1 SOUTHEASTERN PENNSYLVANIA TRANSPORTATION AUTHORITY Ryers Station Improvement Project Robert L. Lund, Jr., PE Assistant General Manager Engineering, Maintenance and Construction Division David J. Sands, PE, F.ASCE Deputy Practice Leader Rail Urban Engineers, Inc., Philadelphia, PA 2013 Rail Conference

2 SEPTA s Regional Rail System Infrastructure built by the Pennsylvania and Reading Railroads. 13 Commuter Rail Lines serving 153 Regional Rail Stations Owned or Leased by SEPTA. 65 Stations are ADA Accessible. 4 Stations are in design for Full Length High Level Platforms. Daily Ridership: 122,000 trips per day.

3 Accessibility and SEPTA Regional Rail Challenges Old/Historic Stations Site Constraint/Difficult Access Freight Traffic Reliability/Durability/Cost Effectiveness Customer Satisfaction

4 Project Goals and Scope of Work ADA Compliant Full Length High Level Platform (Level Boarding) Ramps and Stairs Reduce Dwell Times Improve Security through greater visibility. Canopy and Windscreen Additional Parking Added Passenger Amenities Improve Customer Satisfaction Create Attractive Station

5 Pre-Construction Conditions

6 Pre-Construction Conditions

7 KEY Project Elements and Scope High Level Platform and Access Stormwater Management Increased Parking Bicycle Facilities Repairs to Existing Bridge Station to Remain in Operation During Construction

8 Design SEPTA In-House Design -- Lead General Engineering Consultant (GEC) Utilized for Key Elements

9 Design Division of Work SEPTA Preliminary Engineering Architectural Design Civil Design and Layout Mechanical, Electrical & Plumbing Design Bridge Repairs Permitting Public Outreach

10 Design Division of Work Urban Engineers, Inc. Structural Design Platform Foundations Retaining Walls Pre-cast Platform (SEPTA Standard) Pre-cast Ramps and Stairs Geotechnical Investigation and Report Construction Phase Services

11 Site Plan and Architectural Elevation Views

12 Site Plan and Architectural Elevation Views

13 Hybrid Approach to Station Construction Matches SEPTA in-house work with prefabricated elements made by outside entities. Utilizes third party contractors where appropriate. Leverages outside expertise with the strengths of internal resources. Increases overall productivity and cost effectiveness. Increases component durability. Reduces on-site work adjacent to active tracks for faster construction. Lowers life-cycle costs.

14 Schedule Commence Design Jan 09 Complete Design Oct 09 Issue Bid Set Mar 10 Receive Construction Bids Jun 10 NTP Oct 10 Foundations and Walls In Service March 5, 2012

15 Construction Division of Work 3 rd Party Construction Work Foundations, Walls and Site Work Platform Foundations Pre-cast Ramps and Stairs New and Repaired Retaining Wall Parking Lot Expansion and Storm Water BMP s Landscaping Bridge Abutment Repairs Roofing

16 Construction Division of Work SEPTA Forces Pre-cast Platforms Steel Canopy Installation Windscreen Installation AVPA & Lighting Station Amenities Bridge Painting Sidewalks Demolition and Site Restoration

17 Budget Approved Baseline Budget: $9,552,633 Estimate at Completion: $7,598,077 Project Savings: $1,954,556

18 Challenges Site Grades Maintaining Existing Retaining Wall Maintaining Rail Operations

19 Construction Photographs

20 Construction Photographs

21 Construction Photographs

22 Construction Photographs

23 Construction Photographs Completed 3 rd Party Construction

24 Construction Photographs SEPTA In-House Work

25 Construction Photographs

26 Completed Station

27 Completed Station

28 Completed Station

29 Thank You Questions?

Completed. Project. Melbourne High School. Comprehensive Additions and Renovations

Completed. Project. Melbourne High School. Comprehensive Additions and Renovations Project Update Project Update September 8, 2006 January 06, 2010 Project Manager Project Manager Anibal Caussade Dennis Bonny Field Coordinator Field Coordinator Bud Ball Paul Friel Project Budget Project

More information

Cherokee Nation Entertainment Casino Ramona, Oklahoma. WORK PACKAGE: Existing Casino Demolition and Dismantling 8/7/12

Cherokee Nation Entertainment Casino Ramona, Oklahoma. WORK PACKAGE: Existing Casino Demolition and Dismantling 8/7/12 SCOPE SUMMARY: DIVISION: 0 - LEGAL DOCUMENTS Complete; DIVISION: 1 - GENERAL REQUIREMENTS As Applicable; SECTION: - ATTACHED SKETCH Complete; Geotechnical Engineering Report as prepared by Building and

More information

Capital Rail Constructors: Quarterly Update to MWAA Board of Directors

Capital Rail Constructors: Quarterly Update to MWAA Board of Directors Dulles Corridor Metrorail Project Phase 2, Package A Capital Rail Constructors: Quarterly Update to MWAA Board of Directors Keith Couch Capital Rail Constructors January 2018 Agenda 1. Safety 2. Schedule

More information

NCDOT Overview. Nick Tennyson, Chief Deputy Secretary March 4, 2015

NCDOT Overview. Nick Tennyson, Chief Deputy Secretary March 4, 2015 NCDOT Overview Nick Tennyson, Chief Deputy Secretary March 4, 2015 Overview Major Functions of DOT Board of Transportation Highway System Overview Construction- Road Building Process Operations and Maintenance

More information

Stone Consulting, Inc. Industrial Railroad Projects

Stone Consulting, Inc. Industrial Railroad Projects Stone Consulting, Inc. Industrial Railroad Projects 324 Pennsylvania Avenue West, P. O. Box 306, Warren PA 16365 Phone: (814) 726-9870 Fax: (814) 726-9855 Stone Consulting, Inc. Industrial Railroad Projects

More information

1.0 ABOUT THE NU GUIDELINES

1.0 ABOUT THE NU GUIDELINES Construction Policies & Procedures Northeastern University Guidelines for Capital Project Design & Implementation.0 ABOUT THE NU GUIDELINES This document is intended to describe in a comprehensive manner

More information

PROJECT INFORMATION REPORT INFORMATION. Date: February 25, Owner s Rep: Alrich Lynch. 123 Project Address Drive, Savannah GA 31404

PROJECT INFORMATION REPORT INFORMATION. Date: February 25, Owner s Rep: Alrich Lynch. 123 Project Address Drive, Savannah GA 31404 LDG Consulting Providing Orientation, Direction, and Execution to the Design, Construction, and Real Estate Industries REPORT INFORMATION Date: February 25, 2015 Owner s Rep: Alrich Lynch Electronic Copy:

More information

ARTICLE 987. PD 987. PD 987 was established by Ordinance No , passed by the Dallas City Council on June 14, (Ord.

ARTICLE 987. PD 987. PD 987 was established by Ordinance No , passed by the Dallas City Council on June 14, (Ord. ARTICLE 987. PD 987. SEC. 51P-987.101. LEGISLATIVE HISTORY. PD 987 was established by Ordinance No. 30512, passed by the Dallas City Council on June 14, 2017. SEC. 51P-987.102. PROPERTY LOCATION AND SIZE.

More information

Challenges of Sustainable Infrastructure AAEES UCI

Challenges of Sustainable Infrastructure AAEES UCI Challenges of Sustainable Infrastructure AAEES UCI Sam Ali, PE, LEED AP sam.ali@ocpw.ocgov.com January 16, 2013 Sustainable Infrastructure Defining Sustainable Infrastructure Sustainable Systems Sustainable

More information

Executive Summary October 2017

Executive Summary October 2017 Executive Summary The King of Prussia Rail Draft Environmental Impact Statement/Draft Section 4(f) Evaluation (DEIS) describes and summarizes the transportation and environmental benefits and impacts of

More information

Subject: Lucretia Mott School No. 3 Rehabilitation. Figure 1 Figure 2 Figure 3

Subject: Lucretia Mott School No. 3 Rehabilitation. Figure 1 Figure 2 Figure 3 MEMORANDUM To: Ashley Rosenthal Payne, Indianapolis Historic Preservation Commission Adrienne Schmetzer, Indiana Housing and Community Development Authority Architecture Preservation Interior Design Landscape

More information

DIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012

DIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012 PART FIVE DOCUMENTS FOR SITE AND INFRASTRUCTURE 31 00 00. EARTHWORK 31 10 00. SITE CLEARING.1 STRUCTURE REMOVAL: Include

More information

January 18, 2010 Report No. 7 MONTHLY CONSTRUCTION PROGRESS REPORT

January 18, 2010 Report No. 7 MONTHLY CONSTRUCTION PROGRESS REPORT January 18, 2010 Report No. 7 MONTHLY CONSTRUCTION PROGRESS REPORT METROPOLITAN ENTERTAINMENT & CONVENTION AUTHORITY MONTHLY CONSTRUCTION PROGRESS REPORT Metropolitan Entertainment & Convention Authority

More information

Dulles Corridor Metrorail Project Phase 1 & Phase 2 Updates

Dulles Corridor Metrorail Project Phase 1 & Phase 2 Updates Dulles Corridor Metrorail Project Phase 1 & Phase 2 Updates June 30, 2017 Charles W. Stark Executive Project Director Phase 2 Station Tour 2 Phase 1 Phase 1 Cost Summary Quarter Expenditures (Feb, Mar,

More information

RECOMMENDATION: Staff recommends approval and provides the following motion for the commission s consideration:

RECOMMENDATION: Staff recommends approval and provides the following motion for the commission s consideration: PZ Case No. 17-09 Planning & Zoning Commission COMMUNITY DEVELOPMENT DEPARTMENT March 13, 2017 Subject: Consider making a recommendation on PZ Case No. 17-09; the site plans for Amega Garage Doors at 4901

More information

I-91 Viaduct Public Information Briefing

I-91 Viaduct Public Information Briefing I-91 Viaduct Public Information Briefing Project File No. 607731 MassDOT Contract No. 85020 Briefing no. 10 December 18, 2017 Agenda Welcome Update on Construction Activities (Full Beneficial Use) Next:

More information

Grade-Separated Trail Crossings How Do We Get Over There?

Grade-Separated Trail Crossings How Do We Get Over There? Grade-Separated Trail Crossings How Do We Get Over There? 2008 National Trails Symposium Rory Renfro, Alta Planning + Design Scott Belonger, Loris and Associates Peter Loris, Loris and Associates PRESENTATION

More information

Civil Engineering and Architecture Detailed and Performance Objective Outline

Civil Engineering and Architecture Detailed and Performance Objective Outline Civil Engineering and Architecture Detailed and Performance Objective Outline Deadlines Unit 1: 11 Blocks 1/20/2015 Unit 2: 27 Blocks 2/27/2015 Unit 3: 28 Blocks 4/15/2015 Unit 4: 17 Blocks 5/8/2015 Unit

More information

APPENDICES DESIGN REQUIREMENTS. Appendix A. Performance Criteria for Design Projects

APPENDICES DESIGN REQUIREMENTS. Appendix A. Performance Criteria for Design Projects PROVINCE OF NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND INFRASTRUCTURE RENEWAL DTIR Document DC350 APPENDICES DESIGN REQUIREMENTS Appendix A Performance Criteria for Design Projects 2010 EDITION Printed

More information

AREAWIDE BRIDGE REPLACEMENT AND REHABILITATION

AREAWIDE BRIDGE REPLACEMENT AND REHABILITATION CECIL COUNTY 2018 TRANSPORTATION IMPROVEMENT PROGRAM AREAWIDE BRIDGE REPLACEMENT AND REHABILITATION DESCRIPTION: On-going program to provide major upgrades to state owned bridges that are structurally

More information

TECHNICAL MEMORANDUM

TECHNICAL MEMORANDUM California High-Speed Train Project TECHNICAL MEMORANDUM 15% Design Scope Guidelines TM 0.1 Signed document on file Prepared by: 12 May 08_ Ken Jong, PE Checked by: Signed document on file 12 May 08_ John

More information

Metro-North s Response to Hurricane Irene. Chris Bennett, Vice President AECOM Toby Ritz, Chief Engineer MNR Capital Programs New York

Metro-North s Response to Hurricane Irene. Chris Bennett, Vice President AECOM Toby Ritz, Chief Engineer MNR Capital Programs New York Metro-North s Response to Hurricane Irene Chris Bennett, Vice President AECOM Toby Ritz, Chief Engineer MNR Capital Programs New York The Port Jervis Line Line is operated under a service agreement with

More information

Construction Project Briefing

Construction Project Briefing Construction Project Briefing August 12, 2009 CHICAGO TRANSIT AUTHORITY Today s Presentation Brown Line Capacity Expansion Project Subway Escalators Project Dearborn Subway Tie Replacement Project Systemwide

More information

HOLDER CONSTRUCTION COMPANY Superintendents Weekly Activity Report #92 Douthit Hills Student Community, Clemson University Project Joe Jett

HOLDER CONSTRUCTION COMPANY Superintendents Weekly Activity Report #92 Douthit Hills Student Community, Clemson University Project Joe Jett SAFETY» Total Man Hours Worked This Week: 19935» Total Man Hours on Project: 689727» Crafts On Project This Week: 24» OSHA Recordable Rate: 0 November 13, 2016 Page 1 CURRENT CONSTRUCTION ACTIVITIES East

More information

BOWIE LEARNING CENTER

BOWIE LEARNING CENTER BOWIE LEARNING CENTER Bowie Learning Center BUILDING DATA BOWIE LEARNING CENTER 900 North Elm St., Weatherford, TX 76086 Year Built 1936 No. of Buildings No. of Portables 0 Approx. Total Square Footage

More information

NEW JERSEY STATE RAIL PLAN NJ TRANSIT New Jersey Department of Transportation

NEW JERSEY STATE RAIL PLAN NJ TRANSIT New Jersey Department of Transportation NJ TRANSIT New Jersey Department of Transportation NJ TRANSIT AND NJDOT TEAM Developing State Rail Plan NJ TRANSIT contract Over the next six months Most planning information already exists Data must be

More information

Director of Transportation Planning

Director of Transportation Planning Director of Transportation Planning The Lehigh Valley Planning Commission (LVPC) is seeking a candidate for Director of Transportation Planning to lead a team developing and managing the implementation

More information

Civil Engineering & Architecture PLTW Scope and Sequence Year at a Glance First Semester Three Weeks

Civil Engineering & Architecture PLTW Scope and Sequence Year at a Glance First Semester Three Weeks Civil Engineering & Architecture PLTW Scope and Sequence Year at a Glance First Semester Three Weeks 1 st 3 weeks 2 nd 3 weeks 3 rd 3 weeks 4 th 3 weeks 5 th 3 weeks 6 th 3 weeks Topics/ Concepts I. Overview

More information

Commercial Tax Abatement

Commercial Tax Abatement A confirmation letter is issued by the City upon receipt of this application. This application is not effective and not considered filed until the confirmation letter has been issued. Filing does not assure

More information

Item Name Description Unit of Measure Mobilization Per WSDOT Lump Sum

Item Name Description Unit of Measure Mobilization Per WSDOT Lump Sum Page 1 of 6 DESIGN STANDARDS FOR: MEASUREMENT AND PAYMENT Where bids are utilities for construction, repair or alteration for Public Work park projects, the following bid item descriptions and units of

More information

EJ Industrial Spine BOA Nomination Study

EJ Industrial Spine BOA Nomination Study A. Selecting Priority Sites Section V. Redevelopment of Priority Sites Section IV of this Nomination Study presents a summary of the analyses of the Study Area and market conditions affecting the E-J BOA

More information

OMAHA BASEBALL STADIUM. May 21, 2009 Report No. 2

OMAHA BASEBALL STADIUM. May 21, 2009 Report No. 2 OMAHA BASEBALL STADIUM May 21, 2009 Report No. 2 METROPOLITAN ENTERTAINMENT & CONVENTION AUTHORITY MONTHLY CONSTRUCTION PROGRESS REPORT Metropolitan Entertainment & Convention Authority Omaha, Nebraska

More information

MANHATTAN COLLEGE STUDENT COMMONS

MANHATTAN COLLEGE STUDENT COMMONS MANHATTAN COLLEGE STUDENT COMMONS BUDGET CHECK USING GILBANE S COSTADVISOR MODEL OCTOBER 29, 2010 Introduction: Gilbane developed this CostAdvisor Model of the proposed new Manhattan College Student Commons

More information

CIRCLE K SUB-CONTRACTOR BID FORM

CIRCLE K SUB-CONTRACTOR BID FORM CIRCLE K SUB-CONTRACTOR BID FORM Store No: 3308 Address: 8985 Will Clayton Pkwy Date: Bid Due September 17, 2014 Sub Contractor: Trade CONSTRUCTION TAX Construction Tax EXCAVATION / DIRT WORK Cut / Fill

More information

City of Reno Public Works 1 E. 1 st Street, 8 th Floor P.O. Box 1900 Reno, NV (775) (775) FAX

City of Reno Public Works 1 E. 1 st Street, 8 th Floor P.O. Box 1900 Reno, NV (775) (775) FAX City of Reno Public Works 1 E. 1 st Street, 8 th Floor P.O. Box 1900 Reno, NV 89505 (775) 334-3304 (775) 334-1226 FAX SPECIAL CONDITIONS OF APPROVAL FOR Permit # EAE14-00XXX Applicant: Job Description:

More information

CERTIFICATE OF APPROPRIATENESS APPLICATION

CERTIFICATE OF APPROPRIATENESS APPLICATION City Planning and Development Department - Historic Preservation Office 16 th Floor, City Hall, Room 1603 414 East 12 th Street (816) 513-2902 Kansas City, Missouri 64106-2795 Fax (816) 513-2899 kchp@kcmo.org

More information

CEQA Categorical Exemption Determination

CEQA Categorical Exemption Determination CEQA Categorical Exemption Determination PROPERTY INFORMATION/PROJECT DESCRIPTION Project Address Block/Lot(s) Case No. Permit No. Plans Dated Addition/ Demolition Alteration (requires HRER if over 45

More information

Capital Rail Constructors a Clark & Kiewit Joint Venture Jim Ansari Senior Vice President & General Manager

Capital Rail Constructors a Clark & Kiewit Joint Venture Jim Ansari Senior Vice President & General Manager Program Panelist Capital Rail Constructors a Clark & Kiewit Joint Venture Jim Ansari Senior Vice President & General Manager Moderator Kevin Pavuk, Structural Technologies Presentation 5:30 to 7:00 p.m.

More information

Dulles Corridor Metrorail Project Phase 1 & Phase 2 Updates

Dulles Corridor Metrorail Project Phase 1 & Phase 2 Updates Dulles Corridor Metrorail Project Phase 1 & Phase 2 Updates November 29, 2017 Charles W. Stark Executive Project Director Silver Line: Phase 2 Station Tour Phase 1 Phase 1 Cost Summary Expenditures (May

More information

SIXTH STREET VIADUCT REPLACEMENT PROJECT MONTHLY EXECUTIVE MEETING REPORT JULY 2013

SIXTH STREET VIADUCT REPLACEMENT PROJECT MONTHLY EXECUTIVE MEETING REPORT JULY 2013 SIXTH STREET VIADUCT REPLACEMENT PROJECT MONTHLY EXECUTIVE MEETING REPORT JULY 2013 Sixth Street Viaduct Replacement Project Monthly Executive Meeting Report July 2013 TABLE OF CONTENTS Project Manager

More information

SPACE TYPE: OUTSIDE PARKING (STRUCTURE)

SPACE TYPE: OUTSIDE PARKING (STRUCTURE) SPACE TYPE: OUTSIDE PARKING (STRUCTURE) Construction Criteria The unit costs for Outside Parking (Structure) space types are based on the construction quality and design features in the following table.

More information

ALTERNATIVE PROJECT DELIVERY DIVISION

ALTERNATIVE PROJECT DELIVERY DIVISION VIRGINIA DEPARTMENT OF TRANSPORTATION ALTERNATIVE PROJECT DELIVERY DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Design-Build Requirements for Advertisement SPECIFIC SUBJECT: APPROVED:

More information

RE: Letter of Intent Land Use Application for Plan Commission and UDC Initial/ Final Approval Request

RE: Letter of Intent Land Use Application for Plan Commission and UDC Initial/ Final Approval Request TO: City of Madison Planning Division 126 S. Hamilton Street Madison, WI 53701 Jessica Vaughn Department of Planning & Development City of Madison 126 S. Hamilton Street Madison, WI 53701 RE: Letter of

More information

SOUTHEASTERN PENNSYLVANIA TRANSPORTATION AUTHORITY 1234 MARKET STREET, PHILADELPHIA, PA 19107

SOUTHEASTERN PENNSYLVANIA TRANSPORTATION AUTHORITY 1234 MARKET STREET, PHILADELPHIA, PA 19107 SOUTHEASTERN PENNSYLVANIA TRANSPORTATION AUTHORITY 1234 MARKET STREET, PHILADELPHIA, PA 19107 SPECIFICATION FOR PLATFORM RUBBING EDGE ASSEMBLIES FOR 69 TH ST TC, 40 TH ST, 34 TH ST, 2 ND ST, SPRING GARDEN

More information

Sunrise Project South I-205 Corridor Improvement Project

Sunrise Project South I-205 Corridor Improvement Project Sunrise Project South I-205 Corridor Improvement Project January 24, 2007 Sunrise and I-205 Project Summary Conclusions Sunrise Scoping Study Key Results South I-205 Scoping Study Key Results South I-205

More information

Section Safety Section Cleanup. None Required

Section Safety Section Cleanup. None Required January 2000 Page 1 of 6 PART 1 GENERAL 1.01 OTHER CONTRACT DOCUMENTS 1.02 DESCRIPTION OF WORK 1.03 RELATED SECTIONS PART 2 PRODUCTS The General Conditions of the Contract, General Requirements, and Supplemental

More information

PRESCRIPTIVE COMPLIANCE METHOD

PRESCRIPTIVE COMPLIANCE METHOD CHAPTER PRESCRIPTIVE COMPLIANCE METHOD 3 SECTION 301 GENERAL 301.2 Building materials. Building materials shall comply with the requirements of this section. 301.2.1 Existing materials. Materials already

More information

The State of Ohio Bridges

The State of Ohio Bridges Ohio Department of Transportation John R. Kasich, Governor Jerry Wray, Director ABCD NEOH Chapter The State of Ohio Bridges Tim Keller, P.E. Administrator ODOT Office of Structural Engineering Agenda 1.

More information

The Policies section will also provide guidance and short range policies in order to accomplish the goals and objectives.

The Policies section will also provide guidance and short range policies in order to accomplish the goals and objectives. 4 Goals & Objectives INTRODUCTION The 2015-2040 MTP preserves and promotes the quality of life and economic prosperity of the MAB by providing a transportation system consistent with the regional goals.

More information

Miami River Freight Improvement Plan Financial Management Number:

Miami River Freight Improvement Plan Financial Management Number: Miami River Commission January 8, 2018 Miami, FL Carlos A. Castro, District Freight Coordinator Miami River Freight Improvement Plan Financial Management Number: 437946-1-22-01 Agenda Study Background

More information

extent feasible. Per the and low constructability,

extent feasible. Per the and low constructability, RELEVANT PUBLIC PROJECTS AND REFERENCES TranTech is proud of its accomplishments in structural engineering. Our staff members have provided design servicess to numerous public agencies on very successful

More information

THE DESIGN PROCESS HEALTHCARE DESIGN RESOURCE INDUS HOSPITAL, KARACHI PAKISTAN AUGUST 2010 AUG. 02, 2010

THE DESIGN PROCESS HEALTHCARE DESIGN RESOURCE INDUS HOSPITAL, KARACHI PAKISTAN AUGUST 2010 AUG. 02, 2010 THE DESIGN PROCESS AUGUST 2010 HEALTHCARE DESIGN RESOURCE INDUS HOSPITAL, KARACHI PAKISTAN TAQ ASSOCIATES. ARCHITECTURE & INTERIOR DESIGN KARACHI PAKISTAN 1 SO A BLANK PIECE OF PAPER. HOW DO WE GET FROM

More information

407 TRANSITWAY. Planning & Preliminary Design

407 TRANSITWAY. Planning & Preliminary Design FROM EAST OF HIGHWAY 400 TO KENNEDY ROAD GWP #252-96-00 Public Information Centre #2 June 24 th and 29 th, 2010 Purpose of Public Information Centre #2 The first Public Information Centre (PIC #1) was

More information

Table of Contents for Guide Specifications

Table of Contents for Guide Specifications Table of Contents for Guide Specifications 01270A Measurement and Payment 01355A Environmental Protection 01356A Storm Water Pollution Prevention Measures 01421 Basic Storm Water Pollution Prevention Plan

More information

BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATION PROPOSED MAIN ENTRY - EXTERIOR RENDERING

BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATION PROPOSED MAIN ENTRY - EXTERIOR RENDERING PROPOSED MAIN ENTRY - EXTERIOR RENDERING EXISTING SITE AERIAL PHOTOGRAPH 6TH STREET NW PEDESTRIAN ACCESS School access to existing alley leads students through vehicular path CHAIN LINK ENCLOSED PARKING

More information

MEMORANDUM OF UNDERSTANDING BETWEEN THE CITY OF ANN ARBOR AND THE REGENTS OF THE UNIVERSITY OF MICHIGAN FOR THE DEVELOPMENT OF THE FULLER ROAD STATION

MEMORANDUM OF UNDERSTANDING BETWEEN THE CITY OF ANN ARBOR AND THE REGENTS OF THE UNIVERSITY OF MICHIGAN FOR THE DEVELOPMENT OF THE FULLER ROAD STATION MEMORANDUM OF UNDERSTANDING BETWEEN THE CITY OF ANN ARBOR AND THE REGENTS OF THE UNIVERSITY OF MICHIGAN FOR THE DEVELOPMENT OF THE FULLER ROAD STATION This memorandum of understanding is entered into on

More information

I-405 Sepulveda Pass Widening Project. Community Advisory Committee Meeting June 24, 2010

I-405 Sepulveda Pass Widening Project. Community Advisory Committee Meeting June 24, 2010 I-405 Sepulveda Pass Widening Project Community Advisory Committee Meeting June 24, 2010 1 MWD LA-29 Project Drilling to install beams for shoring to support excavation at Sunset Bl and Church Ln 2 MWD

More information

62 POTOMAC STREET WEST ROXBURY, MA 02132

62 POTOMAC STREET WEST ROXBURY, MA 02132 62 POTOMAC STREET SET P R O J E C T T E A M COVER 1. ALL WORK SHALL BE IN COMPLIANCE WITH ALL APPLICABLE LOCALS BUILDING CODES AND REGULATIONS. 2. CONTRACTOR SHALL BE RESPONSIBLE FOR S REQUIRED FOR CONSTRUCTION

More information

MEET THE AE TEAM YOUR CEI SOLUTION YOUR PARTNERS

MEET THE AE TEAM YOUR CEI SOLUTION YOUR PARTNERS BROWARD COUNTY Broward County Project Number 5413 Qualifications for Construction Engineering and Inspection Services CEI Services for Wiles Road from Riverside Drive to Rock Island Road YOUR CEI SOLUTION

More information

- DATA REQUIREMENTS BIM

- DATA REQUIREMENTS BIM UHS BIM Protocol S E C T I O N 1 - DATA REQUIREMENTS BIM authoring software: The design team is required to use parametric BIM authoring software for creation of models that include all geometry, physical

More information

PROJECT SHOWING MINUTES

PROJECT SHOWING MINUTES PROJECT SHOWING MINUTES Jones Branch Connector Project No. (NFO) 8102-029-065, P101, R201, C501, B628, B627, B629, D610 UPC No. 103907 September 7, 2016 10:00 a.m. Fairfax County EMS Simulation Center

More information

I-11 Project Nevada Transportation Conference. Ryan Wheeler, P.E. NDOT, Senior Project Manager. Nevada Department of Transportation

I-11 Project Nevada Transportation Conference. Ryan Wheeler, P.E. NDOT, Senior Project Manager. Nevada Department of Transportation I-11 Project 2017 Nevada Transportation Conference Ryan Wheeler, P.E. NDOT, Senior Project Manager Nevada Department of Transportation nevadadot.com About NDOT NDOT Core Values: Respect treating others

More information

Newton Group CANADACAR SYSTEM. Basic Construction of the CANADACAR System. CANADACAR Module Format

Newton Group CANADACAR SYSTEM. Basic Construction of the CANADACAR System. CANADACAR Module Format Basic Construction of the CANADACAR System The CANADACAR System is a prefabricated, engineered and constructed freestanding parking garage structure that utilizes superior technology combining pre-cast

More information

University of Texas. Austin, TX. TAS Variance Application Guidelines For Qualifying Historic Structures

University of Texas. Austin, TX. TAS Variance Application Guidelines For Qualifying Historic Structures University of Texas Austin, TX TAS Variance Application Guidelines For Qualifying Historic Structures Architecture, Planning and Historic Preservation, Inc. 2900 S. Congress Ste 200 Austin, TX 78704 512.444.4220

More information

Boise City Public Works General Drainage Plan Review Requirements Checklist

Boise City Public Works General Drainage Plan Review Requirements Checklist Boise City Public Works General Drainage Plan Review Requirements Checklist Development Name Bldg. Permit # Drainage Reviewer Site Address Initial Review Date ODI Number Designer Company Name Treated Acres

More information

SUPPLEMENTAL ECMS ADVANCED INFORMATION JULY 14, 2016 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

SUPPLEMENTAL ECMS ADVANCED INFORMATION JULY 14, 2016 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) Updated June 27, 2016 BEAVER COUNTY SR 7446(LBB) #92912 PROPOSAL:$54.72 PLANS:$42.46 12X18:$52.11 24X36:$752.70 EXSTRUCT:$48.62 12X18:$59.67 24X36:$861.90 The description and location of the project is

More information

URBAN RENEWAL DISTRICT II TAX INCREMENT FINANCING CRITERIA FOR REVIEW

URBAN RENEWAL DISTRICT II TAX INCREMENT FINANCING CRITERIA FOR REVIEW URBAN RENEWAL DISTRICT II TAX INCREMENT FINANCING CRITERIA FOR REVIEW BACKGROUND INFORMATION In 1991, the Missoula City Council adopted an Urban Renewal Plan creating Urban Renewal District II. The intent

More information

Stockton Freight & Passenger Rail Mobility Enhancement

Stockton Freight & Passenger Rail Mobility Enhancement Stockton Freight & Passenger Rail Mobility Enhancement 2017 $10.34 million in 2017 FASTLANE Grant funding to complete engineering design, permitting, and construction of the Stockton Track Extension and

More information

Project Information Session / Meet and Greet # 3

Project Information Session / Meet and Greet # 3 ATL WEST DECK COMPONENT Project Information Session / Meet and Greet # 3 Holder-Austin-Moody-Bryson, a Joint Venture October 10 th, 2017 Agenda 1. HAMB, a JV Company Overview 2. ATL West Deck Project Description

More information

SOUTHEAST FLORIDA REGIONAL COMPACT CLIMATE CHANGE. Sustainable Communities & Transportation Planning

SOUTHEAST FLORIDA REGIONAL COMPACT CLIMATE CHANGE. Sustainable Communities & Transportation Planning SOUTHEAST FLORIDA REGIONAL COMPACT CLIMATE CHANGE Draft Regional Climate Action Plan Sustainable Communities & Transportation Planning SP-1 Develop criteria in collaboration with municipal and county planning

More information

Paul D. Izzo, P.E. Structural Engineer

Paul D. Izzo, P.E. Structural Engineer Paul D. Izzo, P.E. Structural Engineer 1950 Sequoia Trail, Owosso, MI, 48867 989-323-7569 paul_izzo@efiglobal.com Years Experience: 9 Professional Summary: Mr. Izzo has 2 years of experience in forensic

More information

DVRPC Approved Projects for the American Recovery and Reinvestment Act of 2009 Pennsylvania Transit Projects - SEPTA

DVRPC Approved Projects for the American Recovery and Reinvestment Act of 2009 Pennsylvania Transit Projects - SEPTA DVRPC Approved Projects for the American Recovery and Reinvestment Act of 2009 Pennsylvania Transit Projects - SEPTA Status Updates MPMS County Project Title Project Description Amount * Let Date Award

More information

CEQA Categorical Exemption Determination

CEQA Categorical Exemption Determination CEQA Categorical Exemption Determination PROPERTY INFORMATION/PROJECT DESCRIPTION Project Address Block/Lot(s) REC & PARK: 210V HYDE STREET 0336/003 Case No. 2017-016267ENV Permit No. Addition/ Alteration

More information

STATE AID GUIDE FOR: Updated: December 16, 2005

STATE AID GUIDE FOR: Updated: December 16, 2005 STATE AID GUIDE FOR: Updated: December 16, 2005 1. AFTER THE FACT RIGHT OF WAY DEPARTMENT OF MINNESOTA TRANSPORTATION 2. MISCELLANEOUS AFTER THE FACT Traffic Signals, Lighting, Retaining Walls, Sidewalk,

More information

Forney Fire Station No. 2

Forney Fire Station No. 2 Forney Fire Station No. DUNHILL F M 548 FAIRFIELD DIAMOND CREEK VISTA RIDGE HAVENROCK DON T-CATES GATEWWAY REEDER LOST MAPLES REEDER Legend For location reference purposes only City Limits 60'-0" R.O.W.

More information

Design-Build Capital Infrastructure Project

Design-Build Capital Infrastructure Project Design-Build Capital Infrastructure Project US$60 Million Project Duration 2012 Responsible for drainage systems and construction QA-QC oversight and project documentation and as-built review and acceptance.

More information

Project Overview. A Collaborative Effort

Project Overview. A Collaborative Effort Project Overview A Collaborative Effort DRPT and FRA are working closely with CSX, which owns and operates the corridor, as well as with passenger operators Amtrak and Virginia Railway Express (VRE), the

More information

A/E Design Deliverable Checklist

A/E Design Deliverable Checklist A/E Design Deliverable Checklist Design deliverables for the Design Development phase shall include all items listed in the Design Development column as well as those all items listed in the Schematic

More information

Holyoke Station Feasibility Study and Site Analysis

Holyoke Station Feasibility Study and Site Analysis Holyoke Station Feasibility Study and Site Analysis APRIL 2011 TABLE OF CONTENTS List of Figures List of Tables v vii Executive Summary 1 Report Chapters 1 Introduction 15 Project Purpose and Background

More information

HERMIT S REST GRAND CANYON NATIONAL PARK BUILDING CODE REVIEW

HERMIT S REST GRAND CANYON NATIONAL PARK BUILDING CODE REVIEW HERMIT S REST GRAND CANYON NATIONAL PARK BUILDING CODE REVIEW 27 September 2007 prepared by: J. CHRIS EVANS ARCHITECT 3220 E. Terra Alta Blvd. No. 9 Tucson, Arizona 85716 520.319.8835 evansarch@hotmail.com

More information

Planning Commission November 20, 2013 URBAN FORESTRY LANDSCAPING CODE UPDATES

Planning Commission November 20, 2013 URBAN FORESTRY LANDSCAPING CODE UPDATES 1 Planning Commission November 20, 2013 URBAN FORESTRY LANDSCAPING CODE UPDATES 2 Urban Forest: a Major policy emphasis Urban Forest Policy Element Open Space Habitat and Recreation Element Climate Action

More information

Transbay Transit Center Program

Transbay Transit Center Program Transbay Transit Center Program Quality Management System Manual Revision 1 September 2013 Quality Management System Manual Revision 1 September 2013 Prepared for the Transbay Joint Powers Authority

More information

Transbay Transit Center: An Opportunity to supply Architecturally Exposed Cast Steel Structural Nodes for San Francisco s New Transit Hub

Transbay Transit Center: An Opportunity to supply Architecturally Exposed Cast Steel Structural Nodes for San Francisco s New Transit Hub Transbay Transit Center: An Opportunity to supply Architecturally Exposed Cast Steel Structural Nodes for San Francisco s New Transit Hub Transbay Transit Center Foundry Opportunity Project requires a

More information

TORONTO GREEN STANDARD VERSION 2.0

TORONTO GREEN STANDARD VERSION 2.0 For New Mid to High Rise Residential and all New Non-Residential The Toronto Green Standard (TGS) is a two-tier set of performance measures, with supporting guidelines for new development. Its purpose

More information

STATE OF NEW MEXICO Public School Facilities Authority Albuquerque Field Station 1312 Basehart Drive, SE., Suite 200 Albuquerque, NM 87106

STATE OF NEW MEXICO Public School Facilities Authority Albuquerque Field Station 1312 Basehart Drive, SE., Suite 200 Albuquerque, NM 87106 STATE OF NEW MEXICO Public School Facilities Authority Albuquerque Field Station 1312 Basehart Drive, SE., Suite 200 Albuquerque, NM 87106 Johathan Chamblin, Director Telephone: (505) 843-6272 vacant,

More information

SS David L. Seago, P.E. Assistant Director of Construction Dallas District CST Conference

SS David L. Seago, P.E. Assistant Director of Construction Dallas District CST Conference SS 1122 David L. Seago, P.E. Assistant Director of Construction Dallas District Guidance Document (SS 1122) Lists some of the main differences between previous specifications used and newly implemented

More information

RESIDENTIAL BUILDING PLAN REQUIREMENTS

RESIDENTIAL BUILDING PLAN REQUIREMENTS CITY OF MANSFIELD BUREAU OF BUILDING AND CODES 30 NORTH DIAMOND STREET 3RD FLOOR MANSFIELD, OHIO 44902 Phone (419) 755-9688 Fax (419) 755-9453 www.ci.mansfield.oh.us RESIDENTIAL BUILDING PLAN REQUIREMENTS

More information

THE EXPERT APPROACH TO PREMISES LIABILITY

THE EXPERT APPROACH TO PREMISES LIABILITY THE EXPERT APPROACH TO PREMISES LIABILITY THE EXPERT APPROACH TO PREMISES LIABILITY INDEX OF CONTENTS INTRODUCTION PREMISES ACCIDENT TYPES PREMISES ACCIDENT COMPONENTS ACCIDENT INVESTIGATION EVIDENCE:

More information

FAÇADE IMPROVEMENT PROGRAM AND ARCHITECTURAL STANDARDS

FAÇADE IMPROVEMENT PROGRAM AND ARCHITECTURAL STANDARDS FAÇADE IMPROVEMENT PROGRAM AND ARCHITECTURAL STANDARDS Architecture and Building Conditions in the Bellevue-Rutherford Neighborhood The architecture of the Bellevue-Rutherford neighborhood varies in style

More information

Case 1:16-cv ER Document 66 Filed 03/13/18 Page 1 of 10

Case 1:16-cv ER Document 66 Filed 03/13/18 Page 1 of 10 Case 1:16-cv-05023-ER Document 66 Filed 03/13/18 Page 1 of 10 UNITED STATES DISTRICT COURT SOUTHERN DISTRICT OF NEW YORK ------------------------------------------------------------- )C BRONJC INDEPENDENT

More information

City of Augusta SIDEWALK REPLACEMENT PROGRAM

City of Augusta SIDEWALK REPLACEMENT PROGRAM CONDITIONS 1. This program is designed to replace older public sidewalks in the City. 2. This program will not cover new sidewalks, driveways or sidewalks from the public sidewalk to the dwelling or business.

More information

Sustainability Plan 2015 Update

Sustainability Plan 2015 Update Sustainability Plan 2015 Update Building a better tomorrow Sound Transit supports communities, the environment and the economy by providing affordable, environmentally friendly public transit that connects

More information

American Legion Park City Pool Glasgow Ky. REPAIR SPECIFICATIONS SECTION I

American Legion Park City Pool Glasgow Ky. REPAIR SPECIFICATIONS SECTION I American Legion Park City Pool Glasgow Ky. REPAIR SPECIFICATIONS SECTION I A. DESCRIPTION OF WORK INCLUDED PIPING UPDATE INCLUDED ITEMS: Shop fabricate custom perimeter cover plates. Shop fabricate inlet

More information

CITY OF TORONTO. BY-LAW No (OMB)

CITY OF TORONTO. BY-LAW No (OMB) CITY OF TORONTO BY-LAW No. 364-2010(OMB) To amend the General Zoning By-law No. 438-86 of the former City of Toronto with respect to the lands municipally known as 1201 Dundas Street East. WHEREAS the

More information

Attachment D-1: Civil/Structural Scope of Work

Attachment D-1: Civil/Structural Scope of Work Attachment D-1: Civil/Structural Scope of Work Project: Location: Targa Sound Renewable Fuels Project Tacoma, WA Prepared by: NORWEST ENGINEERING Consulting Engineers 4110 N.E. 122 nd Avenue, Portland,

More information

DESIGN AND CONSTRUCTION OF DERRY ROAD AND CANADIAN NATIONAL RAIL GRADE SEPARATION

DESIGN AND CONSTRUCTION OF DERRY ROAD AND CANADIAN NATIONAL RAIL GRADE SEPARATION DESIGN AND CONSTRUCTION OF DERRY ROAD AND CANADIAN NATIONAL RAIL GRADE SEPARATION Vireak Hinh, P.Eng. R.V. Anderson Associates Ltd., Toronto, Canada Jennifer Trimble Region of Halton, Oakville, Canada

More information

Well Road Project Accelerated Bridge Construction Using Self-Propelled Modular Transporters (SPMT s) By: Mark Bucci, P.E.

Well Road Project Accelerated Bridge Construction Using Self-Propelled Modular Transporters (SPMT s) By: Mark Bucci, P.E. Well Road Project Accelerated Bridge Construction Using Self-Propelled Modular Transporters (SPMT s) By: Mark Bucci, P.E. Presentation Outline Project History Project Scope Construction Alternatives Plan

More information

Corridor Residential Traditional District Regulations City of St. Petersburg City Code Chapter 16, Land Development Regulations

Corridor Residential Traditional District Regulations City of St. Petersburg City Code Chapter 16, Land Development Regulations Section 16.20.060 - Corridor Residential Traditional Districts ( CRT ) Typical Buildings in the CRT District Sections: 16.20.060.1 Composition of Traditional Residential Corridors 16.20.060.2 Purpose and

More information

3 CITY CENTER 180 SOUTH CLINTON AVENUE Rochester, NY 14607

3 CITY CENTER 180 SOUTH CLINTON AVENUE Rochester, NY 14607 FOR LEASE 3 CITY CENTER 180 SOUTH CLINTON AVENUE Rochester, NY 14607 PROPERTY OVERVIEW Centrally located at 180 South Clinton Avenue in Downtown Rochester, 3 City Center is a modern 200,000 square foot,

More information

Route 7 Widening Project Project No , P101, R201, C501 UPC No January 15, a.m. NOVA District Building

Route 7 Widening Project Project No , P101, R201, C501 UPC No January 15, a.m. NOVA District Building PROJECT SHOWING MINUTES Route 7 Widening Project January 15, 2013 10 a.m. NOVA District Building Overview / Welcome: Michael Gleasman, PE, Area Construction Engineer (VDOT) Overview: A question and answer

More information