1 Facility Condition Assessment 2014 Sub-Section A Lompoc County Offices Executive Summary The Lompoc County Offices was assessed for deficiencies, and each building system and site was assigned a condition code that reflects the overall usability of the systems. The condition code is based on the reliability of the systems and reflects the first-hand observations of the Consultant and its knowledge of building systems. The condition codes possess, by nature, a subjective element. The condition codes for most of the systems falls around 3.0 ( fair ) to 4.0 ( good ), with individual ratings as low as 2.2 and as high as 4.5. Examination of the County s current funding model shows that the current annual spend of approximately $219,800 for the property falls below required levels and is not sustainable. Given current industry-accepted spend rates and modeling scenarios for the Lompoc County Offices, the Consultant has suggested an annual spend of 2% to 4% of the current replacement value (CRV) of the County s facilities. Based on the CRV of approximately $18.47 MM, the suggested annual spend should fall between $369,400 and $738,800. The econometric model for the properties is further supplemented by the identification of deficiencies that resulted in the generation of some 35 projects that total $489,000 in probable costs. These projects have been further prioritized according to their urgency and have been assigned to suggested funding years 1-3, to years 4-6, and to outlying years The identified project work provides the near-term funding projections derived from the econometric model with a degree of granularity. The Consultant s opinions of these probable costs are based on a variety of methods that reflect the complex nature of the County s facilities, the environment of the County of Santa Barbara, and the local market conditions. Standard industry costing references often served as the starting point in developing budgetary estimates, though difficulty of access, compressed project schedules, and the generally high cost of contractor services all informed the final opinion of probable cost. The largest associated projects are: Pavement Refurbishment - $273,800 Probation Office Window Replacement - $55,400 Admin Building Roof Replacement - $67,850 The Facility Condition Index (FCI) represents a standard means of assessing the relative condition of assets among geographically-dispersed sites. The metric is a ratio of the required repairs and project work to the asset s current replacement value (CRV). The resulting percentage expresses the deficit (deferred repairs and maintenance) against the value. The lower the FCI, the better is the condition. The FCI for the Lompoc County Offices is approximately 3%, which corresponds to very good on the FCI scale. Page 1 of 1 Sub-Section A Betteravia Government Center, Building C, Executive Summary Copyright 2014 Roy Jorgensen Associates, Inc.
2 Section Three Audit and Conditions Building Information: Building Name: Gross Square Footage: Construction Date: P03000: Lompoc County Offices Grounds 115 Civic Center Lompoc, CA 104, Acreage:.29 General: Description Significant Deficiencies Condition Code SITE Site: Landscaping, irrigation systems, site utilities (i.e., gas mains, water and sewer mains, electrical service), rail spurs, and pavements adjacent to and constructed as part of the facility (i.e., sidewalks, parking lots, access roads) security and site lighting. Landscaped. Maintained. Pavement needs work. 3.3 STRUC Structure: Wall and column foundations, superstructure, slabs and floors including pits and covers. Structural mezzanine framing and slabs. Basement walls and dampproofing.
3 Description Significant Deficiencies Condition Code EXT ROOF Exterior: Non-structural exterior wall construction, steel stud and dryvit, face brick veneer, stone veneer, siding (metal, fiberglass, etc.). Exterior coatings, and sealants, windows, and doors, louvers, grilles, screens, and awnings. Roofing: Insulation, vapor retarders, roof coverings, metal roofing, roof openings, skylights, gutters, and flashing. MECH Mechanical s: Heat, ventilating and air conditioning systems including controls; solar energy equipment, exhaust fans, or other mechanical equipment associated with indoor air quality. ELEC Electrical Service & Equipment: Electrical service and distribution equipment, lighting and branch wiring, communications and security equipment, and other electrical equipment and service. PLUMB Plumbing s: Water and sewer systems, including pumps and plumbing fixtures, fire protection piping and pumps, process piping systems (natural gas, compressed air, chilled water, medical gases, etc.). CONV Conveyance s: Elevators, escalators, cranes, hoists, wheelchair, dumbwaiter, turntable, or other lifting mechanisms. INTF Interior Finishes: Non-load bearing interior walls, all finishes on walls, ceilings, floors, stairways. Interior doors, windows, and millwork. Narrative: Grounds are well maintained but parking lot pavement needs repair. Facility Condition Index:
4 Performance Measure 2002 Evaluation 2013 FCA Current Replacement Value (CRV) Not Calculated $2,025,897 Accumulated Deferred Maintenance Not Calculated $ Building (Facility) Condition Index (FCI) Not Calculated %
5 Section Three Audit and Conditions Building Information: Building Name: Gross Square Footage: Constructio n Date: P03001: Lompoc Old Court(Probation ) 115 Civic Center Plaza Lompoc, CA 26, Acreage:.60 General: Description Significant Deficiencies Condition Code SITE Site: Landscaping, irrigation systems, site utilities (i.e., gas mains, water and sewer mains, electrical service), rail spurs, and pavements adjacent to and constructed as part of the facility (i.e., sidewalks, parking lots, access roads) security and site lighting. Landscaped. Maintained. 4.5 STRUC Structure: Wall and column foundations, superstructure, slabs and floors including pits and covers. Structural mezzanine framing and slabs. Basement walls and dampproofing. Fairly old, but looks in Good Condition. 4.0 EXT Exterior: Non-structural exterior wall construction, steel stud and dryvit, face brick veneer, stone veneer, siding (metal, fiberglass, etc.). Exterior coatings, and sealants, windows, and doors, louvers, grilles, screens, and awnings. Fairly old building but exterior well maintained. Mostly stucco. Metal windows are rusting out. 3.8
6 Description Significant Deficiencies Condition Code ROOF Roofing: Insulation, vapor retarders, roof coverings, metal roofing, roof openings, skylights, gutters, and flashing. Areas of clay Spanish tile and flat 3- ply roofing material. Fair condition at best. Needs sealing in several locations. 3.0 MECH Mechanical s: Heat, ventilating and air conditioning systems including controls; solar energy equipment, exhaust fans, or other mechanical equipment associated with indoor air quality. AC units around 14 years old. Nearing end of useful life. 2.5 ELEC Electrical Service & Equipment: Electrical service and distribution equipment, lighting and branch wiring, communications and security equipment, and other electrical equipment and service. Functioning as needed. Is dated. 3.5 PLUMB Plumbing s: Water and sewer systems, including pumps and plumbing fixtures, fire protection piping and pumps, process piping systems (natural gas, compressed air, chilled water, medical gases, etc.). Redone in several visual areas. Some not redone. Getting to end of useful life. 2.7 CONV Conveyance s: Elevators, escalators, cranes, hoists, wheelchair, dumbwaiter, turntable, or other lifting mechanisms. INTF Interior Finishes: Non-load bearing interior walls, all finishes on walls, ceilings, floors, stairways. Interior doors, windows, and millwork. Good condition 4.2 Narrative: This is an old building. Many visual items are new or updated, but this won t help the infrastructure. Windows are original and rusting out.
7 Facility Condition Index: Performance Measure 2002 Evaluation 2013 FCA Current Replacement Value (CRV) Not Calculated $7,364,230 Accumulated Deferred Maintenance Not Calculated $ Building (Facility) Condition Index (FCI) Not Calculated %
8 Section Three Audit and Conditions Building Information: Building Name: Gross Square Footage: Construction Date: P03001X: Lompoc Old Court(Public Defenders Office) 115 Civic Center Plaza Lompoc, CA? 1960 Acreage:.?? General: Description Significant Deficiencies Condition Code SITE Site: Landscaping, irrigation systems, site utilities (i.e., gas mains, water and sewer mains, electrical service), rail spurs, and pavements adjacent to and constructed as part of the facility (i.e., sidewalks, parking lots, access roads) security and site lighting. Landscaped. Maintained. 4.5 STRUC Structure: Wall and column foundations, superstructure, slabs and floors including pits and covers. Structural mezzanine framing and slabs. Basement walls and dampproofing. Fairly old, but looks in Good Condition. Part of same structure as Probation 4.0 EXT Exterior: Non-structural exterior wall construction, steel stud and dryvit, face brick veneer, stone veneer, siding (metal, fiberglass, etc.). Exterior coatings, and sealants, windows, and doors, louvers, grilles, screens, and awnings. Fairly old building but exterior well maintained. Mostly stucco. Metal windows look new 4.5
9 Description Significant Deficiencies Condition Code ROOF Roofing: Insulation, vapor retarders, roof coverings, metal roofing, roof openings, skylights, gutters, and flashing. Areas of clay Spanish tile and flat 3- ply roofing material. Fair condition at best. Needs sealing in several locations. Water leaks apparent based on stains in ceiling tiles. 2.9 MECH Mechanical s: Heat, ventilating and air conditioning systems including controls; solar energy equipment, exhaust fans, or other mechanical equipment associated with indoor air quality. AC units around 14 years old. Nearing end of useful life. 2.5 ELEC Electrical Service & Equipment: Electrical service and distribution equipment, lighting and branch wiring, communications and security equipment, and other electrical equipment and service. Functioning as needed. Is dated. 3.5 PLUMB Plumbing s: Water and sewer systems, including pumps and plumbing fixtures, fire protection piping and pumps, process piping systems (natural gas, compressed air, chilled water, medical gases, etc.). Redone in several visual areas. Some not redone. Getting to end of useful life. 2.7 CONV Conveyance s: Elevators, escalators, cranes, hoists, wheelchair, dumbwaiter, turntable, or other lifting mechanisms. INTF Interior Finishes: Non-load bearing interior walls, all finishes on walls, ceilings, floors, stairways. Interior doors, windows, and millwork. Fair condition but needs painting and carpet cleaning 3.8 Narrative: This is a section within an old building. Many visual items are new or updated, but this won t help the infrastructure. Windows look like they were replaced. More evidence of roof leaks than in Probation.
10 Facility Condition Index: Performance Measure 2002 Evaluation 2013 FCA Current Replacement Value (CRV) Not Calculated $ Accumulated Deferred Maintenance Not Calculated $ Building (Facility) Condition Index (FCI) Not Calculated %
11 Section Three Audit and Conditions Building Information: Building Name: Gross Square Footage: Construction Date: P03002: Lompoc Old Court Addition (DA Office) 115 Civic Center Plaza Lompoc, CA 23,712 top/bottom 2001addition Acreage:.54 General: Description Significant Deficiencies Condition Code SITE Site: Landscaping, irrigation systems, site utilities (i.e., gas mains, water and sewer mains, electrical service), rail spurs, and pavements adjacent to and constructed as part of the facility (i.e., sidewalks, parking lots, access roads) security and site lighting. Maintained. Has security lighting and sidewalks. 4.5 STRUC Structure: Wall and column foundations, superstructure, slabs and floors including pits and covers. Structural mezzanine framing and slabs. Basement walls and dampproofing. Maintained 4.5 EXT Exterior: Non-structural exterior wall construction, steel stud and dryvit, face brick veneer, stone veneer, siding (metal, fiberglass, etc.). Exterior coatings, and sealants, windows, and doors, louvers, grilles, screens, and awnings. Maintained 4.5
12 Description Significant Deficiencies Condition Code ROOF Roofing: Insulation, vapor retarders, roof coverings, metal roofing, roof openings, skylights, gutters, and flashing. Flat 3-ply roofing material. Fair condition at best. 3.5 MECH Mechanical s: Heat, ventilating and air conditioning systems including controls; solar energy equipment, exhaust fans, or other mechanical equipment associated with indoor air quality. AC units around 11 years old. Some equipment such as exhaust fan looks to be close to end of life. 2.8 ELEC Electrical Service & Equipment: Electrical service and distribution equipment, lighting and branch wiring, communications and security equipment, and other electrical equipment and service. Functioning as needed. 4.0 PLUMB Plumbing s: Water and sewer systems, including pumps and plumbing fixtures, fire protection piping and pumps, process piping systems (natural gas, compressed air, chilled water, medical gases, etc.). Fair condition. Water heater very close to end of life. 3.0 CONV Conveyance s: Elevators, escalators, cranes, hoists, wheelchair, dumbwaiter, turntable, or other lifting mechanisms. INTF Interior Finishes: Non-load bearing interior walls, all finishes on walls, ceilings, floors, stairways. Interior doors, windows, and millwork. Good condition 4.2 Narrative: Can t tell where the 2001 addition took place unless in the court which is now run by the state. No sign of updates to mechanical or structure. Also the square footage listed does not reflect the square footage of just the DA s office. Estimate its square footage as half what is shown above, so 11,856 sqft.
13 Facility Condition Index: Performance Measure 2002 Evaluation 2013 FCA Current Replacement Value (CRV) Not Calculated $ Accumulated Deferred Maintenance Not Calculated $ Building (Facility) Condition Index (FCI) Not Calculated %
14 Section Three Audit and Conditions Building Information: Building Name: Gross Square Footage: Construction Date: P03003: Lompoc Admin Bldg (1 st Floor) 401 E. Cypress St. Lompoc, CA 15, Acreage:.17 General: Description Significant Deficiencies Condition Code SITE Site: Landscaping, irrigation systems, site utilities (i.e., gas mains, water and sewer mains, electrical service), rail spurs, and pavements adjacent to and constructed as part of the facility (i.e., sidewalks, parking lots, access roads) security and site lighting. Maintained. See P03000-Lompoc County Offices Grounds. 4.5 STRUC Structure: Wall and column foundations, superstructure, slabs and floors including pits and covers. Structural mezzanine framing and slabs. Basement walls and dampproofing. Maintained 4.5 EXT Exterior: Non-structural exterior wall construction, steel stud and dryvit, face brick veneer, stone veneer, siding (metal, fiberglass, etc.). Exterior coatings, and sealants, windows, and doors, louvers, grilles, screens, and awnings. Maintained 4.5
15 Description Significant Deficiencies Condition Code ROOF Roofing: Insulation, vapor retarders, roof coverings, metal roofing, roof openings, skylights, gutters, and flashing. Clay Tile roof almost 40 years old. Several water stains in interior ceiling tiles. 2.2 MECH Mechanical s: Heat, ventilating and air conditioning systems including controls; solar energy equipment, exhaust fans, or other mechanical equipment associated with indoor air quality. Heating systems fairly new. No centralized AC system. 4.5 ELEC Electrical Service & Equipment: Electrical service and distribution equipment, lighting and branch wiring, communications and security equipment, and other electrical equipment and service. Functioning as needed. 4.0 PLUMB Plumbing s: Water and sewer systems, including pumps and plumbing fixtures, fire protection piping and pumps, process piping systems (natural gas, compressed air, chilled water, medical gases, etc.). Fair condition. Water heater very close to end of life. 3.0 CONV Conveyance s: Elevators, escalators, cranes, hoists, wheelchair, dumbwaiter, turntable, or other lifting mechanisms. Elevator with no current inspection sticker. Does not appear to be maintained well. 3.0 INTF Interior Finishes: Non-load bearing interior walls, all finishes on walls, ceilings, floors, stairways. Interior doors, windows, and millwork. Good condition 4.0 Narrative: This building is almost 40 years old. It is well maintained but there are some areas needing improvements. The Admin section is only the bottom story of this 2 story building. The second story is P03004-Lompoc Mental Health Office. Facility Condition Index:
16 Performance Measure 2002 Evaluation 2013 FCA Current Replacement Value (CRV) Not Calculated $3,152,032 Accumulated Deferred Maintenance Not Calculated $ Building (Facility) Condition Index (FCI) Not Calculated %
17 Section Three Audit and Conditions Building Information: Building Name: Gross Square Footage: Construction Date: P04000: Lompoc Flood Control Grounds 1801 North H St, Lompoc, CA?? Acreage:? General: Description Significant Deficiencies Condition Code SITE Site: Landscaping, irrigation systems, site utilities (i.e., gas mains, water and sewer mains, electrical service), rail spurs, and pavements adjacent to and constructed as part of the facility (i.e., sidewalks, parking lots, access roads) security and site lighting. No landscaping or irrigation. Based on usage, probably best suited. 4.0 STRUC Structure: Wall and column foundations, superstructure, slabs and floors including pits and covers. Structural mezzanine framing and slabs. Basement walls and dampproofing. EXT Exterior: Non-structural exterior wall construction, steel stud and dryvit, face brick veneer, stone veneer, siding (metal, fiberglass, etc.). Exterior coatings, and sealants, windows, and doors, louvers, grilles, screens, and awnings.
18 Description Significant Deficiencies Condition Code ROOF Roofing: Insulation, vapor retarders, roof coverings, metal roofing, roof openings, skylights, gutters, and flashing. MECH Mechanical s: Heat, ventilating and air conditioning systems including controls; solar energy equipment, exhaust fans, or other mechanical equipment associated with indoor air quality. ELEC Electrical Service & Equipment: Electrical service and distribution equipment, lighting and branch wiring, communications and security equipment, and other electrical equipment and service. PLUMB Plumbing s: Water and sewer systems, including pumps and plumbing fixtures, fire protection piping and pumps, process piping systems (natural gas, compressed air, chilled water, medical gases, etc.). CONV Conveyance s: Elevators, escalators, cranes, hoists, wheelchair, dumbwaiter, turntable, or other lifting mechanisms. INTF Interior Finishes: Non-load bearing interior walls, all finishes on walls, ceilings, floors, stairways. Interior doors, windows, and millwork. Narrative: Grounds functioning based on usage. Facility Condition Index: Performance Measure 2002 Evaluation 2013 FCA Current Replacement Value (CRV) Not Calculated $
19 Accumulated Deferred Maintenance Not Calculated $ Building (Facility) Condition Index (FCI) Not Calculated %
20 Section Three Audit and Conditions Building Information: Building Name: Gross Square Footage: Construction Date: P04001: Lompoc Flood Control Office and Shop 1801 North H St, Lompoc, CA Acreage:.02 General: Description Significant Deficiencies Condition Code SITE STRUC EXT Site: Landscaping, irrigation systems, site utilities (i.e., gas mains, water and sewer mains, electrical service), rail spurs, and pavements adjacent to and constructed as part of the facility (i.e., sidewalks, parking lots, access roads) security and site lighting. Structure: Wall and column foundations, superstructure, slabs and floors including pits and covers. Structural mezzanine framing and slabs. Basement walls and dampproofing. Exterior: Non-structural exterior wall construction, steel stud and dryvit, face brick veneer, stone veneer, siding (metal, fiberglass, etc.). Exterior coatings, and sealants, windows, and doors, louvers, grilles, screens, and awnings. See P Flood Control Grounds for overall. 4.5 Metal roof and sided building. No evidence of damage to structure. 3.5 Several areas of rust and peeling paint. 3.0
21 Description Significant Deficiencies Condition Code ROOF Roofing: Insulation, vapor retarders, roof coverings, metal roofing, roof openings, skylights, gutters, and flashing. Metal roof. 3.0 MECH Mechanical s: Heat, ventilating and air conditioning systems including controls; solar energy equipment, exhaust fans, or other mechanical equipment associated with indoor air quality. ELEC Electrical Service & Equipment: Electrical service and distribution equipment, lighting and branch wiring, communications and security equipment, and other electrical equipment and service. Old but functioning. 3.5 PLUMB Plumbing s: Water and sewer systems, including pumps and plumbing fixtures, fire protection piping and pumps, process piping systems (natural gas, compressed air, chilled water, medical gases, etc.). Old and in need of maintenance. 3.0 CONV Conveyance s: Elevators, escalators, cranes, hoists, wheelchair, dumbwaiter, turntable, or other lifting mechanisms. INTF Interior Finishes: Non-load bearing interior walls, all finishes on walls, ceilings, floors, stairways. Interior doors, windows, and millwork. Needs work. 2.8 Narrative: Older metal building without much maintenance inside and out. Facility Condition Index: Performance Measure 2002 Evaluation 2013 FCA Current Replacement Value (CRV) Not Calculated $60,660
22 Accumulated Deferred Maintenance Not Calculated $ Building (Facility) Condition Index (FCI) Not Calculated %
23 Section Three Audit and Conditions Building Information: Building Name: Gross Square Footage: Construction Date: P04002: Lompoc Flood Control Poison Storage 1801 North H St, Lompoc, CA Acreage: General: Description Significant Deficiencies Condition Code SITE Site: Landscaping, irrigation systems, site utilities (i.e., gas mains, water and sewer mains, electrical service), rail spurs, and pavements adjacent to and constructed as part of the facility (i.e., sidewalks, parking lots, access roads) security and site lighting. See P Flood Control Grounds for overall. 4.5 STRUC Structure: Wall and column foundations, superstructure, slabs and floors including pits and covers. Structural mezzanine framing and slabs. Basement walls and dampproofing. Metal seatrain. Some rust evident. 3.0 EXT Exterior: Non-structural exterior wall construction, steel stud and dryvit, face brick veneer, stone veneer, siding (metal, fiberglass, etc.). Exterior coatings, and sealants, windows, and doors, louvers, grilles, screens, and awnings. Exterior in Poor to Fair condition. Rust is evident 3.0
24 Description Significant Deficiencies Condition Code ROOF Roofing: Insulation, vapor retarders, roof coverings, metal roofing, roof openings, skylights, gutters, and flashing. Metal roof. 3.0 MECH Mechanical s: Heat, ventilating and air conditioning systems including controls; solar energy equipment, exhaust fans, or other mechanical equipment associated with indoor air quality. ELEC Electrical Service & Equipment: Electrical service and distribution equipment, lighting and branch wiring, communications and security equipment, and other electrical equipment and service. PLUMB Plumbing s: Water and sewer systems, including pumps and plumbing fixtures, fire protection piping and pumps, process piping systems (natural gas, compressed air, chilled water, medical gases, etc.). CONV Conveyance s: Elevators, escalators, cranes, hoists, wheelchair, dumbwaiter, turntable, or other lifting mechanisms. INTF Interior Finishes: Non-load bearing interior walls, all finishes on walls, ceilings, floors, stairways. Interior doors, windows, and millwork. Narrative: Metal seatrain. Rust is showing. Facility Condition Index: Performance Measure 2002 Evaluation 2013 FCA Current Replacement Value (CRV) Not Calculated $7,958
25 Accumulated Deferred Maintenance Not Calculated $ Building (Facility) Condition Index (FCI) Not Calculated %
26 Facility Condition Assessment 2014 Sub-Section C Analytics Lompoc County Offices Lompoc County Offices Accumulated Deferred Maintenance The County of Santa Barbara has requested a twenty-year outlook for its facilities costs. The current section of the report discusses the opinions of probable costs for the long-term outlook derived through two related methodologies: Observed evidence of deferred maintenance and facility deterioration that are prioritized for the nearterm years 1 through 10 (year cohorts 1-3, 4-6, 7-10), and The development of a customized econometric model to project ongoing costs for both the near-term years and outlying years. The field data collection process is effective in gleaning detailed information regarding the current condition of the County facilities, from which one can generate costing information with a high degree of granularity. This granularity is in the form of defined projects with detailed scopes of work to address recorded deferred maintenance items. Prioritized, these projects fall into years 1 through 10 and provide managers with a partial map for remediation and maintenance efforts required to preserve the facilities. A summary list of these projects appears in Appendix 2. For full annual projections, the Consultant has relied on an econometric model that is founded on an industry best practice methodology, one that incorporates the unique nature of the County s facilities and historical costing data provided to the Consultant by County managers. For the near-term years, 1 through 10, the econometric model is supplemented by identified project work defined through field data collection. As indicated above, the field data provide granularity and detail to the econometric model projection for nearterm years, with decreasing granularity as one reaches outlying year 10. As an illustrative example of this principle, for cohort years 1-3, the econometric models projects accumulated deferred maintenance (ADM) for the Lompoc County Offices of $541,300 of which the field data collection has identified some $489,000 in detailed project scope of work for years As illustrated by the accompanying graph, the Old Court comprises nearly one half of the overall ADM for the group. Among the various systems elements, mechanical and interior finishes contribute the most to the total. Page 1 of 6 Sub-Section C, Analytics Betteravia Government Center Copyright 2014 Roy Jorgensen Associates, Inc.
27 Facility Condition Assessment 2014 Lompoc County Offices Current Replacement Value (CRV) and Condition Index (FCI) The Facility Condition Index (FCI) measures the accumulated deferred maintenance against the current replacement value (CRV) of the property. The estimated CRV for the Lompoc County Offices is approximately $18.47 MM. The CRV is projected to approximately $35.61 MM in budget year FY34/FY35. The accompanying graphic illustration shows the composition of the CRV according to building and to grounds. Based on the amount of accumulated deferred maintenance (approximately $541,300), the current FCI is calculated at approximately 3% ( very good ). Of this overall FCI, all buildings within the group exhibit individual FCIs under 8% ( fair ), with most under 4%. Assuming the current annual funding level of $219,800, the increase in accumulated deferred maintenance rises from $541,300 MM in FY13/14 to $18.73 MM by FY34/35. Assuming that the existing funding levels continue, the FCI will correspondingly increase to 53% ( off-the-chart ) at the end of the modeling period, SBC budget year FY34/FY35. This is an unsustainable course. Page 2 of 6 Sub-Section C, Analytics Betteravia Government Center Copyright 2014 Roy Jorgensen Associates, Inc.
28 Facility Condition Assessment 2014 The relationship between the accumulated deferred maintenance and sustainment level funding is illustrated in the graph below. For the Lompoc County Offices, current funding can never keep pace with the rate of deterioration. While the funding level is discretionary, the factors in the growth of deferred maintenance include: The difference in recommended sustainment funding and actual sustainment funding The nominal rate of inflation The physical plant deterioration rate An Econometric Model for Lompoc County Offices Projections of suggested funding levels have been generated utilizing a customized econometric model. The econometric model is specific to Lompoc County Offices and takes into account the unique nature of the County s facilities, the current conditions and maintenance backlog, and any historical costing data provided to the Consultant by the County. The models are used to produce projections of renewal capital and accumulated deferred maintenance. The opinions of probable cost are based upon an econometric representation of eight variables using two different approaches to addressing the funding requirements of the facilities: 1. Generally-accepted funding levels across all facility types 2. Targeted funding levels to address specific FCI goals Examining both of these approaches will provide the County with greater industry perspectives on sustainment funding, as well as a variety of funding options for addressing the County s long-range strategic interests relative to its facility requirements. Page 3 of 6 Sub-Section C, Analytics Betteravia Government Center Copyright 2014 Roy Jorgensen Associates, Inc.
29 Facility Condition Assessment 2014 Minimum High-Low Sustainment Funding A fundamental premise of the econometric model created for the County of Santa Barbara is that a minimum level of ongoing funding is required in order to maintain the integrity and reliability of the County s physical assets. This premise is reflected in the necessity of planned maintenance work activities that are typically funded through an annual budget cycle to support the assets continuing performance and projected lifecycle. The normal, routine maintenance that is performed on capital assets, such as buildings and fixed assets, generally includes deficiencies that are low in relative cost and that are normally addressed as part of the annual operation and maintenance (O&M) funding, excluding actions that expand the capacity of the asset beyond its original functional intent. The industry broadly maintains that a minimum sustainment funding of 2% to 4% of the CRV is required in most facility environments. For Lompoc County Offices this corresponds to a calculated spend between approximately $369,400 and $738,800 based on the current CRV. Current spend is estimated at approximately $219,800 for year 1, though the County does not strictly account for costs by building, such that this figure remains inexact. The model also allows one to separate the components of these costs segregating them according to operating expense, project expense, and capital expense. For FY13/14, these are summarized below. Page 4 of 6 Sub-Section C, Analytics Betteravia Government Center Copyright 2014 Roy Jorgensen Associates, Inc.
30 Facility Condition Assessment 2014 The table below maps out the high (2%) and low (4%) funding options by fiscal year with the associated CRV, ADM, and FCI. Targeted Funding Levels to Address FCI The second approach bases funding levels on suggested FCI targets. Three funding scenarios have been modeled as alternates for consideration. Scenario 1 moves the Facility Condition Index to approximately 13%, which is considered poor. This scenario will require the investment of $14.26 MM over a 20-year planning horizon. Scenario 2 moves the Facility Condition Index to 8% ( very good ) at the end of the 20-year planning horizon. This scenario will require an investment of $17.11 MM during the modeling period. Page 5 of 6 Sub-Section C, Analytics Betteravia Government Center Copyright 2014 Roy Jorgensen Associates, Inc.
31 Facility Condition Assessment 2014 Scenario 3 maintains the portfolio FCI to a forward average of 3%, or very good and requires approximately $19.96 MM in sustainment funding over the 20-year planning horizon. The relationship between the FCI and the sustainment level funding required for each of the three scenarios is represented graphically below, as well as a table with the specific annual funding requirements. Page 6 of 6 Sub-Section C, Analytics Betteravia Government Center Copyright 2014 Roy Jorgensen Associates, Inc.
Section I Carpinteria Executive Summary
Section I Carpinteria Executive Summary In 2013-2014, the Consultant conducted initial facility condition assessment data collection at the County of Santa Barbara, with specific attention to Carpinteria
More informationSection I Lompoc Animal Services Executive Summary
Section I Lompoc Animal Services Executive Summary In 2013-2014, the Consultant conducted initial facility condition assessment data collection at the County of Santa Barbara, with specific attention to
More informationSub-Section A New Cuyama Executive Summary
Sub-Section A New Cuyama Executive Summary The New Cuyama complex was assessed for deficiencies, and each building system and site was assigned a condition code that reflects the overall usability of the
More informationSection I Santa Rosa Park Executive Summary
Facility Condition Assessment 2014 Section I Santa Rosa Park Executive Summary In 2013-2014, the Consultant conducted initial facility condition assessment data collection at the County of Santa Barbara,
More informationSection I Isla Vista Campus Executive Summary
Section I Isla Vista Campus Executive Summary In 2013-2014, the Consultant conducted initial facility condition assessment data collection at the County of Santa Barbara, with specific attention to the
More informationSection I Rocky Nook Park Executive Summary
Facility Condition Assessment 2014 Section I Rocky Nook Park Executive Summary In 2013-2014, the Consultant conducted initial facility condition assessment data collection at the County of Santa Barbara,
More informationSection I Lookout Park Executive Summary
Facility Condition Assessment 2014 Section I Lookout Park Executive Summary In 2013-2014, the Consultant conducted initial facility condition assessment data collection at the County of Santa Barbara,
More informationSub-Section A Santa Maria Metro Executive Summary
Sub-Section A Santa Maria Metro Executive Summary The Santa Maria Metro was assessed for deficiencies, and each building system and site was assigned a condition code that reflects the overall usability
More informationSection I Live Oak Park Executive Summary
Section I Live Oak Park Executive Summary In 2013-2014, the Consultant conducted initial facility condition assessment data collection at the County of Santa Barbara, with specific attention to Live Oak
More informationSection I Jalama Beach Park Executive Summary
Section I Jalama Beach Park Executive Summary In 2013-2014, the Consultant conducted initial facility condition assessment data collection at the County of Santa Barbara, with specific attention to Jalama
More informationCounty of Santa Barbara, California Facility Condition Assessment Total: $238,124. Appendix 1 Probable Cost Estimates Detail
Project No.:P03000.001 Building Number: P03000-Lompoc County Offices Grounds Project Description: Mill and Overlay with some Partial Depth Patching Background: The site comprises asphalt pavement for the
More informationDeKalb County School District/Elementary Schools Clifton Elementary Final School Assessment Report May 19, 2016
DeKalb County School District/Elementary Schools Clifton Elementary Final School Assessment Report May 19, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 4 School Condition
More informationSchool Assessment Report
School Assessment Report School: Humphries Elementary School Report: Nov 17, 2015 Condition Assessment: Suitability Assessment: Generated: 11/17/2015 10:35:17 AM FOR OFFICIAL USE ONLY Final School Assessment
More informationDeKalb County School District/Stadiums Avondale Stadium Final School Assessment Report May 20, 2016
DeKalb County School District/Stadiums Avondale Stadium Final School Assessment Report May 20, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 4 School Condition Summary
More informationAppendix J - Custom Uniformat for EDU Migration
Appendix J - Custom Uniformat for EDU Migration Nr. MTC Uniformat for VFA.facility Life (Years) Weight (1-100) Out of Scope Cost Y/N 1 A Substructure 150 N 2 A10 Foundations 150 N 3 A1010 Standard Foundations
More informationBVSC BVSC. Midwest Technical Inspections Survey Worksheet. Account / Account Code: Insured: Policy #: Building Data - Section 1
Midwest Technical Inspections Survey Worksheet BVSC BVSC Account / Account Code: Agency: Insured: Policy #: Telephone: Alt. Phone: Building Data - Section 1 Building Name (Entire Valuation) Section Name
More informationSchool Assessment Report
School Assessment Report School: KIPP Vision Report: Dec 15, 14 Condition Assessment: Suitability Assessment: Generated: 12/15/14 12:33:33 PM Final School Assessment Report - Charter Schools, KIPP Vision
More informationSchool Assessment Report
School Assessment Report School: Morningside Elementary School Report: Dec 15, 2014 Condition Assessment: Suitability Assessment: Generated: 12/15/2014 12:11:31 PM FOR OFFICIAL USE ONLY Final School Assessment
More informationSchool Assessment Report
School Assessment Report School: Morningside Elementary School Report: Nov 17, 2015 Condition Assessment: Suitability Assessment: Generated: 11/17/2015 10:29:07 AM FOR OFFICIAL USE ONLY Final School Assessment
More informationProperty Condition Assessment
Property Condition Assessment Pewaukee, WI 53072 Inspection Date: 1/6/15 Prepared For: Report Number: Prepared By: Shamrock Building Inspection Consultants LLC N29 W29951 Shel-Mar Dr. Pewaukee, WI 53072
More informationSchool Assessment Report
School Assessment Report School: Cascade Elementary School Report: Nov 17, 2015 Condition Assessment: Suitability Assessment: Generated: 11/17/2015 10:37:55 AM FOR OFFICIAL USE ONLY Final School Assessment
More informationAlabama Home Inspections
Cover Page Property Inspection Report 1000 Sample Dr., Sampletown USA Inspection prepared for: Report Sample Inspection Date: 1/21/2010 Time: 400pm Size: Approx. 2,200sf Weather: Cloudy 62 Inspector: Bobby
More informationSchool Assessment Report
School Assessment Report School: Sutton Middle School (Powers Ferry) Report: Nov 17, 2015 Condition Assessment: Suitability Assessment: Generated: 11/17/2015 10:32:59 AM FOR OFFICIAL USE ONLY Final School
More informationTABLE OF CONTENTS. Calgary School District No. 19 March Page. Executive Summary. Facility Profile and Summary 1. Section 1 Site Conditions 4
TABLE OF CONTENTS Executive Summary Page i Facility Profile and Summary 1 Section 1 Site Conditions 4 Section 2 Building Exterior 7 Section 3 Building Interior 11 Section 4 Mechanical Systems 14 Section
More informationFormer Truancy Center
DeKalb County School District/Vacant Former Truancy Center Final School Assessment Report May 20, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 3 School Condition Summary
More informationSchool Assessment Report
School Assessment Report School: Carver High School Report: Nov 17, 2015 Condition Assessment: Suitability Assessment: Generated: 11/17/2015 10:37:23 AM FOR OFFICIAL USE ONLY Final School Assessment Report
More informationBuilding Inspection Report
Building Inspection Report Sample Commercial Inspection Report Inspection Date: Prepared For: Prepared By: Professional Property Inspection Consultants 4857 Winterset Drive Columbus, OH 43220 (614) 459-5941
More informationFacility Condition Assessment
Citywide Facility Condition Assessment Report of Facility Condition Assessment For City of Manhattan Beach 1600 Marine Avenue, Manhattan Beach, CA September 4, 2013 (Rev A) Provided By: Faithful+Gould,
More informationOBJECTIVE 1.1: To establish the acceptable use and capacity of each building.
GOAL 1: To implement planned and routine maintenance programs which will extend the useful life of all buildings and prevent premature capital outlay for replacement. Through managed maintenance, Facilities
More informationTABLE OF CONTENTS DIVISION 1 GENERAL REQUIREMENTS
AIA General Conditions... GC-1 to GC-44 Amendments to General Conditions... AM-1 to AM-2 Supplements to General Conditions... SU-1 to SU-7 00200 Instructions To Bidders... 1 3 00201 Contractor s Bidding
More informationGARFIELD ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1910 BUILDING AREA 58,908 SF CURRENT PROGRAM CAPACITY 446 ENROLLMENT 2008 278 WARD 8 PROPOSED PROGRAM CAPACITY 400 Site Plan GARFIELD - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationHatton Drive Warehouse
DeKalb County School District/Leased/Charter Hatton Drive Warehouse Final School Assessment Report May 20, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 3 School Condition
More information0B MAGNOLIA HALL. Scale: 1:110. Date: Feb Time: 7:40 pm. User: brady. 10 ft
0B 2 m 1:110 7:40 pm. 01 5 m 1:230 7:38 pm. 02 5 m 1:230 7:38 pm. 03 5 m 1:230 7:45 pm. Facility Profile ( FP-1 ) City: State: Country: Address: Stories: Attic: Basement: Glassboro New Jersey United States
More informationNALLE ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1950 BUILDING AREA 83,900 SF CURRENT PROGRAM CAPACITY 460 ENROLLMENT 2008 372 WARD 7 PROPOSED PROGRAM CAPACITY 400 Site Plan NALLE - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5
More informationCOOLIDGE SENIOR HIGH SCHOOL
INITIAL YEAR BUILT 1940 BUILDING AREA 271,300 SF CURRENT PROGRAM CAPACITY 1240 ENROLLMENT 2008 652 WARD 4 PROPOSED PROGRAM CAPACITY 1100 Site Plan COOLIDGE - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationExisting Site Aerial Frederick High School Feasibility Study September 5, 2012
Existing Site Aerial Building Developmental History 1981 1966 1939 1977 1978 1955 1966 Exterior Roof: Most of existing roof has multi ply built up roofing. Some areas have gravel ballast, others have cap
More informationAPPLICATION AND CERTIFICATE FOR PAYMENT
AND CERTIFICATE FOR PAYMENT TO OWNER: MASTER TEMPLATE - SAVE PROJECT FILE 1 DATE: 10/5/2012 PERIOD TO: ARCHITECT: PROJECT NO: CONTRACTOR'S FOR PAYMENT Application is made for payment, as shown below, in
More informationFACILITY COMPONENTS - ELEMENTARY SCHOOL
SITE AREAS Parking and Access - Buses 1.0 2.0 0.16 Five fewer bus stalls than minimum standard. Parking and Access - Service / Delivery 1.0 1.0 0.08 No delivery parking adjacent to delivery entrance. Parking
More informationCounty of Santa Barbara, California Facility Condition Assessment 2014
Project No.: P05000.001 Building Number: P05000 Lompoc VMB Grounds Project Description: Overlay, Seal Coat and Restripe Parking Lots Background: The asphalt paving comprises approximately 135,600 square
More informationToronto Community Housing Executive Summary 2016/2017. BCA Report. Sample House High FCI
BCA Report Porfolio Development Size Construction TCHC - All Op Units Scattered Units (CHU 20),005 Sq.Ft. 925 Floor Above Grade 2 Divisional Units Page of 43 Description This dwelling unit is a detached
More informationFacility Condition Assessment
Citywide Facility Condition Assessment Report of Facility Condition Assessment For City of Manhattan Beach 100 Manhattan Beach Boulevard, Manhattan Beach, CA September 18, 2013 (Rev B) Provided By: Faithful+Gould,
More informationPROPERTY PRESERVATION AND CAPITAL PLANNING
PROPERTY PRESERVATION AND CAPITAL PLANNING Overview What am I looking for Remaining Useful Life Estimating Planning TERMINOLOGY Shake Siding Service Head Barge Board Soffit / Overhang Belly Band Knee Brace
More informationTown of Falmouth FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage COSTS FOR SUBSTANTIAL IMPROVEMENTS / REPAIR OF SUBSTANTIAL DAMAGE:
S FOR SUBSTANTIAL IMPROVEMENTS / REPAIR OF SUBSTANTIAL DAMAGE: Included Costs: Items that must be included in the costs of improvement or costs to repair are those that are directly associated with the
More informationDAVIS ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1943 BUILDING AREA 71,100 SF CURRENT PROGRAM CAPACITY 507 ENROLLMENT 2008 227 WARD 7 PROPOSED PROGRAM CAPACITY 325 Site Plan DAVIS - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-
More informationBUILDING CONDITION ASSESSMENT
BUILDING CONDITION ASSESSMENT 500 MacNab Street North, Hamilton ID. No.: EBE 16-0153 Prepared for Corporation By Effective Building Engineering Ltd.. Final Report: July 2016 Project No. 16-0153 Table of
More informationSEATON ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1969 BUILDING AREA 65,000 SF CURRENT PROGRAM CAPACITY 428 ENROLLMENT 2008 280 WARD 2 PROPOSED PROGRAM CAPACITY 325 Site Plan SEATON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5
More informationSTUART-HOBSON MIDDLE SCHOOL
INITIAL YEAR BUILT 1927 BUILDING AREA 105,900 SF CURRENT PROGRAM CAPACITY 460 ENROLLMENT 2008 399 WARD 6 PROPOSED PROGRAM CAPACITY 450 Site Plan STUART-HOBSON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More information1 BASE HOME CONSTRUCTION SPECIFICATIONS: TOWNHOMES 5-13-2015 Note: Specifications noted below may change based on selected options. Verify upgrades from the base specifications with the option sheets and
More informationFoundations. Issue. Slab-On-Grade Liquid Water Control (See Figure 2-2) Goals. Guidance
www.epa.gov/iaq/moisture Foundations Issue Building foundations are vulnerable to moisture problems for a number of reasons, including: Water from rain and from plumbing leaks is drawn by gravity to foundations,
More informationLEVEL TWO NUMBERS AND TITLES. Introductory Information. Bidding Requirements. Contracting Requirements. Facilities and Spaces. Systems and Assemblies
MasterFormat LEVEL TWO NUMBERS AND TITLES Introductory Information 00001 Project Title Page 00005 Certifications Page 00007 Seals Page 00010 Table of Contents 00015 List of Drawings 00020 List of Schedules
More informationFacility Condition Assessment
Citywide Facility Condition Assessment Report of Facility Condition Assessment For 1601 Manhattan Beach Boulevard, Manhattan Beach, CA September 4, 2013 (Rev A) Provided By: Faithful+Gould, Inc. Provided
More informationNational Property Inspections
National Property Inspections Anywhere, USA (325) 382-8754 Property Location 9375 Burt Street Anywhere USA Prepared for John Investor Consultant Al Standard (325) 382-8754 Page 1 of 27 TABLE OF CONTENTS
More informationThe GLOBE Academy at Heritage School
DeKalb County School District/Leased/Charter The GLOBE Academy at Heritage School Final School Assessment Report May 20, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary
More informationSchool Without Walls
INITIAL YEAR BUILT 1938 BUILDING AREA 59,400 SF CURRENT PROGRAM CAPACITY 304 ENROLLMENT 2008 276 WARD 1 PROPOSED PROGRAM CAPACITY 400 SCHOOL WITHOUT WALLS - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationCity of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage
City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage Property Address: Company Name: Contractor Name: Contractor Address: City: State: Zip: License Number: Phone Number
More informationCONSTRUCTION COST BREAKDOWN THIS IS FORM CCB
CONSTRUCTION COST BREAKDOWN Property Owner s Name or Borrowers Name Brief Description of Project John Homeowner Build single family residence Property Address Property City Property Zip Code 4625 Jillbarr
More informationNYC Department of Education
Architectural Inspection Building Assessment Survey 2017-2018 Asset: P.S. 54 MINISCHOOL - QUEENS, 86-02 127TH STREET, New York, 11418 Inspection Id Inspection Type Time In Last Edited SA : Architectural
More informationREPORT CHECKLIST SUPPLEMENT
REPORT CHECKLIST SUPPLEMENT This checklist will assist in assuring that a home inspection report complies with The Arizona Standards of Professional Practice for Home Inspectors For use by: Applicants,
More informationMarch 2018 Progress. Work Completed, Week Ending 3/23/18:
March 2018 Progress Work Completed, Week Ending 3/23/18: Continued draft curtains and liner panels. Continued running power to hangar doors. Continued installation of bath accessories in the gang bathrooms.
More informationAndy Schreder CBO Building Official for St Francis, Nowthen
Andy Schreder CBO Building Official for St Francis, Nowthen Voluntary Compliance Webster says: Voluntary means from one s own choice or consent. Of their own free will Compliance is conformity in fulfilling
More informationB. RESIDENTIAL MASTER PLUMBER $ $ $
FEE SCHEDULE FOR LICENSE Res. Non-Res. Out of State BUILDING CATEGORIES A. GENERAL CONTRACTOR (Unlimited Scope) B. BUILDING CONTRACTOR $ 100.00 $ 150.00 $ 300.00 Limited to construction and remodeling
More information43. CONSERVATORY. Conservatory. Classification: Cluster: Location: Close to junction of Inselrhue and Loiter Way, Belle Isle
Classification: Cluster: Location: Total Area: No. of Stories Acreage Owned: Acquired: 1904 Most Recent Improvements: THE CONSERVATORY Conservatory Close to junction of Inselrhue and Loiter Way, Belle
More informationMAURY ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1886 BUILDING AREA 46,800 SF CURRENT PROGRAM CAPACITY 276 ENROLLMENT 2008 238 WARD 6 PROPOSED PROGRAM CAPACITY 325 Site Plan MAURY - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5
More informationChenango Valley Central School District Potential Capital Project BCK-IBI Group Project No October 23, 2017
Chenango Bridge Elementary School Phase 1 Asphalt Pavement Reconstruction Reconstruct asphalt parking located on west side of building including access drive. Sidewalk Replacement Replace cracked sections
More informationREQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES
REQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES If your home or business incurred damage, the engineering department, in conjunction with the Flood Mitigation Officer, will
More informationEvansville Public Schools. Facility Assessment Report January 28, 2 , General Building Data
Evansville Public Schools Facility Assessment Report January 28, 2, 2013 SGN/Wendel Architects, Design Tree Engineering and R.A. Morton Construction Managers were retained by the Evansville Public School
More informationNational Property Inspections
Monday, August 22, 2011 Inspector Joe Smith 548-254-3658 Page 1 of 33 GENERAL INFORMATION GENERAL CONDITIONS AT TIME OF INSPECTION : No Property Occupied : Property Faces : North South East þ West Year(s)
More informationCity of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage
City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage Property Address: Company Name: Contractor Name: Contractor Address: City: State: Zip: License Number: Phone Number
More informationLECKIE ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1970 BUILDING AREA 65,000 SF CURRENT PROGRAM CAPACITY 471 ENROLLMENT 2008 321 WARD 8 PROPOSED PROGRAM CAPACITY 400 Site Plan LECKIE - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5
More informationEASTERN HIGH SCHOOL. Site Plan East Capitol Street, N.E., Washington, DC INITIAL YEAR BUILT 1923
INITIAL YEAR BUILT 1923 BUILDING AREA 288,800 SF CURRENT PROGRAM CAPACITY 1,425 ENROLLMENT 2008 565 WARD 6 PROPOSED PROGRAM CAPACITY 1,100 Site Plan EASTERN - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationPROGRAM COST MODEL. for. PEER Tall Buildings Study Concrete Structural Option Los Angeles, California
PROGRAM COST MODEL for PEER Tall Buildings Study Concrete Structural Option Los Angeles, California March 8, 2010 PEER Tall Buildings Study Concrete Structural Option March 8, 2010 CONTENTS Page Nos. Overall
More informationJV PROPERTIES, LLC (AQUA GLASS/MASCO) 320 INDUSTRIAL ROAD ADAMSVILLE, MCNAIRY COUNTY, TN Approximately 511,807 square feet
(AQUA GLASS/MASCO) 320 INDUSTRIAL ROAD ADAMSVILLE, MCNAIRY COUNTY, TN 38310 SIZE: GROUND: NUMBER OF BUILDINGS: NUMBER OF FLOORS: Approximately 511,807 square feet Approximately 59 acres, mostly level with
More informationSHEPHERD ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1932 BUILDING AREA 79,700 SF CURRENT PROGRAM CAPACITY 332 ENROLLMENT 2008 355 WARD 4 PROPOSED PROGRAM CAPACITY 400 Site Plan SHEPHERD - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationPigeon Lake Regional High School Falun, Alberta
Pigeon Lake Regional High School School Facilities Evaluation Project Pigeon Lake High Wetaskiwin Regional District No.11 Pigeon Lake High EXECUTIVE SUMMARY In November 1999 Alberta Infrastructure engaged
More informationCity of Oviedo Residential Permit Application Guidelines
City of Oviedo Residential Permit Application Guidelines All permit applications must be complete prior to acceptance. A complete application shall include the following: Building Permit Application completed,
More informationDISTRICT SERVICES BUILDING
DISTRICT SERVICES BUILDING BUILDING DATA DISTRICT SERVICES BUILDING 1100 Longhorn Dr., Weatherford, TX 76086 Year Built 1993 No. of Buildings 1 No. of Portables 0 Approx. Total Square Footage Grades Served
More informationCompleted. Project. Melbourne High School. Comprehensive Additions and Renovations
Project Update Project Update September 8, 2006 January 06, 2010 Project Manager Project Manager Anibal Caussade Dennis Bonny Field Coordinator Field Coordinator Bud Ball Paul Friel Project Budget Project
More informationSITE AND BUILDING INSPECTION CHECKLIST
PARISH BUILDING Page 1 of 6 SITE AND GROUNDS DATE INIT COMMENTS DATE INIT COMMENTS Ramps & Provisions for Handicap Designated parking spaces for Handicap Has soil dropped or heaved Is there standing water
More informationSPARTANBURG COUNTY BUILDING CODES DEPARTMENT
SPARTANBURG COUNTY BUILDING CODES DEPARTMENT PLAN REVIEW CHECK LIST REQUIREMENTS FOR COMMERCIAL BUILDING PERMITS Plan Review Coordinator Kris Brannon 864-596-3180 366 N. Church St Room 500 Spartanburg,
More informationThe Report: Priority 1 thru 5 $ 2,933,064 New Construction $ 6,797,031 Less Redlined Items $ 218,060
Building Condition Assessment Facilities Feasibility Study 124 - Leonelo H. Gonzalez Elementary Educational Needs $ 6,881,962 Safety & Security Needs $ 532,225 Exterior Needs $ 893,302 Needs $ 471,995
More informationLOGAN SCHOOL SCHOOL WITHOUT WALLS AT LOGAN
INITIAL YEAR BUILT 1935 BUILDING AREA 47,200 SF CURRENT PROGRAM CAPACITY 479 ENROLLMENT 2008 418 WARD 6 PROPOSED PROGRAM CAPACITY 450 Site Plan LOGAN - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION HS
More informationLake Highlands North Recreation Center Summary
Lake Highlands North Recreation Center Summary Address Building Purpose 9940 White Rock Trail Dallas, TX 75238 Recreation Center Original Year of Construction 1971 Building Area 33,036 SF Inspection Date
More informationInvitation to Bid. RLS Construction Group requests your firm to submit a quotation on the following project:
RLS CONSTRUCTION GROUP Phone: 717-502-6680 Fax: 717-502-6681 www.rlscg.com Invitation to Bid RLS Construction Group requests your firm to submit a quotation on the following project: Project: Location:
More informationRAYMOND EDUCATION CAMPUS
INITIAL YEAR BUILT 1924 BUILDING AREA 73,600 SF CURRENT PROGRAM CAPACITY 479 ENROLLMENT 2008 302 WARD 1 PROPOSED PROGRAM CAPACITY 600 Site Plan RAYMOND - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationTable of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities
Division 1 Requirements Design and Construction Quality Campus Master Plans Texas Tech University System Operating and Building Maintenance Project Administration Historically Underutilized Business (HUB)
More informationWatercrest - Sand Hill - Columbia, SC TABLE OF CONTENTS PROCUREMENT AND CONTRACTING REQUIREMENTS
Watercrest - Sand Hill - Columbia, SC 00 0110-1 TABLE OF CONTENTS DIVISION 00 PROCUREMENT AND CONTRACTING REQUIREMENTS INTRODUCTORY INFORMATION Document 00 0101 Document 00 0110 Project Title Page CONTRACTING
More informationProperty Condition Assessment. Summary Report
www.real-estate-inspections.com Property Condition Assessment Summary Report Subject Property Prepared for: Client in Detroit File Number: 05-15-005 Inspector: Craig Milliken, PE CPM Real Estate Inspections,
More informationPhase II: Maintenance Management Plan
Section VIII: Maintenance Management System Introduction Phase II, an examination and evaluation of the organization s maintenance management system (MMS). The MMS is a closed- loop workflow process as
More informationMaterial Report - [Trade Contractors] for plan: [E:\SoftPlan14\Projects\Sample Drawings.spf\2-Storey sqft.spf] Page 1 of 5
Material Report - [Trade Contractors] for plan: [E:\SoftPlan14\Projects\Sample Drawings.spf\2-Storey 01-2320 sqft.spf] Page 1 of 5 PREPARATION PRELIM PERMITS & FEES Building Permit 1 each 2200.00 _ 2200.00
More informationBuilding Safety Inspection Report Form STRUCTURAL
Broward County Board of Rules and Appeals Building Safety Inspection Report Form STRUCTURAL Policy # 05-05 Amended 031512 Building Information Building Structure address Legal description Folio # of Building
More informationModule number 3 provides an on-line, self-paced training seminar on chapter 4, foundations and chapter 5, floors from the residential code of ohio.
Module number 3 provides an on-line, self-paced training seminar on chapter 4, foundations and chapter 5, floors from the residential code of ohio. 1 This chapter sets forth the prescriptive requirements
More informationBuilding Excellence IV Capital Levy Projects Under Construction
Building Excellence IV Capital Levy Projects Under Construction Project Slide Number Arbor Heights Elementary School 2 Cascadia Elementary School & Robert Eagle Staff Middle School 14 Genesee Hill Elementary
More informationBCT 102 Printreading SAMPLE DESCRIPTION OF MATERIALS #STORIES: WATER SUPPLY PUBLIC: WELL: BEARING SOIL TYPE FOOTING MATERIAL:
BCT 102 Printreading SAMPLE DESCRIPTION OF MATERIALS OWNER: PROPERTY ADDRESS: LEGAL DESCRIPTION: HOUSE DESCRIPTION SQUARE FT. MAIN LEVEL: 2 ND STORY: BASEMENT: #STORIES: WATER SUPPLY PUBLIC: WELL: SEWAGE
More informationSECTION 6. Residential Warranty Corporation 10 Year, Limited Structural Warranty. Year One
SECTION 6 Residential Warranty Corporation 10 Year, Limited Structural Warranty Year One Foundations basement, crawl space, slab on grade. Framing ceiling, floor, roof, wall. Exterior structurally attached
More informationRCT Webinar-Updated 03/18/12
RCT Webinar-Updated 03/18/12 This instructional write up/guide is for the RCT Form that is found on the Main Information screen. When do we do the RCT? The RCT is done when a full exterior or full interior
More informationRECREATIONAL EAGLE CENTER METAL ROOF ASSESSMENT AND SOLUTION
RECREATIONAL EAGLE CENTER METAL ROOF ASSESSMENT AND SOLUTION Recreational Eagle Center (00550) La Crosse, WI DSF Project No. 07H1E SEG Project No. 10975 Prepared for Division of State Facilities 101 E.
More informationUbuildit. Construction Project Budget for Date Prepared wholesale retail
Ubuildit Construction Project Budget for Date Prepared wholesale retail Buyer: Address: City/St: Living Area SF Frame Ground Floor 170 Living Area SF Frame 2nd Floor 0 189.666667 total veneer total veneer
More informationNYC Department of Education
Architectural Inspection Building Assessment Survey 2017-2018 Asset: SOUTH BRONX HS TRANSPORTABLE - X, 701 ST. ANNS AVENUE, New York, 10455 Inspection Id Inspection Type Time In Last Edited SA : Architectural
More informationThurgood Marshall Recreation Center Summary
Thurgood Marshall Recreation Center Summary Address Building Purpose 5150 Mark Trail Way Dallas, TX 75232 Recreation Center Original Year of Construction 1970 Building Area 21,300 SF Inspection Date August
More informationEidem Farm Brooklyn Park, MN
Eidem Farm Brooklyn Park, MN East Farm House Structural Condition Assessment Prepared By 1 0 0 P O R T L A N D A V E N U E S O U T H, S U I T E 1 0 0 M I N N E A P O L I S, M I N N E S O T A 5 5 4 0 1