Elizabeth River Tunnels Project. ASHE October Technical Meeting ERT Project Overview October 8, 2015

Size: px
Start display at page:

Download "Elizabeth River Tunnels Project. ASHE October Technical Meeting ERT Project Overview October 8, 2015"

Transcription

1 Elizabeth River Tunnels Project ASHE October Technical Meeting ERT Project Overview October 8, 2015

2 Project Location: Hampton Roads, VA

3 ERT Project Scope New, two-lane, WB tunnel Rehab and lifesafety improvements of existing MTT Brambleton Ave. / Hampton Blvd. interchange modifications Extending MLK to I-264, High St. interchange Rehab and lifesafety improvements of existing DTT (EB & WB tubes) Norfolk Portsmouth 3

4 ERT Project Schedule Project Completion Date Refurbishment of Existing Downtown Tunnels August 2016 New MLK Freeway Extension December 2016 New Midtown Tunnel December 2016 Refurbishment of Existing Midtown Tunnel May 2018

5 Value to the Hampton Roads Region Reduces congestion and travel time Reduces idle time saving fuel and reducing emissions Creates seamless connection to I 264 Extends useful life of existing tunnels Ends bi directional traffic in Midtown Tunnel Improves reliability and connectivity Enhanced public transportation services made available through partnership with HRT

6 ERT Project Team Owner Equity / Sponsors Developer Lenders Bank/Bond/TIFIA Design-Build Contractor Operations & Maintenance Tolling Contractor 3M Designers

7 Organizational Responsibility OTP3 VDOT Central Office Pre- Comprehensive Agreement Development OPCO VDOT Hampton Roads District Post Comprehensive Agreement Project Delivery

8 The Design-Build Team Design-Build Joint Venture: - Skanska USA Civil SE - Kiewit Infrastructure Company - Weeks Marine Design Team: - Parsons Brinckerhoff Immersed Tube Tunnel (ITT) Experience: - Since 1964, installed 74% of the ITT s in the USA - Installed 52,500 feet of ITT in the USA - 19,700 feet of ITT in the Norfolk Area - Volkert & Associates

9 ERT Project Funding

10 Project Funding

11

12 Financing Cash Flow No equity repayment until 2021 at earliest (assuming available funds) Any revenue shared w VDOT must be used to benefit users of Project

13 Construction Overview & Update

14 ERT Project Schedule Project Completion Date Refurbishment of Existing Downtown Tunnels August 2016 New MLK Freeway Extension December 2016 New Midtown Tunnel December 2016 Refurbishment of Existing Midtown Tunnel May 2018

15 ERT Project Component 1: Existing Tunnel Rehabilitation

16 Tunnel Rehabilitation Project Scope Rehabilitation Projects Existing WB Downtown Tunnel Existing EB Downtown Tunnel Existing (EB) Midtown Tunnel Rehabilitation Activities Removal of suspended ceilings Replace existing transverse with longitudinal ventilation Fire-life safety upgrades to 100 mega watt Concrete repairs (spalls and cracks) Electrical rehabilitation and upgrades Misc. signage, painting and repairs

17 DTT Rehabilitation: Ceiling Removal

18 DTT Rehabilitation: Barrier Repair

19 DTT Rehabilitation: Fire Protection & Ventilation Upgrades installation of fire protection board installation of longitudinal ventilation system

20 DTT-WB Lighting Before and After

21 ERT Project Component 2: MLK Freeway Extension

22 MLK Freeway Extension I-264 MLK Extension High St. London Blvd. Architectural Rendering

23 MLK Extension: Pile Driving

24 MLK Extension: Ped Bridge Cap Pour

25 MLK Extension: Structural Steel Erection

26 MLK Extension: Aerial 26

27 MLK Extension: Aesthetic Treatments High Street Gateway Turnpike Road Plaza

28 ERT Project Component 3: New Midtown Tunnel Approaches

29 New MTT: Portsmouth Approach Existing MTT Approach New MTT Approach Aerial View

30 New MTT: Portsmouth Approach

31 New MTT: Norfolk Approach Existing MTT Approach New MTT Approach 31

32 New MTT: Norfolk Approach Surface View

33 ERT Project Component 4: New Midtown Tunnel

34 New MTT: Tunnel Element Fabrication

35 New MTT: Floating Tubes

36 New MTT: Element Tow Down

37 New MTT: Element Tow Down

38 New MTT: Elements Moored in Portsmouth

39 New MTT: Screed Barge

40 New MTT: Final Concept Concrete shell, Immerse Tube Tunnel (ITT) Westbound tube connecting Norfolk to Portsmouth Two vehicular lanes and an egress corridor Utility Corridor Deluge System Jet Fans Egress Corridor Promat

41 New MTT: Plan & Profile

42 New MTT: Offset Alignment New Midtown Tunnel Existing Midtown Tunnel

43 New MTT: Ballast Concrete Placement

44 New MTT: Lay Barge

45 New MTT: Elements Docked 45

46 New MTT: Element Seals Seals between Elements - Gina Joint (gasket type) - Omega Seal (inner connection) Elements to connect to Cast in Place Approach work

47 New MTT: Element Placement

48 New MTT: Portsmouth Slot

49 New MTT: Immersion of Element in Slot

50 New MTT: Backfill of Element in Slot

51 New MTT: Immersion of the Final Element 51

52 Questions?

Elizabeth River Crossings OpCo, LLC Elizabeth River Tunnels Project Monthly Report Owners and Holders Pursuant to Continuing Disclosure Agreement

Elizabeth River Crossings OpCo, LLC Elizabeth River Tunnels Project Monthly Report Owners and Holders Pursuant to Continuing Disclosure Agreement Elizabeth River Crossings OpCo, LLC Elizabeth River Tunnels Project Monthly Report Owners and Holders Pursuant to Continuing Disclosure Agreement November 2015 From: Greg Woodsmall, Chief Executive Officer,

More information

Hampton Roads Bridge Tunnel Expansion: Overview of Tunnel Construction Methods

Hampton Roads Bridge Tunnel Expansion: Overview of Tunnel Construction Methods Hampton Roads Bridge Tunnel Expansion: Overview of Tunnel Construction Methods February 21, 2018 James S. Utterback HRBT Project Director Virginia Department of Transportation Ten Hampton Roads Tunnels

More information

Peninsula Widening. Project Description. Overview of Project Status. Estimated Total Project Cost $4.7 - $7.3 Billion

Peninsula Widening. Project Description. Overview of Project Status. Estimated Total Project Cost $4.7 - $7.3 Billion Peninsula Widening SYSTEM: Interstate FROM: I-664 (Hampton Roads) TO: I-95 (Richmond) DESCRIPTION OF WORK: Provide for increased capacity, improve safety standards and minimize roadway geometric and structural

More information

Hampton Roads Bridge-Tunnel

Hampton Roads Bridge-Tunnel December 19, 2008 Hampton Roads Bridge-Tunnel Expansion Feasibility Study Final Report With Tunnel and Bridge Information Provided by PB Americas and Moffatt and Nichol Prepared by: Hampton Roads Bridge-Tunnel

More information

Immersed Tunnels. Richard Lunniss and Jonathan Baber. CRC Press. Taylor & Francis Group. Taylor & Francis Group, A SPON BOOK

Immersed Tunnels. Richard Lunniss and Jonathan Baber. CRC Press. Taylor & Francis Group. Taylor & Francis Group, A SPON BOOK Immersed Tunnels Richard Lunniss and Jonathan Baber CRC Press Taylor & Francis Group Boca Raton London New York CRC Press is an imprint of the Taylor & Francis Group, an informa business A SPON BOOK Contents

More information

Gilmerton Bridge Replacement Project Virginia Society of Professional Engineers (VSPE) March 27, 2013

Gilmerton Bridge Replacement Project Virginia Society of Professional Engineers (VSPE) March 27, 2013 1 Gilmerton Bridge Replacement Project Virginia Society of Professional Engineers (VSPE) March 27, 2013 PRESENTERS: Marc Papini Parsons Brinckerhoff, Project Manager Jim Holtje, P.E. PCL Civil Constructors,

More information

Challenges in Urban Tunneling

Challenges in Urban Tunneling Challenges in Urban Tunneling By Brij B. Goyal, Ph.D; Igor Maevski, Ph. D Presented at INFRA Montreal on November 19, 2012 Agenda Tunneling as a solution for Urban Tunneling Urban Tunneling Problems Urban

More information

Downtown Tunnel/Midtown Tunnel/MLK Extension Project

Downtown Tunnel/Midtown Tunnel/MLK Extension Project Downtown Tunnel/Midtown Tunnel/MLK Extension Project Presented by Frank Fabian, P.E., VDOT Senior Project Manager Geoff Segal, Senior Vice President, Macquarie Capital, ERC Project Overview 2 Value to

More information

PORT OF MIAMI TUNNEL PROJECT Highlights & Where we are today!

PORT OF MIAMI TUNNEL PROJECT Highlights & Where we are today! PORT OF MIAMI TUNNEL PROJECT Highlights & Where we are today! FEBRUARY 12, 2014 FTBA CONSTRUCTION CONFERENCE PROJECT PARTNERS Public Sponsors 90% Equity Partner Contractor 10% Equity Partner Operator Federal

More information

PPTA Project Pipeline

PPTA Project Pipeline PPTA Project Pipeline Commonwealth of Virginia May 2012 Opening Remarks The Commonwealth of Virginia was developed in the 17 th century as a risky, but ultimately highly successful business venture between

More information

Transportation Update

Transportation Update Transportation Update Projects Underway Norview Avenue About the Project: The Norview Avenue Interchange Improvement Project will eliminate the existing weave movement associated with the on- and off-ramps

More information

Pushing the Envelope For 100 Years

Pushing the Envelope For 100 Years Pushing the Envelope For 100 Years Tunneling under the Chesapeake Bay The Parallel Thimble Shoal Highway Tunnel Presented by: Kevin Abt, PE Chesepeake Bay Bridge and Tunnel District Mike Kling, PE, PTOE

More information

IMPROVING I 81 IN MARYLAND

IMPROVING I 81 IN MARYLAND IMPROVING I 81 IN MARYLAND April 25, 2017 Stephen A. Bucy, P.E. Improving I 81 in Maryland Overview: Facts SHA s Comprehensive I 81 Strategy Current Phase 1 Widening Project Update Closing Improving I

More information

ECONOMIC DEVELOPMENT FULLY FUNDED PROJECTS Capital Improvement Program FY FY 2016

ECONOMIC DEVELOPMENT FULLY FUNDED PROJECTS Capital Improvement Program FY FY 2016 ECONOMIC DEVELOPMENT FULLY FUNDED PROJECTS Capital Improvement Program FY 2012 - FY 2016 Project Number Total Funds Appropriated Project Completion Date Annual Operating Cost 30-09 Conference Center Equipment

More information

Purpose Today: Review information to assist with Prioritization

Purpose Today: Review information to assist with Prioritization PRIORITIZATION OF TRANSPORTATION PROJECTS ROJECTS: REVIEW OF CORE I ORE INFORMATION Presented by: Andy Pickard PE, AICP Principal Transportation Engineer Citizen s Transportation Advisory Committee January

More information

Exposition Light Rail Transit Project

Exposition Light Rail Transit Project Exposition Light Rail Transit Project Downtown & Mid-Corridor Project Status Update Meeting Holman United Methodist Church Thursday, July 23, 2009 Phase 1 Project Description 8.6 mile corridor from Downtown

More information

INDEPENDENT REVIEW PANEL MEETING VDOT'S TECHNICAL FINDINGS PRESENTATION DOWNTOWN TUNNEL/MIDTOWN TUNNEL/ MARTIN LUTHER KING FREEWAY EXTENSION

INDEPENDENT REVIEW PANEL MEETING VDOT'S TECHNICAL FINDINGS PRESENTATION DOWNTOWN TUNNEL/MIDTOWN TUNNEL/ MARTIN LUTHER KING FREEWAY EXTENSION INDEPENDENT REVIEW PANEL MEETING VDOT'S TECHNICAL FINDINGS PRESENTATION 0 DOWNTOWN TUNNEL/MIDTOWN TUNNEL/ MARTIN LUTHER KING FREEWAY EXTENSION APRIL, 0 :OO P.M. - :00 P.M. PORTSMOUTH CITY COUNCIL CHAMBERS

More information

PROJECT UPDATE SOUTH NORFOLK JORDAN BRIDGE CITIES OF PORTSMOUTH AND CHESAPEAKE, VIRGINIA. April 2012

PROJECT UPDATE SOUTH NORFOLK JORDAN BRIDGE CITIES OF PORTSMOUTH AND CHESAPEAKE, VIRGINIA. April 2012 PROJECT UPDATE Rendering View from the City of Chesapeake Elizabeth River Boat Landing and Park looking across the Elizabeth River at Portsmouth CITIES OF PORTSMOUTH AND CHESAPEAKE, VIRGINIA The new 5,375

More information

Maritime Work Plan for the High Rise Bridge Construction

Maritime Work Plan for the High Rise Bridge Construction Maritime Work Plan for the High Rise Bridge Construction Version 6, 10/3/2018 I 64 Southside Widening & High Rise Bridge, Phase 1 Chesapeake, Virginia Design Build Project State Project No.: 0064 131 811,

More information

VDOT Major Projects Update

VDOT Major Projects Update VDOT Major Projects Update April 20, 2017 Agenda Introduction Peninsula Projects Southside Projects Harbor Crossing Questions/Comments 2 Summary Construction Execution Timeline I-64 Peninsula Seg. I PE

More information

NORFOLK STREET BRIDGE

NORFOLK STREET BRIDGE Municipal Structure Inspection Form NORFOLK COUNTY NORFOLK STREET BRIDGE Site Number 000022 NORFOLK STREET NORTH, SIMCOE 0.09km N of Windham Concession 14 Road Ontario Structure Inspection Manual - Inspection

More information

ITS Multimodal Initiatives in Virginia HRTO Subcommittee Meeting Hampton, VA, June 11, 2013

ITS Multimodal Initiatives in Virginia HRTO Subcommittee Meeting Hampton, VA, June 11, 2013 ITS Multimodal Initiatives in Virginia HRTO Subcommittee Meeting Hampton, VA, June 11, 2013 Chris Francis ITS Program Development Manager Operations and Security Division Advancing VDOT s Operations Program

More information

DECOU ROAD BRIDGE. Municipal Structure Inspection Form NORFOLK COUNTY. Site Number DECOU ROAD, SIMCOE. 1.Okm E of Willow Drive

DECOU ROAD BRIDGE. Municipal Structure Inspection Form NORFOLK COUNTY. Site Number DECOU ROAD, SIMCOE. 1.Okm E of Willow Drive NORFOLK COUNTY DECOU ROAD BRIDGE Site Number 000003 DECOU ROAD, SIMCOE 1.Okm E of Willow Drive Ontario Structure Inspection Manual - Inspection Form Site Number: 000003 Inventory Data: Structure Name Decou

More information

Exposition Light Rail Transit Project

Exposition Light Rail Transit Project Exposition Light Rail Transit Project Expo Project Briefing Phase 1 and 2 For IRWA October 26, 2010 Phase 1 Phase 1 Project Description Phase 1 from Downtown Los Angeles to Culver City: 8.6 mile corridor

More information

I-64 Peninsula Shoulder Usage Evaluation. Eric Stringfield VDOT Hampton Roads Transportation Planning April 3, 2013

I-64 Peninsula Shoulder Usage Evaluation. Eric Stringfield VDOT Hampton Roads Transportation Planning April 3, 2013 I-64 Peninsula Shoulder Usage Evaluation Eric Stringfield VDOT Hampton Roads Transportation Planning April 3, 2013 Briefing Purpose Evaluation Area / Existing Conditions Code and Policy Engineering Facts

More information

Lesner Bridge Replacement

Lesner Bridge Replacement Lesner Bridge Replacement Rendering of the Completed Lesner Bridge Structure Construction Camera A Construction Camera has been installed to view images of the bridge construction. Images are updated on

More information

9 Conclusion. 9.1 Introduction

9 Conclusion. 9.1 Introduction 9 Conclusion 9.1 Introduction This final chapter presents a synthesis of the evaluation criteria leading to conclusions and recommendations. Also included is a summary of the current status of the Tappan

More information

Exposition Light Rail Transit Project

Exposition Light Rail Transit Project Exposition Light Rail Transit Project Downtown Corridor USC Galen Center November 13, 2007 Project Summary 8.6 mile corridor from 7th/Metro to Culver City 1.3 miles shared with Metro Blue Line 10 stations,

More information

Project Team. D6 South Miami-Dade Resident Engineer Erik Padron, P.E. D6 Construction Project Manager Dari Vorce

Project Team. D6 South Miami-Dade Resident Engineer Erik Padron, P.E. D6 Construction Project Manager Dari Vorce Project Team D6 South Miami-Dade Resident Engineer Erik Padron, P.E. D6 Construction Project Manager Dari Vorce D6 Design Project Manager Ali Toghiani, P.E. CEI: AIM Engineering and Surveying Francis Chin,

More information

Lesner Bridge Replacement

Lesner Bridge Replacement Lesner Bridge Replacement Rendering of the Completed Lesner Bridge Structure Construction Camera A Construction Camera has been installed to view images of the bridge construction. Images are updated on

More information

I-64 Capacity Improvements Segment I Financial Plan Annual Update December 1, 2017

I-64 Capacity Improvements Segment I Financial Plan Annual Update December 1, 2017 I-64 Capacity Improvements Segment I Financial Plan Annual Update December 1, 2017 State Project # 0064-965-264, P101, R201, C501, B616, B617, B618, B619, B620, B621, D601, D602 Federal # NHS-064-3(479),

More information

Independent Technical Review of the George Massey Crossing. December, 2018

Independent Technical Review of the George Massey Crossing. December, 2018 Independent Technical Review of the George Massey Crossing December, 2018 The Independent Technical Review (ITR) The Review will focus on what level of improvement is needed in the context of regional

More information

HUNT STREET BRIDGE. Site Number HUNT STREET, SIMCOE. 0.2 km North of Highway 3

HUNT STREET BRIDGE. Site Number HUNT STREET, SIMCOE. 0.2 km North of Highway 3 NORFOLK COUNTY HUNT STREET BRIDGE Site Number 983502 HUNT STREET, SIMCOE 0.2 km North of Highway 3 Ontario Structure Inspection Manual - Inspection Form Site Number: 983502 Inventory Data: Structure Name

More information

Learning Legacy Document Duration of data recorded (approx.) 1

Learning Legacy Document Duration of data recorded (approx.) 1 Table 1: Crossrail Water Consumption Data Contract C300/C410 - Crossrail Running Tunnels - West; Bond Street & Tottenham Court Road s - Early Access Shafts & SCL Works (JV: BAM Nuttall Ltd / Ferrovial

More information

WHERE GREEN JOBS GROW ON LAND AND WATER THE PORT OF COEYMANS P&M BRICK LLC

WHERE GREEN JOBS GROW ON LAND AND WATER THE PORT OF COEYMANS P&M BRICK LLC WHERE GREEN JOBS GROW ON LAND AND WATER THE PORT OF COEYMANS P&M BRICK LLC A GREEN FACILITY HISTORY The property was formerly a brick manufacturing plant. The plant closed in December 2001 displacing approximately

More information

Zinc Rich Paint in a Pigeon Rich Environment

Zinc Rich Paint in a Pigeon Rich Environment Zinc Rich Paint in a Pigeon Rich Environment Achieving Bridge Rehab without Going to Rehab Louisville Bridge Rehabilitation Lea Joyner Bridge Rehabilitation US 80 / Ouachita River Monroe/West Monroe Ouachita

More information

Congress Parkway over South Branch of the Chicago River

Congress Parkway over South Branch of the Chicago River Congress Parkway over South Branch of the Chicago River Congress Parkway Built in 1956 IDOT owns 10 movable bridges Chicago owns 37 movable bridges Trunion Bridge: A trunion bridge is a style of movable

More information

Walt Whitman Bridge Redecking Fact Sheet

Walt Whitman Bridge Redecking Fact Sheet Walt Whitman Bridge Redecking Fact Sheet Walt Whitman Bridge opened to traffic on May, 9. The DR Board of Commissioners approved two contracts totaling $9,,8. to both redeck the bridge and monitor construction

More information

I-395 Reconstruction MDX SR Improvements I-95 Concrete Pavement Reconstruction

I-395 Reconstruction MDX SR Improvements I-95 Concrete Pavement Reconstruction I-395 Reconstruction MDX SR 83611 Improvements I-95 Concrete Pavement Reconstruction FTBA Conference February 10, 2016 Presentation Outline Project Overview I-395 Reconstruction MDX SR 83611 I-95 Pavement

More information

Ironton Russell Bridge Project

Ironton Russell Bridge Project Construction Update July 1, 2015 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Project Overview The entails the construction of a cast in place

More information

Hampton Roads Bridge-Tunnel Expansion Feasibility Study. Design Considerations

Hampton Roads Bridge-Tunnel Expansion Feasibility Study. Design Considerations Hampton Roads Bridge-Tunnel Expansion Feasibility Study Tunnels Design Considerations The proposed location for the new tunnel crossing is about 250 feet away from the existing westbound tunnel. This matches

More information

Kevin Abt Chief Engineer Virginia Port Authority

Kevin Abt Chief Engineer Virginia Port Authority Capital Outlay Program & Facilities Maintenance Overview Board of Commissioners Session 354 September 24, 2013 Kevin Abt Chief Engineer Virginia Port Authority Agenda VPA Projects NIT Gate Improvements

More information

MISENER DAM. Site Number LYNN STREET, PORT DOVER km N of Highway 6

MISENER DAM. Site Number LYNN STREET, PORT DOVER km N of Highway 6 NORFOLK COUNTY MISENER DAM Site Number 980501 LYNN STREET, PORT DOVER 0.65 km N of Highway 6 Ontario Structure Inspection Manual - Inspection Form Site Number: 980501 Inventory Structure Name Misener Dam

More information

Final Report 6/19/2013. Sponsored by:

Final Report 6/19/2013. Sponsored by: Final Report 6/19/2013 Sponsored by: What is the problem? Widespread premature cracking of concrete bridge parapets Many vertical cracks (between joints) Some horizontal cracks (at level of top bars) A

More information

Second Avenue Subway

Second Avenue Subway Second Avenue Subway Community Board 8 Second Avenue Subway Task Force Update January 22, 2015 Tom Peyton Second Avenue Subway Project Director 0 Scope: Q train service Tunnels from 92nd St to 63rd St

More information

NSBA. Prize Bridge. Awards

NSBA. Prize Bridge. Awards NSBA 2016 Prize Bridge Awards THE COUNTRY S BEST STEEL BRIDGES have been honored in this year s Prize Bridge Awards competition. Conducted every two years by the National Steel Bridge Alliance (NSBA),

More information

DRAFT Noise Analysis Technical Report

DRAFT Noise Analysis Technical Report State Project: 0064-114-F12, PE-102 UPC: 99587 From: I-664/Monitor-Merrimac Memorial Bridge Tunnel in Hampton Roads, VA To: I-564 at Naval Station Norfolk in Norfolk, VA and to Route 164 in Portsmouth,

More information

Benjamin G. Perez, AICP Parsons Brinckerhoff. TRB Conference on Surface Transportation Financing

Benjamin G. Perez, AICP Parsons Brinckerhoff. TRB Conference on Surface Transportation Financing SHRP2 C12 The Effects of Public-Private Partnerships and Non-Standard Procurements on Highway Planning, Environmental Review, and Collaborative Decision-Making Benjamin G. Perez, AICP Parsons Brinckerhoff

More information

Agenda Item 6a. TO: BATA Oversight Committee DATE: November 7, FR: Executive Director W. I. 1252

Agenda Item 6a. TO: BATA Oversight Committee DATE: November 7, FR: Executive Director W. I. 1252 Agenda Item 6a TO: BATA Oversight Committee DATE: November 7, 2018 FR: Executive Director W. I. 1252 RE: Options for Implementing All-Electronic Tolling on State-Owned Bridges The Bay Area Toll Authority

More information

Presentation Outline. Need for Creative Solutions in Technical Construction Problems. creativity, imagination, and innovative skills.

Presentation Outline. Need for Creative Solutions in Technical Construction Problems. creativity, imagination, and innovative skills. Construction Engineering Process and Knowledge Requirements for Fostering Creative Design Solutions on Infrastructure Projects Robert B. Bittner, Bittner-Shen Consulting Engineers Robert L. Schmitt, University

More information

The government of the SOCIALIST REPUBLIC OF VIETNAM HO CHI MINH CITY PEOPLE S S COMMITTEE TUNNEL JAPAN. Official Development Assistance

The government of the SOCIALIST REPUBLIC OF VIETNAM HO CHI MINH CITY PEOPLE S S COMMITTEE TUNNEL JAPAN. Official Development Assistance 0 The government of the SOCIALIST REPUBLIC OF VIETNAM HO CHI MINH CITY PEOPLE S S COMMITTEE TUNNEL JAPAN Official Development Assistance 1 TUNNEL Sub-Sector (Civil) IMAGE OF TUNNEL ENTRANCE 2 Traffic in

More information

Aviation Capital Construction Program Update

Aviation Capital Construction Program Update Aviation Capital Construction Program Update 2012 Completed Projects 2013 Active Projects Bern Seals Program Manager Parsons Management Consultants April 2013 0 Discussion Agenda Program Safety Performance

More information

I-64 Capacity Improvements Segment I Financial Plan Annual Update

I-64 Capacity Improvements Segment I Financial Plan Annual Update I-64 Capacity Improvements Segment I December 1, 2016 State Project # 0064-965-264, P101, R201, C501, B616, B617, B618, B619, B620, B621, D601, D602 Federal # NHS-064-3(479), NHA-064-3(479) UPC 104905

More information

Highway Construction Program

Highway Construction Program Highway Construction Program Monthly Delivery Progress Report Watch List February 2017 This report focuses on Capital Highway Program projects, which have, or may have significant changes in scope, schedule,

More information

HEAD STREET BRIDGE (SIMCOE)

HEAD STREET BRIDGE (SIMCOE) NORFOLK COUNTY HEAD STREET BRIDGE (SIMCOE) Site Number 000009 HEAD STREET, SIMCOE 0.3km S of Windham Street Ontario Structure Inspection Manual - Inspection Form Site Number: 000009 Inventory Structure

More information

VENISON CREEK BRIDGE

VENISON CREEK BRIDGE Municipal Structure Inspection Form NORFOLK COUNTY VENISON CREEK BRIDGE Site Number 000103 TROYER ROAD, SOUTH WALSINGHAM 0.35km N of County Road 60 Inventory Structure Name Venison Creek Bridge On Crossing

More information

POSTER PAPER PROCEEDINGS

POSTER PAPER PROCEEDINGS ITA - AITES WORLD TUNNEL CONGRESS 21-26 April 2018 Dubai International Convention & Exhibition Centre, UAE POSTER PAPER PROCEEDINGS Advanced Developments in Steel and RC Immersed Tunnels Hideki Sakaeda

More information

ADOT Yuma District. Alvin Stump, P.E. ADOT Yuma District Engineer Rural Transportation Summit January 20, 2012

ADOT Yuma District. Alvin Stump, P.E. ADOT Yuma District Engineer Rural Transportation Summit January 20, 2012 ADOT Yuma District Alvin Stump, P.E. ADOT Yuma District Engineer Rural Transportation Summit January 20, 2012 Active Construction Projects SR 95@ Bill Williams River NWR Rd CAP Intersection US 95, Castle

More information

DESIGN OF TEMPLETON OVERPASS FOR THE CANADA LINE. Yulin Gao, M.A.Sc., P.Eng., SNC-Lavalin Inc. Samson Chan, M.Eng.,P.Eng., SNC-Lavain Inc.

DESIGN OF TEMPLETON OVERPASS FOR THE CANADA LINE. Yulin Gao, M.A.Sc., P.Eng., SNC-Lavalin Inc. Samson Chan, M.Eng.,P.Eng., SNC-Lavain Inc. DESIGN OF TEMPLETON OVERPASS FOR THE CANADA LINE Yulin Gao, M.A.Sc., P.Eng., SNC-Lavalin Inc. Samson Chan, M.Eng.,P.Eng., SNC-Lavain Inc. Roger Woodhead, PhD, P.Eng., SNC-Lavain Inc. Paper prepared for

More information

AGENDA ITEM #17: VIRGINIA S 2025 TRANSPORTATION NEEDS ASSESSMENT AND HB2: OIPI CONSULTANT

AGENDA ITEM #17: VIRGINIA S 2025 TRANSPORTATION NEEDS ASSESSMENT AND HB2: OIPI CONSULTANT AGENDA ITEM #17: VIRGINIA S 2025 TRANSPORTATION NEEDS ASSESSMENT AND HB2: OIPI CONSULTANT The Office of Intermodal Planning and Investment (OIPI) is leading the effort to develop and implement the Statewide

More information

Sullivan Lake Cold Water Intake. Pend Oreille PUD No. 1 of Pend Oreille County, WA

Sullivan Lake Cold Water Intake. Pend Oreille PUD No. 1 of Pend Oreille County, WA Sullivan Lake Cold Water Intake Pend Oreille PUD No. 1 of Pend Oreille County, WA April 7, 2016 Project Location Sullivan Lake Project Location Pend Oreille River Sullivan Lake Project Team Project Team

More information

RENTON CONCESSION CULVERT. Site Number COUNTY ROAD 5, WOODHOUSE. 0.4 km S of Highway #3

RENTON CONCESSION CULVERT. Site Number COUNTY ROAD 5, WOODHOUSE. 0.4 km S of Highway #3 NORFOLK COUNTY RENTON CONCESSION CULVERT Site Number 970504 COUNTY ROAD 5, WOODHOUSE 0.4 km S of Highway #3 Ontario Structure Inspection Manual - Inspection Form Site Number: 970504 Inventory Data: Structure

More information

DESIGN OF CAMPBELL ROAD OVERPASS IN KELOWNA. Yulin Gao, M.A.Sc., P.Eng., SNC-Lavalin Inc. Samson Chan, M.Eng., P. Eng., SNC-Lavalin Inc.

DESIGN OF CAMPBELL ROAD OVERPASS IN KELOWNA. Yulin Gao, M.A.Sc., P.Eng., SNC-Lavalin Inc. Samson Chan, M.Eng., P. Eng., SNC-Lavalin Inc. DESIGN OF CAMPBELL ROAD OVERPASS IN KELOWNA Yulin Gao, M.A.Sc., P.Eng., SNC-Lavalin Inc. Samson Chan, M.Eng., P. Eng., SNC-Lavalin Inc. Paper prepared for presentation at the Bridges in a Climate of Change

More information

I-65/I-70 North Split Project

I-65/I-70 North Split Project I-65/I-70 North Split Project Public Open House October 10, 2018 Alternatives Development Process Define Problems Identify Context Gather Input Define Alternatives Balance Trade-Offs Select Alternative

More information

2-2 ALTERNATIVES CONSIDERED AND ELIMINATED

2-2 ALTERNATIVES CONSIDERED AND ELIMINATED Section 2: Alternatives Development and Evaluation 2-1 INTRODUCTION This section of the Scoping Information Packet describes the alternatives to be evaluated in the Environmental Impact Statement (EIS)

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions) FY 2018-2027 WIDE TRANSPORTATION IMPROVEMENT PROGRAM NY Susquehanna and Western Rail Line Bicycle/Pedestrian Path DBNUM: NS9803 / UPC: 058018 The 4.8 mile New York, Susquehanna, and Western Railway (NYS&W)

More information

NATIONAL CAPITAL REGION TRANSPORTATION PLANNING BOARD

NATIONAL CAPITAL REGION TRANSPORTATION PLANNING BOARD NATIONAL CAPITAL REGION TRANSPORTATION PLANNING BOARD September 18, 2013 District Department of Transportation Federal Railroad Administration AGENDA Vision History & Background Study Area Purpose & Need

More information

William R. Bennett Bridge. W.R. Bennett Bridge, Kelowna, B.C. Canada. July 2005 to December 2008

William R. Bennett Bridge. W.R. Bennett Bridge, Kelowna, B.C. Canada. July 2005 to December 2008 William R. Bennett Bridge W.R. Bennett Bridge, Kelowna, B.C. Canada. July 2005 to December 2008 Contract Details Scope: Design & Build the new W.R. Bennett Floating Bridge & Decommission existing Okanagan

More information

Implementing Asset Management: WSDOT s Experience

Implementing Asset Management: WSDOT s Experience Implementing Asset Management: WSDOT s Experience 6 th National Conference on Transportation Asset Management Aaron Butters, P.E. Systems Analysis and Program Development Manager November 2, 2005 1 Highway

More information

TABLE OF CONTENTS 3.0 AFFECTED ENVIRONMENT AND ENVIRONMENTAL CONSEQUENCES

TABLE OF CONTENTS 3.0 AFFECTED ENVIRONMENT AND ENVIRONMENTAL CONSEQUENCES TABLE OF CONTENTS 1.0 PURPOSE AND NEED -------------------------------------------------------------------------------------------- 1-1 1.1 STUDY AREA -----------------------------------------------------------------------------------------------------

More information

WELCOME. Public Meeting for I-35 / I-44 Interchange. October 6, 2015

WELCOME. Public Meeting for I-35 / I-44 Interchange. October 6, 2015 WELCOME Public Meeting for I-35 / I-44 Interchange October 6, 2015 TEAM INTRODUCTIONS PURPOSE OF THIS MEETING is to present the alternative alignments for the I-35/I-44 and I-35/NE 63rd Street Interchanges

More information

SR 0136-G10 ABC BRIDGE REPLACEMENT in Eighty Four, PA

SR 0136-G10 ABC BRIDGE REPLACEMENT in Eighty Four, PA ASHE NATIONAL PROJECT OF THE YEAR SR 0136-G10 ABC BRIDGE REPLACEMENT in Eighty Four, PA For the PENNSYLVANIA DEPARTMENT OF TRANSPORTATION Engineering District 12-0 Submitted By: January 29, 2018 AMERICAN

More information

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2015/16 thru FY 2019/20 Summary of Projects in FDOT District Four

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2015/16 thru FY 2019/20 Summary of Projects in FDOT District Four DISTRICT FOUR PROJECT OVERVIEW Florida s Turnpike Enterprise continues to make significant project investments in District Four. In fiscal years 2014 and 2015, current Turnpike projects total over $127

More information

PortMiami Rail Intermodal and Bascule Bridge Rehabilitation Project TIGER II Grant

PortMiami Rail Intermodal and Bascule Bridge Rehabilitation Project TIGER II Grant PortMiami Rail Intermodal and Bascule Bridge Rehabilitation Project TIGER II Grant Quick Facts PortMiami is located in Miami-Dade County, one of the most diverse, multilingual populations in the U.S. making

More information

NORWICH ROAD BRIDGE. Site Number D00016 NORWICH ROAD, DELHI. 1.0 km N of King Street Delhi

NORWICH ROAD BRIDGE. Site Number D00016 NORWICH ROAD, DELHI. 1.0 km N of King Street Delhi NORWICH ROAD BRIDGE Site Number NORWICH ROAD, DELHI 1.0 km N of King Street Delhi Ontario Structure Inspection Manual - Inspection Form Site Number: Inventory Structure Name Norwich Road Bridge On Crossing

More information

Ironton Russell Bridge Project

Ironton Russell Bridge Project Construction Update January 1, 2016 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Project Overview The Ironton Russell Bridge Project entails

More information

Cumberland Viaduct Rehabilitation Project Contract No. AL R Presenter Bob Bofinger MDSHA Office of Structures

Cumberland Viaduct Rehabilitation Project Contract No. AL R Presenter Bob Bofinger MDSHA Office of Structures Cumberland Viaduct Rehabilitation Project Contract No. AL4095180R Presenter Bob Bofinger MDSHA Office of Structures Project Justification & Improvements Condition State The deck, superstructure and substructure

More information

RESILIENT INFRASTRUCTURE June 1 4, 2016

RESILIENT INFRASTRUCTURE June 1 4, 2016 RESILIENT INFRASTRUCTURE June 1 4, 2016 WESTMINSTER DRIVE UNDERPASS ACCELERATED BRIDGE CONSTRUCTION USING GIGO (GET IN-GET OUT) BRIDGE CONCEPT Mark D Andrea, M.Sc., P.Eng. Stantec Consulting Ltd., Canada

More information

Accelerated Bridge Construction (ABC) webinar Thursday, October 24, 2013 ABC Center at Florida International University (FIU) presents

Accelerated Bridge Construction (ABC) webinar Thursday, October 24, 2013 ABC Center at Florida International University (FIU) presents Accelerated Bridge Construction (ABC) webinar Thursday, October 24, 2013 ABC Center at Florida International University (FIU) presents Washington State s Skagit River Bridge Emergency Slide Bijan Khaleghi

More information

COMMUNITY BOARD EIGHT

COMMUNITY BOARD EIGHT SECOND AVENUE SUBWAY PROJECT COMMUNITY BOARD EIGHT PROJECT UPDATE SEPTEMBER 26, 2011 Scope: SECOND AVENUE SUBWAY - PHASE 1 Tunnels from 92 nd St to 63 rd St Stations at 96 th St, 86 th St, 72 nd St and

More information

ASCE STRUCTURAL ENGINEERING CONFERENCE. Ames Iowa

ASCE STRUCTURAL ENGINEERING CONFERENCE. Ames Iowa 2014 HDR Architecture, 2014 HDR, Inc., all rights reserved. ASCE STRUCTURAL ENGINEERING CONFERENCE Ames Iowa WHAT DO YOU DO IF YOU HAVE MORE PROJECT THAN BUDGET? DESIGN BUILDER SELECTION METHOD Fixed Price

More information

Ironton Russell Bridge Project

Ironton Russell Bridge Project Construction Update March 1, 2014 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Ironton Russell Bridge Project Project Summary: March 1, 2014

More information

Rehabilitation of East Lynn Lake Bridge Steel Pile Bents With Composites

Rehabilitation of East Lynn Lake Bridge Steel Pile Bents With Composites TRB Innovative Technologies for a Resilient Marine Transportation System 3 rd Biennial Research and Development Conference, June 24-26, 2014, Washington, DC Rehabilitation of East Lynn Lake Bridge Steel

More information

ITA Working Group 11 for Immersed and Floating Tunnels

ITA Working Group 11 for Immersed and Floating Tunnels An Owners Guide to Immersed Tunnels ITA Working Group 11 for Immersed and Floating Tunnels N ISBN: 978-2-9700624-5-5 ITA REPORT n 007 / OCT 2011 Author list Main Author(s): Introduction I Markey & Jon

More information

2. ALTERNATIVES. Draft Supplemental Environmental Impact Statement Chapter 2: Alternatives 2.1 INTRODUCTION

2. ALTERNATIVES. Draft Supplemental Environmental Impact Statement Chapter 2: Alternatives 2.1 INTRODUCTION 2. ALTERNATIVES 2.1 INTRODUCTION This chapter describes the alternatives development process for the HRCS SEIS, including the identification of an initial range of alternatives considered and alternatives

More information

B. Reinforcing. Materials shall be as specified in Section 2000 Concrete or as indicated on the plans.

B. Reinforcing. Materials shall be as specified in Section 2000 Concrete or as indicated on the plans. SECTION 1400 - CONCRETE PAVEMENT 1401 SCOPE. This section governs the furnishing of all labor, equipment, tools, and materials and the performance of all work necessary to construct concrete pavement.

More information

I-70 East PACT DRAFT EVALUATION DATA

I-70 East PACT DRAFT EVALUATION DATA I-70 East PACT DRAFT EVALUATION DATA Future Current Alignment NEIGHORHOOD QUALITY: Maintain quality of life and protect community values. Improve or maintain neighborhood connectivity Assess neighborhood

More information

Ironton Russell Bridge Project

Ironton Russell Bridge Project Construction Update October 1, 2015 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Ironton Russell Bridge Project Project Summary: October 1, 2015

More information

Design Challenges and Construction Benefits of Precast Segmental Rail Bridges

Design Challenges and Construction Benefits of Precast Segmental Rail Bridges Design Challenges and Construction Benefits of Precast Segmental Rail Bridges by Amy R. Kohls, P.E., S.E. Director Texas Office Figg Bridge Engineers, Inc. 10000 North Central Expressway Suite 1300 Dallas,

More information

Jane Addams Memorial Tollway (I 90) Fox River Bridge Traffic Needs Drive Innovative Solutions

Jane Addams Memorial Tollway (I 90) Fox River Bridge Traffic Needs Drive Innovative Solutions Jane Addams Memorial Tollway (I 90) Fox River Bridge Traffic Needs Drive Innovative Solutions Scott Eshleman, P.E., S.E, CVS, Stanley Consultants Keith Sargent, P.E., Thomas Engineering Group, LLC February

More information

Westside Purple Line Extension Section 1 Project Overview

Westside Purple Line Extension Section 1 Project Overview Westside Purple Line Extension Section 1 Project Overview Westside Purple Line Extension (WPLE) Section 1 Project Purple Line Project Alignment The WPLE corridor traverses portions of three jurisdictions,

More information

SECTION STORM DRAINAGE UTILITIES. B. Section : Site Restoration and Rehabilitation

SECTION STORM DRAINAGE UTILITIES. B. Section : Site Restoration and Rehabilitation SECTION 33 40 00 STORM DRAINAGE UTILITIES 1. PART 1 GENERAL 1.1 RELATED WORK A. Section 31 23 00: Excavation and Fill B. Section 32 00 01: Site Restoration and Rehabilitation C. Special Conditions for

More information

SEAUPG ANNUAL MEETING NOVEMBER 13, 2013

SEAUPG ANNUAL MEETING NOVEMBER 13, 2013 Trenton M. Clark, P.E. Virginia Asphalt Association David White Superior Paving Corporation Current system is approximately 5,230 ln mi Pavement types Flexible Jointed Concrete Continuously Reinforced

More information

I-4 Ultimate Social Media

I-4 Ultimate Social Media January 7, 2015 I-4 Ultimate Social Media Learning about #I4Ultimate construction and how the project will keep traffic on the go on @idriveorlando @MyFDOT_CFL #I4Ultimate Interstate Today Designed and

More information

TALBOT STREET BRIDGE

TALBOT STREET BRIDGE NORFOLK COUNTY TALBOT STREET BRIDGE Site Number 000016 TALBOT STREET, SIMCOE 0.10 km S of Windham Street Ontario Structure Inspection Manual - Inspection Form Site Number: 000016 Inventory Structure Name

More information

1993 Specifications CSJ SPECIAL SPECIFICATION ITEM 4372 TUNNEL SECTION REMOVAL

1993 Specifications CSJ SPECIAL SPECIFICATION ITEM 4372 TUNNEL SECTION REMOVAL 1993 Specifications CSJ 0389-12-061 SPECIAL SPECIFICATION ITEM 4372 TUNNEL SECTION REMOVAL 1. Description. This item shall govern for the removal of the tunnel sections as shown on the plans and specified

More information

DESIGN OF THE MAIN SPANS OF THE CHONGQING CAIYUANBA BRIDGE

DESIGN OF THE MAIN SPANS OF THE CHONGQING CAIYUANBA BRIDGE Design of the Main Spans of the Chongqing Caiyuanba Bridge ARCH 04 M.C. Tang and J. Sun @CIMNE, Barcelona, 2004 DESIGN OF THE MAIN SPANS OF THE CHONGQING CAIYUANBA BRIDGE Man-Chung Tang* and John Sun+

More information

Nancy Daubenberger, MnDOT Assistant Commissioner Engineering Services

Nancy Daubenberger, MnDOT Assistant Commissioner Engineering Services Nancy Daubenberger, MnDOT Assistant Commissioner Engineering Services Kevin Western, MnDOT State Bridge Engineer House Transportation Policy and Finance Committee April 11, 2016 Introduction to Design

More information

SENIOR THESIS FINAL PROPOSAL

SENIOR THESIS FINAL PROPOSAL Submitted 12/10/2010 Construction Management Advisor: Dr. Robert Leicht [The following report presents a detailed overview of the research topics to be done on the Office Renovation Building. A series

More information

Future Programmatic Beyond 01/06/2020 Sorted By District (Subject to Departmental Changes)

Future Programmatic Beyond 01/06/2020 Sorted By District (Subject to Departmental Changes) Sorted By rict (Subject to Departmental Changes) Future Prog Beyond Prompt By Run : 1/25/2019 1 09/08/20 101082 D01 UBI FY21 Use a consultant to perform underwater bridge inspections. Consultant to perform

More information