1 INSTALLATION STANDARD FOR CPVC SOLVENT CEMENTED HOT AND COLD WATER DISTRIBUTION SYSTEMS IAPMO IS SCOPE. 1.1 This standard shall govern the installation of CPVC piping (IPS pipe and SDR-11 tubing) in potable hot and cold water distributing systems within buildings. (For allowable locations and pressure, see Sections and 2.9.4) Installation, material and inspection shall comply with the current edition of the UPC [UPC] TM, published by the International Association of Plumbing and Mechanical Officials, and shall also comply with this standard. Note: The following sections of the Uniform Plumbing Code apply to CPVC IPS piping and SDR-11 tubing Inspections Minimum Standards Workmanship Prohibited Fittings and Practices Protection of Piping, Materials and Structures Hangers and Supports Plastic Pipe to Other Materials Chapter 6 Water Supply and Distribution Chapter 2* Definitions CPVC Chlorinated Poly (Vinyl Chloride) Pipe or tubing "Pipe" or "Piping" includes both pipe and piping, unless specified as "IPS Pipe" or "tubing". Table 14-1 Chlorinated Poly (Vinyl Chloride) (CPVC) Plastic Hot and Cold Water Distribution System ASTM D 2846 Chlorinated Poly (Vinyl Chloride) (CPVC) Plastic Pipe, Schedules 40 and 80 ASTM F 441 Socket Type Chlorinated Poly (Vinyl Chloride) (CPVC) Plastic Pipe Fittings Schedule 40 ASTM F 438 Socket Type Chlorinated Poly (Vinyl Chloride) (CPVC) Plastic Pipe Fittings Schedule 80 ASTM F 439 Solvent Cements for Chlorinated Poly (Vinyl Chloride) (CPVC) Plastic Pipe and Fittings ASTM F 493 ABBREVIATIONS ASTM American Society for Testing and Materials IAPMO International Association of Plumbing and Mechanical Officials UPC Uniform Plumbing Code published by IAPMO *The first three numbers refer to the corresponding section of the UPC. 1.2 Special Requirements for CPVC Installation within Residential Structures. [HCD 1] In addition to the other requirements in the California Plumbing Code and this Appendix for the installation of CPVC Solvent Cemented Hot and Cold Water Distributions Systems, all installations of CPVC pipe within residential structures shall meet the following: Flushing Procedures. All installations of CPVC pipe within residential structures shall be flushed twice over a period of at least one (1) week. The pipe system shall be first flushed for at least 10 minutes and then filled and allowed to stand for no less than 1 week, after which all the branches of the pipe system must be flushed long enough to fully empty the contained volume. At the time of fill, each fixture shall have a removable tag applied stating: This new plumbing system was first filled on (date) by (name). The California Department of Housing and Community Development requires that the system be flushed after standing at least one week after the fill date specified above. If the system is used earlier than one week after the fill date, the water must be allowed to run for at least two minutes prior to use for human consumption. This tag may not be removed prior to flushing, except by the homeowner Worker Safety Measures. Mechanical ventilation sufficient to maintain exposures below the relevant exposure limits established by state regulation shall be provided in enclosed spaces. This ventilation shall be directed at the breathing zone of the worker installing the pipe. Where mechanical ventilation is not practical, respirators, suitable for organic vapors, shall be used. For the purpose of this subdivision, an enclosed space is defined as: 2010 CALIFORNIA PLUMBING CODE 421

2 (a) A space less than 100 square feet of floor area under a ceiling with a height of 10 feet or less, and which does not have openings (consisting of doors, windows, or unfinished walls) on at least two sides; (b) Crawl spaces having a height of less than three feet; (c) Enclosed attics that have a roof and ceiling; or (d) Trenches having a depth greater than 24 inches. Installers of CPVC pipe withing residential structures shall use non-latex thin gauge (4 millimeters) nitrile gloves, or other gloves providing an equivalent or better degree of protection during the installation of the CPVC plumbing system. Gloves shall be provided to all workers by the contractor, or plumbing subcontractor, and shall be replaced upon contamination by cements. 2.0 PRODUCT REQUIREMENTS. 2.1 Minimum Standards Materials. Materials shall comply with the following: Materials ASTM Standard Raw Material-CPVC D 1784 IPS Pipe Sch. 40 ( 1 2 in., 3 4 in. and 1 in.) F 441 (12.7 mm, 19.1 mm, and 25.4 mm) Sch. 80 ( 1 2 in. 2 in.) F 441 (12.7 mm 51 mm) Tubing SDR 11 ( 1 2 in. thru 2 in.) D 2846 (12.7 mm 51mm) Fittings Sch. 40 ( 1 2 in., 3 4 in. & 1 in.) F 438 (12.7 mm, 19.1 mm, and 25.4 mm) Sch. 80 ( 1 2 in. 2 in.) F 439 (12.7 mm 51mm) Tube Fittings ( 1 2 in. 2 in.) D 2846 (12.7 mm 51 mm) Primer. Listed primers shall be used that are compatible with the type of listed CPVC cement and pipe used. The primer shall be a true solvent for CPVC, containing no slow drying ingredient. Cleaners shall not be allowed to be used as a substitute or equivalent for a listed primer. Exception: Listed solvent cements that do not require the use of primer shall be permitted for use with CPVC pipe and fittings, manufactured in accordance with ASTM D 2846, 1 2 inch through 2 inches in diameter. Note: Manufacturer shall provide test data from an independent testing laboratory acceptable to the Administrative Authority that their CPVC pipe, together with recommended fittings has a Short Term Working Pressure (STWP) and Temperature Rating of 150 psi (1030 kpa) at 210 F (99 C) for 48 hours or more Material. Pipe and fittings are plastic and are usually light gray for IPS pipe and fittings, and tan for SDR 11 tubing and fittings. 2.2 Markings Pipe and Tubing. IPS pipe and tubing markings shall be in accordance with ASTM F 441 or ASTM D [UPC ] Fittings. Fitting markings shall be in accordance with ASTM F 438 or ASTM F 439 or ASTM D [UPC ] Note: Standard number may be omitted on smaller fittings when marked thus with four raised dots Solvent Cement. Container labeling of CPVC solvent cement shall be in accordance with ASTM F Color. Solvent cements requiring the use of a primer shall be colored orange. Solvent cements that do not require the use of a primer shall be colored yellow Primer. Primer container markings shall be in accordance with ASTM F Color. Primer shall be colored so as to make its use obvious on a finished joint, but shall not be colored orange or yellow Position of Markings. Identification markings shall be visible for inspection without moving materials Alignment. Piping and fittings shall be aligned properly without strain. 2.3 Protection of Materials Abrasion. Pipe or tubing passing through drilled or notched metal studs or joists or hollow shell masonry walls shall be protected from abrasion due to thermal expansion and contraction by elastomeric or plastic sleeves or grommets or other approved means. Straight runs may have protection at maximum 3 feet (915 mm) intervals. [UPC 313.0] CALIFORNIA PLUMBING CODE

3 2.3.2 Puncture. Steel plate protection shall be installed when required by the Administrative Authority or Section of the Uniform Plumbing Code Storage and Handling. Pipe shall be stored in a way to protect it from mechanical damage (slitting, puncturing, etc.). It shall be stored under cover to keep it clean and avoid long term exposure to sunlight. Exposure to sunlight during normal construction periods is not harmful. CPVC solvent cements should be stored in a cool place except when actually in use on the job site. The solvent cement manufacturer s specific storage instruction should be followed Freezing. In areas where the system must be drained to protect it from freezing, horizontal lines shall be graded to drain Overheating: (a) Tubing shall not be positioned or closer to devices that generate heat such that the temperature around the CPVC tubing is greater than 180 F. (b) Do not apply direct flame onto CPVC. 2.4 Thermal Expansion General. Allowance for thermal expansion and contraction shall be provided by approved means. Allowance shall be based on an expansion rate of 3.5 inches (89 mm) per 100 feet (30,480 mm) of length of run per 100 F (38 C) temperature change. Note: Expansion rate is independent of the size of the pipe Offsets and Loops. Thermal expansion may be provided for by use of expansion loops, offsets, or changes of direction. From Table 1 determine the length "L" that is required. Note that "L" is based on length of run, diameter of pipe, and maximum temperature of water. 2.5 Clearance. Adequate clearance shall be provided between piping and structure (such as bored holes and sleeves) to allow for free longitudinal movement. 2.6 Hangers and Supports Vertical Piping. Vertical piping shall be supported at each floor or as specified by the design engineer to allow for expansion/contraction. Piping shall have a mid-story guide. [UPC 314.0] Horizontal Piping. Unless an engineered design is provided and approved by the Administrative Authority, the following provisions shall apply. Horizontal piping 1 inch (25.4 mm) or smaller shall be supported at maximum 3 foot (914 mm) intervals. Piping inch (32 mm) or larger shall be supported at maximum 4 foot (1219 mm) intervals Hangers and Anchors. Piping shall not be anchored rigidly to a support, but rather secured with smooth hangers or straps that provide for a degree of movement and that prevent damage to the pipe. Hangers or straps with sharp or abrasive edges shall not be used. Hangers that pinch the piping shall not be used. 2.7 Solvent Cement Joints SAFETY REQUIREMENTS AND PRE- CAUTIONS 1 (a) General. Solvents contained in CPVC plastic pipe cements are classified as airborne contaminants and flammable and combustible liquids. Precautions listed in this appendix should be followed to avoid injury to personnel and the hazard of fire. (b) Prolonged breathing of solvent vapors should be avoided. When pipe and fittings are being joined in partially enclosed areas, a ventilating device should be used in such a manner to minimize the entry of vapors into the breathing areas. (c) Solvent cements should be kept away from all sources of ignition, heat, sparks and open flame. (d) Containers for solvent cements should be kept tightly closed except when the cement is being used. (e) All rags and other materials used for mopping up spills should be kept in a safety waste receptacle which should be emptied daily. TABLE 1 DEVELOPED LENGTH "L" OF EXPANSION LOOPS NOMINAL SIZE LENGTH OF RUN IN FEET (mm) 20 (6096) 40 (12192) 60 (18288) 80 (24384) 100 (30480) Inches (mm) LOOP LENGTH "L" IN INCHES (mm) 1 2 (12.7) 22 (6706) 31 (9449) 38 (11582) 44 (13411) 50 (15240) 3 4 (19.1) 26 (7925) 37 (11278) 46 (14021) 52 (15850) 58 (17678) 1 (25.4) 30 (9144) 42 (12802) 52 (15850) 60 (18288) 67 (20422) (32) 33 (10058) 47 (14326) 57 (17374) 66 (39917) 74 (22555) (38) 36 (10973) 51 (15545) 62 (18898) 72 (21946) 80 (24384) 2 (51) 41 (12497) 58 (17678) 71 (21641) 82 (24994) 91 (27737) 2010 CALIFORNIA PLUMBING CODE 423

4 Example: Pipe Size 1/2 inch (12.7 mm) Length of Run 60 feet (18288 mm): (38") (965 mm) (from table). (f) Most of the solvents used in CPVC pipe cements can be considered eye irritants and contact with the eye should be avoided for it may cause eye injury. Proper eye protection and the use of chemical goggles or face shields are advisable where the possibility of splashing exists in handling solvent cements. In case of eye contact, flush with plenty of water for 15 minutes and call a physician immediately. (g) Repeated contact with the skin should be avoided. Proper gloves impervious to and unaffected by the solvents should be worn when frequent contact with the skin is likely. Application of the solvents or solvent cements with rags and bare hands is not recommended. Brushes and other suitable applicators can be used effectively for applying the solvent cement, thus avoiding skin contact. In the event of excessive contact, remove contaminated clothing and wash skin with soap and water Selection. Follow the manufacturer's recommendations for type of solvent cements for such conditions as temperatures over 100 F (38 C), or humidity over 60% Handling (to maintain effectiveness). Package solvent cement in containers no larger than 1 quart (1 liter). Keep solvent cement can closed and in the shade when not in use. Keep applicator submerged in solvent cement between applications. Discard solvent cement when it thickens appreciably or gels. Solvent cement shall not be thinned Primer. A listed primer in compliance with ASTM F 656 shall be used with CPVC solvent cements that require the use of a primer. CPVC solvent cements that do not require the use of a primer are permitted for joints up to 2 inches in size Size of Applicator. Applicator should be about one half the pipe diameter. Do not use small applicator on large pipes Procedures Step 1. Cut pipe square with hand saw and mitre box, mechanical cutoff saw or tube cutter designed for plastic. Step 2. Ream and chamfer pipe (to eliminate sharp edges, beads and all burrs). Step 3. Clean all dirt, moisture and grease from pipe and fitting socket. Use a clean, dry rag. Step 4. Check dry fit of pipe in fittings. Pipe should enter fitting socket 1 4 to 3 4 of socket depth. On larger sizes of Sch. 80 fittings, a looser fit may be expected. This is a normal condition, and requires care to apply an adequate amount of cement. Step 5. Apply CPVC primer, if required (See Section 2.7.4) to inside of fitting socket. Take care to avoid puddling. Step 6. Apply CPVC primer, if required to outside surface of pipe to depth of fitting socket. Step 7. When using solvent cements requiring a primer wait until primer surface is tacky. DO NOT attempt to soften (dissolve) the surface as is required for PVC. Step 8. Apply a liberal coat of CPVC solvent cement to the outside surface of the pipe to the depth of the fitting socket. Step 9. Apply a light coat of CPVC solvent cement to inside of fitting socket. Apply a second liberal coat of cement to the pipe end. Take particular care in cementing larger sizes of Sch. 80 fittings. Be sure all surfaces are coated. Step 10. While both the inside socket surface and the outside surface of the pipe are WET with solvent cement, forcefully 1 Appendix X1. Safety Requirements And Precautions, from ASTM D Solvent Cements for Poly (Vinyl Chloride) (PVC) Plastic Pipe and Fittings is reprinted with permission from the American Society for Testing and Materials, 1916 Race St., Philadelphia, PA 19103, copyright CALIFORNIA PLUMBING CODE

5 TEMPERA- TURE RANGE OF PIPE AND FITTINGS DUR- ING ASSEMBLY AND CURE F C bottom the pipe in the socket, giving the pipe a quarter turn while inserting, if possible. Step 11. Hold the joint together for 10 to 15 seconds to assure that the pipe remains bottomed against the pipe stop. Step 12. Do not disturb the joint for at least 30 minutes. Note: The joint is weak until the cement is dry. If the joint is adjusted after it is set, the joint will be ruined. See Table 2 for recommended set time. TABLE 2 JOINT CURE SCHEDULE MINIMUM JOINT SET TIME, HRS. (STEP 12) MINIMUM CURE TIME BEFORE TESTING, HRS. (STEP 14) PIPE SIZE in. ( mm) in. (32-51 mm) MINIMUM TIME BEFORE PUT- TING SYSTEM INTO SERVICE AT 80 PSI/160 F (71 C), HRS Step 13. Wipe excess cement from the pipe. A properly made joint will show a bead of cement around its entire perimeter. Any gaps may indicate insufficient cement. Step 14. The system shall not be pressurized until the joints have cured (set) at least as long as recommended by the manufacturer. If the manufacturer s recommendation is not available, the following cure times are required Prohibited Joints. Piping shall not be threaded. Female screwed fittings, with CPVC threads, shall be prohibited. Joints made with adhesives shall be prohibited Threaded Joints. When threads are required, molded male adapters shall be used Location. CPVC threaded joints shall be accessible Lubricants. Only thread tape or thread lubricant approved specifically for use with CPVC shall be used. Conventional pipe thread compounds, putty, linseed oil based products, and unknown mixtures are prohibited Tightening. Joints shall be tightened approximately turns past hand tight. CAUTION: Hand tight refers to the number of threads to reach hand tight with metal pipe. Small sizes of CPVC can be bottomed by hand pressure alone. DO NOT overtighten Special Joints Transition Joints. Transitions from CPVC tubing to metal piping and valves shall be made only with listed transition fittings suitable for that purpose. When required, the transition fittings shall be designed in such a manner that it can be anchored to a building member to prevent rotation. [UPC 316.2] Soldering. Soldered metal joints shall not be made closer than 18 inches (457 mm) to any already installed plastic to metal adapter in the same water line Hose Bibbs. Hose bibbs shall be connected only to metal system components which are adequately anchored to the building structure. The CPVC plastic system shall terminate in wall. 2.8 Pressure Relief Valves CPVC Piping. CPVC piping used for temperature and/or pressure relief valve drain lines shall be graded to the outlet end and shall be supported at 3 foot (914 mm) intervals both vertically and horizontally. 2.9 Installation, Inspection and Testing Finish Nipples. Finish nipples shall be connected to drop ear elbows or other fittings listed for preventing rotation. Finish nipples shall not be CPVC but CPVC stub outs for fixture connections shall be permitted. [UPC 609.0] Location. CPVC tubing shall not be installed so as to be subjected to direct sunlight after installation, and shall not be installed on the surface of the building unless it is protected by paint or a protective covering Water Heaters. There shall be a minimum of six (6) inches (152 mm) of metallic piping between a gas water heater connection and CPVC tubing. CPVC tubing may be installed downstream of instantaneous (coil or immersion) water heaters provided that the water heater temperature controls are maintained for maximum temperature of 180 F Under Slab. Pipe shall be installed in trench with uniform support. Trenches shall be backfilled to a depth of six (6) inches (152 mm) with clean earth, sand or other approved material which shall not contain sharp rocks, boulders, cinder fill or other materials which would damage or break the piping. Pipe shall be stubbed up and all ends shall be capped. The system shall be filled with water and all air shall be bled off. The system shall be pressure tested under a water pressure which is not less than the working pressure which is not less than the working pressure under which it is to be used for a minimum of two (2) hours. All leaks shall be corrected. Foam pipe insulation shall be installed on all stub ups to prevent damage during concrete pour and finishing CALIFORNIA PLUMBING CODE 425

6 2.9.5 Identification. A permanent sign with the legible words "This building has non-metallic interior water piping" shall be fastened on or inside the main electric service panel Position of Marking. When installed, piping and fittings shall be positioned so that when practical, identifying markings shall be readily visible for inspection Testing. Air testing is prohibited Sizing Method. Piping shall be sized in accordance with UPC Section When Appendix A is applicable, use Chart 1 or 2 as appropriate. Flow velocities shall be limited to a maximum of 8 feet per second (2.4 m/s). See Table 3. [UPC 610.1] PIPE SIZE PIPE GPM SCH. 40 TABLE 3 8 FEET PER SECOND PIPE GPM SCH. 80 TUBING GPM SDR 11 Ft.* FV** Ft.* FV** Ft.* FV** *Flush Tank Fixture Units **Flush Valve Fixture Units PIPE SIZE PIPE L/min. TABLE 3 (METRIC) 2.4 METERS PER SECOND SCH. 40 Ft.* FV** PIPE L/min. SCH. 80 Ft.* FV** TUBING L/min. SDR 11 Ft.* FV** *Flush Tank Fixture Units **Flush Valve Fixture Units ADOPTED: 1982 REVISED: 1984, 1985, 1989, 1990, 1991, 1992, 1993, 1995, 1996, 1997, 2000, 2003, 2005, CALIFORNIA PLUMBING CODE

7 CHART CALIFORNIA PLUMBING CODE 427

8 CHART CALIFORNIA PLUMBING CODE

9 CHART CALIFORNIA PLUMBING CODE 429

10 CPVC PIPE SDR 11 (ASTM D 2846) CALCULATED LOOP (OFFSET) LENGTHS WITH T OF APPROX. 80ºF LENGTH OF RUN IN FEET NOMINAL PIPE SIZE LOOP LENGTH ( ) IN INCHES '' '' '' '' '' '' Assume Modulus & Stress at 160 F CPVC PIPE SCHEDULE 80 (ASTM F 441) CALCULATED LOOP (OFFSET) LENGTHS WITH T OF APPROX. 80ºF LENGTH OF RUN IN FEET NOMINAL PIPE SIZE LOOP LENGTH ( ) IN INCHES '' '' '' '' '' '' Assume Modulus & Stress at 160 F CPVC PIPE SCHEDULE 11 (ASTM D 2846) CALCULATED LOOP (OFFSET) LENGTHS WITH T OF APPROX. 100ºF LENGTH OF RUN IN FEET NOMINAL PIPE SIZE LOOP LENGTH ( ) IN INCHES 1 2'' '' '' '' '' '' Assume Modulus & Stress at 160ºF = 3ED( L)/2S where = loop length in inches E = modulus of elasticity at maximum temperature, psi D = outside diameter of pipe, inches L = change in length due to change in temperature, inches S = working stress at maximum temperature, psi CALIFORNIA PLUMBING CODE

11 CPVC PIPE SCHEDULE 80 (ASTM F 441) CALCULATED LOOP (OFFSET) LENGTHS WITH T OF APPROX. 100ºF LENGTH OF RUN IN FEET NOMINAL PIPE SIZE LOOP LENGTH ( ) IN INCHES 2 1 2'' '' '' '' '' '' Assume Modulus & Stress at 160 F THERMAL EXPANSION (inches) LENGTH OF RUN (feet) T 80ºF T 100ºF L = L p X C X T where: L = change in length of pipe in inches L p = length of pipe in inches C = coefficient of thermal expansion for CPVC, 3.4 X 10-5 in/in/ºf T = change in temperature in ºF 2010 CALIFORNIA PLUMBING CODE 431

12 CALIFORNIA PLUMBING CODE

Installation Standard For PVC BUILDING DRAIN, WASTE AND VENT PIPE AND FITTINGS IAPMO IS

Installation Standard For PVC BUILDING DRAIN, WASTE AND VENT PIPE AND FITTINGS IAPMO IS Installation Standard For PVC BUILDING DRAIN, WASTE AND VENT PIPE AND FITTINGS IAPMO IS 9-20036 1.0 SCOPE 1.1 This installation standard shall apply to PVC building drain, waste, and vent systems as governed

More information

INSTALLATION STANDARD FOR PVC COLD WATER BUILDING SUPPLY AND YARD PIPING IAPMO IS

INSTALLATION STANDARD FOR PVC COLD WATER BUILDING SUPPLY AND YARD PIPING IAPMO IS INSTALLATION STANDARD FOR PVC COLD WATER BUILDING SUPPLY AND YARD PIPING IAPMO IS 8-2006.0 Scope.. This standard shall govern the installation of PVC piping (with solvent cemented or elastomeric gasketed

More information

INSTALLATION STANDARD FOR ABS BUILDING DRAIN, WASTE, AND VENT PIPE AND FITTINGS IAPMO IS

INSTALLATION STANDARD FOR ABS BUILDING DRAIN, WASTE, AND VENT PIPE AND FITTINGS IAPMO IS INSTALLATION STANDARD FOR ABS BUILDING DRAIN, WASTE, AND VENT PIPE AND FITTINGS IAPMO IS 5-2006 1.0 Scope. 1.1 This installation standard shall apply to ABS building drain, waste and vent systems as governed

More information

SECTION PLUMBING PIPING SYSTEMS

SECTION PLUMBING PIPING SYSTEMS SECTION 15300 PLUMBING PIPING SYSTEMS PART 1 - GENERAL 1.01 SPECIAL NOTICE A. Each contractor shall read all relevant documents, become familiar with the job, the scope of work, type of general construction,

More information

SOLVENT CEMENT WELDING

SOLVENT CEMENT WELDING PRESENTS... SOLVENT CEMENT WELDING & PLASTIC PIPE and FITTINGS 1 READ THIS BOOK AND FOLLOW DIRECTIONS ON CANS Even if you have installed PVC or CPVC pipe and fittings before! 2 ASSEMBLE MATERIALS NEEDED

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 22 1316 - SANITARY WASTE AND VENT PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01

More information

Engineering Specifications

Engineering Specifications PROPRESS WITH SMART CONNECT FEATURE PART 1: GENERAL 1.1 SUMMARY A. Copper Tubing and Fitting System for Hot and Cold Water Distribution Systems, Sprinkler and Standpipe Systems and Hydronic Piping Systems

More information

PVC CEMENTS PRIMER 8155 CLEANER 7120

PVC CEMENTS PRIMER 8155 CLEANER 7120 PVC CEMENTS 75 76 77 78 726 730 PRIMER 855 CLEANER 720 75 PVC CEMENT Regular Bodied - Clear Weld-All 75 for PVC is a clear, regular bodied, high strength, fast setting PVC solvent cement for all classes

More information

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 22 PLUMBING

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 22 PLUMBING SECTION 221316 - SANITARY WASTE AND VENT PIPING PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following soil and waste, sanitary drainage and vent piping inside the building: 1. Pipe, tube,

More information

FIVE STAR PRODUCTS, INC. (800)

FIVE STAR PRODUCTS, INC.  (800) FIVE STAR PRODUCTS, INC. www.fivestarproducts.com (800) 243-2206 Page 1 of 11 DESIGN-A-SPEC GUIDELINES FIVE STAR RS ANCHOR GEL CONTENTS PART A - GENERAL CONDITIONS PART B - MATERIAL SPECIFICATIONS PART

More information

Double Containment DESIGN & INSTALLATION GUIDE TECHNICAL INFORMATION. Visit our web site

Double Containment DESIGN & INSTALLATION GUIDE TECHNICAL INFORMATION. Visit our web site Double DESIGN & INSTALLATION GUIDE TECHNICAL INFORMATION Visit our web site www.spearsmfg.com 1326 The information contained in this publication is based on current information and Product design at the

More information

TYPICAL INSTALLATION INSTRUCTIONS

TYPICAL INSTALLATION INSTRUCTIONS TYPICAL INSTALLATION INSTRUCTIONS Environment One Grinder Pump Feature Identification 1. Grinder Pump Basin High density polyethylene (HDPE) 2. Accessway Cover Painted Steel 3. Electrical Quick Disconnect

More information

CONDUITS AND FITTINGS

CONDUITS AND FITTINGS CONDUIT AND FITTINGS Rigid Steel Conduit 3801 Rigid PVC Conduit 3803 HDPE Conduit 3803 Flexible Non Metallic Liquid Tight Conduit Type LFNC-B 3804 PVC Coated Urethane Lined Galvanized Rigid Steel Conduit

More information

Solvent Welding Guide PVC, CPVC AND ABS PIPE & FITTINGS. We build tough products for tough environments IPEX CEMENTS, PRIMERS & APPLICATORS

Solvent Welding Guide PVC, CPVC AND ABS PIPE & FITTINGS. We build tough products for tough environments IPEX CEMENTS, PRIMERS & APPLICATORS Solvent Welding Guide IPEX CEMENTS, PRIMERS & APPLICATORS PVC, CPVC AND ABS PIPE & FITTINGS We build tough products for tough environments IPEX Solvent Welding Guide TABLE OF CONTENTS Guide to Solvent

More information

INSTALLATION HANDBOOK: Cross-linked Polyethylene (PEX) Hot and Cold Water-Distribution Systems

INSTALLATION HANDBOOK: Cross-linked Polyethylene (PEX) Hot and Cold Water-Distribution Systems IMPORTANT NOTICE The information in this manual was gathered from publicly available sources, including reports of tests conducted by various independent entities under the test conditions specified in

More information

Daytona Beach Pier Building Renovation Jun 2010

Daytona Beach Pier Building Renovation Jun 2010 SECTION 15150 - SANITARY WASTE AND VENT PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

STEP UP SHOWER BASE INSTALLATION GUIDE FOR TIMBER AND CONCRETE FLOORS

STEP UP SHOWER BASE INSTALLATION GUIDE FOR TIMBER AND CONCRETE FLOORS GUIDE FOR TIMBER AND CONCRETE FLOORS EDITION: APRIL 2016 IMPORTANT: This guide is for the installation of a Step Up shower base on a timber or concrete floor. If you require a walk in (flush with floor)

More information

DIVISION 15-MECHANICAL SECTION SUPPORTS AND ANCHORS PN PART 1 - GENERAL 1.01 SECTION INCLUDES. A. Pipe and equipment support systems.

DIVISION 15-MECHANICAL SECTION SUPPORTS AND ANCHORS PN PART 1 - GENERAL 1.01 SECTION INCLUDES. A. Pipe and equipment support systems. PART 1 - GENERAL 1.01 SECTION INCLUDES A. Pipe and equipment support systems. B. Inserts. 1.02 RELATED SECTIONS A. Section 15890 - Ductwork Supports. 1.03 DEFINITIONS A. Supports: Attachments, hangers,

More information

A. This Section includes sanitary waste and vent piping inside the building and to locations indicated.

A. This Section includes sanitary waste and vent piping inside the building and to locations indicated. SECTION 221316 SANITARY WASTE AND VENT PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

Submittal for Aquatherm Piping System

Submittal for Aquatherm Piping System Submittal for Aquatherm Piping System Project Name: Project Location: Date: To whom it may concern, We are proposing to upgrade the piping parts on the above project to the polypropylene Aquatherm Green

More information

1 AND 2 FAMILY DWELLING REQUIREMENTS

1 AND 2 FAMILY DWELLING REQUIREMENTS PLAN REQUIREMENTS: 1 AND 2 FAMILY DWELLING REQUIREMENTS All residential plans including additions and attached garages shall be designed to the current edition of the International Residential Code. Plans

More information

This section includes materials and installation of ductile-iron pipe and fittings for potable and recycled water systems.

This section includes materials and installation of ductile-iron pipe and fittings for potable and recycled water systems. NORTH MARIN WATER DISTRICT STANDARD SPECIFICATIONS SECTION 15056 DUCTILE-IRON PIPE AND FITTINGS PART 1 GENERAL 1.01 DESCRIPTION This section includes materials and installation of ductile-iron pipe and

More information

SERVICE LINES, METERS AND APPURTENANCES

SERVICE LINES, METERS AND APPURTENANCES AUGUST02 SECTION 02646 SERVICE LINES, METERS AND APPURTENANCES PART 1 - GENERAL 1.1 DESCRIPTION A. This section concerns materials and installation of corporation stops, curb stops, service lines, meters,

More information

Chapter 3: General Regulations

Chapter 3: General Regulations Chapter 3: General Regulations General Comments The content of Chapter 3 is often referred to as miscellaneous, rather than general regulations. Chapter 3 received that label because it is the only chapter

More information

EVALUATION SUBJECT: TEEL BQ POLYPROPYLENE (PP-RCT) PIPING SYSTEM

EVALUATION SUBJECT: TEEL BQ POLYPROPYLENE (PP-RCT) PIPING SYSTEM ICC-ES Report PMG-1452 Issued 01/2018 This report is subject to renewal 01/2019 EVALUATION SUBJECT: TEEL BQ POLYPROPYLENE (PP-RCT) PIPING SYSTEM DIVISION: 22 00 00 PLUMBING SECTION: 22 11 00 FACILITY WATER

More information

INSTALLATION MANUAL. METAL INSULATED PANELS -ROXUL -Expanded Polystyrene

INSTALLATION MANUAL. METAL INSULATED PANELS -ROXUL -Expanded Polystyrene INSTALLATION MANUAL METAL INSULATED PANELS -ROXUL -Expanded Polystyrene Insulated Metal Panels London Eco-Metal Manufacturing Inc. **Also see Eco-Metal s Handling Manual** These instructions are provided

More information

ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS

ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS 701-1 DESCRIPTION 701-1.1 This item shall consist of the construction of pipe culverts, and storm drains, removal of existing storm pipes, connections to existing

More information

Valance Installation. For Units with Beam Style Coils

Valance Installation. For Units with Beam Style Coils Valance Installation For Units with Beam Style Coils 1. Before installation of valance units, determine if drapes are to be used, or if any wall construction will protrude into room. If either drapes or

More information

SIDER-POOL. Product Data. Features and Uses

SIDER-POOL. Product Data. Features and Uses 153 Regur Road Hawkinsville, GA 31036 USA 1.478.892.9800 888-743-3750 sales@sider-crete.com www.sider-crete.com Product Data Features and Uses A true cement-based plaster No-check cracking and no-brushing

More information

EVERHOT INC. Everhot PEX Tubing for Potable Water Applications & Radiant Floor Heating

EVERHOT INC. Everhot PEX Tubing for Potable Water Applications & Radiant Floor Heating Everhot PEX Tubing for Potable Water Applications & Radiant Floor Heating Manual Contents Contents page 2 Overview page 3 Products page 3 Applications page 4 Standards page 4 Listings & Approvals page

More information

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PIPE HANGERS, Section PIPE HANGERS, SUPPORTS, AND RESTRAINTS

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PIPE HANGERS, Section PIPE HANGERS, SUPPORTS, AND RESTRAINTS PART 1 GENERAL 1.01 SUMMARY Section 15140 PIPE HANGERS, This Section includes the furnishing and subsequent installation of: A. Pipe and equipment hangers, supports, and associated anchors B. Equipment

More information

Design & Construction Standards, Revised January

Design & Construction Standards, Revised January PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

2003 International Residential Code ELECTRICAL PROVISIONS ONLY October 2005 EDITORIAL CHANGES SEVENTH PRINTING

2003 International Residential Code ELECTRICAL PROVISIONS ONLY October 2005 EDITORIAL CHANGES SEVENTH PRINTING 2003 International Residential Code ELECTRICAL PROVISIONS ONLY October 2005 EDITORIAL CHANGES SEVENTH PRINTING E3305.3: now reads The space equal to the width and depth of the panelboard and extending

More information

Thermasheath-XP. Insulation for Exposed Use

Thermasheath-XP. Insulation for Exposed Use Insulation for Exposed Use PRODUCT DESCRIPTION Rmax Thermasheath-XP is an energy-efficient thermal insulation board composed of a closed-cell polyisocyanurate (Polyiso) foam bonded to durable, embossed

More information

ARCHITECTURAL GUIDE SPECIFICATIONS - DESCRIPTIVE

ARCHITECTURAL GUIDE SPECIFICATIONS - DESCRIPTIVE ARCHITECTURAL GUIDE SPECIFICATIONS - DESCRIPTIVE MANNINGTON COLORFIELDS SHEET RUBBER FLOORING Section 09 65 16 Sheet rubber Flooring (Thermoset Rubber) Created May 2012 Mannington Mills, Inc. P. O. Box

More information

CHAPTER 11 CONDUITS AND FITTINGS

CHAPTER 11 CONDUITS AND FITTINGS CONDUITS AND FITTINGS CHAPTER 11 CONDUITS AND FITTINGS The standards and requirements for conduits and fittings used for traffic control signal and lighting systems are presented in this chapter. 11.1

More information

Product Information CHEMGLAZE B 9942 A/B. Coating for Casting Pits. Easy Application Chemglaze B 9942 A/B will bond to damp and wet surfaces.

Product Information CHEMGLAZE B 9942 A/B. Coating for Casting Pits. Easy Application Chemglaze B 9942 A/B will bond to damp and wet surfaces. Product Information Chemical Products Division CHEMGLAZE B 9942 A/B Coating for Casting Pits. FEATURES BENEFITS. Easy Application Chemglaze B 9942 A/B will bond to damp and wet surfaces. Will build to

More information

POLYMER CONCRETE 100 EPOXY POLYMER CONCRETE DILUTE ACIDS RESISTANCE

POLYMER CONCRETE 100 EPOXY POLYMER CONCRETE DILUTE ACIDS RESISTANCE RECOMMENDED APPLICATIONS Polymer Concrete 100 is a three-component, epoxy polymer concrete used for the construction of chemical resistant floors, pads, curbing, trenches and sumps. Polymer Concrete 100

More information

EVALUATION SUBJECT: NIRON POLYPROPYLENE (PP-RCT) PIPING SYSTEM DIVISION: PLUMBING SECTION: DOMESTIC WATER PIPING

EVALUATION SUBJECT: NIRON POLYPROPYLENE (PP-RCT) PIPING SYSTEM DIVISION: PLUMBING SECTION: DOMESTIC WATER PIPING ICC-ES Report PMG-1244 Reissued 04/2017 This report is subject to renewal 04/2018 EVALUATION SUBJECT: NIRON POLYPROPYLENE (PP-RCT) PIPING SYSTEM DIVISION: 22 00 00 PLUMBING SECTION: 22 11 16 DOMESTIC WATER

More information

WIRING METHODS CHAPTER 38

WIRING METHODS CHAPTER 38 CHAPTER 38 WIRING METHODS SECTION E3801 GENERAL REQUIREMENTS E3801.1 Scope. This chapter covers the wiring methods for services, feeders and branch circuits for electrical power and distribution. E3801.2

More information

GGI-750. Gravity Grease Interceptor Technical Data. Submittal Special Precautions Specifications Installation

GGI-750. Gravity Grease Interceptor Technical Data. Submittal Special Precautions Specifications Installation Gravity Grease Technical Data Submittal Special Precautions Specifications Installation 75" 81" (205.7 (94.0 cm) 19½" 20" (50.8 (49.5 cm) 21½" 20" (50.8 (54.6 cm) 76½" (194.3 cm) 56½" 57" (144.8 (143.5

More information

Section Domestic Water Piping (Hot and Cold Water Potable Water Distribution)

Section Domestic Water Piping (Hot and Cold Water Potable Water Distribution) Domestic Water Piping 22 11 16 Uponor, Inc. 5925 148th Street West Apple Valley, MN 55124 Toll Free: (800) 321-4739 Phone: (952) 891-2000 Fax: (952) 891-2008 www.uponor-usa.com This specification is a

More information

SECTION RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection

SECTION RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection SECTION 13090 RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection Prepared by: 90 Dayton Avenue, Unit 4B, Suite 13 Passaic, NJ 07055 (973) 574-9077 13090-1 LOW INTENSITY RADIATION PROTECTION

More information

Installation Methods for IPEX System 636 Type BH Class IIA (PVC) and Class IIB (CPVC) Gas Venting Systems

Installation Methods for IPEX System 636 Type BH Class IIA (PVC) and Class IIB (CPVC) Gas Venting Systems Installation Methods for IPEX System 636 Type BH Class IIA (PVC) and Class IIB (CPVC) Gas Venting Systems A. Examine all components for possible shipping damage prior to installation. B. Proper joint construction

More information

B. American Society for Testing and Materials: 1. ASTM F708 - Standard Practice for Design and Installation of Rigid Pipe Hangers.

B. American Society for Testing and Materials: 1. ASTM F708 - Standard Practice for Design and Installation of Rigid Pipe Hangers. SECTION 230529 - HANGERS AND SUPPORTS PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Pipe hangers and supports. 2. Hanger rods. 3. Inserts. 4. Flashing. 5. Sleeves. 6. Mechanical sleeve seals. 7. Firestopping

More information

FS-DUO. Wastewater Flow Distributor Technical Data. Submittal Special Precautions Specifications Installation. (62.2 cm) (62.2 cm)

FS-DUO. Wastewater Flow Distributor Technical Data. Submittal Special Precautions Specifications Installation. (62.2 cm) (62.2 cm) Wastewater Flow Distributor Technical Data Submittal Special Precautions Specifications Installation 24½" (62.2 cm) 12½" (31.8 cm) 24½" (62.2 cm) (30.5 cm) SUBMITTAL STANDARD: 4" plain end inlet/outlet

More information

SECTION POLYVINYL CHLORIDE (PVC) WATERLINE

SECTION POLYVINYL CHLORIDE (PVC) WATERLINE SECTION 02632 POLYVINYL CHLORIDE (PVC) WATERLINE PART 1 - GENERAL 1.01 SCOPE OF WORK A. Furnish all labor, materials, equipment, and incidentals required, and install polyvinyl chloride (PVC) waterline,

More information

DIVISION 7 THERMAL AND MOISTURE PROTECTION SECTION PENETRATION FIRESTOPPING

DIVISION 7 THERMAL AND MOISTURE PROTECTION SECTION PENETRATION FIRESTOPPING DIVISION 7 THERMAL AND MOISTURE PROTECTION SECTION 07 84 13 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

More information

SECTION ACOUSTICAL PANEL CEILINGS

SECTION ACOUSTICAL PANEL CEILINGS SECTION 095113 ACOUSTICAL PANEL CEILINGS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and General Provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

GigaCrete Specification PlasterMax. PlasterMax : Fire Rated Plaster for Direct Application over Cement Masonry Units (CMU) Interior Walls

GigaCrete Specification PlasterMax. PlasterMax : Fire Rated Plaster for Direct Application over Cement Masonry Units (CMU) Interior Walls GigaCrete Inc. 6775 Speedway Blvd. Suite M105 Las Vegas, NV 89115 Ph (702) 643-6363 Fax (702) 643 1453 www.gigacrete.com GigaCrete Specification PlasterMax PlasterMax : Fire Rated Plaster for Direct Application

More information

Specifications Electrical Metallic Tubing (EMT)

Specifications Electrical Metallic Tubing (EMT) T& Fittings Specifications Electrical Metallic Tubing (EMT) Ref. CEC Rule 12-000 not exceeding 750 Volts Electrical Metallic Tubing (EMT) is similar to rigid steel conduit but is much lighter, weighing

More information

Amendment to OPSS 493 (Nov 2015) Construction Specification for Temporary Potable Water Supply Services

Amendment to OPSS 493 (Nov 2015) Construction Specification for Temporary Potable Water Supply Services Engineering & Construction Services Division Standard Specifications for Sewers and Watermains TS 493 September 2017 Amendment to OPSS 493 (Nov 2015) Construction Specification for Temporary Potable Water

More information

SPECIFICATION GUIDELINE

SPECIFICATION GUIDELINE Environmental StoneWorks specification guideline should be used to assist design professionals in the preparation of projects. Edit and delete items that may not be applicable. Verify all referenced section

More information

FIVE STAR PRODUCTS, INC. (800)

FIVE STAR PRODUCTS, INC.  (800) FIVE STAR PRODUCTS, INC. www.fivestarproducts.com (800) 243-2206 1 of 12 DESIGN-A-SPEC GUIDELINES FIVE STAR STRUCTURAL CONCRETE V/O CONTENTS PART A - GENERAL CONDITIONS PART B - MATERIAL SPECIFICATIONS

More information

Diffused Aeration Piping Equipment

Diffused Aeration Piping Equipment 1.0 General 1.1. The specifications in this section include all components of the Diffused Aeration System with the exception of the individual diffuser units. Refer to additional specification sections

More information

This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update.

This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update. Kaf-Tech Product Specification This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update. SECTION 260519 METAL CLAD CABLE - MC-PLUS Neutral

More information

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT. A. ASME B31.1 (American Society of Mechanical Engineers) - Power Piping

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT. A. ASME B31.1 (American Society of Mechanical Engineers) - Power Piping SECTION 22 05 29 HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 SUMMARY A. Section includes pipe and equipment supports, hangers, anchors, bases sleeves and the sealing of

More information

SECTION STAY-IN-PLACE INSULATED CONCRETE FORMING SYSTEM

SECTION STAY-IN-PLACE INSULATED CONCRETE FORMING SYSTEM ARCHITECTURAL SPECIFICATIONS MANUFACTURER: InterBlock LLC PO Box 1123, Sheboygan, WI 53082 Phone Number 920-207-7234 SECTION 03100 STAY-IN-PLACE INSULATED CONCRETE FORMING SYSTEM PART 1 GENERAL 1.01 Summary

More information

PERM-FLEX ASSEMBLY DIRECT APPLICATION TO CEMENTITIOUS SUBSTRATES MANUFACTURERS SPECIFICATION / SECTION 09960

PERM-FLEX ASSEMBLY DIRECT APPLICATION TO CEMENTITIOUS SUBSTRATES MANUFACTURERS SPECIFICATION / SECTION 09960 STUC-O-FLEX PERM-FLEX ASSEMBLY DIRECT APPLICATION TO CEMENTITIOUS SUBSTRATES MANUFACTURERS SPECIFICATION / SECTION 09960 PART 1 - GENERAL 1.01 DESCRIPTION Provide all labor, materials and equipment necessary

More information

Design Standard Conduit for Electrical Systems

Design Standard Conduit for Electrical Systems Design Standard Purpose: This design standard has the purpose of creating a consistent application for the installation of conduits throughout the East Side Union High School District, therefore achieving

More information

By CTS Cement Manufacturing Corp.

By CTS Cement Manufacturing Corp. CSI SECTION 03 60 00 GROUTING 03 62 00 NON-SHRINK GROUTING 03 62 13 NON-METALLIC NON-SHRINK GROUTING High Flow, Non-Metallic, Multi-Purpose, Cementitious, Non-Shrink Grout EDITOR NOTE: The following guideline

More information

Pipe Protection Tape System

Pipe Protection Tape System Pipe Protection Tape System PASCO All Weather Pipe Protection Tape is a pure physical barrier that is moisture proof, inert and non-conducting. Whether the need is to protect overhead piping in industrial

More information

EL DORADO COUNTY REGIONAL FIRE PROTECTION STANDARD

EL DORADO COUNTY REGIONAL FIRE PROTECTION STANDARD EL DORADO COUNTY REGIONAL FIRE PROTECTION STANDARD Fire Water Supply without a Purveyor Residential & Commercial STANDARD #D-003 EFFECTIVE 01-04-2016 1. PURPOSE 1.1. The California Fire Code (CFC) requires

More information

The Inspection Process. Waxhaw N.C.

The Inspection Process. Waxhaw N.C. The Inspection Process In Waxhaw N.C. This information is provided by the Waxhaw Enforcement Division to assist you in the progression of your project. Nothing in this document should be considered "Code"

More information

SECTION GYPSUM BOARD ASSEMBLIES

SECTION GYPSUM BOARD ASSEMBLIES SECTION 09 21 16 GYPSUM BOARD ASSEMBLIES PART 1 GENERAL 1.1 SECTION INCLUDES A. Metal stud wall and ceiling framing, 20 gauge. B. Metal channel suspended ceiling framing. C. Gypsum board. D. Gypsum sheathing.

More information

EVALUATION SUBJECT: AQUAPEX PRESSURE RATED TUBING, PROPEX AND COMPRESSION TYPE FITTINGS

EVALUATION SUBJECT: AQUAPEX PRESSURE RATED TUBING, PROPEX AND COMPRESSION TYPE FITTINGS ICC-ES Report PMG-1006 Reissued 03/2018 This report is subject to renewal 03/2019 EVALUATION SUBJECT: AQUAPEX PRESSURE RATED TUBING, PROPEX AND COMPRESSION TYPE FITTINGS DIVISION: 22 00 00 PLUMBING SECTION:

More information

PASSAIC COUNTY TECHNICAL INSTITUTE CCA 1422 NEW S.T.E.M. BUILDING 2017

PASSAIC COUNTY TECHNICAL INSTITUTE CCA 1422 NEW S.T.E.M. BUILDING 2017 SECTION 02630 - STORM DRAINAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

SECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS

SECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS SECTION 02620 PART 1 GENERAL 1.1 SCOPE OF WORK A. Furnish all labor, materials, equipment, and incidentals required to install High Density Polyethylene (HDPE) pressure pipe, fittings, and appurtenances

More information

CP-24CC Potassium Silicate Concrete

CP-24CC Potassium Silicate Concrete CP-24CC Potassium Silicate Concrete PRODUCT DESCRIPTION Blome CP-24CC is a two component, potassium silicate concrete used for acid resistant pump pads, equipment pads, curbing, floors and sumps. CP-24CC

More information

SECTION CROSS CONNECTION CONTROL AND BACKFLOW PREVENTION

SECTION CROSS CONNECTION CONTROL AND BACKFLOW PREVENTION SECTION 22 11 16.13 CROSS CONNECTION CONTROL AND BACKFLOW PREVENTION PART 1: GENERAL 1.01 SUMMARY A. This Section includes water-distribution backflow prevention products and installation specifications.

More information

SECTION mil thickness COLD FLUID-APPLIED WATERPROOFING

SECTION mil thickness COLD FLUID-APPLIED WATERPROOFING SECTION 07 14 16 CCW-MIRASEAL @ 120 mil thickness COLD FLUID-APPLIED WATERPROOFING PART 1 - GENERAL 1.1 SECTION INCLUDES: Installation of waterproofing membrane on surfaces indicated on drawings, consisting

More information

MODEL SJ10. Installation Manual. SumpJet TM - Water Powered Backup System C IMPORTANT: MODEL SERIAL

MODEL SJ10. Installation Manual. SumpJet TM - Water Powered Backup System C IMPORTANT: MODEL SERIAL Installation Manual 5824000C SumpJet TM - Water Powered Backup System MODEL SJ10 7000 Apple Tree Avenue, Bergen, NY 14416 Phone: (800) 543-2550 liberty@libertypumps.com website: www.libertypumps.com IMPORTANT:

More information

Water Service Inspection Checklist

Water Service Inspection Checklist Water Service Piping Inspection 4 ;ection P2902 Protection of Potable Water Supply Section P2903 Water-supply System Section P2906 Materials, Joints and Connections Section P2907 Changes in Direction Section

More information

ARDEX GUIDE SPECIFICATION ARDEX CD Concrete Dressing and ARDEX CD FINE Concrete Dressing Polymer-Modified, Portland Cement-Based, Resurfacing Compound

ARDEX GUIDE SPECIFICATION ARDEX CD Concrete Dressing and ARDEX CD FINE Concrete Dressing Polymer-Modified, Portland Cement-Based, Resurfacing Compound ARDEX GUIDE SPECIFICATION ARDEX CD Concrete Dressing and ARDEX CD FINE Concrete Dressing Polymer-Modified, Portland Cement-Based, Resurfacing Compound SECTION 03 01 30 MAINTENANCE OF CAST-IN-PLACE CONCRETE

More information

Signature Sports Flooring Installation Instructions. For SignaDeck Premium Rubber Tiles

Signature Sports Flooring Installation Instructions. For SignaDeck Premium Rubber Tiles Signature Sports Flooring Installation Instructions For SignaDeck Premium Rubber Tiles These instructions supersede any verbal or written instructions from Signature Sports Flooring representatives and

More information

PROTECTO-CRETE 800/800SF

PROTECTO-CRETE 800/800SF FEATURES Excellent Bond Strength to Concrete Excellent Wear Resistance RECOMMENDED APPLICATIONS Plating Room Floors Pickling Room Floors Truck Loading Platforms Chemical Storage CHEMICAL RESISTANCE Organic

More information

Read Only Copy Not For Distribution. Chapter 17. Private Potable Water Supply Systems 17.1 GENERAL REGULATIONS 17.2 QUANTITY OF WATER REQUIRED

Read Only Copy Not For Distribution. Chapter 17. Private Potable Water Supply Systems 17.1 GENERAL REGULATIONS 17.2 QUANTITY OF WATER REQUIRED Chapter 17 Private Potable Water Supply Systems 17.1 GENERAL REGULATIONS 17.1.1 Applicability The regulations in this chapter apply to any private potable water supply system where plumbing fixtures are

More information

CHAPTER 3 GENERAL REGULATIONS

CHAPTER 3 GENERAL REGULATIONS CHAPTER 3 GENERAL REGULATIONS SECTION 301 GENERAL 301.1 Scope. The provisions of this chapter shall govern the general regulations regarding the installation of plumbing not specific to other chapters.

More information

MATERIAL SAFETY DATA SHEET General Finishes Corporation. SECTION 2: Composition/Information on Ingredients

MATERIAL SAFETY DATA SHEET General Finishes Corporation. SECTION 2: Composition/Information on Ingredients MATERIAL SAFETY DATA SHEET General Finishes Corporation SECTION 1: Material Identification Material Name: ARM-R-SEAL Heavy Duty Oil & Urethane Top Coat GLOSS, ARM- R-SEAL Heavy Duty Oil & Urethane Top

More information

CHECKLIST Inspecting a Garage

CHECKLIST Inspecting a Garage CHECKLIST Inspecting a Garage By Ben Gromicko This section deals with the details of the garage or carport inspection that may be performed. At the end of this section, you shall be able to: describe the

More information

Contact Clark Public Utilities Construction Services department at (360) to initiate a request for service.

Contact Clark Public Utilities Construction Services department at (360) to initiate a request for service. CHAPTER3 Clark Public Utilities Commercial Electric Service Handbook Commercial Underground Services Preparing for the installation The following checklist will assist in preparing a project for the installation

More information

Spears Low VOC Solvent Cements, Primers & Accessories

Spears Low VOC Solvent Cements, Primers & Accessories SOLVENT CEMENT & ACCESSORIES Spears Low VOC Solvent Cements, Primers & Accessories Low VOC for LEED E Credit Environmentally friendly. LEED Compliant (Leadership in Energy and Environmental Design). Credit

More information

SECTION FACILITY SANITARY SEWERS

SECTION FACILITY SANITARY SEWERS SECTION 22 13 13 FACILITY SANITARY SEWERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SECTION CHAIN LINK FENCES AND GATES (PARK)

SECTION CHAIN LINK FENCES AND GATES (PARK) SECTION 02821 CHAIN LINK FENCES AND GATES (PARK) PART I GENERAL 1.1 SECTION INCLUDES A. Installation of chain link fences, and gate units provided by single source including erection accessories, fittings,

More information

DIVISION 04 MASONRY. Section Title Number MASONRY Maintenance of Masonry Masonry Mortaring Masonry Accessories

DIVISION 04 MASONRY. Section Title Number MASONRY Maintenance of Masonry Masonry Mortaring Masonry Accessories 04 00 00 MASONRY 04 01 00 Maintenance of Masonry 04 01 20 Maintenance of Masonry 04 05 13 Masonry Mortaring 04 05 23 Masonry Accessories 04 20 00 UNIT MASONRY 04 21 00 Clay Unit and Brick Veneer 04 22

More information

SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT SECTION 23 05 29 HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 SUMMARY A. Section includes pipe and equipment supports, hangers, anchors, bases sleeves and the sealing of work

More information

Case Study. Time and Materials Comparison Multifamily. Daniel Worm, CPD

Case Study. Time and Materials Comparison Multifamily. Daniel Worm, CPD Case Study Time and Materials Comparison Multifamily Daniel Worm, CPD 1 Executive Summary With advancements in plumbing materials technology, the importance of remaining price competitive is ever increasing.

More information

SECTION STORM UTILITY DRAINAGE PIPING PART 1 - GENERAL 1.1 SUMMARY 1.2 SUBMITTALS 1.3 PROJECT CONDITIONS

SECTION STORM UTILITY DRAINAGE PIPING PART 1 - GENERAL 1.1 SUMMARY 1.2 SUBMITTALS 1.3 PROJECT CONDITIONS SECTION 334100 - STORM UTILITY DRAINAGE PIPING PART 1 - GENERAL 1.1 SUMMARY Section Includes: 1. Pipe and fittings. 2. Drain Basin. 3. De-chlorination tablet feeder. 4. Non-pressure transition couplings.

More information

Insert Fittings. For Use With Polyethylene Pipe. PRICE SCHEDULE INS Effective September 26, 2010 Supersedes INS

Insert Fittings. For Use With Polyethylene Pipe. PRICE SCHEDULE INS Effective September 26, 2010 Supersedes INS ount (s): 140 PVC & PP 142 PVC Reinforced 143 CPVC 040 PVC Schedule 40 White Molded Fittings Thru 8" 043 PVC Schedule 40 Gray Molded Fittings Thru 8" Item prices may have changed from those shown in this

More information

ADA APPROVED SURFACE APPLIED DETECTABLE WARNING SYSTEM

ADA APPROVED SURFACE APPLIED DETECTABLE WARNING SYSTEM ADA APPROVED SURFACE APPLIED DETECTABLE WARNING SYSTEM PART 1 GENERAL 1. RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Special Conditions, apply to this Section.

More information

SPECIFICATIONS FOR THE INSTALLATION OF REDUCED PRESSURE BACKFLOW PREVENTERS AND CONCRETE VAULTS FOR METERS 4 AND LARGER

SPECIFICATIONS FOR THE INSTALLATION OF REDUCED PRESSURE BACKFLOW PREVENTERS AND CONCRETE VAULTS FOR METERS 4 AND LARGER SPECIFICATIONS FOR THE INSTALLATION OF REDUCED PRESSURE BACKFLOW PREVENTERS AND CONCRETE VAULTS FOR METERS 4 AND LARGER Updated January 2018 RP-2 Installation Specifications 1. In W.H.U.D s service area

More information

MATERIAL SAFETY DATA SHEET General Finishes Corporation. SECTION 2: Composition/Information on Ingredients

MATERIAL SAFETY DATA SHEET General Finishes Corporation. SECTION 2: Composition/Information on Ingredients MATERIAL SAFETY DATA SHEET General Finishes Corporation SECTION 1: Material Identification Material Name: General Finishes Oil Base Gel Satin Topcoat Revision Date: June 10, 2005 HMIS Ratings Health: 2

More information

LAMINATE GENERAL INSTALLATION INSTRUCTIONS FOR DROP LOCK FLOORING

LAMINATE GENERAL INSTALLATION INSTRUCTIONS FOR DROP LOCK FLOORING LAMINATE GENERAL INSTALLATION INSTRUCTIONS FOR DROP LOCK FLOORING WARNING Prior to installation, please ensure that the product received is the correct style and color as well as to the customer s satisfaction.

More information

QUALITY ASSURANCE MANUAL FOR APPLICATORS OF ELASTOMERIC SHEET LININGS

QUALITY ASSURANCE MANUAL FOR APPLICATORS OF ELASTOMERIC SHEET LININGS QUALITY ASSURANCE MANUAL FOR APPLICATORS OF ELASTOMERIC SHEET LININGS 1.0 Purpose To establish a recommended quality assurance program for applicators of elastomeric sheet linings. 2.0 Scope This bulletin

More information

FreeStyle Linear Drain with Full Mortar Bed Adapter Kit

FreeStyle Linear Drain with Full Mortar Bed Adapter Kit FreeStyle Linear Drain with Full Mortar Bed Adapter Kit U.S. Patent No. 8,474,068 Patents Pending: Canada & EP Publication No. 2354339 Discard Linear Drain installation instructions and refer to these

More information

Section X - Miscellaneous

Section X - Miscellaneous Section X - Miscellaneous A. Introduction This section provides design criteria, specific requests/recommendations and preferences related to specifying and constructing systems and materials used in HRSD

More information

1 PVC or ABS drain with strainer

1 PVC or ABS drain with strainer Patents Pending ProBase II Single-Slope Shower Base and Kit CONTENTS 1. General Information...1 2. Materials...1 3. Planning...2 4. Preparation...3 5. Layout...3 6. Install Base and Shims...4 7. Install

More information

SECTION A. American Society for Testing and Materials (ASTM):

SECTION A. American Society for Testing and Materials (ASTM): hp.seal-krete.com 306 Gandy Rd., Auburndale, FL 33823-2723 800.323.7357 863.967.1535 fax:863-965.2326 Seal-Krete High Performance Epoxy-Shell WB 50 Product Specification GUIDE SPECIFICATION SECTION 09725

More information

NATIONAL GYPSUM COMPANY Wood Frame Walls And Ceilings Single- And Double-Layer Construction

NATIONAL GYPSUM COMPANY Wood Frame Walls And Ceilings Single- And Double-Layer Construction Walls And Ceilings Single- And Double-Layer Construction 09 9 00/NGC Single-Layer Construction The single-layer construction system consists of a single layer of Gold Bond brand Gypsum Board applied to

More information