1 THE DESIGN PROCESS AUGUST 2010 HEALTHCARE DESIGN RESOURCE INDUS HOSPITAL, KARACHI PAKISTAN TAQ ASSOCIATES. ARCHITECTURE & INTERIOR DESIGN KARACHI PAKISTAN 1

2 SO A BLANK PIECE OF PAPER. HOW DO WE GET FROM THIS TO.... 2

3 3

4 4

5 & HOW DO WE GET SOMETHING BUILT? 5

6 THE INDUS HOSPITAL KARACHI, TB OPD 6

7 THE INDUS HOSPITAL KARACHI, TB OPD 7

8 THE TEAM 8

9 CLIENT PROJECT STRATEGIC PLANNERS ADMINISTRATION RESEARCHERS DOCTORS NURSES STAFF THE PATIENTS THE PROJECT STAKEHOLDERS, THE TEAM FACILITIES PLANNER BRIEF WRITER ARCHITECT CONSTRUCTION PRIME CONTRACTOR ARCHITECTURAL DESIGNERS STRUCTURAL DESIGNERS ELECTRICAL DESIGNERS PLUMBING DESIGNERS HVAC DESIGNERS BMS DESIGNERS LANDSCAPE DESIGNERS SPECIALTY WORKS DESIGNERS ARCHITECTURAL SITE INSPECTORS CIVIL WORKS SUPERVISORS ELECTRICAL WORKS SUPERVISORS PLUMBING WORKS SUPERVISORS HVAC WORKS SUPERVISORS CIVIL SUBCONTRACTORS ELECTRICAL SUBCONTRACTORS PLUMBING SUB CONTRACTORS HVAC SUBCONTRACTORS WOOD WORK SUBCONTRACTORS FURNISHING SUBCONTRACTORS SPECIALTY SUBCONTRACTORS THE PRODUCT SUPPLIERS 9

10 THE USUAL PROJECT TEAM RELATIONSHIPS CLIENT PROJECT ARCHITECT THE PROJECT PRIME CONTRACTOR 10

11 THE PROJECT TEAM RELATIONSHIPS CLIENT PROJECT FACILITIES PLANNER BRIEF WRITER STRATEGIC PLANNERS ADMINISTRATION RESEARCHERS DOCTORS NURSES STAFF THE PATIENTS CONSTRUCTION ARCHITECT PRIME CONTRACTOR THE PROJECT 11

12 CLIENT PROJECT STRATEGIC PLANNERS ADMINISTRATION RESEARCHERS DOCTORS NURSES STAFF THE PATIENTS THE PROJECT TEAM RESPONSIBILITIES FACILITIES PLANNER BRIEF WRITER CONSTRUCTION Compilation of project requirements Listing of spaces required Area allocation of spaces Description of spaces with respect to their usage Usage relationship of spaces with each other Design of facility / project Read & analyze the project brief Design schematic layouts for the project ARCHITECT Produce architectural working drawings Coordinate with sub consultants/ engineers Produce tender documents for inviting bids Provide top supervision / periodic inspection & periodic reporting to client during construction Develop project timelines for design, documentation & construction Facilitate the processes of design documentation Organize & conclude the contractor selection process Coordinate the flow of drawings & documents Facilitate the project completion and commissioning Supervise the construction process PRIME CONTRACTOR Build the project 12

13 THE PROJECT THE PROCESS 13

14 THE CLIENT AND THE NEED CLIENT& PROJECT MORE HEALTHCARE FACILITIES 14

15 THE STRATEGIC PLANNERS CLIENT PROJECT WHAT DO WE HAVE? WHAT DO WE NEED TODAY? WHAT WILL WE NEED TOMORROW? WHO SHOULD WE ASK? WHO SHOULD WE TALK TO? STRATEGIC PLANNERS ADMINISTRATION RESEARCHERS DOCTORS NURSES STAFF THE PATIENTS 15

16 THE PROJECT BRIEF CLIENT PROJECT WHAT IS A PROJECT BRIEF? BRIEF WRITER Compilation of project requirements Listing of spaces required Area allocation of spaces Description of spaces with respect to their usage Usage relationship of spaces with each other STRATEGIC PLANNERS ADMINISTRATION RESEARCHERS DOCTORS NURSES STAFF THE PATIENTS 16

17 FORMATS Text based List based Matrix formatted Hand written Verbal THE PROJECT BRIEF 17

18 FORMATS Text based List based Matrix formatted Hand written Verbal The brief needs to explain clearly the requirements of the project. The complexity of the document is directly related to the complexity of the objectives to be met. The document can be taken to specific room requirements for equipment & end user needs. THE PROJECT BRIEF I want a BIG room. A COOL room! AC in my room. please 18

19 THE ARCHITECT CLIENT PROJECT BRIEF WRITER ARCHITECT STRATEGIC PLANNERS ADMINISTRATION RESEARCHERS DOCTORS NURSES STAFF THE PATIENTS 19

20 THE ARCHITECT CLIENT PROJECT WHAT TO EXPECT? BRIEF WRITER Design of facility / project Read & analyze the project brief Design schematic layouts for the project Produce architectural working drawings Coordinate with sub consultants/ engineers Produce tender documents for inviting bids ARCHITECT Provide top supervision / periodic inspection & periodic reporting to client during construction STRATEGIC PLANNERS ADMINISTRATION RESEARCHERS DOCTORS NURSES STAFF THE PATIENTS 20

21 THE CONSTRUCTION CLIENT PROJECT STRATEGIC PLANNERS BRIEF WRITER Develop project timelines for design, documentation & construction Facilitate the processes of design documentation Organize & conclude the contractor selection process Coordinate the flow of drawings & documents Supervise the construction process ARCHITECT Facilitate the project. completion &. commissioning. CONSTRUCTION JOB DESCRIPTION ADMINISTRATION RESEARCHERS DOCTORS NURSES STAFF THE PATIENTS 21

22 THE DESIGN & DOCUMENTATION PROCESS WHAT HAPPENS 22

23 THE DESIGN AND DOCUMENTATION PHASES STRATEGIC PLANNERS CLIENT PROJECT THE BRIEF PRESENTATION SCHEMATIC DESIGN CONSTRUCTION PRESENTATION PRESENTATION COST ESTIMATE COST ESTIMATE BILL OF QUANTITIES DRAWINGS DETAILS COMPLETE DRAWINGS DETAILS DESIGN DEVELOPMENT CONSTRUCTION DRAWINGS TENDER DOCUMENTS ENGINEERING SERVICES 23

24 THE ARCHITECTURAL DESIGN CYCLE & PROCESS, stage 1 1 INVESTIGATION & COLLECTION OF INFORMATION Project brief Clients ideas Cultural factors Discussions with Stakeholders Processes Precedence's QUESTION EVERY THING! Study and analyze the PROJECT BRIEF Have detailed DISCUSSIONS with the client and critical staff Understand & incorporate cultural influences OBSERVE FACILITY and hold discussions with operational staff OBSERVE END USER INTERACTION within facility STUDY processes and procedures to be incorporated Collect and study examples of similar projects already existing. PRECEDENCE STUDIES 24

25 THE ARCHITECTURAL DESIGN CYCLE & PROCESS, stage 2 2 SITE ANALYSIS PHYSICAL INFLUENCES The site on the urban scale. The site master plan The site within the site Climatic factors Traffic Neighboring occupancies LOOK FOR ANY THING THAT CAN IMPACT THE PROJECT DESIGN Study the location of the site in the city Understand urban influences that impact the site Understand the climatic factors that effect the site etc: Temperature, wind direction, sun angles Look at the immediate context for influences 25

26 THE ARCHITECTURAL DESIGN CYCLE & PROCESS, stage 3 3 CONCEPTUAL & SCHEMATIC DESIGN Basic layouts & zoning of site Concepts of design, usage & construction PEOPLE CULTURE PROCESSES TECHNOLOGY MATERIALS CONSTRUCTION COST Does the design respond to the needs of the users? Are the processes to be undertaken addressed? Are the appropriate technology & machines incorporated? Are the materials appropriate to their use & context? Is the construction methodology correct? What is the indicative cost? 26

27 THE ARCHITECTURAL DESIGN CYCLE & PROCESS, stage 4 4 SCHEMATIC DESIGN, 3D VISUALS PRESENTATION Finalization of elevations & 3D renderings of project Conceptual discussions about design with engineers Presentation to clients Allow the clients team to LIVE the project 27

28 THE ARCHITECTURAL DESIGN CYCLE & PROCESS, stage 5 5 DESIGN DEVELOPMENT Adjustment & development of design Start of coordination with engineers Identification of materials Preliminary cost estimate. Development of design in greater detail Adjustment of design due to coordination with engineers Changes in design due to designer or clients new input Identification of material usage Clearer idea of cost estimates 28

29 THE ARCHITECTURAL DESIGN CYCLE & PROCESS, stage 6 6 CONSTRUCTION & TENDER DOCUMENTS A comprehensive set of documents to guide the process of construction. These consist of: drawings schedules bill of quantities specifications Conditions of contract Documents required to construct the building 29

30 CONSTRUCTION PHASE 30

31 THE APPROVED ARCHITECTURAL DESIGN CLIENT PROJECT BRIEF WRITER ARCHITECT STRATEGIC PLANNERS CONSTRUCTION ADMINISTRATION RESEARCHERS DOCTORS NURSES STAFF THE PATIENTS 31

32 THE CONTRACTOR CLIENT PROJECT BRIEF WRITER ARCHITECT STRATEGIC PLANNERS ADMINISTRATION RESEARCHERS DOCTORS NURSES STAFF CONSTRUCTION PRIME CONTRACTOR THE PATIENTS 32

33 THE CONSTRUCTION PERIOD CLIENT PROJECT BRIEF WRITER ARCHITECT STRATEGIC PLANNERS ADMINISTRATION RESEARCHERS DOCTORS NURSES STAFF CONSTRUCTION PRIME CONTRACTOR THE PATIENTS 33

34 INTRODUCTION TO THE DESIGN PROCESS THE PROJECT & THE TEAM BRIEF WRITER CLIENT PROJECT ARCHITECT STRATEGIC PLANNERS ADMINISTRATION RESEARCHERS DOCTORS NURSES STAFF CONSTRUCTION THE PATIENTS PRIME CONTRACTOR 34

35 THE PROJECT STAKEHOLDERS, THE TEAM Thank you, TAQ ASSOCIATES PVT.(LTD) ARCHITECTURE & INTERIOR DESIGN ADD: 7G, BLOCK 6 PECHS, KARACHI, PAKISTAN INDUSHDR@GMAIL.COM.35

CLIENTS GUIDE ARCHITECTURE PROCESS. Architecture Urban design Interior Planning. FM ARCHITECTURE

CLIENTS GUIDE ARCHITECTURE PROCESS. Architecture Urban design Interior Planning. FM ARCHITECTURE CLIENTS GUIDE ARCHITECTURE PROCESS FM ARCHITECTURE www.fmarchitecture.com.au Architecture Urban design Interior Planning Undertaking a building project can be a daunting task, especially if you haven t

More information

Attachment 8 Statement of Work (SOW)

Attachment 8 Statement of Work (SOW) Attachment 8 Statement of Work (SOW) The following requirements are necessary for successful implementation of the contract for the proposer to provide design A/E services to assist the County in the Development

More information

APPENDICES DESIGN REQUIREMENTS. Appendix A. Performance Criteria for Design Projects

APPENDICES DESIGN REQUIREMENTS. Appendix A. Performance Criteria for Design Projects PROVINCE OF NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND INFRASTRUCTURE RENEWAL DTIR Document DC350 APPENDICES DESIGN REQUIREMENTS Appendix A Performance Criteria for Design Projects 2010 EDITION Printed

More information

PLANNING AND EVALUATION PRELIMINARY DESIGN

PLANNING AND EVALUATION PRELIMINARY DESIGN PLANNING AND EVALUATION Project Initiation Discuss and refine client requirements Project brief, Schedule, Budget Confirm client's space needs and program Establish scope of work Obtain client-supplied

More information

Step 1 Preliminary Design and Engineering

Step 1 Preliminary Design and Engineering The Austin Company offers a variety of approaches in implementing a project. These generally can be classified into either a design-bid-construct or design-build project approach. In addition, Austin offers

More information

PM in construction I.

PM in construction I. Resources 2016.03.07. PM in construction I. Construction management 2. (BMEEPEKT601-BMEEPEKK601) 24.02.2016 PM in construction From Idea to Hand-over and use Find out Plan/Prepare an investment Perform

More information

University of Illinois Business Instructional Facility LEED Gold Design. University of Illinois. University of Illinois

University of Illinois Business Instructional Facility LEED Gold Design. University of Illinois. University of Illinois Keys to success: Sustainable design strategies included early. Clear and early benchmarking choice. Integrated design process. Consensus building. Keys to success: Sustainable design strategies considered

More information

This document describes how Austin implements projects using The Austin Method. Step 1 Preliminary Design and Engineering

This document describes how Austin implements projects using The Austin Method. Step 1 Preliminary Design and Engineering The Austin Company offers multiple approaches in implementing a project. These generally can be classified into either a design-bid-construct or design-build project approach. In addition, Austin offers

More information

1.0 ABOUT THE NU GUIDELINES

1.0 ABOUT THE NU GUIDELINES Construction Policies & Procedures Northeastern University Guidelines for Capital Project Design & Implementation.0 ABOUT THE NU GUIDELINES This document is intended to describe in a comprehensive manner

More information

POSITION DESCRIPTION DIRECTOR TECHNICAL & DEVELOPMENT SERVICES MANAGER ENGINEERING AND OPERATIONS

POSITION DESCRIPTION DIRECTOR TECHNICAL & DEVELOPMENT SERVICES MANAGER ENGINEERING AND OPERATIONS POSITION DESCRIPTION POSITION: DESIGN OFFICER CLASSIFICATION: BAND 4 DEPARTMENT: SECTION: OCCUPANT: TECHNICAL & DEVELOPMENT SERVICES ENGINEERING & OPERATIONS VACANT DATE: DECEMBER 2006 REVISED: AUGUST

More information

Fairview Park City Schools Facilities Advisory Committee Meeting: 4/12/2017

Fairview Park City Schools Facilities Advisory Committee Meeting: 4/12/2017 Fairview Park City Schools Facilities Advisory Committee Meeting: 4/12/2017 Facilities Advisory Committee (FAC) AGENDA FAC focus and framework FPCS Preliminary Design and Construction Schedule Meet our

More information

Part Q Equipment Planning Guidelines

Part Q Equipment Planning Guidelines Part Q Equipment Planning Guidelines Health Facility Guidelines Version 2 May 2017 Table of Contents 1 Preface... 4 2 Introduction to Equipment Planning... 4 2.1 Objectives and Outcomes... 5 3 Key Performance

More information

It Takes a Community - Architects as a Part. Subjects to be covered:

It Takes a Community - Architects as a Part. Subjects to be covered: It Takes a Community - Architects as a Part Subjects to be covered: 1. The Architecture Profession s role in reducing the wildfire threat to homes and communities 2. What people need to know about working

More information

Civil Engineering and Architecture Detailed and Performance Objective Outline

Civil Engineering and Architecture Detailed and Performance Objective Outline Civil Engineering and Architecture Detailed and Performance Objective Outline Deadlines Unit 1: 11 Blocks 1/20/2015 Unit 2: 27 Blocks 2/27/2015 Unit 3: 28 Blocks 4/15/2015 Unit 4: 17 Blocks 5/8/2015 Unit

More information

Civil Engineering and Architecture Detailed and Performance Objective Outline

Civil Engineering and Architecture Detailed and Performance Objective Outline Civil Engineering and Architecture Detailed and Performance Objective Outline Unit 1: History of Civil Engineering and Architecture (21 Total Days) Lesson 1.1: History of Civil Engineering and Architecture

More information

Ex AC. Examination for Architects in Canada Examen des architectes du Canada

Ex AC. Examination for Architects in Canada Examen des architectes du Canada Ex AC Examination for Architects in Canada Examen des architectes du Canada General and Specific Objectives Theme 1 general objective specific objectives rogramming 1.1 Understand the process for the preparation

More information

Technology Contracting: Designing Systems for Efficiency and Interoperability

Technology Contracting: Designing Systems for Efficiency and Interoperability White Paper Technology Contracting: Designing Systems for Efficiency and Interoperability James F. Dagley Vice President, Channel Marketing and Strategy Johnson Controls, Inc. A best practice is emerging

More information

CHAPTER 1 INTRODUCTION

CHAPTER 1 INTRODUCTION CHAPTER 1 INTRODUCTION Cost is a major factor in most decisions regarding construction, and cost estimates are prepared throughout the planning, design, and construction phases of a construction project,

More information

Superintendent, Construction Project Management. Position Number Community Division/Region Yellowknife Headquarters

Superintendent, Construction Project Management. Position Number Community Division/Region Yellowknife Headquarters IDENTIFICATION Department Position Title Infrastructure Superintendent, Construction Project Management Position Number Community Division/Region 33-13170 Yellowknife Headquarters PURPOSE OF THE POSITION

More information

Quality Management in Construction Projects 8. Dr. Nabil El Sawalhi

Quality Management in Construction Projects 8. Dr. Nabil El Sawalhi Quality Management in Construction Projects 8 Dr. Nabil El Sawalhi 1 Quality in Construction Projects Construction projects are constantly increasing in technological complexity. Electromechanical services

More information

Thoughts on Managing Site Visits

Thoughts on Managing Site Visits Hanover Architects & Engineers Advantage Thoughts on Managing Site Visits Construction phase services are an important element of any design contract involving construction. Design documents cannot be

More information

1 Preface. 2 Introduction to Equipment Planning. International Health Facility Guidelines TAHPI Part Q: Version 2: May 2017 Page 4

1 Preface. 2 Introduction to Equipment Planning. International Health Facility Guidelines TAHPI Part Q: Version 2: May 2017 Page 4 1 Preface This equipment planning guideline provides assistance to those who are involved in the procurement and management of Furniture & Fittings, Fixtures &Equipment (FF&FE) including budgeting, selection

More information

Design Process 101. Michael Barnard, AIA, NCARB. animalsheltering.org/expo #AnimalCareExpo. Copyright

Design Process 101. Michael Barnard, AIA, NCARB. animalsheltering.org/expo #AnimalCareExpo. Copyright Design Process 101 Michael Barnard, AIA, NCARB animalsheltering.org/expo #AnimalCareExpo Copyright 1 Design and Construction Process Needs Assessment Conceptual Design Schematic Design Design Development

More information

Via Internet Site Posting- 1 Page + attachments. Addendum No. 3 Tender Call No Closing Date: 12:00 NOON (LOCAL TIME) December 19, 2017

Via Internet Site Posting- 1 Page + attachments. Addendum No. 3 Tender Call No Closing Date: 12:00 NOON (LOCAL TIME) December 19, 2017 Michael Pacholock Director Purchasing and Materials Management Division City Hall, 18 th Floor, West Tower 100 Queen Street West Toronto, Ontario M5H 2N2 Joanne Kehoe Manager Construction Services December

More information

Facility Basics for Bond Project Communications

Facility Basics for Bond Project Communications Facility Basics for Bond Project Communications TSPRA Annual Conference February 19, 2013 Presented by: Cathy Brandewie O Connell Robertson Architectural Teams can help with Evaluating / Assessing Facilities

More information

Civil Engineering and Architecture TEKS/LINKS Student Objectives One Credit

Civil Engineering and Architecture TEKS/LINKS Student Objectives One Credit First Six Weeks History of Civil Architect CEA 1.1(A) The student will connect modern structural and architectural designs to historical architectural and civil engineering achievements. CEA 1.1(B) The

More information

Absolute Energy Raters Commissioning Plan Outline Template

Absolute Energy Raters Commissioning Plan Outline Template IMPORTANT NOTICE: This sample document is provided for instructional purposes only. Absolute Energy Raters is not rendering advice concerning any commission project or practices. This document is neither

More information

Expression of Interest (EOI)

Expression of Interest (EOI) EOI No. : ICAT/EOI/I&C/Consultancy/2018-19/13 Expression of Interest (EOI) Pre Qualification of Consultants / Architects for the construction of I&C Building and Infrastructure in different states of India.

More information

Weatherization Job Title SOC Code SOC Occupation

Weatherization Job Title SOC Code SOC Occupation The following table identifies the Standard Classification () code and occupation that are related to the weatherization job titles. Please note that the first four occupations were identified by the Center

More information

The New MasterFormat TM & Your HVAC Business

The New MasterFormat TM & Your HVAC Business SMACNA & SMWIA 2006 Partners In Progress Conference Las Vegas/March 30, 2006 The New MasterFormat TM & Your HVAC Business Thomas E. Glavinich, D.E., P.E. Civil, Environmental, & Architectural Engineering

More information

Chapter 4 State Requirements for Educational Facilities Section 4.1

Chapter 4 State Requirements for Educational Facilities Section 4.1 providential cause, other impending danger to life safety, or pursuant to Section 1013.46(1)(b), F.S., the board can declare an emergency, can negotiate a contract with a design-build firm, design professional,

More information

FACTION CONSTRUCTION

FACTION CONSTRUCTION FACTION CONSTRUCTION Firm Profile & Philosophy Philosophy Faction Projects Inc. is focused on real estate development and the provision of integrated development management, architecture and construction

More information

Correlation of Housing and Interior Design. to Pre-PAC Domains and Competencies for Housing and Furnishings

Correlation of Housing and Interior Design. to Pre-PAC Domains and Competencies for Housing and Furnishings Correlation of Housing and Interior Design to Pre-PAC Domains and Competencies for Housing and Furnishings The American Association of Family and Consumer Sciences (AAFCS) in collaboration with AAFCS members

More information

a) Hostel 50 Capacity with twin sharing basis b) Common room for Hostel c) Dean s Residence d) Care taker residence

a) Hostel 50 Capacity with twin sharing basis b) Common room for Hostel c) Dean s Residence d) Care taker residence NOTICE FOR SELECTION OF ARCHITECT FOR CONSTRUCTION OF PREMISES FOR INSTITUTE S CENTRE OF EXCELLENCE (CoE) AT PLOT NO. IIA/3, ACTION AREA- IIA, NEW TOWN, KOLKATA 70017 The Institute of Company Secretaries

More information

DIRECTOR OF FACILITIES, CONSTRUCTION AND MODERNIZATION CLASSIFIED MANAGEMENT DIRECTOR IV SALARY SCHEDULE

DIRECTOR OF FACILITIES, CONSTRUCTION AND MODERNIZATION CLASSIFIED MANAGEMENT DIRECTOR IV SALARY SCHEDULE Board Approved: 6/20/12 Rev: 9/2/14, 6/6/17 DIRECTOR OF FACILITIES, CONSTRUCTION AND MODERNIZATION CLASSIFIED MANAGEMENT DIRECTOR IV SALARY SCHEDULE DESCRIPTION OF BASIC FUNCTIONS AND RESPONSIBILITIES:

More information

2.3.6 Design Development

2.3.6 Design Development 2.3 Management of the Project 2.3.6 Design Development Canadian Handbook of Practice for Architects 2.3.6 Introduction Design Development Tasks Engineering Services for Design Development Structural Mechanical

More information

Lincoln City Visitor and Convention Bureau. City of Lincoln City REQUEST FOR QUALIFICATIONS

Lincoln City Visitor and Convention Bureau. City of Lincoln City REQUEST FOR QUALIFICATIONS Lincoln City Visitor and Convention Bureau City of Lincoln City REQUEST FOR QUALIFICATIONS Visitor Center Concept Development and Designs Architectural Services Lincoln City, Oregon April 20, 2018 RFQ

More information

28.00 Project Briefing & Procurement

28.00 Project Briefing & Procurement 28.00 Project Briefing & Procurement 28.01 Generally A new building marks a significant investment in the future of the University. For many years hence it will reflect the changing role of the University

More information

M55 Architect-Engineer And Related Services Questionnaire for Specific Project

M55 Architect-Engineer And Related Services Questionnaire for Specific Project M55 Architect-Engineer And Related Services Questionnaire for Specific Project 1. Project Name/Location for which Firm is Filing: 2a. 2b. Project Identification Number, if any: 5. Firm (or Joint Venture)

More information

COSVR712 - SQA Unit Code H6AS 04 Manage own professional development

COSVR712 - SQA Unit Code H6AS 04 Manage own professional development Overview This standard is about 1 managing your own knowledge, understanding, skills, experience and time 2 managing your own professional development in order to achieve your work objectives 3 ensuring

More information

INVITATION OF EXPRESSION OF INTEREST FOR EMPANELMENT OF ARCHITECT

INVITATION OF EXPRESSION OF INTEREST FOR EMPANELMENT OF ARCHITECT MAHARASHTRA RAJYA SAHAKARI DUDH MAHASNGH MARYADIT, MUMBAI. INVITATION OF EXPRESSION OF INTEREST FOR EMPANELMENT OF ARCHITECT Page 1 of 13 EMPANELMENT OF ARCHITECT Maharashtra Rajya Sahakari Dudh Mahasangh

More information

COSBEDMO19 - SQA Unit Code FM75 04 Manage project completion and handover in built environment design management

COSBEDMO19 - SQA Unit Code FM75 04 Manage project completion and handover in built environment design management Manage project completion and handover in built environment design Overview This unit applies to designers who are engaged in projects at site level at the handover stage and who are responsible for completing

More information

Occupational Outlook Handbook, Edition

Occupational Outlook Handbook, Edition Page 1 of 6 Occupational Outlook Handbook, 2006-07 Edition U.S. Department of Labor Bureau of Labor Statistics Bulletin 2600 Construction Managers Nature of the Work Working Conditions Training, Other

More information

Design Review Process FACILITY OPERATIONS

Design Review Process FACILITY OPERATIONS Design Review Process FACILITY OPERATIONS DESIGN REVIEW LEAN TEAM AUGUST 2016 CONTENTS Introduction...3 Participants...3 Design Reviewers Facility Operations...4 Providing Feedback...5 Design Review Sessions...6

More information

Architectural and Engineering Basic Services Fee Estimating Guidelines

Architectural and Engineering Basic Services Fee Estimating Guidelines Architectural and Engineering Basic Services Fee Estimating Guidelines Basic Services is the design work customary on a typical project to take an established building program, site, and budget, and then

More information

Request for Qualifications. for. Seattle Public Schools Miscellaneous Consultants and Professional Services Roster

Request for Qualifications. for. Seattle Public Schools Miscellaneous Consultants and Professional Services Roster Seattle Public Schools Contracting Services 2445 Third Avenue South Seattle, WA 98134 Telephone: (206) 252-0566 Fax: (206) 743-3018 contractingservices@seattleschools.org Request for Qualifications for

More information

Project #1139 Budget #82. $ Budgeted $ Billed to Date $ Paid to Date $ Due 210, , , ,158.50

Project #1139 Budget #82. $ Budgeted $ Billed to Date $ Paid to Date $ Due 210, , , ,158.50 Project #1139 Budget #82 $ Budgeted $ Billed to Date $ Paid to Date $ Due 210,087.68 120,979.20 120,979.20 77,158.50 Deposit Paid Deposit Due Phase I: Project Programming and Research $ Budgeted $ Billed

More information

Nov 28-30, 2018 Metro Toronto Convention Centre. Exhibiting Opportunities. thebuildingsshow.com

Nov 28-30, 2018 Metro Toronto Convention Centre. Exhibiting Opportunities. thebuildingsshow.com Nov 28-30, 2018 Metro Toronto Convention Centre Exhibiting Opportunities thebuildingsshow.com Get Ready for Some Big Changes in 2018 STONEX Canada joins World of Concrete Pavilion and HomeBuilder & Renovator

More information

3,740. Demonstrating Competent Performance SIX EXPERIENCE AREAS. INTRODUCTION What is the Architectural Experience Program?

3,740. Demonstrating Competent Performance SIX EXPERIENCE AREAS. INTRODUCTION What is the Architectural Experience Program? What is the Architectural Experience Program? The Architectural Experience Program (AXP ) is an essential step in the path to becoming an architect. Through the AXP, you will learn about the daily realities

More information

ESTATES SERVICES. Soft Landings An Introduction

ESTATES SERVICES. Soft Landings An Introduction ESTATES SERVICES Soft Landings An Introduction 2013 Capital Projects - Context Capital projects have responsibility for all new major build and refurbishment projects A major project is a project with

More information

- DATA REQUIREMENTS BIM

- DATA REQUIREMENTS BIM UHS BIM Protocol S E C T I O N 1 - DATA REQUIREMENTS BIM authoring software: The design team is required to use parametric BIM authoring software for creation of models that include all geometry, physical

More information

GEOTHERMAL BABYLON TOWER:

GEOTHERMAL BABYLON TOWER: GEOTHERMAL BABYLON TOWER: WHEN COMMUNICATION IS OF THE ESSENCE CALGARY GeoExchange TM CONFERENCE December 11 th, 2007 WELCOME! Conference description RESUME: Geothermal projects involve a growing number

More information

TECHNOLOGY CONTRACTING:

TECHNOLOGY CONTRACTING: TECHNOLOGY CONTRACTING: Designing systems for efficiency, interoperability and smart building outcomes By Jim Nannini, Vice President of Building Wide Systems Integration Building Solutions, North America,

More information

Enwon (Australia) Pty Ltd

Enwon (Australia) Pty Ltd PROJECT QUALITY MANAGEMENT PLAN Project: Client: QUALITY STATEMENT The Management of Enwon is committed to the delivery of works and services in compliance with quality requirements for all of the company

More information

HAGAR COURT ARCHITECTURAL GUIDELINES DRAFT 3 September 14, 2004

HAGAR COURT ARCHITECTURAL GUIDELINES DRAFT 3 September 14, 2004 A. Overview of the Approval Process HAGAR COURT ARCHITECTURAL GUIDELINES DRAFT 3 September 14, 2004 Under the provisions of Article 16 of the Covenants, Conditions, and Restrictions of Hagar Court, a process

More information

Careers List Professional Careers in Construction

Careers List Professional Careers in Construction Careers List Professional Careers in Construction Architect Designs buildings, including the preparation of detailed construction drawings and specifications, and advises on their construction. May specialize

More information

KENYA CIVIL AVIATION AUTHORITY

KENYA CIVIL AVIATION AUTHORITY KENYA CIVIL AVIATION AUTHORITY TENDER NO: KCAA/053/2016-2017 EXPRESSION OF INTEREST (EOI) CONSULTANCY SERVICES FOR THE PROPOSED DESIGN, CONSTRUCTION AND SUPERVISION OF A CHAPEL AT THE EAST AFRICAN SCHOOL

More information

Coordination of Consultants

Coordination of Consultants Coordination of Consultants Ontario Association of Architects Practice Tip PT.27 Version 1.0 May 21, 2012 2012 OAA, all rights reserved. Persons who are not members of the OAA must obtain written permission

More information

WE DESIGN! ENGINEERS. CONTRACTORS.. PROJECT MANAGEMENT CONSULTANTS WE ENGINEER!! WE BUILD!!!

WE DESIGN! ENGINEERS. CONTRACTORS.. PROJECT MANAGEMENT CONSULTANTS WE ENGINEER!! WE BUILD!!! Orion WE DESIGN! ENGINEERS. CONTRACTORS.. PROJECT MANAGEMENT CONSULTANTS WE ENGINEER!! WE BUILD!!! TABLE OF CONTENTS 1. COMPANY PROFILE 2. SERVICES OFFERED 3. SUCCESSFULLY COMPLETED WORKS 4. ONGOING AND

More information

Show how a KM database impacts: cost, time, and quality. Demonstrate how Parametric Design could be used to save time, money, and improve quality

Show how a KM database impacts: cost, time, and quality. Demonstrate how Parametric Design could be used to save time, money, and improve quality Executive Summary: Thesis Proposal Final Draft The following pages contain a final draft of the thesis proposal for the South Baltimore District Court House. The basic layout consists of focusing on Knowledge

More information

International Health Facility Guidelines

International Health Facility Guidelines Part E Engineering Health Facility Guidelines Version 3 December 2012 Table of Contents 1 Introduction... 3 1 Engineering Briefing... 3 2 Engineering Services in Health Facilities... 4 3 General Requirements...

More information

CITY OF RICHMOND DEPARTMENT OF PROCUREMENT SERVICES RICHMOND, VIRGINIA (804) May 15, 2018

CITY OF RICHMOND DEPARTMENT OF PROCUREMENT SERVICES RICHMOND, VIRGINIA (804) May 15, 2018 CITY OF RICHMOND DEPARTMENT OF PROCUREMENT SERVICES RICHMOND, VIRGINIA (804) 646-5716 May 15, 2018 Request for Proposals No. G180026673 for Design Professional Services Richmond Public Schools George Mason

More information

CITY OF RICHMOND DEPARTMENT OF PROCUREMENT SERVICES RICHMOND, VIRGINIA (804) May 15, 2018

CITY OF RICHMOND DEPARTMENT OF PROCUREMENT SERVICES RICHMOND, VIRGINIA (804) May 15, 2018 CITY OF RICHMOND DEPARTMENT OF PROCUREMENT SERVICES RICHMOND, VIRGINIA (804) 646-5716 May 15, 2018 Request for Proposals No. G180026671 for Design Professional Services Richmond Public Schools E.S.H Greene

More information

One Project Driven by STEM

One Project Driven by STEM One Project Driven by STEM Surveyor Environmental Engineer Environmental Scientist Geotechnical Engineer Structural Engineer Civil Engineer Landscape Electrical Engineer Mechanical Engineer or Designer

More information

CONSTRUCTION MANAGEMENT

CONSTRUCTION MANAGEMENT CONSTRUCTION MANAGEMENT Construction Management is not a new idea. The function of the Construction Manager is to work on behalf of the owner to complete a project within the plans and specifications provided.

More information

CITY OF RICHMOND DEPARTMENT OF PROCUREMENT SERVICES RICHMOND, VIRGINIA (804) May 15, 2018

CITY OF RICHMOND DEPARTMENT OF PROCUREMENT SERVICES RICHMOND, VIRGINIA (804) May 15, 2018 CITY OF RICHMOND DEPARTMENT OF PROCUREMENT SERVICES RICHMOND, VIRGINIA (804) 646-5716 May 15, 2018 Request for Proposals No. G180026674 for Design Professional Services Richmond Public Schools Elkhardt-Thompson

More information

REQUEST FOR PROPOSAL

REQUEST FOR PROPOSAL THE URBAN DEVELOPMENT CORPORATION OF TRINIDAD AND TOBAGO LIMITED (UDeCOTT) REQUEST FOR PROPOSAL DESIGN-BUILD-EQUIP SERVICES FOR THE ROXBOROUGH HOSPITAL The Tobago House of Assembly (THA) through the Division

More information

BIM EXECUTION PLAN PROJECT INFORMATION PROJECT NUMBER

BIM EXECUTION PLAN PROJECT INFORMATION PROJECT NUMBER PROJECT NAME BIM EXECUTION PLAN PROJECT INFORMATION CLIENT PROJECT NAME PROJECT NUMBER XX XXXXX XX XXXXX XXXXXXXXXXXXXXXXXXXXXXXXX DATE XXXXXXXX 2016 PROJECT LOCATION & ADDRESS XXXXX, XXXXX. INTRODUCTION...

More information

Metropolitan Washington Airports Authority. Request for Qualifications Information. Architectural / Engineering Task Contract Design Services

Metropolitan Washington Airports Authority. Request for Qualifications Information. Architectural / Engineering Task Contract Design Services Request for Qualifications Information Architectural / Engineering Task Contract Design Services At Ronald Reagan Washington National Airport Washington Dulles International Airport Dulles Toll Road System

More information

institutions and Public Sector Undertakings for similar works.

institutions and Public Sector Undertakings for similar works. Limited Cuffe Parade, Mumbai 400 005 Ph: (022) 6655 3355; Fax: (022) 2218 0411 Notice inviting tender for Architects / Consultants for Electrical, HVAC and Allied Works at IDBI Office building at CBD Belapur,

More information

AVIATION AUTHORITY POLICY

AVIATION AUTHORITY POLICY PURPOSE: To establish a policy for the selection of development related professional services firms, including design-build firms for professional services and the Consulting Engineer, pursuant to the

More information

Making / Designing Buildings: From the Rustic Hut to the 21 st Century. Arch 172: Building Construction 1

Making / Designing Buildings: From the Rustic Hut to the 21 st Century. Arch 172: Building Construction 1 Making / Designing Buildings: From the Rustic Hut to the 21 st Century Arch 172: Building Construction 1 How do I become an Architect? Obtain professional degree in architecture 4 year Pre-Professional

More information

3,740. Demonstrating Competent Performance SIX EXPERIENCE AREAS. INTRODUCTION What is the Architectural Experience Program?

3,740. Demonstrating Competent Performance SIX EXPERIENCE AREAS. INTRODUCTION What is the Architectural Experience Program? INTRODUCTION What is the Architectural Experience Program? The Architectural Experience Program (AXP ) is an essential step in the path to becoming an architect. Through the AXP, you will learn about the

More information

Guidelines for the Preparation of Case Studies

Guidelines for the Preparation of Case Studies Guidelines for the Preparation of Case Studies Applicants for initial registration are required to demonstrate the following. Principle 1 The applicant must demonstrate that he or she is able to practise

More information

Document Synopses by Series

Document Synopses by Series Document Synopses by Series AIA Contract Documents are divided into six alphanumeric series by document use or purpose: A Series: Owner/Contractor Agreements B Series: Owner/Architect Agreements (p. 13)

More information

Modern Design & Engineering Consulting M D E C

Modern Design & Engineering Consulting M D E C Modern Design & Engineering Consulting M D E C C O M P A N Y P R O F I L E CONTENTS 1. General Information 1.1 Introduction 1.2 Contact Information 1.3 Principal of the Firm 1.4 Organization Chart 1.5

More information

4. PHASE 1 - PROGRAMMING / PRE-DESIGN PHASE

4. PHASE 1 - PROGRAMMING / PRE-DESIGN PHASE 4. PHASE 1 - PROGRAMMING / PRE-DESIGN PHASE 1. Programming refers to master planning, and functional requirements to deliver the client s program. Programming is considered complete once specific floor

More information

ASSOCIATE ENGINEER. 3. Recommend and assist in the implementation of goals and objectives; implement approved policies and procedures.

ASSOCIATE ENGINEER. 3. Recommend and assist in the implementation of goals and objectives; implement approved policies and procedures. ASSOCIATE ENGINEER Class specifications are intended to present a descriptive list of the range of duties performed by employees in the class. Specifications are not intended to reflect all duties performed

More information

Part E - Building Services and Environmental Design

Part E - Building Services and Environmental Design 1 TABLE OF CONTENTS INDEX Description 600099 1.0.10 1 GENERAL REQUIREMENTS 2 COMMUNICATIONS 3 ELECTRICAL 4 FIRE 5 HYDRAULIC 6 MECHANICAL 7 MEDICAL GASES 8 SECURITY 9 TRANSPORTATION 10 EQUIPMENT 11 APPENDICES

More information

INSTRUCTIONS FOR USING THE MICHIGAN SCHOOL BUSINESS OFFICIALS ( MSBO ) PROTOTYPE FORM OWNER/ARCHITECT AGREEMENT WITH CONSTRUCTION MANAGER COORDINATION

INSTRUCTIONS FOR USING THE MICHIGAN SCHOOL BUSINESS OFFICIALS ( MSBO ) PROTOTYPE FORM OWNER/ARCHITECT AGREEMENT WITH CONSTRUCTION MANAGER COORDINATION INSTRUCTIONS FOR USING THE MICHIGAN SCHOOL USINESS OFFICIALS ( MSO ) PROTOTYPE FORM OWNER/ARCHITECT AGREEMENT WITH CONSTRUCTION MANAGER COORDINATION Please be advised that the purpose of this Instruction

More information

OUTLINING THE PROCESS SECTION 2 YOUR NOTES

OUTLINING THE PROCESS SECTION 2 YOUR NOTES 1 OUTLINING THE PROCESS SECTION 2 YOUR NOTES Photocopy this page for Committee members ABF/10/08 2 OUTLINE THE THE PROCESS Phase 1: Pre-Design Planning Step 1:Needs recognition & initial action Step 2:Strategic

More information

EXHIBIT "A" RESPONSIBILITIES AND SERVICES OF ARCHITECT TABLE OF CONTENTS

EXHIBIT A RESPONSIBILITIES AND SERVICES OF ARCHITECT TABLE OF CONTENTS EXHIBIT "A" RESPONSIBILITIES AND SERVICES OF ARCHITECT TABLE OF CONTENTS A. SCOPE OF PROJECT... 1 B. BASIC SERVICES... 1 C. PRE-DESIGN AND START-UP SERVICES... 4 D. SCHEMATIC DESIGN PHASE... 7 E. DESIGN

More information

CxA Gap Session. April 25, :00 p.m. 4:30 p.m. Instructors: Derek De Jesús, CxA, LEED AP Darren Draper, PE, CxA, LEED AP

CxA Gap Session. April 25, :00 p.m. 4:30 p.m. Instructors: Derek De Jesús, CxA, LEED AP Darren Draper, PE, CxA, LEED AP CxA Gap Session April 25, 2017 2:00 p.m. 4:30 p.m. Instructors: Derek De Jesús, CxA, LEED AP Darren Draper, PE, CxA, LEED AP AIA Provider Number 50111116 Course Description This session and short quiz,

More information

POSITION DESCRIPTION June 16, 2017

POSITION DESCRIPTION June 16, 2017 POSITION DESCRIPTION June 16, 2017 Common Name: Classification: Team / Section: Bureau / Division: ROOFING / BUILDING ENVELOPE PROJECT MANAGER ENGINEERING SPECIALIST MANAGEMENT Project Delivery Services

More information

Architectural Design and Build Process. A Client Guide

Architectural Design and Build Process. A Client Guide Architectural Design and Build Process A Client Guide This guide has been prepared to summarise the various stages of a new-build residential design & construction process. It identifies important tasks

More information

EXHIBIT "A" RESPONSIBILITIES AND SERVICES OF ARCHITECT TABLE OF CONTENTS

EXHIBIT A RESPONSIBILITIES AND SERVICES OF ARCHITECT TABLE OF CONTENTS EXHIBIT "A" RESPONSIBILITIES AND SERVICES OF ARCHITECT TABLE OF CONTENTS A. SCOPE OF PROJECT... 1 B. BASIC SERVICES... 1 C. PRE-DESIGN AND START-UP SERVICES... 4 D. SCHEMATIC DESIGN PHASE... 7 E. DESIGN

More information

Eastern Michigan University

Eastern Michigan University Eastern Michigan University Prepared by: EMU Physical Plant Facilities Planning and Construction Page Intro-1 Purpose of Eastern Michigan University Physical Plant; Facilities Planning and Construction

More information

LIFE OF A CAPITAL PROJECT

LIFE OF A CAPITAL PROJECT LIFE OF A CAPITAL PROJECT CAPITAL ASSET STRATEGIES (CAS) ARCHITECTS AND ENGINEERS (A&E) 5/4/2017 EARLY STEPS OF A MAJOR CAPITAL PROJECT (>$750,000) Scoping & Feasibility Project sponsor and campus leadership

More information

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ SPECIAL CONDITIONS Definitions: a) OWNER: Union County Vocational-Technical Schools UCVTS b) CITY or TOWN: Scotch Plains, New Jersey c) ARCHITECT: Netta Architects 1084 Route 22 West Mountainside, New

More information

Dr Sarah Graham. Greenbuild Expo Low Energy Design. 30 th June 2011

Dr Sarah Graham. Greenbuild Expo Low Energy Design. 30 th June 2011 Greenbuild Expo 2011 Low Energy 30 th June 2011 Dr Sarah Graham B Eng, C EngMCIBSE, EngD UK Sales Manager T: +44 141 945 8500 C: +44 7837 251354 Sarah.graham@iesve.com www.iesve.com Integrated Environmental

More information

Trane U.S. Inc. Authorized Government Price List. GSA Hourly Billing Rates for Labor Categories Under SINs and Position Description

Trane U.S. Inc. Authorized Government Price List. GSA Hourly Billing Rates for Labor Categories Under SINs and Position Description Trane U.S. Inc. GSA Hourly Billing Rates for Labor Categories Under s 811-002 and 811-003 Trane U.S. Inc. Trane Position Title Comparable Government Position Description Non- Exempt GSA Price Rate/Hour

More information

Procedure Yes; No; greater than

Procedure Yes; No; greater than Procedure 1. Project manager (PM) notifies facilities information coordinator of forecasted substantial completion date one month prior to reaching substantial completion. 2. PM completes the project information

More information

The Waldinger Corporation Office & Production Building

The Waldinger Corporation Office & Production Building The Waldinger Corporation Office & Production Building Scout Trail Des Moines, IA 50321 SVPA Project No 18036 U.D.R.B. PROJECT NARRATIVE September 19, 2018 The Waldinger Corporation Office & Production

More information

Best Practices Manual

Best Practices Manual Best Practices Manual Canada, C1A 7L3 Page 1 of 18 Table of Contents Introduction 0 Division 00 - Bid Documents 0.1 Alternate Bids 0.2 To be developed 1 Division 01 - General Requirements 1.1. Tender Document

More information

Township of Severn REQUEST FOR PROPOSAL. Architectural & Professional Services Fire Station Replacement

Township of Severn REQUEST FOR PROPOSAL. Architectural & Professional Services Fire Station Replacement Township of Severn REQUEST FOR PROPOSAL Architectural & Professional Services Fire Station Replacement Deadline for proposal submission is June 15, 2017 at 2:00 p.m. Contact Person: Tim Cranney Director

More information

Civil Engineering & Architecture PLTW Scope and Sequence Year at a Glance First Semester Three Weeks

Civil Engineering & Architecture PLTW Scope and Sequence Year at a Glance First Semester Three Weeks Civil Engineering & Architecture PLTW Scope and Sequence Year at a Glance First Semester Three Weeks 1 st 3 weeks 2 nd 3 weeks 3 rd 3 weeks 4 th 3 weeks 5 th 3 weeks 6 th 3 weeks Topics/ Concepts I. Overview

More information

DIVISION OF FACILITIES CONSTRUCTION AND MANAGEMENT ARCHITECTURAL/ENGINEER/HIGH PERFORMANCE BUILDING FEES EFFECTIVE DATE: December 12, 2017

DIVISION OF FACILITIES CONSTRUCTION AND MANAGEMENT ARCHITECTURAL/ENGINEER/HIGH PERFORMANCE BUILDING FEES EFFECTIVE DATE: December 12, 2017 DIVISION OF FACILITIES CONSTRUCTION AND MANAGEMENT ARCHITECTURAL/ENGINEER/HIGH PERFORMANCE BUILDING FEES EFFECTIVE DATE: December 12, 2017 I. PURPOSE To provide a standard for a reasonable A/E/HPBS consultant

More information

Appendix D University of Maine System. Supplementary Requirements to AIA Document B Standard Form of Architect s Services

Appendix D University of Maine System. Supplementary Requirements to AIA Document B Standard Form of Architect s Services Appendix D University of Maine System Supplementary Requirements to AIA Document B201-2007 Standard Form of Architect s Services This document provides the Architect s scope of services only and must be

More information

Appendix 2: Term Sheet. SECTION 37 TERM SHEET FOR CITY SPACE AT THE CONDOMINIUM TO BE CONSTRUCTED AT 200 DUNDAS STREET EAST (the "Project")

Appendix 2: Term Sheet. SECTION 37 TERM SHEET FOR CITY SPACE AT THE CONDOMINIUM TO BE CONSTRUCTED AT 200 DUNDAS STREET EAST (the Project) September 10, 2013 Appendix 2: Term Sheet SECTION 37 TERM SHEET FOR CITY SPACE AT THE CONDOMINIUM TO BE CONSTRUCTED AT 200 DUNDAS STREET EAST (the "Project") 1. Owner: The term "Owner" in the term sheet

More information

NOTICE INVITING TENDER FOR APPOINTMENT OF ARCHITECT/CONSULTANT INTERIOR AND CIVIL RENOVATION WORKS AT OPENING OF RACPC-IV, NAGAR ROAD, PUNE

NOTICE INVITING TENDER FOR APPOINTMENT OF ARCHITECT/CONSULTANT INTERIOR AND CIVIL RENOVATION WORKS AT OPENING OF RACPC-IV, NAGAR ROAD, PUNE STATE BANK OF INDIA PREMISES AND ESTATE DEPARTMENT, 3rd FLOOR, ZONAL OFFICE,ZONE-I SHARADA COMPLEX, PUNE - 37 NOTICE INVITING TENDER FOR APPOINTMENT OF ARCHITECT/CONSULTANT INTERIOR AND CIVIL RENOVATION

More information