Solicitation HH-89. Design/Build for Rehabilitation of Skewbacks, Viaduct Piers and Lower Level North Abutment at the Henry Hudson Bridge

Size: px
Start display at page:

Download "Solicitation HH-89. Design/Build for Rehabilitation of Skewbacks, Viaduct Piers and Lower Level North Abutment at the Henry Hudson Bridge"

Transcription

1

2 March 9, 2016 ADDENDUM NO. 2 Solicitation HH-89 Design/Build for Rehabilitation of Skewbacks, Viaduct Piers and Lower Level North Abutment at the Henry Hudson Bridge To all Prospective Proposers: The due date to submit Expressions of Interest remains unchanged: March 29, 2016 Attached is the following additional or clarified information for the Project: 1. The presentation from the March 4, 2016 Pre-EOI Informational Meeting is attached. This presentation is being shared for general information and reference only. 2. A copy of the March 4, 2016 Pre-EOI Informational Meeting sign-in sheet is attached. 3. Closing date for Questions is revised to 3/11/16. Please submit your questions in writing to the Point of Contact by 3/11/16 so there is ample time for a complete response. Below are questions received and the Authority responses: Q 5 A 5 Q 6 A 6 Q 7 A 7 Q 8 A 8 Can the designated Construction Inspection Firm also provide the services of the Material Testing Firm provided that it has the required credentials? Yes Will there be an Alternative Technical Concept (ATC) process in the RFP stage? Will be answered in a future addendum. Is it acceptable for a contractor to self-perform the geo technical construction provided that it can demonstrate the requisite experience and resources to perform the work? Yes. Does the Geotechnical Subcontractor as identified in the EOI have to be exclusive to a particular team? No.

3 Solicitation HH-89 Addendum #2 March 9, 2016 Q 9 A 9 Q 10 A 10 Q 11 A 11 Q 12 A 12 Q 13 A 13 Q 14 A 14 Q 15 A 15 Q 16 A 16 The scope of work for the Geotechnical Subcontractor is undefined at this point in the process. Can the Contractor name alternate Geotechnical Subcontractors in order to retain a competitive field of bidders? Yes. Would the TBTA consider removing the naming of the Geotechnical Subcontractor until the RFP process when the scope of work is more clearly defined? No. Please confirm if subcontractors, sub designers or sub consultants of the Design Professional and the Construction Inspection Professional Engineering Firm are required to submit Standard Forms RFQ-4 (rev ) and SF-330. Confirmed except as noted below in A16 Is there a limit to the number of Design-Build firms that will be shortlisted from the evaluation of these Expressions Of Interest? If so, how many? No. May the documents that do not count towards the 60 page total, the RFQ-4 Form and Financial Statements, be submitted on a disk only or shall they be printed out as well? All submittals must be made as hard copies as well as in electronic format. Can the firm performing the Construction Inspection /QC services also provide the Structural Health Monitoring System? No. Can the letter from surety not be included in the page count as they can be multiple pages and vary in page length due to the surety attachments? The only exclusions from the 60-page limitation are the RFQ-4 forms and financial statements. It was stated at the 3/4 pre-eoi meeting that any sub consultants to the Design Professional or Construction Inspection Professional Engineering Firm that are included in the EOI would need to submit the appropriate forms as well (RFQ-4 and SF330). Would the SF330 be an individual SF330 for each subconsultant(s) or would a combined SF330 for the Professional firm and its sub(s) be acceptable? A combined SF-330 is acceptable as long as the company affiliations are clearly noted. Form CU-078 Page 2 (Rev. 1/4/99)

4 Solicitation HH-89 Addendum #2 March 9, 2016 Q 17 A 17 Q 18 A 18 The last paragraph on REOI page 2 of 5 states that no more than five (5) past project descriptions should be provided for the Designer. Is this limitation for the customized SOQ (Item 3.b.ii)? Is the Designer also able to cite the 10 project examples as per the requirements of the SF330 Part I Section F? Please refer to the instruction under Part I Section F which states: Present as many projects as requested by the agency, or 10 projects, if not specified. If subconsultant(s) are being included, are their project examples part of the Professional firm s limitations or can they submit five (5) as well. Additional sub firms may list their own most relevant project examples. Please remain within the stated page limitations. Please be governed accordingly in submitting your Expressions of Interest for this solicitation. Additionally, please acknowledge receipt of this Addendum 2 in your Expression of Interest cover letter. Sincerely, Susan Higgins Director, Procurement Form CU-078 Page 3 (Rev. 1/4/99)

5 TRIBOROUGH BRIDGE AND TUNNEL AUTHORITY REHABILITATION OF SKEWBACKS, APPROACH CONCRETE PIERS, AND LOWER LEVEL NORTH ABUTMENT AT THE HENRY HUDSON BRIDGE DESIGN-BUILD CONTRACT HH-89 / DB R EQUEST FOR E XPRESSIONS OF I NTEREST (EOI) I NFORMATIONAL S UMMARY M ARCH 2016

6 DESIGNATED POINT OF CONTACT SUSAN HIGGINS, Director Triborough Bridge & Tunnel Authority Law & Procurement Department Two Broadway, 24 th Floor New York, NY Alternate Point of Contact is John Weldon Designated Point of Contact for all questions and comments during the procurement phase of the project as stated in the Request for Expressions of Interest and in accordance with the New York State Finance Law 139-j and 139-k. 2

7 HH-89 DESIGN-BUILD PROJECT Project Overview General Location Project Schedule Goals General Scope of Work Utilities 3

8 HENRY HUDSON BRIDGE - GENERAL LOCATION PROJECT HH-89 - Rehabilitation of Skewbacks (4) - Replacement of Bent Pedestals Piers (16) - Replacement of LL North Abutment Pilasters (2) MANHATTAN BRONX 4

9 PROJECT SCHEDULE Notice of Award is anticipated for December 2016 Contract Duration Not to exceed 33 Months Coordination with other projects HH-13A / HH-88B Reconstruction of Toll Plazas and Southbound Approach, and Replacement of Facility Lighting System Construction 11/2016 thru 5/2020 HH-07A / HH-30 Miscellaneous Structural Rehabilitation and Overcoat Painting at Henry Hudson Bridge Construction 6/2019 thru 12/2021 5

10 PROJECT GOALS Meet project requirements: Safety Quality Schedule Budget Provide Alternate Load Path system for arch and tower column loads Replace concrete bent pedestals and Lower Level North Abutment Mitigate concrete expansion and cracking due to Alkali-Silica Reaction (ASR) Reduce moisture and water infiltration into concrete substructures 6

11 GENERAL SCOPE OF WORK HH-89 - Rehabilitation of Skewbacks, Approach Concrete Piers and North Abutment Rehabilitation of (4) concrete skewbacks Replacement of (16) bent pedestal piers Replacement of (2) concrete abutment pilasters. 7

12 SKEWBACK REHABILITATION Alternate Load Path system Design, fabricate, and install structural system to allow transfer of superstructure loads directly to bedrock Reinforced concrete encasement Demolition of 7 of concrete from all vertical faces and 1 of top slab excluding tower column footings Drill and grout dowels into existing concrete Install new 1-2 thick concrete encasement Apply waterproofing/sealant on all surfaces 8

13 SKEWBACK REHABILITATION One concept for Alternate Load Path System The Authority is open to and encourages other methods 9

14 BENT PEDESTAL REPLACEMENT Full replacement of all bent pedestals down to bedrock Replacement of pin bearings at Bent 9 and 10 to fixed connections. Perform temporary support 10

15 NORTH ABUTMENT PILASTER REPLACEMENT Full replacement of Lower Level North Abutment pilasters Replacement of seismic isolation bearings Perform temporary support 11

16 STRUCTURAL HEALTH MONITORING SYSTEM Design, install, and operate a structural health monitoring (SHM) system including sensors for: Strain measurement Displacement measurement Vibration measurement Load cell measurement Tilt monitoring Weather Station System shall monitor the performance of the new construction and existing bridge elements. System shall be web-based and modular to allow for future expansion. Design-Build Team will be required to maintain and operate a SHM System for up to 2 years following substantial completion of Construction. Monitoring reports shall be provided 12

17 ADDITIONAL ITEMS Environmental Permitting Construction Access Noise Monitoring and Mitigation MPT for Local Roads Allowable Work Days and Hours: Bronx Weekdays Only: 8:00 AM to 4:00 PM No Nights or Weekends Manhattan All Days: 7:00 AM to 4:00 PM 13

18 POTENTIAL INTERFERENCE PIER 9W (LOOKING SOUTH) ADJACENT TO PARK PATH SOUTH VIADUCT PIER 11W (LOOKING NORTHWEST) ADJACENT TO PARK PATH PIER 18W (LOOKING WEST) ADJACENT TO EDSALL AVE NORTH VIADUCT PIER 20E (LOOKING WEST) ADJACENT TO OVERHEAD POWER LINES 14

19 PROJECT WORK AREAS (NORTH BRONX) 15

20 PROJECT WORK AREAS (SOUTH MANHATTAN) 16

21 SITE ACCESS MANHATTAN INWOOD HILL PATH ACCESS 17

22 SITE ACCESS BRONX SPUYTEN DUYVIL PARK PATH ACCESS 18

23 UTILITIES COORDINATION Relocate existing utilities that are interfering with work Ensure coordination with utility owner: Consolidated Edison Known existing utilities will be reflected in the RFP Documents 19

24 EXPRESSIONS OF INTEREST (EOI) Design-Build Team shall identify the following: Construction Contractor Geotechnical Subcontractor Design Professional Construction Inspection Professional Engineering Firm Design-Build Team shall be fully experienced in all project aspects including: Fixed steel bridge analysis Rehabilitation and replacement of concrete foundations High capacity deep foundation design and construction Agency coordination and permitting 20

25 QUALITY CONTROL / QUALITY ASSURANCE (QC/QA) QC/QA is Design-Build Team s Responsibility Design-Build Team shall appoint a QC/QA Manager responsible for Project QC/QA Construction Inspection shall be by an Independent Engineering Firm (Retained by the Design-Build Team) Materials Testing shall be by an Independent Testing Firm or Laboratory (Retained by the Design-Build Team) The Authority will perform audit and review QA on Design-Build Team s Design and Construction Activities. Additionally, the Authority will perform in-depth QA inspections of any possible environmental work. 21

26 ANTICIPATED PROCUREMENT SCHEDULE Activity Due Date Request for EOIs Released 02/01/2016 Final Date for receipt of Proposer s questions 03/11/2016 EOI Due Date 03/29/2016 Shortlisted DB Teams Announced April, 2016 RFP Issued May, 2016 Proposals Due August, 2016 Contract Award December,

27 CONTRACT INFORMATION Design-Build Contract amount shall include all construction and engineering services as required by the RFP RFP will include a Price Schedule Two-Step Design-Build Procurement Process Project Schedule Total Duration Not to Exceed 33 Months Milestones, potential incentives, and liquidated damage assessments will be detailed in the RFP Stipend Amount and Agreement will be provided in the RFP M/WBE Goals have been set at 15% / 15% respectively 23

28 EOI EVALUATION AND SELECTION Evaluation Factors Organization and Key Personnel Past Performance of the proposed Team/Firms Record of performing together as a Team and on Design-Build Projects 24

29 SUBMIT EXPRESSION OF INTEREST TO: Solicitation No: HH-89 Attn: Victoria Warren, Manager, Procurement Administration Triborough Bridge and Tunnel Authority 2 Broadway Mail Center Procurement Department New York, NY For additional information and required forms, Visit: 25

30 ADDITIONAL INFORMATION Submittal requirements page limits Cover letter Statement of Qualifications HH-89 Form A RFQ-4, SF-330 Financial statements Letter from Surety Any additional project information will be posted to the Authority website where you obtained this REOI Final date for receipt of questions pertaining to this EOI is March 11, questions to Designated Point of Contact SHIGGINS@MTABT.ORG 26

31 DESIGNATED POINT OF CONTACT SUSAN HIGGINS, Director Triborough Bridge & Tunnel Authority Law & Procurement Department Two Broadway, 24 th Floor New York, NY Alternate Point of Contact is John Weldon Designated Point of Contact for all questions and comments during the procurement phase of the project as stated in the Request for Expressions of Interest and in accordance with the New York State Finance Law 139-j and 139-k. 27

32

33

34

35

36

37

38

39

40

41 February 18, 2016 ADDENDUM NO. 1 Solicitation HH-89 Design/Build for Rehabilitation of Skewbacks, Viaduct Piers and Lower Level North Abutment at the Henry Hudson Bridge To all Prospective Proposers: The due date to submit Expressions of Interest remains unchanged: March 29, 2016 You are hereby notified of the following change to the above referenced solicitation: 1. The date for the Pre-EOI Informational Meeting is changed to March 4, 2016 (meet at 10:00AM, at the Robert Moses Building on Randall s Island, NY) Below are questions received and the Authority responses: Q1 A1 Q2 A2 Reference Solicitation Section 3, Par. b Please confirm the statement 60 pages of text both sides is equivalent to 60 sheets of paper with double sided text. Confirmed Reference Solicitation Section 3, Par. b Please confirm that only the RFQ-4 form and the Financial statements are excluded from the page count and the SF-330 forms are included, Confirmed Q3 A3 Q4 Reference Solicitation Section 2, Par. e Please confirm that the proposed Independent Construction Inspection Professional Engineering Firm and Materials Testing Firm or Laboratory is not required to be exclusive to any one Design-Build proposer. Confirmed What is the definition of the Geotechnical Subcontractor a. Is it the firm which designs / engineers the foundation? b. Is it the firm which performs the actual foundation / anchor work? A4 Geotechnical Subcontractor is referring to the firm performing the actual foundation / anchor work.

42 Solicitation HH-89 Addendum #1 February 18, 2016 Please be governed accordingly in submitting your Expressions of Interest for this solicitation and be sure to register to attend the Informational Meeting as instructed in the solicitation letter. Additionally, please acknowledge receipt of this Addendum 1 in your Expression of Interest cover letter. Sincerely, Susan Higgins Director, Procurement Form CU-078 Page 2 (Rev. 1/4/99)

TRIBOROUGH BRIDGE AND TUNNEL AUTHORITY

TRIBOROUGH BRIDGE AND TUNNEL AUTHORITY TRIBOROUGH BRIDGE AND TUNNEL AUTHORITY FLOOD MITIGATION AT THE HUGH L CAREY TUNNEL AND THE QUEENS MIDTOWN TUNNEL DESIGN-BUILD CONTRACT TUN-MIT-01 R EQUEST FOR E XPRESSIONS OF I NTEREST (EOI) I NFORMATIONAL

More information

Cedrick T. Fulton President. Solicitation RK-23C. Design-Build Services for New Harlem River Drive Connector Ramp

Cedrick T. Fulton President. Solicitation RK-23C. Design-Build Services for New Harlem River Drive Connector Ramp 2 Broadway New York, NY 10004 646 252-7000 Tel Cedrick T. Fulton President Bridges and Tunnels December 5, 2018 ADDENDUM NO. 1 To all Prospective Proposers: Solicitation RK-23C Design-Build Services for

More information

ADDENDUM NO. 1. Re: Expression of Interest for RFP CB-18

ADDENDUM NO. 1. Re: Expression of Interest for RFP CB-18 2 Broadway Cedrick T. Fulton New York, NY 10004 President 646 252-7000 Tel 646 252-7902 TTY Bridges and Tunnels February 22, 2017 ADDENDUM NO. 1 Re: Expression of Interest for RFP CB-18 Design/Build Services

More information

Design-Build Selmon West Extension

Design-Build Selmon West Extension TAMPA-HILLSBOROUGH COUNTY EXPRESSWAY AUTHORITY Letter of Clarification No. 1 FOR REQUESTS FOR PROPOSALS Design-Build Selmon West Extension Page 1 of 8 Letter of Clarification No. 1 ~ Date of Letter of

More information

I-64/ Route 15 (Zion Crossroads) RFQ Information Meeting

I-64/ Route 15 (Zion Crossroads) RFQ Information Meeting I-64/ Route 15 (Zion Crossroads) Diverging Diamond Interchange RFQ Information Meeting December 13, 2011 Brian Arnold District Project Manager Ian Millikan, PE APD Project Manager and POC Introduction

More information

Page 1 of 2 AMENDMENT - REQUEST FOR QUALIFICATIONS (RFQ)

Page 1 of 2 AMENDMENT - REQUEST FOR QUALIFICATIONS (RFQ) Page 1 of 2 Page 1 of 2 AMENDMENT - REQUEST FOR QUALIFICATIONS (RFQ) Amendment No. 2 RFQ No. 4018000166 COMPANY NAME AND ADDRESS (To be completed by Bidder) Project Name Construction Management Services

More information

December 19, 2012 ADDENDUM NO. 11. To Prospective Bidders and Others on:

December 19, 2012 ADDENDUM NO. 11. To Prospective Bidders and Others on: 601096-12 December 19, 2012 ADDENDUM NO. 11 To Prospective Bidders and Others on: Technical/Price Proposals Postponed To: Thursday, January 17, 2013 @ 2:00 PM Transmitting the following Documents and Clarifications:

More information

FACILITIES MANAGEMENT

FACILITIES MANAGEMENT FACILITIES MANAGEMENT Design & Construction August 18, 2017 Re: Request for Proposals- Third Party Testing and Special Inspections University of Iowa The University of Iowa, located in Iowa City, Iowa,

More information

Route 7 Truck Climbing Lane. RFQ Information Meeting

Route 7 Truck Climbing Lane. RFQ Information Meeting Route 7 Truck Climbing Lane From West Market Street to Route 9 RFQ Information Meeting November 9, 2012 Mark Gibney, PE District Project Manager Ian Millikan, PE APD Project Manager and POC Introduction

More information

Gloucester Parkway Extension RFQ Information Meeting

Gloucester Parkway Extension RFQ Information Meeting Gloucester Parkway Extension RFQ Information Meeting May 24, 2013 Tim Hartzell, PE District Project Manager Kevin Reichert, PE APD Project Manager and POC Topics Project Location & Overview RFQ Information

More information

Interstate 66 Widening from. RFQ Information Meeting. January 4, 2012 Christiana Briganti-Dunn, P.E. District Project Manager

Interstate 66 Widening from. RFQ Information Meeting. January 4, 2012 Christiana Briganti-Dunn, P.E. District Project Manager Interstate 66 Widening from Gainesville to Haymarket RFQ Information Meeting January 4, 2012 Christiana Briganti-Dunn, P.E. District Project Manager John C. Daoulas, P.E. APD Project Manager and POC Introduction

More information

I-95 Southbound CD Lanes Rappahannock River Crossing Stafford County/ City of Fredericksburg, Virginia. RFQ Information Meeting - November 9, 2016

I-95 Southbound CD Lanes Rappahannock River Crossing Stafford County/ City of Fredericksburg, Virginia. RFQ Information Meeting - November 9, 2016 I-95 Southbound CD Lanes Rappahannock River Crossing Stafford County/ City of Fredericksburg, Virginia RFQ Information Meeting - November 9, 2016 Krishna Potturi, PE Project Manager Suril Shah APD Project

More information

ADDENDUM NO. 1 Questions and Answers

ADDENDUM NO. 1 Questions and Answers ADDENDUM NO. 1 Questions and Answers Addendum to the Indianapolis Bond Bank RFQ-LJF-2017-004 Request for Qualifications Design and Design Criteria Consulting Services for the Indianapolis-Marion County

More information

NOTICE TO DESIGN PROFESSIONALS / CONTRACTORS REQUEST FOR LETTERS OF INTEREST S.R. 408/ S.R. 417 INTERCHANGE IMPROVEMENTS PHASE 2 PROJECT NO.

NOTICE TO DESIGN PROFESSIONALS / CONTRACTORS REQUEST FOR LETTERS OF INTEREST S.R. 408/ S.R. 417 INTERCHANGE IMPROVEMENTS PHASE 2 PROJECT NO. NOTICE TO DESIGN PROFESSIONALS / CONTRACTORS REQUEST FOR LETTERS OF INTEREST S.R. 408/ S.R. 417 INTERCHANGE IMPROVEMENTS PHASE 2 PROJECT NO. 253G, CONTRACT NO. 001266 The Central Florida Expressway Authority

More information

Questions Due: 12/11/14; Proposals Due 12/30/14: each by 2:00PM Central Standard Time

Questions Due: 12/11/14; Proposals Due 12/30/14: each by 2:00PM Central Standard Time 1. Q: Can you please confirm the Due Date? The Event Details on the webpage states 12/30/14, but when you click into Event Details in the Documents, it lists the Due Date as 12/5/14. A: Proposals are due

More information

RFQ Information Meeting

RFQ Information Meeting August 25, 2016 RFQ Information Meeting I-64 Southside Widening & High Rise Bridge Phase 1 Widen From 4 Lanes to 6 Lanes Rick Correa, PE Project Manager Jeff Roby, PE APD Project Manager and POC Agenda

More information

TENDER BASTION STREET BRIDGE RENEWAL AND SEISMIC RETROFIT ADDENDUM 1

TENDER BASTION STREET BRIDGE RENEWAL AND SEISMIC RETROFIT ADDENDUM 1 TENDER 2334-2019 BASTION STREET BRIDGE RENEWAL AND SEISMIC RETROFIT ADDENDUM 1 This addendum shall be read in conjunction with and considered as an integral part of the Tender Contract 2334-2019. Revisions

More information

SR 0136-G10 ABC BRIDGE REPLACEMENT in Eighty Four, PA

SR 0136-G10 ABC BRIDGE REPLACEMENT in Eighty Four, PA ASHE NATIONAL PROJECT OF THE YEAR SR 0136-G10 ABC BRIDGE REPLACEMENT in Eighty Four, PA For the PENNSYLVANIA DEPARTMENT OF TRANSPORTATION Engineering District 12-0 Submitted By: January 29, 2018 AMERICAN

More information

New York City Transit (NYCT) DATE: July 19, 2018 CONSTRUCTION/ARCHITECTURAL & ENGINEERING CONTRACT SOLICITATION NOTICE/PROJECT OVERVIEW MTA-NYCT IS NOW ADVERTISING FOR THE FOLLOWING: SSE #: 0000226381

More information

1. FROM (Bidder): (Name)

1. FROM (Bidder): (Name) Tender No. [ ] Tender Forms Page 1 1. FROM (Bidder): (Name) (Address) TO: Alberta Transportation, Strategic Procurement Branch Main Floor, Twin Atria Building 4999 Avenue 5000 Edmonton, Alberta, T6B 2X3

More information

ADDITIONAL TYPES OF WORK REQUIRING PRE-QUALIFICATION:

ADDITIONAL TYPES OF WORK REQUIRING PRE-QUALIFICATION: CENTRAL FLORIDA EXPRESSWAY AUTHORITY NOTICE TO PROFESSIONAL ENGINEERING CONSULTANTS REQUEST FOR LETTERS OF INTEREST FOR GENERAL ENGINEERING CONSULTANT SERVICES CONTRACT NO. 001145 The Central Florida Expressway

More information

I-64 Hampton Roads Bridge-Tunnel Expansion Responses to Questions (Questions received as of January 22, 2018)

I-64 Hampton Roads Bridge-Tunnel Expansion Responses to Questions (Questions received as of January 22, 2018) Questions and Responses I-64 Hampton Roads Bridge-Tunnel Expansion Responses to Questions (Questions received as of January 22, 2018) Q1: Appendix A - Definitions defines Lead Designer as follows: Lead

More information

I-64 Capacity Improvements Segment III RFQ Information Meeting

I-64 Capacity Improvements Segment III RFQ Information Meeting I-64 Capacity Improvements Segment III RFQ Information Meeting April 5, 2017 Janet Hedrick, P.E. Design Project Manager Joseph Clarke, P.E. APD Project Manager and POC I-64 Capacity Improvements Segment

More information

Third Party Contracts Quality Management Plan (TPCQMP) Revision 00 Issue Date: August 6, 2018

Third Party Contracts Quality Management Plan (TPCQMP) Revision 00 Issue Date: August 6, 2018 Third Party Contracts Quality Management Plan (TPCQMP) Revision 00 Issue Date: August 6, 2018 Northeast Illinois Regional Commuter Railroad Corporation 547 West Jackson Boulevard Chicago, Illinois 60661

More information

BRIDGE CONSTRUCTION USING SELF-PROPELLED MODULAR TRANSPORTERS (SPMT)

BRIDGE CONSTRUCTION USING SELF-PROPELLED MODULAR TRANSPORTERS (SPMT) SPECIAL PROVISION August 31, 2009 PROJECT # S-R399(42) PROJECT # S-R399(59) PIN # 6697/7236 SECTION 03253S BRIDGE CONSTRUCTION USING SELF-PROPELLED MODULAR TRANSPORTERS (SPMT) Add Section 03253S: PART

More information

MTA - NEW YORK CITY TRANSIT 2 BROADWAY NEW YORK, NY DIVISION OF MATERIEL web.mta.info/nyct/procure/nyctproc.htm

MTA - NEW YORK CITY TRANSIT 2 BROADWAY NEW YORK, NY DIVISION OF MATERIEL web.mta.info/nyct/procure/nyctproc.htm MTA - NEW YORK CITY TRANSIT 2 BROADWAY NEW YORK, NY 10004 DIVISION OF MATERIEL web.mta.info/nyct/procure/nyctproc.htm Vreplies@nyct.com 0000149475 Contract #CM-1058 NOTICE -OF ADDENDUM ADDENDUM #1 INCLUDES

More information

DALLAS FORT WORTH INTERNATIONAL AIRPORT ADDENDUM NO. 01. Terminal D Expansion Joints Rehabilitation CONTRACT NO

DALLAS FORT WORTH INTERNATIONAL AIRPORT ADDENDUM NO. 01. Terminal D Expansion Joints Rehabilitation CONTRACT NO DALLAS FORT WORTH INTERNATIONAL AIRPORT ADDENDUM NO. 01 Terminal D Expansion Joints Rehabilitation CONTRACT NO. 9500663 February 15, 2019 The Request for Bids for the above is hereby revised as follows:

More information

Construction Management/Construction Inspection Services

Construction Management/Construction Inspection Services DELAWARE RIVER JOINT TOLL BRIDGE COMMISSION ADMINISTRATION BUILDING 110 WOOD & GROVE STREETS MORRISVILLE, PA 19067 ADDENDUM NO. 1 This Addendum No. 1 gives additional information in connection with the

More information

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT 2018.04 CLEANING AND PAINTING STEEL STRUCTURES - CIDER HILL ROAD UNDERPASS BRIDGE - MILE 6.2, CAPTAIN THOMAS ROAD UNDERPASS BRIDGE - MILE 14.8, ROUTE 126

More information

TENDER BASTION STREET BRIDGE RENEWAL AND SEISMIC RETROFIT ADDENDUM 2

TENDER BASTION STREET BRIDGE RENEWAL AND SEISMIC RETROFIT ADDENDUM 2 TENDER 2334-2019 BASTION STREET BRIDGE RENEWAL AND SEISMIC RETROFIT ADDENDUM 2 This addendum shall be read in conjunction with and considered as an integral part of the Tender Contract 2334-2019. Revisions

More information

Odd Fellows Road Interchange at US Route 29/460 and Road Improvements UPC # RFQ Information Meeting

Odd Fellows Road Interchange at US Route 29/460 and Road Improvements UPC # RFQ Information Meeting Odd Fellows Road Interchange at US Route 29/460 and Road Improvements UPC #105515 RFQ Information Meeting Raina Rosado, PE District Project Manager Kevin Reichert, PE APD Project Manager and POC July 11,

More information

BIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX BID PACKAGE #1 SITE WORK

BIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX BID PACKAGE #1 SITE WORK HOSKINS ARCHITECTURE, LLC 1827 1 ST AVENUE NORTH, SUITE 104 BIRMINGHAM, ALABAMA 35203 205.321.4122 ADDENDUM NO. 1 PROJECT: BIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX BID PACKAGE #1 SITE WORK

More information

ELANA D. FREEDMAN, P.E. Structural Engineer

ELANA D. FREEDMAN, P.E. Structural Engineer , P.E. EDUCATION Bachelor of Science, Civil Engineering (L.C. Smith College of Engineering), Syracuse University, 2007 Bachelor of Arts, Philosophy (College of Arts & Sciences), Syracuse University, 2007

More information

Pattullo Bridge Replacement Project. Cost Report

Pattullo Bridge Replacement Project. Cost Report Pattullo Bridge Replacement Project Cost Report January 2018 Cost Report Page i TABLE OF CONTENTS 1 PURPOSE... 1 2 BASIS FOR THE ESTIMATE... 2 2.1 Scope of the Works... 2 2.2 Scope of Capital Costs...

More information

SH 183 Managed Lanes Project RFQ Q & A MATRIX #2. (June 4, 2013)

SH 183 Managed Lanes Project RFQ Q & A MATRIX #2. (June 4, 2013) SH 183 Managed Lanes Project RFQ Q & A MATRIX #2 (June 4, 2013) No. Current language states: Project experience provided by a parent or sister company of the Lead Engineering Firm, Lead Contractor or Lead

More information

Metro Gold Line Foothill Extension Construction Authority

Metro Gold Line Foothill Extension Construction Authority Metro Gold Line Foothill Extension Construction Authority REQUEST FOR PROPOSALS (RFQ) C2002 PHASE 2B ALIGNMENT DESIGN-BUILD PROJECT RFQ Issued November 8, 2017 QUESTIONS AND ANSWERS MATRIX 2 Issued December

More information

NOTE: Responses marked with * indicate revisions to the Contract Documents reflected in the future Addendum.

NOTE: Responses marked with * indicate revisions to the Contract Documents reflected in the future Addendum. CONTRACT NO. T-668A, CAPITAL PROJECT 0301A SCUDDER FALLS BRIDGE REPLACEMENT PROJECT RESPONSES TO CONTRACTOR INQUIRIES SUBMITTED TO THE COMMISSION FROM NOVEMBER 2, 2016 THROUGH NOVEMBER 8, 2016 INQUIRIES

More information

SECTION / ENGINEERED AGGREGATE PIERS (SOIL REINFORCEMENT AND FOUNDATION SYSTEM)

SECTION / ENGINEERED AGGREGATE PIERS (SOIL REINFORCEMENT AND FOUNDATION SYSTEM) PART 1 GENERAL 1.01 WORK INCLUDED SECTION 02360 / 31 34 30.13 ENGINEERED AGGREGATE PIERS (SOIL REINFORCEMENT AND FOUNDATION SYSTEM) A. Provide all equipment, material, labor and supervision to design and

More information

Addendum No. 2 February 19, 2014 City University Construction Fund Engineering Design Services Requirements Contracts RFQ Project No.

Addendum No. 2 February 19, 2014 City University Construction Fund Engineering Design Services Requirements Contracts RFQ Project No. Facilities Planning, Construction, and Management Office of Financial Management Procurement Services 555 West 57 th Street 16 th Floor New York, NY 10019 Tel: 646-664-2700 Addendum No. 2 February 19,

More information

ADDENDUM NUMBER ONE Clarifications

ADDENDUM NUMBER ONE Clarifications August 25, 2017 ADDENDUM NUMBER ONE Clarifications RE: Interdisciplinary Science and Technology Building VII (ISTB 7) Request for Qualifications No. CMAR 11976 Total pages in this addendum: Five (5) The

More information

STUDIO 2LR ARCHITECTURE + INTERIORS

STUDIO 2LR ARCHITECTURE + INTERIORS Orangeburg Spec Industrial Building Orangeburg, South Carolina September 29, 2015 ADDENDUM NO. 1 This addendum forms a part of the Contract documents and modifies the original Bidding Documents and any

More information

RFQ CM16-01 Page 1 of 5

RFQ CM16-01 Page 1 of 5 REQUEST FOR QUALIFICATIONS (RFQ) RFQ CM16-01 CONSTRUCTION MANAGEMENT AND INSPECTION SERVICES FOR PAVING AND DRAINGE CONSTRUCTION PROJECTS SELECTION CM01 The City of Houston intends to enter into a contract

More information

FREQUENTLY ASKED QUESTION FOR VDOT DESIGN-BUILD PROJECTS. June 1, 2013

FREQUENTLY ASKED QUESTION FOR VDOT DESIGN-BUILD PROJECTS. June 1, 2013 FREQUENTLY ASKED QUESTION FOR VDOT DESIGN-BUILD PROJECTS June 1, 2013 For general guidance the following information is provided as an aid to those preparing submittals in response to Design-Build solicitations.

More information

Implementation of this Special Provision requires a complete understanding of the following documents:

Implementation of this Special Provision requires a complete understanding of the following documents: VIRGINIA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR Quality Assurance/Quality Control (QA/QC) for the Construction of Deep Foundation Systems for Design-Build and PPTA Contracts November 10, 2009

More information

REQUEST FOR PROPOSALS FOR. Site Civil Services for the Iowa River Landing Arena CITY OF CORALVILLE IOWA

REQUEST FOR PROPOSALS FOR. Site Civil Services for the Iowa River Landing Arena CITY OF CORALVILLE IOWA REQUEST FOR PROPOSALS FOR Site Civil Services for the Iowa River Landing Arena CITY OF CORALVILLE IOWA City of Coralville Iowa Coralville, IA Page 1 of 6 Please review and provide response to this letter

More information

REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGER AT RISK (CMAR) SERVICES WITH GUARANTEED MAXIMUM PRICE

REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGER AT RISK (CMAR) SERVICES WITH GUARANTEED MAXIMUM PRICE CAYUCOS SANITARY DISTRICT 200 Ash Avenue P.O. Box 333, Cayucos, California 93430-0333 www.cayucossd.org 805-995-3290 REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGER AT RISK (CMAR) SERVICES WITH GUARANTEED

More information

APPENDIX F GEOTECHNICAL INVESTIGATION UPDATE CITY OF SANTA CRUZ D RAFT EIR L A B AHIA H OTEL JANUARY 2014

APPENDIX F GEOTECHNICAL INVESTIGATION UPDATE CITY OF SANTA CRUZ D RAFT EIR L A B AHIA H OTEL JANUARY 2014 GEOTECHNICAL INVESTIGATION UPDATE. CITY OF SANTA CRUZ D RAFT EIR L A B AHIA H OTEL JANUARY 2014 October 5, 2013 Project No. SCR-0720 SANTA CRUZ SEASIDE COMPANY Craig French 911 Center Street, Suite B Santa

More information

HAWTHORNE AND THAD WATER & WASTEWATER IMPROVEMENTS ITB #124D 16F CITY OF IRVING ADDENDUM # 1 MAY 10, 2016

HAWTHORNE AND THAD WATER & WASTEWATER IMPROVEMENTS ITB #124D 16F CITY OF IRVING ADDENDUM # 1 MAY 10, 2016 HAWTHORNE AND THAD WATER & WASTEWATER IMPROVEMENTS ITB #124D 16F CITY OF IRVING ADDENDUM # 1 MAY 10, 2016 1. THIS ADDENDUM IS HEREBY MADE AS PART OF THIS CONTRACT SPECIFICATION. THIS ADDENDUM IS ISSUED

More information

Lantz-Boggio Architects, P.C LBA Project No

Lantz-Boggio Architects, P.C LBA Project No SECTION 313430- PART 1 GENERAL 1.1 WORK INCLUDED A. Provide all equipment, material, labor and supervision to design and install Engineered Aggregate Piers for the soil reinforcement. Design shall rely

More information

REQUEST FOR PROPOSALS Engineering Services for Madison Water Utility Prairie Road Water Tower

REQUEST FOR PROPOSALS Engineering Services for Madison Water Utility Prairie Road Water Tower Page 1 of 5 December 1, 2010 I. INTRODUCTION is soliciting proposals for engineering services to include but not be limited to: development of documents suitable for bidding, scheduling, and cost estimating

More information

PROFESSIONAL SERVICES BULLETIN 18-2 ADDENDUM 2

PROFESSIONAL SERVICES BULLETIN 18-2 ADDENDUM 2 PROFESSIONAL SERVICES BULLETIN 18-2 ADDENDUM 2 ADDENDUM 2 does not change the due date or time. STATEMENTS OF INTEREST are due by 4:30:00 p.m. (local time) Due Date: April 24, 2018 Successful Offerors

More information

PROJECT DESCRIPTION. The project is the Spartan Complex Seismic Upgrade, San Jose, California.

PROJECT DESCRIPTION. The project is the Spartan Complex Seismic Upgrade, San Jose, California. REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGEMENT SERVICES FOR THE SPARTAN COMPLEX SEISMIC UPGRADE PROJECT SAN JOSE STATE UNIVERSITY ONE WASHINGTON SQUARE, SAN JOSE, CA 95192-0010 The Trustees of

More information

REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGER SERVICES AT RISK WITH GUARANTEED MAXIMUM PRICE

REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGER SERVICES AT RISK WITH GUARANTEED MAXIMUM PRICE REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGER SERVICES AT RISK WITH GUARANTEED MAXIMUM PRICE Memphis Cook Convention Center Renovation City of Memphis, Department of Housing and Community Development

More information

PROFESSIONAL SERVICES BULLETIN 18-1 ADDENDUM 1

PROFESSIONAL SERVICES BULLETIN 18-1 ADDENDUM 1 PROFESSIONAL SERVICES BULLETIN 18-1 ADDENDUM 1 ADDENDUM 1 does not change the due date or time. STATEMENTS OF INTEREST are due by 4:30:00 p.m. (local time) Due Date: February 13, 2018 Successful Offerors

More information

Jeffrey D. Knueppel, P.E. General Manager. Robert L. Lund, Jr., P.E. Assistant General Manager EM&C

Jeffrey D. Knueppel, P.E. General Manager. Robert L. Lund, Jr., P.E. Assistant General Manager EM&C Accelerated Design-Build Replacement of SEPTA s Crum Creek Viaduct Jeffrey D. Knueppel, P.E. General Manager Robert L. Lund, Jr., P.E. Assistant General Manager EM&C Key Presentation Take-Aways NEED TO

More information

ADDITIONAL TYPES OF WORK REQUIRED

ADDITIONAL TYPES OF WORK REQUIRED NOTICE TO PROFESSIONAL ENGINEERING CONSULTANTS REQUEST FOR LETTERS OF INTEREST FOR DESIGN CONSULTANT SERVICES FOR THE SUPPLEMENTAL DATA COLLECTION SENSOR AND CCTV DEPLOYMENT PROJECT PROJECT NO. 599-537,

More information

CHARLES COUNTY GOVERNMENT ITB NO MATTAWOMAN WATER RECLAMATION FACILITY (MWRF) PRIMARY CLARIFIER NO. 1 IMPROVEMENTS

CHARLES COUNTY GOVERNMENT ITB NO MATTAWOMAN WATER RECLAMATION FACILITY (MWRF) PRIMARY CLARIFIER NO. 1 IMPROVEMENTS CHARLES COUNTY GOVERNMENT Department of Fiscal and Administrative Services Purchasing Division Telephone: 301-645-0656 February 07, 2017 ITB NO. 17-17 MATTAWOMAN WATER RECLAMATION FACILITY (MWRF) PRIMARY

More information

Spring Lake Public Schools. Spring Lake, MI. March RE: High School Storage Buildings

Spring Lake Public Schools. Spring Lake, MI. March RE: High School Storage Buildings Spring Lake Public Schools Spring Lake, MI March 2018 RE: High School Storage Buildings Advertisement for bids Bid Proposal Sealed bids for Spring Lake Public Schools-High School Storage Buildings will

More information

ADDENDUM NO. 1 FOR RENOVATIONS TO LINCOLN ANIMAL SHELTER RFP # February 1, 2018

ADDENDUM NO. 1 FOR RENOVATIONS TO LINCOLN ANIMAL SHELTER RFP # February 1, 2018 ADDENDUM NO. 1 FOR RENOVATIONS TO LINCOLN ANIMAL SHELTER RFP #2018-09-01 NOTICE TO PROSPECTIVE BIDDERS February 1, 2018 Prospective bidders are hereby informed of the following corrections, additions,

More information

REQUEST FOR QUOTES: # LE

REQUEST FOR QUOTES: # LE REQUEST FOR QUOTES: #15-07-1391LE Navajo Division of Transportation Department of Airports Management ADOT GRANT #E5S2R - Independent Fee Estimate - Reconstruct Runway 15/33 (Approximately 2,000 x 75 )

More information

ADDENDUM #1 Construction Support Services for the Water Treatment Plant Project PW

ADDENDUM #1 Construction Support Services for the Water Treatment Plant Project PW January 31, 2018 To Whom It May Concern: I. INSTRUCTIONS ADDENDUM #1 Construction Support Services for the Water Treatment Plant Project 18-0018PW A. The following additions, deletions, revisions, and/or

More information

Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director

Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH 43223 John R. Kasich, Governor Jerry Wray, Director 6/2/2014 Project 140353 Addendum No. 1 PID No. 86675 MOT IR 75 11.75/11.80

More information

RENEWAL/MODERNIZATION FACILITIES REYNOLDS BUILDING #1 COLLEGE OF DESIGN

RENEWAL/MODERNIZATION FACILITIES REYNOLDS BUILDING #1 COLLEGE OF DESIGN Prime DESIGN PHASE SERVICES FOR RENEWAL/MODERNIZATION FACILITIES REYNOLDS BUILDING #1 COLLEGE OF DESIGN Project Scope: $34,000,000 INTRODUCTION The is requesting the services of an ARCHITECTURAL FIRM to

More information

ADDENDUM NO. 2. PROJECT: Request for Submittal of Qualifications DATE: June 1, 2012 Willie L. Brown, Jr. Middle School 2055 Silver Avenue, SF CA

ADDENDUM NO. 2. PROJECT: Request for Submittal of Qualifications DATE: June 1, 2012 Willie L. Brown, Jr. Middle School 2055 Silver Avenue, SF CA SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2011 PROPOSITION A BOND PROGRAM REQUEST FOR SUBMITTAL OF QUALIFICATIONS Pre-Qualification Questionnaire for Prospective Design Build Entities Willie L. Brown, Jr.

More information

Request for Proposal W

Request for Proposal W Request for Proposal 90003519W Clark Hall Professional Engineering Services to Assess the Existing Retaining Wall and to Develop Repair Recommendations 1 2 West Virginia University Request for Proposals

More information

OFFICE OF PROCUREMENT COOLING TOWER REPLACEMENT, CT BUILDING RFP NO.: RFP OPENING DATE: APRIL 16, 3:00 PM ADDENDUM #4.

OFFICE OF PROCUREMENT COOLING TOWER REPLACEMENT, CT BUILDING RFP NO.: RFP OPENING DATE: APRIL 16, 3:00 PM ADDENDUM #4. OFFICE OF PROCUREMENT COOLING TOWER REPLACEMENT, RFP NO.: 618-009 RFP OPENING DATE: APRIL 16, 2018 @ 3:00 PM ADDENDUM #4 April 9, 2018 THIS ADDENDUM IS TO PROVIDE ANSWERS TO THE FOLLOWING QUESTIONS: NOTE:

More information

April 8, 2015 ADDENDUM NO. 2 FOR. Structural Bridge Repair at O Hare and Midway International Airports SPECIFICATION NO RFQ Number: 4722

April 8, 2015 ADDENDUM NO. 2 FOR. Structural Bridge Repair at O Hare and Midway International Airports SPECIFICATION NO RFQ Number: 4722 April 8, 2015 ADDENDUM NO. 2 FOR Structural Bridge Repair at O Hare and Midway International Airports SPECIFICATION NO. 124208 RFQ Number: 4722 For which Bids were due in the office of the Chief Procurement

More information

Assistant Director, Goods and Non-Technology Services

Assistant Director, Goods and Non-Technology Services DATE: June 2, 2016 TO: FROM: RE: All Prospective Proposers Beth Kirk Assistant Director, Goods and Non-Technology Services 301-985-7618 RFP 91418 Pay Structures and Incentive Plan Consulting Services Addendum

More information

SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1

SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1 FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1 PROJECT: OWNER: Shell and Core Improvements-1235 Mission Scope 1: Stairs DATE: December 29, 2017 1235 Mission Street San Francisco, California SFUSD Project

More information

REQUEST FOR QUALIFICATIONS CAMP HALL RAILROAD BUILD-IN DESIGN-BUILD PROJECT

REQUEST FOR QUALIFICATIONS CAMP HALL RAILROAD BUILD-IN DESIGN-BUILD PROJECT REQUEST FOR QUALIFICATIONS CAMP HALL RAILROAD BUILD-IN DESIGN-BUILD PROJECT Camp Hall Commerce Park (Camp Hall) Ridgeville, South Carolina March 2, 2018 Addendum 2 March 29, 2018 Comment Sheet 1 of 5 Sheets

More information

The Richland-Lexington Riverbanks Park District ("District") requests the submittal of Qualifications for Q /19/13-Specialty Contract Design

The Richland-Lexington Riverbanks Park District (District) requests the submittal of Qualifications for Q /19/13-Specialty Contract Design The Richland-Lexington Riverbanks Park District ("District") requests the submittal of Qualifications for Q14001-12/19/13-Specialty Contract Design Build Services Portions of the Children s Garden Project

More information

NYSDOT DESIGN BUILD. Design-Build Info/Design-Build Moving forward/roles and Responsibilities 2015 Overview. AGC Conference December 10, 2015

NYSDOT DESIGN BUILD. Design-Build Info/Design-Build Moving forward/roles and Responsibilities 2015 Overview. AGC Conference December 10, 2015 NYSDOT DESIGN BUILD Design-Build Info/Design-Build Moving forward/roles and Responsibilities 2015 Overview AGC Conference December 10, 2015 Where DOT is currently with Design-Build Websites Under procurement

More information

TGO3 - Buttress, Shoring, Buttress - Issued for Bid

TGO3 - Buttress, Shoring, Buttress - Issued for Bid TGO3 - Buttress, Shoring, Buttress - Issued for Bid s are numbered in the order received. numbers missing in the sequence either have been answered or are still under review and will be published in future

More information

STRUCTURAL CONCRETE - LIGHTWEIGHT

STRUCTURAL CONCRETE - LIGHTWEIGHT SPECIAL PROVISION May 27, 2010 Add Section 03312: PROJECT #MP-I15-6(178)245 PIN #7037 SECTION 03312S STRUCTURAL CONCRETE - LIGHTWEIGHT PART 1 GENERAL 1.1 SECTION INCLUDES A. Materials and procedures for

More information

October 19, 2017 Shailendra G. Patel, PE, DBIA Division Administrator, Alternative Project Delivery

October 19, 2017 Shailendra G. Patel, PE, DBIA Division Administrator, Alternative Project Delivery General Engineering Consultant Services for I-64 Hampton Roads Bridge-Tunnel Expansion Project Hampton Roads District RFP No. HRD-20171013 Optional Pre-Proposal Conference October 19, 2017 Shailendra G.

More information

CONSTRUCTION MANAGER S WEEKLY PROGRESS REPORT From 10/01/2017 to 10/07/2017

CONSTRUCTION MANAGER S WEEKLY PROGRESS REPORT From 10/01/2017 to 10/07/2017 AECOM Field Office 3550 Water Street, NW Under the Key Bridge North Abutment REHABILITATION OF FRANCIS SCOTT KEY BRIDGE FROM ROSSLYN, ARLINGTON, VIRGINIA TO GEORGETOWN WASHINGTON, DC. DC Contract No.:

More information

Well Road Project Accelerated Bridge Construction Using Self-Propelled Modular Transporters (SPMT s) By: Mark Bucci, P.E.

Well Road Project Accelerated Bridge Construction Using Self-Propelled Modular Transporters (SPMT s) By: Mark Bucci, P.E. Well Road Project Accelerated Bridge Construction Using Self-Propelled Modular Transporters (SPMT s) By: Mark Bucci, P.E. Presentation Outline Project History Project Scope Construction Alternatives Plan

More information

Assistant Director, Goods and Non-Technology Services

Assistant Director, Goods and Non-Technology Services DATE: June 10, 2016 TO: FROM: RE: All Prospective Proposers Beth Kirk Assistant Director, Goods and Non-Technology Services 301-985-7618 RFP 91418 Pay Structures and Incentive Plan Consulting Services

More information

Subject: Statement of Qualifications for Public Safety Building Design

Subject: Statement of Qualifications for Public Safety Building Design March 5, 2010 Subject: Statement of Qualifications for Public Safety Building Design The City of Porterville seeks Statements of Qualification (SOQ) from qualified architectural and engineering firms for

More information

SCOPE OF SERVICES. Consultant Engineering and Inspection Services. Interstate 85/385 Interchange Improvements Greenville County.

SCOPE OF SERVICES. Consultant Engineering and Inspection Services. Interstate 85/385 Interchange Improvements Greenville County. SCOPE OF SERVICES Consultant Engineering and Inspection Services Interstate 85/385 Interchange Improvements Greenville County Description The Interstate 85/385 Interchange Project consists of improvements

More information

Rehabilitation of Masonry Piers at Nipigon, Ontario

Rehabilitation of Masonry Piers at Nipigon, Ontario Rehabilitation of Masonry Piers at Nipigon, Ontario Daniel E. J. Adamson, P. Eng. Canadian Pacific Railway 2881 Alyth Road SE Calgary, AB Canada, T2G 5S3 Phone (403) 303-8835 Fax (403) 303-8830 ABSTRACT

More information

NORFOLK SOUTHERN RAILWAY COMPANY FILES: BR & BR

NORFOLK SOUTHERN RAILWAY COMPANY FILES: BR & BR NORFOLK SOUTHERN RAILWAY COMPANY FILES: BR0013844 & BR0013129 COLUMBIA, CHEROKEE COUNTY, SOUTH CAROLINA I-85 UNDERPASS PROJECT (1) REPLACEMENT OF EXISTING I-85 UNDERPASS BRIDGE MILEPOST SB-141.35 DOT/AAR

More information

Response 1: Yes. Please see Changes to Solicitation above. The due date for proposal submission has

Response 1: Yes. Please see Changes to Solicitation above. The due date for proposal submission has This addendum is hereby made part of the Request for Proposal for the above-named project and shall be taken into consideration by all firms preparing a submittal on this project. Acknowledge receipt of

More information

Pulaski Skyway Rocker-Bent Investigation Contract at Span 47 and 97

Pulaski Skyway Rocker-Bent Investigation Contract at Span 47 and 97 Pulaski Skyway Rocker-Bent Investigation Contract at Span 47 and 97 Route U.S. 1 & 9 (Pulaski Skyway) Contract No. 051183160 Town of Jersey City, Hudson County City of Newark, Essex County PRE-BID MEETING

More information

Introduction.» Demolition Concepts» Concept Design» Final Design» Construction» Health Monitoring

Introduction.» Demolition Concepts» Concept Design» Final Design» Construction» Health Monitoring Location of Project Introduction» Demolition Concepts» Concept Design» Final Design» Construction» Health Monitoring Existing Bridge» Built in 1928» 255-foot Open Spandrel Concrete Arch Bridge» 24-foot

More information

Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director

Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH 43223 John R. Kasich, Governor Jerry Wray, Director 11/21/2014 Project 140560 Addendum No. 2 PID No. 82972 HAM IR 275

More information

ADDENDUM NO. 2 REQUEST FOR PROPOSAL NO. R DESIGN SERVICES FOR RENOVATIONS TO KREILING HALL

ADDENDUM NO. 2 REQUEST FOR PROPOSAL NO. R DESIGN SERVICES FOR RENOVATIONS TO KREILING HALL December 1, 2015 ADDENDUM NO. 2 Attention to Proposers: This constitutes Addendum No. 2 to the referenced Request for Proposals (RFP), and consists of this six (6) page cover letter, and a two (2) page

More information

The Columbus Regional Airport Authority (CRAA) hereby issues addenda to the subject solicitation:

The Columbus Regional Airport Authority (CRAA) hereby issues addenda to the subject solicitation: February 13, 2015 NOTICE OF ADDENDUM ADDENDUM #4 Subject: Date Due: Wireless System Design and Replacement; Request For Proposals (RFP) # FIT-2015-001 February 23, 2015 at 2:00 PM EDT Dear Sir or Madam:

More information

ABRAHAM LINCOLN BRIDGE

ABRAHAM LINCOLN BRIDGE ABRAHAM LINCOLN BRIDGE PROJECT LOCATION: CONNECTING LOUISVILLE, KY WITH JEFFERSON, IN ACROSS THE OHIO RIVER. CATEGORY B: TRANSPORTATION PROJECT OWNER: KENTUCKY TRANSPORTATION CABINET COWI North America

More information

Ohio Department of Transportation. Conflict of Interest Waiver Process Guidance Concerning Review of Conflict of Interest Waiver Requests

Ohio Department of Transportation. Conflict of Interest Waiver Process Guidance Concerning Review of Conflict of Interest Waiver Requests June 26, 2017 (rev. 9/29/2017) Ohio Department of Transportation Conflict of Interest Waiver Process Guidance Concerning Review of Conflict of Interest Waiver Requests Purpose The purpose of this document

More information

ADDENDUM NO. 1 Kansas City Area Transportation Authority 1350 E. 17 th Street Kansas City, Missouri 64108

ADDENDUM NO. 1 Kansas City Area Transportation Authority 1350 E. 17 th Street Kansas City, Missouri 64108 ADDENDUM NO. 1 Kansas City Area Transportation Authority 1350 E. 17 th Street Kansas City, Missouri 64108 REQUEST FOR PROPOSAL (RFP) 18-4016-28A TEMPORARY STAFFING AGENCY SERVICES Issue Date: December

More information

METRO GOLD LINE FOOTHILL EXTENSION CONSTRUCTION AUTHORITY REQUEST FOR STATEMENTS OF QUALIFICATIONS PHASE 2B ALIGNMENT DESIGN-BUILD PROJECT

METRO GOLD LINE FOOTHILL EXTENSION CONSTRUCTION AUTHORITY REQUEST FOR STATEMENTS OF QUALIFICATIONS PHASE 2B ALIGNMENT DESIGN-BUILD PROJECT METRO GOLD LINE FOOTHILL EXTENSION REQUEST FOR STATEMENTS OF QUALIFICATIONS PHASE 2B ALIGNMENT RFQ C2002 November 8, 2017 RFQ Table of Contents RFQ Table of Contents i 1. INTRODUCTION 1 2. DEFINITIONS

More information

Pre-Bid Meeting Minutes Invitation to Bid #15-14-KO

Pre-Bid Meeting Minutes Invitation to Bid #15-14-KO Pre-Bid Meeting Minutes Invitation to Bid #15-14-KO Normal Avenue Bridge Superstructure Replacement Project Normal Avenue over Sacony Creek Borough of Kutztown, Berks County, PA Date: August 5, 2015 Location:

More information

Dates/Times: p.m. Pacific Time.

Dates/Times: p.m. Pacific Time. Notice - Request for Qualifications (RFQ) For Corrosion Engineering and Investigations For The "E" Street Reservoir Cover Repainting For The City of Port Angeles 06-12-12 The City of Port Angeles, Washington,

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS REQUEST FOR PROPOSALS College of Pharmacy Building Construct Deep Foundations Special Inspections and Testing Services University of Iowa Project #0329505 Addendum #1 Issued: Thursday, October 06, 2016

More information

SUBJECT: REQUEST FOR QUALIFICATIONS FOR ON-CALL INFORMATION TECHNOLOGY SERVICES

SUBJECT: REQUEST FOR QUALIFICATIONS FOR ON-CALL INFORMATION TECHNOLOGY SERVICES DATE: December 6, 2017 SUBJECT: REQUEST FOR QUALIFICATIONS FOR ON-CALL INFORMATION TECHNOLOGY SERVICES Pursuant to the Request for Proposals (RFP), all proposers were to submit any questions regarding

More information

EXHIBIT A. 1) General:

EXHIBIT A. 1) General: 1) General: EXHIBIT A FINDINGS OF FACT FOR EXEMPTION FROM COMPETITIVE BIDDING AND USE OF THE CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC) METHOD OF CONTRACTING FOR TILLAMOOK PUD OPERATIONS CENTER AND

More information

1. Q. Do Asian Americans count towards the MWBE goal? A. Yes.

1. Q. Do Asian Americans count towards the MWBE goal? A. Yes. 33 rd STREET VIADUCT PROJECT RFP for the provision of Design Services NYCEDC Project # 7208 Question Response Issued February 2, 2018 In connection with the Request for Proposals ( RFP ) for Design Services

More information

STEUBEN COUNTY DEPARTMENT OF PUBLIC WORKS. 3 East Pulteney Square Bath, New York 14810

STEUBEN COUNTY DEPARTMENT OF PUBLIC WORKS. 3 East Pulteney Square Bath, New York 14810 STEUBEN COUNTY DEPARTMENT OF PUBLIC WORKS 3 East Pulteney Square Bath, New York 14810 County Route 22 over Canisteo River Bridge Replacement Project BIN 3333290 D035511 PIN 6755.06 ADDENDUM #1 October

More information

Statement of Special Inspections

Statement of Special Inspections Statement of Special Inspections SUCF Project No: Project Title: Registered Design Professionals in Responsible Charge: (Name) (Address) Architect: Structural Engineer: Mechanical Engineer: Identification

More information