PRE FEASIBILITY REPORT
|
|
- Kathleen Page
- 6 years ago
- Views:
Transcription
1 PRE FEASIBILITY REPORT for PROPOSED EXPANSION OF DISTILLERY of M/s. SHREE GANESH KHAND UDYOG SAHKARI MANDLI LTD. Shri Harisinhji Mahida Bhavan, At & Po: Vataria, Tal: Valia, Dist: Bharuch, Gujarat
2 CONTENTS Sr. No. Description Page No. 1. Executive Summary 3 2. Introduction of the Project/Background information 6 3. Project Description 8 4. Site Analysis Planning Brief Proposed Infrastructure Rehabilitation and resettlement (R& R) Plan Project Schedule & Cost Estimates Analysis of Proposal (Final Recommendations) EXECUTIVE SUMMARY 1.1 Company Profile Shree Ganesh Khand Udyog Sahkari Mandli Limited was founded in the year 1985 in Gujarat, India. The Company is a manufacturer and exporter of diverse range of Agricultural and other products. All the affairs of the company are managed under the guidance of Mr. Banesinh S. Dodia, the managing director. It is under his headship, they have achieved the newer heights of success. Here are the few highlights of the company. Specialization The enterprise is a co-operative Sugar Factory registered under the Co-operative Sugar Societies Act-1961 (Regd. No. SE-42, dt ). The plants installed in our production unit have the capacity of 4200 TCD owing to the same, around 3800 to 4000 MT of Sugarcanes is crushed per day with capacity utilization of around 120%. We have also achieved an average sugar recovery of 10.52% during season Infrastructure The state-of-the-art infrastructure is backed with technologically advanced tools and machineries that assist in the quality and quantity production of our products. Moreover, the robust infrastructural base has also been an essential element of smooth functioning of the business.
3 Quality Assurance Our prime motto is to serve quality products and for the same, various stringent quality tests are conducted under the supervision of our quality control executives. The quality checks are conducted in our well-equipped laboratories that are arranged in our plants of Distillery & Sugar. 1.2 Project Details Products along with Production Capacity NAME OF PRODUCTS Products EXISTING* (MT/Month) TOTAL AFTER EXPANSION (MT/Month) V.P. Sugar 14,500 14,500 Rectified Spirit 33 KLPD 66 KLPD Absolute Alcohol 30 KLPD 60 KLPD By-Products Molasses 6,000 7,500 Bagasse 45,000 45,000 Filter Cake 4,500 4,500 * CTE No dated Dec. 27, 2010 obtained. CCA Inward application no dated June 25, 2015 applied Raw Material Requirement LIST OF RAW MATERIALS SUGAR EXISTING* (MT/Month) TOTAL AFTER EXPANSION (MT/Month) Sugar Cane 1,35,000 1,35,000 Lime Sulphur Phosphoric Acid DISTILLERY 2
4 Molasses 3,750 MT/Month 7,500 MT/Month * CTE No dated Dec. 27, 2010 obtained. CCA Inward application no dated June 25, 2015 applied. 1.3 Water Requirement, Waste Water Generation and Treatment Total water requirement is 1820 KL/Day at present which is met through Bore well. The wastewater generation is 1215 KL/Day at present. Total water requirement will be 2010 KL/Day after proposed expansion which is met through Bore well. The wastewater generation will be 890 KL/Day after proposed expansion. The effluent from sugar factory is sent to ETP consists of primary, secondary & tertiary treatment facility to treat the effluent and treated effluent is reused as per requirement of factory for cooling, washing, irrigation purposes, etc. Entire qty. of wastewater from distillery is utilized in bio-composting and the same shall be followed after proposed expansion. 1.4 Air Pollution Source and Control Management Sr. Stack Stack Height Air Pollution Control Parameter Permissible Limit No. Attached to in meter System Boiler 1 & 2 (20 MT/Hr) Boiler 3 (35 MT/Hr) Boiler 4 (15 MT/Hr) Boiler 5 (Proposed) (2.5 MT/Hr) 40 Multi Cyclone Separator with Scrubber (Wet) Particulate Matter 150 Mg/Nm 3 SO 2 NO X 100 ppm 50 ppm Particulate Matter 150 Mg/Nm 3 SO 2 NO X 100 ppm 50 ppm Particulate Matter 150 Mg/Nm 3 SO 2 NO X 100 ppm 50 ppmler Particulate Matter 150 Mg/Nm 3 SO 2 NO X 100 ppm 50 ppmler There shall be no process emission from the manufacturing process as well as any other ancillary process. 3
5 Sr. No. 1.5 Hazardous Waste Management Type of Hazardous Waste Category Existing Total after Proposed Expansion 1. Used Oil Lit/ Month 2. Discarded Bags / Liners / Drums Nos./Month 3. Bio-Compost MT/Month 4. ETP Sludge MT/Month Mode of Disposal 202 Lit/ Month Collection, storage, transportation and final disposal by sale to registered re processors or use as lubricant Collection, storage, Nos./Month transportation & sale to authorized traders MT/Month Used as manure 1.6 Green Belt Company has developed an effective green belt within the factory and on periphery of the factory. Total Plot Area is 4,86,264 m 2 out of which 1,45,879 m 2 is Green Belt Area. In addition to this, majority of the vacant land shall be planted with trees, shrubs and grasses. 1.7 Power & Fuel Requirements Power required from DGVCL is 75 KW. SR. NO. NAME OF FUEL QUANTITY (MT/HR) EXISTING ADDITIONAL TOTAL 1. Bagasse Biomass (Briquette) INTRODUCTION OF THE PROJECT/BACKGROUND INFORMATION 2.1 Identification of the project and project proponent. In case of mining project, a copy of mining lease/letter of intent should be given. 4
6 Identification of the project Shree Ganesh Khand Udyog Sahkari Mandli Limited, Proposes expansion of distillery at Shri Harisinhji Mahida Bhavan, At & Po: Vataria, Tal: Valia, Dist: Bharuch, Gujarat Identification of the project proponent SR. NAME OF DIRECTOR NO. 1. SHREE SURJITSINH.A.MANGROLA (CHAIRMAN) 2. SHREE MOHANBHAI BECHARBHAI PATEL (VICE-CHAIRMAN) ADDRESS AT & PO.LUNA, MOBILE NO AT & PO : NAGAL, MOBILE NO SHREE MOTISINH GANPATSINH MATIYEDA AT & PO : VALIA, MOBILE NO SHREE VIJAYSINH BHIMSINH VASAVA PO : MIRAPOR, MOBILE NO SHREE DINESHBHAI CHHANABHAI PATEL (CHAUDHARY) PO : AMBAVADI, MOBILE NO SHREE JAYENDRASINH MOTISINH KATHAVADIYA AT & PO : KATHWADA MOBILE NO SHREE ARVINDSINH CHHATRASINH VARACHHIYA AT & PO : KANTVA, MOBILE NO SHREE IBRAHIM GULAM MOHMED MANJRA AT & PO : DIVA, MOBILE NO SHREE PIYUSHKUMAR CHANDRAVADAN PATEL AT : VAGHVAN, MOBILE NO SHREE MAHENDRASINH RANDHIRSINH PILUDARIYA AT & PO : DHAROLI, MOBILE NO SHREE NAVINBHAI PARAGBHAI PATEL AT & PO : SAMLOD, 5
7 MOBILE NO SHREE HIRALAL KANCHANLAL MODI AT & PO : ANKLESHWAR MOBILE NO SHREE KARSHANBHAI.G.PATEL AT & PO : PARDI IDRISH, MOBILE NO SHREE MANHARLAL.M.PATEL AT & POST : CHALTHAN, MOBILE NO SHREE BANESINH.S.DODIA (MANGING DIRECTOR) AT & POST : VATARIA, MOBILE NO DIRECTOR OF SUGAR GANDINAGAR PHONE: JOINT DIRECTOR (AGRI.) VADODARA 18. DIRECTOR GANDHINAGAR PHONE: Brief description of nature of the Project Proposed expansion of Distillery 2.3 Need for the project and its importance to the country and or region The demand for products intended to be manufacture is increasing in the country by expanding this unit M/s Shree Ganesh Khand Udyog Sahkari Mandli Limited will be able to meet the demand of the product locally. This will also generate direct and indirect employment opportunity for various levels of people. 2.4 Demands-Supply Gap Based on our informal survey of the market with our current customers and various traders, we have found that there is a big potential for the range of the products we are planning. 6
8 2.5 Imports vs. Indigenous production Based on the current cost of indigenous raw materials and the non availability of some materials, we will have to import some of the key raw materials as they are not available indigenously. This will make us very competitive against imported finished products and we will export of our finished products to the international markets. 2.6 Export possibility Depending on the international demand of products we shall explore the possibility of exporting the products. 2.7 Domestic/Export Markets Major portion of the product will be used for domestic market and some portion of the product may be exported depending on the international market. 2.8 Employment Generation (Direct and Indirect) due to project. M/s Shree Ganesh Khand Udyog Sahkari Mandli Limited will give direct employment to local people based on qualification and requirement. In addition to direct employment, indirect employment shall generate ancillary business to some extent for the local population. 3.0 Project Description 3.1 Type of Project including interlinked and interdependent projects, if any. Proposed Expansion of Distillery Unit Category: A-5(g) No interlinked project has been submitted. 7
9 3.2 Location (map showing general location, specific location and project boundary & project site layout) with coordinates. Map showing general location (Courtesy: Environmental Information Center, New Delhi) 8
10 Project Site (Google Map) 9
11 10
12 Plot Layout 11
13 3.3 Details of alternate sites considered and the basis of selecting the proposed site, particularly the environmental considerations gone into should be highlighted. It is expansion within existing premises. No alternate site considered. Major factors involved in the selection of site are listed below: Minor site clearance activities shall be carried out to clear shrubs and weed. The project site is located on level ground, which does not require any major land filling for area grading work. Proximity to Raw Material suppliers. Site is very well connected by road and railway. Availability of Power, Water, etc. Modern infrastructure support and amenities at par in other global markets, including: Efficient transport facilities. Environment-friendly zone. Uninterrupted power supply. 3.4 Size or Magnitude of Operation Please refer Section-1.2.1, Page No. 1 to Project Description with process details (a schematic diagram/flow chart showing the project layout, components of the project, etc. should be given) Please refer Please refer Form-I, Annexure-III. 3.6 Raw Material required along with estimated quantity, likely source, marketing area of final product/s, mode of transport of raw material and Finished product. For raw material required along with quantity; Please refer Section-1.2.2, Page No Resource optimization/recycling and reuse envisaged in the project, if any, should be briefly outlined. After proposed expansion, every effort will put to recycle/reuse the water. 12
14 3.8 Availability of water its source, energy/power requirement and source should be given. Water Source Total water requirement shall meet through bore well. Power & Fuel Requirement Power required from DGVCL is 75 KW. Bagasse: 55 MT/Day (40 MT/Day Existing + 15 MT/Day Additional) Biomass (Briquette): 0.5 MT/Day 3.9 Quantity of wastes to be generated (liquid and solid) and scheme for their management/disposal. Please refer Please refer Form-I, Annexure-V & VI Schematic representations of the feasibility drawing which give information of EIA purpose. ACTIVITIES OVERVIEW OF E. I. A. STUDIES SOURCE OF INFORMATION RECONNAISSANCE SURVEY OF EXISTING PLANT MONITORING OF AIR, WATER & SOIL QUALITY & NOISE LEVELS. DATA ON METEOROLOGY SOCIO-ECONOMIC STATUS & BASIC AMENITIES. SITE VISITS BY AND INTERVIEWS WITH LOCALS INTRODUCTION BASELINE ENVIRONMENTAL STATUS SOCIOECONOMIC STATUS & INFRASTRUCTURE PROPOSED PLANT ANNUAL REPORT MARKET ASSESSMENT FINANCIAL REPORT PROJECT REPORT ENVIRONMENTAL INFORMATION CENTRE CENTRAL GROUND WATER BOARD GUJARAT POLLUTION CONTROL BOARD (GPCB) PUBLIC HEALTH ENGINEERING DEPT. AGRICULTURE DEPARTMENT FOREST DEPARTMENT IRRIGATION DEPARTMENT EMPLOYMENT EXCHANGE HEALTH CENTER CENSUS DEPT. INDIAN METEOROLOGICAL DEPT. IDENTIFICATION & ASSESSMENT OF IMPACTS EVALUATION OF IMPACTS BY MATRIX METHOD DESCRIPTION OF EFFLUENT TREATMENT PLAN, AIR POLLUTION CONTROL, HAZARDOUS WASTE MANAGEMENT, GREEN BELT DEVELOPMENT MONITORING PROGRAM IMPACTS METHODOLOGY OF IMPACT ASSESSMENT ENVIRONMENTAL MANAGEMENT PLAN FACILITY DESCRIPTION CONSEQUENCE ANALYSIS PREPARATION OF DISASTER MANAGEMENT PLAN RISK ANALYSIS STUDIES & DISASTER MANAGEMENT PLAN SAFETY, HEALTH & ENVIRONMENTAL POLICY, GUIDELINES BY DIRECTOR GENERAL OF FACTORY SAFETY, MINISTRY OF LABOR. 13
15 4.0 Site Analysis 4.1 Connectivity Site is very well connected by road Availability of water, power facilities 4.2 Land Form, Land Use and Land Ownership It will be incorporated in EIA Studies. 4.3 Topography (along with map) We will be incorporated topography in EIA Studies. 4.4 Existing land use pattern (agriculture, non-agriculture, forest, water bodies (including area under CRZ)), shortest distances from the periphery of the project to periphery of the forests, national park, wild life sanctuary, eco sensitive areas, water bodies (distance from HFL of the river), CRZ. In case of the notified industrial area, a copy of the Gazette notification should be given. It will be incorporated in EIA Studies. 4.5 Existing Infrastructure Existing Infrastructures facilities are listed below: Site is very well connected by road Proximity to sugar cane growers Availability of sufficient land free form cultivation Availability of power evacuation facilities 4.6 Soil Classification It will be incorporated in EIA Studies. 14
16 4.7 Climatic data from secondary sources Primary source: our own weather station & Secondary Sources: Indian Meteorological Department, Ahmedabad. 4.8 Social infrastructure available Depending on the growth of the company the required social infrastructure will be provided. 5.0 Planning Brief 5.1 Planning Concept (type of industries, facilities, transportation, etc) Town and Country planning/development authority classification. Type of Industry: Proposed expansion of distillery 5.2 Population Projection It will be incorporated in EIA Studies. 5.3 Land use planning (breakup along with green belt etc.) Total Area m 2 Plant Area m 2 Open Area m 2 Green Belt Area m Assessment of Infrastructure Demand (Physical & Social) It will be incorporated in EIA Studies. 5.5 Amenities/Facilities It will be incorporated in EIA Studies. 15
17 6.0 Proposed Infrastructure 6.1 Processing Zone m Non- Processing Zone m Green Belt Company has developed an effective green belt within the factory and on periphery of the factory. Total Plot Area is 4,86,264 m 2 out of which 1,45,879 m 2 is Green Belt Area. In addition to this, majority of the vacant land shall be planted with trees, shrubs and grasses. 6.4 Social Infrastructure Depending on the growth of the company the required social infrastructure will be provided. 6.5 Connectivity (Traffic and Transportation Road/ Rail/Metro/ Water ways etc) Major factors involved in the selection of site are listed below: Site is very well connected by road Proximity to sugar cane growers Availability of sufficient land free from cultivation Availability of power facilities Availability of water 6.6 Drinking water Management (Source & Supply of water) Total water requirement shall meet through bore well. 6.7 Sewerage System Sewage pipes would be laid in entire sugar factory for the removal and disposal of mainly non-harmful liquid wastes from the offices, canteen and domestic waste coming from different sections. These liquid wastes would be sent to septic tank & soak pit. 6.8 Solid Waste Management Please refer Section 1.5 (Page No. 3). 16
18 7.0 Rehabilitation and Resettlement (R& R) Plan 7.1 Policy to be adopted (central/state) in respect of the project affected including home oustees, land oustees and landless laborers (a brief outline to be given) There is no habitation on the proposed expansion project activity area and it is barren land, so R & R policy is not applicable to this project. There shall not be displacement of any population in project area. Any major activity that may lead to resettlement of the people is considered as permanent impact. Hence, there is no permanent impact on this account. The increasing industrial activity will boost the commercial and economical status of the locality up to some extent. 8. Project Schedule & Cost Estimates 8.1 Likely date of start of construction and likely date of completion (Time schedule for the project to be given). We shall start construction after getting environmental clearance and consent to establish. We shall start production upon making application for CCA. 8.2 Estimated Project cost along with analysis in terms of economic viability of the project. Total Project Cost for proposed project activity is Rs Crores. 9. Analysis of Proposal (Final Recommendations) 9.1 Financial and social benefits with special emphasis on the benefit to be local people including tribal population, if any, in the area. Employment would be as per prevailing norms of state government for skilled and unskilled people for the proposed expansion project. Social Welfare shall be done. Cordial relation with the industry shall be established and representation shall be made to villagers for help for creation of facilities related to health, education, etc. 17
PRE FEASIBILITY REPORT
PRE FEASIBILITY REPORT for PROPOSED PROJECT FOR DYES, PIGMENTS AND DYE INTERMEDIATES MANUFACTURING PLANT IN GIDC, DAHEJ-II Of M/s. SHREEJI INDUSTRIES Plot No. D2/CH/24, Dahej-II, GIDC Industrial Estate,
More informationPRE FEASIBILITY REPORT
PRE FEASIBILITY REPORT For PROPOSED EXPANSION OF BAKELITE POWDER MANUFACTURING UNIT of M/S. HINDUSTAN BAKELITE COMPANY PLOT NO. J-3436, GIDC ESTATE, ANKLESHWAR, DISTRICT: BHARUCH-393002, GUJARAT 0 CONTENTS
More informationPROPOSED BULK DRUG & BULK DRUG INTERMEDIATES MANUFACTURING UNIT
PRE - FEASIBILITY REPORT For PROPOSED BULK DRUG & BULK DRUG INTERMEDIATES MANUFACTURING UNIT Of M/s. SHREE RAM INDUSTRIES PLOT NO.5117, GIDC-ANKLESHWAR, PIN-393002 TAL: ANKLESHWAR, DIST: BHARUCH, GUJARAT
More informationPRE FEASIBILITY REPORT
PRE FEASIBILITY REPORT For NEW PROJECT (PIGMENT MANUFACTURING PLANT) Of M/s. SHREY INDUSTRIES Survey No. 111 & 112, Plot No. 7 & 8, Village: Dhanot, Ta: Kalol, Dist: Gandhinagar (Gujarat) CONTENTS Sr.
More informationM/S. Dain Colour Chem
PRE FEASIBILITY REPORT For PROPOSED EXPANSION IN EXISTING MANUFACTURING PLANT Of M/S. Dain Colour Chem Plot No.: 5, Nilkanth Estate, Village: Dhanot, Ta.: Kalol, Dist.: Gandhinagar-382729, Gujarat 1 CONTENTS
More informationPRE FEASIBILITY REPORT
PRE FEASIBILITY REPORT For EXPANSION IN EXISTING MANUFACTURING PLANT Of M/s. SHIVA DYE STUFF PVT. LTD Plot no. A2-11/6104,G.I.D.C. Industrial Estate, Ankleshwar-393002, Gujarat. 1 CONTENTS Sr. No. Description
More informationPRE-FEASIBILITY REPORT. for
PRE-FEASIBILITY REPORT for PROPOSED COMMON EFFLUENT TREATMETN PLANT (CETP) of M/s. VIKASHTEX ENVIROTECH CETP PVT. LTD. Block No. 523, Village: Hathoda, Taluka: Mangrol, Dist: Surat - 394 405 (Guj.) Prepared
More informationShri Hari Dyes & Chemicals Plot No.: 439/1,417, Phase No. II, GIDC Estate, Vatva , Ahmedabad
Annexure Prefeasibility Report (PFR) File PRE FEASIBILITY REPORT For PROPOSED EXPANSION IN EXISTING MANUFACTURING PLANT Of Shri Hari Dyes & Chemicals Work & Regd. Office: CONTENTS Sr. No. Description 1.
More informationPRE FEASIBILITY REPORT
PRE FEASIBILITY REPORT For PROPOSED EXPANSION OF CARBON BLACK (10950 TPM TO 15750 TPM ) AND CO-GENERATION POWER PLANT (22 MW TO 32 MW) IN EXISTING PREMISES of M/s. PHILLIPS CARBON BLACK LTD. Survey No.
More informationPre-Feasibility Report For
Pre-Feasibility Report For Proposed New Project for manufacturing of Intermediates of Agro Chemicals & Synthetic Organic Chemicals. By M/s. MANBRO POLYMERS LIMITED, Plot No. D-2/CH-275, INDUSTRIAL ESTATE,
More informationPRE-FEASIBILITY REPORT
PRE-FEASIBILITY REPORT 0.0 EXECUTIVE SUMMARY Shri Ashok Patel Partner of M/s. Patel Polymers is planning to manufacture organic chemical Different Types of Resins, for proposed expansion project at Plot
More informationPRE-FEASIBILITY REPORT
PRE-FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY M/s Arti Chemical Industries is a project located at Plot No. E-22, Vilayat G.I.D.C. Tal: Vagra area of Bharuch district in Gujarat. M/s Arti Chemical Industries
More informationPRE-FEASIBILITY REPORT
PRE-FEASIBILITY REPORT For ToR of Proposed Project of MANUFACTURING OF SYNTHETIC ORGANIC DYES (5 f B IND II) By SHREEJI BAPA DYE CHEM PLOT NO 1319 & 1320, PHASE-III, GIDC, VATVA, AHEMADABAD-382445, GUJARAT,
More informationPre-Feasibility Report
Pre-Feasibility Report 1. Executive Summary Residential, Commercial, Retail and Hotel projects and an IT/ITES. The Project has already obtained an Environmental Clearance from Ministry of Environment &
More informationProposed Project of Halcyon Labs Pvt Ltd D-2/CH : 335,336,337, GIDC-Dahej-2, DIst: Bharuch, Gujarat Ramans Enviro Services Pvt Ltd Ahmedabad
1. EXECUTIVE SUMMARY OF THE PROJECT BRIEF SUMMARY OF THE PROJECT : TYPE OF PROJECT : Proposed Project for manufacturing of pharma intermediates by Halcyon Labs Pvt.Ltd. LOCATION : Proposed Project of Halcyon
More informationPRE-FEASIBILITY REPORT
PRE-FEASIBILITY REPORT For ToR of Proposed Project of MANUFACTURING OF SYNTHETIC ORGANICCHEMICALS (RESINS) (5 f B IND II) By M/s M R INDUSTRIES SURVEY NO. 58/1 & 58/3 OPPOSITE WHOLESOME FOOD PVT. LTD.,
More informationPRE FEASIBILITY REPORT
PRE FEASIBILITY REPORT For NEW MANUFCTURING PLANT Of BHIMANI DYE CHEM INDUSTRIES Plot No. 2, Survey No. 316, At: Dhanot, Ta: Kalol, Dist: Gandhinagar, Gujarat. CONTENTS Sr.No. Description 1. Executive
More informationPREFEASIBILITY REPORT
(B) PREFEASIBILITY REPORT OF EXISTING SAND MINING PROJECT OF RAJESHBHAI BHAGUBHAI PATEL AT VILLAGE:- Panchlai, TALUKA:- Pardi, DIST.:-Valdad. 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE SUMMARY
More information(B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF
(B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF Makwana Dineshbhai Khimjibhai AT VILLAGE:- Tithava, TALUKA:- Wankaner, DIST.:- Morbi 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXCUTIVE SUMMARY
More informationPRE - FEASIBILITY REPORT
PRE - FEASIBILITY REPORT for PROPOSED EXPANSION OF BOILER (24 TPH) AS A UTILITY, COAL BASED CPP & CHANGED IN FUEL FROM NATURAL GAS TO COAL IN EXISTING RUBBER & LATTICES MANUFACTURING UNIT of M/S. APCOTEX
More informationEXISTING PROJECT FOR ORDINARY SAND MINING
(C) PROJECT REPORT OF EXISTING PROJECT FOR ORDINARY SAND MINING OF JASHUBEN CHHAGANBHAI OAD AT VILLAGE:-TIMBA, TALUKA:- KAMREJ, DIST.:- SURAT 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE SUMMARY
More informationPRE FEASIBILITY REPORT FOR. Silica Sand Beneficiation Plant
PRE FEASIBILITY REPORT FOR Silica Sand Beneficiation Plant BY Shree Silicaam Minerals LLP VILLAGE : CHOKI TALUKA : JAGADIA DIST : BHARUCH GUJARAT (INDIA) PRE-FEASIBILITY REPORT: SILICA SAND BENIFICIATION
More informationPREFEASIBILITY REPORT
PREFEASIBILITY REPORT For ToR Application of Expansion Project For MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS (Dyes Intermediates) Proposed By: M/s. Plot No. C/1/B-145-3 Phase-II, GIDC Estate, Naroda,
More informationPRE FEASIBILITY REPORT
PRE FEASIBILITY REPORT For PROPOSED EXPANSION OF WAX PRODUCTS IN EXISTING UNIT OF M/s. WAXOILS PVT. LTD. PLOT NO., 4, 5, 0, &, BHARUCH IND CO. OP. ESTATE, BHOLAV, TAL. & DIST. BHARUCH- 9 00 (GUJ.) CONTENTS
More informationPRE FEASIBILTY REPORT
PRE FEASIBILTY REPORT FOR ENVIRONMENT CLEARANCE OF PROPOSED NEW PROJECT S. O. CHEMICALS (5 f Category) Proposed By: COREL PHARMA CHEM PVT. LTD. SURVEY NO. 473 & 481, BORISANA, KADI THOL ROAD, KADI, DIST
More informationPRE FEASIBILITY REPORT
PRE FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE FOR MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS OF M/s. MAYUR COLOUR AND CHEMICALS LOCATED AT Plot No. 5148, GIDC Industrial Estate, Ankleshwar
More informationPRE FEASIBILITY REPORT
PRE FEASIBILITY REPORT for PROPOSED EXPANSION OF BULK DRUGS IN EXISTING UNIT IN GIDC, ANKLESHWAR of M/s. RUSAN PHARMA LTD. PLOT NO. 6406, NEAR HOECHEST CHOWKADI, G.I.D.C., ANKLESHWAR, DIST.: BHARUCH, GUJARAT
More informationPRE - FEASIBILITY REPORT. M/s. S. R. CHEMICALS
PRE - FEASIBILITY REPORT for PROPOSED EXPANSION BULK DRUG AND BULK DRUG INTERMEDIATES PLANT IN EXISTING PREMISES of M/s. S. R. CHEMICALS PLOT NO. 7516, GIDC ESTATE, ANKLESHWAR, DISTRICT: BHARUCH, GUJARAT
More informationPRE-FEASIBILITY REPORT FOR ORDINARY SAND
PRE-FEASIBILITY REPORT FOR ORDINARY SAND Proponent NISANT TRADERS At- Opp. Survey No.- 3 Panam River Area-2.50.00 Hectare Village-Ramji-ni-Nal, Taluka- Shahera Dist.- Panchmahal Mob.- +91924040782 CONTENTS
More informationSTONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha)
Pre Feasibility Report On STONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha) Submitted to MINISTRY OF ENVIRONMENT & FOREST STATE LEVEL ENVIRONMENTAL
More informationPRE FEASIBILITY REPORT
PRE FEASIBILITY REPORT For PROPOSED SPECIALTY CHEMICALS PLANT IN EXISTING PREMISES of M/s. BROMCHEM LABORATORIES PVT. LTD. SURVEY No. 295, VILLAGE: LUNEJ, TAL: KHAMBHAT, DIST: ANAND, GUJARAT 0 CONTENTS
More informationPROJECT FEASIBILITY REPORT
PROJECT FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE For PROPOSED CHEMICAL MANUFACTURING UNIT From M/s. MORADIA BROTHERS CHEM PVT LTD LOCATED AT: Block No.: 45, JalBhumi Industrial Estate,
More informationPREFEASIBILITY REPORT OF EXISTING SILICA SAND MINING PROJECT OF MANGUBEN KANTILAL THAKKAR
PREFEASIBILITY REPORT OF EXISTING SILICA SAND MINING PROJECT OF MANGUBEN KANTILAL THAKKAR AT VILLAGE:- BRAHMPURI, TALUKA:- Sayla, DIST.:-Surendranagar 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE
More informationPRE-FEASIBILITY REPORT OF SAND QUARRY
PRE-FEASIBILITY REPORT OF SAND QUARRY Survey No Village Taluka District Lease area : 1 Paiki : Marigana : Anjar, : Kutch, Gujarat, : 2.00 Ha. Submitted to MINISTRY OF ENVIRONMENT & FORESTS STATE LEVEL
More informationPRE-FEASIBILITY REPORT
PRE-FEASIBILITY REPORT For ToR of Proposed Project Of MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS of 850 MT/Month By PASHUPATI INDUSTRIES 169/1/A2, Phase 1, Opposite Telephone Exchange, GIDC Naroda, Ahmedabad-382330
More informationPRE-FEASIBILITY REPORT. Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location
1. SUMMARY PRE-FEASIBILITY REPORT Project Stone Quarry Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location Village Taluka District State Rupapali Basna Mahasamund Chhattisgarh 1 Mining Lease
More informationLimestone Mining Project (Area: ha) at Near Village: Bhod, Taluka Ranavav, District Porbandar (Gujarat) Pre-feasibility Report
Limestone Mining Project (Area: 16.18 ha) at Near Village: Bhod, Taluka Ranavav, District Porbandar PRE - FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE For MINING ACTIVITY CATEGORY B2 UNDER
More informationPre - Feasibility Report. For. Modernization of Sugar Unit. Located at
Pre - Feasibility Report For Modernization of Sugar Unit Located at At & Post Village Sayan, Taluka Olpad, District Surat, Gujarat-394130 Of M/s. Shree Sayan Vibhag Sahakari Khand Udhyog Mandli Ltd. SUMMARY
More informationPRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village:
PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY In our Masonry Stone Mining Lease (M.L. No. 15/96, Area: 1.0 ha), Production capacity of masonry stone: 142920 TPA and existing Stone Crusher Unit named M/s.
More informationPRE-FEASIBILITY REPORT
PRE-FEASIBILITY REPORT for PROPOSED EXPANSION OF SILICA SAND PRODUCTION (GLASS GRADE) & LPG STORAGE CAPACITY FOR GLASS MANUFACTURING UNIT of M/s. GUJARAT GUARDIAN LIMITED VILLAGE: KONDH, VALIA ROAD, TAL:
More informationPRE-FEASIBILITY REPORT
PRE-FEASIBILITY REPORT 0.0 EXECUTIVE SUMMARY M/s Colorant Limited (Unit II) is a proposed expansion project located at Plot No. 3225, Phase IV, GIDC Vatva, Ahmedabad in Gujarat State. M/s Colorant Limited
More informationPRE-FEASIBILITY REPORT
PRE-FEASIBILITY REPORT For Polyurethane Foam Manufacturing Facility Of M/s. KRISHNA MARUTI LTD. At Plot No-13, SMG JV Park, Block No- 334,335 Vill- Hansalpur, Tal - Mandal Dist.: Ahmedabad, Gujarat INDEX
More informationM/s. SAL STEEL LTD Survey no.245/p, Village:-Bharapar, Taluka:- Gandhidham, District:-Kutch, Gujarat.
Pre-Feasibility Study Report For Proposed Fly Ash Co-processing clinker grinding cement Unit of 40,000 MT/month Production capacity within our Existing Premises for M/s. SAL STEEL LTD Survey no.245/p,
More informationPre-Feasibility Report
Pre-Feasibility Report Essentials Pharma 1 1. Introduction M/s. Essentials Pharma is an new unit to be located at Plot 19, Survey 10/1, Rajkot-Ahmedabad National Highway 8-B, Village: Hirasar, Tal: Rajkot,
More informationPlot No. 2-D1, Obadenahalli, 3 rd Phase KIADB Industrial Area, Doddaballapur taluk, Bangalore Rural District , Karnataka State.
ON Plot No. 2-D1, Obadenahalli, 3 rd Phase KIADB Industrial Area, Doddaballapur taluk, Bangalore Rural District 561 205, Karnataka State. Table of Contents 1. EXECUTIVE SUMMARY 2. INTRODUCTION OF THE PROJECT/
More informationPre-Feasibility Report
Pre-Feasibility Report M/s. Veer Poly Chem 0 1. Introduction M/s. Veer Polychem is an existing unit located at Plot 119 & 120, Ranpur road, GIDC Dhandhuka, Dist: Ahmedabad, Gujarat. Currently, unit is
More informationPRE-FEASIBILITY REPORT
M/S. VANAS INFRA PROJECTS PVT. LTD SURVEY NO. 598, CHINTALAPALLY VILLAGE, KOLLAPUR MANDAL, NAGARKURNOOL DISTRICT, TELANGANA PRE-FEASIBILITY REPORT SUBMITTED BY M/s. Sri Soma Jitendra H. No. 7-1-397/150,
More informationPRE-FEASIBILITY REPORT. 1. SUMMARY Kudeli Brick Earth Quarry Name of Company / Mine Owner Smt. Premawati Location 744, 760/1, 760/4, 750/1, 750/2
PRE-FEASIBILITY REPORT 1. SUMMARY Project Kudeli Brick Earth Quarry Name of Company / Mine Owner Smt. Premawati Location 744, 760/1, 760/4, 750/1, 750/2 Village Kudeli Taluka Baikunthpur District Koriya
More informationLG POLYMERS INDIA PVT. LTD. SY. NO.S 29 TO 45, 83/1 AND 83/3, RR VENKATAPURAM VILLAGE, PENDURTI MANDAL, VISAKHAPATNAM DISTRICT, ANDHRA PRADESH
LG POLYMERS INDIA PVT. LTD. SY. NO.S 29 TO 45, 83/1 AND 83/3, RR VENKATAPURAM VILLAGE, PENDURTI MANDAL, VISAKHAPATNAM DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT LG Polymers India Pvt. Ltd. Sy. No.s
More informationEXECUTIVE SUMMARY. Kumardeipur Sand Quarry Cum ' 13.3" N to 20 44' 20.7"N Longitude " E to 85 35'27.5 "E
EXECUTIVE SUMMARY 1.0 INTRODUCTION Sri Mahesh Prasad Mishra proposes to mine Sand Quarry from an approved Mining Lease over an area of 14.85 Ac or 6.01 hectares (Non-Forest Land) which is located in at
More informationPRE FEASIBILITY REPORT
PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY AND INTRODUCTION OF THE PROJECT Shivneri Sugars Ltd., A/p. - Ganesh tekadi, Nhavi (Bk.), Tal.: Koregaon, Dist.: Satara, Maharashtra State was registered vide
More information2. PRE-FEASIBILITY REPORT
2. PRE-FEASIBILITY REPORT 2.1 Executive Summary Sri D. Ujjinappa has applied for quarry lease for extracting of Building stone in Sy No. 19/2, Chatnihalli Village, Harpanahalli Taluk, Davangere District,
More informationPRE-FEASIBILITY REPORT PROPOSED PROJECT FOR MANUFACTURING OF DYES INTERMEDIATES. OF M/s. UMIYA CHEM INTERMEDIATES
PRE-FEASIBILITY REPORT ON PROPOSED PROJECT FOR MANUFACTURING OF DYES INTERMEDIATES OF M/s. UMIYA CHEM INTERMEDIATES AT PLOT NO: 4705/1/1, GIDC ESTATE,ANKLESHWAR, DIST:BHARUCH STATE:-GUJARAT 1 1.0 EXECUTIVE
More informationMinistry of Environment and Forests. Pre-Feasibility Report as per Ministry of Environment and Forests Letter dated 30 th December, 2010
Ministry of Environment and Forests Pre-Feasibility Report as per Ministry of Environment and Forests Letter dated 30 th December, 2010 1. Executive Summary Reekriti Distilleries Pvt Ltd Unit- 100 KLPD
More informationANNEXURES. 1 Google image showing proposed project site. 3 Manufacturing process details. 4 Details of hazardous waste management
ANNEXURES Annexure No. Description 1 Google image showing proposed project site 2 Plant Lay-Out 3 Manufacturing process details 4 Details of hazardous waste management 5 Details of Effluent Treatment Plant
More informationPRE-FEASIBILITY REPORT GHODACH SOAPSTONE & DOLOMITE MINES (APPLICANT: M/S KASTURI MINERALS)
20 PRE-FEASIBILITY REPORT OF GHODACH SOAPSTONE & DOLOMITE MINES (APPLICANT: M/S KASTURI MINERALS) 1. EXECUTIVE SUMMARY: The project is for mining of Ghodach soapstone & Dolomite Mine M.L. No. 69/2010 Near
More informationPRE FEASIBILITY REPORT
PRE FEASIBILITY REPORT For PROPOSED EXPANSION OF DYES AND DYE INTERMEDIATES IN EXISTING MANUFACTURING UNIT of M/s. PEARL CHEMICAL INDUSTRIES PLOT NO.C1-B-3416, NR.PCI CHOKDI, GIDC ESTATE, ANKLESHWAR-393002,
More informationPRE FEASIBILITY REPORT FOR
- PRE FEASIBILITY REPORT FOR PROPOSED EXPANSION OF SYNTHETIC ORGANIC CHEMICALS AND PESTICIDE INTERMEDIATES IN EXISTING UNIT of M/s. ORGANIC INDUSTRIES PVT. LTD. PLOT NO. S/163, GIDC, DAHEJ-I, TALUKA: VAGRA,
More informationPREFEASIBILITY REPORT
PREFEASIBILITY REPORT 1.0 INTRODUCTION OF THE PROJECT Pannageshwar Sugar Mills Ltd. (PSML), At: Pangaon, Tal.: Renapur, Dist.: Latur, Maharashtra was registered vide registration no. 11-130803 dated 01.01.2001.
More information1.0 EXECUTIVE SUMMARY
1.0 EXECUTIVE SUMMARY M/s Merino Industries Limited has proposed for manufacturing Phenol Formaldehyde Resin, Melamine Formaldehyde Resin at Plot No D2 CH 36, Dahej Phase II, Dist. Bharuch, Gujarat. The
More informationANNEXURE A DETAILS OF PRODUCTS
Annexures to Form 1 & Pre Feasibility Report Proposed Project for manufacturing of Dyes Intermediates of M/s Jay Dyechem, Narol-Vatva Road,Ta : City, District : Ahmedabad, Gujarat. ANNEXURE A DETAILS OF
More informationTable 1.1: The Salient Features of the Project Proposed Quartz Mine Of M/s. Viswanadha Stone Crusher & 16 others
1. EXECUTIVE SUMMARY 1.1 Introduction The Road Metal Quarries was granted in Guntur District, Andhra Pradesh has been allotted to M/s. Viswanadha Stone Crusher & 16 others by Assistant Director of Mines
More informationPRE FEASIBILITY REPORT
VENSUB LABORATORIES PRIVATE LIMITED SY. NO. 29, TUPAKULAGUDEM VILLAGE, TALLAPUDI MANDAL, WEST GODAVARI DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT VENSUB LABORATORIES PRIVATE LIMITED Duplex No. 12,
More informationPREFEASIBILITY REPORT. Jakraya Sugar Ltd. (JSL), Watwate, Tal.: Mohol, Dist.: Solapur was registered vide registration no.u15421pn2007plc
PREFEASIBILITY REPORT 1.0 INTRODUCTION OF THE PROJECT Jakraya Sugar Ltd. (JSL), Watwate, Tal.: Mohol, Dist.: Solapur was registered vide registration no.u15421pn2007plc130078. As per the provision of EIA
More informationPre- Feasibility RepoRt
Pre- Feasibility RepoRt AREA- 59.28 ACRE (24.0 HA) FOR KEN RIVER SAND/MORRUM MINING AT BLOCK NO-09 KHAND NO-03 GATA NO-337 VILLAGE- KANWARA TEHSIL-BANDA, DISTRICT- BANDA(U.P) SHRI RAVINDRA NATH SINGH JULY
More informationPRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY AND INTRODUCTION OF THE PROJECT
PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY AND INTRODUCTION OF THE PROJECT Shri Dudhganga Vedganga Sahakari Sakhar Karkhana Limited, (SDVSSKL) located at Bidri (Mouninagar), Tal.: Kagal, Dist.: Kolhapur,
More informationM/s. RAPID INTERMEDIATES
BRIEF SUMMARY OF THE PROJECT for PROPOSED PESTICIDE SPECIFIC INTERMEDIATES AND SPECIALTY CHEMICALS PLANT of M/s. RAPID INTERMEDIATES PLOT NO. 2325, GIDC ESTATE-PANOLI, TALUKA: ANKLESHWAR, DIST: BHARUCH,
More information2. PRE-FEASIBILITY REPORT
2. PRE-FEASIBILITY REPORT 2.1 Executive Summary Smt. J N Rukmini, has applied for extracting of Building stone in Sy No. 40, Kuroda Bore Kavala village, Hassan Taluk & District, Karnataka over an extent
More informationPREFEASIBILITY REPORT
PREFEASIBILITY REPORT 1.0 INTRODUCTION OF THE PROJECT Deshbhakt Ratnappa Kumbhar Panchganga Sahakari Sakhar Karkhana Ltd. (D.B.R.K. Panchganga S.S.K.L.) leased unit of Shree Renuka Sugars Ltd. is located
More informationTo The Member Secretary State Expert Appraisal Committee Paryavaran Bhavan Sector 10 A Gandhinagar
March 18, 2019 BY HAND DELIVERY/RPAD To The Member Secretary State Expert Appraisal Committee Paryavaran Bhavan Sector 10 A Gandhinagar 382 010 SUB.: APPLICATION FOR SUBMISSION OF ESSENTIAL DETAIL SOUGHT
More informationPRE FEASIBILITY REPORT. For
PRE FEASIBILITY REPORT For PROPOSED EXPANSION OF BULK DRUG & BULK DRUG INTERMEDIATES & SPECIALTY CHEMICALS MANUFACTURING PLANT IN EXISTING PREMISES of M/s. SHIVAM INCHEM PLOT NO - D-2/CH/202, GIDC DAHEJ
More informationFor TOR New Projects. Mo. no. : Contact no. and ID of the Applicant
SEAC, Gujarat : Page 1 of 6 For TOR New Projects 1. Basic Information of the Project: i Name & Address of the Project site (Complete details with plot /Survey, Landmark etc. ) M/s. Perstorp Industries
More informationPROJECT PRE-FEASIBILITY REPORT. For
PROJECT PRE-FEASIBILITY REPORT For THE PROPOSED ORGANIC CHEMICALS MANUFACTURING IN EXISTING IN FORMULATION OF PESTICIDE, AGROCHEMICAL AND BIO FERTILIZERS MANUFACTURING UNIT AT M/S. SULPHUR MILLS LTD. PLOT
More informationPRE- FEASIBILITY REPORT FOR PROPOSED ORDINARY EARTH EXCAVATION PROJECT (94.59 ARES) of Shri Saji Sebastian, Madeckal House, Kizhakambalam P.
PRE- FEASIBILITY REPORT FOR PROPOSED ORDINARY EARTH EXCAVATION PROJECT (94.59 ARES) of Shri Saji Sebastian, Madeckal House, Kizhakambalam P.O, Ernakulam (Dist.) Survey No. 129/1-4,129/2-1, Arakuzha Village,
More informationPRE FEASIBILITY REPORT
Page1 PRE FEASIBILITY REPORT KALDA FLAG STONE QUARRY AREA OF -1.55 HACTARE STRICTLY AS PER MOEF GUIDELINE DATE 30/12/2006 IN TERMS OF PROVISIONS OF EIA NOTIFICATION 2006 VILLAGE KALDA TEHSIL PAWAI DISTRICT
More information1. PRE-FEASIBILITY REPORT
1. PRE-FEASIBILITY REPORT 1.1 Executive Summary Sri. T. Thimmegowda, has applies quarry lisence for extracting of Building Stone Quarry in Sy No. 33/2, Kurodbore Kaval village, Hassan Taluk, Hassan District,
More informationPROPOSED EXPANSION OF DEVELOPER AND AZOCOLORANTS DYES IN EXISTING UNIT. M/s. BASF INDIA LTD. (UNIT-II)
BRIEF SUMMARY OF THE PROJECT for PROPOSED EXPANSION OF DEVELOPER AND AZOCOLORANTS DYES IN EXISTING UNIT of M/s. BASF INDIA LTD. (UNIT-II) PLOT NO. 8001 & 8001A, PHASE-VI, G.I.D.C., ANKLESHWAR, DIST: BHARUCH-393002,
More informationPRE FEASIBILITY REPORT
PRE FEASIBILITY REPORT For PROPOSED PESTICIDE SPECIFIC INTERMEDIATES AND SPECIALTY CHEMICALS PLANT of M/s. GALAXY LIFE SCIENCE PLOT NO. 6104/13/A-2, GIDC ESTATE, TALUKA: ANKLESHWAR, DIST: BHARUCH, GUJARAT
More informationM/s. Lakeland Chemicals (India) Ltd.
FOR THE PROPOSED EXPANSION PROJECT FOR MANUFACTURING OF SPECALITY CHEMICALS Category: 5(f) A OF Located at: Plot no 63,6A,6B, Rasayani Road, Vill. Madap, Tq. Khalapur, Dist. Raigad.( Maharashtra) 1 Project
More informationPRE FEASIBILITY REPORT
PRE FEASIBILITY REPORT For Proposed Expansion in API Intermediate & Fine Chemicals Manufacturing Plant M/S. ASCENT FINECHEM (P) LTD Plot No. 273A & B, 272/5/P/1 2 & 493, Phase II, GIDC Vatva, Ahmedabad
More informationPRE-FEASIBILITY REPORT INTEGRATED SUGAR 5000 TCD, COGEN 18 MW AND NEW 30 KLPD DISTILLERY GAT NO.10, 11/1, 11/2, 15/3(PART), KAVATHE
PRE-FEASIBILITY REPORT OF INTEGRATED SUGAR 5000 TCD, COGEN 18 MW AND NEW 30 KLPD DISTILLERY AT GAT NO.10, 11/1, 11/2, 15/3(PART), KAVATHE MALKAPUR, TAL. SANGAMNER, DIST. AHMEDNAGAR, MAHARASHTRA BY M/S.
More informationMODIFIED QUARRYING PLAN FOR "SHINGATALOOR SAND MINING BLOCK-2" EXTENT Acres (4.86 Ha) IN TUNGABHADRA RIVER BED ADJ ACENT TO SY.
MODIFIED QUARRYING PLAN FOR "SHINGATALOOR SAND MINING BLOCK-2" EXTENT -12.00 Acres (4.86 Ha) IN TUNGABHADRA RIVER BED ADJ ACENT TO SY.NO - 129 & 131OF SHINGATALOOR - VILLAGE MUNDARGI - TALUK GADAG - DISTRICT
More informationPREFEASIBILITY REPORT OF EXISTING BENTONITE PROJECT OF
PREFEASIBILITY REPORT OF EXISTING BENTONITE PROJECT OF TRICHEMIN ASSOCIATES AT VILLAGE:- SATAPAR, TALUKA:- KALYANPUR, DIST.:- DEVBHUMI DWARKA 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE SUMMARY
More informationPRE FEASIBILITY REPORT OF KANIYAKULAM EARTH QUARRY
PRE FEASIBILITY REPORT OF AZHAGAPPAPURAM EARTH FOR OVER AN EXTENT OF 0.61.0HA IN AZHAGAPPAPURAM VILLAGE, AGASTEESWARAM TALUK, KANNIYAKUMARI DISTRICT, TAMIL NADU OF, (Under the Guidelines of Ministry of
More informationPRE FEASIBILITY REPORT
PRE FEASIBILITY REPORT Of Shri Upendra Suryawanshi At Khasra No. 413/1, 413/3 Vill.-Ambada, Tehsil-Amla, District-Betul (M.P.) Production Capacity: Max 6,320 Cu.mt/year Area 1.00Hectare Proponent Name
More informationHind Energy & Coal Beneficiation (India) Ltd.
SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. 0.96 MTPA Wet type Coal Washery at Birgahani Village, Baloda Tehsil Janjgir-Champa District, Chhattisgarh
More informationSRI K. RAVI SHANKAR SURVEY NO.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH
SRI K. RAVI SHANKAR SURVEY NO.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT (OPENCAST QUARTZ MINE 40.313 ha) SUBMITTED BY Sri Door No. 39/49/39,
More informationPRE-FEASIBILITY REPORT
PRE-FEASIBILITY REPORT For Excavation of Brick Earth (Total Mining Area 1.112Ha.) (For Manufacturing of Bricks) Submitted By M/s New Kaptan Brick Field Shri Krishna Kr. Singh S/o Shri Brahma DevSingh Pure
More informationPre-Feasibility Study Report
Pre-Feasibility Study Report Of to be set-up at Survey No.: 1905/1, Village: Gangad, Taluka: Bavla District: Ahmedabad - 382 240, Gujarat INDEX S.N. 1. Executive Summary 2. Introduction of Project (ii)
More informationPRE FEASIBILITY REPORT. M/s. Riddhi Dyechem Industries
PRE FEASIBILITY REPORT FOR OBTAINING ENVIRONMENTAL CLEARANCE For the Proposed Dye Manufacturing Unit of M/s. Riddhi Dyechem Industries Block No.: 680/p, 681/p, 682/p Village: Pariej, Taluka: Matar, District:
More informationRESINS & ALLIED CHEMICALS INDUSTRIES (BOMBAY) PVT. LTD.
FOR THE PROPOSED EXPANSION PROJECT FOR THE MANUFACTURING OF KETONIC RESINS Category: 5(f) OF RESINS & ALLIED CHEMICALS INDUSTRIES (BOMBAY) PVT. LTD. Located at: Plot No. C-1/46, 100 SHED AREA, GIDC, Vapi,
More informationPre-feasibility Report
Pre-feasibility Report for expansion of production capacity of Fluoropolymers including Poly Tetrafluoro Ethylene (PTFE), manufacturing of new age refrigerant gas Difluoromethane (HFC 32) and related products,
More informationPRE-FEASIBILITY REPORT FOR M/s FIXEM CEMENT PRIVATE LIMITED
PRE-FEASIBILITY REPORT FOR M/s FIXEM CEMENT PRIVATE LIMITED 1. SUMMARY Kacari Silica Sand,Khanda,Stone And Moram Project at Khsara No.-144,145,146,147, 148,150, 309, 310, 311,312,313,314,315,316,317,318,320,399,403,404,405,
More informationPRE-FEASIBILITY REPORT FOR M/s FIXEM CEMENT PRIVATE LIMITED
PRE-FEASIBILITY REPORT FOR M/s FIXEM CEMENT PRIVATE LIMITED 1. SUMMARY Kacari Silica Sand,Khanda,Geeti And Moram Project at Khasra No.-10,11,12,13,101, 102,122, 126, 127,128,129,130,131, 167,568,570,571,572,
More informationKadam Environmental Consultants
M/s. PERSTORP INDUSTRIES INDIA PRIVATE Prefeasibility Report for Proposed Pentaerythritols Manufacturing Plant at Plot No. T 49 to T 54, Saykha Industrial Estate, Vagra Taluka, Bharuch District MARCH 2018
More informationvii Total cost of Proposed Project Existing : 0.16 Cr Proposed: 0.25 Cr Total : 0.41 Cr viii Total Plot area ( sq. meter)
SEAC, Gujarat: Page 1 of 28 For TOR Expansion Case. 1. Basic Information of the Project: i Name & Address of the Project site (Complete details with plot no./survey no., Landmark etc. ) M/s. Om Interchem
More informationADDITIONAL ATTACHMENT LIST OF ANNEXURE
ANNEXURE ADDITIONAL ATTACHMENT LIST OF ANNEXURE TITLE I. Copy of Environment Clearance (EC) of unit for distillery II. III. IV. Valid consent Copy (CTO/CC&A) Details of Production & Raw Material Consumption
More informationPRE FEASIBILITY REPORT
PRE FEASIBILITY REPORT BANDOL CRUSHER STONE QUARRY OF SHRI TULSIRAM SAHU AT Khasra No. 15/2,23/2 Village Bandol Tehsil District State Madhya Pradesh Production Capacity 45030 M3/Year Area 3.150 Hectare
More informationPRE-FEASIBILITY REPORT
PRE-FEASIBILITY REPORT ON PROPOSED PROJECT OF MANUFACTURING OF ORGANIC CHEMICALS OF AARTI INDUSTRIES LIMITED (UNIT-V) LOCATED AT Plot 41/1, GIDC Estate, Jhagadia, Bharuch-393110 1.0 EXECUTIVE SUMMARY M/s.
More informationPRE-FEASIBILITY PROJECT REPORT. Captive Power Plant 25 MW (Under Construction)
PRE-FEASIBILITY PROJECT REPORT o f Captive Power Plant 25 MW (Under Construction) o f M/s Grace Industries Limited. to be located at A-23 MIDC Industrial Area, Tadali Growth Centre, Tadali, Dist. - Chandrapur
More information