1 School Assessment Report School: Morningside Elementary School Report: Dec 15, 2014 Condition Assessment: Suitability Assessment: Generated: 12/15/ :11:31 PM FOR OFFICIAL USE ONLY Final

2 School Assessment Report - Grady Cluster, Morningside Elementary School Table of Contents Executive Summary 3 Condition Budget Summary 3 Suitability Summary 7 Enrollment Projection 9 Buildings 10 Building Name: 1930_1934_1958 Bldg 2010_2011_ Building Condition Budget Summary 11 Building Condition Budget Detail 11 Building Priority 14 Building Condition Deficiencies 15 Building Condition Deficiencies Narrative 16 Building Name: 1994 Addition 2013_ Building Condition Budget Summary 23 Building Condition Budget Detail 23 Building Priority 26 Building Condition Deficiencies 27 Building Condition Deficiencies Narrative 28 Building Name: 2000 Bldg Building Condition Budget Summary 32 Building Condition Budget Detail 32 Building Priority 35 Building Condition Deficiencies 36 Building Condition Deficiencies Narrative 37 Sites 40 Site Summary 40 Condition Budget Summary: Site 41 Site Deficiencies Budget Detail 42 Site Renewal Schedule 43 Site Priority 43 Site Condition Deficiencies 44 Site Deficiencies Budget Narrative 45 Appendix 1 - Educational Suitability Reports 48 Suitability Report 48 The following reference documents may be viewed at the Atlanta Public Schools ecomet Feedback website under 'Support' tab: Generated: 12/15/ :11:31 PM FOR OFFICIAL USE ONLY Final

3 School Assessment Report - Grady Cluster, Morningside Elementary School ecomet Glossary UNIFORMAT Definitions Suitability Criteria Score Description Text Generated: 12/15/ :11:31 PM FOR OFFICIAL USE ONLY Final

4 School Assessment Report - Grady Cluster, Morningside Elementary School Executive Summary School Name: Morningside Elementary School Number of Buildings: 3 Gross Area (SF): 97,995 Replacement Value: $20,467,406 Condition Budget: $3,268,762 Total FCI: 15.97% Suitability Budget: $1,901,882 Total RSLI: 12% Total APSFI: 25.81% Condition Score: Suitability Score: School Score: Summary: The Morningside Elementary School consists of (2) main school buildings and (1) ancillary building located at 1053 E. Rock Springs Road, in Atlanta, GA. The original campus was constructed in Additions to the main building were constructed in 1934, 1958 and The ancillary building was constructed in In addition to the buildings, the campus contains covered walkways, modular classrooms and play yards. The school campus and site are well maintained in good overall condition. Roof covering has 11 main sections including some smaller sections. Roofing is typically low slope with built-up system in deteriorated condition and should be replaced, the single ply membrane installed in 2005 and standing seam metal panel system installed in 1999 are both in good conditions with no reported leaks. The pitched roof with asphalt compostion shingles installed in 1995 is in fair condition with reported repairs needed to the deteriorated surface. The pitched roof installed in the 1993 Building Section and in the New 1999 Building with standing seam metal panel system is in good condition with no reported leaks. (Roofing membrane report and drawings are available on the home page of each school in ecomet on the drop down menu Drawings/Attachments ) Domestic water and sanitary waste systems were installed in 1994 and 2000 and are in good condition, the systems installed in the building section have reached the end of life expectancy. HVAC systems were installed in 1994 and 2000 and are in fair condition with some inefficiency reports on the heating/cooling controls and balance of the system. Electrical service and Lighting were installed in 1994 and 2000 and are in good condition except for the building section have reached the end of life expectancy. This report contains condition and adequacy data collected during the 2013 APS Facility Assessment. The detailed condition and deficiency statements are contained in this report for each building and site improvements on the campus. Condition Budget Summary Building condition is evaluated based on the functional systems and elements of a building and organized according to the UNIFORMAT II Elemental Classification. The grouping of these systems and elements and applying a current replacement value to them develops a representative building cost model. Cost Models are developed for similar building types and functions. Systems and their elements are evaluated based on their current replacement values, life cycles, installation dates and next renewal dates. Systems and their elements that are within their useful lives are further evaluated to identify current deficient conditions that may have a significant impact on a system s or element's remaining service life, and to determine if they are beyond their predicted useful life. The system's or element's current replacement value is based on RS Means Commercial Cost Data. Generated: 12/15/ :11:21 PM FOR OFFICIAL USE ONLY Final 3

5 School Assessment Report - Grady Cluster, Morningside Elementary School Following are the cost model's system details for this facility. The Remaining Service Life Index (RSLI), also known as the Condition Index (CI), is calculated as the sum of a renewable system's Remaining Service Life (RSL) divided by the sum of a system's Replacement Value (both values exclude softcost to simplify calculation updates) expressed as a percentage ranging from % (new system) to 0.00% (system expired). The System Condition Index (SCI) is the ratio of a system's current condition deficiency costs to its replacement value - also known as "percent used" ranging from 0 percent to 100 percent or greater due to the addition of the system's renewal premium, the additional costs to prepare for the system's renewal such as demolition costs. The Condition Budget, also known as Condition Needs, represents the budgeted contractor installed costs plus owner's soft costs for the repair, replacement or renewal for a component or system level deficiency. It excludes contributing costs for other components or systems that might also be associated with the corrective actions due to packaging the work. Generated: 12/15/ :11:21 PM FOR OFFICIAL USE ONLY Final 4

6 School Assessment Report - Grady Cluster, Morningside Elementary School Current Investment Requirement and Condition by Uniformat Classification Uniformat Classification RSLI SCI Condition Budget A10 Foundations 0% 0.00% $0 A20 Basement Construction 0% 0.00% $0 B10 Superstructure 0% 0.00% $0 B20 Exterior Enclosure 20% 0.46% $8,984 B30 Roofing 10% 0.00% $0 C10 Interior Construction 46% 0.00% $0 C20 Stairs 0% 0.00% $0 C30 Interior Finishes 8% 9.41% $189,399 D10 Conveying 10% 0.00% $0 D20 Plumbing 14% 57.79% $498,732 D30 HVAC 14% 2.07% $82,555 D40 Fire Protection 3% % $418,901 D50 Electrical 8% 63.08% $1,077,738 E10 Equipment 26% 0.00% $0 E20 Furnishings 10% 62.84% $97,020 G20 Site Improvements 34% 12.04% $202,147 G30 Site Mechanical Utilities 0% % $424,208 G40 Site Electrical Utilities 17% 45.10% $269,077 Total: $3,268,762 Condition Priority Building Condition Budget /Site GSF FCI Priority 1 Priority 2 Priority 3 Priority 4 Priority 5 Total 1930_1934_ , % $24,055 $0 $1,376,724 $426,568 $0 $1,827,347 Bldg 2010_2011_ Addition 30, % $21,858 $0 $263,478 $140,321 $0 $425, _ Bldg , % $4,911 $0 $53,369 $62,045 $0 $120,326 Site 33.7% $0 $96,438 $208,672 $590,322 $0 $895,433 Total: 97, % $50,823 $96,438 $1,902,243 $1,219,257 $0 $3,268, Critical Immediate Need $50,823 (1.55%) 2 - Trending Critical (Year 1) $96,438 (2.95%) 4 - Recommended (Years 6-10) $1,219,257 (37.3%) 3 - Necessary (Years 2-5) $1,902,243 (58.19%) School Condition Budget: $3,268,762 Generated: 12/15/ :11:22 PM FOR OFFICIAL USE ONLY Final 5

7 School Assessment Report - Grady Cluster, Morningside Elementary School Renewal Schedule Systems Current Total Total $3,268,761 $4,440,192 $1,636,610 $1,841,008 $570,457 $1,061,267 $1,388,298 $812,537 $15,019,130 Substructure Foundations Standard Foundations Special Foundations Slab on Grade Basement Construction Basement Excavation Basement Walls Shell $8,984 $1,275,531 $208,388 $1,492,903 Superstructure Floor Construction Roof Construction Exterior Enclosure $8,984 $8,984 Exterior Walls $8,984 $8,984 Exterior Windows Exterior Doors Roofing $1,275,531 $208,388 $1,483,919 Roof Coverings $1,275,531 $208,388 $1,483,919 Roof Openings Interiors $189,399 $1,838,905 $268,806 $300,401 $254,536 $2,852,047 Interior Construction $233,729 $38,255 $271,984 Partitions Interior Doors Fittings $233,729 $38,255 $271,984 Stairs Stair Construction Interior Finishes $189,399 $1,605,176 $268,806 $262,146 $254,536 $2,580,063 Wall Finishes $189,399 $268,806 $254,536 $712,741 Floor Finishes $887,122 $144,764 $1,031,886 Ceiling Finishes $718,054 $117,382 $835,436 Services $2,077,925 $1,244,871 $1,367,804 $1,841,008 $514,626 $1,388,298 $37,715 $8,472,247 Conveying $115,376 $18,725 $134,101 Elevators and Lifts $115,376 $18,725 $134,101 Escalators and Moving Walks Other Conveying Systems Plumbing $498,732 $254,031 $103,086 $855,849 Plumbing Fixtures $367,233 $202,874 $94,831 $664,938 Domestic Water Distribution $37,686 $37,686 Sanitary Waste $93,813 $93,813 Rain Water Drainage Other Plumbing Systems $51,157 $8,255 $59,412 HVAC $82,555 $278,012 $1,314,832 $1,841,008 $181,810 $1,388,298 $5,086,515 Energy Supply Heat Generating Systems $51,543 $259,456 $310,999 Cooling Generating Systems $471,833 $471,833 Distribution Systems $278,012 $130,267 $657,009 $1,065,288 Terminal & Package Units $1,199,419 $1,703,835 $2,903,254 Controls & Instrumentation $41,840 $96,292 $137,173 $275,305 Systems Testing & Balance $40,715 $19,121 $59,836 Other HVAC Systems/Equip Fire Protection $418,901 $37,715 $456,616 Sprinklers $392,239 $392,239 Standpipes $26,662 $26,662 Fire Protection Specialties Other Fire Protection Systems $37,715 $37,715 Electrical $1,077,737 $597,452 $52,972 $211,005 $1,939,166 Electrical Service/Distribution $224,854 $36,845 $261,699 Lighting and Branch Wiring $674,330 $372,598 $174,160 $1,221,088 Communications and Security $365,588 $52,972 $418,560 Other Electrical Systems $37,819 $37,819 Equipment & Furnishings $97,020 $80,885 $37,852 $215,757 Equipment $26,962 $12,684 $39,646 Institutional Equipment $3,094 $1,409 $4,503 Vehicular Equipment Other Equipment $23,868 $11,275 $35,143 Furnishings $97,020 $53,923 $25,168 $176,111 Fixed Furnishings $97,020 $53,923 $25,168 $176,111 Special Construction Special Construction Special Structures Integrated Construction Special Construction Systems Special Facilities Building Sitework $895,433 $570,457 $520,286 $1,986,176 Site Preparation Site Clearing Site Demolition and Relocations Site Earthwork Hazardous Waste Remediation Site Improvements $202,147 $570,457 $772,604 Roadways Parking Lots Pedestrian Paving $96,438 $96,438 Site Development $570,457 $570,457 Landscaping $105,709 $105,709 Site Mechanical Utilities $424,209 $424,209 Water Supply $98,845 $98,845 Sanitary Sewer $208,672 $208,672 Storm Sewer $116,692 $116,692 Heating Distribution Cooling Distribution Fuel Distribution Other Site Mechanical Utilities Site Electrical Utilities $269,077 $520,286 $789,363 Electrical Distribution $269,077 $269,077 Site Lighting $357,927 $357,927 Site Communication and Security $162,359 $162,359 Other Site Electrical Utilities Generated: 12/15/ :11:22 PM FOR OFFICIAL USE ONLY Final 6

8 Final Suitability - Grady Cluster, Morningside Elementary School Suitability Summary The educational suitability assessment of a school facility is a measure of how well the building(s) and grounds support and enhance the educational programs being offered. The assessment evaluates multiple systems or categories. Some of these are school-wide, like learning environment, while others are focused on specific space types such as art rooms. Some systems or categories are found in all types of schools, such as general classrooms, while others are specific to certain grade configurations, like preschool classrooms. Each school receives an educational suitability score based on a 100 point scale developed as a percentage of possible points for all scored suitability categories. The educational suitability assessment team evaluated the adequacy of the specific space types in each school model, e.g., general classrooms, science rooms, support spaces, etc. The possible score for each space type was weighted based on that space type's proportion of the total area of the school model. Consequently, general classrooms in an elementary school receive more possible points than general classrooms in a high school, since they represent a greater proportion of the total space. Suitability Scoring The suitability scoring system includes additional educational suitability categories that cannot always be weighted based on simple square footage. Some examples of these categories include ease of supervision, learning environment, pedestrian traffic, and others. The weightings of these categories were determined through field work by experienced educators and architects and reflect each category's relative importance in that particular model. The points assigned a specific educational suitability category in one model may differ from another model. A comparison of the points assigned to a specific educational suitability category across models is not appropriate because the size and proportion of spaces will be different based on the type of school. For example, an auditorium is typical at a high school, but elementary and middle schools may have multi-purpose spaces (e.g., "cafegymtoriums"). The points assigned to these spaces are likely to be different. Another aspect of the suitability scoring system is that the weights assigned to the categories are expressed in numbers to two decimal points. This is due to several factors. Using a 100 point scale to review numerous educational suitability systems and categories, many of the point assignments are a fraction of a whole number. Expanding point assignments to two decimals allows the system to reflect the original logic of basing the suitability scoring on square footage and relative importance, and facilitates consistent sums when adding to arrive at a total suitability score. Suitability Budget The budget for correcting educational suitability deficiencies is intended to be used as an estimate for correcting the overall educational suitability needs of a facility and not as a means to develop cost estimates for individual deficiencies. Experience has shown that it is difficult to calculate the cost of correcting items such as classrooms that are sized incorrectly, spaces with inappropriate adjacencies, lack of a variety of teaching and learning spaces, etc. The remediation of these deficiencies can take a variety of forms and requires a design study before accurate cost calculations can be made. A budget was developed for suitability improvements based on the overall suitability score of a particular school and team experience in correcting the overall deficiencies based on that score. Suitability Budget needs for each facility are included in the report and should be used as a starting place for long range planning. Much like a facility condition index, the inverse of the suitability score is a measure of the value of the building which should be reinvested to remediate the deficiencies. The Atlanta Public School Facilities Inventory (APSFI) includes a model which is adequate to develop budget projections for remediating educational suitability deficiencies. The model is as follows: Atlanta Suitability Index = (1.0 - Suitability Score (%)) APSFI x.35 x School Current Replacement Value (CRV) =Total Suitability Budget Needs The APSFI budget projection of 35% of the Current Replacement Value is based on several factors: First, the remediation of educational suitability deficiencies may be accomplished in a number of ways. For instance, remediating a classroom which does not meet the size standard for a given number of students can be "fixed" by, on one extreme, lowering the class size which costs no capital dollars, and on the other extreme, by building a new classroom, which would cost 100% of the replacement cost. Most often, the solution is to carve out some additional space, or combine three classrooms into two by removing the internal walls. Consequently, the cost of remediation is most often less than 100% of the replacement cost and our experience has shown that the 35% factor is an effective planning parameter. Second, the fact that these deficiencies are typically remediated along with building condition deficiencies and often overlap in scope of work and cost. Budgets for both assessments at 100% of the replacement cost would likely result in excessive budgets. Generated: 12/15/ :11:22 PM FOR OFFICIAL USE ONLY Final 7

9 Final Suitability - Grady Cluster, Morningside Elementary School The report below provides information about the Educational Suitability of this school, based on the Criteria in Appendix 1. Each area was scored 1 through 5, or "NA" with 1 being the high score. Items are scored "NA" if they are not appropriate to that school program (e.g., football fields at an elementary school or preschool at a high school) or are not needed at a school (e.g., no computer lab at a school where every student has a laptop). All scores are shown. However, the suitability deficiency budget reflects only the deficiencies identified with scores of 2 or lower. Suitability Narrative: Morningside Elementary is a neighborhood school serving grades kindergarten through fifth. The school is housed in a multi-story building with a 30-car garage on the basement floor, six portable classroom buildings, and an outdoor recreation field within a two-story recreation facility owned by the school district. Approximately 6,400sf of space (in the recreation center) is used by both the school and the City of Atlanta's community recreation services. Suitability Category Scoring Summary Task No Task Description Score 4845 Support Spaces Learning Environment General Classrooms Kindergarten Pre-K Self-Contained Special Ed Instructional Resource Rooms Science Music Art Computer Labs P.E Performing Arts Media Center Outside Safety and Security Morningside Elementary School Suitability Budget Total: $1,901,882 Generated: 12/15/ :11:22 PM FOR OFFICIAL USE ONLY Final 8

10 Final Suitability - Grady Cluster, Morningside Elementary School Enrollment Projection Enrollment projections are merely an estimate of future activity based on the historical data and information provided. These numbers can be highly accurate, but it must be remembered that the numbers are still a projection or estimate. During the implementation of any of the recommendations provided, it is critical that the school reassess these numbers on a regular basis and adjust plans accordingly. Morningside Elementary School Projected Enrollment Grade Kindergarten Subtotal ** EC Students are not used in the development of the projections. Generated: 12/15/ :11:22 PM FOR OFFICIAL USE ONLY Final 9

11 School Assessment Report - Grady Cluster, Morningside Elementary School, 1930_1934_1958 Bldg 2010_2011_2012 Buildings Building Name: 1930_1934_1958 Bldg 2010_2011_2012 Year Built: 1930 Gross Area (SF): 56,340 Replacement Value: $10,411,992 Repair Cost: $1,827,347 Total FCI: 17.55% Total RSLI: 10% The superstructure is mostly wood frame. Floor and roof construction is wood. The ground floor level is mostly concrete slab on grade. The exterior enclosure is comprised of solid masonry load bearing walls. Exterior windows are aluminum frame with fixed and operable panes. Exterior doors are mostly hollow metal with glazing. Roofing is both low slope with built-up and sloped with asphaltic shingles. The roof is in only fair condition. Some reported roof leaks have been recently repaired. Generated: 12/15/ :11:23 PM FOR OFFICIAL USE ONLY Final 10

12 School Assessment Report - Grady Cluster, Morningside Elementary School, 1930_1934_1958 Bldg 2010_2011_2012 Building Condition Budget Summary Building condition is evaluated based on the constructed physical elements of a building and organized according to the UNIFORMAT II Elemental Classification. The grouping of these elements is used to construct a building cost model. Models are developed for similar building types and function. Systems are evaluated based on their costs, design life, installation date and predicted next renewal date. Systems that are within their design life are further evaluated to identify current deficient conditions which may have a significant impact on a system s or component's remaining service life. The system value is based on RS Means Commercial Cost Data. Following are the systems detail for this facility. Uniformat Classification RSLI SCI Condition Budget A10 Foundations 0% 0.00% $0 A20 Basement Construction 0% 0.00% $0 B10 Superstructure 0% 0.00% $0 B20 Exterior Enclosure 22% 0.00% $0 B30 Roofing 1% 0.00% $0 C10 Interior Construction 20% 0.00% $0 C20 Stairs 0% 0.00% $0 C30 Interior Finishes 1% 0.00% $0 D10 Conveying 0% 0.00% $0 D20 Plumbing 0% 99.30% $498,732 D30 HVAC 27% 2.32% $57,731 D40 Fire Protection 7% 96.45% $239,744 D50 Electrical 0% 95.49% $934,120 E10 Equipment 48% 0.00% $0 E20 Furnishings 0% % $97,020 Total: $1,827,347 Building Condition Budget Detail Uniformat System Description Unit Price Life Install Year Calc Next Renewal Replacement RSLI SCI Condition Budget A1010 Standard Foundations $ $358, % $0 A1020 Special Foundations $ $18, % $0 A1030 Slab on Grade $ $307, % $0 A2010 Basement Excavation $ $11, % $0 A2020 Basement Walls $ $111, % $0 B1010 Floor Construction $ $847, % $0 B1020 Roof Construction $ $594, % $0 B2010 Exterior Walls $ $654, % $0 B2020 Exterior Windows $ $436,627 53% 0.00% $0 B2030 Exterior Doors $ $37,175 33% 0.00% $0 B3010 Roof Coverings $ $732,572 0% 0.00% $0 B3020 Roof Openings $ $24,784 33% 0.00% $0 C1010 Partitions $ $268,974 16% 0.00% $0 C1020 Interior Doors $ $174,942 50% 0.00% $0 C1030 Fittings $ $134,123 0% 0.00% $0 C2010 Stair Construction $ $132, % $0 C3010 Wall Finishes $ $230,341 10% 0.00% $0 C3020 Floor Finishes $ $509,520 0% 0.00% $0 C3030 Ceiling Finishes $ $412,573 0% 0.00% $0 D1010 Elevators and Lifts $ $66,332 0% 0.00% $0 D2010 Plumbing Fixtures $ $333,849 0% 110% $367,233 D2020 Domestic Water Distribution $ $34,260 0% 110% $37,686 D2030 Sanitary Waste $ $85,284 0% 110% $93,813 D2040 Rain Water Drainage $ $19, % $0 D2090 Other Plumbing Systems $ $29,157 0% 0.00% $0 D3020 Heat Generating Systems $ $180,774 40% 0.00% $0 D3030 Cooling Generating Systems $ $328,746 40% 0.00% $0 D3040 Distribution Systems $ $457,766 40% 0.00% $0 D3050 Terminal & Package Units $ $1,376,214 20% 0.00% $0 D3060 Controls & Instrumentation $ $110,797 20% 21.71% $24,055 D3070 Systems Testing & Balance $ $30,615 20% 110% $33,676 D4010 Sprinklers $ $204,100 0% 110% $224,509 D4020 Standpipes $ $13,850 0% 110% $15,235 D4030 Fire Protection Specialties $ $5,102 87% 0.00% $0 Generated: 12/15/ :11:23 PM FOR OFFICIAL USE ONLY Final 11

13 School Assessment Report - Grady Cluster, Morningside Elementary School, 1930_1934_1958 Bldg 2010_2011_2012 Uniformat D4090 System Description Unit Price Life Install Year Calc Next Renewal Replacement RSLI SCI Condition Budget Other Fire Protection Systems $ $25,512 60% 0.00% $0 Electrical Service/Distribution $ $129,020 0% 0.00% $0 D5010 D5020 Lighting and Branch Wiring $ $613,028 0% 110% $674,330 Communications and D5030 Security $ $216,491 0% 110% $238,140 D5090 Other Electrical Systems $ $19,681 0% 110% $21,649 E1020 Institutional Equipment $ $5,102 0% 0.00% $0 E1090 Other Equipment $ $39,362 55% 0.00% $0 E2010 Fixed Furnishings $ $88,200 0% 110% $97,020 Total $ $10,411,992 15% 17.55% $1,827,347 Generated: 12/15/ :11:23 PM FOR OFFICIAL USE ONLY Final 12

14 School Assessment Report - Grady Cluster, Morningside Elementary School, 1930_1934_1958 Bldg 2010_2011_2012 Renewal Schedule Systems Current Total Total $1,827,346 $2,281,066 $268,806 $1,841,008 $1,388,298 $37,715 $7,644,239 Substructure Foundations Standard Foundations Special Foundations Slab on Grade Basement Construction Basement Excavation Basement Walls Shell $830,004 $830,004 Superstructure Floor Construction Roof Construction Exterior Enclosure Exterior Walls Exterior Windows Exterior Doors Roofing $830,004 $830,004 Roof Coverings $830,004 $830,004 Roof Openings Interiors $1,196,692 $268,806 $1,465,498 Interior Construction $151,961 $151,961 Partitions Interior Doors Fittings $151,961 $151,961 Stairs Stair Construction Interior Finishes $1,044,731 $268,806 $1,313,537 Wall Finishes $268,806 $268,806 Floor Finishes $577,286 $577,286 Ceiling Finishes $467,445 $467,445 Services $1,730,326 $254,370 $1,841,008 $1,388,298 $37,715 $5,251,717 Conveying $75,155 $75,155 Elevators and Lifts $75,155 $75,155 Escalators and Moving Walks Other Conveying Systems Plumbing $498,732 $33,035 $531,767 Plumbing Fixtures $367,233 $367,233 Domestic Water Distribution $37,686 $37,686 Sanitary Waste $93,813 $93,813 Rain Water Drainage Other Plumbing Systems $33,035 $33,035 HVAC $57,731 $1,841,008 $1,388,298 $3,287,037 Energy Supply Heat Generating Systems $259,456 $259,456 Cooling Generating Systems $471,833 $471,833 Distribution Systems $657,009 $657,009 Terminal & Package Units $1,703,835 $1,703,835 Controls & Instrumentation $24,055 $137,173 $161,228 Systems Testing & Balance $33,676 $33,676 Other HVAC Systems/Equip Fire Protection $239,744 $37,715 $277,459 Sprinklers $224,509 $224,509 Standpipes $15,235 $15,235 Fire Protection Specialties Other Fire Protection Systems $37,715 $37,715 Electrical $934,119 $146,180 $1,080,299 Electrical Service/Distribution $146,180 $146,180 Lighting and Branch Wiring $674,330 $674,330 Communications and Security $238,140 $238,140 Other Electrical Systems $21,649 $21,649 Equipment & Furnishings $97,020 $97,020 Equipment Institutional Equipment Vehicular Equipment Other Equipment Furnishings $97,020 $97,020 Fixed Furnishings $97,020 $97,020 Special Construction Special Construction Special Structures Integrated Construction Special Construction Systems Special Facilities Generated: 12/15/ :11:23 PM FOR OFFICIAL USE ONLY Final 13

15 School Assessment Report - Grady Cluster, Morningside Elementary School, 1930_1934_1958 Bldg 2010_2011_2012 Building Priority Deficiencies by Priority: 1 - Critical Immediate Need $24,055 (1.32%) 4 - Recommended (Years 6-10) $426,568 (23.34%) 3 - Necessary (Years 2-5) $1,376,724 (75.34%) 1930_1934_1958 Bldg 2010_2011_2012 Condition Budget: $1,827,347 Generated: 12/15/ :11:23 PM FOR OFFICIAL USE ONLY Final 14

16 School Assessment Report - Grady Cluster, Morningside Elementary School, 1930_1934_1958 Bldg 2010_2011_2012 Building Condition Deficiencies Current deficiencies included systems or components that have reached or exceeded their intrinsic useful life or components of the systems that are in need of repair. Systems that have reached the end their intrinsic useful life are identified as current deficiencies and assigned the distress 'Beyond Expected Life'. The following chart includes all current condition deficiencies associated with this facility. Standpipes $15,235 (.83%) Other Electrical Systems $21,649 (1.18%) Controls & Instrumentation $24,055 (1.32%) Systems Testing & Balance $33,676 (1.84%) Domestic Water Distribution $37,686 (2.06%) Sanitary Waste $93,813 (5.13%) Fixed Furnishings $97,020 (5.31%) (36.9%) Lighting and Branch Wi $674,330 Sprinklers $224,509 (12.29%) Communications and Secu $238,140 (13.03%) Plumbing Fixtures $367,233 (20.1%) 1930_1934_1958 Bldg 2010_2011_2012 Condition Budget: $1,827,346 Generated: 12/15/ :11:23 PM FOR OFFICIAL USE ONLY Final 15

17 School Assessment Report - Grady Cluster, Morningside Elementary School, 1930_1934_1958 Bldg 2010_2011_2012 Building Condition Deficiencies Narrative System: D Plumbing Fixtures Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in It has a 20-year service life which expired in Recomm.: The system should be replaced. Location: 1930_1934_1958 Bldg 2010_2011_2012 Distress: Beyond Expected Life Category: Deferred Maintenance Priority: 3 - Necessary (Years 2-5) Correction: Renew System Qty: 1-Ea. Condition Budget: $367,233 System: D Domestic Water Distribution Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in It has a 30-year service life which expired in Recomm.: The system should be replaced. Location: 1930_1934_1958 Bldg 2010_2011_2012 Distress: Beyond Expected Life Category: Deferred Maintenance Priority: 4 - Recommended (Years 6-10) Correction: Renew System Qty: 1-Ea. Condition Budget: $37,686 Generated: 12/15/ :11:23 PM FOR OFFICIAL USE ONLY Final 16

18 School Assessment Report - Grady Cluster, Morningside Elementary School, 1930_1934_1958 Bldg 2010_2011_2012 System: D Sanitary Waste Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in It has a 30-year service life which expired in Recomm.: The system should be replaced. Location: 1930_1934_1958 Bldg 2010_2011_2012 Distress: Beyond Expected Life Category: Deferred Maintenance Priority: 4 - Recommended (Years 6-10) Correction: Renew System Qty: 1-Ea. Condition Budget: $93,813 System: D Controls & Instrumentation Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in It has a 15-year service life. However, in the assessment, it was found to be currently deficient. Recomm.: The system should be replaced. Photo is not available. Location: 1930_1934_1958 Bldg 2010_2011_2012 Material: Controls & Instrumentation Distress: Inadequate Category: Facility Integrity Priority: 1 - Critical Immediate Need Notes: Control and instrumentation study to include; test, adjust and overall design review to improve HVAC system and components. Replace damaged and malfunctioning controls and equipment, and retest. Correction: Control and Instrumentation Study Qty: 56,340-S.F. Condition Budget: $24,055 Generated: 12/15/ :11:23 PM FOR OFFICIAL USE ONLY Final 17

19 School Assessment Report - Grady Cluster, Morningside Elementary School, 1930_1934_1958 Bldg 2010_2011_2012 System: D Systems Testing & Balance Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in It has a 15-year service life. However, in the assessment, it was found to be currently deficient. Recomm.: The system should be replaced. Location: 1930_1934_1958 Bldg 2010_2011_2012 Distress: Failing Category: Deferred Maintenance Priority: 4 - Recommended (Years 6-10) Notes: Principal, building mechanic and multiple staff reported rooms where cooling is non-functional over a long time and other rooms where cooling is intermittent and requiring teachers to reset power to units. Reports from all that temperature between adjacent rooms is inconsistent. Reports from all that humidity remains high causing problems for the usage of paper based materials. Correction: Renew System Qty: 1-Ea. Condition Budget: $33,676 System: D Sprinklers Analysis: The system is missing. Recomm.: The system should be installed. Photo is not available. Location: 1930_1934_1958 Bldg 2010_2011_2012 Distress: Missing Category: Code Compliance Priority: 4 - Recommended (Years 6-10) Notes: Facility has no fire protection system. Install per owner standards. Correction: Renew System Qty: 1-Ea. Condition Budget: $224,509 Generated: 12/15/ :11:23 PM FOR OFFICIAL USE ONLY Final 18

20 School Assessment Report - Grady Cluster, Morningside Elementary School, 1930_1934_1958 Bldg 2010_2011_2012 System: D Standpipes Analysis: The system is missing. Recomm.: The system should be installed. Photo is not available. Location: 1930_1934_1958 Bldg 2010_2011_2012 Distress: Missing Category: Code Compliance Priority: 4 - Recommended (Years 6-10) Notes: Facility has no fire protection system. Install per owner standards. Correction: Renew System Qty: 1-Ea. Condition Budget: $15,235 System: D Lighting and Branch Wiring Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in It has a 20-year service life which expired in Recomm.: The system should be replaced. Location: 1930_1934_1958 Bldg 2010_2011_2012 Distress: Beyond Expected Life Category: Deferred Maintenance Priority: 3 - Necessary (Years 2-5) Correction: Renew System Qty: 1-Ea. Condition Budget: $674,330 Generated: 12/15/ :11:24 PM FOR OFFICIAL USE ONLY Final 19

21 School Assessment Report - Grady Cluster, Morningside Elementary School, 1930_1934_1958 Bldg 2010_2011_2012 System: D Communications and Security Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in It has a 15-year service life which expired in Recomm.: The system should be replaced. Photo is not available. Location: 1930_1934_1958 Bldg 2010_2011_2012 Distress: Beyond Expected Life Category: Deferred Maintenance Priority: 3 - Necessary (Years 2-5) Correction: Renew System Qty: 1-Ea. Condition Budget: $238,140 System: D Other Electrical Systems Analysis: The system is missing. Recomm.: The system should be installed. Photo is not available. Location: 1930_1934_1958 Bldg 2010_2011_2012 Distress: Missing Category: Reliability Priority: 4 - Recommended (Years 6-10) Notes: No emergency generator, client standard required. Correction: Renew System Qty: 1-Ea. Condition Budget: $21,649 Generated: 12/15/ :11:24 PM FOR OFFICIAL USE ONLY Final 20

22 School Assessment Report - Grady Cluster, Morningside Elementary School, 1930_1934_1958 Bldg 2010_2011_2012 System: E Fixed Furnishings Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed at an unknown date. It has a 20-year service life. Recomm.: The system should be replaced. Location: 1930_1934_1958 Bldg 2010_2011_2012 Distress: Beyond Expected Life Category: Modernization Priority: 3 - Necessary (Years 2-5) Correction: Renew System Qty: 1-Ea. Condition Budget: $97,020 Generated: 12/15/ :11:24 PM FOR OFFICIAL USE ONLY Final 21

23 School Assessment Report - Grady Cluster, Morningside Elementary School, 1994 Addition 2013_2020 Building Name: 1994 Addition 2013_2020 Year Built: 1994 Gross Area (SF): 30,152 Replacement Value: $5,289,455 Repair Cost: $425,657 Total FCI: 8.05% Total RSLI: 5% The superstructure is steel frame. Floor construction is slab on-grade. Roof construction is steel. The exterior enclosure is comprised of walls with brick veneer over CMU. Exterior windows are aluminum framed with fixed and operable panes. Exterior doors are hollow metal, mostly with glazing. Roofing is sloped with standing seam metal coverings. There were no reported leaks. Generated: 12/15/ :11:24 PM FOR OFFICIAL USE ONLY Final 22

24 School Assessment Report - Grady Cluster, Morningside Elementary School, 1994 Addition 2013_2020 Building Condition Budget Summary Building condition is evaluated based on the constructed physical elements of a building and organized according to the UNIFORMAT II Elemental Classification. The grouping of these elements is used to construct a building cost model. Models are developed for similar building types and function. Systems are evaluated based on their costs, design life, installation date and predicted next renewal date. Systems that are within their design life are further evaluated to identify current deficient conditions which may have a significant impact on a system s or component's remaining service life. The system value is based on RS Means Commercial Cost Data. Following are the systems detail for this facility. Uniformat Classification RSLI SCI Condition Budget A10 Foundations 0% 0.00% $0 A20 Basement Construction 0% 0.00% $0 B10 Superstructure 0% 0.00% $0 B20 Exterior Enclosure 14% 1.48% $8,984 B30 Roofing 1% 0.00% $0 C10 Interior Construction 52% 0.00% $0 C20 Stairs 0% 0.00% $0 C30 Interior Finishes 0% 22.00% $136,030 D10 Conveying 0% 0.00% $0 D20 Plumbing 7% 0.00% $0 D30 HVAC 4% 1.22% $12,874 D40 Fire Protection 1% % $128,735 D50 Electrical 0% 26.50% $139,034 E10 Equipment 0% 0.00% $0 E20 Furnishings 0% 0.00% $0 Total: $425,657 Building Condition Budget Detail Uniformat System Description Unit Price Life Install Year Calc Next Renewal Replacement RSLI SCI Condition Budget A1010 Standard Foundations $ $192, % $0 A1020 Special Foundations $ $9, % $0 A1030 Slab on Grade $ $165, % $0 A2010 Basement Excavation $ $6, % $0 A2020 Basement Walls $ $59, % $0 B1010 Floor Construction $ $454, % $0 B1020 Roof Construction $ $319, % $0 B2010 Exterior Walls $ $351, % $8,984 B2020 Exterior Windows $ $234,454 33% 0.00% $0 B2030 Exterior Doors $ $19,895 33% 0.00% $0 B3010 Roof Coverings $ $393,227 0% 0.00% $0 B3020 Roof Openings $ $13,264 33% 0.00% $0 C1010 Partitions $ $144,339 80% 0.00% $0 C1020 Interior Doors $ $94,016 50% 0.00% $0 C1030 Fittings $ $72,170 0% 0.00% $0 C2010 Stair Construction $ $71, % $0 C3010 Wall Finishes $ $123,664 0% 110% $136,030 C3020 Floor Finishes $ $273,465 0% 0.00% $0 C3030 Ceiling Finishes $ $221,190 0% 0.00% $0 D1010 Elevators and Lifts $ $35,500 0% 0.00% $0 D2010 Plumbing Fixtures $ $179,059 0% 0.00% $0 D2020 Domestic Water Distribution $ $18,335 33% 0.00% $0 D2030 Sanitary Waste $ $46,033 33% 0.00% $0 D2090 Other Plumbing Systems $ $15,994 0% 0.00% $0 D3040 Distribution Systems $ $245,377 0% 0.00% $0 D3050 Terminal & Package Units $ $738,472 7% 0.00% $0 D3060 Controls & Instrumentation $ $59,296 7% 21.71% $12,874 D3070 Systems Testing & Balance $ $16,384 7% 0.00% $0 D4010 Sprinklers $ $109,620 0% 110% $120,582 D4020 Standpipes $ $7,412 0% 110% $8,153 D4030 Fire Protection Specialties $ $2,731 87% 0.00% $0 D5010 Electrical Service/Distribution $ $69,439 0% 0.00% $0 D5020 Lighting and Branch Wiring $ $328,860 0% 0.00% $0 Generated: 12/15/ :11:24 PM FOR OFFICIAL USE ONLY Final 23

25 School Assessment Report - Grady Cluster, Morningside Elementary School, 1994 Addition 2013_2020 Uniformat Unit Price Install Year Calc Next Renewal Replacement RSLI SCI Condition Budget System Description Life Communications and Security $ $115,862 0% 110% $127,448 D5030 D5090 Other Electrical Systems $ $10,533 0% 110% $11,586 E1020 Institutional Equipment $ $2,731 0% 0.00% $0 E1090 Other Equipment $ $21,066 0% 0.00% $0 E2010 Fixed Furnishings $ $47,593 0% 0.00% $0 Total $ $5,289,455 8% 8.05% $425,657 Generated: 12/15/ :11:24 PM FOR OFFICIAL USE ONLY Final 24

26 School Assessment Report - Grady Cluster, Morningside Elementary School, 1994 Addition 2013_2020 Renewal Schedule Systems Current Total Total $425,657 $2,159,126 $950,108 $182,813 $3,717,704 Substructure Foundations Standard Foundations Special Foundations Slab on Grade Basement Construction Basement Excavation Basement Walls Shell $8,984 $445,527 $454,511 Superstructure Floor Construction Roof Construction Exterior Enclosure $8,984 $8,984 Exterior Walls $8,984 $8,984 Exterior Windows Exterior Doors Roofing $445,527 $445,527 Roof Coverings $445,527 $445,527 Roof Openings Interiors $136,030 $642,213 $182,813 $961,056 Interior Construction $81,768 $81,768 Partitions Interior Doors Fittings $81,768 $81,768 Stairs Stair Construction Interior Finishes $136,030 $560,445 $182,813 $879,288 Wall Finishes $136,030 $182,813 $318,843 Floor Finishes $309,836 $309,836 Ceiling Finishes $250,609 $250,609 Services $280,643 $990,501 $950,108 $2,221,252 Conveying $40,221 $40,221 Elevators and Lifts $40,221 $40,221 Escalators and Moving Walks Other Conveying Systems Plumbing $220,996 $220,996 Plumbing Fixtures $202,874 $202,874 Domestic Water Distribution Sanitary Waste Rain Water Drainage Other Plumbing Systems $18,122 $18,122 HVAC $12,874 $278,012 $950,108 $1,240,994 Energy Supply Heat Generating Systems Cooling Generating Systems Distribution Systems $278,012 $278,012 Terminal & Package Units $861,789 $861,789 Controls & Instrumentation $12,874 $69,198 $82,072 Systems Testing & Balance $19,121 $19,121 Other HVAC Systems/Equip Fire Protection $128,735 $128,735 Sprinklers $120,582 $120,582 Standpipes $8,153 $8,153 Fire Protection Specialties Other Fire Protection Systems Electrical $139,034 $451,272 $590,306 Electrical Service/Distribution $78,674 $78,674 Lighting and Branch Wiring $372,598 $372,598 Communications and Security $127,448 $127,448 Other Electrical Systems $11,586 $11,586 Equipment & Furnishings $80,885 $80,885 Equipment $26,962 $26,962 Institutional Equipment $3,094 $3,094 Vehicular Equipment Other Equipment $23,868 $23,868 Furnishings $53,923 $53,923 Fixed Furnishings $53,923 $53,923 Special Construction Special Construction Special Structures Integrated Construction Special Construction Systems Special Facilities Generated: 12/15/ :11:24 PM FOR OFFICIAL USE ONLY Final 25

27 School Assessment Report - Grady Cluster, Morningside Elementary School, 1994 Addition 2013_2020 Building Priority Deficiencies by Priority: 1 - Critical Immediate Need $21,858 (5.14%) 4 - Recommended (Years 6-10) $140,321 (32.97%) 3 - Necessary (Years 2-5) $263,478 (61.9%) 1994 Addition 2013_2020 Condition Budget: $425,657 Generated: 12/15/ :11:24 PM FOR OFFICIAL USE ONLY Final 26

28 School Assessment Report - Grady Cluster, Morningside Elementary School, 1994 Addition 2013_2020 Building Condition Deficiencies Current deficiencies included systems or components that have reached or exceeded their intrinsic useful life or components of the systems that are in need of repair. Systems that have reached the end their intrinsic useful life are identified as current deficiencies and assigned the distress 'Beyond Expected Life'. The following chart includes all current condition deficiencies associated with this facility. Standpipes $8,153 (1.92%) Exterior Walls $8,984 (2.11%) Other Electrical Systems $11,586 (2.72%) Controls & Instrumentation $12,874 (3.02%) Wall Finishes $136,030 (31.96%) Sprinklers $120,582 (28.33%) 1994 Addition 2013_2020 Condition Budget: $425,657 Communications and Security $127,448 (29.94%) Generated: 12/15/ :11:24 PM FOR OFFICIAL USE ONLY Final 27

29 School Assessment Report - Grady Cluster, Morningside Elementary School, 1994 Addition 2013_2020 Building Condition Deficiencies Narrative System: C Wall Finishes Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in It has a 10-year service life which expired in Recomm.: The system should be replaced. Photo is not available. Location: 1994 Addition 2013_2020 Distress: Beyond Expected Life Category: Deferred Maintenance Priority: 3 - Necessary (Years 2-5) Correction: Renew System Qty: 1-Ea. Condition Budget: $136,030 System: D Controls & Instrumentation Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in It has a 15-year service life. However, in the assessment, it was found to be currently deficient. Recomm.: The system should be replaced. Photo is not available. Location: 1994 Addition 2013_2020 Material: Controls & Instrumentation Distress: Inadequate Category: Facility Integrity Priority: 1 - Critical Immediate Need Notes: Control and instrumentation study to include; test, adjust and overall design review to improve HVAC system and components. Replace damaged and malfunctioning controls and equipment, and retest. Correction: Control and Instrumentation Study Qty: 30,152-S.F. Condition Budget: $12,874 Generated: 12/15/ :11:24 PM FOR OFFICIAL USE ONLY Final 28

30 School Assessment Report - Grady Cluster, Morningside Elementary School, 1994 Addition 2013_2020 System: D Sprinklers Analysis: The system is missing. Recomm.: The system should be installed. Photo is not available. Location: 1994 Addition 2013_2020 Distress: Missing Category: Code Compliance Priority: 4 - Recommended (Years 6-10) Notes: Facility has no fire protection system. Install per owner standards. Correction: Renew System Qty: 1-Ea. Condition Budget: $120,582 System: D Standpipes Analysis: The system is missing. Recomm.: The system should be installed. Photo is not available. Location: 1994 Addition 2013_2020 Distress: Missing Category: Code Compliance Priority: 4 - Recommended (Years 6-10) Notes: Facility has no fire protection system. Install per owner standards. Correction: Renew System Qty: 1-Ea. Condition Budget: $8,153 Generated: 12/15/ :11:24 PM FOR OFFICIAL USE ONLY Final 29

31 School Assessment Report - Grady Cluster, Morningside Elementary School, 1994 Addition 2013_2020 System: D Communications and Security Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in It has a 15-year service life which expired in Recomm.: The system should be replaced. Photo is not available. Location: 1994 Addition 2013_2020 Distress: Beyond Expected Life Category: Deferred Maintenance Priority: 3 - Necessary (Years 2-5) Correction: Renew System Qty: 1-Ea. Condition Budget: $127,448 System: D Other Electrical Systems Analysis: The system is missing. Recomm.: The system should be installed. Photo is not available. Location: 1994 Addition 2013_2020 Distress: Missing Category: Reliability Priority: 4 - Recommended (Years 6-10) Notes: No emergency generator, client standard required. Correction: Renew System Qty: 1-Ea. Condition Budget: $11,586 Generated: 12/15/ :11:24 PM FOR OFFICIAL USE ONLY Final 30

32 School Assessment Report - Grady Cluster, Morningside Elementary School, 2000 Bldg 2030 Building Name: 2000 Bldg 2030 Year Built: 2000 Gross Area (SF): 11,503 Replacement Value: $2,105,141 Repair Cost: $120,326 Total FCI: 5.72% Total RSLI: 18% The superstructure is steel frame. Floor construction is slab on-grade. Roof construction is steel. The exterior enclosure is comprised of walls with brick veneer over CMU and E.I.F.S. over metal framing. Exterior windows are aluminum framed with fixed and operable panes. Exterior doors are hollow metal, mostly with glazing. Roofing is sloped with standing seam metal coverings. There were no reported leaks. Generated: 12/15/ :11:25 PM FOR OFFICIAL USE ONLY Final 31

33 School Assessment Report - Grady Cluster, Morningside Elementary School, 2000 Bldg 2030 Building Condition Budget Summary Building condition is evaluated based on the constructed physical elements of a building and organized according to the UNIFORMAT II Elemental Classification. The grouping of these elements is used to construct a building cost model. Models are developed for similar building types and function. Systems are evaluated based on their costs, design life, installation date and predicted next renewal date. Systems that are within their design life are further evaluated to identify current deficient conditions which may have a significant impact on a system s or component's remaining service life. The system value is based on RS Means Commercial Cost Data. Following are the systems detail for this facility. Uniformat Classification RSLI SCI Condition Budget A10 Foundations 0% 0.00% $0 A20 Basement Construction 0% 0.00% $0 B10 Superstructure 0% 0.00% $0 B20 Exterior Enclosure 23% 0.00% $0 B30 Roofing 29% 0.00% $0 C10 Interior Construction 66% 0.00% $0 C20 Stairs 0% 0.00% $0 C30 Interior Finishes 23% 22.03% $53,369 D10 Conveying 30% 0.00% $0 D20 Plumbing 34% 0.00% $0 D30 HVAC 11% 2.64% $11,951 D40 Fire Protection 1% % $50,422 D50 Electrical 24% 2.23% $4,584 E10 Equipment 29% 0.00% $0 E20 Furnishings 30% 0.00% $0 Total: $120,326 Building Condition Budget Detail Uniformat System Description Unit Price Life Install Year Calc Next Renewal Replacement RSLI SCI Condition Budget A1010 Standard Foundations $ $75, % $0 A1020 Special Foundations $ $3, % $0 A1030 Slab on Grade $ $64, % $0 A2010 Basement Excavation $ $2, % $0 A2020 Basement Walls $ $23, % $0 B1010 Floor Construction $ $178, % $0 B1020 Roof Construction $ $125, % $0 B2010 Exterior Walls $ $137, % $0 B2020 Exterior Windows $ $91,826 53% 0.00% $0 B2030 Exterior Doors $ $7,888 53% 0.00% $0 B3010 Roof Coverings $ $154,035 30% 0.00% $0 C1010 Partitions $ $56,554 86% 0.00% $0 C1020 Interior Doors $ $36,909 65% 0.00% $0 C1030 Fittings $ $28,277 30% 0.00% $0 C2010 Stair Construction $ $27, % $0 C3010 Wall Finishes $ $48,517 0% 110% $53,369 C3020 Floor Finishes $ $107,006 30% 0.00% $0 C3030 Ceiling Finishes $ $86,765 30% 0.00% $0 D1010 Elevators and Lifts $ $13,841 30% 0.00% $0 D2010 Plumbing Fixtures $ $70,097 30% 0.00% $0 D2020 Domestic Water Distribution $ $7,144 53% 0.00% $0 D2030 Sanitary Waste $ $18,008 53% 0.00% $0 D2090 Other Plumbing Systems $ $6,102 30% 0.00% $0 D3020 Heat Generating Systems $ $38,099 30% 0.00% $0 D3040 Distribution Systems $ $96,290 30% 0.00% $0 D3050 Terminal & Package Units $ $289,317 7% 0.00% $0 D3060 Controls & Instrumentation $ $23,217 7% 21.15% $4,911 D3070 Systems Testing & Balance $ $6,400 7% 110% $7,039 D4010 Sprinklers $ $42,862 0% 110% $47,148 D4020 Standpipes $ $2,977 0% 110% $3,274 D4030 Fire Protection Specialties $ $1,042 87% 0.00% $0 D5010 Electrical Service/Distribution $ $27,235 30% 0.00% $0 D5020 Lighting and Branch Wiring $ $128,734 30% 0.00% $0 Generated: 12/15/ :11:25 PM FOR OFFICIAL USE ONLY Final 32

34 School Assessment Report - Grady Cluster, Morningside Elementary School, 2000 Bldg 2030 Uniformat Unit Price Install Year Calc Next Renewal Replacement RSLI SCI Condition Budget System Description Life Communications and Security $ $45,392 7% 0.00% $0 D5030 D5090 Other Electrical Systems $ $4,167 0% 110% $4,584 E1020 Institutional Equipment $ $1,042 30% 0.00% $0 E1090 Other Equipment $ $8,334 30% 0.00% $0 E2010 Fixed Furnishings $ $18,603 30% 0.00% $0 Total $ $2,105,141 27% 5.72% $120,326 Generated: 12/15/ :11:25 PM FOR OFFICIAL USE ONLY Final 33

35 School Assessment Report - Grady Cluster, Morningside Elementary School, 2000 Bldg 2030 Renewal Schedule Systems Current Total Total $120,325 $417,696 $1,061,267 $71,723 $1,671,011 Substructure Foundations Standard Foundations Special Foundations Slab on Grade Basement Construction Basement Excavation Basement Walls Shell $208,388 $208,388 Superstructure Floor Construction Roof Construction Exterior Enclosure Exterior Walls Exterior Windows Exterior Doors Roofing $208,388 $208,388 Roof Coverings $208,388 $208,388 Roof Openings Interiors $53,369 $300,401 $71,723 $425,493 Interior Construction $38,255 $38,255 Partitions Interior Doors Fittings $38,255 $38,255 Stairs Stair Construction Interior Finishes $53,369 $262,146 $71,723 $387,238 Wall Finishes $53,369 $71,723 $125,092 Floor Finishes $144,764 $144,764 Ceiling Finishes $117,382 $117,382 Services $66,956 $417,696 $514,626 $999,278 Conveying $18,725 $18,725 Elevators and Lifts $18,725 $18,725 Escalators and Moving Walks Other Conveying Systems Plumbing $103,086 $103,086 Plumbing Fixtures $94,831 $94,831 Domestic Water Distribution Sanitary Waste Rain Water Drainage Other Plumbing Systems $8,255 $8,255 HVAC $11,950 $364,724 $181,810 $558,484 Energy Supply Heat Generating Systems $51,543 $51,543 Cooling Generating Systems Distribution Systems $130,267 $130,267 Terminal & Package Units $337,630 $337,630 Controls & Instrumentation $4,911 $27,094 $32,005 Systems Testing & Balance $7,039 $7,039 Other HVAC Systems/Equip Fire Protection $50,422 $50,422 Sprinklers $47,148 $47,148 Standpipes $3,274 $3,274 Fire Protection Specialties Other Fire Protection Systems Electrical $4,584 $52,972 $211,005 $268,561 Electrical Service/Distribution $36,845 $36,845 Lighting and Branch Wiring $174,160 $174,160 Communications and Security $52,972 $52,972 Other Electrical Systems $4,584 $4,584 Equipment & Furnishings $37,852 $37,852 Equipment $12,684 $12,684 Institutional Equipment $1,409 $1,409 Vehicular Equipment Other Equipment $11,275 $11,275 Furnishings $25,168 $25,168 Fixed Furnishings $25,168 $25,168 Special Construction Special Construction Special Structures Integrated Construction Special Construction Systems Special Facilities Generated: 12/15/ :11:25 PM FOR OFFICIAL USE ONLY Final 34

36 School Assessment Report - Grady Cluster, Morningside Elementary School, 2000 Bldg 2030 Building Priority Deficiencies by Priority: 1 - Critical Immediate Need $4,911 (4.08%) 3 - Necessary (Years 2-5) $53,369 (44.35%) 4 - Recommended (Years 6-10) $62,045 (51.56%) 2000 Bldg 2030 Condition Budget: $120,326 Generated: 12/15/ :11:25 PM FOR OFFICIAL USE ONLY Final 35

37 School Assessment Report - Grady Cluster, Morningside Elementary School, 2000 Bldg 2030 Building Condition Deficiencies Current deficiencies included systems or components that have reached or exceeded their intrinsic useful life or components of the systems that are in need of repair. Systems that have reached the end their intrinsic useful life are identified as current deficiencies and assigned the distress 'Beyond Expected Life'. The following chart includes all current condition deficiencies associated with this facility. Standpipes $3,274 (2.72%) Other Electrical Systems $4,584 (3.81%) Controls & Instrumentation $4,911 (4.08%) Systems Testing & Balance $7,039 (5.85%) Wall Finishes $53,369 (44.35%) Sprinklers $47,148 (39.18%) 2000 Bldg 2030 Condition Budget: $120,325 Generated: 12/15/ :11:25 PM FOR OFFICIAL USE ONLY Final 36

38 School Assessment Report - Grady Cluster, Morningside Elementary School, 2000 Bldg 2030 Building Condition Deficiencies Narrative System: C Wall Finishes Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in It has a 10-year service life which expired in Recomm.: The system should be replaced. Photo is not available. Location: 2000 Bldg 2030 Distress: Beyond Expected Life Category: Deferred Maintenance Priority: 3 - Necessary (Years 2-5) Correction: Renew System Qty: 1-Ea. Condition Budget: $53,369 System: D Controls & Instrumentation Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in It has a 15-year service life. However, in the assessment, it was found to be currently deficient. Recomm.: The system should be replaced. Photo is not available. Location: 2000 Bldg 2030 Material: Controls & Instrumentation Distress: Inadequate Category: Facility Integrity Priority: 1 - Critical Immediate Need Notes: Control and instrumentation study to include; test, adjust and overall design review to improve HVAC system and components. Replace damaged and malfunctioning controls and equipment, and retest. Correction: Control and Instrumentation Study Qty: 11,503-S.F. Condition Budget: $4,911 Generated: 12/15/ :11:25 PM FOR OFFICIAL USE ONLY Final 37

39 School Assessment Report - Grady Cluster, Morningside Elementary School, 2000 Bldg 2030 System: D Systems Testing & Balance Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in It has a 15-year service life. However, in the assessment, it was found to be currently deficient. Recomm.: The system should be replaced. Location: 2000 Bldg 2030 Distress: Inadequate Category: Deferred Maintenance Priority: 4 - Recommended (Years 6-10) Notes: Reports from multiple staff of continual failed HVAC systems contributing to high humidity and occupant discomfort. Correction: Renew System Qty: 1-Ea. Condition Budget: $7,039 System: D Sprinklers Analysis: The system is missing. Recomm.: The system should be installed. Photo is not available. Location: 2000 Bldg 2030 Distress: Missing Category: Code Compliance Priority: 4 - Recommended (Years 6-10) Notes: Facility has no fire protection system. Install per owner standards. Correction: Renew System Qty: 1-Ea. Condition Budget: $47,148 Generated: 12/15/ :11:25 PM FOR OFFICIAL USE ONLY Final 38

40 School Assessment Report - Grady Cluster, Morningside Elementary School, 2000 Bldg 2030 System: D Standpipes Analysis: The system is missing. Recomm.: The system should be installed. Photo is not available. Location: 2000 Bldg 2030 Distress: Missing Category: Code Compliance Priority: 4 - Recommended (Years 6-10) Notes: Facility has no fire protection system. Install per owner standards. Correction: Renew System Qty: 1-Ea. Condition Budget: $3,274 System: D Other Electrical Systems Analysis: The system is missing. Recomm.: The system should be installed. Photo is not available. Location: 2000 Bldg 2030 Distress: Missing Category: Reliability Priority: 4 - Recommended (Years 6-10) Notes: No emergency generator, client standard required. Correction: Renew System Qty: 1-Ea. Condition Budget: $4,584 Generated: 12/15/ :11:25 PM FOR OFFICIAL USE ONLY Final 39

41 School Assessment Report - Grady Cluster, Morningside Elementary School, Site Sites Site Summary Condition Budget: $895,433 Site Acreage Total FCI: 33.65% Replacement Value: $2,660,818 Total RSLI: 25% Condition Score: Site: SITE NARRATIVE Morningside Elementary School was constructed in 1930 and additions to the main school building were constructed in 1934, 1958, 1994 and an ancillary building constructed in Campus site features include paved driveways and parking lots, pedestrian pavement, flag pole, landscaping, retaining walls, stairways, modular classrooms with covered walkways and fencing. Site mechanical and electrical features include water, sewer, natural gas, and site lighting. This report contains condition and adequacy data collected during the 2013 APS Facility Assessment. The detailed condition and deficiency statements are contained in this report for each building and site improvements on the campus. Generated: 12/15/ :11:26 PM FOR OFFICIAL USE ONLY Final 40

42 School Assessment Report - Grady Cluster, Morningside Elementary School, Site Condition Budget Summary: Site Uniformat Classification RSLI SCI Condition Budget G20 Site Improvements 34% 12.04% $202,147 G30 Site Mechanical Utilities 0% % $424,208 G40 Site Electrical Utilities 17% 45.10% $269,077 Total: $895,433 Generated: 12/15/ :11:26 PM FOR OFFICIAL USE ONLY Final 41

43 School Assessment Report - Grady Cluster, Morningside Elementary School, Site Site Deficiencies Budget Detail Uniformat System Description Unit Price Life Install Year Calc Next Renewal Replacement RSLI SCI Condition Budget G2010 Roadways $ $213,415 43% 0.00% $0 G2020 Parking Lots $ $741,335 43% 0.00% $0 G2030 Pedestrian Paving $ $193,446 43% 49.85% $96,438 G2040 Site Development $ $434,317 20% 0.00% $0 G2050 Landscaping $ $96,099 0% 110% $105,709 G3010 Water Supply $ $89,859 0% 110% $98,845 G3020 Sanitary Sewer $ $189,702 0% 110% $208,672 G3030 Storm Sewer $ $106,083 0% 110% $116,692 G4010 Electrical Distribution $ $244,616 0% 110% $269,077 G4020 Site Lighting $ $242,119 30% 0.00% $0 G4030 Site Communication and Security $ $109,827 30% 0.00% $0 Total $21.32 $2,660,818 26% 33.65% $895,433 Generated: 12/15/ :11:26 PM FOR OFFICIAL USE ONLY Final 42

44 School Assessment Report - Grady Cluster, Morningside Elementary School, Site Site Renewal Schedule Systems Current Total Total $895,433 $570,457 $520,286 $1,986,176 Building Sitework $895,433 $570,457 $520,286 $1,986,176 Site Preparation Site Clearing Site Demolition and Relocations Site Earthwork Hazardous Waste Remediation Site Improvements $202,147 $570,457 $772,604 Roadways Parking Lots Pedestrian Paving $96,438 $96,438 Site Development $570,457 $570,457 Landscaping $105,709 $105,709 Site Mechanical Utilities $424,209 $424,209 Water Supply $98,845 $98,845 Sanitary Sewer $208,672 $208,672 Storm Sewer $116,692 $116,692 Heating Distribution Cooling Distribution Fuel Distribution Other Site Mechanical Utilities Site Electrical Utilities $269,077 $520,286 $789,363 Electrical Distribution $269,077 $269,077 Site Lighting $357,927 $357,927 Site Communication and Security $162,359 $162,359 Other Site Electrical Utilities Site Priority 2 - Trending Critical (Year 1) $96,438 (10.77%) 3 - Necessary (Years 2-5) $208,672 (23.3%) 4 - Recommended (Years 6-10) $590,322 (65.93%) Site Condition Budget: $895,433 Generated: 12/15/ :11:26 PM FOR OFFICIAL USE ONLY Final 43

45 School Assessment Report - Grady Cluster, Morningside Elementary School, Site Site Condition Deficiencies Pedestrian Paving $96,438 (10.77%) Water Supply $98,845 (11.04%) Electrical Distribution $269,077 (30.05%) Landscaping $105,709 (11.81%) Storm Sewer $116,692 (13.03%) Sanitary Sewer $208,672 (23.3%) Site Condition Budget: $895,433 Generated: 12/15/ :11:26 PM FOR OFFICIAL USE ONLY Final 44

46 School Assessment Report - Grady Cluster, Morningside Elementary School, Site Site Deficiencies Budget Narrative System: G Pedestrian Paving Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in It has a 35-year service life. However, in the assessment, it was found to be currently deficient. Recomm.: The system should be replaced. Location: Site Material: Pedestrian Paving Distress: Failing Category: Deferred Maintenance Priority: 2 - Trending Critical (Year 1) Notes: Although pedestrian paving system was provided with the 1994 and 1999 additions, original pedestrian pavement system has significant damage. Correction: Replace Pedestrian Paving/SF Qty: 54,808-S.F. Condition Budget: $96,438 System: G Landscaping Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in It has a 25-year service life which expired in Recomm.: The system should be replaced. Location: Site Distress: Beyond Expected Life Category: Deferred Maintenance Priority: 4 - Recommended (Years 6-10) Correction: Renew System Qty: 1-Ea. Condition Budget: $105,709 Generated: 12/15/ :11:26 PM FOR OFFICIAL USE ONLY Final 45

47 School Assessment Report - Grady Cluster, Morningside Elementary School, Site System: G Water Supply Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in It has a 50-year service life which expired in Recomm.: The system should be replaced. Location: Site Distress: Beyond Expected Life Category: Deferred Maintenance Priority: 4 - Recommended (Years 6-10) Correction: Renew System Qty: 1-Ea. Condition Budget: $98,845 System: G Sanitary Sewer Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in It has a 50-year service life which expired in Recomm.: The system should be replaced. Photo is not available. Location: Site Distress: Beyond Expected Life Category: Deferred Maintenance Priority: 3 - Necessary (Years 2-5) Correction: Renew System Qty: 1-Ea. Condition Budget: $208,672 Generated: 12/15/ :11:26 PM FOR OFFICIAL USE ONLY Final 46

48 School Assessment Report - Grady Cluster, Morningside Elementary School, Site System: G Storm Sewer Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in It has a 50-year service life which expired in Recomm.: The system should be replaced. Location: Site Distress: Beyond Expected Life Category: Deferred Maintenance Priority: 4 - Recommended (Years 6-10) Correction: Renew System Qty: 1-Ea. Condition Budget: $116,692 System: G Electrical Distribution Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in It has a 30-year service life which expired in Recomm.: The system should be replaced. Location: Site Distress: Beyond Expected Life Category: Deferred Maintenance Priority: 4 - Recommended (Years 6-10) Correction: Renew System Qty: 1-Ea. Condition Budget: $269,077 Generated: 12/15/ :11:26 PM FOR OFFICIAL USE ONLY Final 47

School Assessment Report

School Assessment Report School Assessment Report School: Morningside Elementary School Report: Nov 17, 2015 Condition Assessment: Suitability Assessment: Generated: 11/17/2015 10:29:07 AM FOR OFFICIAL USE ONLY Final School Assessment

More information

School Assessment Report

School Assessment Report School Assessment Report School: Humphries Elementary School Report: Nov 17, 2015 Condition Assessment: Suitability Assessment: Generated: 11/17/2015 10:35:17 AM FOR OFFICIAL USE ONLY Final School Assessment

More information

School Assessment Report

School Assessment Report School Assessment Report School: Sutton Middle School (Powers Ferry) Report: Nov 17, 2015 Condition Assessment: Suitability Assessment: Generated: 11/17/2015 10:32:59 AM FOR OFFICIAL USE ONLY Final School

More information

School Assessment Report

School Assessment Report School Assessment Report School: KIPP Vision Report: Dec 15, 14 Condition Assessment: Suitability Assessment: Generated: 12/15/14 12:33:33 PM Final School Assessment Report - Charter Schools, KIPP Vision

More information

School Assessment Report

School Assessment Report School Assessment Report School: Carver High School Report: Nov 17, 2015 Condition Assessment: Suitability Assessment: Generated: 11/17/2015 10:37:23 AM FOR OFFICIAL USE ONLY Final School Assessment Report

More information

School Assessment Report

School Assessment Report School Assessment Report School: Cascade Elementary School Report: Nov 17, 2015 Condition Assessment: Suitability Assessment: Generated: 11/17/2015 10:37:55 AM FOR OFFICIAL USE ONLY Final School Assessment

More information

DeKalb County School District/Stadiums Avondale Stadium Final School Assessment Report May 20, 2016

DeKalb County School District/Stadiums Avondale Stadium Final School Assessment Report May 20, 2016 DeKalb County School District/Stadiums Avondale Stadium Final School Assessment Report May 20, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 4 School Condition Summary

More information

The GLOBE Academy at Heritage School

The GLOBE Academy at Heritage School DeKalb County School District/Leased/Charter The GLOBE Academy at Heritage School Final School Assessment Report May 20, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary

More information

DeKalb County School District/Elementary Schools Clifton Elementary Final School Assessment Report May 19, 2016

DeKalb County School District/Elementary Schools Clifton Elementary Final School Assessment Report May 19, 2016 DeKalb County School District/Elementary Schools Clifton Elementary Final School Assessment Report May 19, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 4 School Condition

More information

Hatton Drive Warehouse

Hatton Drive Warehouse DeKalb County School District/Leased/Charter Hatton Drive Warehouse Final School Assessment Report May 20, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 3 School Condition

More information

Show how a KM database impacts: cost, time, and quality. Demonstrate how Parametric Design could be used to save time, money, and improve quality

Show how a KM database impacts: cost, time, and quality. Demonstrate how Parametric Design could be used to save time, money, and improve quality Executive Summary: Thesis Proposal Final Draft The following pages contain a final draft of the thesis proposal for the South Baltimore District Court House. The basic layout consists of focusing on Knowledge

More information

Former Truancy Center

Former Truancy Center DeKalb County School District/Vacant Former Truancy Center Final School Assessment Report May 20, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 3 School Condition Summary

More information

Appendix J - Custom Uniformat for EDU Migration

Appendix J - Custom Uniformat for EDU Migration Appendix J - Custom Uniformat for EDU Migration Nr. MTC Uniformat for VFA.facility Life (Years) Weight (1-100) Out of Scope Cost Y/N 1 A Substructure 150 N 2 A10 Foundations 150 N 3 A1010 Standard Foundations

More information

School Without Walls

School Without Walls INITIAL YEAR BUILT 1938 BUILDING AREA 59,400 SF CURRENT PROGRAM CAPACITY 304 ENROLLMENT 2008 276 WARD 1 PROPOSED PROGRAM CAPACITY 400 SCHOOL WITHOUT WALLS - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

NALLE ELEMENTARY SCHOOL

NALLE ELEMENTARY SCHOOL INITIAL YEAR BUILT 1950 BUILDING AREA 83,900 SF CURRENT PROGRAM CAPACITY 460 ENROLLMENT 2008 372 WARD 7 PROPOSED PROGRAM CAPACITY 400 Site Plan NALLE - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5

More information

Lake Highlands North Recreation Center Summary

Lake Highlands North Recreation Center Summary Lake Highlands North Recreation Center Summary Address Building Purpose 9940 White Rock Trail Dallas, TX 75238 Recreation Center Original Year of Construction 1971 Building Area 33,036 SF Inspection Date

More information

RAYMOND EDUCATION CAMPUS

RAYMOND EDUCATION CAMPUS INITIAL YEAR BUILT 1924 BUILDING AREA 73,600 SF CURRENT PROGRAM CAPACITY 479 ENROLLMENT 2008 302 WARD 1 PROPOSED PROGRAM CAPACITY 600 Site Plan RAYMOND - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Timberglen Recreation Center Summary

Timberglen Recreation Center Summary Timberglen Recreation Center Summary Address Building Purpose 3810 Timberglen Road Dallas, TX 75287 Recreation Center Original Year of Construction 2003 Building Area 15,000 SF Inspection Date August 2,

More information

LASALLE - BACKUS EDUCATION CAMPUS

LASALLE - BACKUS EDUCATION CAMPUS INITIAL YEAR BUILT 1957 BUILDING AREA 63,000 SF CURRENT PROGRAM CAPACITY 406 ENROLLMENT 2008 349 WARD 4 PROPOSED PROGRAM CAPACITY 425 Site Plan LASALLE - BACKUS - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

LEWIS ELEMENTARY SCHOOL

LEWIS ELEMENTARY SCHOOL INITIAL YEAR BUILT 1962 BUILDING AREA 49,500 SF CURRENT PROGRAM CAPACITY 550 ENROLLMENT 2008 288 WARD 1 PROPOSED PROGRAM CAPACITY 450 Site Plan LEWIS - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5

More information

DAVIS ELEMENTARY SCHOOL

DAVIS ELEMENTARY SCHOOL INITIAL YEAR BUILT 1943 BUILDING AREA 71,100 SF CURRENT PROGRAM CAPACITY 507 ENROLLMENT 2008 227 WARD 7 PROPOSED PROGRAM CAPACITY 325 Site Plan DAVIS - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-

More information

SEATON ELEMENTARY SCHOOL

SEATON ELEMENTARY SCHOOL INITIAL YEAR BUILT 1969 BUILDING AREA 65,000 SF CURRENT PROGRAM CAPACITY 428 ENROLLMENT 2008 280 WARD 2 PROPOSED PROGRAM CAPACITY 325 Site Plan SEATON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5

More information

POWELL ELEMENTARY SCHOOL

POWELL ELEMENTARY SCHOOL INITIAL YEAR BUILT 1925 BUILDING AREA 38,500 SF CURRENT PROGRAM CAPACITY 304 ENROLLMENT 2008 319 WARD 4 PROPOSED PROGRAM CAPACITY 325 Site Plan POWELL - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-3

More information

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural % 8/11/ Building Rating System Percent Site: 1.0 Total 0 163 82% Building: 2.1 Building Exterior Elements 0 82 82% 2.2 Accessibility 0 92 92% 2.3 Structural 0 91 91% 2.4 Building Envelope 0 84 84% 2. Interior

More information

Facility Condition Assessment

Facility Condition Assessment Citywide Facility Condition Assessment Report of Facility Condition Assessment For 1601 Manhattan Beach Boulevard, Manhattan Beach, CA September 4, 2013 (Rev A) Provided By: Faithful+Gould, Inc. Provided

More information

MAURY ELEMENTARY SCHOOL

MAURY ELEMENTARY SCHOOL INITIAL YEAR BUILT 1886 BUILDING AREA 46,800 SF CURRENT PROGRAM CAPACITY 276 ENROLLMENT 2008 238 WARD 6 PROPOSED PROGRAM CAPACITY 325 Site Plan MAURY - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5

More information

STUART-HOBSON MIDDLE SCHOOL

STUART-HOBSON MIDDLE SCHOOL INITIAL YEAR BUILT 1927 BUILDING AREA 105,900 SF CURRENT PROGRAM CAPACITY 460 ENROLLMENT 2008 399 WARD 6 PROPOSED PROGRAM CAPACITY 450 Site Plan STUART-HOBSON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Thurgood Marshall Recreation Center Summary

Thurgood Marshall Recreation Center Summary Thurgood Marshall Recreation Center Summary Address Building Purpose 5150 Mark Trail Way Dallas, TX 75232 Recreation Center Original Year of Construction 1970 Building Area 21,300 SF Inspection Date August

More information

Facility Condition Assessment

Facility Condition Assessment Citywide Facility Condition Assessment Report of Facility Condition Assessment For City of Manhattan Beach 1600 Marine Avenue, Manhattan Beach, CA September 4, 2013 (Rev A) Provided By: Faithful+Gould,

More information

NOYES EDUCATION CAMPUS

NOYES EDUCATION CAMPUS INITIAL YEAR BUILT 1930 BUILDING AREA 49,700 SF CURRENT PROGRAM CAPACITY 321 ENROLLMENT 2008 337 WARD 5 PROPOSED PROGRAM CAPACITY 450 Site Plan NOYES - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-8

More information

SHEPHERD ELEMENTARY SCHOOL

SHEPHERD ELEMENTARY SCHOOL INITIAL YEAR BUILT 1932 BUILDING AREA 79,700 SF CURRENT PROGRAM CAPACITY 332 ENROLLMENT 2008 355 WARD 4 PROPOSED PROGRAM CAPACITY 400 Site Plan SHEPHERD - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

WATKINS ELEMENTARY SCHOOL

WATKINS ELEMENTARY SCHOOL INITIAL YEAR BUILT 1962 BUILDING AREA 69,300 SF CURRENT PROGRAM CAPACITY 578 ENROLLMENT 2008 550 WARD 6 PROPOSED PROGRAM CAPACITY 550 Site Plan WATKINS - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

LECKIE ELEMENTARY SCHOOL

LECKIE ELEMENTARY SCHOOL INITIAL YEAR BUILT 1970 BUILDING AREA 65,000 SF CURRENT PROGRAM CAPACITY 471 ENROLLMENT 2008 321 WARD 8 PROPOSED PROGRAM CAPACITY 400 Site Plan LECKIE - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5

More information

WILKINSON ELEMENTARY SCHOOL

WILKINSON ELEMENTARY SCHOOL INITIAL YEAR BUILT 1976 BUILDING AREA 144,900 SF CURRENT PROGRAM CAPACITY 508 ENROLLMENT 2008 451 WARD 8 PROPOSED PROGRAM CAPACITY 600 Site Plan WILKINSON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Facilities Feasibility Study Matthew A. Henson ES Condition Assessment

Facilities Feasibility Study Matthew A. Henson ES Condition Assessment Summary of Findings The Matthew A. Henson ES Facility located at 1600 N. Payson Street in Baltimore, Maryland, was built in 1964. It comprises 75,228 gross square feet. The total current deficiencies for

More information

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural % 8/11/ Building Rating System Percent Site: 1.0 Total 0 9 8 Building: 2.1 Building Exterior Elements 0 82 82% 2.2 Accessibility 0 82 82% 2.3 Structural 0 7 7% 2.4 Building Envelope 0 47 47% 2. Interior

More information

PATTERSON ELEMENTARY SCHOOL

PATTERSON ELEMENTARY SCHOOL INITIAL YEAR BUILT 1945 BUILDING AREA 78,300 SF CURRENT PROGRAM CAPACITY 368 ENROLLMENT 2008 463 WARD 8 PROPOSED PROGRAM CAPACITY 500 Site Plan PATTERSON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Facilities Feasibility Study Frederick Douglass HS Condition Assessment

Facilities Feasibility Study Frederick Douglass HS Condition Assessment Summary of Findings The Frederick Douglass HS Facility located at 2301 Gwynns Falls Parkway in Baltimore, Maryland, was built in 1927. It comprises 194,249 gross square feet. The total current deficiencies

More information

Edmonton Public School District No. 7

Edmonton Public School District No. 7 EXECUTIVE SUMMARY 1. Overall Impressions The 1966 non-core school has actively pursued an ongoing maintenance and upgrade program to improve a number of past problem areas within the school. Extensive

More information

CONCURRENT ADVERTISEMENT FOR SUBCONTRACTOR PREQUALIFICATION AND BIDS

CONCURRENT ADVERTISEMENT FOR SUBCONTRACTOR PREQUALIFICATION AND BIDS CONCURRENT ADVERTISEMENT FOR SUBCONTRACTOR PREQUALIFICATION AND BIDS (August 28, 2018) PIERCE HALL IMPROVEMENTS PROJECT NO. 950511-950532 UNIVERSITY OF CALIFORNIA, RIVERSIDE PREQUALIFICATION PROCESS ALL

More information

APPLICATION AND CERTIFICATE FOR PAYMENT

APPLICATION AND CERTIFICATE FOR PAYMENT AND CERTIFICATE FOR PAYMENT TO OWNER: MASTER TEMPLATE - SAVE PROJECT FILE 1 DATE: 10/5/2012 PERIOD TO: ARCHITECT: PROJECT NO: CONTRACTOR'S FOR PAYMENT Application is made for payment, as shown below, in

More information

Overbrook Theater / Fruenthal Foundation Art Center. 1.0 Total Points % 2.1 Building Exterior Elements %

Overbrook Theater / Fruenthal Foundation Art Center. 1.0 Total Points % 2.1 Building Exterior Elements % 8/13/ Building Rating System Percent Site: 1.0 Total 0 9 8 Building: 2.1 Building Exterior Elements 0 64 64% 2.2 Accessibility 0 66 66% 2.3 Structural 0 77 77% 2.4 Building Envelope 0 4 4% 2. Interior

More information

Facilities Feasibility Study Laurence G. Paquin Building Condition Assessment

Facilities Feasibility Study Laurence G. Paquin Building Condition Assessment Summary of Findings The Laurence G. Paquin Building Facility located at 2200 SINCLAIR LANE in Baltimore, Maryland, was built in 1975. It comprises 65,666 gross square feet. The total current deficiencies

More information

DENNIS TOWNSHIP FEASIBILITY STUDY

DENNIS TOWNSHIP FEASIBILITY STUDY DENNIS TOWNSHIP FEASIBILITY STUDY October 29, 2015 TABLE OF CONTENTS I. INTRODUCTION II. EXECUTIVE SUMMARY III. GENERAL FACILITY DATA A. Primary School B. Elementary / Middle School IV. FACILITIES ASSESSMENT

More information

Section I Lompoc Animal Services Executive Summary

Section I Lompoc Animal Services Executive Summary Section I Lompoc Animal Services Executive Summary In 2013-2014, the Consultant conducted initial facility condition assessment data collection at the County of Santa Barbara, with specific attention to

More information

LOGAN SCHOOL SCHOOL WITHOUT WALLS AT LOGAN

LOGAN SCHOOL SCHOOL WITHOUT WALLS AT LOGAN INITIAL YEAR BUILT 1935 BUILDING AREA 47,200 SF CURRENT PROGRAM CAPACITY 479 ENROLLMENT 2008 418 WARD 6 PROPOSED PROGRAM CAPACITY 450 Site Plan LOGAN - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION HS

More information

Toronto Community Housing Executive Summary 2016/2017. BCA Report. Sample House High FCI

Toronto Community Housing Executive Summary 2016/2017. BCA Report. Sample House High FCI BCA Report Porfolio Development Size Construction TCHC - All Op Units Scattered Units (CHU 20),005 Sq.Ft. 925 Floor Above Grade 2 Divisional Units Page of 43 Description This dwelling unit is a detached

More information

Harry Stone Recreation Center Summary

Harry Stone Recreation Center Summary Harry Stone Recreation Center Summary Address Building Purpose 2400 Millmar Drive Dallas, TX 75228 Recreation Center Original Year of Construction 1957 (Expansion 2013) Building Area 22,281 SF Inspection

More information

Building Information Modeling (BIM) Execution Plan

Building Information Modeling (BIM) Execution Plan 10/19/2017 for [Stanford Project Name] [Stanford Project Number] Developed by [Primary A/E] TABLE OF CONTENTS USE OF THE BIM EXECUTION PLAN... 3 1. PROJECT INFORMATION... 3 2. PROJECT SCHEDULE AND MILESTONES...

More information

The Report: Priority 1 thru 5 $ 2,124,417 Lifecycle Years 1 thru 3 ½ $ 384,097 New Construction $ 2,451,568 Less Redlined Items $ 43,534

The Report: Priority 1 thru 5 $ 2,124,417 Lifecycle Years 1 thru 3 ½ $ 384,097 New Construction $ 2,451,568 Less Redlined Items $ 43,534 Building Condition Assessment Facilities Feasibility Study 106 - Sam Houston Elementary Educational Needs $ 2,451,568 Safety & Security Needs $ 588,049 Exterior Needs $ 622,503 Interior Needs $ 703,790

More information

MCER Study for Little Powder K-8

MCER Study for Little Powder K-8 MCER Study for Little Powder K-8 CCSD #1 Little Powder K-8 Weston, WY Wyoming School Facilities Department Cheyenne, WY TSP, Inc. Sheridan, WY May 16, 2016 Table of Contents Introduction 3 Goals and Objectives

More information

0B MAGNOLIA HALL. Scale: 1:110. Date: Feb Time: 7:40 pm. User: brady. 10 ft

0B MAGNOLIA HALL. Scale: 1:110. Date: Feb Time: 7:40 pm. User: brady. 10 ft 0B 2 m 1:110 7:40 pm. 01 5 m 1:230 7:38 pm. 02 5 m 1:230 7:38 pm. 03 5 m 1:230 7:45 pm. Facility Profile ( FP-1 ) City: State: Country: Address: Stories: Attic: Basement: Glassboro New Jersey United States

More information

GARFIELD ELEMENTARY SCHOOL

GARFIELD ELEMENTARY SCHOOL INITIAL YEAR BUILT 1910 BUILDING AREA 58,908 SF CURRENT PROGRAM CAPACITY 446 ENROLLMENT 2008 278 WARD 8 PROPOSED PROGRAM CAPACITY 400 Site Plan GARFIELD - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Property Condition Assessment

Property Condition Assessment Property Condition Assessment Pewaukee, WI 53072 Inspection Date: 1/6/15 Prepared For: Report Number: Prepared By: Shamrock Building Inspection Consultants LLC N29 W29951 Shel-Mar Dr. Pewaukee, WI 53072

More information

EASTERN HIGH SCHOOL. Site Plan East Capitol Street, N.E., Washington, DC INITIAL YEAR BUILT 1923

EASTERN HIGH SCHOOL. Site Plan East Capitol Street, N.E., Washington, DC INITIAL YEAR BUILT 1923 INITIAL YEAR BUILT 1923 BUILDING AREA 288,800 SF CURRENT PROGRAM CAPACITY 1,425 ENROLLMENT 2008 565 WARD 6 PROPOSED PROGRAM CAPACITY 1,100 Site Plan EASTERN - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

SPACE TYPE: OUTSIDE PARKING (STRUCTURE)

SPACE TYPE: OUTSIDE PARKING (STRUCTURE) SPACE TYPE: OUTSIDE PARKING (STRUCTURE) Construction Criteria The unit costs for Outside Parking (Structure) space types are based on the construction quality and design features in the following table.

More information

K.B. Polk Recreation Center Summary

K.B. Polk Recreation Center Summary K.B. Polk Recreation Center Summary Address Building Purpose 6801 Roper Street Dallas, TX 75209 Recreation Center Original Year of Construction 1988 Building Area 14,305 SF Inspection Date July 20, 2016

More information

TABLE OF CONTENTS Page

TABLE OF CONTENTS Page TABLE OF CONTENTS Page Executive Summary i Facility Profile and Summary 1 Section 1 Site Conditions 4 Section 2 Building Exterior 7 Section 3 Building Interior 11 Section 4 Mechanical Systems 14 Section

More information

Evansville Public Schools. Facility Assessment Report January 28, 2 , General Building Data

Evansville Public Schools. Facility Assessment Report January 28, 2 , General Building Data Evansville Public Schools Facility Assessment Report January 28, 2, 2013 SGN/Wendel Architects, Design Tree Engineering and R.A. Morton Construction Managers were retained by the Evansville Public School

More information

Hartsville Area Schools - Building Evaluations

Hartsville Area Schools - Building Evaluations Darlington County School District Darlington, South Carolina August 8, 2012 Hartsville Area Schools - Building Evaluations School Name: Principal: Grade Levels: Site Size: Student Population: Staff Size:

More information

PLUMMER ELEMENTARY SCHOOL

PLUMMER ELEMENTARY SCHOOL INITIAL YEAR BUILT 1959 BUILDING AREA 69,400 SF CURRENT PROGRAM CAPACITY 481 ENROLLMENT 2008 228 WARD 7 PROPOSED PROGRAM CAPACITY 325 Site Plan PLUMMER - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

National Property Inspections

National Property Inspections National Property Inspections Anywhere, USA (325) 382-8754 Property Location 9375 Burt Street Anywhere USA Prepared for John Investor Consultant Al Standard (325) 382-8754 Page 1 of 27 TABLE OF CONTENTS

More information

MANHATTAN COLLEGE STUDENT COMMONS

MANHATTAN COLLEGE STUDENT COMMONS MANHATTAN COLLEGE STUDENT COMMONS BUDGET CHECK USING GILBANE S COSTADVISOR MODEL OCTOBER 29, 2010 Introduction: Gilbane developed this CostAdvisor Model of the proposed new Manhattan College Student Commons

More information

CEFPI Monthly Meeting

CEFPI Monthly Meeting CEFPI Monthly Meeting LISD School Construction Cost Information Background Information School Cost Information How Does LISD Compare? Other District Comparisons Background Information Cost Discussion Type

More information

Completed. Project. Melbourne High School. Comprehensive Additions and Renovations

Completed. Project. Melbourne High School. Comprehensive Additions and Renovations Project Update Project Update September 8, 2006 January 06, 2010 Project Manager Project Manager Anibal Caussade Dennis Bonny Field Coordinator Field Coordinator Bud Ball Paul Friel Project Budget Project

More information

BARNARD ELEMENTARY SCHOOL

BARNARD ELEMENTARY SCHOOL INITIAL YEAR BUILT 2002 BUILDING AREA 67,000 SF CURRENT PROGRAM CAPACITY 520 ENROLLMENT 2008 329 WARD 4 PROPOSED PROGRAM CAPACITY 450 Site Plan BARNARD - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Sub-Section A Lompoc County Offices Executive Summary

Sub-Section A Lompoc County Offices Executive Summary Facility Condition Assessment 2014 Sub-Section A Lompoc County Offices Executive Summary The Lompoc County Offices was assessed for deficiencies, and each building system and site was assigned a condition

More information

Mills Elementary School Site Summary

Mills Elementary School Site Summary 1 Mills Elementary School Site Summary Address 6201 Davis Lane Austin, TX 78749 Number of Permanent Campus Facilities 1 Original Year of Construction 1998 Total Campus Building Area (combined) 81,368 SF

More information

BALLOU SENIOR HIGH SCHOOL

BALLOU SENIOR HIGH SCHOOL INITIAL YEAR BUILT 1960 BUILDING AREA 271,300 SF CURRENT PROGRAM CAPACITY 1565 ENROLLMENT 2008 9-12 (1,252) STAY (753) WARD 8 PROPOSED PROGRAM CAPACITY 1200 Site Plan BALLOU - 1 PROPOSED PROGRAM PROFILE

More information

G703 Continuation Sheet Minimum Schedule of Values Please use the breakdown listed below when submitting your billing for the project

G703 Continuation Sheet Minimum Schedule of Values Please use the breakdown listed below when submitting your billing for the project Billing Requirements G703 Continuation Sheet Minimum Schedule of Values Please use the breakdown listed below when submitting your billing for the project Sitework / Paving Excavation and Grading Labor

More information

BVSC BVSC. Midwest Technical Inspections Survey Worksheet. Account / Account Code: Insured: Policy #: Building Data - Section 1

BVSC BVSC. Midwest Technical Inspections Survey Worksheet. Account / Account Code: Insured: Policy #: Building Data - Section 1 Midwest Technical Inspections Survey Worksheet BVSC BVSC Account / Account Code: Agency: Insured: Policy #: Telephone: Alt. Phone: Building Data - Section 1 Building Name (Entire Valuation) Section Name

More information

< 15% 15 to 25% 25 to 45% 45 to 60% > 60% Buildings Minimal Current Capital Funding Required. Systems

< 15% 15 to 25% 25 to 45% 45 to 60% > 60% Buildings Minimal Current Capital Funding Required. Systems Facility Condition Assessment Summary Report This report provides a summary of the Facility Condition Index (FCI) value of a school facility and select major building systems. The FCI calculation represents

More information

FACILITIES LIFE CYCLE ANALYSIS

FACILITIES LIFE CYCLE ANALYSIS FACILITIES LIFE CYCLE ANALYSIS Scottsdale Unified School District Governing Board Study Session September 8, 2016 Terry Worcester A.I.A. COCHISE Elementary School 1991 Media Center 2001 Classrooms, Administration

More information

Peter Kirk Elementary School Modernization vs. New-in-lieu of Modernization Report

Peter Kirk Elementary School Modernization vs. New-in-lieu of Modernization Report Peter Kirk Elementary School Modernization vs. New-in-lieu of Modernization Report January 2016 Summary In consideration for a potential 2016 Bond measure for the Capital Facilities Program, Kirk Elementary

More information

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural % BartelsRode Gymnasium 8/11/ Building Rating System Percent Site: 1.0 Total 0 13 77% Building: 2.1 Building Exterior Elements 0 8 8% 2.2 Accessibility 0 74 74% 2.3 Structural 0 76 76% 2.4 Building Envelope

More information

Belington Elementary School Grades PK 5

Belington Elementary School Grades PK 5 Barbour County Schools Comprehensive Educational Facilities Plan 2010-2020 Belington Elementary School Grades PK 5 Blackwood Associates, Inc. / MSES consultants, Inc. / Roy Blizzard and Associates Belington

More information

Health Life Safety Survey and Master Facilities Plan

Health Life Safety Survey and Master Facilities Plan Health Life Safety Survey and Master Facilities Plan Community Presentation Board Meeting June 22, 2015 June 22, 2014 Board Presentation Overview and Summary of the Health Life Safety Survey and Master

More information

Darlington Area Schools - Building Evaluations

Darlington Area Schools - Building Evaluations Darlington County School District Darlington, South Carolina August 2, 2012 Darlington Area Schools - Building Evaluations School Name: Brunson-Dargan Observed By: Creed/Carter Principal: Mrs. Ada O Sindab

More information

Building Inspection Report

Building Inspection Report Building Inspection Report Sample Commercial Inspection Report Inspection Date: Prepared For: Prepared By: Professional Property Inspection Consultants 4857 Winterset Drive Columbus, OH 43220 (614) 459-5941

More information

ST CECELIA ELEMENTARY SCHOOL CALGARY, ALBERTA

ST CECELIA ELEMENTARY SCHOOL CALGARY, ALBERTA ST CECELIA ELEMENTARY SCHOOL CALGARY, ALBERTA School Facility Evaluation Project Calgary Roman Catholic Separate School South Region, District #1 Prepared For Alberta Infrastructure March 2000 Prepared

More information

Sub-Section A Santa Maria Metro Executive Summary

Sub-Section A Santa Maria Metro Executive Summary Sub-Section A Santa Maria Metro Executive Summary The Santa Maria Metro was assessed for deficiencies, and each building system and site was assigned a condition code that reflects the overall usability

More information

< 15% 15 to 25% 25 to 45% 45 to 60% > 60% Buildings Minimal Current Capital Funding Required. Systems

< 15% 15 to 25% 25 to 45% 45 to 60% > 60% Buildings Minimal Current Capital Funding Required. Systems Facility Condition Assessment Summary Report This report provides a summary of the Facility Condition Index (FCI) value of a school facility and select major building systems. The FCI calculation represents

More information

Section I Carpinteria Executive Summary

Section I Carpinteria Executive Summary Section I Carpinteria Executive Summary In 2013-2014, the Consultant conducted initial facility condition assessment data collection at the County of Santa Barbara, with specific attention to Carpinteria

More information

Facility Condition Assessment

Facility Condition Assessment Citywide Facility Condition Assessment Report of Facility Condition Assessment For Hamilton and Pool Pump Building 203 El Bonito Drive, Novato, CA March 4, 2013 Provided By: Faithful+Gould, Inc. Provided

More information

Darlington Area Schools - Building Evaluations

Darlington Area Schools - Building Evaluations Darlington County School District Darlington, South Carolina August 2, 2012 Darlington Area Schools - Building Evaluations School Name: Cain Elementary School Observed By: Creed/Carter Principal: Grade

More information

Cupertino Union School District

Cupertino Union School District Cupertino Union School District Update For Citizens Bond Oversight Committee September 21, 2016 WORK IN PROGRESS 1 STEVENS CREEK KINDERGARTEN CLASSROOM STEVENS CREEK KINDERGARTEN CLASSROOM 2 STEVENS CREEK

More information

ADDENDUM 2 - JULY 14, 2015

ADDENDUM 2 - JULY 14, 2015 7/9/2015 The Professional(s) of Record above has signed for the following specification sections: DIVISION 1 GENERAL REQUIREMENTS Section 01 10 00 Summary of Work Section 01 25 00 Substitution Procedures

More information

Project Estimate Summary

Project Estimate Summary Project Estimate Summary Project Cost Evaluation Table 4 shows the Construction Cost, CC/SF, Total Cost, TC/SF, the Building Systems Cost, and Building Systems Cost/SF based on the budget for. Table 4

More information

Section I Rocky Nook Park Executive Summary

Section I Rocky Nook Park Executive Summary Facility Condition Assessment 2014 Section I Rocky Nook Park Executive Summary In 2013-2014, the Consultant conducted initial facility condition assessment data collection at the County of Santa Barbara,

More information

Beckley-Saner Recreation Center Summary

Beckley-Saner Recreation Center Summary Beckley-Saner Recreation Center Summary Address Building Purpose 114 West Hobson Avenue, Dallas, TX 75224 Recreation Center Original Year of Construction 1949 Building Area 34,510 SF Inspection Date July

More information

Sub-Section A New Cuyama Executive Summary

Sub-Section A New Cuyama Executive Summary Sub-Section A New Cuyama Executive Summary The New Cuyama complex was assessed for deficiencies, and each building system and site was assigned a condition code that reflects the overall usability of the

More information

Hartsville Area Schools - Building Evaluations

Hartsville Area Schools - Building Evaluations Darlington County School District Darlington, South Carolina August 8, 2012 Hartsville Area Schools - Building Evaluations School Name: West Hartsville Elementary Observed By: Cannon/Carter Principal:

More information

Invitation to Bid. RLS Construction Group requests your firm to submit a quotation on the following project:

Invitation to Bid. RLS Construction Group requests your firm to submit a quotation on the following project: RLS CONSTRUCTION GROUP Phone: 717-502-6680 Fax: 717-502-6681 www.rlscg.com Invitation to Bid RLS Construction Group requests your firm to submit a quotation on the following project: Project: Location:

More information

Architectural Services Consultant Registration Form

Architectural Services Consultant Registration Form Architectural Services Consultant Registration Form Send three copies of the completed registration form to: San Bernardino Community College District, Facilities Project Management, Attn: Scott Stark,

More information

Section I Santa Rosa Park Executive Summary

Section I Santa Rosa Park Executive Summary Facility Condition Assessment 2014 Section I Santa Rosa Park Executive Summary In 2013-2014, the Consultant conducted initial facility condition assessment data collection at the County of Santa Barbara,

More information

FREMONT UNIFIED. Thornton Middle School Conversion S C H O O L D I S T R I C T. Quattrocchi Kwok Architects. Sept 26, 2018

FREMONT UNIFIED. Thornton Middle School Conversion S C H O O L D I S T R I C T. Quattrocchi Kwok Architects. Sept 26, 2018 FREMONT UNIFIED S C H O O L D I S T R I C T Thornton Middle School Conversion Quattrocchi Kwok Architects Sept 26, 2018 1 Transforming Thornton Incoming 6 th graders in year 2021/22 Student population

More information

Cheldelin Middle School

Cheldelin Middle School Facility Information Address: 987 NE Conifer Blvd Corvallis Site Size: Building Area: Construction Date: Improved Parking: Grade Levels Served: Regular Classrooms: Portable Classrooms: Sept. 2007 Enrollment:

More information

Mount Vernon Elementary School Grades PK 5

Mount Vernon Elementary School Grades PK 5 Barbour County Schools Comprehensive Educational Facilities Plan 2010-2020 Mount Vernon Elementary School Grades PK 5 Blackwood Associates, Inc. / MSES consultants, Inc. / Roy Blizzard and Associates Mount

More information

Section I Isla Vista Campus Executive Summary

Section I Isla Vista Campus Executive Summary Section I Isla Vista Campus Executive Summary In 2013-2014, the Consultant conducted initial facility condition assessment data collection at the County of Santa Barbara, with specific attention to the

More information

Darlington Area Schools - Building Evaluations

Darlington Area Schools - Building Evaluations Darlington County School District Darlington, South Carolina August 2, 2012 Darlington Area Schools - Building Evaluations School Name: Pate Elementary School Observed By: Creed/Carter Principal: Grade

More information