Preliminary Geotechnical Engineering Study DCPL Capitol View Branch Library Washington, D.C. HCEA Job No A. Prepared for:

Size: px
Start display at page:

Download "Preliminary Geotechnical Engineering Study DCPL Capitol View Branch Library Washington, D.C. HCEA Job No A. Prepared for:"

Transcription

1 Preliminary Geotechnical Engineering Study DCPL Capitol View Branch Library Washington, D.C. HCEA Job No A Prepared for: Smoot Construction Company 5335 Wisconsin Avenue, NW Washington, DC HLLS-CARNES ENGNEERNG ASSOCATES, NC.

2 February 4, 2015 Smoot Construction Company 5335 Wisconsin Avenue, NW Washington, DC Attention: Mr. Stuart M. Dziura Re: Gentlemen: Preliminary Geotechnical Engineering Study DCPL Capitol View Branch Library Washington, D.C. HCEA Job No A Guilford Road, Suite A Post Office Box 241 Annapolis Junction, MD Baltimore DC Metro Fax Hillis-Carnes Engineering Associates, nc. (HCEA) is pleased to submit this report concerning the preliminary subsurface exploration and subsequent preliminary geotechnical evaluation for the proposed library construction that is to be located in Washington, D.C. ENGNEERNG ASSOCATES, NC. We wish to advise you that the boring samples will be stored at our Annapolis Junction, Maryland office for a period of 30 days from the date of this letter. Should you wish the samples to be stored for a longer period of time or to be delivered to you or another party, please advise us in writing prior to the end of the 30-day period. Otherwise, the samples will be discarded at the end of the 30-day storage period. HCEA appreciates having had the opportunity to provide the geotechnical consultation for this project, and we will remain available for further consultation during the various design stages. n order to provide complete professional services, we strongly recommend that inspection of the geotechnical aspects of construction be conducted by HCEA. This will help to verify that the construction operations are performed in accordance with the design recommendations of this report and the overall project plans and specifications. Should you have any questions concerning the contents of this report, or require additional consultation, design, inspection, or testing services, please contact our Office. Very truly yours, HLLS-CARNES ENGNEERNG ASSOCATES, NC. Michael P. Johnson, P.E. Timothy B. Hill, P.E. HLLS-CARNES ENGNEERNG ASSOCATES, NC.

3 TABLE OF CONTENTS LETTER OF TRANSMTTAL... i 1.0 PURPOSE AND SCOPE PROJECT CHARACTERSTCS FELD EXPLORATON SUBSURFACE CONDTONS Man-Placed Fill Materials Natural Materials Groundwater PRELMNARY EVALUATONS AND RECOMMENDATONS General Site Preparation Fill Selection, Placement and Compaction Foundation Evaluations Ground-Supported Slabs Groundwater and Drainage REMARKS... 7 APPENDX... 9 HLLS-CARNES ENGNEERNG ASSOCATES, NC.

4 PRELMNARY GEOTECHNCAL ENGNEERNG STUDY DCPL CAPTOL VEW BRANCH LBRARY WASHNGTON, D.C. HCEA JOB NO A 1.0 PURPOSE AND SCOPE The purpose of this study was to preliminarily determine the general subsurface conditions at the boring locations and to preliminarily evaluate those conditions with respect to concept and design of foundation systems and floor slabs for the proposed construction. The preliminary evaluations and recommendations presented in this report were developed from an analysis of project characteristics and an interpretation of the general subsurface conditions at the site based on the boring information. The stratification lines indicated on the boring logs represent the approximate boundaries between soil types. n-situ, however, the transitions may be gradual. Such variations can best be evaluated during construction and, if necessary, any minor design changes can be made at that time. An evaluation of the site with respect to potential construction problems and recommendations dealing with the earthwork and inspection during construction are also included. The inspection is considered necessary to verify the subsurface conditions and to verify that the soils-related construction phases are performed properly. The Appendix contains a summary of the field work on which this report is based. 2.0 PROJECT CHARACTERSTCS The project site is located at 5001 Central Avenue, SE in Washington D.C. as shown on the Project Location Map (Figure 1) in the Appendix. Based on information provided by the Client, we understand that the proposed construction at the site is to include is to include a new library building. The site is currently occupied by an existing library structure that is to be removed prior to the initiation of new construction. Additional details concerning the proposed construction were not available at the time that this report was being prepared. Should any of the project characteristics differ from those outlined above, then this office should be contacted for a reevaluation of the site. HLLS-CARNES ENGNEERNG ASSOCATES, NC.

5 DCPL CAPTOL VEW BRANCH LBRARY Preliminary Geotechnical Engineering Study 3.0 FELD EXPLORATON n order to determine the general foundation soil types and to develop preliminary design parameters, five Standard Penetration Test (SPT) soil borings were drilled to depths of 45 ft below existing site grades in accessible locations at the site. We understand that additional borings are to be drilled once the existing structure is demolished and removed to confirm the subsurface conditions in currently inaccessible areas of the site. The boring locations were located in the field by HCEA by estimation from existing site features. Therefore, the boring locations shown on the Boring Location Plan (Figure 2) in the Appendix should be considered approximate. The borings were advanced with hollow-stem augers and the subsurface soils were sampled at 2.5 ft and 5.0 ft intervals. Samples were taken by driving a 1-3/8 inch.d. (2-inch O.D.) split-spoon sampler in accordance with ASTM D-1586 specifications. The sampler was first seated 6 inches to penetrate any loose cuttings and then was driven an additional foot with blows of a 140 pound hammer falling 30 inches. The number of hammer blows required to drive the sampler the final foot is designated as the "Penetration Resistance" or "N" value. The penetration resistance, when properly evaluated, is an index to the soil strength and compression characteristics. Representative portions of each soil sample were placed in glass jars and transported to HCEA's laboratory. n the laboratory, the samples were visually examined by the Geotechnical Engineer to verify the driller's field classifications. The samples were visually classified in general accordance with the Unified Soil Classification System and the field classifications were revised where necessary. The Unified Soil Classification Symbols appear on the Boring Logs and the system nomenclature is briefly described in the Appendix. 4.0 SUBSURFACE CONDTONS Details of the subsurface conditions encountered at the site are shown on the Records of Soil Exploration. A brief description of the subsurface conditions and pertinent engineering characteristics of the soils are given below. Strata divisions shown on the Records of Soil Exploration have been estimated based on visual examinations of the recovered boring samples. n the field, strata changes could occur gradually and/or at slightly different levels than indicated. Also, groundwater conditions indicated on the Records of Soil Exploration are those observed during the period of the subsurface exploration. Fluctuations in groundwater levels could occur seasonally and might also be influenced by changes in grading, runoff and infiltration rates, and other influencing factors. HLLS-CARNES ENGNEERNG ASSOCATES, NC. 2

6 DCPL CAPTOL VEW BRANCH LBRARY Preliminary Geotechnical Engineering Study Generalized subsurface conditions based on the results of the borings are discussed below: 4.1 Man-Placed Fill Materials Materials specifically identified as man-placed fill materials or possible manplaced fill materials were encountered at the following locations in the borings: Approximate Depth Boring of Fill Material (ft) B B B B B Since the size of the samples obtained is relatively small in comparison to the areal extent of the site and since the fill materials could be of similar composition to the natural soils encountered at the site, it is often difficult to determine the presence and composition of fill materials from the SPT samples. t should be anticipated that man-placed fill materials may be encountered at other locations and to different depths across the site due to the previous construction that has occurred on and around the project site. 4.2 Natural Materials The natural soils encountered at the site were visually classified in general accordance with the Unified Soil Classification System as silty sand (SM) and silty or sandy clay (CL or CH). "N" values from the Standard Penetration Test (SPT) borings typically indicated relative densities in the dense to very dense range for the more granular natural materials encountered. The more fine-grained materials typically exhibited consistencies in the very stiff to hard range. 4.3 Groundwater Groundwater levels were monitored in the open boreholes. The shallowest groundwater encountered in the borings was located at a depth of ft below existing site grades in the caved borehole at the location of Boring B-5. Water that appeared to be perched within the existing fill materials was encountered at a depth of 8.5+ ft in Boring B-4 and at a depth of 5.5+ ft in Boring B-5. HLLS-CARNES ENGNEERNG ASSOCATES, NC. 3

7 DCPL CAPTOL VEW BRANCH LBRARY Preliminary Geotechnical Engineering Study A more accurate determination of the hydrostatic water table would require the installation of perforated pipes or piezometers which could be monitored over an extended period of time. The actual level of the hydrostatic water table and the amount and level of perched water should be anticipated to fluctuate throughout the year, depending on variations in precipitation, surface run-off, infiltration, site topography, and drainage. t should also be anticipated that perched water will be encountered in pockets within the fill materials or at the interface of fill materials and natural soils. 5.0 PRELMNARY EVALUATONS AND RECOMMENDATONS Our findings indicate that the site can be developed for the proposed structure utilizing conventional spread footings and ground-supported slab construction. The presence of relatively soft and loose existing fill/possible fill materials to estimated depths of 17+ ft to ft below existing site grades will have a significant impact on construction operations. Footings should not be constructed on or over any existing fill materials. t is recommended that the proposed structure be supported on a deep foundation system consisting of either augered, cast-in-place concrete piles or drilled shafts. Alternatively, it may be possible to utilize alternative subgrade modification techniques (such as rammed-aggregate piers) in order to provide a shallow foundation alternative for the structure. The following preliminary recommendations have been developed on the basis of the previously described project characteristics and subsurface conditions. f there are any changes to the project characteristics or if different subsurface conditions are encountered during construction, HCEA should be consulted so that the recommendations of this report can be reviewed and revised, if necessary. 5.1 General Site Preparation All existing structures (including all above and below ground construction) within the areas to be developed should be removed prior to the initiation of new construction. We suggest that all available information regarding the existing utilities at the site be reviewed prior to construction. Removal should include all underground pipes, utilities, and underground structures that might interfere with the new construction. f abandoned underground utilities are to be removed prior to the initiation of construction, provisions should be made in the construction specifications and budget to restore the subgrade to stable condition. Restoration should include backfilling and compaction of the excavation areas. After the initial stripping process is completed, areas of the site to receive fill, or areas of the site at-grade where structures will be located, should be proofrolled. The proofrolling operations should be performed using a 20-ton, fully-loaded dump truck or another pneumatic-tire vehicle of similar size and HLLS-CARNES ENGNEERNG ASSOCATES, NC. 4

8 DCPL CAPTOL VEW BRANCH LBRARY Preliminary Geotechnical Engineering Study weight. The purpose of the proofrolling will be to locate any near-surface pockets of soft or loose soils requiring undercutting. A Geotechnical Engineer or experienced Soils nspector should witness the proofrolling operations and should determine which areas need further undercutting and/or stabilization. 5.2 Fill Selection, Placement and Compaction All material to be used as fill or backfill should be inspected, tested and approved by the Geotechnical Engineer. n general, the on-site soils which are free from organic and other deleterious components can be re-used as general site fill. Materials suitable for various construction purposes can be identified by an experienced Soils nspector during grading operations. Moisture conditioning (that is, wetting or drying) of the soils should be anticipated to achieve proper compaction. The moisture contents of the soils should be controlled properly to avoid extensive construction delays. f imported fill material is required, those materials should have Unified Soil Classifications of SM or better. All fill should be placed in relatively horizontal 8-inch (maximum) loose lifts and should be compacted to a minimum of 95 percent of the Standard Proctor (ASTM D-698) maximum dry density. Fill materials in landscape and other non-structural areas should be compacted to at least 90 percent of the Standard Proctor maximum dry density if significant subsidence of the fill under its own weight is to be avoided. Field moisture contents should be maintained within 2 percentage points of the optimum moisture content in order to provide adequate compaction. Structural fill should extend a minimum of ten feet beyond building lines where floor slabs are to be constructed on the fill. Fill slopes no steeper than 2(H):1(V), or flatter, should be used. A sufficient number of in-place density tests should be performed by an experienced Engineering Technician on a full-time basis to verify that the proper degree of compaction is being obtained. 5.3 Foundation Evaluations As stated previously, relatively soft and loose existing fill/possible fill materials were encountered to estimated depths of 17+ ft to ft below existing site grades at the site. As such, foundations for the proposed structure will require special consideration. Footings should not be placed on or over any existing fill materials. Footings should not be constructed on or over any existing fill materials. As such, it is recommended that the proposed structure be supported on a HLLS-CARNES ENGNEERNG ASSOCATES, NC. 5

9 DCPL CAPTOL VEW BRANCH LBRARY Preliminary Geotechnical Engineering Study deep foundation system consisting of either augered, cast-in-place concrete piles or drilled shafts. Alternatively, it may be possible to utilize alternative subgrade modification techniques (such as rammed-aggregate piers) in order to provide a shallow foundation alternative for the structure. t is recommended that the additional borings (that are to be drilled during the final study once the existing structure has been removed) be drilled to greater depths below existing site grades to be able to better evaluate the most economical foundation system for the structure. 5.4 Ground-Supported Slabs Floor slabs should be supported on approved, firm natural soils, or on new compacted fill. The slab subgrade should be prepared in accordance with the procedures outlined in Sections 5.1 and 5.2 of this report. n particular, the slab subgrade should be heavily proofrolled to delineate any soft or loose areas requiring undercutting and/or stabilization. Since relatively soft/loose fill materials were encountered in the borings drilled during this study, additional slab subgrade evaluation will be required during the final study. t should be anticipated that the modification of slab subgrade materials will be required at a minimum. Structurally supporting the slab may also need to be considered. t is recommended that the slab be directly supported on a minimum 4-inch layer of clean granular materials such as washed sand, clean sand and gravel, or screened, crushed stone. These materials will require acquisition from an off-site source. A suitable moisture/vapor barrier (that is, polyethylene sheeting) should also be provided. These procedures will provide a moisture break that will help to prevent capillary rise, dampness of the floor slabs and also help to cure the slab concrete. t is also recommend that construction joints on the slab surface and isolation joints between the slab and structural walls be provided (such that the slab would be groundsupported). On most projects, there is a significant time lag between initial grading and a point when the contractor is ready to pour the slabs-on-grade. Environmental conditions and construction traffic often disturb the subgrade soils. Provisions should be made in the construction specifications for the restoration of the subgrade soils to a stable condition prior to the placement of the concrete for the floor slabs. 5.5 Groundwater and Drainage Groundwater levels were monitored in the open boreholes. The shallowest groundwater encountered in the borings was located at a depth of ft below existing site grades in the caved borehole at the location of Boring B-5. Water that appeared to be perched within the existing fill materials HLLS-CARNES ENGNEERNG ASSOCATES, NC. 6

10 DCPL CAPTOL VEW BRANCH LBRARY Preliminary Geotechnical Engineering Study 6.0 REMARKS was encountered at a depth of 8.5+ ft in Boring B-4 and at a depth of 5.5+ ft in Boring B-5. t should be anticipated that additional water or perched water will be encountered at varying depths across the site. The magnitude of the impact of the water on construction will be dependent on the foundation and slab alternatives selected. Adequate drainage should be provided at the site to minimize any increases in the moisture contents of the foundation soils. All pavement or parking areas should be sloped away from the structure to prevent the ponding of water around the building. The site drainage should also be such that run-off onto adjacent properties is controlled properly. This report has been prepared to aid in the evaluation of the site for the proposed library construction. t is considered that adequate recommendations have been provided to serve as a basis for preliminary site evaluation. Additional recommendations can be provided as needed. These preliminary analyses and recommendations are, of necessity, based on the information made available to us at the time of the actual writing of the report and the on-site conditions, surface and subsurface, that existed at the time the exploratory borings were drilled. Further assumption has been made that the limited exploratory borings, in relation both to the areal extent of the site and to depth, are representative of conditions across the site. f subsurface conditions are encountered which differ from those reported herein, this Office should be notified immediately so that the analyses and recommendations can be reviewed and/or revised as necessary. t is also recommended that: 1. We be given the opportunity to review any plans and specifications in order to comment on the interaction of the soil conditions as described herein and the design requirements. 2. A Geotechnical Engineer or experienced Soils nspector be present at the site during the construction phase to verify installation according to the approved plans and specifications. This is particularly important during excavation, placement, and compaction of fill materials. Please note that successful completion of the project is dependent on your compliance with all of the recommendations provided in this report. While represented separately, the recommendations represent work that is intertwined. The successful completion of the project is specifically conditioned on your complying with all recommendations. HLLS-CARNES ENGNEERNG ASSOCATES, NC. 7

11 DCPL CAPTOL VEW BRANCH LBRARY Preliminary Geotechnical Engineering Study Our professional services have been performed, our findings obtained, and our recommendations prepared in accordance with generally accepted engineering principles and practices. This warranty is in lieu of all other warranties either implied or expressed. Hillis-Carnes Engineering Associates, nc. assumes no responsibility for interpretations made by others based on work or recommendations made by HCEA. HLLS-CARNES ENGNEERNG ASSOCATES, NC. 8

12 DCPL CAPTOL VEW BRANCH LBRARY Preliminary Geotechnical Engineering Study APPENDX Figure 1: Project Location Map Figure 2: Boring Location Plan Subsurface Profile Particle Size Distribution Reports Records of Soil Exploration Field Classification Sheet HLLS-CARNES ENGNEERNG ASSOCATES, NC. 9

13 PROJECT LOCATON MAP HLLS-CARNES ENGNEERNG ASSOCATES, NC. Scale: Reduced Figure: 1

14 B-2 B-4 B-3 B-5 B-1 LEGEND: SOL BORNG LOCATON BORNG LOCATON PLAN DCPL - CAPTOL VEW BRANCH LBRARY Guilford Road, Suite A Annapolis Junction, Maryland (410) Fax: (410) CENTRAL AVE, SE WASHNGTON, DC 14465A 11/24/14 1" = 40' 1 WH AM MPJ

15 HLLS-CARNES ENGNEERNG ASSOCATES, NC. LOG OF BORNGS DCPL Capitol View Branch B B B B B Elevation in Feet Elevation in Feet Fill Description not given for: "FE" Low plasticity clay Description not given for: "O:" Description not given for: "OZ" Silty sand Description not given for: "0O" Low-high plasticity clays

16 Particle Size Distribution Report in. 3 in. 2 in. 1½ in. 1 in. ¾ in. ½ in. 3/8 in. #4 #10 #20 #30 #40 #60 #100 #140 # PERCENT FNER GRAN SZE - mm. % +3" % Gravel % Sand % Silt % Clay SEVE PERCENT SPEC.* PASS? SZE FNER PERCENT (X=NO) 3" 2" 1 1/2" 1" 3/4" 3/8" #4 #10 #40 #100 # Material Description Orange brown silty sand Atterberg Limits PL= NP LL= NP P= NP Coefficients D 90 = D 85 = D 60 = D 50 = D 30 = D 15 = D 10 = C u = C c = Classification USCS= SM AASHTO= A-2-4(0) Remarks Moisture Content: 6.9% * (no specification provided) Location: B-1, S-9 Sample Number: 1 Depth: 33.5'-35.0' Date: HLLS-CARNES ENGNEERNG ASSOCATES, NC. Annapolis Junction, MD Client: Project: Project No: DCPL - Capitol View Branch Library 14465A Figure 01/23/15

17 Particle Size Distribution Report in. 3 in. 2 in. 1½ in. 1 in. ¾ in. ½ in. 3/8 in. #4 #10 #20 #30 #40 #60 #100 #140 # PERCENT FNER GRAN SZE - mm. % +3" % Gravel % Sand % Silt % Clay SEVE PERCENT SPEC.* PASS? SZE FNER PERCENT (X=NO) 3" 2" 1 1/2" 1" 3/4" 3/8" #4 #10 #40 #100 # Material Description Red with brown fat clay Atterberg Limits PL= 26 LL= 64 P= 38 Coefficients D 90 = D 85 = D 60 = D 50 = D 30 = D 15 = D 10 = C u = C c = USCS= CH Classification AASHTO= Remarks Moisture content: 18.4% A-7-6(45) * (no specification provided) Location: B-3, S-6 Sample Number: 2 Depth: 18.5'-20.0' Date: HLLS-CARNES ENGNEERNG ASSOCATES, NC. Annapolis Junction, MD Client: Project: Project No: DCPL - Capitol View Branch Library 14465A Figure 01/23/15

18 STANDARD PENETRATON TEST-DRVNG 2" O.D. SAMPLER 1' WTH 140# HAMMER FALLNG 30": COUNT MADE AT 6" NTERVALS. HLLS - CARNES ENGNEERNG ASSOCATES, NC. RECORD OF SOL EXPLORATON Project Name DCPL Capitol View Branch Boring No. B-1 Location Washington DC, SE Job # 14465A SAMPLER Datum MSL Hammer Wt. 140 lbs. Hole Diameter 6" Foreman M. Stawas Surf. Elev ft Hammer Drop 30 in. Rock Core Diameter N/A nspector W. Harris Date Started 12/3/14 Pipe Size 2.0 in. Boring Method HSA Date Completed 1/2/15 Elevation/ Depth SOL SYMBOLS/ SAMPLE CONDTONS Description Orange-Brown, moist, loose clayey SAND with gravel. (SC) Possible Fill Gray/Orange-Brown, moist, soft CLAY with sand and organics (CL) Possible Fill Light Brown, moist, soft CLAY with silt and trace sand (CL) Possible Fill Boring and Sampling Notes 3" of Asphalt 2" of Stone Rec. NM% SPT Blows 16" 15" N SPT Blows/Foot C u r v e Mottled Light Gray/Dark Red- Brown/Orange-Brown, moist, very stiff CLAY with fine sand (CL) Possible Fill Mottled Brown/Orange-Brown/Dark Gray, moist, very stiff SLT with clay and sand (ML) Possible Fill 7" Light Brown, moist, very stiff CLAY with silt, trace sand (CL) Gray with Yellow-Brown, moist, very stiff sandy CLAY (CL) Brown/Gray, moist, very stiff silty CLAY with sand (CL) Light Red-Brown to Gray, moist, GROUND WATER SAMPLER TYPE SAMPLE CONDTONS BORNG METHOD DRVEN SPLT SPOON UNLESS OTHERWSE D - DSNTEGRATED AT COMPLETON Dry ft ft. HSA - HOLLOW STEM AUGERS PT - PRESSED SHELBY TUBE - NTACT AFTER 24 HRS. ft. ft. CFA - CONTNUOUS FLGHT AUGERS CAVE N DEPTH CA - CONTNUOUS FLGHT AUGER U - UNDSTURBED AFTER HRS. ft. ft. DC - DRVNG CASNG RC - ROCK CORE L - LOST MD - MUD DRLLNG

19 STANDARD PENETRATON TEST-DRVNG 2" O.D. SAMPLER 1' WTH 140# HAMMER FALLNG 30": COUNT MADE AT 6" NTERVALS. HLLS - CARNES ENGNEERNG ASSOCATES, NC. RECORD OF SOL EXPLORATON Project Name DCPL Capitol View Branch Boring No. B-1 Location Washington DC, SE Job # 14465A SAMPLER Datum MSL Hammer Wt. 140 lbs. Hole Diameter 6" Foreman M. Stawas Surf. Elev ft Hammer Drop 30 in. Rock Core Diameter N/A nspector W. Harris Date Started 12/3/14 Pipe Size 2.0 in. Boring Method HSA Date Completed 1/2/15 Elevation/ Depth 35 SOL SYMBOLS/ SAMPLE CONDTONS Description very dense silty SAND (SM) Boring and Sampling Notes Rec. NM% SPT Blows N SPT Blows/Foot C u r v e Groundwater encountered at 38.5 while drilling 17" /5" Bottom of boring at 45 ft Boring backfilled with grout and patched at completion GROUND WATER SAMPLER TYPE SAMPLE CONDTONS BORNG METHOD DRVEN SPLT SPOON UNLESS OTHERWSE D - DSNTEGRATED AT COMPLETON Dry ft ft. HSA - HOLLOW STEM AUGERS PT - PRESSED SHELBY TUBE - NTACT AFTER 24 HRS. ft. ft. CFA - CONTNUOUS FLGHT AUGERS CAVE N DEPTH CA - CONTNUOUS FLGHT AUGER U - UNDSTURBED AFTER HRS. ft. ft. DC - DRVNG CASNG RC - ROCK CORE L - LOST MD - MUD DRLLNG

20 STANDARD PENETRATON TEST-DRVNG 2" O.D. SAMPLER 1' WTH 140# HAMMER FALLNG 30": COUNT MADE AT 6" NTERVALS. HLLS - CARNES ENGNEERNG ASSOCATES, NC. RECORD OF SOL EXPLORATON Project Name DCPL Capitol View Branch Boring No. B-2 Location Washington DC, SE Job # 14465A SAMPLER Datum MSL Hammer Wt. 140 lbs. Hole Diameter 6" Foreman M. Stawas Surf. Elev ft Hammer Drop 30 in. Rock Core Diameter N/A nspector W. Harris Date Started 1/6/15 Pipe Size 2.0 in. Boring Method HSA Date Completed 1/6/15 Elevation/ Depth SOL SYMBOLS/ SAMPLE CONDTONS Description Orange-Brown/Dark Brown/Gray, moist, loose clayey SAND with gravel and organics (SC) Possible Fill Mottled Light Gray/Red-Orange- Brown/Dark Brown/Yellow-Brown, moist, medium stiff sandy CLAY (CL) Possible Fill Dark Brown/Brown, moist, stiff, sandy SLT with clay (ML) Possible Fill Mottled Brown/Orange-Brown, moist, very loose to medium dense silty fine SAND with clay (SM) Possible Fill Boring and Sampling Notes 1" of Topsoil Rec. NM% SPT Blows 14" 13" 15" 17" N SPT Blows/Foot C u r v e " Red-Brown with Light Gray, moist, very stiff sandy CLAY (CL) Light Red-Brown, moist, dense silty SAND (SM) Light Red-Brown, moist, dense to Groundwater GROUND WATER SAMPLER TYPE SAMPLE CONDTONS BORNG METHOD DRVEN SPLT SPOON UNLESS OTHERWSE D - DSNTEGRATED AT COMPLETON Dry ft ft. HSA - HOLLOW STEM AUGERS PT - PRESSED SHELBY TUBE - NTACT AFTER 24 HRS. ft. ft. CFA - CONTNUOUS FLGHT AUGERS CAVE N DEPTH CA - CONTNUOUS FLGHT AUGER U - UNDSTURBED AFTER HRS. ft. ft. DC - DRVNG CASNG RC - ROCK CORE L - LOST MD - MUD DRLLNG

21 STANDARD PENETRATON TEST-DRVNG 2" O.D. SAMPLER 1' WTH 140# HAMMER FALLNG 30": COUNT MADE AT 6" NTERVALS. HLLS - CARNES ENGNEERNG ASSOCATES, NC. RECORD OF SOL EXPLORATON Project Name DCPL Capitol View Branch Boring No. B-2 Location Washington DC, SE Job # 14465A SAMPLER Datum MSL Hammer Wt. 140 lbs. Hole Diameter 6" Foreman M. Stawas Surf. Elev ft Hammer Drop 30 in. Rock Core Diameter N/A nspector W. Harris Date Started 1/6/15 Pipe Size 2.0 in. Boring Method HSA Date Completed 1/6/15 Elevation/ Depth 35 SOL SYMBOLS/ SAMPLE CONDTONS Description very dense silty SAND with Light Red-Brown clay seams (SM) Boring and Sampling Notes encountered at 35 ft while drilling Rec. NM% SPT Blows N SPT Blows/Foot C u r v e Light Red-Brown to Gray, moist, very dense silty SAND (SM) Bottom of boring at 45 ft Boring backfilled with grout and patched at completion GROUND WATER SAMPLER TYPE SAMPLE CONDTONS BORNG METHOD DRVEN SPLT SPOON UNLESS OTHERWSE D - DSNTEGRATED AT COMPLETON Dry ft ft. HSA - HOLLOW STEM AUGERS PT - PRESSED SHELBY TUBE - NTACT AFTER 24 HRS. ft. ft. CFA - CONTNUOUS FLGHT AUGERS CAVE N DEPTH CA - CONTNUOUS FLGHT AUGER U - UNDSTURBED AFTER HRS. ft. ft. DC - DRVNG CASNG RC - ROCK CORE L - LOST MD - MUD DRLLNG

22 STANDARD PENETRATON TEST-DRVNG 2" O.D. SAMPLER 1' WTH 140# HAMMER FALLNG 30": COUNT MADE AT 6" NTERVALS. HLLS - CARNES ENGNEERNG ASSOCATES, NC. RECORD OF SOL EXPLORATON Project Name DCPL Capitol View Branch Boring No. B-3 Location Washington DC, SE Job # 14465A SAMPLER Datum MSL Hammer Wt. 140 lbs. Hole Diameter 6" Foreman M. Stawas Surf. Elev ft Hammer Drop 30 in. Rock Core Diameter N/A nspector W. Harris Date Started 1/5/15 Pipe Size 2.0 in. Boring Method HSA Date Completed 1/5/15 Elevation/ Depth SOL SYMBOLS/ SAMPLE CONDTONS Description Orange-Brown, moist, very loose clayey SAND with gravel (SC) Possible Fill Orange-Brown to Orange-Brown/ Yellow-Brown /Light Gray, moist, soft sandy CLAY (CL) Possible Fill Boring and Sampling Notes 4" of Asphalt 2" of Stone Rec. NM% SPT Blows 10" 8" 10" N SPT Blows/Foot C u r v e Orange-Brown, moist, very loose clayey SAND (SC) Possible Fill Groundwater encountered at 13.5 ft while drilling 13" Brown/Orange-Brown, very moist, very loose clayey GRAVEL and SAND (GC-SC) Possible Fill 3" Red-Brown/Brown, moist, very stiff CLAY with silt and trace to some sand (CL-CH) 17" Light Red-Brown to Gray, moist, dense to very dense silty SAND (SM) GROUND WATER SAMPLER TYPE SAMPLE CONDTONS BORNG METHOD DRVEN SPLT SPOON UNLESS OTHERWSE D - DSNTEGRATED AT COMPLETON Dry ft ft. HSA - HOLLOW STEM AUGERS PT - PRESSED SHELBY TUBE - NTACT AFTER 24 HRS. ft. ft. CFA - CONTNUOUS FLGHT AUGERS CAVE N DEPTH CA - CONTNUOUS FLGHT AUGER U - UNDSTURBED AFTER HRS. ft. ft. DC - DRVNG CASNG RC - ROCK CORE L - LOST MD - MUD DRLLNG

23 STANDARD PENETRATON TEST-DRVNG 2" O.D. SAMPLER 1' WTH 140# HAMMER FALLNG 30": COUNT MADE AT 6" NTERVALS. HLLS - CARNES ENGNEERNG ASSOCATES, NC. RECORD OF SOL EXPLORATON Project Name DCPL Capitol View Branch Boring No. B-3 Location Washington DC, SE Job # 14465A SAMPLER Datum MSL Hammer Wt. 140 lbs. Hole Diameter 6" Foreman M. Stawas Surf. Elev ft Hammer Drop 30 in. Rock Core Diameter N/A nspector W. Harris Date Started 1/5/15 Pipe Size 2.0 in. Boring Method HSA Date Completed 1/5/15 Elevation/ Depth 35 SOL SYMBOLS/ SAMPLE CONDTONS Description Boring and Sampling Notes Rec. NM% SPT Blows N SPT Blows/Foot C u r v e Bottom of boring at 45 ft Boring backfilled with grout and patched at completion GROUND WATER SAMPLER TYPE SAMPLE CONDTONS BORNG METHOD DRVEN SPLT SPOON UNLESS OTHERWSE D - DSNTEGRATED AT COMPLETON Dry ft ft. HSA - HOLLOW STEM AUGERS PT - PRESSED SHELBY TUBE - NTACT AFTER 24 HRS. ft. ft. CFA - CONTNUOUS FLGHT AUGERS CAVE N DEPTH CA - CONTNUOUS FLGHT AUGER U - UNDSTURBED AFTER HRS. ft. ft. DC - DRVNG CASNG RC - ROCK CORE L - LOST MD - MUD DRLLNG

24 STANDARD PENETRATON TEST-DRVNG 2" O.D. SAMPLER 1' WTH 140# HAMMER FALLNG 30": COUNT MADE AT 6" NTERVALS. HLLS - CARNES ENGNEERNG ASSOCATES, NC. RECORD OF SOL EXPLORATON Project Name DCPL Capitol View Branch Boring No. B-4 Location Washington DC, SE Job # 14465A SAMPLER Datum MSL Hammer Wt. 140 lbs. Hole Diameter 6" Foreman M. Stawas Surf. Elev ft Hammer Drop 30 in. Rock Core Diameter N/A nspector W. Harris Date Started 1/5/15 Pipe Size 2.0 in. Boring Method HSA Date Completed 1/5/15 Elevation/ Depth SOL SYMBOLS/ SAMPLE CONDTONS Description Orange-Brown/Red-Brown/Gray, moist, stiff sandy CLAY with gravel (CL) Possible Fill Gray with Yellow-Brown, moist, medium stiff CLAY (CL) Possible Fill Red-Brown with Gray to Gray, moist to wet, very loose silty SAND (SM) Possilbe Fill Boring and Sampling Notes 4" of Asphalt No Stone Encountered Groundwater encountered at 8.5 ft while drilling Rec. NM% SPT Blows 16" 17" 17" WOH/12"-1 N SPT Blows/Foot C u r v e Gray/Yellow-Brown, moist, medium stiff CLAY with sand (CL) Possible Fill 15" Red-Brown/Light Gray to Red Brown, moist, very stiff to hard sandy CLAY (CL) GROUND WATER SAMPLER TYPE SAMPLE CONDTONS BORNG METHOD DRVEN SPLT SPOON UNLESS OTHERWSE D - DSNTEGRATED AT COMPLETON Dry ft ft. HSA - HOLLOW STEM AUGERS PT - PRESSED SHELBY TUBE - NTACT AFTER 24 HRS. ft. ft. CFA - CONTNUOUS FLGHT AUGERS CAVE N DEPTH CA - CONTNUOUS FLGHT AUGER U - UNDSTURBED AFTER HRS. ft. ft. DC - DRVNG CASNG RC - ROCK CORE L - LOST MD - MUD DRLLNG

25 STANDARD PENETRATON TEST-DRVNG 2" O.D. SAMPLER 1' WTH 140# HAMMER FALLNG 30": COUNT MADE AT 6" NTERVALS. HLLS - CARNES ENGNEERNG ASSOCATES, NC. RECORD OF SOL EXPLORATON Project Name DCPL Capitol View Branch Boring No. B-4 Location Washington DC, SE Job # 14465A SAMPLER Datum MSL Hammer Wt. 140 lbs. Hole Diameter 6" Foreman M. Stawas Surf. Elev ft Hammer Drop 30 in. Rock Core Diameter N/A nspector W. Harris Date Started 1/5/15 Pipe Size 2.0 in. Boring Method HSA Date Completed 1/5/15 Elevation/ Depth 35 SOL SYMBOLS/ SAMPLE CONDTONS Description Boring and Sampling Notes Rec. NM% SPT Blows N SPT Blows/Foot C u r v e Light Red-Brown/Gray to Gray, moist, dense to very dense silty SAND (SM) 17" /5" Bottom of boring at 45 ft Boring backfilled with grout and patched at completion GROUND WATER SAMPLER TYPE SAMPLE CONDTONS BORNG METHOD DRVEN SPLT SPOON UNLESS OTHERWSE D - DSNTEGRATED AT COMPLETON Dry ft ft. HSA - HOLLOW STEM AUGERS PT - PRESSED SHELBY TUBE - NTACT AFTER 24 HRS. ft. ft. CFA - CONTNUOUS FLGHT AUGERS CAVE N DEPTH CA - CONTNUOUS FLGHT AUGER U - UNDSTURBED AFTER HRS. ft. ft. DC - DRVNG CASNG RC - ROCK CORE L - LOST MD - MUD DRLLNG

26 STANDARD PENETRATON TEST-DRVNG 2" O.D. SAMPLER 1' WTH 140# HAMMER FALLNG 30": COUNT MADE AT 6" NTERVALS. HLLS - CARNES ENGNEERNG ASSOCATES, NC. RECORD OF SOL EXPLORATON Project Name DCPL Capitol View Branch Boring No. B-5 Location Washington DC, SE Job # 14465A SAMPLER Datum MSL Hammer Wt. 140 lbs. Hole Diameter 6" Foreman M. Stawas Surf. Elev ft Hammer Drop 30 in. Rock Core Diameter N/A nspector W. Harris Date Started 12/31/14 Pipe Size 2.0 in. Boring Method HSA Date Completed 12/31/14 Elevation/ Depth 110 SOL SYMBOLS/ SAMPLE CONDTONS Description Mottled Dark Brown/Red-Brown Dark Gray, moist, very loose silty SAND with no to trace clay(sm) Possible Fill Boring and Sampling Notes 3" of Asphalt 2" of Stone Rec. NM% SPT Blows 14" " N 5 3 SPT Blows/Foot C u r v e Dark Brown/Red-Brown/Dark Gray, moist, soft to very soft CLAY with sand (CL) Possible Fill Groundwater encountered at 5.5 ft 16" 1/12" " Red-Brown/Brown, very moist, very dense silty SAND with gravel (SM) Possible Fill Light Brown/Orange-Brown to Mottled Light Gray/Dark Red- Brown/Orange-Brown, moist, very stiff to hard CLAY with silt and trace sand (CL) 14" Light Red-Brown to Gray, moist, GROUND WATER SAMPLER TYPE SAMPLE CONDTONS BORNG METHOD DRVEN SPLT SPOON UNLESS OTHERWSE D - DSNTEGRATED AT COMPLETON 25.2 ft ft. HSA - HOLLOW STEM AUGERS PT - PRESSED SHELBY TUBE - NTACT AFTER 24 HRS. ft. ft. CFA - CONTNUOUS FLGHT AUGERS CAVE N DEPTH CA - CONTNUOUS FLGHT AUGER U - UNDSTURBED AFTER HRS. ft. ft. DC - DRVNG CASNG RC - ROCK CORE L - LOST MD - MUD DRLLNG

27 STANDARD PENETRATON TEST-DRVNG 2" O.D. SAMPLER 1' WTH 140# HAMMER FALLNG 30": COUNT MADE AT 6" NTERVALS. HLLS - CARNES ENGNEERNG ASSOCATES, NC. RECORD OF SOL EXPLORATON Project Name DCPL Capitol View Branch Boring No. B-5 Location Washington DC, SE Job # 14465A SAMPLER Datum MSL Hammer Wt. 140 lbs. Hole Diameter 6" Foreman M. Stawas Surf. Elev ft Hammer Drop 30 in. Rock Core Diameter N/A nspector W. Harris Date Started 12/31/14 Pipe Size 2.0 in. Boring Method HSA Date Completed 12/31/14 Elevation/ Depth SOL SYMBOLS/ SAMPLE CONDTONS Description dense to very dense silty SAND (SM) Boring and Sampling Notes Rec. NM% SPT Blows N SPT Blows/Foot C u r v e " 27-50/5" Bottom of Boring at 45 ft Boring backfilled with grout and patched at completion GROUND WATER SAMPLER TYPE SAMPLE CONDTONS BORNG METHOD DRVEN SPLT SPOON UNLESS OTHERWSE D - DSNTEGRATED AT COMPLETON 25.2 ft ft. HSA - HOLLOW STEM AUGERS PT - PRESSED SHELBY TUBE - NTACT AFTER 24 HRS. ft. ft. CFA - CONTNUOUS FLGHT AUGERS CAVE N DEPTH CA - CONTNUOUS FLGHT AUGER U - UNDSTURBED AFTER HRS. ft. ft. DC - DRVNG CASNG RC - ROCK CORE L - LOST MD - MUD DRLLNG

28 HLLS-CARNES ENGNEERNG ASSOCATES, nc Guilford Road, Suite A Annapolis Junction, Maryland Phone: (410) Fax: (410) Description of Soils per ASTM D2487 Major Component Component Type Component Description Symbol Group Name Coarse-Grained Soils, Gravels More than 50% of the coarse Clean Gravels <5% GW Well Graded Gravel More than 50% is fraction is retained on the No. 4 sieve. Passing No. 200 sieve GP Poorly Graded Gravel retained on the No. 200 Coarse = 1 to 3 Gravels with fines, >12% GM Silty Gravel sieve Medium = ½ to 1 Passing the No. 200 sieve GC Clayey Gravel Fine = ¼ to ½ Sands More than 50% of the coarse Clean Sands <5% Passing SW Well Graded Sand fraction passes the No. 4 sieve. No. 200 sieve SP Poorly Graded Sand Coarse = No.10 to No.4 Sands with fines, >12% SM Silty Sand Medium = No. 10 to No. 40 Passing the No. 200 sieve SC Clayey Sand Fine = No. 40 to No. 200 Fine Grained Soils, Silts and Clays norganic ML Silt More than 50% passes Liquid Limit is less than 50 CL Lean Clay the No. 200 sieve Low to medium plasticity Organic OL Organic silt Organic Clay Silts and Clays norganic MH Elastic Silt Liquid Limit of 50 or greater CH Fat Clay Medium to high plasticity Organic OH Organic Silt Organic Clay Highly Organic Soils Primarily Organic matter, dark color, organic odor PT Peat Proportions of Soil Components Particle Size dentification Component Description Approximate percent Particle Size Particle dimension Form by weight Noun Sand, Gravel, Silt, Clay, etc. 50% or more Boulder 12 diameter or more Adjective Sandy, silty, clayey, etc. 35% to 49% Cobble 3 to 12 diameter Some Some sand, some silt, etc. 12% to 34% Gravel ¼ to 3 diameter Trace Trace sand, trace mica, etc. 1% to 11% Sand to ¼ diameter With With sand, with mica, etc. Presence only Silt/Clay (fines) Cannot see particle Cohesive Soils Granular Soils Field Description No. of SPT Consistency No. of SPT Blows/ft Relative Density Blows/ft Easily Molded in Hands 0 3 Very Soft 0 4 Very Loose Easily penetrated several inches by thumb 4 5 Soft 5 10 Loose Penetrated by thumb with moderate effort 6 10 Medium Medium Dense Penetrated by thumb with great effort Stiff Dense ndented by thumb only with great effort Greater than 30 Hard Greater than 50 Very Dense Other Definitions: Fill: Encountered soils that were placed by man. Fill soils may be controlled (engineered structural fill) or uncontrolled fills that may contain rubble and/or debris. Saprolite: Soil material derived from the in-place chemical and physical weathering of the parent rock material. May contain relic structure. Also called residual soils. Occurs in Piedmont soils, found west of the fall line. Disintegrated Rock: Residual soil material with rock-like properties, very dense, N = 60 to 51/0. Karst: Descriptive term which denotes the potential for solutioning of the limestone rock and the development of sinkholes. Alluvium: Recently deposited soils placed by water action, typically stream or river floodplain soils. Groundwater Level: Depth within borehole where water is encountered either during drilling, or after a set period of time to allow groundwater conditions to reach equilibrium. Caved Depth: Depth at which borehole collapsed after removal of augers/casing. ndicative of loose soils and/or groundwater conditions.

Geotechnical Engineering Study Josiah Henson Park Visitor Center Rockville, Maryland HCEA Job No A. Prepared for: Ms.

Geotechnical Engineering Study Josiah Henson Park Visitor Center Rockville, Maryland HCEA Job No A. Prepared for: Ms. Geotechnical Engineering Study Josiah Henson Park Visitor Center Rockville, Maryland HCEA Job No. 17096A Prepared for: Ms. Darragh Brady Ziger/Snead LLP 1006 Morton Street Baltimore, Maryland 21201 February

More information

Addendum # 1 Public Safety Complex Wetland Date of Addendum: 2/23/17

Addendum # 1 Public Safety Complex Wetland Date of Addendum: 2/23/17 Wicomico County Purchasing 125 N. Division St. Room B-3 Salisbury, MD 21801 Ph. 410-548-4805 Fax 410-334-3130 Email: purchasing@wicomicocounty.org Addendum # 1 Public Safety Complex Wetland Date of Addendum:

More information

EXHIBIT G GEOTECHNICAL REPORT (DRAFT)

EXHIBIT G GEOTECHNICAL REPORT (DRAFT) EXHIBIT G GEOTECHNICAL REPORT (DRAFT) APPENDIX 1 PROJECT SITE 'B' B-1 B-2 I-2 B-3 B-4 B-5 I-1 PROJECT LOCATION LEGEND B-1 = APPROXIMATE BORING LOCATION I-1 = APPROXIMATE INFILTRATION

More information

April 7, Webster Street Sub-Surface Stormwater Storage System Bid No Bid Date: 4/13/17 ADDENDUM NO 1

April 7, Webster Street Sub-Surface Stormwater Storage System Bid No Bid Date: 4/13/17 ADDENDUM NO 1 PUBLIC WORKS DEPARTMENT David A. Jones, P.E., Director April 7, 2017 Webster Street Sub-Surface Stormwater Storage System Bid No. 2017-022 Bid Date: 4/13/17 ADDENDUM NO 1 Please make the following changes

More information

Appendix A - Vicinity Map Vicinity Map: Palm Beach Gardens City Hall Additions, 000 N Military Trail, Palm Beach Gardens, FL Proposed Location of Police Dept. Attached Addition Proposed Location of New

More information

Project Manual Penn Pennsylvania Avenue SE, Washington, D.C.

Project Manual Penn Pennsylvania Avenue SE, Washington, D.C. RECEIVED 9/14/2012 Project Manual Gilford Corporation 1442 Penn 1442 Pennsylvania Avenue SE, Washington, D.C. Issued for Bid/Permit September 12, 2012 SECTION 00 0102 PROJECT INFORMATION PART 1 GENERAL

More information

Subsurface Investigation Report. Proposed New 1-Story Building 6447 Grand Avenue Gurnee, Illinois

Subsurface Investigation Report. Proposed New 1-Story Building 6447 Grand Avenue Gurnee, Illinois AGI Project No. -11 Subsurface Investigation Report For the Proposed New 1-Story Building 6447 Grand Avenue Gurnee, Illinois Prepared for Mr. Steve Panko Key Development Partners, LLC North State Street,

More information

FIGURES Printed By: aday Print Date: 3/23/2011 12:48:08 PM File Name: \\geodesign.local\files\jobs\m-r\penskeauto\penskeauto-1\penskeauto-1-01\figures\cad\penskeauto-1-01-vm01.dwg Layout: FIGURE 1 VICINITY

More information

SUBSURFACE INVESTIGATION & GEOTECHNICAL RECOMMENDATIONS PROPOSED MONOPOLE CELL TOWER INDIANAPOLIS, INDIANA A&W PROJECT NO: 15IN0464

SUBSURFACE INVESTIGATION & GEOTECHNICAL RECOMMENDATIONS PROPOSED MONOPOLE CELL TOWER INDIANAPOLIS, INDIANA A&W PROJECT NO: 15IN0464 SUBSURFACE INVESTIGATION & GEOTECHNICAL RECOMMENDATIONS PROPOSED MONOPOLE CELL TOWER INDIANAPOLIS, INDIANA A&W PROJECT NO: 15IN0464 PREPARED FOR: AAA DEVELOPMENT AND CONSULTING, INC GREENFIELD, INDIANA

More information

Typical Subsurface Profile. November 28, 2016

Typical Subsurface Profile. November 28, 2016 November 28, 2016 RSCCD Facility Planning, District Construction and Support Services 2323 N. Broadway, Suite 112, Santa Ana, CA 92706 Attn: Re: Ms. Allison Coburn Facilities Project Manager P: (714) 480-7530

More information

Site Location. Figure 1: Site Location Map US-24 and I-275 Interchange Ash Township, Monroe County, Michigan

Site Location. Figure 1: Site Location Map US-24 and I-275 Interchange Ash Township, Monroe County, Michigan Site Location 0606 1771 North Dixie Highway Monroe, Michigan 48162 Tel: 734-289-2200 Fax: 734-289-2345 www.manniksmithgroup.com Figure 1: Site Location Map US-24 and I-275 Interchange Ash Township, Monroe

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Pavement Subgrade Survey State Highway 125 over Hudson Creek Ottawa County, Oklahoma September 23, 21 Terracon Project No. 415121 Prepared for: Guy Engineering Services,

More information

REPORT OF GEOTECHNICAL EXPLORATION WEST MARJORY AVENUE TAMPA, FLORIDA

REPORT OF GEOTECHNICAL EXPLORATION WEST MARJORY AVENUE TAMPA, FLORIDA REPORT OF GEOTECHNICAL EXPLORATION WEST MARJORY AVENUE TAMPA, FLORIDA AREHNA PROJECT NO. B-15-008 March 11, 2015 Prepared For: City of Tampa Stormwater Division 306 W. Jackson Street, 6N Tampa, Florida

More information

Civil Geotechnical Surveying

Civil Geotechnical Surveying Civil Geotechnical Surveying Mr. David Burnett Cabarrus County Schools 4425 Old Airport Road Charlotte, North Carolina 28025 May 16, 2017 Reference: Geotechnical Engineering Evaluation Future PLC Site

More information

REPORT OF GEOTECHNICAL EXPLORATION PEPSI PLACE WATER MAIN REPLACEMENT JACKSONVILLE, FLORIDA E&A PROJECT NO CLIENT ID: 4784

REPORT OF GEOTECHNICAL EXPLORATION PEPSI PLACE WATER MAIN REPLACEMENT JACKSONVILLE, FLORIDA E&A PROJECT NO CLIENT ID: 4784 REPORT OF GEOTECHNICAL EXPLORATION PEPSI PLACE WATER MAIN REPLACEMENT JACKSONVILLE, FLORIDA E&A PROJECT NO. 35-55 CLIENT ID: 78 Prepared for: Construction & Engineering Services Consultants, Inc. 93 Baymeadows

More information

CONTRACT 5E-2 APPENDIX A - TEST HOLE LOGS DYREGROV ROBINSON INC. PORTAGE AVE WINSTON DR BOURKEVALE CAVELL PARKSIDE DR ASSINIBOINE AVE

CONTRACT 5E-2 APPENDIX A - TEST HOLE LOGS DYREGROV ROBINSON INC. PORTAGE AVE WINSTON DR BOURKEVALE CAVELL PARKSIDE DR ASSINIBOINE AVE APPENDIX A - TEST HOLE LOGS PORTAGE AVE TH -9 CONTRACT E- DR DR BOURKEVALE CAVELL WINSTON DR PARKSIDE DR ASSINIBOINE AVE AUTHORIZED BY: DATE: CONSULTING GEOTECHNICAL ENGINEERS AUTHORIZED /0/ CLIENT DRAWING

More information

May 2, Mr. Tim Kurmaskie, AIA ARCHITECT KURMASKIE ASSOCIATES, INC Washington Street Raleigh, NC

May 2, Mr. Tim Kurmaskie, AIA ARCHITECT KURMASKIE ASSOCIATES, INC Washington Street Raleigh, NC Mr. Tim Kurmaskie, AIA ARCHITECT KURMASKIE ASSOCIATES, INC. 1030 Washington Street Raleigh, NC 27605-1258 May 2, 2017 Re: Report of Subsurface Investigation Westfield Rehabilitation & Health Care Additions

More information

DEPARTMENT OF TRANSPORTATION DIVISION: MATERIALS REPORT COVER SHEET. Revised Soil Survey Report November 24, 2015 Matthew G. Moore, P.E.

DEPARTMENT OF TRANSPORTATION DIVISION: MATERIALS REPORT COVER SHEET. Revised Soil Survey Report November 24, 2015 Matthew G. Moore, P.E. LD-0 /12/09 DEPARTMENT OF TRANSPORTATION DIVISION: MATERIALS REPORT COVER SHEET Revised Soil Survey Report November 2, 201 Matthew G. Moore, P.E. VDOT (Division) or Company Name Insert Location, Virginia

More information

GEOTECHNICAL INVESTIGATION I-15 SIGN BRIDGES LAS VEGAS EA JANUARY

GEOTECHNICAL INVESTIGATION I-15 SIGN BRIDGES LAS VEGAS EA JANUARY GEOTECHNICAL INVESTIGATION I-15 SIGN BRIDGES LAS VEGAS EA 73171 JANUARY 06 MATERIALS DIVISION STATE OF NEVADA DEPARTMENT OF TRANSPORTATION MATERIALS DIVISION GEOTECHNICAL SECTION GEOTECHNICAL REPORT I-15

More information

GEOTECHNICAL ENGINEERING REPORT. KU Parking Lot 300E Southeast of Lied Center Lawrence, Kansas. Project No. D16G1696. KU No. Lz_n/11062.

GEOTECHNICAL ENGINEERING REPORT. KU Parking Lot 300E Southeast of Lied Center Lawrence, Kansas. Project No. D16G1696. KU No. Lz_n/11062. GEOTECHNICAL ENGINEERING REPORT KU Parking Lot 300E Southeast of Lied Center Lawrence, Kansas April 1, 2016 Prepared for: University of Kansas Bartlett & West Prepared by: GeoSource, LLC April 1, 2016

More information

GEOTECHNICAL ENGINEERING REPORT

GEOTECHNICAL ENGINEERING REPORT GEOTECHNICAL ENGINEERING REPORT Project: NW Bucklin Hill at Silverdale Way NW Project Number: 12023 Prepared for: Barber Development P.O. Box 473 Redmond, WA 98073 Prepared by: South Sound Geotechnical

More information

Applied GeoScience, Inc Hammond Dr., Suite 6 Schaumburg, Illinois

Applied GeoScience, Inc Hammond Dr., Suite 6 Schaumburg, Illinois AGI Project No. 13-276 Subsurface Investigation Report For the Proposed New Retail Center 9601 South Pulaski Road Evergreen Park, Illinois Prepared for Mr. Feras Sweis FHS Design + Build LLC 2010 West

More information

CONDUCTED FOR: PREPARED FOR: 5 May 2016 YPC Project No. 16GY146

CONDUCTED FOR: PREPARED FOR: 5 May 2016 YPC Project No. 16GY146 GEOTECHNICAL EXPLORATION SERVICES REPORT CONDUCTED FOR: Collier Boulevard PREPARED FOR: Mr. Christopher L. Johnson Director of Land Development Stock Development, LLC Professional Circle, Suite 01 Naples,

More information

Subsurface Environmental Investigation

Subsurface Environmental Investigation Subsurface Environmental Investigation Lake Development East Lake and 21 st Avenue South February 23, 201 Terracon Project No. MP14738A Prepared for: Minneapolis Public Schools Prepared by: Terracon Consultants,

More information

LETTER OF TRANSMITTAL AS REQUESTED FOR REVIEW AND COMMENT FOR APPROVAL PLEASE RECYCLE

LETTER OF TRANSMITTAL AS REQUESTED FOR REVIEW AND COMMENT FOR APPROVAL PLEASE RECYCLE 199 Highland Vista Dr., Suite 170 (703) 726-8030 www.geoconcepts-eng.com TO: LETTER OF TRANSMITTAL Mr. Rob McGinnis FASLA FROM: Rebecca L. Smith-Zakowicz, CPG 108 Second Street, SW, Unit #36 Charlottesville,

More information

Geotechnical Exploration and Evaluation Report

Geotechnical Exploration and Evaluation Report Geotechnical Exploration and Evaluation Report Nassau Reclaimed Water Main From Radio Avenue to Harts Road Nassau County, Florida CSI Geo Project No.: 71-17-329-04 Client Project No.: JEA 09302-049-01

More information

REPORT OF GEOTECHNICAL EXPLORATION AND ENGINEERING ANALYSIS

REPORT OF GEOTECHNICAL EXPLORATION AND ENGINEERING ANALYSIS FIGURE 3 Geotechnical Report (2) REPORT OF GEOTECHNICAL EXPLORATION AND ENGINEERING ANALYSIS RIVER TOWER RESTORATION RIVER TOWER PARK TAMPA, FLORIDA AREHNA PROJECT NO. B-13-002 February 22, 2013 Prepared

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Turner Turnpike Widening Milepost 203 to 210 Drainage Structure Pipe Jacking Creek County, Oklahoma June 1, 2016 Terracon Project No. 04155197 Prepared for: Garver, LLC

More information

GEOTECHNICAL STUDY PROPOSED CONCRETE ROADWAY TIKI ISLAND COMMUNITY GALVESTON COUNTY, TEXAS PROJECT NO E

GEOTECHNICAL STUDY PROPOSED CONCRETE ROADWAY TIKI ISLAND COMMUNITY GALVESTON COUNTY, TEXAS PROJECT NO E GEOTECHNICAL STUDY PROPOSED CONCRETE ROADWAY TIKI ISLAND COMMUNITY GALVESTON COUNTY, TEXAS PROJECT NO. 15-945E TO VILLAGE OF TIKI ISLAND TIKI ISLAND, TEXAS BY SERVICING TEXAS, LOUISIANA, NEW MEXICO, OKLAHOMA

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Turner Turnpike Widening Milepost 210 to 218 Drainage Structure Pipe Jacking Creek County, Oklahoma July 1, 2016 Terracon Project No. 04165017 Prepared for: Benham Tulsa,

More information

CONDUCTED FOR: PREPARED FOR: 18 October 2010 YPC Project No. 10GY133

CONDUCTED FOR: PREPARED FOR: 18 October 2010 YPC Project No. 10GY133 GEOTECHNICAL EXPLORATION AND ENGINEERING SERVICES REPORT CONDUCTED FOR: Immokalee Stormwater Master Plan Implementation Immokalee, Collier County, Florida PREPARED FOR: Mr. Marc Stonehouse, P. E. Project

More information

August 3, 2018 TTL Project No Supplemental Test Borings Cleveland Bulk Terminal Cleveland, Ohio

August 3, 2018 TTL Project No Supplemental Test Borings Cleveland Bulk Terminal Cleveland, Ohio 1915 North 12 th Street Toledo, OH 43604-5305 T 419-324-2222 F 419-241-1808 www.ttlassoc.com August 3, 2018 TTL Project No. 1706701 Mr. Vito Melilli Coastal Engineer KS Associates, Inc. 260 Burns Road,

More information

Soil Survey Summary Report

Soil Survey Summary Report Soil Survey Summary Report Benton Boulevard Extension Pooler, Chatham County, Georgia February, 206 Terracon Project No. ES5553 Prepared for: McGee Partners, Inc. Atlanta, Georgia Prepared by: Terracon

More information

APPENDIX A REPORT OF GEOTECHNICAL EXPLORATION

APPENDIX A REPORT OF GEOTECHNICAL EXPLORATION APPENDIX A REPORT OF GEOTECHNICAL EXPLORATION THIS PAGE IS INTENTIONALLY LEFT BLANK Report of Geotechnical Exploration Proposed Stormwater Drainage Improvements (Segments B-F) Governor Road, La Honda Drive,

More information

Report of Exploratory Test Pits

Report of Exploratory Test Pits Report of Exploratory Test Pits UNF Transportation Projects Stockpile Investigation Osprey Ridge Road Extension Jacksonville, Florida CSI Geo Project No.: 71-17-135-20 Arcadis Project No.: JK017002.0001

More information

GEOTECHNICAL ENGINEERING REPORT

GEOTECHNICAL ENGINEERING REPORT GEOTECHNICAL ENGINEERING REPORT INNSBROOK DOMINION BOULEVARD OUTPARCEL 4101 DOMINION BOULEVARD HENRICO COUNTY, VIRGINIA JOB NUMBER: 36310 PREPARED FOR: BELLEAU WOOD DEVELOPMENT P.O. BOX 2022 BURLINGTON,

More information

GEOTECHNICAL ENGINEERING STUDY. MERIWETHER LEWIS ELECTRIC COOPERATIVE BUILDING Houston/Stewart County Industrial Park AG & E FILE NUMBER:

GEOTECHNICAL ENGINEERING STUDY. MERIWETHER LEWIS ELECTRIC COOPERATIVE BUILDING Houston/Stewart County Industrial Park AG & E FILE NUMBER: GEOTECHNICAL ENGINEERING STUDY MERIWETHER LEWIS ELECTRIC COOPERATIVE BUILDING Houston/Stewart County Industrial Park AG & E FILE NUMBER: 016-043 Prepared By American Geotechnical & Environmental, Inc.

More information

Sepetember 27, Florida Department of Environmental Protection Attn: Dawn Templin 160 Governmental Center Pensacola, FL

Sepetember 27, Florida Department of Environmental Protection Attn: Dawn Templin 160 Governmental Center Pensacola, FL Bay County Solid Waste 11411 Landfill Rd. Panama City Beach, Florida 32413 Telephone: (850) 236-2212 Fax: (850) 233-5053 Board of County Commissioners www.baycountyfl.gov Sepetember 27, 2018 Florida Department

More information

APPENDIX A DRAINAGE STUDY PHASE 2 ALTERNATIVE IMPROVEMENTS CRYSTAL LAKE ALTERNATIVE 4C IMPROVEMENTS LAKEWOOD PIRATELAND SWASH HORRY COUNTY, SC

APPENDIX A DRAINAGE STUDY PHASE 2 ALTERNATIVE IMPROVEMENTS CRYSTAL LAKE ALTERNATIVE 4C IMPROVEMENTS LAKEWOOD PIRATELAND SWASH HORRY COUNTY, SC DRAINAGE STUDY PHASE ALTERNATIVE IMPROVEMENTS CRYSTAL LAKE ALTERNATIVE C IMPROVEMENTS ` FOR: LAKEWOOD PIRATELAND SWASH HORRY COUNTY, SC APPENDIX A J-.000 Prepared by: Savannah, GA Charleston, SC Myrtle

More information

Florida s Leading Engineering Source

Florida s Leading Engineering Source Since 1988 Florida s Leading Engineering Source Environmental Geotechnical Construction Materials Testing Threshold and Special Inspections Plan Review & Code Compliance Mr. Ron Ridenour Hanson Professional

More information

LITTLE BENNETT TRAIL CLARKSBURG, MARYLAND

LITTLE BENNETT TRAIL CLARKSBURG, MARYLAND GEOTECHNICAL ENGINEERING REPORT LITTLE BENNETT TRAIL CLARKSBURG, MARYLAND Consulting Geotechnical Engineers 11127 New Hampshire Ave. Silver Spring, MD 20904 Tel: (301) 754-2882 Fax: (301) 754-2884 1500

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Parking Lot Evaluation & Physical Plant Additions Rogers State University Claremore, Oklahoma May 20, 2015 Terracon Project No. 04155080 Prepared for: Rogers State University

More information

SUBSURFACE EXPLORATION & GEOTECHNICAL ENGINEERING EVALUATION

SUBSURFACE EXPLORATION & GEOTECHNICAL ENGINEERING EVALUATION Report of Subsurface Exploration and Geotechnical Engineering Evaluation Proposed Courtyard Marriott Phenix City, Alabama BHATE Project Number: 112263 October 9, 2012 SUBSURFACE EXPLORATION & GEOTECHNICAL

More information

Subsurface Investigation and Geotechnical Analysis Target Outparcel Midlothian Turnpike Richmond, Virginia. Client: Interface Properties

Subsurface Investigation and Geotechnical Analysis Target Outparcel Midlothian Turnpike Richmond, Virginia. Client: Interface Properties Subsurface Investigation and Geotechnical Analysis Target Outparcel 11309 Midlothian Turnpike Richmond, Virginia Client: Interface Properties December 5, 2017 December 5, 2017 The Heritage Group, LLC Attn:

More information

GEOTECHNICAL INVESTIGATION PROPOSED OUTFALL LOCATION CITY OF MORGAN S POINT DRAINAGE HARRIS COUNTY, TEXAS REPORT NO

GEOTECHNICAL INVESTIGATION PROPOSED OUTFALL LOCATION CITY OF MORGAN S POINT DRAINAGE HARRIS COUNTY, TEXAS REPORT NO GEOTECHNICAL INVESTIGATION PROPOSED OUTFALL LOCATION CITY OF MORGAN S POINT DRAINAGE HARRIS COUNTY, TEXAS REPORT NO. 1140198001 Reported to: SIRRUS ENGINEERS, INC. Houston, Texas Submitted by: GEOTEST

More information

For. Report of Geotechnical Exploration. University of North Florida Parking Lot 47 Jacksonville, Florida

For. Report of Geotechnical Exploration. University of North Florida Parking Lot 47 Jacksonville, Florida Report of Geotechnical Exploration For University of North Florida Parking Lot 47 Jacksonville, Florida MAE Project No. 0019-0009 April 5, 2017 Revised: April 6, 2017 Prepared for: Prepared by: Jacksonville,

More information

REPORT OF GEOTECHNICAL EXPLORATION BYFORGE ENGINEERING FOR REFERENCE ONLY

REPORT OF GEOTECHNICAL EXPLORATION BYFORGE ENGINEERING FOR REFERENCE ONLY REPORT OF GEOTECHNICAL EXPLORATION BYFORGE ENGINEERING FOR REFERENCE ONLY HERITAGE BAY MASTER PUMP STATION ISSUED FOR BID REPORT OF GEOTECHNICAL EXPLORATION PROPOSED INLINE WASTEWATER BOOSTER STATION Collier

More information

GEOTECHNICAL SUBSURFACE DATA REPORT

GEOTECHNICAL SUBSURFACE DATA REPORT GEOTECHNICAL SUBSURFACE DATA REPORT SC-41 REPLACEMENT BRIDGE OVER MAIDEN DOWN SWAMP MARION COUNTY, SOUTH CAROLINA PREPARED FOR Mr. Joshua Meetze, E.I.T. RPG-2 GDS South Carolina Department of Transportation

More information

Geotechnical Investigation for Navajo Gallup Water Supply Project Reach 26.3

Geotechnical Investigation for Navajo Gallup Water Supply Project Reach 26.3 Geotechnical Investigation for Navajo Gallup Water Supply Project Reach 26.3 Geo-Test Geotechnical Engineering Services Report No. 1-718 for Reach 26.3 Tank Site Geo-Test Job No. 1-718, Addendum No. 1

More information

mtec REPORT OF GEOTECHNICAL EXPLORATION FTFA Construct Bin Wall at HERD Eglin AFB, Florida

mtec REPORT OF GEOTECHNICAL EXPLORATION FTFA Construct Bin Wall at HERD Eglin AFB, Florida mtec REPORT OF GEOTECHNICAL EXPLORATION FTFA 14-3001 - Construct Bin Wall at HERD Eglin AFB, Florida MTEC Project Number 2014-101 November 10, 2014 Revised: January 5, 2015 Prepared For: Peterson Engineering,

More information

REPORT OF SUBSURFACE EXPLORATION. Burn and Rescue Facility Spartanburg County Emergency Services Academy Duncan, SC GeoTrack Project No.

REPORT OF SUBSURFACE EXPLORATION. Burn and Rescue Facility Spartanburg County Emergency Services Academy Duncan, SC GeoTrack Project No. 3620 Pelham Road, PMB #292 Phone: 8643290013 Greenville, SC 296155044 FAX: 8643290014 REPORT OF SUBSURFACE EXPLORATION Burn and Rescue Facility Spartanburg County Emergency Services Academy Duncan, SC

More information

Draft Geotechnical Engineering Services

Draft Geotechnical Engineering Services May 20, 2011 Draft Geotechnical Engineering Services Proposed Weir Wall at Stockbridge Stormwater Management Facility Prince William County, Virginia 19955 Highland Vista Drive, Suite 170 Ashburn, VA 20147

More information

REPORT OF GEOTECHNICAL EXPLORATION KINLOCK FM REPLACEMENT NEW MANHOLE STRUCTURE JACKSONVILLE, FLORIDA ECS PROJECT NO A CLIENT ID: 0199

REPORT OF GEOTECHNICAL EXPLORATION KINLOCK FM REPLACEMENT NEW MANHOLE STRUCTURE JACKSONVILLE, FLORIDA ECS PROJECT NO A CLIENT ID: 0199 REPORT OF GEOTECHNICAL EXPLORATION KINLOCK FM REPLACEMENT NEW MANHOLE STRUCTURE JACKSONVILLE, FLORIDA ECS PROJECT NO. 3-6187-A CLIENT ID: 0199 Prepared for: JEA 1 West Church Street Jacksonville, Florida

More information

EEI PROJECT NUMBER 5891G-NC PREPARED FOR: HILCO LTD 1435 US HIGHWAY 285 N KINSTON, NC SUBMITTED BY: MATTHEW C. KIRCHNER, E.I.

EEI PROJECT NUMBER 5891G-NC PREPARED FOR: HILCO LTD 1435 US HIGHWAY 285 N KINSTON, NC SUBMITTED BY: MATTHEW C. KIRCHNER, E.I. SUMMARY REPORT OF GEOTECHNICAL SUBSURFACE EXPLORATION AND ENGINEERING EVALUATION PROPOSED PINEY GROVE NURSING & REHABILIATION CENTER EXPANSION 728 PINEY GROVE RD KERNERSVILLE, NORTH CAROLINA EEI PROJECT

More information

SECTION FILL AND BACKFILL

SECTION FILL AND BACKFILL PART 1 GENERAL 1.1 SECTION INCLUDES A. Filling, backfilling, and compacting for building volume below grade, footings, slabs-on-grade, paving, site structures, and utilities within the building. B. Backfilling

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Shaw AFB East Gate Entrance Control Facility Amendment Sumter, South Carolina September 13, 2010 Terracon Project No. 73105020A Prepared for: TranSystems North Charleston,

More information

GEOTECHNICAL INVESTIGATION ADDENDUM Pavement Improvements for Imperial Avenue, Wake Avenue, and Danenberg Drive, El Centro, California

GEOTECHNICAL INVESTIGATION ADDENDUM Pavement Improvements for Imperial Avenue, Wake Avenue, and Danenberg Drive, El Centro, California Mr. Victor Garcia The Holt Group 1601 N. Imperial Ave. El Centro, California 92243 September 28, 2017 Project No. EC595 SUBJECT: REFERENCE: GEOTECHNICAL INVESTIGATION ADDENDUM Pavement Improvements for

More information

November 13, Eckas Water 1514 Ambrosia Court Fort Collins, Colorado Attn: Mr. Wayne Eckas

November 13, Eckas Water 1514 Ambrosia Court Fort Collins, Colorado Attn: Mr. Wayne Eckas November 13, 2018 Eckas Water 1514 Ambrosia Court Fort Collins, Colorado 80526 Attn: Mr. Wayne Eckas (wayne@eckaswater.com) Re: Geotechnical Subsurface Exploration Walker Recharge Pipeline Project Morgan

More information

Thi_ Qar University College of Engineering/Civil Engineering Department. Highway Lectures. Fourth Class. Part #2: - Subgrade Soil

Thi_ Qar University College of Engineering/Civil Engineering Department. Highway Lectures. Fourth Class. Part #2: - Subgrade Soil Thi_ Qar University College of Engineering/Civil Engineering Department Highway Lectures Fourth Class Part #2: - Subgrade Soil Lecture #2 Soil Classification DAS, Chapter 4, Engineering Classification

More information

GEOTECHNICAL ENGINEERING REPORT

GEOTECHNICAL ENGINEERING REPORT GEOTECHNICAL ENGINEERING REPORT PROJECT MINECRAFT ACCESS ROAD BOYDTON PLANK ROAD DINWIDDIE COUNTY, VIRGINIA JOB NUMBER: 37775.003 PREPARED FOR: DINWIDDIE COUNTY PO BOX 70 DINWIDDIE COUNTY, STATE 23841

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Caswell County Public Library Yanceyville, North Carolina June 15, 2017 Project No. 75175054 Revised Prepared for: Gunn Memorial Public Library Yanceyville, North Carolina

More information

GFA INTERNATIONAL FLORIDA S LEADING ENGINEERING SOURCE

GFA INTERNATIONAL FLORIDA S LEADING ENGINEERING SOURCE GFA INTERNATIONAL FLORIDA S LEADING ENGINEERING SOURCE Report of Geotechnical Exploration Addie s Corner Entry Bridge and Lake Areas 8799 Immokalee Road Naples, Collier County, Florida October 26, 2016

More information

Geotechnical Exploration Report Butterfly Branch Pedestrian Bridge Spartanburg, South Carolina S&ME Project No

Geotechnical Exploration Report Butterfly Branch Pedestrian Bridge Spartanburg, South Carolina S&ME Project No S&ME Project No. 16 16 11 Prepared for: City of Spartanburg PO Box 179 90 Prepared by: S&ME, Inc. 01 Zima Park Drive 870 December 5, 016 S&ME Project No. 16-16-11 December 5, 016 City of Spartanburg PO

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Shaw AFB West Gate Entrance Control Facility Amendment Sumter, South Carolina September 13, 20 Terracon Project No. 735021A Prepared for: TranSystems North Charleston, South

More information

Geotechnical Engineering Report Proposed Communications Tower Spain Park Site Hoover, Alabama

Geotechnical Engineering Report Proposed Communications Tower Spain Park Site Hoover, Alabama Geotechnical Engineering Report Proposed Communications Tower Spain Park Site Hoover, Alabama July 24, 2014 Terracon Project No. E1145095 Prepared for: The City Of Hoover Hoover, Alabama Prepared by: Terracon

More information

GEOTEK ENGINEERING & TESTING SERVICES, INC. 909 East 50 th Street North Sioux Falls, South Dakota Phone Fax

GEOTEK ENGINEERING & TESTING SERVICES, INC. 909 East 50 th Street North Sioux Falls, South Dakota Phone Fax GEOTEK ENGINEERING & TESTING SERVICES, INC. 909 East 50 th Street North Sioux Falls, South Dakota 57104 Phone 605-335-5512 Fax 605-335-0773 September 8, 2016 City of Viborg 101 N. Main Street 57070 Attn:

More information

GEOTECHNICAL INVESTIGATION

GEOTECHNICAL INVESTIGATION GEOTECHNICAL INVESTIGATION SHEETZ CONVENIENCE STORE FREEPORT ROAD AND CALIFORNIA AVENUE NATRONA HEIGHTS, PENNSYLVANIA Prepared For: Mr. David J. Mastrostefano, P.E. Sheetz Incorporated 817 Brookfield Drive

More information

GEOTECHNICAL REPORT US 93 WILDLIFE UNDERCROSSINGS North of Wells, Nevada E.A July 2009

GEOTECHNICAL REPORT US 93 WILDLIFE UNDERCROSSINGS North of Wells, Nevada E.A July 2009 GEOTECHNICAL REPORT US 93 WILDLIFE UNDERCROSSINGS North of Wells, Nevada E.A. 73523 July 2009 MATERIALS DIVISION STATE OF NEVADA DEPARTMENT OF TRANSPORTATION MATERIALS DIVISION GEOTECHNICAL SECTION GEOTECHNICAL

More information

GFA INTERNATIONAL FLORIDA S LEADING ENGINEERING SOURCE

GFA INTERNATIONAL FLORIDA S LEADING ENGINEERING SOURCE GFA INTERNATIONAL FLORIDA S LEADING ENGINEERING SOURCE Geotechnical Exploration Report Minto Westlake Retail & Sales Center 00 Seminole Pratt Whitney Road, Loxahatchee, Florida September 1, 01 GFA Project

More information

Geotechnical Investigation Long Timber Brewing Building Highway 99 and Kelly Street Monroe, Oregon TABLE OF CONTENTS

Geotechnical Investigation Long Timber Brewing Building Highway 99 and Kelly Street Monroe, Oregon TABLE OF CONTENTS Highway 99 and Kelly Street TABLE OF CONTENTS PROJECT INFORMATION... 1 FIELD EXPLORATION... 1 SITE CONDITIONS... 2 Surface Conditions:... 2 Subsurface Conditions:... 2 FILL.... 2 Topsoil.... 2 Clay Alluvium....

More information

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants SUBSURFACE SOIL EXPLORATION ANALYSIS AND RECOMMENDATIONS PROPOSED WEIRS AT STATIONS 130+00 AND 16+00 DRAINAGE IMPROVEMENTS TO THE FOUR CORNERS MSBU HENDRY COUNTY, FLORIDA Ardaman & Associates, Inc. Geotechnical,

More information

Report of Geotechnical Study

Report of Geotechnical Study Report of Geotechnical Study Leakes Mill Park Phase 2 Goochland County, Virginia F&R Project No. 60S-0585 Prepared For: Dewberry 4085 Lake Brook Drive, Suite 200 Richmond, Virginia 23060 Prepared By: Froehling

More information

Page 4 Blythe Municipal Airport Project County of Riverside, California December 7, 2015 CTE Job No G

Page 4 Blythe Municipal Airport Project County of Riverside, California December 7, 2015 CTE Job No G Geotechnical Investigation Page 4 Blythe Municipal Airport Project County of Riverside, California December 7, 2015 CTE Job No. 40-3264G Laboratory CBR Tests Laboratory CBR tests were performed on samples

More information

REPORT OF GEOTECHNICAL CONSULTING SERVICES

REPORT OF GEOTECHNICAL CONSULTING SERVICES REPORT OF GEOTECHNICAL CONSULTING SERVICES Escambia County Public Works Department Thompson, Crary and McNeal Roadway Project Escambia County, Century,FL Thompson Engineering Project No.: 15-1101-0297

More information

624 Water Street Prairie du Sac, Wisconsin Phone Fax GEOTECHNICAL REPORT

624 Water Street Prairie du Sac, Wisconsin Phone Fax   GEOTECHNICAL REPORT 624 Water Street Prairie du Sac, Wisconsin 53578 608.644.1449 Phone 608.644.1549 Fax www.edgeconsult.com GEOTECHNICAL REPORT NEW GLARUS PUBLIC LIBRARY (GLARNER PARK SITE) NEW GLARUS, WISCONSIN PREPARED

More information

Geotechnical Investigation Report

Geotechnical Investigation Report Geotechnical Investigation Report Proposed,000-Gallon Water Storage Tank Fagasa Pass Tank Upper Pago Pago, American Samoa Prepared for: ASPA Water Engineering Division Tafuna, American Samoa PO Box PPB

More information

Report of Geotechnical Study

Report of Geotechnical Study Report of Geotechnical Study Albemarle County, Virginia F&R Project No. 71T0082 Prepared For: Office of Facilities Development 401 McIntire Road, Room 228 Charlottesville, Virginia 22902-4596 Prepared

More information

Geotechnical Testing Laboratory, Inc. Engineering and Construction Materials Testing Services

Geotechnical Testing Laboratory, Inc. Engineering and Construction Materials Testing Services Engineering and Construction Materials Testing Services February 27, 15 Central Louisiana Economic and Development Alliance P.O. Box 465 Alexandria, Louisiana 719 Attention: Mr. Rick Ranson Vice President

More information

GEOTECHNICAL ENGINEERING REPORT

GEOTECHNICAL ENGINEERING REPORT GEOTECHNICAL ENGINEERING REPORT 58.6 ROAD (KIMBALL CREEK) 58.9 ROAD TO 58.7 ROAD MESA COUNTY, COLORADO February 9, 2018 Prepared By: Prepared For: Mr. Eric Krch, P.E. SGM, Inc. 744 Horizon Court, Suite

More information

Report of Geotechnical Study

Report of Geotechnical Study Report of Geotechnical Study Dumfries Mixed-Use Development Dumfries, Virginia 22026 F&R Project No. 74T-0009 Prepared For: Community Housing Partners 4915 Radford Avenue, Suite 300 Richmond, Virginia

More information

WILLMER ENGINEERING INC. Willmer Project No Prepared for. Clark Patterson Lee Suwanee, Georgia. Prepared by

WILLMER ENGINEERING INC. Willmer Project No Prepared for. Clark Patterson Lee Suwanee, Georgia. Prepared by SOIL SURVEY REPORT (Revised March 6, 2013) New Hospital Connector Road GDOT Project No. CSSTP-0006-00(276), PI No. 0006276 Duluth, Gwinnett County, Georgia WILLMER ENGINEERING INC. Willmer Project No.

More information

Woodhaven Retirement Community Addition Wentworth Street Livonia, Michigan 48154

Woodhaven Retirement Community Addition Wentworth Street Livonia, Michigan 48154 Report of Geotechnical Investigation Woodhaven Retirement Community Addition 9 Wentworth Street Livonia, Michigan 81 Latitude.08 N Longitude 8.898 W Prepared for: Fusco, Shaffer & Pappas, Inc. 0 E. Nine

More information

REPORT OF SUBSURFACE INVESTIGATION AND GEOTECHNICAL ENGINEERING SERVICES

REPORT OF SUBSURFACE INVESTIGATION AND GEOTECHNICAL ENGINEERING SERVICES REPORT OF SUBSURFACE INVESTIGATION AND GEOTECHNICAL ENGINEERING SERVICES Elizabeth City, North Carolina G E T Project No: EC14-188G May 30, 2014 PREPARED FOR: 106 Capital Trace, Unit E Elizabeth City,

More information

Report of Geotechnical Exploration For. University of North Florida Kernan Shuttle Stop Jacksonville, Florida

Report of Geotechnical Exploration For. University of North Florida Kernan Shuttle Stop Jacksonville, Florida Report of Geotechnical Exploration For University of North Florida Kernan Shuttle Stop Jacksonville, Florida MAE Project No. 0016-0023 March 18, 2015 Prepared for: Prepared by: Jacksonville, Florida 32256

More information

GEOTECHNICAL REPORT US 95 WIDENING ANN ROAD

GEOTECHNICAL REPORT US 95 WIDENING ANN ROAD GEOTECHNICAL REPORT US 95 WIDENING ANN ROAD to KYLE CANYON ROAD Package 2 E.A. 73627 January 212 MATERIALS DIVISION STATE OF NEVADA DEPARTMENT OF TRANSPORTATION MATERIALS DIVISION GEOTECHNICAL SECTION

More information

SECTION UTILITY BACKFILL MATERIALS

SECTION UTILITY BACKFILL MATERIALS SECTION 31 23 23 UTILITY BACKFILL MATERIALS PART 1: GENERAL 1.01 SECTION INCLUDES A. Material Classifications B. : 1. Concrete sand 2. Gem sand 3. Pea gravel 4. Crushed stone 5. Crushed concrete 6. Bank

More information

Geotechnical Engineering Report

Geotechnical Engineering Report The Residence at Yukon Hills Cornwell Drive and Vandament Avenue Yukon, Oklahoma May 20, 2016 Terracon Project No. 03165108 Prepared for: Jones Gillam Renz Architects, Inc. Salina, Kansas Prepared by:

More information

B. The Bidder shall acknowledge receipt of this Addendum in the appropriate space on the Bid Form.

B. The Bidder shall acknowledge receipt of this Addendum in the appropriate space on the Bid Form. City of Casper Baler Building / MRF Expansion DOCUMENT 9113 ADDENDUM.1 ADDENDUM NUMBER: 1.2 PROJECT INFORMATION A. Project Name: Baler Building / MRF Expansion B. Owner: City of Casper C. Architect: Hein

More information

TRENCH EXCAVATION AND BACKFILL

TRENCH EXCAVATION AND BACKFILL TRENCH EXCAVATION AND BACKFILL PART 1 - GENERAL 1.01 SECTION INCLUDES A. Trench Excavation for Pipe Systems B. Trench Foundation Stabilization C. Pipe Bedding and Backfill 1.02 DESCRIPTION OF WORK A. Excavate

More information

GEOTEK ENGINEERING & TESTING SERVICES, INC. 909 East 50 th Street North Sioux Falls, South Dakota Phone Fax

GEOTEK ENGINEERING & TESTING SERVICES, INC. 909 East 50 th Street North Sioux Falls, South Dakota Phone Fax GEOTEK ENGINEERING & TESTING SERVICES, INC. 909 East 50 th Street North Sioux Falls, South Dakota 57104 Phone 605-335-5512 Fax 605-335-0773 November 1, 2016 City of Viborg PO Box 56 57070-0056 Attn: Lori

More information

GEOTECHNICAL EXPLORATION FOR PROPOSED PAVEMENT IMPROVEMENTS, SIERRA MIDDLE SCHOOL, 4950 CENTRAL AVENUE, CITY OF RIVERSIDE, CALIFORNIA.

GEOTECHNICAL EXPLORATION FOR PROPOSED PAVEMENT IMPROVEMENTS, SIERRA MIDDLE SCHOOL, 4950 CENTRAL AVENUE, CITY OF RIVERSIDE, CALIFORNIA. GEOTECHNICAL EXPLORATION FOR PROPOSED PAVEMENT IMPROVEMENTS, SIERRA MIDDLE SCHOOL, 4950 CENTRAL AVENUE, CITY OF RIVERSIDE, CALIFORNIA Prepared for: RIVERSIDE UNIFIED SCHOOL DISTRICT 3070 Washington Street

More information

REPORT OF SUBSURFACE EXPLORATION

REPORT OF SUBSURFACE EXPLORATION REPORT OF SUBSURFACE EXPLORATION WELDING & JOINING TECHNOLOGY FACILITY NORTH GEORGIA TECHNICAL COLLEGE CLARKESVILLE, GEORGIA S&ME PROJECT NO. 161-10-061 Prepared For: LW Engineering, P.C. Post Office Box

More information

REPORT OF GEOTECHNICAL EXPLORATION GLYNN COUNTY DETENTION CENTER GLYNN COUNTY, GEORGIA E&A PROJECT NO

REPORT OF GEOTECHNICAL EXPLORATION GLYNN COUNTY DETENTION CENTER GLYNN COUNTY, GEORGIA E&A PROJECT NO REPORT OF GEOTECHNICAL EXPLORATION GLYNN COUNTY DETENTION CENTER GLYNN COUNTY, GEORGIA E&A PROJECT NO. - Prepared for: IPG Architects, Inc. Northwood Park Drive Valdosta, Georgia Prepared by: Ellis & Associates,

More information

Geotechnical Engineering Study

Geotechnical Engineering Study Geotechnical Engineering Study SAWS Service Road Brackish Desalinization Production Well Services Package I Bexar County, Texas Arias Job No. 09-1122 Prepared For LBG Guyton & Associates March 9, 11 TABLE

More information

B. Borrow: Satisfactory soil imported from off-site for use as fill or backfill.

B. Borrow: Satisfactory soil imported from off-site for use as fill or backfill. SECTION 312000- EARTHWORK PART 1 - GENERAL 1.1 RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Special Conditions, apply to this Section. 1.2 SUMMARY This Section

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Rodgers Chapel Expansion 502 James B. Hunt Drive Mount Olive, North Carolina August 26, 2016 Project No. 72165063 Prepared for: University of Mount Olive Mount Olive, North

More information

April 21, Odom Investments, Inc. Attn: Mr. Jerry Odom 7100 Westwind Dr., Suite 230 El Paso, TX 79912

April 21, Odom Investments, Inc. Attn: Mr. Jerry Odom 7100 Westwind Dr., Suite 230 El Paso, TX 79912 April 21, 2016 Odom Investments, Inc. Attn: Mr. Jerry Odom 7100 Westwind Dr., Suite 230 El Paso, TX 79912 Re: GEOTECHNICAL ENGINEERING REPORT Proposed San Elizario Retail Center Socorro Road & Chicken

More information

GEOTEK ENGINEERING & TESTING SERVICES, INC. 909 East 50 th Street North Sioux Falls, South Dakota Phone Fax

GEOTEK ENGINEERING & TESTING SERVICES, INC. 909 East 50 th Street North Sioux Falls, South Dakota Phone Fax GEOTEK ENGINEERING & TESTING SERVICES, INC. 909 East 50 th Street North Sioux Falls, South Dakota 57104 Phone 605-335-5512 Fax 605-335-0773 May 10, 2016 Banner Associates, Inc. 2307 W. 57 th Street, Suite

More information

Report of Geotechnical Study

Report of Geotechnical Study Report of Geotechnical Study 12930 Warwick Blvd. Prepared For: 712 Gum Rock Court 23606 Prepared By: Froehling & Robertson, Inc. Greenbrier Commerce Park 833 Professional Place, W. Chesapeake, Virginia

More information

PROJECT INFORMATION... 1 SITE AND SUBSURFACE CONDITIONS... 2 EVALUATION AND RECOMMENDATIONS... 4 CONSTRUCTION CONSIDERATIONS... 5

PROJECT INFORMATION... 1 SITE AND SUBSURFACE CONDITIONS... 2 EVALUATION AND RECOMMENDATIONS... 4 CONSTRUCTION CONSIDERATIONS... 5 TABLE OF CONTENTS Page No. PROJECT INFORMATION... 1 Project Authorization... 1 Project Description... 1 Purpose and Scope of Services... 1 SITE AND SUBSURFACE CONDITIONS... 2 Site Location and Description...

More information