview Risk management is a process that provides management with the balance of meeting business objectives or missions and the need to protect
More informationKathy Schwalbe, Ph.D., PMP
Solutions to Accompany Information Technology Project Management, Eighth Edition Comprehensive package: Solutions Manual, Instructor's Resource Manual, Additional Cases, Answer keys, Solutions Files Excel
More informationTemplate for ToR for Transaction Advisory Services
Template for ToR for Transaction Advisory Services Addendum 1 Prepared by Genesis Analytics 4 December 2013 PPP TRANSACTION ADVISOR TERMS OF REFERENCE Terms of reference for transaction advisor services
More informationA Primer for the Project Management Process by David W. Larsen 1. Table of Contents
A Primer for the Project Management Process by David W. Larsen 1 Table of Contents Description... 2 STAGE/STEP/TASK SUMMARY LIST... 3 Project Initiation 3 Project Control 4 Project Closure 6 Project Initiation...
More informationSocial Media Manager Contract
Social Media Manager Contract This contract is a legally binding agreement between (client's name) of Personal/ business/ ministry/ accounts (client's organization) and The Visionary s Branding Agency,
More informationPMP 2 Days Classroom Training
PMP 2 Days Classroom Training Learning from the class PMP signifies that you speak and understand the global language of project management and connects you to a community of professionals, organizations
More informationManager, Supervisor & CEMA Skill Set Model County of Santa Clara
Leads Innovation Leadership Styles Manages Change Models Integrity, Trust & Transparency Strategic Thinking and Planning Manager, Supervisor & CEMA Skill Set Model County of Santa Clara Conflict Management
More informationI. POLICY FOR INTERNAL ALIGNMENT
1 TABLE OF CONTENTS PHASE I Summary.... 3 I. Internal Alignment.....3 II. Job Structure Evaluation..3 Appendix I. Compensable Families...6 Appendix II. Compensable levels...7 Appendix III Defining Compensable
More informationHYBRID PPM FOR JIRA: SUCCESSFULLY MANAGING PORTFOLIOS OF HYBRID AND AGILE JIRA PROJECTS
A WHITE PAPER by Gerald Aquila, CEO HYBRID PPM FOR JIRA: SUCCESSFULLY MANAGING PORTFOLIOS OF HYBRID AND AGILE JIRA PROJECTS HYBRID PPM FOR JIRA is where onepoint PROJECTS's real-time, two-way Jira integration
More informationAgenda. PMBOK Guide Third Edition. PMI Standards Background. PMI Life Cycle Plan for Standards. Presented by Kevin Chui, PMP. How Did We Get Here?
Agenda PMBOK Guide Third Edition Presented by Kevin Chui, PMP Vice President, PMI Hong Kong Chapter Background PMBOK Guide 2004 Update Project Structural Changes to the Standard Process Group Changes Knowledge
More information151 First Side. Technical Assignment 2 November 16 th, William J. Buchko. AE 481w Senior Thesis The Pennsylvania State University
November 16 th, 2007 William J. Buchko AE 481w Senior Thesis The Pennsylvania State University Thesis Advisor: Kevin Parfitt Table of Contents Executive Summary... 3 Structural System Overview Foundation...
More informationMIDAS Training Series
MIDAS midas Civil Title: All-In-One Super and Sub Structure Design NAME Edgar De Los Santos / MIDAS IT United States 2016 Substructure Session 1: 3D substructure analysis and design midas Civil Session
More informationCopyright 2013 Pearson Education, Inc. Publishing as Prentice Hall 5-1
Copyright 2013 Pearson Education, Inc. Publishing as Prentice Hall -1 Learning objectives Manage the planning process of a project Understand the work breakdown structure of a project Understand different
More informationProject Management Professional (PMP) Exam Prep Chapter 09 - Project Human Resource Management
Project Management Professional (PMP) Exam Prep Chapter 09 - Project Human Resource Management Slide 1 Looking Glass Development, LLC (303) 663-5402 / (888) 338-7447 4610 S. Ulster St. #150 Denver, CO
More informationWSH (Design for Safety) Regulations - An Overview -
- An Overview - Commencement Enacted - 10 July 2015 Come into force 1 Aug 2016 Apply to (a) project that (i) is undertaken by a developer in the course of the developer s business; (ii) involves or is
More informationreasons to invest in a CMMS
11 reasons to invest in a CMMS 11 reasons to invest in a CMMS 1. Effectively plan preventive maintenance The purpose of preventive maintenance (PM) is to plan scheduled inspections so that defects are
More informationPMP in the Real World. Scott Bailey, MBA, PMP, SSGB
PMP in the Real World Scott Bailey, MBA, PMP, SSGB PMP in the Real World Webinar purpose To understand the relevance of the PMI PMP certification and its influence on the success or failure of projects
More informationContent Break-up & Methodology for awarding Contact Hours / PDUs
N.I.T.E - Project Management Professional (PMP) Exam Prep Course Content Break-up & Methodology for awarding Contact Hours / PDUs This course is based on Project Management Book of Knowledge PMBOK Guide
More informationOverview of Project Management
Back to Basics Overview of Tim Perkins and Roald E. Peterson /SAIC Larry Smith Every organization or program creates and implements projects to help it move toward its goals. Every assigned project manager
More informationFREEMAN DISPLAY LABOR
P. O. Box 14210 Orange, CA 92863-1610 714/254-3400 Fax: 714/490-0801 FreemanAnaheimES@freemanco.com NAME OF SHOW: COMPANY NAME: BOOTH#: CONTACT NAME: PHONE#: FAX #: Straight Time- 8:00 A.M. to 5:00 P.M.
More informationJust like QUALITY Good Project Management Practices start with an Internal Kick-Off Meeting. It is the Project Managers job to communicate:
Just like QUALITY Good Project Management Practices start with an Internal Kick-Off Meeting It is the Project Managers job to communicate: What is the team trying to accomplish? How the team is going to
More informationPMP MOCK EXAMS BASED ON PMBOK 5TH EDITION
PMP MOCK EXAMS http://www.tutorialspoint.com/pmp-exams/pmp_mock_exams_set2.htm Copyright tutorialspoint.com BASED ON PMBOK 5TH EDITION Here are 200 objective type sample questions and their answers are
More informationCertificate IV in Project Management Student Assessment Guide
Overview The assessment for the Certificate IV in Project Management comprises Team Assignment Development of a detailed Project Management Plan for chosen case study - 30% for blended classes Individual
More informationPSA TEC 2016: Stakeholder Management - Strategies for Project Success
PSA Security Network PSA TEC 2016: Stakeholder Management - Strategies for Project Success Executive Summary PSA Project Management Committee 16 May 2016 TEC 2016 Stakeholder Management: Strategies for
More informationProject Management for Non-Profits What s in it for you? Benefits of Improved Project Management (PM) Skills, Techniques and Processes.
Project Management for Non-Profits What s in it for you? Benefits of Improved Project Management (PM) Skills, Techniques and Processes Nov 2014 1 Overview What is a project? Impact on organizational results
More informationProject Management Professional (The Project Professional MBA)
HR CERTIFICATION INSTITUTE ISO 9001:2015 Certified :2010 Certified An Intensive 10 - Day Seminar On Project Management Professional DUBAI 10-21 December 2017 EuroMaTech is proud to be associated with the
More informationSpecifications for the Secondary Installation of Communication Equipment on MLGW Transmission Structures
Page 1 of 7 Specifications for the Secondary Installation of Communication Equipment on MLGW Transmission Structures 1. Request and Approval Procedure 1.1. The telecommunications provider Carrier will
More informationPROJECT SCOPE MANAGEMENT
PROJECT SCOPE MANAGEMENT CREATE WBS Process by process group Planning 5.1 Plan Scope Management 5.2 Collect Requirements 5.3 Define Scope 5.4 Create WBS Monitoring and Controlling 5.5 Validate Scope 5.6
More informationOpen-Web Trusses. Including Red-L, Red-W, Red-S, Red-M and Red-H Trusses. Design Flexibility. Outstanding Strength-to-Weight Performance
Open-Web Trusses Including Red-L, Red-W, Red-S, Red-M and Red-H Trusses Download your free copy at RedBuilt.com. Specify Open-Web trusses for your next project using RedSpec single-member sizing software.
More informationCareer Planning and Development Tools
Career Planning and Development Tools June 29, 2015 Original publish date: 2/29/12 Revision 1 date: 10/16/14 Revision 2 date: 6/29/15 Purpose of Tools Clearly describe typical career paths and job classifications
More informationDIPLOMA OF HUMAN RESOURCES MANAGEMENT-BSB50615 Study Support materials for Manage recruitment selection and induction processes BSBHRM506
DIPLOMA OF HUMAN RESOURCES MANAGEMENT-BSB50615 Study Support materials for Manage recruitment selection and induction processes BSBHRM506 STUDENT HANDOUT This unit describes the performance outcomes, skills
More information2017 VICTORIA BRANCH POPSICLE STICK BRIDGE BUILDING COMPETITION RULE BOOK
2017 VICTORIA BRANCH POPSICLE STICK BRIDGE BUILDING COMPETITION RULE BOOK 1 of 8 Contents 1. Registration:... 3 2. Bridge Dimensions and Rules... 3 a) Construction... 3 b) Dimensions... 3 c) Materials
More informationVIEW 360-DEGREE IS YOUR STANDING IN THE WAY OF NEXT LEVEL CRM?
IS YOUR 360-DEGREE VIEW STANDING IN THE WAY OF NEXT LEVEL CRM? WHY YOU NEED TO REGULARLY REVISIT YOUR 360-DEGREE VIEW TO IDENTIFY AND ELIMINATE BLIND SPOTS, PLUS HOW TO DO IT CONTENTS Building Your Next
More informationWelcome Baby Impact Evaluation Request for Proposals FREQUENTLY ASKED QUESTIONS. Information Webinar
Last Updated: December 18, 2015 Welcome Baby Impact Evaluation Request for Proposals FREQUENTLY ASKED QUESTIONS Information Webinar Please note that some responses may have been refined to more clearly
More informationTHE DESIGN AND FABRICATION OF AN AUTOMATED SHEAR STUD WELDING SYSTEM. Andrew Glenn Ziegler, Research Assistant
THE DESIGN AND FABRICATION OF AN AUTOMATED SHEAR STUD WELDING SYSTEM Andrew Glenn Ziegler, Research Assistant Alexander Henry Slocum, Assistant Professor of Civil Engineering Massachusetts Institute of
More informationInvitation to Tender. Reference: IOSVSP4P-Metal
1 Invitation to Tender Metal fabrication / installation works at Plot 4, Porthmellon Industrial Estate, St Marys, Isles of Scilly Reference: IOSVSP4P-Metal 1 2 1 Background/Introduction Plot 4 Porthmellon
More informationAchieving Project Management Competence
Endeavor Management 2700 Post Oak Blvd. P + 713.877.8130 Suite 1400 F + 713.877.1823 Houston, Texas 77056 www.endeavormgmt.com Background Achieving Project Management Competence Project management (PM)
More informationContracting for Goods and Services
Contracting for Goods and Services Northwest Territories Office of the Auditor General of Canada Bureau du vérificateur général du Canada Ce document est également publié en français. This document is
More informationCRASH COURSE IN PROJECT MANAGEMENT. Jon Hicks, MBA, PMP Scaling Value
CRASH COURSE IN PROJECT MANAGEMENT Jon Hicks, MBA, PMP Scaling Value Course Overview Day 1 What is Project Management? Where does it fit in to today s organizations? The Role of the Project Manager The
More informationInformation Technology Project Management, Sixth Edition. Note: See the text itself for full citations. More courses at cie-wc.edu
Management, Sixth Edition Note: See the text itself for full citations. More courses at cie-wc.edu Understand the importance of good project scope management Discuss methods for collecting and documenting
More informationNGO Self-assessment through a SWOT exercise
NGO Self-assessment through a SWOT exercise Step 1: Analyse your NGO s Capacity > page 2 Step 2: Do the SWOT Exercise > page 5 Step 3: Make a Strategic Plan > page 8 Step 4: Implement, Monitor, Evaluate
More informationProject Management. Week 2 - What is Project Management? 2012/13
Project Management Week 2 - What is Project Management? 2012/13 Last Week What is a project? Characteristics: Temporary, Unique Product, Progressive Elaboration Operations vs. Projects Constraints of a
More informationWork Breakdown Structures
D page 1 of 19 Long Description Title page for Module 2, Lesson 5: Program Management and Acquisition Concepts, containing three photos: two professionals consulting paperwork, a professional in an office,
More informationOperational Excellence Methodology Continuous Improvement
Operational Excellence Methodology Continuous Improvement Duvan Luong, Ph.D. Operational Excellence Networks In our everyday life, we all have objectives. Usually, the objectives are associated with obligations
More information