COMPLEX PROJECT FOR THE DEVELOPMENT OF BROWN COAL DEPOSITS KARA-KECHE AND MIN- KUSH (AK-ULAK SECTION)
|
|
- Dorthy Russell
- 6 years ago
- Views:
Transcription
1 COMPLEX PROJECT FOR THE DEVELOPMENT OF BROWN COAL DEPOSITS KARA-KECHE AND MIN- KUSH (AK-ULAK SECTION)
2 Project Summary Project on development of brown coal Kara-Keche and Min-Kush (section Akulak) deposits; Project on construction of Kara-Keche thermal power plants; Project on construction of Balykchy Kara-Keche railway Terms and conditions of tender procedures for the right of subsoil use
3 Complex Project Location
4 Project on development of brown coal Kara-Keche and Min-Kush (section Ak-Ulak) deposits p Brown coal deposit Kara-Keche is located on the territory of Jumgal, Naryn region in the upper valley of Kara-Keche river on the northern slope of the Moldo-Too Kavak coal basin ridge. p The absolute level of deposits surface is between m. The nearest Balykchy train station is located in 230 km. p There are two seams of coal, referred to the lower part of complex and basic sections, in the coal-bearing strata capacity of up to 540 m. p The main coal seam is the largest industrial reservoir, that concentrates 91% of the total reserves of the field. Seam capacity varies from 1.15 m to m, the structure is simple. p The coal seam Basic is characterized by a relatively sustained both in power and in the structure. p Coal deposit meets the requirements of fuel standards for domestic and industrial consumption. p The field's reserves million tons
5 Project on development of brown coal Kara-Keche and Min-Kush (section Ak-Ulak) deposits p Kara-Keche mine is divided into 12 coal mines, developed by the open way. p SE Kyrgyz Komur owns Central district, located in the middle portion of the field, its length is 3,7km, seam capacity m, the area for development 1,8 km square. p Open-ended method of coal mining is used. The projected capacity is tones. Today, annual capacity is about thousand tones.
6 Project on development of brown coal Kara-Keche and Min-Kush (section Ak-Ulak) deposits p A second brown coal deposit of Kavak basin is Min-Kush field, located at the eastern extremity of Kok-Moinok cavity. p The administrative area of the deposit belongs to Jumgal Naryn region. p The field is divided into 4 sections: Turakavak, Ak-Ulak, West and East. p Ak-Ulak plot is located in the eastern part of the northern belt of Jurassic deposits between Ak-Ulak river and Sasyktash tracts pass out in the river Keregetash valley. p The structure of a reservoir is complex, consisting of 3-5 (8) packets of coal, carbonaceous siltstones and mudstones. Reservoir capacity between 1.5 m to 16.0 m. p Ak-Ulak section allocates 8 layers. p The deposit reserves 56 million tons
7 Kara-Keche TPP Construction In km from the Kara-Keche coal deposit, building of a thermal power plant with capacity of MW is planned. Annual consumption of coal plant will be 3.0 mln. tons, coal will be supplied by Kara-Keche coal deposit.
8 Construction of Balykchy Kara Keche Railway The length of Balykchy - Kara-Keche railway is about 183 km, almost coincides with direction of planned railway Kyrgyzstan North - South
9 Construction of Balykchy Kara Keche Railway Balykchy - Kara-Keche Railway is divided into 2 sections: q Balykchy Kochkor Section The total length is about 63km. Starts at the end station of the existing Balykchy railway, and ends in Kochkor town of Naryn province, about 2 km from Kochkor town in the west, 1 stop station will be built. Project work on the working drawings of the site have already been implemented by the Kazakhstan railway design institute in In 2003, construction was started, however, due to problems with financing the construction was suspended. Along the railway line had only completed work on the filling of the roadway and pipe laying of outlets. q Kochkor Kara-Keche Section The total length is about 120 km. Located in the Naryn region, the line is on both sides of the existing highway A-367.
10 The terms and procedures of tender conduction for the right to use natural resources for the development of an integrated brown coal deposits
11 The purpose of tender; Basic requirements for the participants of tender; Main conditions of the project; Size, order and terms of payment collection, guarantee fee, taxes and other payments; Stages of tender and documents provided by participants of the tender; Criteria for determining the winner.
12 The Purpose of Tender Determining the winner based on the most favorable conditions provided for the Kyrgyz Republic
13 Basic Requirements for the Participants of Tender Legal entities registered in the Kyrgyz Republic; Legal entities registered in a foreign country Having experience in the fields of mining, construction, power plant and railways of not less than 5 years; Possess and apply modern technology Have own tools and the ability to raise additional financing in the form of direct investments necessary for the development of an integrated project
14 Main Conditions of the Project Implementation Provide direct investment based on the feasibility study for the implementation of an integrated project Complete the full feasibility study on an integrated project during 6 months Ensure compliance with international and internal standards, norms and requirements of the Kyrgyz Republic in the field of industrial safety, environmental safety, conservation of resources and rational use of mineral resources, construction and safety and the requirements of the Law Begin construction of the railway and TPP no later than 3 months from the date of negotiation with the State authorities of the project documentation on development of brown coal deposits
15 Main Conditions of the Project Implementation Apply modern technology in the implementation of an integrated project Pay concession fee Provide comprehensive feasibility study of the project including section on development of the region and submit no later than 2 months from the date of signing of the concession contract Provide share of Kyrgyz Republic in the joint venture in the amount of not less than 30 percent
16 Size, Order and Terms of Payment Collection, Guarantee Fee, Taxes and Other Payments Fee for a package of brief geological information 2,3 million som Charge for participation in the tender - 15 million som Guaranteed participation fee 76 million som Concession Fee
17 Stages of the Tender and the Documents Submitted by Participants 1 stage Application for participation in the tender and other required documents Copies of documents confirming the payment of contributions Documents should be submitted to the State Geology and Mineral Resources Agency under the Parliament of the Kyrgyz Republic Opening of the documents produced by the Tender Commission on the next working day after the expiry of the deadline of documents receipt Tender Commission within 10 working days after the opening of the envelope shall review the submitted documents
18 Stages of the Tender and the Documents Submitted by Participants 2 stage Not later than 4 months from the date of passage to the 2nd stage, contestants should submit the following documents: The program of integrated brown coal deposits development; The package of measures on application of modern technologies on mineral resources exploration, mining and processing of coal, thermal power plants and the construction of railroad; Confirmation of their own funds existence or the possibility of raising funds; Proposals for the social package; The proposed amount of payment for the concession
19 Criteria for Determining the Winner The quality of the presented program on the development of brown coal deposits - up to 3 points Proposals for the application of modern technologies on mineral resources exploration, mining and processing of coal, thermal power plants and the construction of the railway - up to 5 points The financial effectiveness of the project - up to 15 points Donation of shares in the authorized capital of the concession enterprise to the Kyrgyz Republic - for each 1% - 0,5 points
20 Criteria for Determining the Winner The volume of funds allocated for social benefits, beyond the amount - up to 3 points Timing of the railway construction: 1 phase Balykchy Kochkor section up to 1 year 7 points, from 1 year and longer 3 points; 2 phase Kochkor Kara-Keche section up to 3 years 7 points, from 3 years and longer 3 points Timing of construction of the thermal power plant up to 3 years - 5 points, up to 4 years 2 points, up to 5 years - 1 points
21 Criteria for Determining the Winner Each party gains scores from the Tender Commission; The winner of tender is the participant with the highest number of scores Consulting company analysis (transaction advisory) Determination of the Winner Signing of the Investment Agreement Concession Enterprise establishment
22
Approved by the Resolution of the Jogorku Kenesh of the Kyrgyz Republic dated April 24, 2008 N 346 -IV
Approved by the Resolution of the Jogorku Kenesh of the Kyrgyz Republic dated April 24, 2008 N 346 -IV NATIONAL ENERGY PROGRAM of the Kyrgyz Republic for 2008-2010 and the fuel and energy complex development
More informationRAILROAD VAHDAT KARAMIK (KYRGYZ BORDER)
TRACECA PROJECT FICHE RAILROAD VAHDAT KARAMIK (KYRGYZ BORDER) 1. BASIC INFORMATION TITLE: Railroad Vahdat Karamik (Kyrgyz border) SECTOR: Intermodal Transport LOCATION: The start of the route is located
More informationOJSC Corporation Ural Industrial- Ural Polar
OJSC Corporation Ural Industrial- Ural Polar Founders subjects of the Russian Federation: Khanty Mansi Autonomous Region -Yugra Yamal Nenets Autonomous Region Tyumen region Chelyabinsk region Sverdlovsk
More informationLAW ON PUBLIC-PRIVATE PARTNERSHIP IN THE REPUBLIC OF SRPSKA
LAW ON PUBLIC-PRIVATE PARTNERSHIP IN THE REPUBLIC OF SRPSKA Article 1 This Law regulates the scope, principles, manner, and forms of public-private partnership, requirements for the establishment of a
More informationREPUBLIC OF UZBEKISTAN
REPUBLIC OF UZBEKISTAN ENERGY POLICY Ministry of Economy of Uzbekistan Contents * Uzbekistan: General Information * Current energy policy. * Energy demand and supply (statistics) * Outlook of energy policy,
More informationEXPERIENCE OF KYRGYZ REPUBLIC: ENERGY SECTOR S SERVICES
MULTI-YEAR EXPERT MEETING ON SERVICES, DEVELOPMENT AND TRADE: THE REGULATORY AND INSTITUTIONAL DIMENSION Geneva, 17-19 March 2010 EXPERIENCE OF KYRGYZ REPUBLIC: ENERGY SECTOR S SERVICES By Ular MATEEV
More informationPunjab - An Emerging Investment Hub. Seminar on investment opportunities in Pakistan Rome, Italy April 2016
Punjab - An Emerging Investment Hub Seminar on investment opportunities in Pakistan Rome, Italy April 2016 Pakistan Asia s Next Big Market Multilateral Agencies And Leading International Entities Have
More informationMINERAL RAW MATERIAL BASE OF THE REPUBLIC OF UZBEKISTAN AND ITS DEVELOPMENT PERSPECTIVES
MINERAL RAW MATERIAL BASE OF THE REPUBLIC OF UZBEKISTAN AND ITS DEVELOPMENT PERSPECTIVES 2013 GOSCOMGEOLOGY On February 12, 1991 by the Decree of the President of the Republic of Uzbekistan No UP- 142
More informationTHE REPORT ON THE COUNTRY
IEEJ : June 2011 THE REPORT ON THE COUNTRY Electric power industry of the Republic of Uzbekistan. The Power Industry of Uzbekistan operates in the framework of the State Joint Stock Company Uzbekenergo,
More informationNOTICE INVITING BIDS (NIB) (International Competitive Bidding)
NOTICE INVITING BIDS (NIB) (International Competitive Bidding) SECTION-1 1.0 INTRODUCTION NOTICE INVITING BIDS (NIB) (International Competitive Bidding) Gujarat State Electricity Corporation Limited (GSECL)
More informationSECTOR ASSESSMENT (SUMMARY): ENERGY
Power Sector Rehabilitation Project (RRP KGZ 44198) SECTOR ASSESSMENT (SUMMARY): ENERGY Sector Road Map 1. Sector Performance, Problems, and Opportunity a. Introduction 1. The Kyrgyz Republic is a landlocked
More informationA DECREE ON PROCLAMATION OF THE LAW ON CONCESSIONS AND PUBLIC PRIVATE PARTNERSHIP
20120060164 ASSEMBLY OF THE REPUBLIC OF MACEDONIA On the basis of Article 75 paragraph 1 and 2 of the Constitution of the Republic of Macedonia, the President of the Republic of Macedonia and the President
More informationPolicy and Legislation for Facilitation of Energy Efficiency Enhancement and Renewable Energy Sources Use in the Republic of Belarus
Policy and Legislation for Facilitation of Energy Efficiency Enhancement and Renewable Energy Sources Use in the Republic of Belarus Andrei Minenkov Head of Division for Scientific-Technical Policy and
More informationCEZ INVESTMENT IN CLEANER ELECTRICITY PRODUCTION FROM BROWN COAL
CEZ INVESTMENT IN CLEANER ELECTRICITY PRODUCTION FROM BROWN COAL Vladimir BUDINSKY, MBA SD Severoceske doly Company, Member of CEZ GROUP 1 INTRODUCTION The Czech Republic is the last country in the CEE
More informationOverview of Adopted and Pending Changes to the Ukraine s PSA Legislation. Irina Paliashvili. Managing Partner. Olga Nevmerzhytska
Irina Paliashvili Managing Partner irinap@rulg.com Olga Nevmerzhytska Senior Counsel olga.nevmerzhytska@ulg.kiev.ua Overview of Adopted and Pending Changes to the Ukraine s PSA Legislation 2 By Irina Paliashvili
More informationThe Republic of the Union of Myanmar Ministry of Agriculture and Irrigation Notification No. 1/2012 August 31, 2012
The Republic of the Union of Myanmar Ministry of Agriculture and Irrigation Notification No. 1/2012 August 31, 2012 The Ministry of Agriculture and Irrigation, exercising its given rights, and with the
More informationMinerals Policy Country Profile BULGARIA
Minerals Policy Country Profile BULGARIA Minerals Policy Country Profile BULGARIA POLICY 1 POLICY 2 POLICY 3 POLICY 1 POLICY 2 POLICY 3 POLICY 4 POLICY 5 POLICY 6 POLICY 7 POLICY 8 POLICY 9 POLICY 10 POLICY
More informationNorth-East Asian Regional Power Interconnection and Cooperation Forum 2018 CURRENT STATUS AND PROGRESS IN MONGOLIA FOR POWER INTERCONNECTION
North-East Asian Regional Power Interconnection and Cooperation Forum 2018 CURRENT STATUS AND PROGRESS IN MONGOLIA FOR POWER INTERCONNECTION M.Tumenjargal, Director Ulaanbaatar, Mongolia, 31 October-1
More informationDEVELOPMENT OF THE RENEWABLE ENERGY IN KAZAKHSTAN - THE REGULATORY FRAMEWORK OVERVIEW
Photo: Forbes.ru DEVELOPMENT OF THE RENEWABLE ENERGY IN KAZAKHSTAN - THE REGULATORY FRAMEWORK OVERVIEW ABYLKAIROVA BAYAN DEPUTY CHIEF OF PARTY USAID POWER THE FUTURE REGIONAL PROGRAM Tashkent, July 11,
More informationRepublika e Kosovës Republika Kosovo - Republic of Kosovo Kuvendi - Skupština - Assembly
Republika e Kosovës Republika Kosovo - Republic of Kosovo Kuvendi - Skupština - Assembly Law No. 04/L-045 Assembly of Republic of Kosovo, ON PUBLIC-PRIVATE-PARTNERSHIP Based on Article 65 (1) of the Constitution
More informationPUBLIC-PRIVATE PARTNERSHIP
PUBLIC-PRIVATE PARTNERSHIP Law firm Sajic GP Banja Luka Bulevar vojvode Zivojina Misica 49B, Banja Luka Bosnia and Herzegovina Tel: +387 51 227 620 Fax: +387 51 227 623 e-mail: info@afsajic.com www.advokatskafirmasajic.com
More informationCBM AND CMM DEVELOPMENT IN MONGOLIA NEW POLICIES TO STIMULATE CLEAN ENERGY PROJECTS
CBM AND CMM DEVELOPMENT IN MONGOLIA NEW POLICIES TO STIMULATE CLEAN ENERGY PROJECTS Dr. Badarch Mendbayar, Director Mongolia Nature and Environment Consortium Global Methane Forum Washington, DC 29 30
More informationCOAL A HIDDEN TREASURE
COAL A HIDDEN TREASURE Coal mining is one of the oldest industries of Pakistan. The discovery of coal in Balochistan during the late 18th century led to its commercial utilization mainly by North-Western
More informationCooperation in the Energy Sector
MINISTRY OF ENERGY AND INDUSTRY OF THE KYRGYZ REPUBLIC Cooperation in the Energy Sector Ministry of Energy and Industry of the Kyrgyz Republic Speaker: Aibek R. Kaliev, Deputy Minister Bishkek, 2014 Following
More informationSMALL GUIDE FOR INVESTMENT PROJECTS OF KYRGYZ REPUBLIC
NATIONAL INSTITUTE FOR STRATEGIC STUDIES SMALL GUIDE FOR INVESTMENT PROJECTS OF KYRGYZ REPUBLIC 2012 National Institute for Strategic Studies 1 Content Agrocluster creation "Sugar"... 3 Creation of the
More informationInvestment Project for sanitary ware production with capacity 200 thousand pcs. per year in Republic of Uzbekistan
Investment Project for sanitary ware production with capacity 200 thousand pcs. per year in Republic of Uzbekistan 1. Project Initiator: Joint Stock Company Uzbuildingmaterils - www.uzsm.uz 2. Local market
More informationEurasian Economic Union and Silk Road Economic Belt: is it really a win-win cooperation? The case of Central Asia
Eurasian Economic Union and Silk Road Economic Belt: is it really a win-win cooperation? The case of Central Asia Zalina Enikeeva Institute of Public Policy and Administration University of Central Asia
More informationActuality and perspectives of using of the biogas technology in Uzbekistan Nasriddin Najimov
Actuality and perspectives of using of the biogas technology in Uzbekistan Nasriddin Najimov Ministry of Agriculture and Water Resources of the Republic of Uzbekistan Brief information about the country
More informationGeothermal Hot Water Supply of Saburtalo District in Tbilisi, Georgia
Geothermal Hot Water Supply of Saburtalo District in Tbilisi, Georgia 1. Project brief The project proposal Geothermal hot water supply of Saburtalo district in Tbilisi, Georgia has been developed in order
More informationGeneral Introduction of 2018 China (Henan) Industrial and. Commercial Enterprises Cross-border Investment and Trade Event
General Introduction of 2018 China (Henan) Industrial and Commercial Enterprises Cross-border Investment and Trade Event In order to open a window to the world, to boost Henan local enterprises going global,
More informationPrice Monitoring for Food Security in the Kyrgyz Republic
Issue 23 October 2017 Price Monitoring for Food Security in the Kyrgyz Republic Monthly monitoring and outlook of basic food prices in the Kyrgyz Republic Highlights and outlook for the next few months
More information1 von :40
1 von 5 16.07.2016 20:40 16.07.2016, 23:59 Astana Kazakhstan 2050 p?id=1725) Official website of the President w.akorda.kz/) Official website of the Government (http://ru.government.kz/) Official website
More information«BELENERGO» Investment projects: Construction of Hydropower plants. State Production Association of Electric Power Industry
State Production Association of Electric Power Industry «BELENERGO» Investment projects: Construction of Hydropower plants Advantages to make business in Belarus: Full protection of foreign investments
More informationINDUSTRIAL PARK «ALUMINIUM VALLEY» PROJECT
INDUSTRIAL PARK «ALUMINIUM VALLEY» PROJECT ALUMINIUM VALLEY: PROJECT CONCEPT HIGHLIGHTS Location in the center of Russia, Siberian Federal District (Krasnoyarsk region) «Green» renewable energy suppliers
More informationMINING EQUIPMENT FOR MINES IN REK BITOLA
MINING EQUIPMENT FOR MINES IN REK BITOLA Skopje, 2016 INTRODUCTION Project description The procurement of the mining equipment for the mines in REK Bitola refer to the following mines: Underlying coal
More informationUnited Automobile Technologies Co., Ltd. SMZ Industrial Park
SMZ Industrial Park 1 GOALS Main Goals: Giving to manufacturers SMZ production facilities for rent or longterm rent with a right of future purchasing Meeting residents requirements to maximum level due
More informationRWE Power International. Bankable Feasibility Study Thar Lignite Mine Work Progress
RWE Power International Bankable Feasibility Study Thar Lignite Mine Work Progress Project Time Schedule 2 Actual Work Status Phase I: Review and Planning Stage Task Status Data review Design and specification
More informationAvailable online at ScienceDirect. Procedia Economics and Finance 24 ( 2015 )
Available online at www.sciencedirect.com ScienceDirect Procedia Economics and Finance 24 ( 2015 ) 246 250 International Conference on Applied Economics, ICOAE 2015, 2-4 July 2015, Kazan, Russia The place
More informationDevelopment of renewable energy sector in the Kyrgyz Republic
Ministry of Energy of the Kyrgyz Republic Development of renewable energy sector in the Kyrgyz Republic Almaz Stomaliev Chief of the Power Generation and Transmission Department September 2013 Almaty 1
More informationACTUAL STATE AND POTENTIAL OF LOGISTICS CENTERS IN SMALL AND MEDIUM SIZED CITIES NEAR THE EUROPEAN CORRIDORS 4 & 8 in BULGARIA
ACTUAL STATE AND POTENTIAL OF LOGISTICS CENTERS IN SMALL AND MEDIUM SIZED CITIES NEAR THE EUROPEAN CORRIDORS 4 & 8 in BULGARIA Prof. Assoc., Dr. Vikenti SPASSOV Chef of Department Logistics of engineering
More informationON THERMAL ENERGY. Based on Article 65 (1) of the Constitution of the Republic of Kosovo, LAW ON THERMAL ENERGY CHAPTER I GENERAL PROVISIONS
LAW No. No. 05/L 05/L -058-052 ON ON INDUSTRIAL THERMAL ENERGY DESIGN LAW No. 05/L -052 ON THERMAL ENERGY Assembly of the Republic of Kosovo, Based on Article 65 (1) of the Constitution of the Republic
More informationMinerals and Infrastructure Development in the South. Ministry of Industry and Trade
Minerals and Infrastructure Development in the South Ministry of Industry and Trade 1 The South Region The South region comprises Umnugobi, Dornogobi, Dundgobi, and Gobisumber aimags. Strategic deposits:
More informationProtection From Environmental Noise Act. Chapter One GENERAL PROVISIONS
Protection From Environmental Noise Act Promulgated, State Gazette No. 74/13.09.2005, effective 1.01.2006, amended, SG No. 30/11.04.2006, effective 12.07.2006, amended and supplemented, SG No. 41/2.06.2009,
More informationAscot signs Heads of Agreement to acquire Urabá coal mining concession in Colombia
Perth Office: Ascot Resources Ltd 512 Hay Street Subiaco WA 6008 T: + 61 8 9381 4534 F: + 61 8 9380 6440 E: info@ascotresources.com W: www.ascotresourcs.com ASX ANNOUNCEMENT 22 July 2013 The Manager Company
More informationDISTRICT HEATING IN BITOLA, NOVACI, AND MOGILA STAGE I
DISTRICT HEATING IN BITOLA, NOVACI, AND MOGILA STAGE I Prepared by: Development and Investments Department Skopje, 2017 1 INTRODUCTION The introduction of a district heating system for the city of Bitola
More information«KAZAKHSTAN INDUSTRY DEVELOPMENT INSTITUTE» JSC «KAZAKHSTAN INDUSTRY DEVELOPMENT INSTITUTE» JSC
«KAZAKHSTAN INDUSTRY DEVELOPMENT INSTITUTE» JSC «KAZAKHSTAN INDUSTRY DEVELOPMENT INSTITUTE» JSC ASTANA, 213 1 «KIDI» JSC MAIN DIRECTIONS OF COMPANY S ACTIVITY Industry sectors analyses Applied field researches
More informationPhase 1 - Technical Assessment Kettle River Watershed Management Plan. Request for Proposals
Phase 1 - Technical Assessment Kettle River Watershed Management Plan Request for Proposals Closing date and time: 4:00 PM, January 28, 2011 Pacific Standard Time Location of proposal closing: Regional
More informationCMD projects in the Kyrgyz Republic Hydropower
CMD projects in the Kyrgyz Republic Hydropower 1 The Kyrgyz Republic ratified the UN Framework Convention on Climate Change (UNFCCC) in January 14, 2000 The Kyoto Protocol was ratified January 15, 2003
More informationAdopted by the State Duma on May 22, 1998 Approved by the Federation Council on June 10, 1998
FEDERAL LAW NO. 89-FZ OF JUNE 24, 1998 ON PRODUCTION AND CONSUMPTION WASTE (with the Amendments and Additions of December 29, 2000, January 10, 2003, August 22, December 29, 2004, May 9, December 31, 2005,
More informationPrefeasibility Study of Naliakh Mine: Opportunities and Challenges
Prefeasibility Study of Naliakh Mine: Opportunities and Challenges M. Badarch, Dr Director of Mongolian Nature and Environment Consortium B. Namkhainyam, Mongolian University of Science and Technology
More informationEnergy Strategy of Russia till 2030: Methodology, Expected Results, System of Implementation
Energy Strategy of Russia till 2030: Methodology, Expected Results, System of Implementation Deputy Director of Department of State Energy Policy and Energy Efficiency of Ministry of Energy of Russia Yury
More information1. EXECUTIVE SUMMARY AND KEY RECOMMENDATIONS... 9 PART I POLICY ANALYSIS GENERAL ENERGY POLICY ENERGY EFFICIENCY...
TABLE OF CONTENTS 1. EXECUTIVE SUMMARY AND KEY RECOMMENDATIONS... 9 Executive summary... 9 Key recommendations... 14 PART I POLICY ANALYSIS...15 2. GENERAL ENERGY POLICY... 17 Country overview... 17 Energy
More informationShivee Energy integrated energy complex
Shivee Energy integrated energy complex In the long run, once our energy supply exceeds domestic demand, we intend to export the excess energy. Under this requirement, we will continue to utilize our thermal
More informationSector policy of Water resources management in Republic of Macedonia
Sector policy of Water resources management in Republic of Macedonia Ministry of Environment and Physical Planning Republic of Macedonia 23-27 h, September 2013,Bucharest-Romania Macedonia is a landlocked
More informationStrategic planning features of subsurface management in Kemerovo Oblast
IOP Conference Series: Earth and Environmental Science PAPER OPEN ACCESS Strategic planning features of subsurface management in Kemerovo Oblast To cite this article: V Romanyuk et al 2016 IOP Conf. Ser.:
More informationCE397 Transboundary Water Resources
... 1 Objectives... 1 The Aral Sea Basin... 1 The Principles of the Aral Game... 3 Structure of the Negotiation and Cooperation Game Assignments... 5 The Assignments... 5 In-Class Assignment Simulating
More informationQinghai Provincial People s Government Notice on Issuing Opinions for the Implementation of the Iron and Steel Industry Adjustment and Revitalization
Qinghai Provincial People s Government Notice on Issuing Opinions for the Implementation of the Iron and Steel Industry Adjustment and Revitalization Qing Zheng [2009] No. 33 People s government of Xining
More information2001 Question 28 Organic Geology A Non-renewable Resource (25 marks) (a) (i) Identify ONE property of coal that changes with increasing coal rank.
2001 Question 28 Organic Geology A Non-renewable Resource (25 marks) (a) (i) Identify ONE property of coal that changes with increasing coal rank. 1 (ii) Coal mined from a coal seam contains mineral matter
More informationSECTOR ASSESSMENT (SUMMARY): ENERGY. 1. Sector Background, Performance, Problems, and Opportunities
Uch-Kurgan Hydropower Plant Modernization Project (RRP KGZ 49240-002) SECTOR ASSESSMENT (SUMMARY): ENERGY Sector Road Map 1. Sector Background, Performance, Problems, and Opportunities 1. The Kyrgyz Republic
More informationWorld Small Hydropower Development Report 2013
World Small Hydropower Development Report 2013 www.smallhydroworld.org SPAIN Disclaimer Published in 2013 by United Nations Industrial Development Organization (UNIDO) and International Center on Small
More informationReport on Ozone center s activities devoted to 16-September International day of ozone layer protection
Report on Ozone center s activities devoted to 16-September International day of ozone layer protection In 2010 representatives of Ozone center of Kyrgyzstan took part in a number of activities, held at
More informationBuilding the system of sustainable data for Sustainable Development Goals (SDG)
of the Kyrgyz Republic Building the system of sustainable data for Sustainable Development Goals (SDG) Mr. Akylbek Osmonaliev Chairman of the of the Kyrgyz Republic Xi an, China, 19-22 October 2015 1 Kyrgyz
More informationD E C R E E FOR DECLARATION OF THE LAW ON ENERGY
919. Based on article 75, paragraphs 1 and 2 of the Republic of Macedonia Constitution, the President of the Republic of Macedonia and the President of the Republic of Macedonia Parliament issue a D E
More informationPUBLIC-PRIVATE PARTNERSHIP IN KAZAKHSTAN
PUBLIC-PRIVATE PARTNERSHIP IN KAZAKHSTAN First Meeting of the Public-Private Partnership and Infrastructure Financing Network of Asia and the Pacific City of Guiyang, Guizhou Province, PRC 12-13 th of
More informationPROCUREMENT NOTICE EXECUTIVE DESIGN AND COMPLETION OF WORKS FOR REHABILITATION OF WATER AND SANITATION SYSTEMS OF KIAMBERE BASIN AND CAPACITY BUILDING
Document for completion and publication by the Contracting Authority. KENYA PROCUREMENT NOTICE EXECUTIVE DESIGN AND COMPLETION OF WORKS FOR REHABILITATION OF WATER AND SANITATION SYSTEMS OF KIAMBERE BASIN
More informationAral Sea Basin. Surface Water Availability Average Year. Water Balance Average flow to sea ~60 km³. Drought Year
Aral Sea Basin Surface Water Availability Average Year Amu Darya 78 km³ Syr Darya 37 km³ Total 115 km³ Drought Year Amu Darya 47 km³ Syr Darya 21 km³ Total 68 km³ Water Balance Average flow to sea ~60
More informationLAW OF THE REPUBLIC OF INDONESIA NUMBER 7 OF 2004 REGARDING WATER RESOURCES
LAW OF NUMBER 7 OF 2004 REGARDING WATER RESOURCES BY THE GRACE OF THE ALMIGHTY GOD, THE PRESIDENT OF Considering : a. that water resources is the gift of the Almighty God which gives benefits for the realization
More informationOPTION TO PURCHASE BUENA VISTA IRON ORE DEPOSIT
ASX Release 19 February 2010 OPTION TO PURCHASE BUENA VISTA IRON ORE DEPOSIT HIGHLIGHTS Option to purchase 100% of USA based Buena Vista Iron ore deposit for total consideration of $US8 million over approximately
More informationPOWER ENGINEERING IN POLAND BEFORE ENTERING EUROPEAN UNION: EXPERIENCES AND FORECASTS
POWER ENGINEERING IN POLAND BEFORE ENTERING EUROPEAN UNION: EXPERIENCES AND FORECASTS Zbigniew Bicki Chairman of the Polish Member Committee of the World Energy Council ZBIGNIEW BICKI CONSULTING ul. Wiejska
More information1.2. Status of Water and Energy Complex of the Kazakhstan Part of the Syrdarya Basin, V. Borisovsky
1.2. Status of Water and Energy Complex of the Kazakhstan Part of the Syrdarya Basin, V. Borisovsky V. Borisovsky, Ph.D. and Head of Division, Scientific and Technical Development and Monitoring Ministry
More informationRESOURCE ADEQUACY IN MACEDONIA (DEVELOPMENT OF NEW ENERGY CAPACITY)
RESOURCE ADEQUACY IN MACEDONIA (DEVELOPMENT OF NEW ENERGY CAPACITY) 1 State authorities involved in the process of planning and construction of new energy facilities Government of the Republic of Macedonia
More informationEnvironmental Effects of Dewatered Open Pit Mines
Environmental Effects of Dewatered Open Pit Mines By Dr R. Jambrik Associate Professor, Head of the Department of Hydrogeology and Engineering Geology, University ofmiskolc ABSTRACT Before the initial
More informationKAZAKHSTAN COUNTRY PROFILE 86
KAZAKHSTAN COUNTRY PROFILE 86 Overview Kazakhstan has a population of approximately 15.48 million, with a GDP around USD 33.13 billion. The total primary energy supply in 2007 was 66.46 Mtoe, of which
More information2.24 VIENGPHOUKA THERMAL PROJECT
2.24 VIENGPHOUKA THERMAL PROJECT The Viengphouka Thermal Project is a mine-mouth coal-fired base load power generation project located in Luangnamtha Province. The Consultant has evaluated the Project
More informationPROPOSAL IMPLEMENTATION OF STATE S SHARE OF JSC «NAVOIYAZOT» FOR STRATEGIC INVESTORS
PROPOSAL IMPLEMENTATION OF STATE S SHARE OF JSC «NAVOIYAZOT» FOR STRATEGIC INVESTORS (UNDER THE PROVISIONS OF EXECUTION OF THE PRESIDENT OF THE REPUBLIC OF UZBEKISTAN Number PP-2340 from 28.04.2015 y.)
More informationREPUBLIC OF MOLDOVA. Geneva, 7-9 October 2009
REPUBLIC OF MOLDOVA Geneva, 7-9 October 2009 The Republic of Moldova is highly dependent on energy imports. 97% of the energy needs (fossil fuels and electricity) are covered from imports. The weight of
More informationWays to Improve Environmental Policy in Russia*
Ways to Improve Environmental Policy in Russia* Tatiana Tagaeva, Vadim Gilmundinov Novosibirsk National Research State University Institute of Economics and Industrial Engineering SB of RAS Novosibirsk,
More informationSupplement to the Official Journal of the European Union. Official name: National registration number: 2
Supplement to the Official Journal of the European Union Info and online forms: http://simap.ted.europa.eu Section I: Contracting entity I.1) Name and addresses 1 (please identify all contracting entities
More informationQUARTERLY REPORT FOR THE QUARTER ENDED 30 JUNE 2018 (ASX : CNX)
QUARTERLY REPORT FOR THE QUARTER ENDED 30 JUNE 2018 (ASX : CNX) CARBON ENERGY LIMITED (ABN 58 057 552 137) QUARTERLY ACTIVITIES REPORT FOR THE QUARTER ENDED 30 JUNE 2018 KEY EVENTS FOR THE QUARTER AND
More informationBANK OF INDIA, GROUND FLOOR, GOD 45- PU-4, SCHEME NO -54, A. B. ROAD, INDORE TENDER DOCUMENT FOR
BANK OF INDIA, GROUND FLOOR, GOD 45- PU-4, SCHEME NO -54, A. B. ROAD, INDORE - 452010 TENDER DOCUMENT FOR Soil Investigation Report for Zonal Office Building And Residential Flats for Bank of India at
More informationThe State Procurement Agency of the Republic of Azerbaijan
The State Procurement Agency of the Republic of Azerbaijan Welcomes the participants of the 11 th Public Procurement Knowledge Exchange Forum Procurement Oversight and Monitoring a means for effective
More informationSocial and Economic Development of the Republic of Uzbekistan. Ministry of Economy of the Republic of Uzbekistan
Social and Economic Development of the Republic of Uzbekistan Ministry of Economy of the Republic of Uzbekistan November 6 th, 2014 Main trends of social economic development of Uzbekistan Sustained high
More informationTRANSPORT OF THE RUSSIAN FAR EAST AS A PART OF NEA REGIONAL TRANSPORTATION SYSTEM
TRANSPORT OF THE RUSSIAN FAR EAST AS A PART OF NEA REGIONAL TRANSPORTATION SYSTEM Pavel MINAKIR COMMENTS Transportation system of the Russian Far East is a part of the entire Northeast Asian transportation
More informationUse of water and energy resources in Central Asia
«EURO INBO 2012» 10th EUROPEAN CONFERENCE ON THE WATER FRAMEWORK DIRECTIVE IMPLEMENTATION Use of water and energy resources in Central Asia Kholmatov Daler October 2012, Istanbul, Turkey Dear ladies and
More informationBid Invitation Announcement
Bid Invitation Announcement Project Name: Wind Turbine Foundation Construction Project (section II) for Putian Pinghai Bay Offshore Wind Power Farm Phase II Project (hereinafter referred to as the Project
More informationECONOMIC AND SOCIAL EFFECTIVENESS OF STATE ADMINISTRATION OF SMALL ENTERPRISE IN BELARUS
ECONOMIC AND SOCIAL EFFECTIVENESS OF STATE ADMINISTRATION OF SMALL ENTERPRISE IN BELARUS Kristina Kozel 1, Andrey Temichev 2 Belarusian National Technical University Minsk, Republic of Belarus, 2 atemichev@bntu.by
More informationKERIO VALLEY DEVELOPMENT AUTHORITY INVITATION TO TENDER
KERIO VALLEY DEVELOPMENT AUTHORITY KVDA REPUBLIC OF KENYA MINISTRY OF ENVIRONMENT, WATER AND NATURAL RESOURCES INVITATION TO TENDER Introduction Kerio Valley Development Authority (KVDA) is a Parastatal
More informationGABON SPECIAL ECONOMIC ZONE
INTRODUCTION: Gabon is a picturesque and oil rich country in West Central Africa. With the Atlantic Ocean on the West, it shares the Northern boundary with Cameroon & Equatorial Guinea and the Eastern
More informationUnited States. Coal Resource Development and Overseas Supply Potential
United States Coal Resource Development and Overseas Supply Potential Current Import Levels from the U.S. are Insignificant 2 Increasing Challenges to Demand & Supply Demand Coal will remain base load
More informationRENEWABLE ENERGY IN KAZAKHSTAN
RENEWABLE ENERGY IN KAZAKHSTAN Ainur Akhmetova International Law Firm Integrites Kazakhstan CHINA GERMANY KAZAKHSTAN NETHERLANDS RUSSIA UKRAINE UNITED KINGDOM 1 ST FLOOR, SUCCESS BUSINESS CENTER, 1/1,
More informationON ENERGY RESOURCES UTILIZATION
THE LAW OF AZERBAIJAN REPUBLIC ON ENERGY RESOURCES UTILIZATION This Law determines legal, economic and social basis of the State policy in the field of energy resources utilization as well as main directions
More informationStudy on Systematic Structure of Modern Regional Logistics Industry
Study on Systematic Structure of Modern Regional Logistics Industry Sun Shusheng School of Management, Wuhan University of Science and Technology, Wuhan, P.R., China, 430081 (E-mail:sun1368@263.net) Abstract
More informationSERVICE CONTRACT NOTICE. Supervising Engineer for Serbia Floods Rehabilitation Support - Emergency works project
Ref. Ares(2016)3956592-27/07/2016 Public document to be completed by the Contracting Authority SERVICE CONTRACT NOTICE Supervising Engineer for Serbia Floods Rehabilitation Support - Emergency works project
More informationUNMIK REGULATION NO. 2004/22 ON THE PROMULGATION OF A LAW ADOPTED BY THE ASSEMBLY OF KOSOVO ON ELECTRICITY
UNITED NATIONS United Nations Interim Administration Mission in Kosovo UNMIK NATIONS UNIES Mission d Administration Intérimaire des Nations Unies au Kosovo UNMIK/REG/2004/22 30 June 2004 REGULATION NO.
More informationLAW OF MONGOLIA ON WATER \revised\ May 17, 2012 CHAPTER ONE GENERAL PROVISIONS
unofficial translation LAW OF MONGOLIA ON WATER \revised\ May 17, 2012 Article 1. Purpose of the Law CHAPTER ONE GENERAL PROVISIONS 1.1.The purpose of the present law is to govern relations concerning
More informationBusiness Opportunity. Title: United Kingdom-London: Railway equipment. Document Type: Contract Notice. Published By: Network Rail
Business Opportunity Title: United Kingdom-London: Railway equipment Document Type: Contract Notice Published By: Network Rail Date Published: 25 February 2016 Deadline Date: 24 March 2016 SECTION I: CONTRACTING
More informationLAW on special legal status of Gagauzia (Gagauz-Yeri)
LAW on special legal status of Gagauzia (Gagauz-Yeri) Being governed by principles of the Constitution of the Republic of Moldova; showing willingness and aspiration to keep good relations among peoples
More informationLaw of the People's Republic of China on Conserving Energy
Law of the People's Republic of China on Conserving Energy (Adopted at the 28th Meeting of the Standing Committee of the Eighth National People's Congress on November 1, 1997, promulgated by Order No.
More informationRenewable energy in Belarus
Renewable energy in Belarus Introduction The Republic of Belarus belongs to the group of countries without their own considerable energy and fuel resources (EFR). The EFR include: crude oil, natural gas,
More informationInvestor presentation September 2011
Investor presentation September 2011 Content Samruk-Energy at a glance Review of Kazakhstan electricity market Operational overview and performance Financial overview and performance Strategy Key risks
More information