Development of Stage-Discharge Ratings for Site 2240 Bear Creek at Cold Spring

Size: px
Start display at page:

Download "Development of Stage-Discharge Ratings for Site 2240 Bear Creek at Cold Spring"

Transcription

1 Development of Stage-Discharge Ratings for Site 2240 Bear Creek at Cold Spring Prepared for: Urban Drainage and Flood Control District 2480 W. 26 th Avenue Suite 156-B Denver, CO May 19, 2006 (Rev May 2007) 1225 Red Cedar Circle, Suite A Fort Collins, CO (970)

2 Table of Contents 1.0 Certification Introduction Field Survey Methods Data Reduction, Modeling And Analysis Rating Development Site 2240 Channel Survey Site 2240 HEC-RAS Modeling Site 2240 Depth Above PT Discharge Rating Site 2240 Staff Gage Depth Discharge Rating Site 330 Discussion of Rating Results References Survey Field Notes Table of Figures Figure 1. Site 2240 Instrument Standpipe and Upstream Diversion Structure Figure 2. Site 2240 Location Map Figure 3. Site 2240 Approximate Locations of Surveyed Cross Sections Figure 4. Site 2240 Cross-Section 1.0, Looking Downstream Figure 5. Site 2240 Cross-Section 2.0, Looking Downstream Figure 6. Site 2240 Cross-Section 3.0, Looking Downstream Figure 7. Site 2240 Cross-Section 4.0, Looking Downstream Figure 8. Site 2240 Measured Landmark Elevations Figure 9. Site 2240 Landmark Locations Figure 10. Staff Gage Installed at Site Figure 11. Exposed PT Intake Pipe Observed at Site Figure 12. View Upstream at Floodplain Valley at Site Figure 13. Site 2240 Approximate Floodplain Boundaries at High Flow Figure 14. Site 2240 Reduced Survey Notes and Estimated Cross Sections Figure 15. Site 2240 Distances Between Surveyed and Estimated Cross Sections Figure 16. Site 2240 Cross Sections Used in the HEC-RAS Model Figure 17. Site 2240 HEC-RAS Model Output Figure 18. Site 2240 Modeled Cross Sections at Maximum Flow Figure 19. Site 2240 Discharge Measurement Notes Figure 20. Site 2240 Model-Predicted Stage-Discharge Relationship Figure 21. Site 2240 Stage-Discharge Relationship Comparison Figure 22. Site 2240 Stage-Discharge Relationship Log-Log Plot Figure 23. Site 2240 Staff Gage Stage-Discharge Relationship Table of Tables Table 1. Site 2240 Predicted Stage-Discharge Relationship Tabular Data Table 2. Current UDFCD Rating for Site Table 3. Stage-Discharge Relationship for The Stage Gage at Site UDFCD Site 2240 Rating Development 2 Water and Earth Technologies, Inc.

3 1.0 CERTIFICATION I, Richard Spotts, state that the information presented in this report entitled, Development of Stage-Discharge Ratings for Site 2240 Bear Creek at Cold Spring, prepared for The Urban Drainage and Flood Control District, Denver, Colorado was prepared by me or by persons under my supervision and is correct to the best of my knowledge and information. Richard Spotts, P.E. Registration No UDFCD Site 2240 Rating Development 3 Water and Earth Technologies, Inc.

4 2.0 INTRODUCTION Water and Earth Technologies, Inc. (WET) was contracted by The Urban Drainage and Flood Control District (UDFCD) to develop a hydraulic rating at Site 2240, Bear Creek at Cold Spring. This station, located downstream of a drinking water treatment plant intake structure is already instrumented to measure river stage. Stage information for this site is telemetered in real time to local base stations that assess the flooding potential during large runoff events. In addition to stage, discharge information is valuable for decision-making. Stage-discharge rating relationships (ratings) are used to convert the stage, represented as a water depth in feet above a reference elevation monitored by a pressure transducer (PT) in the stream to values of discharge in cubic feet per second (cfs). The discharge rating developed in this report is based on precise measurement of the river channel and physical structures controlling flow and mathematical approximation of the hydraulics at this site. This report includes the following sections: an introduction, a discussion of field survey methods, a discussion of office procedures for data reduction and analysis, a description of each site and a discussion and presentation of survey data and model results (including model output, a stage-discharge rating table and a plot of the rating curve, and recommendations relevant to the results), a compilation of references, and cross section field survey notes 3.0 FIELD SURVEY METHODS A theoretical step-backwater technique using the U.S. Army Corps of Engineers HEC-RAS computer model (USACOE 2002) was used to develop the stage-discharge ratings. The modeling typically requires data for five cross sections at a site. Typically, the cross section in which stage is observed bracketed by one or more cross sections both upstream and downstream Cross sections were surveyed from left to right looking downstream. Cross sections were numbered from downstream to upstream. Bench marks and end points of each cross section were marked as appropriate. A mapping grade GPS unit was used to determine the latitude and longitude of monument bench marks at each site, the stage measurement sensor housing (with the cap removed) and each cross-section end point so that cross sections and bench marks can be easily located in the future. Additionally, the coordinates were used to establish cross-section orientation in the HEC-RAS model. A self-leveling level, tape and survey rod were used to measure each point in the cross section and to relate streambed and water-surface cross section elevations to the bench mark elevation. Variations in channel roughness (Manning s n value) were determined for each cross section. The main channel and overbank areas within each cross section were subdivided into n-value break points (locations where n-values change), and n-values specific to each subdivision were estimated. A current meter measurement was made and was referenced to the water-surface elevation in the gaged cross section. Section velocity measurements and discharge determinations were made using the midsection method. This information was used to determine the Manning s n-value associated with the measured stage, low-flow discharge, and gradient of UDFCD Site 2240 Rating Development 4 Water and Earth Technologies, Inc.

5 the water surface between cross sections. The information was used to check the calibration of the HEC-RAS model run associated with the measured discharge. Photos of the site and each surveyed cross section were taken. Cross-section location selection, spacing, and orientation; surveying techniques; roughness parameter selection (Manning s n values); current meter/velocity measurement techniques; and photographic and methods documentation followed standard protocols (Arcement and Schneider 1990; Barnes 1987; Benson and Dalrymple 1984; Dalrymple and Benson 1984; Harrelson et. al. 1994; Schulz 1974; U.S Army COE 2002; U.S. Geological Survey 1977). 4.0 DATA REDUCTION, MODELING AND ANALYSIS As previously mentioned, the U.S. Army COE HEC-RAS computer model was used to analyze the field data and develop the stage-discharge rating relationships. HEC-RAS is an integrated system of software, designed for interactive use in a multi-tasking environment. The steady flow water-surface profile component of the modeling system was used to calculate water surface profiles and elevations for a wide range in flows, from very low flow to flood flows, or flow that would occur at the highest stage contained within the channel and surveyed overbank. The basic computational procedure is based on the solution of a one-dimensional energy equation describing gradually varied uniform flow through the channel. Energy losses are evaluated by friction (Manning s equation) and contraction/expansion (coefficient multiplied by the change in velocity head). WET s HEC-RAS modeling input applied the initial assumption that the downstream modeling boundary condition was controlled by normal depth as defined by measured channel conditions and slope. At higher flows however, other cross sections (such as the location of the bridge contraction) may control the flow. These controlling locations and conditions are additional valuable output from the HEC RAS model. Output values from the HEC-RAS model include the predicted water surface elevations at each cross section for a range of known discharges. The water surface predictions at the pressure transducer cross section were used to develop the stage discharge rating for the site. Where possible, the current rating defined by UDFCD are compared to the HEC-RAS modeling results based on the WET channel survey. UDFCD Site 2240 Rating Development 5 Water and Earth Technologies, Inc.

6 5.0 RATING DEVELOPMENT A general site investigation was performed by WET staff on January 10, The site was surveyed by WET staff on February 28, River cross sections were surveyed to describe the channel and used as input data to the HEC-RAS hydraulic model in order to develop a stage discharge relationship at the PT cross section. Site 2240, Bear Creek at Cold Spring (Figure 1) is located between Morrison and Evergreen, CO in Bear Creek Canyon (circled in red in Figure 2). The PT is located to measure the depth in a pool below a small sheet pile dam, used to back up water for intake to a water treatment plant. Cold Spring Gulch enters the Bear Creek from the north just downstream of the PT cross section. Figure 1. Site 2240 Instrument Standpipe and Upstream Diversion Structure. UDFCD Site 2240 Rating Development 6 Water and Earth Technologies, Inc.

7 Figure 2. Site 2240 Location Map. 5.1 Site 2240 Channel Survey On February 28, 2006 WET surveyed four channel cross sections at this site. An aerial photo with the approximate locations of the surveyed cross sections and landmarks is presented in Figure 3. Photos of the surveyed cross sections from downstream to upstream are presented in Figure 4 - Figure 7. UDFCD Site 2240 Rating Development 7 Water and Earth Technologies, Inc.

8 .!.!. Xsec 2.0!. Standpipe BM1!( PT TOP!(!(!. BM2!(!.!.!.!. Xsec 3.0 Xsec 1.0 Xsec 4.0 Flow Figure 3. Site 2240 Approximate Locations of Surveyed Cross Sections Feet UDFCD Site 2240 Rating Development 8 Water and Earth Technologies, Inc.

9 Figure 4. Site 2240 Cross-Section 1.0, Looking Downstream. UDFCD Site 2240 Rating Development 9 Water and Earth Technologies, Inc.

10 Figure 5. Site 2240 Cross-Section 2.0, Looking Downstream. UDFCD Site 2240 Rating Development 10 Water and Earth Technologies, Inc.

11 Figure 6. Site 2240 Cross-Section 3.0, Looking Downstream. UDFCD Site 2240 Rating Development 11 Water and Earth Technologies, Inc.

12 Figure 7. Site 2240 Cross-Section 4.0, Looking Downstream. UDFCD Site 2240 Rating Development 12 Water and Earth Technologies, Inc.

13 Above Cross-Section 4.0, at the sheet pile dam, a pool exists to back up water for an intake structure for a water treatment plant. Approximately 500 feet upstream of the sheet pile dam, a concrete bridge over the river provides access to the Lair O the Bear open space. Just downstream of Cross-Section 3.0, the Cold Spring Gulch enters from the north. The PT stage measurement will not accurately account for flow entering the Bear Creek from Cold Spring Gulch. A survey grade GPS unit was used to measure the elevation of three landmarks at the site (Figure 9). Differential correction was used to remove errors from the logged data to provide more accurate elevations. The elevation of landmark BM 1, measured at 6, ft amsl, was used as the vertical control elevation for the survey. Elevations of the landmarks are presented in Figure 8. Figure 8. Site 2240 Measured Landmark Elevations. A staff gage upstream of the sheet pile dam was observed. This gage is used by water treatment plant operators as a depth of water in the intake structure for pumping uphill to the plant. A photo of this staff gage is presented in Figure 10. The elevation of the channel bottom at the base of the staff gage was measured at ft amsl. At the time of survey the PT riser intake pipe was almost one foot out of the water (Figure 11). There was water approximately 1-foot deep in the PT cross section. Unless the PT riser has another hydraulic connectivity, it is unlikely that the PT as currently installed can correctly measure low stage. UDFCD Site 2240 Rating Development 13 Water and Earth Technologies, Inc.

14 BM 1 BM 2 Figure 9. Site 2240 Landmark Locations. UDFCD Site 2240 Rating Development 14 Water and Earth Technologies, Inc.

15 Figure 10. Staff Gage Installed at Site Figure 11. Exposed PT Intake Pipe Observed at Site UDFCD Site 2240 Rating Development 15 Water and Earth Technologies, Inc.

16 Based on observations at the site, at very high flow conditions a split flow, or valley-wide flow may occur. In this extreme event, the PT installed at its present location may not be able to measure the flow properly. A view upstream of the floodplain valley adjacent to the Bear Creek is shown in Figure 12. Note the woody debris in the center left of the image. The PT is installed out of the picture to the right. Figure 12. View Upstream at Floodplain Valley at Site An aerial photo of the possible inundation and split flow that could occur is presented in Figure 13. Note a bridge across the Bear Creek in the lower left corner of Figure 13. This bridge is very low and consists of concrete deck and concrete sides. At high flows this bridge is likely to become flooded and act as a constriction causing flow to leave the main river channel and flow overland short-cutting the river bend downstream. Extrapolation of surveyed cross sections was performed to expand the HEC-RAS model prediction for this type of high flow event. The approximate extent of the expanded surveyed Cross-Sections as well as two estimated Cross-Sections 5.0 and 6.0 are presented in Figure 13. UDFCD Site 2240 Rating Development 16 Water and Earth Technologies, Inc.

17 .!.!. Xsec 2.0!. Standpipe!. BM1!( PT TOP!(!( BM2!(!.!. Xsec 5.0 Xsec 1.0!.!.!.!. Xsec 3.0 Xsec 4.0!.!. Xsec Feet Figure 13. Site 2240 Approximate Floodplain Boundaries at High Flow. 5.2 Site 2240 HEC-RAS Modeling The four surveyed cross sections were input to the HEC-RAS modeling system and a low-flow rating developed. As requested by UDFCD, surveyed cross sections were extended across the valley using distances measured from the available GIS data and end point elevations measured during the survey. To facilitate modeling of the valley-wide flows and for the prediction of water surface elevation at the staff gage location, two additional cross sections were estimated, numbered 5.0 and 6.0. The reduced survey notes with both the measured and estimated cross sections are presented in Figure 14. UDFCD Site 2240 Rating Development 17 Water and Earth Technologies, Inc.

18 Figure 14. Site 2240 Reduced Survey Notes and Estimated Cross Sections. The measured and estimated distances between the cross sections are presented in Figure 15. Figure 15. Site 2240 Distances Between Surveyed and Estimated Cross Sections. Graphical descriptions of the surveyed and extrapolated cross sections are presented in Figure 16. HEC-RAS model output is presented in Figure 17. HEC-RAS water surface elevations at all cross sections for an extreme flow event are presented in Figure 18. UDFCD Site 2240 Rating Development 18 Water and Earth Technologies, Inc.

19 Figure 16. Site 2240 Cross Sections Used in the HEC-RAS Model. UDFCD Site 2240 Rating Development 19 Water and Earth Technologies, Inc.

20 Figure 17. Site 2240 HEC-RAS Model Output. UDFCD Site 2240 Rating Development 20 Water and Earth Technologies, Inc.

21 Figure 18. Site 2240 Modeled Cross Sections at Maximum Flow. A comparison was performed between model simulations using the estimated and expanded cross sections and a simulation using only the surveyed Cross-Sections Based on the UDFCD Site 2240 Rating Development 21 Water and Earth Technologies, Inc.

22 modeling results, water is predicted to be maintained in the main surveyed channel for all surveyed and estimated cross section for flows only below about 500 cfs. At higher flows, water is predicted to flow over the right bank near Cross Section 1.0 and a split flow is likely to occur at the bridge at estimated Cross-Section 6.0. Model simulations demonstrate that for flows between 1,000 and 1,500 cfs, water is predicted to be overbank at the PT cross section. Based on these results, above 1,500 cfs, a split flow or valley-wide flow is likely to occur and may not be properly measured by the PT. On February 28, 2006 a discharge measurement was taken at the 2240 site. A flowmeter was used to measure the water depth and velocity along a cross section just downstream of Cross- Section 2.0. The measured data and calculated discharge are presented in Figure 19. The flow measured on February 28, 2006 was 11.1 cfs. Figure 19. Site 2240 Discharge Measurement Notes. The HEC-RAS water surface elevation at the PT cross section for a range of discharges is presented in Figure 20. The low-flow flowmeter measurement matches the rating quite well. UDFCD Site 2240 Rating Development 22 Water and Earth Technologies, Inc.

23 Discharge (cfs) Water Surface Elevation at the PT (ft amsl) Figure 20. Site 2240 Model-Predicted Stage-Discharge Relationship. 5.3 Site 2240 Depth Above PT Discharge Rating The rating desired by UDFCD is expressed as stream discharge as a function of water depth at the PT. The reference elevation for zero depth at the PT has been assigned to the minimum measured elevation at the PT cross section. (6, ft amsl). The minimum channel elevation at the PT control Cross-Section 2.0 was measured as 6, ft amsl, 0.11 ft higher than the channel bottom upstream at the PT cross section. This elevation is considered the zero flow elevation, where water could pool to a depth of 0.11 ft before water begins to flow down the channel. These values are used to calculate depth of water above the PT from the HEC-RAS water surface elevation predictions for a range of discharge values (Table 1). UDFCD Site 2240 Rating Development 23 Water and Earth Technologies, Inc.

24 Table 1. Site 2240 Predicted Stage-Discharge Relationship Tabular Data. Predicted Water Surface Elevation (ft Depth above PT (ft) 1 Discharge (cfs) Condition amsl) 6, , , , , , , , , , , , ,000 6, ,500 Split flow likely to begin 6, ,000 6, ,000 6, ,000 6, ,000 1 Depth is calculated as predicted water surface elevation minus minimum surveyed channel elevation at Cross-Section 3.0 (6, ft amsl) 2 The zero flow elevation is the minimum measured channel depth at Cross-Section 2.0 (6, ft amsl) The current UDFCD rating for this site is presented in Table 2 and a graphical comparison between these data and the HEC-RAS rating are presented in Figure 21. At flows between 500 and 10,000 cfs, the HEC-RAS rating predicts higher depths for discharges, compared to the UDFCD rating. At the highest modeled discharge of 15,000 cfs, the ratings are similar. A Log- Log plot of the HEC-RAS rating is presented in Figure 22. Table 2. Current UDFCD Rating for Site Depth (ft) 1 Discharge (cfs) , , , , ,000 UDFCD Site 2240 Rating Development 24 Water and Earth Technologies, Inc.

25 HEC-RAS rating UDFCD rating Discharge (cfs) Flow likely to leave main channel and form split flow Depth at PT (ft) Figure 21. Site 2240 Stage-Discharge Relationship Comparison Discharge (cfs) Depth at PT (ft) Figure 22. Site 2240 Stage-Discharge Relationship Log-Log Plot. 5.4 Site 2240 Staff Gage Depth Discharge Rating A cross section was estimated to describe the pool with bottom elevation the same as the staff gage bottom elevation, located 20 feet upstream of the sheet pile dam. This cross section (numbered 5.0) was added to the model to provide water surface elevation predictions for the UDFCD Site 2240 Rating Development 25 Water and Earth Technologies, Inc.

26 staff gage location at the site. For better hydraulic connectivity in low-flow conditions, the pool at the staff gage location may provide a better PT intake location. If the PT intake were to be relocated to the staff gage site and the PT reference elevation set to ft amsl, the measured bottom of the staff gage, the stage-discharge relationship presented in Figure 23 and Table 3 would be valid, based on model predictions Discharge (cfs) Staff Gage Depth (ft) Figure 23. Site 2240 Staff Gage Stage-Discharge Relationship. Table 3. Stage-Discharge Relationship for The Stage Gage at Site Staff Gage Depth (ft) Discharge (cfs) , , , , , ,000 UDFCD Site 2240 Rating Development 26 Water and Earth Technologies, Inc.

27 5.5 Site 330 Discussion of Rating Results The rating of the depth of water above the PT is based on the reference elevation of the channel bed at the PT cross section 6, ft amsl or 5.82 ft below the top of the PT riser pipe with the cap removed. At the time of the survey the PT riser intake pipe was measured at an elevation of 6, ft amsl, 1.63 ft higher than the channel bottom elevation used as the PT reference level. Before using this rating with confidence, the intake pipe should be lowered and the elevation of the installed PT should be lowered below the reference elevation and verified in the field. A field verification of water depth above the reference level should be performed using the installed PT reading and a field measurement of water surface elevation. Based on modeling results, some overbank flows are predicted to occur downstream from the PT cross section above about 500 cfs. Above an estimated 1,500 cfs, overbank flows are predicted to occur throughout the surveyed reach and a split flow is likely to occur beginning at the open space bridge upstream of the PT. Flows higher than 1,500 cfs have been modeled using estimated valley-wide cross sections. Water depths at the PT for discharge values above 1,500 cfs have been provided, but the complex hydraulic conditions of split or valley wide flows for these discharges may not be properly measured by the PT. Therefore, discharge predictions above stage values of about 7 feet of depth at the PT should be considered estimates. An additional rating for the channel cross section at the staff gage location was also provided in case the PT intake were to be located there to provide better hydraulic connectivity in low-flow conditions. This rating relationship has been calculated for the Bear Creek above the Cold Spring Gulch and assumes that inflow from the Cold Spring Gulch does not occur between PT and PT control downstream. UDFCD Site 2240 Rating Development 27 Water and Earth Technologies, Inc.

28 6.0 REFERENCES Arcement, G.J., and Schneider, V.R. (1990). Guide for Selecting Manning s Roughness Coefficients for Natural Channels and Flood Plains. United States Geological Survey Water- Supply Paper Barnes, H.H. (1987). Roughness Characteristics of Natural Channels. U.S. Geological Survey Water-Supply Paper United States Government Printing Office, Washington. D.C. Benson, M.A., and Dalrymple, T. (1984). General Field and Office Procedures for Indirect Discharge Measurements. Techniques for Water-Resources Investigations of the United States Geological Survey, Book 3 Applications of Hydraulics, Chapter A1. United States Government Printing Office, Washington, D.C. Dalrymple, T., and Benson, M.A. (1984). Measurement of Peak Discharge by the Slope-Area Method. Techniques for Water-Resources Investigations of the United States Geological Survey, Book 3 Applications of Hydraulics, Chapter A2. United States Government Printing Office, Washington, D.C. Harrelson, C.C., Rawlins, C.L., and Potyondy, J.P. (1994). Stream Channel Reference Sites: An Illustrated Guide to Field Technique. General Technical Report RM-245. U.S. Department of Agriculture, Forest Service, Rocky Mountain Forest and Range Experiment Station. Fort Collins, Colorado Schulz, E.F. (1974). Problems in Applied Hydrology. Water Resources Publications, Fort Collins, Colorado. U.S. Army Corps of Engineers, Hydrologic Engineering Center. (2002). HEC-RAS River Analysis System. Version 3.1 User s Manual, Hydraulic Reference Manual, and Applications Guide. Institute for Water Resources, Davis, California. U.S. Geological Survey. (1977). National Handbook of Recommended Methods for Water- Data Acquisition. U.S. Department of the Interior, Prepared under the sponsorship of the Office of Water Data Coordination, Geological Survey, Chapter 1, Surface Water. Reston, Virginia. U.S. Geological Survey. (2005). Aerial Photography via Terraserver. UDFCD Site 2240 Rating Development 28 Water and Earth Technologies, Inc.

29 7.0 SURVEY FIELD NOTES UDFCD Site 2240 Rating Development 29 Water and Earth Technologies, Inc.

30 UDFCD Site 2240 Rating Development 30 Water and Earth Technologies, Inc.

31 UDFCD Site 2240 Rating Development 31 Water and Earth Technologies, Inc.

32 UDFCD Site 2240 Rating Development 32 Water and Earth Technologies, Inc.

33 UDFCD Site 2240 Rating Development 33 Water and Earth Technologies, Inc.

Development of a Stage-Discharge Rating for Site Van Bibber Creek at Route 93

Development of a Stage-Discharge Rating for Site Van Bibber Creek at Route 93 Development of a Stage-Discharge Rating for Site 330 - Van Bibber Creek at Route 93 Prepared for: Urban Drainage and Flood Control District 2480 W. 26 th Avenue Suite 156-B Denver, CO 80211 May 19, 2006

More information

Stream Reaches and Hydrologic Units

Stream Reaches and Hydrologic Units Chapter United States 6 Department of Agriculture Natural Resources Conservation Service Chapter 6 Stream Reaches and Hydrologic Units Rain clouds Cloud formation Precipitation Surface runoff Evaporation

More information

Prepared for: City of Jeffersonville. November Prepared by

Prepared for: City of Jeffersonville. November Prepared by JEFFERSONVILLE STORMWATER MASTER PLAN HYDRAULICS APPENDIX JEFFERSONVILLE, INDIANA Prepared for: City of Jeffersonville November 2011 Prepared by Christopher B. Burke Engineering, Ltd. 115 W. Washington

More information

Pajaro River Watershed Flood Prevention Authority. Phase 3 and 4a. Pajaro River Watershed Study

Pajaro River Watershed Flood Prevention Authority. Phase 3 and 4a. Pajaro River Watershed Study Pajaro River Watershed Flood Prevention Authority Phase 3 and 4a FEBRUARY 2005 Funding for this project has been provided in full or in part through a contract with the SWRCB pursuant to the Costa-Machado

More information

Hydraulic Report. County Road 595 Bridge over Mulligan Creek. Prepared By AECOM Brian A. Hintsala, P.E

Hydraulic Report. County Road 595 Bridge over Mulligan Creek. Prepared By AECOM Brian A. Hintsala, P.E Prepared for: Prepared by: Marquette County Road Commission AECOM Ishpeming, MI Marquette, MI 60240279 December 9. 2011 Hydraulic Report County Road 595 Bridge over Mulligan Creek Prepared By AECOM Brian

More information

Hydrotechnical Design Guidelines for Stream Crossings

Hydrotechnical Design Guidelines for Stream Crossings Hydrotechnical Design Guidelines for Stream Crossings Introduction Design of stream crossings and other in-stream highway facilities requires estimation of design highwater elevation and mean channel velocity.

More information

IMPROVED MODELING OF THE GREAT PEE DEE RIVER: DOCUMENTATION IN SUPPORT OF FEMA APPEAL. Horry County, South Carolina

IMPROVED MODELING OF THE GREAT PEE DEE RIVER: DOCUMENTATION IN SUPPORT OF FEMA APPEAL. Horry County, South Carolina IMPROVED MODELING OF THE GREAT PEE DEE RIVER: DOCUMENTATION IN SUPPORT OF FEMA APPEAL Horry County, South Carolina July 15, 2016 CONTENTS 1 Introduction... 2 2 Hydrology... 3 3 HEC-RAS Model... 7 3.1 Cross

More information

Drop Height For Channel Erosion Control

Drop Height For Channel Erosion Control Drop Height For Channel Erosion Control James C.Y. Guo, Professor and Director Department of Civil Engineering, U. of Colorado at Denver, Denver, Colorado 8017 E-mail: James.Guo@cudenver.edu Introduction

More information

Distribution Restriction Statement Approved for public release; distribution is unlimited.

Distribution Restriction Statement Approved for public release; distribution is unlimited. CECW-EH-Y Regulation No. 1110-2-1464 Department of the Army U.S. Army Corps of Engineers Washington, DC 20314-1000 Engineering and Design HYDROLOGIC ANALYSIS OF WATERSHED RUNOFF Distribution Restriction

More information

EFFECT OF RAINGAGE DENSITY ON RUNOFF SIMULATION MODELING by ABSTRACT

EFFECT OF RAINGAGE DENSITY ON RUNOFF SIMULATION MODELING by ABSTRACT EFFECT OF RAINGAGE DENSITY ON RUNOFF SIMULATION MODELING by Ben Urbonas, P.E., D.WRE 1, Michael Paul Jansekok 2, James C.Y. Guo, PhD, P.E. 3 ABSTRACT Rainfall and runoff data for a 3.08 square mile urban

More information

Hydraulic Report. County Road 595 Bridge over Dead River. Prepared By AECOM Brian A. Hintsala, P.E

Hydraulic Report. County Road 595 Bridge over Dead River. Prepared By AECOM Brian A. Hintsala, P.E Prepared for: Prepared by: Marquette County Road Commission AECOM Ishpeming, MI Marquette, MI 60240279 December 9, 2011 Hydraulic Report County Road 595 Bridge over Dead River Prepared By AECOM Brian A.

More information

Hydraulic and Sediment Transport Modeling Strategy

Hydraulic and Sediment Transport Modeling Strategy Appendix B Hydraulic and Sediment Transport May 2014 Technical Memorandum Channel Capacity Report September 2014 San Joaquin River Restoration Program Hydraulic and Sediment Transport The San Joaquin River

More information

SECTION IV WATERSHED TECHNICAL ANALYSIS

SECTION IV WATERSHED TECHNICAL ANALYSIS A. Watershed Modeling SECTION IV WATERSHED TECHNICAL ANALYSIS An initial step in the preparation of this stormwater management plan was the selection of a stormwater simulation model to be utilized. It

More information

PA of NY&NJ - TETERBORO AIRPORT RUNWAY 6-24 Engineered Material Arresting System (EMAS) UNSTEADY-STATE FLOODPLAIN ANALYSIS

PA of NY&NJ - TETERBORO AIRPORT RUNWAY 6-24 Engineered Material Arresting System (EMAS) UNSTEADY-STATE FLOODPLAIN ANALYSIS 1 NEW JERSEY ASSOCIATION FOR FLOODPLAIN MANAGEMENT PRESENTATION FOR THE 10 TH ANNUAL CONFERENCE PA of NY&NJ - TETERBORO AIRPORT RUNWAY 6-24 Engineered Material Arresting System (EMAS) UNSTEADY-STATE FLOODPLAIN

More information

Flood Analysis of Wainganga River by using HEC-RAS model

Flood Analysis of Wainganga River by using HEC-RAS model Flood Analysis of Wainganga River by using HEC-RAS model Heena Ingale, R. V. Shetkar Government College of Engineering Aurangabad (M.S.) India Corresponding Email : heenaingale.gcoea@gmail.com Abstract:

More information

Appendix VI: Illustrative example

Appendix VI: Illustrative example Central Valley Hydrology Study (CVHS) Appendix VI: Illustrative example November 5, 2009 US Army Corps of Engineers, Sacramento District Prepared by: David Ford Consulting Engineers, Inc. Table of contents

More information

CLAY STREET BRIDGE REPLACEMENT

CLAY STREET BRIDGE REPLACEMENT HYDROLOGY /HYDRAULICS REPORT. EL DORADO COUNTY CLAY STREET BRIDGE REPLACEMENT Prepared by: Joseph Domenichelli Domenichelli & Associates 1107 Investment Blvd., Suite 145 El Dorado Hills, California 95762

More information

Technical Memorandum. Hydraulic Analysis Smith House Flood Stages. 1.0 Introduction

Technical Memorandum. Hydraulic Analysis Smith House Flood Stages. 1.0 Introduction Technical Memorandum Hydraulic Analysis Smith House Flood Stages 1.0 Introduction Pacific International Engineering (PIE) performed a hydraulic analysis to estimate the water surface elevations of the

More information

Flood Risk Analysis of Bridge A Case Study

Flood Risk Analysis of Bridge A Case Study ISBN 978-93-84468-11-8 Proceedings of International Conference on Architecture And Civil Engineering (ICAACE'14) Dubai, December 25-26, 2014, pp. 128-134 Flood Risk Analysis of Bridge A Case Study Safa

More information

Breach Analyses of High Hazard Dams in Williamson County

Breach Analyses of High Hazard Dams in Williamson County Breach Analyses of High Hazard Dams in Williamson County John R. King 1, P.E., Kim Patak 2, P.E., Blaine Laechelin 3, E.I.T. Abstract The Upper Brushy Creek WCID operates 23 dams in the Upper Brushy Creek

More information

Discharge Estimation in a Backwater Affected River Junction Using HPG

Discharge Estimation in a Backwater Affected River Junction Using HPG Discharge Estimation in a Backwater Affected River Junction Using HPG Ji-Sung Kim 1, Won Kim 2, Jong Pil Kim *3 1,2,3 Water Resources and Environment Research Department, Korea Institute of Civil Engineering

More information

Engineering Report Preliminary Floodplain Study. Executive Summary

Engineering Report Preliminary Floodplain Study. Executive Summary Executive Summary Engineering Report Preliminary Floodplain Study The Federal Emergency Management Agency (FEMA) has updated the Flood Insurance Rate Maps (FIRM) for Finney County, including the City of

More information

Freight Street Development Strategy

Freight Street Development Strategy Freight Street Development Strategy Appendix B: Naugatuck River Floodplain Analysis Freight Street Development Strategy DECEMBER 2017 Page B-1 1.0 NAUGATUCK RIVER FLOODPLAIN AT FREIGHT STREET 1.1 Watershed

More information

Floodplain Development

Floodplain Development Floodplain Development Floodplain Regulations State: Part 31 of Public Act 451 Local: Federal: Building Codes, Zoning and Floodplain Management Ordinances National Flood Insurance Program Floodplain:

More information

5/25/2017. Overview. Flood Risk Study Components HYDROLOGIC MODEL (HEC-HMS) CALIBRATION FOR FLOOD RISK STUDIES. Hydraulics. Outcome or Impacts

5/25/2017. Overview. Flood Risk Study Components HYDROLOGIC MODEL (HEC-HMS) CALIBRATION FOR FLOOD RISK STUDIES. Hydraulics. Outcome or Impacts HYDROLOGIC MODEL (HEC-HMS) CALIBRATION FOR FLOOD RISK STUDIES C. Landon Erickson, P.E.,CFM Water Resources Engineer USACE, Fort Worth District April 27 th, 2017 US Army Corps of Engineers Overview Flood

More information

The Beckett s Run Experience. Fort Wayne, Indiana

The Beckett s Run Experience. Fort Wayne, Indiana The Beckett s Run Experience Fort Wayne, Indiana Introductions Charlie Cochran City of Fort Wayne, Wet Weather Storm & Sewer Engineering Jason Durr, PE Christopher B. Burke Engineering, LLC 2 A Little

More information

APPENDIX A HYDROLOGIC AND HYDRAULIC ANALYSIS

APPENDIX A HYDROLOGIC AND HYDRAULIC ANALYSIS APPENDIX A HYDROLOGIC AND HYDRAULIC ANALYSIS GENERAL The Hydrologic and Hydraulic information presented in this appendix is provided as a supplement to the Dallas Floodway Extension General Re-evaluation

More information

Failure Consequence Classification

Failure Consequence Classification Failure Consequence Classification Audience: Dam Safety Officers (DSO) Owners of small dams Community emergency preparedness coordinators Introduction This document provides an overview of failure consequence

More information

UPRR criteria for sizing waterway openings under bridges and through culverts are as follows:

UPRR criteria for sizing waterway openings under bridges and through culverts are as follows: UNION PACIFIC RAILROAD SCOPE OF HYDROLOGIC/HYDRAULIC DESIGN ENGINEERING AND PERMITTING SERVICES FOR SIZING WATERWAY OPENINGS AT NEW AND REPLACEMENT STRICTURES These flood passage criteria were developed

More information

San Luis Obispo Creek Watershed Hydrologic Model Inputs

San Luis Obispo Creek Watershed Hydrologic Model Inputs Jeff Werst San Luis Obispo County Department of Public Works 1050 Monterey Street San Luis Obispo CA 93408 December 14, 2007 Subject: San Luis Obispo Creek Watershed Hydrology and Hydraulic Model Dear

More information

CONSTRUCTION PLAN CHECKLIST

CONSTRUCTION PLAN CHECKLIST CONSTRUCTION PLAN CHECKLIST The design engineer is responsible for ensuring that plans submitted for city review are in accordance with this checklist. It is requested that the executed checklist be submitted

More information

LAKE COUNTY HYDROLOGY DESIGN STANDARDS

LAKE COUNTY HYDROLOGY DESIGN STANDARDS LAKE COUNTY HYDROLOGY DESIGN STANDARDS Lake County Department of Public Works Water Resources Division 255 N. Forbes Street Lakeport, CA 95453 (707)263-2341 Adopted June 22, 1999 These Standards provide

More information

FLOOD MAGNITUDE AND FREQUENCY OF LITTLE TIMBER CREEK AT THE CULVERT ON INTERSTATE ROUTE 295 IN HADDON HEIGHTS TOWNSHIP, CAMDEN COUNTY, NEW JERSEY

FLOOD MAGNITUDE AND FREQUENCY OF LITTLE TIMBER CREEK AT THE CULVERT ON INTERSTATE ROUTE 295 IN HADDON HEIGHTS TOWNSHIP, CAMDEN COUNTY, NEW JERSEY FLOOD MAGNITUDE AND FREQUENCY OF LITTLE TIMBER CREEK AT THE CULVERT ON INTERSTATE ROUTE 295 IN HADDON HEIGHTS TOWNSHIP, CAMDEN COUNTY, NEW JERSEY U.S. GEOLOGICAL SURVEY Open-File Report 96-321 Prepared

More information

PRELIMINARY HYDROLOGY/HYDRAULICS ANALYSES RESULTS

PRELIMINARY HYDROLOGY/HYDRAULICS ANALYSES RESULTS PRELIMINARY HYDROLOGY/HYDRAULICS ANALYSES RESULTS Coldstream Park Stream Corridor Restoration and Preservation Consent Decree SEP Prepared for Lexington-Fayette Urban County Government Division of Water

More information

Bear Creek Dam and Reservoir NID# OR Douglas County, Oregon

Bear Creek Dam and Reservoir NID# OR Douglas County, Oregon Bear Creek Dam and Reservoir NID# OR00614 Douglas County, Oregon FINAL Dam Breach Study and Flood Inundation Mapping March, 2009 Prepared for: The City of Drain, Oregon 129 West C Avenue Drain, OR 97435

More information

MILL CREEK FISH PASSAGE CONCEPTUAL DESIGNS FINAL REPORT

MILL CREEK FISH PASSAGE CONCEPTUAL DESIGNS FINAL REPORT MILL CREEK FISH PASSAGE CONCEPTUAL DESIGNS FINAL REPORT Prepared for Tri State Steelheaders Contact: Brian Burns 216 N. Roosevelt, PO Box 1375 Walla Walla, WA 99362 Prepared by Waterfall Engineering, L.L.C.

More information

TECHNICAL GUIDANCE and CASE STUDY for INEFFECTIVE FLOW and CONVEYANCE SHADOW AREAS

TECHNICAL GUIDANCE and CASE STUDY for INEFFECTIVE FLOW and CONVEYANCE SHADOW AREAS Utilities electric stormwater wastewater water 700 Wood St. PO Box 580 Fort Collins, CO 80522 970.221.6700 970.221.6619 fax 970.224.6003 TDD utilities@fcgov.com fcgov.com/utilities TECHNICAL GUIDANCE and

More information

SECTION III: WATERSHED TECHNICAL ANALYSIS

SECTION III: WATERSHED TECHNICAL ANALYSIS Trout Creek Watershed Stormwater Management Plan SECTION III: WATERSHED TECHNICAL ANALYSIS A. Watershed Modeling An initial step this study of the Trout Creek watershed was the selection of a stormwater

More information

Reservoir on the Rio Boba

Reservoir on the Rio Boba Reservoir on the Rio Boba Michael J. Burns II Guillermo Bustamante J. James Peterson Executive Summary The National Institute of Water Resources in the Dominican Republic (INDRHI) plans to construct a

More information

Flooding of the Androscoggin River during December 18-19, 2003, in Canton, Maine

Flooding of the Androscoggin River during December 18-19, 2003, in Canton, Maine In cooperation with the Federal Emergency Management Agency Flooding of the Androscoggin River during December 18-19, 2003, in Canton, Maine Open File Report 2005-1176 U.S. Department of the Interior U.S.

More information

Contact the Jurisdictional Engineer for materials allowed by each jurisdiction.

Contact the Jurisdictional Engineer for materials allowed by each jurisdiction. Design Manual Chapter 3 - Sanitary Sewers 3C - Facility Design 3C-1 Facility Design A. Capacity of Pipe Pipe sizes 15 inches and smaller should carry the peak flow at a depth of no more than 0.67 of the

More information

Appendix B Stormwater Site Plan Submittal Requirements Checklist

Appendix B Stormwater Site Plan Submittal Requirements Checklist Stormwater Site Plan Submittal Requirements Checklist The Submittal Requirements Checklist is intended to aid the design engineer in preparing a Stormwater Site Plan. All items included in the following

More information

Prepared for Urban Drainage and Flood Control District

Prepared for Urban Drainage and Flood Control District BERM FAILURE TECHNICAL ANALYSES SOUTH PLATTE GRAVEL PIT EVALUATION CRITERIA Prepared for Urban Drainage and Flood Control District Wright Water Engineers, Inc. January 2013 121-030.000 TABLE OF CONTENTS

More information

December 7, Dr. Christine Pomeroy University of Utah Civil and Environmental Engineering MCE Salt Lake City, UT. Dear Dr.

December 7, Dr. Christine Pomeroy University of Utah Civil and Environmental Engineering MCE Salt Lake City, UT. Dear Dr. December 7, 2012 Dr. Christine Pomeroy University of Utah Civil and Environmental Engineering MCE 2042 Salt Lake City, UT 84112 Dear Dr. Pomeroy, The following document is the final report of the Red Butte

More information

Representation of Vegetation in Two Dimensional Hydrodynamic Models in both Laboratory and Field Applications

Representation of Vegetation in Two Dimensional Hydrodynamic Models in both Laboratory and Field Applications Representation of Vegetation in Two Dimensional Hydrodynamic Models in both Laboratory and Field Applications F. Douglas Shields Jr., Ph.D., P.E. Kevin Coulton, P.E., CFM Heidi Nepf, Ph.D. Brandon T. Forbes

More information

TECHNICAL MEMORANDUM Summerhill Rd Texarkana, Texas fax

TECHNICAL MEMORANDUM Summerhill Rd Texarkana, Texas fax TECHNICAL MEMORANDUM 5930 Summerhill Rd Texarkana, Texas 75503 903 838 8533 fax 903 832 4700 TO: Becky Griffith, Jon Jarvis FROM Spandana Tummuri SUBJECT: Technical Memorandum on IP Analysis PROJECT: Sulphur

More information

APPENDIX A. Hydraulic Investigations: Cascade Mall at Burlington

APPENDIX A. Hydraulic Investigations: Cascade Mall at Burlington APPENDIX A m SUMMARY REPORT FOR E.I.S. Hydraulic Investigations: Cascade Mall at Burlington July 12, 1982 John E. Norman, P.E. 14779 Northeast 32nd, #A201 Bellevue, WA 98007 (206) 882-1767 92 General A

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GREENE COUNTY ASH POND ALABMA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GREENE COUNTY ASH POND ALABMA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GREENE COUNTY ASH POND ALABMA POWER COMPANY Section 257.82 of EPA s regulations requires the owner or operator of an existing or new CCR surface impoundment

More information

World Meteorological Organization Working together in weather, climate and water

World Meteorological Organization Working together in weather, climate and water World Meteorological Organization Working together in weather, climate and water Indirect determination of peak discharge Jérôme LE COZ Irstea, Lyon, France 4th IAHR WMO IAHS Training Course on Stream

More information

IMPROVED WATER RESOURCE MANAGEMENT USING AN ACOUSTIC PULSED DOPPLER SENSOR IN A SHALLOW OPEN CHANNEL

IMPROVED WATER RESOURCE MANAGEMENT USING AN ACOUSTIC PULSED DOPPLER SENSOR IN A SHALLOW OPEN CHANNEL IMPROVED WATER RESOURCE MANAGEMENT USING AN ACOUSTIC PULSED DOPPLER SENSOR IN A SHALLOW OPEN CHANNEL Mike Cook 1, PhD Craig Huhta 1 SonTek/YSI Inc., San Diego, California, USA Abstract. Over the years

More information

TABLE OF CONTENTS. 1.0 Background Watershed Description Hydrology - HEC-HMS Models Hydraulics - HEC-RAS Models...

TABLE OF CONTENTS. 1.0 Background Watershed Description Hydrology - HEC-HMS Models Hydraulics - HEC-RAS Models... TABLE OF CONTENTS 1.0 Background... 1 2.0 Watershed Description... 1 3.0 Hydrology - HEC-HMS Models... 2 3.1 Hydrologic Approach... 2 3.2 Drainage Areas... 2 3.3 Curve Numbers... 2 3.4 Lag Times... 3 3.5

More information

River Processes River action (fluvial)

River Processes River action (fluvial) River action (fluvial) is probably the single most important geomorphic agent and their influence in geomorphology can hardly be overestimated. 1 To understand the complexity associated with river flow

More information

- Site Location and Conditions. A. Project Location. B. Existing Conditions

- Site Location and Conditions. A. Project Location. B. Existing Conditions H&H Report - Site Location and Conditions Page 1 of 2 A. Project Location 1. Site Identification District County Mu nicipali ty 06 Bucks Hilltown (Twp) Site MINSI TRAIL S.R. 4019 Section 60M Segment 0050

More information

Lateral Inflow into High-Velocity Channels

Lateral Inflow into High-Velocity Channels Lateral Inflow into High-Velocity Channels by Richard L. Stockstill PURPOSE: This Coastal and Hydraulics Engineering Technical Note (CHETN) investigates lateral flow discharging into a high-velocity channel.

More information

HYDRAULIC STUDY OF TURNERS FALLS IMPOUNDMENT, BYPASS REACH AND BELOW CABOT

HYDRAULIC STUDY OF TURNERS FALLS IMPOUNDMENT, BYPASS REACH AND BELOW CABOT Relicensing Study 3.2.2 HYDRAULIC STUDY OF TURNERS FALLS IMPOUNDMENT, BYPASS REACH AND BELOW CABOT Initial Study Report Summary Northfield Mountain Pumped Storage Project (No. 2485) and Turners Falls Hydroelectric

More information

The Texas A&M University and U.S. Bureau of Reclamation Hydrologic Modeling Inventory (HMI) Questionnaire

The Texas A&M University and U.S. Bureau of Reclamation Hydrologic Modeling Inventory (HMI) Questionnaire The Texas A&M University and U.S. Bureau of Reclamation Hydrologic Modeling Inventory (HMI) Questionnaire May 4, 2010 Name of Model, Date, Version Number Dynamic Watershed Simulation Model (DWSM) 2002

More information

Unsteady-Flow Modeling for Emergency Shutdown of the CAP Canal

Unsteady-Flow Modeling for Emergency Shutdown of the CAP Canal Utah State University DigitalCommons@USU International Symposium on Hydraulic Structures Jun 29th, 1:30 PM - 3:30 PM Unsteady-Flow Modeling for Emergency Shutdown of the CAP Canal Bert Clemmens bclemmens@westconsultants.com

More information

Appendix Q Draft Location Hydraulic Study Report For the State Route 32 Widening Between Fir Street and Yosemite Drive at Dead Horse Slough and South

Appendix Q Draft Location Hydraulic Study Report For the State Route 32 Widening Between Fir Street and Yosemite Drive at Dead Horse Slough and South Appendix Q Draft Location Hydraulic Study Report For the State Route 32 Widening Between Fir Street and Yosemite Drive at Dead Horse Slough and South Fork Dead Horse Slough in the, California Draft Location

More information

Section H Project Description Narrative

Section H Project Description Narrative Section H Project Description Narrative Permit No. Pennsylvania Department of Transportation, Engineering District 2-0, 1924 Daisy Street Extension, P.O. Box 342, Clearfield, PA 16830 S.R. 2004, Section

More information

Control and mitigation of floods along transbasin diversion channel of Mekong tributaries and Nan river, Thailand

Control and mitigation of floods along transbasin diversion channel of Mekong tributaries and Nan river, Thailand Control and mitigation of floods along transbasin diversion channel of Mekong tributaries and Nan river, Thailand Tawatchai Tingsanchali* School of Civil Engineering, Asian Institute of Technology, P.O.Box

More information

TWO-DIMENSIONAL HYDROLOGIC MODELING TO EVALUATE AQUATIC HABITAT CONDITIONS

TWO-DIMENSIONAL HYDROLOGIC MODELING TO EVALUATE AQUATIC HABITAT CONDITIONS TWO-DIMENSIONAL HYDROLOGIC MODELING TO EVALUATE AQUATIC HABITAT CONDITIONS Pamela Edwards, Hydrologist, USDA Forest Service, Parsons, WV, pjedwards@fs.fed.us; Frederica Wood, IT Specialist, USDA Forest

More information

Characterizing the Soap Lake Floodplain CHAPTER 2

Characterizing the Soap Lake Floodplain CHAPTER 2 Characterizing the Soap Lake Floodplain CHAPTER 2 CHAPTER 2 CHARACTERIZING THE SOAP LAKE FLOODPLAIN This chapter provides some background on Soap Lake including a general description of the Lake location,

More information

UPDATE OF ARC TP108 RUN-OFF CALCULATION GUIDELINE

UPDATE OF ARC TP108 RUN-OFF CALCULATION GUIDELINE UPDATE OF ARC TP108 RUN-OFF CALCULATION GUIDELINE Bodo Hellberg, Stormwater Action Team, Auckland Regional Council Matthew Davis, Stormwater Action Team, Auckland Regional Council ABSTRACT This paper focuses

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. Part PLANT MCINTOSH ASH POND 1 GEORGIA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. Part PLANT MCINTOSH ASH POND 1 GEORGIA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. Part 257.82 PLANT MCINTOSH ASH POND 1 GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R. Part

More information

Preliminary Drainage Study: Town of Hillsboro Pedestrian & Traffic Safety Project Traffic Calming Project UPC# 70587

Preliminary Drainage Study: Town of Hillsboro Pedestrian & Traffic Safety Project Traffic Calming Project UPC# 70587 Preliminary Drainage Study: Town of Hillsboro Pedestrian & Traffic Safety Project Traffic Calming Project UPC# 70587 Introduction: The intent of this study was to perform a preliminary drainage study of

More information

2

2 1 2 3 4 5 6 The program is designed for surface water hydrology simulation. It includes components for representing precipitation, evaporation, and snowmelt; the atmospheric conditions over a watershed.

More information

Technical Memorandum

Technical Memorandum Tucson Office 3031 West Ina Road Tucson, AZ 85741 Tel 520.297.7723 Fax 520.297.7724 www.tetratech.com Technical Memorandum To: Kathy Arnold From: Greg Hemmen, P.E. Company: Rosemont Copper Company Date:

More information

City of Katy Flood Protection Study (Meeting 3 of 3) October 23, 2017

City of Katy Flood Protection Study (Meeting 3 of 3) October 23, 2017 City of Katy Flood Protection Study (Meeting 3 of 3) October 23, 2017 Phasing of Meetings April Meeting May Meeting October Review of Tax Day Storm Event and Immediate Actions Taken By City Review of Coordination

More information

S.R. 0944, Section 015 (Wertzville Road) Bridge over the West Branch of Simmons Creek. Silver Spring Township Cumberland County.

S.R. 0944, Section 015 (Wertzville Road) Bridge over the West Branch of Simmons Creek. Silver Spring Township Cumberland County. Hydrologic and Hydraulic Report For S.R. 0944, Section 015 (Wertzville Road) Bridge over the West Branch of Simmons Creek Silver Spring Township Cumberland County August 13, 2003 Prepared For Pennsylvania

More information

Conceptual Design and Feasibility of a Natural Fishway at the Fremont BART Weir, Alameda Creek, California

Conceptual Design and Feasibility of a Natural Fishway at the Fremont BART Weir, Alameda Creek, California Conceptual Design and Feasibility of a Natural Fishway at the Fremont BART Weir, Alameda Creek, California Final Report September 2005 Prepared by Center for Ecosystem Management and Restoration, Oakland,

More information

DR DRAINAGEWAY THORNTON VALLEY SUBDIVISION OVERALL DEVELOPMENT PLAN & CONCEPTUAL SITE PLAN SWC OF COLO BLVD & THORNTON PKWY THORNTON, CO

DR DRAINAGEWAY THORNTON VALLEY SUBDIVISION OVERALL DEVELOPMENT PLAN & CONCEPTUAL SITE PLAN SWC OF COLO BLVD & THORNTON PKWY THORNTON, CO /CONCEPTUAL SITE PLAN TRACT A, THORNTON VALLEY FILING NO. 1 LOCATED IN THE NE 1/4 OF SEC. 24, T. 2 S., R. 68 W., OF THE 6TH P.M., CITY OF UNTY OF ADAMS, STATE OF COLORADO Planning. Architecture. Engineering.

More information

DRAINAGE SUBMITTAL CHECKLIST

DRAINAGE SUBMITTAL CHECKLIST Project Name: Firm Name: Map ID: Engineer: Address: City: State: Zip: Phone Number: Fax Number: Property Owner: Address: City: State: Zip: Reviewed By: Date Received: Date Accepted for Review: The following

More information

Chapter 7 Ditches and Channels

Chapter 7 Ditches and Channels Chapter 7 Ditches and Channels TABLE OF CONTENTS CHAPTER 7 - DITCHES AND CHANNELS... 7-1 7.1 Introduction... 7-1 7.2 Design Policy... 7-2 7.2.1 Federal Policy... 7-2 7.2.2 Commonwealth of Virginia Policy...

More information

HYDROLOGIC AND HYDRAULIC ANALYSES OF THE HENNEPIN CANAL FROM LOCK 27 TO THE ROCK RIVER. by Misganaw Demissie and Nani G. Bhowmik

HYDROLOGIC AND HYDRAULIC ANALYSES OF THE HENNEPIN CANAL FROM LOCK 27 TO THE ROCK RIVER. by Misganaw Demissie and Nani G. Bhowmik SWS Contract Report 335 HYDROLOGIC AND HYDRAULIC ANALYSES OF THE HENNEPIN CANAL FROM LOCK 27 TO THE ROCK RIVER by Misganaw Demissie and Nani G. Bhowmik Prepared for the Illinois Department of Conservation

More information

The Instream Flow Incremental Methodology

The Instream Flow Incremental Methodology The Instream Flow Incremental Methodology Introduction to IFIM Scientific support for complex management decisions involving water use and impacts to aquatic systems requires a better understanding of

More information

Stormwater Management Studies PDS Engineering Services Division ES Policy # 3-01

Stormwater Management Studies PDS Engineering Services Division ES Policy # 3-01 Stormwater Management Studies PDS Engineering Services Division Revised Date: 2/28/08 INTRODUCTION The City of Overland Park requires submission of a stormwater management study as part of the development

More information

Cherokee County Future Conditions Floodplain Development

Cherokee County Future Conditions Floodplain Development TECHNICAL MEMORANDUM Cherokee County Future Conditions Floodplain Development Prepared for: Prepared by: Geoff Morton, P.E., County Engineer Cherokee County Richard Greuel, P.E.,, Inc. Richard Taylor,

More information

Modernization of High Hazard Dams in Austin, Texas. TFMA Spring Conference May 23, 2007

Modernization of High Hazard Dams in Austin, Texas. TFMA Spring Conference May 23, 2007 Modernization of High Hazard Dams in Austin, Texas TFMA Spring Conference May 23, 2007 Modernization of High Hazard Dams in Austin, Texas City of Austin Glen Taffinder, P.E. Stormwater Pond Dam Safety

More information

Bridge Replacement Project. Preliminary Hydraulic Study. Lincoln, California BRLS-5089 (021) BRIDGE 19C Mcbean Park Drive at Auburn Ravine

Bridge Replacement Project. Preliminary Hydraulic Study. Lincoln, California BRLS-5089 (021) BRIDGE 19C Mcbean Park Drive at Auburn Ravine Bridge Replacement Project Preliminary Hydraulic Study Lincoln, California BRLS-5089 (021) BRIDGE 19C 0059 Mcbean Park Drive at Auburn Ravine Prepared By: Prepared By: Date 11/25/2014 Thomas S. Plummer

More information

Simulation of Daily Streamflow

Simulation of Daily Streamflow US Army Corps of Engineers Hydrologic Engineering Center Simulation of Daily Streamflow April 1968 Approved for Public Release. Distribution Unlimited. TP-6 REPORT DOCUMENTATION PAGE Form Approved OMB

More information

APPENDIX 4 ARROYO MODELING

APPENDIX 4 ARROYO MODELING APPENDIX 4 ARROYO MODELING The existing HEC-HMS model can serve as a baseline for further development and analysis of major arroyos in the city. The model would need to be updated and expanded to consider

More information

S.R. 4031, SECTION FVR OVER BEAVER RUN SEGMENT 0170, OFFSET 6093 EAST NANTMEAL TOWNSHIP, CHESTER CO. ENGINEERING DISTRICT 6-0

S.R. 4031, SECTION FVR OVER BEAVER RUN SEGMENT 0170, OFFSET 6093 EAST NANTMEAL TOWNSHIP, CHESTER CO. ENGINEERING DISTRICT 6-0 S.R. 4031, SECTION FVR OVER BEAVER RUN SEGMENT 0170, OFFSET 6093 EAST NANTMEAL TOWNSHIP, CHESTER CO. ENGINEERING DISTRICT 6-0 HYDROLOGIC & HYDRAULIC STUDY REPORT OCTOBER 2007 Prepared For: Prepared By:

More information

Chapter 3 Stream Discharge

Chapter 3 Stream Discharge Chapter 3 Stream Discharge - Introductory Level Volunteer Water Quality Monitoring Training Notebook - What is Discharge (Flow)? Discharge, also called flow, is the amount of water that flows past a given

More information

Jacobi, Toombs, and Lanz, Inc.

Jacobi, Toombs, and Lanz, Inc. Area 5: Blackiston Mill Road at Dead Man's Hollow Flooding Assessment Jacobi, Toombs, and Lanz, Inc. This document summarizes an assessment of drainage and flooding concerns and provides recommendations

More information

HEC-HMS Modeling Summary: Cherry Creek Basin Tributary to Cherry Creek Dam

HEC-HMS Modeling Summary: Cherry Creek Basin Tributary to Cherry Creek Dam HEC-HMS Modeling Summary: Cherry Creek Basin Tributary to Cherry Creek Dam October 2008 Prepared by: U.S. Army Corps of Engineers, Omaha District Hydrology Section - Hydrologic Engineering Branch 66 Capitol

More information

Southeast Policy Area Drainage Study

Southeast Policy Area Drainage Study Southeast Policy Area Drainage Study Prepared for City of Elk Grove January 2014 448-00-12-03 Table of Contents 1.0 Introduction... 1 2.0 Watershed Description... 1 3.0 Drainage Plan Concept... 1 4.0

More information

PRESENTATION FOR THE POTENTIAL ADDITION OF SPECIAL FLOOD HAZARD AREAS

PRESENTATION FOR THE POTENTIAL ADDITION OF SPECIAL FLOOD HAZARD AREAS PRESENTATION FOR THE POTENTIAL ADDITION OF SPECIAL FLOOD HAZARD AREAS 1 255 255 255 237 237 237 217 217 217 200 200 200 Part 1: Summary of Floodplain Analysis for Los 0 Angeles 163 131 River239 110 112

More information

DRAFT. Technical Memorandum. Whitney Road Drainage & Safety Enhancements Phase III Hydraulic Update. Prepared For:

DRAFT. Technical Memorandum. Whitney Road Drainage & Safety Enhancements Phase III Hydraulic Update. Prepared For: DRAFT Technical Memorandum Whitney Road Drainage & Safety Enhancements Phase III Hydraulic Update Prepared For: Pinellas County Department of Environment and Infrastructure Division of Engineering and

More information

Appendix C, Attachment 4 June 11, Diversion Channel Outlet Hydraulic Modeling RAS and ADH

Appendix C, Attachment 4 June 11, Diversion Channel Outlet Hydraulic Modeling RAS and ADH Diversion Channel Outlet Hydraulic Modeling RAS and ADH 11 June 2012 1 Contents Introduction... 3 HEC-RAS modeling of Outlet... 3 Transition Structure Geometry... 3 ADH Modeling of Outlet and Floodplain...

More information

Technical Memorandum No. 8 June 3, 2013 Page 2. FEMA Floodplain Mapping Flood Elevations at WWTP

Technical Memorandum No. 8 June 3, 2013 Page 2. FEMA Floodplain Mapping Flood Elevations at WWTP Page 2 FEMA Floodplain Mapping Flood Elevations at WWTP Existing Flood Control Facilities The City of Davis WWTP is located immediately north of the Willow Slough Bypass and west of the Yolo Bypass (see

More information

FLOOD CHARACTERISTICS

FLOOD CHARACTERISTICS simple yet widely accepted modeling approach that uses a constant flow to represent a flooding event, and it is currently the most common tool used for FIS efforts. Modeling for the FM Diversion project

More information

JACKSON COUNTY, GEORGIA AND INCORPORATED AREAS

JACKSON COUNTY, GEORGIA AND INCORPORATED AREAS Jackson County JACKSON COUNTY, GEORGIA AND INCORPORATED AREAS COMMUNITY NAME COMMUNITY NUMBER ARCADE, CITY OF 130597 BRASELTON, TOWN OF 130343 COMMERCE, CITY OF 130212 HOSCHTON, CITY OF 130344 JACKSON

More information

WWTP Protection Memo INTRODUCTION AND PURPOSE MODEL DEVELOPMENT AND ALTERNATIVES. August 31, PROJECT: TO: FROM: Re:

WWTP Protection Memo INTRODUCTION AND PURPOSE MODEL DEVELOPMENT AND ALTERNATIVES. August 31, PROJECT: TO: FROM: Re: WWTP Protection Memo August 31, 2017 PROJECT: TO: FROM: Re: City of Montesano WWTP Protection Log Jacks Matt Kastberg, Parametrix, Inc. Keelan Jensen, Dan Eggers, Henry Hu, WEST Consultants, Inc. WWTP

More information

Facilities Development Manual

Facilities Development Manual State of Wisconsin Department of Transportation Facilities Development Manual ORIGINATOR Director, Bureau of Highway Development PROCEDURE 13-25-35 CHAPTER 13 Drainage SECTION 25 Storm Sewer Design SUBJECT

More information

TABLE OF CONTENTS PART III - MINIMUM DESIGN STANDARDS Section 105 DRAINAGE SYSTEM DESIGN SPECIFICATIONS AND SCOPE 105.1

TABLE OF CONTENTS PART III - MINIMUM DESIGN STANDARDS Section 105 DRAINAGE SYSTEM DESIGN SPECIFICATIONS AND SCOPE 105.1 TABLE OF CONTENTS PART III - MINIMUM DESIGN STANDARDS Section 105 DRAINAGE SYSTEM DESIGN SECTION TITLE PAGE 105.1. SPECIFICATIONS AND SCOPE 105.1 105.2. METHODS OF ANALYSIS 105.1 105.2.1. Rational Method

More information

Case Studies in Hazard Class Reductions Implementation of NY s Guidance for Dam Hazard Classification

Case Studies in Hazard Class Reductions Implementation of NY s Guidance for Dam Hazard Classification Case Studies in Hazard Class Reductions Implementation of NY s Guidance for Dam Hazard Classification Gregory J Daviero, PhD, PE, Principal Kevin Ruswick, PE, CFM, Associate May 2, 2014 Schnabel Engineering

More information

SAW MILL RIVER DAYLIGHTING ANALYSIS AT RIVER PARK CENTER

SAW MILL RIVER DAYLIGHTING ANALYSIS AT RIVER PARK CENTER SAW MILL RIVER DAYLIGHTING ANALYSIS AT RIVER PARK CENTER Prepared for: Struever Fidelco Cappelli LLC McLaren Project No. 6 August 28 TABLE OF CONTENTS. INTRODUCTION 2. SAW MILL RIVER: FEMA STUDY... 2..

More information

2. DEFINITIONS. American Association of State Highway and Transportation Officials.

2. DEFINITIONS. American Association of State Highway and Transportation Officials. 2. DEFINITIONS 2.010 Definitions [See Amendment 2] In addition to words and terms that may be defined elsewhere in this manual, the following words and terms shall have the meanings defined below: AASHTO:

More information

APPENDIX G HYDRAULIC GRADE LINE

APPENDIX G HYDRAULIC GRADE LINE Storm Drainage 13-G-1 APPENDIX G HYDRAULIC GRADE LINE 1.0 Introduction The hydraulic grade line is used to aid the designer in determining the acceptability of a proposed or evaluation of an existing storm