1 Development of the Urban Water and Sanitation Sector in South Sudan (DUWSS) Bill of Quantities for SIX CHAMBER VIP LATRINE FACILITY LOCATED AT PRIMARY & SECONDARY SCHOOL YEI RIVER COUNTY South Sudan JUN, 2012
2 Development of the Urban Water and Sanitation Sector in South Sudan (DUWSS) VIP Latrines,Yei River County, South Sudan ITEM DESCRIPTION UNIT QTY I. SIX CHAMBER VIP TOILETS for SCHOOLS A. SUBSTRUCTURE 1. EXCAVATION & EARTHWORKS Unless other wise stated, Rate shall include for a) back filling with selected excavated material & consolidating. Surface treatment; compaction before filling / foundation. b) disposal of surplus soil as directed & keeping all excavations free from water unless other wise measured separately. c) any additional excavation for working space. d) Trees will require protection 1.1 Clear off site to remove top soil to an average depth of 20cm. m Bulk excavation in ordinary soil to a depth of 100cm for VIP Latrine pit. m Ditto but over 100cm and not exceeding 400cm. m Excavate for foundation trench to the external beams in ordinary soil to a depth not exceeding 150cm from the stripped ground level m Return fill around foundation with good, dry excavated material from site and well ram in layers every 20cm interval. m Fill under floor slab with selected material from quarry and well compacted, rolled in layers every 20cm interval. m Remove and spread surplus excavated material with in the compound. m cm thick basaltic or equivalent stone hardcore and blinded with crushed stone. m Total EXCAVATION & EARTHWORKS 2.CONCRETE WORKS 1 / 5
3 2.1 5cm thick lean concrete in C-7 200kg cement/m3: a) under floor slab. m b) under foundation brick wall. m Reinforced concrete in C-25, 360kg cement/m3 filled into formworks and vibrated around rod reinforcement. Steel reinforcement and formworks measured separately. a) In grade beams m b) In 10cm thick precast ground floor slabs m b) In 10cm thick on compound ground floor slab m STEEL REINFORCEMENT 2.3 Steel reinforcement according to drawing. Price includes cutting, bending, placing in position and tying wires. a)dia.6mm ribbed bar kg b)dia.8mm ribbed bar kg c)dia.10mm ribbed bar kg d)dia.12mm ribbed bar kg FORMWORK 2.4 Provide,cut and fix in position sawn wood or steel formworks to: a) Grade beams m b) 10cm thick precast ground floor slab m Total CONCRETE WORKS 3. BRICK WORK cm thick brick wall bedded in cement mortar 1:6 for pit linning and foundation. m Total BRICK WORK B. SUPERSTRUCTURE 1.CONCRETE WORKS 1.1 Reinforced concrete in C-25, 360kg cement/m3 filled into formworks and vibrated around rod reinforcement. Steel reinforcement and formworks measured separately. a) In beams and lintels. m STEEL REINFORCEMENT 1.2 Steel reinforcement according to drawing. Price includes cutting, bending, placing in position and tying wires. a) Dia.6mm deformed bar kg b) Dia.8mm deformed bar kg 8.22 c) Dia.10mm deformed bar kg d) Dia.12mm deformed bar kg FORMWORK 2 / 5
4 1.3 Provide,cut and fix in position sawn wood or steel formworks to: a) Beams and lintels. m Total CONCRETE WORKS 2. BRICK/BLOCK WORKS cm thick HCB wall bedded in cement mortar 1:3 mix both sides left for plastering. m cm thick brick wall bedded in cement mortar 1:3 mix both sides left for plastering. m Ditto but to 12cm thick brick wall. m cm thick perforated brick or block wall. m Total BRICK/BLOCK WORKS 3. ROOFING 3.1 Supply & fix roof cover in G-28 corrugated Iron sheet (CIS) nailed on 5x7cm wooden purlin price includes headed nails & other necessary accessories. M Supply & fix minimum Dia.10cm wooden truss rafters Ml Supply & fix 5x7cm wooden purlin Ml Supply & fix G-26 corrugated Iron sheet (CIS) roof gutter with all necessary accessories. ML Supply & fix 8''x1'' Facia board. ML 6.85 Total ROOFING 4.CARPENTRY & JOINERY 4.1 Supply and fix 40mm thick wooden door with best quality hard wood frames and door list and both sides covered with best quality 5mm thick plywood. Price includes ASSA door lock or similar, two coats of oil paint, kicking plate, door stopper and all necessary iron mongery. All according to door and window schedule. a)type D1 size:70x210 cm No 6.00 b)type D2 size:90x210 cm No 2.00 Total CARPENTRY & JOINERY 5. PLASTER & OTHER FLOOR & WALL FINISHINGS 5.1 Apply three coats of plaster in cement-mortar (1:3) upto fine trowel finish to all internal walls. m Ditto but to external with wood float finsh m / 5
5 5.3 Apply two coats of plaster to receive wall tiles. m x20x0.60cm white glazed wall tiles and including cement mortar backing and joints pointed in white cement.(for Urinal bath tub) m cm thick concrete copping a) 25 cm wide m Total PLASTER & OTHER FLOOR & WALL FINISHINGS 6.PAINTING 6.1 Apply in three coats of plastic emulsion paint to internal plastered wall surfaces and exposed beams and columns. m Ditto but external wall surfaces. m Total PAINTING 7. SANITARY INSTALATION WATER SUPPLY DISTRIBUTION 7.1 Supply and install upvc water supply pipes for water distribution from the water reservoir to urinal and washing facilities according to where shown on the drawings complete with the necessary connecting, pieces such as bends, unions, nipples tees, elbows, etc. unit price shall include all the necessary assistance to the installation work such as chiselling of walls, slabs floors, etc. and closing then with concrete to normal condition the installation shall be tested at a pressure of 1Mpa, before pipes are covered at the expense of the contractor. dia 15mm. Lm dia 20mm.. Lm Supply and install, on water supply lines chromplated, gate valves, made of bronze or brass parts complete with rubber gaskets, hand whells, unions and other accessories. dia 15mm. Pcs dia 20mm. Pcs 6.00 WASTE WATER COLLECTION AND VENTILATION 7.3 Supply and install soil waste and vent pipes in horizontal branches and vertical stacks made of UPVC pipes and fittings conforming to BS 5255 and BS4514. Fittings should include bends, branches, tees clear outs, reducers, etc. joints are to be done with solvent weld conforming to BS4514. Unit price shall include all the necessary assistance work to the installation, such as chiselling of walls, slabs, floors, etc. and closing them with concrete. All pipes entering manholes shall be trapped. dia 50mm. Lm 6.00 dia 100mm. Lm Supply and fix floor drains in steel frame and removable enamelled cast iron grating with a minimum water seal of 25mm. complete with all accessories. 4 / 5
6 dia 100mm. Pcs Supply and fix vent cap. dia100mm Pcs 7.00 SANITARY FIXTURES 7.6 Supply and fix prefabricated cement or ceramic squating pan. Pcs Supply and fabricate insitu concrete or similar toilet paper holder complete and as instructed on site Supply and fabricate insitu concrete or similar soap holder complete and as instructed on site. 7.9 Supply and fix fiber glass or equivalent water tank of a volumetric capacity of 1m3(1000litres), with all it's accessories. Price includes mercury float valve. Pcs 2.00 Pcs 2.00 Total SANITARY INSTALATION Bill of Quantities Sub-Total for 1 Block Bill of Quantities Sub-Total for 3 Blocks 10% for physical contingencies Bill of Quantities Total (excl. Taxes and Duties) 5 / 5
7 Development of the Urban Water and Sanitation Sector in South Sudan (DUWSS) A. SUBSTRUCTURE SUMMARY Primary & Secondary School, VIP Latrines,Yei River County, South Sudan SIX CHAMBER VIP TOILETS for SCHOOLS 1. EXCAVATION AND EARTHWORKS 2. CONCRETE WORKS 3. FOUNDATION BRICK WORKS SUBTOTAL(A) B. SUPERSTRUCTURE 1. CONCRETE WORKS 2. BRICK/BLOCK WORKS 3. ROOFING 4. CARPENTRY AND JOINERY 5. PLASTER AND OTHER FLOOR & WALL FINISHINGS 6. PAINTING 7. SANITARY INSTALLATION SUB TOTAL(B) TOTAL(A+B) for 1 Block TOTAL(A+B) for 3 Blocks Add 10% for physical contingencies GRAND TOTAL for 3 Blocks
Description Unit Quantity Rate Kshs. Amount Kshs.
BILL No.1 40m3 MASONRY STORAGE TANK No. Description Unit Quantity Rate Kshs. Amount Kshs. 1 SETTING OUT AND EARTH WORKS 1.1 General site clearance and setting out 1.2 Excavate over site 200mm to remove
More informationAppendix 4. Bills of Quantities
Appendix 4. Bills of Quantities 201 A4.1 Deep trench latrines Partitions of local materials 1m apart Timber foot rests and floor plates Lightweight timber frame Excavated soil (used for back-fill) Plastic
More informationWORK BELOW LOWEST FLOOR FINISH 1/7 230, , , FRAME 2/6 96, , ,056.00
Description Page No Summary Amount Summary 1/7 230,694.60 22,019.25 22,642.65 2/6 96,801.30 80,150.60 114,056.00 Total Per Unit (MYR) 327,495.90 102,169.85 136,698.65 Total Unit(s) X 1 2 2 Total Per Type
More informationEstimate FOR THE SEPTIC TANK
Estimate FOR THE SEPTIC TANK S.NO ITEM DESCRIPTION. 1 Excavation in soil,soft & hard murum... Qty UNIT Rate Excavation for footing, machine foundation, plinth beams, wall footing, gutters,brick wall, tanks
More informationBOQ for Plumbing, Sanitary Works
BOQ for Plumbing, Sanitary Works Page of 6 Sr.No Item Description Quantity Unit Rate Amount (Rs.) SANITARY FIXTURES a Providing & Fixing star white colour vitreous china wall mounted wc with heavy duty
More informationPART A : CPVC PIPES AND FITTNGS (EXTERNAL WATERSUPPLY):
PART A : CPVC PIPES AND FITTNGS (EXTERNAL WATERSUPPLY): 01 Providing and Fixing of CPVC pipes confirming to ASTM standard including all CPVC fittings like tees, elbows, bends, unions, coupling, reducer
More informationARCHITECTURAL DRAWINGS
PROJECT DETAILS Implementation Partner: Project title: Grant No.: KIS062 Content : ARCHITECTURAL DRAWINGS SHEET NO. REHABILITATION OF GRANT NO.: - KIS062 COVER SHEET INDEX SHEET CONTENTS 01 02 03 04 05
More informationRFP/GRC/LSV/ : RENOVATION (CIVIL WORKS) OF THR 8th PRIMARY SCHOOL TOILETS IN MYTILENE. Annex A - BILL OF QUANTITIES 1/9
RFP/GRC/LSV/2017-005: RENOVATION (CIVIL WORKS) OF THR 8th PRIMARY SCHOOL TOILETS IN MYTILENE Annex A - BILL OF QUANTITIES 1/9 The Contractor shall consider in his price all costs or expenses of all requirements
More informationBILL OF QUANTITY ENGINEERING & MANAGEMENT CONSULTING CENTRE. "Beit Hanoun Emergency Water Supply Project"
"Beit Hanoun Emergency Water Supply Project" " Rehabilitation and Construction of Beit Hanoun Water Network " BILL OF QUANTITY ENGINEERING & MANAGEMENT CONSULTING CENTRE Bill of Quantities PREAMBLE TO
More informationRCC PRECAST TOILET UNITS
RCC PRECAST TOILET UNITS TOILET UNIT PHOTO TOILET UNIT PLANS PDG Vinay Kulkarni Wins Coordinator West Zone Quotation for Toilet Units with Bio Digester Sr. Description Price (Rs.) Unit No. 1 TTSS1: 1 Super
More informationBUILDING SKILLS. Building Skills : Basic Painting. Building Skills : Plaster & Tiler. Course Content : Course Content : Duration : 10 Days
Building Skills : Basic Painting Use and maintain hand tools Prepare new wall surfaces Prepare old wall surfaces Coat new wall surface with P. V. A Prepare wooden & metal surface (Door & Frame) for enamel
More informationTERMS OF REFERENCE UPGRADING THE FISHERY SECTOR IN SOUTH SUDAN
UNITED NATIONS INDUSTRIAL DEVELOPMENT ORGANIZATION ORGANISATION DES NATIONS UNIES POUR LE DEVELOPPEMENT INDUSTRIEL TERMS OF REFERENCE UPGRADING THE FISHERY SECTOR IN SOUTH SUDAN CONSTRUCTION OF A FISH
More informationName of work: Renovation of toilets in main building near molecular biology lab. Sl Rate Amount Description Quantity Unit No Rs Ps Rs Ps Schedule A
SPECIFICATIONS AND SCHEDULE OF QUANTITIES Name of work: Renovation of toilets in main building near molecular biology lab Sl Rate Amount Schedule A 1 Demolishing concrete in cement mortar including disposal
More informationRFP/GRC/LSV/ : RENOVATION (CIVIL WORKS) AT SKALA SYKAMNIAS CHILDRENS PLAYGROUND BILL OF QUANTITIES
RFP/GRC/LSV/2017-003: RENOVATION (CIVIL WORKS) AT SKALA SYKAMNIAS CHILDRENS PLAYGROUND BILL OF QUANTITIES 1/7 The Contractor shall consider in his price all costs or expenses of all requirements stipulated
More informationChild Friendly Schools in Rwanda
Child Friendly Schools in Rwanda Typical drawings of school building and toilet block Approved by MINEDUC/UCEFS Eng. Warren Habimana UNICEF Rwanda PO Box 381, Kigali Education section: tel. +250 592750-55
More informationCONSTRUCTION AND REHABILITATION OF FENCE AT GPL'S VERSAILLES COMPOUND
BILL Nr1 - PRELIMINARIES 1.0 PRELIMINARY PARTICULARS 1.1 Funding The funding shall be provided by the Guyana Power & light Inc., of 40 Main street, North Cummingsburg, Georgetown. 1.2 Engineer The Engineer
More informationSPECIFICATION FOR PIPE CULVERT CONSTRUCTION
SPECIFICATION FOR PIPE CULVERT CONSTRUCTION 1. SCOPE Pipe culverts shall be constructed in accordance with this specification and in conformity with the lines, levels and cross-sections shown on the drawings.
More informationLot 2: Construction of ANC Facility-Pochalla, Jonglei State 1/21
1/21 SOUTH SUDAN -Health Systems Strengthening Round 9 Lot 2:Bill of Quantities for Construction of Antenatal Clinic at Pochalla Civil Hospital Jonglei State Currency A MAIN SUMMARY A.1 A.2 Bill No.1-
More informationA. Codes and Standards that are standard at the University. C. Coordinate cleanout locations with Architect.
PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is
More informationD Bulk Excavate in black cotton soils depth exceeding 1.5 M but not exceeding 3.0m 2,488 CM 450 1,119,600.00
SUBSTRUCTURES (All provisional) Site Preparation A Clear site of all bushes, shrubs and grub up roots and remove from site 1,800 SM 120 216,000.00 B C Excavations & Earthworks Excavate oversite soil average
More informationLOT 3:BILLS OF QUANTITY FOR CONSTRUCTION OF BLOOD BANK AT MALAKAL HOSPITAL UPPER NILE STATE Currency. Item Description Qty Unit
Lot 3 Construction of Blood Bank at Malakal Hospital Pages 1/40 SOUTH SUDAN-Health Systems Strengthening Round LOT 3:BILLS OF QUANTITY FOR CONSTRUCTION OF BLOOD BANK AT MALAKAL HOSPITAL UPPER NILE STATE
More informationReturn, fill in and ram well selected excavated materials to make up levels around wall foundations.
ELEMENT NO. 1 EARTH WORKS & SUBSTRUCTURE [ALL PROVISIONAL] The works in this section includes all work up to and including ground floor slab :- Excavation / Earth works A. B. Clear the site of all bushes,
More informationHeavy Rib. Page 1 of 6. Expanded Mesh & Metal Products. Key Product Features:
TMI- is used widely in construction work for joints, stop-end, retaining walls and columns. It creates a strong bond base for successive pours. is fixed as permanent formwork. Key Product Features: Unique
More informationTable of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities
Division 1 Requirements Design and Construction Quality Campus Master Plans Texas Tech University System Operating and Building Maintenance Project Administration Historically Underutilized Business (HUB)
More informationBILL OF QUANTITIES. Construction and Rehabilitation of wadi Gaza Bridges PAL Funded by Government of Brazil
United Nations Development Programme Programme of Assistance to the Palestinian People-PAPP Construction and Rehabilitation of wadi Gaza Bridges PAL10-00054031 Funded by Government of Brazil BILL OF QUANTITIES
More informationPARTICULAR SPECIFICATIONS PLUMBING AND SANITARY WORK
Sl.Pg.No.439 PARTICULAR SPECIFICATIONS PLUMBING AND SANITARY WORK 1.0 GENERAL 1.1.0 These specifications shall cover supply, installation testing & commissioning of all works related with public health
More informationNo # Specifications Rate To Be Quoted. Unit Qty (in figures) (in words) Total Amount
Revised Schedule B as per corrigendum no. SASB/NIT/Works/818/2016/09 dated 28.01.2016. SCHEDULE B (FINANCIAL BID) B- a FABRICATION AND SUPPLY OF 200 EUROPEAN TYPE TOILETS (Rate to be quoted in Rupees both
More informationA. This Section includes sanitary waste and vent piping inside the building and to locations indicated.
SECTION 221316 SANITARY WASTE AND VENT PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationPRECAST CEMENT PRODUCTS
Profile No.: 30 NIC Code: 23959 PRECAST CEMENT PRODUCTS 1. INTRODCUTION: Reinforced cement concrete products are becoming popular as modular house and apartment buildings are based on standard designs.
More informationSECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL PRECAST CONCRETE MANHOLES
Section SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL... 39-1 39-2 PRECAST CONCRETE MANHOLES... 39-1 39-2.01 Precast Concrete Storm Drain Manholes... 39-1 39-3 SADDLE MANHOLES... 39-2 39-3.01 Saddle
More informationGeneral Conditions 39,522 5, ,292 26,050 75,921 1, Labor hours
Basic Edition Standard Estimate Report Page 1 Name 1000 General Conditions 1107 Professional Consultant 10 Surveying 1.00 day 600.000 /day 600 - - - - - - 600 Professional Consultant 600 600 8.00 hours
More informationMANUFACTURER S SPECIFICATIONS Section LIME CONCRETE. A. This section describes the requirements for floors and slabs on grade.
MANUFACTURER S SPECIFICATIONS Section 03330 LIME CONCRETE ST. ASTIER NATURAL HYDRAULIC LIME CONCRETE PART 1 GENERAL 1.01 General A. This section describes the requirements for floors and slabs on grade.
More informationSECTION MANHOLES AND STRUCTURES. A. Section Includes: 1. Manholes for water, storm drain and sanitary sewer systems.
SECTION 33 05 13 MANHOLES AND STRUCTURES PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Manholes for water, storm drain and sanitary sewer systems. B. Related Sections: 1. Section 03 20 00 - Concrete
More informationSECTION PLUMBING PIPING SYSTEMS
SECTION 15300 PLUMBING PIPING SYSTEMS PART 1 - GENERAL 1.01 SPECIAL NOTICE A. Each contractor shall read all relevant documents, become familiar with the job, the scope of work, type of general construction,
More informationThe Schools Ecological Sanitation Programme 2. Building an Arborloo. Peter Morgan and Annie Shangwa June 2008
The Schools Ecological Sanitation Programme 2. Building an Arborloo Peter Morgan and Annie Shangwa June 2008 Every family needs a toilet! Why not teach the method at school! Simple ecological toilets which
More informationPROPOSED YONTOY PREFAB OFFICES PROPOSED PREFAB INSTALLATION -YONTOY- JUBBALAND STATE OF SOMALIA PROJECT: IMPLMENTED BY: GOVERNMENT.
PROJECT: IMPLMENTED BY: PROPOSED YONTOY GOVERNMENT. PREFAB OFFICES JUBBALAND STATE OF SOMALIA - YONTOY - OCTOBER 2017 DRAWING INDEX 01. 02. 03. 04. 05. 06. 07. 08. 09. 10. 11. SHEET N O 01/27 02/27 03/27
More informationDRAINS AND CLEANOUTS. 1. Division 7 - Thermal and Moisture Protection Piping (Plumbing).
SECTION 15421 DRAINS AND CLEANOUTS PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. Division 7 - Thermal and Moisture Protection. 2. 15410 - Piping (Plumbing). 1.02 SUBMITTALS A. Product Data: Submit
More informationPASSAIC COUNTY TECHNICAL INSTITUTE CCA 1422 NEW S.T.E.M. BUILDING 2017
SECTION 02630 - STORM DRAINAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More informationSOUTH SUDAN -Health Systems Strengthening Round 9
1/38 SOUTH SUDAN -Health Systems Strengthening Round 9 Lot 1:Bill2-Bill of Quantities for Construction of Antenatal Clinic and M & E Offices at Aweil Northern Bar E l Ghazel Currency Amount A MAIN SUMMARY
More informationBOQ for Lintel, Chajja, Brick work & Plastering work at Pkg. - III - Phase - I
BOQ for Lintel, Chajja, Brick work & Plastering work at Pkg. - III - Phase - I S.No. Description Unit Qty RATE Amount PART-I CIVIL WORKS B-PLAIN AND REINFORCED CEMENT CONCRETE : Notes : ( the following
More informationSPACE TYPE: OUTSIDE PARKING (STRUCTURE)
SPACE TYPE: OUTSIDE PARKING (STRUCTURE) Construction Criteria The unit costs for Outside Parking (Structure) space types are based on the construction quality and design features in the following table.
More informationUnderground Exhaust System
Operation and Maintenance Manual Underground Exhaust MONOXIVENT - SOURCE CAPTURE SYSTEMS - info@ Oct. - 2015 Underground Duct Construction Standards 1. Dig trench depth to allow for minimum distance from
More informationNORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017
SECTION 22 1319 - SANITARY WASTE PIPING SPECIALTIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division
More informationMASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 22 PLUMBING
SECTION 221316 - SANITARY WASTE AND VENT PIPING PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following soil and waste, sanitary drainage and vent piping inside the building: 1. Pipe, tube,
More informationONE PIPE LENGTH MAX (REFER TO 1/4"/FT SLOPE (MIN) 5'-0" (MIN) OR 4" LATERAL NOTE #1) INCREASER RIGHT-OF-WAY/ 4"x6" REFER TO TYPICAL EXCAVATION,
VENT CAP (MUSHROOM TYPE) SOLID CAP EXIST GRADE MIN BUILDING REFER TO NOTE #4 MIN CONCRETE SIDEWALK CURB OR EDGE OF SIDEWALK STREET CLEANOUT (REFER TO NOTE #3) VENT PIPE 4" PVC 6" PVC CLEANOUT CONCRETE
More informationNORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017
SECTION 22 1316 - SANITARY WASTE AND VENT PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01
More informationSECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT. A. ASME B31.1 (American Society of Mechanical Engineers) - Power Piping
SECTION 22 05 29 HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 SUMMARY A. Section includes pipe and equipment supports, hangers, anchors, bases sleeves and the sealing of
More informationResidential Building Inspections
Residential Building Inspections Foundations, Grade Beams, Pile Caps, Foundation Pads 1. All trenches or excavations and formwork shall be in accordance with the size(s) and configuration(s) as per approved
More informationSECTION UTILITY MANHOLES AND STRUCTURES
SECTION 33 05 14 UTILITY MANHOLES AND STRUCTURES PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Precast reinforced concrete manholes and structures with tongue-and-groove joints with masonry transition
More informationA. Codes and Standards that are Standards at the University. A. Provide floor drains in all toilet rooms, janitor closets, and mechanical rooms.
PART 1: GENERAL 1.01 Purpose A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is
More informationSAMPLE. Slab On Ground Construction. Carpentry - Residential Construction. Product Code: 5597
Slab On Ground Construction Carpentry - Residential Construction Product Code: 5597 Publishing details: Second Edition 2012 TAFE NSW Training and Education Support, Industry Skills Unit Orange and Granville
More informationSECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT
SECTION 23 05 29 HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 SUMMARY A. Section includes pipe and equipment supports, hangers, anchors, bases sleeves and the sealing of work
More informationSCHEDULE OF QUANTITIES INTERIOR WORKS FOR RACC,GADAG Description Qty. Unit Rate Amount
Item No. 1 PARTITION 1.1 DOUBLE SKIN WOODEN PARTITION SCHEDULE OF QUANTITIES INTERIOR WORKS FOR RACC,GADAG Description Qty. Unit Rate Amount Providing and fixing 71 mm thick solid fully or partly glazed
More informationCivil Engineering Construction Chapter 5
Civil Engineering Construction Chapter 5 Introduction to Floor Dr Mohamad Syazli Fathi Department of Civil Engineering UTM RAZAK School of Engineering & Advanced Technology UTM International Campus August
More informationResidencial Las Américas - Edificio California C/ Sierra de Gredos,
Don t you think it s time to change your life? Then, bear this in mind! One more step in the creation of one of the best urban developent conceptions in Almería: Residencial Las Américas. Edificio Californi
More information6. Urine-Diverting Toilets
6. Urine-Diverting Toilets Urine-diverting toilets use a special pedestal or squat plate in which the urine enters the front part of the pedestal and is then diverted through a pipe and is thus separated
More informationPremier Inn, Wilson Street, Middlesbrough, TS1 1AE. Site progress report. February 2017
Premier Inn, Wilson Street, Middlesbrough, TS1 1AE Site progress report February 2017 Site set up Currently 4 weeks in to the build the site has been cleared and hoardings have been erected. Welfare cabins
More informationImprovements to the Distribution Pipe Lines in Zalengi, Central Darfur Please insert the currency Item Description
RETURNABLE BID SCHEDULE 4 BILL OF QUANTITIES Case No. SDPC/76613/WORKS/ITB056 Improvements to the Distribution Pipe Lines in Zalengi, Central Darfur Please insert the currency 1 General 1 Mobilization
More informationMANHOLES, VAULTS AND CATCH BASINS SECTION A. Section Soil and Aggregate Materials. C. Section Storm Drainage Systems
SECTION 02607-1 1.0 GENERAL 1.1 SCOPE: A. This section covers the work necessary for the construction of sanitary and storm system manholes, catch basins, and miscellaneous concrete structures complete.
More informationPROGRESS REPORT NAMILANGI SCHOOL PROJECT PHASE III
ZAMBIA OFFICE PROGRESS REPORT NAMILANGI SCHOOL PROJECT PHASE III December,2016 1 P a g e BACKGROUND In 2014, Lions Aid Norway (LAN) in partnership with Lions District 413, Zambia embarked on a project
More informationSITE ANALYSIS, DESIGN BRIEF AND CASE STUDY
Page 1 of 13 UNIVERSITY OF NAIROBI SCHOOL OF THE BUILT ENVIRONMENT PORTFOLIO PROPOSED HOTEL IN WESTLANDS SITE ANALYSIS, DESIGN BRIEF AND CASE STUDY Prepared by: OGEGA DOUGLAS OKIOMA BACHELOR OF CONSTRUCTION
More informationBUY FROM PORTUGAL BUILDING MATERIALS. Ago 2016
BUY FROM PORTUGAL BUILDING MATERIALS Ago 2016 PROFILE 3 KEY 4 COMPETITIVE 5 ADVANTAGES SECTORS 6-14 METALS 7 ORNAMENTAL STONE 8 CIMENT AND CONCRETE 9 TIMBER AND CORK 10 CERAMICS 11 PLASTICS 12 PAINT AND
More informationBILL NO 1 MASONRY SUPPLEMENTARY PREAMBLES BRICKWORK. Rectification Project Illinge, Eastern Cape Roof Replacement (Partially Done)
ectification Project oof eplacement (Partially Done) Item Quantity ate Amount BILL NO 1 MASONY SUPPLEMENTAY PEAMBLES BICKWOK Sizes in descriptions Where sizes in descriptions are given in brick units,
More informationDARTMOUTH COLLEGE DESIGN January 3, 2012 & CONSTRUCTION GUIDELINES
SECTION 15420 DRAINAGE AND VENT SYSTEMS PART 1 DESIGN DIRECTIVES 1.1 DESIGN CRITERIA A. All cleanouts above finished (accessible and non-accessible) ceilings shall be extended to the floor above. B. Do
More informationA. BILL OF QUANTITIES FOR SANITARY SEWER
Note: Unit prices of BoQ items shall include the execution of all small and unforeseen works not covered by BoQ, but that are necessary to be carried out during construction for smooth process of works
More informationNepal Biogas Plant -- Construction Manual. Construction Manual for GGC 2047 Model Biogas Plant
Nepal Biogas Plant -- Construction Manual Construction Manual for GGC 2047 Model Biogas Plant Introduction The success or failure of any biogas plant mainly depends upon the quality of construction works.
More informationRUWAIS HOUSING COMPLEX PHASE IV CIVIL & ELECTROMECHANICAL WORKS
AL NASR SCOPE OF WORKS: Construction of water storage tank consisting of: 3 Water storage tanks 2,641,721 gal of 42 m diameter and 7.65 m each 2300 m³ of concrete 2450 m² of water proofing external 4300
More informationAnchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi
STRUCTURAL NOTES MATERIAL STRENGTHS Structural Steel Reinforcing Steel Concrete Masonry Structural Lumber Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel
More informationITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS
ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS 701-1 DESCRIPTION 701-1.1 This item shall consist of the construction of pipe culverts, and storm drains, removal of existing storm pipes, connections to existing
More informationUNOPS BILL OF QUANTITIES
UNOPS UNITED NATIONS OFFICE FOR PROJECT SERVICES BILL OF QUANTITIES Ai Khanem Border Crossing Point Facilities Takhar, Afghanistan Customs and Police Office Buildings NOTICE TO ALL BIDDERS COMPLETE PROJECT
More informationSEPTIC TANK CONSTRUCTION GUIDELINES
SEPTIC TANK CONSTRUCTION GUIDELINES Septic tank for this airport will be designed/ built by the general contractor of the building facilities. At the time of the project design, availability of a septic
More informationRODINNÉ DOMY STODŮLKY. Standards
RODINNÉ DOMY STODŮLKY Standards BUILDING Floors in residential rooms Entrance hall Kahrs Linnea 3-layer veneer floor, 3-parquet, finished with a moulding, a selection from natural oak and bleached oak
More informationUNIT III Earthwork Estimation & Reinforcement Estimation
SIDDHARTH GROUP OF INSTITUTIONS :: PUTTUR Siddharth Nagar, Narayanavanam Road 517583 QUESTION BANK (DESCRIPTIVE) Subject with Code : ECV(13A01605) Year & Sem: IV-B.Tech & I-Sem Course & Branch: B.Tech
More informationStorm Drainage
University of New Hampshire University of New Hampshire Scholars' Repository Division 33 Utilities Chapter 5 Technical Construction and Renovation Standards 4-23-2015 334100 - Storm Drainage Sandra Hickey
More informationNORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017
SECTION 33 3400 STORM UTILITY DRAINAGE PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationA101 S001 1 SUB-BASEMENT 3/16" = 1'-0" SHEET (906) PH (906) FX 2 S101 NEW CONCRETE WALLS TO FORM WAVE TANK 3' - 0" 5' - 5"
5' - 5" 3' - 0" 2 S0 NEW CONCRETE WALLS TO FORM WAVE TANK 7 SHEET NOTES (906) 487-2303 PH (906) 487-329 FX 9/22/207 :34:03 AM FILE: \\nas2.dcs.it.mtu.edu\sas_homes\desktop\meem wave tank.rvt 7 2' - 4"
More informationISSUE DATE JANUARY 1st, 2008 SECTION 5G FIBERGLASS PACKAGE LIFT STATION
ISSUE DATE JANUARY 1st, 2008 SECTION 5G FIBERGLASS PACKAGE LIFT STATION FIBERGLASS PACKAGE LS SITE PLAN PAGE No. 111 NUMBER: FG-LS-SITE-PLN FIBERGLASS PACKAGE LS PIPING PLAN PAGE No. 112 NUMBER: FG-LS-PIPE-PLN
More informationLIQUID RUBBER INDUSTRIES ENGINEERING SPECIFICATIONS FOR ENGINEERS AND ARCHITECTS. Diagram 1: Standard Membrane Continuation 150 mm Overlap
LIQUID RUBBER INDUSTRIES ENGINEERING SPECIFICATIONS FOR ENGINEERS AND ARCHITECTS Diagram 1: Standard Membrane Continuation 150 mm Overlap Ensure Membrane to Membrane Contact Diagram 2: Membrane Continuation
More informationTCC/SHORE TRANSIT BUS MAINTENANCE FACILITY PHASE II
SECTION 334100 - STORM UTILITY DRAINAGE PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01
More informationMETHODOLOGICAL EXPLANATION CONSTRUCTION COST INDEX FOR NEW RESIDENTIAL BUILDINGS
METHODOLOGICAL EXPLANATION CONSTRUCTION COST INDEX FOR NEW RESIDENTIAL BUILDINGS This methodological explanation relates to the data release: - Construction cost indices for residential buildings, Slovenia,
More information***************************************************************************************************************
02720 STORM DRAINAGE SYSTEM *************************************************************************************************************** SPECIFIER: CSI MasterFormat 2004 number 33 40 00. ***************************************************************************************************************
More informationTHE POTTING SHED PF-1D-1144 CONSTRUCTION DRAWINGS PROJECT PLAN INDEX FOUNDATION / FLOOR PLAN 2 ROOF PLAN 3
THE POTTING SHED CONSTRUCTION DRAWINGS Corresponds with the garden shed built for Progressive Farmer s Idea House & Farmstead, August 2004 issue, page 42 Topped with a handsome roof and trimmed with custom-cut
More informationHITT STREET UNIVERSITY PROJECT #: CP REFER TO CP PLANS FOR ELECTRICAL DUCTBANK IN HITT STREET INSTALL:
N 1133521.33 E 1689742.43 STA: 10+53.07 INSTALL: 2-10" 90 BENDS CONNECT TO MIDDLEBUSH HALL INTERIOR PLANT PLUMBING MIDDLEBUSH HALL HW1 HWS HWR 10+00 FREDRICK APARTMENTS FINE ARTS INSTALL 422 LF 10" HWS
More informationFacility Sanitary Sewers
University of New Hampshire University of New Hampshire Scholars' Repository Division 22 Plumbing Chapter 5 Technical Construction and Renovation Standards 4-23-2015 221313 - Facility Sanitary Sewers Sandra
More informationMonth , creation and 200 per day X 5 days X 4 weeks in a month X 12
DETAILED PROJECT BUGDET FOR NIGEE'S GIRLS' EMPOWERMENT CENTER (GEC) FOR MONTHS (ST JANUARY - 3ST DECEMBER 07) FUNDED BY GLOBAL GIVING - UK PROJECT NUMBER : 99 NO. COST BY CATEGORIES UNIT QUANTITY UNIT
More informationFoirgniochta. Marking Scheme Leaving Certificate Examination, Ordinary Level. Construction Studies
2000 Foirgniochta Marking Scheme Leaving Certificate Examination, 2000 Construction Studies Ordinary Level of site.. Adjoining. Distinct Landmarks.. site in Red.. 1: (ii) Site Boundary site. Site. Drainage
More informationBILL SUMMARY. BILL No. DESCRIPTION AMOUNT
CLIENT: GUYANA POWER AND LIGHT INC PROJECT CONSTRUCTION OF LEGUAN COMMERCIAL BUILDING : BILL SUMMARY BILL No. DESCRIPTION AMOUNT 1 PRELIMINARIES 2 DAY WORKS 3 EXCAVATION AND EARTHWORKS 4 CONCRETE WORKS
More informationBiogas Construction Process
Paper presented at the Biogas Training Programme Conducted at CARD, Alam Village, Myitkyina. Metta Development Foundation Biogas Construction Process Govinda Prasad Devkota P.O. Box 20506 Kathmandu, Napal
More informationConstruction Specification for Utility Adjustments
Engineering & Construction Services Division Standard Specifications for Road Works TS 4.50 September 2017 for Utility Adjustments Table of Contents TS 4.50.01 SCOPE... 2 TS 4.50.02 REFERENCES... 2 TS
More informationNew Fulton State Hospital Energy Control Center and Services Building (ECC/SVC) Project Number: M
SECTION 334100 - STORM UTILITY DRAINAGE PIPING PART 1 -GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationBuilding Systems and Design Elements included in SliDeRulE
Building Systems and Design Elements included in SliDeRulE No. System Subsystem Design Element 1.1.1 Foundation Deep Foundation Steel H-pile 1.1.2 Foundation Deep Foundation Steel pipe pile 1.1.3 Foundation
More informationBBA 001 Documents included under the scope of BBA s ISO UKAS accreditation
BBA 001 Documents included under the scope of BBA s ISO 17065 UKAS accreditation Product Standard Building Systems and Kits BBA Technical Specification 001 Ceiling Products BBA Technical Specification
More informationConcrete Slab-on-Ground
Concrete Slab-on-Ground This training package provides information on concrete slab-on-ground construction, including reinforcement, formwork, mix, placement and curing, for village infrastructure and
More informationPRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
Roof Parapet (Detail 911) 21 0 380 380 40 Tie Beams (Detail 8) Tie Beams (Detail 8) FGL Raft foundation (Detail 6) 4 H=0 min Column (Detail 7) + 0.00 PLAIN CONCRETE,6 ELEVATION VIEW 1/0 FGL Floor Tank
More informationCITY OF CEDAR FALLS DEPARTMENT OF DEVELOPMENTAL SERVICES INSPECTION SERVICES DIVISION PHONE Residential Accessory Structures
CITY OF CEDAR FALLS DEPARTMENT OF DEVELOPMENTAL SERVICES INSPECTION SERVICES DIVISION PHONE - 268-5161 Residential Accessory Structures This information has been compiled for the benefit of any person
More informationFERROCEMENT WATER TANKS
FERROCEMENT WATER TANKS Action Sheet 21 What is this Action Sheet about? This Action Sheet describes how to build ferrocement water tanks. Take advice from an engineer or other experienced person if necessary,
More informationSANITARY SEWERS. B. Construct or relocate building sanitary sewer services, stubs, and connections.
SANITARY SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Sanitary Sewer Gravity Mains B. Sanitary Sewer Force Mains C. Sanitary Sewer Services 1.02 DESCRIPTION OF WORK A. Construct sanitary sewer gravity
More informationLEVEL TWO NUMBERS AND TITLES. Introductory Information. Bidding Requirements. Contracting Requirements. Facilities and Spaces. Systems and Assemblies
MasterFormat LEVEL TWO NUMBERS AND TITLES Introductory Information 00001 Project Title Page 00005 Certifications Page 00007 Seals Page 00010 Table of Contents 00015 List of Drawings 00020 List of Schedules
More informationTECHNICAL SPECIFICATION DANTECO HERMANNS. CONTAINER FOR BULK POWDER Equipped with HERMANNS Aeration and Conveyance Device
TECHNICAL SPECIFICATION DANTECO HERMANNS CONTAINER FOR BULK POWDER Equipped with HERMANNS Aeration and Conveyance Device 6058(20') x 2438(8') x 2591(8'6") MODEL NO. : CX09-20SNX1 SPEC. NO : CX09-20SNX1-S3
More information