STANDARD SPECIFICATIONS. Followings have been covered in this section. The work is to be carried based on the standard specifications:

Size: px
Start display at page:

Download "STANDARD SPECIFICATIONS. Followings have been covered in this section. The work is to be carried based on the standard specifications:"

Transcription

1 STANDARD SPECIFICATIONS APPENDIX -3 Followings have been covered in this section. The work is to be carried based on the standard specifications: 1) Standard Specifications for Cold Insulation 2) Standard Specifications for Hot Insulation 3) Standard Specifications for Scaffolding STANDARD SPECIFICATIONS FOR COLD INSULATION 1.0 SCOPE:- This specification covers technical requirements and procedure for the application of self-extinguishing type insulation viz. expanded Polystyrene, rigid Polyurethane foam, Mineral wool etc. to Vessels, equipments, pumps and piping. 2.0 GENERAL REQUIREMENTS :- 2.1 Insulation shall be provided on piping, valves, pipe-fittings, vessels, exchangers and instruments, etc. containing fluids or vapour, for which it is necessary to :- a. Maintain low temperature for process control. b. Avoid surface condensation. 2.2 Protection of partially completed jobs:- All precautions shall be taken to ensure that each day s works is vapour sealed and cladded during erection and before being left over-night to prevent seepage of water into the materials and getting trapped. The system shall be protected by tarpaulin, water shed and other protective means All flanged joints, valves and pump-body shall be cold insulated with removable box type insulation. 2.4 Items not requiring insulation: - Bonnets of valves above gland packing, Name plates, stampings etc. of vessels & equipments. 2.5 Protection of Materials: - Insulation materials must be protested against any damage from delivery to finish cladding. Proper covering shall be provided and material shall never be stacked directly on soil. 3. INSULATION MATERIALS :- 3.1 General:- All materials used for insulation, fixing, sealing and protection shall be new and shall conform to the details given below and in clause 4.0. All insulating materials whether dry or wet shall be non-corrosive to the surfaces insulated. 3.2 Insulation material for insulating piping, vessels and exchangers in Cold and Dual temperature (Cold / Hot) service shall be Polyurethane foam for operating temperature range of C to C. 3.3 Foam of insulation shall be as follows:- Pipes upto 400 NB : Preformed pipe sections.

2 Pipes above 400 NB : Radial lags/preformed pipe segments Vessel shells : Radial lags. Vessel heads : Preformed sections or slabs contoured to the profile of vessel heads. Equipments : Radial logs or slabs as applicable to form contour of surface 3.4 Dimensions of preformed sections for piping insulation shall be defined by the outside diameter and insulation thickness. Tolerances for preformed sections shall be as under:- Outside diameter - 0%, + 5% Concentricity + 3% O. D. Bore Length, width and thickness of slabs + 2 mm + 2 mm 3.5 The material used shall not disintegrate, settle, and change its form of composition, in a detrimental way, of the service conditions. 3.6 The insulating material shall be chemically inert, moisture free, rot and vermin proof. 3.7 Preformed half sections and slabs shall be provided having their longitudinal and circumferential faces flat and smooth so as to mate with the mating sections at the whole face area. Ends of the preformed half sections shall be flat end perpendicular to the centre line. 3.8 The insulation material shall be self-extinguishing type, when tested by the method prescribed in Appendix-E of IS: PROPERTIES OF POLYURETHANE FOAM, MINERAL WOOL & PUF SUPPORT: The insulation material shall be rigid preformed cellular urethane foam of selfextinguishing type in accordance with ASTM C 591, Type II, Grade 2. The foam shall be formulated in such a way that it shall be of a self-extinguishing quality which under no circumstances shall cause fire to spread Density:- The density of finished foam shall be within 35.0 kg/m 3 to 39.9 kg/m 3 and shall be determined in accordance with ASTM C Thermal Conductivity:- Thermal conductivity of the Polyurethane foam slabs and sections shall not exceed K Cal / hr. M 0 C (0.16 BTU / ft 2 hr. 0 F / in) at 10 0 C mean temperature after ageing. The thermal conductivity shall be tested by the method prescribed in ASTM C Closed Cell Content:- The closed cell content shall be at least 95% by volume Mineral Wool: Material specification for mineral wool shall be as specified in Annexure- C. Density of mineral wool shall be kg/m 3 except for piping subjected to foot traffic where it shall be 150 kg/m 3.

3 3.11 PUF Support: Density of PUF support shall be 160 kg/m 3 and 300 kg/m 3 as per requirements in SOR. Shape shall be half round in two halves as per diameter of pipes. 4.0 ANCILLARY MATERIALS:- 4.1 Wire - netting, facing and binding wire:- Wire netting shall be galvanized 24 SWG x 20 mm to secure insulation blocks. Lacing and stitching wires shall be 20 and 22 SWG galvanized iron wire respectively. 4.2 Bands :- Bands shall be of Aluminum, of dimensions 20 mm width x 24 SWG, unless specified otherwise. 4.3 Adhesives: - The adhesive to be used for banding Polyurethane sections shall be Foster Fire Resistive Adhesive In case of non-availability of Foster s adhesive, blown bitumen, type 85/25 conforming to IS:702 shall be used as an alternative. 4.4 Vapour Seal :- The vapour seal for Polyurethane insulation shall be Foster Fire Retardant Mastic or equal. In case of non-availability of Foster s mastic, Bitumen Emulsion mastic Insulkote Grade T-12 or equivalent shall be used as an alternative. 4.5 Filler Material For Polyurethane :- Polyurethane foam dust or Mineral Wool mixed with specified adhesives shall be packed tightly so as to fill all irregular voids and at contraction joints For Mineral Wool : Loose mineral wool shall be used to fill oil voids and surface irregularities and at contraction joints. 4.6 Joint Sealer : The joint sealer to be used for sealing Polyurethane insulation joints and at flashing of insulation shall be Foster Foam Seal Sealer For Polystyrene and mineral wool insulation, the adhesive specified shall be used to seal oil joints. 4.7 Glass Cloth : The glass cloth to be used for vapour barrier reinforcement, shall be open weave 10 mesh Glass Cloth having glass fibre thickness of 5 mils. 4.8 Aluminum sheets for cladding of Vapour barrier on the insulation shall be Aluminum sheet of Gauge 22 SWG. 4.9 Anti-Corrosive Paint: A primer coat of red oxide zinc chromate primer shall be applied on all carbon steel and alloy steel piping before application of cold insulation. Item made of stainless steel shall not be painted but shall be wrapped with 0.10mm aluminum foil before application of cold insulation Bituminized roofing felt:-bituminized self-finishing roofing felt shall conform to IS:1322, Type 3, Grade APPLICATION OF COLD INSULATION:- 5.1 GENERAL: - The following applies to all types of cold insulated equipment and piping Surface Preparation: - The surface of vessels, piping and valves etc. on which cold insulation is to be applied, shall be free of dust, loose paint or any other foreign matter. One coat of red oxide zinc chromate primer shall be applied on the CS/AS surfaces to be insulated and allowed to dry before application of insulation.

4 5.1.2 Vapour Barrier : A 3.0 mm ( wet ) thick coating of vapour seal mastic shall be applied to the surface of the insulation as soon as possible after erection, to reduce the time the insulation is exposed to the weather to a minimum. Whilst this coat is still wet, glass cloth shall be laid over the surface and embedded in the mastic. Care shall be taken to ensure that the glass cloth is laid smooth and free from wrinkles, and that no pockets of air are trapped beneath the surface. At junctions in the glass cloth, the overlap shall not be less than 75mm. A second 3mm thick coat of mastic shall be applied after approximately twelve hours. When dry, this coating shall be a minimum of 1.5 mm thick. Care must be taken, however to ensure that the individual coats are not greater than 3 mm (especially in corners), otherwise some cracking of dried coat may result. The mastic shall not be applied over wet insulation or until the adhesive is dry. During this drying time the insulation shall be protected from the weather by Alkothene film, tarpaulin or similar materials approved by the Engineer-in-Charge. Where joints have been left un-insulated, a complete vapour seal as specified above shall be applied to the exposed and of the insulation and flashed weather tight on to the metal Vapour barrier shall be protected by cladding with aluminum sheets. Joints in aluminum sheet shall be staggered and suitably sealed with an approved sealer. Aluminum cladding shall not be applied until the vapour barrier has completely dried and its solvents have dissipated. Self tapping screws shall not be used to secure aluminum cladding as they may puncture the vapour barrier Stainless Steel Piping & Equipments:- All pipes, vessels & equipments of stainless steel shall be wrapped with 0.1 mm thick aluminum foil with an overlap of 50 mm having barium chromate sealer interposed in the joint prior to application of insulation. Foil shall be secured in position by aluminum bands, taking every precaution to avoid formation of pin holes or cracking in the aluminum foil. Cladding shall be done after the insulation and vapour barrier exactly the same way as above. 5.2 APPLICATION ON VESSELS AND EQUIPMENTS: All surfaces shall be prepared / cleaned before application of insulation. Insulation radial lags / preformed sections of handy sizes shall be installed on the surfaces of vessels adhering to each other with applicable joint sealer and secured in position by G.I. wire netting and aluminum bands at an interval of 225 mm. In case of multilayer, the inner layer of insulation shall be bonded to the vessel with the applicable adhesive. Subsequent layers of insulation shall be bonded to the preceding layer with the applicable adhesive. All the layers except the final shall be secured in position by metallic bands at an interval of 225 mm while the final layer shall be first secured with G.I. wire net and then with metallic bands at an interval of 225 mm. Bands shall be staggered on successive layers. There shall be no through joints in the insulation Shell of Vertical Vessels: Slabs in handy sizes shall be applied resting onto the supports with joints tightly butted, staggered & adhering to each other with applicable adhesive and secured in position by circumferential metallic bands at a pitch of 225 mm Top heads of Vertical Vessels: Shaped insulation sections shall be installed on top head, bonded and butted tightly to each other. Insulation shall be held in position by making use of galvanized iron floating ring (25 mm X 0.6 mm) placed over the

5 insulation and positioned in the centre of the head so as not to touch the nozzle at the vertex. The insulation shall be held in position by use of radial metallic bands, one end of which shall be fastened to the floating ring and the other end shall be anchored to the band(s) placed around the cylindrical section close to the head Bottom heads of Vertical Vessels : In all the skirt supported vessels, insulation supports are provided inside the skirt. Floating ring and wire loops around the nozzles and bands shall be used to support downward facing of insulation. Such a floating ring shall be positioned centrally around the nozzle but over the insulation by radial bands anchored to the logging support angle ring fixed inside the skirt at a pitch of 300 mm ensured over the support angle ring Securing cladding on insulation: Aluminum band 12mm (min.) wide X 24 SWG thick shall be used. 5.3 APPLICATION ON PIPING : Piping surface shall be cleaned of loose rust mill scale, grease, dust or any other foreign contaminants The insulation shall be applied to pipes in half round sections in reasonable handty sizes. Where the insulation thickness is greater than 50mm or the metal temperature is below -40 Deg C, multilayer construction shall be followed with all the joints staggered in successive layers The inner layer of insulation shall be bonded to the piping with applicable adhesive. Subsequent layers of insulation shall be bonded to the preceding layers with the above adhesive. Joint sealer shall be applied to the ends and edges of all sections for sealing all longitudinal and circumferential joints. Adhesive shall be applied evenly and the half sections shall be closely butted to each other both longitudinally and circumferentially All the insulation layers except the final layer shall be secured in position by metallic bonds at an interval of 225mm while the final layer shall first be secured with GI wire netting and then with metallic bond at an interval of 225mm. Bonds shall be staggered on successive layers Insulation of piping shall be stopped short of flanges to allow for withdrawal of bolts. For fittings, the insulation shall be completed by applying cut segments at the same insulation sections used for pipes Flanges & Valves:-Removable covers shall be provided over all flanges and valves. Aluminum covers over the valves and flanges shall be fitted with quick release clips. This application shall be proposed for each case by the insulation contractor and approved by the Engineer-in-Charge. 5.4 PIPE SUPPORT: In all the supporting arrangements at both horizontal and vertical piping, dry hard PUF pipe support bearing blocks coated with fire retardant paint / mastic shall be used All finished insulated surface on all types of pipes, valves, strainers, flanges, equipments, pump body etc. shall be well covered as per standard practice with aluminium sheet of gauge 22 SWG.

6 5.5 ALUMINIUM CLADDING : PIPING Straight pipe shall have aluminum cladding, cut and machine rolled(approx. 1.0 mtr. Long) wrapped around, with min, 50 mm overlaps on both longitudinal and circumferential overlaps. All laps shall be arranged to shed water A single bead shall be made on all overlaps to ensure tight arrangement. Self tapping screws, at every 150mm shall be provided at all longitudinal overlaps for both horizontal and vertical piping The cladding shall be secured tightly around the insulated pipe and held in position with bands on a maximum 300 mm centre. One band shall locate in each circumferential lap and the distance between laps divided at equal band spacing. The band securing seal shall be kept neatly in line and positioned away from viewing angle as much as possible Vertical overlaps on vertical or near vertical piping shall be staggered to provide overlaps at North and South positions at alternate sections of coverings On vertical piping, the securing bands shall be supported with S clips or J clips fabricated out of the cladding material as per the requirement and instruction of EIC EQUIPMENTS : The cladding over the vertical vessel shells shall be constructed with corrugated sheet metal, unless otherwise specified The cladding shall be applied commencing at the bottom of the vessel. Each circumferential ring of the cladding shall be tensioned by means of tensioning bands until the final joint is screwed tight. S clips shall be used as sheeting support at unscrewed circumferential overlaps The cladding shall be held tight over the vessel insulation by means of circumferential bands and sealed. The bands shall be positioned at all horizontal overlaps and at 450 mm Centres. Bands shall be held at their relative positions with the help of J clips and be machine stretched and sealed to remove slack only. The bands which are not supported by J clips shall be held in position on cladding by providing pop rivets at every two meters centres The cladding shall be minimum overlap of one corrugation on vertical joints and 80 mm on horizontal joints. The overlaps shall be arranged to shed water all the times The heads of the vertical and horizontal vessels shall be fabricated out of flat sheet metal in an orange peel construction with all radial seams overlapping a minimum of 50 mm centres. All overlaps shall be ball swaged and be rendered water tight Projections from the heads shall be sealed using metal flashings, neatly cut to fit around the projections and extending above the shell insulation for a minimum of 80mm. The seal between the flashing and shell insulation shall be weather proofed with self taping screws and mastics For vertical vessels, the cladding shall be secured to support ring by bolting. In case bolts are not provided, same are to be provided by the contractor at 300 mm centre on angles provided at every 1175 centres vertically. Felt washer, aluminum washers and nut shall be supplied by the contractor for all bolted connections at shell & heads.

7 6.0 TABLE OF THICKNESSES FOR EXPANDED POLYURETHANE INSULATION Nom. Pipe Diameter in inch Thickness in Millimeters & below Nom. Pipe Diameter in inch Thickness in Millimeters V V E / E Other vessels & equipments as per SOR Notes :- 1. Thickness do not include finish thickness and most of the cases, would be applicable for new insulations. In case of repair/replacement of old insulations, the existing thickness shall be considered. 2. Maximum single layer insulation thickness - 50 mm. Wherever thickness exceeds 50 mm two layers of insulation shall be used. For higher thicknesses several layers shall be used. 7.0 MEASUREMENT OF INSULATION: Joint measurement shall be recorded over the finished insulated piping as per IS However, billing of insulation for inspection pockets shall be done separately as per SOR and it has no relation with piping measurement.

8

9 STANDARD SPECIFICATION FOR HOT INSULATION. 1.0 GENERAL :- 1.1 This specification covers design and material requirements for above ground, external insulation of piping and valves operating between ambient temperature and C for the purpose of heat conservation, process stabilization, temperature maintenance, personnel protection and fire protection. Wherever necessary this specification indicates the basis for selecting a criterion This specification is suitable for use in outdoor service with normal process plant atmospheres. 2.0 MATERIAL AND SPECIFICATIONS:- 2.1 General : All material shall be of high quality and good appearance. This specification covers two materials - Rockwool & Glass Wool Insulation materials shall be of low chloride content, chemically inert, non-sulfurous, rot proof, vermin proof, impervious to hot water and steam, non-injurious to health and non-corrosive to steel and aluminum ( even if soaked in water at ambient temperatures for extended periods ) The use of insulation or finishing materials containing ASBESTOS in any form is not permitted. 2.2 INSULATION MATERIAL: Fibrous Material ( Rock and Glass Wool ) : Shall be a preformed insulation and shall be of long fibred rock or glass material processed from a molten state into fibrous form bonded with a binder and suitable for the intended operational temperature range from ambient to C. Slag wool is not acceptable Unless otherwise specified herein, insulation material shall strictly conform to all the requirements of quality standards listed below :- Preformed pipe insulation Mineral fibre block & board thermal insulation : IS 9842 ; Latest issue for piping & equipments. : IS : 8183 ; Latest issue Density : 140 to 150 kg/m3 ( Density shall be within this range and density test shall be as per IS:5688/IS:3144, Latest Issue. Moisture content } And moisture } absorption } Not more than 2% ( IS:3144 ) }

10 Incombustibility ( IS:3144) Incombustible; Loss in weight not more than 5%. Thermal Conductivity ( IS : 3346 ) :- Mean Temperature 0 C Thermal / Conductivity mw/cm 0 C Mean Temperature is [ ( Hot Face Temp. + Cold Face Temp. ) / 2 ] Sulpher Content (IS: 3144) : Not more than 0.6 percent Linear Shrinkage (IS:3144 ) : Not more than 2% when subjected to soaking conditions of soaking heat at the stated maximum temperature of use ( C ) for 24 hours. Heat Resistance (IS:3144) : When heated to max. temp. ( C ),sample shall maintain its general form and shall not suffer visible deformation of the fibrous structure. Recovery after compression :After compression to 75% of the original (IS: Appendix A ; thickness, recovery shall not be less than (IS:9842 Appendix A ) 90% of original thickness. Alkalinity (IS:8183 Appendix B ) : ph of the solution of the material shall be between 7.0 and IS:9842 Appendix B ) Chloride Content (IS:3144): Not to exceed 20 ppm 3.0 Ancillary Material 3.1 For securing fibrous insulation :- On Piping :- On Equipment:- Band, 24 SWG thick x 12mm ( min ) wide, Aluminum. Band, 24 SWG thick x 20mm ( min ) wide, Aluminum. 3.2 Screws required for metal jacket securement shall be cadmium plated steel self tapping type A No. 8 dia x 12 mm long to BS 4176 complete with neoprene washers under the head. 3.3 To ensure perfect water proofing, all the cladding joints shall be packed with sealing materials which may either be in the form of a elastomeric sealing compound or fibre based bituminous felt strips. 4.0 APPLICATION OF HOT INSULATION:- 4.1 General: The application methods, given in this Standard are general in nature. The Contractor is responsible for applying an insulating system that will provide satisfactory operational performance and the requirements given herein shall be regarded as the acceptable minimum. The Contractor shall carryout the work in

11 accordance with the best practices of insulation application with the minimum of waste and debris and the final job shall have a neat, efficient and workmanlike appearance The insulation Contractor shall only insulate those sections of the plant that has been specifically released for such work by the Engineer-in-Charge Surfaces to be insulated shall be thoroughly cleaned, dried and made free from loose scale, oil or grease. It shall be the Contractor s responsibility to remove loosely adhering scale and dirt before applying insulation The insulation contractor shall not carryout any welding or drilling on plant equipment and piping Insulation shall be finished, beveled and weather proofed at all terminal points where it is required to remove bolts etc. without damage to the insulation All projections, such as lifting lugs, trunnions and stiffeners on piping shall be insulated with the same thickness of insulation as specified for pipeline Double layer insulation shall be required when the insulation thickness is greater than 75 mm. Insulation installed in two or more layers shall be staggered joint construction and each layer shall be secured in place and details of securement shall be the same for each layer Wet or Damaged Insulation shall not be used under any Circumstances :- Insulation material to be applied shall not be kept over bare ground to avoid water absorption. Installed material awaiting its protective cover shall be adequately protected from damage, rain and contamination and shall be covered with cladding at a minimum loss of time A minimum clearance of 25 mm between outside surface of any insulation finish and adjacent equipment, pipe or structural members shall be maintained Mattress ( Fibrous insulation - Rock or Glass Wool ) shall be applied over the surface with joints tightly butted and laced together with 1 mm dia galvanized lacing wire Insulation Securement ( All insulation materials ) :- Each layer of insulation shall be secured firmly in place with at least 3 loops of binding wire / band, one loop to be placed not more than 75 mm from each end and at least one loop to be equally spaced between end loops, for each section. Binding wire shall be drawn about the insulation with ends tightly twisted together, bent under and pressed into the surface of insulation. Bands or wires in no case be spaced more than 200 mm apart. Each layer of insulation shall be secured by the same method as above All insulated finished surface on pipes, valves, flanges, equipments etc. shall be well covered as per standard practice with aluminium sheet of gauge 22 SWG Securing cladding on insulation: Cladding shall be carried as per the procedure specified in the cold insulation and as per the instruction of EIC. Aluminum band 12mm (min.) wide X 24 SWG thick shall be used for securing the cladding as indicated the Annexure -B. 5.0 MEASUREMENT OF INSULATION: Joint measurement shall be recorded over the finished insulated piping as per IS However, billing of insulation for inspection pockets shall be done separately as per SOR and it has no relation with piping measurement.

12 PROCEDURE FOR ERECTION OF SCAFFOLDING: A) SCAFFOLDING is to be made out of tubular structures (Standards scaffolding pipes of 40 mm dia in order to complete entire painting work safely. All the scaffolding material including necessary fittings, clamps, platforms has to be arranged by the contractor at his own cost. The engineer-in-charge may accept better scaffolding material/technique than that given here in case if the contractor prefer to provide. Proper approach ladder for climbing from bottom platform to top platform are to be erected for easy climbing. B) Height between two horizontal members (Pipes) of tubular structures should be 500 mm to 800 mm (Maximum) to have ease and safety of climbing up or down by the working and inspecting personnel. In special cases the height may have to be reduced if felt necessary by the engineer-in-charge of GAIL. Provision must be kept for the same. C) Working platform or stages are to be made by steel/aluminum perforated sheets or similar material and secured firmly. These platforms are to be provided at a vertical distances of about 1200 mm. Similar stages are to be made all around the structures, pipes and vessels etc. for cleaning, painting and inspection works. (D) (E) A clear Gap of mm should be maintained between the edge of scaffolding pipes and sidewall of any vessel. Wooden planks, Bamboo, coir ropes, nylon ropes, cotton or any combustible material should not be used for making scaffolding Removal: Scaffolding shall be removed after completion of all necessary works.

This specification describes the minimum requirements for industrial thermal insulation.

This specification describes the minimum requirements for industrial thermal insulation. 016/09/7 1/7 1.0 PURPOSE This specification describes the minimum requirements for industrial thermal insulation. Read it in conjunction with the applicable insulation and insulation finish specifications

More information

PIPEWORK INSULATION. 14/ Page 1 of 10 Pipework Insulation Rev D

PIPEWORK INSULATION. 14/ Page 1 of 10 Pipework Insulation Rev D PIPEWORK INSULATION 14/10-2014 Page 1 of 10 Pipework Insulation Rev D Contents INTRODUCTION General Scope Surfaces to be Insulated Pumps, Turbines etc Performance Minimum Pipe Insulation Thickness Physical

More information

10.1 APPLICATION 1 A. HOT PIPING 1 B. ANTI SWEAT PIPING 1 C. COLD PIPING FINISHES 2

10.1 APPLICATION 1 A. HOT PIPING 1 B. ANTI SWEAT PIPING 1 C. COLD PIPING FINISHES 2 SECTION 10: 10.1 APPLICATION 1 A. HOT PIPING 1 B. ANTI SWEAT PIPING 1 C. COLD PIPING 2 10.2 FINISHES 2 10.3 PIPING FORMAT 3 A. PIPE INSULATION 3 B. PIPE INSULATION 3 C. INSULATION ATTACHMENT 3 D. INSULATION

More information

Revision:C Pipework Insulation Issued:14/11/2012 PIPEWORK INSULATION CU14. 14/11/2012 Page 1 of 10 Pipework Insulation - RevC

Revision:C Pipework Insulation Issued:14/11/2012 PIPEWORK INSULATION CU14. 14/11/2012 Page 1 of 10 Pipework Insulation - RevC PIPEWORK INSULATION CU14 14/11/2012 Page 1 of 10 - RevC Contents INTRODUCTION 5 General 5 Scope 5 Surfaces to be Insulated 5 Pumps, Turbines etc 5 Performance 6 Minimum Pipe Insulation Thickness 6 Physical

More information

FIRE STATION 55 June 14, 2010

FIRE STATION 55 June 14, 2010 SECTION 15250 MECHANICAL INSULATION PART 1 - GENERAL 1.01 DESCRIPTION A. Work Includes 1. Insulation of Domestic Water Piping. 2. Pipe Insulation of refrigerant piping. 3. Insulation of ductwork. 4. Aluminum

More information

Addendum to Specifications

Addendum to Specifications Addendum to Specifications SOW #: Construction Specification #: Date: Additions to Specifications: Deletions to Specifications: Engineer Date Design Engineering Manager Date Page 2 of 7 PART 1 - GENERAL

More information

INTERPLANT STANDARD - STEEL INDUSTRY CODE OF PRACTICE FOR THERMAL. Based on IS 7240:1981 (Superseded by IS 14164:2008)

INTERPLANT STANDARD - STEEL INDUSTRY CODE OF PRACTICE FOR THERMAL. Based on IS 7240:1981 (Superseded by IS 14164:2008) INTERPLANT STANDARD - STEEL INDUSTRY IPSS CODE OF PRACTICE FOR THERMAL INSULATION OF COLD SERVICES Based on IS 7240:1981 (Superseded by IS 14164:2008) IPSS:1-06-031-17 (Second Revision) Formerly : IPSS:1-06-031-02

More information

ACOUSTICAL INSULATION (LAGGING) FOR PIPING AND EQUIPMENT

ACOUSTICAL INSULATION (LAGGING) FOR PIPING AND EQUIPMENT ACOUSTICAL INSULATION (LAGGING) FOR PIPING AND EQUIPMENT Specification for Acoustical Insulation (Lagging) for Piping and Equipment 1 of 5 TABLE OF CONTENTS 1.0SCOPE..... 3 2.0REFERENCED PUBLICATIONS...

More information

SPECIFICATION FOR COLD INSULATION

SPECIFICATION FOR COLD INSULATION SPECIFICATION FOR COLD INSULATION Specification for Cold Insulation 1 of 21 TABLE OF CONTENTS 1.0. SCOPE..... 3 2.0. REFERENCED PUBLICATIONS... 3 3.0. GENERAL CONDITIONS... 3 4.0. MATERIALS... 5 5.0. APPLICATIONS...

More information

INSTALLATION GUIDELINES for ISO-C1 POLYISOCYANURATE MECHANICAL INSULATION for CHILLED WATER SYSTEMS

INSTALLATION GUIDELINES for ISO-C1 POLYISOCYANURATE MECHANICAL INSULATION for CHILLED WATER SYSTEMS INSTALLATION GUIDELINES for ISO-C1 POLYISOCYANURATE MECHANICAL INSULATION for CHILLED WATER SYSTEMS Dyplast Products Copyright 2014 1 Rev 0414 DYPLAST PRODUCTS INSTALLATION GUIDELINES ISO-C1 POLYISOCYANURATE

More information

INSTALLATION GUIDELINES for ISO-C1 POLYISOCYANURATE MECHANICAL INSULATION for CHILLED WATER SYSTEMS

INSTALLATION GUIDELINES for ISO-C1 POLYISOCYANURATE MECHANICAL INSULATION for CHILLED WATER SYSTEMS INSTALLATION GUIDELINES for ISO-C1 POLYISOCYANURATE MECHANICAL INSULATION for CHILLED WATER SYSTEMS Dyplast Products Copyright 2018 1 Rev 0618 DYPLAST PRODUCTS INSTALLATION GUIDELINES ISO-C1 POLYISOCYANURATE

More information

INSTALLATION GUIDELINES FOR CHILL WATER PIPE INSULATION

INSTALLATION GUIDELINES FOR CHILL WATER PIPE INSULATION PermaTherm, Inc. 269 Industrial Park Road Monticello, GA 31064 (706) 468-7500 www.insulate.pipe.com/ Temperature Range 34 F to 167 F INSTALLATION GUIDELINES FOR CHILL WATER PIPE INSULATION PERMATHERM,

More information

ITW INSULATION SYSTEMS

ITW INSULATION SYSTEMS ITW INSULATION SYSTEMS 1SCOPE TRYMER RIGID POLYISOCYANURATE INSULATION IN LIQUEFIED NATURAL GAS APPLICATIONS (-260 F) 1.1 This guideline covers the installation of Trymer* Rigid Polyisocyanurate Insulation

More information

ITW INSULATION SYSTEMS

ITW INSULATION SYSTEMS ITW INSULATION SYSTEMS 1SCOPE TRYMER RIGID POLYISOCYANURATE INSULATION IN LIQUEFIED NATURAL GAS APPLICATIONS (Cryogenic to -70 F) 1.1 This guideline covers the installation of TRYMER Rigid Polyisocyanurate

More information

Design & Construction Standards, Revised January

Design & Construction Standards, Revised January PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

Division 15 INSULATION Section 15100

Division 15 INSULATION Section 15100 Page 1 of 5 SECTION PAGE PART 1 GENERAL 2 1.1 General 2 1.2 References 2 1.3 Work Included 2 1.4 Related Work 2 1.5 Quality Assurance 3 PART 2 PRODUCTS 3 2.1 Description 3 PART 3 EXECUTION 3 3.1 Workmanship

More information

A. ASTM E84 Standard Test Method for Surface Burning Characteristics of Building Materials

A. ASTM E84 Standard Test Method for Surface Burning Characteristics of Building Materials PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

SPECIFICATION GUIDELINES FOR THE USE OF CRYOGEL Z ON COLD PIPING AND EQUIPMENT

SPECIFICATION GUIDELINES FOR THE USE OF CRYOGEL Z ON COLD PIPING AND EQUIPMENT SPECIFICATION GUIDELINES FOR THE USE OF CRYOGEL Z ON COLD PIPING AND EQUIPMENT Page 1 of 15 Ver. 3-0 March 2010 TABLE OF CONTENTS 1. Scope... 3 2. General System Requirements... 3 3. Installation Details...

More information

SECTION HVAC INSULATION

SECTION HVAC INSULATION PART 1 GENERAL 1.1 SUMMARY SECTION 23 07 00 HVAC INSULATION A. Section Includes: 1. Ductwork insulation. 2. Duct liner. 3. Insulation jackets. 4. Equipment insulation 5. Piping system insulation. 6. Insulation

More information

D. Provide UL-approved assemblies for pipes and ducts passing through fire-rated floors, walls, or partitions as required.

D. Provide UL-approved assemblies for pipes and ducts passing through fire-rated floors, walls, or partitions as required. PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

UBC Technical Guidelines Section Edition Thermal Insulation for Piping Page 1 of 5

UBC Technical Guidelines Section Edition Thermal Insulation for Piping Page 1 of 5 Page 1 of 5 1.0 GENERAL 1.1 Related UBC Guidelines.1 Refer to Division 33 and Division 23 - Underground Steam and Condensate Piping.2 Refer to Division 23 - Steam and Condensate Piping Above Grade 1.2

More information

Architectural Roof and Wall Products Guide Specifications

Architectural Roof and Wall Products Guide Specifications Architectural Roof and Wall Products Guide Specifications Western States Metal Roofing 901 W. Watkins St. Phoenix, AZ 85007 PH: 602-495-0048 FX: 602-261-7726 FORMED METAL WALL PANELS This Guide Specification

More information

INSTALLATION GUIDELINES FOR COLD/CRYOGENIC PIPE INSULATION

INSTALLATION GUIDELINES FOR COLD/CRYOGENIC PIPE INSULATION PermaTherm, Inc. 269 Industrial Park Road Monticello, GA 31064 (706) 468-7500 www.insulate.pipe.com/ Temperature Range -310 F to 32 F INSTALLATION GUIDELINES FOR COLD/CRYOGENIC PIPE INSULATION PERMATHERM,

More information

Cold Work Cladding Fabrication & Application

Cold Work Cladding Fabrication & Application TRADE OF Industrial Insulation PHASE 2 Module 3 Substructures, Advanced Cold Work and Cladding UNIT: 4 Cold Work Cladding Fabrication & Application Produced by In cooperation with subject matter expert:

More information

A. This Section includes duct and plenum insulation; accessories and attachments; and sealing compounds.

A. This Section includes duct and plenum insulation; accessories and attachments; and sealing compounds. SECTION 230713 DUCT INSULATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

ITEM 458 WATERPROOFING FOR STRUCTURES

ITEM 458 WATERPROOFING FOR STRUCTURES ITEM 458 WATERPROOFING FOR STRUCTURES 458.1. Description. This Item shall govern for the furnishing and placing of waterproofing on concrete and steel bridge decks of railroad structures and on other structures

More information

SECTION PIPING INSULATION

SECTION PIPING INSULATION SECTION 23 07 19 PIPING INSULATION PART 1 - GENERAL 1.1 SUMMARY A. Section includes: 1. Piping insulation for refrigerant piping within building envelope. 2. Furnishing and installation of insulation.

More information

Architectural Roof and Wall Products Guide Specifications

Architectural Roof and Wall Products Guide Specifications Architectural Roof and Wall Products Guide Specifications 901 W. Watkins St. Phoenix, AZ 85007 PH: 602-495-0048 FX: 602-261-7726 FORMED METAL ROOF AND WALL PANELS This Guide Specification is to be used

More information

INSTALLATION GUIDELINES for ISO-C1 POLYISOCYANURATE MECHANICAL INSULATION for LIQUEFIED NATURAL GAS (LNG) CRYOGENIC REFRIGERATION CHILLED WATER

INSTALLATION GUIDELINES for ISO-C1 POLYISOCYANURATE MECHANICAL INSULATION for LIQUEFIED NATURAL GAS (LNG) CRYOGENIC REFRIGERATION CHILLED WATER INSTALLATION GUIDELINES for ISO-C1 POLYISOCYANURATE MECHANICAL INSULATION for LIQUEFIED NATURAL GAS (LNG) CRYOGENIC REFRIGERATION CHILLED WATER Dyplast Products Copyright 2012 1 Rev 0112 DYPLAST PRODUCTS

More information

PROJ. NO SECTION HVAC DUCT INSULATION

PROJ. NO SECTION HVAC DUCT INSULATION SECTION 23 07 13 HVAC DUCT INSULATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

ITW INSULATION SYSTEMS

ITW INSULATION SYSTEMS Installation Guidelines for TRYMER Insulation ITW INSULATION SYSTEMS TRYMER Rigid Polyisocyanurate Insulation in Refrigeration Applications (-70 F to 35 F) 1 SCOPE 1.1 This guideline covers the installation

More information

A. Product Data: Identify thermal conductivity, thickness, and jackets (both factory and field applied, if any), for each type of product indicated.

A. Product Data: Identify thermal conductivity, thickness, and jackets (both factory and field applied, if any), for each type of product indicated. SECTION 23 07 13 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

SECTION (15081) - HVAC INSULATION

SECTION (15081) - HVAC INSULATION PART 1 GENERAL 1.01 SUMMARY A. Section Includes: SECTION 23 07 00 (15081) - HVAC INSULATION 1. Insulation Materials 2. Jackets 3. Accessories and Attachments 4. Vapor Retarders B. Related Sections: 1.02

More information

A. Section Fire Procection, HVAC & Plumbing Penetration Firestopping. B. Section Interior Painting: Painting insulation jacket.

A. Section Fire Procection, HVAC & Plumbing Penetration Firestopping. B. Section Interior Painting: Painting insulation jacket. SECTION 230719 - HVAC PIPING INSULATION PART 1 GENERAL 1.1 SECTION INCLUDES A. Piping insulation. B. Jackets and accessories. 1.2 RELATED REQUIREMENTS A. Section 07813 - Fire Procection, HVAC & Plumbing

More information

INSTALLATION GUIDELINE FOR TRYMER INSULATION ITW INSULATION SYSTEMS

INSTALLATION GUIDELINE FOR TRYMER INSULATION ITW INSULATION SYSTEMS INSTALLATION GUIDELINE FOR TRYMER INSULATION ITW INSULATION SYSTEMS TRYMER RIGID POLYISOCYANURATE INSULATION IN HOT APPLICATIONS (80 F to 300 F) 1 SCOPE 1.1 This guideline covers the installation of TRYMER

More information

UBC Technical Guidelines Section Edition Insulation of Tanks, Steam and Condensate Piping Page 1 of 6

UBC Technical Guidelines Section Edition Insulation of Tanks, Steam and Condensate Piping Page 1 of 6 Page 1 of 6 1.0 GENERAL 1.1 Related UBC Guidelines.1 Refer to Division 33 and Division 23 - Underground Steam and Condensate Piping.2 Refer to Division 23 - Steam and Condensate Piping Above Grade.3 Section

More information

.1 Thermal insulation for insulated piping and piping accessories affected by construction and new pipe sections as indicated on drawings.

.1 Thermal insulation for insulated piping and piping accessories affected by construction and new pipe sections as indicated on drawings. BID OPPORTUNITY NO. 253-2011 PAGE 1 OF 8 PART 1 GENERAL 1.1 SUMMARY.1 Section Includes: 1.2 REFERENCES.1 Thermal insulation for insulated piping and piping accessories affected by construction and new

More information

INSTALLATION GUIDELINE FOR TRYMER INSULATION ITW INSULATION SYSTEMS

INSTALLATION GUIDELINE FOR TRYMER INSULATION ITW INSULATION SYSTEMS INSTALLATION GUIDELINE FOR TRYMER INSULATION ITW INSULATION SYSTEMS TRYMER RIGID POLYISOCYANURATE INSULATION IN HOT APPLICATIONS (80 F to 300 F) 1 SCOPE 1.1 This guideline covers the installation of Trymer*

More information

1. Division 23 Section "Hangers and Supports for HVAC Piping and Equipment" for pipe insulation shields and protection saddles.

1. Division 23 Section Hangers and Supports for HVAC Piping and Equipment for pipe insulation shields and protection saddles. SECTION 23 07 19 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

B. Refer to Section : Air Distribution for lined ductwork requirements.

B. Refer to Section : Air Distribution for lined ductwork requirements. SECTION 230700 MECHANICAL INSULATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

INSTALLATION GUIDELINE FOR TRYMER INSULATION ITW INSULATION SYSTEMS

INSTALLATION GUIDELINE FOR TRYMER INSULATION ITW INSULATION SYSTEMS INSTALLATION GUIDELINE FOR TRYMER INSULATION ITW INSULATION SYSTEMS TRYMER RIGID POLYISOCYANURATE INSULATION IN REFRIGERATION APPLICATIONS (-70 F to 35 F) 1 SCOPE 1.1 This guideline covers the installation

More information

A. Deliver material to job site in original, nonbroken, factory packaging, labeled with manufacturer's density and thickness.

A. Deliver material to job site in original, nonbroken, factory packaging, labeled with manufacturer's density and thickness. SECTION 15250 PIPING AND EQUIPMENT INSULATION PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract including General and Supplementary Conditions, Division 1 Specification

More information

SECTION PLUMBING INSULATION

SECTION PLUMBING INSULATION SECTION 22 07 00 PLUMBING INSULATION PART 1 - GENERAL 1.1 SUMMARY A. Section includes equipment insulation, covering, and thermal insulation for piping systems including vapor retarders, jackets and accessories.

More information

J41 Reinforced bitumen membrane roof coverings

J41 Reinforced bitumen membrane roof coverings J41 Reinforced bitumen membrane roof coverings To be read with Preliminaries/General conditions. A comprehensive waterproofing system comprising two reinforced bituminous membranes fully adhered to thermal

More information

SECTION MECHANICAL INSULATION. A. Types of insulation specified in this section include the following:

SECTION MECHANICAL INSULATION. A. Types of insulation specified in this section include the following: SECTION 15250 PART I - GENERAL 1.01 WORK INCLUDED A. Types of insulation specified in this section include the following: 1. Piping System Insulation: a. Domestic Cold Water b. Domestic Hot water c. Heating

More information

Pipe and Equipment Insulations. Zeston. PVC Insulated Fitting Covers Installation Instructions for Hot, Cold and USDA Piping Systems

Pipe and Equipment Insulations. Zeston. PVC Insulated Fitting Covers Installation Instructions for Hot, Cold and USDA Piping Systems Pipe and Equipment Insulations Zeston PVC Insulated Fitting Covers Installation Instructions for Hot, Cold and USDA Piping Systems Zeston PVC Insulated Fitting Covers Installation Instructions for Hot,

More information

DSC BUILDING 1200 ALTERATIONS OCTOBER 2011 SECTION DUCT INSULATION

DSC BUILDING 1200 ALTERATIONS OCTOBER 2011 SECTION DUCT INSULATION SECTION 230713 DUCT INSULATION PART 1 GENERAL 1.1 SUMMARY A. Related Sections: 1. 233113 Ductwork and Accessories 1.2 REFERENCES A. American Society for Testing and Materials (ASTM): 1. E84-96a Test Method

More information

PRESTON HEALTH SERVICES ARCHITECT S NO. 2700

PRESTON HEALTH SERVICES ARCHITECT S NO. 2700 SECTION 22 0700 - PLUMBING INSULATION PART 1 - GENERAL 1.1 DESCRIPTION OF WORK: A. All work covered in this section consists of furnishing all labor, equipment, materials and accessories, and performing

More information

This Design guideline contained herein includes the requirements for mechanical insulation at The University of Texas at Austin

This Design guideline contained herein includes the requirements for mechanical insulation at The University of Texas at Austin PART 1: GENERAL 1.01 Purpose: This Design guideline contained herein includes the requirements for mechanical insulation at The University of Texas at Austin 1.02 Scope: A. Extent of mechanical insulation

More information

FOAMGLAS INSULATION SPECIFICATION

FOAMGLAS INSULATION SPECIFICATION FOAMGLAS INSULATION SPECIFICATION PITTSBURGH CORNING CORPORATION FOAMGLAS Products Technical Support 800 Presque Isle Drive Pittsburgh, PA 15239 724-327-6100 SPECIFICATION # I-H/C-89-02-01 REVISION 06/28/2004

More information

1.2 The Engineer shall select appropriate sections of the specification to ensure that the specification is comprehensive for specified work.

1.2 The Engineer shall select appropriate sections of the specification to ensure that the specification is comprehensive for specified work. STAC Coating System Specification & Installation Guide 1.0 Scope 1.1 This specification may be used for the priming, caulking and wrapping with the STAC Petrolatum Coating System of any of the following

More information

Application Guidelines

Application Guidelines Application Guidelines 1.0 SCOPE This document contains general instructions and recommended practices for the application of the SERVIWRAP cold applied tape coating system. The various coating grades

More information

J41 Reinforced bitumen membrane roof coverings

J41 Reinforced bitumen membrane roof coverings J41 Reinforced bitumen membrane roof coverings To be read with Preliminaries/ General conditions. TYPES OF COVERING 115A SINGLE LAYER REINFORCED BITUMEN MEMBRANE WARM DECK ROOF COVERING warm roofing system

More information

PIP INSC1000 Cold Service Insulation Materials and Installation Specification

PIP INSC1000 Cold Service Insulation Materials and Installation Specification COMPLETE REVISION Ocber 2017 Insulation PIP Cold Service Insulation Materials and Installation Specification PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort minimize the cost of process industry

More information

INSTALLATION GUIDELINE FOR TRYMER INSULATION

INSTALLATION GUIDELINE FOR TRYMER INSULATION INSTALLATION GUIDELINE FOR TRYMER INSULATION TRYMER RIGID POLYISOCYANURATE INSULATION IN CHILLED WATER APPLICATIONS (35 F to 60 F) 1 SCOPE 1.1 This guideline covers the installation of Trymer Rigid Polyisocyanurate

More information

079 Quick Installation Guide

079 Quick Installation Guide INSULATION 2212 W. 5th Pl., Tempe, AZ 85268 (480) 967-8888 Step 1: 079 Quick Installation Guide Step 2: *see attached literature for complete installation instructions Step 3: Position the next piece and

More information

FIRESTOP JOINT SPRAY CFS-SP WB. 2mm (0.079") WET FILM ± 7.5 ± 5

FIRESTOP JOINT SPRAY CFS-SP WB. 2mm (0.079) WET FILM ± 7.5 ± 5 Design No. CEJ 27 P (HI/JS 20-05) Table. CONCRETE FLOOR ASSEMBLY: Max. two-hour rated concrete floor assembly made from either lightweight or normal weight concrete with a density of 00-50 pcf, with a

More information

Design No. HI/BP PERIMETER FIRE BARRIER SYSTEM Hilti, Inc. ASTM E 2307 Table 1

Design No. HI/BP PERIMETER FIRE BARRIER SYSTEM Hilti, Inc. ASTM E 2307 Table 1 FIRESTOP JOINT SPRAY CFS-SP WB SILICONE JOINT SPRAY CFS-SP SIL F-RATING 2-HR. 2-HR. T-RATING -HR. -HR. APPLICATION THICKNESS PERIMETER FIRE BARRIER SYSTEM Hilti, Inc. ASTM E 2307 Table /8" WET FILM (/6"

More information

Architectural Roof and Wall Products Guide Specifications

Architectural Roof and Wall Products Guide Specifications Architectural Roof and Wall Products Guide Specifications 901 W. Watkins St. Phoenix, AZ 85007 PH: 602-495-0048 FX: 602-261-7726 FORMED METAL ROOF AND WALL PANELS This Guide Specification is to be used

More information

GENERAL GUIDELINES FOR INSULATION WORKS

GENERAL GUIDELINES FOR INSULATION WORKS GENERAL GUIDELINES FOR INSULATION WORKS ISSUED FOR TENDER SPECIFICATION BHEL : PSSR : SCT : 1206 This booklet is given as a general guideline to this Tenderers about insulation works, However instructions

More information

Light-Metal Roof Edge, Raised

Light-Metal Roof Edge, Raised NAIL WOOD CANT TO BLOCKING 2 ROWS STAGGERED EACH ROW 24 O.C. 1/2 MIN. 10 0 MAX. FASTEN 18 O.C. WITH NEOPRENE GASKETED FASTENERS 3-1/2 MIN. 4 6 JOINT COVER PLATE SET IN TWO BEADS OF SEALANT 4 MIN. SPECIFIED

More information

CONSTRUCTION SPECIFICATION FOR CHAIN LINK FENCE

CONSTRUCTION SPECIFICATION FOR CHAIN LINK FENCE ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 541 DECEMBER 1990 CONSTRUCTION SPECIFICATION FOR CHAIN LINK FENCE 541.01 SCOPE 541.02 REFERENCES 541.03 DEFINITIONS 541.05 MATERIALS TABLE OF CONTENTS

More information

SECTION GLASS UNIT MASONRY ASSEMBLIES

SECTION GLASS UNIT MASONRY ASSEMBLIES PART 1 GENERAL 1.01 SCOPE OF WORK A. The Contractor shall furnish and install all materials, labor, equipment and incidentals required to install glass unit masonry as shown on the contract drawings and

More information

PROTECTION OF PIPELINE FITTINGS AND VALVES

PROTECTION OF PIPELINE FITTINGS AND VALVES CI/SfB reference by SfB Agency (59) 1 PROTECTION OF PIPELINE FITTINGS AND VALVES 70 YEARS OF PIPELINE PROTECTION Product and Application Data Flanges Valves Couplings Features Easy to use No skilled labour

More information

CONCRETE STEPS, HANDRAILS, AND SAFETY RAIL

CONCRETE STEPS, HANDRAILS, AND SAFETY RAIL SUDAS Standard Specifications Division 9 - Site Work and Landscaping Section 9080 - Concrete Steps, Handrails, and Safety Rail CONCRETE STEPS, HANDRAILS, AND SAFETY RAIL PART - GENERAL.0 SECTION INCLUDES

More information

SECTION HVAC PIPING INSULATION

SECTION HVAC PIPING INSULATION SECTION 23 0719 HVAC PIPING INSULATION PART 1 - GENERAL 1.1 SUMMARY A. Includes But Not Limited To: 1. Furnish and install insulation on above ground refrigerant piping and fittings as described in Contract

More information

CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY DISTRIBUTION ENGINEERING DISTRIBUTION EQUIPMENT

CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY DISTRIBUTION ENGINEERING DISTRIBUTION EQUIPMENT CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY 10003 DISTRIBUTION ENGINEERING DISTRIBUTION EQUIPMENT SPECIFICATION EO-1007 REVISION 13 DECEMBER 2013 EFFECTIVE DATE DECEMBER 16,

More information

MECHANICAL INSULATION

MECHANICAL INSULATION MECHANICAL INSULATION GENERAL INFORMATION 1.1 Comply with more stringent of following latest edition of Energy Conservation and Construction Code of New York City, ASHRAE and this Guideline. DESIGN REQUIREMENTS

More information

SECTION 2 DIVISION 05 METALS

SECTION 2 DIVISION 05 METALS SECTION 2 DIVISION 05 METALS DIVISION 5 - METALS Note: This is a guide for Designers only. Contents shall not be used in lieu of specifications as part of the Designer s Contract Documents. GENERAL DESIGN:

More information

DUCTWRAP AND DUCTSLAB For the thermal insulation of ductwork and water storage tanks.

DUCTWRAP AND DUCTSLAB For the thermal insulation of ductwork and water storage tanks. DUCTWRAP AND DUCTSLAB For the thermal insulation of ductwork and water storage tanks. DUCTWRAP AND DUCTSLAB ROCKWOOL Ductwrap and Ductslab provide thermal insulation for air conditioning, warm air and

More information

Mechanical Services Standard Specification Thermal Insulation. May For ROYAL HOLLOWAY UNIVERSITY OF LONDON

Mechanical Services Standard Specification Thermal Insulation. May For ROYAL HOLLOWAY UNIVERSITY OF LONDON Mechanical Services Standard Specification 11.0 - Thermal Insulation May 2010 For ROYAL HOLLOWAY UNIVERSITY OF LONDON Prepared For The Estates Division By: Hulley & Kirkwood Consulting Engineers Ltd Castle

More information

STANDARD ENGINEERING SPECIFICATION for THERMAL INSULATION DESIGN

STANDARD ENGINEERING SPECIFICATION for THERMAL INSULATION DESIGN STANDARD ENGINEERING SPECIFICATION for HINDUSTAN PETROLEUM CORPORATION. VISAKH REFINERY DHT PROJECT JOB NO. : 6261 DOCUMENT NO. : A-6261-480-007 0 22/10/2008 FOR BID ENQUIRY AMS MAM JMG REV. DATE DESCRIPTION

More information

Installation Guidelines for ITW Insulation Systems Metal Jacketing Used on Insulated Pipe

Installation Guidelines for ITW Insulation Systems Metal Jacketing Used on Insulated Pipe Installation Guidelines for ITW Insulation Systems Metal Jacketing Used on Insulated Pipe 1 SCOPE 1.1 This guideline covers the installation of ITW Insulation Systems Pabco-Childers brand aluminum and

More information

SECTION 1208 CHAIN LINK FENCING DESCRIPTION

SECTION 1208 CHAIN LINK FENCING DESCRIPTION SECTION 1208 CHAIN LINK FENCING 1208-1 DESCRIPTION This item covers the requirements for furnishing materials and constructing new chain link fences and gates in accordance with the details included herein

More information

CONCRETE STEPS, HANDRAILS, AND SAFETY RAIL

CONCRETE STEPS, HANDRAILS, AND SAFETY RAIL CONCRETE STEPS, HANDRAILS, AND SAFETY RAIL PART 1 - GENERAL 1.01 SECTION INCLUDES A. Concrete Steps B. Handrails C. Safety Rail 1.02 DESCRIPTION OF WORK A. Construction of concrete steps. B. Furnishing

More information

SECTION REINFORCING STEEL

SECTION REINFORCING STEEL SECTION REINFORCING STEEL 1. DESCRIPTION This specification shall govern the furnishing and placing of reinforcing steel, deformed and smooth, of the size and quantity designated on the plans and in accordance

More information

J41 Reinforced bitumen membrane roof coverings

J41 Reinforced bitumen membrane roof coverings J41 Reinforced bitumen membrane roof coverings To be read with Preliminaries/General conditions. TYPES OF COVERING 110 BUILT-UP REINFORCED BITUMEN MEMBRANE WARM DECK ROOF COVERING Substrate: Plywood to

More information

SECTION MECHANICAL INSULATION

SECTION MECHANICAL INSULATION SECTION 15250 PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division-1 Specification sections, apply to work

More information

CONSTRUCTION SPECIFICATION FOR CHAIN-LINK FENCE

CONSTRUCTION SPECIFICATION FOR CHAIN-LINK FENCE ONTARIO PROVINCIAL STANDARD SPECIFICATION OPSS.PROV 772 NOVEMBER 2017 (Formerly OPSS 772, November 2012) Note: The PROV published in November 2017 replaces OPSS 772 COMMON, November 2012 with no technical

More information

1. Temperature Change: 120 deg F (67 deg C), ambient; 180 deg F (100 deg C), material surfaces.

1. Temperature Change: 120 deg F (67 deg C), ambient; 180 deg F (100 deg C), material surfaces. SECTION 05500- METAL FABRICATIONS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

Ductslab and Ductwrap

Ductslab and Ductwrap CONSTRUCTION TYPE: DUCTS AND TANKS Ductslab and Ductwrap For the thermal insulation of ductwork and water storage tanks ROCKWOOL provide thermal insulation for air conditioning, warm air and extract ducts

More information

PERMATHERM PIPE INSULATION PRODUCTS

PERMATHERM PIPE INSULATION PRODUCTS PERMATHERM PIPE INSULATION PRODUCTS PERMATHERM, INC. 269 Industrial Park Road Monticello, GA 31064 (706) 468-7500 www.pipe-insulation.net September 2012 This Specification Guideline in the 3-Part Format

More information

roofing ROOFING Design of the base ROOFING DETAILS

roofing ROOFING Design of the base ROOFING DETAILS DETAILS The general arrangement details and the principles to be followed at skirtings, upstands, abutments, verges, gutters and expansion joints are as details illustrated. SELECTION PARAMETERS It is

More information

DIVISION 5 - STRUCTURAL STEEL AND IRON WORK

DIVISION 5 - STRUCTURAL STEEL AND IRON WORK DIVISION 5 - STRUCTURAL STEEL AND IRON WORK SECTION 05100 STRUCTURAL METAL FRAMING PART 1.00 GENERAL 1.01 SCOPE OF WORK A. Work Included: 1. 2. Structural steel complete in place. Steel joists complete

More information

METALS Commissioning of Metals Structural Steel Framing Steel Studs... 2

METALS Commissioning of Metals Structural Steel Framing Steel Studs... 2 ~ 05-1 ~ 05 00 00 Metals 05 00 00 METALS... 2 05 08 00 Commissioning of Metals... 2 05 12 00 Structural Steel Framing... 2 05 12 30 Steel Studs... 2 05 45 00 METAL SUPPORT ASSEMBLIES... 2 05 50 00 METAL

More information

Student Services & Classroom Addition

Student Services & Classroom Addition SECTION 071326 - SELF-ADHERING SHEET WATERPROOFING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

DUCTWRAP AND DUCTSLAB For the thermal insulation of ductwork and water storage tanks.

DUCTWRAP AND DUCTSLAB For the thermal insulation of ductwork and water storage tanks. DUCTWRAP AND DUCTSLAB For the thermal insulation of ductwork and water storage tanks. DUCTWRAP AND DUCTSLAB ROCKWOOL Ductwrap and Ductslab provide thermal insulation for air conditioning, warm air and

More information

Sarnavap 5000E SA Vapour Control Layer

Sarnavap 5000E SA Vapour Control Layer Roofing Product Data Sheet Edition 09.2008 Identification no. 02 09 01 05 402 0 000007 Version no. 02 Sarnavap 5000E SA Vapour Control Layer Product Description Sarnavap 5000E SA is a multi-layer self-adhesive

More information

PERMATHERM, INC. SPECIFICATION FOR COLD/CRYO PIPE INSULATION

PERMATHERM, INC. SPECIFICATION FOR COLD/CRYO PIPE INSULATION PermaTherm, Inc. 269 Industrial Park Road Monticello, GA 31064 (706) 468-7500 www.insulate.pipe.com/ PERMATHERM, INC. SPECIFICATION FOR COLD/CRYO PIPE INSULATION The specification guideline in the three-part

More information

A. ASTM E 84 - Standard Test Method for Surface Burning Characteristics of Building Materials

A. ASTM E 84 - Standard Test Method for Surface Burning Characteristics of Building Materials PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

1 of 17. PO Box Bellevue Rd, Newark, DE V F

1 of 17. PO Box Bellevue Rd, Newark, DE V F 1 of 17 Raw Material Manufactured from 4 8-foot sheets Fiber-reinforced 1-mil aluminumfaced polyisocyanurate panels 0.032 embossed aluminum Other patterns and stainless steel are available Necessary supplies

More information

PERMATHERM, INC. SPECIFICATION FOR COLD/CRYO PIPE INSULATION

PERMATHERM, INC. SPECIFICATION FOR COLD/CRYO PIPE INSULATION PermaTherm, Inc. 269 Industrial Park Road Monticello, GA 31064 (706) 468-7500 www.insulatepipe.com PERMATHERM, INC. SPECIFICATION FOR COLD/CRYO PIPE INSULATION The specification guideline in the three-part

More information

TATA BLUESCOPE STEEL LIMITED PRODUCT SPECIFICATION LANGUAGE FOR PRE ENGINEERED STEEL BUILDING (BUTLER BUILDING SYSTEM- WITH MR-24 ROOF SYSTEM)

TATA BLUESCOPE STEEL LIMITED PRODUCT SPECIFICATION LANGUAGE FOR PRE ENGINEERED STEEL BUILDING (BUTLER BUILDING SYSTEM- WITH MR-24 ROOF SYSTEM) Section 1: General Product specification Language Item language Item No. Description EX. Works Supply Price Freight Erection Taxes & Duties Total Amount Item 1 Structural Members Supply of BUTLER Building

More information

ITEM 431 PNEUMATICALLY PLACED CONCRETE. All material shall conform to the pertinent requirements of the following items:

ITEM 431 PNEUMATICALLY PLACED CONCRETE. All material shall conform to the pertinent requirements of the following items: ITEM 431 PNEUMATICALLY PLACED CONCRETE 431.1. Description. This Item shall govern for furnishing and placing of "Pneumatically Placed Concrete" for encasement of designated structural steel members, the

More information

Application Guidelines

Application Guidelines Application Guidelines 1.0 SCOPE This document contains general instructions and recommended practices for the application of the SERVIWRAP cold applied tape coating system. The various coating grades

More information

SECTION BUILT-UP BITUMINOUS WATERPROOFING

SECTION BUILT-UP BITUMINOUS WATERPROOFING SECTION 07 12 00 BUILT-UP BITUMINOUS WATERPROOFING SPEC WRITER NOTE: Delete any item or paragraph not applicable in the section and renumber the paragraphs. PART 1 - GENERAL 1.1 DESCRIPTION: This section

More information

PERMATHERM, INC. SPECIFICATION FOR CHILLED WATER PIPE INSULATION

PERMATHERM, INC. SPECIFICATION FOR CHILLED WATER PIPE INSULATION PermaTherm, Inc. 269 Industrial Park Road Monticello, GA 31064 (706) 468-7500 www.insulate.pipe.com/ PERMATHERM, INC. SPECIFICATION FOR CHILLED WATER PIPE INSULATION The specification guideline in the

More information

379 Quick Installation Guide

379 Quick Installation Guide Step 1: INSULATION 2212 W. 5th Pl., Tempe, AZ 85268 (480) 967-8888 379 Quick Installation Guide Step 2: Step 3: *see attached literature for complete installation instructions Remove and discard packing

More information

Addendum 1 Section THERMAL INSULATION FOR PIPING Burrow Avenue Pumping Station Upgrades Page 1 of 5

Addendum 1 Section THERMAL INSULATION FOR PIPING Burrow Avenue Pumping Station Upgrades Page 1 of 5 Burrow Avenue Pumping Station Upgrades Page 1 of 5 Part 1 General 1.1 SUMMARY.1 Section Includes:.1 Thermal insulation for piping and piping accessories in commercial type applications. 1.2 REFERENCES.1

More information

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY. Section PIPE AND EQUIPMENT INSULATION

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY. Section PIPE AND EQUIPMENT INSULATION PART 1 GENERAL 1.01 SUMMARY Section 15145 This Section includes insulation for piping and equipment as called out on the Plans. 1.02 MEASUREMENT AND PAYMENT No separate payment will be provided for the

More information