1 AGENDA ITEM C8 DATE: February 6, 2017 TO: Matt Jordan, General Manager FROM: Charles H. Carden, Chief Operating Officer SUBJECT: South Pasco Transmission Main Phase III Condition Assessment Services with Pure Technologies U.S. Inc. - Approve. SUMMARY: Tampa Bay Water has been performing inspections of its Pre-Stressed Concrete Cylinder (PCCP) pipe to identify potential future issues. This allows staff to target pipe sections for repair or replacement rather than a more expensive replacement of the entire pipeline. Three pipeline sections have been inspected to date. Staff has negotiated an amendment with Pure Technologies U.S. Inc. to complete Phase III condition assessment activities at the South Pasco Transmission Main. RECOMMENDATION: Approve condition assessment services for the South Pasco Transmission Main Phase III with Pure Technologies U.S. Inc. COST/FUNDING SOURCE: $215,348.48/Uniform Rate (Total project costs $520, includes $304,952 previously committed to Phase II) DISCUSSION: A desktop analysis of the pipelines in Tampa Bay Water s Pre-Stressed Concrete Cylinder (PCCP) system was completed by AECOM to prioritize pipelines for inspection based on relative condition and consequence of failure. Three pipelines have been inspected so far: 8.6 miles of South-Central Hillsborough Regional Wellfield Transmission Main April miles of Cypress Creek Wellfield Collection Main condition July miles of the South Pasco Transmission Main (Phase I- northern portion) May The South Pasco Transmission Main provides regional supply to Hillsborough County s Fawn Ridge and Lake Park Treatment Plants, and to St. Petersburg s Cosme Treatment Plant. This Pre-stressed Concrete Cylinder Pipe (PCCP), constructed between 1961 and 1971, has been given a medium priority in the Tampa Bay Water PCCP Condition Assessment Program, based on potential condition and risk of failure. The condition assessment activities for this pipeline has been broken into phases to be completed over three fiscal years. Phase I of the northern portion of the transmission main was completed in May 2015.

2 Matt Jordan February 6, 2017 Page 2 Phase II condition assessment activities for the central portion of the South Pasco Transmission Main was scheduled to take place in fiscal year After Board approval in April 2016, a task was issued to Pure Technologies for $304, to inspect 2.16 miles of pipe. While preparing for this inspection, an 18-inch plug valve obstruction was identified on the record drawings near the intersection of Dale Mabry Highway and Van Dyke Road. Staff investigated replacing the plug valve, but cost was determined to be excessive. Staff have elected to defer Phase II, and to continue with Phase III of the southern and western portion of the South Pasco Transmission Main Assessment using the funds approved for Phase II to fund part of Phase III. An amendment to the Phase II amount for additional funds is required because Phase III includes more miles of pipe than were in the Phase II scope. Phase III includes approximately 6.22 miles of 42-inch diameter transmission main, and the assessment will cost a total of $520, including the previously approved Phase II funds and this proposed amendment. Other contract costs to open and close the line, provide entry for personnel and equipment and clear the line when completed, are budgeted separately and largely dependent on groundwater levels when the work is executed. There is currently only one vendor, Pure Technologies U.S. Inc. that provides condition assessment services for PCCP while keeping the line in service. Tampa Bay Water is using the terms, conditions and unit rates of the $35 million dollar Miami-Dade Contract BW9537-0/16 for pipeline condition assessment. This is the procedure used for other Tampa Bay Water pipeline condition assessments. The Miami contract was awarded February 15, 2012 and expires February 28, Miami-Dade has submitted a Supplemental Agreement to extend the existing contract for a period of six (6) months, commencing March 1, 2017 and expiring August 28, 2017, for approval this February The attached Agreement includes a copy of the Miami-Dade Contract, and a scope for the proposed Phase III assessment. The results of the condition assessment may lead to repair of areas determined to be in poor condition. Recommended repairs will be included in a future renewal and replacement project for portions of the South Pasco Transmission Main. BACKGROUND: Buried pipelines comprise approximately 80% of Tampa Bay Water s total agency assets. These pipes vary in age and material. Tampa Bay Water and many other Municipalities have had failures of pre-stressed concrete cylinder pipe (PCCP), which is constructed with a steel cylinder wrapped with pre-stressed wires, which is coated and lined with cement. Failure of PCCP can occur due to corrosion of the pre-stressed wires, caused by low-grade materials of construction, or damage during original transport and installation. For example, the 20-mile-long Cypress Creek Transmission Main was replaced in its entirety due to multiple pipeline failures and its critical position in the Tampa Bay Water system. It would be extremely costly to replace all the remaining 62 miles of PCCP in our system. Advanced condition assessment technologies have been developed over

3 Matt Jordan February 6, 2017 Page 3 the years to help utilities identify where pipe future failures are more likely to occur. This allows staff to target pipe sections for repair or replacement rather than a more expensive replacement of the entire pipeline. Attachment

4 PCCP Assessment South Pasco to Cosme WTP Transmission Main Suzannah Folsom, P.E. January 19, 2017 Tampa Bay Water 2575 Enterprise Road Clearwater, FL Dear Ms. Folsom: Pure Technologies U.S. Inc. (Pure) has been tasked with performing a condition assessment of 2.16 miles of piping including the southern portion of the Contract C-35 piping, the eastern portion of the C-18 piping and the northern portion of the C-21 piping. A plug valve obstruction at the north end of the C-21 piping has made inspection of this portion of the piping not feasible. This amended scope of services provides a revised scope for the next and final phase of the South Pasco Transmission Main condition assessment. We are pleased to offer our services to Tampa Bay Water (TBW) for pipeline assessment. We understand that TBW would like to assess the condition of the 42-inch diameter portions of Contracts C-35, C-18, C17, C-27 and C-28 that are part of the South Pasco Transmission Main. The pipeline is constructed of prestressed concrete cylinder pipe (PCCP), was installed in stages between 1961 and 1971 and extends from the South Pasco Transmission Main to the Cosme Water Treatment Plant in Odessa, Florida. According to the plans provided by TBW, the pipeline to be assessed consists of the following diameters and lengths: Contract C-35 o 42-inch Station to Station , 2,790 feet, 0.53 miles Contracts C-18 and C17 o 42-inch Station to Station 0+00, 25,557 feet, 4.84 miles Contracts C-27 and C-28 to Cosme WTP o 42-inch Station to Station 29+60, 4,509 feet, 0.85 miles The total distances listed above are according to a preliminary review of the pipeline asbuilt plans. Accessibility to the pipeline will be confirmed following a field visit and the total distance of assessment will be confirmed after the analysis of the collected data. The pipeline will be inspected in one mobilization and is tentatively scheduled to occur after April 1, A detailed project plan will be provided to TBW upon acceptance of this scope of work. In the interim, the preliminary plan for South Pasco will be to insert the equipment 1 P a g e

5 PCCP Assessment South Pasco to Cosme WTP Transmission Main through the access manhole at Station in Contract C-35 (the Horse Farm) and to extract before the Cosme Water Treatment Plant at Station in Contracts C-27 and C-28. Details for the insertion and extraction shall be coordinated with TBW, but if feasible, should include a temporary shut down and depressurization by TBW. This project will deliver to TBW the following: 1. The number of broken prestressing wire wraps in each inspected pipe section as well as any leaks found. 2. A performance curve for each pipe design class/soil depth combination for each pipe design with broken pre-stressing wires calculated using a 3-D non-linear finite element analysis 3. A structural engineering analysis detailing the repair priority for each pipe section with broken prestressing wire wraps. This report will provide TBW: A. Categorization of the structural damage found, allowing TBW to prioritize its rehabilitation program and allocate funds accordingly in an emergency and/or an annual basis. B. Information needed to extend the useful life of their pipelines using the information as a starting point for a root cause analysis if the pipeline is deteriorating. Cost Estimate Pure will deliver the electromagnetic inspection on the PipeDiver platform; leak detection will be performed on the SmartBall platform. TBW will be contracting Pure through an agreement Pure currently has with the Miami-Dade Water and Sewer Department (WASD). The terms and conditions associated with the assessment for TBW are based on the contract approved for WASD by the Miami-Dade County Department of Procurement Management (Master Agreement BW ). The cost for this project is referenced in Appendix B of this Master Agreement and is detailed in the table on the following page. 2 P a g e

6 PCCP Assessment South Pasco to Cosme WTP Transmission Main Service Quantity Unit Cost Total Cost PipeDiver/SmartBall Mobilization & Planning 1 $85, $85, Inspection/Analysis/Reporting: 6.22 miles* $69, $435, Total $520, Available Funds PO# $304, Additional Funds Requested $215, *- Mileage to be confirmed after data collection. TBW and Pure s responsibilities are detailed in the Master Agreement, Appendix A. We look forward to providing these specialized services. If you have any questions or concerns, please do not hesitate to contact me. Regards, Alan Bair alan.bair@puretechltd.com 3 P a g e

AGENDA ITEM C2. COST/FUNDING SOURCE: $304,952.00/ Uniform Rate

AGENDA ITEM C2. COST/FUNDING SOURCE: $304,952.00/ Uniform Rate AGENDA ITEM C2 DATE: April 4, 2016 TO: Matt Jordan, General Manager FROM: Charles H. Carden, Chief Operating Officer SUBJECT: South Pasco Transmission Main Condition Assessment Services with Pure Technologies

More information

Acoustic Fiber Optic Monitoring of PCCP and Pipelines of Other Materials. Stewart Day, Pure Technologies

Acoustic Fiber Optic Monitoring of PCCP and Pipelines of Other Materials. Stewart Day, Pure Technologies Acoustic Fiber Optic Monitoring of PCCP and Pipelines of Other Materials Stewart Day, Pure Technologies 1 Presentation Outline PCCP Common failure modes Metallic pipe failure modes PCCP & metallic pipe

More information

Predictive Models Based on Force Main Condition Assessment

Predictive Models Based on Force Main Condition Assessment Overview Let s focus on some general concepts: TSX: PUR global innovative sustainable infrastructure management solutions Predictive Models Based on Force Main Condition Assessment Understand failure modes

More information

Acoustic Monitoring of Large Diameter Water Transmission Mains - City of Ottawa Case Study

Acoustic Monitoring of Large Diameter Water Transmission Mains - City of Ottawa Case Study Acoustic Monitoring of Large Diameter Water Transmission Mains - City of Ottawa Case Study CERIU - INFRA - 2011 Stewart Day, PURE Technologies, Regional Manager- Canada Shelley McDonald, City of Ottawa,

More information

Assessment Methods For Large Diameter Water & Sewer Pressure Pipelines

Assessment Methods For Large Diameter Water & Sewer Pressure Pipelines Assessment Methods For Large Diameter Water & Sewer Pressure Pipelines Procrastinator s Workshop Thursday, December 12, 2013 Presented by: Michael J. Livermore Midwest Regional Manager Solutions for Sustainable

More information

Using Condition Assessment to more Efficiently Manage your Pipelines

Using Condition Assessment to more Efficiently Manage your Pipelines Using Condition Assessment to more Efficiently Manage your Pipelines Traditional Management Approach Prioritize Pipelines Replace Pipelines Traditionally, prioritizations were based on age, material and

More information

Numbers Don t Lie, PCCP Performance and Deterioration Based on a Statistical Review of a Decade of Condition Assessment Data

Numbers Don t Lie, PCCP Performance and Deterioration Based on a Statistical Review of a Decade of Condition Assessment Data 298 Numbers Don t Lie, PCCP Performance and Deterioration Based on a Statistical Review of a Decade of Condition Assessment Data Michael S. Higgins, P.E. 1 ; Allison Stroebele, P.Eng. 1 ; Sana Zahidi 1

More information

Condition Assessment of Pipeline Systems Within Power Generating Plants

Condition Assessment of Pipeline Systems Within Power Generating Plants Condition Assessment of Pipeline Systems Within Power Generating Plants Condition Assessment of Pipeline Systems within Power Generating Plants Many cities depend on safe, reliable power delivered from

More information

Where Intelligence Meets Infrastructure PA AWWA Conference

Where Intelligence Meets Infrastructure PA AWWA Conference Where Intelligence Meets Infrastructure 2017 PA AWWA Conference Analysis and Verification of PCCP Stiffness Testing Using Non-Invasive Acoustic Testing Name: John Marciszewski jmarciszewski@echologics.com

More information

In-Service Forcemain Condition Assessment

In-Service Forcemain Condition Assessment In-Service Forcemain Condition Assessment Tim Ross and Reid McDougall TRENCHLESS TECHNOLOGY ROADSHOW May 28-29, 2014 Scotiabank Convention Centre, Niagara Falls, ON Agenda Project background & planning

More information

Pipeline Condition Assessment. The Essential Engineering Step in the Asset Management Process

Pipeline Condition Assessment. The Essential Engineering Step in the Asset Management Process Pipeline Condition Assessment. The Essential Engineering Step in the Asset Management Process Tom Sangster. Principal, Jason Consultants Group, Geneva, Switzerland Synopsis Condition assessment is a critical

More information

City of Phoenix Superior Pipeline PCCP Investigation and Assessment

City of Phoenix Superior Pipeline PCCP Investigation and Assessment City of Phoenix Superior Pipeline PCCP Investigation and Assessment Ronald Ablin, P.E. 1, Brandy Kelso, P.E. 2, Bethany Williams, P.E. 3, Myron Shenkiryk 4, The City of Phoenix is currently in a multi-year

More information

Subsequent to these early efforts, the complexities associated with potable water provision have increased significantly.

Subsequent to these early efforts, the complexities associated with potable water provision have increased significantly. 10.1 INTRODUCTION The reliable supply, treatment and distribution of potable water is vital to the health, safety and welfare of urban areas. The citizens and officials of the have long been involved with

More information

Observations from Several Condition Assessments of Prestressed Concrete Cylinder Pipe used at Energy Generation Facilities

Observations from Several Condition Assessments of Prestressed Concrete Cylinder Pipe used at Energy Generation Facilities 147 Observations from Several Condition Assessments of Prestressed Concrete Cylinder Pipe used at Energy Generation Facilities Todd Stong PE 1, Ron R. Jorgenson 2, and Jacob Sauer 3 1 Senior Engineer,

More information

SECTION 3.0 SPECIFICATIONS FOR DRINKING WATER DISTRIBUTION SYSTEMS DESIGN

SECTION 3.0 SPECIFICATIONS FOR DRINKING WATER DISTRIBUTION SYSTEMS DESIGN 3.1 GENERAL SECTION 3.0 SPECIFICATIONS FOR DRINKING WATER DISTRIBUTION SYSTEMS DESIGN 3.1.1 The following specifications cover the general design, review of plans and specifications, and acceptance of

More information

VERIFICATION OF PCCP FAILURE MARGIN AND RISK CURVES

VERIFICATION OF PCCP FAILURE MARGIN AND RISK CURVES 1413 VERIFICATION OF PCCP FAILURE MARGIN AND RISK CURVES Rasko P. Ojdrovic *, Peter D. Nardini, and Mehdi S. Zarghamee * Ph.D., P.E., M. ASCE, Principal, rpojdrovic@sgh.com, (781) 907-9231 P.E., A.M. ASCE,

More information

There are many technologies available for

There are many technologies available for Engineering Technologies for Pipeline Asset Management Bryon L. Livingston, Ahmad Habibian, and Dan Kugler There are many technologies available for managing the condition of underground infrastructure,

More information

8-5. Engineering and Operations Committee. Board of Directors. 1/13/2015 Board Meeting. Subject. Executive Summary

8-5. Engineering and Operations Committee. Board of Directors. 1/13/2015 Board Meeting. Subject. Executive Summary Board of Directors Engineering and Operations Committee 1/13/2015 Board Meeting Subject Appropriate $34.3 million; and authorize: (1) final design to rehabilitate prestressed concrete cylinder pipe (PCCP)

More information

GUIDANCE MEMO NO : GUIDANCE CRITERIA FOR THE SEPARATION OF WATER MAINS AND NON-POTABLE PIPELINES

GUIDANCE MEMO NO : GUIDANCE CRITERIA FOR THE SEPARATION OF WATER MAINS AND NON-POTABLE PIPELINES State of California Memorandum Department of Health Services Date: April 4, 2003 To: From: Subject: Regional and District Engineers David P. Spath, Ph.D., Chief (Original signed by Dave) Drinking Water

More information

CALLEGUAS MUNICIPAL WATER DISTRICT ENGINEERING & CONSTRUCTION COMMITTEE April 27, 2015

CALLEGUAS MUNICIPAL WATER DISTRICT ENGINEERING & CONSTRUCTION COMMITTEE  April 27, 2015 CALLEGUAS MUNICIPAL WATER DISTRICT ENGINEERING & CONSTRUCTION COMMITTEE www.calleguas.com April 27, 2015 NOTICE AND CALL OF A MEETING OF THE CALLEGUAS ENGINEERING & CONSTRUCTION COMMITTEE An Engineering

More information

Miami-Dade Water and Sewer Department: Implementing a Resilient Water & Sewer Utility

Miami-Dade Water and Sewer Department: Implementing a Resilient Water & Sewer Utility By: Hardeep Anand (WASD) Josenrique Cueto (Hazen) Maricela J. Fuentes (AECOM) Miami-Dade Water and Sewer Department: Implementing a Resilient Water & Sewer Utility Introduction 01 02 03 04 System Overview

More information

The attached Status Report provides a summary of on-going activities and projects related to the Agency s Energy Management Program.

The attached Status Report provides a summary of on-going activities and projects related to the Agency s Energy Management Program. AGENDA ITEM B5 DATE: October 1, 2012 TO: Gerald J. Seeber, General Manager FROM: Charles H. Carden, Chief Operating Officer SUBJECT: Energy Management Program Status Report SUMMARY: The attached report

More information

Force Main Condition Assessment. Water Environment School March 2017

Force Main Condition Assessment. Water Environment School March 2017 Force Main Condition Assessment Water Environment School March 2017 Safety Moment First Aid App Studies show that most workplace first aid training is forgotten over 90 days after certification Mobile

More information

Implementing and Managing a Large Water Utility s Underground Corrosion-Control Program

Implementing and Managing a Large Water Utility s Underground Corrosion-Control Program Implementing and Managing a Large Water Utility s Underground Corrosion-Control Program Jeff Schramuk NACE CP Specialist #7695 630-235-1559 www.cpsolutionsinc.net Danny J. Klopfer, P.E. Infrastructure

More information

Capital Investment Plan Quarterly Report for period ending September 2017

Capital Investment Plan Quarterly Report for period ending September 2017 Report Engineering Services Group Capital Investment Plan Quarterly Report for period ending September 2017 Summary This report provides a summary of accomplishments to date on the Capital Investment Plan

More information

SECTION 7 SEPARATION OF WATER MAINS AND SANITARY SEWERS

SECTION 7 SEPARATION OF WATER MAINS AND SANITARY SEWERS SECTION 7 SEPARATION OF WATER MAINS AND SANITARY SEWERS To prevent the contamination of the public water supplies from nearby sanitary sewers, the following State Water Resources Control Board Division

More information

REQUEST FOR PROPOSALS TO PROVIDE PLANNING, RECOMMENDATIONS, AND CONTRACT DOCUMENTS FOR PIPELINE INSPECTION AND CONDITION ASSESSMENT FOR THE

REQUEST FOR PROPOSALS TO PROVIDE PLANNING, RECOMMENDATIONS, AND CONTRACT DOCUMENTS FOR PIPELINE INSPECTION AND CONDITION ASSESSMENT FOR THE REQUEST FOR PROPOSALS TO PROVIDE PLANNING, RECOMMENDATIONS, AND CONTRACT DOCUMENTS FOR PIPELINE INSPECTION AND FOR THE 24-INCH UNIT B AND 27-INCH UNIT K RANCHO SUMMIT DRIVE PIPELINES 12-INCH ENCINITAS

More information

Beyond the Wires. A Sustainable Approach to Prestressed Concrete Cylinder Pipe Management

Beyond the Wires. A Sustainable Approach to Prestressed Concrete Cylinder Pipe Management 1214 Beyond the Wires A Sustainable Approach to Prestressed Concrete Cylinder Pipe Management Nathan D. Faber, P.E. 1, Martin R. Coghill CEng MICE 2, and John J. Galleher, P.E. 3 1 San Diego County Water

More information

Texas Groundwater Summit

Texas Groundwater Summit Guadalupe-Blanco River Authority Mid-Basin Water Supply Projects Texas Groundwater Summit James Lee Murphy, Esq. Executive Manager for Water Resources & Utility Operations Guadalupe-Blanco River Authority

More information

WEKO-SEAL Internal Joint Sealing. internal pipe-joint sealing

WEKO-SEAL Internal Joint Sealing. internal pipe-joint sealing WEKO-SEAL Internal Joint Sealing internal pipe-joint sealing We know seals inside and out. Retaining Band Test Valve WEKO-SEAL WEKO-SEAL is the leading trenchless system for internally and economically

More information

February 22, Mr. Kevin Koning Holland Board of Public Works 625 Hastings Avenue Holland, MI 49423

February 22, Mr. Kevin Koning Holland Board of Public Works 625 Hastings Avenue Holland, MI 49423 February 22, 2017 Mr. Kevin Koning Holland Board of Public Works 625 Hastings Avenue Holland, MI 49423 Subject: SmartBall Leak and Gas Pocket Inspection Proposal, 36-inch PCCP Transmission Main Dear Mr.

More information

Public Hearing December 12, 2013

Public Hearing December 12, 2013 Public Hearing December 12, 2013 Commission s Water Transmission System Finished Water Transmission System South Transmission Main South Transmission Main Route South Main Replacement Route from Provin

More information

The New Age for Sewer Planning at the City of Los Angeles

The New Age for Sewer Planning at the City of Los Angeles The New Age for Sewer Planning at the City of Los Angeles Mario Dimzon 1 * P.E., Fernando Gonzalez 1 P.E., Ali Poosti 1 PE, Adel Hagekhalil 1 PE, Erick Heath 2 P.E., Rajan Ray 2 P.E., Erin Breen 2 P.E.

More information

1. B16.1 Cast Iron Pipe Flanges and Flanged Fittings, Class C 111 Rubber Gasket Joints for Ductile Iron Pressure Pipe and Fittings

1. B16.1 Cast Iron Pipe Flanges and Flanged Fittings, Class C 111 Rubber Gasket Joints for Ductile Iron Pressure Pipe and Fittings SECTION 33 34 00 SANITARY FORCE MAIN PART 1 GENERAL 1.1 SCOPE OF WORK A. This section specifies the requirements for furnishing and installing sanitary force main and appurtenances. The pipe shall be of

More information

Florida Gas Transmission Section #3 Hydrostatic Test

Florida Gas Transmission Section #3 Hydrostatic Test Florida Gas Transmission Section #3 Hydrostatic Test 14-Inch Saint Petersburg Lateral Pipeline From East of Lake Magdalene to West of County Line Hillsborough and Pinellas Counties Today s Outline Who

More information

PNWS AWWA 2009 Annual Conference What s its Condition? Inspection of a Large Diameter Transmission Main

PNWS AWWA 2009 Annual Conference What s its Condition? Inspection of a Large Diameter Transmission Main PNWS AWWA 2009 Annual Conference What s its Condition? Inspection of a Large Diameter Transmission Main Wayne Gresh, P.E. Project Manager, Black & Veatch greshhw@bv.com / 503-699-2218 May 6, 2009 Outline

More information

UNIFORM DESIGN AND CONSTRUCTION STANDARDS FOR EXTENDING WATER DISTRIBUTION SYSTEMS SECTION 2 DESIGN STANDARDS

UNIFORM DESIGN AND CONSTRUCTION STANDARDS FOR EXTENDING WATER DISTRIBUTION SYSTEMS SECTION 2 DESIGN STANDARDS UNIFORM DESIGN AND CONSTRUCTION STANDARDS FOR EXTENDING WATER DISTRIBUTION SYSTEMS SECTION 2 DESIGN STANDARDS DESIGN STANDARDS SECTION 2 INDEX ITEM DESCRIPTION 2.00 GENERAL STATEMENT 2.01 WATER DISTRIBUTION

More information

PROCESSING COMBINED LASER, SONAR AND HD IMAGING FOR BETTER EVALUATION DECISIONS

PROCESSING COMBINED LASER, SONAR AND HD IMAGING FOR BETTER EVALUATION DECISIONS North American Society for Trenchless Technology (NASTT) No-Dig Show 2011 Washington, D.C. March 27-31, 2011 Paper F-3-05 PROCESSING COMBINED LASER, SONAR AND HD IMAGING FOR BETTER EVALUATION DECISIONS

More information

Fully Structural Renewal of 39-inch PCCP Water Transmission Main with Swagelining and HDPE

Fully Structural Renewal of 39-inch PCCP Water Transmission Main with Swagelining and HDPE Caribbean Water & Wastewater Conference 2015 Topic: Water & Wastewater Pipeline Rehabilitation, Trenchless Technology Fully Structural Renewal of 39-inch PCCP Water Transmission Main with Swagelining and

More information

Appendix A EXAMPLE COLLECTION SYSTEM PERFORMANCE INDICATOR DATA COLLECTION FORM

Appendix A EXAMPLE COLLECTION SYSTEM PERFORMANCE INDICATOR DATA COLLECTION FORM Appendix A EXAMPLE COLLECTION SYSTEM PERFORMANCE INDICATOR DATA COLLECTION FORM EXAMPLE COLLECTION SYSTEM PERFORMANCE INDICATOR DATA COLLECTION FORM I. General Information A. Agency Name B. Agency Address

More information

Exploring the Direct Relationship Between Transients and Wire Breaks. February 9 2pm EST

Exploring the Direct Relationship Between Transients and Wire Breaks. February 9 2pm EST Exploring the Direct Relationship Between Transients and Wire Breaks February 9 2pm EST Do you have PCCP lines? Poll Question Poll Question Do you have a budget to repair or replace or do condition assessment

More information

Special Research Study. Comparison of Stormwater Pipe Installation Lengths and Costs in Texas: Frisco, Arlington, Austin, Victoria and Hidalgo County

Special Research Study. Comparison of Stormwater Pipe Installation Lengths and Costs in Texas: Frisco, Arlington, Austin, Victoria and Hidalgo County Special Research Study Comparison of Stormwater Pipe Installation Lengths and Costs in Texas: Frisco, Arlington, Austin, Victoria and Hidalgo County Client: American Chemistry Council BCC Research 49 Walnut

More information

3.0 DESIGN CRITERIA FOR SANITARY SEWER FACILITIES

3.0 DESIGN CRITERIA FOR SANITARY SEWER FACILITIES 3.0 DESIGN CRITERIA FOR SANITARY SEWER FACILITIES All sanitary sewers shall be designed in accordance with these Design Standards, LBWD Rules and Regulations, and to accepted engineering principles. In

More information

SANITARY SEWER OVERFLOWS AND THE TEXAS COMMISSION ON ENVIRONMENTAL

SANITARY SEWER OVERFLOWS AND THE TEXAS COMMISSION ON ENVIRONMENTAL SANITARY SEWER OVERFLOWS AND THE TEXAS COMMISSION ON ENVIRONMENTAL Greg Diehl DFW Region Office Wastewater Work Leader QUALITY OVERVIEW: The TCEQ s SSO Initiative What is it and how does it work? The data

More information

7. Allowable Fittings.

7. Allowable Fittings. 7. Allowable Fittings. a. General Requirements. 1) The fittings listed in this section are generally the allowable fittings for the design of DIP and PVC pipe. For steel pipe and fittings, see Part One,

More information

The Pipelines Regulations, 2000

The Pipelines Regulations, 2000 PIPELINES, 2000 P-12.1 REG 1 1 The Pipelines Regulations, 2000 being Chapter P-12.1 Reg 1 (effective April 1, 2000) as amended by the Statutes of Saskatchewan, 2014, c.21; and by Saskatchewan Regulations

More information

CITY OF TAMPA WASTEWATER DEPARTMENT TECHNICAL STANDARDS GUIDELINE. FOR CONSTRUCTION OF WASTEWATER FACILITIES July 2014 Version 6

CITY OF TAMPA WASTEWATER DEPARTMENT TECHNICAL STANDARDS GUIDELINE. FOR CONSTRUCTION OF WASTEWATER FACILITIES July 2014 Version 6 CITY OF TAMPA WASTEWATER DEPARTMENT TECHNICAL STANDARDS GUIDELINE FOR CONSTRUCTION OF WASTEWATER FACILITIES July 2014 Version 6 2545 Guy N Verger Boulevard, Tampa, FL 33605 www.tampagov.net TECHNICAL STANDARDS

More information

C. BOARD MEMBER REQUESTS & INFORMATIONAL ITEMS

C. BOARD MEMBER REQUESTS & INFORMATIONAL ITEMS NON-AGENDA May 5, 2017 Board Policy: EL-7 Communication and Support to the Board The BAOs shall inform and support the Board in its work. Page # A. NEWSLETTERS & BRIEFINGS 4 ACWA e-news: 05/03/17 B. CEO

More information

POLK COUNTY SOUTHEAST WELLFIELD DESCRIPTION OF PROJECT PLANNING LEVEL PROJECT DETAILS. (Water Supply Options project number 28)

POLK COUNTY SOUTHEAST WELLFIELD DESCRIPTION OF PROJECT PLANNING LEVEL PROJECT DETAILS. (Water Supply Options project number 28) POLK COUNTY SOUTHEAST WELLFIELD (Water Supply Options project number 28) DESCRIPTION OF PROJECT The proposed Polk County Southeast Wellfield project includes the construction of a new water treatment plant

More information

CITY OF PALM BEACH GARDENS CITY COUNCIL Agenda Cover Memorandum

CITY OF PALM BEACH GARDENS CITY COUNCIL Agenda Cover Memorandum CITY OF PALM BEACH GARDENS CITY COUNCIL Agenda Cover Memorandum Meeting Date: May 2, 2013 Resolution 33, 2013 Subject/Agenda Item: Contract Award to Stahlman-England Irrigation, Inc. to replace the irrigation

More information

Application for Underground Pipeline Crossing or Longitudinal of Railroad Property and or Track

Application for Underground Pipeline Crossing or Longitudinal of Railroad Property and or Track Wheeling and Lake Erie Railway Company Real Estate Department, 100 East First Street, Brewster, OH 44613 Application for Underground Pipeline Crossing or Longitudinal of Railroad Property and or Track

More information

TAMDID PIPES GRP MANHOLE BROCHURE

TAMDID PIPES GRP MANHOLE BROCHURE TAMDID PIPES GRP MANHOLE BROCHURE 1) Types & Description of Manholes: Tamdid Pipes offer two types of Manholes; Structural and Liner Manholes: a. Structural Manholes Tamdid Pipes offers concentric and

More information

EL PASO WATER - PUBLIC SERVICE BOARD REQUEST FOR SUBMITTALS RFS June 27, 2017

EL PASO WATER - PUBLIC SERVICE BOARD REQUEST FOR SUBMITTALS RFS June 27, 2017 EL PASO WATER - PUBLIC SERVICE BOARD REQUEST FOR SUBMITTALS RFS 21-17 June 27, 2017 TO: RE: Invited Firms Request for Submittals to El Paso Water - Public Service Board (EPWater) Statement of Work Professional

More information

Case Based Reasoning for Prestressed Concrete Cylinder Pipe Condition Assessment

Case Based Reasoning for Prestressed Concrete Cylinder Pipe Condition Assessment Case Based Reasoning for Prestressed Concrete Cylinder Pipe Condition Assessment Nada M. Elbouri and Saleh M. Amaitik Operation and Maintenance Department, Building Maintenance Section, Man Made River

More information

ASSET MANAGEMENT PROGRAM

ASSET MANAGEMENT PROGRAM ASSET MANAGEMENT PROGRAM July 2017 Orange Water and Sewer Authority Carrboro, North Carolina A public, non-profit agency providing water, sewer and reclaimed water services to the Carrboro-Chapel Hill

More information

Sliplining 36-in. PCCP with Fusible PVC - DC Water's Long-Term Control Plan 'Division E'

Sliplining 36-in. PCCP with Fusible PVC - DC Water's Long-Term Control Plan 'Division E' North American Society for Trenchless Technology (NASTT) NASTT s 2014 No-Dig Show Orlando, Florida April 13-17, 2014 Paper MA-T4-02 Sliplining 36-in. PCCP with Fusible PVC - DC Water's Long-Term Control

More information

AGENDA ITEM M6. DATE: August 3, 2015

AGENDA ITEM M6. DATE: August 3, 2015 AGENDA ITEM M6 DATE: TO: Matt Jordan, General Manager FROM: Alison Adams, Chief Technical Officer SUBJECT: Science and Technology Activity Report for June 2015 and July 2015 SUMMARY: The Science and Technology

More information

CITY OF CHINO HILLS. Request for Proposals (RFP) for On-Call and Emergency Repair Services Including Water and Sewer Systems

CITY OF CHINO HILLS. Request for Proposals (RFP) for On-Call and Emergency Repair Services Including Water and Sewer Systems CITY OF CHINO HILLS Request for Proposals (RFP) for On-Call and Emergency Repair Services Including Water and Sewer Systems February 18, 2016 Department: Public Works Proposal Due Date: March 17, 2016

More information

Saad Arfan, Great Man-Made River Authority Corrosion and Inspection Center Benghazi - Libya

Saad Arfan, Great Man-Made River Authority Corrosion and Inspection Center Benghazi - Libya Paper No. 09052 2009 EVALUATION OF A COAL TAR EPOXY COATING PERFORMANCE FOR PRESTRESSED CONCRETE CYLINDER PIPE OF THE GREAT MAN-MADE RIVER PROJECT (GMRP) PIPE LINES IN LIBYA Saad Arfan, Great Man-Made

More information

Pipe Grouting Longevity Effectiveness Evaluation

Pipe Grouting Longevity Effectiveness Evaluation North American Society for Trenchless Technology (NASTT) NASTT s 2014 No-Dig Show Orlando, Florida April 13-17, 2014 TM2-T4-04 Pipe Grouting Longevity Effectiveness Evaluation James W. Shelton. PE, ARCADIS,

More information

PipeLine. Increasing Sewer Capacity. January 2015, Issue 72

PipeLine. Increasing Sewer Capacity. January 2015, Issue 72 January 2015, Issue 72 PipeLine Contents 1 I Increasing Sewer Capacity 4 I HOBAS Pipe Chosen for Large Diameter Force Main 6 I 26 Year Old Force Main Still Performing Well 8 I HOBAS Pipe Expands Field

More information

SURFACE WATER UTILITY FEE

SURFACE WATER UTILITY FEE The Surface Water Utility Fee section of the FY2014 Budget Message provides background, impacts and actions associated with the County s prior and new surface water level of service in the unincorporated

More information

SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION

SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION 820-1 SCOPE OF WORK: SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION a. Furnish all labor, materials, equipment, and incidentals required for demolition and/or removal and disposal of existing

More information

CIPP Lateral Renewal Connection System

CIPP Lateral Renewal Connection System Product Submittal Document Information CIPP Lateral Renewal Connection System ManEntry Lapel Liner Updated 6/12/14 Product Submittal Review ITEM 1. Manufacturer Company Name: LMK Technologies, LLC Contact

More information

Special Research Study: Comparison of Water Main Pipeline Installation Lengths and Costs in Ohio. Client: American Chemistry Council

Special Research Study: Comparison of Water Main Pipeline Installation Lengths and Costs in Ohio. Client: American Chemistry Council Special Research Study: Comparison of Water Main Pipeline Installation Lengths and Costs in Ohio Client: American Chemistry Council BCC Research 49 Walnut Park Wellesley, Massachusetts USA February 25,

More information

An Update on Acoustic Emission Testing of PCCP. Will Worthington, P.E. Member ASCE 1

An Update on Acoustic Emission Testing of PCCP. Will Worthington, P.E. Member ASCE 1 From the Proceedings of the 1998 Pipeline Division Conference, American Society of Civil Engineers, San Diego, CA, August 23-37, 1998 I. Abstract An Update on Acoustic Emission Testing of PCCP by Will,

More information

FINAL ASSET MANAGEMENT PROGRAM March 2016

FINAL ASSET MANAGEMENT PROGRAM March 2016 FINAL ASSET MANAGEMENT PROGRAM March 2016 Orange Water and Sewer Authority Carrboro, North Carolina A public, non-profit agency providing water, sewer and reclaimed water services to the Carrboro-Chapel

More information

EXHIBIT A SCOPE OF SERVICES Districtwide Storm Sewer Inspection

EXHIBIT A SCOPE OF SERVICES Districtwide Storm Sewer Inspection EXHIBIT A SCOPE OF SERVICES Districtwide Storm Sewer Inspection 1.0 Objective: The Department desires to obtain services from the Vendor to inspect existing storm sewer systems. This includes the remote

More information

The Buried Pipeline Replacement Era: A Costeffectiveness Analysis of Pipeline Replacement Strategies for the Santa Clara Valley Water District

The Buried Pipeline Replacement Era: A Costeffectiveness Analysis of Pipeline Replacement Strategies for the Santa Clara Valley Water District San Jose State University SJSU ScholarWorks Master's Projects Master's Theses and Graduate Research Spring 2016 The Buried Pipeline Replacement Era: A Costeffectiveness Analysis of Pipeline Replacement

More information

Water Main Break Rates In the USA and Canada: A Comprehensive Study

Water Main Break Rates In the USA and Canada: A Comprehensive Study Utah State University DigitalCommons@USU Mechanical and Aerospace Engineering Faculty Publications Mechanical and Aerospace Engineering 3-1-2018 Water Main Break Rates In the USA and Canada: A Comprehensive

More information

GWINNETT COUNTY DEPARTMENT OF WATER RESOURCES

GWINNETT COUNTY DEPARTMENT OF WATER RESOURCES July 23, 2012 NOTICE OF PRE-QUALIFICATION OF CONTRACTORS FOR THE PRESTRESSED CONCRETE CYLINDER PIPE (PCCP) PRESSURIZED WATER MAINS 48 AND LARGER AND APPURTENANCES Gwinnett County is soliciting applications

More information

Cured-in-Place Pipe (CIPP) for Pressure Pipe. Presented by: Mike Moore

Cured-in-Place Pipe (CIPP) for Pressure Pipe. Presented by: Mike Moore Cured-in-Place Pipe (CIPP) for Pressure Pipe Presented by: Mike Moore CIPP Proven Technology Introduced over 45 years ago Most used trenchless technology for the rehabilitation of gravity flow pipeline

More information

OTEC 2017 Spray Applied Pipe Liner Supplemental Specifications 833 Calculations for the Resin Based Liner Presented by Peter Blais, PE

OTEC 2017 Spray Applied Pipe Liner Supplemental Specifications 833 Calculations for the Resin Based Liner Presented by Peter Blais, PE Innovative Solutions through Engineered Products OTEC 2017 Spray Applied Pipe Liner Supplemental Specifications 833 Calculations for the Resin Based Liner Presented by Peter Blais, PE HydraTech Engineered

More information

Ivins City Standard Specifications for Design and Construction Part 2 Engineering and Design Standards

Ivins City Standard Specifications for Design and Construction Part 2 Engineering and Design Standards 2.9. WATER SYSTEM DESIGN Ivins City Standard Specifications for Design and Construction All culinary water mains and appurtenances shall be designed to provide for adequate future service for all contiguous

More information

Material Specification for. Large Diameter Watermains

Material Specification for. Large Diameter Watermains Engineering & Construction Services Division Standard Specifications for Sewers and Watermains TS 7.80 November 2016 Large Diameter Watermains Table of Contents TS 7.80.01 SCOPE... 2 TS 7.80.01.01 Application...

More information

WATER RESOURCES - WATER SUPPLY

WATER RESOURCES - WATER SUPPLY EXECUTIVE SUMMARY Sacramento County Water Agency (SCWA) constructs water supply improvement projects to serve both newly developing areas and existing customers. This report summarizes those construction

More information

Springfield Water and Sewer Commission. Fiscal Year 2017 Budget and Capital Plan Public Hearing June 7, 2016

Springfield Water and Sewer Commission. Fiscal Year 2017 Budget and Capital Plan Public Hearing June 7, 2016 Springfield Water and Sewer Commission Fiscal Year 2017 Budget and Capital Plan Public Hearing June 7, 2016 Joshua Schimmel Executive Director Introduction Overview of System Presentation Summary Commission

More information

Eastern Sewershed Package IV Project Solicitation Number: CO Job No.: ADDENDUM 1 April 20, 2018

Eastern Sewershed Package IV Project Solicitation Number: CO Job No.: ADDENDUM 1 April 20, 2018 Eastern Sewershed Package IV Project Solicitation Number: CO-00149 Job No.: 17-4527 ADDENDUM 1 April 20, 2018 To Bidder of Record: This addendum, applicable to work referenced above, is an amendment to

More information

QuakeWrap, Inc. Pipe Repair October 2012

QuakeWrap, Inc. Pipe Repair October 2012 History Innovative Applications of Carbon FRP in Pipelines Mo Ehsani, Ph.D., P.E., S.E. President, PipeMedic, LLC and Professor Emeritus of Civil Engineering, Univ. of Arizona QuakeWrap, Inc. was founded

More information

DALLAS PROACTIVE PIPELINE ASSESSMENT PROGRAM SAVES MILLIONS OF GALLONS OF WATER AND PREVENTS CATASTROPHIC PIPELINE FAILURES

DALLAS PROACTIVE PIPELINE ASSESSMENT PROGRAM SAVES MILLIONS OF GALLONS OF WATER AND PREVENTS CATASTROPHIC PIPELINE FAILURES DALLAS PROACTIVE PIPELINE ASSESSMENT PROGRAM SAVES MILLIONS OF GALLONS OF WATER AND PREVENTS CATASTROPHIC PIPELINE FAILURES RANDY PAYTON, ASSISTANT DIRECTOR CITY OF DALLAS WATER UTILITIES OCTOBER 28, 2015

More information

1. Cast-in-place concrete is specified in Section

1. Cast-in-place concrete is specified in Section SECTION 03 38 00 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section describes the requirements for furnishing and installing post-tensioned slabs, jacks, jacking and anchors at Parking Structure, and record

More information

PIPE BURSTING GRAVITY SEWER MAINS WITH HDPE PIPE

PIPE BURSTING GRAVITY SEWER MAINS WITH HDPE PIPE PIPE BURSTING GRAVITY SEWER MAINS WITH HDPE PIPE SUGGESTED STANDARD SPECIFICATION January, 2012 Prepared by International Pipe Bursting Association Thanks to the following participants for the development

More information

CONTRACTOR PREQUALIFICATION APPLICATION

CONTRACTOR PREQUALIFICATION APPLICATION CONTRACTOR PREQUALIFICATION APPLICATION Revised 12/17/13 ATTACHMENTS TO APPLICATION IN ORDER TO COMPLETE YOUR APPLICATION, IT IS VERY IMPORTANT THAT THE FOLLOWING ATTACHMENTS BE PROVIDED WHEN YOU SUBMIT

More information

Special Research Study. Comparison of Water Pipe Installation Lengths and Costs in Michigan: Port Huron, Grand Rapids, Monroe, and Livonia

Special Research Study. Comparison of Water Pipe Installation Lengths and Costs in Michigan: Port Huron, Grand Rapids, Monroe, and Livonia Special Research Study Comparison of Water Pipe Installation Lengths and Costs in Michigan: Port Huron, Grand Rapids, Monroe, and Livonia Client: American Chemistry Council BCC Research 49 Walnut Park

More information

ATTACHMENT 4 OVERALL GOAL CALCULATION FOR CAR RENTALS FY

ATTACHMENT 4 OVERALL GOAL CALCULATION FOR CAR RENTALS FY ATTACHMENT 4 OVERALL GOAL CALCULATION FOR CAR RENTALS FY 2015-2017 I. Introduction In fulfillment of the requirements of 49 CFR Part 23, the Tampa International Airport (Airport), owned and operated by

More information

Site Utility Study. Prepared By: Rodolfo Ibarra, PE, PA SW 117 th Avenue Unit #3 Miami, Florida 33177

Site Utility Study. Prepared By: Rodolfo Ibarra, PE, PA SW 117 th Avenue Unit #3 Miami, Florida 33177 WEST BRICKELL CENTRE Major Use Special Permit 290 SW 10 th Street, 245 SW 11 th Street,240-270 SW 10 th Street, 251-253 SW 11 th Street, 255 SW 11 th Street, and 267 SW 11 th Street Site Utility Study

More information

INLINER LAY_InLiner Brochure_FA_ indd 1

INLINER LAY_InLiner Brochure_FA_ indd 1 INLINER LAY_InLiner Brochure_FA_010913.indd 1 Layne Inliner, LLC is the second largest cured-in-place pipe (CIPP) lining company in the United States. We began as the first U.S. licensee of the Inliner

More information

TECHNICAL PROCEDURE TABLE OF CONTENTS

TECHNICAL PROCEDURE TABLE OF CONTENTS TECHNICAL PROCEDURE No. Page DATE: 07/3/5 CATEGORY UNDERGROUND STRUCTURES SUBJECT OF SMUD s UNDERGROUND TRANSMISSION TABLE OF CONTENTS PURPOSE... 2 2 REFERENCES... 2 3 MINIMUM REQUIREMENTS... 2 4 RELATED

More information

Chapter 6: Regional Transportation

Chapter 6: Regional Transportation Chapter 6: Regional Transportation Continued growth and development throughout the region magnifies the significance of connections to surrounding counties as economic and social interactions continue

More information

Adopted Projects at Priority List Meeting August 9, 2017

Adopted Projects at Priority List Meeting August 9, 2017 Adopted Projects at Priority List Meeting August 9, 2017 Drinking Water State Revolving Fund Recipient Amount Project Big Bend Water $30,000 Planning for a water distribution system replacement project.

More information

Improved Inflow & Infiltration (I&I) Monitoring Program

Improved Inflow & Infiltration (I&I) Monitoring Program City of Abbotsford Improved Inflow & Infiltration (I&I) Monitoring Program Submission For 2009 UBCM Community Excellence Awards Best Practices City of Abbotsford Improved Inflow & Infiltration (I&I) Monitoring

More information

Wood Pole Restoration

Wood Pole Restoration Osmo-C-Truss 50th Anniversary 2015 marks the 50th anniversary of the Osmo-C-Truss wood pole restoration system. Installations of the CTruss and C2-TrussTM have restored over 1 million poles nationwide.

More information

PHASE I ERNEST MINE COMPLEX. The objective of the project was to develop an economically feasible, safe

PHASE I ERNEST MINE COMPLEX. The objective of the project was to develop an economically feasible, safe PHASE I ERNEST MINE COMPLEX Project Objectives The objective of the project was to develop an economically feasible, safe method of diverting all flows from the Ernest Mine Complex to a central discharge

More information

I. Project Overview and Limits. Project Goal

I. Project Overview and Limits. Project Goal Scope of Work and Deliverables for Subsurface Utility Engineering (SUE) for both Underground and Overhead Utilities on T.H. 10, and its Connecting Roads under S.P. 8001-40 I. Project Overview and Limits

More information

SECTION 4 - DESIGN STANDARDS FOR WATER DISTRIBUTION FACILITIES

SECTION 4 - DESIGN STANDARDS FOR WATER DISTRIBUTION FACILITIES SECTION 4 - DESIGN STANDARDS FOR WATER DISTRIBUTION FACILITIES 4.1 GENERAL REQUIREMENTS 4.1.1 Water and fire protection distribution facilities are to be provided solely for the purpose of supplying potable

More information

Virginia Walsh, PhD, P.G. Ed Rectenwald, P.G. February 25, 2016

Virginia Walsh, PhD, P.G. Ed Rectenwald, P.G. February 25, 2016 Miami-Dade Water & Sewer Department Nutrient Reduction by Use of Industrial Deep Injection Wells, Miami-Dade County, Florida Virginia Walsh, PhD, P.G. Ed Rectenwald, P.G. February 25, 2016 Miami-Dade Water

More information

SEPTIC VS. SEWER: A COST COMPARISON FOR COMMUNITIES IN SARASOTA COUNTY, FLORIDA

SEPTIC VS. SEWER: A COST COMPARISON FOR COMMUNITIES IN SARASOTA COUNTY, FLORIDA ABSTRACT SEPTIC VS. SEWER: A COST COMPARISON FOR COMMUNITIES IN SARASOTA COUNTY, FLORIDA Daniel G. Burden, Ph.D., P.E., and Damann L. Anderson, P.E. Hazen and Sawyer, P.C. Patrick Zoeller, P.E. Sarasota

More information

Wastewater Master Facility Report. (Project Name) (Project Basin Location)

Wastewater Master Facility Report. (Project Name) (Project Basin Location) Wastewater Master Facility Report For (Project Name) (Project Basin Location) The Wastewater Master Facility Report for (Project name) dated (Date); located in the (Basin Name) Basin has been completed

More information

Irrigation Rehabilitation Program Design and Construction Standards

Irrigation Rehabilitation Program Design and Construction Standards Irrigation Rehabilitation Program Design and Construction Standards Prepared by the IRP Standards Review Committee For Alberta Agriculture and Rural Development, Irrigation Secretariat April 26, 2010 Adopted

More information

The following definitions apply with regard to requirements specified in this document:

The following definitions apply with regard to requirements specified in this document: GUIDELINES FOR INSTALLATION OF TEMPORARY AND PERMANENT ABOVEGROUND DIESEL FUEL TANKS FOR EMERGENCY AND STANDBY POWER SYSTEMS LOCATED OUTSIDE OF BUILDINGS For Use by Unidocs Member Agencies or where approved

More information