1

2

3 Carpentry Technology Construction Planning and Foundations (CAR801D) Course Description Prior to the start of any successful construction project, extensive planning and organization must be completed. Construction Planning and Foundations will develop the skills required by carpenters prior to construction. Students will learn building layout and excavation methods. They will develop an understanding of the various types of foundations available, and their supporting structures. Framing and placement methods for concrete slabs will be taught. Construction blueprint reading skills will be developed. Pneumatic and fuel-powered tools will be introduced, with an emphasis on their safe use. Math skills will be developed through calculation of ratio and proportion, mechanical advantage, and percentage. Classroom Component Suggested time: 23 hours This component of the curriculum is required to teach the knowledge and skills associated with the learning outcomes of the curriculum. Skill Development Component Suggested time: 87 hours This component of the curriculum is required by the student to apply the knowledge and develop the skills related to the learning outcomes of the curriculum. SCO - Identifies the Specific Curriculum Outcome (SCO) Column 1 SCO - Delineations Describes what the students are expected to know, be able to do, and value in order to achieve the SCO. The teacher is responsible for the planning and facilitation of learning as well as the assessment of each SCO - Delineation. Column 3 Teacher Lessons / Demonstrations Provides suggestions for developing and delivering the content for student learning. Student Activities / Assessments Provides suggestions for creating meaningful activities to allow the student to achieve the SCO. Column 2 Student Knowledge, Abilities, and Competencies Provides clarity to the SCO by describing the Knowledge, Abilities, and Competencies that the students develop. This column is designed to indicate the depth and breadth of the SCO. It is not necessary to use all of these suggestions or that all of the students be engaged in the same learning activity. Column 4 Resources Lists a variety of resources that support the teaching and learning related to the SCO. These resources are suggested to support the teacher in developing an effective instructional package for delivery to the students. 1

4 CURRICULUM OUTCOMES Module 1: Preliminary Building Operations (~4 hours Classroom Component) 29. Students will be able to identify preliminary building operations required prior to the footings being placed. Students will be expected to 29.1 describe initial site procedures and requirements 29.2 describe building layout procedures 29.3 describe the application of levelling equipment 29.4 describe the excavation and shoring procedures Module 2: Pneumatic and Fuel-Powered Tools (~2 hours Classroom Component) 30. Students will be able to identify and describe the safe operation of pneumatic and fuel-powered tools. Students will be expected to 30.1 identify and describe the safe operation and maintenance of pneumatic tools 30.2 identify and describe the safe operation and maintenance of fuel-powered tools Module 3: Concrete Flatwork (~2 hours Classroom Component) 31. Students will be able to construct slabs that will meet service requirements with low construction costs and minimal future maintenance. Students will be expected to 31.1 describe the sub grade preparation, reinforcement, and concrete placement requirements for slabs on grade 31.2 describe forming methods and concrete placement methods for slabs on grade Module 4: Foundation Supports (~2 hours Classroom Component) 32. The student will be able to describe continuous and independent footings for light construction. Students will be expected to 32.1 describe the types of and design considerations for concrete footings 32.2 describe the layout and construction of concrete footings 32.3 describe the various types of piles and their construction 2

5 CURRICULUM OUTCOMES Module 5: Conventional Concrete Foundations (~4 hours Classroom Component) 33. Students will be able to describe construction methods for conventional concrete foundations. Students will be expected to 33.1 describe the components and erection processes for Strip-Ease and other modular foundation form systems 33.2 describe steel reinforcement, concrete placement, and form removal for concrete foundations 33.3 describe the damp-proofing, drainage, and backfill requirements for concrete foundations Module 6: Alternate Foundation Systems (~2 hours Classroom Component) 34. Students will be able to describe alternate foundation systems. Students will be expected to 34.1 identify and describe the components of a permanent wood foundation system and the required construction procedures 34.2 identify and describe the components of insulated concrete systems and the basic construction procedures 34.3 identify and describe other foundation systems Module 7: Blueprint Reading Principles 2 Views and Groups of Drawings (~4 hours Classroom Component) 35. Students will be able to identify and interpret the information contained in the different views presented in a set of working drawings (blueprints). Students will be expected to 35.1 identify the different views (drawings), explain how they are viewed, and describe the paths between views 35.2 identify the different groups of drawings 35.3 describe the different views found in a set of plans Module 8: Calculating Ratio and Proportion, Mechanical Advantage, and Percentage (~3 hours Classroom Component) 36. Students will be able to use a calculator and the appropriate math operations to solve various traderelated problems involving ratio and proportion, mechanical advantage, and percentage. Students will be expected to 36.1 describe ratio and proportion and their application in trade-related calculations 36.2 describe mechanical advantage and related calculations for levers, pulleys, and gears 36.3 describe percentage calculations and their trade-related applications 3

6 4

7 Preliminary Building Operations (~4 hours Classroom Component) CAR801D - CONSTRUCTION PLANNING AND FOUNDATIONS Introduction Specific Curriculum Outcome Prior to starting any construction project, a builder must do a great deal of planning, and a number of administrative tasks must be completed. These preliminary operations include securing property titles and permits; surveying; drawing plans; checking regulations; arranging for inspections and environmental evaluations; and so on. Overlooking or ignoring these essential planing requirements will result in problems, fines, cease work orders, and/or costly mistakes. The apprentice should develop a thorough knowledge of the preliminary building operations required prior to the commencement of construction. 29. Students will be able to identify preliminary building operations required prior to the footings being placed. SCO - Delineations Students will be expected to 29.1 describe initial site procedures and requirements 29.2 describe building layout procedures 29.3 describe the application of levelling equipment 29.4 describe excavation and shoring procedures Assessment Strategies Resources Paper/Pencil Self/Peer-Assessments Skills Performance Teacher Observation Career Portfolio Alberta Module a, Preliminary Building Operations 5

8 CAR80AD - CONSTRUCTION PLANNING AND FOUNDATIONS - MODULE 1 Preliminary Building Operation (~4 hours Classroom Component) SCO 29. Students will be able to identify preliminary building operations required prior to the footings being placed. SCO - Delineations Students will be expected to 29.1 describe initial site procedures and requirements Student Knowledge, Abilities, and Competencies Topic: Building Codes and Local Authorities Demonstrate an understanding of the need for, and the use of, national and provincial building codes. Explain the use of building codes. Demonstrate the use of building codes to find specific information. Identify the local authorities for construction projects. Develop a flowchart of the local regulatory matrix. Demonstrate an understanding of the use of local by-laws, and building covenants. Explain the importance of the building permit. Describe the process of obtaining a building permit. Describe the requirements for building inspections. Explain the need for survey documentation. Topic: Plot Plans Identify the plot plan in a set of drawings. Identify and describe the information required on a plot plan: location, scale, elevations, grades, dimensions, services, roads, utilities, and direction (north arrow). Explain elevations, grades, and contours. Topic: Soils Identify the various types of soils. Explain the load-carrying characteristics of various soils. Explain the factors which determine the depth of the foundation: building weight, frost penetration, water table, and drainage. Explain why buildings should not be built on backfilled soil. 6

9 CAR801D - CONSTRUCTION PLANNING AND FOUNDATIONS - MODULE 1 Preliminary Building Operation (~4 hours Classroom Component) SCO 29. Students will be able to identify preliminary building operations required prior to the footings being placed. Teacher Lessons / Demonstrations Topic: Building Codes and Local Authorities Introduce the National Building Code, and describe its local use. Identify the local authorities. Describe the chain of authority. Describe the process of obtaining a building permit. Introduce the building permit application form. Explain building inspection requirements and identify inspection authorities. Topic: Plot Plans Introduce the plot plan. Describe the use of the plot plan within the plan package. Describe the information required on a plot plan. Demonstrate how this information is incorporated in the building permit application. Describe elevations, contour lines, and grades. Topic: Soils Discuss the various types of soils: sand, silt, clay, gravel, and rock. Explain the load carrying required for building support. Brainstorm to identify the factors that determine the depth of the foundation. Explain why buildings should not be built on backfilled soil or topsoil. Resources Texts/Teacher Resource Alberta Module a Preliminary Building Operation pp CMHC, Canadian Wood-Frame House Construction National Building Code SAS Resources Visuals/Handouts/Tests ILM Self-Test Preliminary Building Operation Internet Building codes Building covenants CBL Contact the local building permit authority for a demonstration of a soil percolation test. Student Activities / Assessments Literacy Research and interpret building codes. Develop a flowchart of the local regulatory matrix. Create a directory of local authorities and their contact information. Demonstrate the completion of a building permit application. Draw a plot plan suitable for a permit application. Enrichment / Research Activities Working from a legal description (Schedule A) on a deed, create a plot plan of the property. Develop a 3-D model from contour lines. 7

10 CAR80AD - CONSTRUCTION PLANNING AND FOUNDATIONS - MODULE 1 Preliminary Building Operation (~4 hours Classroom Component) SCO 29. Students will be able to identify preliminary building operations required prior to the footings being placed. SCO - Delineations Students will be expected to 29.2 describe building layout procedures 29.3 describe the application of levelling equipment 29.4 describe excavation and shoring procedures Student Knowledge, Abilities, and Competencies Topic: Building Layout Explain the need for accurate layout procedures. Identify the tools required to layout a building excavation. Interpret the layout information from a plot plan. Demonstrate the methods to check for square: - measuring diagonals triangle - Pythagorean theorem Describe the use of batter boards. Demonstrate the erection of batter boards. Demonstrate the use of the plumb bob to locate corners. Topic: Levelling Equipment Identify the common equipment used for levelling: - optical levels - laser levels Define the terms benchmark and datum. Describe eye safety considerations and precautions while using laser levels. Describe how to transport a level. Describe how to set up a tripod and level the instrument. Demonstrate how to hold the rod. Explain the difference between a level and a transit. Demonstrate how to use a line level. Describe the use of a water level. Topic: Underground Utilities Identify what utilities you may encounter while excavating. Identify the international colour code for marking buried utilities. Explain what you should do before you start to dig. Explain what you should do if you dig up a marker tape. Topic: Excavations List five factors that affect the depth of the excavation. Describe safety considerations with excavations. Identify the maximum depth and width of excavation allowed before trench safety provisions apply. Define the terms angle of repose, shoring, spoil pile. 8

11 CAR801D - CONSTRUCTION PLANNING AND FOUNDATIONS - MODULE 1 Preliminary Building Operation (~4 hours Classroom Component) SCO 29. Students will be able to identify preliminary building operations required prior to the footings being placed. Teacher Lessons / Demonstrations Topic: Building Layout Explain the importance of accurate building layout. Explain who should provide the preliminary survey and lay out the building excavation. Demonstrate the layout through calculations. Demonstrate the setup of batter boards. Explain the three common methods of squaring a residential building. Demonstrate the use of the plumb bob. Topic: Levelling Equipment Identify the common equipment used for levelling. Demonstrate how to hold the rod. Demonstrate the use of a line level. Demonstrate the use of a water level. CBL Conduct a field trip to a building excavation Invite a surveyor to come in to demonstrate the use of a level and/or transit. Student Activities / Assessments Numeracy Complete the layout calculations from a plot plan. Demonstrate the construction of batter boards. Demonstrate the use of a plumb bob to locate a building corner. Square or layout a proposed building site and confirm through calculations. Complete levelling calculations. Complete depth of excavation calculations. Resources Texts Alberta Module a Preliminary Building Operation pp CMHC, Canadian Wood-Frame House Construction National Building Code SAS Resources Visuals/Handouts/Tests Plot plan Squaring calculation worksheet Levelling worksheet Excavation worksheet ILM Self-Test Preliminary Building Operation Internet Building layout Surveyor s level Enrichment / Research Activities Working from a legal description, or a plot plan, lay out a building lot and locate a proposed house. Set up batter boards and grade stakes. 9

12 CAR801D - CONSTRUCTION PLANNING AND FOUNDATIONS 10

13 CAR801D - CONSTRUCTION PLANNING AND FOUNDATIONS Pneumatic and Fuel-Powered Tools (~2 hours Classroom Component) Introduction Pneumatic fastening tools, or air nailers, are commonly used in the construction industry. These tools have greatly increased productivity, increasing profits and reducing costs. Along with this increased efficiency comes a safety hazard. These tools fire high-powered, sharp projectiles, and need to be treated with caution and respect. The apprentice must become comfortable with the use of pneumatic tools, while always being conscious of the potential hazards and maintaining a safe environment. Specific Curriculum Outcome 30. Students will be able to identify and describe the safe operation of pneumatic and fuel-powered tools. SCO - Delineations Students will be expected to 30.1 identify and describe the safe operation and maintenance of pneumatic tools 30.2 identify and describe the safe operation and maintenance of fuel-powered tools Assessment Strategies Paper/Pencil Self/Peer-Assessments Skills Performance Teacher Observation Career Portfolio Resources Alberta Module f, Pneumatic and Fuel Powered Tools 11

14 CAR801D - CONSTRUCTION PLANNING AND FOUNDATIONS - MODULE 2 Pneumatic and Fuel Powered Tools (~2 hours Classroom Component) SCO 30. Students will be able to identify and describe the safe operation of pneumatic and fuel-powered tools. SCO - Delineations Students will be expected to 30.1 identify and describe the safe operation and maintenance of pneumatic tools 30.2 identify and describe the safe operation and maintenance of fuel-powered tools Student Knowledge, Abilities, and Competencies Topic: Pneumatic Tools Compressors Identify various gas and electric compressors. Describe the air delivery ratings (psi, cfm). Identify tool requirements. Identify and compare oil and oilless lubrication systems. Demonstrate the use and maintenance of compressors. Demonstrate proper safety and use of PPE. Air nailers and staplers Identify various types of air nailers and staplers. Describe the trigger system operation of air nailers. Demonstrate the proper operation of an air nailer. Demonstrate lubricating, loading, and connecting the air nailer. Demonstrate bounce firing and sequential firing. Demonstrate clearing jammed fasteners. Identify the types of fasteners and magazine styles. Identify cordless and combustion nailers. Other pneumatic tools Identify other pneumatic tools: - specialty nailers - drills - sanders - screw guns - spray guns Topic: Chain Saws Identify the main parts of a chain saw. Identify the potential hazards in operating a chain saw. Identify chain saw safety equipment and PPE which must be used. Describe general chain saw safety. Describe chain saw maintenance (e.g., chain tensioning, lubrication,sharpening). Describe the use of abrasive saws, noting the similarity with chain saws. Demonstrate an understanding of the safe use of gas generators. 12

15 CAR801D - CONSTRUCTION PLANNING AND FOUNDATIONS - MODULE 2 Pneumatic and Fuel Powered Tools (~2 hours Classroom Component) SCO 30. Students will be able to identify and describe the safe operation of pneumatic and fuel-powered tools. Teacher Lessons / Demonstrations Topic: Pneumatic Tools Describe the various types and styles of compressors. Explain the air delivery rating systems. Demonstrate the use and maintenance of compressors. Demonstrate proper safety and use of PPE. Describe the various types and styles of air nailers and staplers. Describe the trigger system operation of air nailers. Demonstrate the proper operation of air nailers. Demonstrate lubrication, loading, and connection of pneumatic tools. Demonstrate bounce firing and sequential firing. Demonstrate clearing jammed fasteners. Discuss the potential for trip hazards on the air hose. Topic: Chain Saws Identify chain saw safety equipment and PPE to be used. Describe general chain saw safety. Demonstrate the proper starting method. Discuss the safe use of gas generators. CBL Have a forestry worker or local dealer demonstrate the proper of chain saws and other fuel-powered equipment, along with recommended safety precautions. Resources Texts Alberta Module f Pneumatic and Fuel Powered Tools pp CMHC, Canadian Wood-Frame House Construction National Building Code SAS Resources Visuals/Handouts/Tests Pneumatic tool safety sheet Chainsaw safety sheet Generator safety sheet ILM Self-Test Pneumatic and Fuel Powered Tools Internet Pneumatic tool safety Chain saw safety Generator safety Student Activities / Assessments Demonstrate lubrication, loading, and connection of air nailers. Demonstrate the proper operation of air nailers. Demonstrate bounce firing and sequential firing. Demonstrate the proper use of appropriate PPE. Complete a test on air tool safety. Complete a chain saw safety sheet. Enrichment / Research Activities Research various types of air nailers, compare several models, and select the best choice, listing the specifications and prices. 13

16 CAR801D - CONSTRUCTION PLANNING AND FOUNDATIONS 14

17 Concrete Flatwork (~2 hours Classroom Component) CAR801D - CONSTRUCTION PLANNING AND FOUNDATIONS Introduction Concrete slabs are commonly used in residential construction for basement and garage floors, sidewalks, and driveways. They are also common in commercial and industrial applications, as well as in civil works projects. Carpenters are often required to build the forms and place the concrete for these applications. The apprentice must therefore become familiar with the layout and building of forms for concrete slab construction. Specific Curriculum Outcome 31. Students will be able to construct slabs that will meet service requirements with low construction costs and minimal future maintenance. SCO - Delineations Students will be expected to 31.1 describe the subgrade preparation, reinforcement, and concrete placement requirements for slabs on grade 31.2 describe forming methods and concrete placement methods for slabs on grade Assessment Strategies Paper/Pencil Self/Peer-Assessments Skills Performance Teacher Observation Career Portfolio Resources Alberta Module b, Concrete Flatwork 15

18 CAR801D - CONSTRUCTION PLANNING AND FOUNDATIONS - MODULE 3 Concrete Flatwork (~2 hours Classroom Component) SCO 31. Students will be able to construct slabs that will meet service requirements with low construction costs and minimal future maintenance. SCO - Delineations Students will be expected to 31.1 describe the subgrade preparation, reinforcement, and concrete placement requirements for slabs on grade Student Knowledge, Abilities, and Competencies Topic: Subgrade Preparation Explain the term subgrade as it applies to concrete slab construction. Identify clay and organic (top) soils as providing poor support for slab construction. Explain that the subgrade must contain a uniform soil with good bearing capacity and compaction. Explain that if fill is required, it must be properly compacted. Demonstrate an understanding that poor compaction or poor load-bearing capacity will lead to settling and cracking. Identify the subbase as a thin layer of granular material (gravel or sand) that is placed on the subgrade and compacted. Describe the methods and machines used to compact the subgrade and subbase. Describe the requirements for and placement of a vapour barrier under an interior concrete slab. Describe the requirement to thicken the slab under load-bearing walls and heavy machinery locations. Explain the placement of reinforcement in the lower portion of the slab (in tension). Identify concrete reinforcement materials. Explain the need for joints in concrete slabs. Explain the ordering requirements for concrete slab construction: - minimum design strength, 28 (mpa) - slump, 2"- 4" - entrained air (for resistance to freeze-thaw cycles) 16

19 CAR801D - CONSTRUCTION PLANNING AND FOUNDATIONS - MODULE 3 Concrete Flatwork (~2 hours Classroom Component) SCO 31. Students will be able to construct slabs that will meet service requirements with low construction costs and minimal future maintenance. Teacher Lessons / Demonstrations Topic: Subgrade Preparation Describe the durability and various uses of concrete slabs. Identify the need to have a suitable load-bearing base for the slab. Display a diagram to identify the components of slab construction. Describe soils which are not suitable for subbase materials. Describe the need for compaction and the machines and methods that are used. Explain the placement of granular subgrade materials. Explain the placement of a vapour barrier under slabs. Explain the placement of reinforcing steel mesh and bars. Describe the common thicknesses for slab construction. Explain the concrete ordering requirements for slab construction. Literacy Anticipation Guide: Create an anticipation guide to assess students knowledge of concrete slab construction. Student Activities / Assessments Draw a sketch of the components of concrete slab construction. Describe the components of good subgrade construction. Describe the materials used for subbase construction. Create a chart to define the slab requirements for various slab construction, including slab thickness, concrete strength, air entrainment and reinforcement. Construct a form for sidewalk slab construction. Demonstrate the installation of vapour barrier and reinforcing steel. Resources Texts/Teacher Resources Alberta Module b Concrete Flatwork pp CMHC, Canadian Wood-Frame House Construction National Building Code SAS Resources Visuals/Handouts/Tests Concrete slab construction ILM Self-Test Concrete Flatwork Internet Concrete slab construction Enrichment / Research Activities Numeracy Estimate the amount of concrete required for a basement floor. Create an order list to order the concrete. 17

20 CAR801D - CONSTRUCTION PLANNING AND FOUNDATIONS - MODULE 3 Concrete Flatwork (~2 hours Classroom Component) SCO 31. Students will be able to construct slabs that will meet service requirements with low construction costs and minimal future maintenance. SCO - Delineations Students will be expected to 31.2 describe forming methods and concrete placement methods for slabs on grade Student Knowledge, Abilities, and Competencies Topic: Forming and Pouring Slabs Consult project plans to locate concrete slabs. Locate the slab on the site. Demonstrate an understanding of the requirements to set elevation and grade for the slab. Demonstrate the ability to set grade stakes. Evaluate the subgrade soil and suggest actions on removal, fill, and compaction. Demonstrate the ability to construct, square, level, and grade forms. Set grade for the subbase material. Identify the three types of joints used in concrete slab construction (isolation joint, control joint, construction joint). Describe the use and construction of an isolation joint. Describe the use and construction of a control joint. Describe the use and construction of a construction joint. Describe methods to place concrete as close to its final position as possible (e.g., chute, pump, wheelbarrow, hopper bucket/crane, shovel). Describe the process of consolidation of the concrete. Explain the process of screeding concrete. Define the term tolerance in relation to the surface placement of concrete slabs. Explain the process of finishing the concrete slab, including bull floating, hand floating, edging, jointing, trowelling, and power trowelling. Explain the need to cure concrete, and describe methods commonly used. 18

21 CAR801D - CONSTRUCTION PLANNING AND FOUNDATIONS - MODULE 3 Concrete Flatwork (~2 hours Classroom Component) SCO 31. Students will be able to construct slabs that will meet service requirements with low construction costs and minimal future maintenance. Teacher Lessons / Demonstrations Topic: Forming and Pouring Slabs Display plans showing the location of concrete slabs Demonstrate how to locate the slab on site. Demonstrate various ways to determine and set elevation and grade. Demonstrate form construction for a small slab. Explain the purpose for concrete joints and describe the three types of joints used in slab construction (use ILM graphics). Describe the various methods used to place concrete. Explain concrete finishing, including consolidation, screeding, floating, and trowelling. Explain the concrete curing process (28-day design strength) and methods used to cure concrete. Literacy Interpret plans to determine and set slab location. Student Activities / Assessments Interpret plans to determine the location of concrete slabs. Demonstrate the ability to set grades and elevations for slabs. Demonstrate the ability to build simple forms for a slab. Explain the use and location of the three types of concrete joints (using diagrams). Explain the process of placing and finishing concrete. Explain the importance of curing concrete. Resources Texts/Teacher Resources Alberta Module b Concrete Flatwork pp CMHC, Canadian Wood-Frame House Construction National Building Code Blueprint package SAS Resources Visuals/Handouts/Tests Concrete joints ILM Self-Test Concrete Flatwork Internet Concrete joints Curing concrete Enrichment / Research Activities Construct a set of forms for sidewalk construction. 19

22 CAR801D - CONSTRUCTION PLANNING AND FOUNDATIONS 20

23 Foundation Supports (~2 hours Classroom Component) CAR801D - CONSTRUCTION PLANNING AND FOUNDATIONS Introduction Specific Curriculum Outcome SCO - Delineations The load of a building is transmitted to the earth through the foundation and foundation supports. Carpenters must be familiar with the basic design of foundation supports and be able to interpret the National Building Code to construct foundation supports for residential construction. It is important for the apprentice to develop an understanding of the design and construction of the various types of foundation supports. 32. The student will be able to describe continuous and independent footings for light construction. Students will be expected to 32.1 describe the types of and design considerations for concrete footings 32.2 describe the layout and construction of concrete footings 32.3 describe the various types of piles and their construction Assessment Strategies Paper/Pencil Self/Peer-Assessments Skills Performance Teacher Observation Career Portfolio Resources Alberta Module a, Foundation Supports 21

24 CAR801D - CONSTRUCTION PLANNING AND FOUNDATIONS - MODULE 4 Foundation Supports (~2 hours Classroom Component) SCO 32. The student will be able to describe continuous and independent footings for light construction. SCO - Delineations Students will be expected to 32.1 describe the types of and design considerations for concrete footings Student Knowledge, Abilities, and Competencies Topic: Types of Foundations List the five types of residential foundations: - full basement - crawl space - surface foundation - slab on grade - grade beam foundation Topic: Excavation and Elevations Describe foundation excavation and the need to remove all organic material. Explain the factors that determine the depth of a foundation excavation: - depth of frost - finished grade - size of basement windows - height of the footing and wall - contour of the land, and drainage patterns - depth of sewer lines - other buildings, and covenants - soil bearing capacity Explain the working clearance requirements for foundations: - 1 m horizontal clearance minimum to soil cut m maximum height on a straight cut without shoring Explain why uneven excavations should not be filled in with soil. Explain why the areas which bridge utility trenches need to be reinforced. Topic: Design of Concrete Footings Explain that footing sizes are regulated by the National Building Code (NBC, section 9.12). Explain that footings shall rest on undisturbed soil, rock, or compacted granular fill. Describe the required depth for residential footings in the Maritimes as 1.2 m, or 4 ft., below grade. Determine minimum footing width/area from building code tables (table 1, or CMHC, Canadian Wood-Frame House Construction) Determine the required footing depth (100 mm minimum, or width of footing projection). Topic: Types of Concrete Footings List and describe the common types of residential footings: - strip footings - column or pad footings - stepped footings 22

25 CAR801D - CONSTRUCTION PLANNING AND FOUNDATIONS - MODULE 4 Foundation Supports (~2 hours Classroom Component) SCO 32. The student will be able to describe continuous and independent footings for light construction. Teacher Lessons / Demonstrations Topic: Types of Foundations List and provide examples of the five types of residential foundations. Topic: Excavation and Elevations Describe common excavation methods. Explain the importance of removing all of the organic/top soil. Explain the factors that determine the depth of a foundation Topic: Design of Concrete Footings Explain that footing sizes are regulated by the National Building Code. Describe the required depth for residential footings in the Maritimes as 1.2 m, or 4 ft., (depth of frost) below grade. Explain that the footings must be placed on undisturbed soil or compacted gravel. Source the NBC or CMHC to determine minimum footing sizes. Topic: Types of Concrete Footings Describe the common types of residential footings. Literacy Freewrite: Have students write what they know about supporting a foundation and building. Student Activities / Assessments List the five types of residential foundations. Explain the factors that determine the depth of a foundation excavation. Describe the common types of residential footings. Interpret code tables to design footings. Calculate the amount of concrete required for a residential foundation. Enrichment / Research Activities Draw a footing plan for a house. Resources Texts/Teacher Resources Alberta Module a Foundation Supports pp CMHC, Canadian Wood-Frame House Construction National Building Code Castilian Plans SAS Resources Visuals/Handouts/Tests Design charts ILM Self-Test Foundation Supports Internet Concrete foundations and footings 23

26 CAR801D - CONSTRUCTION PLANNING AND FOUNDATIONS - MODULE 4 Foundation Supports (~2 hours Classroom Component) SCO 32. The student will be able to describe continuous and independent footings for light construction. SCO - Delineations Students will be expected to 32.2 describe the layout and construction of concrete footings Student Knowledge, Abilities, and Competencies Topic: Locating the Footing Demonstrate an understanding that property lines should be confirmed and marked by a licensed land surveyor. Demonstrate an understanding that it is best if the original building location is laid out by the surveyor. Demonstrate the ability to read a plot plan to determine a building s location. Demonstrate the ability to complete calculations to set up a batter board system. Demonstrate the ability to lay out a batter board or nail and offsets system. Demonstrate the ability to measure diagonals to confirm that a building is square. Demonstrate the ability to use a plumb bob to locate a corner. Calculate the depth of an excavation. Topic: Building Forms for the Footing Identify that footings are usually formed using 2x6 lumber. Determine from codes the size of the footing to be used. Describe two rules of thumb for sizing footings: - Footings should be twice as wide as the foundation wall. - Footings should be as deep as the projection beyond the wall. Calculate the location and dimensions of the footing. Demonstrate how to locate the outside footing form. Demonstrate how to locate the inside footing form. Construct a footing form. Calculate the dimensions and location of pad footings. Describe the construction of step footings. Construct a template for anchor bolts. Locate anchor bolts on a foundation drawing. Construct a bevelled keyway form from lumber. Determine the specifications for ordering concrete for footings. Describe the requirements for placing concrete. Describe the methods of concrete placement describe the various types of piles and their construction Topic: Piles and Piers Describe a foundation pile. Describe a foundation pier. Explain the common uses of piles and piers in residential construction. 24

27 CAR801D - CONSTRUCTION PLANNING AND FOUNDATIONS - MODULE 4 Foundation Supports (~2 hours Classroom Component) SCO 32. The student will be able to describe continuous and independent footings for light construction. Teacher Lessons / Demonstrations Topic: Locating the Footing Explain the responsibilities associated with locating a building (surveyor). Demonstrate the ability to read a plot plan to determine the building location. Explain building layout procedures. Explain the use of batter boards for foundation layout. Describe the considerations for foundation depths: (e.g., soil bearing, frost depth, basement height). Topic: Building Forms for the Footing Locate and explain the codes for foundation supports. Interpret design sizes from the codes. Discuss the rules of thumb for footing design. Describe the common materials and construction procedures used for residential footings. Describe methods for anchoring the wall to the footing: keyway, rebar. Discuss placing steel reinforcing in the footing. Explain the requirements and procedures associated with placing concrete. Resources Texts/Teacher Resources Alberta Module a Foundation Supports pp CMHC, Canadian Wood-Frame House Construction National Building Code Castilian Plans SAS Resources Visuals/Handouts/Tests Footing design codes and chart Locating the footing ILM Self-Test Foundation Supports Topic: Piles and Piers Describe a foundation pile. Describe a foundation pier. Explain the common uses of piles and piers in residential construction. Literacy Freewrite: Have students write what they know about locating the foundation footings. KWL: Use a KWL strategy to access students knowledge about footing pads and piers. Numeracy Determine the amount of concrete required for footing and pier construction. Student Activities / Assessments Interpret foundation plans to determine the footing locations and details. Demonstrate the ability to determine the depth of a foundation (complete a worksheet). Design footings in accordance with building codes. Demonstrate the layout of footing forms. Construct a bevelled keyway form from lumber. Construct a template for anchor bolts. Calculate the amount of concrete required for foundation footings from drawings. Enrichment / Research Activities Source design information on commercial foundation pier forms (e.g., Bigfoot). 25

28 CAR801D - CONSTRUCTION PLANNING AND FOUNDATIONS 26

29 CAR801D - CONSTRUCTION PLANNING AND FOUNDATIONS Conventional Concrete Foundations (~4 hours Classroom Component) Introduction In Canada, the majority of foundations are constructed of cast-in-place concrete. Concrete foundations are strong and durable, standing up to the test of time. Concrete is delivered to the site in a plastic state and placed in forms that will support the concrete in the desired shape until it hardens. Carpenters are required to construct the forms, and must understand the loads and forces placed on the forms and how to control them. The apprentice must develop an understanding of conventional concrete foundations and the various form systems commonly used in industry. Specific Curriculum Outcome 33. Students will be able to describe construction methods for conventional concrete foundations. SCO - Delineations Students will be expected to 33.1 describe the components and erection processes for Strip-Ease and other modular foundation form systems 33.2 describe steel reinforcement, concrete placement, and form removal for concrete foundations 33.3 describe the damp-proofing, drainage, and backfill requirements for concrete foundations Assessment Strategies Resources Paper/Pencil Self/Peer-Assessments Skills Performance Teacher Observation Career Portfolio Alberta Module c, Conventional Concrete Foundations 27

30 CAR801D - CONSTRUCTION PLANNING AND FOUNDATIONS - MODULE 5 Conventional Concrete Foundations (~4 hours Classroom Component) SCO 33. Students will be able to describe construction methods for conventional concrete foundations. SCO - Delineations Students will be expected to 33.1 describe the components and erection processes for Strip- Ease and other modular foundation form systems Student Knowledge, Abilities, and Competencies Topic: Modular Foundation Form Systems Identify the components of a flat-bar (e.g., Strip-Ease) forming system. Describe the type and size of plywood panels. Describe the design of form ties. Explain the design and fabrication of the tie spacings in the form panel. Explain the design of the corner panels. Describe the design and installation of the flat waler bars. Explain the location and application of kickers on the footing. Explain the use of ribbons and braces in form construction. Describe the pre-planning and site preparation for form erection. Describe the procedure to construct form inserts for beam pockets and window/door bucks. Topic: Erecting the Flat-Bar Form System Identify the outside finished dimensions of the foundation. Calculate the inside dimensions. Describe the method to lay out the inside lines for kicker installation. Explain the method used to check for square. Describe the methods used to install the kicker. Describe the method used to erect, level, and secure the inside corners. Describe the installation of the inside panels Describe the installation of the ribbons and bracing. Describe the installation of the ties and flat waler bars. Describe the straightening and levelling of the wall. Describe the installation and location of reinforcing steel. Describe the installation of beam pockets and window bucks. Describe the installation of the exterior panels. Identify other form systems (Dura-Form or Advance). 28

31 CAR801D - CONSTRUCTION PLANNING AND FOUNDATIONS - MODULE 5 Conventional Concrete Foundations (~4 hours Classroom Component) SCO 33. Students will be able to describe construction methods for conventional concrete foundations. Teacher Lessons / Demonstrations Topic: Modular Foundation Form Systems Introduce the concept of cast-in-place concrete foundations. Describe the forces that must be supported by the forms. Identify the components of a flat-bar forming (Strip-Ease) system (e.g., form panels, corner panels, form ties, waler bars, kickers, ribbons, braces). Explain the design of the various components. Describe the pre-planning and site preparation for form erection. Describe the construction of form inserts for beam pockets and window/door bucks. Topic: Erecting the Flat-Bar Form System Interpret drawings to determine the finished dimensions of a foundation, and the wall thickness. Calculate the inside dimensions. Explain the procedure used to lay out chalk lines on the footing for installation of the kickers. Explain the methods used to check for square. Describe the methods used to install the kickers. Explain the methods used to erect, level and secure the inside corners. Describe the installation of the inside panels, ribbons, and bracing. Describe the installation of the form ties and flat waler bars. Describe the straightening and levelling of the wall. Describe the installation and location of any reinforcing steel. Describe the installation of beam pockets and window bucks. Describe the installation of exterior panels. Identify other common form systems (Dura-Form or Advance). Literacy Anticipation Guide: Create an anticipation guide to assess students knowledge of forming a foundation. Vocabulary Development: Define kickers, ribbons, form ties, waler bars, and cast-in-place. Think Aloud: Use a Think Aloud strategy to promote student awareness of the forces of the concrete on the forms. Student Activities / Assessments Identify and diagram the components of a flat-bar forming system (i.e., form panels, corner panels, form ties, waler bars, kickers, ribbons, braces)/ Use chalk lines to demonstrate the layout of a foundation. Build a window buck or beam pocket. Lay out a form panel for tie slots (ILM, figure 4) Erect forms using the flat-bar system. Enrichment / Research Activities Numeracy Calculate the forces of concrete on forms: - Concrete weighs 150 lbs./cubic ft. If the wall is 8' high, 150 lbs. cu. ft x 8 ft. = 1200 lbs./ square ft. at the base of the form. - How much does each form tie have to hold? - What about the impact forces of vibration/consolidation loads? Perform a slump test. Resources Texts/Teacher Resources Alberta Module c Conventional Concrete Foundations pp CMHC, Canadian Wood-Frame House Construction National Building Code Castilian Plans SAS Resources Visuals/Handouts/Tests Components of a flat-bar forming system ILM Self-Test Conventional Concrete Foundations Internet Dura-Form Systems Advance form systems Strip-Ease form systems 29

32 CAR801D - CONSTRUCTION PLANNING AND FOUNDATIONS - MODULE 5 Conventional Concrete Foundations (~4 hours Classroom Component) SCO 33. Students will be able to describe construction methods for conventional concrete foundations. SCO - Delineations Students will be expected to 33.2 describe steel reinforcement, concrete placement, and form removal for concrete foundations Student Knowledge, Abilities, and Competencies Topic: Steel Reinforcement Identify reinforcing steel, also called rebar or deformed steel bar. Explain the reason that rebar is used to reinforce concrete (tension forces). Describe the common placement location of rebar in the foundation wall. Topic: Floor Frame Attachment Describe the common methods for attaching the floor frame: - anchor bolts - cast-in-place ladder - cast-in-place sill plate Topic: Concrete Placement Identify four factors that influence lateral pressure on forms (placement, temperature, slump, consolidation/vibration). Explain that forms must be free of foreign debris prior to pouring of concrete. Demonstrate an understanding that the concrete pour should continue until the forms are filled, to prevent cold joints. Demonstrate an understanding that concrete should not be dropped or moved too far in the forms, to avoid segregation of the aggregates (max mm). Demonstrate an understanding that vibration helps consolidation of the concrete but applies lateral forces on the forms. Describe how rodding helps consolidation of the concrete within the forms. Describe the process for striking off the concrete surface. Describe the process and location for installing anchor bolts. Explain the process for breaking the ties and removal of the forms describe the damp-proofing, drainage, and backfill requirements for concrete foundations Topic: Damp-proofing the Foundation Identify the problems caused by water or hydrostatic pressure on the foundation. Describe the common procedures for applying a waterproof membrane to the concrete foundation. Describe the placement of drainage weeping tile around the foundation. Describe the proper method of placing granular backfill around the foundation weeping tile. Explain the proper methods to backfill the foundation. 30

33 CAR801D - CONSTRUCTION PLANNING AND FOUNDATIONS - MODULE 5 Conventional Concrete Foundations (~4 hours Classroom Component) SCO 33. Students will be able to describe construction methods for conventional concrete foundations. Teacher Lessons / Demonstrations Topic: Steel Reinforcement Introduce reinforcing steel, also called rebar or deformed steel bar. Explain how rebar is used to reinforce concrete, to increase its ability to withstand tension forces. (Concrete is very good in compression but poor when placed in tension, having only 1/10 of the compression strength.) Describe the common location of rebar in the foundation wall. Topic: Floor Frame Attachment Describe the common methods for attaching the floor frame (anchor bolts, cast-in-place ladder, cast-in-place sill plate). Topic: Concrete Placement Identify four factors that influence lateral pressure on forms (placement, temperature, slump, consolidation/vibration). Explain why forms must be free of foreign debris prior to pouring of concrete. Explain that the concrete pour should continue until the forms are filled, to prevent cold joints. Explain that concrete should not be dropped or moved too far in the forms, to avoid segregation of the aggregates (max mm). Describe the consolidation methods of rodding and vibration. Describe the process used for striking off the concrete surface. Describe the location and installation of anchor bolts. Explain the process for breaking the ties and removal of the forms. Topic: Damp-proofing the Foundation Identify problems caused by water or hydrostatic pressure on the foundation (e.g., cracking, moisture/mould problems, flooding). Describe common procedures for applying a waterproof membrane to the concrete foundation. Describe the placement of drainage tile and gravel around the foundation. Explain the proper methods to backfill the foundation. Literacy Anticipation Guide: Create anticipation guides to assess students knowledge of placing rebar and attaching a floor frame. Vocabulary Development: Define rebar, slump, segregation, consolidation, vibration, cold joints, and hydrostatic pressure. CBL Visit a site where a foundation is being built. Student Activities / Assessments Demonstrate an understanding of the placement of rebar in a foundation. Demonstrate an understanding of the methods used to attach a floor frame to the foundation. Lay out and diagram an anchor bolt plan for a foundation. Build a form for a small concrete project and place and finish the concrete. Demonstrate an understanding of damp-proofing a foundation. Demonstrate an understanding of the placement of drainage tile and gravel around a foundation. Enrichment / Research Activities Answer the question, Where does the water go after we collect it in the tile? Design a drainage system for a foundation (include sump pump, dry well, ditch, and storm sewer. Resources Texts/Teacher Resources Alberta Module c Conventional Concrete Foundations pp CMHC, Canadian Wood-Frame House Construction National Building Code Castilian Plans SAS Resources Visuals/Handouts/Tests Anchor bolt plan ILM Self-Test Conventional Concrete Foundations Internet Concrete reinforcing steel Placing concrete Waterproofing concrete 31

34 CAR801D - CONSTRUCTION PLANNING AND FOUNDATIONS 32

35 Alternate Foundation Systems (~2 hours Classroom Component) CAR801D - CONSTRUCTION PLANNING AND FOUNDATIONS Introduction In recent years the construction industry has developed many alternative systems for foundation construction. In this module the apprentice will be exposed to several types: preserved wood, concrete insulated forms, concrete block, and precast concrete. Carpenters are required to construct, or assist in the construction of the various foundation systems currently available. The apprentice must develop an understanding of alternate foundation systems and the various new technologies used in industry. Specific Curriculum Outcome 34. Students will be able to describe alternate foundation systems. SCO - Delineations Students will be expected to 34.1 identify and describe the components of a permanent wood foundation system and the required construction procedures 34.2 identify and describe the components of insulated concrete systems and the basic construction procedures 34.3 identify and describe other foundation systems Assessment Strategy Resources Paper/Pencil Self/Peer Assessments Skills Performance Teacher Observation Career Portfolio Alberta Module d, Alternate Foundation Systems 33

10 EXTREME BASEMENT PANELS

10 EXTREME BASEMENT PANELS 10 EXTREME BASEMENT PANELS On Granular Footings 1. The type of soil is a factor in determining foundation construction details such as footing design, backfill, and drainage provisions. Soils are classified

More information

4 EXTREME FOUNDATION PANELS

4 EXTREME FOUNDATION PANELS 4 EXTREME FOUNDATION PANELS For House Crawl Space On Concrete Footings 1. The type of soil is a factor in determining foundation construction details such as footing design, backfill, and drainage provisions.

More information

See the IRC for additional information. See CPD-DS Information Bulletin 100 for Requirements for 1 & 2 Family Dwelling plan submittals.

See the IRC for additional information. See CPD-DS Information Bulletin 100 for Requirements for 1 & 2 Family Dwelling plan submittals. As a customer service initiative, the Kansas City, Missouri, City Planning and Development Department/Development Services, in cooperation with the Greater Kansas City Home Builders Association, has developed

More information

4 EXTREME FOUNDATION PANELS

4 EXTREME FOUNDATION PANELS 4 EXTREME FOUNDATION PANELS For Garages On Granular Footings 1. The type of soil is a factor in determining foundation construction details such as footing design, backfill, and drainage provisions. Soils

More information

Important: Before You Start

Important: Before You Start Advantage ICF System Advantage ICF System TM Field Guide Important: Before You Start Does Your Building Inspector Know You Are Building with the Advantage ICF System? You are required to check with your

More information

National Craft Assessment and Certification Program S P E C I F I C A T I O N S

National Craft Assessment and Certification Program S P E C I F I C A T I O N S National Craft Assessment and Certification Program S P E C I F I C A T I O N S Industrial Carpentry V5 TBD Focus Statement An industrial carpenter erects concrete forms, plumb, level and to grade; places

More information

Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi

Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi STRUCTURAL NOTES MATERIAL STRENGTHS Structural Steel Reinforcing Steel Concrete Masonry Structural Lumber Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel

More information

SLAB ON GRADE Insul-Joint or Expansion Joint Material as Required by A/E Specifications AquaCheck Liquid Coating 400 (Waterproofing Membrane) with Aqu

SLAB ON GRADE Insul-Joint or Expansion Joint Material as Required by A/E Specifications AquaCheck Liquid Coating 400 (Waterproofing Membrane) with Aqu INSTALLATION INSTRUCTIONS Note: The following installation instructions are based off of ASTM E 1643 (Standard Practice for Installation of Water Vapor Retarders Used in Contact with Earth or Granular

More information

SECTION CAST-IN-PLACE CONCRETE

SECTION CAST-IN-PLACE CONCRETE SECTION 03300 CAST-IN-PLACE CONCRETE PART 1 GENERAL 1.01 SECTION INCLUDES A. The Contractor shall furnish all work and materials, including cement, sand and coarse aggregate, water, admixtures, curing

More information

Concrete Framing: Slab on Grade

Concrete Framing: Slab on Grade Concrete Framing: Slab on Grade Casting a Concrete Slab on Grade Concrete Slabs Subgrade Preparation Drainage Layer Slab Edges Vapor Retarder (Moisture Barrier) Reinforcing Pouring the Concrete Finishing

More information

Slab on Grade. Introduction CHAPTER 10

Slab on Grade. Introduction CHAPTER 10 CHAPTER 10 Slab on Grade Introduction A concrete slab on grade is a level surface of concrete that lies directly on the ground. Slabs on grade are used for roads, sidewalks, patios, airport runways and

More information

Table of Contents. 1 Introduction. 2 Description. 3 Tools and materials. 4 Footings or slabs. 5 Coursing placement. 6 Reinforcing steel

Table of Contents. 1 Introduction. 2 Description. 3 Tools and materials. 4 Footings or slabs. 5 Coursing placement. 6 Reinforcing steel Table of Contents 1 Introduction 2 Description 3 Tools and materials 4 Footings or slabs 5 Coursing placement 6 Reinforcing steel 7 Alignment scaffold installation 8 Concrete placement 9 Exterior and interior

More information

BELMURO WALL SYSTEM INSTALLATION GUIDE

BELMURO WALL SYSTEM INSTALLATION GUIDE BELMURO WALL SYSTEM INSTALLATION GUIDE TABLE OF CONTENTS TABLE OF CONTENTS... 1 SYSTEM DESCRIPTION... 2 DRY STACK SYSTEM: INSTALLATION GUIDE... 5 GEOGRID WALL SYSTEM: INSTALLATION GUIDE... 9 MASONRY WALL

More information

A-ONE Insulated Forms Installation Manual

A-ONE Insulated Forms Installation Manual A-ONE Insulated Forms Installation Manual Rockford, MN www.aoneform.com www.diversifoam.com info@diversifoam.com A-ONE Manual 180426.docx Disclaimer Notice The information in the A-ONE Insulated Forms

More information

SECTION STAY-IN-PLACE INSULATED CONCRETE FORMING SYSTEM

SECTION STAY-IN-PLACE INSULATED CONCRETE FORMING SYSTEM ARCHITECTURAL SPECIFICATIONS MANUFACTURER: InterBlock LLC PO Box 1123, Sheboygan, WI 53082 Phone Number 920-207-7234 SECTION 03100 STAY-IN-PLACE INSULATED CONCRETE FORMING SYSTEM PART 1 GENERAL 1.01 Summary

More information

Polycrete Big Block Standard Specification

Polycrete Big Block Standard Specification Polycrete Big Block Standard Specification SECTION 03 11 19 INSULATED CONCRETE FORMING 10/13 PART 1 GENERAL 1.1 REFERENCES The publications listed below form a part of this specification to the extent

More information

ACCESSORY STRUCTURE Building permit information For 1 & 2-family dwellings

ACCESSORY STRUCTURE Building permit information For 1 & 2-family dwellings ACCESSORY STRUCTURE Building permit information For 1 & 2-family dwellings Building Safety Department 400-2 nd Street South St. Cloud, MN 56301 (320) 255-7239 A building permit is required for any accessory

More information

INSPECTION TIMING CHECKLIST FOR RESIDENTIAL FRAME BUILDING PRIOR TO INSPECTION REQUEST

INSPECTION TIMING CHECKLIST FOR RESIDENTIAL FRAME BUILDING PRIOR TO INSPECTION REQUEST Village of Vernon Hills Community Development Department - Building Division 290 Evergreen Drive, Vernon Hills, IL 60061 Phone 847-367-3704 - Fax 847-367-2541 - http://www.vernonhills.org INSPECTION TIMING

More information

2.15 CONCRETE PLACEMENT

2.15 CONCRETE PLACEMENT 2.15 CONCRETE PLACEMENT PRE-PLACEMENT CHECKLIST DATE: FOREMAN: JOB: Prior to placing concrete in Logix insulated concrete forms, be certain to mark off each item on the checklist provided in this section.

More information

RESIDENTIALFOUNDATION GUIDELINE

RESIDENTIALFOUNDATION GUIDELINE Department of Community Development 04/01/2019 RESIDENTIALFOUNDATION GUIDELINE Johnson County Building Officials Association Residential Foundation Guideline This document is provided through endorsement

More information

CONCRETE FOOTINGS AND WALLS Job Ready Checklist

CONCRETE FOOTINGS AND WALLS Job Ready Checklist CONCRETE FOOTINGS AND WALLS Job Ready Checklist This list is to be reviewed by the Builder/Superintendent to verify that the job site is ready for the Trade Contractor to arrive and begin work. Check box

More information

INSPECTION REQUIREMENTS: FOUNDATIONS

INSPECTION REQUIREMENTS: FOUNDATIONS Foundations Page 1 of 9 Revision Date: 1/2/2018 DEVELOPMENT SERVICES BUILDING INSPECTION INSPECTION REQUIREMENTS: FOUNDATIONS INSPECTION CODE: 204 SCOPE: RESIDENTIAL APPLICABLE CODES: 2016 CBC, CRC, CPC,

More information

Structural Tests and Special Inspections Form. Inspection of Fabricators (1704.2)

Structural Tests and Special Inspections Form. Inspection of Fabricators (1704.2) Inspection of Fabricators (1704.2) Furnish inspection reports (1704.2.1) - Fabricators that have not been approved Provide a Certificate of Compliance (1704.2.2) - Approved Fabricators Steel Construction

More information

Installation Manual. Bigfoot Systems Inc. EM

Installation Manual. Bigfoot Systems Inc.  EM Installation Manual Bigfoot Systems Inc. www.bigfootsystems.com EM info@bigfootsystems.com 6750 Highway 3, Martin s Point RR #2, Mahone Bay, Nova Scotia Canada B0J 2E0 TF 1-800-934-0393 PH (902) 627-1600

More information

TECHNICAL SPECIFICATION

TECHNICAL SPECIFICATION TECHNICAL SPECIFICATION ITEM 03100 CONCRETE FORMWORK 1.0 GENERAL 1.1 DESCRIPTION This section defines requirements and limitations for design, construction, erection, and removal of concrete formwork for

More information

PHASE 1 Foundation & Drainage New Construction Phased Inspection Report John & Mary Doe 5237 Clinton Street, Denver, CO 80238

PHASE 1 Foundation & Drainage New Construction Phased Inspection Report John & Mary Doe 5237 Clinton Street, Denver, CO 80238 PHASE 1 Foundation & Drainage New Construction Phased Inspection Report John & Mary Doe 5237 Clinton Street, Denver, CO 80238 PHASE 1 Foundation & Drainage New Construction Phased Inspection Report Buyers

More information

INSTALLATION CHECKLIST 2 ND EDITION. Fox Blocks Abbott Drive Omaha, NE

INSTALLATION CHECKLIST 2 ND EDITION. Fox Blocks Abbott Drive Omaha, NE Fox Blocks INSTALLATION CHECKLIST ND EDITION Fox Blocks Installation Checklist: ND Edition 6110 Abbott Drive Omaha, NE 6110-69-6 WWW.FOXBLOCKS.COM INSTALLATION CHECKLISTS The Checklists on the following

More information

CONCRETE SLABS Job Ready Checklist

CONCRETE SLABS Job Ready Checklist CONCRETE SLABS Job Ready Checklist This list is to be reviewed by the Builder/Superintendent to verify that the job site is ready for the Trade Contractor to arrive and begin work. Check box when complete

More information

Concrete Slab-on-Ground

Concrete Slab-on-Ground Concrete Slab-on-Ground This training package provides information on concrete slab-on-ground construction, including reinforcement, formwork, mix, placement and curing, for village infrastructure and

More information

Seven Wonders of the Ancient World

Seven Wonders of the Ancient World Seven Wonders of the Ancient World Pyramid of Meidum shed 250,000 tons of limestone outer casings Typical Pyramid Pyramid at Meidum Mexico Alameda buildings Palace of Fine Arts National Theater

More information

SENTINEL BARRIER - GENERAL INSTALLATION GUIDELINES

SENTINEL BARRIER - GENERAL INSTALLATION GUIDELINES SENTINEL BARRIER - GENERAL INSTALLATION GUIDELINES Safety Precautions in the Excavation of a Sentinel Wedge take all necessary steps to make sure the pit is secured. Follow all OSHA requirements for digging

More information

Content Domain. NCCER Progress Blvd. Alachua, FL

Content Domain. NCCER Progress Blvd. Alachua, FL National Craft Assessment and Certification Program S P E C I F I C A T I O N S Masonry V1 June 2016 Focus Statement A journey level mason must be able to build, maintain and repair block and brick edifices,

More information

Installation Manual. Foundations. Version 2

Installation Manual. Foundations. Version 2 Installation Manual Foundations Version 2 Contents Overview...1 Planning the Job... 2 Introducing DMX FlexSheet...2 Supplies Required...3 Tools Required...4 Preparing the Site...4 Where to Start?...5 Installing

More information

Paragraph Description Page No General Materials Concrete Masonry Work Altitude Valve Vault Cover 25-4

Paragraph Description Page No General Materials Concrete Masonry Work Altitude Valve Vault Cover 25-4 City of Columbia Engineering Regulations PART 25: SPECIFICATIONS FOR ALTITUDE VALVE VAULT Table of Contents Paragraph Description Page No. 25.1 General 25-1 25.2 Materials 25-1 25.3 Concrete Masonry Work

More information

One and Two Family Additions

One and Two Family Additions One and Two Family Additions An addition to a house, duplex, garage, or an accessory structure requires a building permit prior to performing any construction. Building Department & Permit Office Mon-Fri

More information

Installation Guidelines

Installation Guidelines 815 NE 172 nd Avenue Vancouver, WA 98684 877-694-0141 Installation Guidelines Installation steps include job planning, layout, excavating and preparing the soil subgrade, applying geotextiles (optional),

More information

Miller Collective Safety at Height Solutions EPIC ULTRA Barrier System EPIC Post-N-Barrier System EPIC Basic Barrier System

Miller Collective Safety at Height Solutions EPIC ULTRA Barrier System EPIC Post-N-Barrier System EPIC Basic Barrier System For over 65 years the Miller brand has been synonymous with personal fall protection products and services. As the global leader in safety at height solutions, Honeywell Safety Products introduces a new

More information

Heartland Perma-Column 1841 E 1450 Rd. Lawrence, KS (785)

Heartland Perma-Column 1841 E 1450 Rd. Lawrence, KS (785) Perma-Column Installation Instructions Unlike any other concrete post-frame foundation system, Perma-Column Precast Concrete Piers use 10,000 psi concrete and our unique Sturdi-Wall Plus wet-set bracket

More information

CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF ELECTRICAL CHAMBER

CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF ELECTRICAL CHAMBER ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 602 MARCH 1993 CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF ELECTRICAL CHAMBER 602.01 SCOPE 602.02 REFERENCES 602.05 MATERIALS TABLE OF CONTENTS

More information

RESIDENTIAL CONSTRUCTION New Dwellings and Additions

RESIDENTIAL CONSTRUCTION New Dwellings and Additions How to Obtain a Building Permit For RESIDENTIAL CONSTRUCTION New Dwellings and Additions MIAMI COUNTY, KANSAS CODE SERVICES DEPARTMENT 201 South Pearl Street, Suite 201 Paola, Kansas 66071-1777 Phone:

More information

ITEM 431 PNEUMATICALLY PLACED CONCRETE. All material shall conform to the pertinent requirements of the following items:

ITEM 431 PNEUMATICALLY PLACED CONCRETE. All material shall conform to the pertinent requirements of the following items: ITEM 431 PNEUMATICALLY PLACED CONCRETE 431.1. Description. This Item shall govern for furnishing and placing of "Pneumatically Placed Concrete" for encasement of designated structural steel members, the

More information

CONSTRUCTION SPECIFICATION FOR CONCRETE BARRIERS

CONSTRUCTION SPECIFICATION FOR CONCRETE BARRIERS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 553 FEBRUARY 1991 CONSTRUCTION SPECIFICATION FOR CONCRETE BARRIERS 553.01 SCOPE 553.02 REFERENCES 553.03 DEFINITIONS TABLE OF CONTENTS 553.04 SUBMISSION

More information

TILT-UP PRECAST CONCRETE SANDWICH PANELS. A. Work includes, but is not limited to, the following:

TILT-UP PRECAST CONCRETE SANDWICH PANELS. A. Work includes, but is not limited to, the following: PART 1 GENERAL 1.01 SUMMARY SECTION 03460 TILT-UP PRECAST CONCRETE SANDWICH PANELS A. Work includes, but is not limited to, the following: 1. Architectural precast concrete sandwich wall panels. 2. Integral

More information

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7)

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7) Page 1 of 7 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7) PART 1: GENERAL 1.01 Description A. Work includes furnishing and installing precast modular

More information

SECTION TILT-UP PRECAST CONCRETE SANDWICH PANELS. A. Work includes, but is not limited to, the following:

SECTION TILT-UP PRECAST CONCRETE SANDWICH PANELS. A. Work includes, but is not limited to, the following: PART 1 GENERAL 1.01 SUMMARY SECTION 03460 TILT-UP PRECAST CONCRETE SANDWICH PANELS A. Work includes, but is not limited to, the following: 1. Architectural precast concrete sandwich wall panels. 2. Integral

More information

The better way to build TM. Installation Manual FOUNDATION SIPs & FROST WALLS SIPs

The better way to build TM. Installation Manual FOUNDATION SIPs & FROST WALLS SIPs The better way to build TM Installation Manual FOUNDATION SIPs & FROST WALLS SIPs November 2016 PWF FOUNDATION & FROST WALL SIPs Installation Manual Table of Contents Topics General Requirements....................................

More information

Concreting. A guide to managing a concrete pour

Concreting. A guide to managing a concrete pour Concreting A guide to managing a concrete pour A Guide To Managing A Pour, And Getting The Best Results From Your Concrete An awareness of the process and associated difficulties that are required to effectively

More information

Carpentry/Carpenter CIP Task Grid

Carpentry/Carpenter CIP Task Grid Secondary Task List 100 SAFETY/OCCUPATIONAL ORIENTATION 101 Identify and follow all basic safety practices and procedures. 102 Identify and follow all lab safety practices and procedures. 103 Identify

More information

Foundation Systems 1, spread foundations. What s the point? What types? The foundation s primary purpose is:

Foundation Systems 1, spread foundations. What s the point? What types? The foundation s primary purpose is: Foundation Systems 1, spread foundations What s the point? The foundation s primary purpose is: Distribute building loads to the soil Prevent frost uplift of the building (act as frost barrier) Some foundation

More information

PS 3000 Installation Manual Step-By-Step Procedures C.9. DOOR AND WINDOW OPENINGS C.9.1 PREPARE IN ADVANCE. C.9.2 VBUCK CONSTRUCTION.

PS 3000 Installation Manual Step-By-Step Procedures C.9. DOOR AND WINDOW OPENINGS C.9.1 PREPARE IN ADVANCE. C.9.2 VBUCK CONSTRUCTION. C.9. DOOR AND WINDOW OPENINGS Openings for doors and windows are formed with bucks, or frames, which are constructed to the rough opening dimensions required for the doors and windows to be installed.

More information

Module number 3 provides an on-line, self-paced training seminar on chapter 4, foundations and chapter 5, floors from the residential code of ohio.

Module number 3 provides an on-line, self-paced training seminar on chapter 4, foundations and chapter 5, floors from the residential code of ohio. Module number 3 provides an on-line, self-paced training seminar on chapter 4, foundations and chapter 5, floors from the residential code of ohio. 1 This chapter sets forth the prescriptive requirements

More information

SECTION US Patent 8,857,130 B1 CAST-IN-PLACE CONCRETE WITH ARDEX CONCRETE MANAGEMENT SYSTEMS (ACMS ) EARLY MC APPLICATION

SECTION US Patent 8,857,130 B1 CAST-IN-PLACE CONCRETE WITH ARDEX CONCRETE MANAGEMENT SYSTEMS (ACMS ) EARLY MC APPLICATION ARDEX GUIDE SPECIFICATION ARDEX CONCRETE MANAGEMENT SYSTEMS (ACMS ) Cast-In-Place Concrete to Receive the ARDEX Concrete Management Systems including ARDEX Self-Leveling Underlayments SECTION 03 30 00

More information

SECTION CONCRETE CURBS, GUTTERS AND SIDEWALKS

SECTION CONCRETE CURBS, GUTTERS AND SIDEWALKS SECTION 32 16 13 CONCRETE CURBS, GUTTERS AND SIDEWALKS PART 1 GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide all labor, materials, equipment, and incidentals as shown, specified, and required

More information

Polycrete FLEX 850 Installation Manual. Version: 1.0 Revision: 1.3 Date:

Polycrete FLEX 850 Installation Manual. Version: 1.0 Revision: 1.3 Date: Polycrete FLEX 850 Installation Manual Version: 1.0 Revision: 1.3 Date: 2010-04-28 Polycrete is a registered trademark. Polycrete Flex 850 About this manual This manual is intended to assist the contractor,

More information

Interior Hangers. Application

Interior Hangers. Application Application Interior bridge deck hangers are typically fabricated using two heavy duty sheet metal end clips that have been electrically resistance welded to an appropriate sized wire or formed metal connecting

More information

Low Maintenance Slabs Supports Are Needed for Long-Term Performance of Welded Wire Reinforcement In Slabs-On-Grade

Low Maintenance Slabs Supports Are Needed for Long-Term Performance of Welded Wire Reinforcement In Slabs-On-Grade TF 702-R-08 Low Maintenance Slabs Supports Are Needed for Long-Term Performance of Welded Wire Reinforcement In Slabs-On-Grade INTRODUCTION With its cost-efficiency and superior performance attributes,

More information

Table of Contents. Page Title

Table of Contents. Page Title Page Title Table of Contents 1 Floor plan/ Room utilization 2 Elevation (EAST) 3 Elevation (SOUTH) 4 Elevation (WEST) 5 Elevation (NORTH) 6 Foundation plan details 7 Foundation cross sections A Main grade

More information

Carroll County Bureau of Permits and Inspection Residential Code Compliance Guidelines Detached Garage

Carroll County Bureau of Permits and Inspection Residential Code Compliance Guidelines Detached Garage Carroll County Bureau of Permits and Inspection Residential Code Compliance Guidelines Detached Garage The following list of code requirements is intended to assist you in complying with the Code of Public

More information

PLATON RUGGED, DIMPLED HIGH-DENSITY POLYETHYLENE (HDPE) MEMBRANE THAT KEEPS FOUNDATIONS AND FLOORING DRY ADVANCED TECHNOLOGY EASY INSTALLATION

PLATON RUGGED, DIMPLED HIGH-DENSITY POLYETHYLENE (HDPE) MEMBRANE THAT KEEPS FOUNDATIONS AND FLOORING DRY ADVANCED TECHNOLOGY EASY INSTALLATION DRAINAGE SOLUTIONS SINCE 1908 PLATON RUGGED, DIMPLED HIGH-DENSITY POLYETHYLENE (HDPE) MEMBRANE THAT KEEPS FOUNDATIONS AND FLOORING DRY ADVANCED TECHNOLOGY EASY INSTALLATION PROVEN PERFORMANCE ARMTEC.COM

More information

2/23/2009 R15-R20R20

2/23/2009 R15-R20R20 Foundations What is important to know about foundations? You (probably) won t design it What are the components that make up a properly designed and built foundation? Determine whether house has a good

More information

INSTALLATION GUIDE PLEASE READ ENTIRE INSTRUCTION MANUAL BEFORE PROCEEDING!

INSTALLATION GUIDE PLEASE READ ENTIRE INSTRUCTION MANUAL BEFORE PROCEEDING! DURA - TRENCH INSTALLATION GUIDE This guide is intended to aide in the installation of Dura-Trench systems. There are many different applications and situations for the use of this product and the installation

More information

CAST-IN-PLACE CONCRETE SLOTTED FLOORS FOR SWINE

CAST-IN-PLACE CONCRETE SLOTTED FLOORS FOR SWINE CAST-IN-PLACE CONCRETE SLOTTED FLOORS FOR SWINE The Canada Plan Service prepares detailed plans showing how to construct modern farm buildings, livestock housing systems, storages and equipment for Canadian

More information

CITY OF CEDAR FALLS DEPARTMENT OF DEVELOPMENTAL SERVICES INSPECTION SERVICES DIVISION PHONE Residential Accessory Structures

CITY OF CEDAR FALLS DEPARTMENT OF DEVELOPMENTAL SERVICES INSPECTION SERVICES DIVISION PHONE Residential Accessory Structures CITY OF CEDAR FALLS DEPARTMENT OF DEVELOPMENTAL SERVICES INSPECTION SERVICES DIVISION PHONE - 268-5161 Residential Accessory Structures This information has been compiled for the benefit of any person

More information

Excavation. Stages. Surprises

Excavation. Stages. Surprises Excavation Stages Layout the excavation Strip the topsoil within building lines - store separately Begin excavation Hit water - de-water Slope sides of excavation according to the angle of repose for the

More information

U.S. EDITION RESIDENTIAL CONSTRUCTION DETAILS SAMPLE. A visual guide to construction detailing. Emma Walshaw

U.S. EDITION RESIDENTIAL CONSTRUCTION DETAILS SAMPLE. A visual guide to construction detailing. Emma Walshaw RESIDENTIAL CONSTRUCTION DETAILS U.S. EDITION A visual guide to construction detailing Emma Walshaw Contents INTRODUCTION 4 PRINCIPLES OF CONSTRUCTION DETAILING 6 FOUNDATIONS 9 PRINCIPLES OF FOUNDATION

More information

Residential Plan Review for New One and Two Family Dwellings

Residential Plan Review for New One and Two Family Dwellings The following is a list of items that are normally included in a set of construction drawings for one and two family dwellings. The items in bold depict those items that will be reviewed for during the

More information

Strengthened Soil Wall Construction Manual

Strengthened Soil Wall Construction Manual Strengthened Soil Wall Construction Manual This information has been prepared by Shaw Technologies, Inc. as an aid in constructing their Strengthened Soil Wall system. Final determination of the suitability

More information

SPECIFICATION FOR REINFORCED SOIL WALL

SPECIFICATION FOR REINFORCED SOIL WALL SPECIFICATION FOR REINFORCED SOIL WALL 1.0 EXTENT OF WORK The work shall consist of Reinforced Soil walls built in accordance with this specification and in conformity with the lines, levels and details

More information

PENTABLOCK Technical Information 190mm Series

PENTABLOCK Technical Information 190mm Series PENTABLOCK Technical Information 190mm Series The PENTABLOCK Walling System was developed in consultation with masonry construction stakeholders with an aim of reducing labor time and material costs required

More information

Installation Manual 2.1 TOOLS

Installation Manual 2.1 TOOLS 2.1 TOOLS Tape measure Pliers Rubber mallet Chalk line Loop tie twister Bolt cutters String line Cordless drill Pruning saw Hammer Foam dispensing gun * Pruning shears Hand saw Hot knife Tin snips Reciprocating

More information

GUIDELINES FOR RETAINING WALLS 4-0 IN HEIGHT OR LESS

GUIDELINES FOR RETAINING WALLS 4-0 IN HEIGHT OR LESS GUIDELINES FOR RETAINING WALLS 4-0 IN HEIGHT OR LESS Version 2014-11-11 Prepared by: Building Development Division Department of Development Services 5 County Complex Ct. Suite 120 Prince William, VA 22192

More information

ICBO Evaluation Service, Inc Workman Mill Road, Whittier, California

ICBO Evaluation Service, Inc Workman Mill Road, Whittier, California Reissued June 1, 2002 ICBO Evaluation Service, Inc. 5360 Workman Mill Road, Whittier, California 90601 www.icboes.org Filing Category: DESIGN Concrete DURISOL WALL FORMS FOR CONCRETE CONSTRUCTION DURISOL

More information

SECTION MISCELLANEOUS CAST-IN-PLACE CONCRETE

SECTION MISCELLANEOUS CAST-IN-PLACE CONCRETE SECTION 033053- MISCELLANEOUS CAST-IN-PLACE CONCRETE PART 1- GENERAL 1.1 RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01

More information

1 Exam Prep Prov Module: Vertical Formwork Questions and Answers

1 Exam Prep Prov Module: Vertical Formwork Questions and Answers 1 Exam Prep Prov Module: 27308-14 Vertical Formwork Questions and Answers 1. The amount of formwork needed for a job can be influenced by. A. The size of the forming crew B. The project budget C. Materials

More information

DESIGNING AND CONSTRUCTION OF T-WALL RETAINING WALL SYSTEM

DESIGNING AND CONSTRUCTION OF T-WALL RETAINING WALL SYSTEM Istanbul Bridge Conference August 11-13, 2014 Istanbul, Turkey DESIGNING AND CONSTRUCTION OF T-WALL RETAINING WALL SYSTEM T. C. NEEL and K.BOZKURT ABSTRACT This work shall consist of the design, manufacture

More information

NOVEMBER 2016 GRANDWALL. retaining walls installation guide

NOVEMBER 2016 GRANDWALL. retaining walls installation guide NOVEMBER 2016 GRANDWALL retaining walls installation guide RETAINING WALL INSTALLATION GUIDE RETAINING WALL information Austral Masonry Grandwall retaining wall blocks are an ideal choice for retaining

More information

Residential Building Inspections

Residential Building Inspections Residential Building Inspections Foundations, Grade Beams, Pile Caps, Foundation Pads 1. All trenches or excavations and formwork shall be in accordance with the size(s) and configuration(s) as per approved

More information

Basic Information for Obtaining Permits, Submitting Plans, Scheduling Inspections, etc.

Basic Information for Obtaining Permits, Submitting Plans, Scheduling Inspections, etc. Basic Information for Obtaining Permits, Submitting Plans, Scheduling Inspections, etc. Franklin County Septic & Zoning permit application: A septic and zoning permit is required for residential or commercial

More information

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF ELECTRICAL CHAMBERS

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF ELECTRICAL CHAMBERS ONTARIO PROVINCIAL STANDARD SPECIFICATION OPSS.PROV 602 NOVEMBER 2017 CONSTRUCTION SPECIFICATION FOR INSTALLATION OF ELECTRICAL CHAMBERS TABLE OF CONTENTS 602.01 SCOPE 602.02 REFERENCES 602.03 DEFINITIONS

More information

T-WALL Retaining Wall System

T-WALL Retaining Wall System CONSTRUCTION MANUAL T-WALL Retaining Wall System The T-WALL Solution... THE NEEL COMPANY 8328 Traford Lane Springfield, VA 22152 Phone 703-913-7858 Fax 703-913-7859 T-WALL Retaining Wall System CONSTRUCTION

More information

REINFORCED CONCRETE MASONRY SECTION

REINFORCED CONCRETE MASONRY SECTION SECTION 04 22 02 - REINFORCED CONCRETE MASONRY PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 01 Specification

More information

Successful Home Contracting

Successful Home Contracting Successful Home Contracting How to save thousands of dollars and get a better quality home by acting as your own contractor. Return to Home-Building-Answers.com Lesson Fourteen Construction! Clearing,

More information

BROCHURE # 108 CONSTRUCTION PLAN COMPONENTS

BROCHURE # 108 CONSTRUCTION PLAN COMPONENTS BROCHURE # 108 CONSTRUCTION PLAN COMPONENTS Please note: This construction plan component list is to be used as a guide to assist you with your project. There may be elements unique to your project not

More information

CONSTRUCTION MANUAL 2.5 x 5 UNITS

CONSTRUCTION MANUAL 2.5 x 5 UNITS CONSTRUCTION MANUAL 2.5 x 5 UNITS www.neelco.com 8328-D Traford Lane, Springfield, VA 22152 703 913 7858 T-WALL Retaining Wall System CONSTRUCTION Manual Contents Part I earthwork... 1 The Structure depends

More information

FORMING THE RETAINING WALL FOUNDATION OUTER WALL

FORMING THE RETAINING WALL FOUNDATION OUTER WALL THE RETAINING WALL FOUNDATION SYSTEM This recipe is based on using 1 1/8 plywood forms ripped from 4x8 sheets into halves. It incorporates Rapid Form brand clips and anchor bolt holders. It is based on

More information

SECTION CAST IN PLACE CONCRETE PART 1 GENERAL 1.01 RELATED DOCUMENTS

SECTION CAST IN PLACE CONCRETE PART 1 GENERAL 1.01 RELATED DOCUMENTS SECTION 03301 - CAST IN PLACE CONCRETE PART 1 GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

Plans created at home centers are acceptable for plan review. These computer designs do not allow homeowners to duplicate conditions at their home.

Plans created at home centers are acceptable for plan review. These computer designs do not allow homeowners to duplicate conditions at their home. DECK PLANS BUILDING DEPARTMENT 160 LAKE STREET NORTH BIG LAKE MN 55309 (Main) 763-251-2971 / (Fax) 763-263-0133 www.biglakemn.org This handout is intended only as a guide and is based in part on the 2015

More information

Concrete Framing Systems - Walls and Columns

Concrete Framing Systems - Walls and Columns Concrete Framing Systems - Walls and Columns Casting a Concrete Wall Wall Footing Reinforcing Wall Forms Pouring Concrete Finishing the Concrete Controlling Cracking Insulating Concrete Forms (ICF) Tilt-Up

More information

SECTION WOOD FRAMING. A. Includes But Not Limited To 1. Furnish and install wood framing and blocking as described in Contract Documents.

SECTION WOOD FRAMING. A. Includes But Not Limited To 1. Furnish and install wood framing and blocking as described in Contract Documents. SECTION 06110 WOOD FRAMING PART 1 GENERAL 1.1 SUMMARY A. Includes But Not Limited To 1. Furnish and install wood framing and blocking as described in Contract Documents. B. Products Installed But Not Supplied

More information

Lonsdale Building Inspections Department 415 Central Street W. PO Box 357 Lonsdale, MN (507) fax (507)

Lonsdale Building Inspections Department 415 Central Street W. PO Box 357 Lonsdale, MN (507) fax (507) Lonsdale Building Inspections Department 415 Central Street W. PO Box 357 Lonsdale, MN 55046 (507) 744-2327 fax (507) 744-5554 2006 RESIDENTIAL CONSTRUCTION CHECKLIST The following checklist has been designed

More information

SECTION STRUCTURAL EXCAVATION FOR STRUCTURES

SECTION STRUCTURAL EXCAVATION FOR STRUCTURES 1 1 1 0 1 0 1 0 1 SECTION 1. STRUCTURAL EXCAVATION FOR STRUCTURES BASED ON DFD MASTER SPECIFICATION DATED /1/1 P A R T 1 - G E N E R A L SCOPE The work under this section shall consist of providing all

More information

SECTION CONCRETE FORMWORK

SECTION CONCRETE FORMWORK SECTION 03100 CONCRETE FORMWORK PART 1 GENERAL 1.1 REFERENCES A. The following is a list of standards which may be referenced in this section: 1. American Concrete Institute (ACI): a. 117, Standard Specifications

More information

Carpenter Level 2 Rev. September 2017

Carpenter Level 2 Rev. September 2017 Level 2 A5 Site Layout II Duration: 14 hours 7 hours 7 hours Upon completion of this unit the apprentice will demonstrate knowledge of site layout tools and equipment and their applications and procedures

More information

MagnumStone Specifications Gravity

MagnumStone Specifications Gravity MagnumStone Specifications Gravity SPECIFICATION FOR MAGNUMSTONE GRAVITY MECHANICALLY STABILIZED EARTH SYSTEM PART 1: GENERAL.01Description The work consists of supplying and installing all aspects of

More information

City of Westerville Guide to Commercial Inspections

City of Westerville Guide to Commercial Inspections City of Westerville Guide to Commercial Inspections FOOTINGS - After the excavation, with the form work and any required reinforcing steel in place. All footings shall have loose soil removed, reinforcing

More information

CONSTRUCTION MANUAL. T-WALL Retaining Wall System FOR RAILROAD PROJECTS. The T-WALL Solution...

CONSTRUCTION MANUAL. T-WALL Retaining Wall System FOR RAILROAD PROJECTS. The T-WALL Solution... T-WALL Retaining Wall System CONSTRUCTION MANUAL FOR RAILROAD PROJECTS T-WALL railroad units are 5.0' high x 7.5' wide. (stem lengths will vary) The T-WALL Solution... T-WALL Retaining Wall System CONSTRUCTION

More information

DIVISION 03 CONCRETE SPECIFICATION : FORMS AND FORMWORK

DIVISION 03 CONCRETE SPECIFICATION : FORMS AND FORMWORK DIVISION 03 CONCRETE SPECIFICATION 031000: FORMS AND FORMWORK PART 1.0 GENERAL 1.1 DESCRIPTION The work of this specification includes furnishing of all labor, materials, equipment and incidentals to install,

More information

Installation Manual. Foundations. Version 4.3ᵠ

Installation Manual. Foundations. Version 4.3ᵠ Installation Manual Foundations Version 4.3ᵠ (*) - Denotes Current Revisions throughout this Installation Manual Version 4 (ᵠ) - Denotes Current Revisions for Version 4.3 of this Manual Manual updated

More information

Misan University - College of Engineering Civil Engineering Department

Misan University - College of Engineering Civil Engineering Department CHAPTER 2 Soil and Excavations Soil investigation including two phases: surface investigation and subsurface investigation Surface investigation involves making a preliminary judgment about the site s

More information

UPRR INDUSTRIAL LEAD BRIDGE T-WALL RETAINING WALL SYSTEM 5.0 x 7.5 UNITS DESIGN UNIT 018 WORK PACKAGE 04

UPRR INDUSTRIAL LEAD BRIDGE T-WALL RETAINING WALL SYSTEM 5.0 x 7.5 UNITS DESIGN UNIT 018 WORK PACKAGE 04 UPRR INDUSTRIAL LEAD BRIDGE T-WALL RETAINING WALL SYSTEM 5.0 x 7.5 UNITS DESIGN UNIT 018 WORK PACKAGE 04 1. Description This work shall consist of the design, manufacture and construction of a T-WALL structure

More information