The West Bengal Power Development Corporation Limited

Size: px
Start display at page:

Download "The West Bengal Power Development Corporation Limited"

Transcription

1 The West Bengal Power Development Corporation Limited (A Government of West Bengal Enterprise) Open Tender Notice No. 38/OT/WBPDCL-KTPS/PH- IV/Tr. Linking/PKG-1/2014 Dated Laying, Linking of Railway track including supply of Track Ballast & P. Way fittings including Formation in connection with Construction & Project Management Service for the Railway Infrastructure required to serve Kolaghat Thermal Power Project Phase-4, Dist-Purba Medinipur. West Bengal. PART- 2 FINANCIAL BID CONTENTS SCHEDULE (BILL) OF QUANTITIES (Percentage rate tender) Issued to (name of Tenderer): Address of tenderer: Signature of officer issuing the documents Designation Date of Issue RITES Ltd. (A Govt. of IndiaEnterprise) Kolkata Project Office 56 C. R. Avenue, 2 nd floor Kolkata e.mail :po rites.com Phone no: /7146/7162/7143( Fax) 1

2 PART 2 FINANCIAL BID SCHEDULE (BILL) OF QUANTITIES 2

3 PART 2 SCHEDULE (BILL) OF QUANTITIES (PERCENTAGE RATE TENDER) ABSTRACT OF COST (PERCENTAGE TO BE QUOTED BY THE BIDDER) SCH - A DESCRIPTION TOTAL ESTIMATED COST (IN RUPEES) (1) P. Way works Rs. 3,17,95, ( Rs. Three Crore Seventeen Lakh Ninety Five Thousand Seven Hundred Forty One & Paise Sixty Six only) (2) Supply of P. Way fittings Rs. 96,78, ( Rs. Ninety Six Lakh Seventy Eight Thousand Two Hundred Fifty Seven & Paise Thirty Two only) ( 3) Civil Work Rs. 70,09, ( Rs. Seventy Lakh Nine Thousand One Hundred Forty & Paise Thirty Nine only) TOTAL ESTIMATED COST OF SCHEDULES (1) TO (3) (RUPEES) PERCENTAGE ABOVE (+) OR BELOW (-) OF TOTAL ESTIMATED COST OF SCHEDULES (1) TO (3) AS QUOTED Rs.4,84,83, (Rs. Four Crore Eighty Four Lakh Eighty Three Thousand One Hundred Thirty Nine & Paise Thirty Seven only) PERCENTAGE * (+) or (-) IN FIGURES PERCENTAGE IN WORDS * (PLUS) or (MINUS) TOTAL QUOTED COST OF SCHEDULS (1) TO (3) BASED ON PERCENTAGE QUOTED (+) or (-) (RUPEES) AMOUNT IN FIGURES (RUPEES) AMOUNT IN WORDS (RUPEES) LESS REBATE ( (IN WORDS) %), IF ANY Rs. NET QUOTED COST OF SCHEDULES (1) TO (3) (RUPEES) * strike out which is not applicable i. SIGNATURE OF AUTHORISED SIGNATORY OF TENDERER ii. NAME OF SIGNATORY iii. NAME AND SEAL OF TENDERER iv. DATE v. PLACE 3

4 Schedule (Bill) of Quantities Schedule of work for Laying, Linking of Railway track including supply of Track Ballast & P. Way fittings including Formation in connection with Construction & Project Management Service for the Railway Infrastructure required to serve Kolaghat Thermal Power Project Phase-4, Dist-Purba Medinipur. West Bengal. Schedule 1 (P. Way works) S.N. Description of Items Unit Qty Rate Amount (Rs.) 1 Transportation of released rails, fittings & fastenings from the works site to Deptl. store of RITES/KTPS upto a distance of 3 Km by contractor's transport MT including handling, loading, unloading of materials with all lead, lift, crossing road/ rly. tracks etc complete. 2 Through packing of any kind of sleepers (M+7 density) with stone ballast to maintain correct alignment cross and longitudinal level as required for maintaining track gauge, versine, superelevation etc. on both straight and curve track laid with contractor's tools and labour inclusive of all charges as per IRPWM and as directed by Engineer-in-charge. 2a First through packing of track Tr.m b 2nd through packing of track Tr.m c 3rd through packing of track Tr.m d 4th through packing of track Tr.m Through packing of 1 in 8½ Turn-out/Sym. split on any kind of sleepers with stone ballast to maintain correct alignment cross and longitudinal level as required for maintaining track gauge, versine, superelevation etc. on both straight and curve track laid with contractor's tools and labour inclusive of all charges as per IRPWM and as directed by Engineer-in-charge. (Note: Length of turnout will be considered from stock rail joint to the rail joint after 4th exit sleeper) 3a First Through packing set b 2nd Through packing set c 3rd Through packing set d 4th Through packing set Through packing of 1 in 8½ Derailing switch on any kind of sleepers with stone ballast to maintain correct alignment cross and longitudinal level as required for maintaining track gauge, versine, superelevation etc. on both straight and curve track laid with contractor's tools and labour inclusive of all charges as per IRPWM and as directed by Engineer-in-charge. 4a First Through packing set

5 S.N. Description of Items Unit Qty Rate Amount (Rs.) 4b 2nd Through packing set c 3rd Through packing set d 4th Through packing set Trolleying New/SH/Released ordinary B.G. wooden/st/ci /PSC sleepers upto 2 Km on contractor's diplorry/transport including loading, unloading and stacking at nominated place as per direction of Engineer-in-Charge with all lead, lift, handling etc complete (CI sleepers means two plates one tie bars.) 6 Transporting/Trolleying new rails, PSC sleepers from the Client/RITES Site store to the site of work by contractors transport/diplorry upto a distance of 2 km including handling, loading, unloading of materials with all lead, lift, crossing road/ rly. tracks etc complete. 7 Transporting/Trolleying new rails, PSC sleepers for every addl. ½ km by contractors transport/diplorry 8 Excavation of earth, overburden, etc. from the track and screening of complete ballast section of the track through seive of specified size up to a depth of as specified below bottom of sleeper. This includes opening of ballst, digging down for the following depth below the bottom of sleepers, taking out caked ballast and muck etc, from the entire section, putting back of cleaned ballast as per required ballast profile, throwing away screened muck, overburden etc. on the toe of the bank or on the cess if low or above the top of cutting for any lead within WBPDCL premishes as per direction of Engineer-in-charge, grading the bed to the edge of the formation for effective drainage and including one round of kutcha packing with ballast. 8a Up to a depth of 250 mm below bottom of PSC sleeper (as required). 9 Excavation of earth, overburden, etc. from the T- out and screening of ballast for 1 in 8½ Turnouts/Sym. Split in running track upto a depth as specified below bottom of sleeper through seive of specified size. This includes opening of ballst, digging down for the following depth below the bottom of sleepers, taking out caked ballast and muck etc, from the entire section, putting back of cleaned ballast as per required ballast profile, throwing away screened muck, overburden etc for any lead within WBPDCL premishes as per direction of Engineer-in-charge, grading the bed to the edge of the formation for effective drainage and including initial packing of sleepers. 9a Up to a depth of 250mm below bottom of PSC sleeper (as required). each MT MT Tr.m set

6 S.N. Description of Items Unit Qty Rate Amount (Rs.) 10 Excavation of earth, overburden, etc. from the T- out and screening of ballast for 1 in 8½ Derailing switch in running track upto a depth as specified below bottom of sleeper through seive of specified size. This includes opening of ballst, digging down for the following depth below the bottom of sleepers, taking out caked ballast and muck etc, from the entire section, putting back of cleaned ballast as per required ballast profile, throwing away screened muck, overburden etc at a distance of 50m as per direction of Engineer-incharge, grading the bed to the edge of the formation for effective drainage and including initial packing of sleepers. 10a Up to a depth of 250mm below bottom of PSC sleeper ( as required). set Supply & delivery of Machine crushed stone ballast of 50 mm size clean angular, hard and durable track ballast as per specification and staking the same on cess of the formation or toe of the bank or at suitable place as directed by Engineer-in-charge at site. the rate include all cost of lead, lift,royalty, sales tax & others tax and duties and all incidental charges complete as applicable, tools, plant & screens of approved mesh & dimensions required for inspection & passing at the time of measurement are to be arranged by the contractor. the rate also includes leveling of ground if necessary, where the ballast are to be stacked. 12 Handling, lifting and leading of ballast from stacks with any lead and lift,which have been duly measured and spreading ballast on formation, Track & turnouts to ensure uniform and compact ballast cushion under the sleepers desired ballast profile. Spreading of ballast should be as per specified line and level and maintaining approved profile as provided in the technical specifications. Spreading of ballast on formation will be done only after supply is completed for a particular stretch as decided by Engineer in charge and ballast stacks have been released for spreading. 13 Dismantling of Wood/ CI/ST/PSC sleepers from running track and stacking nearby. cum cum each

7 S.N. Description of Items Unit Qty Rate Amount (Rs.) 14 Manufacturing and fixing of check rails for L-Xing Track by cutting flange of 90R/52 kg./60kg. rails of required size and bending/planning the ends as per RDSO Drg.no. T-3282/4215 with upto date Alt. conforming to IRS, drilling holes on web. Fixing the check rail to the inner side of running rail with the help of C.I. Bracket, bolts, nuts and plate screw at an intervals as directed by Engineer-in-charge maintaining proper check rail clearance and fixing them on each concrete sleeper (Rails will be provided by RITES/WBPDCL free of cost) Rail transportation charge will be extra.. Metre 15 Manufacturing and fixing of check rails for Metre curve/guard rail as as per RDSO Drg. by Machine cuts of 52/60/90R Kg rails of required size, drilling holes on web by drilling machine as per requirement, fixing of check rail to inner side of the inside curve with the help of C.I Brackets bolts & nuts and plate screw at an intervals as directed by the Engineer in Charge maintaining proper check rails clearance and fixing them on each concrete sleeper (Rails will be provided by RITES/Employer free of cost at client yard/ store within plant area) Rail transportation charge will be extra. 16 Making and fixing in position cement concrete (1:2:4) Fouling Mark as per enclosed drawing each with proper painting and lettering as per directives of the Engineer-in-Charge of the work. The rate is inclusive of all materials like cement, stone agreegates, sand and paints etc, with all incidental works required for fixing in position complete in all respects. 17 Making and fixing in position cement concrete (1:2:4) kilometre/curve/gradient pillar as per enclosed drawing with proper painting and lettering as per directives of the Engineer-in- Charge of the work. The rate is inclusive of all materials like cement, stone agreegates, sand and paints etc, earth work in excavation and all each incidental works required for fixing position complete in all respect. 18 Assembling, linking and laying in position B.G.Standard 60 kg/52 kg turn-outs on P.S.C. sleepers including approach & exit PSC sleeper portion to correct alignment & gauge.this includes switches lead rails, stock rails both straight and curve, crossing with 60 kg/52 kg rails and standard fittings ensuring correct spacing of sleepers fixing & tightening of Fish bolts & nuts and maintaining proper guage, expansion gap at rail joints and with one initial through packing. The rate should be inclusive of dekinking of rails as required, bending stock rails, cutting of rails to required standard size and drilling holes on web of rails 7

8 square to rail surface by using proper template (for fixing fishplates, distance block, stretcher bars), greasing and oiling of fish plates & fish bolts and nuts and at fishing zone of the rail ends including supply of grease, oil etc. complete in all respects. The rate should also be inclusive of carrying rails, sleepers, switches, crossings, fittings & fastenings with all lead, lift, ascent, descent crossing Road/Rly line if necessary from Client/RITES Store Depot to Site of work within a distance of 2 km. Sleeper spacing shall also be marked by the contractor with white/yellow paint at his own cost. The work has to be carried out as laid down in IRPWM and as per direction of the Engineer-in- Charge at site. 18a 1 in 8½ Turnout/Sym. split set b 1 in 8½ Derailing switch set Dismantling of existing B.G. Turn-out/Sym. split of 52Kg/90R or any section of rails with any kind of sleepers with fittings and fastenings. The rate should be inclusive of cutting of bolts & nuts by gas cutter if necessary, for dismantling of track. Dismantled materials should be segregated and are to be kept seperately i.e. Rails, Sleepers, fastenings etc. by the side of the track up to a free lead of 30m as per direction of the Engineer-in- Charge. 19a 1 in 8½ Turnout/Sym. split set b 1 in 8½ Derailing switch set Renewal of existing any type of scattered single metre rails i.e. rails upto & incl. 13m by 60 kg/52 kg/90 R (New/SH) single rails including dismantling existing rails from all infringment to moving direction with standard fittings fixing & tightening of Fish bolts & nuts and maintaining proper guage. Note: The rate is exclusive of carrying rails to site of work, drilling holes and cutting rails. 21 Re-spacing of any kind of sleepers in the existing each running track irrespective of any sleeper density existed and to be provided for 3-rail panel at specified spacing alongwith removing & refixing of fitting & fastenings, 22 Distribution of New/SH fittings & fastenings at site MT by contractors transport/dip lorry upto a distance of 2 km including handling, loading, unloading of materials with any lift, crossing road/ rly. tracks etc complete. 23 Distribution of small fittings by trolly for every addl. 1 km or part thereof MT Lifting of track upto 150 mm in stages of not more than 50mm at a time including two round packing. Track Metre

9 S.N. Description of Items Unit Qty Rate Amount (Rs.) 25 Renewal of wooden/steel/ CI/PSC sleepers by each PSC sleepers irrespective of any sleeper density existed and to be provided for i.e. removing the existing sleepers and its fastenings including clearing removed sleepers from all infringement to moving direction inserting new sleepers at specified spacing alongwith fastenings, including tightening of fastenings (sleepers at site involving lead not more than 30m). 26 Removing of overburden from track i.e. Tr M excavation in all conditions & classification of soil mixed with coal, coal dust, ballast,moorum, rubbish, muck, vegetation, weeds etc from track profile (i.e. from top of sleeper level for a width of m on either side from centre line of track) by digging upto formation level to expose the buried track and disposal of the same at any distance within WBPDCL premishes area. 27 Drilling holes 28mm/32mm dia (as directed by Engineer at site)in rails (New/SH) fpr fish bolts inside/outside track. 52kg/90R/60 Kg (New/SH) rails section each Cutting rails(new+sh)rails section inside/outside track 52kg/90R/60 Kg (New/SH)rails section each Shifting of Lock Bars,Rod Run including ancilliaries near KTPS-Cabin related to shifting of Pts & X-ing and Derailing switch of Kolaghat entry line along with resizing,refitting to maintain the S & T system active including welding complete in all respect as per direction of EIC 30 Removing of overburden from Turnout i.e excavation in all conditions & classification of soil mixed with coal dust, rubbish, muck,moorum, vegetation, weeds etc from 1 in 8.5 turnout (from SRJ to end of long turnout sleeper) profile (i.e for a width of m on either side from centre line of main line & turnout track) by digging upto formation level to expose the buried track and disposal of the same at any distance within WBPDCL premishes. LS LS Each set Total of Schedule 1 3,17,95,

10 Schedule 2 (Supply of P. Way Fittings) S.N. Description of Items Unit Qty Rate (Rs.) Amount 1 Supplying of Elastic Rail clips with flat toe Each (MK.III) for BG 52Kg rail section for use with 60kg/52 kg PRC Sleepers to RDSO Drg. No.T (Alt.3) conforming to specifications IRS-T- 31/89. 2 Supplying of Elastic rail clips type'j' for BG Each kg/52 kg rail section for use with PRC Sleepers at fish plated joints as per RDSO Drg. No. T-4158 conforming to IRS Specification. 3 Supplying of composite liners(gfn) for 60 Kg BG PRC sleepers, to RDSO Drg. No.T-3707 & 3708 (upto date Alteration) conforming to IRS specification for use with Mark-III flat toe ERC ( Drg. No. T-3701) 4 Supplying of Grooved Rubber Sole Plate for use with 60 KG BG PSC sleepers to RDSO Drg. No.T-3711 (upto date Alteration) conforming to IRS Specification for 6 mm thick grooved rubber sole plates (Provisional) Supply of 52 Kg Fish Plates 610 mm. long to Drg.No.T- 090(M) & IRS specification (Note: 1 Pair = 2 Fish Plates). 6 Supplying of End cut composite liners(gfn) for 60 Kg BG PRC sleepers, to RDSO Drg. No.T & 3708 (upto date Alteration) conforming to IRS specification for use with Mark-III flat toe ERC ( Drg. No. T-3701) 7 Supplying of Fish Bolts and nuts 25mmx140mm as per RDSO Drg. No.T-1899 Alt-2 of size 25 mm dia and 140 mm long conforming to IRS Specification No.T-23/67. 8 Fittings of check rail for L-Xing Sleepers for 52 Kg. Rail. One set comprises of following materials under 8(a) to 8(e).(for 09 sets) (a) Single coil spring washer as per RDSO Drg. No- T , conforming to IS: (Grade 20) and IRS-T-10 (b) Bolts & Nuts (22 mm X 110 mm) including single coil Spring washer as per RDSO Drg. No. T , IRS T-10 Set Each Pair Set Each nos nos

11 S.N. Description of Items Unit Qty Rate (Rs.) Amount ( c) Plate screw as per RDSO Drg. No. T conforming to IRS T-16 (d) C.I.Distance bracket as per RDSO Drg. No. T for 52 kg. Rail conforming to IS: (Grade 20) and IRS-T-11 (e) C. I. 'L' bracket for L-xing Check rail as per RDSO Drg. No. T conforming to IS: (Grade 20) and IRS-T-10 (f) Supply of Switch Clamp (Male & Female)) as per RDSO Drg.No.T-858 to T-858/1. nos nos nos set Fitting for guard rail arrangement of Bridge PSC sleepers to RDSO Drg. No. T-4089 to T i) Rail Screw T-4153 IRS T-16 Each ii) Grooved Rubber sole plate T-3703 IRS-T-37- Each iii) MS protecting plate under guard rail T-4105 Each vii) Metal liners RDSO T-3740, IS: for sleeper no T-4090 to T-4097& Comb. Fish plate 60 Kg as per RDSO drg. T-696, T-697, T-698 & T-699 with upto date alt. and conforming to IRS- T-6 11 Bolts & nuts (25 mm X 180 mm ) as per RDSO drg. No. T-11513, IRS T- 23 and Steel round up to 63 mm conforming to IS-1875 Each Set Each Total of Schedule 2 96,78,

12 Schedule 3 (Civil work) Sl Description of Item Unit Quantity Rate Amount No 1 Earth work in excavation by mechanical means (Hydraulic excavator) /manual means over areas (exceeding 30cm in depth. 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, any lead and lift, disposed earth to be levelled and neatly dressed. All kinds of soil cum Supplying and filling in plinth with coarse sand under floors, including watering, ramming, consolidating and dressing complete. 3 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6(1 Cement: 3 coarse sand: 6 graded stone aggregate.20 mm nominal size) 4 Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) 5 Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level Thermo-Mechanically Treated bars. 6 Centering and shuttering including strutting, propping etc. and removal of form for :Suspended floors, roofs, landings, balconies and access platform 7 Centering and shuttering including strutting, propping etc. and removalof form for :Foundations, footings, bases of columns, etc. for massconcrete 8 Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate (M-25) 20 mm nominal size) cum cum cum 90 5, kg sqm sqm cum 328 6,

13 Sl No Description of Item Unit Quantity Rate Amount 9 Supplying Stone Boulder Weighing minimum 35 kg cum each at site and Providing Boulder Backing behind wing wall, return wall, retaining wall with hand packed boulders & cobbles with smaller size boulders toward the back including all lead, lift, labour & other incidental charges as complete work in all respect. Payment for boulder/cobbles will be done extra. 10 Providing and laying in position cement concrete of specified gradeexcluding the cost of centering and shuttering - All work up to plinthlevel :1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size) cum 50 4, Providing and laying semi dense Bituminous Cum concrete using crushed stone aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher equipped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction and density as per specification, complete and as per directions of Engineer-in-Charge.25 mm compacted thickness with bitumen of grade VG- (percentage by weight of total mix) and lime 2% (percentage by weight of Aggregate) prepared in Batch Type Hot Mix Plant of TPH capacity. 12 Steel work welded in built up sections/ framed kg work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In stringers, treads, landings etc. of stair cases, including use of chequered plate wherever required, all complete Total of Schedule 3 70,09,

Signature of the tenderer

Signature of the tenderer PART 2 FINANCIAL BID SCHEDULE (BILL) OF QUANTITIES 2 PART 2 SCHEDULE (BILL) OF QUANTITIES (PERCENTAGE RATE TENDER) ABSTRACT OF COST (PERCENTAGE TO BE QUOTED BY THE BIDDER) SCHEDULE DESCRIPTION TOTAL ESTIMATED

More information

MEJA URJA NIGAM PVT. LIMITED

MEJA URJA NIGAM PVT. LIMITED MEJA URJA NIGAM PVT. LIMITED NAME OF WORK: TENDER AND CONTRACT DOCUMENT FOR Supply of PSC Sleepers, P-Way materials (except rails) including Points & Crossings, Laying and linking of track including Points

More information

PRICED BILL OF QUANTITIES

PRICED BILL OF QUANTITIES Engineering Projects (dia) Limited (A Govt of dia Enterprise) Words 1 EARTH WORK 1.1 Earth work in excavation by mechanical means (Hydraulic Excavator) / Manual means over areas (exceeding 30 cm in depth,

More information

Brahmaputra Cracker and Polymer Limited SCHEDULE OF RATES

Brahmaputra Cracker and Polymer Limited SCHEDULE OF RATES SCHEDULE OF RATES NAME OF WORK: EXECUTION PACKAGE I (Part-A: Earthwork in Railway Formation & Part-B: Laying of Railway Track), FOR RAIL INFRASTRUCTURE OF BRAHMAPUTRA CRACKER AND POLYMER LIMITED (BCPL)

More information

NTPC Ltd. KORBA VOLUME-II (FINANACIAL BID) Consultants

NTPC Ltd. KORBA VOLUME-II (FINANACIAL BID) Consultants NTPC Ltd. KORBA OPEN TENDER NOTICE NO.RITES/GGM/NGP/T-07-2015, DATED 05.03.2015 Name of work: Earthwork in Drain Foundation, construction of minor bridges and RCC drain, P-Way works etc for the construction

More information

Bihar State Power Generation Company Ltd. (BSPGCL)

Bihar State Power Generation Company Ltd. (BSPGCL) Bihar State Power Generation Company Ltd. (BSPGCL) Open Tender tice. 16/OT/BSPGCL-BTPS/Rly. Siding/PKG-II/2015 Dated 06.05.2015. Tender document for the work of Earthwork in formation including blanketing,

More information

KANTI BIJLEE UTPADAN NIGAM LIMITED (KBUNL) (A Joint Venture of NTPC Ltd. And BSEB ) SCHEDULE (BILL) OF QUANTITIES (Percentage Rate Contract)

KANTI BIJLEE UTPADAN NIGAM LIMITED (KBUNL) (A Joint Venture of NTPC Ltd. And BSEB ) SCHEDULE (BILL) OF QUANTITIES (Percentage Rate Contract) KANTI BIJLEE UTPADAN NIGAM LIMITED (KBUNL) (A Joint Venture of NTPC Ltd. And BSEB ) TENDER NO. 39/OT/R/KBUNL-MTPP/Formation /PKG- II/2013 Dated 27.08.2013 Tender and Contract document for earthwork in

More information

SCHEDULE OF QUANTITIES OF COMPOUND WALL WORK FOR PROPOSED CONSTRUCTION OF TEMPERATURE CONTROLLED WAREHOUSE AT PATALGANGA MIDC, DIST- RAIGARH, MUMBAI.

SCHEDULE OF QUANTITIES OF COMPOUND WALL WORK FOR PROPOSED CONSTRUCTION OF TEMPERATURE CONTROLLED WAREHOUSE AT PATALGANGA MIDC, DIST- RAIGARH, MUMBAI. SCHEDULE OF QUANTITIES OF COMPOUND WALL WORK FOR PROPOSED CONSTRUCTION OF TEMPERATURE CONTROLLED WAREHOUSE AT PATALGANGA MIDC, DIST RAIGARH, MUMBAI. Tender Reference No. BL/LI/CC/TCWMUM/BOUNDARY WALL/1617/04

More information

SCHEDULE A BILL OF QUANTITIES Part - I : Construction of Road

SCHEDULE A BILL OF QUANTITIES Part - I : Construction of Road Sl.Pg.No.193 Name of Work : Construction of 20.0 m. wide road in Sector 16 under 12.5% scheme around Shelghar Village at Ulwe Node, Navi Mumbai. SCHEDULE A BILL OF QUANTITIES Part - I : Construction of

More information

Estimate FOR THE SEPTIC TANK

Estimate FOR THE SEPTIC TANK Estimate FOR THE SEPTIC TANK S.NO ITEM DESCRIPTION. 1 Excavation in soil,soft & hard murum... Qty UNIT Rate Excavation for footing, machine foundation, plinth beams, wall footing, gutters,brick wall, tanks

More information

C H E N N A I M E T R O R A I L L I M I T E D A D D E N D U M - 1

C H E N N A I M E T R O R A I L L I M I T E D A D D E N D U M - 1 C H E N N A I M E T R O R A I L L I M I T E D C H E N N A I M E T R O R A I L P R O J E C T P H A S E - 1 E X T E N S I O N A D D E N D U M - 1 T O B I D D I N G D O C U M E N T S for CONTRACT ATW-07 Installation,

More information

Schedule Of Works. 35 Konkan Railway Corporation Limited Signature of Tenderer

Schedule Of Works. 35 Konkan Railway Corporation Limited Signature of Tenderer Schedule Of Works 35 Konkan Railway Corporation Limited Signature of Tenderer Schedule of Works (Package II, Chainage 5/400 to 7/800 = 2400 mtrs SCHEDULE - A (CUTTING) Name of work: Limited tender for

More information

GUJARAT ENERGY TRANSMISSION CORPORATION LTD. Division Office,Jamla, 220 kv Sub-Station Compound

GUJARAT ENERGY TRANSMISSION CORPORATION LTD. Division Office,Jamla, 220 kv Sub-Station Compound GUJARAT ENERGY TRANSMISSION CORPORATION LTD. Division Office,Jamla, 220 kv Sub-Station Compound Website : www.gseb.com Phone No. 02764 280551 E-mail : eetrjamla.getco@gebmail.com TENDER NO : JTD 14 Technical

More information

Description Unit Quantity Rate Kshs. Amount Kshs.

Description Unit Quantity Rate Kshs. Amount Kshs. BILL No.1 40m3 MASONRY STORAGE TANK No. Description Unit Quantity Rate Kshs. Amount Kshs. 1 SETTING OUT AND EARTH WORKS 1.1 General site clearance and setting out 1.2 Excavate over site 200mm to remove

More information

WORK BELOW LOWEST FLOOR FINISH 1/7 230, , , FRAME 2/6 96, , ,056.00

WORK BELOW LOWEST FLOOR FINISH 1/7 230, , , FRAME 2/6 96, , ,056.00 Description Page No Summary Amount Summary 1/7 230,694.60 22,019.25 22,642.65 2/6 96,801.30 80,150.60 114,056.00 Total Per Unit (MYR) 327,495.90 102,169.85 136,698.65 Total Unit(s) X 1 2 2 Total Per Type

More information

BOQ for Lintel, Chajja, Brick work & Plastering work at Pkg. - III - Phase - I

BOQ for Lintel, Chajja, Brick work & Plastering work at Pkg. - III - Phase - I BOQ for Lintel, Chajja, Brick work & Plastering work at Pkg. - III - Phase - I S.No. Description Unit Qty RATE Amount PART-I CIVIL WORKS B-PLAIN AND REINFORCED CEMENT CONCRETE : Notes : ( the following

More information

PART A : CPVC PIPES AND FITTNGS (EXTERNAL WATERSUPPLY):

PART A : CPVC PIPES AND FITTNGS (EXTERNAL WATERSUPPLY): PART A : CPVC PIPES AND FITTNGS (EXTERNAL WATERSUPPLY): 01 Providing and Fixing of CPVC pipes confirming to ASTM standard including all CPVC fittings like tees, elbows, bends, unions, coupling, reducer

More information

TENDER INVITATION FOR CONSTRUCTION OF 06 NOS. FOUR MULTI PURPOSE SHEDS MULTI PURPOSE SHEDS AT DIFFERENT BEEJ NIGAM FARMS UNDER RKVY.

TENDER INVITATION FOR CONSTRUCTION OF 06 NOS. FOUR MULTI PURPOSE SHEDS MULTI PURPOSE SHEDS AT DIFFERENT BEEJ NIGAM FARMS UNDER RKVY. M.P.RAJYA BEEJ EVAM FARM VIKAS NIGAM (An ISO 9001:2008 certified Organization) (MP Govt. Undertaking) 36, BEEJ BHAWAN MOTHER TERESA MARGARERA HILLS BHOPAL Phone:0755-2775048, 2571368 FAX: 0755-2775042

More information

B.O.Q. Two Laning Of Pasighat-Mariyang- Yingkiong Road from Km 0.00 to Km in the State Of Arunachal Pradesh

B.O.Q. Two Laning Of Pasighat-Mariyang- Yingkiong Road from Km 0.00 to Km in the State Of Arunachal Pradesh B.O.Q Two Laning Of Pasighat-Mariyang- Yingkiong Road from Km 0.00 to Km 19.887 in the State Of Arunachal Pradesh 1 BILL NO. 1. SITE CLEARANCE AND DISMANTLING 1.01 201 Cutting of Trees, including cutting

More information

BILL OF QUANTITY ENGINEERING & MANAGEMENT CONSULTING CENTRE. "Beit Hanoun Emergency Water Supply Project"

BILL OF QUANTITY ENGINEERING & MANAGEMENT CONSULTING CENTRE. Beit Hanoun Emergency Water Supply Project "Beit Hanoun Emergency Water Supply Project" " Rehabilitation and Construction of Beit Hanoun Water Network " BILL OF QUANTITY ENGINEERING & MANAGEMENT CONSULTING CENTRE Bill of Quantities PREAMBLE TO

More information

Sieve Size 2" 1" 3/8" No. 10 No. 40 No. 200 % Passing Size

Sieve Size 2 1 3/8 No. 10 No. 40 No. 200 % Passing Size VII. MATERIALS 7.01 SUBBALLAST Subballast shall be crusher-run stone (dense graded aggregate), preferably limestone or granite material and shall meet the requirements as set out in Chapter 1, Part 2,

More information

SPECIFICATION FOR PIPE CULVERT CONSTRUCTION

SPECIFICATION FOR PIPE CULVERT CONSTRUCTION SPECIFICATION FOR PIPE CULVERT CONSTRUCTION 1. SCOPE Pipe culverts shall be constructed in accordance with this specification and in conformity with the lines, levels and cross-sections shown on the drawings.

More information

STANDARD SPECIFICATION FOR TANK PADS

STANDARD SPECIFICATION FOR TANK PADS STANDARD SPECIFICATION FOR TANK PADS STANDARD SPECIFICATION FOR TANK PADS 0.0 SCOPE The specification describes the technical requirements for the materials and construction of tank pads of murrum fill

More information

BALMER LAWRIE & CO. LTD. 32, Sattangadu Village, Manali, Chennai Phone: /628, Fax No:

BALMER LAWRIE & CO. LTD. 32, Sattangadu Village, Manali, Chennai Phone: /628, Fax No: BALMER LAWRIE & CO. LTD. 32, Sattangadu Village, Manali, Chennai 600068 Phone: 044-25946621/628, Fax No: 044-25941436 Email No: srinivas.pcs@balmerlawrie.com DUE DATE & TIME: [16/02/2018 at 15:00 Hrs.]

More information

SPECIFICATION FOR REINFORCED SOIL WALL

SPECIFICATION FOR REINFORCED SOIL WALL SPECIFICATION FOR REINFORCED SOIL WALL 1.0 EXTENT OF WORK The work shall consist of Reinforced Soil walls built in accordance with this specification and in conformity with the lines, levels and details

More information

INDEX FOR SPECIFICATIONS FOR REMOVING CULVERTS AND PLACING CULVERTS SCOPE... 1

INDEX FOR SPECIFICATIONS FOR REMOVING CULVERTS AND PLACING CULVERTS SCOPE... 1 March 2002 No. 400 INDEX FOR SPECIFICATIONS FOR REMOVING CULVERTS AND PLACING CULVERTS 400. 1 SCOPE... 1 400. 2 REMOVING CULVERTS AND TIMBER STRUCTURES 2.1 Concrete and Metal Pipe Culverts... 1 2.2 Structural

More information

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS Section Page 14-1 GENERAL... 14.1 14-2 PRIVATE ROADS... 14.1 14-3 STREETS AND PARKING LOTS... 14.1 14-3.01 Aggregate Base... 14.1 14-3.02 Asphalt

More information

BOQ for Plumbing, Sanitary Works

BOQ for Plumbing, Sanitary Works BOQ for Plumbing, Sanitary Works Page of 6 Sr.No Item Description Quantity Unit Rate Amount (Rs.) SANITARY FIXTURES a Providing & Fixing star white colour vitreous china wall mounted wc with heavy duty

More information

No # Specifications Rate To Be Quoted. Unit Qty (in figures) (in words) Total Amount

No # Specifications Rate To Be Quoted. Unit Qty (in figures) (in words) Total Amount Revised Schedule B as per corrigendum no. SASB/NIT/Works/818/2016/09 dated 28.01.2016. SCHEDULE B (FINANCIAL BID) B- a FABRICATION AND SUPPLY OF 200 EUROPEAN TYPE TOILETS (Rate to be quoted in Rupees both

More information

WATER WORKS SECTION भ रत य प र द य स स थ खड़गप र Indian Institute of Technology, Kharagpur TENDER NOTICE

WATER WORKS SECTION भ रत य प र द य स स थ खड़गप र Indian Institute of Technology, Kharagpur TENDER NOTICE WATER WORKS SECTION भ रत य प र द य स स थ खड़गप र Indian Institute of Technology, Kharagpur TENDER NOTICE No. : IIT/WW/2017-18/ 35 Dt. : 19.01.2018 The Sr. Executive Engineer (Water Works), IIT Kharagpur

More information

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT 325.0 957 100.130 F.L.=99.780 12205 2300 2300 2300 2720 125 EXPANSION GAP 125 EXPANSION GAP OUTER COVER PLATE 640X40X1070 938.5 1350 1350 1350 1282.5 1350 1350 1122.5 1350 1356.5 1356.5 1350 1122.5 1350

More information

ST ANDARD SPECI FI CAT I ON FOR T ANK PADS

ST ANDARD SPECI FI CAT I ON FOR T ANK PADS ST ANDAR D SPECIFICAT ION 0 26.10.2005 I SSUED T ENDER HS HS RPB No. Date Revision By Chkd Appd C1088-ECS-SP-211 Page 1 of 6 0 CONT ENT S 1. SCOPE 2. R EFER ENCE STANDARDS 3. SUB-GR ADE PREPARATION 4.

More information

MISHRA DHATU NIGAM LIMITED P.O.KANCHANBAGH, HYDERABAD. Part-II (PRICE BID)

MISHRA DHATU NIGAM LIMITED P.O.KANCHANBAGH, HYDERABAD. Part-II (PRICE BID) MISHRA DHATU NIGAM LIMITED P.O.KANCHANBAGH, HYDERABAD Part-II (PRICE BID) RETROFITTING OF B5 & C5 COLUMNS OF FORGE SHOP, MIDHANI, KANCHANBAGH, HYDERABAD-58. PURCHASE DEPARTMENT Tender Notice No: MDN/PUR/AP2061032/ADVT/146/16-17

More information

MTSP MANUFACTURE AND SUPPLY OF INSULATED RAIL JOINTS

MTSP MANUFACTURE AND SUPPLY OF INSULATED RAIL JOINTS Engineering Specification Track MANUFACTURE AND SUPPLY OF INSULATED RAIL JOINTS Version: 2 Issued: December 2015 Owner: Engineering Division Approved By: Liam Palmer Cannon A/Head of Engineering Track

More information

A. Texas Department of Transportation 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TxDOT).

A. Texas Department of Transportation 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TxDOT). SECTION 32 01 16 ASPHALT OVERLAY PART 1 - GENERAL 1.1 SCOPE OF WORK A. This Section specifies the requirements for scarifying, grinding, sweeping and repair of existing asphalt concrete pavement to establish

More information

CONSTRUCTION SPECIFICATION FOR CONCRETE CROSSWALK INDEX TS SCOPE...3

CONSTRUCTION SPECIFICATION FOR CONCRETE CROSSWALK INDEX TS SCOPE...3 CITY OF TORONTO TS 3.65 TRANSPORTATION SERVICES STANDARD CONSTRUCTION SPECIFICATIONS June 2001 CONSTRUCTION SPECIFICATION FOR CONCRETE CROSSWALK INDEX TS 3.65.01 SCOPE...3 TS 3.65.02 TS 3.65.03 REFERENCES...3

More information

SECTION A1 EXCAVATION AND BACKFILL GENERAL

SECTION A1 EXCAVATION AND BACKFILL GENERAL SECTION A1 EXCAVATION AND BACKFILL GENERAL The work under this section shall include all excavation to such width and depth as shown on the drawings, specified herein, or ordered by the Engineer. Such

More information

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PIPE HANGERS, Section PIPE HANGERS, SUPPORTS, AND RESTRAINTS

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PIPE HANGERS, Section PIPE HANGERS, SUPPORTS, AND RESTRAINTS PART 1 GENERAL 1.01 SUMMARY Section 15140 PIPE HANGERS, This Section includes the furnishing and subsequent installation of: A. Pipe and equipment hangers, supports, and associated anchors B. Equipment

More information

SECTION RIPRAP, BOULDERS, AND BEDDING

SECTION RIPRAP, BOULDERS, AND BEDDING SECTION 31 37 00 RIPRAP, BOULDERS, AND BEDDING PART 1 GENERAL 1.01 SECTION INCLUDES A. The WORK includes excavation, grading, and installation of riprap, boulders, soil riprap, void-filled riprap, and

More information

BILL OF QUANTITIES. Construction and Rehabilitation of wadi Gaza Bridges PAL Funded by Government of Brazil

BILL OF QUANTITIES. Construction and Rehabilitation of wadi Gaza Bridges PAL Funded by Government of Brazil United Nations Development Programme Programme of Assistance to the Palestinian People-PAPP Construction and Rehabilitation of wadi Gaza Bridges PAL10-00054031 Funded by Government of Brazil BILL OF QUANTITIES

More information

STOCKHOLDING DOCUMENT MANAGEMENT SERVICES LIMITED FORMERLY KNOWN AS SHCIL PROJECTS LIMITED

STOCKHOLDING DOCUMENT MANAGEMENT SERVICES LIMITED FORMERLY KNOWN AS SHCIL PROJECTS LIMITED STOCKHOLDING DOCUMENT MANAGEMENT SERVICES LIMITED FORMERLY KNOWN AS SHCIL PROJECTS LIMITED REQUEST FOR PROPOSAL (RFP) 130616 FOR SUPPLY INSTALLATION AND COMMISSIONING OF STEEL MEZZANINE FLOORING AT MAHAPE

More information

ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS

ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS 701-1 DESCRIPTION 701-1.1 This item shall consist of the construction of pipe culverts, and storm drains, removal of existing storm pipes, connections to existing

More information

ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS

ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS 6.1 DESCRIPTION This work shall consist of constructing curbs, gutters, sidewalks, ramps, local depressions and driveways of the form and dimensions shown

More information

TECHNICAL SPECIFICATION FOR MS BEAMS 116X100 11MTR LONG FOR SUB-STATIONS

TECHNICAL SPECIFICATION FOR MS BEAMS 116X100 11MTR LONG FOR SUB-STATIONS GUJARAT ENERGY TRANSMISSION CORPORATION LTD. Sardar Patel Vidyut Bhavan, Race Course, Vadodara: 390 007 TECHNICAL SPECIFICATION FOR MS BEAMS 116X100 11MTR LONG FOR SUB-STATIONS GETCO/E/TS-MS024/R0DT01-04-2008

More information

SCOPE OF WORK FOR PILING JOB

SCOPE OF WORK FOR PILING JOB SCOPE OF WORK FOR PILING JOB 1.0 PURPOSE This document defines the scope of works and specific requirements for the tank pad construction including pile foundation system for the proposed tanks at Wadala

More information

Box Rail. Single Box Rail Bracket

Box Rail. Single Box Rail Bracket HANGERS & RAILS Box Rail Accordion Door Hangers Max. Door Weight (SWL) 450 lbs Meets ANSI/BHMA A156.14, Grade 1. Rail is carefully formed to give an even tread to hanger wheels. Packaging: Bundled without

More information

Schedule (A) Non Schedule Items:

Schedule (A) Non Schedule Items: BILL OF QUANTITY Annexure D Name of work: Construction of 50m x 30m x 4m size store shed on RCC footing, RCC and steel columns, Brick wall, SAW tooth type steel truss, Beams, purlins etc. Galvalume and

More information

BILL OF QUANTITIES. Construction and Rehabilitation of wadi Gaza Bridges PAL Funded by Government of Brazil

BILL OF QUANTITIES. Construction and Rehabilitation of wadi Gaza Bridges PAL Funded by Government of Brazil United Nations Development Programme Programme of Assistance to the Palestinian People-PAPP Construction and Rehabilitation of wadi Gaza Bridges PAL10-00054031 Funded by Government of Brazil BILL OF QUANTITIES

More information

UNIT III Earthwork Estimation & Reinforcement Estimation

UNIT III Earthwork Estimation & Reinforcement Estimation SIDDHARTH GROUP OF INSTITUTIONS :: PUTTUR Siddharth Nagar, Narayanavanam Road 517583 QUESTION BANK (DESCRIPTIVE) Subject with Code : ECV(13A01605) Year & Sem: IV-B.Tech & I-Sem Course & Branch: B.Tech

More information

RCC PRECAST TOILET UNITS

RCC PRECAST TOILET UNITS RCC PRECAST TOILET UNITS TOILET UNIT PHOTO TOILET UNIT PLANS PDG Vinay Kulkarni Wins Coordinator West Zone Quotation for Toilet Units with Bio Digester Sr. Description Price (Rs.) Unit No. 1 TTSS1: 1 Super

More information

SECTION CHAIN LINK FENCES AND GATES (PARK)

SECTION CHAIN LINK FENCES AND GATES (PARK) SECTION 02821 CHAIN LINK FENCES AND GATES (PARK) PART I GENERAL 1.1 SECTION INCLUDES A. Installation of chain link fences, and gate units provided by single source including erection accessories, fittings,

More information

TERMS OF REFERENCE UPGRADING THE FISHERY SECTOR IN SOUTH SUDAN

TERMS OF REFERENCE UPGRADING THE FISHERY SECTOR IN SOUTH SUDAN UNITED NATIONS INDUSTRIAL DEVELOPMENT ORGANIZATION ORGANISATION DES NATIONS UNIES POUR LE DEVELOPPEMENT INDUSTRIEL TERMS OF REFERENCE UPGRADING THE FISHERY SECTOR IN SOUTH SUDAN CONSTRUCTION OF A FISH

More information

Name of work: Renovation of toilets in main building near molecular biology lab. Sl Rate Amount Description Quantity Unit No Rs Ps Rs Ps Schedule A

Name of work: Renovation of toilets in main building near molecular biology lab. Sl Rate Amount Description Quantity Unit No Rs Ps Rs Ps Schedule A SPECIFICATIONS AND SCHEDULE OF QUANTITIES Name of work: Renovation of toilets in main building near molecular biology lab Sl Rate Amount Schedule A 1 Demolishing concrete in cement mortar including disposal

More information

S.No Description Unit Quantity Rate (Rs) Amount (Rs)

S.No Description Unit Quantity Rate (Rs) Amount (Rs) , S.No Description Unit Quantity Rate (Rs) Amount (Rs) 1 2 Vertical load testing of piles in accordance with IS 2911 (Part IV) including installation of loading platform by Kentledge method and preparation

More information

2014 Capital Project Phase 3 Grand Island Central School District Cannon Design Project No SECTION PAVING PART 1 - GENERAL

2014 Capital Project Phase 3 Grand Island Central School District Cannon Design Project No SECTION PAVING PART 1 - GENERAL SECTION 321200 - PAVING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. The Contractor for this work shall be held to have read all of the Bidding Requirements, the Proposal Forms, the General Conditions of

More information

SECTION C1 DUCTILE IRON PIPE AND FITTINGS GENERAL

SECTION C1 DUCTILE IRON PIPE AND FITTINGS GENERAL SECTION C1 DUCTILE IRON PIPE AND FITTINGS GENERAL This section covers the furnishing and installation of ductile iron water pipe, fittings, thrust restraint and pipe disinfection. Ductile Iron Pipe MATERIALS

More information

PART 7 Technical Specification for Overhead and Underground Service Connection works for the Year

PART 7 Technical Specification for Overhead and Underground Service Connection works for the Year PART 7 Technical Specification for Overhead and Underground Service Connection works for the Year 2016-17 Technical Specification for Overhead and Underground Service Connection works for the Year 2016-17

More information

Union County Vocational - Technical Schools Scotch Plains, New Jersey

Union County Vocational - Technical Schools Scotch Plains, New Jersey SECTION 055113 - METAL PAN STAIRS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

Stanford University Facilities Design Guidelines SECTION SEAL COATS. C. Section : Traffic Striping and Pavement Markings

Stanford University Facilities Design Guidelines SECTION SEAL COATS. C. Section : Traffic Striping and Pavement Markings SECTION 32 12 36 SEAL COATS PART 1 GENERAL 1.1 RELATED WORK A. Section 31 10 00: Site Preparation B. Section 32 12 00: Flexible Paving C. Section 32 17 23 01: Traffic Striping and Pavement Markings 1.2

More information

SCHEDULE A BILL OF QUANTITIES Part - I : Road Work

SCHEDULE A BILL OF QUANTITIES Part - I : Road Work Sl.Pg.No.193 Name of Work : Construction of 36.0 m. wide road and storm water drains along BPCL compound wall at Dronagiri, Navi Mumbai. SCHEDULE A BILL OF QUANTITIES Part - I : Road Work 1. Demarcation

More information

Highway construction C 5

Highway construction C 5 Highway construction C 5 Contents Equipments used in Highway Construction Construction of Earth Roads Gravel Roads Water Bound Macadam Roads Bituminous Pavements Cement Concrete Pavements Equipment used

More information

STATE UNIVERSITY CONSTRUCTION FUND. UNIVERSITY CON DIRECTIVE 5-1 Issue date: October 2014

STATE UNIVERSITY CONSTRUCTION FUND. UNIVERSITY CON DIRECTIVE 5-1 Issue date: October 2014 STATE STRUCTION FUND DIRECTIVE 5-1 Issue date: October 2014 STRUCTURAL STEEL 1. General: It is the Fund's policy that the design of the structural steel is the prime responsibility of the project's Structural

More information

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS Section Page SECTION 14 RESTORATION OF SURFACES... 14.1 14-1 GENERAL... 14.1 14-2 PRIVATE ROADS... 14.1 14-3 STREETS AND PARKING LOTS... 14.1 14-3.01

More information

SECTION METAL FLOOR PLATE STAIRS

SECTION METAL FLOOR PLATE STAIRS SECTION 05513 - METAL FLOOR PLATE STAIRS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SCHEDULE OF RATES DAM AND ALLIED WORKS REFERENCE DATA NOTES ON BASIC RATES DATA FOR SCHEDULE OF RATES

SCHEDULE OF RATES DAM AND ALLIED WORKS REFERENCE DATA NOTES ON BASIC RATES DATA FOR SCHEDULE OF RATES RATES IN THIS FILE ARE LINKED WITH RATES IN BASIC DATA / HIRE CHARGES / LEAD CHARGES FILES TO THE EXTENT THEY ARE RELEVANT. IN THE DIALOG BOX THAT APPEARS ON THE MONITOR SCREEN ON OPENING THIS FILE CLICK

More information

STANDARD SPECIFICATION FOR CRIBLOCK CONCRETE CRIBWALL

STANDARD SPECIFICATION FOR CRIBLOCK CONCRETE CRIBWALL STANDARD SPECIFICATION FOR CRIBLOCK CONCRETE CRIBWALL 1. SCOPE 2. DESIGN 3. MATERIALS 4. CONSTRUCTION 5. METHOD OF MEASUREMENT AND PAYMENT SCOPE This Specification sets out requirements for the design,

More information

ITEM 458 WATERPROOFING FOR STRUCTURES

ITEM 458 WATERPROOFING FOR STRUCTURES ITEM 458 WATERPROOFING FOR STRUCTURES 458.1. Description. This Item shall govern for the furnishing and placing of waterproofing on concrete and steel bridge decks of railroad structures and on other structures

More information

BIO-AQUIFER STORM SYSTEM

BIO-AQUIFER STORM SYSTEM BIO-AQUIFER STORM SYSTEM Specifications for Construction PART 1 GENERAL 1.01 SECTION INCLUDES A. Providing labor, materials, tools and equipment to furnish and install a permeable concrete paving stone

More information

PAVING SLABS ON A CONCRETE BASE

PAVING SLABS ON A CONCRETE BASE SECTION 32 14 13.16 PAVING SLABS ON A CONCRETE BASE (1995 MasterFormat Section 02784) Note: This guide specification for the U.S. is for paving slabs on a sand bed over concrete for pedestrian applications.

More information

September 13, Enclosed is Addendum No. 6 to SEPTA's Sealed Bid No AMJP Frazer Shop & Yard Expansion Contract 2.

September 13, Enclosed is Addendum No. 6 to SEPTA's Sealed Bid No AMJP Frazer Shop & Yard Expansion Contract 2. September 13, 2016 Dear Sir/Madam Enclosed is Addendum No. 6 to SEPTA's Sealed Bid No. 16-00138-AMJP Frazer Shop & Yard Expansion Contract 2. The bid opening date and time scheduled for Monday, September

More information

Asphalt Rubber Chip Sealing DRAFT MAINTENANCE SPECIFICATION. March 22, 2007

Asphalt Rubber Chip Sealing DRAFT MAINTENANCE SPECIFICATION. March 22, 2007 Asphalt Rubber Chip Sealing DRAFT MAINTENANCE SPECIFICATION March 22, 2007 Description: This work consists of furnishing and applying asphalt rubber binder followed by an application of treated cover aggregate

More information

TS 805 POLES TTS CONSTRUCTION SPECIFICATION FOR POLE INSTALLATION TTS MATERIAL SPECIFICATION FOR STEEL POLES BASE MOUNTED

TS 805 POLES TTS CONSTRUCTION SPECIFICATION FOR POLE INSTALLATION TTS MATERIAL SPECIFICATION FOR STEEL POLES BASE MOUNTED TORONTO TRANSPORTATION January 2012 TS 805 POLES TABLE OF CONTENTS 1. DRAWINGS TTD 805.001 POLE HANDHOLE ORIENTATION DETAILS TTD 805.005 WOOD POLE IN EARTH TTD 805.010 BACK GUY MOUNTING DETAILS TTD 805.015

More information

CONCRETE BLOCK MASONRY

CONCRETE BLOCK MASONRY CONCRETE BLOCK MASONRY CONTENT Introduction Types Manufacturing process Properties Advantages Introduction These are the concrete blocks either hollow or solid. A hollow unit is that unit which has core

More information

CITY OF LETHBRIDGE SECTION Construction Specifications SIDEWALK CONSTRUCTION PAGE 1 of 5

CITY OF LETHBRIDGE SECTION Construction Specifications SIDEWALK CONSTRUCTION PAGE 1 of 5 Construction Specifications SIDEWALK CONSTRUCTION PAGE 1 of 5 1.0 EXCAVATION AND FILL 1.1 GENERAL.1 The excavation or fill shall be made to provide proper grade, lines and crosssection for the laying of

More information

BITUMEN-SET PRECAST CONCRETE PAVING SLABS

BITUMEN-SET PRECAST CONCRETE PAVING SLABS SECTION 32 14 13.16 BITUMEN-SET PRECAST CONCRETE PAVING SLABS (1995 MasterFormat Section 02784) NOTE: This guide specification is the U.S. for concrete paving slabs adhered with a neoprene mastic to a

More information

Smarter. Safer. Leaner.

Smarter. Safer. Leaner. Smarter. Safer. Leaner. Fast Installation and Removal Decrease Leading Edge Exposure by 87% OSHA Compliant Versatile and Reusable Use Perimeter Protection Posts During Construction: At Building Perimeter

More information

SECTION 2200 PAVING CITY OF BLUE SPRINGS, MISSOURI CONSTRUCTION SPECIFICATIONS

SECTION 2200 PAVING CITY OF BLUE SPRINGS, MISSOURI CONSTRUCTION SPECIFICATIONS SECTION 2200 PAVING CITY OF BLUE SPRINGS, MISSOURI CONSTRUCTION SPECIFICATIONS The City of Blue Springs hereby adopts Section 2200 of the Kansas City Metropolitan Chapter of APWA Construction and Material

More information

SECTION FLEXIBLE PAVING

SECTION FLEXIBLE PAVING SECTION 321200 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. Include GENERAL CONDITIONS and applicable parts of Division 1 as part of this Section. B. Examine all Drawings and other Sections of the Specifications

More information

Development of the Urban Water and Sanitation Sector in South Sudan (DUWSS) Bill of Quantities. for LOCATED AT PRIMARY & SECONDARY SCHOOL.

Development of the Urban Water and Sanitation Sector in South Sudan (DUWSS) Bill of Quantities. for LOCATED AT PRIMARY & SECONDARY SCHOOL. Development of the Urban Water and Sanitation Sector in South Sudan (DUWSS) Bill of Quantities for SIX CHAMBER VIP LATRINE FACILITY LOCATED AT PRIMARY & SECONDARY SCHOOL YEI RIVER COUNTY South Sudan JUN,

More information

SPECIAL PROVISIONS - SP2014 BOOK Page 1 October 8, 2013

SPECIAL PROVISIONS - SP2014 BOOK Page 1 October 8, 2013 SPECIAL PROVISIONS - SP2014 BOOK Page 1 S-1 (2104) REMOVE AND REPLACE BITUMINOUS PAVEMENT (ADA) Always include SP2014-119 (PLANT MIXED ASPHALT PAVEMENT) or SP2014-121 (PLANT MIXED ASPHALT PAVEMENT FOR

More information

B. Polyethylene samples shall be submitted for Owner approval of color and quality.

B. Polyethylene samples shall be submitted for Owner approval of color and quality. Glass Rail ENGINEERED DASHERBOARD SPECIFICATIONS PART 1 - GENERAL 1.01 PROJECT SCOPE A. Contractor shall furnish and install one complete set of steel framed dasherboards as indicated on the drawings and

More information

ITEM 275 PORTLAND CEMENT TREATED MATERIALS (ROAD MIXED)

ITEM 275 PORTLAND CEMENT TREATED MATERIALS (ROAD MIXED) ITEM 275 PORTLAND CEMENT TREATED MATERIALS (ROAD MIXED) 275.1. Description. This Item shall govern for treating subgrade, new and/or existing base [with or without asphaltic concrete pavement (ACP)], or

More information

SECTION HANGERS AND SUPPORTS FOR PLUMBING

SECTION HANGERS AND SUPPORTS FOR PLUMBING SECTION 22 05 29 HANGERS AND SUPPORTS FOR PLUMBING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

TENDER DOCUMENT. TENDER No.: BHI/PI(S)/675/1007 FOR

TENDER DOCUMENT. TENDER No.: BHI/PI(S)/675/1007 FOR TENDER DOCUMENT TENDER No.: BHI/PI(S)/675/1007 FOR Tender for supply of perforated cable tray for the Project of - Augmentation of Fuel & Flux Crushing Facilities (Pkg- 064) for Bhilai Steel Plant at Chhattisgarh

More information

A-Series Aluminum Gantry Crane

A-Series Aluminum Gantry Crane SPANCO PRODUCT SPECIFICATIONS 1 A-Series Aluminum Gantry Crane This guide can be used to prepare a bid specification for the incorporation of an A-Series Gantry Crane into a competitive bid project or

More information

built build to FORMWORKS CLIMBING, RETAINING WALLS, SPECIAL

built build to FORMWORKS CLIMBING, RETAINING WALLS, SPECIAL uilt build to FORMWORKS Company Projects Products CLIMBING SYSTEMS Pilosio s CLIMBING SYSTEM with mechanical handling enable vertical construction joints to be created in succession without the aid of

More information

TECHNICAL SPECIFICATION OF MS TOR BARS FOR TRANSMISSION LINES

TECHNICAL SPECIFICATION OF MS TOR BARS FOR TRANSMISSION LINES GUJARAT ENERGY TRANSMISSION CORPORATION LTD. Sardar Patel Vidyut Bhavan, Race Course, Vadodara: 390 007 TECHNICAL SPECIFICATION OF MS TOR BARS FOR TRANSMISSION LINES GETCO/E/TS-MS024/R2 DT08-02-2012 TECHNICAL

More information

Sri Rama Krishna Institute of Technology Basic civil engineering Unit-2(BUILDING COMPONENTS AND STRUCTURES) 2 mark questions

Sri Rama Krishna Institute of Technology Basic civil engineering Unit-2(BUILDING COMPONENTS AND STRUCTURES) 2 mark questions Sri Rama Krishna Institute of Technology Basic civil engineering Unit-2(BUILDING COMPONENTS AND STRUCTURES) 2 mark questions 1. What is masonry? Masonry is defined as construction of building units bonded

More information

SITE VISIT REPORT DATE: JOB: NO. OF VISIT: PAGE OF : PURPOSE OF VISIT: CONTRACTOR: Items to be checked Observations Actions SETTING OUT

SITE VISIT REPORT DATE: JOB: NO. OF VISIT: PAGE OF : PURPOSE OF VISIT: CONTRACTOR: Items to be checked Observations Actions SETTING OUT SETTING OUT Correct to boundaries Correct to building lines? Diagonals accurate? Levels correct? EXCAVATIONS Adjoining structures OK? Centres of foundations line with walls? Bottoms of trenches uniform,

More information

TENDER SPECIFICATION

TENDER SPECIFICATION TENDER SPECIFICATION BHEL PSSR SCT 1324 FABRICATION & ERECTION OF STRUCTURAL STEEL IN POWER HOUSE, MILL BUNKER BAY, AUXILLIARY BUILDINGS AND PIPE RACK ETC FOR 2 X 600 MW TPP FOR TAMIL NADU ELECTRICITY

More information

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS SECTION 26 05 29 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS PART 1 GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide all labor, materials, equipment, and incidentals as shown, specified, and

More information

The City of Winnipeg SECTION ST. VITAL LIBRARY RENOVATION PROJECT 6 FERMOR AVE. Page 1 of 5

The City of Winnipeg SECTION ST. VITAL LIBRARY RENOVATION PROJECT 6 FERMOR AVE. Page 1 of 5 The City of Winnipeg SECTION 05 50 00 METAL FABRICATIONS ST. VITAL LIBRARY RENOVATION PROJECT 6 FERMOR AVE. Page 1 of 5 Part 1 General 1.1 REFERENCES.1 American Society for Testing and Materials International,

More information

The Contractor is responsible for quality control, including workmanship and materials furnished by his subcontractors and suppliers.

The Contractor is responsible for quality control, including workmanship and materials furnished by his subcontractors and suppliers. SECTION 05 31 13 STEEL FLOOR DECKING PART 1 - GENERAL 1.1 RELATED DOCUMENTS Drawings and general provisions of the contract, including General and Supplementary Conditions and Division 01 - Specification

More information

CW 3170 EARTHWORK AND GRADING TABLE OF CONTENTS

CW 3170 EARTHWORK AND GRADING TABLE OF CONTENTS CW 3170 EARTHWORK AND GRADING TABLE OF CONTENTS 1. GENERAL CONDITIONS...1 3. DESCRIPTION...1 5. MATERIALS...1 5.1 General...1 5.2 Handling and Storage of Materials...1 5.3 Testing and Approval...1 5.4

More information

HANDSET WALL FORM. Handset Wall Form. Quick Assembly - can be built using only a hammer. Reduced weight increases productivity

HANDSET WALL FORM. Handset Wall Form. Quick Assembly - can be built using only a hammer. Reduced weight increases productivity HANDSET WALL FORM Quick Assembly - can be built using only a hammer Reduced weight increases productivity Unsurpassed flexibility in design and availability of panels for a wide variety of applications

More information

PATHWAYS FOR COMMUNICATIONS SYSTEMS

PATHWAYS FOR COMMUNICATIONS SYSTEMS 270528 PATHWAYS FOR PART 1 GENERAL 1.1 WORK INCLUDED A. Provide all labor, materials, and equipment for the complete installation of work called for in the Contract Documents. 1.2 SCOPE OF WORK A. This

More information

Method of Measurement for Road Works Series MM Structural Concrete

Method of Measurement for Road Works Series MM Structural Concrete Method of Measurement for Road Works Series MM 1700 - CC-RMP-01700 December 2013 CC Construction & Commissioning Standards TRANSPORT INFRASTRUCTURE IRELAND (TII) PUBLICATIONS About TII Transport Infrastructure

More information

SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS

SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS Section Page 26-1 GENERAL... 26.1 26-2 PAVEMENT KEYCUTTING... 26.1 26-3 PAVEMENT PLANING... 26.2 26-4 PLANED PAVEMENT CONFORMS... 26.3

More information

MASTERSPEC - SHORT FORM. B. See Division 5 Section "Metal Stairs" for steel tube railings associated with metal stairs.

MASTERSPEC - SHORT FORM. B. See Division 5 Section Metal Stairs for steel tube railings associated with metal stairs. SECTION 05721 - ORNAMENTAL RAILINGS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Glass supported railings. B. See Division 5 Section "Metal Stairs" for steel tube railings associated

More information

BHARAT HEAVY ELECTRICAL LIMITED, JHANSI Specification No.

BHARAT HEAVY ELECTRICAL LIMITED, JHANSI Specification No. NOTE : SCOPE : BHARAT HEAVY ELECTRICAL LIMITED, JHANSI Specification No. CRJ/9577 Item No. SP/CRJ/9577/1 & SP/CRJ/9577/2 Location NEW M.G.HOUSE Quantity 2 NOS. DESIGN, MANUFACTURING, SUPPLY, ERECTION &

More information