Best Practices for Exceeding Project Goals and Reducing Risk on Construction Projects
|
|
- Rosalyn Matthews
- 6 years ago
- Views:
Transcription
1 Best Practices for Exceeding Project Goals and Reducing Risk on Construction Projects Presented by: Robyn Minter Smyers Alan S. Ritchie Heather A. Bartzi Erin Luke
2 Presentation Team Robyn Minter Smyers Partner, Thompson Hine Alan Ritchie Partner, Thompson Hine Heather Bartzi Partner, Thompson Hine Erin Luke Senior Associate, Thompson Hine
3 Beginning of Design and Construction Project Ideal Process Plenty of Time Ample Budget Project Goals Clearly Identified Competitive Selection of Designer and Constructor Abundant Information 3
4 But, IRL Starting Tomorrow Way Over Budget Unresponsive Proposals Scope of Project is a Moving Target Result: Do what you did for the last project with the same design and construction team. 4
5 What Happens? Late Completion Over-Budget Bad Fit, No Cooperation Among Team Disappointment Unhappy Stakeholders Basically 5
6
7 The Fix Effectively Plan the Project Early Align Goals and Address Project Risks and Challenges Select Appropriate Project Delivery Method Use Good RFP/RFQ for Selection of Designers and Constructors 7
8 Best Practices of Construction Projects: Front End Planning and Process We will discuss in this seminar: Review and prioritize critical project parameters Identify constraints that limit possible delivery options Review project delivery methodologies Compare options based upon stakeholder priorities Identify special tools to enhance project delivery success 8
9 Address Key Questions What are the critical project parameters? Absolute constraints that limit options? What is owner s need for control vs. shifting risk to designer and/or constructor? Type of project? (e.g., manufacturing, office building, infrastructure) Other concerns? (e.g., real estate, environmental, health & safety) 9
10 Roles & Responsibilities Of Stakeholders Management Profile: In-House Expertise & Resources Approach to Design Management Tolerance for Risk Relationship Network 10
11 Project Management The Problem Project delivery system often selected without objective analysis The way we always do it What the Architect/Engineer wanted The form the lawyer used LET S DO WHAT S NEW AND EXCITING!!! and not tailored to solve project specific issues. Can lead to project failure time, scope and cost 11
12 What is Project Delivery? Business and legal structure that identifies and aligns: Project Goals Project Requirements Project Processes Legal Structures Risk Mitigation 12
13 Legal Structure Quality Budget Changes Safety Process and Risk Management Schedule Aesthetics
14 Acceleration of Detail/Decisions into Design 14
15 Project Delivery Methodologies Multiple Prime Contracting Design-Bid-Build (General Contractor) Construction Management As Advisor Not utilized often At-Risk (As Constructor) Design-Build Bridging Design-Build Integrated Project Delivery 15
16 Design/Bid/Build (General Contractor) Approach A/E Owner Consultant Consultant Consultant P R I C E General Contractor Design Construction SUB SUB SUB 16
17 Construction Manager at Risk Approach A/E Owner Construction Manager Consultant Consultant Consultant P R I C E Design + Precon Construction SUB SUB SUB 17
18 Bridging Design/Build Approach Criteria A/E Owner Consultant Consultant Consultant Design/ Builder A/E SUB SUB SUB Consultant Consultant Consultant 18
19 Project Compensation Models Lump Sum, Stipulated Price Cost of the Work No GMP Cost of the Work with GMP Target Price 19
20 Basis of Design and Pricing Owner s Basis of Design Performance Requirements Design- Build Schematic or Design Development Documents Bridging Design- Build 35% to 95% Construction Documents Risk Complete Construction Documents General Contractor (D-B-B) 20
21 Lump Sum vs. GMP Approach Lump Sum Contract GMP Contract GMP Contingency Final Savings Lump Sum Cost of the Work Cost of the Work GCs Fee GCs Fee 21
22 Lump Sum vs. GMP Approach Lump Sum Contract GMP GMP Contract Contingency Final Loss Cost Cost of the Lump Sum of the Work Work GCs GCs Fee Fee 22
23 Target Pricing 23
24 Selection of Design and Construction Team Identify Goals Uses & Needs Budget & Contingency Schedule & Milestones What s Important What s Unique Set Team Facilities Finance Management Legal EHS Owner s Rep 24
25 Good Paperwork RFQ / RFP Uniform Requests = Uniform Submissions 25
26 Required Submissions Firm Profile Project Experience Insurance and Bonding Current Workload Litigation History Key Personnel / Staffing Financial Strength Agreement Comments References Pricing Proposal Approach / Method Value Add Ideas 26
27 Due Diligence Review Preliminary Research Firm Interviews Contact References Assemble Information Discuss and Evaluate Teamwork v. Price 27
28 Project Partnering Communication Protocols ID Key Stakeholders Address Concerns Collaboration Team Work Project Success! 28
29 Tools to Enhance Project Success Project Sponsorship/ Resources Project Delivery Facilitated GMP Process Contingency Management Insurance Review Dispute Resolution Issues 29
30
31 Yippee- Kai-Yay!
32 Questions? Robyn Minter Smyers Partner, Thompson Hine Alan Ritchie Partner, Thompson Hine Heather Bartzi Partner, Thompson Hine Erin Luke Senior Associate, Thompson Hine
33 This presentation may be reproduced, in whole or in part, with the prior permission of Thompson Hine LLP and acknowledgement of its source and copyright. This publication is intended to inform clients about legal matters of current interest. It is not intended as legal advice. Readers should not act upon the information contained in it without professional counsel. This document may be considered attorney advertising in some jurisdictions THOMPSON HINE LLP. ALL RIGHTS RESERVED. 33
AIA Contract Documents
AIA Contract Documents Contract Relationship Diagrams April 2017 Conventional (A201) Design-Bid-Build For use when the s project is divided into separate contracts for design () and construction (Contractor).
More informationLease-Leaseback Project Delivery Method
Lease-Leaseback Project Delivery Method ASBA Technical Meeting & Tradeshow Winter 2013 Presented by: Mark Baginski Principal Verde Design, Inc. James Moore V.P. of Pre-Construction Services Robert A. Bothman,
More informationRequest for Proposals for: Construction Management Services For The ADDISON PUBLIC LIBRARY INTERIOR RENOVATION
Request for Proposals for: Construction Management Services For The ADDISON PUBLIC LIBRARY INTERIOR RENOVATION May 19, 2015 The Addison Public Library invites you to submit a reply to this Request for
More informationConstruction Family of Documents
Construction Family of Documents The EJCDC Construction Family Documents (C-Series) is intended for engineered construction projects. The current edition (2013) is endorsed by both the Construction Specifications
More information2017 National Council of Architectural Registration Boards (NCARB) This document, effective August 2017, supersedes all previous editions of the ARE
ARE 5.0 Handbook 2017 National Council of Architectural Registration Boards (NCARB) This document, effective August 2017, supersedes all previous editions of the Handbook. Please check NCARB s website,
More informationA , Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum
A101 2007, Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum AIA Document A101 2007 is a standard form of agreement between owner and contractor for
More informationEJCDC Contract Documents for America s Infrastructure Buy online at
EJCDC Contract Documents for America s Infrastructure Buy online at www.booksforengineers.com N-122 Uniform Location of Subject Matter (2012) Published jointly with AIA and CSI. FREE DOWNLOAD Construction
More informationProgressive Design-Build
November 15,2016 Progressive Design-Build A Smart Alternative to Lease/Lease back? PRESENTERS Praful Kulkarni, AIA Rebekah Gladson, FAIA, DBIA Robynne T. Parkinson, JD, DBIA Presentation Outline Value
More informationConsensusDocs. Catalog. Updated Docs Inside
ConsensusDocs ConsensusDocs Contracts Catalog Updated Docs Inside ConsensusDocs Keeping You Ahead of the Cur ve ConsensusDocs... Building A Better Way! Whether working at the office, from the road or even
More informationConsensusDocs. ConsensusDocs CONTRACTS CATALOG. Updated Docs Inside. ou Ah. ead o f the Cur v. e K
CONTRACTS CATALOG Updated Docs Inside ou Ah ead o f the Cur v e gy epin e K ... BUILDING A BETTER WAY! Whether working at the office, from the road or even at home, the platform provides instant access
More informationSounds good. What could possibly go wrong? 5/6/2014. Potential Benefits of Design Build. Potential Downsides of Design Build
When Design Build Goes Wrong: Worst Practices to Avoid DBIA Edition for the O.N.E. Conference Blue Springs MO May 8, 2014 Dale Munhall, AIA Sounds good. What could possibly go wrong? Potential Benefits
More informationUNIVERSITY OF CALIFORNIA, SAN DIEGO
BERKELEY DAVIS IRVINE LOS ANGELES MERCED RIVERSIDE SAN DIEGO SAN FRANCISCO SANT A BARBARA SANT A CRUZ OFFICE OF THE ASSOCIATE VICE CHANCELLOR CAPITAL PROGRAM MANAGEMENT TEL: (858) 534-2177 FAX: (858) 534-4363
More informationStandard Form of Agreement Between Owner and Architect with Standard Form of Architect s Services
B-Series B- S E R I E S The documents in the B Series relate to various forms of agreement between an owner and an architect for professional services. B141 Standard Form of Agreement Between Owner and
More informationIntegrated Project Delivery (IPD) Across the Spectrum of Delivery Systems Who Owns/Controls the Risk? An Owner s Perspective
CMAA National Conference October 13, 2008 Integrated Project Delivery (IPD) Across the Spectrum of Delivery Systems Who Owns/Controls the Risk? An Owner s Perspective Date Presenters Howard W. Ashcraft,
More informationREQUEST FOR PROPOSALS FOR AN INTEGRATED PROJECT DELIVERY METHOD UTILIZING DESIGN/BUILD GUARANTEED MAXIMUM PRICE (GMP) SERVICES
REQUEST FOR PROPOSALS FOR AN INTEGRATED PROJECT DELIVERY METHOD UTILIZING DESIGN/BUILD GUARANTEED MAXIMUM PRICE (GMP) SERVICES Pueblo Urban Renewal Authority (PURA) Pueblo Convention Center Expansion &
More informationDesign Process 101. Michael Barnard, AIA, NCARB. animalsheltering.org/expo #AnimalCareExpo. Copyright
Design Process 101 Michael Barnard, AIA, NCARB animalsheltering.org/expo #AnimalCareExpo Copyright 1 Design and Construction Process Needs Assessment Conceptual Design Schematic Design Design Development
More informationConstruction Manager as Constructor (CMc) Manual
Construction Manager as Constructor (CMc) Manual Manual Courtesy of Purdue University Presented By Table of Contents 1.0 Executive Summary 2.1 House Bill 1196 2.2 Analysis of House Bill 1196 and Requirements
More informationWorking Effectively with Outside Counsel Checklist
View the online version at http://us.practicallaw.com/7-617-8668 Working Effectively with Outside Counsel Checklist PRACTICAL LAW This Checklist provides in-house counsel with general guidance on working
More informationStrategic Management and Project Selection
Strategic Management and Project Selection Strategic Management and Project Selection Maturity of Project Management Overview Criteria for PS Models Nature of PS Models Types of PS Models Uncertainty Analysis
More informationComparison of Conventional and Alternative Project Delivery Methods: What s in an Acronym? PNWS AWWA May, 2013
Comparison of Conventional and Alternative Project Delivery Methods: What s in an Acronym? PNWS AWWA May, 2013 Outline Alternative Delivery Options Oregon and Washington Legal Context Things an Owner Should
More informationContracting Methods and Risk Management
Contracting Methods and Risk Management In Tunneling and Underground Construction Michael S Schultz Senior Vice President CDM Smith Boston, Massachusetts September 12, 2016 Topics What is a Contract and
More informationAPPENDIX D Forms for Analytical Delivery Decision Approach (Tier 1)
APPENDIX D Forms for Analytical Delivery Decision Approach (Tier 1) The first tier in the systematic approach developed in this guidebook is the Analytical Delivery Decision Approach discussed in Chapter
More informationPLI s 8th Annual Patent Law Institute
PLI s 8th Annual Patent Law Institute Managing Patent Litigation Michelle Waites Senior Patent Counsel Xerox Corporation Focus on Efficiency Focus on Controlling Costs At the Start of the Case Thorough
More informationEmployment & Labour Law Practice
Employment & Labour Law Practice Experts in Employment Law ABSOLUTE SPECIALIZATION DEFINITIVE ADVICE POWERFUL LITIGATION Our Employment & Labour Law Practice has in-depth, genuine and proven expertise
More information2016 Architecture & Engineering
2016 Architecture & Engineering Market Outlook Survey The results are in... 1 Grassi & Co. and Zetlin & De Chiara LLP are pleased to announce the release of our 2016 Architecture & Engineering (A&E) Industry
More informationNew York State Contract Reporter NYS' official source of contracting opportunities Bringing business and government together
The New York State Contract Reporter NYS' official source of contracting opportunities Bringing business and government together This document printed Friday, 04/15/2016 Contracting Opportunity Title:
More informationFMD Project File Management Procedures
Issued: November 10, 2014 Revised: April 9, 2015 GUIDELINE: Applies to: All Planning, Project Management and Business Office Employees of the Facilities Management Department (FMD) PURPOSE: To establish
More informationQualifications Based Selection of Contractors
Qualifications Based Selection of Contractors AGC of America Project Delivery Committee QBS Working Group 1 Table of Contents QBS & The Industry: An Introduction Pages 3-4 Selection Criteria for QBS Page
More informationHelpful Hints for Creating Requests for Proposals:
Helpful Hints for Creating Requests for Proposals: Troy W. Miller, AIA, REFP Education Focus Leader Troy.Miller@LHBcorp.com Direct: 612.766.2819 Cell: 952.448.3357 Agenda 1. The Typical Request for Proposal
More informationTips For Managing The In-House And Outside Counsel Relationship. By David F. Johnson
Tips For Managing The In-House And Outside Counsel Relationship By David F. Johnson Introduction Corporate counsel owe duties to their clients to retain effective and cost-appropriate outside counsel.
More informationRisks Associated with Alternative Delivery Methods. Managing Expectations. Presented by Dan Becker, CCM, PMP, CCE
Risks Associated with Alternative Delivery Methods Managing Expectations Presented by Dan Becker, CCM, PMP, CCE 1 3 Primary Methods for Delivering Projects in WA and OR Design/Bid/Build Design/Build CM
More informationTrinity Well Field and Production Facilities Project Management Using CMAR
Trinity Well Field and Production Facilities Project Management Using CMAR Ian Taylor, P.E., PMP New Braunfels Utilities David Bennett, P.E. Freese and Nichols Kirby Anderson MGC Contractors February 27,
More informationFREQUENTLY ASKED QUESTION FOR VDOT DESIGN-BUILD PROJECTS. June 1, 2013
FREQUENTLY ASKED QUESTION FOR VDOT DESIGN-BUILD PROJECTS June 1, 2013 For general guidance the following information is provided as an aid to those preparing submittals in response to Design-Build solicitations.
More informationChoosing Delivery Method
Page 1 of 12 Advancing Professional Construction and Program Management Worldwide home contact us site map Search Find-A-CM/PM My Account Sign In Bookstore Career Center Home Choosing Delivery Method Choosing
More information1/4/2014. Alternative Project Delivery Methods 1. Agenda
Steven. C. Thweatt Assistant Vice Chancellor Facilities Management University of Colorado @ Boulder Steven.thweatt@colorado.edu Introduction Fun in the air More Fun in Chattanooga Licensed Architect Georgia
More informationEnergy Trading Risk Management (ETRM) System Selection and Implementation Top Challenges
Energy Trading Risk Management (ETRM) System Selection and Implementation Top Challenges May 27, 2014 Energy Trading Risk Management Challenges Agenda Agenda Speaker Introduction Overview of Energy Trading
More informationTwo Parts of our Discussion
Two Parts of our Discussion Part One: The basics (what, why, how, when, etc) An overview of process By no means comprehensive (not enough time) Part Two: From the trenches stuff Not contained in statute
More informationMentoring Plan Template In-House Lawyers
Mentoring Plan Template In-House Lawyers NOTE: If you wish to delete activities or to add activities not listed, simply confirm with CAMP or with your Sponsoring Program facilitator, especially if you
More informationFEMA PA Match Training
FEMA PA Match Training PROCUREMENT REQUIREMENTS USING CDBG-DR FUNDS Regulatory/Statutory Citations Selection Procedures - (2 CFR 200.319) Conflict of Interest - (2 CFR 200.318) Contract Administration
More informationOwner s Representative SCOPE OF SERVICES
Owner s Representative SCOPE OF SERVICES Scope of Services DeMaria s steady growth has enabled the construction of more sophisticated buildings through various methods and services. As your Owners Representative,
More informationPRIVACY 101 SETTING UP THE FUNCTION
PRIVACY 101 SETTING UP THE FUNCTION Evie Kyriakides, Mars, Incorporated Heather Egan Sussman, McDermott Will & Emery LLP Mac Macmillan, Hogan Lovells International LLP March 5, 2014 INTRODUCTION Making
More informationconstruction solutions asia pacific
construction solutions asia pacific The outlook of the construction industry within the Asia Pacific region remains strong, however pressures to successfully deliver projects against a backdrop of finite
More informationProgressive Design-Build
Progressive Design-Build Progressive Design-Build Design-Build Procured with a Progressive Design & Price A Design-Build Done RightTM Primer 1 Design-Build Progressive Design-build Design-Build Procured
More informationMetropolitan Washington Airports Authority. Request for Qualifications Information (RFQI) RFQI No C084. for
Request for Qualifications Information (RFQI) RFQI No. for Project Controls Task Contract for Project Support & Management at Washington Dulles International Airport and Ronald Reagan Washington National
More informationCONSTRUCTION MANAGEMENT
CONSTRUCTION MANAGEMENT Construction Management is not a new idea. The function of the Construction Manager is to work on behalf of the owner to complete a project within the plans and specifications provided.
More informationProject Agreements, Risk Management and Litigation Risk Sean Ralph, General Counsel, Sasol Canada Phil Scheibel, Partner, Rose LLP
Project Agreements, Risk Management and Litigation Risk Sean Ralph, General Counsel, Sasol Canada Phil Scheibel, Partner, Rose LLP Canadian Energy Law Foundation March 1, 2013 11:00 a.m. 12:00 p.m. Introduction
More informationREQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES NOT AT RISK FOR THE. St. Charles County Ambulance District
REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES NOT AT RISK FOR THE St. Charles County Ambulance District Base 3 & Training Facility Construction 4169 Old Mill Parkway St. Peters, MO 63376 September
More informationJob Description: Solicitor
Job Description: Solicitor Reporting to: Location: Responsible for: Head of Team Cambridge No direct reports Special Requirements: This post is office based but will involve out of office activity and
More informationFACILITIES CONFERENCE
FACILITIES CONFERENCE April 24-26, 2013 Construction Manager at Risk Lessons Learned Minnesota State Colleges and Universities The Minnesota State Colleges and Universities system is an Equal Opportunity
More information1913 Lausanne, Switzerland
FIDIC What is FIDIC? An international federation of consulting engineers, founded in 1913 with its headquarters located in Lausanne, Switzerland, whose objective is to promote the common interests of the
More informationLegal Project Management (LPM)
Legal Project Management (LPM) NGB Extra session 9 February 2017 Agenda Introduction LPM 15.45 16.30 Examples / common pitfalls 16.30 16.45 Break 16.45 17.00 Planning exercise and group discussion 17.00
More informationCouncil Agenda Report
Agenda Item #7 Council Agenda Report SUBJECT: REVIEW, DISCUSS AND PROVIDE STAFF WITH DATES TO SCORE PROPOSALS AND INTERVIEW ATTORNEY FIRMS MEETING DATE: December 16, 2010 RECOMMENDATION Staff recommends
More informationPOSITION NUMBER: LOCATION: Vancouver. DATE: January 2013
POSITION TITLE: Human Resources Consultant REGION: CLBC Headquarters CURRENT CLASSIFICATION LEVEL: Management SUPERVISOR POSITION NUMBER: POSITION NUMBER: LOCATION: Vancouver DATE: January 2013 SUPERVISOR
More informationChoosing a Project Delivery Method. A Design-Build Done Right Primer
Choosing a Project Delivery Method A Design-Build Done Right Primer DESIGN-BUILD DONE RIGHT PRIMER 1 Choosing a Project Delivery Method A DESIGN-BUILD DONE RIGHT PRIMER A DESIGN-BUILD INSTITUTE OF AMERICA
More informationMiddle East Delivering Expertise Since 1978
Middle East Delivering Expertise Since 1978 Global Construction Consultancy ABOUT US We have excelled at providing construction and engineering focused services since 1978. Our Project Management, Programming,
More informationPORTFOLIO OF SERVICES
Supporting gender equality in business leadership by providing startups that have women founders or women senior executives with greater access to the legal services and the networks needed to launch,
More informationMT. PLEASANT, MICHIGAN
THE CITY OF MT. PLEASANT, MICHIGAN CITY HALL 320 W. Broadway St. 48858-2312 (989) 779-5300 (989) 773-4691 fax PUBLIC SAFETY 804 E. High 48858-3595 (989) 779-5100 (989) 773-4020 fax PUBLIC WORKS 1303 N.
More informationRequest for Proposal For: 2018 American Bar Association Temporary Services
Table of Contents Bid Timetable [2] 1.0 General Bid Information [3] 2.0 Proposal Requirements [5] 3.0 Criteria for Selection [7] 4.0 Specifications and Work Statement [7] Appendix A: Bidder Response Sheet
More informationTHE KEY ELEMENTS OF QUANTITY SURVEYING WORK
THE KEY ELEMENTS OF QUANTITY SURVEYING WORK A Presentation to the Institution of Surveyors of Uganda by Tom Joseph Mukasa BSc, MSc, MRICS, ICIOB, AISU 2016 1. The following are key elements (divided into
More informationREQUEST FOR PROPOSAL (RFP) LEGAL SERVICES. Submission Date: November 28, :00 p.m.
COLTS NECK TOWNSHIP BOARD OF EDUCATION 70 CONOVER ROAD, COLTS NECK, NJ 07722 REQUEST FOR PROPOSAL (RFP) LEGAL SERVICES Submission Date: November 28, 2017 4:00 p.m. The Colts Neck Township School District
More informationVeterinarians Rely on Pacific Continental Bank
Veterinarians Rely on Pacific Continental Bank Just as veterinarians are committed to their patients welfare, Pacific Continental is committed to the financial health of veterinary clinics. We understand
More informationA DESIGN-BUILDER'S LOOK AT THE NEW AIA DESIGN-BUILD FAMILY OF DOCUMENTS
American Bar Association Forum on the Construction Industry A DESIGN-BUILDER'S LOOK AT THE NEW AIA DESIGN-BUILD FAMILY OF DOCUMENTS Matthew A. Gillies Stites & Harbison, PLLC 400 West Market Street, Suite
More informationjackson lewis Preventive Strategies and Positive Solutions for the Workplace Corporate Diversity Counseling ALL WE DO IS WORK
Corporate Diversity Counseling jackson lewis Preventive Strategies and Positive Solutions for the Workplace ALL WE DO IS WORK Attorneys in our Corporate Diversity Counseling practice bring to bear over
More informationICES Core Cost Engineering Competencies
CM CORE 1 Cost Engineering Commercial Management Core Competency Cost Engineering Specialism COMPETENCIES AND ASSESSMENT Financial and commercial processes in civil engineering January 2015 Technical Member
More informationExpression of Interest Guidelines. February Financial Services Page 1 of 8
February 2012 Financial Services Page 1 of 8 Financial Services EXPRESSION OF INTEREST GUIDELINES Responsible Position: Manager, Financial Operations Approved by: Chief Financial Officer Table of Contents
More informationIntegrated Project Delivery
2014 HDR Architecture, 2014 HDR, Inc., all all rights reserved. Integrated Project Delivery It s A New World, And How It Can Benefit Municipal Owners Rich Atoulikian, PMP, PE Rich.Atoulikian@hdrinc.com
More informationPROJECT PROCUREMENT MANAGEMENT. 1 Powered by POeT Solvers Limited
PROJECT PROCUREMENT MANAGEMENT 1 www.pmtutor.org Powered by POeT Solvers Limited CONDUCT PROCUREMENT PROCESSES BY PROCESS GROUP Planning Executing Monitoring and controlling Closing 12.1 12.2 12.3 12.4
More informationWelcome. Bill Gibson, President COLPM
Welcome Bill Gibson, President COLPM Welcome Ron Staudt, Chicago-Kent College of Law Scholarship Center for Access to Justice & Technology Center for Information, Society and Policy Center for Open Government
More information1997 Part 2. Document B141. Standard Form of Architect's Services: Design and Contract Administration TABLE OF ARTICLES
TM Document B141 Standard Form of Architect's Services: Design and Contract Administration 1997 Part 2 TABLE OF ARTICLES 2.1 PROJECT ADMINISTRATION SERVICES 2.2 SUPPORTING SERVICES 2.3 EVALUATION AND PLANNING
More informationREQUEST FOR QUALIFICATIONS CONSTRUCTION MANAGEMENT AT RISK SERVICES SUPPLEMENTAL INFORMATION PACKAGE
MASSACHUSETTS PORT AUTHORITY CAPITAL PROGRAMS DEPARTMENT SUITE 209S - LOGAN OFFICE CENTER ONE HARBORSIDE DRIVE EAST BOSTON, MASSACHUSETTS 02128-2909 REQUEST FOR QUALIFICATIONS CONSTRUCTION MANAGEMENT AT
More informationREQUEST FOR PROPOSAL
REQUEST FOR PROPOSAL DATE: February 24, 2015 Shimizu North America LLC 909 3rd Avenue, 28th Floor New York, NY 10022 RFP Queries (646) 205-4722 Fax (212) 223-1930 PROJECT: The Japan Foundation New York
More informationARCHITECTURAL / ENGINEERING SERVICES RFQ. North Sound Behavioral Health Organization
ARCHITECTURAL / ENGINEERING SERVICES RFQ North Sound Behavioral Health Organization ARCHITECTURAL/ENGINEERING RFQ TABLE OF CONTENTS SECTION 1.0 PROJECT DESCRIPTION... 3 Background Owner & Team Members
More informationContinuing Education Credits
Recent Developments in (IPD) for NECA Members October 14, 2013 9:00-9:50 AM Following this session, you will be able to: Explain the concept and structure of an IPD project. Identify the issues and risks
More informationCareers List Professional Careers in Construction
Careers List Professional Careers in Construction Architect Designs buildings, including the preparation of detailed construction drawings and specifications, and advises on their construction. May specialize
More informationClient Focused Results Driven
Client Focused Results Driven Accountants & consultants YOU CAN TRUST. ACM offers you a World Class Experience through our highly skilled team of passionate professionals, unique delivery model and global
More informationCoordination of Consultants
Coordination of Consultants Ontario Association of Architects Practice Tip PT.27 Version 1.0 May 21, 2012 2012 OAA, all rights reserved. Persons who are not members of the OAA must obtain written permission
More informationREQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR THE ROOF AND HVAC REPLACEMENT PROJECT PW1320
REQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR THE 2015 2016 ROOF AND HVAC REPLACEMENT PROJECT PW1320 Issued by: City of Stockton Public Works Department 22 E. Weber Avenue, Room 301 Stockton, CA 95202
More informationNeighborhood Community and Revitalization Program (NCR) Procurement, Contract, and Construction Standards
Subrecipient Administrative Training (SAT) Meeting McAfee Center, Fort Monmouth, NJ August 13, 2014 Neighborhood Community and Revitalization Program (NCR) Procurement, Contract, and Construction Standards
More informationDESIGN/BUILD GUARANTEED MAXIMUM PRICE (GMP) AGREEMENT (STATE FORM SC-9.0)
STATE OF COLORADO OFFICE OF THE STATE ARCHITECT STATE BUILDINGS PROGRAMS DESIGN/BUILD GUARANTEED MAIMUM PRICE (GMP) AGREEMENT (STATE FORM ) CONTRACT ID NUMBER: AGENCY IDENTIFICATION NUMBER: 2007-133P14-02
More informationRequest for Qualifications (Design-Build Contract) State of Ohio Standard Forms and Documents
Request for Qualifications (Design-Build Contract) State of Ohio Standard Forms and Documents Administration of Project: Local Higher Education Project Name Bishop Woods Landscape Restoration Response
More informationCommonwealth of Virginia
Commonwealth of Virginia Alternative Project Delivery Division April 2017 Virginia Department of Transportation TABLE OF CONTENTS INTRODUCTION... 2 1.0 DEFINITIONS... 3 2.0 PRELIMINARY PROJECT SELECTION...
More informationCONTRACT / CONSTRUCTION REQUIREMENTS FOR PUBLIC SCHOOLS PROJECTS. August 2005
CONTRACT / CONSTRUCTION REQUIREMENTS FOR PUBLIC SCHOOLS PROJECTS August 2005 Projects Requiring Licensed Architect / Engineer: *Project Cost Threshold New Construction or Additions $135,000 + Major Repairs
More informationFairfax County Government Construction Management At Risk (CMAR)
Fairfax County Government Construction Management At Risk (CMAR) Presented for: CMAA - Owner s Committee Presented by: Matt Doyle Branch Chief, Wastewater Design and Construction Division Department of
More informationConnecting Clients With Solutions. Navigant Consulting 2005 Annual Report
Connecting Clients With Solutions Navigant Consulting 2005 Annual Report Navigant Consulting Financial Highlights Navigant Consulting is an international Results of Operations 2003 2004 2005 consulting
More informationRequest for Qualifications (RFQ) #HM-R6-RFQ1 2018/2019 Highway Maintenance Agreements Prequalification RESPONSES TO RESPONDENT QUESTIONS SUMMARY #1
RESPONSES TO RESPONDENT QUESTIONS SUMMARY #1 NOMINATED WORK EXAMPLES Question 1.01: When providing Nominated Work Examples, is it permitted for the Respondent Team to use Nominated Work Examples specific
More information(pronounced krice'-son) (origin Ancient Greek κρείσσων, ον) (noun) stronger, i.e. greater advantage: better
(pronounced krice'-son) (origin Ancient Greek κρείσσων, ον) (noun) stronger, i.e. greater advantage: better ABOUT US Kreisson is a construction, engineering and property law firm based in Sydney. We act
More informationInvitation to Tender. External Audit Services. July 2015
External Audit Services July Contents 1. Important notices... 3 1.1. Confidentiality... 3 1.2. Accuracy of information and liability of SLH... 3 1.3. Canvassing... 4 1.4. Non-collusion... 4 1.5. Copyright...
More informationCONSTRUCTION INDUSTRY COUNCIL Technical Seminar on Construction Procurement Selection of Consultants 27 November 2015
CONSTRUCTION INDUSTRY COUNCIL Technical Seminar on Construction Procurement Selection of Consultants 27 November 2015 Background A Task Force established by CIC Comprising Government, Clients, Consultants,
More informationMetrics that Matter: A Law Firm Management Workshop
Metrics that Matter: A Law Firm Management Workshop Dr. Evan Parker, LawyerMetrix Steven R. Petrie, Faegre Baker Daniels Jill S. Weber, Stinson Leonard Street Agenda Case Study Overview (15 minutes) Small
More informationExtended Enterprise Risk Management
Extended Enterprise Risk Management Driving performance through the extended enterprise October 2015 A network within a network The Extended Enterprise is the concept that an organization does not operate
More informationVendor Selection: Identifying Effective Procedures & Strategies
Outsourcing Clinical Trials Canada 15 th November 2012 Vendor Selection: Identifying Effective Procedures & Strategies John S Andrews PhD President and CSO, NeurAxon Inc President, Ketogen Inc CSO, Talon
More informationSchulteRieSenkampff.
SchulteRiesenkampff. Company Profile Legal expertise, sector specific know-how and business savvy to meet your business objectives. Interlinked thinking, cooperation with different teams and personal advice,
More informationGETTING THE CLIENT RELATIONSHIP REVIEW MEETING RIGHT
GETTING THE CLIENT RELATIONSHIP REVIEW MEETING RIGHT We are often asked by clients how they can conduct effective client relationship review meetings. Getting this right is very important the feedback
More informationPresentation for the New York State Bar Association. Keith Emmer Startegix LLC
Presentation for the New York State Bar Association Keith Emmer Startegix LLC 212.920.9205 keith@startegix.com Lawyers and Public Relations Lawyers are a Great Fit for PR! U.S. Media Consumption How much
More informationDeveloping a Proper Franchise Program
AUTHOR: Michael H. Seid, Managing Director Developing a Proper Franchise Program Franchising represents an attractive means for many manufacturers, retailers, and service providers to expand their businesses.
More informationProject Delivery Method Selection Workshop
3 rd Avenue Bridge Rehabilitation, Minneapolis Project Delivery Method Selection Workshop Project Name: SP Project Workshop Date: 5/2/2017 Workshop Location: Water s Edge Room C Facilitator: Kevin Hagness
More informationContracting for Architectural and Engineering (A/E) Services Webinar. August 30, AM to 11:30 AM
Contracting for Architectural and Engineering (A/E) Services Webinar August 30, 2011 10 AM to 11:30 AM 1 Where We're Going Today Webinar Operation - Fred Ward 5 minutes (+/-) Topic Introduction - John
More informationTips for Hiring a Consultant. Why hire a consultant
Tips for Hiring a Consultant Why hire a consultant When your organization is faced with problems that won't go away, a consultant may be your answer. In the long run, you can save time and money by funding
More informationREQUEST FOR PROPOSAL
COLORADO HOUSING AND FINANCE AUTHORITY REQUEST FOR PROPOSAL (RFP) COLORADO HOUSING AND FINANCE AUTHORITY 1981 BLAKE STREET DENVER, CO 80202 REQUEST FOR PROPOSAL Technology Assessment POSTED: 11/17/2017
More informationTemplate for ToR for Transaction Advisory Services
Template for ToR for Transaction Advisory Services Addendum 1 Prepared by Genesis Analytics 4 December 2013 PPP TRANSACTION ADVISOR TERMS OF REFERENCE Terms of reference for transaction advisor services
More information