Report. Sheet Number: I Revision Number: I Page: N/A I R000 I 1 of 82

Size: px
Start display at page:

Download "Report. Sheet Number: I Revision Number: I Page: N/A I R000 I 1 of 82"

Transcription

1 ONTARIOPiiiiiiER GENERATION Report P-REP I PiCKERING NGS PERIODIC SAFETY REVIEW SUMMARY I ~ii:lassificalion: Sheet Number: I Revision Number: I Page: N/A I R000 I 1 of 82 Ontario Power Generation Inc., This document has been produced and distributed for Ontario Power Generation Inc. purposes only. No part of this document may be reproduced, published, converted, or stored in any data retrieval system, or transmitted in any form or by any means (electronic, mechanical, photocopying, recording, or otherwise) without the prior written permission of Ontario Power Generation Inc. Pickering NGS Periodic Safety Review Summary P-REP R Order Number: NIA Other Reference Number: Prepared by: /IJJ March 28, 2018 D. Duncan Date Principal Consultant Kinectrics (J/ ~~t Verified by: March 28, 2018 L. Watt Date Principal Consultant Kinectrics Approved by:,7jyjcutri(,{.tuu March 28, 2018 K. Martineau Date Department Manager Kinectrics Verified by: Verified by: Accepted by: G. Archinoff Executive Consultant Kinectrics March 28, 2018 Date ~ ')' ~7 March 28, 2018 J. Huang Date Senior Consultant Kinectr1 :/ / Jj ~ ~;: uly Manager Pickering Engineering - Aging Management & Strategic Initiatives

2 N/A R000 2 of 82 Table of Contents Page List of Tables and Figures... 4 Revision Summary... 5 Executive Summary INTRODUCTION OVERVIEW OF THE PERIODIC SAFETY REVIEW PROCESS OVERALL PLANT PERFORMANCE Management and Organization Plant Design Features Major Modifications Since Initial Operation Programs and Processes Continuous Improvement Fukushima Operating Experience Pickering B ISR Continued Operations Plan Radiation Protection Initiatives RESULTS OF THE SAFETY FACTOR REVIEW AND GAP EVALUATION ASSESSMENT OF OVERALL ACCEPTABILITY OF CONTINUED OPERATION Pickering NGS Strengths Identified in PSR Defence-in-Depth Acceptable Deviations THE INTEGRATED IMPLEMENTATION PLAN CONCLUSIONS OF THE PICKERING NGS PSR PSR2 Review and Acceptance by the CNSC Conclusion of the Assessment of Overall Acceptability of Operation of the Plant ACRONYMS AND ABBREVIATIONS REFERENCES... 30

3 N/A R000 3 of 82 Appendix A: PSR2 Results by CNSC Safety and Control Area...33 Appendix B: Strengths Used in the Defence-in-Depth Assessment...44 Appendix C: Global Issue, Proposed Resolution Statement, and IIP Action Summaries...48

4 N/A R000 4 of 82 List of Tables and Figures Page Table 1-1: Safety Factors Required by REGDOC Table A-1: Mapping of Safety Factors to Safety and Control Areas...34

5 N/A R000 5 of 82 Revision Summary Revision Number Date Comments D000 Oct 2017 Draft summary of Global Assessment Report issued for OPG review. (Candesco report K R00D01) D001 Feb 2018 Draft summary of Periodic Safety Review issued for OPG feedback. (Candesco report K R00D02) D002 Mar 2018 Addressed OPG feedback on K R00D02 and converted to OPG template. Issued for formal OPG review. R000 Mar 2018 Issued for use.

6 N/A R000 6 of 82 Executive Summary Ontario Power Generation (OPG) is planning to extend operation of the Pickering Nuclear Generating Station (NGS) to the end of Six of the station's eight nuclear reactors are operational. These are Pickering A Units 1 and 4 and Pickering B Units 5 to 8. Pickering A Units 2 and 3 are permanently shut down and will remain in a safe storage state throughout the period of extended operation. OPG has completed a Periodic Safety Review of Pickering NGS to support the decision to extend operation. A Periodic Safety Review is an internationally accepted method of evaluating the safety of an operating nuclear power plant against current standards and identifying practicable enhancements that would further increase safety. This document is a summary of the Periodic Safety Review, which is referred to as PSR2 because it builds on previous assessments. PSR2 comprises four major elements: 1. Production of a PSR2 Basis Document, which has been reviewed and accepted by Canadian Nuclear Safety Commission (CNSC) staff. 2. A comprehensive assessment of the station for each of fifteen Safety Factors that cover plant design, operation, management, safety analysis, radiological impact on the environment and radiation protection. 3. Production of a Global Assessment Report, which integrates information from the Safety Factor reviews, identifies practicable safety enhancements, and reaches a conclusion on the overall safety of the plant for the extended operating period. 4. Production of an Integrated Implementation Plan, which translates the safety enhancements identified in the Global Assessment Report into specific actions with target completion dates. CNSC staff has confirmed that the Integrated Implementation Plan fulfills regulatory requirements and meets CNSC staff expectations and is acceptable. PSR2 concludes that the current plant design, operation, processes and management system will ensure continued safe operation of the station both in the short term, and for operation to The Pickering NGS units will be operated only if fitness for service of the structures, systems and components important to safety is assured. OPG and the Pickering Station Leadership Team are committed to investing in the plant, and focusing the organization to strive for continued improvement in the plant condition, operation and performance. The Periodic Safety Review of Pickering NGS answers a series of questions to reach a conclusion on the safety of the station now and for operation to 2024 and to develop a set of safety enhancements that will be implemented. 1. What is the basis for saying the plant is safe today? The Global Assessment Report describes the current plant safety basis, including the plant design, management system and operating processes, and the means by which personnel are qualified and trained to safely execute their responsibilities. This description accounts for the extensive safety enhancements, including equipment replacements and upgrades,

7 N/A R000 7 of 82 that have been completed over the life of the station to date. The Global Assessment also describes the plant's multiple, overlapping barriers to the release of radioactivity to the environment. These multiple barriers result in extensive defence-in-depth for the current plant. The assessment describes how the enhancements that will be implemented via the Integrated Implementation Plan will further strengthen safety and defence-in-depth. 2. How does Pickering NGS compare to current safety standards? The operating licence issued by the CNSC already requires Pickering NGS to meet many safety standards that are current and that are consistent with global best practice. Nevertheless, the Safety Factor phase of PSR2 assesses the current plant design, processes, performance and management system against specific criteria and additional, modern safety standards that are not already identified as requirements in the operating licence. Differences whose resolution has the potential to enhance safety are identified as "Gaps". The Global Assessment collects Gaps that are similar in nature or that are on the same topic into a series of Global Issues. PSR2 identifies 51 Global Issues. 3. How are the Global Issues resolved? The Global Assessment identifies 23 Global Issues that can be resolved in a practicable way to enhance the safety of the station. For these Global Issues, the Global Assessment identifies a total of 35 potential safety enhancements, referred to as proposed Resolution Statements, each of which describes an action or actions that would resolve specific aspects of the associated Global Issue. The Global Assessment confirms that the other 28 Global Issues: Were either resolved subsequent to completion of the Safety Factor Reports so no further action is needed, or Are being addressed by ongoing activities outside of the PSR2 process, or Will be resolved through proposed Resolution Statements associated with another Global Issue, or Have no or low safety significance and a practicable resolution is not readily evident, or Will be addressed through combinations of the above. 4. How do the proposed Resolution Statements get implemented? The Integrated Implementation Plan, which was produced in the final phase of the Periodic Safety Review, takes the proposed Resolution Statements from the Global Assessment as input, and develops specific actions with target completion dates for each. The Integrated Implementation Plan identifies a total of 63 specific actions, each with documented completion criteria. These actions are included as an appendix to this document. More than half of the actions will be completed in 2018, and all actions are scheduled to be complete by the end of The safety of the plant is incrementally enhanced as each action in the Integrated Implementation Plan is completed. 5. Is the plant safe to operate in the short-term and through the period of extended operation to 2024? The Global Assessment includes a detailed assessment of the defence-in-depth of the station, considers the safety significance of the Global Issues and the safety benefits of the

8 N/A R000 8 of 82 proposed Resolution Statements, and performs an objective assessment which concludes that the station is currently safe and that it can be operated safely throughout the period of extended operation. Nineteen of the 35 proposed Resolution Statements and 35 of the 63 specific actions in the Integrated Implementation Plan support the fitness for service or address aging of structures, systems and components that are important to safety, such as the Fuel Channels in the reactor core, the Feeder piping that connects the Fuel Channels to the Heat Transport System piping, the Steam Generators, electrical cables, concrete structures, and other equipment and structures whose safe operation needs to be assured for the operating life of the station. OPG already has comprehensive processes in place to monitor the condition of structures, systems and components important to safety and to undertake the necessary maintenance or component replacement. As a result, many of the actions identified in PSR2 are already underway to ensure the continued fitness for service of structures, systems and components important to safety throughout the extended operating period. Eleven of the 35 proposed Resolution Statements and 23 of the 63 specific actions in the Integrated Implementation Plan will result in physical enhancements to the station to prevent or mitigate accidents, or in additional safety analysis to confirm the robustness of the plant against postulated accidents considering the period of extended operation. Several of these proposed Resolution Statements build on actions already completed or that are underway to enhance safety based on lessons learned from the Fukushima event that occurred in Japan in The specific PSR2 actions include design enhancements to restore power to Containment Air Coolers and Hydrogen Igniters to maintain containment integrity for Fukushima-type events, and establishing additional cooling water sources for Units 1,4 for such events. of these actions will ensure that in addition to already meeting the probabilistic safety goals, Units 1,4 will also meet the more challenging administrative safety goals. Units 5-8 already meet these goals and targets. The remaining 5 proposed Resolution Statements and 5 specific actions in the Integrated Implementation Plan pertain to specific enhancements to align the plant with modern safety standards in other areas. These include actions to interconnect the Units 1,4 and 5-8 Fire Protection Systems, to enhance the overall robustness of fire protection for the station. In summary, OPG has completed a Periodic Safety Review for Pickering NGS. The Periodic Safety Review has been performed consistent with Canadian regulatory requirements and accepted international practice. The Periodic Safety Review confirms the safety of the current plant and includes enhancements that will increase safety and strengthen defence-in-depth for the period of extended operation. Actions are presently underway to implement many of these enhancements, and actions for all of the enhancements are documented in the Integrated Implementation Plan. The Periodic Safety Review demonstrates that the current plant design, operation, processes and management system will ensure continued safe operation of the station both in the short term, and for extended operation to 2024.

9 N/A R000 9 of INTRODUCTION This report summarizes the methodology and results of a Periodic Safety Review (PSR) that OPG has conducted in support of extending the operation of Pickering NGS Units 1,4 and 5 through 8 to the end of Units 2 and 3 are permanently shut down and will remain in a safe storage state throughout the period of extended operation. This Periodic Safety Review builds on earlier OPG Integrated Safety Review (ISR) work performed for Pickering NGS and Darlington and other associated assessments, and so is called PSR2. The work has been performed consistent with the requirements of Canadian Nuclear Safety Commission (CNSC) REGDOC-2.3.3, Periodic Safety Reviews [R-1]. The objective of PSR2 is to provide an overall assessment of the safety of the plant, to identify practicable safety enhancements that will be implemented, and to assess the acceptability of Pickering NGS for continued operation over the PSR2 period taking the enhancements into account. PSR2 was performed according to the PSR2 Basis Document [R-2]. The PSR2 Basis Document describes four phases, the first of which is preparation of the Basis Document itself, which establishes the scope and methodology for PSR2. As noted in the PSR2 Basis Document [R-2], the current planning basis for Pickering NGS is that Pickering NGS units will operate until the end of To align with the anticipated expiry date of the next power reactor operating licence (PROL), for the purposes of PSR2 the review period is assumed to extend until the end of This review period reflects that some systems and components will be required to remain in service and available for a period of time after the end of commercial operation. The remaining three PSR2 phases are as follows: 1. Safety Factor Assessments. A Safety Factor is an aspect of safety to be assessed in a Periodic Safety Review. PSR2 assessed fifteen Safety Factors, listed in Table 1-1, which cover all aspects of plant design, operation, management, safety analysis, radiological impact on the environment and radiation protection. Each Safety Factor Report is comprised of assessments of review tasks suggested in IAEA SSG-25, Periodic Safety Review of Nuclear Power Plants [R-3], and REGDOC [R-1] and clarified in the PSR2 Basis Document [R-2]. The Safety Factor reports also document the results of the assessments of Pickering NGS against relevant modern Laws, Regulations, Codes and Standards that are not already requirements per the current operating licence and consider OPG Program effectiveness reviews. PSR2 includes a review of other sources of information that could provide useful information on the safety of continued operation. These complementary reviews considered actions in the earlier plan for extending operation of Pickering B to 2020, referred to as the Continued Operations Plan (COP) [R-4]. They also considered the Fukushima Action Items (FAIs) [R- 5] established after the Fukushima accident in 2011 to confirm and enhance safety at OPG stations. The Safety Factor phase identifies Gaps where the plant design or programs do not fully meet a review task or a safety significant element of a modern Law, Regulation, Code or Standard, or where a COP or FAI action is applicable to PSR2. Gaps represent

10 N/A R of 82 opportunities to enhance safety over and above current requirements, and are the input to the next phase of PSR2. 2. Global Assessment The assessment of the safety of continued operation is documented in the Pickering NGS Global Assessment Report [R-6]. The Global Assessment takes into account the Gaps identified in the Safety Factor Reports and complementary reviews. The Global Assessment consolidates similar Gaps into Global Issues, and develops proposed Resolution Statements for each Global Issue. The Global Assessment presents an assessment of the five levels of defence-in-depth, including consideration of other findings, such as Strengths (areas where Pickering NGS meets or exceeds modern requirements) and enhancements proposed through the Global Issue resolutions, in order to make a conclusion on the overall safety of extended operation of the plant. 3. Integrated Implementation Plan Preparation of the Integrated Implementation Plan (IIP) [R-7] involves transforming proposed Global Issue Resolution Statements resulting from the Global Assessment into actions with corresponding schedules for implementation prior to the end of Section 2.0 of this report presents an overview of the methodology of the Periodic Safety Review; Section 3.0 presents a high-level view of the safety of Pickering NGS at the time of PSR2 and identifies the major physical modifications that will be made to the station as part of the IIP to further enhance safety; Section 4.0 summarizes the review of the plant against modern expectations; Section 5.0 presents the assessment of acceptability of extended operation; Section 6.0 summarizes the IIP action groupings; and Section 7.0 presents the conclusion of the assessment of overall acceptability of operation of the plant.

11 N/A R of 82 Table 1-1: Safety Factors Required by REGDOC Safety Factor # Topic 1 Plant Design 2 Actual Condition of Structures, Systems and Components Important to Safety 3 Equipment Qualification 4 Aging 5 Deterministic Safety Analysis 6 Probabilistic Safety Assessment 7 Hazard Analysis 8 Safety Performance 9 Use of Experience from Other Plants and Research Findings 10 Organization, the Management System and Safety Culture 11 Procedures 12 Human Factors 13 Emergency Planning 14 Radiological Impact on the Environment 15 Radiation Protection

12 N/A R of OVERVIEW OF THE PERIODIC SAFETY REVIEW PROCESS The requirements for a Periodic Safety Review are defined in REGDOC [R-1]. The specific process followed in PSR2 is described in the PSR2 Basis Document [R-2] and outlined below. The PSR2 Basis Document, along with other PSR2 deliverables discussed in this section, fulfills the requirements of REGDOC Subsequent to acceptance of the PSR2 Basis Document by CNSC staff, the Safety Factor Reports and complementary reviews were completed, as discussed in Section 1.0. The Safety Factor Reports present the assessments of the review tasks for each Safety Factor, conformance with modern Laws, Regulations, Codes and Standards, and OPG Program effectiveness. In addition, the Safety Factor Reports include assessments of inputs from the following sources: 1. Pickering 1 and 4 integrated safety assessments performed during the Pickering A Return to Service; 2. Darlington ISR results applicable to PSR2, which included assessments of OPG programs and processes; and 3. OPG commitments to the CNSC and open CNSC action items. The Gaps identified in the Safety Factor Reports and the complementary reviews provided the input to the Global Assessment process, which consists of the following elements: 1. Consolidation of Gaps into Global Issues. Gaps with clear similarity in themes or topical areas are consolidated into a specific Global Issue. 2. Prioritization of the Global Issues. Each Global Issue is prioritized for its potential enhancement of nuclear safety. The prioritization process comprises deterministic and probabilistic considerations. 3. Development of proposed Global Issue resolutions. Global Issues with a high or medium potential impact on nuclear safety are evaluated for resolution. Where the Global Issues have not already been resolved subsequent to the Safety Factor phase, proposed Resolution Statements to address the Global Issues are developed. Generally, Global Issues for which the potential impact on nuclear safety is very low or low and a practicable solution is not readily evident are classed as Acceptable Deviations and enhancement actions are not developed. 4. Assessment of Defence-in-Depth. The adequacy of the provisions for defence-in-depth is confirmed by demonstrating that the Pickering NGS design and operation are aligned with the specific safety principles covered in IAEA SRS-46 [R-8], taking into account the Strengths and proposed Resolution Statements, and the impact of Acceptable Deviations. The Global Assessment Report documents the results of the elements listed above and the assessment of overall acceptability of extended operation of Pickering NGS over the PSR2 period.

13 N/A R of 82 The final phase of the Periodic Safety Review is the development of the IIP, which defines actions derived from the proposed Resolution Statements to address the Global Issues identified in the Global Assessment. The IIP Actions include new initiatives as well as existing initiatives. The latter generally comprise the ongoing execution of existing OPG programs, with the timeframe extended to cover operation to In addition to initial internal review by the Periodic Safety Review preparation teams, a number of targeted and overall reviews were performed during the Periodic Safety Review process. These reviews are: 1. Review of the methodologies, Gaps, Global Issues, proposed Resolution Statements, IIP Actions and overall conclusions by a third party Expert Panel, comprised of experienced individuals who are familiar with the design and operation of Pickering NGS (and other nuclear plants) and who have demonstrated leadership in the Nuclear Industry, participating in external review committees and initiatives. 2. Review of the Periodic Safety Review reports by OPG s PSR2 project staff members and by OPG Subject Matter Experts. 3. Review and approval of proposed Global Issue Resolution Statements, the overall Global Assessment Report conclusions, and the IIP Actions and schedule by OPG s Senior Management Scope Review Board [R-9]. 4. Authorization of and a commitment to execute the IIP by OPG s Senior Vice President Pickering. An action tracking and management system has been established for OPG and regulatory oversight, and an IIP change management process has been implemented to ensure that IIP Actions are completed according to the schedule in the IIP.

14 N/A R of OVERALL PLANT PERFORMANCE As noted above, the Safety Factor Reports contain assessments of the current state of the plant against modern expectations of programs and nuclear plant design. This section presents an overview of Pickering NGS's management system and organization, the current state of the plant's design, and an overview of current programs and processes to provide context for the Safety Factor and complementary reviews. In addition, the Global Assessment uses the current state of the programs and plant as a component in its assessment of the safety of extended operation of the plant. 3.1 Management and Organization Nuclear safety is a core value at OPG. This is reflected in OPG Policy N-POL-0001, Nuclear Safety Policy [R-10], that is endorsed by OPG s Board of Directors. The policy places nuclear safety as the overriding priority above that of cost, schedule and production. It requires that all employees conduct themselves in a manner consistent with the behaviour of a healthy nuclear safety culture. Such conduct requires that staff always consider how their everyday activities can impact on the fundamental safety functions of the station. OPG has established extensive programs and procedures and employs qualified staff to safely and effectively manage its nuclear plants. The programs and training were developed based on regulatory requirements, Canadian Standards Association (CSA) standards, International Atomic Energy Agency (IAEA) Guides, World Association of Nuclear Operators (WANO) recommendations and best nuclear industry practices from around the world. As part of continuous improvement, the programs and training are kept up to date, based on audits, self-assessments, benchmarking, and ongoing use of industry operating experience (OPEX). The existing corporate structure supports well-defined lines of responsibility throughout the organization. In particular, the appropriate functions are in place and adequately staffed to support and enhance nuclear safety at all levels of defence-in-depth. Pickering NGS management is committed to continuously strengthen the safety culture within the Pickering NGS organization. The health of safety culture is identified as a Strength for Pickering NGS (see Appendix B). 3.2 Plant Design Features Pickering NGS was designed and built to high standards using the principles of defence-in-depth. The design includes a number of robust active and passive safety characteristics, as well as engineered and administrative safety features. These characteristics and features prevent accidents and/or mitigate accident progression should one occur Major Modifications Since Initial Operation Numerous modifications to enhance safety have been made to Units 1,4 and Units 5-8 since the units commenced operation. These enhancements reflect OPG s continuous improvement philosophy and they bring the station into closer alignment with modern codes and standards. Key modifications that have been made to Units 1,4 include:

15 N/A R of 82 Replacement of Fuel Channels Shutdown System Enhancement by adding independent trip parameters and trip logic Replacement of reactor system control computers Comprehensive Fire Protection System upgrade Emergency Coolant Injection Recovery System safety enhancements to assure that fuel can be cooled under certain accident conditions Emergency Boiler Water Supply System installation to assure boiler cooling water makeup under certain accident conditions Installation of independent stack monitors to isolate containment when high radioactivity is present in the containment exhaust Safety enhancements to the Low and High Pressure Service Water Systems to improve the capacity and reliability of emergency cooling to nuclear systems Safety enhancements to the Uninterruptible Power Supply Instrument Air System reliability improvements Environmental qualification implementation Seismic improvements The key modifications that have been made to Units 5-8 are as follows: Installation of a third Emergency Power Generator Standby Generator governor and controls upgrade Fire protection upgrades in key areas of the plant In addition, a number of other major enhancements have been made that apply to Units 1,4 and Units 5-8. These are: Enhancement of the Electrical Power System for multiple sources of backup power (this has been identified as a Strength for Pickering NGS in Appendix B) Installation of Hydrogen Igniters and Passive Auto-catalytic Recombiners in containment Installation of Critical Safety Parameter Monitoring equipment Provision of Emergency Mitigating Equipment (EME) for Beyond Design Basis Accidents (BDBA) In summary, Pickering NGS has been continually upgraded and extensively modernized over its decades of operation to align it, as much as practicable, with current industry best practices. Pickering NGS will continue to implement physical changes to enhance safety. In particular, physical changes will be implemented as part of the IIP per the following Global Issues (GI): 1. GI-27 - Implement design changes to Pickering 1,4 to provide connection of the firewater system as an emergency cooling source to the Steam Generators, the Heat Transport System (HTS), and the calandria vessel to provide additional barriers for preventing accident progression to a severe accident. These safety enhancements augment the

16 N/A R of 82 existing EME provisions for post-bdba fuel cooling and will improve the margins to probabilistic safety goals; 2. GI-40 - Complete the installation of the Phase 2 Emergency Mitigating Equipment, which includes supplying cooling water, and power to essential loads via EME generators, to allow for operation of Air Cooling Units (ACUs), Hydrogen Igniters, and the Filtered Air Discharge System (FADS) during BDBAs to protect Containment integrity; and 3. GI-48 - Interconnect the Pickering 1,4 and Pickering 5-8 Fire Protection System water supplies to meet the safety intent of CSA N The IIP Actions and target completion dates are presented in Appendix C for these and the other Global Issues. 3.3 Programs and Processes Pickering NGS is operated and maintained in accordance with current nuclear industry codes and standards consistent with regulatory and safety requirements and industry best practice. Normal plant operation is controlled by detailed, validated and formally approved procedures. The programs comprising Pickering's Nuclear Management System are aligned with modern industry best practice, as evidenced by the few PSR2 Gaps identified in the related Safety Factor Reports, and they typically support multiple levels of defence-in-depth. Some of the key programs are listed and summarized below: Engineering Change Control: This program ensures that all modifications to Structures, Systems, and Components (SSCs) important to safety, including software and station engineered tooling, are planned, designed, installed, commissioned, decommissioned, placed into service or removed from service within the Safe Operating Envelope (SOE), design basis and plant licensing conditions. An aspect of this program, specifically the implementation of Human Factors Engineering, is identified as a Strength for Pickering NGS (see Appendix B). Equipment Reliability: This program defines the requirements for establishing and maintaining optimum levels of reliability for components important to nuclear safety, production, and environmental protection. Reliable performance of components means very low numbers of component failures, equipment is kept in good operating condition, and redundancy is maintained on key systems. This program is identified as a Strength for Pickering NGS. System Health reporting, which is an integral element of the Equipment Reliability Program, is also identified as a Strength for Pickering NGS (see Appendix B). Risk and Reliability Program: This program establishes a framework for the development and use of Probabilistic Safety Assessment (PSA) as a tool for determining the impact of station configuration changes on margins to PSA safety goals. An aspect of this program, specifically Operationalization of Probabilistic Safety Assessments, is identified as a Strength for Pickering NGS (see Appendix B). The PSA is used to support conduct of engineering, maintenance and operation at Pickering NGS.

17 N/A R of 82 Reactor Safety Program: This program defines the key elements for the management of issues related to deterministic nuclear safety analysis, generic safety issues (CANDU Safety Issues) and the following components of safe operation: o o o o Safety Analysis Basis SOE BDBA Management Safety Reports Deterministic Safety Analysis is assessed as a Strength for Pickering NGS. In addition, implementation of the SOE program is identified as a separate Strength (see Appendix B). Human Performance Program: This program provides guidance to reduce the probability and consequences of human error associated with the worker-machine interface required to operate, maintain and support Pickering NGS. Conventional Health and Safety, a key indicator of the Human Performance Program, has met or exceeded performance objectives and all applicable regulatory requirements. 3.4 Continuous Improvement The continuous improvement process through which OPG strives to improve the safety and performance of its nuclear power plants is longstanding, ongoing, and covers all aspects of operation. Current performance is compared to management expectations, industry standards of excellence, internal and external OPEX, and regulatory requirements to identify areas with opportunities for improvement, prepare action plans and incorporate enhancements. Established programs and processes are used to identify and address areas for improvement. OPG participates with industry partners in developing new or revised codes and standards, in research and development activities, in the application of emerging technologies, and in the exchange of OPEX. This is done through membership in organizations such as WANO, INPO, the CANDU Owners Group, the CSA and the Electric Power Research Institute. The following sections describe some of the more significant areas of ongoing improvement Fukushima Operating Experience Following the March 2011 earthquake in Japan, the safety systems at the Fukushima Daiichi Nuclear Power Plant operated as designed and the reactors were automatically shut down. However, the tsunami that followed disabled power to critical support systems. OPG acted promptly to understand what had happened at Fukushima Daiichi and confirmed that the OPG nuclear fleet remained safe for continued operation. OPG has completed additional assessments including those requested by the CNSC to review the impact of a similar event (that is, an event resulting in a total loss of all AC power, subsequently resulting in a total loss of heat sinks) at OPG stations. Enhancements to provisions to maintain or re-establish the Control, Cool, Contain and Monitor safety functions were assessed to determine those that are most practicable to implement and also meet specified requirements. Several enhancements

18 N/A R of 82 have been implemented and additional ones are being implemented (see the descriptions of GI-27 and GI-40 presented in Section and in Appendix C). From a PSA perspective, the Pickering NGS Units 1,4 and 5-8 Level 1 and Level 2 At-Power Internal Events Risk Assessments have been updated as part of the Fukushima Action Item update, and demonstrate the benefits of the Fukushima enhancements. A Mutual Aid Agreement for Nuclear Emergency Support [R-11] is in place with all Canadian nuclear utilities to provide support in the event of an emergency. OPG continues to have a strong presence in international forums and with all operators of Canadian nuclear generating stations to ensure that the lessons learned from the 2011 Fukushima accident are applied at Pickering NGS. Implementation of Fukushima Action Items is identified as a Strength for Pickering NGS (see Appendix B) Pickering B ISR Continued Operations Plan The purpose of the Pickering B ISR Continued Operations Plan (COP) was to document the progress of improvement actions that provide the technical basis for the continued operation of Pickering 5-8. These improvement actions were originally identified in the 2011 Pickering B ISR IIP and supplemented with new actions. Implementation of the COP has supplemented existing OPG Programs and processes to provide the technical basis for continued operation beyond 2015 for approximately five additional years to Radiation Protection Initiatives Consistent with the policy of continuous improvement, OPG identifies and implements strategic improvement initiatives which would further reduce radiation exposures, to ensure that doses will be As Low As Reasonably Achievable (ALARA) during continued operation. These strategic initiatives include radiation source elimination, shielding, and worker protection. The use of advanced technology to enhance radiation protection has been identified as a Strength for Pickering NGS (see Appendix B).

19 N/A R of RESULTS OF THE SAFETY FACTOR REVIEW AND GAP EVALUATION As discussed in Sections 1.0 and 2.0, the assessments presented in the Safety Factor Reports determine if the intent of the review tasks is met and whether the current state of the plant design and operation conforms with the safety-significant elements of modern Laws, Regulations, Codes, and Standards. A number of Gaps were identified in the Safety Factor Reports and in the complementary reviews of the Pickering B COP and the FAIs. However, none of the fifteen Safety Factor Reports or the two complementary reviews identified any fundamental safety issues. Overall, OPG has in place effective programs and processes for continued safe operation of the Pickering NGS through to the end of As noted in Section 2.0, Gaps with clear similarity in themes or topical areas are consolidated into a specific Global Issue. For example, governance issues, where their resolution would require modification to OPG governance documentation, are grouped into a single Global Issue. For Gaps related to the implementation or effectiveness of governance, but where the governance itself is adequate, a distinct Global Issue for Governance Implementation/Effectiveness Issues is identified. The consolidation of Gaps also considers the expected differences between the level of safety significance of Gaps and their resolutions. For example, Gaps related to Steam Generator Fitness for Service (FFS) and Fiberglass Reinforced Plastic Material FFS are consolidated into separate Global Issues. The Global Issues resulting from the consolidation of Gaps and for which proposed Resolution Statements are developed are listed in Appendix C. As noted in Section 2.0, resolutions are not developed for Global Issues for which the potential impact on nuclear safety is very low or low and a practicable resolution is not readily evident, or for which the resolution has already been completed, so these Global Issues are not listed in Appendix C. The appendix shows the proposed Resolution Statement(s) and IIP Actions associated with each Global Issue listed. The CNSC uses a Safety and Control Area (SCA) framework to assess licensee conformance with regulatory requirements and expectations. The 14 SCAs cover all facility programs. Appendix A shows how the Global Issues for which there are proposed Resolution Statements align with the 14 SCAs.

20 N/A R of ASSESSMENT OF OVERALL ACCEPTABILITY OF CONTINUED OPERATION Overall acceptability of operation of the plant for the extended operating period is evaluated on the basis of a balanced view of all PSR2 results. The evaluation considers enhancements associated with the Global Issue proposed Resolution Statements, Strengths, Acceptable Deviations, and the assessment of defence-in-depth. Global Issues have been discussed in Section 4.0 above; Strengths, Acceptable Deviations, and the Defence-in-Depth Assessment are discussed in this section. 5.1 Pickering NGS Strengths Identified in PSR2 The Pickering NGS Strengths are used in the Global Assessment as indicators of alignment with modern codes, standards, and practices, and in the development of proposed Resolution Statements for Global Issues. They are also used in the Defence-in-Depth Assessment described in Section 5.2 to demonstrate fulfillment of the safety requirements of defence-in-depth. REGDOC [R-1] defines strengths as current practices that are equivalent to or better than those established in modern codes and standards, practices. Positive findings in PSR2 are identified as possible strengths if there is clear evidence that Pickering NGS and/or OPG programs are equivalent to or surpass the provisions of modern requirements and practices or review task objectives. The following sources were reviewed for explicit statements of strength or discussions that indicated a strength: Safety Factor Reports Codes and Standards Assessments Complementary reviews of the Pickering B COP [R-4] and the Fukushima Action Items [R-5] Independent Third Party Assessments These sources, such as the CNSCs Regulatory Oversight Report [R-12], were used to corroborate indications identified in the three sources listed above. CNSC feedback on PSR2 A total of 24 Strengths are identified for Pickering NGS. They are listed in Appendix B, which also shows the levels of defence-in-depth supported by each Strength. 5.2 Defence-in-Depth Defence-in-depth is a comprehensive approach to safety. It establishes five levels, each designed to prevent an accident from occurring, to mitigate an accident should one occur, or to prevent an accident from degrading to a more serious event. The general objective of defence-in-depth is to ensure that a single equipment or human failure at one level of the five levels of defence, and even a combination of failures at one level of defence, would not jeopardize the integrity of subsequent levels. In this way, defence-in-depth provides multiple, redundant safety provisions for the protection of the public and the environment.

21 N/A R of 82 The approach taken in this assessment was based on IAEA Safety Report Series No. 46, Assessment of Defence in Depth for Nuclear Power Plants [R-8]. The approach analyzed the five independent levels of defence. All levels of defence-in-depth rely on multiple barriers of protection to prevent or limit equipment failures or human errors and mitigate the consequences should these failures or errors occur. The intent of the review was to confirm that, for each of the five levels of defence, the barriers will be effective for the period of extended operation. The scope considers the following elements of PSR2: The Strengths that have been identified in the PSR2 process, and how they support the baseline plant meeting the requirements of defence-in-depth. The positive impact on defence-in-depth of the proposed enhancements associated with the Global Issue proposed Resolution Statements. Confirmation that Acceptable Deviations do not have a significant adverse effect on defence-in-depth, either individually or in aggregate. The results of the assessment for the five levels of defence-in-depth are summarized below. Level 1 Prevention of abnormal operation and failures The first level of defence requires a high quality in the design and construction of the plant with barriers to prevent the occurrence of abnormal operating conditions. This is particularly important for the physical barriers surrounding the radioactive material in the fuel. The assessment has confirmed that effective Level 1 barriers are ensured through the original conservative design supplemented by design improvements implemented since initial operation (some of which are discussed in Section 3.2), comprehensive programs in place, including effective operating and maintenance programs to ensure continued fitness for service and operation within the design basis, and ongoing continuous improvements based on national and international OPEX and evolving regulatory requirements. Given the focus and priority placed on equipment reliability to address the findings in the areas of equipment condition, this level of defence will continue to be strong and effective for Pickering NGS. Level 2 Control of abnormal operation and detection of failures The second level of defence is the provision of barriers to prevent or control abnormal process conditions, with an objective to bring the plant back to normal operating conditions. The plant design possesses a number of strong features regarding Level 2 defence-in-depth. Digital computerized monitoring is used extensively in the design. Automatic reactor control features detect and respond to abnormal conditions before these conditions progress to the point that safety provisions in the next level of barriers are required to act. A well-established framework of operating procedures is in place to respond to equipment malfunctions in a timely manner, thereby ensuring that the plant stays within its well-defined SOE. The assessment of Level 2 defence-in-depth confirms that the provisions in place are mature and robust and will be enhanced by completion of proposed Resolution Statements related to Level 2.

22 N/A R of 82 Level 3 Control of accidents within the design basis The third level of defence is the barriers to minimize the consequences of accidents should they occur by providing inherent safety features, fail-safe design, additional equipment, and mitigating procedures. Pickering NGS has multiple heat removal systems supported by multiple electrical systems. The Pickering NGS Safety Reports [R-13][R-14] demonstrate the effectiveness of the automatic responses of the safety systems and that regulatory dose limits are met for postulated accidents. In addition, confirmation of the effectiveness of the Level 3 barriers has been significantly enhanced with the completion of the CNSC S-294 [R-15] compliant PSA. The station design is of a high quality that includes extensive mitigating provisions, comprehensive accident management procedures, and a robust set of safety analyses. Twenty-one strengths associated with Level 3 defences support the conclusion that Pickering NGS has strong Level 3 barriers. Level 4 Control of severe plant conditions, including prevention of accident progression and mitigation of the consequences of severe accidents The fourth level of defence includes barriers to prevent severe plant conditions or control them should they occur, for example, operator action to maintain water in the calandria such that fuel cooling is assured. The measures considered at the first three levels of defence will ensure maintenance of the structural integrity of the core and limit potential radiation hazards for members of the public for accidents within the design basis. Pickering NGS Units 1,4 and 5-8 also have complementary design features for BDBAs. These design features include redundant power systems, design adequacy for internal and external hazards, and hydrogen igniters and Passive Auto-catalytic Recombiners. If actions identified in Operating Manuals and Abnormal Incident Manuals are unsuccessful in terminating the accident progression, actions will be taken per the Emergency Mitigating Equipment Guidelines to prevent the accident from progressing to a severe accident. In addition, OPG has adequate plans, staff, facilities and equipment in place for dealing with a full range of emergencies. The complete implementation of Severe Accident Management Guidelines and the OPEX from the 2011 Fukushima event has also significantly strengthened this level. OPG is continuing to implement enhancements, namely, completion of the installation of the Phase 2 Emergency Mitigating Equipment, which includes supplying cooling water, and power to essential loads via EME generators, to allow for operation of ACUs and Hydrogen Igniters for Pickering NGS Units 1,4 and 5-8, and connection of the firewater system to the EBWS, the HTS, and the calandria as an emergency cooling source for Pickering NGS Units 1,4 (see IIP Actions for GI-40 and GI-27, respectively, in Appendix C), that will further strengthen defence-in-depth Level 4. Level 5 Mitigation of radiological consequences of significant releases of radioactive materials The fifth level of defence is associated with the management and mitigation of off-site radiological consequences should an accident occur.

23 N/A R of 82 The coordinated emergency response capability of the various response organizations and the implementation of OPEX from the 2011 Fukushima event support the strength of the Level 5 defence-in-depth provisions. Implementation of the planned improvement initiatives will further enhance the barriers for Level 5 at Pickering NGS. In conclusion, a review of the five levels of defence performed in support of the Global Assessment has confirmed that Pickering NGS meets the defence-in-depth requirements, as a robust set of barriers is in place for the five levels of defence. The adequacy of these provisions has been confirmed by the comprehensive PSAs. No additional Gaps were identified or improvements required beyond those being addressed by the Global Issue proposed Resolution Statements. The levels of defence, particularly Levels 3 and 4, will be further strengthened as the planned safety improvements are implemented. 5.3 Acceptable Deviations An assessment was performed to determine if Gaps that were not individually significant could become more significant when their collective effect was considered. The interaction assessment focused on the Gaps that were categorized as Acceptable Deviations, which includes Gaps with a very low safety significance or low overall safety significance for which a practicable solution is not readily evident and, consequently, there would be no further consideration beyond the Global Assessment. The assessment of Acceptable Deviations confirms there is no impact on the conclusion of the Defence-in-Depth Assessment or the Global Assessment, either individually or in aggregate.

24 N/A R of THE INTEGRATED IMPLEMENTATION PLAN As discussed in Section 2.0, the IIP is completed in the final phase of the Periodic Safety Review process and defines the actions derived from the proposed Resolution Statements to address the Global Issues identified in the Global Assessment. The Global Assessment identified 51 Global Issues. Dispositions of 28 of these Global Issues were categorized in the Global Assessment as follows and, thus, proposed Resolution Statements are not required: The Global Issue is either resolved subsequent to completion of the Safety Factor Reports so no further action is needed, or The Global Issue is being addressed by ongoing activities outside of the PSR2 process, or The Global Issue will be resolved through proposed Resolution Statements associated with another Global Issue, or The Global Issue has very low safety significance or low safety significance and a practicable resolution is not readily evident, or The Global Issue will be addressed through combinations of the above. The Global Assessment identified 35 proposed Resolution Statements for the remaining 23 Global Issues. Specific actions to enhance safety were prepared in the IIP for these proposed Resolution Statements, resulting in 63 IIP Actions. These 63 IIP Actions may be grouped as follows: 35 specific actions to support fitness for service or address aging of SSCs that are important to safety, such as the Fuel Channels and the Heat Transport System piping; 23 specific actions to implement physical enhancements to the station to prevent or mitigate accidents, or perform additional safety analysis to confirm the robustness of the plant against postulated accidents considering the period of extended operation; and 5 specific actions to align the plant with modern safety standards in other areas. More than half of these actions are scheduled in the IIP to be completed in 2018, and all actions are scheduled to be complete by the end of The IIP Actions and target completion dates are shown in Appendix C. The Expert Panel concluded that the IIP provided a balanced and comprehensive set of activities which addresses the results from the Global Assessment. The Expert Panel also concluded that the IIP had been prepared in a manner consistent with the regulatory requirements and with the PSR Basis Document and that successful IIP implementation will ensure that the Pickering station will be safe to operate both in the short term and for extended operation.

25 N/A R of CONCLUSIONS OF THE PICKERING NGS PSR2 7.1 PSR2 Review and Acceptance by the CNSC According to CNSC REGDOC [R-1], the reports produced in each phase of a Periodic Safety Review must be submitted to the CNSC. In particular, CNSC staff confirms that the PSR2 Basis Document is acceptable, reviews the Safety Factor Reports and the Global Assessment Report, and confirms that the IIP is acceptable. The CNSC accepted the PSR2 Basis Document [R-2]. The PSR2 Safety Factor Reports and the complementary reviews were submitted to the CNSC. CNSC staff reviewed the reports and their comments have been taken into account in the subsequent elements of PSR2, including the identification of additional Gaps. The Global Assessment Report [R-6] was submitted to the CNSC. CNSC staff reviewed the Global Assessment Report and their comments have been taken into account in the IIP. The IIP [R-7] was submitted to CNSC staff, who confirmed that it fulfills regulatory requirements and meets CNSC staff expectations and is acceptable [R-16]. 7.2 Conclusion of the Assessment of Overall Acceptability of Operation of the Plant The Periodic Safety Review demonstrates that Pickering NGS will operate safely during the extended operating period. Activities are in progress and planned that will further enhance safe plant operation. The justification for this conclusion is based on the following: Current Plant State: i) The Pickering Station Leadership Team has effectively aligned the organization to significantly improve performance in a number of key focus areas. Station performance improvement has been recognized through industry reviews. The plant is safe, and is operated safely. ii) iii) iv) OPG has comprehensive programs in place to ensure the condition of SSCs important to safety at Pickering 1,4 and Pickering 5-8 is well understood, to assess the level of fitness for service, and to effectively take action to maintain good plant condition. This has led to continuous improvement in the condition of the plant, and plant performance. OPG has made significant improvements to the Pickering plant design and processes. The plant design enhancements, discussed in Section 3.2, together with the process enhancements, closely align the plant with safety-significant requirements of modern codes and standards (which in some cases are beyond current requirements), and enhance defence-in-depth. In particular, enhancements made in response to the 2011 Fukushima accident have reduced, and will further reduce, the risk associated with BDBAs. Design and operation of the plant meet the current deterministic safety analysis dose limits, and processes are in place to ensure the safety analysis accounts for any additional aging effects associated with extended operation. The Probabilistic Safety Assessment shows that the OPG risk-based Safety Goals for Core Damage Frequency and Large Release Frequency are met. Initiatives have been proposed to further enhance the margins to these goals.

26 N/A R of 82 v) Radiological dose performance and environmental impact performance are significantly better than regulatory limits. Programs in place ensure the ongoing effectiveness of the radiological protection of workers, the public and the environment. Results of the Periodic Safety Review: i) The Global Assessment identifies 24 Strengths (refer to Section 5.1), indicating that Pickering NGS is well aligned with modern codes, standards and practices in key areas. ii) iii) iv) The Global Assessment identifies 51 Global Issues. Proposed Resolution Statements for Global Issues are developed, and many are in progress to further enhance safety, including enhancements to further reduce the risk associated with BDBAs (see IIP Actions for Global Issues GI-27 and GI-40 in Appendix C). Most of the proposed Global Issue proposed Resolution Statement actions reflect existing work programs and plans at the station. In particular, for the Global Issues of highest safety significance (that is, fitness for service to cover the extended operating period), OPG was already fully aware of these issues and is actively working on addressing them for the extended operating period. None of the Global Issues identify a safety concern that requires additional planned or urgent action to be taken. Specific IIP Actions in the Integrated Implementation Plan have been identified to address the Global Issues. The Global Issues of highest safety significance pertain to fitness for service of SSCs important to safety over the extended operating period. Units will be operated only if fitness for service of SSCs important to safety is assured. OPG has comprehensive programs in place to ensure the condition of SSCs important to safety is well understood, to assess the level of fitness for service, and to effectively take action to maintain good plant condition. The proposed Resolution Statements for these Global Issues will ensure the ongoing fitness for service of SSCs for the operational life of the plant, and these plans are actively being progressed. The Global Assessment includes a Resolution Statement that proposes the investigation and implementation of design, operational, and/or analytical options to further enhance margins to probabilistic Safety Goals. The IIP commits to providing alternative cooling sources and to enhance power supplies to systems that will further protect Containment integrity under accident conditions. v) The assessment of Acceptable Deviations confirms there is no impact on the conclusion of the Global Assessment, either individually or in aggregate. vi) The assessment of defence-in-depth of the plant includes a detailed review and confirmation of the adequacy of the provisions for each level of defence. This is based on an assessment of how the related safety principles for each level of defence-in-depth are met, taking into account the plant design, the ongoing operations and maintenance activities at the plant, the identified Strengths, as well as the proposed enhancements identified in the Global Assessment process and that will be implemented through the IIP. The assessment also accounts for the aggregate effect of Acceptable Deviations. The Defence-in-Depth Assessment shows that Pickering Units 1,4 and Pickering Units 5-8 design and operation have adequate and effective barriers in all levels of defence-in-depth.

27 N/A R of 82 vii) viii) The IIP comprises a total of 63 specific actions, which will implement the 35 Global Assessment proposed Resolution Statements. More than half of the specific actions in the IIP are planned for completion by the end of 2018, and all are planned for completion by the end of OPG s organizational structure and management system provides the requisite processes, tools, resources and oversight that will ensure continued safe operation of the plant. In summary, the current plant design, operation, processes and management system will ensure continued safe operation of Pickering 1,4 and Pickering 5-8 both in the short term, and for extended operation. of the actions identified in the IIP will further enhance safety. OPG and the Pickering Station Leadership Team are committed to investing in the plant, and focusing the organization to strive for continued improvement in the plant condition, operation and performance.

28 N/A R of ACRONYMS AND ABBREVIATIONS AFS AIFB ALARA BDBA CA CANDU CHR CNSC COP CSA CSI CT DA EBWS EME EQ EQA FAI Available for Service Auxiliary Irradiated Fuel Bay As Low As Reasonably Achievable Beyond Design Basis Accident Condition Assessment CANada Deuterium Uranium Component Health Report Canadian Nuclear Safety Commission Continued Operations Plan Canadian Standards Association CANDU Safety Issue Calandria Tube Deaerators Emergency Boiler Water System Emergency Mitigating Equipment Environmental Qualification Environmental Qualification Assessment Fukushima Action Item FCRP2024 Fuel Channel Readiness Plan in Support of Operation to the end of 2024 FFS FADS FM GI HTS IAEA IAM IFB IIP INPO ISR LCMP Fitness for Service Filtered Air Discharge System Fueling Machine Global Issue Heat Transport System International Atomic Energy Agency Integrated Aging Management Irradiated Fuel Bay Integrated Implementation Plan Institute of Nuclear Power Operations Integrated Safety Review Life Cycle Management Plan

29 N/A R of 82 LISS LOCA LOF MVVP NFPA NGS NOP NPP OPEX OPG PIP PLBB PRD PROL PSA PSR Liquid Injection Shutdown System Loss of Coolant Accident Loss of Flow Main Vacuum Volume Pump National Fire Protection Association Nuclear Generating Station Neutron Overpower Nuclear Power Plant Operating Experience Ontario Power Generation Periodic Inspection Program Probabilistic Leak Before Break Pressure Relief Duct Power Reactor Operating Licence Probabilistic Safety Assessment Periodic Safety Review PSR2 Periodic Safety Review 2 RB RS SBLOCA SCA SHR SOE SSCs VB WANO Reactor Building Resolution Statement Small Break Loss of Coolant Accident Safety and Control Area System Health Report Safe Operating Envelope Structures, Systems and Components Vacuum Building World Association of Nuclear Operators

30 N/A R of REFERENCES [R-1] [R-2] [R-3] [R-4] [R-5] [R-6] [R-7] [R-8] [R-9] CNSC Regulatory Document, Periodic Safety Reviews, REGDOC-2.3.3, April OPG Report, Pickering NGS Periodic Safety Review 2 (PSR2) Basis Document, P-REP R002, June IAEA Specific Safety Guide, Periodic Safety Review of Nuclear Power Plants, SSG-25, March OPG Report, Pickering 5-8 Continued Operations Plan Review in Support of PNGS Periodic Safety Review 2 (PSR2), P-REP R000, January OPG Report, Fukushima Action Item Review in Support of PNGS Periodic Safety Review 2 (PSR2), P-REP R000, February 6, OPG Report, Pickering NGS Global Assessment Report, P-REP R001, February OPG Report, Pickering NGS Periodic Safety Review 2 (PSR2) Integrated Implementation Plan, P-REP R001, March 1, IAEA Report, Assessment of Defence in Depth for Nuclear Power Plants, Safety Report Series No. 46, February OPG Plan, Pickering 2024 Securing Ontario s Clean Power Future Scope Review Board Terms of Reference, P-PLAN R001, February 02, [R-10] OPG Policy, Nuclear Safety Policy, N-POL-0001-R003, April 7, [R-11] OPG File, Mutual Aid Agreement for Nuclear Emergency Support, N-LEGL R0, November 30, [R-12] CNSC Reports, Regulatory Oversight Report for Canadian Nuclear Power Plants: 2014, 2015, [R-13] OPG Safety Report, Pickering Nuclear 1-4 Safety Report: Part 3 Accident Analysis, NA44-SR R004, October 31, [R-14] OPG Safety Report, Pickering Nuclear 5-8 Safety Report: Part 3 Accident Analysis, NK30-SR R004, October 30, [R-15] CNSC Standard, Probabilistic Safety Assessment (PSA) for Nuclear Power Plants, S-294, April 2005.

31 N/A R of 82 [R-16] CNSC Correspondence, A. Viktorov to R. Lockwood, Pickering NGS: CNSC Staff Acceptance of Pickering NGS Periodic SafetyReview 2 (PSR2) Integrated Implementation Plan (IIP), Revision 1, e-doc , OPG File No. P-CORR R000, March 2, [R-17] OPG Report, Pickering NGS PSR2 Safety Factor 1 Report: Plant Design, P-REP R000, March [R-18] OPG Report, Pickering NGS PSR2 Safety Factor 2 Report: Actual Condition of Structures, Systems and Components Important to Safety, P-REP R001, March [R-19] OPG Report, Pickering NGS PSR2 Safety Factor 3 Report: Equipment Qualification, P-REP R000, July [R-20] OPG Report, Pickering NGS PSR2 Safety Factor 4 Report: Aging, P-REP R000, July [R-21] OPG Report, Pickering NGS PSR2 Safety Factor 5 Report: Deterministic Safety Analysis, P-REP R000, March [R-22] OPG Report, Pickering NGS PSR2 Safety Factor 6 Report: Probabilistic Safety Assessment, P-REP R000, March [R-23] OPG Report, Pickering NGS PSR2 Safety Factor 7 Report: Hazard Analysis, P-REP R000, March [R-24] OPG Report, Pickering NGS PSR2 Safety Factor 8 Report: Safety Performance, P-REP R000, December [R-25] OPG Report, Pickering NGS PSR2 Safety Factor 9 Report: Use of Experience from Other Plants and Research Findings, P-REP R000, October [R-26] OPG Report, Pickering NGS PSR2 Safety Factor 10 Report: Organization, the Management System and Safety Culture, P-REP R000, December [R-27] OPG Report, Pickering NGS PSR2 Safety Factor 11 Report: Procedures, P-REP R000, October [R-28] OPG Report, Pickering NGS PSR2 Safety Factor 12 Report: Human Factors, P-REP R000, December [R-29] OPG Report, Pickering NGS PSR2 Safety Factor 13 Report: Emergency Planning, P-REP R000, December [R-30] OPG Report, Pickering NGS PSR2 Safety Factor 14 Report: Radiological Impact on the Environment, P-REP R000, December 2016.

32 N/A R of 82 [R-31] OPG Report, Pickering NGS PSR2 Safety Factor 15 Report: Radiation Protection, P-REP R001, April [R-32] OPG Report, Pickering NGS Periodic Safety Review 2: Codes and Standard Reviews for Safety Factors 2 (Actual Condition of SCCs), 3 (Equipment Qualification), and 4 (Aging), P-REP R000, July [R-33] OPG Report, Pickering PSR2 Law, Regulation, Code and Standard Reviews Associated with Safety Factors 9, 11, and 15, P-REP R000, September [R-34] OPG Report, Pickering PSR2 Law, Regulation, Code and Standard Reviews Associated with Safety Factors 8, 10, 12, 13, and 14, P-REP R000, December [R-35] OPG Report, Pickering PSR2 Law, Regulation, Code and Standard Reviews Associated with Safety Factors 1, 5, 6, and 7, P-REP R000, March [R-36] CNSC Reports, CNSC Staff Integrated Safety Assessment of Canadian Nuclear Power Plants for 2012, [R-37] CNSC Regulatory Document, Deterministic Safety Analysis, REGDOC-2.4.1, May [R-38] CNSC Regulatory Document, Probabilistic Safety Assessment (PSA) for Nuclear Power Plants, REGDOC-2.4.2, May 2014.

33 N/A R of 82 Appendix A: PSR2 Results by CNSC Safety and Control Area REGDOC [R-1] specifies that PSRs be comprised of the assessments of 15 Safety Factors, which are identical to the 14 Safety Factors specified in the IAEA's guidance, SSG-25 [R-3], plus Radiation Protection. The CNSC evaluates and reports nuclear power plant safety performance according to 14 Safety and Control Areas (SCA) to confirm that licensees meet expectations for the provision of measures to protect health, safety and the environment and with respect to Canada's international obligations. Although the Safety Factors and the SCAs are not the same, there are significant similarities. The PSR2 Global Issues are presented in this appendix in the context of the Safety and Control Areas to facilitate understanding of how the PSR2 results support and will enhance performance in each of the SCAs. Table A-1 lists the SCAs in the first column and the Safety Factors in the column headings in the first row. A check mark in a cell indicates that the Safety Factor correlates partially or totally to the SCA. In many cases, several Safety Factors are related to a single SCA, and some safety factors are relevant to multiple SCAs. Shading in a row indicates that the SCA is not within the scope of the Periodic Safety Review. The table indicates that the emphasis of a Periodic Safety Review is on reactor safety, including design, operating programs and performance, safety analysis, radiation protection and impact on the environment. Licensee programs that are not directly related to reactor safety, such as security, safeguards, conventional health and safety, etc., are subject to regulatory oversight outside of the Periodic Safety Review process. This appendix states the purpose of each SCA, identifies the Safety Factors applicable to each SCA and summarizes the findings of PSR2 for each SCA. Appendix C provides a composite list of the Global Issues and Global Issue proposed Resolution Statements that are discussed under each SCA, as well as the IIP Actions associated with each proposed Resolution Statement. The CNSC publishes an annual regulatory oversight report, organized by SCA, which provides the CNSC's assessment of the nuclear power industry's safety performance. Each SCA discussion in this section includes the CNSC's rating of Pickering NGS's safety performance for that SCA from the reports of the last five years as an indicator of future safety performance. This is followed by a summary of PSR2 results indicating Pickering NGS's conformance with modern requirements and expectations, which has a direct bearing on extended operation. The CNSC has assessed Pickering Nuclear Generating Station's overall performance as satisfactory or fully satisfactory over the last five years [R-36][R-12].

34 Safety Factor Plant Design Actual Condition of Structures, Systems and Components Important to Safety Equipment Qualification Aging Deterministic Safety Analysis Probabilistic Safety Assessment Hazard Analysis Safety Performance Use of Experience from other NPPs and Research Findings Organization, the Management System and Safety Culture Procedures Human Factors Emergency Planning Radiological Impact on the Environment Radiation Protection Report N/A R of 82 Table A-1: Mapping of Safety Factors to Safety and Control Areas Safety and Control Area Management system Human performance management Operating performance Safety analysis Physical design Fitness for service Radiation protection Conventional health and safety Environmental protection Emergency management and fire protection Waste management Security Safeguards and non-proliferation Packaging and transport

35 N/A R of 82 A.1 Management System The Management System SCA covers the framework that establishes the processes and programs required to ensure an organization achieves its safety objectives, continuously monitors its performance against these objectives, and fosters a healthy safety culture. PSR2 addressed specific aspects of the Management System SCA in the Organization, Management System, and Safety Culture [R-26], Procedures [R-27], Use of Experience from Other Nuclear Power Plants and Research Findings [R-25], and Human Factors [R-28] Safety Factors. In addition to the 42 review tasks associated with these Safety Factors, OPG programs and 12 modern codes and standards related to the management subject area were assessed. The assessment of the Safety Factor on Organization, Management System, and Safety Culture states that the review has confirmed that the Pickering NGS organization, the management system and safety culture are adequate and effective for ensuring the safe operation of the plant [R-26]. There are no Global Issues listed in Appendix C that are associated with the Management System SCA. The CNSC has consistently assessed the Management System SCA as satisfactory over the last five years [R-36][R-12]. The positive results of PSR2 related to this SCA, including Strengths shown in Appendix B, S-01, Management, S-10, Healthy Safety Culture, and S-19, Use of Operating Experience and Research Findings, indicate that this will continue during extended operation. A.2 Human Performance Management The Human Performance Management SCA covers activities that enable effective human performance through the development and implementation of processes that ensure that licensees have sufficient staff in all relevant job areas with the necessary knowledge, skills, procedures and tools in place to safely carry out their duties. PSR2 addressed specific aspects of human performance in the Organization, Management System, and Safety Culture [R-26], Procedures [R-27], and Human Factors [R-28] Safety Factors. The assessment of the Safety Factor on Human Factors states that the review "has confirmed that the various human factors that may affect the safe operation of Pickering NGS have been appropriately addressed [R-28]. There are no Global Issues listed in Appendix C that are associated with the Human Performance Management SCA.

36 N/A R of 82 The CNSC has consistently assessed the Human Performance Management SCA as satisfactory over the last five years [R-36][R-12]. The positive results of PSR2 related to this SCA, including Strengths shown in Appendix B, S-10, Healthy Safety Culture, S-16, Human Factors Engineering Program, S-20, Minimum Staff Complement Management, and S-21, Training, indicate that this will continue during extended operation. A.3 Operating Performance The Operating Performance SCA includes an overall review of the conduct of the licensed activities and the activities that enable effective performance. PSR2 addressed specific aspects of the Operating Performance SCA in the Safety Performance [R-24], Use of Experience form Other Plants and of Research Findings [R-25], Organization, Management System, and Safety Culture [R-26], and Procedures [R-27] Safety Factors. The assessment of the Safety Factor on Safety Performance states that the review has confirmed that the safety performance indicators and records of operating experience, including the evaluation of root causes of plant events, exist and are utilized to ensure the safe operation of Pickering NGS [R-24]. The assessment of the Safety Factor on Use of Experience from Other Nuclear Power Plants and Research Findings states that the review has confirmed for Pickering NGS that there is adequate feedback of relevant experience from other nuclear power plants and from findings of research, and that this is used to introduce reasonable and practicable safety improvements at the plant or in the operating organization [R-25]. There are no Global Issues listed in Appendix C that are related to the Operating Performance SCA. The CNSC has consistently assessed the Operating Performance SCA as satisfactory or fully satisfactory over the last five years [R-36][R-12]. The positive results of PSR2 related to this SCA, including Strengths shown in Appendix B, S-01, Management, S-10, Healthy Safety Culture, S-18, Comprehensive Set of Performance Indicators, and S-19, Use of Operating Experience and Research Findings, indicate that this will continue during extended operation.

37 N/A R of 82 A.4 Safety Analysis The Safety Analysis SCA pertains to maintaining the safety analysis that supports the overall safety case for the facility. Safety analysis is a systematic evaluation of the potential hazards associated with the conduct of a proposed activity or facility and considers the effectiveness of preventive measures and strategies in reducing the effects of such hazards. PSR2 addressed specific aspects of the Safety Analysis SCA in the Deterministic Safety Analysis [R-21], Probabilistic Safety Assessment [R-22], and Hazard Analysis [R-23] Safety Factors. The assessments in the deterministic safety analysis and probabilistic safety assessment Safety Factor Reports state that the analysis-related programs and procedures at OPG are comprehensive, resulting in a systematic and disciplined approach to identifying, prioritizing and addressing safety analysis issues [R-21][R-22]. The hazard analysis Safety Factor Report states that the review has confirmed the adequacy of protection of Pickering NGS against internal and external hazards, with account taken of plant design (including confirmation that analyses/methods address the condition of SSCs important to safety), site characteristics, and current analytical methods, safety standards and knowledge [R-23]. The assessments confirmed that analyses documented in the Safety Report or stand-alone assessments demonstrate that regulatory safety limits and industry best practice safety goals are met [R-22]. Five Global Issues related to the Safety Analysis SCA are listed in Appendix C. These may be summarized as follows: 1. GI-24, GI-25, and GI-31: The Resolution Statements for GI-24 and GI-25 propose updating the deterministic analysis or assessment to demonstrate the safety of the plant to the end of the extended operating period. The Resolution Statements for GI-31 propose completion of the implementation plan for REGDOC [R-37] with consideration of extended operation. Work on GI-31 resolution is in progress. 2. GI-27 and GI-32: The Resolution Statements for GI-27 propose completion of actions from the PSA improvement plan, and consideration of additional practicable design, operational and/or analytical enhancements that will improve the margins to the probabilistic safety goals. The Resolution Statement for GI-32 proposes completion of the implementation plan for REGDOC [R-38] with consideration of extended operation. The work on these Resolution Statements is in progress. The CNSC has consistently assessed the Safety Analysis SCA as satisfactory or fully satisfactory over the last five years [R-36][R-12]. The positive results of PSR2 related to this SCA, including Strengths shown in Appendix B, S-06, Deterministic Safety Analysis, S-07, Probabilistic Safety Assessment, S-08, Operationalization of Probabilistic Safety Assessment, and S-09, Implementation of Safe Operating Envelope Program, and the enhancements to safety through resolution of the Global Issues, indicate that this will continue during extended operation.

38 N/A R of 82 A.5 Physical Design The Physical Design SCA relates to activities that affect the ability of structures, systems and components to meet and maintain their design basis, given new information arising over time and taking changes in the external environment into account. PSR2 addressed specific aspects of the Physical Design SCA in the review of Plant Design [R- 17], Equipment Qualification [R-19], Aging [R-20] and Actual Condition of SSCs Important to Safety [R-18] Safety Factors. The majority of review tasks for the Aging [R-20] and Actual Condition of SSCs Important to Safety [R-18] Safety Factors are relevant to the Fitness for Service SCA, so these aspects are discussed in Section A.6. Four Global Issues shown in Appendix C are related to the Plant Design and Equipment Qualification Safety Factors. They may be summarized as follows: 1. There are two Global Issues related to equipment qualification. The Resolution Statement for GI-9 proposes documenting the seismic capacity of spent fuel basket stacking arrangements. The Resolution Statement for GI-12 ensures that equipment qualifications will continue to be valid for operation beyond the year The work on GI-12 is actively progressing. 2. There are two Global Issues related to fire protection. The Resolution Statement for GI-47 proposes installation of wrenches and locks on the Pickering 058 Yard Fire Protection System to satisfy Fire Protection Code NFPA 24. This work has been initiated. The Resolution Statement for GI-48 proposes connecting the Pickering 1,4 and Pickering 5-8 Fire Protection Systems to satisfy the intent of CSA N293. The Plant Design Safety Factor Report states that the review has confirmed, by assessment against the current licensing basis and applicable standards, requirements and practices, that the design of Pickering NGS and its documentation are adequate [R-17]. The CNSC has consistently assessed the Physical Design SCA as satisfactory over the last five years [R-36][R-12]. The positive results of PSR2 related to this SCA, including Strengths shown in Appendix B, S-14, Heat Removal Systems, S-15, Electric Power System, and S-17, Environmental Qualification Program. and the enhancements to safety through resolution of the Global Issues, indicate that this will continue during extended operation. A.6 Fitness for Service The Fitness for Service SCA covers activities that affect the physical condition of structures, systems and components to ensure that they remain effective over time. This includes programs that ensure all equipment is available to perform its intended design function when called upon to do so. PSR2 addressed specific aspects of the Fitness for Service SCA in the review of Plant Design [R-17], Environmental Qualification [R-19], Deterministic Safety Analysis and Probabilistic

39 N/A R of 82 Safety Assessment [R-21][R-22], Aging [R-20], and Actual Condition of SSCs Important to Safety [R-18] Safety Factors. The conclusions of the review of the first two Safety Factors are provided in Section A.5; the conclusions of the review of the Safety Analysis Safety Factors are provided in Section A.4. The results of the Safety Factor Reports on Aging and Actual Condition of SSCs Important to Safety are discussed under this SCA. OPG manages the aging and obsolescence of SSCs through the Integrated Aging Management (IAM) Program. The IAM Program is consistent with best industry practices and ensures the safe long term operation of the station. The IAM Program establishes an integrated set of activities that ensure: The long term health of SSCs, The high operational reliability of equipment, and The safety and operating margins are monitored and maintained. The condition of Major Components, consisting of Fuel Channels, Feeders, Steam Generators, and Reactor Components and Structures is managed by rigorous Life Cycle Management Plans (LCMPs) stipulated by the IAM Program. To support the station equipment reliability program, a comprehensive assessment of the plant condition is documented in a series of Condition Assessments. The associated Safety Factor Report [R-18] identified 18 Gaps, the majority of which require system fitness for service assessments and LCMP updates to cover the extended operating period. Similar Gaps were identified in the Pickering B Continued Operations Plan Review [R-4]. Global Issues GI-1 through GI-4 and GI-19 address these Gaps. The proposed resolutions for all condition assessments have been consolidated into one proposed Resolution Statement under GI-8, with the exception of condition assessment of safety-related civil structures (non-containment), which has been captured in GI-43. Work is actively underway to update condition assessments and confirm assurance of fitness for service for safety-related SSCs for the extended operating period. Much of this work is already complete for There are four additional Global Issues associated with the condition of or understanding the condition of systems, as follows: 1. An assessment of Class 1 piping and component service limits has been completed. However, the assessment needs to be updated to account for environmental factors to confirm the adequacy of the assessment. This is captured in the proposed Resolution Statement for GI-5. The assessment does not apply to Major Components. 2. As a consequence of revision to the Criticality Coding, which is used for determining cable risk rating, the cable surveillance program needs to be assessed for the impact of the revision and the surveillance plan adjusted accordingly. The proposed action is captured in the Resolution Statement for GI The Resolution Statement for GI-10 proposes completion of mitigation of lrradiated Fuel Bay leakage to the liner interspace that is already in progress. 4. Assessments were completed confirming the adequacy of buried piping. GI-7 proposes activities to update the Buried Piping Program asset management plan and risk ranking for the extended operating period, and to update governance to reflect a graded approach in the event that any leakage in fuel oil piping occurs.

40 N/A R of 82 The review of modern codes and standards related to Fitness for Service resulted in one Global Issue shown in Appendix C. The review of CSA N285.4, Periodic Inspection of CANDU Nuclear Power Plant Components, identified a number of Gaps resulting from changes between the 2005 and the 2009 versions that have been consolidated under Global Issue GI-50. The GI-50 Resolution Statements propose changes to align Periodic Inspection Program (PIP) governance and the PIPs with the new version, as well as an assessment of the impact of code concessions granted by the CNSC on extended operation. The Aging Safety Factor Report states that the review, has confirmed that aging aspects affecting SSCs important to safety are being effectively managed and that an effective aging management program is in place at Pickering NGS [R-20]. The Safety Factor Report on Actual Condition of SSCs Important to Safety states, This assessment has not identified any major concerns that the SSCs will continue to operate as per the design basis requirements during life extension [R-18]. The CNSC has consistently assessed the Fitness for Service SCA as satisfactory over the last five years [R-36][R-12]. The positive results of PSR2 related to this SCA, including Strengths shown in Appendix B, S-02, Effective Equipment Reliability Program, S-03, Major Components Program, and S-04, System and Component Health Reporting, and the enhancements to safety through resolution of the Global Issues, indicate that this will continue during extended operation. A.7 Radiation Protection The Radiation Protection SCA covers the implementation of a radiation protection program in accordance with the Radiation Protection Regulations. This program must ensure that contamination and radiation doses received are monitored and controlled. PSR2 addressed specific aspects of the Radiation Protection SCA in the Plant Design [R-17], Safety Performance [R-24], Organization, Management, and Safety Culture [R-26], and Radiation Protection [R-31] Safety Factor Reports. The assessments in the Safety Factor phase did not identify any Gaps in the Radiation Protection governance and design and equipment. Consequently, there are no Global Issues listed in Appendix C that are related to the Radiation Protection SCA. The Radiation Protection Safety Factor Report states that the review, confirmed that Radiation Protection has been adequately accounted for in the design and operation of Pickering NGS, and that Radiation Protection provisions (including design and equipment) provide adequate protection of persons from the harmful effects of radiation and ensure that contamination and radiation exposures and doses to persons are monitored and controlled and maintained ALARA [R-31]. The CNSC has consistently assessed the Radiation Protection SCA as satisfactory or fully satisfactory over the last five years [R-36][R-12]. The positive results of PSR2 related to this SCA, including Strengths shown in Appendix B,

41 N/A R of 82 S-12, Dose to Public, S-13, Radiation Exposure Performance, and S-24, Advanced Technology to Support Radiation Protection, indicate that this will continue during extended operation. A.8 Conventional Health and Safety The Conventional Health and Safety SCA covers the implementation of a program to manage workplace safety hazards and to protect personnel and equipment. The Conventional Health and Safety SCA is not within the scope of PSR2. A.9 Environmental Protection The Environmental Protection SCA covers programs that identify, control and monitor all releases of radioactive and hazardous substances and effects on the environment from facilities or as the result of licensed activities. The PSR2 review of the Safety Performance [R-24] and Radiological Impact on the Environment [R-30] Safety Factor confirmed that the Pickering NGS operating organization has an adequate program for the surveillance of the radiological and non-radiological impacts of the station on the environment. The Safety Factor on Radiological Impact on the Environment states that the review has confirmed that Pickering NGS has an adequate and effective program for monitoring the radiological impact of the plant on the environment, which ensures that emissions are properly controlled and are as low as reasonably achievable. It also states that, a comprehensive program for monitoring and controlling effluent releases is in place [R-30]. No Global Issues were created that impact the Environmental Protection SCA. The CNSC has consistently assessed the Environmental Protection SCA as satisfactory over the last five years [R-36][R-12]. The positive results of PSR2 related to this SCA, including the Strength shown in Appendix B, S-23, Environmental Protection Program, indicate that this will continue during extended operation. A.10 Emergency Management and Fire Protection The Emergency Management and Fire Protection SCA covers emergency plans and emergency preparedness programs that exist for emergencies and for non-routine conditions including any results of exercise participation. The Emergency Management and Fire Protection SCA was addressed in the PSR2 review of the Emergency Planning [R-29] Safety Factor. This Safety Factor Report includes the fire response assessment results while fire protection operations, design and analysis are

42 N/A R of 82 discussed and rated in the appropriate SCA of operating performance, safety analysis or physical design. Two Global Issues are listed in Appendix C that relate to the Emergency Management and Fire Protection SCA, GI-26 and GI-40. The Resolution Statement for GI-26 proposes enhancement of the Emergency Response Projection software to address multi-unit BDBA scenarios. The work to address GI-26 is in progress. The Resolution Statement for GI-40 proposes completion of the installation of the last of the Emergency Mitigating Equipment. Installation of this equipment is in progress. The Emergency Planning Safety Factor Report states that the review has confirmed that OPG Nuclear has: a) adequate plans, staff, facilities and equipment in place for dealing with emergencies, and b) there are adequate arrangements in place for regular emergency training and exercises, and interaction and coordination with local and national authorities [R-29]. The CNSC has consistently assessed the Emergency Management and Fire Protection SCA as satisfactory over the last five years [R-36][R-12]. The positive results of PSR2 related to this SCA, including Strengths shown in Appendix B, S-05, Implementation of Fukushima Action Items, S-11, Relationship with Stakeholders and Public, and S-22, Emergency Management, and the enhancements to safety through resolution of the Global Issues, indicate that this will continue during extended operation. A.11 Waste Management The Waste Management SCA covers internal waste-related programs that form part of the facility's operations up to the point where the waste is removed from the facility to a separate waste management facility. This also covers the planning for decommissioning. The Waste Management SCA is not within the scope of PSR2. A.12 Security The Security SCA covers the programs required to implement and support the security requirements stipulated in the regulations, in their licence, in orders, or in expectations for their facility or activity. The Security SCA is not within the scope of PSR2. A.13 Safeguards and Non-Proliferation The Safeguards and Non-Proliferation SCA covers the programs and activities required for the successful implementation of the obligations arising from the Canada/IAEA safeguards agreements as well as all other measures arising from the Treaty on the Non-Proliferation of Nuclear Weapons. The Safeguards and Non-Proliferation SCA is not within the scope of PSR2.

43 N/A R of 82 A.14 Packaging and Transport The packaging and transport SCA covers the safe packaging and transport of nuclear substances and radiation devices to and from the licensed facility. The packaging and transport SCA is not within the scope of PSR2.

44 N/A R of 82 Appendix B: Strengths Used in the Defence-in-Depth Assessment Strength ID Strength Title and Description Defence-in- Depth Level S-01 Management The Pickering Station Leadership Team has effectively aligned the organization to significantly improve performance in several focus areas. 1, 2, 3, 4, 5 S-02 Effective Equipment Reliability Program Pickering NGS Equipment Reliability Program implementation and execution of the program is a station priority. The station management team monitors implementation, and leaders enforce accountability. Obsolescence Management and Performance Monitoring, Condition Assessments, and Predictive Maintenance are also noted as taking into consideration the long-term aging management assessments. 1, 2, 3, 4 S-03 Major Components Program Strong governance framework with comprehensive programs is in place for Major Component Life Cycle Management Plans, addressing the full spectrum of disciplines, including administrative, engineering, inspection, maintenance, training, quality assurance, engineering change control in conjunction with application of OPEX and research findings. 1, 2, 3, 4 S-04 System and Component Health Reporting The conditions of the Pickering NGS SSCs are tracked in System and Component Health Reports that are aligned with industry best practices. 1 S-05 Implementation of Fukushima Action Items Pickering NGS has implemented and is continuing to enhance significant provisions to prevent and mitigate severe accident progression and protect Containment integrity and enhance defence-indepth against BDBAs. 4, 5 S-06 Deterministic Safety Analysis The deterministic safety analysis is robust and effectively implemented. 1, 2, 3, 4

45 N/A R of 82 Strength ID Strength Title and Description Defence-in- Depth Level S-07 Probabilistic Safety Assessment The PSA program meets or exceeds performance objectives. OPG has developed and implemented a process of maintenance of the probabilistic risk assessment model to ensure that the model is representative of the actual plant configuration and operation and testing at the station. 1, 2, 3, 4 S-08 Operationalization of Probabilistic Safety Assessment Probabilistic Safety Assessment (PSA) is used to support conduct of engineering, maintenance and operation. 1, 2, 3, 4 S-09 Implementation of Safe Operating Envelope Program Comprehensive program in place for systematic application of Safe Operating Envelope (SOE) definition, implementation and maintenance (to end of station life). 1,2,3 S-10 Healthy Safety Culture Pickering has a healthy Nuclear Safety Culture and a respect for nuclear safety and there is a strong bias to put safety over production. Pickering has formally implemented Nuclear Safety Culture Monitoring Panels for regular monitoring of safety behaviour to promote use of error-free performance tools, risk-informed decision making and questioning attitude in day-to-day activities throughout the organization. 1, 2, 3, 4 S-11 Relationship with Stakeholders and Public OPG has fostered a strong relationship with stakeholders and interested public. A longstanding positive relationship with the community is in place to promote communication, education and awareness regarding the role of nuclear power and the overriding priority being placed on safety and environment. 4, 5 S-12 Dose to Public The dose to the off-site public resulting from operation of the station is very much less than the dose from background radiation. 1, 2, 3, 4, 5 S-13 Radiation Exposure Performance Radiation protection performance exceeds objectives and application of As Low as Reasonably Achievable (ALARA) meets or exceeds regulatory expectations. 1, 2, 3, 4

46 N/A R of 82 Strength ID Strength Title and Description Defence-in- Depth Level S-14 Heat Removal Systems Pickering NGS has made modifications to achieve multiple overlapping heat removal provisions for normal operation and design basis events, and for Beyond Design Basis conditions. 1, 2, 3, 4 S-15 Electrical Power System Pickering NGS has implemented design modifications to provide standby and Emergency Power Systems to provide the necessary electrical power to maintain the plant in a safe shutdown state and ensure nuclear safety in Design Basis Accidents and Beyond Design Basis conditions, and support Severe Accident Management actions. 1, 2, 3, 4, 5 S-16 Human Factors Engineering Program A robust human factors engineering program has been established. 1, 2, 3, 4 S-17 Environmental Qualification Program The Environmental Qualification Program at OPG is fully developed. 1, 2, 3 S-18 Comprehensive Set of Performance Indicators A comprehensive set of station performance indicators is in place to monitor operations. 1, 2, 3, 4, 5 S-19 Use of Operating Experience and Research Findings Rigour in the identification and application of OPEX and of research findings, and support of a senior advisory team for Research & Development issue identification and action implementation. 1, 2, 3, 4, 5 S-20 Minimum Staff Complement Management An online computer program for monitoring staffing level for minimum complement roles, as well as forecasting future staffing needs, thereby ensuring minimum complement coverage, is effectively managed on a continuous basis. 1, 2, 3, 4 S-21 Training A mature training and certification program is in place that includes a rigorous and comprehensive training program for selecting and training candidates. 1, 2, 3, 4, 5

47 N/A R of 82 Strength ID Strength Title and Description Defence-in- Depth Level S-22 Emergency Management A mature emergency response infrastructure is in place, and the requisite qualified manpower and expertise are maintained. As well, a mutual aid emergency support agreement among the Canadian nuclear operators has been established for inter-utility emergency support. Pickering has a well established Severe Accident Management Program. 3, 4, 5 S-23 Environmental Protection Program The Environmental Protection Program is robust. 1, 2, 3, 4, 5 S-24 Advanced Technology to Support Radiation Protection Remotely controlled technology in place to simulate radiation environments and hazards is providing a safe learning environment for training and practicing radiation protection procedures. 1, 2, 3, 4

48 N/A R of 82 Appendix C: Global Issue, Proposed Resolution Statement, and IIP Action Summaries The Global Issues resulting from the consolidation of Gaps and for which there are proposed Resolution Statements, along with the associated IIP actions, are presented in this appendix. The information is presented as exemplified below, along with a description of each of the columns. Content of Appendix C Tables (1) Global Issue/Safety and Control Area: a. Global Issue (GI) number, as identified in the GAR. b. CNSC Safety and Control Area number and description, as defined in CNSC REGDOC-2.3.3, to which the Global Issue is associated. (A.x) refers to the section in Appendix A PSR Results by CNSC Safety and Control Area. (2) Global Issue Title of the GI, as identified in the GAR.

Bringing safety performance of older plants on par with advanced reactor designs

Bringing safety performance of older plants on par with advanced reactor designs Bringing safety performance of older plants on par with advanced reactor designs A. Viktorov Canadian Nuclear Safety Commission 280 Slater St, K1P 5S9, Ottawa, ON, Canada alexandre.viktorov@canada.ca G.

More information

CNSC Fukushima Task Force Nuclear Power Plant Safety Review Criteria

CNSC Fukushima Task Force Nuclear Power Plant Safety Review Criteria CNSC Fukushima Task Force E-doc 3743877 July 2011 Executive Summary In response to the March 11, 2011 accident at the Fukushima Daiichi Nuclear Power Plant (NPP), the CNSC convened a Task Force to evaluate

More information

Canadian Regulatory Approach for Safe Long-Term Operation of Nuclear Power Plants

Canadian Regulatory Approach for Safe Long-Term Operation of Nuclear Power Plants Canadian Regulatory Approach for Safe Long-Term Operation of Nuclear Power Plants Technical and Regulatory Issues Facing Nuclear Power Plants: Leveraging Global Experience June 1 2, 2016 Chicago, IL Dr.

More information

Randy Lockwood, Senior Vice President CMD 18-H6.1A. PICKERING NUCLEAR GENERATING STATION Part I Hearing Licence Renewal April 4, 2018

Randy Lockwood, Senior Vice President CMD 18-H6.1A. PICKERING NUCLEAR GENERATING STATION Part I Hearing Licence Renewal April 4, 2018 Randy Lockwood, Senior Vice President CMD 18-H6.1A PICKERING NUCLEAR GENERATING STATION Part I Hearing Licence Renewal April 4, 2018 Presentation Outline Opening Remarks Performance Highlights Our Request

More information

IAEA International Conference on Topical Issues in Nuclear Installation Safety

IAEA International Conference on Topical Issues in Nuclear Installation Safety IAEA International Conference on Topical Issues in Nuclear Installation Safety Guidance on the Implementation of Modifications to Mitigate Beyond Design Basis Accidents Fred Dermarkar Vice President Engineering

More information

Pickering Nuclear Generating Station Licence Renewal

Pickering Nuclear Generating Station Licence Renewal Pickering Nuclear Generating Station Licence Renewal Commission Hearing (Part 2), June 25-29, 2018 CNSC Staff Presentation e-doc 5510377 (PPTX) e-doc 5558535 (PDF) PURPOSE OF PRESENTATION e-doc 5510377

More information

Introduction to the 2015 Darlington NGS Probabilistic Safety Assessment. Carlos Lorencez and Robin Manley Ontario Power Generation August 2015

Introduction to the 2015 Darlington NGS Probabilistic Safety Assessment. Carlos Lorencez and Robin Manley Ontario Power Generation August 2015 Introduction to the 2015 Darlington NGS Probabilistic Safety Assessment Carlos Lorencez and Robin Manley Ontario Power Generation August 2015 Introduction to the 2015 Darlington NGS Probabilistic Safety

More information

DRAFT Regulatory Document RD 337 Design of New Nuclear Power Plants Issued for Internal Review and External Stakeholder Consultation October 2007

DRAFT Regulatory Document RD 337 Design of New Nuclear Power Plants Issued for Internal Review and External Stakeholder Consultation October 2007 DRAFT Regulatory Document RD 337 Design of New Nuclear Power Plants Issued for Internal Review and External Stakeholder Consultation October 2007 Draft release date: 18/10/07 CNSC REGULATORY DOCUMENTS

More information

DARLINGTON NUCLEAR GENERATING STATION APPLICATION FOR LICENCE RENEWAL

DARLINGTON NUCLEAR GENERATING STATION APPLICATION FOR LICENCE RENEWAL DARLINGTON NUCLEAR GENERATING STATION APPLICATION FOR LICENCE RENEWAL December 2013 Table of Contents Page 1.0 OVERVIEW... 6 1.1 Introduction... 6 1.2 Darlington Nuclear Generating Station (NGS)... 6 1.3

More information

IAEA-J4-TM TM for Evaluation of Design Safety

IAEA-J4-TM TM for Evaluation of Design Safety Canadian Nuclear Utility Principles for Beyond Design Basis Accidents IAEA-J4-TM-46463 TM for Evaluation of Design Safety Mark R Knutson P Eng. Director of Fukushima Projects Ontario Power Generation Overview

More information

CNA Communications Workshop. Communicating About Nuclear Issues: Nuclear Power Plants. Darlington Generating Station April 8, 2004

CNA Communications Workshop. Communicating About Nuclear Issues: Nuclear Power Plants. Darlington Generating Station April 8, 2004 CNA Communications Workshop Communicating About Nuclear Issues: Nuclear Power Plants Darlington Generating Station April 8, 2004 1 NUCLEAR POWER PLANTS 2 The CANDU Technology On-power fueling Heavy water

More information

Background. Introduction. Overview of vendor design review process

Background. Introduction. Overview of vendor design review process Executive Summary A pre-licensing review of a new nuclear power plant (NPP), also referred to as a vendor design review (VDR), provides an opportunity for CNSC staff to assess a design prior to any licensing

More information

Ontario Power Generation Inc. Darlington Nuclear Generating Station. Ontario Power Generation Inc. Centrale nucléaire de Darlington

Ontario Power Generation Inc. Darlington Nuclear Generating Station. Ontario Power Generation Inc. Centrale nucléaire de Darlington UNPROTECTED/NON PROTÉGÉ ORIGINAL/ORIGINAL CMD: 15-H8 Date signed/signé le : 8 JULY 2015 A Licence Renewal Un renouvellement de permis Ontario Power Generation Inc. Darlington Nuclear Generating Station

More information

Canadian Nuclear Safety Commission. Suqiang Xu, Technical Specialist Christopher Cole, Director

Canadian Nuclear Safety Commission. Suqiang Xu, Technical Specialist Christopher Cole, Director SCREENING OF STRUCTURES, SYSTEMS AND COMPONENTS FOR AGING MANAGEMENT AND RELIABILITY PROGRAMS FOR NUCLEAR POWER PLANTS IN CANADA, A REGULATORY PERSPECTIVE Suqiang Xu, Technical Specialist Christopher Cole,

More information

2013 Regulatory Oversight Summary Pickering and Darlington

2013 Regulatory Oversight Summary Pickering and Darlington 2013 Regulatory Oversight Summary Pickering and Darlington Pickering Community Advisory Council September 16, 2014 Miguel Santini e-doc #4501099 (PPT) e-doc #4504053 (PDF) Outline Highlights Industry challenges

More information

Guidance on the Use of Deterministic and Probabilistic Criteria in Decision-making for Class I Nuclear Facilities

Guidance on the Use of Deterministic and Probabilistic Criteria in Decision-making for Class I Nuclear Facilities DRAFT Regulatory Document RD-152 Guidance on the Use of Deterministic and Probabilistic Criteria in Decision-making for Class I Nuclear Facilities Issued for Public Consultation May 2009 CNSC REGULATORY

More information

Ontario Power Generation Questions and Answers

Ontario Power Generation Questions and Answers Ontario Power Generation Questions and Answers Natural Disasters Could a similar earthquake or tsunami happen in Ontario? No. Ontario s reactors are at two sites on Lake Ontario and one site on Lake Huron

More information

IAEA International Experts Meeting on Severe Accident Management in the Light of the Accident at the Fukushima Daiichi Nuclear Power Plant

IAEA International Experts Meeting on Severe Accident Management in the Light of the Accident at the Fukushima Daiichi Nuclear Power Plant IAEA International Experts Meeting on Severe Accident Management in the Light of the Accident at the Fukushima Daiichi Nuclear Power Plant Enhancements to Severe Accident Management Guidelines to Address

More information

Format and Content of the Safety Analysis Report for Nuclear Power Plants - Core Set -

Format and Content of the Safety Analysis Report for Nuclear Power Plants - Core Set - Format and Content of the Safety Analysis Report for Nuclear Power Plants - Core Set - 2013 Learning Objectives After going through this presentation the participants are expected to be familiar with:

More information

Canadian Regulatory Perspective on Safety Challenges for New NPP

Canadian Regulatory Perspective on Safety Challenges for New NPP Canadian Regulatory Perspective on Safety Challenges for New NPP A. Viktorov, Canadian Nuclear Safety Commission IAEA Technical Meeting June 22-26, 2015 1 How this presentation works.. 1. CNSC outline

More information

OPG s Response to Fukushima Event- Update

OPG s Response to Fukushima Event- Update OPG s Response to Fukushima Event- Update Darlington and Pickering Joint Community Advisory Committee Meeting- January 21, 2014 Mark Knutson- Director- Fukushima Support Tho-Dien Le- Projects Design Manager-

More information

Design of Small Reactors RD-367

Design of Small Reactors RD-367 Design of Small Reactors RD-367 Design of Small Reactors Draft Regulatory Document RD-367 Published by the Canadian Nuclear Safety Commission Minister of Public Works and Government Services Canada 2010

More information

Stress tests specifications Proposal by the WENRA Task Force 21 April 2011

Stress tests specifications Proposal by the WENRA Task Force 21 April 2011 Stress tests specifications Proposal by the WENRA Task Force 21 April 2011 Introduction Considering the accident at the Fukushima nuclear power plant in Japan, the Council of the European Union declared

More information

PHWR Group of Countries Implementation of Lessons Learned from Fukushima Accident in CANDU Technology

PHWR Group of Countries Implementation of Lessons Learned from Fukushima Accident in CANDU Technology Implementation of Lessons Learned from Fukushima Accident in CANDU Technology Greg Rzentkowski Director General Directorate of Power Reactor Regulation Canadian Nuclear Safety Commission on behalf of CANDU

More information

Ageing Management and Development of a Programme for Long Term Operation of Nuclear Power Plants

Ageing Management and Development of a Programme for Long Term Operation of Nuclear Power Plants DS485 17 July 2017 IAEA SAFETY STANDARDS for protecting people and the environment STEP 13: Establishment by the Publications Committee Reviewed in NSOC (Asfaw) Ageing Management and Development of a Programme

More information

Safety Classification of Structures, Systems and Components in Nuclear Power Plants

Safety Classification of Structures, Systems and Components in Nuclear Power Plants IAEA SAFETY STANDARDS DS367 Draft 6.1 Date: 20 November 2010 Formatted: Space Before: 0 pt, After: 0 pt, Line spacing: single Deleted: 5.10 Deleted: 1912 October Deleted: 18 for protecting people and the

More information

Integration of Human and Organization Factors in Canada

Integration of Human and Organization Factors in Canada Integration of Human and Organization Factors in Canada Presented to International Atomic Energy Agency Technical Meeting on the Interaction between Individuals Technology and Organization A Systemic Approach

More information

CANADIAN APPROACH ON REGULATORY ISSUES REGARDING AGEING MANAGEMENT, LONG TERM OPERATION AND PLANT LIFE MANAGEMENT

CANADIAN APPROACH ON REGULATORY ISSUES REGARDING AGEING MANAGEMENT, LONG TERM OPERATION AND PLANT LIFE MANAGEMENT CANADIAN APPROACH ON REGULATORY ISSUES REGARDING AGEING MANAGEMENT, LONG TERM OPERATION AND PLANT LIFE MANAGEMENT T. Viglasky, A. Blahoianu, K. Kirkhope Canadian Nuclear Safety Commission, Canada Email

More information

Readiness for Regulating Advanced Reactor Projects

Readiness for Regulating Advanced Reactor Projects Readiness for Regulating Advanced Reactor Projects Advanced Reactors Technical Summit V & Technology Trailblazers Showcase February 22, 2018 Texas A&M University, College Station, Texas, U.S. Ramzi Jammal

More information

Oral Presentation. Exposé oral. Submission from SNC-Lavalin. Mémoire de SNC-Lavalin CMD 18-H6.44

Oral Presentation. Exposé oral. Submission from SNC-Lavalin. Mémoire de SNC-Lavalin CMD 18-H6.44 CMD 18-H6.44 File / dossier: 6.01.07 Date: 2018-05-07 Edocs: 5528930 Oral Presentation Submission from SNC-Lavalin Exposé oral Mémoire de SNC-Lavalin In the Matter of À l égard de Ontario Power Generation

More information

EXTRABUDGETARY PROGRAMME ON SAFETY ASPECTS OF LONG TERM OPERATION OF WATER MODERATED REACTORS

EXTRABUDGETARY PROGRAMME ON SAFETY ASPECTS OF LONG TERM OPERATION OF WATER MODERATED REACTORS IAEA-EBP-LTO-03 21-05-04 EXTRABUDGETARY PROGRAMME ON SAFETY ASPECTS OF LONG TERM OPERATION OF WATER MODERATED REACTORS STANDARD REVIEW PROCESS INTERNATIONAL ATOMIC ENERGY AGENCY 1. INTRODUCTION The number

More information

Use of PSA to Support the Safety Management of Nuclear Power Plants

Use of PSA to Support the Safety Management of Nuclear Power Plants S ON IMPLEMENTATION OF THE LEGAL REQUIREMENTS Use of PSA to Support the Safety Management of Nuclear Power Plants РР - 6/2010 ÀÃÅÍÖÈß ÇÀ ßÄÐÅÍÎ ÐÅÃÓËÈÐÀÍÅ BULGARIAN NUCLEAR REGULATORY AGENCY TABLE OF CONTENTS

More information

Results and Insights from Interim Seismic Margin Assessment of the Advanced CANDU Reactor (ACR ) 1000 Reactor

Results and Insights from Interim Seismic Margin Assessment of the Advanced CANDU Reactor (ACR ) 1000 Reactor 20th International Conference on Structural Mechanics in Reactor Technology (SMiRT 20) Espoo, Finland, August 9-14, 2009 SMiRT 20-Division 7, Paper 1849 Results and Insights from Interim Seismic Margin

More information

Implementation of Lessons Learned from Fukushima Accident in CANDU Technology

Implementation of Lessons Learned from Fukushima Accident in CANDU Technology e-doc 4395709 Implementation of Lessons Learned from Fukushima Accident in CANDU Technology Greg Rzentkowski Director General, Power Reactor Regulation Canadian Nuclear Safety Commission on behalf of CANDU

More information

Readiness for Regulating Small Modular Reactors

Readiness for Regulating Small Modular Reactors Readiness for Regulating Small Modular Reactors Nuclear Energy Agency Workshop: Multilateral Cooperation in the Regulatory Reviews of Small Modular Reactors August 10-11, 2017 Ottawa, Ontario, Canada Ramzi

More information

Regulation of existing and new nuclear power stations in South Africa in the light of the Fukushima Accident

Regulation of existing and new nuclear power stations in South Africa in the light of the Fukushima Accident Regulation of existing and new nuclear power stations in South Africa in the light of the Fukushima Accident O Phillips: Senior Executive Manager - National Nuclear Regulator The Fukushima Ministerial

More information

ACR Safety Systems Safety Support Systems Safety Assessment

ACR Safety Systems Safety Support Systems Safety Assessment ACR Safety Systems Safety Support Systems Safety Assessment By Massimo Bonechi, Safety & Licensing Manager ACR Development Project Presented to US Nuclear Regulatory Commission Office of Nuclear Reactor

More information

Canadian National Report for the Second Extraordinary Meeting of the Convention on Nuclear Safety

Canadian National Report for the Second Extraordinary Meeting of the Convention on Nuclear Safety Canadian National Report for the Second Extraordinary Meeting of the Convention on Nuclear Safety Canadian National Report May 2012 Canada s Report to the Second Extraordinary Meeting of the Convention

More information

Severe Accident Progression Without Operator Action

Severe Accident Progression Without Operator Action DAA Technical Assessment Review of the Moderator Subcooling Requirements Model Severe Accident Progression Without Operator Action Facility: Darlington Classification: October 2015 Executive summary After

More information

Nuclear Safety Standards Committee

Nuclear Safety Standards Committee Nuclear Safety Standards Committee 41 st Meeting, IAEA 21 23 Topical June, Issues 2016 Conference in Nuclear Installation Safety Agenda item Safety Demonstration of Advanced Water Cooled NPPs Title Workshop

More information

Application of Technologies in CANDU Reactors to Prevent/Mitigate the Consequences of a Severe Accidents

Application of Technologies in CANDU Reactors to Prevent/Mitigate the Consequences of a Severe Accidents Application of Technologies in CANDU Reactors to Prevent/Mitigate the Consequences of a Severe Accidents Lovell Gilbert Section Manager/Technical Advisor, Reactor Safety Engineering Bruce Power IAEA International

More information

MEETING THE OBJECTIVES OF THE VIENNA DECLARATION ON NUCLEAR SAFETY: LICENSING OF NEW NUCLEAR POWER PLANTS IN PAKISTAN

MEETING THE OBJECTIVES OF THE VIENNA DECLARATION ON NUCLEAR SAFETY: LICENSING OF NEW NUCLEAR POWER PLANTS IN PAKISTAN MEETING THE OBJECTIVES OF THE VIENNA DECLARATION ON NUCLEAR SAFETY: LICENSING OF NEW NUCLEAR POWER PLANTS IN PAKISTAN N.MUGHAL Email: nasir.mughal@pnra.org F.MANSOOR J.AKHTAR Abstract In the aftermath

More information

Joint ICTP-IAEA Essential Knowledge Workshop on Deterministic Safety Analysis and Engineering Aspects Important to Safety. Trieste,12-23 October 2015

Joint ICTP-IAEA Essential Knowledge Workshop on Deterministic Safety Analysis and Engineering Aspects Important to Safety. Trieste,12-23 October 2015 Joint ICTP- Essential Knowledge Workshop on Deterministic Safety Analysis and Engineering Aspects Important to Safety Trieste,12-23 October 2015 Safety classification of structures, systems and components

More information

New Safety Requirements Addressing Feedback From the Fukushima Daiichi Accident

New Safety Requirements Addressing Feedback From the Fukushima Daiichi Accident New Safety Requirements Addressing Feedback From the Fukushima Daiichi Accident Alexander Sapozhnikov Federal Environmental, Industrial and Nuclear Supervision Service of Russia, 109147 Moscow, Taganskaya,

More information

Arab Journal of Nuclear Science and Applications, 48(3), ( ) 2015

Arab Journal of Nuclear Science and Applications, 48(3), ( ) 2015 Specific Considerations in the Safety Assessment of Predisposal Radioactive Waste Management Facilities in Light of the Lessons Learned from the Accident at the Fukushima-Daiichi Nuclear Power Plant A.

More information

Également publié en français sous le titre de : Rapport de surveillance réglementaire des centrales nucléaires au Canada : 2014

Également publié en français sous le titre de : Rapport de surveillance réglementaire des centrales nucléaires au Canada : 2014 Canadian Nuclear Safety Commission (CNSC) 2015 PWGSC catalogue number CC171-25E-PDF ISSN 2369-5579 Extracts from this document may be reproduced for individual use without permission provided the source

More information

Preliminary Lessons Learned from the Fukushima Daiichi Accident for Advanced Nuclear Power Plant Technology Development

Preliminary Lessons Learned from the Fukushima Daiichi Accident for Advanced Nuclear Power Plant Technology Development Preliminary Lessons Learned from the Fukushima Daiichi Accident for Advanced Nuclear Power Plant Technology Development A. Introduction The IAEA Report on Reactor and Spent Fuel Safety in the Light of

More information

ONTARIOFiiWER GENERATION. Brian Duncan Senior Vice President. Darlington Nuclear. May 1, 2014 NK P NK38-CORR P

ONTARIOFiiWER GENERATION. Brian Duncan Senior Vice President. Darlington Nuclear. May 1, 2014 NK P NK38-CORR P ONTAROFiiWER GENERATON Brian Duncan Senior Vice President Darlington Nuclear P.O. Box 4000 Bowmanville, ON LlC 3Z8 Tel: 905-697-7499 Fax: 905-697-7596 brian.duncan@opg.com May 1, 2014 NK38-00531 P NK38-CORR-00531-16780

More information

Operating Performance Accident Management. REGDOC-2.3.2, Version 2

Operating Performance Accident Management. REGDOC-2.3.2, Version 2 Operating Performance Accident Management REGDOC-2.3.2, Version 2 September 2015 Accident Management Regulatory Document REGDOC-2.3.2, Version 2 Canadian Nuclear Safety Commission (CNSC) 2015 PWGSC catalogue

More information

Regulatory Actions and Follow up Measures against Fukushima Accident in Korea

Regulatory Actions and Follow up Measures against Fukushima Accident in Korea Int Conference on Effective Nuclear Regulatory Systems, April 9, 2013, Canada Regulatory Actions and Follow up Measures against Fukushima Accident in Korea Seon Ho SONG* Korea Institute of Nuclear Safety

More information

Reporting Requirements for Operating Nuclear Power Plants: Compliance Monitoring RD-99.2

Reporting Requirements for Operating Nuclear Power Plants: Compliance Monitoring RD-99.2 Reporting Requirements for Operating Nuclear Power Plants: Compliance Monitoring RD-99.2 November 2010 Reporting Requirements for Operating Nuclear Power Plants: Compliance Monitoring Draft Regulatory

More information

IAEA SAFETY STANDARDS for protecting people and the environment. Predisposal Management of Radioactive Waste from Nuclear Fuel Cycle Facilities

IAEA SAFETY STANDARDS for protecting people and the environment. Predisposal Management of Radioactive Waste from Nuclear Fuel Cycle Facilities DS447 Date: 20 February 2015 IAEA SAFETY STANDARDS for protecting people and the environment STATUS: SPESS STEP 12 For submission to CSS Predisposal Management of Radioactive Waste from Nuclear Fuel Cycle

More information

Enhancing Nuclear Regulation in the Post-Fukushima World

Enhancing Nuclear Regulation in the Post-Fukushima World Enhancing Nuclear Regulation in the Post-Fukushima World Robert Lojk Regulatory Program Director Directorate of Power Reactor Regulation Canadian Nuclear Safety Commission Presentation to the 2012 INPRO

More information

Darlington NGS Integrated Implementation Plan (IIP) Change Control and Closeout Process

Darlington NGS Integrated Implementation Plan (IIP) Change Control and Closeout Process RETENTION: P Dietmar Reiner Senior Vice President Nuclear Projects 1855 Energy Drive, Courtice, ON L1E 0E7 Tel: 905-623-6670 ext. 5400 d.reiner@opg.com March 25, 2015 File No.: NK38-00531 P CD#.: NK38-CORR-00531-17309

More information

SPESS F Document Preparation Profile (DPP) Version 04 dated 16 November 2018

SPESS F Document Preparation Profile (DPP) Version 04 dated 16 November 2018 1 SPESS F Document Preparation Profile (DPP) Version 04 dated 16 November 2018 1. IDENTIFICATION Document Category or set of publications to be revised in a concomitant manner: Safety Guides Working ID:

More information

Darlington Unit 2 CNSC Process for Return to Service

Darlington Unit 2 CNSC Process for Return to Service Darlington Unit 2 CNSC Process for Return to Service Public Meeting February 20, 2019 CNSC Staff Presentation e Doc 5723630 (PPTX) e Doc 5783914 (PDF) Introduction Darlington Nuclear Generating Station

More information

Enhanced CANDU 6. Safe, dependable and clean energy solutions

Enhanced CANDU 6. Safe, dependable and clean energy solutions Enhanced CANDU 6 Safe, dependable and clean energy solutions The SNC-Lavalin Solution With more than a century of experience in the power sector, and over 60 years invested in the nuclear industry, SNC-Lavalin

More information

Integration of Human and Organization Factors in Canada Enhancing Nuclear Safety

Integration of Human and Organization Factors in Canada Enhancing Nuclear Safety Integration of Human and Organization Factors in Canada Enhancing Nuclear Safety Presented to International Atomic Energy Agency International Conference on Challenges Faced by Technical and Scientific

More information

WENRA and its expectations on the safety of new NPP

WENRA and its expectations on the safety of new NPP WENRA and its expectations on the safety of new NPP INPRO Dialogue Forum on Global Nuclear Energy Sustainability Licensing and Safety Issues for Small- and Medium-sized Reactors (SMRs) Vienna, 29 July

More information

Probabilistic Safety Assessment Safety & Regulatory Framework

Probabilistic Safety Assessment Safety & Regulatory Framework Probabilistic Safety Assessment Safety & Regulatory Framework Presentation to the CNSC August 2017 Dr. V.G. Snell 1 Purpose To summarize work done under CNSC contract 87055-16-0251: Role of the Probabilistic

More information

Safety Implication for Gen-IV SFR based on the Lesson Learned from the Fukushima Dai-ichi NPPs Accident. Ryodai NAKAI Japan Atomic Energy Agency

Safety Implication for Gen-IV SFR based on the Lesson Learned from the Fukushima Dai-ichi NPPs Accident. Ryodai NAKAI Japan Atomic Energy Agency Safety Implication for Gen-IV SFR based on the Lesson Learned from the Fukushima Dai-ichi NPPs Accident Ryodai NAKAI Japan Atomic Energy Agency Contents Introduction Japanese Government Report to the IAEA

More information

Aging Management for Nuclear Power Plants RD-334

Aging Management for Nuclear Power Plants RD-334 Aging Management for Nuclear Power Plants RD-334 August 2010 Aging Management for Nuclear Power Plants Draft Regulatory Document RD-334 Published by the Canadian Nuclear Safety Commission Minister of Public

More information

Update on CANDU Safety Issues, COG Large LOCA and Severe Accident Projects

Update on CANDU Safety Issues, COG Large LOCA and Severe Accident Projects Excellence through Collaboration Update on CANDU Safety Issues, COG Large LOCA and Severe Accident Projects Krish Krishnan and Jeff Weed IAEA Workshop on Good Practices in HWR Operation Buenos Aires, Argentina,

More information

Enhancement of Nuclear Safety

Enhancement of Nuclear Safety Enhancement of Nuclear Safety Soon Heung Chang Handong Global University May 6, 2015 Contents 1 2 3 4 Importance of Energy Fundamentals of Nuclear Safety How to Enhance Nuclear Safety Closing Remarks 2

More information

EVALUATION OF SAFETY CULTURE IN WANO PRE-STARTUP REVIEWS

EVALUATION OF SAFETY CULTURE IN WANO PRE-STARTUP REVIEWS EVALUATION OF SAFETY CULTURE IN WANO PRE-STARTUP REVIEWS Todd Brumfield World Association of Nuclear Operators (WANO) Atlanta, Georgia, USA ABSTRACT: The requirements for performance of pre-startup reviews

More information

Nuclear I&C Systems Safety. The Principles of Nuclear Safety for Instrumentation and Control Systems

Nuclear I&C Systems Safety. The Principles of Nuclear Safety for Instrumentation and Control Systems Nuclear I&C Systems Safety The Principles of Nuclear Safety for Instrumentation and Control Systems Legal and Regulatory Framework Legal framework, regulatory bodies and main standards of Nuclear Power

More information

Evaluation of Nuclear Safety Culture During the Pre-Operational Phase

Evaluation of Nuclear Safety Culture During the Pre-Operational Phase Evaluation of Nuclear Safety Culture During the Pre-Operational Phase Todd Brumfield WANO-World Association of Nuclear Operators Formed in 1989 following accident at Chernobyl Has members in more than

More information

Major: Title change does not reflect that the intent of the document is the design of NEW nuclear power plants.

Major: Title change does not reflect that the intent of the document is the design of NEW nuclear power plants. REGDOC-2.5.2, Design of Reactor Facilities: Nuclear Power Plants / Conception d'installations dotées de réacteurs : centrales nucléaires Comments received from additional consultation / Commentaires reçus

More information

Module X. Operational safety including operational feedback

Module X. Operational safety including operational feedback Module X Operational safety including operational feedback International Atomic Energy Agency, May 2015 v1.0 Background In 1991, the General Conference (GC) in its resolution RES/552 requested the Director

More information

SAFETY OF NUCLEAR POWER PLANTS: COMMISSIONING AND OPERATION

SAFETY OF NUCLEAR POWER PLANTS: COMMISSIONING AND OPERATION IAEA SAFETY STANDARDS SERIES SPECIFIC SAFETY REQUIREMENTS No. SSR-2/2 (Rev. 1) SAFETY OF NUCLEAR POWER PLANTS: COMMISSIONING AND OPERATION STEP 13: SUBMISSION TO THE PUBLICATIONS COMMITTEE AND THE BOG

More information

CNSC Evaluation of Plant-Specific SAMG

CNSC Evaluation of Plant-Specific SAMG CNSC Evaluation of Plant-Specific SAMG Quanmin Lei IAEA Technical Meeting on Verification and Validation of SAMG Vienna, Austria December 12-14, 2016 e-docs # 5104918 nuclearsafety.gc.ca Outline Summarize

More information

Internal Use Only NK38-PLAN R000 Title: NUCLEAR REFURBISHMENT PROGRAM HEALTH AND SAFETY MANAGEMENT PLAN

Internal Use Only NK38-PLAN R000 Title: NUCLEAR REFURBISHMENT PROGRAM HEALTH AND SAFETY MANAGEMENT PLAN Document Number: NK38-PLAN-09701-10067 Sheet Number: 0016 R000 N/A Revision: Ontario Power Generation Inc., 2013. This document has been produced and distributed for Ontario Power Generation Inc. purposes

More information

REGULATORS FORUM PILOT PROJECT REPORT

REGULATORS FORUM PILOT PROJECT REPORT SMR REGULATORS FORUM PILOT PROJECT REPORT Considering the application of a graded approach, defence-in-depth and emergency planning zone size for Small Modular Reactors S. MAGRUDER International Atomic

More information

Plant Life Management Canada

Plant Life Management Canada 2017/02/22 TWG on LM for NPP Plant Life Management Canada - Copyright - General Utility Focus/Concerns Expanded focus last few years: Still driven primarily by desire to improve Equipment Reliability Index

More information

Wolsong-1 Stress Test

Wolsong-1 Stress Test PHWR Safety 2014/CANSAS-2014 Wolsong-1 Stress Test June 23, 2014 Geun-Sun Auh Korea Institute of Nuclear Safety Table of Contents 1. Stress Test Definition 2. EU Stress Test 3. Stress Test of Korea 4.

More information

NRC INSPECTION MANUAL

NRC INSPECTION MANUAL NRC INSPECTION MANUAL IRIB INSPECTION PROCEDURE 71124 RADIATION SAFETY PUBLIC AND OCCUPATIONAL PROGRAM APPLICABILITY: IMC 2515 EFFECTIVE DATE: January 1, 2010 71124-01 INSPECTION OBJECTIVE To independently

More information

Human Resources and Staffing Copenhagen May, 2014

Human Resources and Staffing Copenhagen May, 2014 Human Resources and Staffing Copenhagen 27-28 May, 2014 KHS Solutions Kevin Scissons, Canada Inspector Competencies and Training. This part of our discussion will focus on the Regulator the required compentancies,

More information

CNSC s regulatory oversight of Human and Organizational Factors (HOF) Alice F Salway nuclearsafety.gc.ca

CNSC s regulatory oversight of Human and Organizational Factors (HOF) Alice F Salway nuclearsafety.gc.ca CNSC s regulatory oversight of Human and Organizational Factors (HOF) Alice F Salway nuclearsafety.gc.ca 15th, December, 2015 e-docs # 4873780 Overview CNSC - organization regulatory framework Safety and

More information

PNRA Safety Goals for Nuclear Installations

PNRA Safety Goals for Nuclear Installations PNRA Safety Goals for Nuclear Installations Shahid Rashid Pakistan Nuclear Regulatory Authority Technical Meeting (TM) on Development of the IAEA Technical Document on the Development and Application of

More information

L11. Integration of Deterministic Safety Assessment (DSA) and PSA into a Risk-informed Decision Making Process

L11. Integration of Deterministic Safety Assessment (DSA) and PSA into a Risk-informed Decision Making Process L11. Integration of Deterministic Safety Assessment (DSA) and PSA into a Risk-informed Decision Making Process John Fraser Preston john.preston@poyry.com ANSN Regional Workshop on Integrated Deterministic

More information

KHNP s strategies for Multi-unit Extreme Hazards Response

KHNP s strategies for Multi-unit Extreme Hazards Response KHNP s strategies for Multi-unit Extreme Hazards Response Jang Hwan Na 2018. 5. 8 Safety Technology Center Central Research Institute, KHNP Contents 1 Post Fukushima Safety Measures 2 Stress Tests 3 Integrated

More information

Advanced Fuel CANDU Reactor. Complementing existing fleets to bring more value to customers

Advanced Fuel CANDU Reactor. Complementing existing fleets to bring more value to customers Advanced Fuel CANDU Reactor Complementing existing fleets to bring more value to customers Depleted Enriched Spent Fuel Storage Recovered Actinides Thorium Cycle LWR NUE Enrichment Thorium Mine + Fissile

More information

N-CORR P CD#: N-CORR Dear Mr. Dallaire,

N-CORR P CD#: N-CORR Dear Mr. Dallaire, From: FLEET Barry -NUCLEAR [mailto:barry.fleet@opg.com] Sent: Friday, November 16, 2012 9:20 AM To: Consultation; Dallaire, Mark Cc: WILLIAMS Don -DNNP; MACEACHERON R J -NUCLEAR; HARRIS Elaine -NUCLEAR;

More information

CNSC Staff Briefing CMD 11-M15 March 30, 2011

CNSC Staff Briefing CMD 11-M15 March 30, 2011 CNSC Staff Briefing CMD 11-M15 March 30, 2011 CNSC Response CNSC took action immediately to: Activate Emergency Operations Centre on 3 rd floor Slater (11-March) Staff Nuclear Emergency Organization in

More information

Safety enhancement of NPPs in China after Fukushima Accident

Safety enhancement of NPPs in China after Fukushima Accident Safety enhancement of NPPs in China after Fukushima Accident CHAI Guohan 29 June 2015, Brussels National Nuclear Safety Administration, P. R. China Current Development of Nuclear Power Mid of year 2015

More information

SENIOR REGULATORS MEETING Strengthening the Implementation of Defence in Depth IAEA Perspective

SENIOR REGULATORS MEETING Strengthening the Implementation of Defence in Depth IAEA Perspective SENIOR REGULATORS MEETING Strengthening the Implementation of Defence in Depth IAEA Perspective 58th IAEA General Conference 25 September 2014 James Lyons Director of the Division of Nuclear Installation

More information

Attachment: A. Candu Energy Inc. s Comments on REGDOC-2.3.1, Commissioning of Reactor Facilities

Attachment: A. Candu Energy Inc. s Comments on REGDOC-2.3.1, Commissioning of Reactor Facilities Attachment: A. Candu Energy Inc. s Comments on REGDOC-2.3.1, Commissioning of Reactor Facilities Page 2 of 11 Attachment A Candu Energy Inc. s Comments on REGDOC-2.3.1, Commissioning of Reactor Facilities

More information

Application of Selected Safety Requirements from IAEA SSR-2/1 in the EC6 Reactor Design

Application of Selected Safety Requirements from IAEA SSR-2/1 in the EC6 Reactor Design Application of Selected Safety Requirements from IAEA SSR-2/1 in the EC6 Reactor Design Technical Meeting on Safety Challenges for New NPPs 22-25 June 2015, Vienna, Austria - Copyright - A world leader

More information

Follow-up Audit of the CNSC Performance Measurement and Reporting Frameworks, November 2011

Follow-up Audit of the CNSC Performance Measurement and Reporting Frameworks, November 2011 Audit of Mobile Telecommunication Devices June 21, 2012 Follow-up Audit of the CNSC Performance Measurement and Reporting Frameworks, November 2011 Presented to the Audit Committee on November 21, 2016

More information

For reference, the key elements of a StarCore Nuclear (StarCore) reactor plant project are:

For reference, the key elements of a StarCore Nuclear (StarCore) reactor plant project are: StarCore Nuclear Response and Comments, 23 September 2016, On CNSC Discussion Paper DIS-16-04, March 2016 Small Modular Reactors: Regulatory Strategy, Approaches and Challenges Introduction The discussion

More information

IAEA SAFETY STANDARDS for protecting people and the environment. Predisposal Management of Radioactive Waste from Nuclear Fuel Cycle Facilities

IAEA SAFETY STANDARDS for protecting people and the environment. Predisposal Management of Radioactive Waste from Nuclear Fuel Cycle Facilities DS447 Date: September 2014 IAEA SAFETY STANDARDS for protecting people and the environment STATUS: SPESS STEP 11 MS comments incorporated Review Committee Member comments due 31 Oct Predisposal Management

More information

OVERVIEW ON FINAL STRESS TEST REPORT CERNAVODA NPP Dumitru DINA CEO Nuclearelectrica. 16 th of May 2012 Nuclear 2012 Pitesti, Romania

OVERVIEW ON FINAL STRESS TEST REPORT CERNAVODA NPP Dumitru DINA CEO Nuclearelectrica. 16 th of May 2012 Nuclear 2012 Pitesti, Romania OVERVIEW ON FINAL STRESS TEST REPORT CERNAVODA NPP Dumitru DINA CEO Nuclearelectrica 16 th of May 2012 Nuclear 2012 Pitesti, Romania 1 PREAMBLE On 25 March, 2011, European Council decided that nuclear

More information

Ibero-American Forum of Radiological and Nuclear Regulators, FORO. Complementary Safety Assessments of the Iberoamerican FORO Countries

Ibero-American Forum of Radiological and Nuclear Regulators, FORO. Complementary Safety Assessments of the Iberoamerican FORO Countries Ibero-American Forum of Radiological and Nuclear Regulators, FORO IAEA Technical Meeting on EVALUATION OF NUCLEAR POWER PLANT DESIGN SAFETY IN THE AFTERMATH OF THE FUKUSHIMA DAIICHI ACCIDENT 26 29 August

More information

Contents. 4.1 Principles Barrier concept Defence-in-depth concept Main safety functions and safety functions...

Contents. 4.1 Principles Barrier concept Defence-in-depth concept Main safety functions and safety functions... Note: This is a translation of the RSK statement entitled RSK-Verständnis der Sicherheitsphilosophie. In case of discrepancies between the English translation and the German original, the original shall

More information

GUIDELINES FOR REGULATORY REVIEW OF EOPs AND SAMGs

GUIDELINES FOR REGULATORY REVIEW OF EOPs AND SAMGs GUIDELINES FOR REGULATORY REVIEW OF EOPs AND SAMGs CNCAN, ROMANIA 2016 1 TABLE OF CONTENTS 1. INTRODUCTION 1.1. Background 1.2. Purpose and scope of the guidelines 1.3. Structure of the guidelines 1.4.

More information

Readiness For Regulating Small Modular Reactors

Readiness For Regulating Small Modular Reactors Readiness For Regulating Small Modular Reactors International Nuclear Regulators Association September 19, 2017 Vienna, Austria Ramzi Jammal Executive Vice-President and Chief Regulatory Operations Officer

More information

CNSC Activities in Support of Regulation of Activities Involving New Reactor Technologies

CNSC Activities in Support of Regulation of Activities Involving New Reactor Technologies CNSC Activities in Support of Regulation of Activities Involving New Reactor Technologies Technical and Regulatory Issues Facing Nuclear Power Plants: Leveraging Global Experience June 1 & 2, 2016 Chicago,

More information

Canada. Record of Decision. In the Matter of. Ontario Power Generation. Applicant

Canada. Record of Decision. In the Matter of. Ontario Power Generation. Applicant Canadian Nuclear Safety Commission Commission canadienne de sorete nucleaire Record of Decision In the Matter of Applicant Ontario Power Generation Subject Application to Renew the Waste Facility Operating

More information

Design of Instrumentation and Control Systems for Nuclear Power Plants

Design of Instrumentation and Control Systems for Nuclear Power Plants Date: 2014 March 21 IAEA SAFETY STANDARDS for protecting people and the environment Draft M Step 10 Addressing Member States for comments. Design of Instrumentation and Control Systems for Nuclear Power

More information

India s HWR Activities S.G.Ghadge Executive Director (Reactor Safety & Analysis) Nuclear Power Corporation of India Limited

India s HWR Activities S.G.Ghadge Executive Director (Reactor Safety & Analysis) Nuclear Power Corporation of India Limited India s HWR Activities S.G.Ghadge Executive Director (Reactor Safety & Analysis) Nuclear Power Corporation of India Limited 13 th Meeting of the Technical Working Group on Advanced Technologies for HWRs

More information