1 Assignment: At the January 2017 meeting in Ft. Myers, FL ballot was proposed by the subcommittee and general committee to combine Sections 4.11 and 4.13 into a single Section and add Commentary. Rationale: Sections 4.11 and 4.13 were very closely related so combining them seems logical. Submitted by: Heather Gilmer, Chair SC 3 Fabrication & Erection Due Date: April 28, 2017 Replace existing Section 4.11, delete existing Section 4.13 (re-numbering subsequent Sections) and add new Commentary Section as shown. Section titles for existing Sections 4.18 through 4.31 are shown as they will appear in the 2017 Manual (due to relocation of Section 4.18 of the 2016 Manual to the Appendix). Deletions in bold red strikethrough, new text in red bold underline: SECTION 4.11 ERECTION PROCEDURE, SHORING, AND FALSEWORK ( ) 1 a. To assure the b. The Engineer will When required by the nature of the work or stipulated in the contract, erection procedure plans or demolition plans shall be prepared by the Contractor. a. It is the Contractor s responsibility to develop erection plans, shoring plans, falsework plans, and demolition plans. This shall include the design of all temporary supports, methods for lifting or jacking all temporary and permanent material, and the amount and type of equipment to be used. The contractor shall provide all work and materials for installing, maintaining, modifying or adjusting, and removing all shoring and falsework. The supports must be adequate to carry the entire balanced or unbalanced weight of the supported structure, plus all additional loads such as those resulting from wind forces, construction materials and equipment, temporary erection forces, accumulations of snow, ice, dirt, etc. b. The Contractor is responsible for the adequacy of the design, fabrication, installation, and maintenance of all shoring and falsework. The Contractor shall determine the actual maximum loads and imbalance moments and shall design a method that will safely support those loads and moments. c. If temporary falsework, shoring, or erection loads are placed on any portion of the permanent structure, the Contractor shall ensure that they are placed so that they cause no harm to any portion of the permanent structure. Use base plates, cap plates, grillages, softening blocks or other protection as needed between the shoring and/or falsework and the permanent structure.
2 d. The Contractor must retain the services of a licensed professional engineer to prepare, sign, and seal an erection plan and calculations for the erection of the structural steel. As a minimum, the erection plan must include: Erection Drawings, including falsework and shoring Erection procedure Any attachments or alterations to the permanent structure e. The Contractor and the Contractor s engineer must take into account all loads, forces, and conditions affecting the erection, shoring, and falsework. f. The erection documents must indicate, at a minimum, a detailed sequence for use and placement of each and every falsework item, including when they will be installed and removed. g. The sealed erection plan and calculations shall be submitted to the Engineer for general compliance review prior to installation. It will, however, remain the Contractor's responsibility to ensure that the structure is erected and shored where needed in a safe manner. The Engineer s consent to proceed shall be obtained before field erection may be started. 1 See Part 9 Commentary If the Contractor SECTION 4.12 ALTERATION OF MEMBERS (2016) SECTION 4.13 FALSEWORK (2016) Where the erection procedure involves the use of falsework, the Contractor shall prepare and submit to the Engineer for review, plans for the falsework. The falsework shall be properly designed and substantially constructed for the loads to which it will be subjected. Review by the Engineer of the Contractor s plans shall not be considered as relieving the Contractor of full responsibility. SECTION ALLOWABLE STRESSES DURING ERECTION (1991) R(2015) SECTION DRIFT OR TRAFFIC PINS (1991) R(2016) SECTION FIELD ASSEMBLY OF MEMBERS (2017) SECTION FIT-UP OF FIELD CONNECTIONS (2017) SECTION HIGH-STRENGTH BOLTED FIELD CONNECTIONS (1991) R(2015)
3 SECTION FIELD WELDING (1991) R(2015) SECTION FIELD CONNECTIONS USING PINS (1991) R(2015) SECTION FIELD INSPECTION (1991) R(2015) SECTION MISFITS (1991) R(2015) SECTION FIELD CLEANING AND COATING (2016) SECTION DECK (1991) R(2015) SECTION REMOVAL OF OLD STRUCTURE AND FALSEWORK, AND CLEANUP (1991) R(2015) a. Where required b. The Contractor shall provide blocking, shoring, struts, or falsework as necessary to safely dismantle or remove the existing structure. cb. Where the falsework is the property of the Company dc. Where the falsework is the property of the Contractor ed. The Contractor shall fe. On completion SECTION INTERFERENCE WITH TRAFFIC (1983) R( ) SECTION COMPANY EQUIPMENT (1983) R(2015) SECTION WORK TRAIN SERVICE (1983) R(2015) SECTION RISK (1983) R(2015) SECTION LAWS AND PERMITS (1983) R(2015) SECTION PATENTS (1983) R(2015) [Continued on next page]
4 [Add new Commentary] SECTION ERECTION PROCEDURE, SHORING, AND FALSEWORK (2018) a. Some projects are complex or have other peculiar aspects such that comprehensive erection plans are needed. On these types of projects, or other less complex projects, the Company may require that the Contractor prepare such plans and submit them for review. b. To assure the Company that erection will proceed in an orderly sequence and that it will be completed within the contract time, it is beneficial for the Contractor to advise the Engineer fully as to the procedure which will be followed and the amount and kind of equipment that is proposed for the project. e. Typical loads, forces, and conditions that must be considered would include, but not be limited to, the following: Soil conditions and potential effects on slope stability due to construction operations Sequencing of erection Shoring or falsework Stability Pick points Girder or member shape Girder or member deformation and roll Cross frame/diaphragm connections The use of oversize holes or slots Blocking of bearings Plumbness Specified tolerances Clearances to railroad operations Maintenance of rail traffic
5 Maintenance of vehicular traffic, if working over a public thoroughfare Maintenance of navigation, if working over a navigable waterway
CHAPTER 15 STEEL STRUCTURES 1
5 CHAPTER 5 STEEL STRUCTURES FOREWORD Part through Part 4, Part 6, and Part 7 formulate specific and detailed recommendations for the design, fabrication, erection, maintenance, inspection, and rating
More informationKANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 2007 EDITION
Sheet 1 of 5 Add a new SECTION to DIVISION 700: KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 2007 EDITION SECTION 737 CONTROLLED DEMOLITION 737.1 DESCRIPTION Controlled
More informationKANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 2007 EDITION
Sheet 1 of 5 Add a new SECTION to DIVISION 700: KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 2007 EDITION SECTION 737 CONTROLLED DEMOLITION 737.1 DESCRIPTION Controlled
More informationCONSTRUCTION SPECIFICATION FOR INSTALLATION OF SECTIONAL STEEL HIGH MAST LIGHTING POLES
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 630 APRIL 2004 CONSTRUCTION SPECIFICATION FOR INSTALLATION OF SECTIONAL STEEL HIGH MAST LIGHTING POLES TABLE OF CONTENTS 630.01 SCOPE 630.02 REFERENCES
More informationA. Provide all wood trusses as indicated on the drawings or as required to do a complete job.
SECTION 06100 - PART ONE GENERAL 1.1 SECTION INCLUDES A. Provide all wood trusses as indicated on the drawings or as required to do a complete job. 1.2 QUALITY ASSURANCE A. Engineering drawings conforming
More informationPRECAST CONCRETE GIRDER ERECTION
7.1 Precast Concrete Girder Erection - General Erection of precast concrete girders includes transporting the girders to the site, handling and temporary storage, installing anchor bolts, shear blocks
More information1. Cast-in-place concrete is specified in Section
SECTION 03 38 00 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section describes the requirements for furnishing and installing post-tensioned slabs, jacks, jacking and anchors at Parking Structure, and record
More informationBRIDGE CONSTRUCTION USING SELF-PROPELLED MODULAR TRANSPORTERS (SPMT)
SPECIAL PROVISION August 31, 2009 PROJECT # S-R399(42) PROJECT # S-R399(59) PIN # 6697/7236 SECTION 03253S BRIDGE CONSTRUCTION USING SELF-PROPELLED MODULAR TRANSPORTERS (SPMT) Add Section 03253S: PART
More informationProject Address: Name of Person Completing Form:
Statement of Inspections This form is provided as a way to list aspects of the project that require special inspection and testing in accordance with IBC Sections 107.1, 1704, and 1705 and define duties
More informationRESPONSIBILITIES IN THE DESIGN PROCESS INVOLVING METAL PLATE CONNECTED WOOD TRUSSES
CHAPTER 2 RESPONSIBILITIES IN THE DESIGN PROCESS INVOLVING METAL PLATE CONNECTED WOOD TRUSSES 2.1 PURPOSE The purpose of this chapter is as follows: 2.1.1 To define and draw attention to the typical duties
More informationPotential Solutions- Background: Current Designs. Potential Solutions. Goals for Design What are we concerned about?
Potential Solutions Potential Solutions- Background: Current Designs Goals for Design What are we concerned about? Primary Goal: Get the deck on successfully Stability during deck pour Girder plumbness
More information1. Base plates, setting plates and anchor rods for columns. 8. Lintels if connected to structural steel columns.
PAGE 051200-1 SECTION 051200 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification sections,
More informationSECTION PLATE CONNECTED WOOD TRUSSES
SECTION 06173 PLATE CONNECTED WOOD TRUSSES PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Shop fabricated wood trusses for roof and floor framing. 2. Bridging, bracing, and anchorage. B. Related Sections:
More informationBNSF RAILWAY COMPANY
BNSF RAILWAY COMPANY GUIDELINES FOR PREPARATION OF BRIDGE DEMOLITION & REMOVAL PLAN OVER THE BNSF RAILWAY OFFICE OF DIRECTOR BRIDGE ENGINEERING KANSAS CITY, KANSAS August 21, 2008 INDEX ITEM PAGE I. General
More informationC. Miscellaneous Metal Fabricators are specified elsewhere in Division 5.
SECTION 05 1200 - STRUCTURAL STEEL FRAMING PART 1 - GENERAL 1.01 SUMMARY A. Extent of structural steel work is shown on drawings, including schedules, notes and details to show size and location of members,
More informationCritical Structures Construction Issues
Critical Structures Construction Issues FLORIDA DEPARTMENT OF TRANSPORTATION STATE CONSTRUCTION OFFICE Specification 1-3: Definitions Contractor s Engineer of Record Specialty Engineer CLASS OF CONTRACTOR
More informationCantilever Loading Platform Erection Procedures and Guidance Notes
Cantilever Loading Platform Erection Procedures and Guidance Notes Please note this is a six page document. 1 Introduction 1 Issue Date: January 2007 It is essential that the procedures are read and fully
More informationSECTION STEEL JOIST FRAMING
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 05 21 00 1. Use this section only for NCA projects. 2. Delete between //---// if not applicable to project. Also delete any other item or paragraph not applicable
More informationSTRUCTURAL STEEL INSPECTION
STRUCTURAL STEEL INSPECTION Doug Beer, P.E. Bridge Division Construction and Maintenance September 26, 2018 Structural Steel Welded Field Splices Diaphragm Welding Shear Connectors Bolted Splices Steel
More informationSTATE UNIVERSITY CONSTRUCTION FUND. UNIVERSITY CON DIRECTIVE 5-1 Issue date: October 2014
STATE STRUCTION FUND DIRECTIVE 5-1 Issue date: October 2014 STRUCTURAL STEEL 1. General: It is the Fund's policy that the design of the structural steel is the prime responsibility of the project's Structural
More informationSPECIFICATION OF JACKED ANCHOR FOR RETAINING STRUCTURES
SPECIFICATION OF JACKED ANCHOR FOR RETAINING STRUCTURES 1.0 GENERAL This specification deals with jacked anchors and shall be read in conjunction with the conditions of contract and the Specification for
More informationDIVISION 5 METALS SECTION STRUCTURAL STEEL
DIVISION 5 METALS SECTION 05 12 00 PART 1 GENERAL 1.01 SUMMARY A. Section Includes: All labor and materials required to furnish and install the structural steel shown on the Drawings and required by these
More informationRapid Axial Load Testing of Drilled Shafts
Supplemental Technical Specification for Rapid Axial Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (9/15) September 4, 2015 1.0 GENERAL This work shall consist of performing a rapid axial
More informationKEYWORDS: Barge Stability, Steel Truss Erection, Horizontal Sliding of Steel Trusses
Replacement of the BNSF Approach Spans over the Mississippi River DAVID ROGOWSKI, P.E. AND JOSH CRAIN, Genesis Structures Inc., Kansas City, Missouri and DAN SIEVE AND KEVIN BECKER, Walsh Construction
More informationAmerican Railway Engineering & Maintenance-of-Way Association Letter Ballot No
Letter Ballot No 15-17-20 Assignment: At the May 2017 meeting in Buffalo, NY the Committee members present voted to submit the following for letter ballot: Move to Commentary tables that repeat ASTM A709
More informationI-94/I-69 Interchange Bridge Construction
I-94/I-69 Interchange Bridge Construction General Project Information Let in August 2013 Cost of $76 million Prime Contractor Walter Toebe Construction Company Reconstruction of I-94 from Griswold to Lapeer
More informationCONSTRUCTION SPECIFICATION FOR MODULAR BRIDGE STRUCTURES FOR TEMPORARY INSTALLATIONS
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.MUNI 918 APRIL 2017 (formerly OPSS 918 Common, March 1998) Note: The MUNI implemented in April 2017 replaces OPSS 918 COMMON, March 1998 with no technical
More informationDESIGN AND LAUNCHING OF A REDUNDANT TRUSS OVER RAILROAD YARD
2018 Purdue Road School Transportation Conference Rendering by Touchstone Architecture Martin Furrer, PE, SE March 6, 2018 DESIGN AND LAUNCHING OF A REDUNDANT TRUSS OVER RAILROAD YARD Project Location
More informationTCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II
SECTION 052100 - STEEL JOISTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. Drawings and General Provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections
More informationSECTION STRUCTURAL STEEL
SECTION 051200 STRUCTURAL STEEL PART 1 GENERAL 1.01 SECTION INCLUDES A. Structural steel framing members and support members. B. Base plates, shear stud connectors. C. Grouting under base plates. 1.02
More informationSECTION STRUCTURAL METAL FRAMING
SECTION 05100 STRUCTURAL METAL FRAMING PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Structural steel framing including lintels, shelf angles, bearing plates, anchor bolts and other items as shown on
More informationA. Section Metal Decking. (05300 in MF95) B. Section Cold Formed Metal Framing. (05400 in MF95)
SECTION 05 44 00 - PRE-ENGINEERED PRE-FABRICATED COLD-FORMED STEEL TRUSSES (Section 05425 in MasterFormat 1995) PART 1 GENERAL 1.1 SECTION INCLUDES A. Pre-engineered cold-formed steel trusses. B. Cold-formed
More informationERRATA for G12.1, Guidelines to Design for Constructability, 2016 Edition
ERRATA for December 2016 Dear Customer: Recently, we were made aware of some technical revisions that need to be applied to the Guidelines to Design for Constructability, 2016 Edition. Please scroll down
More informationInsulating Cellular Concrete Steel Joists Painting. A. America Society for Testing and Materials (ASTM):
SECTION 05120 STRUCTURAL STEEL PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 03342 - Insulating Cellular Concrete. 2. 05210 - Steel Joists. 3. 09900 - Painting. 1.02 REFERENCES A. America Society
More informationGUIDE SPECIFICATIONS CURA ADJUSTABLE REROOF FRAMING SYSTEMS SECTION REROOFING ADJUSTABLE FRAMING SYSTEM
- --- -- ----..-------~------------------------------------ GUIDE SPECIFICATIONS CURA ADJUSTABLE REROOF FRAMING SYSTEMS SECTION 07415 REROOFING ADJUSTABLE FRAMING SYSTEM PART 1 - GENERAL 1.01 SCOPE A.
More informationJONES AIRWAY, LLC CLEVELAND REGIONAL JETPORT SECTION STRUCTURAL STEEL
CLEVELAND REGIONAL JETPORT 05 1200-1 PART 1 - GENERAL SECTION 05 1200 STRUCTURAL STEEL 1.1 RELATED SPECIFICATION SECTIONS: A. Bolting of wood to steel, steel anchors for work of other trades, concrete
More informationSECTION FABRICATED ENGINEERED STRUCTURES. A. Pre-engineered, shop-fabricated structural steel building with formed purlin framing.
PART 1 GENERAL 1.1 RELATED DOCUMENTS SECTION 13 34 00 FABRICATED ENGINEERED STRUCTURES A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1
More informationCONSTRUCTION SPECIFICATION FOR INSTALLATION OF SECTIONAL STEEL HIGH MAST LIGHTING POLES
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 630 NOVEMBER 2011 CONSTRUCTION SPECIFICATION FOR INSTALLATION OF SECTIONAL STEEL HIGH MAST LIGHTING POLES TABLE OF CONTENTS 630.01 SCOPE 630.02 REFERENCES
More informationSECTION PRECAST CONCRETE COVER SYSTEM
SECTION 13500 PRECAST CONCRETE COVER SYSTEM PART 1 GENERAL 1.1 SYSTEM DESCRIPTION A. Design Criteria: 1. Precast manufacturer shall be responsible for structural design of individual precast components,
More informationSPECIAL SPECIFICATION 4584 Segmental Concrete Bridge Unit
2004 Specifications CSJ: 0028-09-111 SPECIAL SPECIFICATION 4584 Segmental Concrete Bridge Unit 1. Description. Construct cast-in-place segmental concrete box girder superstructure according to the plans,
More informationGrade Separation Systems. Single-Span Rail Bridge Construction Procedure. An innovation from art engineering inc.
Grade Separation Systems Single-Span Rail Bridge Construction Procedure An innovation from art engineering inc. GSS Single-Span Example Shown: An existing railroad grade crossing. Existing railroad Existing
More informationSection 713. BRIDGE REHABILITATION STEEL
713.01 Section 713. BRIDGE REHABILITATION STEEL 713.01. Description. This work consists of repairing and replacing portions of structural steel bridges. A redundant structure consists of supporting elements
More informationDIVISION 5 - STRUCTURAL STEEL AND IRON WORK
DIVISION 5 - STRUCTURAL STEEL AND IRON WORK SECTION 05100 STRUCTURAL METAL FRAMING PART 1.00 GENERAL 1.01 SCOPE OF WORK A. Work Included: 1. 2. Structural steel complete in place. Steel joists complete
More informationSECTION (formerly 05425) PRE-ENGINEERED, PRE-FABRICATED COLD-FORMED STEEL ROOF & FLOOR TRUSSES
SECTION 05 44 00 (formerly 05425) PRE-ENGINEERED, PRE-FABRICATED COLD-FORMED STEEL ROOF & FLOOR TRUSSES PART 1 GENERAL 1.1 SUMMARY A. Section includes pre-engineered, pre-fabricated cold-formed steel framing
More information.2 Section Waste Management and Disposal.
Issued 2006/08/01 Section 05121 Structural Steel for Buildings Page 1 of 5 PART 1 GENERAL 1.1 RELATED SECTIONS.1 Section 01330 Submittal Procedures..2 Section 01355 Waste Management and Disposal..3 Section
More informationLIGHT-GAUGE PANELIZED WALL SYSTEMS. Michael Waggoner Mark Schroeder
LIGHT-GAUGE PANELIZED WALL SYSTEMS Michael Waggoner Mark Schroeder INTRODUCTION Development of Light-Gauge Panelized Wall Systems Selecting the Right Framing Systems Building Code Design Considerations
More informationSPECIAL INSPECTION AND OBSERVATION PROGRAM City of Walnut Creek Building Division. Project Address:
SPECIAL INSPECTION AND OBSERVATION PROGRAM City of Walnut Creek Building Division Permit Application #: Project Address: Purpose: To meet the requirements of City of Walnut Creek Municipal Code Section
More informationTCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II
SECTION 051200 - STRUCTURAL STEEL FRAMING PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. Drawings and General Provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification
More informationOpen-Web Truss Long Span Installation Guidelines
TECHNICAL BULLETIN #301 Open-Web Truss Long Span Installation Guidelines RedBuilt has maintained a policy of manufacturing and marketing products of the highest quality to our customers. We guarantee the
More informationSITE ACCESS / TRAFFIC CONTROL CONSTRUCTION NOTES
GENERAL NOTES GENERAL NOTES (CONT'D). ALL MATERIALS AND CONSTRUCTION METHODS SHALL CONFORM TO THE "STANDARD SPECIFICATION FOR ROAD AND BRIDGE CONSTRUCTION" ADOPTED APRIL, 206 BY THE ILLINOIS, INCLUDING
More informationChallenging Skew: Higgins Road Bridge over I-90
Challenging Skew: Higgins Road Bridge over I-90 Lance Peterman, P.E.,S.E. 13th Annual Midwest Bridge Symposium April 28, 2016 2014 HDR, all rights reserved. Presentation Outline Project Overview Design
More informationChicago. Crossing. A new Chicago bridge takes over the duties of a former Centurion.
A new Chicago bridge takes over the duties of a former Centurion. Chicago by Robert Hong, S.E., P.E., P. Eng., Soliman Khudeira, S.E., P.E., Ph.D., and Joseph Glennon, P.E. Crossing A few years ago, the
More information2. Clarification: The notice to proceed construction period of 60 days will begin after the Contractor receives all materials and equipment.
East Energy Chiller 1 Cooling Tower Addition State Project Number H27-1969 Addendum One June 28, 2012 NOTE: The following amendments, additions, and deletions shall be made to the Construction Documents
More informationMICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PREFABRICATED STEEL PEDESTRIAN BRIDGE, TYPE 2
MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PREFABRICATED STEEL PEDESTRIAN BRIDGE, TYPE 2 OFS:MJF 1 of 10 APPR:JAB:POJ:09-29-18 FHWA:APPR:10-01-18 a. Description. This work consists of
More informationMICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PREFABRICATED STEEL PEDESTRIAN BRIDGE, TYPE 2
MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PREFABRICATED STEEL PEDESTRIAN BRIDGE, TYPE 2 OFS:MJF 1 of 10 APPR:JAB:POJ:07-07-17 FHWA:APPR:07-11-17 a. Description. This work consists of
More informationTxDOT Project : Curved Plate Girder Design for Safe and Economical Construction
0-5574-P1 GUIDELINES FOR DESIGN AND SAFE HANDLING OF CURVED I-SHAPED STEEL GIRDERS Authors: Jason Stith Brian Petruzzi Todd Helwig Michael Engelhardt Karl Frank Eric Williamson TxDOT Project 0-5574: Curved
More informationSECTION COLD-FORMED METAL TRUSSES
SECTION 054400 COLD-FORMED METAL TRUSSES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationDivision 03 - Concrete Section New Westminister Multi-Use Civic Facility & Office Building Project No Page 1
Project No. 210022 Page 1 PART 1 GENERAL 1.7 Documents.1 The General Conditions of the Canadian Standard Construction Document CCDC-2, together with all amendments and supplements and Division 1 General
More informationCONSTRUCTION SPECIFICATION FOR GUIDE RAIL END TREATMENT - ECCENTRIC LOADER TERMINAL SYSTEM
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 555 NOVEMBER 2008 CONSTRUCTION SPECIFICATION FOR GUIDE RAIL END TREATMENT - ECCENTRIC LOADER TERMINAL SYSTEM TABLE OF CONTENTS 555.01 SCOPE 555.02
More informationSPECIFICATIONS FOR ERECTION OF PRECAST PRESTRESSED CONCRETE GIRDERS
SPECIFICATIONS FOR ERECTION OF PRECAST PRESTRESSED CONCRETE GIRDERS 1.0 DESCRIPTION The Work shall consist of:.1 Transportation, unloading, and erection of precast prestressed concrete girders;.2 Supply
More informationMETAL FABRICATION..1 General Conditions and Division 1 shall govern Work of this section.
CITY OF BRAMPTON LANDSCAPE SPECIFICATIONS SECTION 05500-1 PART 1 GENERAL 1.1 Description of Work.1 General Conditions and Division 1 shall govern Work of this section. 1.2 Quality Assurance.1 Personnel:.1
More informationCONSTRUCTION SPECIFICATION FOR STRUCTURAL WOOD SYSTEMS
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 907 NOVEMBER 2006 CONSTRUCTION SPECIFICATION FOR STRUCTURAL WOOD SYSTEMS TABLE OF CONTENTS 907.01 SCOPE 907.02 REFERENCES 907.03 DEFINITIONS 907.04
More informationPOLYCAST Trench Drain Systems
POLYCAST 3621 Industrial Park Drive Lenoir City, TN 37771 Phone: 800-346-3061 Fax: 865-986-0585 Email: hpsliterature@hubbell.com www.polycastdrain.com POLYCAST Trench Drain Systems FP800 Series Specification
More informationPAVING SLABS ON AGGREGATE BED FOR ROOF PLAZA DECKS
SECTION 32 14 13.16 PAVING SLABS ON AGGREGATE BED FOR ROOF PLAZA DECKS (1995 MasterFormat Section 02784) Note: This guide specification for the U.S. is for paving slabs used as ballast and/or paving on
More informationFABRICOIL BASIC January 10, 2006
FABRICOIL BASIC January 10, 2006 General Notes: This guide specification document is provided by Raynor Door for use by design professionals in preparing project specification documents for FABRICOIL BASIC
More informationSECTION COMPOSITE METAL DECKING
PART 1 GENERAL 1.1 DESCRIPTION SECTION 05 36 00 1. Use this section only for NCA projects. 2. Delete between // ---- // if not applicable to project. Also delete any other item or paragraph not applicable
More informationSTANDARD SPECIFICATION FOR ALUMINUM FRAMING FOR RAILROAD PASSENGER SHELTERS
SOUTHEASTERN PENNSYLVANIA TRANSPORTATION AUTHORITY 1234 MARKET STREET, PHILADELPHIA, PA 19107 STANDARD SPECIFICATION FOR ALUMINUM FRAMING FOR RAILROAD PASSENGER SHELTERS REVISION DATE SPECIFICATION # F-S-304_
More informationNORFOLK SOUTHERN CORPORATION UNDERPASS GRADE SEPARATION DESIGN CRITERIA
NORFOLK SOUTHERN CORPORATION UNDERPASS GRADE SEPARATION DESIGN CRITERIA PURPOSE AND SCOPE These criteria modify and supplement the applicable sections of the AREMA Manual of Recommended Practice in connection
More informationSTRUCTURAL STEEL FRAMING
SECTION 05 12 00 - STRUCTURAL STEEL FRAMING PART 1 - GENERAL 1.1 SUMMARY A. Section includes 1. Structural steel framing 2. Structural steel framing required for support and framing of rooftop mechanical
More informationCANTILEVER RACK SPECIFICATIONS PART 1 GENERAL 1.1 SCOPE 1.2 APPROVED MANUFACTURER 1.3 REGULATORY ORGANIZATIONS AND GROUPS 1.4 QUALITY ASSURANCE
CANTILEVER RACK SPECIFICATIONS PART 1 GENERAL 1.1 SCOPE This specification is intended to describe the general requirements applicable to a proper structural cantilever rack design. In addition, it is
More informationJobsite Layout Considerations
1 Jobsite Layout Considerations The controlling contractor must consider many factors when laying out a site to support construction operations Site and building size and Equipment requirements configuration
More informationHARVEY MUDD COLLEGE TEACHING AND LEARNING CENTER SECTION Page 1 of 6 VOIDED CONCRETE SLAB
030111 Page 1 of 6 PART 1 - GENERAL 1.1 SUMMARY A. This Section specifies: 1. Voided concrete floor and roof slab system consisting of structural reinforced concrete containing hollow (bubbles) spherical
More informationHaystack Bridge: Repurpose of a Bascule
SIXTEENTH BIENNIAL SYMPOSIUM September 19-22, 2016 Haystack Bridge: Repurpose of a Bascule Claus Frederiksen, P.E. COWI Bridge John Williams, P.E. Stafford Bandlow Engineering, Inc. REV 0 14 July 2016
More information2016 AISC Standards. Specification for Structural Steel Buildings & Code of Standard Practice for Steel Buildings and Bridges.
2016 AISC Standards Specification for Structural Steel Buildings & Code of Standard Practice for Steel Buildings and Bridges Eric Bolin Staff Engineer June 1, 2017 2016 AISC Standards 2018 INTERNATIONAL
More informationCASE STUDY OF LONG SPAN STEEL BRIDGE STABILITY DURING DESIGN AND CONSTRUCTION
CASE STUDY OF LONG SPAN STEEL BRIDGE STABILITY DURING DESIGN AND CONSTRUCTION KEVIN D. SEAR, PE SUSAN STEELE, PE BIOGRAPHY Kevin Sear has been a structural engineer for over 42 years, the first 10 years
More informationBi-Directional Static Load Testing of Drilled Shafts
Supplemental Technical Specification for Bi-Directional Static Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (9/15) September 2, 2015 1.0 GENERAL This work shall consist of furnishing all
More informationBi-Directional Static Load Testing of Drilled Shafts
Supplemental Technical Specification for Bi-Directional Static Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (01/18) 1.0 GENERAL This work shall consist of furnishing all materials, equipment,
More informationCONSTRUCTION SPECIFICATION FOR ERECTION OF POLES
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 615 NOVEMBER 2008 CONSTRUCTION SPECIFICATION FOR ERECTION OF POLES TABLE OF CONTENTS 615.01 SCOPE 615.02 REFERENCES 615.03 DEFINITIONS - Not Used 615.04
More informationCONSTRUCTION SPECIFICATION FOR ERECTION OF POLES
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 615 NOVEMBER 2008 (Reissued November 2010) CONSTRUCTION SPECIFICATION FOR ERECTION OF POLES TABLE OF CONTENTS 615.01 SCOPE 615.02 REFERENCES 615.03
More informationSECTION ALTERNATING TREAD STEEL STAIRS
SECTION 05 51 33.23 - ALTERNATING TREAD STEEL STAIRS PART 1 - GENERAL 1.1 SCOPE OF WORK Fabricate and Install metal alternating tread stair assemblies in accordance with the requirements set forth in this
More informationProvide heavy hex nuts for the temporary hanger rods according to ASTM A 563 Class 10S, and washers according to ASTM F 436.
713.01 Section 713. BRIDGE REHABILITATION - STEEL 713.01 Description. Repair and replace structural steel portions of bridges. A redundant structure is a structure whose remaining supporting elements will
More informationSECTION COLD-FORMED METAL FRAMING
SECTION 05.40.00 COLD-FORMED METAL FRAMING PART 1 GENERAL 1.1 SECTION INCLUDES A. Cold-formed metal framing for: B. Exterior load-bearing steel stud walls. 1. Interior load-bearing steel stud walls. 2.
More informationSECTION 503 TEMPORARY PAVEMENT RESTORATION
SECTION 503 TEMPORARY PAVEMENT RESTORATION 503-1 DESCRIPTION: This work consists of furnishing, placing, compacting, and maintaining a temporary pavement surface suitable for driving in accordance with
More informationSECTION MECHANICALLY ASSISTED MOBILE STORAGE SHELVING PART 1 - GENERAL 1.1 RELATED DOCUMENTS
SECTION 10560 MECHANICALLY ASSISTED MOBILE STORAGE SHELVING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and
More informationSPECIAL INSPECTION AND OBSERVATION PROGRAM CITY OF CONCORD BUILDING DIVISION. Project Address:
SPECIAL INSPECTION AND OBSERVATION PROGRAM CITY OF CONCORD BUILDING DIVISION Permit Application #: Project Address: Purpose: To meet the requirements of CBC Section 1704.3 this form may be used as a statement
More informationCONSTRUCTION SPECIFICATION FOR STRUCTURAL STEEL
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 906 FEBRUARY 1993 CONSTRUCTION SPECIFICATION FOR STRUCTURAL STEEL 906.01 SCOPE 906.02 REFERENCES 906.03 DEFINITIONS TABLE OF CONTENTS 906.04 SUBMISSION
More information2014 HDR, all rights reserved.
2014 HDR, all rights reserved. That s No Ordinary Bridge Ben Zeman, P.E. Lance Peterman, P.E.,S.E. Caahlen McAtee, P.E. 2014 HDR, all rights reserved. Presentation Outline Project Overview Design Behavior
More informationSECTION STRUCTURAL STEEL FRAMING
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 05 12 00 SPEC WRITER NOTES: 1. Use this section only for NCA projects. 2. Delete between // ---// if not applicable to project. Also delete any other item or paragraph
More information2012 VIRGINIA TECH SCHEDULE OF SPECIAL INSPECTIONS
2012 VIRGINIA TECH SCHEDULE OF SPECIAL INSPECTIONS HECO-6 GENERAL Pre-construction conference Preconstruction meeting Scheduled by SI with the Contractor, UBO, A/E, and relevant subs prior to commencement
More informationCONCRETE TILE PAVERS
Section 32 14 13 CONCRETE TILE PAVERS (1995 MasterFormat Section 02780) Note: This guide specification for the U.S. is for the installation of concrete tile paving units whose thickness are less than the
More informationCONSTRUCTION SPECIFICATION FOR PERMANENT SMALL SIGNS AND SUPPORT SYSTEMS
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 703 NOVEMBER 2013 CONSTRUCTION SPECIFICATION FOR PERMANENT SMALL SIGNS AND SUPPORT SYSTEMS TABLE OF CONTENTS 703.01 SCOPE 703.02 REFERENCES 703.03
More informationAnchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi
STRUCTURAL NOTES MATERIAL STRENGTHS Structural Steel Reinforcing Steel Concrete Masonry Structural Lumber Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel
More informationIntroduction.» Demolition Concepts» Concept Design» Final Design» Construction» Health Monitoring
Location of Project Introduction» Demolition Concepts» Concept Design» Final Design» Construction» Health Monitoring Existing Bridge» Built in 1928» 255-foot Open Spandrel Concrete Arch Bridge» 24-foot
More informationCODE OF STANDARD PRACTICE
SPECIAL PROFILE STEEL JOISTS, 1.1 SCOPE The practices and customs set forth herein are in accordance with good engineering practice and tend to insure safety in SP-Series joist construction. There shall
More informationB. Maintain a direct channel of communication with the Engineer, and keep the General Contractor informed of the subject of such communication.
SECTION 051000 - STRUCTURAL STEEL PART 1 GENERAL 1.01 RELATED DOCUMENTS 1.02 SCOPE A. Drawings and general provisions of the Contract, including General and Special Conditions and Division 01 Specification
More informationSTANDARD PLAN SYMBOLS & STANDARD LEGEND
EXISTING NEW STANDARD PLAN SYMBOLS & STANDARD LEGEND GENERAL NOTES: DRAINAGE AND EROSION CONTROL NOTES: DRAINAGE AND EROSION CONTROL NOTES (CONTINUED): UTILITY NOTES: STANDARD NOTES - 1 LANDSCAPE NOTES:
More informationMezzanines By Design Page 1
SECTION 05120 STRUCTURAL STEEL PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General Conditions and Division 1 apply to this Section. 1.2 SUMMARY
More informationReliant Holdings Ltd Safety Management System
Preparation: Safety Mgr Authority: President Issuing Dept: Safety Page: Page 1 of 7 Purpose The purpose of this program is to prevent injuries due to falls from elevated work areas and ensure employees
More informationStatement of Special Inspections Michigan Building Code 2012 (MBC 2012)
Gaines Charter Township 8555 Kalamazoo Ave SE Caledonia MI 49316 PH: 616 698-6640 Fax: 616 698-2490 www.gainestownship.org Building Department Statement of Special Inspections Michigan Building Code 2012
More informationDesign Responsibilities for Commercial Construction Projects in the State of Idaho
Background: Design Responsibilities for Commercial Construction Projects in the State of Idaho Released March 5, 2009 SBCA has developed this Tech Note to clearly outline a component manufacturer s role
More information