1 SECTION PLUMBING PIPING SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section , "Mechanical General Provisions", govern this Section. 1.2 APPLICABLE PUBLICATIONS NSF/ANSI 61 --Drinking Water System Components Health Effects NSF/ANSI Drinking Water System Components Lead Content 1.3 DESCRIPTION OF WORK: A. Work Included: Provide complete operating plumbing piping systems including pipe, tube, fittings, and appurtenances as indicated and in compliance with these Specifications. The Work of this Section shall include, but not be limited to: 1. Securing and installing plumbing services for the building. 2. A complete domestic hot and cold water distribution system. In laboratory facilities, the domestic hot and cold water distribution system shall be distinct from the industrial water distribution system. 3. [A complete laboratory air and vacuum distribution system.] 4. [A complete natural gas distribution system.] 5. A complete sanitary soil waste and vent system. 6. A complete storm water piping system. 7. Testing of piping and disinfection of potable water systems 8. Miscellaneous plumbing equipment and specialties required for a complete plumbing system as specified. B. Plumbing Services: Secure all plumbing services necessary for the project as required or shown on the Contract Drawings, including paying all required fees and charges. Work related to plumbing services maybe shown on Plumbing, Civil, Architectural or other drawings in the Contract Documents. Plumbing services include, but are not limited to: 1. Securing water connection permit from the authority having jurisdiction. 2. Tapping or arranging for tapping of the city main in accordance with the authority having jurisdiction. 3. Extending water service to meter box. 4. Installation of water meter and meter box in accordance with authority having jurisdiction. 5. Extending water service from meter box to building entry. 6. Securing sanitary sewer connection permit from the authority having jurisdiction. 7. Connecting or arranging for the connection of the sanitary lines(s) into the sanitary sewer in accordance with the authority having jurisdiction. 8. Securing storm sewer connection permit from the authority having jurisdiction. 9. Connecting of or arranging for the connection of the storm drain(s) into the storm sewer system in accordance with the authority having jurisdiction. AE Project Number: Plumbing Piping Systems

2 10. Installing all drainage systems with the proper slope as required by code. 11. Boring and jacking existing streets, sidewalks, etc., in city right-of-ways as is necessary. (Where this stipulation cannot be met, it shall be the responsibility of the plumbing contractor to secure all necessary permits at his cost to do whatever is required to secure the service from the city or local authority, and make whatever repairs necessary after the service is secured.) 12. Arranging with the gas company to have the necessary gas service and properly sized gas meter station located where shown on drawings. 13. Extending gas service from the gas meter station to the building entry. C. Coordination: The Division 23 Contractor shall be responsible for coordinating plumbing services and site utility work as shown on the Contract Drawings with the General Contractor to determine what work is included in the scope of the Division 23 Contractor. D. Applications: Applications of piping systems include, but are not limited to, the systems as listed below: AE Project Number: WORKING OPERATING SYSTEM PRESSURE TEMPERATURES Domestic Cold Water High 350 psig 55 F to 80 F Medium 300 psig 55 F to 80 F Low 150 psig 55 F to 80 F Domestic Hot Water High 350 psig 105 F to 110 F Medium 300 psig 105 F to 110 F Low 150 psig 105 F to 110 F Make-Up Water High 350 psig 55 F to 80 F Medium 300 psig 55 F to 80 F Low 150 psig 55 F to 80 F Condensate Drainage F to 60 F Sanitary Drainage Storm Drainage Natural Gas [Laboratory Air] [100 psig] [--] [Laboratory Vacuum] [-25" HG] [--] Fuel Oil (Emergency Generator) 125 psig 55 F to 95 F Pressures High... Floors [ ] through [ ] Medium... Floors [ ] through [ ] Low... Floors [ ] through [ ] E. Basic Materials and Methods: Refer to Section for additional plumbing piping system requirements. F. Valves and Accessories: Refer to Section for additional plumbing piping system components. G. Vibration Isolation: Refer to Section , "Vibration Isolation", for piping system isolation. H. Insulation: Refer to Section , "System Insulation", for piping system insulation. Plumbing Piping Systems

3 1.4 QUALITY ASSURANCE: A. Welding: Qualify welding procedures, welders, and operators in accordance with ANSI B31.1, Paragraph 127.5, for shop and job site welding of piping work. Make welded joints on the piping system with continuous welds, without backing rings and with pipe ends beveled before welding. Gas cuts shall be true and free from burned metal. Before welding, surfaces shall be thoroughly cleaned. The piping shall be carefully aligned and no weld metal shall project inside the pipe. Refer to Section for additional requirements. B. [UPC Listing: All materials, fixtures or devices used or entering into the construction of the plumbing system shall be listed for UPC or shall conform to Alternate Standards recognized as "equal" by the City Officials having jurisdiction.] C. Cast Iron Pipe Testing: All cast iron waste and vent pipe shall be 100% factory water pressure tested at 50 psig minimum pressure prior to application of the exterior coating. A certified factory test report shall be furnished to the Engineer with the pipe submittal. D. Cast Iron Pipe Manufacturers: Cast iron pipe shall be as manufactured by Tyler Pipe or Charlotte Pipe or AB & I and shall bear the CI mark indicating compliance with the CISPI quality assurance and inspection program. E. Grooved Systems: To assure uniformity and compatibility of piping components in grooved piping systems, all grooved products utilized shall be supplied by Victaulic. Grooving tools shall be of the same manufacturer as the grooved components. 1.5 SUBMITTALS: A. Shop drawing submittals shall include, but not be limited to, the following: 1. Cut sheets marked to clearly indicate all plumbing piping system materials. 2. Piping fabrication drawings for all main piping runs [including connections to existing piping]. Fabrication drawings shall include plan views and suitable elevations and shall include all accessories and equipment. 3. Additional items as required in Section Grooved joint couplings and fittings shall be shown on drawings and product materials, and be specifically identified with the applicable Victaulic style or series number. 1.6 PRODUCT DELIVERY, STORAGE AND HANDLING: A. Deliver components in factory-fabricated water resistant packaging, as applicable. B. Handle components carefully to avoid damages to components, enclosures, and finish. C. Store components in a clean, dry space, and protect from weather. PART 2 - PRODUCTS 2.1 PIPING MATERIALS: A. General: Provide pipe and tube of type, joint, grade, size, and weight (wall thickness, schedule or class) indicated for each service. Comply with applicable governing regulations and industry standards. 1. Lead Content: Material or equipment containing a weighted average of greater than 0.25 percent lead shall not be used in any potable water system intended for Human consumption, and shall be certified in accordance with NSF/ANSI 61 or NSF 372. Endpoint devices used to dispense water for drinking must meet the requirements of NSF/ANSI 61, Section 9. AE Project Number: Plumbing Piping Systems

4 2. Steel Pipe: ASTM A53 or ASTM A106 black or hot-dipped galvanized as specified. [Piping shall be domestically manufactured by one of the manufacturers listed in the latest edition of the American Petroleum Institute (API) approved manufacturers listing.] 3. Copper Tube: ASTM B88, Types "K", Type "L", or Type "M" copper water tube as defined by the Copper and Brass Research Association. 4. Ductile Iron Pipe: ANSI A21.51, Class 350 with bell and spigot ends for push-on joints. 5. Cast Iron Soil Pipe: ASTM A74, most current edition. 6. Hubless Cast Iron Soil Pipe: CISPI 301, most current edition. 7. [Polyvinyl Chloride (PVC) Storm Pipe: Sewer main SDR 41 or SDR 26, ASTM D3034 with bell ends and pre-inserted gasket joints.] 8. [Polyvinyl Chloride (PVC) Water Pipe: Class 150, thickwall, AWWA C900 mechanical joint.] 2.2 PIPE/TUBE FITTINGS: A. General: Provide factory-fabricated fittings of type, materials, grade, class, and pressure rating indicated for each service and pipe size. Provide sizes and types matching pipe, tube, valve, and equipment connections. Where not otherwise indicated, comply with governing regulations, industry standards, and where applicable, with pipe manufacturer's instructions for selections. 1. Cast Iron Flanged Fittings: ANSI B16.1, Class 125 or Class 250, black or galvanized as specified, including bolting and gasketing. 2. Cast Iron Threaded Fittings: ANSI B16.4 or ASTM A126, Class 125 or Class 250, black or galvanized as specified. 3. Malleable Iron Threaded Fittings: ANSI B16.3, Class 150 or Class 300, black or galvanized as specified. 4. Malleable Iron Threaded Unions: ANSI B16.39, select for proper piping fabrication and service requirements including style, end connections, and metal-to-metal seats (iron, bronze, or brass), plain or galvanized as specified. 5. Threaded Pipe Plugs: ANSI B Steel Flanges/Fittings: ANSI B16.5, including bolting, gasketing, and butt weld end connections. 7. Forged Steel Socket-welding and Threaded Fittings: ANSI B16.11, rated to match schedule of connected pipe. 8. Wrought Steel Butt-welding Fittings: ANSI B16.9, except ANSI B16.28 for short radius elbows and returns; rated to match connected pipe. 9. Cast Iron Drainage Fittings: ANSI B16.22 galvanized, recessed fittings with pitched threaded ends. 10. Pipe Nipples: Fabricated from same pipe as used for connected pipe, except do not use less than Schedule 80 pipe where length remaining unthreaded is less than 1/2". Do not thread nipples full length (no all-thread nipples). 11. Wrought Copper/Bronze Solder-joint Fittings: ANSI B16.22 suitable for working pressure up to 250 psig. 12. Hubless Cast Iron Pipe Fittings: CISPI 301, most current edition, and comply with governing regulations. 13. Cast Iron Soil Pipe Fittings: ASTM A74, most current edition. AE Project Number: Plumbing Piping Systems

5 14. Compression Gaskets: ASTM C1563 for gasket testing and ASTM C564 for elastomeric compound. 15. Lead/Oakum Joint Materials: Sealite white oakum and pure pig caulking lead. 16. Standard Grooved End Fittings: ASTM A234 forged steel or ASTM A53 fabricated carbon steel, or ASTM A536 ductile iron fittings joined with Victaulic Style 77 or Style 07 couplings and Grade "E" gaskets on steel systems. [On copper systems, ASTM B-75 alloy C12200 or sand casting B alloy CDA 844 ( ) with Style 606 coupling.] 17. Flanged Fittings: Comply with ANSI B16.15 for bolt-hole dimensioning, materials, and flangethickness. 18. Flange Bolts: Bolts shall be carbon steel ASTM A307 Grade A hexagon head bolts and hexagonal nuts. Where one or both flanges are cast iron, furnish Grade B bolts. Cap screws utilized with flanged butterfly valves shall be ASTM A307 Grade B with hexagon heads. 19. Flange Bolt Thread Lubricant: Lubricant shall be an antiseize compound designed for temperatures up to 1000 F and shall be Crane Anti-Seize Thread Compound or approved equal. 20. Mechanical Joints for Cast Iron and Ductile Iron Pipe: AWWA/ANSI with appropriate gaskets, nuts and bolts. 21. [Polyvinyl Chloride (PVC) Fittings: ASTM D2665, Carlon, Vylon "Z" high strength sewer fittings.] B. Miscellaneous Piping Materials/Products: 1. Welding Materials: Comply with ASME Boiler and Pressure Vessels Code, Section II, Part C, for welding materials. 2. Brazing Materials: American Welding Society, AWS A5.B, Classification BCup Gaskets for Flanged Joints: 1/16" thick for all pipe size 10" and smaller and 1/8" thick for all pipe size 12" and larger. Ring-type shall be used between raised face flanges and full face-type between flat face flanges with punched bolt holes and pipe opening. Gaskets shall be Garlock Style 3400 compressed nonasbestos or equal. 4. Insulating (Dielectric) Unions: Provide dielectric unions at all pipe connections between ferrous and nonferrous piping. Unions shall be "Clearflow" waterway as made by Victaulic, "Delvin" as made by Pipeline Seal and Insulator Company or "EPCO" as made by Epco Sales, Inc. and shall have nylon insulation. 5. Gaskets for Cast Iron Soil Pipe: ASTM C564, neoprene, compression-type. 6. Push-on-joints: ANSI A21.11, rubber compression-type, "Tyton Joint" as manufactured by U.S. Pipe or equal. 7. Hubless Cast Iron Joints: Heavy duty couplings: Clamp all 125, Husky SD4000 or MG. 8. Solder: All solder used for sweating of water [and laboratory air and vacuum] piping joints shall be 95/5 tin-antimony or tin-silver. All solder used for sweating of natural gas piping joints shall be phosphorous-free, non-lead bearing silver brazing solder with a melting point in excess of 1000 F. 9. Threadsealing Tape: Threadsealing tape used for plumbing piping applications shall be stretched or nonstretched teflon tape. Threadsealing tape used for natural gas piping applications shall be nonstretched 0.004" thick teflon tape and shall be yellow in color for identification. PART 3 - EXECUTION 3.1 PIPING INSTALLATION: A. General: AE Project Number: Plumbing Piping Systems

6 1. Industry Practices: Install pipe, tube, and fittings in accordance with recognized industry practices which will achieve permanently leakproof piping systems, capable of performing each indicated service without failure or degradation of service. Install each run with a minimum of joints and couplings, but with adequate and accessible unions or flanged connections to permit disassembly for maintenance/replacement of valves and equipment. Reduce sizes (where indicated) by use of reducing fittings. Align accurately at connections, within 1/16" misalignment tolerance. Coordinate piping locations with other trades to avoid conflict. Give ductwork preference unless directed otherwise by the Engineer. 2. Systems: Install piping parallel or perpendicular to lines of building, true to line and grade, and with sufficient hangers to prevent sags between hangers. Provide fittings at changes in direction. Piping in finished areas shall be concealed, except in mechanical rooms. Where pipes of different sizes join, provide reducing elbows, tees, or couplings. Bushings will not be acceptable. 3. Expansion and Contraction: Install loops, offsets, sizing joints, and expansion joints, as necessary, to avoid strain resulting from expansion and contraction of piping systems on fixtures and equipment. AE Project Number: a. Expansion Loops and Offsets: Provide expansion loops and offsets in piping systems for not less than one inch (1") expansion or contraction per 100'of pipe. Use Victaulic style 75 or 77 flexible type couplings on expansion loops in accordance with the latest Victauliv recommendations for expansion compensation. b. [Mechanical Grooved Couplings: Provide mechanical grooved connections equal to Victaulic style 75 or 77 where indicated on the Drawings and Specifications to reduce vibration at equipment connections. Provide expansion joints in piping systems by mechanical grooved connections where specifically indicated on the Drawings.] Expansion joints shall be of one of the following types: Packless, gasketed slip-type expansion joint grooved end telescoping body for installation with Victaulic style 07 rigid type couplings, providing axial end movement up to 3. Victaulic style 150 Mover. combination of Victaulic style 77 or 75 flexible type couplings and short nipples joined in tandem for increased expansion. Joined movement and expansion capabilities determined by the number and style of couplings/nipples used in the joint. Victaulic series Pipe Grading: Install domestic water piping to pitch down in the direction of flow for drainage. Grade storm, soil, and waste piping at 1/4" per foot whenever possible, and not in any case less than 1/8" per foot for pipe sizes 4" and larger, unless shown otherwise on the Drawings. Grade vent piping at 1/4" per foot whenever possible, and not in any case less than 1/8" per foot toward vents. Grade gas piping at a minimum of 1/8" per foot toward condensation traps at connected equipment. B. Steel Pipe: Ream steel pipe after cutting and before threading. Thread with clean-cut taper threads of length to engage all threads in fittings and leave no full-cut threads exposed after make-up. Use John Crane or approved equal teflon thread tape applied only to male threads to make-up joints. C. Copper Pipe: Cut copper pipe square and ream to remove burrs. Clean fitting socket and pipe ends with sand cloth, No. 00 cleaning pads or wire brush. No acids shall be used to clean either pipe or fittings or as a flux in sweating joints. The use of drilled T connections is not permitted. D. [PVC Pipe: Cut PVC pipe square and remove all burrs. Clean fitting and pipe butt prior to installation. Install all PVC piping in accordance with the manufacturer's recommendations.]underground installation of PVC piping shall be in compliance with ASTM D2321. E. Final Connections to Equipment Furnished by Owner or Under Other Divisions of These Specifications: Where Drawings show equipment to be furnished under other Divisions of these Specifications or by the Owner, such equipment will be delivered to the site, uncrated, assembled, and set in-place under those other Divisions of these Specifications or under the separate contracts. Any Plumbing Piping Systems

7 required automatic control valves shall also be provided under those other Divisions of these Specifications or other separate contracts. Make all final connections of chilled water, hot water, condenser water, gas, domestic water, waste, and vent as shown. Provide valves, unions, strainers, check valves, and traps as required for proper operation of systems and equipment. Equipment not shown or noted on the piping drawings shall not be included in the scope of this requirement. F. Excavation, Installation, and Backfill for Underground Pipe: 1. Layout: Pipes shall be laid and pipe joints made in presence of the Owner's Representative and field measurements, layouts, batter board alignment, grade establishments, and similar locations shall be performed by a Professional Engineer in the employ of the Contractor. The Contractor's engineer shall be on the job during all underground work. A "Bench-Mark" reference for use by the Contractor shall be provided by the Owner. 2. Pipe Grading: Lay and maintain all pipes at required lines and grades during the course of the Work to comply with the Drawings. 3. Trench: Excavate the trench to the depth required. Properly brace and dewater the trench and keep it free of water during installation, testing pipe, and backfilling. No water shall be discharged onto a street or freeway without approval by the Architect. Refer to Section for additional requirements. 4. Excavation: The trench shall be at least 18" wider than the maximum diameter of the pipe or largest bell and the pipe shall be laid in the center of the trench. The trench shall be excavated to a depth sufficient to provide for pipe cushions or supports as specified with a minimum backfill cover of 30". Trench width may be increased as required and piling left in place until sufficient compacted backfill is in place. Properly sheet and brace all open trenches to render them secure and remove all such sheeting and bracing before completing the backfill. Comply with local regulations or, in the absence thereof, with the "Manual of Accident Prevention in Construction" of the Associated General Contractors of America, Inc. The quantity of excavation required to install sheeting and the installation and removal of sheetings and bracings will not be regarded as Extra Work. All costs incurred for this excavation and the installation of sheeting shall be included in the Contract Price. Refer to Section for additional requirements. 5. Grading: Upon completion of excavation and prior to the laying of the pipe, the trench bottom shall be brought up to the required elevation with a pipe cushion, except where the cushion has been eliminated by the Engineer. Pipe cushions shall be select material deposited in the trench and shall be compacted, leveled off, and shaped to obtain a smooth compacted bed along the laying length of the pipe. Pipe cushion shall be as follows: AE Project Number: a. Stable, Firm Semidry Trench: Piping shall be laid on undisturbed earth, in a constant uniformly sloped trench. Laying space for hubs or mechanical joints shall be hand cut to 6" either side of the joint and stabilized sand poured and wet in to even with the natural earth trench bottom. The leakproof integrity test of the piping system shall be inspected by the Owner's Representative prior to covering the piping. Failure to notify the Owner's Representative for inspection prior to covering the piping will result in the piping being uncovered and the test being performed again. Where the slope of the trench is found to belly down along the line of piping, before joining, the pipe shall be removed from the trench and the belly converted to uniform slope by adding stabilized bank sand, wet down and slightly mounded to the center of the trench. The section of piping will then be "rolled" into place so with support uniform along its entire length. Where the slope of the trench is found to arch up along the line of piping, before joining, the pipe shall be removed from the trench and the arch converted to uniform slope by cutting the arch out. The section of piping will then be reset into place with support uniform along its entire length. b. Wet Clay - Black Gumbo: Piping shall be laid in a constant, uniformly sloped trench. After shaping, the trench shall receive 3" minimum clean bedding sand, which shall be uniformly distributed on the trench bottom. Laying space for the hubs or mechanical joints shall then be hand removed and the piping placed on the setting bed with the weight of the piping distributed evenly on the setting bed over its entire length. The leakproof integrity test of the Plumbing Piping Systems

8 piping system shall be inspected by the Owner's Representative prior to covering the piping by the Engineer's agent. Failure to notify the Owner's Representative for inspection prior to covering the piping will result in the piping being uncovered and the test performed again. c. Rock: Where rock is encountered, the trench shall be excavated to a minimum of 6" below the pipe elevation and then backfilled with bedding sand to provide a uniform layer for pipe support. Backfill shall be as indicated for Wet Clay - Black Gumbo. d. Special Considerations: Where there are expansive soil conditions on the site, special precautions shall be taken to prevent pushing and breakage of underground piping. Precautions shall be in accordance with local installation techniques and may include carton forms or special pipe bedding. 6. Anchors: Cast iron pipes shall have concrete anchors at each change in direction and/or as directed. Any change in direction exceeding 15 degrees shall be anchored. Concrete anchors shall rest against solid (virgin) ground with the required area of bearing on pipe and ground to provide suitable anchoring. 7. Backfill: Backfill trenches only after piping has been inspected, tested, and approved by the Architect. Place backfill material in the trench either by hand or approved mechanical methods. The compaction of backfill material shall be accompanied by tamping with hand tools or approved pneumatic tampers, by using vibratory compactors, by puddling, or by any combination of the three. The method of compaction shall be approved and all compaction shall be done to the satisfaction of the Architect. Backfill completely around pipe, including 18" above the pipe, with suitable bank sand, tamped in 4" layers under, around, and over pipe. Water down backfill as required. The remainder of the backfill for pipes shall be select backfill material tamped at intervals of no more than 12" depths, to attain a 95% Proctor Compaction Density. All materials to be used as select material backfill shall be approved by the Architect. If, in the opinion of the Architect, the excavated material does not meet the requirements of select material, the Contractor shall be required to screen the material prior to its use as select material backfill. Material used in the upper portion of the backfill or subgrade shall not contain stone, rock, or other material larger than 6" in its longest dimension. No wood, vegetable matter, or other material, which in the opinion of the Architect is unsuitable, shall be included in the backfill. The upper 24" of backfill may be water jetted, if desired. Bring backfill up to finish grade identified on the Architectural Drawings, including additional backfill required to offset settlement during consolidation. When removal of unsuitable, excavated material creates a shortage of backfill material, the Contractor shall, at no change in Contract amount, furnish material as specified in this Section in the amount required to complete the backfill. 8. Existing Surfaces: Restore existing streets, driveways, and sidewalks damaged during the excavation work to acceptable condition, subject to approval by the Architect. 9. Safety: Provide street and sidewalk excavations with approved barricades, warning lights, and cover plates as required by the City. Refer to Section and Division 1 for additional requirements. G. Pipe Fabrication Drawings: 1. Pipe fabrication drawings shall be submitted for all piping in the Central Plant, [Utility Tunnel,] Mechanical Rooms, Penthouse and for Equipment connections and all other areas requiring coordination with other trades. 2. Pipe fabrication drawings shall be double line drawings to scale on 1/4" scale building floor plans and shall indicate pipe size, fittings, valves, accessories, connections, system type, insulation, support requirements, pipe elevations and other information required for coordination with other trades and fabrication of pipings. 3. Pipe fabrication drawings shall be coordinated with other trades and building construction prior to submittal for approval. Refer to Section for additional shop drawing requirements. AE Project Number: Plumbing Piping Systems

9 H. Basic Materials and Methods: Refer to Section for additional requirements related to plumbing piping. 3.2 PLUMBING SERVICES: A. General: Install the various piping systems as described and as required by the local plumbing inspection department. 1. Slope domestic hot and cold water [and laboratory air and vacuum] piping to drain and provide with hose valves (drain valves) at low points. [Branch taps for laboratory air and vacuum piping shall be made from the top of the piping main.] 2. Install soil, waste, and vent piping with horizontal lines pitched in accordance with local codes, but in no case less than 1/4" per foot for pipe 3" and smaller and 1/8" per foot for pipe 4" and larger. Install soil, waste, and vent piping with hubs of each length of piping in the upstream position. 3. Make-up lead and oakum joints with molten lead run into hubs in one continuous pour, to a minimum depth of one inch (1"). 4. Make-up "Ty-Seal" or "Dual-Tite" gasketed joints using lubrication and joining tools as instructed by the manufacturers. Base of stacks, horizontal runs under pressure, and gasketed pipe 5" and larger shall be made up using "Tyler Lubrifast" joining material. Horizontal joints, 5 and larger, shall be restrained. 5. Torque "No-Hub" joints in accordance with manufacturer's instructions. Do not install "No-Hub" joints below ground. 6. Provide chrome-plated piping at each fixture installed in a finished space. Install with proper strap wrenches to avoid marking or defacing. 7. Provide proper restraints on riser and stack offsets. 8. [Kitchen equipment shall be furnished under another Division of the Specifications. This Contractor shall install all faucets, drains, hose outlets, and similar items supplied by kitchen equipment Contractor. This Contractor shall furnish and install traps, trim, stops, and similar connections as required to make piping system complete in every way. All exposed piping to sinks, disposals, hose reels, and similar items shall be chrome-plated. Gas piping to kitchen equipment shall be black steel pipe.] B. Plumbing Connections to Mechanical Equipment: [VERIFY THE FOLLOWING] 1. General: Provide necessary pipe and fittings. Make final connections to provide cold water make-up and natural gas supply to mechanical equipment. Locate cold water make-up and gas supply where shown and connect with suitable stop valves, check valves and bypass valves as applicable. 2. Gas Supply: Provide gas supply to boilers and kitchen equipment as indicated on Drawings. 3.3 MAKE-UP WATER PIPING SYSTEMS: A. Connections: Connect domestic water to automatic fill and manual quick-fill connections on each HVAC piping system and as shown on Drawings. Provide reduced pressure backflow preventers at each system. B. Compatibility: Use piping and fittings of same material type as materials of the domestic water supply. 3.4 DOMESTIC HOT AND COLD WATER PIPING SYSTEMS: A. Interior Hot and Cold Water Piping: 1. Piping 3" and smaller, Type "L" copper tubing hard drawn joined using non-lead bearing solder, such as 95-5 silver or antimony solder (95% tin and 5% silver or antimony). [or grooved ends AE Project Number: Plumbing Piping Systems

10 with Victaulic Style 606/607 couplings {flaring of tube and fitting ends to IPS dimensions is not permitted}]. 2. Piping 4" and larger, Schedule 40, galvanized steel pipe, ASTM A53 with galvanized malleable iron fittings, or galvanized cast iron flanged fittings. 3. Provide isolation fitting whenever dissimilar materials are used. 4. [Option: At the Contractor's option, for galvanized steel piping 4" and larger, a grooved piping connection system with "cut-grooves" may be used. Grooved couplings shall be Victaulic Style 75 or 77 flexible type with Grade "E" synthetic rubber gaskets. Rigid couplings shall be used at valves and in other areas where piping system rigidity is required and shall be Victaulic Style 07 Zero-Flex couplings with Grade "E" gaskets syntahetic rubber gaskets. Taps to mains shall be made using Victaulic Style 72 or Style 920/920N hot dip galvanized outlet couplings or fittings or Gruvlok Fig. 7045/7046 hot dip galvanized outlet couplings or fittings. Mechanical "T" couplings with U-bolts shall not be permitted. Flange connections shall be made using Victaulic Style 741 or 743 flanges with Grade "E" synthetic rubber gaskets. Fittings for elbows, tees, reducers, etc. shall be Victaulic or Gruvlok hot dip galvanized full flow fittings. All grooved piping connection materials shall be utilized with the manufacturer's recommended groove cutting tool. All grooved piping couplings and fittings used in association with an individual coupling or fitting shall be by the same manufacturer. The use of boltless couplings, reducing couplings and Mechanical "T" fittings with U-bolts is prohibited. All wetted surfaces in the piping system shall be hot dip galvanized and all proposed grooved piping connection materials shall be suitable for domestic water use at the temperatures and pressures at the point of application. Painted couplings may be used where they meet the above requirements. Grooved reducing couplings shall not be installed.] B. Piping Runouts to Fixtures: Provide piping runouts to fixtures sized to comply with governing regulations. Where not otherwise indicated, provide runouts sized to comply with the following: lavatories - 1/2" hot, 1/2" cold; water closet flush valves - one and one half inch (1-1/2") cold; urinal flush valves - one inch (1") cold; drinking fountains - 1/2" cold. Provide each fixture with a shut-off valve for each supply line. All exposed lines shall be chromium-plated. C. Air Chambers: 1. Riser Air Chambers: At the top of each main hot and cold water riser, provide [a properly sized Wade Shoktrol or approved equal sealed air chamber] [an air chamber two pipe sizes larger than riser pipe and 24" high]. 2. Fixture Air Chambers: At each hot and cold water supply pipe at each fixture, provide [a properly sized Wade Shoktrol or approved equal sealed air chamber] [an air chamber the same size as the fixture branch and not less than 18" high]. 3.5 UNDERGROUND DOMESTIC WATER AND FIRE PROTECTION PIPING: A. Service Piping Two Inches and Smaller: Type "K", copper tubing with wrought copper brazed end fittings. B. Service Piping Three Inches and Larger: Class A, 150 AWWA ductile iron bell and spigot, push-on joint, pressure water pipe. Joints shall be of the push-on-type employing a molded rubber "O" ring gasket retained in a ring recessed into the inside of the bell [per ANSI A21.1] [Class 150 cast iron domestic water pipe with mechanical joints.] [Class 150 mechanical joint PVC]. [All underground cast iron or ductile iron pipe shall be encased in black 8-mil thick, polyethylene plastic sheet, per ANSI/ AWWA, C105/A , Method C.] [Pipe and joints shall be manufactured by Tyler Pipe and Foundry Company or equal. Coat pipe and fittings inside and outside with the manufacturer's standard coal tar enamel suitable for domestic water service.] C. Underslab Piping: Piping under the building slab for hose bibbs and equipment stubs shall be no larger than one inch (1") and shall be Type "K" soft drawn copper tubing. Piping shall be run continuous from slab penetration to penetration and there shall not be any fittings or connections AE Project Number: Plumbing Piping Systems

11 below the slab. Piping shall have minimum 12" cover in nonpaved areas. Underground piping up to 3" above slab penetrations shall be protected as described herein below. D. Underground Pipe Protection: Underground metallic water piping which is not coated with coal tar enamel shall be coated with 3M Scotchwrap Pipe Wrap Insulation No. 50, applied in strict accordance with the manufacturer's recommendations. Machine wrapping of piping is acceptable. Concrete thrust blocks shall be poured at all turns and offsets of mechanical joint piping. E. [Water service piping shall not be installed under concrete slabs on grade.] 3.6 STORM AND SANITARY DRAINAGE SYSTEM: A. Waste and Vent Piping Underground: All underground waste and vent piping, including turns to the vertical to 12" above the grade floor slab, shall be constructed of service weight (SV) hub and spigot cast iron soil pipe and fittings with positive sealing elastomeric gasket joints.] Elastomeric gaskets shall be installed using an approved gasket lubricant.] Pour concrete thrust blocks at all below grade turns and offsets for waste piping 6" and larger. B. [Vertical] Waste [and Vent] [Stacks] [and Waste] [Piping] Above Grade: Service weight (SV) cast iron pipe and fittings with positive sealing neoprene elastomeric compression type gasket joints. Elastomeric gaskets shall be installed using gasket lubricant. All horizontal stack offsets [and elbows] (4" and larger) shall be joint-strapped and supported using riser clamps and threaded rod. C. [Horizontal Fixture, Waste and] Vent [Manifolds] [Piping] Above Grade: Connect to the vertical stack with "No-Hub" cast iron soil pipe and fittings assembled with Stainless Steel No-Hub Coupling Assemblies. D. Building Storm Drainage Piping Underground: All underground horizontal Storm Water piping including turns to the vertical to 12" above the grade floor slab, shall be constructed of service weight (SV) hub and spigot cast iron soil pipe and fittings with [ [positive sealing neoprene gasket] joints. [Elastomeric gaskets shall be installed using an approved gasket lubricant.] Pour concrete thrust blocks at all below grade turns and offsets. The Building Storm Water System shall extend [5'-0"] outside the Building [to a catch basin as shown on the Drawings]. E. Building Storm Piping Above Grade: All Storm Drainage piping within the Building shall be service weight (SV) cast iron pipe and fittings with positive sealing neoprene elastomeric gasket joints. Elastomeric gaskets shall be installed using an approved gasket lubricant. All horizontal stack offsets [and all elbows] shall be joint-strapped and supported using riser clamps and threaded rod. F. Insulation: All [kitchen grease waste,] condensate drains and related piping, roof drain[,] and overflow roof drain bodies and horizontal runs of storm drainage piping within the occupied spaces of the building, shall be insulated as specified in Section G. Parking Garage Storm Drain Piping Underground: All underground Storm Water piping including turns to the vertical to 12" above the grade floor slab shall be constructed of [service weight (SV) hub and spigot cast iron soil pipe and fittings with positive sealing neoprene elastomeric gasket joints.] [PVC SDR-41 pipe and solvent welded fittings.] [Elastomeric gaskets shall be installed using an approved gasket lubricant.] Pour concrete thrust blocks as all below grade turns and offsets. The Garage Storm Water System shall extend [5'-0"] outside the Garage [to a catch basin as shown on the Drawings]. [All parking garage drainage shall route through an oil interceptor prior to discharge.] H. Parking Garage Storm Drain Piping Above Grade: All Storm Drainage piping within the Parking Garage shall be [service weight (SV) cast iron pipe and fittings with elastomeric neoprene gasketed joints.] [PVC SDR-35 (ASTM D2241) pipe and solvent welded fittings (ASTM D2466, D2564). All PVC shall be supported at each floor level.] [Elastomeric gaskets shall be installed using an approved gasket lubricant.] All horizontal stack offsets [and all elbows] shall be jointstrapped and supported by riser clamps and threaded rod. I. Pump Discharge Piping: Discharge from pumps to the horizontal gravity main shall be Schedule 40 galvanized steel with galvanized cast iron drainage fittings. Each pump discharge shall be carried AE Project Number: Plumbing Piping Systems

12 separately to the horizontal gravity main and shall discharge into the top of the horizontal gravity main with a wye fitting. J. Cleanouts: 1. Locations: a. At base of every drainage stack. b. Upper terminal of each horizontal drainage pipe. c. Each 90'length of horizontal straight run of drainage piping on the exterior, each 50 length of horizontal straight run of drainage piping in the interior. d. Where shown on Drawings. e. As required by local code. 2. Size: Cleanouts shall be line size for piping up to 4" and 4" size for piping larger than 4". 3. Access: Provide access doors for access to cleanouts installed in concealed locations. K. Fixture Connections: 1. Water Closets: Galvanized castable nipples. 2. Urinals: Copper or cast iron nipples with suitable adapters. 3. Lavatories: Copper or cast iron nipples with suitable adapters. 4. Service Sinks: Brass or cast iron nipples with suitable adapters. 5. Drinking Fountains: Copper or cast iron nipples with suitable adapters. L. Grease Traps and Sampling Wells: Furnish and install grease traps and sampling wells as shown on the drawings and required by local authorities. Grease traps and sampling wells may be precast or cast-in-place concrete. Coordinate forming and pouring or purchase and setting of grease traps with the General Contractor. 3.7 NATURAL GAS PIPING SYSTEM: A. Code Compliance Products: Comply with local utility company and AGA regulations which require the products used for gas piping work to be selected from lists in certain published standards or coded as indicated. B. Gas Piping: Gas piping intended for operation at pressures of 5 psig or greater shall be ASTM A53, Schedule 40, black steel joined by Schedule 40, black welding fittings. Gas piping, 2-1/2" and smaller, intended for operation at pressures less than 5 psig shall be ASTM A53, Schedule 40, black steel joined by Class 150 socket weld fittings except that Class 150, banded, black malleable iron, threaded fittings maybe used at valves and equipment connection [and downstream of room isolation valves]. Gas piping, 3" pipe size and larger, intended for operation at pressures less than 5 psig shall be ASTM A53, Schedule 40, black steel joined by Schedule 40, black welding fittings. Provide condensation traps with removable caps at all equipment connections. C. Concealed Piping and Protection: Gas piping run concealed in walls, chases, or above ceilings shall be installed in a Schedule 20 welded steel sleeve vented to the outside atmosphere. Suitable internal spacers shall be provided. Inaccessible piping shall be all-welded connections. Socket type weld fittings may be used for sleeved gas piping. D. Underground Piping: Gas piping installed below grade shall be coated with Republic Steel Corporation (US) "X-Tru-Coat" high density polyethylene extruded coating, factory-applied with a fluid mastic to a minimum thickness of 0.040". Field welds, joints, and fittings shall be protected with mastic undercoat and by wrapping at least two layers of "X-Tru-Tape" installed as instructed by manufacturer. AE Project Number: Plumbing Piping Systems

13 E. Gas Distribution System Drip Pipes: Drip pipes shall be provided throughout the gas piping systems for the purpose of accumulating moisture and condensate. They shall be sized no smaller than the gas main which they drain in each instance. F. Gas Distribution System Fabrication Methods: 1. All interior gas piping shall, wherever possible, be installed so as to grade back toward the gas entry. In all cases where such grading is impracticable and it is necessary to grade the house piping away from the inlet, drip pipes of adequate capacity must be installed where traps are formed by such changes in grade. Drip pipes shall terminate a screwed pattern, malleable iron black cap. No drip pipes shall be used as outlets for the attachment of any fixture or gas appliance. Drip pipes must, moreover, be placed at the bottom of all vertical pipes which rise from and connect to the end of any horizontal pipe. 2. All branch outlet pipes shall be taken from the top or sides of running horizontal lines and not from the bottom. No crosses shall be installed in any horizontal gas line. No unions, gas cocks, or valves shall be used in any concealed location. Every gas cock and valve shall be accessible for inspection and repair. 3. The general arrangement of all gas piping shall be such that the number of threaded joints involved is reduced to an absolute minimum. If obstructions are encountered, pipe shall not be bent to circumvent such obstructions. Welding fittings shall be used for this purpose in the case of welded lines, and if threaded lines are involved, screwed fittings shall be used. Wherever gas pipes run through outside brick, stone, or other walls, the opening around the pipe shall be securely and rigidly sealed. Gas pipe sizes shall be at least one pipe size larger than the inlet of the gas appliance which they supply. No bushings shall be used in conjunction with any gas piping. G. Gas Distribution System Protective Coating: Gas piping systems installed underground shall utilize pipe which has been factory coated with Scotchkote protective resin No All materials, surface preparation, application and testing shall conform to Federal Specification L-C-530 B-Type 2. This coating shall be applied by A&A Coating Company, Lone Star, Texas. Underground welded joints and fittings shall be coated with Scotchkote No. 306 epoxy resin and taped with vinyl Scotchwrap-50 brand tape. Flanged joints shall be given two coats of Koppers Company No. 300M Catalyzed Coal Tar Epoxy. Under no circumstances shall any backfilling operations be begun until these pipe protection operations have been completed. 3.8 [LABORATORY AIR AND VACUUM PIPING SYSTEM: A. Pipe and Fittings: Piping 4" and smaller shall be Type "L" copper tubing hard drawn with wrought copper brazed end fittings. a. Victaulic grooved end copper fittings shall be wrought copper conforming to ASME B16.22, or bronze sand castings conforming to ASME B16.18, manufactured to copper tubing dimensions with grooves designed to accept Victaulic Style 606/6-7 couplings. Grade E EPDM synthetic rubber gasket for oil-free air, or grade T Nitrile for air with oil vapors, FlushSeal design. (Flaring of tube and fittings ends to IPS dimensions is not permitted). B. Cleaning: All piping and fitting shall be washed and sealed prior to installation and shall be blown out with compressed air before service fittings are installed.] 3.9 CONDENSATE DRAINAGE: A. General: Provide a condensate drain pipe to connect each cooling unit drain pan and secondary drain pan to extend to and discharge into an open-type drain in the plumbing system. B. Assembly: Use Schedule 40, galvanized steel pipe made up with Class 125, galvanized, threaded fittings. Assemble fittings to form a trap with depth equal to or greater than operating pressure of the unit served. Drains shall be of the sizes indicated, but not less than the full size of the drain pan connection. Air handling unit drains shall have deep seal traps to permit unit pan drainage. Install a deep seal trap for each blow-through or draw-through air handling unit to maintain the water seal. AE Project Number: Plumbing Piping Systems

14 3.10 CHASE AND WALL PIPING SUPPORTS: A. All piping whether sanitary or water shall be rigidly installed in all chases or walls. Test for rigidity shall be that the piping is virtually immovable by hand short of deforming the piping. Valve, stop and fixture penetrations thru chase or fixture mounting walls shall be firmly supported from just inside the wall or chase prior to penetration to the room-side of the chase or wall. B. Support inside the chase or wall for Sanitary Waste and Vent Piping shall be accomplished by utilizing fixture carrier bolt-downs, "Uni-Strut" or similar structural bracing system, "U-bolts", nuts and lockwashers, all bolted to the floor and to the piping system. C. Support for Water Piping or other similar service piping shall be accomplished by using a "system" designed for that purpose. An approved system shall consist of preformed steel supports which shall be installed between studs or joists and preformed nonmetallic pipe holder inserts which are designed to rigidly support or hold the piping to the steel supports. D. In no case shall Sanitary Sewer Waste or Vent Piping depend on blocks, brick, stone or wood sleepers for its final support. In no case shall Water Piping or similar service piping depend on its final support on "tie-wires", soldering or brazing to metal studs or joists, copper tube soldered to risers and tied to joists or any other method which does not have the written approval of the Engineer. Piping improperly supported shall have improper supports promptly removed and replaced with specified supports at the direction of the Engineer at no additional cost to the Owner and/or Architect/Engineer. E. Support system shall be as manufactured by "Holdrite" or an approved equal CLEANING, FLUSHING, TESTING AND INSPECTING: A. Cleaning: Clean exterior surfaces of installed piping systems and prepare surface for application of any required coatings. B. Piping Tests: 1. General: Blank off equipment during tests. Perform tests before piping is enclosed in walls, floors, partitions or in any other way concealed from view. Tests may be performed in sections. Tests shall be witnessed by the Engineer or Owner's Representative and local inspectors and results presented to the Engineer for acceptance and approval prior to concealing piping from view. Provide all necessary equipment for testing, including pumps and gauges. Refer to Section for additional requirements. 2. Domestic Water Systems: Test hot and cold water systems hydrostatically to a pressure of 150 psig or 1-1/2 times working pressure, whichever is greater, for a period of 24 hours. Repair all leaks, replacing materials as necessary, and repeat tests until systems are proven tight. 3. Soil, Waste and Vent Piping System: Test soil, waste, and vent piping by plugging all openings and filling system to height required by UH Plumbing Inspector, but not less than 10'above the level of the pipe being tested, for a minimum of 3 hours. Inspect all joints for leaks, repair all leaks found, and retest until piping is demonstrated to be free from leaks as evidenced by no perceptible lowering of the water level after 3 hours. In addition to water test, apply peppermint or smoke tests, if required by local code. 4. Storm Drainage Piping System: Test storm drainage piping same as specified for Soil, Waste, and Vent Piping System. 5. Sump Pump and Sewage Ejector Discharge Piping: Test sump pump and sewage ejector piping same as specified for domestic water systems. 6. Natural Gas Piping System: Test natural gas piping with compressed air or nitrogen to a pressure of five times the expected service pressure, but not less than 100 psig, for a period of 24 hours. Repair all leaks, replacing materials as necessary, and repeat test until systems are proven absolutely tight. After all pneumatic testing of the entire gas piping system has been completed and all leaks have been repaired and at a time deemed suitable by the Owner's duly authorized representative, the Contractor shall have the gas supply turned on and the gas AE Project Number: Plumbing Piping Systems

SECTION PLUMBING PIPING SYSTEMS

SECTION PLUMBING PIPING SYSTEMS SECTION 15300 PLUMBING PIPING SYSTEMS PART 1 - GENERAL 1.01 SPECIAL NOTICE A. Each contractor shall read all relevant documents, become familiar with the job, the scope of work, type of general construction,

More information

SECTION PLUMBING PIPING

SECTION PLUMBING PIPING SECTION 22 1000 PLUMBING PIPING PART 1 GENERAL 1.1 QUALITY ASSURANCE A. Perform Work in accordance with authority having jurisdiction standards. Utilize products as indicated in drawings and as allowed

More information

SECTION (15150) - SANITARY WASTE AND VENT PIPING

SECTION (15150) - SANITARY WASTE AND VENT PIPING SECTION 22 13 16 (15150) - SANITARY WASTE AND VENT PIPING PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Pipe Materials. 2. Fittings. 3. Joining Materials. B. Related Sections: 1.02 REFERENCES 1.

More information

SECTION HYDRONIC PIPING

SECTION HYDRONIC PIPING PART 1 GENERAL 1.1 REFERENCES SECTION 15510 HYDRONIC PIPING A. ANSI/ASME SEC 9: Welding and Brazing Qualifications. B. ANSI/ASME B16.3: Malleable Iron Threaded Fittings Class 150 and 300. C. ANSI/ASME

More information

SECTION HYDRONIC PIPING

SECTION HYDRONIC PIPING PART 1 GENERAL 1.1 REFERENCES SECTION 23 21 13 HYDRONIC PIPING A. ANSI/ASME SEC 9: Welding and Brazing Qualifications B. ANSI/ASME B16.3: Malleable Iron Threaded Fittings Class 150 and 300 C. ANSI/ASME

More information

East Central College

East Central College SECTION 221116 - DOMESTIC WATER PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

A. Product Data: For Piping, fittings, transition fittings and dielectric fittings.

A. Product Data: For Piping, fittings, transition fittings and dielectric fittings. SECTION 22 11 16 - DOMESTIC WATER PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

Design and Construction Standards SECTION HYDRONIC PIPING

Design and Construction Standards SECTION HYDRONIC PIPING SECTION 15510 HYDRONIC PIPING PART 1 GENERAL 1.1 REFERENCES A. ANSI/ASME SEC 9: Welding and Brazing Qualifications. B. ANSI/ASME B16.3: Malleable Iron Threaded Fittings Class 150 and 300. C. ANSI/ASME

More information

SECTION HYDRONIC PIPING

SECTION HYDRONIC PIPING PART 1 GENERAL 1.1 REFERENCES SECTION 23 21 13 HYDRONIC PIPING A. ASME BPVC Section IX - Welding and Brazing Qualifications B. ASME B16.3 - Malleable Iron Threaded Fittings Classes 150 and 300 C. ASME

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 22 1316 - SANITARY WASTE AND VENT PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01

More information

A. Codes and Standards that are Standard at the University: 1. AGA Compliance: LC 1-91 Interior Fuel Gas Piping Systems

A. Codes and Standards that are Standard at the University: 1. AGA Compliance: LC 1-91 Interior Fuel Gas Piping Systems PART 1: GENERAL 1.01 Purpose: This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is to

More information

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 22 PLUMBING

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 22 PLUMBING SECTION 221316 - SANITARY WASTE AND VENT PIPING PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following soil and waste, sanitary drainage and vent piping inside the building: 1. Pipe, tube,

More information

DIVISION 22 PLUMBING SECTION INTERIOR SANITARY WASTE AND VENT PIPING SYSTEM

DIVISION 22 PLUMBING SECTION INTERIOR SANITARY WASTE AND VENT PIPING SYSTEM DIVISION 22 PLUMBING PART 1 GENERAL 1.01 DESCRIPTION A. Provide a complete system of soil, waste, and vent piping to fixtures and equipment, including traps, floor drains and cleanouts, extending to a

More information

SECTION FACILITY STORM DRAINAGE PIPING

SECTION FACILITY STORM DRAINAGE PIPING SECTION 22 1413 FACILITY STORM DRAINAGE PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01

More information

SECTION FACILITY STORM DRAINAGE PIPING

SECTION FACILITY STORM DRAINAGE PIPING SECTION 221413 FACILITY STORM DRAINAGE PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

Brown University Revised August 3, 2012 Facilities Design & Construction Standards SECTION HVAC PIPES AND TUBES

Brown University Revised August 3, 2012 Facilities Design & Construction Standards SECTION HVAC PIPES AND TUBES SECTION 23 20 00 - HVAC PIPES AND TUBES PART 1 - GENERAL 1.1 SUMMARY: A. Section includes pipe and pipe fittings for: heating water, chilled water, steam and steam condensate, condenser water, glycol,

More information

SANITARY WASTE AND VENT PIPING

SANITARY WASTE AND VENT PIPING SECTION 15420 - SANITARY WASTE AND VENT PIPING PART 1 GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

SANITARY SEWERS. B. Construct or relocate building sanitary sewer services, stubs, and connections.

SANITARY SEWERS. B. Construct or relocate building sanitary sewer services, stubs, and connections. SANITARY SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Sanitary Sewer Gravity Mains B. Sanitary Sewer Force Mains C. Sanitary Sewer Services 1.02 DESCRIPTION OF WORK A. Construct sanitary sewer gravity

More information

SECTION 13. A. Extent of Work: The requirements of this section apply to the piping systems specified elsewhere in these specifications.

SECTION 13. A. Extent of Work: The requirements of this section apply to the piping systems specified elsewhere in these specifications. SECTION 13 PIPE, TUBE AND PART 1 - GENERAL 1.01 DESCRIPTION A. Extent of Work: The requirements of this section apply to the piping systems specified elsewhere in these specifications. 1.02 QUALITY ASSURANCE

More information

SECTION PLUMBING EQUIPMENT AND SPECIALTIES

SECTION PLUMBING EQUIPMENT AND SPECIALTIES FULTON H3 PLUMBING EQ. AND SPECIALTIES 221114-1 SECTION 221114 PLUMBING EQUIPMENT AND SPECIALTIES 1.PART I - GENERAL 1. 01 All plumbing equipment included in this Specification shall be furnished and installed,

More information

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 22 PLUMBING. A. This Section includes the following storm drainage piping inside the building.

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 22 PLUMBING. A. This Section includes the following storm drainage piping inside the building. SECTION 221413 - FACILITY STORM DRAINAGE PIPING PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following storm drainage piping inside the building. 1. Pipe, tube, and fittings. 2. Special pipe

More information

SECTION PLUMBING PIPING SYSTEM

SECTION PLUMBING PIPING SYSTEM SECTION 15410 - PLUMBING PIPING SYSTEM PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Basic Requirements: Provisions of Section 15010, BASIC MECHANICAL REQUIREMENTS, are a part of this Section. 1.02 SUMMARY

More information

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II SECTION 221313 - FACILITY SANITARY SEWERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

Design Standard HVAC Piping

Design Standard HVAC Piping Design Standard Revisions Log: Version Date Description of changes/updates 2 April 30, 2015 Expansion of direction pertaining to rooftop installations of copper piping Purpose: The heating, ventilating

More information

A. This Section includes sanitary waste and vent piping inside the building and to locations indicated.

A. This Section includes sanitary waste and vent piping inside the building and to locations indicated. SECTION 221316 SANITARY WASTE AND VENT PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

Daytona Beach Pier Building Renovation Jun 2010

Daytona Beach Pier Building Renovation Jun 2010 SECTION 15150 - SANITARY WASTE AND VENT PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

Ice Rink Renovation & New Clubhouse

Ice Rink Renovation & New Clubhouse SECTION 331213 - WATER SERVICE CONNECTIONS PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Pipe and fittings for domestic water service connections to buildings. 2. Corporation stop assembly. 3. Curb

More information

This section includes materials and installation of ductile-iron pipe and fittings for potable and recycled water systems.

This section includes materials and installation of ductile-iron pipe and fittings for potable and recycled water systems. NORTH MARIN WATER DISTRICT STANDARD SPECIFICATIONS SECTION 15056 DUCTILE-IRON PIPE AND FITTINGS PART 1 GENERAL 1.01 DESCRIPTION This section includes materials and installation of ductile-iron pipe and

More information

Read Only Document Not For Distribution

Read Only Document Not For Distribution Chapter 4 4.1 GENERAL REQUIREMENTS Joints and Connections 4.1.1 Tightness Joints and connections in the plumbing system shall be gas tight and watertight for the pressure required by test, with the exceptions

More information

A. Piping materials shall bear label, stamp, or other markings of specified testing agency.

A. Piping materials shall bear label, stamp, or other markings of specified testing agency. SECTION 221316- PART 1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Pipe, tube, and fittings. 2. Specialty pipe fittings. 1.2 INFORMATIONAL SUBMITTALS A. Field quality-control reports. 1.3 QUALITY ASSURANCE

More information

University of Delaware

University of Delaware University Contact: Energy & Engineering Group (302) 831-1744 SECTION 22 13 00 _SANITARY SEWER PIPING SYSTEMS PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Sanitary sewer piping buried 2. Sanitary

More information

PLUMBING. 1. New kitchen sinks and vanity sinks in residential units; new accessible showers and tubs in residential units and public showers.

PLUMBING. 1. New kitchen sinks and vanity sinks in residential units; new accessible showers and tubs in residential units and public showers. SECTION 220500 PLUMBING 1.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section.

More information

SECTION COMMON WORK RESULTS FOR FIRE SUPPRESSION

SECTION COMMON WORK RESULTS FOR FIRE SUPPRESSION SECTION 21 05 00 COMMON WORK RESULTS FOR FIRE SUPPRESSION PART 1 - GENERAL 1.1 SUMMARY A. This section supplements all sections in this division, including pipe, fittings, valves, and connections for sprinkler

More information

University of Delaware

University of Delaware University Contact: Energy & Engineering Group (302) 831-1744 SECTION 22 14 00 _STORM WATER PIPING SYSTEMS PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Storm water piping 2. Roof drains. 3. Area

More information

A. Codes and Standards that are standard at the University. C. Coordinate cleanout locations with Architect.

A. Codes and Standards that are standard at the University. C. Coordinate cleanout locations with Architect. PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

Gas Station & C Store SECTION CWM Job No

Gas Station & C Store SECTION CWM Job No SECTION 211010 - PART 1 - GENERAL 1.1 WORK INCLUDED A. Provide labor, materials, equipment and services to perform operations required for the complete installation and related Work as required in Contract

More information

UNIVERSITY OF MISSOURI Hydronic Energy Distribution 2016 Q1

UNIVERSITY OF MISSOURI Hydronic Energy Distribution 2016 Q1 GENERAL: The scope of this document is to provide instruction for the installation and testing of chilled water piping installed for the University of Missouri. DESIGN GUIDELINES: 1. Materials 1.1. Pipe

More information

DARTMOUTH COLLEGE DESIGN January 3, 2012 & CONSTRUCTION GUIDELINES

DARTMOUTH COLLEGE DESIGN January 3, 2012 & CONSTRUCTION GUIDELINES SECTION 15420 DRAINAGE AND VENT SYSTEMS PART 1 DESIGN DIRECTIVES 1.1 DESIGN CRITERIA A. All cleanouts above finished (accessible and non-accessible) ceilings shall be extended to the floor above. B. Do

More information

SECTION DRAINAGE AND VENT SYSTEMS CONSTRUCTION STANDARD

SECTION DRAINAGE AND VENT SYSTEMS CONSTRUCTION STANDARD PART 1: GENERAL 1.01 The design guidelines contained herein include the requirements for drainage and vent systems utilized at The University of Texas at Austin. It is the intention of this document to

More information

Section 4 Service Lines

Section 4 Service Lines Section 4 Service Lines A. General 1. A service line is that portion of a sanitary sewer line that extends from the outer building wall or foundation wall to its connection with the sewer lateral at the

More information

Errata for the 2003 Uniform Plumbing Code Study Guide (5th Printing)

Errata for the 2003 Uniform Plumbing Code Study Guide (5th Printing) Errata for the 2003 Uniform Plumbing Code Study Guide (5th Printing) The following is a list of changes that we found after the fifth printing of the 2003 Uniform Plumbing Code Study Guide. These changes

More information

Student Services & Classroom Addition. A. This Section includes the following sanitary drainage piping specialties:

Student Services & Classroom Addition. A. This Section includes the following sanitary drainage piping specialties: SECTION 221319 - SANITARY WASTE PIPING SPECIALTIES PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following sanitary drainage piping specialties: 1. Cleanouts. 2. Floor drains. 3. Roof flashing

More information

Union County Vocational - Technical Schools Scotch Plains, New Jersey. A. This Section includes the following sanitary drainage piping specialties:

Union County Vocational - Technical Schools Scotch Plains, New Jersey. A. This Section includes the following sanitary drainage piping specialties: SECTION 221319 - SANITARY WASTE PIPING SPECIALTIES PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following sanitary drainage piping specialties: 1. Cleanouts. 2. Floor drains. 3. Roof flashing

More information

PROJECT TITLE PROJECT NO: CONTRACT TITLE GRANT NO: UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

PROJECT TITLE PROJECT NO: CONTRACT TITLE GRANT NO: UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA The following standard specification is intended to be edited according to the specifics of the project. Brackets [ ] and areas shaded in gray [e.g. format] indicate requirements that are optional depending

More information

SECTION FACILITY STORM DRAINAGE

SECTION FACILITY STORM DRAINAGE PART 1 - GENERAL 1.1 DESCRIPTION SECTION 22 14 00 Storm drainage systems, including piping and all necessary accessories as designated in this section. 1.2 RELATED WORK A. Penetrations in rated enclosures:

More information

STANDARD SPECIFICATIONS

STANDARD SPECIFICATIONS TOWN OF COLONIE DEPARTMENT OF PUBLIC WORKS DIVISION OF PURE WATERS STANDARD SPECIFICATIONS for RESIDENTIAL SANITARY SEWER CONNECTIONS Latest Revision Date: November 2017 TABLE OF CONTENTS Section Page

More information

HYDRONIC PIPING CHAPTER 12

HYDRONIC PIPING CHAPTER 12 CHAPTER 12 HYDRONIC PIPING SECTION 1201 GENERAL 1201.1 Scope. The provisions of this chapter shall govern the construction, installation, alteration and repair of hydronic piping systems. This chapter

More information

DOMESTIC WATER PIPING SECTION DOMESTIC WATER PIPING PART 1 - GENERAL

DOMESTIC WATER PIPING SECTION DOMESTIC WATER PIPING PART 1 - GENERAL 13686.00 DOMESTIC WATER PIPING 221116-1 SECTION 221116 - DOMESTIC WATER PIPING 1.1 RELATED DOCUMENTS PART 1 - GENERAL A. Drawings and general provisions of the Contract, including General and Supplementary

More information

A. Provide floor drains in all restrooms placed a minimum of 7 from back of wet wall, janitor closets, and mechanical rooms.

A. Provide floor drains in all restrooms placed a minimum of 7 from back of wet wall, janitor closets, and mechanical rooms. SECTION 22 13 00 FACILITY SANITARY SEWERAGE PART 1 - GENERAL 1.1 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design.

More information

DIVISION 26 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS PART 1 - GENERAL RELATED DOCUMENTS

DIVISION 26 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS PART 1 - GENERAL RELATED DOCUMENTS PART 1 - GENERAL 01.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 Specification sections, apply to work of this Section.

More information

SECTION STANDPIPE AND HOSE SYSTEMS

SECTION STANDPIPE AND HOSE SYSTEMS SECTION 15375 STANDPIPE AND HOSE SYSTEMS PART 1 GENERAL 1.01 SUMMARY A. Section Includes: A complete fire protection standpipe system including necessary accessories as indicated on Construction Documents,

More information

ADDENDUM NUMBER 1 PARTICULARS 1.01 DATE: APRIL 6, 2018

ADDENDUM NUMBER 1 PARTICULARS 1.01 DATE: APRIL 6, 2018 PARTICULARS 1.01 DATE: APRIL 6, 2018 ADDENDUM NUMBER 1 1.02 PROJECT: MIDLANDS TECHNICAL COLLEGE NE CAMPUS - CET CHILLER REPLACEMENT 1.03 OWNER'S PROJECT NUMBER: H59-N991-FW 1.04 ENGINEER: GMK ASSOCIATES

More information

A. This Section includes the following sanitary drainage piping specialties:

A. This Section includes the following sanitary drainage piping specialties: Page 221319-1 SECTION 221319 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 22 1413 FACILITY STORM DRAINAGE PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01

More information

SANITARY SEWERS. B. Construct or relocate building sanitary sewer services, stubs, and connections.

SANITARY SEWERS. B. Construct or relocate building sanitary sewer services, stubs, and connections. SANITARY SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Sanitary Sewer Gravity Mains B. Sanitary Sewer Force Mains C. Sanitary Sewer Services 1.02 DESCRIPTION OF WORK A. Construct sanitary sewer gravity

More information

SECTION STEAM AND CONDENSATE HEATING PIPING

SECTION STEAM AND CONDENSATE HEATING PIPING PART 1 GENERAL 1.01 SECTION INCLUDES A. Pipe and pipe fittings. B. Pipe hangers and supports. C. Valves. D. Steam piping system. E. Steam condensate piping system. 1.02 RELATED REQUIREMENTS A. Section

More information

HYDRONIC PIPING CHAPTER 12

HYDRONIC PIPING CHAPTER 12 CHAPTER 12 HYDRONIC PIPING SECTION 1201 GENERAL 1201.1 Scope. The provisions of this chapter shall govern the construction, installation, alteration and repair of hydronic piping systems. This chapter

More information

SECTION PUBLIC WATER SERVICE CONNECTIONS

SECTION PUBLIC WATER SERVICE CONNECTIONS SECTION 33 14 14 PUBLIC WATER SERVICE CONNECTIONS PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Pipe and fittings for water service connections to small commercial, light industrial, and residential

More information

A. Gravity-Flow, Nonpressure, Drainage-Piping Pressure Rating: 10-foot head of water (30 kpa).

A. Gravity-Flow, Nonpressure, Drainage-Piping Pressure Rating: 10-foot head of water (30 kpa). SECTION 221313 - FACILITY SANITARY SEWERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SECTION FACILITY SANITARY SEWERS

SECTION FACILITY SANITARY SEWERS SECTION 22 1313 FACILITY SANITARY SEWERS PART 1 - GENERAL 1.1 SUMMARY A. Includes But Not Limited To: 1. Furnish and install soil, waste, and vent piping systems within building and connect with outside

More information

SECTION PLUMBING SYSTEMS

SECTION PLUMBING SYSTEMS SECTION 15400 PLUMBING SYSTEMS PART 1 - GENERAL 1.1 DESCRIPTION Domestic water, sewer and fuel gas systems, including piping, equipment and all necessary accessories as designated in this section. 1.2

More information

PASSAIC COUNTY TECHNICAL INSTITUTE CCA 1422 NEW S.T.E.M. BUILDING 2017

PASSAIC COUNTY TECHNICAL INSTITUTE CCA 1422 NEW S.T.E.M. BUILDING 2017 SECTION 02630 - STORM DRAINAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

B. This Contractor's work shall include the following specification sections: SECTION MECHANICAL AND ELECTRICAL GENERAL CONDITIONS

B. This Contractor's work shall include the following specification sections: SECTION MECHANICAL AND ELECTRICAL GENERAL CONDITIONS SECTION 22 20 00 - PLUMBING SYSTEMS 1. GENERAL A. Provisions of Division 1, GENERAL REQUIREMENTS, and Section 23 00 00, MECHANICAL AND ELECTRICAL GENERAL CONDITIONS, Section 23 21 00 INSTALLATION OF PIPING,

More information

VALLECITOS WATER DISTRICT SECTION POLYVINYL CHLORIDE (PVC) PRESSURE PIPE

VALLECITOS WATER DISTRICT SECTION POLYVINYL CHLORIDE (PVC) PRESSURE PIPE PART 1 - GENERAL 1.1 DESCRIPTION A. This section designates the requirements for the manufacture and installation of polyvinyl chloride, abbreviated PVC, pressure pipe. 1.2 RELATED WORK SPECIFIED ELSEWHERE

More information

SECTION SANITARY SEWERAGE PART 1 GENERAL 1.01 RELATED DOCUMENTS

SECTION SANITARY SEWERAGE PART 1 GENERAL 1.01 RELATED DOCUMENTS SECTION 02530 - SANITARY SEWERAGE PART 1 GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections,

More information

SECTION HVAC PIPING

SECTION HVAC PIPING SECTION 23 21 13 PART 1 - GENERAL 1.1 SUMMARY A. Work Included: 1. Heating Water Piping, Buried 2. Heating Water Piping, Above Ground 3. Chilled Water Piping, Buried 4. Chilled Water Piping, Above Grade

More information

A. Compatibility: Products shall be suitable for piping service fluids, materials, working pressures, and temperatures.

A. Compatibility: Products shall be suitable for piping service fluids, materials, working pressures, and temperatures. SECTION 23 05 16 PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

Michigan State University Construction Standards. DOMESTIC WATER PIPING Page SECTION DOMESTIC WATER PIPING PART 1 - GENERAL

Michigan State University Construction Standards. DOMESTIC WATER PIPING Page SECTION DOMESTIC WATER PIPING PART 1 - GENERAL Page 221116-1 SECTION 221116 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

SECTION SANITARY UTILITY SEWERAGE PIPING

SECTION SANITARY UTILITY SEWERAGE PIPING SECTION 33 31 00 SANITARY UTILITY SEWERAGE PIPING PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Sanitary sewer pipe and fittings. 2. Underground pipe markers. 3. Connection to existing manholes. 4.

More information

SECTION PLUMBING PIPING

SECTION PLUMBING PIPING SECTION 22 10 00 PLUMBING PIPING PART 1 - GENERAL 1.1 SYSTEM DESCRIPTION A. This section provides specifications for plumbing piping inside a building: Domestic water, industrial water, recycled water,

More information

SECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS

SECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS SECTION 02620 PART 1 GENERAL 1.1 SCOPE OF WORK A. Furnish all labor, materials, equipment, and incidentals required to install High Density Polyethylene (HDPE) pressure pipe, fittings, and appurtenances

More information

PART 2 SECTION 9 WATERLINES

PART 2 SECTION 9 WATERLINES PART 2 SECTION 9 WATERLINES 9-1 General - All pipe, pipeline installations and facilities related thereto, shall be as specified herein. All pipe installation shall be in accordance with the manufacturers

More information

A. Codes and Standards that are Standards at the University. A. Provide floor drains in all toilet rooms, janitor closets, and mechanical rooms.

A. Codes and Standards that are Standards at the University. A. Provide floor drains in all toilet rooms, janitor closets, and mechanical rooms. PART 1: GENERAL 1.01 Purpose A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

SECTION STORM UTILITY DRAINAGE PIPING PART 1 - GENERAL 1.1 SUMMARY 1.2 SUBMITTALS 1.3 PROJECT CONDITIONS

SECTION STORM UTILITY DRAINAGE PIPING PART 1 - GENERAL 1.1 SUMMARY 1.2 SUBMITTALS 1.3 PROJECT CONDITIONS SECTION 334100 - STORM UTILITY DRAINAGE PIPING PART 1 - GENERAL 1.1 SUMMARY Section Includes: 1. Pipe and fittings. 2. Drain Basin. 3. De-chlorination tablet feeder. 4. Non-pressure transition couplings.

More information

CITY OF FARGO SPECIFICATIONS SEWER AND WATER SERVICE CONNECTIONS

CITY OF FARGO SPECIFICATIONS SEWER AND WATER SERVICE CONNECTIONS SEWER AND WATER SERVICE CONNECTIONS PART 1 DESCRIPTION OF WORK The work to be done under this section of the Specifications and the accompanying plans consists of the furnishing of all labor, material,

More information

TECHNICAL SPECIAL PROVISION FOR FINANCIAL PROJECT ID:

TECHNICAL SPECIAL PROVISION FOR FINANCIAL PROJECT ID: TECHNICAL SPECIAL PROVISION FOR 1001 WATER DISTRIBUTION SYSTEM FINANCIAL PROJECT ID: 200105-7-52-01 The official record of this Technical Special Provision is the electronic file signed and sealed under

More information

TENOCHCA HALL - PROJECT NO FAN COIL UNITS, RESTROOM AND FINISH RENOVATION

TENOCHCA HALL - PROJECT NO FAN COIL UNITS, RESTROOM AND FINISH RENOVATION SECTION 221119 - DOMESTIC WATER PIPING SPECIALTIES PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Strainers. 2. Drain valves. 3. Water-hammer arresters. 4. Trap-seal primer valves. 1.2 SUBMITTALS

More information

NORTHWESTERN UNIVERSITY PROJECT NAME FOR: JOB # ISSUED: 12/12/2017

NORTHWESTERN UNIVERSITY PROJECT NAME FOR: JOB # ISSUED: 12/12/2017 SECTION 22 1118 - DOMESTIC WATER DISTRIBUTION SYSTEM GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SECTION (15194) - FACILITY NATURAL-GAS PIPING

SECTION (15194) - FACILITY NATURAL-GAS PIPING SECTION 23 11 23 (15194) - FACILITY NATURAL-GAS PIPING PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Pipe, Fittings and Joining Materials. 2. Protective Coating. 3. Piping Specialties. 4. Valves.

More information

101 S. George St 116 E Gas Ave York, PA York, PA (717) (717)

101 S. George St 116 E Gas Ave York, PA York, PA (717) (717) City of York Qdot Engineering 101 S. George St 116 E Gas Ave York, PA 17405 York, PA 17405 (717) 849-2329 (717) 744-8315 INSPECTION CHECKLIST Residential Plumbing Rough-In April 2011 2009 Codes This checklist

More information

SECTION HANGERS AND SUPPORTS FOR PLUMBING

SECTION HANGERS AND SUPPORTS FOR PLUMBING SECTION 22 05 29 HANGERS AND SUPPORTS FOR PLUMBING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

A. This section is intended to provide design guidelines for Utility Direct Buried Piping and Conduit Systems.

A. This section is intended to provide design guidelines for Utility Direct Buried Piping and Conduit Systems. Date Description of Change Pages / Sections Modified ID 6/15/16 Entire document - mgl44 PART 1 - INTRODUCTION 1.1 PURPOSE A. This section is intended to provide design guidelines for Utility Direct Buried

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 22 1118 - DOMESTIC WATER DISTRIBUTION SYSTEM PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

SECTION COMMON WORK RESULTS FOR FIRE SUPPRESSION

SECTION COMMON WORK RESULTS FOR FIRE SUPPRESSION Page 210500-1 SECTION 210500 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

A. This Section includes gravity-flow, nonpressure storm drainage outside the building, with the following components:

A. This Section includes gravity-flow, nonpressure storm drainage outside the building, with the following components: SECTION 334100 - STORM UTILITY DRAINAGE PIPING PART 1 - GENERAL 1.I RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

SECTION FACILITY SANITARY SEWERS

SECTION FACILITY SANITARY SEWERS SECTION 22 13 13 FACILITY SANITARY SEWERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

ARTICLE 26 UTILITY LINE INSTALLATION REQUIREMENTS

ARTICLE 26 UTILITY LINE INSTALLATION REQUIREMENTS UTILITY LINE INSTALLATION REQUIREMENTS Index 26.01 JACK AND BORE OPERATIONS 26.02 PRESSURE PIPE RESTRAINT 26.03 PRESSURE CONNECTION BACK TO TABLE OF CONTENTS Section 26.01 JACK AND BORE OPERATIONS 26.01.01

More information

2. A preconstruction meeting with the TWA s staff is required prior to initiating construction.

2. A preconstruction meeting with the TWA s staff is required prior to initiating construction. General: 1. Construct utilities in accordance to TWA approved plans and shop drawings. Any deviation from the approved plans shall be approved by the DEVELOPER S ENGINEER and TWA 2. A preconstruction meeting

More information

SECTION DUCTILE IRON FITTINGS. A. This section includes materials, installation, and testing of ductile iron fittings 48 inches and smaller.

SECTION DUCTILE IRON FITTINGS. A. This section includes materials, installation, and testing of ductile iron fittings 48 inches and smaller. PART 1 - GENERAL 1.1 DESCRIPTION A. This section includes materials, installation, and testing of ductile iron fittings 48 inches and smaller. 1.2 RELATED WORK SPECIFIED ELSEWHERE A. Section 01300 Record

More information

DIVISION 15-MECHANICAL PN SECTION BASIC MECHANICAL MATERIALS AND METHODS PART 1 - GENERAL 1.01 APPLICATION OF THIS SECTION

DIVISION 15-MECHANICAL PN SECTION BASIC MECHANICAL MATERIALS AND METHODS PART 1 - GENERAL 1.01 APPLICATION OF THIS SECTION PART 1 - GENERAL 1.01 APPLICATION OF THIS SECTION A. This Section applies to all other Sections in Division 15, as the work is applicable. 1.02 SECTION INCLUDES A. Drawing intent. B. Arrangement of work.

More information

SECTION POLYVINYL CHLORIDE (PVC) WATERLINE

SECTION POLYVINYL CHLORIDE (PVC) WATERLINE SECTION 02632 POLYVINYL CHLORIDE (PVC) WATERLINE PART 1 - GENERAL 1.01 SCOPE OF WORK A. Furnish all labor, materials, equipment, and incidentals required, and install polyvinyl chloride (PVC) waterline,

More information

SECTION BASIC FIRE SUPPRESSION MATERIALS AND METHODS. A. Section includes pipe, fittings, valves, and connections for sprinkler systems.

SECTION BASIC FIRE SUPPRESSION MATERIALS AND METHODS. A. Section includes pipe, fittings, valves, and connections for sprinkler systems. SECTION 210500 - BASIC FIRE SUPPRESSION MATERIALS AND METHODS PART 1 GENERAL 1.1 SUMMARY A. Section includes pipe, fittings, valves, and connections for sprinkler systems. B. Related Sections: 1. Section

More information

Construction Specification

Construction Specification PART 1 - GENERAL 1.01 SUMMARY A. The domestic water, sanitary drain, storm water, natural gas, and compressed air piping and connections shall be made under this Division of the Specifications. B. Related

More information

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT. A. ASME B31.1 (American Society of Mechanical Engineers) - Power Piping

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT. A. ASME B31.1 (American Society of Mechanical Engineers) - Power Piping SECTION 22 05 29 HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 SUMMARY A. Section includes pipe and equipment supports, hangers, anchors, bases sleeves and the sealing of

More information

PIPE AND FITTINGS. Submit product information sheet for joint restraint system to be used.

PIPE AND FITTINGS. Submit product information sheet for joint restraint system to be used. PIPE AND FITTINGS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Pipe B. Fittings C. Special Fittings D. Pipeline Accessories 1.02 DESCRIPTION OF WORK Construct water mains and building service pipes. 1.03

More information

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PIPE HANGERS, Section PIPE HANGERS, SUPPORTS, AND RESTRAINTS

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PIPE HANGERS, Section PIPE HANGERS, SUPPORTS, AND RESTRAINTS PART 1 GENERAL 1.01 SUMMARY Section 15140 PIPE HANGERS, This Section includes the furnishing and subsequent installation of: A. Pipe and equipment hangers, supports, and associated anchors B. Equipment

More information

Facility Sanitary Sewers

Facility Sanitary Sewers University of New Hampshire University of New Hampshire Scholars' Repository Division 22 Plumbing Chapter 5 Technical Construction and Renovation Standards 4-23-2015 221313 - Facility Sanitary Sewers Sandra

More information

SECTION LAYING AND JOINTING BURIED PIPELINES

SECTION LAYING AND JOINTING BURIED PIPELINES SECTION 02650 LINES PART 1 GENERAL 1.1 SUMMARY A. Section Includes: Installation of all underground pipelines. Provide pipeline materials, coatings and linings as specified and pipe of the types, sizes

More information

SECTION WASTEWATER FORCE MAINS

SECTION WASTEWATER FORCE MAINS SECTION 02732 WASTEWATER FORCE MAINS PART - GENERAL 1.01 GENERAL: A. This section includes the general requirements for design and installation of force main systems serving wastewater lift stations. B.

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 22 1319 - SANITARY WASTE PIPING SPECIALTIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information