1 PIDILITE INDUSTRIES LTD. PFR for Environmental Clearance (EC) of proposed Expansion project of manufacturing of Polymers based on Vinyl Acetate Monomer, Acrylate, styrene, Ethylene monomers & Adhesives based on PVA at Plot No.: A-22/1 & A-21/2, Mahad MIDC, Raigad , Maharashtra. Goldfinch Environmental Engineering Systems Private Limited ( Goldfinch ), July 2017 This report is released for the use of the M/s. Pidilite Industries Ltd. Regulators and relevant stakeholders solely as part of the subject EC of Proposed expansion project of Manufacturing of Polymers based on Vinyl Acetate Monomer, Acrylate, styrene, Ethylene monomers & Adhesives based on PVA at Plot No.: A- 22/1 & A-21/2, Mahad MIDC, Raigad , Maharashtra. Information provided (unless attributed to referenced third parties) is otherwise copyrighted and shall not be used for any other purpose without the written consent of Goldfinch/Pidilite. QUALITY CONTROL Pidilite Industries Ltd. proposed expansion project to manufacture of Polymers Name of based on Vinyl Acetate Monomer, Acrylate, styrene, Ethylene monomers & Publication Adhesives based on PVA at Plot No.: A-22/1 & A-21/2, Mahad MIDC, Raigad , Maharashtra Project Number Report No. 1 Version 1 Released August, 2017 Prepared By Mr. Siddhesh Karangutkar & Mr. Umesh Parab Reviewed By Dr. Nivedita Kulkarni Released By Mr. Anand Apte DISCLAIMER Goldfinch has taken all reasonable precautions in the preparation of this report as per its auditable quality plan. Goldfinch also believes that the facts presented in the report are based on information submitted by Pidilite and based on the technical expertise of Goldfinch as on the date it was written. However, it is impossible to dismiss absolutely, the possibility of errors or omissions. Goldfinch therefore specifically disclaims any liability of any form resulting from the use or application of the information contained in this report. The information is not intended to serve as legal advice related to the individual situation. PFR for M/s. Pidilite industries Ltd. Prepared by Goldfinch Engineering Systems Pvt. Ltd. Page 1

2 Contents 1.0 INTRODUCTION OF THE PROJECT Introduction of the Project Introduction of the Project Proponent Brief description of nature of the project Need for the project and its importance to the country and or region PROJECT DESCRIPTION Type of Project Project Location Details of alternate sites considered and the basis of selecting the proposed site Size or Magnitude of Operation Raw Materials Resource optimization/recycling and reuse envisaged in the project Availability of water its source, energy/power requirement and source Water Requirement and Source Fuel Requirement Quantity of wastes to be generated (liquid and solid) and scheme for their management/disposal Gaseous Emissions Effluent Connectivity Land Form, Land use and Land ownership Topography Soil classification Climatic data from secondary sources Social Infrastructure Availability Planning In Brief Planning Concept Land Use Planning Assessment of Infrastructure Demand (Physical & Social) Amenities/Facilities Population Projection Existing infrastructure Industrial area Residential Area PFR for M/s. Pidilite industries Ltd. Prepared by Goldfinch Engineering Systems Pvt. Ltd. Page 2

3 5.3 Green Belt Social Infrastructure Drinking Water Management Sewage System Industrial Water Management Solid Waste Management Power Requirement & Supply / source Rehabilitation and Resettlement (R & R) Plan Policy to be adopted (Central/State) in respect of the project affected persons PROJECT SCHEDULE & COST ESTIMATES Likely date of start of construction and likely date of completion Estimated project cost Economic Viability ANALYSIS OF PROPOSAL (FINAL RECOMMENDATIONS) PFR for M/s. Pidilite industries Ltd. Prepared by Goldfinch Engineering Systems Pvt. Ltd. Page 3

4 EXECUTIVE SUMMARY Since inception in 1959, Pidilite Industries Limited has been a pioneer in consumer and Specialty chemicals in India. Over two-third of the company s sales come from products and segments it has pioneered in India. Pidilite Industries is the market leader in adhesives and sealants, construction chemicals, hobby colors and polymer emulsions in India. Brand name Fevicol has become synonymous with adhesives to millions in India and is ranked amongst the most trusted brands in India. Fevicol is now the largest selling adhesives brand in Asia. Pidilite Industries Limited, has proposed an expansion project for manufacturing of polymers based on Vinyl Acetate Monomer (VAM), Acrylate, Styrene and adhesives based on Poly Vinyl Alcohol (PVA) to increase production to MT per year, at Plot no. A-22/1 & A- 21/2, MIDC- Mahad, Dist. Raigad, Maharashtra. The proposed project falls under classification 5(f) of schedules listed in EIA notification SO1533 dated 14/09/2006. Its appraisal category is B-1. Project Synopsis: Sr. No Parameters Description 1. Category as per EIA Notification 5 (f) B-1 2. Latitude 18 6'32.59"N 3. Longitude 73 28'18.96"E Existing Capacity: Products : TPA Proposed Capacity For expansion 4. Proposed Production Capacity Products : TPA Total after expansion Products : TPA 5. Total Plot Area Sq.m. Existing 2995 Sq.m + proposed 1677 Sq.m 6. Green Belt Area 7. Fresh Water Requirement Existing 202 CMD + Proposed 121 CMD Total: 323 CMD PFR for M/s. Pidilite industries Ltd. Prepared by Goldfinch Engineering Systems Pvt. Ltd. Page 4

5 Sr. No Parameters Description 8. Effluent Quantity (Trade + Domestic) 9. Trade Effluent Treatment 10. Domestic Waste water Treatment 11. Fuel requirement at full load 12. Power Requirement 13. Dispersion of emission DG Sets, Trade Effluent: Existing 42.5 CMD + Proposed 25.5 CMD Total: 68.0 CMD Domestic: Existing 8.0 CMD + Proposed 1.0 CMD Total: 9 CMD Effluent treatment plant of designed capacity 50.0 CMD consisting primary, secondary and tertiary treatment followed by RO and Evaporator. During proposed expansion it will be upgraded to Capacity of 80.0 CMD for the treatment of 68.0 CMD. Out of total effluent 48.0 CMD effluent will be sent to CETP and 20 CMD will be treat in RO and permeate will be reused for the cooling tower and gardening. Domestic wastewater treatment in proposed STP of capacity 15 CMD No Boiler or Thermopack at the site. Steam is being supplied by own adjacent plant located at A 21 Plot Steam requirement: Steam requirement Existing kg/day. Proposed Kg/Day. Total = kg/day Existing power (Connected load): 1750 KW Additional power required: 250 KW No DG set at the site, DG power is tapped from our sister concern (Pidilite A21 site). 14. Work Force Existing 222 Nos. + Additional 28 Nos. Total: 250 Nos. Existing facility cost Cr + Additional Cr 15. Total Capital Cost the project Total Cr. PFR for M/s. Pidilite industries Ltd. Prepared by Goldfinch Engineering Systems Pvt. Ltd. Page 5

6 1.0 INTRODUCTION OF THE PROJECT 1.1 Introduction of the Project Pidilite Industries Ltd. (Hereafter being referred as Pidilite for brevity in this text) proposed expansion project to manufacture of polymers based on Vinyl Acetate Monomer (VAM), Acrylate, Styrene and adhesives based on Poly Vinyl Alcohol (PVA). Since inception in 1959, Pidilite Industries Limited has been a pioneer in consumer and Specialty chemicals in India. Over two-third of the company s sales come from products and segments it has pioneered in India. Pidilite Industries is the market leader in adhesives and sealants, construction chemicals, hobby colours and polymer emulsions in India. Brand name Fevicol has become synonymous with adhesives to millions in India and is ranked amongst the most trusted brands in India. Fevicol is now the largest selling adhesives brand in Asia. Pidilite Industries Limited, has proposed an expansion project for manufacturing of polymers based on Vinyl Acetate Monomer (VAM), Acrylate, Styrene and adhesives based on Poly Vinyl Alcohol (PVA) to increase production to MT per year, at Plot no. A-22/1 & A- 21/2, MIDC- Mahad, Dist. Raigad, Maharashtra. As per the EIA Notification S.O dated 14 th September 2006, proposed activity is covered under Synthetic Organic Chemical Industry 5 (f) and needs prior environmental clearance. Further, as the proposed industry is under category B. Since it is located in a notified industrial area the project will not need public approval and is under category B Introduction of the Project Proponent List of directors along with their designation is given in Table 1-1 Table 1-1: List of Directors and their designations Name of Director Shri M B Parekh Shri N K Parekh Shri Bharat Puri Shri Bansi S Mehta Shri Ranjan Kapur Shri A B Parekh Designation Executive Chairman Non-Executive Vice Chairman Managing Director Independent Director Independent Director Whole time director PFR for M/s. Pidilite industries Ltd. Prepared by Goldfinch Engineering Systems Pvt. Ltd. Page 6

7 Shri A N Parekh Shri Sanjeev Aga Shri Uday chander Khanna Smt Meera Shankar Shri Sabyasachi Patnaik Shri Vinod Kumar Dasari Whole time director Independent Director Independent Director Independent Director Whole time director Independent Director 1.3 Brief description of nature of the project The proposed expansion will be carried out on Plot No. A-22/1 & A-21/2 at Mahad MIDC, Raigad, with land admeasuring Sq. m to manufacture of polymers having existing capacity of products TPA and after expansion having capacity of TPA. 1.4 Need for the project and its importance to the country and or region The proposed project is needed to serve increasing demand from local and international market. The finished product will earn foreign exchange, which is beneficial to economical grown of country. The project will generate extra employment to the youths. Overall the project will be beneficial to counties economic and social growth. Projection for next years Year Capacity Growth Average Gap % % % % % % PFR for M/s. Pidilite industries Ltd. Prepared by Goldfinch Engineering Systems Pvt. Ltd. Page 7

8 1.5 Demands-Supply Gap Competition in the Indian Chemical market swelled in recent years, with increasing generic penetration. This had many companies opting out of low-margin segments, as competition resulted in lower prices. This created a gap between demand and supply. Such unusual price hikes take place when there is withdrawal of some of the key competitors, which leads to demand override and as a consequence prices start soaring in a free-pricing market. 1.6 Imports vs. Indigenous Production The proposed products, including production of Specialty chemicals having high demand in the export market. Also their demand is increasing in the domestic market. Production of these products are domestically reduces the need to import these in future along with significant scope for export in these products. 1.7 Domestic /Export Markets The finished goods will be sold in domestic market and would be largely exported to the Regulated International Market as per demand all over the world. 1.8 Employment Generation due to the project We estimate that 28 additional persons would be required for additional production. PFR for M/s. Pidilite industries Ltd. Prepared by Goldfinch Engineering Systems Pvt. Ltd. Page 8

9 2.0 PROJECT DESCRIPTION 2.1 Type of Project Proposed project is an expansion project to manufacture of Polymers falling in category 5(f) B-1 of EIA notification The existing capacity of products TPA and after expansion having capacity of TPA 2.2 Project Location Pidilite has a manufacturing unit at Plot No A-22/1 & A-21/2, Mahad MIDC, Raigad. Major factories adjacent to the manufacturing unit are Ashok Alochem, Laxmi Organics and Pidilite A21 unit on East side. The proposed site is well connected by road to Mumbai- Goa National Highway (NH 66) at distance of 1.5 Km. Nearest railway station is at Veer which is 17 km away from site. The nearest airport is Mumbai at 180 km. ` Corner Latitude Longitude A 18 6'27.02"N 73 28'19.62"E B 18 6'29.95"N 73 28'16.69"E C 18 6'31.44"N 73 28'16.30"E D 18 6'33.72"N 73 28'16.09"E E 18 6'34.87"N 73 28'16.40"E F 18 6'36.85"N 73 28'21.00"E G 18 6'36.54"N 73 28'23.11"E center 18 6'32.59"N 73 28'18.96"E Figure 2-1 : Satelite Image of the Site PFR for M/s. Pidilite industries Ltd. Prepared by Goldfinch Engineering Systems Pvt. Ltd. Page 9

10 Figure 2-2 : Mahad MIDC Map PFR for M/s. Pidilite industries Ltd. Prepared by Goldfinch Engineering Systems Pvt. Ltd. Page 10

11 The project site is situated in Mahad MIDC. It is a notified industrial area where the land is owned by Maharashtra Industrial Development Corporation (MIDC) and leased to the Company. The land is meant for industrial activity. Land Ownership: Land is owned by Maharashtra Industrial Development Corporation (MIDC) and leased to the Company for 99 years. 2.3 Details of alternate sites considered and the basis of selecting the proposed site The proposal is for expansion in the existing products at same manufacturing unit using existing infrastructure only hence consideration of alternate site is not done. 2.4 Size or Magnitude of Operation The products manufactured and their capacities proposed are shown in below Table Table 2-1: Existing and Proposed Production Capacity. Proposed products for Environmental Clearance Polymeric based on VAM, Acrylate, Styrene monomers and Adhesive based on PVA Proposed products quantity (MT/A) Existing Proposed Total PFR for M/s. Pidilite industries Ltd. Prepared by Goldfinch Engineering Systems Pvt. Ltd. Page 11

12 2.5 PROCESS DESCRIPTION: Polymers based on Vinyl Acetate Monomer, Polyvinyl Alcohol, Styrene, Acryate Etc. The required quantity of Monomers is received in overhead mixing vessel/ or Reactor. Water and Surfactants are charged and emulsion is prepared. Requisite quantity of surfactants, activator/catalyst are charged to the reactor. Monomer emulsion is then added to the reactor over a period of time maintaining moderate temperature under atmospheric pressure. After the reaction, the contents are cooled, filtered and packed as product. If necessary. water and other additives are added to the reactor prior to filtration. No gases are generated and vented during the process. Process Flow Diagram: PFR for M/s. Pidilite industries Ltd. Prepared by Goldfinch Engineering Systems Pvt. Ltd. Page 12

13 Material Balance PFR for M/s. Pidilite industries Ltd. Prepared by Goldfinch Engineering Systems Pvt. Ltd. Page 13

14 Chemical reaction PFR for M/s. Pidilite industries Ltd. Prepared by Goldfinch Engineering Systems Pvt. Ltd. Page 14

15 2.6 Raw material required along with estimated quantity, likely source, marketing area of final Product/s, mode of transport of raw material and finished product Raw Materials: The detailed raw material list for proposed products as per selected capacity is detailed below for all reactants, solvents and support chemicals. Source for Raw Material Procurement: Raw Materials are easily available in the local market, from Mumbai and Gujarat. Mode of Transport of Raw Materials: Raw Material and finished goods will be transported through Trucks/ Tankers. Storage at the site: Raw Materials will be stored in storage yard at the project site. Location of storage yard is demarcated in Layout Plan. PFR for M/s. Pidilite industries Ltd. Prepared by Goldfinch Engineering Systems Pvt. Ltd. Page 15

16 Table 2-3: Details of Raw material Quantity Sr. No. Chemicals / Items Unit Capacity, MT Consump tions in MT per day Storage Physical State (Solid / Liquid / Gas) Max. qty. stored at any point of time Days of Storage Source of Supply Means of Transpor t (By Road / Ship / Air) 1 Styrene MT 46.7X2 16 Tanks Liquid Local Road 2 Dibutyl Maleate MT 15.7X2 1.6 Tanks Liquid Local Road 3 Dibutyl Pthalete MT Tanks Liquid Local Road 4 Diocyl Maleate MT Tanks Liquid Local Road 5 Vinyl Acetate Monomer 6 Methyl Methacrylate MT Tank Liquid Local Road MT Tank Liquid 15 5 Local Road 7 Butyl acrylate MT Tank Liquid Local Tanker 8 2-Ethyl Hexyl acrylate MT Tank Liquid 15 3 Local Tanker 9 Ethyl acrylate MT 87 8 Tank Liqid Local Tanker 10 Polyvinyl Alcohol MT Bags Solid 35 7 Local By Truck 11 Acrylonitrile MT Tank Liquid 15 9 Local Tanker PFR for M/s. Pidilite industries Ltd. Prepared by Goldfinch Engineering Systems Pvt. Ltd. Page 16

17 12 Acrylic acid MT Tank Liquid Local Tanker 13 Methacrylic acid MT 25 2 Tank Liquid Local Tanker 2.7 Resource optimization/recycling and reuse envisaged in the project Most energy efficient technology is selected. In proposed expansion project, domestic waste water will be treated in proposed STP of capacity 15 CMD and this treated water will be recycle. 2.8 Availability of water its source, energy/power requirement and source Water Requirement and Source Total fresh water requirement after expansion of the project for domestic and industrial activity during operation phase will be 323 CMD for first day and afterwards it will be reduced to 294 CMD. The water supply is from MIDC. The details of water requirement are given in Table 2-4 Table 2-4: Details of Raw water consumption Sr. Existing requirement Proposed Total Units No. CMD CMD CMD A Process B Utilities 1 Cooling water Boiler make up D Domestic E Gardening Total Recycle water From STP + RO Net Water requirement Power Requirement Power requirement for project made available through State Electricity Board. Present Power sanctioned load is 1750 KW. Additional 250 KW power will be required for proposed expansion. PFR for M/s. Pidilite industries Ltd. Prepared by Goldfinch Engineering Systems Pvt. Ltd. Page 17

18 Emergency power There are no DG sets at the site. DG power is tapped from our sister concern (Pidilite A21 site) Fuel Requirement As there are no DG and Boiler at the site, hence there is no requirement of fuel at the site. 2.9 Quantity of wastes to be generated (liquid and solid) and scheme for their management/disposal Gaseous Emissions Details of gaseous emissions from Process and Flue gas are given in Table 2-5 PFR for M/s. Pidilite industries Ltd. Prepared by Goldfinch Engineering Systems Pvt. Ltd. Page 18

19 Table 2-5: Details of emissions from process and flue gas A From fuel burning: Existing Proposed 1 Number of stacks vents : Nil Nil 2 Type of fuel and its quantity (Separately for each other) B From process : Steam is being supplied by own adjacent plant located at A 21 Plot : No gaseous emission from process. Continue to utilize steam from our adjacent unit located at A 21 plot Effluent The quantity of effluent generated proposed project is given in Table 2.7 S. No. Units Table 2-7: Details of Effluent Generation Effluent generation Qty. Existing Effluent generation Qty. Proposed Effluent generation Qty. Total A Process B Utilities 1 Cooling water Boiler Total C Domestic Out of total effluent, 48.0 CMD effluent will be sent to CETP and 20 CMD will be reused in cooling tower and gardening. PFR for M/s. Pidilite industries Ltd. Prepared by Goldfinch Engineering Systems Pvt. Ltd. Page 19

20 Water Balance: Particulars Consumption (CMD) Loss (CMD) Effluent (CMD) Water Requirement Existing Proposed Total Existing Proposed Total Existing Proposed Total Domestic (To STP) 1 (To STP) 9 (To STP) Industrial process Cooling Tower Gardening Total Water Recycled Total fresh water required to CETP and 20 to RO PFR for M/s. Pidilite industries Ltd. Prepared by Goldfinch Engineering Systems Pvt. Ltd. Page 20

21 Treatment Scheme for Trade Effluent The effluent from process washing after pre-treatment, utilities blow downs, floor washing, canteen and other amenities are collected under gravity. Collected effluent will be pumped to equalization tank of ETP. A screen shall be provided at the inlet of tank for removal of bigger size suspended matters. The collected effluent in equalization tank shall be subject to air scouring for equalization and acid/alkali dosing for neutralization. There will be two tanks for the purpose; one under equalization & neutralization while other is under operation. The neutralized and equalized effluent shall be pumped to primary clarifier mixer, where Poly Aluminium Chloride solution along with Flocculent shall be added for flocculation and coagulation. Coagulated effluent shall be passed through primary clarifier, in which solid liquid separation take place. Clear overflowing water free of suspended particles will be sent to secondary treatment. Settled sludge in the clarifier shall be removed periodically from the bottom for dewatering. Dewatered sludge shall be sent for disposal in TSDF, while filtrate water shall be recycled in to the system in feed well of clarifier. Effluent from primary clarifier shall be fed to aeration tank of secondary treatment system. The effluent passes through Pressure Sand Filter and GAF before going to MBR (Membrane Bio- Reactor). MBR is compact built purification system combining a biological degradation with membrane separation step. The effluent is fed to the aerated bioreactor where organic components are oxidized by activated sludge. Next the aqueous sludge passes through the membrane filtration unit, separating water from the sludge. The sludge returns to the bioreactor while permeate is discharged or sent to RO. RO reject will be treated in evaporator & the salts will be disposed to CHWTSDF. PFR for M/s. Pidilite industries Ltd. Prepared by Goldfinch Engineering Systems Pvt. Ltd. Page 21

22 M/S PIDILITE INDUSTRIES LTD. PFR for M/s. Pidilite industries Ltd. Prepared by Goldfinch Engineering Systems Pvt. Ltd. Page 22

23 Treatment Scheme for Domestic Wastewater Details of Hazardous and Non Hazardous wastes The types of Hazardous wastes generated from the project, method of disposal is shown in below table below Table 2-7: Details of Proposed Solid waste along with the Category and disposal method Hazardous Wastes 1 Type of waste Category No. Existing Qty. Total Disposal Additional 1 Spent oil Lit/ A 242 Lit/A 642 Lit/A Waste residue containing oil Waste/residue (Adhesive) & residue including filters Discarded containers/barrels & liners used for HW/Chemicals ETP Sludge and Salts from evaporator MT/A MT/A MT/A MT/A & 6.7 MT/A 1855 Nos./ A & 4017 Nos./ A MT/A & 4.0 MT/A 1125 Nos./A & 2433 Nos./A MT/A & 10.7 MT/A 3000 Nos./A & 6450 Nos./A Sale to authorized recycler Sale to authorized recycler CHWTSDF Sale to authorized recycler 38.6 MT/A MT/A 62.6 MT/A CHWTSDF 6 Spent Carbon from ETP MT/A 8.00 MT/A CHWTSDF Non Hazardous & other Wastes 1 Type of waste Qty. Total Disposal Existing Additional 1 Waste paper, Pallet, Sweeping material, Etc. 5.0 MT/M MT/M Sale 2 E-Waste MT/A 0.3 MT/A 3 Battery waste MT/A 0.4 MT/A Sale to authorized dismantlers / Recyclers. Returned to battery manufacturer through authorized dealer on buy back procurement PFR for M/s. Pidilite industries Ltd. Prepared by Goldfinch Engineering Systems Pvt. Ltd. Page 23

24 2.10 Schematic representations of the feasibility drawing which give information of EIA purpose. Project Identification What environmental impacts are normally associated with such type of projects being proposed? Pre-feasibility Analysis Is the Project feasible from an environment point of view? Project Design (a) What negative environmental impacts could arise if the proposed project is implemented with proposed design? (b) Is there alternative design with less environmental impacts? Project Appraisal Have all the environmental concerns associated with the project been eliminated? Project Implementation What environmental concerns might arise at the implementation phase of the project? Preparation of an Environment Monitoring and Evaluation Plan (a) What environment monitoring indicators are required to ensure that the implementation of components of the project will be executed within environmentally sound limits? (b) What is required to ensure that the recommended environmental control measures will be implemented and enforced? (c) (Prepare a comprehensive environment monitoring and management plan) (d) Post EIA Monitoring and Environment Audit (a) Is the implementation of components of the project being executed in an environmentally sound manner? (b) Are all the recommended environmental control measures being implemented and enforced? Are there any environmental impacts that were earlier not anticipated when EIA was done? ( Identify gaps and corrective action ) PFR for M/s. Pidilite industries Ltd. Prepared by Goldfinch Engineering Systems Pvt. Ltd. Page 24

25 3.0 SITE ANALYSIS 3.1 Connectivity Proposed unit is planned at Plot No. A-22/1 & A-21/2, Mahad MIDC, Raigad, Maharashtra. The nearest city from the site is Mahad at a distance of 6.5 Km. The nearest railway station is Veer at 17 Km The nearest airport is at Mumbai at 180 km. Site is well connected to Mumbai Goa national highway (NH 66). 3.2 Land Form, Land use and Land ownership The proposed land is situated in approved chemical zone of MIDC where land use is industrial. Land is owned by MIDC and is leased for 99 years. 3.3 Topography The industry is located at Latitude 18 6'32.59"N and Longitude '18.96"E. Toposheet of the site is shown below. The study area (10 km radius) around the project site exhibits flat terrain. Figure 3.1: Toposheet Showing Project site and 10Km of area PFR for M/s. Pidilite industries Ltd. Prepared by Goldfinch Engineering Systems Pvt. Ltd. Page 25

26 3.4 Existing land use pattern (agriculture, non-agriculture, forest, water bodies (including area under CRZ), shortest distances from the periphery of the project to periphery of the forests, national park, wild life sanctuary, eco sensitive areas, water bodies (distance from HFL of the river), CRZ. Proposed site falls under the Industrial MIDC. The land is reserved for Industrial use. Savitri river at 2.2 km and Kaal River is at 2.4 Km from the project site. 3.5 Soil classification Soil is the product of parent rocks. Climate, rainfall, humidity and vegetation affect the soil formation in the Konkan region. The soil of the district is essentially derived from the Deccan trap which is the predominant rock formation of the district. The main types of soil found in the district are black soil, khar or salt soil, coastal alluvium and literate soils. The district is has course soil, medium black soil, deep black soil and lateritic soil in 0.91 lakh hectares 1.43 lakh hectares, 0.80 lakh and 0.25 lakh hectares respectively. 3.6 Climatic data from secondary sources The climate of Raigad district is typical hot and humid that of the west coast of India characterized with plentiful and regular monsoon rainfall. The weather is oppressive in hot months and highly humid throughout the year. The summer season is from March to May followed by the south west monsoon season from June to September. The period from December to February is of winter season. Region receives the rainfall from the south-west monsoon. The average annual rainfall in the district is mm. 3.7 Social Infrastructure Availability Key infrastructure such as hospitals, schools, bank, places of worship and social/ community facilities such as park, market, playground etc. education, health care, community development, income distribution, employment and social welfare are available in nearby area of Maharashtra Industrial Estate. PFR for M/s. Pidilite industries Ltd. Prepared by Goldfinch Engineering Systems Pvt. Ltd. Page 26

27 4.0 Planning In Brief 4.1 Planning Concept MIDC Industrial area, provides many basic facilities like uninterrupted water supply, power and road network & solids disposal facility if feasible. When various sites were seen, this site appeared to be environmentally best as also from the business angle and therefore this option was finally adopted. This site is inside the campus of the MIDC and means safe transportation, less need of Utilities, less constructing buildings and roads, less fuel, less water with optimization of infrastructure. 4.2 Land Use Planning Existing land is already developed and located in a designated industrial area. The total plot area is sq.m. Table 4-2: Land Use Break Up Sr. No. Area Area in sq. m. Existing Proposed 1 Area used for manufacturing Safety area & Tank storage Area used for storage of raw materials/products Area used for utilities (Boilers, Thermopack, chimneys, D G sets, Cooling towers, ETP and STP) Administrative Building (Including offices, security, Excise office) Roads Open area Area used for green belt development Area provided for Parking Area for Storm water Nala Recreation Area Total plot area PFR for M/s. Pidilite industries Ltd. Prepared by Goldfinch Engineering Systems Pvt. Ltd. Page 27

28 4.3 Assessment of Infrastructure Demand (Physical & Social) Key infrastructure such as hospitals, schools, bank, places of worship and social/ community facilities such as park, market, playground etc. education, health care, community development, income distribution, employment and social welfare are available in nearby area of Maharashtra Industrial Estate. 4.4 Amenities/Facilities In proposed site many basic facilities like uninterrupted water supply, Power and Road Network & solids disposal facility if feasible are available. This site is inside the campus of the MIDC and means safe transportation, less need of utilities, less constructing buildings and roads, less fuel, less water with optimization of infrastructure and networking with CHWSTDF (Common Hazardous Waste Storage Treatment and Disposal facility), Taloja, in vicinity established with support of MIDC and MPCB. All nearby villages are provided with drinking water from wells or Government Water Supply Schemes RWS. Hence we do not encroach upon their supply. 4.5 Population Projection Population plays a key role in the development of the agriculture of the region. Like other districts of Maharashtra, Raigad is essentially a district of villages. The total population of the district as per census 2001 was of which per cent is rural and per cent is urban population. Out of this population per cent are male and per cent are female population. There are altogether 1919 inhabited places in the district of which 1893 are villages and 26 municipal towns. In 2011, Raigad had population of 2,634,200 of which male and female were 1,344,345 and 1,289,855 respectively. In 2001 census, Raigad had a population of 2,207,929 of which males were 1,117,628 and remaining 1,090,301 were females. Raigad District population constituted 2.34 percent of total Maharashtra population. In 2001 census, this figure for Raigad District was at 2.28 percent of Maharashtra population. PFR for M/s. Pidilite industries Ltd. Prepared by Goldfinch Engineering Systems Pvt. Ltd. Page 28

29 5.0 Existing infrastructure 5.1 Industrial area Industrial Area (Processing area) Utilities Cooling tower Non- Processing Area Administrative Cabins Security cabins Workers restroom Water reservoirs Temporary storage sites Works block etc. 5.2 Residential Area There is no residential area proposed at Site. 5.3 Green Belt The project is built on an MIDC plot with plot area of Sq.m and existing green belt area is 2995.sq.m. & proposed green belt area will be 1677 Sq.m. There are around 2150 nos. of plants already planted at the site. 5.4 Social Infrastructure The basic amenities within the study area include primary schools, dispensaries, water supply, electric supply, public telephones, hotels, banks, post offices, petrol pumps, bus services, technical training institute and entertainment etc. PFR for M/s. Pidilite industries Ltd. Prepared by Goldfinch Engineering Systems Pvt. Ltd. Page 29

30 5.5 Connectivity Proposed unit is planned at Plot No. A-22/1 & A-21/2, Mahad MIDC, Raigad, Maharashtra. The nearest city from the site is Mahad at a distance of 6.5 Km. The nearest railway station is Veer at 17 Km The nearest airport is at Mumbai at 180 km. Site is well connected to Mumbai Goa National Highway (NH 66). 5.6 Drinking Water Management The source of water supply is from MIDC. 5.7 Sewage System Domestic sewage will be treated in proposed STP of 15 CMD. Treated water will be reused for gardening. 5.8 Industrial Water Management Effluent treatment plant of designed capacity 50.0 CMD is consisting of primary, secondary and tertiary treatment followed by RO & evaporator. During proposed expansion ETP will be upgraded to capacity of 80 CMD for the treatment of 68.0 CMD of industrial effluent. Out of total effluent, 48.0 CMD effluent will be sent to CETP. Presently 12 CMD of effluent is reused and after proposed expansion 20 CMD will be reused in cooling tower and gardening after treatment in RO. 5.9 Solid Waste Management Hazardous solid waste generated from the process and from ETP will be collected, stored, transported and sent to MWML, Taloja as per Hazardous waste (Management, Handling and Transboundry Movement) Rules Power Requirement & Supply / source The present connected load is 1750 KW. Additional 250 KW power is required for proposed expansion.. PFR for M/s. Pidilite industries Ltd. Prepared by Goldfinch Engineering Systems Pvt. Ltd. Page 30

31 6.0 Rehabilitation and Resettlement (R & R) Plan 6.1 Policy to be adopted (Central/State) in respect of the project affected persons including home oustees, land oustees and landless. This project does not require acquisition of land and the infrastructure. Hence, there is no any kind of activity of Rehabilitation and resettlement carried out over it. PFR for M/s. Pidilite industries Ltd. Prepared by Goldfinch Engineering Systems Pvt. Ltd. Page 31

32 7.0 PROJECT SCHEDULE & COST ESTIMATES 7.1 Likely date of start of construction and likely date of completion The expansion activity is likely to start after getting Environmental Clearance and NOC/CTE from the authorized committee. 7.2 Estimated project cost along with analysis in terms of economic viability of the project The total investment envisaged is Rs with the break-up as given below Table 7-3 Table 7-3: Cost Break-Up Sr. No. Particulars (Cost in Cr.) Existing Proposed Total 1 Land Building & Premises Plant and Machinery & Equipment Furniture and Fixtures Environmental Management Included in Equipments Vehicles/Misc Total Cost Economic Viability The project has been conceived assuming that there will be a growth in demand for the proposed products, leading to a reasonable rate of return in the medium term. The project is considered bankable. PFR for M/s. Pidilite industries Ltd. Prepared by Goldfinch Engineering Systems Pvt. Ltd. Page 32

33 8.0 ANALYSIS OF PROPOSAL (FINAL RECOMMENDATIONS) Proposed expansion activity will provide benefits to the local people in terms of financial and social welfare. Some of the product will be exported, which will fetch foreign exchange to the Nation. Local people will get direct financial benefit by way of employment. Local people will get some contract of supply and services to get indirect income. Company will contribute in improving education and health facilities in nearby area. As the company is observing treatment of all emissions as per norm, No impact on the environment after all mitigation measures. PFR for M/s. Pidilite industries Ltd. Prepared by Goldfinch Engineering Systems Pvt. Ltd. Page 33

34 Annexure I Plant Layout PFR for M/s. Pidilite industries Ltd. Prepared by Goldfinch Engineering Systems Pvt. Ltd. Page 34

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For ToR of Proposed Project of MANUFACTURING OF SYNTHETIC ORGANIC DYES (5 f B IND II) By SHREEJI BAPA DYE CHEM PLOT NO 1319 & 1320, PHASE-III, GIDC, VATVA, AHEMADABAD-382445, GUJARAT,

More information

Shri Hari Dyes & Chemicals Plot No.: 439/1,417, Phase No. II, GIDC Estate, Vatva , Ahmedabad

Shri Hari Dyes & Chemicals Plot No.: 439/1,417, Phase No. II, GIDC Estate, Vatva , Ahmedabad Annexure Prefeasibility Report (PFR) File PRE FEASIBILITY REPORT For PROPOSED EXPANSION IN EXISTING MANUFACTURING PLANT Of Shri Hari Dyes & Chemicals Work & Regd. Office: CONTENTS Sr. No. Description 1.

More information

PROJECT FEASIBILITY REPORT

PROJECT FEASIBILITY REPORT PROJECT FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE For PROPOSED CHEMICAL MANUFACTURING UNIT From M/s. MORADIA BROTHERS CHEM PVT LTD LOCATED AT: Block No.: 45, JalBhumi Industrial Estate,

More information

PRE-FEASIBILITY REPORT. for

PRE-FEASIBILITY REPORT. for PRE-FEASIBILITY REPORT for PROPOSED COMMON EFFLUENT TREATMETN PLANT (CETP) of M/s. VIKASHTEX ENVIROTECH CETP PVT. LTD. Block No. 523, Village: Hathoda, Taluka: Mangrol, Dist: Surat - 394 405 (Guj.) Prepared

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT VENSUB LABORATORIES PRIVATE LIMITED SY. NO. 29, TUPAKULAGUDEM VILLAGE, TALLAPUDI MANDAL, WEST GODAVARI DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT VENSUB LABORATORIES PRIVATE LIMITED Duplex No. 12,

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For Polyurethane Foam Manufacturing Facility Of M/s. KRISHNA MARUTI LTD. At Plot No-13, SMG JV Park, Block No- 334,335 Vill- Hansalpur, Tal - Mandal Dist.: Ahmedabad, Gujarat INDEX

More information

IDA, JEEDIMETLA, QUTUBULLAPUR MANDAL, RANGAREDDY DISTRICT, TELANGANA

IDA, JEEDIMETLA, QUTUBULLAPUR MANDAL, RANGAREDDY DISTRICT, TELANGANA M/s. ARTEMIS BIO TECH LTD., (A Division of Themis Medicare Ltd.,) PLOT NO. 1 & 5, Phase I, IDA, JEEDIMETLA, QUTUBULLAPUR MANDAL, RANGAREDDY DISTRICT, TELANGANA PRE FEASIBILITY REPORT Artemis Bio tech Ltd.,

More information

Kana Aroma Industries. Pre-Feasibility Report

Kana Aroma Industries. Pre-Feasibility Report Pre-Feasibility Report 1. INTRODUCTION M/s. is a proposed unit to be located at Shed no. C1-41/B/1 & 2, GIDC Industrial Estate, Nandesari, Vadodara, Gujarat and proposes to manufacture Allyl Iso Thiocynate,

More information

Consultant: M/s. SADEKAR ENVIRO ENGINEERS PVT. LTD.

Consultant: M/s. SADEKAR ENVIRO ENGINEERS PVT. LTD. Summary For Ria Organics Private Limited, D-26/2, Kurkumbh - MIDC, Taluka - Daund Dist. Pune, Maharashtra, India. Consultant: M/s. SADEKAR ENVIRO ENGINEERS PVT. LTD. Accredited by QCI NABET Lab. Recognized

More information

M/s. SAL STEEL LTD Survey no.245/p, Village:-Bharapar, Taluka:- Gandhidham, District:-Kutch, Gujarat.

M/s. SAL STEEL LTD Survey no.245/p, Village:-Bharapar, Taluka:- Gandhidham, District:-Kutch, Gujarat. Pre-Feasibility Study Report For Proposed Fly Ash Co-processing clinker grinding cement Unit of 40,000 MT/month Production capacity within our Existing Premises for M/s. SAL STEEL LTD Survey no.245/p,

More information

M/S. CLEAN SCIENCE PRIVATE LIMITED.

M/S. CLEAN SCIENCE PRIVATE LIMITED. M/S. CLEAN SCIENCE PRIVATE LIMITED. PFR for Environmental Clearance (EC) of Proposed Greenfield project of Manufacturing of Synthetic Organic Chemicals at Plot No.: No.: D-25/1/1 MIDC, Kurkumbh, Tehsil

More information

Environment Clearance for Proposed Inland Water Transport along East Coast of Mumbai.

Environment Clearance for Proposed Inland Water Transport along East Coast of Mumbai. To, Maharashtra Maritime Board at Ferry Wharf (Bhaucha Dhakka), Nerul and Mandwa Environment department, Room No. 217, 2nd floor, Mantralaya, Annexe, Mumbai- 400 032. Date:April 10, 2017 Subject: Sir,

More information

Prefeasibility Report. 30,000 KLPY Anhydrous (Absolute) Alcohol Manufacturing Plant at Patalganga MIDC

Prefeasibility Report. 30,000 KLPY Anhydrous (Absolute) Alcohol Manufacturing Plant at Patalganga MIDC Prefeasibility Report For 30,000 KLPY Anhydrous (Absolute) Alcohol Manufacturing Plant at Patalganga MIDC of Alkyl Amines Chemicals Limited 401-407 Nirman Vyapar Kendra, Plot No. 10, Sector 17, Vashi,

More information

Table 1.1: The Salient Features of the Project. Proposed Quartz Mine Of Sri. Syed Masthan Basha

Table 1.1: The Salient Features of the Project. Proposed Quartz Mine Of Sri. Syed Masthan Basha 1. EXECUTIVE SUMMARY 1.1 Introduction The Eknampuram Quartz mine of 89.80 Acres/ 36.34 ha is located in Sy. No. 60, Eknampuram Village, C.S. Puram Mandal, Prakasam District, Andhra Pradesh has been allotted

More information

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION Jaypee Group is a leading Business House of the country with its presence in Core industries and Service Sectors like Cement, Infrastructure development,

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT DR. REDDY S LABORATORIES LTD. CHEMICAL TECHOPS III PLOT NO.116, 116A, 116B & 126C, S.V. CO OP. IND. ESTATE, BOLLARAM VILLAGE, JINNARAM MANDAL, MEDAK DISTRICT, TELANGANA PRE FEASIBILITY REPORT DR. REDDY

More information

PRE-FEASIBILITY REPORT FOR OM SAIRAM STEEL AND ALLOYS PVT LTD

PRE-FEASIBILITY REPORT FOR OM SAIRAM STEEL AND ALLOYS PVT LTD PRE-FEASIBILITY REPORT FOR OM SAIRAM STEEL AND ALLOYS PVT LTD PLOT No. F-1,2,3,8,9,10, ADDL. MIDC, PHASE II, AND GUT NO. 46 & 63, VILLAGE DAREGAON, TEHSIL: JALNA DIST: JALNA, MAHARASHTRA 2014-15 1. Executive

More information

PRE FEASIBILITY REPORT. For PROPOSED BULK DRUG PRODUCTS MANUFACTURING UNITS. M/s. M.K. DRUGS. F-10, Industrial Area, Focal Point, Tehsil: Derabassi

PRE FEASIBILITY REPORT. For PROPOSED BULK DRUG PRODUCTS MANUFACTURING UNITS. M/s. M.K. DRUGS. F-10, Industrial Area, Focal Point, Tehsil: Derabassi PRE FEASIBILITY REPORT For PROPOSED BULK DRUG PRODUCTS MANUFACTURING UNITS Of M/s. M.K. DRUGS F-10, Industrial Area, Focal Point, Tehsil: Derabassi Dist: Mohali, Punjab INTRODUCTION M/s. M.K. Drugs is

More information

4. The ambient air quality monitoring stations We are monitoring the ambient air quality

4. The ambient air quality monitoring stations We are monitoring the ambient air quality GLOBAL CALCIUM PRIVATE LTD., 125&126, SIPCOT COMPLEX, HOSUR 635 126 Ref : No. J-11011/411/2006-IA-II(I) dated 1 st August 2007. Compliance Report for the Period ending 31.3.2015 Sl. Specific Conditions

More information

CHECK LIST OF DOCUMENTS / OTHER REQUISITES FOR OBTAINING VARIOUS CLEARANCES FROM THE STATE POLLUTION CONTROL BOARD, ODISHA.

CHECK LIST OF DOCUMENTS / OTHER REQUISITES FOR OBTAINING VARIOUS CLEARANCES FROM THE STATE POLLUTION CONTROL BOARD, ODISHA. CHECK LIST OF DOCUMENTS / OTHER REQUISITES FOR OBTAINING VARIOUS CLEARANCES FROM THE STATE POLLUTION CONTROL BOARD, ODISHA. A. CONSENT TO ESTABLISH UNDER THE PROVISIONS OF WATER (PREVENTION & CONTROL OF

More information

Proposed Greenfield project of Speciality Chemicals & Intermediates at Plot No.:B-14, MIDC Mahad, Dist: Mahad, Maharashtra

Proposed Greenfield project of Speciality Chemicals & Intermediates at Plot No.:B-14, MIDC Mahad, Dist: Mahad, Maharashtra CLASSIC OIL LTD. PFR for Environmental Clearance (EC) of Proposed Greenfield project of Manufacturing of speciality Chemicals& intermediates at Plot No.: B-14 MIDC Mahad, District: Raigad, Maharashtra

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT for PROPOSED EXPANSION OF DISTILLERY of M/s. SHREE GANESH KHAND UDYOG SAHKARI MANDLI LTD. Shri Harisinhji Mahida Bhavan, At & Po: Vataria, Tal: Valia, Dist: Bharuch, Gujarat-393001

More information

Pre Feasibility Report

Pre Feasibility Report Pre Feasibility Report For 20 MLD Common Effluent Treatment Plant (ZLD) With Recycling of Treated Waste Water For Textile Processing Industries At TDK Green Enviro Private Limited Village Tadkeshwar, Taluka

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. (Change in Technology) at Hindadih Village, Masturi Tehsil Bilaspur District, Chhattisgarh Submitted to

More information

TECHNOLOGIES IN WASTE PRESENTATION ON EMERGING WATER TREATMENT THERMAX LTD WELCOME

TECHNOLOGIES IN WASTE PRESENTATION ON EMERGING WATER TREATMENT THERMAX LTD WELCOME WELCOME TO PRESENTATION ON EMERGING TECHNOLOGIES IN WASTE WATER TREATMENT BY THERMAX LTD Thermax Solutions Steam & Hot Water for Health Club Hot Water for Swimming Pool Hot Water for Room Service Air Pollution

More information

M/s. Pest Control (India) Pvt. Ltd.

M/s. Pest Control (India) Pvt. Ltd. Prefeasibility Report of Pest Control (India) Pvt. Ltd. at, Plot no. 38 and 39, MIDC Taloja, Taluka Panvel, District Raigad, Maharashtra Prepared by, Sadekar Enviro Engineers Pvt. Ltd. QCI-NABET Accredited

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For PRIOR ENVIRONMENTAL CLEARANCE STORAGE CAPACITY ENHANCEMENT OF HPCL, LPG BOTTLING PLANT Capacity: 3 X 500 MT At Plot No.499 Kota-Jhalawar Road (NH-12) Village- Mandana, Tehsil-

More information

Membrane Filtration Technology: Meeting Today s Water Treatment Challenges

Membrane Filtration Technology: Meeting Today s Water Treatment Challenges Membrane Filtration Technology: Meeting Today s Water Treatment Challenges Growing global demand for clean water and increasing environmental concerns make membrane filtration the technology of choice

More information

F.P.No.52, S.No.53/B, 54/2/B, D.T.P.S.No.80, Village: Bhat, Dist: Gandhinagar.

F.P.No.52, S.No.53/B, 54/2/B, D.T.P.S.No.80, Village: Bhat, Dist: Gandhinagar. 20. Karnavati Premier Living F.P.No.52, S.No.53/B, 54/2/B, D.T.P.S.No.80, Village: Bhat, Dist: Gandhinagar. Screening & scoping / appraisal Details of the proposed project as presented before the committee

More information

PRE- FEASIBILITY REPORT

PRE- FEASIBILITY REPORT PRE- FEASIBILITY REPORT PREPARED FOR SHIV SHANTHI CEMENT PRIVATE LIMITED Sy. Nos. 92, 93 & 94, Tatiguda Village, Garividi Mandal, Vizianagaram District, Andhra Pradesh. PREPARED BY ISO 9001: 2008 Certified

More information

2. A SURVEY OF EFFLUENT TREATMENT PLANTS IN TANNING INDUSTRIES AROUND TIRUCHIRAPPALLI

2. A SURVEY OF EFFLUENT TREATMENT PLANTS IN TANNING INDUSTRIES AROUND TIRUCHIRAPPALLI 2. A SURVEY OF EFFLUENT TREATMENT PLANTS IN TANNING INDUSTRIES AROUND TIRUCHIRAPPALLI 2.1. INTRODUCTION Currently, the overall share of India in the global leather trade is around 3% (ITC, 1999). There

More information

Sr. No. Date of starting the project and completion schedule. January 2012 January 2017 (Tentative)

Sr. No. Date of starting the project and completion schedule. January 2012 January 2017 (Tentative) Six Monthly Progress Report reg. Construction of Group Housing Colony at village Sarai Aurangabad in Sector 3-A, Bahadurgarh (Distt. Jhajjar), Haryana by M/s Prabhu Shanti Real Estate Pvt. Ltd., due in

More information

Nadeem Shakir Qatar Petroleum. The 2nd Joint Qatar Japan Environmental Symposium, QP JCCP The 21st Joint GCC Japan Environmental Symposium

Nadeem Shakir Qatar Petroleum. The 2nd Joint Qatar Japan Environmental Symposium, QP JCCP The 21st Joint GCC Japan Environmental Symposium Nadeem Shakir Qatar Petroleum Scheme of Presentation General Overview of QP Refinery, Mesaieed. Challenges in Treatment Existing Waste Water Treatment Facilities Capacity Expansion and Upgradation of WWTP

More information

INTRODUCTION. Installed Capacity: The total installed capacity of the plant for the product will be as per details given below:- PRODUCT:

INTRODUCTION. Installed Capacity: The total installed capacity of the plant for the product will be as per details given below:- PRODUCT: INTRODUCTION Himalaya Alkalies& Chemicals ltd will setup Caustic soda Plant of 400 MTPD. The Plant site is situated in Village Johron, Kala Amb, Tehsil Nahan, District Sirmaur, Himachal Pradesh. It is

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. 0.96 MTPA Wet type Coal Washery at Birgahani Village, Baloda Tehsil Janjgir-Champa District, Chhattisgarh

More information

Environmental Impact Assessment

Environmental Impact Assessment Environmental Impact Assessment A brief discussion Presented by: Apekshit Solanki Kirti Neetu Yadav Sameera Vishakha Shankar Introduction EIA is a formal process to predict the environmental consequences

More information

The unit obtained NOC (CFE) of A.P. Pollution control Board in the year 1988 and started operations.

The unit obtained NOC (CFE) of A.P. Pollution control Board in the year 1988 and started operations. 1. Introduction M/s. Sri Krishna Pharmaceuticals Limited, Unit-III (Formerly Sri Krishna Drugs Limited) was established in the year 1988. It is located at Sy. No. 57, Golkonda kalan, Raikunta (V), shamshabad

More information

Rawal Lake Water Treatment Plant Rawalpindi, Pakistan

Rawal Lake Water Treatment Plant Rawalpindi, Pakistan Rawal Lake Water Treatment Plant Rawalpindi, Pakistan 1. Background Information Rawal Lake Water Treatment Plant is managed by the Water & Sanitation Agency (WASA) under the Rawalpindi Development Authority

More information

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA 1.0 INTRODUCTION M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA dry type of coal washery at Village: Hindadih, Tehsil: Masturi, District: Bilaspur (C.G.) for which

More information

Sustainable Industrial Waste Water Management for a Industrial development cooperation in Thane, Maharashtra

Sustainable Industrial Waste Water Management for a Industrial development cooperation in Thane, Maharashtra Sustainable Industrial Waste Water Management for a Industrial development cooperation in Thane, Maharashtra Pratik Patil #, Oshmi Ghosh*and H. Jeswani** # Graduate Student, Civil Engineering Dept., Sardar

More information

Phase II (BIA Phase-II),

Phase II (BIA Phase-II), PROJECT PREFEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENTAL CLEARENCE IN TERMS OF PROVISIONS OF EIA NOTIFICATION-2006 1.0 EXECUTIVE SUMMARY OF THE PROJECT Sr. No Description Details 1 Proposed project

More information

PRE FEASIBILITY REPORT INCREASE IN THE PRODUCTION OF PENTAERYTHRITOL FROM 560 MTM TO 730 MTM & SODIUM FORMATE FROM 336 MTM TO 480 MTM

PRE FEASIBILITY REPORT INCREASE IN THE PRODUCTION OF PENTAERYTHRITOL FROM 560 MTM TO 730 MTM & SODIUM FORMATE FROM 336 MTM TO 480 MTM PRE FEASIBILITY REPORT INCREASE IN THE PRODUCTION OF PENTAERYTHRITOL FROM 560 MTM TO 730 MTM & SODIUM FORMATE FROM 336 MTM TO 480 MTM (PRODUCT IS IN POWDER & SOLUTION FORM) at SIPCOT INDUSTRIAL COMPLEX,

More information

Improvements in Pollution Management Vapi Industrial Estate

Improvements in Pollution Management Vapi Industrial Estate Improvements in Pollution Management Vapi Industrial Estate August 2009 Background Vapi is a highly successful industrial estate in Gujarat, India. Developed by Gujarat Industrial Development Corporation

More information

6 WASTEWATER. 6.1 Overview. 6.2 Darvill Wastewater Works

6 WASTEWATER. 6.1 Overview. 6.2 Darvill Wastewater Works 6 WASTEWATER 6.1 Overview Umgeni Water currently owns and operates the Darvill and Ixopo Wastewater Works (WWWs). It also operates the Howick WWW for umgungundlovu District Municipality under a management

More information

Ministry of Environment & Forests (C.P. Division) Revised Guidelines for the Centrally Sponsored Scheme of Common Effluent Treatment Plants (CETPs)

Ministry of Environment & Forests (C.P. Division) Revised Guidelines for the Centrally Sponsored Scheme of Common Effluent Treatment Plants (CETPs) Ministry of Environment & Forests (C.P. Division) ++ Revised Guidelines for the Centrally Sponsored Scheme of Common Effluent Treatment Plants (CETPs) 1. Introduction: Under the Water (Prevention and Control

More information

PROJECT BRIEF. Noise environment: No Entrant noise generation sources exist in and around project area.

PROJECT BRIEF. Noise environment: No Entrant noise generation sources exist in and around project area. PROJECT BRIEF PROJECT LOCATION: - Pahar Kua Marble Range Mining Project Q L No 235 is located near village Pahar Kua, Tehsil Makrana., District Nagaur Rajasthan. Project is approachable from national highway.

More information

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 Group Housing Complex My woods AT Plot no. GH-04, Sector -16 C, Noida Extension, Greater Noida, U.P. Being developed by M/s Mahagun India Pvt. Ltd. A-19, Sector-63,

More information

ADDITIONAL ATTACHMENTS TO FORM-1 M/S. SDB DIAMOND BOURSE

ADDITIONAL ATTACHMENTS TO FORM-1 M/S. SDB DIAMOND BOURSE ADDITIONAL ATTACHMENTS TO FORM-1 FOR OBTAINING ENVIRONMENT CLEARANCE For Proposed Commercial Complex Surat Diamond Bourse M/S. SDB DIAMOND BOURSE Block No. 177/P, Moje- Khajod, Taluka- Surat City, District

More information

North East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA)

North East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA) SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF North East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA) Proposed at: Bonda Industrial

More information

Lowering The Total Cost Of Operation

Lowering The Total Cost Of Operation Lowering The Total Cost Of Operation The system removes more solids than conventional clarification, so filters can run longer between backwash cycles. Fewer backwash cycles means less backwash water,

More information

Form V is to be filled before 30th September annually; for the period from 1st April to 31st March PART A. Company Information

Form V is to be filled before 30th September annually; for the period from 1st April to 31st March PART A. Company Information Form V is to be filled before 30th September annually; for the period from 1st April to 31st March PART A Company Information Company Name : Facility Name : Person Name * : Designation * : Premise Name

More information

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra Draft Terms of References (ToR) (Based on the model TOR given in Environmental Impact Assessment Guidance Manual for building construction projects by MoEF & CC) For PROPOSED IT PARK By M/s.Balewadi Tech

More information

Max. building height (m)

Max. building height (m) Environmental Management Plan (EMP) for Himalaya Falaknuma by Himalaya Developers Ahmedabad No. Particulars Details 1. Proposal for New Project 2. Type of Project and Commercial Building Construction Project

More information

Zero Discharge for Textile Industry

Zero Discharge for Textile Industry Zero Discharge for Textile Industry C K Sandeep, General Manager Corporate Marketing, Ion Exchange (India) Ltd. Introduction The post liberalization period has led to the rapid growth of industrial output

More information

Evaluation of Conventional Activated Sludge Compared to Membrane Bioreactors

Evaluation of Conventional Activated Sludge Compared to Membrane Bioreactors Evaluation of Conventional Activated Sludge Compared to Membrane Bioreactors Short Course on Membrane Bioreactors 3/22/06 R. Shane Trussell, Ph.D., P.E. shane@trusselltech.com Outline Introduction Process

More information

FEASILBLITY REPORT. CONVERSION OF PAPL Facility to produce POLYOLS

FEASILBLITY REPORT. CONVERSION OF PAPL Facility to produce POLYOLS FEASILBLITY REPORT CONVERSION OF PAPL Facility to produce POLYOLS Petro Araldite Pvt. Ltd (PAPL) was set up in the year 1996 as joint venture between Ciba India Limited (part of the Swiss Ciba Geigy group

More information

PREFEASIBILITY REPORT OF PROPOSED BUILDING LIMESTONE PROJECT OF

PREFEASIBILITY REPORT OF PROPOSED BUILDING LIMESTONE PROJECT OF PREFEASIBILITY REPORT OF PROPOSED BUILDING LIMESTONE PROJECT OF Indulal C. Vora AT VILLAGE:- Palakhda, TALUKA:- Porbandar, DIST.:-Porbandar 1 (B) CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE SUMMARY

More information

Details of the proposed project as presented before the committee are tabulated below:

Details of the proposed project as presented before the committee are tabulated below: Shrungal Homes Block No. 141, F.P.No.42, O.P.No.42, T.P.S.No.58 (Bamroli), Choryasi, Surat. Screening & scoping / appraisal. Details of the proposed project as presented before the committee are tabulated

More information

RED CATEGORY CONSENT & AUTHORIZATION ORDER BY REGISTERED POST WITH ACKNOWLEDGEMENT DUE

RED CATEGORY CONSENT & AUTHORIZATION ORDER BY REGISTERED POST WITH ACKNOWLEDGEMENT DUE ANDHRA PRADESH POLLUTION CONTROL BOARD Paryavarana Bhavan, A-III, Industrial Estate, Sanathnagar, Hyderabad-500 018 Phone : 040-23887500, Website : www.appcb.ap.nic.in RED CATEGORY CONSENT & AUTHORIZATION

More information

M/s.Aarti Industries Limited (Apple Organics Division), Vapi.

M/s.Aarti Industries Limited (Apple Organics Division), Vapi. EXECUTIVE SUMMARY M/s. Aarti Industries Limited (Apple Organics Division) first obtained CCA order 3431, issued on 16/08/2004. Further it was extended by CCA order no. AWH-73091 dated 14/09/2015 for manufacturing

More information

Proposal by Russia to delete hot sub-spot Hot sub-spot name South-West Wastewater Treatment Plant

Proposal by Russia to delete hot sub-spot Hot sub-spot name South-West Wastewater Treatment Plant Proposal by Russia to delete hot sub-spot 18.4 LAND 14/2009, Document 6/3/Rev.1 ATTACHMENT 1. Hot sub-spot name South-West Wastewater Treatment Plant 2. Location Block 2, 123, Volkhonskoye shosse, St.

More information

Profile No.: 40 NIC Code: CASEIN FROM MILK

Profile No.: 40 NIC Code: CASEIN FROM MILK Profile No.: 40 NIC Code: 10797 CASEIN FROM MILK 1. INTRODUCTION: Casein is the major protein in cows and buffalo milk, and comprises about 80 % of the total protein content of which the rest, some 20

More information

ENVIRONMENTAL MANAGEMENT PLAN. CONSTRUCTION PHASE 1.Construction Contractors

ENVIRONMENTAL MANAGEMENT PLAN. CONSTRUCTION PHASE 1.Construction Contractors 1. Increased water demand (12 KLD) due water usage for, dust suppression and for workers 2. Sewage generation (11 KLD) and disposal 3. Municipal solid waste generation (15 kg/day) by workers 4. Construction

More information

Rajasthan State Pollution Control Board

Rajasthan State Pollution Control Board M/s Raj West Power Private Limited Village- Bhadresh, Tehsil:Barmer District:Barmer Sub: Ref: Sir, Consent to Operate under section 25/26 of the Water (Prevention & Control of Pollution) Act, 1974 and

More information

PRE FEASIBILITY REPORT PROPOSED CONSCTRUCTION BUILDING PROJECT

PRE FEASIBILITY REPORT PROPOSED CONSCTRUCTION BUILDING PROJECT PRE FEASIBILITY REPORT FOR PROPOSED CONSCTRUCTION BUILDING PROJECT (BUILT UP AREA: 77420.15 SQ. M) BY AMC EWS HOUSING PROJECT RESIDENTIAL BUILDING & COMMERCIAL PROJECT F. P. NO. 174, T.P. NO. 32, GOTA,

More information

Pre-Feasibility Report for. New Synthetic Organic Chemical Manufacturing Unit. M/s Veeral Additives Private Limited

Pre-Feasibility Report for. New Synthetic Organic Chemical Manufacturing Unit. M/s Veeral Additives Private Limited Pre-Feasibility Report for New Synthetic Organic Chemical Manufacturing Unit By M/s. Veeral Additives Private Limited PROJECT TERMED UNDER SCHEDULE 5 (f) (SYNTHETIC ORGANIC CHEMICALS) CATEGORY - B Prepared

More information

Bishunpur Small Hydro Power Project

Bishunpur Small Hydro Power Project 1.0 INTRODUCTION 1.1 General The state of Jharkhand almost comprises hilly terrain mostly of Chhotanagpur plateau and 30% of total area (79,714 sq km) is covered with forest. The normal annual rainfall

More information

Your Water Treatment Technology Partners for Wash Water & Industrial Water Treatment. Design Supply Integration Installation Maintenance

Your Water Treatment Technology Partners for Wash Water & Industrial Water Treatment. Design Supply Integration Installation Maintenance Your Water Treatment Technology Partners for Wash Water & Industrial Water Treatment Design Supply Integration Installation Maintenance The Challenge for Businesses that Use Water PUBLIC HEALTH EPA state

More information

Reclaimed Waste Water for Power Plant Cooling Tower Water & Boiler Feed Make-up. Richard Coniglio, Business Product Manager

Reclaimed Waste Water for Power Plant Cooling Tower Water & Boiler Feed Make-up. Richard Coniglio, Business Product Manager Reclaimed Waste Water for Power Plant Cooling Tower Water & Boiler Feed Make-up Richard Coniglio, Business Product Manager 70% Covered with Water 3% is Fresh Water 1% of the Fresh Water is only accessible.

More information

PRE FEASIBILITY REPORT (PFR)

PRE FEASIBILITY REPORT (PFR) APPLICANT : M/s PLANTERS AGGREGATES 27 PRE FEASIBILITY REPORT (PFR) APPLICANT : M/s PLANTERS AGGREGATES 28 INDEX S. No. Contents Page No. 1.0 EXECUTIVE SUMMARY 30 2.0 INTRODUCTION OF THE PROJECT / BACKGROUND

More information

Aqua Pristine Global Technologies, an ISO 9001:2008 & CE certified company is a leading supplier of world class Domestic RO, Industrial RO Plant,

Aqua Pristine Global Technologies, an ISO 9001:2008 & CE certified company is a leading supplier of world class Domestic RO, Industrial RO Plant, Aqua Pristine Global Technologies, an ISO 9001:2008 & CE certified company is a leading supplier of world class Domestic RO, Industrial RO Plant, Domestic Water Softener, Industrial Water Softener, Sand

More information

final report Water quality improvement strategy for a processing site

final report Water quality improvement strategy for a processing site final report Project title: Water Quality Improvement Strategy Project code: P.PSH.0449 Prepared by: GHD Date published: July 2010 PUBLISHED BY Meat & Livestock Australia Limited Locked Bag 991 NORTH SYDNEY

More information

KARNATAKA STATE POLLUTION CONTROL BOARD

KARNATAKA STATE POLLUTION CONTROL BOARD KARNATAKA STATE POLLUTION CONTROL BOARD FORM - XIII (To be submitted in triplicate) Application for consent for establishment or taking any step for establishment of industries, operation, or any process

More information

HINAUTI LIMESTONE MINE Mine Lease area ha. (A UNIT OF JAIPRAKASH ASSOCIATES LIMITED) JAYPEE VIHAR, SIDHI (M.P)

HINAUTI LIMESTONE MINE Mine Lease area ha. (A UNIT OF JAIPRAKASH ASSOCIATES LIMITED) JAYPEE VIHAR, SIDHI (M.P) HINAUTI LIMESTONE MINE Mine Lease area 378.261 ha. (A UNIT OF JAIPRAKASH ASSOCIATES LIMITED) JAYPEE VIHAR, SIDHI (M.P) 2012-2013 SUBMITTED TO M.P.POLLUTION CONTROL BOARD BHOPAL (M.P.) Jaypee Sidhi Cement

More information

Watershed Management and Rainwater Harvesting in Vishwaniketan Campus

Watershed Management and Rainwater Harvesting in Vishwaniketan Campus Watershed Management and Rainwater Harvesting in Vishwaniketan Campus 1. Rupesh Devale, 2 Sayyed Sohail, 3 Dr. Seema Jagtap 1 PG Student, Dept. of Civil Engg, Yadavrao Tasgonkar College of Engg. and Management,

More information

Proposal by Russia to delete hot spot 18.2

Proposal by Russia to delete hot spot 18.2 Proposal by Russia to delete hot spot 18.2 1. Hot spot Central Aeration Station 2. Location 1, Bely Island, St. Petersburg 3. Reasons for designation of hot spot Discharges of phosphorus higher than requirements

More information

PRE - FEASIBILITY REPORT

PRE - FEASIBILITY REPORT PRE - FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE For EXISTING MINING ACTIVITY CATEGARY B2 UNDER THE EIA NOTIFICATION 2006 AMENDED ON 31/05/2012 TO PIRABHAI VALABHAI NANDASANIYA LOCATED

More information

Unit Treatment Processes in Water and Wastewater Engineering

Unit Treatment Processes in Water and Wastewater Engineering Unit Treatment Processes in Water and Wastewater Engineering T J Casey AQUAVARRA RESEARCH LIMITED 22A Brookfield Avenue Blackrock Co. Dublin. October 2006 Author s Note Water and wastewater treatment technology

More information

Pre-Feasibility Report. for. Proposed Construction project of Santnagari

Pre-Feasibility Report. for. Proposed Construction project of Santnagari Pre-Feasibility Report for Proposed Construction project of Santnagari at Survey No. 1439, Near Dharoi Dam, Village Mahor, Taluka Vadali, District Sabarkantha, Gujarat By Gujarat Pavitra Yatradham Vikas

More information

STANDARD OPERATING PROCEDURE

STANDARD OPERATING PROCEDURE STANDARD OPERATING PROCEDURE Consent to Established/Operate Procedural Guidelines Consent to Establish NOC Check List Consent to Operate NOC Check List Renewal to Consent to Operate Check List Time Frame

More information

ESG - Twillingate Shrimp Shell Drying Operation. Additional Information as Requested by the Minister of the Department of Environment

ESG - Twillingate Shrimp Shell Drying Operation. Additional Information as Requested by the Minister of the Department of Environment ESG - Twillingate Shrimp Shell Drying Operation Additional Information as Requested by the Minister of the Department of Environment 1. Design and Operational Details Our plan is to operate 24 hours per

More information

INNOVATIVE WASTEWATER TREATMENT PROCESS FOR EASTERN COASTAL AREA

INNOVATIVE WASTEWATER TREATMENT PROCESS FOR EASTERN COASTAL AREA INNOVATIVE WASTEWATER TREATMENT PROCESS FOR EASTERN COASTAL AREA Dr.-Ing. Marius Mohr Regional Workshop on Integrated Resource Management in Asian Cities: The Urban Nexus Da Nang, Vietnam, 25 June 2014

More information

Individual Residential Spray Irrigation Systems (IRSIS)

Individual Residential Spray Irrigation Systems (IRSIS) Individual Residential Spray Irrigation Systems (IRSIS) The components, function, and recommended maintenance of an Individual Residential Spray Irrigation System (or IRSIS) are discussed. The IRSIS was

More information

Wastewater Treatment Processes

Wastewater Treatment Processes Wastewater Treatment Processes CEL212 Environmental Engineering (2 nd Semester 2010-2011) Dr. Arun Kumar (arunku@civil.iitd.ac.in) Department of Civil Engineering Indian Institute of Technology (Delhi)

More information

TEXTILE INDUSTRY AND ENVIRONMENT. W.J.K.Dushyanthi Ranpatige Research Officer Industrial Technology Institute

TEXTILE INDUSTRY AND ENVIRONMENT. W.J.K.Dushyanthi Ranpatige Research Officer Industrial Technology Institute TEXTILE INDUSTRY AND ENVIRONMENT W.J.K.Dushyanthi Ranpatige Research Officer Industrial Technology Institute The textile industry One of the major contributors to many Asian economies and one of the main

More information

WATER RECYCLING SOLUTIONS

WATER RECYCLING SOLUTIONS WATER RECYCLING SOLUTIONS Reverse Osmosis De-Mineralization Softening Sand/ Carbon Filtration Cartridge/ Bag Filtration Zero Liquid Discharge EVIAN ENGINEERING PRIVATE LIMITED A-80, Mohan Garden, Uttam

More information

PART A. M/s Shree Cement Ltd, (Grinding Unit) village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan

PART A. M/s Shree Cement Ltd, (Grinding Unit) village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan Page 1 of 9 Environmental Statement for Clinker Grinding Unit of M/s Shree Cement Limited, situated at village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan for the Period from: 10

More information

GENERAL COMPANY FOR CHEMICAL INDUSTRIES

GENERAL COMPANY FOR CHEMICAL INDUSTRIES GENERAL COMPANY FOR CHEMICAL INDUSTRIES A PANORAMIC VIEW OF GCCI INTRODUCTION TO GCCI The construction of the GCCI at Abu Kammash is one of the largest industrial projects carried out in the LIBYAN Jamahiriya.

More information

Prefeasibility Report

Prefeasibility Report Prefeasibility Report Proposed 60 KLPD Grain Based Distillery At sr. no. 126,127&110 Village Kadwa-Mhalungi, Tal. Dindori, Dist. Nashik, Maharashtra Pernod Ricard India Pvt. Ltd. Environmental Consultant

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT Of Stone Quarry (Area 1.00 ha) Survey No: - 526, 527 & 528 (Part) Village Raimoha, Taluka Shirur (Kasar), Dist - Beed (M.S). Owner & Lessee Shri. Chakradhar Subhash Dhakane Prepared

More information

WATER RECYCLING PLANT IN WAFRA. Feras Al Salem

WATER RECYCLING PLANT IN WAFRA. Feras Al Salem WATER RECYCLING PLANT IN WAFRA Feras Al Salem Introduction 2 The Joint Operations (JO) was born in 1960 when the two oil companies formed a joint committee to oversee and supervise their operations with

More information

TOTAL WATER MANAGEMENT IN THE STEEL INDUSTRY. By N. Ramachandran, Ion Exchange (India) Ltd

TOTAL WATER MANAGEMENT IN THE STEEL INDUSTRY. By N. Ramachandran, Ion Exchange (India) Ltd TOTAL WATER MANAGEMENT IN THE STEEL INDUSTRY By N. Ramachandran, Ion Exchange (India) Ltd Large quantities of water are required to produce steel and steel products - typically 180-200 m 3 of water per

More information

Environmental Clearance Compliance Half Yearly Report

Environmental Clearance Compliance Half Yearly Report Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- April 2015 to September 2015 Ref: 1. MOEF, New Delhi Environment Clearance F. No. J-11011/119/2007- IA II (I) dated

More information

JAYPEE NIGRIE SUPER THERMAL POWER PROJECT

JAYPEE NIGRIE SUPER THERMAL POWER PROJECT JAYPEE NIGRIE SUPER THERMAL POWER PROJECT (A Unit of M/s Jaiprakash Power Ventures Limited) Villages: Nigrie, Tehsil :Sarai District: Singrauli 2014 2015 SUBMITTED M.P. POLLUTION CONTROL BOARD BHOPAL (M.P.)

More information

by M k h GROVER Degremont

by M k h GROVER Degremont Innovative Technologies for Urban Waste Water Treatment by M k h GROVER Mukesh Degremont 4th March2013 Sewage a complex waste water URBAN WASTE WATER - SEWAGE Source of Foul odour Infectious Diseases Surface

More information

POREX Tubular Membrane Filter Modules For Metal Contaminated Wastewater Treatment & Reclamation

POREX Tubular Membrane Filter Modules For Metal Contaminated Wastewater Treatment & Reclamation POREX Tubular Membrane Filter Modules For Metal Contaminated Wastewater Treatment & Reclamation Background Industrial processes can often result in waste water contaminated with heavy metals (Hg, Pb, Zn,

More information

Table 1 Population in MBMC

Table 1 Population in MBMC EXECUTIVE SUMMARY 1.1 Existing status of physical infrastructure Mira Bhayandar which is part of Thane district is located at the northern threshold of greater Mumbai between 18 2'N 20 20'N latitude and

More information

Health and safety norms of CPWD should be followed during construction.

Health and safety norms of CPWD should be followed during construction. Status of Compliance of Conditions of the Environmental Clearance Issued to Riveria Commercial Developers Ltd. DLF Center, Sansad Marg, New Delhi 110001- Construction of "YASHWANT PLACE COMMUNITY CENTRE"

More information

Molvan- Chhamuchhal Group Gram Panchayat. Taluka- Mangrol, District- Surat. Ph. No

Molvan- Chhamuchhal Group Gram Panchayat. Taluka- Mangrol, District- Surat. Ph. No Serial Number FORM 1 (Application for Environment Clearance Certificate) Item 1. Name of the project/s 2. S. No. in the schedule 3. Proposed capacity/ area/ length/ tonnage to be handled/ command area/lease

More information

BEFORE THE ARIZONA CORPORATION COMMISSION

BEFORE THE ARIZONA CORPORATION COMMISSION COMMISSIONERS DOUG LITTLE, Chairman BOB STUMP TOM FORESE BOB BURNS ANDY TOBIN BEFORE THE ARIZONA CORPORATION COMMISSION IN THE MATTER OF THE APPLICATION OF EPCOR WATER ARIZONA INC. FOR A DETERMINATION

More information