1 South East Route 2011/12 Scour Assessment Programme Detailed Scour Assessment Report Bridge: ESK-1209 at 111miles 0968yards June 2012 Network Rail South East Route General Offices Waterloo Station LONDON SE1 8SW
2 JBA Office JBA Consulting The Old School House St. Joseph s Street Tadcaster North Yorkshire LS24 9HA JBA Project Manager Matthew Kendall Revision History Revision Ref / Date Issued Amendments Issued to 1.0 / June Stuart Hines-Randle Contract This report describes work commissioned by Network Rail. Network Rail s representative for the contract was Stuart Hines-Randle. Matthew Kendall and Richard Buck of JBA Consulting carried out this work. Prepared by... Ben Darville HND Assistant Engineer Reviewed by... Matthew Kendall, HNC Project Manager Approved by... Richard Buck BEng CEng MICE MCIWEM Purpose Director This document has been prepared solely as a Detailed Scour Assessment for Network Rail South East Route. JBA Consulting accepts no responsibility or liability for any use that is made of this document other than by the Client for the purposes for which it was originally commissioned and prepared. Copyright Jeremy Benn Associates Limited _ESK_1209_S3.doc
3 Contents 1. Introduction Background About this report Data gathering Site location and access Asset data Structure description Previous Analyses Underwater Examinations Archive Drawings Method Design flood, water levels and velocities Depth of scour Priority category Results Design floods, water levels and velocities Depth of scour Priority category Superstructure Conclusions and recommendations Conclusions Recommendations... 8 References... 9 A. Appendix A - Figures B. Appendix B - Archive Drawing _ESK_1209_S3.doc
4 List of Tables Table 2-1: Asset data... 2 Table 4-1: Catchment characteristics... 6 Table 4-2: Design floods, water levels and velocities... 6 Table 4-3: Scour and foundation depths... 6 Table 4-4: Priority category... 6 Table 5-1: Priority categories and recommended actions... 8 List of Figures Figure 1: Location plan (Scale 1:200,000) Figure 2: Location plan (Scale 1:5,000) Figure 3: Site Plan and Elevation Figure 4: Photographs _ESK_1209_S3.doc
5 1. Introduction 1.1 Background As part of a nationwide survey of railway bridges and culverts over water or likely to be affected by floodwaters, Network Rail South East Route are implementing a rolling programme of assessments in accordance with the Specification NR/SP/CIV/080 Management of Existing Bridges and Culverts, Issue 1, April 2004, and Company Standard NR/CS/CIV/032 Managing Existing Structures, Issue 1, April As part of this programme, Network Rail South East Route has let a contract for the inspection and assessment of 320 Underbridges to Jeremy Benn Associates Limited of which the current report forms part. 1.2 About this report ESK-1209 was assessed in March 2007 using the EX2502 preliminary Scour Assessment Procedure. The findings of the site survey and EX2502 calculation showed the structure to have a Priority Rating of i.e. a structure of Medium Priority for scour. The purpose of this detailed assessment is to undertake a more detailed analysis of scour potential using a combination of computational modelling and further site investigation, if required, to estimate scour depths. A study to determine likely flows, water levels and velocities at the structure for given return periods has been undertaken to establish the risk (if any) posed by floodwaters on the structure and line. The results of these analyses have then been used to re-calculate the Priority Score using the EX2502/BSIS Assessment Procedure. 2012_ESK_1209_S3.doc 1
6 2. Data gathering 2.1 Site location and access The site is located between Beccles and Oulton Broad South Stations. Location plans are given in Figures 1 and 2 at the back of this report. Access to the structure was gained from the A146 heading east from Beccles then taking Marsh Lane through North Cove to Great Carr. After parking at the level crossing, cross the track and then immediately bear left following the drain through woodland towards the structure. 2.2 Asset data Asset data is given in Table 2-1 below. Table 2-1: Asset data Carrs Guid: D1EBA45D9E E4AD01A ELR: East Suffolk Mileage: 111 miles 968yards Local Route: Anglian OS NGR: TM (645729, ) OS 1:50,000 Sheet: 134 Watercourse Name: River Yare Watercourse Type: Main River Agency Region: Anglia Region Agency Area: Eastern Area Existing Flood Marker: None Present 2.3 Structure description A sketch plan and upstream elevation of the structure is given in Figure 3. The structure is a two span underbridge with equal 5.5m spans. The abutments and pier are of concrete construction and support a 8.75m wide concrete beam deck. The central pier is protected by concrete bagwork although archive drawings (dated 1917) suggest this pier and both abutments are actually constructed on timber piles. The water course is a small drainage channel of flat slope passing through flat dense deciduous woodland. Clearance between bed level and the deck underside is limited to approximately 2.2m. The channel flows through span 1 of the structure, span 2 acting as flood relief. The bed of span 2 was heavily silted and clearance reduced to approximately 1.2m. The depth and clarity of the water in the channel at the time of inspection prevented any observations being made about the presence of any scour protection on the bed. 2.4 Previous Analyses JBA Initial Assessment (March 2007): PR _ESK_1209_S3.doc 2
7 2.5 Underwater Examinations Bridgezone (February 2011): The structure was found to be in an overall poor condition with undermining to pier 1 identified as a significant defect. It was strongly recommended that an intrusive structural assessment of pier 1 was carried out to ascertain the impact of the undermining. However, as it is now known that the structure is founded on timber piles, the works recommended above are not considered appropriate. The undermining identified by the underwater report is simply an undermining of the concrete capping rather than of the bridge substructure itself. The defect therefore has no detrimental effect on the overall of structural stability of the bridge. 2.6 Archive Drawings An archive drawing of the structure is available a copy of which is shown in Appendix B. The drawing, dated 1917, shows that the bridge supports are founded on timber piles. JBA adopt an assumed foundation of 3m for structures supported by timber piles (see below): 2012_ESK_1209_S3.doc 3
8 3. Method 3.1 Design flood, water levels and velocities The design flood is the flood that a structure should withstand without suffering damage, the probability of which is normally expressed by the return period, the average period between events of a similar magnitude. For T-year return period flood, the lifetime probability of exceedance r during a design life N is given by where r 1 ( 1 1 ) n T r = lifetime probability of exceedance (%) T = return period of event (years) N = design life (years) The design flood for 10 to 200-year return periods were estimated using the Flood Estimation Handbook (Reed, et al, 1999) and in-house Flood Estimation Software (FES) Version 2.0 (JBA Consulting, 2007). The median annual flood (QMED) was estimated from catchment characteristics then scaled up to the design peak flows using a pooled growth curve. The effects of climate change are not considered. The findings are given in Section 4.1. The design water levels and velocities were estimated using a simple one-dimensional hydraulic model of the watercourse in the vicinity of the structure. The model software was HEC-RAS model (Version 4.1.0, US Army Corps of Engineers, 2010) and the model geometry comprised four cross-sections, two upstream and two downstream of the bridge, based on measurements taken from the topographic survey of the upstream elevation. The modelled water levels and flow velocities are given in Section 4.1. It should be noted that greater confidence in the results could be obtained using topographical survey data of a section of watercourse channel and floodplain. 3.2 Depth of scour The depth of scour at a structure is the sum of the general scour (also known as contraction scour) and local scour. The depth of general scour d g at the bridge was estimated using NR Scour (JBA Consulting, 1997), which is based on the Bridge scour information system (BSIS) (Bullen and Partners, 1990) and Hydraulic aspects of bridges: assessment of the risk of scour (EX2502) (HR Wallingford, 1993). The depth of local scour at piers d s was estimated using the method in the Manual on scour at bridges and other hydraulic structures (MAY ET AL, 2002, pp ), with a safety factor to allow for the probability of scour depth being exceeded during a flood event, and a debris factor to allow for an increase in effective width due to debris accumulation. This method was adopted by JBA Consulting in March 2012 and replaces the method used in previous scour assessments (Melville & Sutherland, 1988). Benefits include a wide range of pier shape factors, user-friendly formulae for alignment, depth and velocity factors. The method was applied using an in-house spreadsheet Local scour at bridges v1.23.xls (JBA Consulting, 2012). where s angle shape depth velocity F debris (3.1) d D F. F. F. F. S. F (3.1) d s = depth of local scour (m) D = width of pier or abutment (m) F angle = alignment factor (piers only) (-) F shape = shape factor (-) 2012_ESK_1209_S3.doc 4
9 F depth = flow depth factor for piers (-) F velocity = velocity factor (-) S F = safety factor (-) F debris = debris factor (-) The depth of local scour at an abutment is given by (Melville, 1995), from Bridge scour (Melville and Coleman, 2000). Local scour depth is related to the discharge intercepted by the embankment rather than the length of the embankment itself. This is an envelope equation and no safety factor is required. where y K. K. K. K s yd s G K yd = flow depth-foundation width factor (-) K s = foundation shape factor (-) K θ = foundation alignment factor (-) K G = approach channel geometry factor (-) (3-2) For all calculations it was assumed that there was no scour protection and that the bed material was unchanged with depth. 3.3 Priority category The preliminary priority rating (PR) was calculated for each bridge element after EX2502 (HR Wallingford, 1993). The PR is a function of the ratio between scour depth and bridge foundation depth and indicates the risk of bridge failure due to scour (Equation 3.3). where PPR 15 ln d d t f PPR = priority rating (range ) d t d f = depth of total scour below bed level (m) = depth of foundation below bed level (m) (3.3) If the load bearing material is rock, a satisfactory invert or scour protection is present, then the final priority rating PR is Priority rating = 10 (Low priority) (3.4) For all other cases, PR is Priority rating = PPR + TR + LBM (3.5) where PPR = Preliminary priority rating (-) TR = correction factor for river type (-) LBM = correction factor for load-bearing material (-) Finally, a priority score, priority category and recommended action were assigned to each bridge element in accordance with EX2502 (HR Wallingford, 1993) (Table 5-1). 2012_ESK_1209_S3.doc 5
10 4. Results 4.1 Design floods, water levels and velocities The catchment area and catchment characteristics for the watercourse at the structure were identified using the Flood Estimation Handbook (FEH) CD-ROM Version 3.0 (Centre for Ecology and Hydrology, Wallingford, 2010) (Table 4-1 below). Table 4-1: Catchment characteristics Catchment Area (DTM AREA) (km 2 ) 4.62 Baseflow Index (BFI-HOST) (-) Standard Annual Rainfall (SAAR) (mm) 610 Urban Index (URBEXT) (-) Source: Flood Estimation Handbook (FEH) CD-ROM Version 3.0, The design floods, water levels and flow velocities calculated in accordance with Section 3.1 are given in Table 4-2 below. The 200-year return period flood was used as the design flood as this is the design standard for scour protection schemes. Table 4-2: Design floods, water levels and velocities Return period 10-year 50-year 100-year 150-year 200-year Design flood (m 3 /s) Modelled water level (maod) Modelled flow velocity (m/s) Depth of scour The scour and foundation depths are given in Table 4-3 below. Table 4-3: Scour and foundation depths Nr Description General scour, d g (m) Local scour, d s (m) Total scour, d t (m) Foundation depth, d f (m) 1 Low mileage (left) abutment Pier High mileage (right) abutment Priority category The priority rating (PR) is given in Table 4-4 below. This estimate assumes a foundation depth of 3m and scour protection to the pier. Table 4-4: Priority category Nr Description Priority rating, PR (-) Priority score (-) Priority category (-) 1 Low mileage (left) abutment Low 2 Pier Medium 5 High mileage (right) abutment Low 2012_ESK_1209_S3.doc 6
11 4.4 Superstructure The bridge soffit is 10.00mALD and design flood water level is 9.02mALD. During the design flood, the bridge has a freeboard of 0.98 metres and flood water levels are unlikely to reach the deck or cause track flooding. However, the risk of flooding or surcharging may increase in the future due to blockage at the structure, accumulations of sediment, climate change or changes within the catchment area. 2012_ESK_1209_S3.doc 7
12 5. Conclusions and recommendations 5.1 Conclusions Priority Rating For an assumed foundation depth of 3.0 metre, this bridge falls within the Low priority category, with a priority score of 4 and a preliminary priority rating of Superstructure For the design flood, the bridge has a freeboard of 0.98 metres and there is a low risk of surcharging of the bridge or inundation of the track. 5.2 Recommendations Flood warning procedure The EX2502 procedure for Medium priority bridges should be adopted for this bridge, in accordance with NR/SP/CIV/080 (Table 5-1). Table 5-1: Priority categories and recommended actions Priority rating Priority Priority Recommended Action score category Priority 1 Priority 2 High Detailed Hydraulic Assessment. If the High Priority is confirmed then the structure is to be included in the flood warning plan or physical protection works to be constructed. Whilst at High Priority the structure should have yearly underwater exams. The priority should be reviewed following protection works, a flood event or underwater exam Priority 3 Medium Repeat of EX2502 assessment and underwater exams (where necessary) every 3 years. The priority Priority 4 should be reviewed following protection works, a flood event or underwater exam Priority 5 Priority 6 Low Repeat of EX2502 assessment every 6 years and underwater exams (where necessary) every 3 years. The priority should be reviewed following protection works, a flood event or underwater exam Foundations Coring is not considered necessary at this structure Routine examinations In addition regular inspections for scour and flood damage, particularly following a major flood, should be carried out and the bridge reassessed using the EX2502 calculation procedure at a minimum interval of every 3 years. Furthermore, it is also recommended that underwater examinations of the structure be undertaken every 3 years dependent on the results of first examination Remedial works It is recommended that the recently installed concrete bagwork is removed and replaced with rock armour around the base of Pier 1 to prevent any further loss of bed material Superstructure We consider it unnecessary to include this structure in the current zonal flood plan for water pressure. 2012_ESK_1209_S3.doc 8
13 References BULLEN AND PARTNERS (1994) Bridge scour information system HIGHWAYS AGENCY (1994) The design of highway bridges for hydraulic action, Advice Note BA59/94. HIGHWAYS AGENCY (1998) Assessment of Scour at Highway Bridges, Revision D, Advice Note. HR WALLINGFORD (1993) Hydraulic Aspects of Bridges - Assessment of the Risk of Scour, Report EX2502, HR Wallingford, Wallingford. This is the Preliminary Scour Assessment Procedure developed for British Rail which provides an indicative assessment of scour at a structure based on a site visit, measurement of key structure dimensions and a simple assessment of river geomorphology. JBA CONSULTING (1997) NR Scour. Replaces the former BSIS (Bridge Scour Information System). A database developed for British Rail Engineering Technical Support Group, Kings Cross, NR Scour is essentially a computerised version of the EX2502 scour assessment procedure and contains information on: ELR, Bridge Name, Mileage, Watercourse crossed, Bridge and stream type, Details of diving and coring surveys, Details of EX2502 scour assessments. MAY, R.W.P., ACKERS, J.C. and KIRBY, A.M. (2002) Manual on scour at bridges and other hydraulic structures, Report C551, Construction Industry Research and Information Association (CIRIA), London. MELVILLE B.W. & SUTHERLAND, A.J. (1988) Design Method for Local Scour at Bridge Piers, In: Journal of Hydraulic Engineering, Vol.114(10), 1988, ASCE. NETWORK RAIL (2004) Management of Existing Bridges and Culverts, Issue 1, Specification NR/SP/CIV/080. NETWORK RAIL (2004) Managing Existing Structures, Issue 1, Company Standard NR/CS/CIV/032. REED D. et al (1999) Flood Estimation Handbook, 5 Volumes. CEH Institute of Hydrology, Wallingford. 2012_ESK_1209_S3.doc 9
14 A. Appendix A - Figures Figure 1: Location plan (Scale 1:200,000) Scale 1:200,000 Contains Ordnance Survey data Crown copyright and database right 2012 Figure 2: Location plan (Scale 1:5,000) Scale 1:5,000 Contains Ordnance Survey data Crown copyright and database right _ESK_1209_S3.doc 10
15 Figure 3: Site Plan and Elevation 2012_ESK_1209_S3.doc 11
16 Photograph 1 Downstream elevation Figure 4: Photographs Photograph 2 View downstream 2012_ESK_1209_S3.doc 12
17 B. Appendix B - Archive Drawing 2012_ESK_1209_S3.doc 13
18 Offices at Atherstone Doncaster Edinburgh Haywards Heath Limerick Newcastle upon Tyne Newport Saltaire Skipton Tadcaster Wallingford Warrington Registered Office South Barn Broughton Hall SKIPTON North Yorkshire BD23 3AE t:+44(0) Jeremy Benn Associates Ltd Registered in England Visit our website
Iarnród Éireann/Irish Rail Risk Management and Scour Protection Works on Masonry Arches and Piers
Iarnród Éireann/Irish Rail Risk Management and Scour Protection Works on Masonry Arches and Piers Assessment & Maintenance of Masonry Arch Bridges Engineers Ireland 29 th January 2016 Stephen Bateson BSc
More informationCLAY STREET BRIDGE REPLACEMENT
HYDROLOGY /HYDRAULICS REPORT. EL DORADO COUNTY CLAY STREET BRIDGE REPLACEMENT Prepared by: Joseph Domenichelli Domenichelli & Associates 1107 Investment Blvd., Suite 145 El Dorado Hills, California 95762
More informationAPPLICATION FORM AF-50: CONSENT UNDER SECTION 50, ARTERIAL DRAINAGE ACT, 1945
APPLICATION FORM AF-50: CONSENT UNDER SECTION 50, ARTERIAL DRAINAGE ACT, 1945 APPLICATION DETAILS Name of Applicant: Company / authority: Address: Tel: Fax: Email: Date of Application: Client (if appropriate):
More information3.5 Hydrology & Hydraulics
3.5 Hydrology & Hydraulics 3.5.1 Purpose The purpose of this section is to provide results from the analysis and assessment of the impact of the proposed Carmichael Rail Alignment (Option 11 Revision 1)
More information10(a) Bridge and culvert design information
10(a) Bridge and culvert design information The following information is required to accompany resource consent applications for bridges or culverts on waterways. Please answer all questions if possible.
More informationSouth Worcestershire Strategic Flood Risk Assessment Level 2 Update
South Worcestershire Strategic Flood Risk Assessment Level 2 Update Worcester West Site Assessment Final Report February 2015 This page is intentionally left blank 2015s2316 Worcester West Site Assessment
More informationUNDERWATER BRIDGE INSPECTION REPORT DISTRICT 6 - RICE COUNTY
UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 66532 227 th STREET (TWP 45) OVER THE STRAIGHT RIVER DISTRICT 6 - RICE COUNTY SEPTEMBER 12, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION
More informationCOACHELLA VALLEY WATER DISTRICT GUIDELINE K-2 SLOPE (BANK) PROTECTION DESIGN GUIDANCE
COACHELLA VALLEY WATER DISTRICT GUIDELINE K-2 SLOPE (BANK) PROTECTION DESIGN GUIDANCE K.2.1 General Requirements The design and construction of slope protection works may be required for several types
More informationUPRR criteria for sizing waterway openings under bridges and through culverts are as follows:
UNION PACIFIC RAILROAD SCOPE OF HYDROLOGIC/HYDRAULIC DESIGN ENGINEERING AND PERMITTING SERVICES FOR SIZING WATERWAY OPENINGS AT NEW AND REPLACEMENT STRICTURES These flood passage criteria were developed
More informationAPPLICATION FORM AF-50: CONSENT UNDER SECTION 50, ARTERIAL DRAINAGE ACT, 1945
APPLICATION FORM AF-50: CONSENT UNDER SECTION 50, ARTERIAL DRAINAGE ACT, 1945 APPLICATION DETAILS Name of Applicant: Company / authority: Address: Date of Application: Client (if appropriate): BRIDGE DETAILS
More informationChapter 11 Culverts and Bridges
Chapter 11 Culverts and Bridges Contents 1.0 Introduction... 1 2.0 General Design... 1 2.1 Design Criteria... 1 2.2 Design Flows... 1 2.3 Permitting and Regulations... 1 2.4 Aesthetics and Safety... 2
More informationUNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO MSAS NO. 119 OVER THE RED LAKE RIVER DISTRICT 2 - POLK COUNTY, CITY OF EAST GRAND FORKS
UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 60019 MSAS NO. 119 OVER THE RED LAKE RIVER DISTRICT 2 - POLK COUNTY, CITY OF EAST GRAND FORKS AUGUST 29, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF
More informationLAKE COUNTY HYDROLOGY DESIGN STANDARDS
LAKE COUNTY HYDROLOGY DESIGN STANDARDS Lake County Department of Public Works Water Resources Division 255 N. Forbes Street Lakeport, CA 95453 (707)263-2341 Adopted June 22, 1999 These Standards provide
More informationBridge scour reliability under changing environmental conditions
The Value of Structural Health Monitoring for the reliable Bridge Management Zagreb 2-3 March 2017 Bridge scour reliability under changing environmental conditions Boulent Imam, Alexandros Kallias DOI:
More informationFlood Risk Analysis of Bridge A Case Study
ISBN 978-93-84468-11-8 Proceedings of International Conference on Architecture And Civil Engineering (ICAACE'14) Dubai, December 25-26, 2014, pp. 128-134 Flood Risk Analysis of Bridge A Case Study Safa
More informationUNDERWATER BRIDGE INSPECTION REPORT RED RIVER OF THE NORTH DISTRICT 4 - CLAY COUNTY
UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 6646 CSAH NO. 36 OVER THE RED RIVER OF THE NORTH DISTRICT 4 - CLAY COUNTY PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS,
More informationBridge Planning Updates. Bridge Planning Practitioners Workshop April 2012
Bridge Planning Updates Bridge Planning Practitioners Workshop April 2012 Bridge Website Bridge Website Bridge Website Bridge Website BPG 11 Stormwater Management at Rural Bridges Released July 2010 Documents
More informationUNDERWATER BRIDGE INSPECTION REPORT DISTRICT 4 - WILKIN COUNTY
UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 84505 CSAH NO. 14 OVER THE OTTER TAIL RIVER DISTRICT 4 - WILKIN COUNTY PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS, INC.
More informationAppendix E: Bridge Site Information Summary
BRIDGE MANUAL E - 1 APPENDIX E: BRIDGE SITE INFORMATION SUMMARY Appendix E: Bridge Site Information Summary Table of Contents Notes..E 3 Section 1: Basic Information..E 4 Section 2: River Data..E 8 Section
More informationFloodplain Development
Floodplain Development Floodplain Regulations State: Part 31 of Public Act 451 Local: Federal: Building Codes, Zoning and Floodplain Management Ordinances National Flood Insurance Program Floodplain:
More informationUNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO TRUNK HIGHWAY NO. 3 rd Avenue/Central Avenue OVER THE MISSISSIPPI RIVER
UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 2440 TRUNK HIGHWAY NO. 3 rd Avenue/Central Avenue OVER THE MISSISSIPPI RIVER DISTRICT M HENNEPIN COUNTY OCTOBER 23, 2008 PREPARED FOR THE MINNESOTA DEPARTMENT
More informationAppendix Q Draft Location Hydraulic Study Report For the State Route 32 Widening Between Fir Street and Yosemite Drive at Dead Horse Slough and South
Appendix Q Draft Location Hydraulic Study Report For the State Route 32 Widening Between Fir Street and Yosemite Drive at Dead Horse Slough and South Fork Dead Horse Slough in the, California Draft Location
More informationPrepared for: City of Jeffersonville. November Prepared by
JEFFERSONVILLE STORMWATER MASTER PLAN HYDRAULICS APPENDIX JEFFERSONVILLE, INDIANA Prepared for: City of Jeffersonville November 2011 Prepared by Christopher B. Burke Engineering, Ltd. 115 W. Washington
More informationHydrotechnical Design Guidelines for Stream Crossings
Hydrotechnical Design Guidelines for Stream Crossings Introduction Design of stream crossings and other in-stream highway facilities requires estimation of design highwater elevation and mean channel velocity.
More informationScour risk assessment at river crossings
Scour risk assessment at river crossings Marta Roca 1 and Richard Whitehouse 2 1 HR Wallingford, Howbery Park, Wallingford, OX10 8BA, UK, m.roca@hrwallingford.com 2 HR Wallingford, Howbery Park, Wallingford,
More informationUNDERWATER BRIDGE INSPECTION REPORT RED RIVER OF THE NORTH DISTRICT 4 - CLAY COUNTY, CITY OF MOORHEAD
UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 14511 MSAS NO. 115 OVER THE RED RIVER OF THE NORTH DISTRICT 4 - CLAY COUNTY, CITY OF MOORHEAD PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY
More information498 AVE BRIDGE HYDRAULICS INVESTIGATION OF IMPACTS RELATED TO TOWN OF HIGH RIVER FLOOD MITIGATION WORKS
498 AVE BRIDGE HYDRAULICS INVESTIGATION OF IMPACTS RELATED TO TOWN OF HIGH RIVER FLOOD MITIGATION WORKS Submitted to: M.D. of Foothills No. 31 High River, Alberta Submitted by: Amec Foster Wheeler Environment
More informationHydraulic Report. County Road 595 Bridge over Dead River. Prepared By AECOM Brian A. Hintsala, P.E
Prepared for: Prepared by: Marquette County Road Commission AECOM Ishpeming, MI Marquette, MI 60240279 December 9, 2011 Hydraulic Report County Road 595 Bridge over Dead River Prepared By AECOM Brian A.
More informationUNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO COUNTY STATE AID HIGHWAY 10 OVER THE POMME DE TERRE RIVER DISTRICT 4 STEVENS COUNTY
UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 75501 COUNTY STATE AID HIGHWAY 10 OVER THE POMME DE TERRE RIVER DISTRICT 4 STEVENS COUNTY SEPTEMBER 24, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION
More informationCreated by Simpo PDF Creator Pro (unregistered version) Asst.Prof.Dr. Jaafar S. Maatooq
Lect.No.9 2 nd Semester Barrages, Regulators, Dams 1 of 15 In order to harness the water potential of a river optimally, it is necessary to construct two types of hydraulic structures, as shown in Figure
More informationDRAINAGE REVIEW: Berwick Health and Education Precinct. for. Victorian Planning Authority
DRAINAGE REVIEW: Berwick Health and Education Precinct for Victorian Planning Authority April 2017 Document history Revision: Revision no. 03 Author/s Jonathon McLean Approved Jonathon McLean Distribution:
More informationCITY OF KIMBERLEY HYDROLOGICAL & HYDRAULIC ASSESSMENT
HYDROLOGICAL & HYDRAULIC ASSESSMENT ISSUED FOR USE January 31, 2012 FILE: 2011-015 LACAS CONSULTANTS INC. CONSULTING ENGINEERS & HYDROLOGICAL SPECIALISTS, SINCE 1991 Suite 200, 1311 Howe Street, Vancouver,
More informationChapter 11 Culverts and Bridges
Chapter 11 Table of Contents 11-1 Introduction... 1 11-2 General Design... 1 11-2-1 Design Criteria... 1 11-2-2 Design Flows... 1 11-2-3 Permitting and Regulations... 2 11-2-4 Aesthetics and Safety...
More informationChapter 11 Culverts and Bridges
Chapter 11 Table of Contents 11-1 Introduction... 1 11-2 General Design... 1 11-2-1 Design Criteria... 1 11-2-2 Design Flows... 1 11-2-3 Permitting and Regulations... 2 11-2-4 Aesthetics and Safety...
More informationUNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 3 OVER THE RED LAKE RIVER DISTRICT 2 - PENNINGTON COUNTY
UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 57518 CSAH NO. 3 OVER THE RED LAKE RIVER DISTRICT 2 - PENNINGTON COUNTY AUGUST 27, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY AYRES
More informationAppendix 15.3 Hydraulic Assessment of Sewers
Appendix 15.3 Hydraulic Assessment of Sewers Irish Water Arklow Wastewater Treatment Plant Project EIA Report Issue September 2018 Arup \\GLOBAL\EUROPE\DUBLIN\JOBS\247000\247825-00\4. INTERNAL\4-03 DESIGN\4-03-02
More informationSCOUR AT COMPLEX BRIDGE STRUCTURES THE BENEFITS OF TWO-DIMENSIONAL HYDRAULIC MODELLING IN THE ESTIMATION OF SCOUR DEPTHS
SCOUR AT COMPLEX BRIDGE STRUCTURES THE BENEFITS OF TWO-DIMENSIONAL HYDRAULIC MODELLING IN THE ESTIMATION OF SCOUR DEPTHS M Burgess 1, C Moore 1 1 Arup, Sydney, NSW Abstract Assessing scour potential at
More informationMINNESOTA DEPARTMENT OF TRANSPORTATION BRIDGE SCOUR EVALUATION PROCEDURE FOR MINNESOTA BRIDGES
MINNESOTA DEPARTMENT OF TRANSPORTATION BRIDGE SCOUR EVALUATION PROCEDURE FOR MINNESOTA BRIDGES December 2009 Introduction This document describes the policy of the Minnesota Department of Transportation
More informationTemporary Watercourse Crossing: Culverts
Temporary Watercourse Crossing: Culverts DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent Symbol
More informationESTABLISHING A SOLID FOUNDATION FOR NEW BRIDGE CONSTRUCTION REPLACEMENT OF BRIDGE OVER THE SOUTH CANADIAN RIVER NEAR PURCELL, OKLAHOMA
ESTABLISHING A SOLID FOUNDATION FOR NEW BRIDGE CONSTRUCTION REPLACEMENT OF BRIDGE 412.1 OVER THE SOUTH CANADIAN RIVER NEAR PURCELL, OKLAHOMA BURLINGTON NORTHERN AND SANTA FE RAILWAY By: John W. Hronek
More informationFreight Street Development Strategy
Freight Street Development Strategy Appendix B: Naugatuck River Floodplain Analysis Freight Street Development Strategy DECEMBER 2017 Page B-1 1.0 NAUGATUCK RIVER FLOODPLAIN AT FREIGHT STREET 1.1 Watershed
More informationUNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 5 (FRANKLIN AVENUE) OVER THE MISSISSIPPI RIVER HENNEPIN COUNTY
UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 2441 CSAH NO. 5 (FRANKLIN AVENUE) OVER THE MISSISSIPPI RIVER HENNEPIN COUNTY OCTOBER 29, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY
More informationTemporary Stream Crossing
Temporary Stream Crossing NS-4 Objectives EC Erosion Control SE Sediment Control TR Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution
More informationFRST 557 Lecture 7b Cross Drainage Structures: Culverts and Bridges
FRST 557 Lecture 7b Cross Drainage Structures: Culverts and Bridges Lesson Background and Overview: The last lesson introduced the topic of water management relative to forest roads and further explored
More informationChapter 1. General Design Information. Section 1.02 Structure Selection and Geometry. Introduction
Chapter 1 Bridge Design Manual General Design Information Section 1.02 Selection and Geometry Introduction Selection or Rehabilitation Report This section of the design manual provides guidance on the
More informationTransactions on Ecology and the Environment vol 19, 1998 WIT Press, ISSN
Water surface profiles and scour analysis for a river reach with multiple bridge proposals C.C. Nuthmann & C.C. Chang Sverdrup Civil, Inc., Two Center Plaza, Boston, Massachusetts, USA, 02108 Email: nuthmacc@sverdrup.
More informationtechnical memorandum
technical memorandum bridges and other Bridge condition indicator guide TM-4008 March 2014 1.0 Introduction 1.1 The need for bridge indicators In order to maintain and manage a stock of bridges and other
More informationCHAPTER 3 Environmental Guidelines for WATERCOURSE CROSSINGS GOVERNMENT OF NEWFOUNDLAND AND LABRADOR DEPARTMENT OF ENVIRONMENT AND LABOUR
GOVERNMENT OF NEWFOUNDLAND AND LABRADOR DEPARTMENT OF ENVIRONMENT AND LABOUR CHAPTER 3 Environmental Guidelines for WATERCOURSE CROSSINGS WATER RESOURCES MANAGEMENT DIVISION Water Investigations Section
More informationUNDERWATER BRIDGE INSPECTION REPORT DISTRICT 7 WATONWAN COUNTY
UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 83001 CSAH 9 OVER THE WATONWAN RIVER DISTRICT 7 WATONWAN COUNTY SEPTEMBER 11, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS,
More informationRising Sun. Scaffold Hill. Flood Risk Assessment
Rising Sun Scaffold Hill Flood Risk Assessment August 2010 Contents 1.0 Introduction... 4 2.0 Site Description... 5 3.0 Legislative Framework... 6 4.0 Flood Risk... 10 5.0 Surface Water Drainage... 11
More informationS.R. 0944, Section 015 (Wertzville Road) Bridge over the West Branch of Simmons Creek. Silver Spring Township Cumberland County.
Hydrologic and Hydraulic Report For S.R. 0944, Section 015 (Wertzville Road) Bridge over the West Branch of Simmons Creek Silver Spring Township Cumberland County August 13, 2003 Prepared For Pennsylvania
More informationScour Analysis and Countermeasure Design
Scour Analysis and Countermeasure Design for UNION STREET RAILROAD BRIDGE (Trail Connection Project) Key No. 11085 ODOT, Region 2 Local Agency On-Call ATA 23456 WOC 1 City of Salem, Urban Development HDR
More informationSURFACE DRAINAGE SYSTEM FOR ROADS. Components of Surface Drainage System
Lecture Hour-49 UNIT 8 10CV755 HGD SURFACE DRAINAGE SYSTEM FOR ROADS Components of Surface Drainage System The surface water from the roadway and the adjoining land is to be collected and then disposed
More informationStream Reaches and Hydrologic Units
Chapter United States 6 Department of Agriculture Natural Resources Conservation Service Chapter 6 Stream Reaches and Hydrologic Units Rain clouds Cloud formation Precipitation Surface runoff Evaporation
More information5th Street Bridge Replacement Project Yuba City, California Location Hydraulic Study Report Bridge No. 18C0012
EA 03-0L2324 Yuba City, California Location Hydraulic Study Report Submitted to: Prepared by: November 2012 Table of Contents Executive Summary... iii Acronyms... v 1 General Description... 1 1.1 Project
More informationTULLAMORE FLOOD RISK ASSESSMENT AND MANAGEMENT STUDY
TULLAMORE FLOOD RISK ASSESSMENT AND MANAGEMENT STUDY FINAL HYDRAULICS REPORT 1794/RP/004/C June 2008 FRAM Section Engineering Services Office of Public Works Doc. No. 1794/RP/004/C ii June 2008 INDEX OF
More informationReport. Inflow Design Flood Control System Plan St. Clair Power Plant St. Clair, Michigan. DTE Energy Company One Energy Plaza, Detroit, MI
Report Inflow Design Flood Control System Plan St. Clair Power Plant St. Clair, Michigan DTE Energy Company One Energy Plaza, Detroit, MI October 14, 2016 NTH Project No. 62-160047-04 NTH Consultants,
More informationSection H Project Description Narrative
Section H Project Description Narrative Permit No. Pennsylvania Department of Transportation, Engineering District 2-0, 1924 Daisy Street Extension, P.O. Box 342, Clearfield, PA 16830 S.R. 2004, Section
More informationDevelopment of a Stage-Discharge Rating for Site Van Bibber Creek at Route 93
Development of a Stage-Discharge Rating for Site 330 - Van Bibber Creek at Route 93 Prepared for: Urban Drainage and Flood Control District 2480 W. 26 th Avenue Suite 156-B Denver, CO 80211 May 19, 2006
More informationAction plans for hotspot locations
Action plans for hotspot locations Ash Vale North 1. Local evidence indicates the culvert could not discharge during December 2013 because the outlet was blocked on the western side of the railway. Guildford
More informationTemporary Stream Crossing
Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Objective
More informationDrainage Strategy Report
CONSULTING ENGINEERS Report No: Date: C1014 Aug 2017 Project: Drainage Strategy Report Danygraig Works, Risca Client: P.D. Edenhall This report is provided for the benefit only of the party to whom it
More informationDevelopment of Stage-Discharge Ratings for Site 2240 Bear Creek at Cold Spring
Development of Stage-Discharge Ratings for Site 2240 Bear Creek at Cold Spring Prepared for: Urban Drainage and Flood Control District 2480 W. 26 th Avenue Suite 156-B Denver, CO 80211 May 19, 2006 (Rev
More informationUNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CR 27 OVER THE RED LAKE RIVER DISTRICT 2 PENNINGTON COUNTY
UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 57521 CR 27 OVER THE RED LAKE RIVER DISTRICT 2 PENNINGTON COUNTY PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS, INC. JOB
More informationTechnical Memorandum. Hydraulic Analysis Smith House Flood Stages. 1.0 Introduction
Technical Memorandum Hydraulic Analysis Smith House Flood Stages 1.0 Introduction Pacific International Engineering (PIE) performed a hydraulic analysis to estimate the water surface elevations of the
More informationUNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CR 958 OVER A STREAM ST. LOUIS COUNTY
UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 88631 CR 958 OVER A STREAM ST. LOUIS COUNTY SEPTEMBER 18, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS, INC. JOB NO.
More informationHydraulic Report. County Road 595 Bridge over Mulligan Creek. Prepared By AECOM Brian A. Hintsala, P.E
Prepared for: Prepared by: Marquette County Road Commission AECOM Ishpeming, MI Marquette, MI 60240279 December 9. 2011 Hydraulic Report County Road 595 Bridge over Mulligan Creek Prepared By AECOM Brian
More informationJacobi, Toombs, and Lanz, Inc.
Area 5: Blackiston Mill Road at Dead Man's Hollow Flooding Assessment Jacobi, Toombs, and Lanz, Inc. This document summarizes an assessment of drainage and flooding concerns and provides recommendations
More informationUNDERWATER BRIDGE INSPECTION REPORT DISTRICT 3 - MORRISON COUNTY
UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 49528 CSAH NO. 26 OVER THE MISSISSIPPI RIVER DISTRICT 3 - MORRISON COUNTY OCTOBER 25, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS
More informationCE 435/535, Fall 2003 Preliminary Design Example 1 / 6
CE 435/535, Fall 2003 Preliminary Design Example 1 / 6 Perform a preliminary design for a bridge on a state highway over a large creek in rural Alabama. Produce a construction layout drawing showing profile
More informationCONSTRUCTION PLAN CHECKLIST
CONSTRUCTION PLAN CHECKLIST The design engineer is responsible for ensuring that plans submitted for city review are in accordance with this checklist. It is requested that the executed checklist be submitted
More informationSWAP Risk Informed Methods for Stormwater Assessment and Prioritization
SWAP Risk Informed Methods for Stormwater Assessment and Prioritization Sara Hillegas Woida, Hydraulic Engineer US Army Corps of Engineers, Pittsburgh Thomas Maier, Biologist/Planner US Army Corps of Engineers,
More informationState of New Jersey NEW JERSEY DEPARTMENT OF TRANSPORTATION 1035 PARKWAY AVENUE P.O. Box 600 TRENTON, NEW JERSEY
State of New Jersey NEW JERSEY DEPARTMENT OF TRANSPORTATION 1035 PARKWAY AVENUE P.O. Box 600 TRENTON, NEW JERSEY 08625-0600 BRIDGE RE-EVALUATION SURVEY REPORT STRUCTURE NO. 3XXX-XXX ROUTE I-287 SB OVER
More informationLYTH AND WITHERSLACK. Water Level Management Board Justification Statement SUMMARY REPORT. July 2015
LYTH AND WITHERSLACK Water Level Management Board Justification Statement SUMMARY REPORT July 2015 Foreword This summary of the Justification Statement has been prepared by JBA Consulting on behalf of
More informationModeling a Complex Hydraulic Environment Using a 1-D Approach Supplemented with Simple 2-D Principles Manas Borah Ed Dickson June 5, 2014
ASFPM 2014 Annual Conference Modeling a Complex Hydraulic Environment Using a 1-D Approach Supplemented with Simple 2-D Principles Manas Borah Ed Dickson June 5, 2014 Agenda Overview and Background Hydrology
More informationHydrology & Hydraulic Design Criteria
Hydrology and Hydraulics Design Criteria Page No: i CONTENTS 1.0 INTRODUCTION...1 1.1 Background...1 1.2 Document Purpose...3 1.3 Definitions...3 1.4 Codes and Standards...3 2.0 DESIGN CRITERIA...3 2.1
More informationMICHIGAN DEPARTMENT OF TRANSPORTATION
STR 7004 MICHIGAN DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY INSPECTION REPORT Facility Latitude / Longitude MDOT Structure ID Structure Condition 4 3/4 MILE RD 43.5688 / -84.3455 56314H00009B010 Good
More informationA Tale of Two Floods Reconstruction and Improvements to the CRANDIC Iowa River Crossing
A Tale of Two Floods Reconstruction and Improvements to the CRANDIC Iowa River Crossing Chad Lambi, PE Cedar Rapids and Iowa City Railway 2330 12 th Street SW Cedar Rapids, IA 52404 319-786-3618 ChadLambi@alliantenergy.com
More informationUNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 15 OVER THE ARCOLA CHANNEL HENNEPIN COUNTY
UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 27510 CSAH NO. 15 OVER THE ARCOLA CHANNEL HENNEPIN COUNTY MAY 21, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS, INC.
More informationStrategies to Mitigate Scour Critical Structures
U.S. Department of Transportation Federal Highway Administration Strategies to Mitigate Scour Critical Structures Dan Ghere Hydraulics Engineer (708) 283-3557 dan.ghere@dot.gov Support Material HEC 23,
More informationPhotos - On site visit 23/08/2010 to 27/08/2010
APPENDIX B: PHOTOS Photo No02 Photo No06 Photo No01 Photo No05 Photos - On site visit 23/08/2010 to 27/08/2010 Photo No07 Photo No03 Photo No08 Photo No04 Photo No10 Photo No14 Photo No09 Photo No13 Photos
More informationSTORM DRAINAGE DESIGN MANUAL
Appendix I STORM DRAINAGE DESIGN MANUAL by: SUNGATE DESIGN GROUP, P.A. GEN ERAL DESIGN STAN DARDS AN D POLICIES 1. STREET AND LOCAL DRAINAGE Discharge estimates for specified design storms shall be calculated
More information4. Present Activities and Roles
4. Present Activities and Roles The present missions, authorities, activities and roles of the various agencies involved with flood protection, floodplain management and flood-damage reduction are identified
More informationGEOMORPHIC EFECTIVENESS OF FLOODS ON LOWER TAPI RIVER BASIN USING 1-D HYDRODYNAMIC MODEL,HEC-RAS
GEOMORPHIC EFECTIVENESS OF FLOODS ON LOWER TAPI RIVER BASIN USING 1-D HYDRODYNAMIC MODEL,HEC-RAS Darshan Mehta 1, Raju Karkar 2, Lalji Ahir 3 Assistant Professor, CED, S.S.A.S.I.T, Surat, Gujarat, India
More informationPAPERWORK REDUCTION ACT A. GENERAL
U.S. DEPARTMENT OF HOMELAND SECURITY - FEDERAL EMERGENCY MANAGEMENT AGENCY RIVERINE STRUCTURES FORM O.M.B No. 1660-0016 Expires: 12/31/2010 PAPERWORK REDUCTION ACT Public reporting burden for this form
More information1 layer of untreated timber running planks, 254 mm x 89 mm.
BRIDGE INSPECTION BRIDGE NO./NAME N2-103: Kootenay By-Pass (9.50 km) Inspection Date: September 23 rd, 2012 Inspected By: M. Hanson, R. Veitch Year Built: 1982 Number of Spans: 4 Span Lengths: Spans 1
More informationFailure Consequence Classification
Failure Consequence Classification Audience: Dam Safety Officers (DSO) Owners of small dams Community emergency preparedness coordinators Introduction This document provides an overview of failure consequence
More informationRail Structure Interaction
Rail Structure Interaction Case Study Modelling and Benefits Jeremy Barnes Associate Director Hewson Consulting Engineers Nathan Griffiths Design Engineer Hewson Consulting Engineers Introduction Development
More informationAPPENDIX A CHECKLIST FOR PREPARATION OF H&H REPORTS
OFFICE OF STRUCTURES MANUAL ON HYDROLOGIC AND HYDRAULIC DESIGN CHAPTER 3 APPENDIX A CHECKLIST FOR PREPARATION OF H&H REPORTS (SEE ALSO APPENDIX B FOR DESIGN-BUILD PROJECTS) MARCH 2011 MARCH 2011 1 CHAPTER
More informationILLINOIS URBAN MANUAL PRACTICE STANDARD TEMPORARY STREAM CROSSING (no.) CODE 975. Source: Hey and Associates, Inc.
ILLINOIS URBAN MANUAL PRACTICE STANDARD TEMPORARY STREAM CROSSING (no.) CODE 975 Source: Hey and Associates, Inc. DEFINITION A bridge or culvert crossing installed across a stream or watercourse for short-term
More informationAppendix C, Attachment 4 June 11, Diversion Channel Outlet Hydraulic Modeling RAS and ADH
Diversion Channel Outlet Hydraulic Modeling RAS and ADH 11 June 2012 1 Contents Introduction... 3 HEC-RAS modeling of Outlet... 3 Transition Structure Geometry... 3 ADH Modeling of Outlet and Floodplain...
More informationHighway Drainage 1- Storm Frequency and Runoff 1.1- Runoff Determination
Highway Drainage Proper drainage is a very important consideration in design of a highway. Inadequate drainage facilities can lead to premature deterioration of the highway and the development of adverse
More informationMISENER DAM. Site Number LYNN STREET, PORT DOVER km N of Highway 6
NORFOLK COUNTY MISENER DAM Site Number 980501 LYNN STREET, PORT DOVER 0.65 km N of Highway 6 Ontario Structure Inspection Manual - Inspection Form Site Number: 980501 Inventory Structure Name Misener Dam
More informationTABLE OF CONTENTS. 1.0 Background Watershed Description Hydrology - HEC-HMS Models Hydraulics - HEC-RAS Models...
TABLE OF CONTENTS 1.0 Background... 1 2.0 Watershed Description... 1 3.0 Hydrology - HEC-HMS Models... 2 3.1 Hydrologic Approach... 2 3.2 Drainage Areas... 2 3.3 Curve Numbers... 2 3.4 Lag Times... 3 3.5
More informationSOUTHEAST TEXAS CONTINUING EDUCATION
EXAM No. 118 FLOOD - RUNOFF ANALYSIS 1. Information gained from flood - runoff analysis includes which one: A. Stage, discharge, volume. B. Measure depth, volume. C. Velocity, depth, storm occurrence.
More informationMICHIGAN DEPARTMENT OF TRANSPORTATION
STR 6947 MICHIGAN DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY INSPECTION REPORT Facility Latitude / Longitude MDOT Structure ID Structure Condition 9 MILE ROAD 43.5362 / -84.4294 56200055000B010 Fair Condition(6)
More informationIsle of Wight Strategic Flood Risk Assessment MK2. Appendix P Newport
Isle of Wight Strategic Flood Risk Assessment MK2 Appendix P June 2010 Isle of Wight Strategic Flood Risk Assessment Overview Please review this discussion in conjunction with the mapping provided in this
More informationc. Effects of the Project on Public Health, Safety and the Environment
INTRODUCTION a. Description of Proposed Activity This report is for the hydrologic and hydraulic analysis for the structure located at Sta.100+80.67 on S.R. 0978 in North Fayette Township, Allegheny County,
More informationAppendix C: Port Jervis Line Capacity Improvements Analysis. Technical Memorandum 2: Passing Siding Alternative
Appendix C: Port Jervis Line Capacity Improvements Analysis Technical Memorandum 2: Passing Siding Alternative January 2018 TABLE OF CONTENTS 1. Introduction... 1 2. Passing Sidings: Locations and Components...
More information2016 STRUCTURE INSPECTION APPRAISAL REPORT. Prepared For: THE CORPORATION OF THE TOWNSHIP OF AMARANTH COUNTY OF DUFFERIN
2016 STRUCTURE INSPECTION APPRAISAL REPORT Prepared For: THE CORPORATION OF THE TOWNSHIP OF AMARANTH COUNTY OF DUFFERIN by K. SMART ASSOCIATES LIMITED 8 McIntyre Drive Kitchener ON N2R 1H6 August 2016
More information