1 School Assessment Report School: Cascade Elementary School Report: Nov 17, 2015 Condition Assessment: Suitability Assessment: Generated: 11/17/ :37:55 AM FOR OFFICIAL USE ONLY Final

2 School Assessment Report - Mays Cluster, Cascade Elementary School Table of Contents Executive Summary 3 Condition Budget Summary 3 Suitability Summary 6 Enrollment Projection 8 Buildings 9 Building Name: 1994_Bldg Building Condition Budget Summary 10 Building Condition Budget Detail 10 Building Deficiency Priority 13 Building Condition Deficiencies 14 Building Condition Deficiencies Narrative 15 Sites 22 Site Summary 22 Deficiency Condition Budget Summary: Site 23 Site Deficiencies Budget Detail 24 Site Renewal Schedule 25 Site Deficiency Priority 25 Site Condition Deficiencies 26 Site Deficiencies Budget Narrative 27 Appendix 1 - Educational Suitability Reports 28 Suitability Report 28 The following reference documents may be viewed at the Atlanta Public Schools ecomet Feedback website under 'Support' tab: ecomet Glossary UNIFORMAT Definitions Suitability Criteria Score Description Text Generated: 11/17/ :37:55 AM FOR OFFICIAL USE ONLY Final

3 School Assessment Report - Mays Cluster, Cascade Elementary School Executive Summary School Name: Cascade Elementary School Number of Buildings: 1 Gross Area (SF): 70,101 Replacement Value: $15,478,294 Condition Budget: $4,360,787 Total FCI: 28.17% Suitability Budget: $758,782 Total RSLI: 28% Total APSFI: 33.31% Condition Score: Suitability Score: School Score: Summary: The Cascade Elementary School consists of (1) main school building located at 2326 Venetian Drive, in Atlanta, GA. The original campus was constructed in The school campus and site are well maintained in good overall condition. Roof covering was installed in 2009 and has 19 main sections including some smaller sections. Roofing is typically pitched with standing seam metal panel system and is in good condition with no reported leaks. (Roofing membrane report and drawings are available on the home page of each school in ecomet on the drop down menu Drawings/Attachments ). Domestic water and sanitary waste systems were upgraded in 1994 and are in good condition. HVAC systems were upgraded in 2009 and are in good condition. Electrical service and lighting systems were upgraded in 1994 and are in good condition. This report contains condition and adequacy data collected during the 2013 APS Facility Assessment. The detailed condition and deficiency statements are contained in this report for each building and site improvements on the campus. Condition Budget Summary Building condition is evaluated based on the functional systems and elements of a building and organized according to the UNIFORMAT II Elemental Classification. The grouping of these systems and elements and applying a current replacement value to them develops a representative building cost model. Cost Models are developed for similar building types and functions. Systems and their elements are evaluated based on their current replacement values, life cycles, installation dates and next renewal dates. Systems and their elements that are within their useful lives are further evaluated to identify current deficient conditions that may have a significant impact on a system s or element's remaining service life, and to determine if they are beyond their predicted useful life. The system's or element's current replacement value is based on RS Means Commercial Cost Data. Following are the cost model's system details for this facility. The Remaining Service Life Index (RSLI), also known as the Condition Index (CI), is calculated as the sum of a renewable system's Remaining Service Life (RSL) divided by the sum of a system's Replacement Value (both values exclude softcost to simplify calculation updates) expressed as a percentage ranging from % (new system) to 0.00% (system expired). The System Condition Index (SCI) is the ratio of a system's current condition deficiency costs to its replacement value - also known as "percent used" ranging from 0 percent to 100 percent or greater due to the addition of the system's renewal premium, the additional costs to prepare for the system's renewal such as demolition costs. The Condition Budget, also known as Condition Needs, represents the budgeted contractor installed costs plus owner's soft costs for the repair, replacement or renewal for a component or system level deficiency. It excludes contributing costs for other components or systems that might also be associated with the corrective actions due to packaging the work. Generated: 11/17/ :37:50 AM FOR OFFICIAL USE ONLY Final 3

4 School Assessment Report - Mays Cluster, Cascade Elementary School Current Investment Requirement and Condition by Uniformat Classification Uniformat Classification RSLI SCI Condition Budget A10 Foundations 0% 0.00% $0 A20 Basement Construction 0% 0.00% $0 B10 Superstructure 0% 0.00% $0 B20 Exterior Enclosure 13% 0.00% $0 B30 Roofing 70% 0.00% $0 C10 Interior Construction 11% 25.34% $213,500 C30 Interior Finishes 0% % $1,860,642 D20 Plumbing 7% 82.28% $556,696 D30 HVAC 63% 0.00% $0 D40 Fire Protection 37% 0.00% $0 D50 Electrical 0% % $1,515,451 E10 Equipment 0% % $69,836 E20 Furnishings 0% % $144,661 G20 Site Improvements 32% 0.00% $0 G30 Site Mechanical Utilities 58% 0.00% $0 G40 Site Electrical Utilities 29% 0.00% $0 Total: $4,360,787 Condition Deficiency Priority Building Condition Budget /Site GSF FCI Priority 1 Priority 2 Priority 3 Priority 4 Priority 5 Total 1994_Bldg , % $0 $0 $4,267,006 $93,780 $0 $4,360,787 Site 0.0% $0 $0 $0 $0 $0 $0 Total: 70, % $0 $0 $4,267,006 $93,780 $0 $4,360, Recommended (Years 6-10) $93,780 (2.15%) 3 - Necessary (Years 2-5) $4,267,006 (97.85%) School Condition Budget: $4,360,787 Generated: 11/17/ :37:50 AM FOR OFFICIAL USE ONLY Final 4

5 School Assessment Report - Mays Cluster, Cascade Elementary School Renewal Schedule Systems Current Total Total $4,360,785 $482,838 $5,426,891 $496,087 $10,766,601 Substructure Foundations Standard Foundations Special Foundations Slab on Grade Basement Construction Basement Excavation Basement Walls Shell $981,501 $981,501 Superstructure Floor Construction Roof Construction Exterior Enclosure $981,501 $981,501 Exterior Walls Exterior Windows $904,699 $904,699 Exterior Doors $76,802 $76,802 Roofing Roof Coverings Roof Openings Interiors $2,074,142 $496,087 $2,570,229 Interior Construction $213,500 $213,500 Partitions Interior Doors Fittings $213,500 $213,500 Stairs Stair Construction Interior Finishes $1,860,642 $496,087 $2,356,729 Wall Finishes $369,135 $496,087 $865,222 Floor Finishes $804,117 $804,117 Ceiling Finishes $687,390 $687,390 Services $2,072,146 $3,816,656 $5,888,802 Conveying Elevators and Lifts Escalators and Moving Walks Other Conveying Systems Plumbing $556,696 $244,725 $801,421 Plumbing Fixtures $511,801 $511,801 Domestic Water Distribution $67,690 $67,690 Sanitary Waste $177,035 $177,035 Rain Water Drainage Other Plumbing Systems $44,895 $44,895 HVAC $3,148,871 $3,148,871 Energy Supply Heat Generating Systems Cooling Generating Systems Distribution Systems Terminal & Package Units $2,857,285 $2,857,285 Controls & Instrumentation $227,802 $227,802 Systems Testing & Balance $63,784 $63,784 Other HVAC Systems/Equip Fire Protection $423,060 $423,060 Sprinklers $423,060 $423,060 Standpipes Fire Protection Specialties Other Fire Protection Systems Electrical $1,515,450 $1,515,450 Electrical Service/Distribution $192,549 $192,549 Lighting and Branch Wiring $923,836 $923,836 Communications and Security $305,285 $305,285 Other Electrical Systems $93,780 $93,780 Equipment & Furnishings $214,497 $214,497 Equipment $69,836 $69,836 Institutional Equipment $7,981 $7,981 Vehicular Equipment Other Equipment $61,855 $61,855 Furnishings $144,661 $144,661 Fixed Furnishings $144,661 $144,661 Special Construction Special Construction Special Structures Integrated Construction Special Construction Systems Special Facilities Building Sitework $482,838 $628,734 $1,111,572 Site Preparation Site Clearing Site Demolition and Relocations Site Earthwork Hazardous Waste Remediation Site Improvements $482,838 $482,838 Roadways Parking Lots Pedestrian Paving Site Development $391,885 $391,885 Landscaping $90,953 $90,953 Site Mechanical Utilities Water Supply Sanitary Sewer Storm Sewer Heating Distribution Cooling Distribution Fuel Distribution Other Site Mechanical Utilities Site Electrical Utilities $628,734 $628,734 Electrical Distribution $247,328 $247,328 Site Lighting $261,647 $261,647 Site Communication and Security $119,759 $119,759 Other Site Electrical Utilities Generated: 11/17/ :37:51 AM FOR OFFICIAL USE ONLY Final 5

6 Final Suitability - Mays Cluster, Cascade Elementary School Suitability Summary The educational suitability assessment of a school facility is a measure of how well the building(s) and grounds support and enhance the educational programs being offered. The assessment evaluates multiple systems or categories. Some of these are school-wide, like learning environment, while others are focused on specific space types such as art rooms. Some systems or categories are found in all types of schools, such as general classrooms, while others are specific to certain grade configurations, like preschool classrooms. Each school receives an educational suitability score based on a 100 point scale developed as a percentage of possible points for all scored suitability categories. The educational suitability assessment team evaluated the adequacy of the specific space types in each school model, e.g., general classrooms, science rooms, support spaces, etc. The possible score for each space type was weighted based on that space type's proportion of the total area of the school model. Consequently, general classrooms in an elementary school receive more possible points than general classrooms in a high school, since they represent a greater proportion of the total space. Suitability Scoring The suitability scoring system includes additional educational suitability categories that cannot always be weighted based on simple square footage. Some examples of these categories include ease of supervision, learning environment, pedestrian traffic, and others. The weightings of these categories were determined through field work by experienced educators and architects and reflect each category's relative importance in that particular model. The points assigned a specific educational suitability category in one model may differ from another model. A comparison of the points assigned to a specific educational suitability category across models is not appropriate because the size and proportion of spaces will be different based on the type of school. For example, an auditorium is typical at a high school, but elementary and middle schools may have multi-purpose spaces (e.g., "cafegymtoriums"). The points assigned to these spaces are likely to be different. Another aspect of the suitability scoring system is that the weights assigned to the categories are expressed in numbers to two decimal points. This is due to several factors. Using a 100 point scale to review numerous educational suitability systems and categories, many of the point assignments are a fraction of a whole number. Expanding point assignments to two decimals allows the system to reflect the original logic of basing the suitability scoring on square footage and relative importance, and facilitates consistent sums when adding to arrive at a total suitability score. Suitability Budget The budget for correcting educational suitability deficiencies is intended to be used as an estimate for correcting the overall educational suitability needs of a facility and not as a means to develop cost estimates for individual deficiencies. Experience has shown that it is difficult to calculate the cost of correcting items such as classrooms that are sized incorrectly, spaces with inappropriate adjacencies, lack of a variety of teaching and learning spaces, etc. The remediation of these deficiencies can take a variety of forms and requires a design study before accurate cost calculations can be made. A budget was developed for suitability improvements based on the overall suitability score of a particular school and team experience in correcting the overall deficiencies based on that score. Suitability Budget needs for each facility are included in the report and should be used as a starting place for long range planning. Much like a facility condition index, the inverse of the suitability score is a measure of the value of the building which should be reinvested to remediate the deficiencies. The Atlanta Public School Facilities Inventory (APSFI) includes a model which is adequate to develop budget projections for remediating educational suitability deficiencies. The model is as follows: Atlanta Suitability Index = (1.0 - Suitability Score (%)) APSFI x.35 x School Current Replacement Value (CRV) =Total Suitability Budget Needs The APSFI budget projection of 35% of the Current Replacement Value is based on several factors: First, the remediation of educational suitability deficiencies may be accomplished in a number of ways. For instance, remediating a classroom which does not meet the size standard for a given number of students can be "fixed" by, on one extreme, lowering the class size which costs no capital dollars, and on the other extreme, by building a new classroom, which would cost 100% of the replacement cost. Most often, the solution is to carve out some additional space, or combine three classrooms into two by removing the internal walls. Consequently, the cost of remediation is most often less than 100% of the replacement cost and our experience has shown that the 35% factor is an effective planning parameter. Second, the fact that these deficiencies are typically remediated along with building condition deficiencies and often overlap in scope of work and cost. Budgets for both assessments at 100% of the replacement cost would likely result in excessive budgets. Generated: 11/17/ :37:51 AM FOR OFFICIAL USE ONLY Final 6

7 Final Suitability - Mays Cluster, Cascade Elementary School The report below provides information about the Educational Suitability of this school, based on the Criteria in Appendix 1. Each area was scored 1 through 5, or "NA" with 1 being the high score. Items are scored "NA" if they are not appropriate to that school program (e.g., football fields at an elementary school or preschool at a high school) or are not needed at a school (e.g., no computer lab at a school where every student has a laptop). All scores are shown. However, the suitability deficiency budget reflects only the deficiencies identified with scores of 2 or lower. Suitability Narrative: Cascade Elementary serves students in grades PK-5 in a one-story school. The school serves students from the surrounding neighborhoods and has a general education focus. It has two classrooms for physically challenged students. Suitability Category Scoring Summary Task No Task Description Score 4845 Support Spaces Learning Environment General Classrooms Kindergarten Pre-K Self-Contained Special Ed Instructional Resource Rooms Science Music Art Computer Labs P.E Performing Arts Media Center Outside Safety and Security Cascade Elementary School Suitability Budget Total: $758,782 Generated: 11/17/ :37:51 AM FOR OFFICIAL USE ONLY Final 7

8 Final Suitability - Mays Cluster, Cascade Elementary School Enrollment Projection Enrollment projections are merely an estimate of future activity based on the historical data and information provided. These numbers can be highly accurate, but it must be remembered that the numbers are still a projection or estimate. During the implementation of any of the recommendations provided, it is critical that the school reassess these numbers on a regular basis and adjust plans accordingly. Cascade Elementary School Projected Enrollment Grade Kindergarten Subtotal ** EC Students are not used in the development of the projections. Generated: 11/17/ :37:51 AM FOR OFFICIAL USE ONLY Final 8

9 School Assessment Report - Mays Cluster, Cascade Elementary School, 1994_Bldg 2010 Buildings Building Name: 1994_Bldg 2010 Year Built: 1994 Gross Area (SF): 70,101 Replacement Value: $13,507,456 Repair Cost: $4,360,787 Total FCI: 32.28% Total RSLI: 27% The superstructure is steel frame. Floor construction is slab on-grade. Roof construction is metal pan deck with lightweight fill. The exterior enclosure is comprised of walls of brick veneer over CMU. Exterior windows are aluminum frame mostly with fixed panes. Exterior doors are hollow metal steel mostly with glazing. Roofing is typically pitched with single ply membrane and is in good condition with no reported leaks. Generated: 11/17/ :37:51 AM FOR OFFICIAL USE ONLY Final 9

10 School Assessment Report - Mays Cluster, Cascade Elementary School, 1994_Bldg 2010 Building Condition Budget Summary Building condition is evaluated based on the constructed physical elements of a building and organized according to the UNIFORMAT II Elemental Classification. The grouping of these elements is used to construct a building cost model. Models are developed for similar building types and function. Systems are evaluated based on their costs, design life, installation date and predicted next renewal date. Systems that are within their design life are further evaluated to identify current deficient conditions which may have a significant impact on a system s or component's remaining service life. The system value is based on RS Means Commercial Cost Data. Following are the systems detail for this facility. Uniformat Classification RSLI SCI Condition Budget A10 Foundations 0% 0.00% $0 A20 Basement Construction 0% 0.00% $0 B10 Superstructure 0% 0.00% $0 B20 Exterior Enclosure 13% 0.00% $0 B30 Roofing 70% 0.00% $0 C10 Interior Construction 11% 25.34% $213,500 C30 Interior Finishes 0% % $1,860,642 D20 Plumbing 7% 82.28% $556,696 D30 HVAC 63% 0.00% $0 D40 Fire Protection 37% 0.00% $0 D50 Electrical 0% % $1,515,451 E10 Equipment 0% % $69,836 E20 Furnishings 0% % $144,661 Total: $4,360,787 Building Condition Budget Detail Uniformat System Description Unit Price Life Install Year Calc Next Renewal Replacement RSLI SCI Condition Budget A1010 Standard Foundations $ $511, % $0 A1020 Special Foundations $ $24, % $0 A1030 Slab on Grade $ $441, % $0 A2010 Basement Excavation $ $16, % $0 A2020 Basement Walls $ $161, % $0 B1020 Roof Construction $ $859, % $0 B2010 Exterior Walls $ $959, % $0 B2020 Exterior Windows $ $630,342 30% 0.00% $0 B2030 Exterior Doors $ $53,511 30% 0.00% $0 B3010 Roof Coverings $ $1,068,407 70% 0.00% $0 B3020 Roof Openings $ $36,279 80% 0.00% $0 C1010 Partitions $ $394, % $0 C1020 Interior Doors $ $253,951 48% 0.00% $0 C1030 Fittings $ $194,091 0% 110% $213,500 C3010 Wall Finishes $ $335,578 0% 110% $369,135 C3020 Floor Finishes $ $731,015 0% 110% $804,117 C3030 Ceiling Finishes $ $624,900 0% 110% $687,390 D2010 Plumbing Fixtures $ $465,274 0% 110% $511,801 D2020 Domestic Water Distribution $ $47,162 30% 0.00% $0 D2030 Sanitary Waste $ $123,347 30% 0.00% $0 D2090 Other Plumbing Systems $ $40,814 0% 110% $44,895 D3020 Heat Generating Systems $ $270,276 70% 0.00% $0 D3030 Cooling Generating Systems $ $456,204 70% 0.00% $0 D3040 Distribution Systems $ $700,178 70% 0.00% $0 D3050 Terminal & Package Units $ $1,990,792 60% 0.00% $0 D3060 Controls & Instrumentation $ $158,719 60% 0.00% $0 D3070 Systems Testing & Balance $ $44,441 60% 0.00% $0 D4010 Sprinklers $ $294,764 30% 0.00% $0 D4030 Fire Protection Specialties $ $7,256 80% 0.00% $0 Other Fire Protection D4090 Systems $ $38,093 87% 0.00% $0 Electrical D5010 Service/Distribution $ $175,045 0% 110% $192,549 D5020 Lighting and Branch Wiring $ $839,851 0% 110% $923,836 Communications and D5030 Security $ $277,532 0% 110% $305,285 D5090 Other Electrical Systems $ $85,255 0% 110% $93,780 Generated: 11/17/ :37:51 AM FOR OFFICIAL USE ONLY Final 10

11 School Assessment Report - Mays Cluster, Cascade Elementary School, 1994_Bldg 2010 Uniformat System Description Unit Price Life Install Year Calc Next Renewal Replacement RSLI SCI Condition Budget E1020 Institutional Equipment $ $7,256 0% 110% $7,981 E1090 Other Equipment $ $56,232 0% 110% $61,855 E2010 Fixed Furnishings $ $131,510 0% 110% $144,661 Total $ $13,507,456 35% 32.28% $4,360,787 Generated: 11/17/ :37:51 AM FOR OFFICIAL USE ONLY Final 11

12 School Assessment Report - Mays Cluster, Cascade Elementary School, 1994_Bldg 2010 Renewal Schedule Systems Current Total Total $4,360,785 $4,798,157 $496,087 $9,655,029 Substructure Foundations Standard Foundations Special Foundations Slab on Grade Basement Construction Basement Excavation Basement Walls Shell $981,501 $981,501 Superstructure Floor Construction Roof Construction Exterior Enclosure $981,501 $981,501 Exterior Walls Exterior Windows $904,699 $904,699 Exterior Doors $76,802 $76,802 Roofing Roof Coverings Roof Openings Interiors $2,074,142 $496,087 $2,570,229 Interior Construction $213,500 $213,500 Partitions Interior Doors Fittings $213,500 $213,500 Stairs Stair Construction Interior Finishes $1,860,642 $496,087 $2,356,729 Wall Finishes $369,135 $496,087 $865,222 Floor Finishes $804,117 $804,117 Ceiling Finishes $687,390 $687,390 Services $2,072,146 $3,816,656 $5,888,802 Conveying Elevators and Lifts Escalators and Moving Walks Other Conveying Systems Plumbing $556,696 $244,725 $801,421 Plumbing Fixtures $511,801 $511,801 Domestic Water Distribution $67,690 $67,690 Sanitary Waste $177,035 $177,035 Rain Water Drainage Other Plumbing Systems $44,895 $44,895 HVAC $3,148,871 $3,148,871 Energy Supply Heat Generating Systems Cooling Generating Systems Distribution Systems Terminal & Package Units $2,857,285 $2,857,285 Controls & Instrumentation $227,802 $227,802 Systems Testing & Balance $63,784 $63,784 Other HVAC Systems/Equip Fire Protection $423,060 $423,060 Sprinklers $423,060 $423,060 Standpipes Fire Protection Specialties Other Fire Protection Systems Electrical $1,515,450 $1,515,450 Electrical Service/Distribution $192,549 $192,549 Lighting and Branch Wiring $923,836 $923,836 Communications and Security $305,285 $305,285 Other Electrical Systems $93,780 $93,780 Equipment & Furnishings $214,497 $214,497 Equipment $69,836 $69,836 Institutional Equipment $7,981 $7,981 Vehicular Equipment Other Equipment $61,855 $61,855 Furnishings $144,661 $144,661 Fixed Furnishings $144,661 $144,661 Special Construction Special Construction Special Structures Integrated Construction Special Construction Systems Special Facilities Generated: 11/17/ :37:51 AM FOR OFFICIAL USE ONLY Final 12

13 School Assessment Report - Mays Cluster, Cascade Elementary School, 1994_Bldg 2010 Building Deficiency Priority Deficiencies by Priority: 4 - Recommended (Years 6-10) $93,780 (2.15%) 3 - Necessary (Years 2-5) $4,267,006 (97.85%) 1994_Bldg 2010 Condition Budget: $4,360,787 Generated: 11/17/ :37:52 AM FOR OFFICIAL USE ONLY Final 13

14 School Assessment Report - Mays Cluster, Cascade Elementary School, 1994_Bldg 2010 Building Condition Deficiencies Current deficiencies included systems or components that have reached or exceeded their intrinsic useful life or components of the systems that are in need of repair. Systems that have reached the end their intrinsic useful life are identified as current deficiencies and assigned the distress 'Beyond Expected Life'. The following chart includes all current condition deficiencies associated with this facility. Institutional Equipment $7,981 (.18%) Other Plumbing Systems $44,895 (1.03%) Other Equipment $61,855 (1.42%) Other Electrical Systems $93,780 (2.15%) Fixed Furnishings $144,661 (3.32%) Electrical Service/Distribution $192,549 (4.42%) Lighting and Branch Wiring $923,836 (21.19%) Fittings $213,500 (4.9%) Communications and Se $305,285 (7.%) Wall Finishes $369,135 (8.46%) Floor Finishes $804,117 (18.44%) Plumbing Fixtures $511,801 (11.74%) Ceiling Finishes $687,390 (15.76%) 1994_Bldg 2010 Condition Budget: $4,360,785 Generated: 11/17/ :37:52 AM FOR OFFICIAL USE ONLY Final 14

15 School Assessment Report - Mays Cluster, Cascade Elementary School, 1994_Bldg 2010 Building Condition Deficiencies Narrative System: C Fittings Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in It has a 20-year service life which expired in Recomm.: The system should be replaced. Photo is not available. Deficiency Location: 1994_Bldg 2010 Distress: Beyond Expected Life Category: Deferred Maintenance Priority: 3 - Necessary (Years 2-5) Correction: Renew System Qty: 1-Ea. Condition Budget: $213,500 System: C Wall Finishes Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in It has a 10-year service life which expired in Recomm.: The system should be replaced. Photo is not available. Deficiency Location: 1994_Bldg 2010 Distress: Beyond Expected Life Category: Deferred Maintenance Priority: 3 - Necessary (Years 2-5) Correction: Renew System Qty: 1-Ea. Condition Budget: $369,135 Generated: 11/17/ :37:52 AM FOR OFFICIAL USE ONLY Final 15

16 School Assessment Report - Mays Cluster, Cascade Elementary School, 1994_Bldg 2010 System: C Floor Finishes Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in It has a 20-year service life which expired in Recomm.: The system should be replaced. Photo is not available. Deficiency Location: 1994_Bldg 2010 Distress: Beyond Expected Life Category: Deferred Maintenance Priority: 3 - Necessary (Years 2-5) Correction: Renew System Qty: 1-Ea. Condition Budget: $804,117 System: C Ceiling Finishes Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in It has a 20-year service life which expired in Recomm.: The system should be replaced. Photo is not available. Deficiency Location: 1994_Bldg 2010 Distress: Beyond Expected Life Category: Deferred Maintenance Priority: 3 - Necessary (Years 2-5) Correction: Renew System Qty: 1-Ea. Condition Budget: $687,390 Generated: 11/17/ :37:52 AM FOR OFFICIAL USE ONLY Final 16

17 School Assessment Report - Mays Cluster, Cascade Elementary School, 1994_Bldg 2010 System: D Plumbing Fixtures Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in It has a 20-year service life which expired in Recomm.: The system should be replaced. Photo is not available. Deficiency Location: 1994_Bldg 2010 Distress: Beyond Expected Life Category: Deferred Maintenance Priority: 3 - Necessary (Years 2-5) Correction: Renew System Qty: 1-Ea. Condition Budget: $511,801 System: D Other Plumbing Systems Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in It has a 20-year service life which expired in Recomm.: The system should be replaced. Photo is not available. Deficiency Location: 1994_Bldg 2010 Distress: Beyond Expected Life Category: Deferred Maintenance Priority: 3 - Necessary (Years 2-5) Correction: Renew System Qty: 1-Ea. Condition Budget: $44,895 Generated: 11/17/ :37:52 AM FOR OFFICIAL USE ONLY Final 17

18 School Assessment Report - Mays Cluster, Cascade Elementary School, 1994_Bldg 2010 System: D Electrical Service/Distribution Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in It has a 20-year service life which expired in Recomm.: The system should be replaced. Photo is not available. Deficiency Location: 1994_Bldg 2010 Distress: Beyond Expected Life Category: Deferred Maintenance Priority: 3 - Necessary (Years 2-5) Correction: Renew System Qty: 1-Ea. Condition Budget: $192,549 System: D Lighting and Branch Wiring Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in It has a 20-year service life which expired in Recomm.: The system should be replaced. Photo is not available. Deficiency Location: 1994_Bldg 2010 Distress: Beyond Expected Life Category: Deferred Maintenance Priority: 3 - Necessary (Years 2-5) Correction: Renew System Qty: 1-Ea. Condition Budget: $923,836 Generated: 11/17/ :37:52 AM FOR OFFICIAL USE ONLY Final 18

19 School Assessment Report - Mays Cluster, Cascade Elementary School, 1994_Bldg 2010 System: D Communications and Security Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in It has a 15-year service life which expired in Recomm.: The system should be replaced. Photo is not available. Deficiency Location: 1994_Bldg 2010 Distress: Beyond Expected Life Category: Deferred Maintenance Priority: 3 - Necessary (Years 2-5) Correction: Renew System Qty: 1-Ea. Condition Budget: $305,285 System: D Other Electrical Systems Analysis: The system is missing. Recomm.: The system should be installed. Photo is not available. Deficiency Location: 1994_Bldg 2010 Distress: Missing Category: Reliability Priority: 4 - Recommended (Years 6-10) Notes: No Emergency Generator installed, client requested standard. Correction: Renew System Qty: 1-Ea. Condition Budget: $93,780 Generated: 11/17/ :37:52 AM FOR OFFICIAL USE ONLY Final 19

20 School Assessment Report - Mays Cluster, Cascade Elementary School, 1994_Bldg 2010 System: E Institutional Equipment Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in It has a 20-year service life which expired in Recomm.: The system should be replaced. Photo is not available. Deficiency Location: 1994_Bldg 2010 Distress: Beyond Expected Life Category: Deferred Maintenance Priority: 3 - Necessary (Years 2-5) Correction: Renew System Qty: 1-Ea. Condition Budget: $7,981 System: E Other Equipment Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in It has a 20-year service life which expired in Recomm.: The system should be replaced. Photo is not available. Deficiency Location: 1994_Bldg 2010 Distress: Beyond Expected Life Category: Deferred Maintenance Priority: 3 - Necessary (Years 2-5) Correction: Renew System Qty: 1-Ea. Condition Budget: $61,855 Generated: 11/17/ :37:52 AM FOR OFFICIAL USE ONLY Final 20

21 School Assessment Report - Mays Cluster, Cascade Elementary School, 1994_Bldg 2010 System: E Fixed Furnishings Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in It has a 20-year service life which expired in Recomm.: The system should be replaced. Photo is not available. Deficiency Location: 1994_Bldg 2010 Distress: Beyond Expected Life Category: Deferred Maintenance Priority: 3 - Necessary (Years 2-5) Correction: Renew System Qty: 1-Ea. Condition Budget: $144,661 Generated: 11/17/ :37:52 AM FOR OFFICIAL USE ONLY Final 21

22 School Assessment Report - Mays Cluster, Cascade Elementary School, Site Sites Site Summary Condition Budget: $0 Site Acreage Total FCI: 0.00% Replacement Value: $1,970,839 Total RSLI: 35% Condition Score: Site: Cascade Elementary School was constructed in Campus site features include paved driveways and parking lots, pedestrian pavement, flag pole, landscaping, and fencing. Site mechanical and electrical features include water, sewer, natural gas, and site lighting. This report contains condition and adequacy data collected during the 2013 APS Facility Assessment. The detailed condition and deficiency statements are contained in this report for each building and site improvements on the campus. Generated: 11/17/ :37:52 AM FOR OFFICIAL USE ONLY Final 22

23 School Assessment Report - Mays Cluster, Cascade Elementary School, Site Deficiency Condition Budget Summary: Site Uniformat Classification RSLI SCI Condition Budget G20 Site Improvements 32% 0.00% $0 G30 Site Mechanical Utilities 58% 0.00% $0 G40 Site Electrical Utilities 29% 0.00% $0 Total: $0 Generated: 11/17/ :37:52 AM FOR OFFICIAL USE ONLY Final 23

24 School Assessment Report - Mays Cluster, Cascade Elementary School, Site Site Deficiencies Budget Detail Uniformat System Description Unit Price Life Install Year Calc Next Renewal Replacement RSLI SCI Condition Budget G2010 Roadways $ $162,347 40% 0.00% $0 G2020 Parking Lots $ $541,459 40% 0.00% $0 G2030 Pedestrian Paving $ $147,836 40% 0.00% $0 G2040 Site Development $ $316,531 16% 0.00% $0 G2050 Landscaping $ $73,464 16% 0.00% $0 G3010 Water Supply $ $68,929 58% 0.00% $0 G3020 Sanitary Sewer $ $140,580 58% 0.00% $0 G3030 Storm Sewer $ $81,627 58% 0.00% $0 G4010 Electrical Distribution $ $172,324 30% 0.00% $0 G4020 Site Lighting $ $182,300 30% 0.00% $0 G4030 Site Communication and Security $ $83,441 30% 0.00% $0 Total $21.73 $1,970,839 36% 0.00% $0 Generated: 11/17/ :37:52 AM FOR OFFICIAL USE ONLY Final 24

25 School Assessment Report - Mays Cluster, Cascade Elementary School, Site Site Renewal Schedule Systems Curr ent Total Total $482,838 $628,734 $1,111,572 Building Sitework $482,838 $628,734 $1,111,572 Site Preparation Site Clearing Site Demolition and Relocations Site Earthwork Hazardous Waste Remediation Site Improvements $482,838 $482,838 Roadways Parking Lots Pedestrian Paving Site Development $391,885 $391,885 Landscaping $90,953 $90,953 Site Mechanical Utilities Water Supply Sanitary Sewer Storm Sewer Heating Distribution Cooling Distribution Fuel Distribution Other Site Mechanical Utilities Site Electrical Utilities $628,734 $628,734 Electrical Distribution $247,328 $247,328 Site Lighting $261,647 $261,647 Site Communication and Security $119,759 $119,759 Other Site Electrical Utilities Site Deficiency Priority The facility does not have observed deficiencies. Generated: 11/17/ :37:52 AM FOR OFFICIAL USE ONLY Final 25

26 School Assessment Report - Mays Cluster, Cascade Elementary School, Site Site Condition Deficiencies The facility does not have observed deficiencies. Generated: 11/17/ :37:52 AM FOR OFFICIAL USE ONLY Final 26

27 School Assessment Report - Mays Cluster, Cascade Elementary School, Site Site Deficiencies Budget Narrative The facility does not have observed deficiencies. Generated: 11/17/ :37:52 AM FOR OFFICIAL USE ONLY Final 27

28 School Assessment Report - Mays Cluster, Cascade Elementary School Appendix 1 - Educational Suitability Reports Suitability Report Educational Suitability Report Task No Task Description Rating Score Possible Percent Estimate Notes 4845 Support Spaces Restrooms (Student) Good $9,610 The student restroom do not have urinal partitions Administration Excel $ Counseling Fair $5,544 The counselor's office is in the main administration area and there is no waiting area for students Clinic Fair $11,088 The clinic does not have a locking medicine cabinet and has only one bed Staff Lounge-WkRm Good $13, Cafeteria Excel $ Food Service and Prep Excel $ Custodial and Excel $0 Maintenance 4846 Learning Environment Learning Style Variety Fair $94,804 The building design does not accommodate flexible spaces for differentiated instruction Interior Environment Good $21, Exterior Environment Excel $ General Classrooms Environment Good $53, Size Excel $ Location Excel $ Storage/Fixed Equip Excel $ Kindergarten Environment Good $4, Size Excel $ Location Excel $ Storage/Fixed Equip Excel $ Pre-K Environment Good $5, Size Excel $ Location Excel $ Storage/Fixed Equip Excel $ Self-Contained Special Ed Environment Good $5, Size Excel $ Location Excel $ Storage/Fixed Equip Fair $6,826 The self-contained special education rooms lack a private changing area and a shower Instructional Resource Rooms Environment Poor $19,503 The instructional resource room is a converted small workroom with no windows and it is distant from classrooms Size Unsat $97,513 The instructional resource room does not meet the minimum size requirements Location Poor $14,627 The instructional resource room is accessed via the media center or an office Storage/Fixed Equip Fair $10,239 There are not sufficient computers, tables or chairs in the room for small group instruction Science Environment Unsat $27,087 A science room does not exist at this school Size Unsat $67,717 A science room does not exist at this school Location Unsat $20,315 A science room does not exist at this school Storage/Fixed Equip Unsat $20,315 A science room does not exist at this school Music Environment Fair $14,046 The music room is lacking acoustical treatments and appropriate ventilation and/or HVAC for instrument storage Size Excel $ Location Excel $ Storage/Fixed Equip Good $6, Art Environment Good $5, Size Excel $ Location Good $3,802 The art room is adjacent to classrooms contributing to noise transfer Storage/Fixed Equip Fair $6,653 The art room does is lacking sufficient display space for student work Computer Labs Environment Fair $6,468 The computer lab is in a room with windows and sinks. Windows did not have security shutters Size Excel $ Location Fair $4,852 The computer lab is on the first floor with external windows Storage/Fixed Equip Fair $4,852 The computer lab lacks security access and monitoring devices P.E Environment Excel $ Size Excel $0 Generated: 11/17/ :37:54 AM FOR OFFICIAL USE ONLY Final 28

29 School Assessment Report - Mays Cluster, Cascade Elementary School Task No Task Description Rating Score Possible Percent Estimate Notes Location Excel $ Storage/Fixed Equip Good $15,603 The gymatorium does not have rubber flooring Performing Arts Environment Good $6, Size Excel $ Location Excel $ Storage/Fixed Equip Fair $8,593 The stage in the gymatorium has ADA access only at the rear and there is no stage lighting Media Center Environment Excel $ Size Excel $ Location Excel $ Storage/Fixed Equip Excel $ Outside Vehicular Traffic Excel $ Pedestrian Traffic Excel $ Parking Excel $ Play Areas Unsat $126,810 No covered play area, hard surface play area, or play equipment exists at this school Safety and Security Fencing Good $8, Signage & Way Finding Poor $27,087 Only one of the four required signs is present at this school Ease of Supervision Excel $ Controlled Entrances Good $5,417 This school does not have a security vestibule. Total For Site: $758,782 Generated: 11/17/ :37:55 AM FOR OFFICIAL USE ONLY Final

School Assessment Report

School Assessment Report School Assessment Report School: Sutton Middle School (Powers Ferry) Report: Nov 17, 2015 Condition Assessment: Suitability Assessment: Generated: 11/17/2015 10:32:59 AM FOR OFFICIAL USE ONLY Final School

More information

School Assessment Report

School Assessment Report School Assessment Report School: Humphries Elementary School Report: Nov 17, 2015 Condition Assessment: Suitability Assessment: Generated: 11/17/2015 10:35:17 AM FOR OFFICIAL USE ONLY Final School Assessment

More information

School Assessment Report

School Assessment Report School Assessment Report School: Morningside Elementary School Report: Nov 17, 2015 Condition Assessment: Suitability Assessment: Generated: 11/17/2015 10:29:07 AM FOR OFFICIAL USE ONLY Final School Assessment

More information

School Assessment Report

School Assessment Report School Assessment Report School: KIPP Vision Report: Dec 15, 14 Condition Assessment: Suitability Assessment: Generated: 12/15/14 12:33:33 PM Final School Assessment Report - Charter Schools, KIPP Vision

More information

School Assessment Report

School Assessment Report School Assessment Report School: Morningside Elementary School Report: Dec 15, 2014 Condition Assessment: Suitability Assessment: Generated: 12/15/2014 12:11:31 PM FOR OFFICIAL USE ONLY Final School Assessment

More information

School Assessment Report

School Assessment Report School Assessment Report School: Carver High School Report: Nov 17, 2015 Condition Assessment: Suitability Assessment: Generated: 11/17/2015 10:37:23 AM FOR OFFICIAL USE ONLY Final School Assessment Report

More information

DeKalb County School District/Stadiums Avondale Stadium Final School Assessment Report May 20, 2016

DeKalb County School District/Stadiums Avondale Stadium Final School Assessment Report May 20, 2016 DeKalb County School District/Stadiums Avondale Stadium Final School Assessment Report May 20, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 4 School Condition Summary

More information

The GLOBE Academy at Heritage School

The GLOBE Academy at Heritage School DeKalb County School District/Leased/Charter The GLOBE Academy at Heritage School Final School Assessment Report May 20, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary

More information

Hatton Drive Warehouse

Hatton Drive Warehouse DeKalb County School District/Leased/Charter Hatton Drive Warehouse Final School Assessment Report May 20, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 3 School Condition

More information

DeKalb County School District/Elementary Schools Clifton Elementary Final School Assessment Report May 19, 2016

DeKalb County School District/Elementary Schools Clifton Elementary Final School Assessment Report May 19, 2016 DeKalb County School District/Elementary Schools Clifton Elementary Final School Assessment Report May 19, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 4 School Condition

More information

Former Truancy Center

Former Truancy Center DeKalb County School District/Vacant Former Truancy Center Final School Assessment Report May 20, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 3 School Condition Summary

More information

Show how a KM database impacts: cost, time, and quality. Demonstrate how Parametric Design could be used to save time, money, and improve quality

Show how a KM database impacts: cost, time, and quality. Demonstrate how Parametric Design could be used to save time, money, and improve quality Executive Summary: Thesis Proposal Final Draft The following pages contain a final draft of the thesis proposal for the South Baltimore District Court House. The basic layout consists of focusing on Knowledge

More information

Appendix J - Custom Uniformat for EDU Migration

Appendix J - Custom Uniformat for EDU Migration Appendix J - Custom Uniformat for EDU Migration Nr. MTC Uniformat for VFA.facility Life (Years) Weight (1-100) Out of Scope Cost Y/N 1 A Substructure 150 N 2 A10 Foundations 150 N 3 A1010 Standard Foundations

More information

NALLE ELEMENTARY SCHOOL

NALLE ELEMENTARY SCHOOL INITIAL YEAR BUILT 1950 BUILDING AREA 83,900 SF CURRENT PROGRAM CAPACITY 460 ENROLLMENT 2008 372 WARD 7 PROPOSED PROGRAM CAPACITY 400 Site Plan NALLE - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5

More information

School Without Walls

School Without Walls INITIAL YEAR BUILT 1938 BUILDING AREA 59,400 SF CURRENT PROGRAM CAPACITY 304 ENROLLMENT 2008 276 WARD 1 PROPOSED PROGRAM CAPACITY 400 SCHOOL WITHOUT WALLS - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Timberglen Recreation Center Summary

Timberglen Recreation Center Summary Timberglen Recreation Center Summary Address Building Purpose 3810 Timberglen Road Dallas, TX 75287 Recreation Center Original Year of Construction 2003 Building Area 15,000 SF Inspection Date August 2,

More information

Facilities Feasibility Study Frederick Douglass HS Condition Assessment

Facilities Feasibility Study Frederick Douglass HS Condition Assessment Summary of Findings The Frederick Douglass HS Facility located at 2301 Gwynns Falls Parkway in Baltimore, Maryland, was built in 1927. It comprises 194,249 gross square feet. The total current deficiencies

More information

RAYMOND EDUCATION CAMPUS

RAYMOND EDUCATION CAMPUS INITIAL YEAR BUILT 1924 BUILDING AREA 73,600 SF CURRENT PROGRAM CAPACITY 479 ENROLLMENT 2008 302 WARD 1 PROPOSED PROGRAM CAPACITY 600 Site Plan RAYMOND - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

SEATON ELEMENTARY SCHOOL

SEATON ELEMENTARY SCHOOL INITIAL YEAR BUILT 1969 BUILDING AREA 65,000 SF CURRENT PROGRAM CAPACITY 428 ENROLLMENT 2008 280 WARD 2 PROPOSED PROGRAM CAPACITY 325 Site Plan SEATON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5

More information

LEWIS ELEMENTARY SCHOOL

LEWIS ELEMENTARY SCHOOL INITIAL YEAR BUILT 1962 BUILDING AREA 49,500 SF CURRENT PROGRAM CAPACITY 550 ENROLLMENT 2008 288 WARD 1 PROPOSED PROGRAM CAPACITY 450 Site Plan LEWIS - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5

More information

MAURY ELEMENTARY SCHOOL

MAURY ELEMENTARY SCHOOL INITIAL YEAR BUILT 1886 BUILDING AREA 46,800 SF CURRENT PROGRAM CAPACITY 276 ENROLLMENT 2008 238 WARD 6 PROPOSED PROGRAM CAPACITY 325 Site Plan MAURY - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5

More information

Lake Highlands North Recreation Center Summary

Lake Highlands North Recreation Center Summary Lake Highlands North Recreation Center Summary Address Building Purpose 9940 White Rock Trail Dallas, TX 75238 Recreation Center Original Year of Construction 1971 Building Area 33,036 SF Inspection Date

More information

NOYES EDUCATION CAMPUS

NOYES EDUCATION CAMPUS INITIAL YEAR BUILT 1930 BUILDING AREA 49,700 SF CURRENT PROGRAM CAPACITY 321 ENROLLMENT 2008 337 WARD 5 PROPOSED PROGRAM CAPACITY 450 Site Plan NOYES - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-8

More information

DAVIS ELEMENTARY SCHOOL

DAVIS ELEMENTARY SCHOOL INITIAL YEAR BUILT 1943 BUILDING AREA 71,100 SF CURRENT PROGRAM CAPACITY 507 ENROLLMENT 2008 227 WARD 7 PROPOSED PROGRAM CAPACITY 325 Site Plan DAVIS - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-

More information

SHEPHERD ELEMENTARY SCHOOL

SHEPHERD ELEMENTARY SCHOOL INITIAL YEAR BUILT 1932 BUILDING AREA 79,700 SF CURRENT PROGRAM CAPACITY 332 ENROLLMENT 2008 355 WARD 4 PROPOSED PROGRAM CAPACITY 400 Site Plan SHEPHERD - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

POWELL ELEMENTARY SCHOOL

POWELL ELEMENTARY SCHOOL INITIAL YEAR BUILT 1925 BUILDING AREA 38,500 SF CURRENT PROGRAM CAPACITY 304 ENROLLMENT 2008 319 WARD 4 PROPOSED PROGRAM CAPACITY 325 Site Plan POWELL - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-3

More information

LASALLE - BACKUS EDUCATION CAMPUS

LASALLE - BACKUS EDUCATION CAMPUS INITIAL YEAR BUILT 1957 BUILDING AREA 63,000 SF CURRENT PROGRAM CAPACITY 406 ENROLLMENT 2008 349 WARD 4 PROPOSED PROGRAM CAPACITY 425 Site Plan LASALLE - BACKUS - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

WATKINS ELEMENTARY SCHOOL

WATKINS ELEMENTARY SCHOOL INITIAL YEAR BUILT 1962 BUILDING AREA 69,300 SF CURRENT PROGRAM CAPACITY 578 ENROLLMENT 2008 550 WARD 6 PROPOSED PROGRAM CAPACITY 550 Site Plan WATKINS - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

WILKINSON ELEMENTARY SCHOOL

WILKINSON ELEMENTARY SCHOOL INITIAL YEAR BUILT 1976 BUILDING AREA 144,900 SF CURRENT PROGRAM CAPACITY 508 ENROLLMENT 2008 451 WARD 8 PROPOSED PROGRAM CAPACITY 600 Site Plan WILKINSON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Facilities Feasibility Study Matthew A. Henson ES Condition Assessment

Facilities Feasibility Study Matthew A. Henson ES Condition Assessment Summary of Findings The Matthew A. Henson ES Facility located at 1600 N. Payson Street in Baltimore, Maryland, was built in 1964. It comprises 75,228 gross square feet. The total current deficiencies for

More information

Thurgood Marshall Recreation Center Summary

Thurgood Marshall Recreation Center Summary Thurgood Marshall Recreation Center Summary Address Building Purpose 5150 Mark Trail Way Dallas, TX 75232 Recreation Center Original Year of Construction 1970 Building Area 21,300 SF Inspection Date August

More information

STUART-HOBSON MIDDLE SCHOOL

STUART-HOBSON MIDDLE SCHOOL INITIAL YEAR BUILT 1927 BUILDING AREA 105,900 SF CURRENT PROGRAM CAPACITY 460 ENROLLMENT 2008 399 WARD 6 PROPOSED PROGRAM CAPACITY 450 Site Plan STUART-HOBSON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Facilities Feasibility Study Laurence G. Paquin Building Condition Assessment

Facilities Feasibility Study Laurence G. Paquin Building Condition Assessment Summary of Findings The Laurence G. Paquin Building Facility located at 2200 SINCLAIR LANE in Baltimore, Maryland, was built in 1975. It comprises 65,666 gross square feet. The total current deficiencies

More information

PATTERSON ELEMENTARY SCHOOL

PATTERSON ELEMENTARY SCHOOL INITIAL YEAR BUILT 1945 BUILDING AREA 78,300 SF CURRENT PROGRAM CAPACITY 368 ENROLLMENT 2008 463 WARD 8 PROPOSED PROGRAM CAPACITY 500 Site Plan PATTERSON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Evansville Public Schools. Facility Assessment Report January 28, 2 , General Building Data

Evansville Public Schools. Facility Assessment Report January 28, 2 , General Building Data Evansville Public Schools Facility Assessment Report January 28, 2, 2013 SGN/Wendel Architects, Design Tree Engineering and R.A. Morton Construction Managers were retained by the Evansville Public School

More information

LECKIE ELEMENTARY SCHOOL

LECKIE ELEMENTARY SCHOOL INITIAL YEAR BUILT 1970 BUILDING AREA 65,000 SF CURRENT PROGRAM CAPACITY 471 ENROLLMENT 2008 321 WARD 8 PROPOSED PROGRAM CAPACITY 400 Site Plan LECKIE - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5

More information

K.B. Polk Recreation Center Summary

K.B. Polk Recreation Center Summary K.B. Polk Recreation Center Summary Address Building Purpose 6801 Roper Street Dallas, TX 75209 Recreation Center Original Year of Construction 1988 Building Area 14,305 SF Inspection Date July 20, 2016

More information

BALLOU SENIOR HIGH SCHOOL

BALLOU SENIOR HIGH SCHOOL INITIAL YEAR BUILT 1960 BUILDING AREA 271,300 SF CURRENT PROGRAM CAPACITY 1565 ENROLLMENT 2008 9-12 (1,252) STAY (753) WARD 8 PROPOSED PROGRAM CAPACITY 1200 Site Plan BALLOU - 1 PROPOSED PROGRAM PROFILE

More information

LOGAN SCHOOL SCHOOL WITHOUT WALLS AT LOGAN

LOGAN SCHOOL SCHOOL WITHOUT WALLS AT LOGAN INITIAL YEAR BUILT 1935 BUILDING AREA 47,200 SF CURRENT PROGRAM CAPACITY 479 ENROLLMENT 2008 418 WARD 6 PROPOSED PROGRAM CAPACITY 450 Site Plan LOGAN - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION HS

More information

PLUMMER ELEMENTARY SCHOOL

PLUMMER ELEMENTARY SCHOOL INITIAL YEAR BUILT 1959 BUILDING AREA 69,400 SF CURRENT PROGRAM CAPACITY 481 ENROLLMENT 2008 228 WARD 7 PROPOSED PROGRAM CAPACITY 325 Site Plan PLUMMER - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Hartsville Area Schools - Building Evaluations

Hartsville Area Schools - Building Evaluations Darlington County School District Darlington, South Carolina August 8, 2012 Hartsville Area Schools - Building Evaluations School Name: Principal: Grade Levels: Site Size: Student Population: Staff Size:

More information

Facility Condition Assessment

Facility Condition Assessment Citywide Facility Condition Assessment Report of Facility Condition Assessment For City of Manhattan Beach 1600 Marine Avenue, Manhattan Beach, CA September 4, 2013 (Rev A) Provided By: Faithful+Gould,

More information

BARNARD ELEMENTARY SCHOOL

BARNARD ELEMENTARY SCHOOL INITIAL YEAR BUILT 2002 BUILDING AREA 67,000 SF CURRENT PROGRAM CAPACITY 520 ENROLLMENT 2008 329 WARD 4 PROPOSED PROGRAM CAPACITY 450 Site Plan BARNARD - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

GARFIELD ELEMENTARY SCHOOL

GARFIELD ELEMENTARY SCHOOL INITIAL YEAR BUILT 1910 BUILDING AREA 58,908 SF CURRENT PROGRAM CAPACITY 446 ENROLLMENT 2008 278 WARD 8 PROPOSED PROGRAM CAPACITY 400 Site Plan GARFIELD - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

DENNIS TOWNSHIP FEASIBILITY STUDY

DENNIS TOWNSHIP FEASIBILITY STUDY DENNIS TOWNSHIP FEASIBILITY STUDY October 29, 2015 TABLE OF CONTENTS I. INTRODUCTION II. EXECUTIVE SUMMARY III. GENERAL FACILITY DATA A. Primary School B. Elementary / Middle School IV. FACILITIES ASSESSMENT

More information

Corsicana High School

Corsicana High School Contents Corsicana High School...2 General comments, campus capacity, and student demographics...2 1.0 School Site...4 2.0 Building Systems and Components...6 3.0 Building Safety and Security...19 4.0

More information

CONCURRENT ADVERTISEMENT FOR SUBCONTRACTOR PREQUALIFICATION AND BIDS

CONCURRENT ADVERTISEMENT FOR SUBCONTRACTOR PREQUALIFICATION AND BIDS CONCURRENT ADVERTISEMENT FOR SUBCONTRACTOR PREQUALIFICATION AND BIDS (August 28, 2018) PIERCE HALL IMPROVEMENTS PROJECT NO. 950511-950532 UNIVERSITY OF CALIFORNIA, RIVERSIDE PREQUALIFICATION PROCESS ALL

More information

ADDENDUM 2 - JULY 14, 2015

ADDENDUM 2 - JULY 14, 2015 7/9/2015 The Professional(s) of Record above has signed for the following specification sections: DIVISION 1 GENERAL REQUIREMENTS Section 01 10 00 Summary of Work Section 01 25 00 Substitution Procedures

More information

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural % 8/11/ Building Rating System Percent Site: 1.0 Total 0 163 82% Building: 2.1 Building Exterior Elements 0 82 82% 2.2 Accessibility 0 92 92% 2.3 Structural 0 91 91% 2.4 Building Envelope 0 84 84% 2. Interior

More information

G703 Continuation Sheet Minimum Schedule of Values Please use the breakdown listed below when submitting your billing for the project

G703 Continuation Sheet Minimum Schedule of Values Please use the breakdown listed below when submitting your billing for the project Billing Requirements G703 Continuation Sheet Minimum Schedule of Values Please use the breakdown listed below when submitting your billing for the project Sitework / Paving Excavation and Grading Labor

More information

FACILITY COMPONENTS - ELEMENTARY SCHOOL

FACILITY COMPONENTS - ELEMENTARY SCHOOL SITE AREAS Parking and Access - Buses 1.0 2.0 0.16 Two stalls fewer than minimum standard. Parking and Access - Service / Delivery 2.0 1.0 0.16 Parking and Access - Staff 1.0 3.0 0.24 Thirty-seven stalls

More information

3. 21st Century Learning A. Districtwide Flexible Learning $600,000 Subtotal $600,000

3. 21st Century Learning A. Districtwide Flexible Learning $600,000 Subtotal $600,000 1. Safety and Security A. Additional Cameras District Wide $382,000 B. Interior Locks Upgrades $300,000 C. Tilden Entrance Upgrades $50,000 D. Door and Glass Improvements $500,000 E. Alert Systems $800,000

More information

Harry Stone Recreation Center Summary

Harry Stone Recreation Center Summary Harry Stone Recreation Center Summary Address Building Purpose 2400 Millmar Drive Dallas, TX 75228 Recreation Center Original Year of Construction 1957 (Expansion 2013) Building Area 22,281 SF Inspection

More information

Edmonton Public School District No. 7

Edmonton Public School District No. 7 EXECUTIVE SUMMARY 1. Overall Impressions The 1966 non-core school has actively pursued an ongoing maintenance and upgrade program to improve a number of past problem areas within the school. Extensive

More information

BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATION PROPOSED MAIN ENTRY - EXTERIOR RENDERING

BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATION PROPOSED MAIN ENTRY - EXTERIOR RENDERING PROPOSED MAIN ENTRY - EXTERIOR RENDERING EXISTING SITE AERIAL PHOTOGRAPH 6TH STREET NW PEDESTRIAN ACCESS School access to existing alley leads students through vehicular path CHAIN LINK ENCLOSED PARKING

More information

Facility Condition Assessment Dr. Harry L. Halliwell Memorial School

Facility Condition Assessment Dr. Harry L. Halliwell Memorial School Dr. Harry L. Halliwell Memorial School October 2016 Address: 358 Victory Highway, Slatersville, RI 02876 D R AF T Report Generated: October 06, 2016 MඵAඵPඵPඵ^ Ξ :ĂĐŽďƐ ϮϬϭϲ 1 Dr. Harry L. Halliwell Memorial

More information

SPACE TYPE: OUTSIDE PARKING (STRUCTURE)

SPACE TYPE: OUTSIDE PARKING (STRUCTURE) SPACE TYPE: OUTSIDE PARKING (STRUCTURE) Construction Criteria The unit costs for Outside Parking (Structure) space types are based on the construction quality and design features in the following table.

More information

WALKER-JONES EDUCATION CAMPUS

WALKER-JONES EDUCATION CAMPUS INITIAL YEAR BUILT 2009 BUILDING AREA 123,750 SF CURRENT PROGRAM CAPACITY 509 ENROLLMENT 2008 189 WARD 6 PROPOSED PROGRAM CAPACITY 750 Site Plan WALKER-JONES - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Facility Condition Assessment

Facility Condition Assessment Citywide Facility Condition Assessment Report of Facility Condition Assessment For 1601 Manhattan Beach Boulevard, Manhattan Beach, CA September 4, 2013 (Rev A) Provided By: Faithful+Gould, Inc. Provided

More information

Collins Middle School

Collins Middle School Contents Collins Middle School...2 General comments, campus capacity, and student demographics:...2 1.0 School Site...4 2.0 Building Systems and Components...5 3.0 Building Safety and Security...19 4.0

More information

Health Life Safety Survey and Master Facilities Plan

Health Life Safety Survey and Master Facilities Plan Health Life Safety Survey and Master Facilities Plan Community Presentation Board Meeting June 22, 2015 June 22, 2014 Board Presentation Overview and Summary of the Health Life Safety Survey and Master

More information

Upper Adams School District Facility Study Presentation Part 2 November 17, 2016

Upper Adams School District Facility Study Presentation Part 2 November 17, 2016 Upper Adams School District Facility Study Presentation Part 2 November 17, 2016 Providing a Client Oriented Approach to Architecture Crabtree, Rohrbaugh & Associates, Architects Agenda Part 1 Current

More information

Villa Park Public Library

Villa Park Public Library Villa Park Public Library Plan for Village Board Approval Submitted By: CCS International Inc. 1815 South Meyers Road, Suite 1070 Oakbrook Terrace, IL 60171 630.678.0808 630.678.0858 FAX www.ccsdifference.com

More information

FACILITY COMPONENTS - ELEMENTARY SCHOOL

FACILITY COMPONENTS - ELEMENTARY SCHOOL SITE AREAS Parking and Access - Buses 1.0 2.0 0.16 Five fewer bus stalls than minimum standard. Parking and Access - Service / Delivery 1.0 1.0 0.08 No delivery parking adjacent to delivery entrance. Parking

More information

The Report: Priority 1 thru 5 $ 2,124,417 Lifecycle Years 1 thru 3 ½ $ 384,097 New Construction $ 2,451,568 Less Redlined Items $ 43,534

The Report: Priority 1 thru 5 $ 2,124,417 Lifecycle Years 1 thru 3 ½ $ 384,097 New Construction $ 2,451,568 Less Redlined Items $ 43,534 Building Condition Assessment Facilities Feasibility Study 106 - Sam Houston Elementary Educational Needs $ 2,451,568 Safety & Security Needs $ 588,049 Exterior Needs $ 622,503 Interior Needs $ 703,790

More information

Facility Assessment Report, Montgomery Independent School District

Facility Assessment Report, Montgomery Independent School District NATATORIUM CAMPUS DATA NATATORIUM 22628 Hwy 105 West, Montgomery TX 77356 Year Built 2009 Approx. Total Square Footage Grades Served 30,420 n/a Current Enrollment n/a Building Levels 1 1 MASTER PLAN 2

More information

< 15% 15 to 25% 25 to 45% 45 to 60% > 60% Buildings Minimal Current Capital Funding Required. Systems

< 15% 15 to 25% 25 to 45% 45 to 60% > 60% Buildings Minimal Current Capital Funding Required. Systems Facility Condition Assessment Summary Report This report provides a summary of the Facility Condition Index (FCI) value of a school facility and select major building systems. The FCI calculation represents

More information

Darlington Area Schools - Building Evaluations

Darlington Area Schools - Building Evaluations Darlington County School District Darlington, South Carolina August 2, 2012 Darlington Area Schools - Building Evaluations School Name: Cain Elementary School Observed By: Creed/Carter Principal: Grade

More information

Hartsville Area Schools - Building Evaluations

Hartsville Area Schools - Building Evaluations Darlington County School District Darlington, South Carolina August 8, 2012 Hartsville Area Schools - Building Evaluations School Name: Southside Early Childhood Observed By: Cannon/Carter Principal: Grade

More information

Building Assessment Report

Building Assessment Report Building Assessment Report Building: HH.5 Main Report: Apr 25, 23 Building Assessment Report - HH.5 Main Table of Contents HH.5 Main Executive Summary Photo Album 5 System Listing 6 Renewal Schedule 7

More information

Completed. Project. Melbourne High School. Comprehensive Additions and Renovations

Completed. Project. Melbourne High School. Comprehensive Additions and Renovations Project Update Project Update September 8, 2006 January 06, 2010 Project Manager Project Manager Anibal Caussade Dennis Bonny Field Coordinator Field Coordinator Bud Ball Paul Friel Project Budget Project

More information

Attachment A Master Plan Scope Matrix

Attachment A Master Plan Scope Matrix Attachment A Master Plan Scope Matrix The following matrix is a worksheet to identify required and optional scope for master planning services, adapted from the CDE Master Plan Guidelines. Please identify

More information

Hartsville Area Schools - Building Evaluations

Hartsville Area Schools - Building Evaluations Darlington County School District Darlington, South Carolina August 8, 2012 Hartsville Area Schools - Building Evaluations School Name: West Hartsville Elementary Observed By: Cannon/Carter Principal:

More information

Building Information Modeling (BIM) Execution Plan

Building Information Modeling (BIM) Execution Plan 10/19/2017 for [Stanford Project Name] [Stanford Project Number] Developed by [Primary A/E] TABLE OF CONTENTS USE OF THE BIM EXECUTION PLAN... 3 1. PROJECT INFORMATION... 3 2. PROJECT SCHEDULE AND MILESTONES...

More information

KEY ELEMENTARY SCHOOL

KEY ELEMENTARY SCHOOL INITIAL YEAR BUILT 1925 BUILDING AREA 52,000 SF CURRENT PROGRAM CAPACITY 320 ENROLLMENT 2008 328 WARD 3 PROPOSED PROGRAM CAPACITY 325 Site Plan KEY - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5

More information

< 15% 15 to 25% 25 to 45% 45 to 60% > 60% Buildings Minimal Current Capital Funding Required. Systems

< 15% 15 to 25% 25 to 45% 45 to 60% > 60% Buildings Minimal Current Capital Funding Required. Systems Facility Condition Assessment Summary Report This report provides a summary of the Facility Condition Index (FCI) value of a school facility and select major building systems. The FCI calculation represents

More information

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural % 8/11/ Building Rating System Percent Site: 1.0 Total 0 9 8 Building: 2.1 Building Exterior Elements 0 82 82% 2.2 Accessibility 0 82 82% 2.3 Structural 0 7 7% 2.4 Building Envelope 0 47 47% 2. Interior

More information

MCER Study for Little Powder K-8

MCER Study for Little Powder K-8 MCER Study for Little Powder K-8 CCSD #1 Little Powder K-8 Weston, WY Wyoming School Facilities Department Cheyenne, WY TSP, Inc. Sheridan, WY May 16, 2016 Table of Contents Introduction 3 Goals and Objectives

More information

HERITAGE MIDDLE SCHOOL. Overview: Livingston School District Heritage Middle School

HERITAGE MIDDLE SCHOOL. Overview: Livingston School District Heritage Middle School HERITAGE MIDDLE SCHOOL Overview: The is located at 20 Foxcroft Drive and consists of a three-story building with Three-Story Classroom and Multi-Purpose Room Additions completed in 2002. The building has

More information

Toronto Community Housing Executive Summary 2016/2017. BCA Report. Sample House High FCI

Toronto Community Housing Executive Summary 2016/2017. BCA Report. Sample House High FCI BCA Report Porfolio Development Size Construction TCHC - All Op Units Scattered Units (CHU 20),005 Sq.Ft. 925 Floor Above Grade 2 Divisional Units Page of 43 Description This dwelling unit is a detached

More information

Property Condition Assessment

Property Condition Assessment Property Condition Assessment Pewaukee, WI 53072 Inspection Date: 1/6/15 Prepared For: Report Number: Prepared By: Shamrock Building Inspection Consultants LLC N29 W29951 Shel-Mar Dr. Pewaukee, WI 53072

More information

Sub-Section A Lompoc County Offices Executive Summary

Sub-Section A Lompoc County Offices Executive Summary Facility Condition Assessment 2014 Sub-Section A Lompoc County Offices Executive Summary The Lompoc County Offices was assessed for deficiencies, and each building system and site was assigned a condition

More information

CENTENNIAL SCHOOL DISTRICT

CENTENNIAL SCHOOL DISTRICT CENTENNIAL SCHOOL DISTRICT Middle School Feasibility Study Project PLANNING STUDY PRESENTATION 24 May 2016 Middle School Master Planning Process 1. Familiarized team with existing middle schools and sites

More information

Darlington Area Schools - Building Evaluations

Darlington Area Schools - Building Evaluations Darlington County School District Darlington, South Carolina August 2, 2012 Darlington Area Schools - Building Evaluations School Name: Pate Elementary School Observed By: Creed/Carter Principal: Grade

More information

Mills Elementary School Site Summary

Mills Elementary School Site Summary 1 Mills Elementary School Site Summary Address 6201 Davis Lane Austin, TX 78749 Number of Permanent Campus Facilities 1 Original Year of Construction 1998 Total Campus Building Area (combined) 81,368 SF

More information

Section I Carpinteria Executive Summary

Section I Carpinteria Executive Summary Section I Carpinteria Executive Summary In 2013-2014, the Consultant conducted initial facility condition assessment data collection at the County of Santa Barbara, with specific attention to Carpinteria

More information

Tech Assignment 1 University Medical Center of Princeton. Plainsboro Road, Township of Plainsboro, New Jersey

Tech Assignment 1 University Medical Center of Princeton. Plainsboro Road, Township of Plainsboro, New Jersey Tech Assignment 1 University Medical Center of Princeton Plainsboro Road, Township of Plainsboro, New Jersey David Bodnar CM Chris Maget 10/5/2009 Table of Contents Executive Summary...3 Project Schedule

More information

FACILITY COMPONENTS - MIDDLE SCHOOL

FACILITY COMPONENTS - MIDDLE SCHOOL SITE AREAS Parking and Access - Buses 2.0 2.0 0.30 Parking and Access - Serv. / Delivery 3.0 1.0 0.22 Parking and Access - Staff 4.0 3.0 0.89 Parking and Access - Visitors 1.0 3.0 0.22 Four fewer stalls

More information

The Report: Priority 1 thru 5 $ 2,933,064 New Construction $ 6,797,031 Less Redlined Items $ 218,060

The Report: Priority 1 thru 5 $ 2,933,064 New Construction $ 6,797,031 Less Redlined Items $ 218,060 Building Condition Assessment Facilities Feasibility Study 124 - Leonelo H. Gonzalez Elementary Educational Needs $ 6,881,962 Safety & Security Needs $ 532,225 Exterior Needs $ 893,302 Needs $ 471,995

More information

Building Inspection Report

Building Inspection Report Building Inspection Report Sample Commercial Inspection Report Inspection Date: Prepared For: Prepared By: Professional Property Inspection Consultants 4857 Winterset Drive Columbus, OH 43220 (614) 459-5941

More information

Mount Vernon Elementary School Grades PK 5

Mount Vernon Elementary School Grades PK 5 Barbour County Schools Comprehensive Educational Facilities Plan 2010-2020 Mount Vernon Elementary School Grades PK 5 Blackwood Associates, Inc. / MSES consultants, Inc. / Roy Blizzard and Associates Mount

More information

Section I Isla Vista Campus Executive Summary

Section I Isla Vista Campus Executive Summary Section I Isla Vista Campus Executive Summary In 2013-2014, the Consultant conducted initial facility condition assessment data collection at the County of Santa Barbara, with specific attention to the

More information

EASTERN HIGH SCHOOL. Site Plan East Capitol Street, N.E., Washington, DC INITIAL YEAR BUILT 1923

EASTERN HIGH SCHOOL. Site Plan East Capitol Street, N.E., Washington, DC INITIAL YEAR BUILT 1923 INITIAL YEAR BUILT 1923 BUILDING AREA 288,800 SF CURRENT PROGRAM CAPACITY 1,425 ENROLLMENT 2008 565 WARD 6 PROPOSED PROGRAM CAPACITY 1,100 Site Plan EASTERN - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Overbrook Theater / Fruenthal Foundation Art Center. 1.0 Total Points % 2.1 Building Exterior Elements %

Overbrook Theater / Fruenthal Foundation Art Center. 1.0 Total Points % 2.1 Building Exterior Elements % 8/13/ Building Rating System Percent Site: 1.0 Total 0 9 8 Building: 2.1 Building Exterior Elements 0 64 64% 2.2 Accessibility 0 66 66% 2.3 Structural 0 77 77% 2.4 Building Envelope 0 4 4% 2. Interior

More information

Section I Lompoc Animal Services Executive Summary

Section I Lompoc Animal Services Executive Summary Section I Lompoc Animal Services Executive Summary In 2013-2014, the Consultant conducted initial facility condition assessment data collection at the County of Santa Barbara, with specific attention to

More information

APPLICATION AND CERTIFICATE FOR PAYMENT

APPLICATION AND CERTIFICATE FOR PAYMENT AND CERTIFICATE FOR PAYMENT TO OWNER: MASTER TEMPLATE - SAVE PROJECT FILE 1 DATE: 10/5/2012 PERIOD TO: ARCHITECT: PROJECT NO: CONTRACTOR'S FOR PAYMENT Application is made for payment, as shown below, in

More information

INSPIRE each student to develop a strong

INSPIRE each student to develop a strong DEL PASO MANOR ELEMENTARY SCHOOL Valuing a culturally and academically DIVERSE COMMUNITY, Del Paso Manor Elementary School s Mission is to EDUCATE and INSPIRE each student to develop a strong A C A D E

More information

Belington Elementary School Grades PK 5

Belington Elementary School Grades PK 5 Barbour County Schools Comprehensive Educational Facilities Plan 2010-2020 Belington Elementary School Grades PK 5 Blackwood Associates, Inc. / MSES consultants, Inc. / Roy Blizzard and Associates Belington

More information

Edmonton Public School District No. 7

Edmonton Public School District No. 7 EXECUTIVE SUMMARY 1. Overall Impressions Sherwood Elementary School resides in a quiet residential neighborhood with a shared parking area adjacent to the community league on the north and a generous play