White River Hub Customer Meeting November 6, 2008
|
|
- Marjorie Summers
- 5 years ago
- Views:
Transcription
1 White River Hub Customer Meeting November 6, 2008 Gary A. Schmitt Questar Pipeline Company General Manager, Marketing and Business Development
2 Enterprise White River Hub Questar Northwest REX TransColorado CIG WIC 2
3 Agenda Introduction - Gary Schmitt Regulatory Issues - Mark Petersen Initiation of Service and Point Capacity Scheduling including Operating Characteristics and Tolerances of WRH - Greg Paige Nominations, Fuel and Confirmations - Lori Creer Interruptible Service - Shelley Wright Wrap-Up and Adjournment - Gary Schmitt 3
4 Regulatory Issues Mark A. Petersen Questar Pipeline Company Supervisor, Certificates and Tariffs
5 Regulatory Issues White River Hub (WRH) is a FERCjurisdictional project Accelerated regulatory approval First introduced the project to the FERC on September 26, 2007 Filed certificate application, including a pro forma tariff, supporting exhibits and environmental reports on May 16, 2008 (eight months prep time) 5
6 Regulatory Issues Accelerated regulatory approval (continued) The FERC issued an order approving the project on August 1, 2008 the very day requested in WRH s certificate application (2 ½ months processing time) The BLM issued the ROW grant on August 28, 2008 Construction commenced on August 29, 2008 Filed compliance tariff with the FERC on September 30, 2008 Waiting for approval of tariff prior to commencing service 6
7 Regulatory Issues Transportation services: Firm (FT) transportation service Reservation Rate $ /Dth/Month Unit Rate $ /Dth May flex their receipt and delivery point capacities May release capacity 7
8 Regulatory Issues Transportation services (continued): Residue Gas Service (RGS) Alternate form of FT service Reservation Rate $ /Dth/Month Unit Rate $ /Dth 8
9 Regulatory Issues Transportation services (continued): RGS (continued) Available to any Gas Processing Customer that owns residue gas delivered from a processing plant directly into WRH Gas Processing Customer may elect to either contract, nominate and schedule its own gas on WRH or have the processing plant operator act as agent 9
10 Regulatory Issues Transportation services (continued): RGS (continued) Processing plant operator, acting as agent, is known as the Gas Service Administrator (GSA) GSA signs an RGS agreement for transport on WRH on behalf of its Gas Processing Customers, manages that contract by allocating daily capacity to its customers based on plant throughput and manages nomination, scheduling, billing and other transport needs The Gas Processing Customer must execute an Agency Appointment Agreement with the GSA 10
11 Regulatory Issues Transportation services (continued): RGS (continued) Under RGS, shipper may not flex its receipt point to an alternate receipt point but may flex its delivery point Title to the gas remains with the Gas Processing Customer Capacity can be made available for release as FT capacity 11
12 Regulatory Issues Transportation services (continued): Interruptible (IT) transportation service Maximum rate - $ /Dth Subordinate to FT and RGS Priority based upon rate paid 12
13 Point Capacity Scheduling Including Operating Characteristics and Tolerances of White River Hub Greg Paige Questar Pipeline Company Director, Gas Control and Scheduling
14 Approximate Capacities and Configuration Interconnecting Party Interconnect Name MAP No. Capacity (Mcf/d) Point MAOP Owner/ Operator Colorado Interstate Gas Flat Top (CIG) ,000 Delivery 1440 PSIG CIG Enterprise Gas Processing, LLC Meeker Plant Interconnect 604 1,700,000 Receipt 1480 PSIG WRH Northwest Pipeline GP Magnolia ,000 Receipt 1440 PSIG WRH Rockies Express Pipeline Company White/Rex Meeker Delivery 1480 PSIG REX 605 1,030,000 LLC Questar Pipeline Company Wolf Creek ,000 Receipt 1440 PSIG QPC Questar Pipeline Company Wolf Creek ,000 Delivery 1440 PSIG QPC TransColorado Gas Transmission White/Trans Ryan Gulch Delivery 1480 PSIG TC ,000 Company Wyoming Interstate Company Trappers Lake ,000 Delivery 1440 PSIG WIC Wyoming Interstate Company Trappers Lake ,000 Receipt 1440 PSIG WIC 14
15 In-Service Dates November 21, 2008 Meeker Plant Interconnect MAP 604 White/Rex Meeker MAP 605 White/Trans Ryan Gulch MAP 606 Wolf Creek Delivery MAP 608 Magnolia MAP
16 In-Service Dates continued Mid-January 2009 Wolf Creek MAP 607 February 1, 2009 Flat Top (CIG) MAP 602 Trappers Lake MAP 601 Trappers Lake MAP
17 White River Hub Configuration Meeker Plant Interconnect MAP Hatch Gulch Pool Meter MAP Flat Top CIG MAP 602 Trappers Lake WIC MAP 600 and 601 Wolf Creek QPC MAP 607 and 608 Magnolia NPC MAP 603 Scheduling Point White/Trans Ryan Gulch MAP 606 White/REX Meeker MAP
18 Scheduling Information WRH has sufficient mainline capacity to meet contracted obligations. Volume reductions will be based on interconnect confirmations. In the event nominations exceed meter capacity or pipeline throughput capacity, then WRH will schedule volumes. 18
19 Scheduling Information continued For informational purposes, the pooling meter (MAP 800) has been located on the REX side of the Hatch Gulch interconnect. The scheduling point has been located between the pooling meter and REX. 19
20 Confirmation and Balancing Operational Balancing: Because the pipeline is only 7 miles in length with approximately 22,000 Dth of line pack, nominations and actual volumes must be aligned to prevent operational problems. Gas Control will coordinate with the other pipelines via telephone call as we do now to adjust set points. Gas Control Contact: (801)
21 Nominations, Fuel and Confirmations Lori Creer Questar Pipeline Company Supervisor, Scheduling
22 Nominations Standard NAESB deadlines for all cycles Nominate via QuestLine at: from the Customer Activities link 22
23 Nominations Two part nominations are required for all shippers 23
24 Nominations In-Kind Fuel Gas L & U only Charged on path downstream of Pool MAP 800 November 2008 L & U = 0% FGRP will be filed annually but can vary monthly as necessary 24
25 Confirmations Standard NAESB deadlines for all cycles Interconnect parties will negotiate confirmation processes On-line EDI 25
26 Scheduling Contacts Primary for WRH Lori Creer, Supervisor (801) James Bonnett (801) Other Schedulers Patt Rodgers (801) Lorraine Hieb (801) Greg Groat (801) Connie Tilk (801) Chad Campbell (801) Annette Thacker (801) Charles Penrod (801) Jessie Harrison (801)
27 Interruptible Service Shelley A. Wright Questar Pipeline Company Director, Business Development
28 Interruptible Transportation Prior to the beginning of the month, through the informational postings, White River will post rates at which it is willing to transport gas on an interruptible basis between specific receipt and delivery points during the succeeding month. Interruptible Shippers paying a discounted rate are subject to allocation based on rate. Shippers may amend their Interruptible Transportation Service Agreements to request a higher rate using the contracting procedures outlined in White River s FERC Gas Tariff. Acceptance of any new rate will be confirmed and contracted through the Customer Activities web site. 28
29 Access Agreements Customer Activities Capacity Release/Contracting Access Agreements: Request for Company Access Electronic Access Agreement (QuestLine) Request for User Access Request for Signature Code Access Contact: Mark Christiansen (801)
30 Enterprise White River Hub Questar Northwest REX TransColorado CIG WIC 30
QUESTAR PIPELINE CUSTOMER MEETING MARCH 2017 PARK CITY, UTAH
QUESTAR PIPELINE CUSTOMER MEETING MARCH 2017 PARK CITY, UTAH Ron Jorgensen Vice President Operations & Gas Control, Questar Pipeline 2 Merger Related Update February 1, 2016 Dominion/Questar merger announced
More informationCheyenne Connector Binding Open Season
Cheyenne Connector Binding Open Season Page 1 of 9 Cheyenne Connector Description Tallgrass Energy Partners, LP ( Tallgrass ) is pleased to announce a binding open season ( Open Season ) for the Cheyenne
More informationRockies Alliance Pipeline. Presentation to the Wyoming Pipeline Authority. May 20, 2008
Rockies Alliance Pipeline Presentation to the Wyoming Pipeline Authority May 20, 2008 Slide 2 Rockies Alliance Pipeline Route RAP New Facilities New Hampto n Proposed Pipeline Facilities Wamsutter to Ventura:
More informationMagnum Gas Storage, LLC
MAGNUM GAS STORAGE PROJECT OPEN SEASON FOR INTERSTATE NATURAL GAS STORAGE SERVICES Response Due By July 31, 2009, at 5:00 MDT June 9, 2009 Magnum Gas Storage, LLC (Magnum), invites your company to participate
More informationBINDING OPEN SEASON Rockies Express Pipeline Cheyenne Hub Enhancement
BINDING OPEN SEASON Rockies Express Pipeline Cheyenne Hub Enhancement Page 1 of 8 REX Cheyenne Hub Enhancement Rockies Express Pipeline LLC ( REX ) is pleased to announce a binding open season ( Open Season
More informationShelley Wright Kendrick General Manager, Marketing & Business Development. April 13, 2012 Platt s 6 th Annual Rockies Oil & Gas Conference
Shelley Wright Kendrick General Manager, Marketing & Business Development April 13, 2012 Platt s 6 th Annual Rockies Oil & Gas Conference 1 Questar Pipeline System Overview Overthrust Pipeline Company
More informationQuestar Pipeline Current Capacity and Development
Questar Pipeline Current Capacity and Development Gary A. Schmitt Manager, Marketing and Business Development April 27, 2007 Platts Rockies Gas and Oil Conference 1 Agenda Questar Pipeline Overview Basin
More informationFERC GAS TARIFF. First Revised Volume No. 1 MILLENNIUM PIPELINE COMPANY, L.L.C. FILED WITH THE FEDERAL ENERGY REGULATORY COMMISSION
FERC GAS TARIFF First Revised Volume No. 1 Of MILLENNIUM PIPELINE COMPANY, L.L.C. FILED WITH THE FEDERAL ENERGY REGULATORY COMMISSION Communications concerning this Tariff should be addressed to: John
More informationRockies Alliance Pipeline. Presentation to the Wyoming Pipeline Authority. May 20, 2008
Rockies Alliance Pipeline Presentation to the Wyoming Pipeline Authority May 20, 2008 Slide 2 Rockies Alliance Pipeline Route RAP New Facilities New Hamp ton Proposed Pipeline Facilities Wamsutter to Ventura:
More informationVector Pipeline L.P. Original Sheet No. 30 FERC Gas Tariff First Revised Volume No. 1 v0.0.0 RATE SCHEDULE FT-1 FIRM TRANSPORTATION SERVICE
Vector Pipeline L.P. Original Sheet No. 30 1. AVAILABILITY RATE SCHEDULE FT-1 FIRM TRANSPORTATION SERVICE This FT-1 Rate Schedule is available to any party (hereinafter called "Shipper"), for firm transportation
More informationFERC GAS TARIFF THIRD REVISED VOLUME NO. 2. (Superseding Second Revised Volume No. 2) WYOMING INTERSTATE COMPANY, L.L.C.
FERC GAS TARIFF THIRD REVISED VOLUME NO. 2 (Superseding Second Revised Volume No. 2) of WYOMING INTERSTATE COMPANY, L.L.C. filed with the FEDERAL ENERGY REGULATORY COMMISSION Communication Covering This
More informationMagnum Gas Storage, LLC
September 2016 Non-Binding Open Season Providing the Western US with Critical Energy Infrastructure www.westernenergyhub.com/natural-gas-midstream.php MAGNUM GAS STORAGE PROJECT OPEN SEASON FOR FIRM INTERSTATE
More informationColorado Interstate Gas Company, L.L.C. Non-binding Open Season Soliciting Interest in DJ Expansion Capacity of up to 1.2 Bcf/day
Colorado Interstate Gas Company, L.L.C. Non-binding Open Season Soliciting Interest in DJ Expansion Capacity of up to 1.2 Bcf/day Portable Document Format (.pdf) file of Open Season: https://pipeportal.kindermorgan.com/portalui/openseasondocs.aspx?tsp=cigd
More informationWELCOME & INTRODUCTIONS
WELCOME & INTRODUCTIONS Ron Jorgensen Vice-President, Operations & Gas Control 1 Agenda 8:30 a.m. Welcome and Introductions Ron Jorgensen 8:45 a.m. Meet the Pipeline President Micheal Dunn 9:10 a.m. Integrity
More informationTable of Contents. Trailblazer Pipeline Company LLC 6th Revised Volume No. 1. Rate Schedules. Rate Schedule FTS. Rate Schedule ITS.
6th Revised Volume No. 1 Table of Contents Rate Schedules Rate Schedule FTS Rate Schedule ITS Rate Schedule FTB Rate Schedule Wheeling Service Rate Schedule PALS Rate Schedules 6th Revised Volume No. 1
More informationFERC NGA GAS TARIFF. THIRD REVISED VOLUME NO. 1 (Superseding Second Revised Volume No. 1) SEA ROBIN PIPELINE COMPANY, LLC.
FERC NGA GAS TARIFF THIRD REVISED VOLUME NO. 1 (Superseding Second Revised Volume No. 1) of SEA ROBIN PIPELINE COMPANY, LLC Filed With The Federal Energy Regulatory Commission Communications Concerning
More informationQUESTAR PIPELINE OPERATIONS & CUSTOMER SERVICE MEETING
QUESTAR PIPELINE OPERATIONS & CUSTOMER SERVICE MEETING 2013 Meeting Hotel Park City Park City, Utah WELCOME Larry Conti V.P. Operations & Engineering NEW PIPEVIEWER Jeannie Yerkovich SCADA Analyst Classic
More informationFERC GAS TARIFF THIRD REVISED VOLUME NO. 1-A DOMINION ENERGY OVERTHRUST PIPELINE, LLC. filed with the FEDERAL ENERGY REGULATORY COMMISSION
FERC GAS TARIFF THIRD REVISED VOLUME NO. 1-A of DOMINION ENERGY OVERTHRUST PIPELINE, LLC filed with the FEDERAL ENERGY REGULATORY COMMISSION Communications regarding this Tariff should be addressed to:
More informationKinder Morgan Illinois Pipeline LLC Original Sheet No. 15 FERC Gas Tariff First Revised Volume No. 1
Kinder Morgan Illinois Pipeline LLC Original Sheet No. 15 RATE SCHEDULE FTS FIRM TRANSPORTATION SERVICE 1. AVAILABILITY This Rate Schedule FTS is available to any entity (hereinafter called Shipper) which:
More informationFERC GAS TARIFF. Second Revised Volume No. 1 CROSSROADS PIPELINE COMPANY FILED WITH THE FEDERAL ENERGY REGULATORY COMMISSION
FERC GAS TARIFF Second Revised Volume No. 1 Of CROSSROADS PIPELINE COMPANY FILED WITH THE FEDERAL ENERGY REGULATORY COMMISSION Communications concerning this Tariff should be addressed to: James R. Downs,
More informationTrailblazer Pipeline Company LLC Docket No. RP Exhibit No. TPC-0080
Trailblazer Pipeline Company LLC Docket No. RP- -000 UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION Trailblazer Pipeline Company LLC ) ) ) Docket No. RP- -000 SUMMARY OF PREPARED
More informationConversion to the DART System: Update on Implementation Schedule
Conversion to the DART System: Update on Implementation Schedule March 11, 2015 WebEx at 1:00 p.m. CCT 1 Agenda Updated Timeline to Convert to DART Additional Tariff Changes Other Updates and Next Steps
More informationFERC GAS TARIFF FIRST REVISED VOLUME NO. 1 CENTRAL KENTUCKY TRANSMISSION COMPANY FILED WITH THE FEDERAL ENERGY REGULATORY COMMISSION
FERC GAS TARIFF FIRST REVISED VOLUME NO. 1 OF CENTRAL KENTUCKY TRANSMISSION COMPANY FILED WITH THE FEDERAL ENERGY REGULATORY COMMISSION Communications concerning this Tariff should be addressed to: Stanley
More informationUniversity of Wyoming The 2008 Conference The Wyoming Pipelines: The Territory Ahead
FERC CERTIFICATION University of Wyoming The 2008 Conference The Wyoming Pipelines: The Territory Ahead 1 Robert Cupina, Principal Deputy Director Federal Energy Regulatory Commission Cheyenne, Wyoming
More informationOctober 2010 Open Season Defining the Future of Natural Gas Storage
3 Riverway Suite 1110 Houston, Texas 77056 October 2010 Open Season Defining the Future of Natural Gas Storage RYCKMAN CREEK RESOURCES, LLC OPEN SEASON NOTICE Response Due By November 1, 2010, at 5:00
More information6th Revised Volume No. 1 Section Version: TABLE OF CONTENTS
Table of Contents TABLE OF CONTENTS Sixth Revised Volume No. 1 Table of Contents Preliminary Statement System Map Section Name Table of Contents Preliminary Statement System Map Currently Effective Rates
More informationSecond Revised Volume No. 1 Section Version: 5.0.0
Table of Contents Second Revised Volume No. 1 Section Version: 5.0.0 Description Section Preliminary Statement... Preliminary Statement System Maps System Map... System Map CHDP Zone Map... CHDP Zone Map
More informationEl Paso Natural Gas Company Binding Open Season. Delaware Basin to Waha
INTRODUCTION El Paso Natural Gas Company Binding Open Season Delaware Basin to Waha In response to increasing demand for take-away capacity from the Delaware Basin with deliveries to the Waha area interconnections,
More informationWyoming Pipelines - The Territory Ahead October 31, 2008 October 15, 2013
Wyoming Pipelines - The Territory Ahead October 31, 2008 October 15, 2013 1 $ per MMBtu Representative Wyoming Natural Gas Price by Month 10.00 9.00 8.00 7.00 6.00 5.00 4.00 3.00 2.00 1.00 0.00 Jan Feb
More informationRuby Pipeline Project
Ruby Pipeline Project Ed Miller Ruby Project Manager October 21, 2008 El Paso Pipeline System Ruby Pipeline CIG & WIC Tennessee Gas Pipeline Mojave Pipeline El Paso Natural Gas Cheyenne Plains Pipeline
More informationLOCKRIDGE TO WAHA PROJECT NOTICE OF BINDING OPEN SEASON
Announcement of Open Season Natural Gas Pipeline Company of America LLC ( NGPL ) has entered into a binding transaction with a third party ( Prearranged Shipper ) to develop a project to provide 500,000
More informationTable of Contents. Great Lakes Gas Transmission Limited Partnership. Third Revised Volume No. 1. Third Revised Volume No. 1 1 TABLE OF CONTENTS
Great Lakes Gas Transmission Limited Partnership Table of Contents 1 TABLE OF CONTENTS 2 PRELIMINARY STATEMENT 3 MAPS 4 STATEMENT OF RATES 4.1 Rate Schedules FT, LFT & EFT 4.2 Reserved for Future Use 4.3
More informationKern River Gas Transmission Company. Customer Meetings 2018
Kern River Gas Transmission Company Customer Meetings 2018 1 Exceptional Businesses and Assets 11.6 million customers worldwide Top-rated service provider within the industry 22,700 employees worldwide
More informationTransCanada PipeLines Limited and ANR Pipeline Company Joliet XPress Project Binding Open Season May 16, 2018 through June 15, 2018
TransCanada PipeLines Limited and ANR Pipeline Company Joliet XPress Project Binding Open Season May 16, 2018 through June 15, 2018 Proposing firm service from Empress to the Chicago market area, including
More informationSheet No. 5 - Currently Effective Rates - Rate Schedules FTS and ITS. Sheet No. 6 - Statement of Negotiated Rate Transactions
Kinder Morgan Illinois Pipeline LLC Table of Contents Sheet No. 1 - Table of Contents Sheet No. 3 - Preliminary Statement Sheet No. 4 - System Map Sheet No. 5 - Currently Effective Rates - Rate Schedules
More informationIssued February 21, Haynesville Global Access Pipeline LLC. Notice of Non-Binding Open Season
Issued February 21, 2018 Haynesville Global Access Pipeline LLC Notice of Non-Binding Open Season Notice of Non-Binding Open Season Haynesville Global Access Pipeline LLC ( HGAP ), a wholly-owned subsidiary
More informationMidwest Supply Update: Alliance Pipeline and Rockies Alliance Pipeline
Midwest Supply Update: Alliance Pipeline and Rockies Alliance Pipeline Tony Straquadine Government Affairs Manager Forward looking statements and information o Certain information contained in this [presentation],
More informationOpen Season Notice of Available and Expansion Firm Capacity on El Paso Natural Gas Company, L.L.C. (EPNG)
Open Season Notice of Available and Expansion Firm Capacity on El Paso Natural Gas Company, L.L.C. (EPNG) Bid Deadline 2:00 PM Mountain Time, March 22, 2018 Portable Document Format (.pdf) file of Open
More informationAgency Agreement. Both will be signed by EEC and one will be returned to you.
Elba Express Company, L.L.C. Agency Agreement Under Section 24.2 of the General Terms and Conditions of Elba Express Company s Tariff, a shipper can appoint an agent and request EEC to recognize such appointment.
More informationMarch 2014
www.kindermorgan.com March 2014 www.kindermorgan.com Francisco Tarin Director Regulatory Affairs DART Tariff Proposal Each of the Rockies Pipelines will submit a tariff filing to the Federal Energy Regulatory
More informationWachovia LNG Conference
Wachovia LNG Conference November 13, 007 Forward Looking Statements This presentation contains forward looking statements, including these, within the meaning of Section 7A of the Securities Act of 1933,
More informationNotice Text. Notice 17238/Previous Notice 17236
TSP Name: El Paso Natural Gas Company,L.L.C TSP: 00-800-1703 Notice ID: 17238 Critical: N Notice Type Desc: Other Notice Stat Desc: Initiate Subject: Revised Line 1600 to Waha Open Season (17238) Prior
More informationIssued March 21, Permian Global Access Pipeline LLC. Notice of Non-Binding Open Season
Issued March 21, 2018 Permian Global Access Pipeline LLC Notice of Non-Binding Open Season Notice of Non-Binding Open Season Permian Global Access Pipeline LLC ( PGAP ), a wholly-owned subsidiary of Tellurian
More informationFERC GAS TARIFF. Third Revised Volume No. 1. (Superseding Second Revised Volume No. 1) COLUMBIA GULF TRANSMISSION, LLC FILED WITH
FERC GAS TARIFF (Superseding Second Revised Volume No. 1) of COLUMBIA GULF TRANSMISSION, LLC FILED WITH FEDERAL ENERGY REGULATORY COMMISSION Communications concerning this tariff should be addressed to:
More informationUNITED STATES OF AMERICA 100 FERC 61,204 FEDERAL ENERGY REGULATORY COMMISSION ORDER ON COMPLIANCE WITH ORDER NOS. 637, 587-G, AND 587-L
UNITED STATES OF AMERICA 100 FERC 61,204 FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Pat Wood, III, Chairman; William L. Massey, Linda Breathitt, and Nora Mead Brownell. Overthrust Pipeline
More informationFERC GAS TARIFF. First Revised Volume No. 1. Filed with. Federal Energy Regulatory Commission. Communication Covering Rates Should be Addressed To:
FERC GAS TARIFF First Revised Volume No. 1 Of Destin Pipeline Company, L.L.C. Filed with Federal Energy Regulatory Commission Communication Covering Rates Should be Addressed To: Regina Gregory, SVP, General
More informationFERC GAS TARIFF VOLUME NO. 1 KO TRANSMISSION COMPANY FILED WITH THE FEDERAL ENERGY REGULATORY COMMISSION
KO Transmission Company Filing Category: Amendment Filing Date: 07/27/2016 FERC Docket: RP16-01097-001 FERC Action: Accept FERC Order: 156 FERC 61,147 Order Date: 08/31/2016 Effective Date: 02/01/2017
More informationData Request of FERC Staff OEP/DPC/CB-2 Dated June 11, 2015
Docket No. CP15-93-000 Data Request of FERC Staff OEP/DPC/CB-2 Dated June 11, 2015 8. Rover proposes at Part VI General Terms and Conditions, GT&C Section 1. Definitions, to define Transportation to include
More informationTransCanada s GTN System Notice of Available Multi-Month Parking Service. November 17, 2009
TransCanada s GTN System Notice of Available Multi-Month Parking Service November 17, 2009 TransCanada s GTN System ( GTN ) is providing notice of the availability of multi-month Parking Service, offered
More informationWBI Energy Wind Ridge Pipeline, LLC Wind Ridge Pipeline Project Sale of Long Term Firm Capacity Commencing October 10, Binding Open Season
WBI Energy Wind Ridge Pipeline, LLC Wind Ridge Pipeline Project Sale of Long Term Firm Capacity Commencing October 10, 2014 Binding Open Season WBI Energy Wind Ridge Pipeline, LLC announces a Binding Open
More informationCurrently Effective Rates - FTS and FTB Existing System. Currently Effective Rates FTS and FTB Expansion System
6th Revised Volume No. 1 Table of Contents Table of Contents Preliminary Statement System Map Currently Effective Rates Currently Effective Rates - FTS and FTB Existing System Currently Effective Rates
More informationCarlton Resolution Frequently Asked Questions
What is the? The is a negotiated settlement among Northern s shippers and Northern where the shippers agreed to deliver up to 250,000 Dth/day, upon request by Northern, at the interconnect between Northern
More informationFoothills Pipe Lines Ltd.
Page 1 SERVICE AGREEMENT FIRM TRANSPORTATION SERVICE FOR TRANSPORTATION OF GAS This AGREEMENT made, 20 BETWEEN: AND: FOOTHILLS PIPE LINES LTD., a body corporate having an office and carrying on business
More informationEMPIRE PIPELINE, INC. FERC GAS TARIFF FIRST REVISED VOLUME NO. 1
EMPIRE PIPELINE, INC. FERC GAS TARIFF FIRST REVISED VOLUME NO. 1 (Superseding Original Volume No. 1) Communication concerning this tariff should be addressed to: Randy C. Rucinski, Esq. Empire Pipeline,
More informationRate Schedule FT Firm Transportation Service
Rate Schedule FT Firm Transportation Service 1. Availability This Rate Schedule is available for the transportation of natural gas by Heartland Gas Pipeline for any Customer: 1.1 Where Customer: a) Has
More informationHorizon Pipeline Company, L.L.C. First Revised Sheet No First Revised Volume No. 1 Original Sheet No. 100 GENERAL TERMS AND CONDITIONS
Horizon Pipeline Company, L.L.C. First Revised Sheet No. 100 Superseding Original Sheet No. 100 1. DEFINITIONS 1.1 AGREEMENT "Agreement" shall mean a transportation agreement subject to, as applicable,
More informationMarch 1, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C
March 1, 2013 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 RE: TRANSWESTERN PIPELINE COMPANY, LLC Docket No. RP13-404- Tariff Filing
More informationJune 25, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C
June 25, 2010 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Northern Border Pipeline Company 717 Texas Street, Suite 2400 Houston, TX
More informationJOB TITLES DESCRIPTIONS FOR TRANSMISSION FUNCTION EMPLOYEES. Job Description
GAS INFRASTRUCTURE GROUP" TRANSMISSION Energy Transmission, Inc. (DETI) Director, Gas Control Plans and directs transportation gas control activities to meet shipper obligations, system reliability, safe
More informationNovember 20, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426
November 20, 2015 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Gas Transmission Northwest LLC 700 Louisiana Street, Suite 700 Houston,
More informationSOUTHERN LNG SERVICE REQUEST FORM
SOUTHERN LNG SERVICE REQUEST FORM Southern LNG Company, L.L.C. Post Office Box 2563 Birmingham, AL 35202 Gentlemen: (Customer) hereby requests services from Southern LNG Company, L.L.C. (Southern LNG)
More informationTable of Contents Original Sheet No. 0 6 Original Sheet No. 1 7 First Revised Sheet No. 2 8 Original Sheet No. 3 9 First Revised Sheet No.
Table of Contents Original Sheet No. 0 6 Original Sheet No. 1 7 First Revised Sheet No. 2 8 Original Sheet No. 3 9 First Revised Sheet No. 4 10 Sheet Nos. 5-99 11 Third Revised Sheet No. 100 12 Seventh
More informationQuarterly Recomputation of Fuel and Lost and Unaccounted-for Percentages, Wyoming Interstate Company, L.L.C.; Docket No. RP19-
Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 October 31, 2018 Attention: Ms. Kimberly D. Bose, Secretary Re: Quarterly Recomputation of Fuel and Lost and Unaccounted-for
More informationFERC Job Title Account Representative III, Capacity Services
FERC Job Title Account Representative III, Capacity Services Description (Updated 9/5/2018) Members of this team are primarily responsible for assisting customers in transacting their daily business on
More informationOpen Season Market-Based Storage in the Heart of the PA Marcellus Shale Region
Open Season Market-Based Storage in the Heart of the PA Marcellus Shale Region Open Season starts 8:00AM Feb 12, 2018 Open Season bids due 12:00PM Feb 21, 2018 Contracts awarded on 12:00PM Feb 23, 2018
More informationNortheast Energy Direct
Northeast Energy Direct The Northeast Pipeline Expansion Solution for Lower Energy Costs and Enhanced Electric Reliability Open Season for Firm Service www.northeastenergyfuture.com @NEDEnergy Open Season
More informationReforms to Improve Gas-Electric Coordination Mark R. Haskell, Floyd L. Norton, IV, Brett A. Snyder April 29, 2014
Reforms to Improve Gas-Electric Coordination Mark R. Haskell, Floyd L. Norton, IV, Brett A. Snyder April 29, 2014 www.morganlewis.com Presentation Overview Revisions to the operating and scheduling processes
More informationFERC GAS TARIFF. First Revised Volume No. 1 NORTHERN BORDER PIPELINE COMPANY. Filed with. Federal Energy Regulatory Commission
FERC GAS TARIFF of NORTHERN BORDER PIPELINE COMPANY Filed with Federal Energy Regulatory Commission Communications Concerning This Tariff Should Be Addressed To: Joan Collins Manager, Tariffs and Compliance
More informationTennessee Gas Pipeline Company, L.L.C. Market Area Pooling Area Revisions and Other Tariff Changes Docket No. RP
July 12, 2018 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Re: Tennessee Gas Pipeline Company, L.L.C. Market Area Pooling Area Revisions
More informationDominion Energy Transmission, Inc. FERC Gas Tariff Tariff Record No. 20. Fifth Revised Volume No. 1 Version TARIFF RATE SCHEDULES
Rate Schedules FERC Gas Tariff Tariff Record No. 20. TARIFF RATE SCHEDULES TARIFF RATE RECORD SCHEDULE SERVICE NO. FT Firm Transportation Service 20.1 FTNN Firm Transportation, No-Notice Service 20.2 IT
More informationKinder Morgan Louisiana Pipeline LLC First Revised Sheet No First Revised Volume No. 1 Original Sheet No. 100 GENERAL TERMS AND CONDITIONS
Kinder Morgan Louisiana Pipeline LLC First Revised Sheet No. 100 First Revised Volume No. 1 Original Sheet No. 100 1. DEFINITIONS 1.1 AGREEMENT "Agreement" shall mean a transportation agreement subject
More informationOPERATING STATEMENT NORTHERN ILLINOIS GAS COMPANY D/B/A NICOR GAS COMPANY ( NICOR GAS COMPANY ) FILED WITH THE FEDERAL ENERGY REGULATORY COMMISSION
OPERATING STATEMENT OF NORTHERN ILLINOIS GAS COMPANY D/B/A NICOR GAS COMPANY ( NICOR GAS COMPANY ) FILED WITH THE FEDERAL ENERGY REGULATORY COMMISSION EFFECTIVE SEPTEMBER 1, 2015 Communications Concerning
More informationTranscontinental Gas Pipe Line Company, LLC RP Technical Conference March 28, 2018
WE MAKE ENERGY HAPPEN Transcontinental Gas Pipe Line Company, LLC RP18-314-000 Technical Conference March 28, 2018 NYSE: WMB williams.com AGENDA > Introductions > Background Information > No-Notice Priorities
More informationFERC GAS TARIFF FIRST REVISED VOLUME NO. 1 CHEYENNE PLAINS GAS PIPELINE COMPANY, L.L.C. filed with the FEDERAL ENERGY REGULATORY COMMISSION
FERC GAS TARIFF FIRST REVISED VOLUME NO. 1 of CHEYENNE PLAINS GAS PIPELINE COMPANY, L.L.C. filed with the FEDERAL ENERGY REGULATORY COMMISSION Communications regarding this Tariff should be addressed to:
More informationTable of Contents/Section Index With Links
Boardwalk Storage Company, LLC Third Revised Volume No. 1 Table of Contents/Section Index With Links Third Revised Volume No. 1 1. Table of Contents 2. Preliminary Statement 3. System Map 4. Currently
More informationDOMINION EAST OHIO CASE NO GA-EXM STANDARD SERVICE OFFER/STANDARD CHOICE OFFER CAPACITY RELEASE INFORMATION PACKAGE
DOMINION EAST OHIO CASE NO. 07-1224-GA-EXM STANDARD SERVICE OFFER/STANDARD CHOICE OFFER CAPACITY RELEASE INFORMATION PACKAGE Disclaimer The information presented in this information package, at the information
More informationDirector TGP Facility Planning and Gas Control June 3, Prepared for the Harvard Electricity Policy Group
www.elpaso.com NYSE:EP Anders Johnson Director TGP Facility Planning and Gas Control June 3, 2011 Prepared for the Harvard Electricity Policy Group D E P E N D A B L E N A T U R A L G A S El Paso Corporation
More informationRATE SCHEDULE 291-T ALL CUSTOMERS TRANSPORT ONLY (5,000 Dth but less than 30,000 Dth annually)
1 st Revised Tariff 291-T.1 P. O. BOX 401, OKLAHOMA CITY, OKLAHOMA Replacing Tariff 291-T.1 RATE SCHEDULE 291-T ALL CUSTOMERS TRANSPORT ONLY (5,000 Dth but less than 30,000 Dth annually) Availability Natural
More informationFERC Job Title Description (Updated 2/2/2018) Account Representative II, Capacity Services
FERC Job Title Description (Updated 2/2/2018) Account Representative II, Capacity Services Account Representative II, Offshore Transportation Account Representative II, System Balances Members of this
More information146 FERC 61,202 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION
146 FERC 61,202 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Cheryl A. LaFleur, Acting Chairman; Philip D. Moeller, John R. Norris, and Tony Clark. California Independent
More informationStatement of Qualifications Page 1
Statement of Qualifications Page 1 ALPINE ARCHAEOLOGY OVERVIEW Alpine Archaeological Consultants, Inc. is a respected, fullservice archaeological consulting firm established to help clients implement their
More informationFERC GAS TARIFF FIRST REVISED VOLUME NO. 1. (Superseding Original Volume No. 1) SOUTHERN STAR CENTRAL GAS PIPELINE, INC.
FERC Gas Tariff FERC GAS TARIFF FIRST REVISED VOLUME NO. 1 ( Original Volume No. 1) Of SOUTHERN STAR CENTRAL GAS PIPELINE, INC. Filed With FEDERAL ENERGY REGULATORY COMMISSION Communications Covering Rates
More informationDominion Energy Questar Pipeline, LLC 2018 Customer Meeting. February 27, 2018
Dominion Energy Questar Pipeline, LLC 2018 Customer Meeting 1 Shelley Kendrick Director Marketing and Business Development Dominion Energy Questar Pipeline 2 Ron Jorgensen Vice President Western Pipeline
More informationColumbia Gas Transmission, LLC FERC NGA Gas Tariff Baseline Tariffs Proposed Effective Date: December 1, 2016 Service Agreement No.
Columbia Gas Transmission, LLC FERC NGA Gas Tariff Baseline Tariffs Proposed Effective Date: December 1, 2016 Service Agreement No. 183409 Nytis Exploration Company, LLC Option Code A Service Agreement
More informationWest Region Customer Meeting. September 23, 2015
West Region Customer Meeting September 23, 2015 Gas-Electric Coordination Update September 23, 2015 John Driscoll Manager West Region Transportation/Storage Services CIG CPG KGS Ruby WIC TCGT Young 9/23/2015
More informationMerchant Energy Partners & The East Cheyenne Gas Storage Project
Merchant Energy Partners & The East Cheyenne Gas Storage Project Wyoming Pipeline Authority December 10, 2009 10901 West Toller Drive, Suite 200, Littleton, CO 80127 Merchant Energy Partners & The East
More informationPhiladelphia Gas Works
Philadelphia Gas Works REQUEST FOR PROPOSALS For NATURAL GAS STORAGE ASSET MANAGEMENT RFP NO. 28399 April 1, 2014 through March 31, 2015 The Philadelphia Gas Works ( PGW ) is requesting proposals for asset
More informationEXTENDED OPEN SEASON FOR INTERIM CAPACITY Ruby Pipeline Project
EXTENDED OPEN SEASON FOR INTERIM CAPACITY Ruby Pipeline Project Ruby Pipeline, LLC ( Ruby ) is conducting an open season for a limited quantity of unsubscribed capacity commencing upon the In-Service Date
More information1.0.0 Rate Schedule GPS Gas Parking Service GT&C Section 7. Operational Balancing Agreements
September 28, 2016 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Re: Trunkline Gas Company, LLC Docket No. RP16- Revision to Term Provision
More informationALLIANCE PIPELINE LIMITED PARTNERSHIP by its General Partner, ALLIANCE PIPELINE LTD. ( Alliance Canada or Alliance )
ALLIANCE PIPELINE LIMITED PARTNERSHIP by its General Partner, ALLIANCE PIPELINE LTD. ( Alliance Canada or Alliance ) BINDING OPEN SEASON March 28 May 30, 2018 For: Capacity Expansion, Capacity Turn Backs,
More informationFoothills Pipe Lines Ltd.
Page 1 SERVICE AGREEMENT SHORT TERM FIRM TRANSPORTATION SERVICE FOR TRANSPORTATION OF GAS This AGREEMENT made, 20 BETWEEN: AND: FOOTHILLS PIPE LINES LTD., a body corporate having an office and carrying
More informationAccount Representative II, Capacity Services
FERC Job Title Account Representative II, Capacity Services Description Members of this team are primarily responsible for assisting customers in transacting their daily business on the pipeline with a
More informationFrequently Asked Questions. DART Implementation
October 7, 2016 Frequently Asked Questions DART Implementation The Kinder Morgan West Region Pipelines, which include El Paso Natural Gas Company, LLC, (EPNG) and Mojave Pipeline Company, LLC, (Mojave)
More informationJim Cleary President, El Paso Western Pipelines. Platts Conference, Rockies Gas & Oil April 25, 2008
Jim Cleary President, El Paso Western Pipelines Platts Conference, Rockies Gas & Oil April 25, 2008 Cautionary Statement Regarding Forward-looking Statements This presentation includes forward-looking
More informationOPEN SEASON
OPEN SEASON 2012-2014 Rooted in Tradition, Branching to New Opportunities E astern Shore Natural Gas Company ( Eastern Shore ) is pleased to announce its Open Season 2012-2014. Eastern Shore has been serving
More informationGENERAL SERVICE GAS SCHEDULE C
Baltimore Gas and Electric Company -- Gas 33 GENERAL SERVICE GAS SCHEDULE C 1. AVAILABILITY: For use for 3 or more dwelling units served within a building through a single meter and all other non-domestic
More informationFebruary 10, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426
February 10, 2011 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Northern Border Pipeline Company 717 Texas Street, Suite 2400 Houston, TX
More informationTransportation. Tariff. Vector Pipeline Limited Partnership
Transportation Tariff of Vector Pipeline Limited Partnership (Effective April 1, 2004 Unless Indicated Otherwise) Communications Concerning this Tariff Should be Addressed to: Vector Pipeline Limited 38705
More informationALPINE ARCHAEOLOGICAL CONSULTANTS, INC. Pipeline Projects
Project: TransColorado Natural Gas Pipeline (FERC) Client: TransColorado Gas Transmission Company Alpine Archaeological Consultants conducted cultural resource inventory, archaeological monitoring, and
More informationTrailblazer Pipeline Company LLC Docket No. RP Exhibit No. TPC-0090
Trailblazer Pipeline Company LLC Docket No. RP18- -000 Docket No. RP18- -000 Schedule No. 1 Trailblazer Pipeline Company LLC Interstate Natural Gas Pipelines by Proxy Entity Proxy Entity (1) Interstate
More information