PRESENTATION TO THE FARMINGTON CITY COUNCIL FOR THE PROPOSED FARMINGTON CIVIC CENTER EXPANSION SEPTEMBER 20, 2016

Size: px
Start display at page:

Download "PRESENTATION TO THE FARMINGTON CITY COUNCIL FOR THE PROPOSED FARMINGTON CIVIC CENTER EXPANSION SEPTEMBER 20, 2016"

Transcription

1 PRESENTATION TO THE FARMINGTON CITY COUNCIL FOR THE PROPOSED FARMINGTON CIVIC CENTER EXPANSION SEPTEMBER 20, 2016

2 WORK LEGEND OVERALL WORK TO BOTH BUILDINGS Existing corridors will receive new ceiling, lighting, wall paint, carpet and fire protection. The existing doors and hardware will be replaced, frames to remain and receive new paint (aluminum storefront doors, frames and hardware will remain as is, no new work) Existing meetings rooms A and C-F will receive new ceiling, lighting, wall paint, carpet and fire protection. They will also receive new HD video projectors and motorized screens and updated sound system to match ballrooms, New ADA room signs, new doors and hardware, frames to remain and receive new paint. New 5,500 GSF North addition consisting of ballrooms (brings seating to 620), corridors and storage. The walls, floor, ceilings, lighting, folding partitions and A/V systems in ballroom portion of the addition will match 2012 renovation. The existing admin offices in the exhibit building will be remodeled. Improvements include: new plastic laminate storage cabinets, new wall finishes, new floor finishes, new ceilings, lighting and new fire protection, and new HVAC system. This same work will also be provided to the box office. The exterior walls in the exhibit and theater buildings will receive patching of damaged wall areas as well as a new color scheme. A new outdoor trellis will be provided on the South side of both buildings as well as new landscaping for the South lawn areas. A new voice activated fire alarm system will be provided. The existing electrical distribution system will be replaced and consolidated. The existing electrical services which will be replaced/repaired will be brought up to current electrical codes. The basement of the theater building will receive new fire protection and lighting replacement. The exterior lighting will be replaced and a video surveillance system will be provided. An exterior sound system will be provided for the South lawn area as well as a new digital marquee. Both the exhibit hall and theater buildings will receive new roofing and parapet coping. 3 5 Kitchen will be remodeled and receive new kitchen equipment. Improvements include: new wall finishes, new floor finishes, new ceilings, lighting and new electrical, plumbing and mechanical upgrades related to new layout and kitchen cooking equipment. 6 Existing restroom areas to be renovated to fully meet ADA, number of WC provided will increase. New finishes include: ceramic wall and floor tile, new ceilings, lighting, improved exhaust and fire protection. Single occupant ADA restrooms will also be provided. In the South end of the exhibit building, existing meeting room B will be used to create a new larger male restroom group and the area that currently houses both the male and female restrooms will be used to create larger female restrooms as well as single occupant ADA restroom and new janitor room Existing ballrooms to receive new roofing and HVAC work. The existing ballrooms will receive ADA compliant Assisted Listening System (ALS). The A/V control system will be upgraded and the existing lighting batten for stage lights will be relocated N EXHIBITION BUILDING

3 WORK LEGEND OVERALL WORK TO BOTH BUILDINGS 1 2 Existing corridors will receive new ceiling, lighting, wall paint, carpet and fire protection. The quarry tile in the theater lobby will be covered with carpet and the existing wood panel walls in the lobby and gallery will be covered and new porcelain wall tile will be installed. The existing doors and hardware will be replaced, frames to remain and receive new paint (aluminum storefront doors, frames and hardware will remain as is, no new work). The lobby will also receive a new networked digital signage system. A new elevator or wheelchair lift will be provided to allow ADA access to gallery and theater upper seating area. Theater back of house will be remodeled. Improvements include: new wall finishes, new floor finishes, new ceilings, lighting and new fire protection, and new HVAC system. New plastic laminate counters will be provided at performers dressing area. New ADA restrooms and showers will be provided for the performers. The exterior walls in the exhibit and theater buildings will receive patching of damaged wall areas as well as a new color scheme. A new outdoor trellis will be provided on the South side of both buildings as well as new landscaping for the South lawn areas. A new voice activated fire alarm system will be provided. The existing electrical distribution system will be replaced and consolidated. The existing electrical services which will be replaced/repaired will be brought up to current electrical codes. The basement of the theater building will receive new fire protection and lighting replacement. The exterior lighting will be replaced and a video surveillance system will be provided. An exterior sound system will be provided for the South lawn area as well as a new digital marquee. Both the exhibit hall and theater buildings will receive new roofing and parapet coping. 4 Theater front of house will receive new ceilings, lighting and fire protection. 6 6 Existing restroom areas to be renovated to fully meet ADA. New finishes include: ceramic wall and floor tile, new ceilings, lighting, improved exhaust and fire protection. 6 8 Existing theater will receive new fire protection, new wall paint, new carpet (will replace existing carpeted areas), new house lighting, new HVAC work, new roll-up door and pneumatic lift for dock. Wheelchair and companion seating will be provided along cross aisle. 8 Theatrical improvements include: new permanent loudspeaker system capable of meeting the needs of local and regional acts, a permanent mixing location within the seating area, dead-hung stage rigging system with motorized stage electrics and spare sets (will replace existing manual batten system), new stage drapery, astragal system for existing pit lift, new house lighting dimming system and controls, replace worn and damaged distribution strips and drop boxes for existing lighting (existing performance lighting to remain, no new work), ADA compliant Assisted Listening System (ALS), replace 8 microphones operating in prohibited frequency bands N THEATER BUILDING

4 PROPOSED NORTH ADDITION

5 VIEW FROM EXISTING BALLROOMS TOWARDS NEW ADDITION

6 VIEW FROM NEW ADDITION TOWARDS STAGE AREA

7 PROPOSED ENTRANCE

8 PROPOSED NEW TRELLIS

9 PROPOSED SOUTH TRELLIS

10 PROPOSED SOUTH TRELLIS

11 20 TYP TYP TYP TYP TYP TYP. 7 4 TYP TYP. E CONCEPT KEYED NOTES 1. PROPOSED MID-BLOCK CROSSING 2. DROP-OFF LANE TO REMAIN 3. LAWN 4. CONCRETE PAVING, PATTERN AND COLOR VARIES 5. LOW RETAINING WALL 6. REMOVABLE BOLLARDS 7. SIGNAGE 8. ADA PARKING 9. OUTDOOR RECEPTION SPACE 10. STREET TREES 11. BENCH 12. SEMI/BUS PARKING & DELIVERY 13. ENTRY COLUMNS 14. SCULPTURE 15. PLANTING BED 16. DRY DECK FOUNTAIN, LEVEL WITH PLAZA 17. VEHICLE RAMP 18. PERIMETER FENCE OR WALL 19. POTTED PLANTS 20. TRELLIS AT BUILDING FACADE 21. FLAGPOLE PLAN VIEW

12 VIEW LOOKING NORTH VIEW LOOKING WEST AERIAL LOOKING NORTHEAST FROM N BEHREND AVE RENDERINGS

13 VIEW LOOKING NORTH VIEW LOOKING WEST VIEW LOOKING NORTHWEST FROM N ALLEN AVE RENDERINGS

14 VIEW LOOKING NORTH VIEW LOOKING NORTH FROM W ARRINGTON ST RENDERINGS

15 DRY DECK FOUNTAIN

16 Architect's Opinion of Probable Cots (AOPC) for the Proposed Farmington Civic Center Expansion Work Presented to the Farmington City Council on September 20, 2016 Req Min / Rec / Opt Building Description AOPC Req Min Exhibit Exhibit Building Re-roof (No Insulation) $562, Req Min Exhibit Exhibit Building Restroom Remodel $199, Req Min Exhibit Remodel Existing Kitchen $183, Req Min Exhibit Ceiling & Lighting Replacement Exhibit Building - Corridors (needed because of fire protection work) $63, Req Min Exhibit Ceiling & Lighting Replacement for Rooms A-F in Exhibit Building (needed because of fire protection work) $55, Req Min Exhibit Replace doors in Exhibit Building (frames to remain) $31, Req Min Exhibit Renovate Box Office $4, Req Min Exhibit Ceiling & Lighting Replacement for Admin Offices [needed because of fire protection work] - Exhibit Building $13, Req Min Exhibit Repair Damaged Stucco on Exhibit Building & Coat with Elastomeric Finish $116, Req Min Exhibit Create New Family Restroom in Exhibit Building $12, Req Min Exhibit Misc Architectural & Structural - Exhibit Hall $20, Req Min Exhibit ADA Room Signs for Exhibit Building $1, Req Min Exhibit Update Water Entry Assembly $5, Req Min Exhibit Elec. Distribution Update Priority Group 1: Consolidate services and address the most serious safety concerns $130, Req Min Exhibit Elec. Distribution Update Priority Group 3: Replace feeders with code violations not addressed in other priority groups $4, Req Min Exhibit New Fire Alarm System-Voice Evac $27, Req Min Exhibit Add thermostatic mixing valves at each lavatory $2, Req Min Exhibit Replace all plumbing fixtures within the facility $94, Req Min Exhibit To Address Life and Safety Code Items (Priority 1 from D.L. Adams & Associates Condition Analysis Matrix) $10, Req Min Exhibit Address structural items identified in Section 7 $115, Req Min Exhibit Address civil items identified in Section 8 $76, Req Min Theater Theater Building Re-roof (No Insulation) $357, Req Min Theater Theater Building Restroom Remodel $147, Req Min Theater Ceiling & Lighting Replacement for Corridors - Theater (needed because of fire protection work) $109, Req Min Theater Ceiling & Lighting Replacement for Back of House (needed because of fire protection work) $56, Req Min Theater New Roll-up Door for Theater Dock $9, Req Min Theater Replace doors in Theater Building (frames to remain) $54, Req Min Theater Elevator for Theater - Addition $124, Req Min Theater Ceiling & Lighting Replacement for Front of House (needed because of fire protection work) $17, Req Min Theater Fire Protection & Lighting for Theater Basement $56, Req Min Theater Fire Protection & Lighting for Theater $174, Req Min Theater Cover Quarry Tile in Theater Lobby $8, Req Min Theater Repair Damaged Stucco on Theater Building & Coat with Elastomeric Finish $108, Req Min Theater Permanent Mixing Location within Theater Seating $6, Req Min Theater Create New Family Restroom in Theater Building $18, Req Min Theater Provide Wheelchair Spaces Along Cross Aisle (will need 11 spaces and companion seat) $12, Req Min Theater Pneumatic Lift for Theater Dock $12, Req Min Theater Misc Architectural & Structural - Theater Building $100, Req Min Theater ADA Room Signs for Theater Building $2, Req Min Theater Update Water Entry Assembly $5, Req Min Theater Replace Exhausters $4, Req Min Theater Elec. Distribution Update Priority Group 2: Replace equipment in basement mech room to address various code violations $42, Req Min Theater Add ventilation to the theater offices $16, Req Min Theater Replace Air Handler Unit for Theater Building $140, Req Min Theater Elec. Distribution Update Priority Group 1: Consolidate services and address the most serious safety concerns $130, Req Min Theater Elec. Distribution Update Priority Group 3: Replace feeders with code violations not addressed in other priority groups $4, Req Min Theater New Fire Alarm System-Voice Evac $27, Req Min Theater Add thermostatic mixing valves at each lavatory $2, Req Min Theater Replace all plumbing fixtures within the facility $94, Req Min Theater To Address Life and Safety Code Items (Priority 1 from D.L. Adams & Associates Condition Analysis Matrix) $530, Rec Exhibit New Kitchen Equipment for Kitchen Remodel $175, Rec Exhibit Carpet Replacement & Wall Paint Exhibit Building Corridors $18, Rec Exhibit Interior Remodel of Rooms A-F $282, Rec Exhibit North Addition to Ballrooms (5,500 gsf of ballroom, corridor and storage) brings seating from 450 to 620 $1,925, Rec Exhibit Renovate Admin Offices (3 spaces) - Exhibit Building $44, Rec Exhibit Elec. Distribution Update Priority Group 4: Replace remaining panels due to age only. $42, Rec Exhibit To Provide Base Improvements to Exhibit Hall (Priority 2 from D.L. Adams & Associates Condition Analysis Matrix) $188, Rec Theater Carpet Replacement & Wall Paint for Theater Building Corridors $26, Rec Theater Interior Remodel of Theater back of House $218, Rec Theater Carpet Replacement & Wall Paint for Theater Walls $45, Rec Theater Cover Wood Panel Walls in Theater Lobby $44, Rec Theater Cover Wood Panel Walls in Theater Balcony (Gallery) $37, Rec Theater Patch & Paint Low Theater Walls $8, Rec Theater Elec. Distribution Update Priority Group 4: Replace remaining panels due to age only. $42, Optional Facility Wide Replace exterior lighting from section 1.4 of Facility Assessment $40, Optional Facility Wide Provide Video Surveillance $44, Optional Landscape Implement Proposed Landscape Concept B $1,226, Optional Landscape Provide new outdoor Trellis (4,590 $55.00 /sf) $252, Optional Theater Provide networked digital signage system for theater lobby (from D.L. Adams CE) $46, Optional Theater Base Level CE Option A: Provide permanent loudspeaker system capable of meeting the needs of local and regional acts $119, Optional Landscape Provide digital outdoor marquee (line item only) $70, Architect's Opinion of Probable Cost - AOPC (w/o tax) $9,007, Soft 25% of AOPC $2,251, Total Project Cost (Base Bid) $11,258, Dry-deck Fountain (Additive Alternate) $107, Total Project Costs (Base Bid & Additive Alternate) $11,366, C:\Users\smeza.MAIN\AppData\Local\Temp\Bluebeam Software xlsx Page 1

17 Limits of work included in Attachment OPC for Option "B" 8 Landscaping Items Limits of work included in Cost Estimate Page 3

18 VIEW LOOKING NORTH VIEW LOOKING WEST VIEW LOOKING NORTHWEST FROM N ALLEN AVE RENDERINGS

A/E Design Deliverable Checklist

A/E Design Deliverable Checklist A/E Design Deliverable Checklist Design deliverables for the Design Development phase shall include all items listed in the Design Development column as well as those all items listed in the Schematic

More information

Subject: Lucretia Mott School No. 3 Rehabilitation. Figure 1 Figure 2 Figure 3

Subject: Lucretia Mott School No. 3 Rehabilitation. Figure 1 Figure 2 Figure 3 MEMORANDUM To: Ashley Rosenthal Payne, Indianapolis Historic Preservation Commission Adrienne Schmetzer, Indiana Housing and Community Development Authority Architecture Preservation Interior Design Landscape

More information

COOLIDGE SENIOR HIGH SCHOOL

COOLIDGE SENIOR HIGH SCHOOL INITIAL YEAR BUILT 1940 BUILDING AREA 271,300 SF CURRENT PROGRAM CAPACITY 1240 ENROLLMENT 2008 652 WARD 4 PROPOSED PROGRAM CAPACITY 1100 Site Plan COOLIDGE - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

A/E Design Deliverable Checklist

A/E Design Deliverable Checklist A/E Design Deliverable Checklist Design deliverables for the Design Development phase shall include all items listed in the Design Development column as well as those all items listed in the Schematic

More information

NEW YORK STATE MAIN STREET PROGRAM BEFORE & AFTER

NEW YORK STATE MAIN STREET PROGRAM BEFORE & AFTER SUMMARY OGDENSBURG, NY The New York Main Street program (NYMS) is administered by the Office of Community Renewal (OCR) under the direction of the New York State Housing Trust Fund Corporation (HTFC).

More information

CLARIFICATIONS. Item 3. Specification Sections and A. All finish wood shall have sealer coat and two coats of finish material REVISIONS

CLARIFICATIONS. Item 3. Specification Sections and A. All finish wood shall have sealer coat and two coats of finish material REVISIONS Addendum #2 Project Name: Global Campus Interior Renovation Project Address: 2 E. Center Street Fayetteville, AR 72701 Date: 06/14/17 This document is issued as a response to Clarifications. These revisions

More information

M-DCPS DESIGN CRITERIA Table of Contents

M-DCPS DESIGN CRITERIA Table of Contents M-DCPS DESIGN CRITERIA Table of Contents TITLE Page No. Division 0: General Considerations 1.1 General... 0-1 1.2 Sustainability... 0-2 1.3 Site (Rev. 6/20/16)... 0-3 1.4 Buildings (Rev. 1/29/16)... 0-6

More information

Facilities Condition Assessment Qualcomm Stadium

Facilities Condition Assessment Qualcomm Stadium Qualcomm Stadium Facilities Condition Assessment Qualcomm Stadium Facilities Condition Assessment AECOM San Diego, California April 2011 Qualcomm Stadium Qualcomm Stadium Facilities Condition Assessment

More information

WILKINSON ELEMENTARY SCHOOL

WILKINSON ELEMENTARY SCHOOL INITIAL YEAR BUILT 1976 BUILDING AREA 144,900 SF CURRENT PROGRAM CAPACITY 508 ENROLLMENT 2008 451 WARD 8 PROPOSED PROGRAM CAPACITY 600 Site Plan WILKINSON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

SANDTOWN CROSSING PROFESSIONAL OFFICE PARK Atlanta, GA

SANDTOWN CROSSING PROFESSIONAL OFFICE PARK Atlanta, GA Atlanta, GA LOCATED AT CAMP CREEK PARKWAY AND CAMPBELLTON ROAD For Sale or Lease Single units start at 1,176sf and can be combined to exact specification Custom Designed Medical and Professional finishes

More information

Budget Estimate Basic Tenant Improvement

Budget Estimate Basic Tenant Improvement Building work rules, conditions and insurance: 1. Review the work rules. If they are not available no budget should be provided. 2. Hours available for construction 3. Insurance requirements 4. Entities

More information

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities Division 1 Requirements Design and Construction Quality Campus Master Plans Texas Tech University System Operating and Building Maintenance Project Administration Historically Underutilized Business (HUB)

More information

Facility Assessment Report, Montgomery Independent School District

Facility Assessment Report, Montgomery Independent School District NATATORIUM CAMPUS DATA NATATORIUM 22628 Hwy 105 West, Montgomery TX 77356 Year Built 2009 Approx. Total Square Footage Grades Served 30,420 n/a Current Enrollment n/a Building Levels 1 1 MASTER PLAN 2

More information

Edouard AVANT GROVE U I C U I C. Modern Living Made Easy uichomes.com

Edouard AVANT GROVE U I C U I C. Modern Living Made Easy uichomes.com Edouard Modern Living Made Easy uichomes.com - new construction - 3 stories + full basement - 4 bedrooms - 2.5 baths - 2,380 s.f. call 314.881.2333 or e-mail sales@uicstl.com PLAN NTS DECK 13' 0" X 12'-0"

More information

FACILITY ASSESSMENT PRESENTATION 11 October SCHRADERGROUP architecture

FACILITY ASSESSMENT PRESENTATION 11 October SCHRADERGROUP architecture FACILITY ASSESSMENT PRESENTATION 11 October 2017 SCHRADERGROUP architecture AGENDA 1. 1 Facility Assessment Review 2. 2 Prioritizing the Scope of Work with Associated Costs 3 Timeline of Work 3. 4 Procurement

More information

Alterations, disproportionality, and the 20% rule

Alterations, disproportionality, and the 20% rule Alterations, disproportionality, and the 20% rule By M. Bradley Gaskins, AIA, CASp and Ellis L. McIntosh Jr., AIA, LEED AP The MCintosh group 1850 South Boulder Avenue Tulsa, OK 74119 918.585.8555 tmgada.com

More information

SPACE TYPE: PHYSICAL FITNESS (EXERCISE ROOM)

SPACE TYPE: PHYSICAL FITNESS (EXERCISE ROOM) SPACE TYPE: PHYSICAL FITNESS (EXERCISE ROOM) Construction Criteria The unit costs for the Physical Fitness Center (Exercise Room) space type are based on the construction quality and design features in

More information

LASALLE - BACKUS EDUCATION CAMPUS

LASALLE - BACKUS EDUCATION CAMPUS INITIAL YEAR BUILT 1957 BUILDING AREA 63,000 SF CURRENT PROGRAM CAPACITY 406 ENROLLMENT 2008 349 WARD 4 PROPOSED PROGRAM CAPACITY 425 Site Plan LASALLE - BACKUS - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Facility Improvements

Facility Improvements CA-SI-01 ACCESSIBLE PARKING STALL ADDITIONS CA-SI-07 BASEBALL & SOFTBALL INFIELD IMPROVEMENTS Additional parking stalls and signage needed for disabled individuals and to meet ADA requirements. Installation

More information

LECKIE ELEMENTARY SCHOOL

LECKIE ELEMENTARY SCHOOL INITIAL YEAR BUILT 1970 BUILDING AREA 65,000 SF CURRENT PROGRAM CAPACITY 471 ENROLLMENT 2008 321 WARD 8 PROPOSED PROGRAM CAPACITY 400 Site Plan LECKIE - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5

More information

CHARTRES COURT Washington Avenue Houston, Texas ChartresCourtHouston.com CHARTRES COURT LLC

CHARTRES COURT Washington Avenue Houston, Texas ChartresCourtHouston.com CHARTRES COURT LLC CHARTRES COURT 713-868 - 7226 5023 Washington Avenue Houston, Texas 77007 ChartresCourtHouston.com CHARTRES COURT LLC Features Open floor concept living/dining with spacious island kitchen Great master

More information

Velma F Thomas Early Childhood Center

Velma F Thomas Early Childhood Center Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

CONTRACT DOCUMENTS REVIEW PACKAGE CHECKLIST

CONTRACT DOCUMENTS REVIEW PACKAGE CHECKLIST CONTRACT DOCUMENTS REVIEW PACKAGE CHECKLIST Check off each item that is included within the submitted Contract Documents Review Package. Provide a written explanation for any omissions. The following items,

More information

Yardmen Arena Expansion & Renovation Project Update

Yardmen Arena Expansion & Renovation Project Update For Immediate Release 25, September,2017 Yardmen Arena Expansion & Renovation Project Update BELLEVILLE ON With 33 days until puck drop of the home opening game of the American Hockey League s Belleville

More information

Total Building Area: 1964 Construction 30,140 square feet 1976 Construction 36,787 square feet 66,927 square feet

Total Building Area: 1964 Construction 30,140 square feet 1976 Construction 36,787 square feet 66,927 square feet FLANDERS ELEMENTARY SCHOOL Located at 167 Boston Post Road, East Lyme, Connecticut the school s original structure was built in 1964 and replaced the Central Office Building as the elementary school. Two

More information

Division 09 FINISHES TABLE OF CONTENTS

Division 09 FINISHES TABLE OF CONTENTS Division 09 FINISHES TABLE OF CONTENTS 09 1000 GENERAL... 3 A. RELATED SECTIONS... 3 B. MAINTENANCE OF FINISHES... 3 C. PUBLIC AREAS... 3 D. CUTTING AND PATCHING... 3 E. CLEANING... 3 F. RECOMMENDED FLOORING

More information

PROGRAM COST MODEL. for. PEER Tall Buildings Study Concrete Structural Option Los Angeles, California

PROGRAM COST MODEL. for. PEER Tall Buildings Study Concrete Structural Option Los Angeles, California PROGRAM COST MODEL for PEER Tall Buildings Study Concrete Structural Option Los Angeles, California March 8, 2010 PEER Tall Buildings Study Concrete Structural Option March 8, 2010 CONTENTS Page Nos. Overall

More information

Horace Greeley Elementary School 832 W Sheridan Rd Chicago, IL 60613

Horace Greeley Elementary School 832 W Sheridan Rd Chicago, IL 60613 832 W Sheridan Rd Chicago, IL 3 Facility Assessment Report This report contains the detailed findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each

More information

Work Write Up / Specification of Repairs HUD DIVISION 1. MASONRY HUD DIVISION 2. SIDING. Toll Free

Work Write Up / Specification of Repairs HUD DIVISION 1. MASONRY HUD DIVISION 2. SIDING. Toll Free / / Paperport 2000 official estimating report Work Write Up / Specification of Repairs Toll Free 1-877-932-7177 Clients Name. GREAT CLIENT Property Address. NUMBER ONE GOOD ROAD METRO, VA 20000 Primary

More information

LEVEL TWO NUMBERS AND TITLES. Introductory Information. Bidding Requirements. Contracting Requirements. Facilities and Spaces. Systems and Assemblies

LEVEL TWO NUMBERS AND TITLES. Introductory Information. Bidding Requirements. Contracting Requirements. Facilities and Spaces. Systems and Assemblies MasterFormat LEVEL TWO NUMBERS AND TITLES Introductory Information 00001 Project Title Page 00005 Certifications Page 00007 Seals Page 00010 Table of Contents 00015 List of Drawings 00020 List of Schedules

More information

LEWIS ELEMENTARY SCHOOL

LEWIS ELEMENTARY SCHOOL INITIAL YEAR BUILT 1962 BUILDING AREA 49,500 SF CURRENT PROGRAM CAPACITY 550 ENROLLMENT 2008 288 WARD 1 PROPOSED PROGRAM CAPACITY 450 Site Plan LEWIS - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5

More information

STUART-HOBSON MIDDLE SCHOOL

STUART-HOBSON MIDDLE SCHOOL INITIAL YEAR BUILT 1927 BUILDING AREA 105,900 SF CURRENT PROGRAM CAPACITY 460 ENROLLMENT 2008 399 WARD 6 PROPOSED PROGRAM CAPACITY 450 Site Plan STUART-HOBSON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Exhibit A EXISTING RTU TO BE SCREENED ' BUILDING A EXISTING TO BE RENOVATED 2,100 SF EXISTING LANDSCAPE AREA TO REMAIN NEW ENTRANCE AREA

Exhibit A EXISTING RTU TO BE SCREENED ' BUILDING A EXISTING TO BE RENOVATED 2,100 SF EXISTING LANDSCAPE AREA TO REMAIN NEW ENTRANCE AREA Received April 9, 08 - AR Exhibit A MIXED USE WITH RESIDENTIAL 44' PROPOSED BUILDING TO MIXED USE BUILDING 6.8' LOT TO LOT DISTANCE TO RESIDENTIAL USE 87.5' BUILDING TO MIXED USE BUILDING 0' 78' 4.6' 0.64'

More information

School Without Walls

School Without Walls INITIAL YEAR BUILT 1938 BUILDING AREA 59,400 SF CURRENT PROGRAM CAPACITY 304 ENROLLMENT 2008 276 WARD 1 PROPOSED PROGRAM CAPACITY 400 SCHOOL WITHOUT WALLS - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

HISTORICAL OVERVIEW OPN ARCHITECTS. Home Office Building of The Bankers Life Building, 1940

HISTORICAL OVERVIEW OPN ARCHITECTS. Home Office Building of The Bankers Life Building, 1940 OPN ARCHITECTS Home Office Building of The Bankers Life Building, 1940 HISTORICAL OVERVIEW Designed as the home office of The Bankers Life Insurance Company by architects Tinsley, McBroom & Higgins in

More information

John T Pirie Fine Arts & Academic Center ES 650 E 85th St Chicago, IL 60619

John T Pirie Fine Arts & Academic Center ES 650 E 85th St Chicago, IL 60619 E 8th St Chicago, IL 19 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will

More information

Toronto Community Housing Executive Summary 2016/2017. BCA Report. Sample House High FCI

Toronto Community Housing Executive Summary 2016/2017. BCA Report. Sample House High FCI BCA Report Porfolio Development Size Construction TCHC - All Op Units Scattered Units (CHU 20),005 Sq.Ft. 925 Floor Above Grade 2 Divisional Units Page of 43 Description This dwelling unit is a detached

More information

Gerald Desmond Bridge Replacement

Gerald Desmond Bridge Replacement Item # Room # icip. # of Occupants 101 12 Conference / Crew Room 1 400 400 Supervisor Offices Conference and secondary training room for up to 12 people Flooring: VCT Electrical Type: rmal (utility power)

More information

The parking lot is in varying condition depending upon location. The vehicular and pedestrian traffic flow is generally good.

The parking lot is in varying condition depending upon location. The vehicular and pedestrian traffic flow is generally good. EAST LYME HIGH SCHOOL Located at 30 Chester Field Road, East Lyme, Connecticut 06333, the High School s original structure was built in 1967. An addition and alterations occurred in 1973. The building

More information

SPACE TYPE: ENHANCED OFFICE

SPACE TYPE: ENHANCED OFFICE SPACE TYPE: ENHANCED OFFICE Construction Criteria The unit costs for Enhanced Office space types are based on the construction quality and design features in the following table. This information has been

More information

OFFICE OF EDUCATIONAL FACILITIES FLORIDA BUILDING CODE SECTION 423 APPLICATION MATRIX

OFFICE OF EDUCATIONAL FACILITIES FLORIDA BUILDING CODE SECTION 423 APPLICATION MATRIX 423.1 Scope: Public educational facilities 423.2 Public schools and community colleges general requirements 423.2.1 Owner 423.2.2 Exemption from local requirements 423.2 Code enforcement 423.3.1 School

More information

Rebuilding your Home after the storm? Adding on, renovating, or remodeling your home? Here's information YOU need to know about the 50% Rule.

Rebuilding your Home after the storm? Adding on, renovating, or remodeling your home? Here's information YOU need to know about the 50% Rule. FEMA 50% RULE - SUBSTANTIAL IMPROVEMENT SUBSTANTIAL IMPROVEMENT/DAMAGE Z101-0410 NOTICE TO PROPERTY OWNERS Rebuilding your Home after the storm? Adding on, renovating, or remodeling your home? Here's information

More information

LOGAN SCHOOL SCHOOL WITHOUT WALLS AT LOGAN

LOGAN SCHOOL SCHOOL WITHOUT WALLS AT LOGAN INITIAL YEAR BUILT 1935 BUILDING AREA 47,200 SF CURRENT PROGRAM CAPACITY 479 ENROLLMENT 2008 418 WARD 6 PROPOSED PROGRAM CAPACITY 450 Site Plan LOGAN - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION HS

More information

BOWIE LEARNING CENTER

BOWIE LEARNING CENTER BOWIE LEARNING CENTER Bowie Learning Center BUILDING DATA BOWIE LEARNING CENTER 900 North Elm St., Weatherford, TX 76086 Year Built 1936 No. of Buildings No. of Portables 0 Approx. Total Square Footage

More information

PLUMMER ELEMENTARY SCHOOL

PLUMMER ELEMENTARY SCHOOL INITIAL YEAR BUILT 1959 BUILDING AREA 69,400 SF CURRENT PROGRAM CAPACITY 481 ENROLLMENT 2008 228 WARD 7 PROPOSED PROGRAM CAPACITY 325 Site Plan PLUMMER - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

REQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES

REQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES REQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES If your home or business incurred damage, the engineering department, in conjunction with the Flood Mitigation Officer, will

More information

CITY OF NOVI. Police Department

CITY OF NOVI. Police Department CITY OF NOVI Police Department Indoor Gun Range and Training Facility Assessment Analysis with Master Plan for Novi Police Department at Community Build Out Field Services Complex Facility Needs Master

More information

LANSDOWNE HIGH SCHOOL RENOVATION PRELIMINARY DESIGN PRESENTATION. The Board of Education of Baltimore County Verletta White, Interim Superintendent

LANSDOWNE HIGH SCHOOL RENOVATION PRELIMINARY DESIGN PRESENTATION. The Board of Education of Baltimore County Verletta White, Interim Superintendent RENOVATION PRELIMINARY DESIGN PRESENTATION The Board of Education of Baltimore County Verletta White, Interim Superintendent AGENDA 2 Project Location General Information Existing Conditions Structural

More information

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural % BartelsRode Gymnasium 8/11/ Building Rating System Percent Site: 1.0 Total 0 13 77% Building: 2.1 Building Exterior Elements 0 8 8% 2.2 Accessibility 0 74 74% 2.3 Structural 0 76 76% 2.4 Building Envelope

More information

Proposal Request (attachment to AIA Form G709)

Proposal Request (attachment to AIA Form G709) Proposal Request (attachment to AIA Form G09) PR No: PR-0 Date: January, 06 Project: Great Work Montessori School Owner: Great Work Inc. Architect: Cuningham Group Copy To: File DESCRIPTION OF WORK The

More information

DESIGN DEVELOPMENT PHASE

DESIGN DEVELOPMENT PHASE UNIVERSITY OF MICHIGAN DESIGN DELIVERABLES FEBRUARY 2012 As part of the deliverables for formal UM review at each of the major phases of design listed below, the Design Professional shall submit this "Design

More information

3 CITY CENTER 180 SOUTH CLINTON AVENUE Rochester, NY 14607

3 CITY CENTER 180 SOUTH CLINTON AVENUE Rochester, NY 14607 FOR LEASE 3 CITY CENTER 180 SOUTH CLINTON AVENUE Rochester, NY 14607 PROPERTY OVERVIEW Centrally located at 180 South Clinton Avenue in Downtown Rochester, 3 City Center is a modern 200,000 square foot,

More information

SPACE TYPE: OUTSIDE PARKING (STRUCTURE)

SPACE TYPE: OUTSIDE PARKING (STRUCTURE) SPACE TYPE: OUTSIDE PARKING (STRUCTURE) Construction Criteria The unit costs for Outside Parking (Structure) space types are based on the construction quality and design features in the following table.

More information

Property Condition Assessment (PCA) Checklist c:\users\joseph\documents\hhc\blog\pca cklist template.doc Friday, August 11, 2006

Property Condition Assessment (PCA) Checklist c:\users\joseph\documents\hhc\blog\pca cklist template.doc Friday, August 11, 2006 FORUM for Historic Harvard Property Assessment (PCA) Checklist c:\users\joseph\documents\hhc\blog\pca cklist template.doc Friday, August 11, 2006 The purpose of this document is to identify in checklist

More information

Highland Park. Exceptional Interiors (cont.) Green Technology. Designer Kitchen Features. Distinctive Exterior Features

Highland Park.  Exceptional Interiors (cont.) Green Technology. Designer Kitchen Features. Distinctive Exterior Features unit 2 HOMES 650 Mill Valley Parkway 2332 Sq.Ft. 3-Car 4/3 $542,800 6 Mt. Shasta Views 643 Mill Valley Parkway 2332 Sq.Ft. 3-Car 4/3 $552,800 8 Mt. Shasta Views Under construction 945 Rollingview Raised

More information

TOWN OF PORT ROYAL BUILDING CODES DEPARTMENT Building Permit Submittal Requirements

TOWN OF PORT ROYAL BUILDING CODES DEPARTMENT Building Permit Submittal Requirements TOWN OF PORT ROYAL BUILDING CODES DEPARTMENT Building Permit Submittal Requirements 700 Paris Ave. PO Drawer 9 Port Royal, SC 29935 Application for Permit - P O Drawer 9, Port Royal South Carolina Permit

More information

RATIONALE AND REASONING

RATIONALE AND REASONING RATIONALE AND REASONING Background The main tenant residing in BMH is the Anthropology Department. Most of the building systems constructed in the building are over forty years old and are at the end of

More information

6502 MILWAUKEE STREET

6502 MILWAUKEE STREET LOCATION MAP PROJECT SITE NEIGHBORING CONTEXT NEIGHBORING CONTEXT PROJECT SITE PROJECT SITE PROJECT DESCRIPTION: The site is currently zoned PD as part of the Metrotech Neighborhood (2002). Originally

More information

CHANCELLORS RESIDENCE ANNUAL INSPECTION REPORT BY BOT GOVERNANCE COMMITTEE MEMBERS A. ITEMS FROM PREVIOUS SITE INSPECTIONS-INCOMPLETE OR ON HOLD

CHANCELLORS RESIDENCE ANNUAL INSPECTION REPORT BY BOT GOVERNANCE COMMITTEE MEMBERS A. ITEMS FROM PREVIOUS SITE INSPECTIONS-INCOMPLETE OR ON HOLD TAB D-2b CHANCELLORS RESIDENCE ANNUAL INSPECTION REPORT BY BOT GOVERNANCE COMMITTEE MEMBERS August 5, 2015 Items added to Inspection performed by Facilities Management Team of July 16, 2015 The care of

More information

DeKalb County School District/Stadiums Avondale Stadium Final School Assessment Report May 20, 2016

DeKalb County School District/Stadiums Avondale Stadium Final School Assessment Report May 20, 2016 DeKalb County School District/Stadiums Avondale Stadium Final School Assessment Report May 20, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 4 School Condition Summary

More information

Material Report - [Trade Contractors] for plan: [E:\SoftPlan14\Projects\Sample Drawings.spf\2-Storey sqft.spf] Page 1 of 5

Material Report - [Trade Contractors] for plan: [E:\SoftPlan14\Projects\Sample Drawings.spf\2-Storey sqft.spf] Page 1 of 5 Material Report - [Trade Contractors] for plan: [E:\SoftPlan14\Projects\Sample Drawings.spf\2-Storey 01-2320 sqft.spf] Page 1 of 5 PREPARATION PRELIM PERMITS & FEES Building Permit 1 each 2200.00 _ 2200.00

More information

RODINNÉ DOMY STODŮLKY. Standards

RODINNÉ DOMY STODŮLKY. Standards RODINNÉ DOMY STODŮLKY Standards BUILDING Floors in residential rooms Entrance hall Kahrs Linnea 3-layer veneer floor, 3-parquet, finished with a moulding, a selection from natural oak and bleached oak

More information

College of the Desert Athletics Facilities

College of the Desert Athletics Facilities College of the Desert Athletics Facilities C13-005-PID-01 The LEED Gold project will include a new gymnasium, new tennis courts, renovation of an existing shower and locker building, and an upgrade of

More information

SUBSTANTIAL IMPROVEMENT

SUBSTANTIAL IMPROVEMENT SUBSTANTIAL IMPROVEMENT General Discussion The following discussion addresses several of the issues surrounding the NFIP regulations concerning substantial improvement and substantial damage. The attached

More information

Completed. Project. Melbourne High School. Comprehensive Additions and Renovations

Completed. Project. Melbourne High School. Comprehensive Additions and Renovations Project Update Project Update September 8, 2006 January 06, 2010 Project Manager Project Manager Anibal Caussade Dennis Bonny Field Coordinator Field Coordinator Bud Ball Paul Friel Project Budget Project

More information

Bureau of Indian Affairs

Bureau of Indian Affairs Bureau of Indian Affairs Office of Facilities Management and Construction JUSTICE / DETENTION FACILITIES SPACE TEMPLATES Table of Contents BUREAU OF INDIAN AFFAIRS JUSTICE DETENTION FACILITIES SPACE TEMPLATES

More information

RANCHO MONTE ALEGRE SANTA BARBARA CALIFORNIA

RANCHO MONTE ALEGRE SANTA BARBARA CALIFORNIA RANCHO MONTE ALEGRE SANTA BARBARA CALIFORNIA Lot Total Acres 0 Residential Development Envelope acres Agricultural Easement and Development Envelope. acres Final SBAR Approval $,00,000 Lot Total Acres

More information

Successful Restaurant. Accessibility. Accessibility. Did you sign in? Best Practices. Copyright Materials. Course Description

Successful Restaurant. Accessibility. Accessibility. Did you sign in? Best Practices. Copyright Materials. Course Description Successful Restaurant Accessibility Successful Restaurant Accessibility TDLR Provider #1521 AIA/CES Provider #G583 Michael Love APA ICC IIDA Best Practices Did you sign in? Accessibility Professionals

More information

James B Farnsworth Elementary School 5414 N Linder Ave Chicago, IL 60630

James B Farnsworth Elementary School 5414 N Linder Ave Chicago, IL 60630 Linder Ave Chicago, IL 030 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will

More information

JMU Capital Projects SWaM Outreach Event Presentations

JMU Capital Projects SWaM Outreach Event Presentations JMU Capital Projects SWaM Outreach Event Presentations Kjellstrom + Lee Contact: Jessica Marcus jmarcus@kjellstromandlee.com Project: College of Business Renovation/Expansion Please contact Kjellstrom

More information

SECTION ALTERNATES

SECTION ALTERNATES SECTION 01 23 00 - ALTERNATES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

UPPER ARLINGTON SCHOOLS 2015 FACILITIES ASSESSMENT. Windermere Elementary School Physical Assessment

UPPER ARLINGTON SCHOOLS 2015 FACILITIES ASSESSMENT. Windermere Elementary School Physical Assessment 2015 FACILITIES ASSESSMENT Windermere Elementary School Physical Assessment December 8, 2015 2015 FACILITIES ASSESSMENT WINDERMERE ELEMENTARY SCHOOL Executive mary The Moody Nolan/Korda/EMH&T/Turner team

More information

Westlake Reed Leskosky AMS A - 1

Westlake Reed Leskosky AMS A - 1 History On November 5, 1905 the official dedication of the theater took place. The event was attended by Governor Frank Hanly and the Indiana Attorney General. Prominent citizens from all over Southern

More information

DESIGN AND CONSTRUCTION STANDARDS. Section 2: Standards for Specific Categories of Work. Laboratory Standards

DESIGN AND CONSTRUCTION STANDARDS. Section 2: Standards for Specific Categories of Work. Laboratory Standards Laboratory Standards These criteria include general planning guidelines. They are intended for use of Designers during the design phases of the project. Planning Assumptions Overview In order to maximize

More information

APPLICATION AND CERTIFICATE FOR PAYMENT

APPLICATION AND CERTIFICATE FOR PAYMENT AND CERTIFICATE FOR PAYMENT TO OWNER: MASTER TEMPLATE - SAVE PROJECT FILE 1 DATE: 10/5/2012 PERIOD TO: ARCHITECT: PROJECT NO: CONTRACTOR'S FOR PAYMENT Application is made for payment, as shown below, in

More information

BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATION PROPOSED MAIN ENTRY - EXTERIOR RENDERING

BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATION PROPOSED MAIN ENTRY - EXTERIOR RENDERING PROPOSED MAIN ENTRY - EXTERIOR RENDERING EXISTING SITE AERIAL PHOTOGRAPH 6TH STREET NW PEDESTRIAN ACCESS School access to existing alley leads students through vehicular path CHAIN LINK ENCLOSED PARKING

More information

HERMIT S REST GRAND CANYON NATIONAL PARK BUILDING CODE REVIEW

HERMIT S REST GRAND CANYON NATIONAL PARK BUILDING CODE REVIEW HERMIT S REST GRAND CANYON NATIONAL PARK BUILDING CODE REVIEW 27 September 2007 prepared by: J. CHRIS EVANS ARCHITECT 3220 E. Terra Alta Blvd. No. 9 Tucson, Arizona 85716 520.319.8835 evansarch@hotmail.com

More information

INSPIRE each student to develop a strong

INSPIRE each student to develop a strong DEL PASO MANOR ELEMENTARY SCHOOL Valuing a culturally and academically DIVERSE COMMUNITY, Del Paso Manor Elementary School s Mission is to EDUCATE and INSPIRE each student to develop a strong A C A D E

More information

Developed by. 31 Bank Street, West End

Developed by. 31 Bank Street, West End ONYX apartments fixtures and Finishes guide. Developed by 31 Bank Street, West End the interiors of ONYX draw inspiration from the local surrounds. the textural darkened joinery and contrasting palette

More information

Project #1139 Budget #82. $ Budgeted $ Billed to Date $ Paid to Date $ Due 210, , , ,158.50

Project #1139 Budget #82. $ Budgeted $ Billed to Date $ Paid to Date $ Due 210, , , ,158.50 Project #1139 Budget #82 $ Budgeted $ Billed to Date $ Paid to Date $ Due 210,087.68 120,979.20 120,979.20 77,158.50 Deposit Paid Deposit Due Phase I: Project Programming and Research $ Budgeted $ Billed

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS ************************************************************************** SECTION TABLE OF CONTENTS

UNIFIED FACILITIES GUIDE SPECIFICATIONS ************************************************************************** SECTION TABLE OF CONTENTS USACE / NAVFAC / AFCEC / NASA UFGS-09 06 00 (May 2009) Change 1-11/13 ----------------------------- Preparing Activity: USACE Superseding UFGS-09 06 90 (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

Manufacturing Facilities Proposal

Manufacturing Facilities Proposal Manufacturing Facilities Proposal Construction proposal To assist business owners with expansion projects, Wisconsin Public Service has compiled information and renderings of common building types in business

More information

CARL E. SCHLUTER ELEMENTARY SCHOOL

CARL E. SCHLUTER ELEMENTARY SCHOOL CARL E. SCHLUTER ELEMENTARY SCHOOL Carl E. Schluter Elementary School Campus Data CARL E. SCHLUTER ELEMENTARY SCHOOL 1220 Mesa Crest Drive, Haslet, Texas 76052 Year Built 2011 Approx. Total Square Footage

More information

Interior Architects, P.C REV 2 CONCEPTUAL ESTIMATE. Brooklyn Heights Library, Brooklyn Public Library, Brooklyn, NY GARDINER AND THEOBALD INC FOR: AT:

Interior Architects, P.C REV 2 CONCEPTUAL ESTIMATE. Brooklyn Heights Library, Brooklyn Public Library, Brooklyn, NY GARDINER AND THEOBALD INC FOR: AT: REV 2 CONCEPTUAL ESTIMATE FOR: Interior Architects, P.C Brooklyn Heights Library, Brooklyn Public Library, Brooklyn, NY AT: BY: GARDINER AND THEOBALD INC Issued: 6/20/2013 BROOKLYN HEIGHTS LIBRARY, BROOKLYN

More information

PERMIT APPLICATION CHECKLIST Municipal Address, Phone & Fax NONRESIDENTIAL

PERMIT APPLICATION CHECKLIST Municipal Address, Phone & Fax NONRESIDENTIAL PERMIT APPLICATION CHECKLIST Municipal Address, Phone & Fax NONRESIDENTIAL Permit Application #: Date: mm/dd/yy Project Address Applicant s Name NOTE TO PERMIT APPLICANTS: All permit applications must

More information

REQUEST FOR ARCHITECTURAL AND ENGINEERING DESIGN SERVICES DRUMLIN DINING HALL RENOVATION. University of Wisconsin-Whitewater.

REQUEST FOR ARCHITECTURAL AND ENGINEERING DESIGN SERVICES DRUMLIN DINING HALL RENOVATION. University of Wisconsin-Whitewater. REQUEST FOR ARCHITECTURAL AND ENGINEERING DESIGN SERVICES DRUMLIN DINING HALL RENOVATION University of Wisconsin-Whitewater March 2008 Project No. 08B21 TABLE OF CONTENTS PAGE Table of Contents... 2 Project

More information

St. Germain Facility Study

St. Germain Facility Study Prepared for: Town of St. Germain Presented on: April 4, 2107 Prepared by: Funktion Design Studio, LLC 207 Windtree Drive Wausau, WI 54401 207 Windtree Drive Wausau, WI 54401 Melody 715-571-8122 Rick 920-379-7133

More information

TERMINAL BUILDING EVALUATION

TERMINAL BUILDING EVALUATION TERMINAL BUILDING EVALUATION 1.0 INTRODUCTION This report evaluates the existing Terminal Building at Frederick Municipal Airport (FDK) to determine the suitability of the building for continued use as

More information

Element Z General Design Requirements Room Standards

Element Z General Design Requirements Room Standards Toilet Room Guidelines PART 1 - GENERAL 1.01 OVERVIEW A. This document provides design and construction criteria for public/patient, and staff toilet rooms at (Owner). PART 2 - DESIGN CRITERIA 2.01 GENERAL

More information

CONSTRUCTION AND RENOVATION FUNDED BY THE CFI EXAMPLE OF A DETAILED COST ALLOCATION METHOD

CONSTRUCTION AND RENOVATION FUNDED BY THE CFI EXAMPLE OF A DETAILED COST ALLOCATION METHOD CONSTRUCTION AND RENOVATION FUNDED BY THE CFI EXAMPLE OF A DETAILED COST ALLOCATION METHOD March 2009 CONSTRUCTION AND RENOVATION FUNDED BY THE CFI Prepared For: CANADA FOUNDATION FOR INNOVATION 230 QUEEN

More information

1. Unified Facilities Criteria - Design: General Building Requirements (UFC ).

1. Unified Facilities Criteria - Design: General Building Requirements (UFC ). 1. GENERAL GUIDANCE REGARDING DESIGN A. Commissary facilities are Department of Defense (DoD) projects, and as such must be constructed in accordance with the following criteria, codes, and standards.

More information

PATTAYA POSH. A chance to own the best location in North Pattaya. North Pattaya Road, Pattaya, Thailand

PATTAYA POSH. A chance to own the best location in North Pattaya. North Pattaya Road, Pattaya, Thailand PATTAYA POSH A chance to own the best location in North Pattaya North Pattaya Road, Pattaya, Thailand Pattaya Posh is a prestigious high-rise condominium development, occupying the best location in the

More information

WAYNE COUNTY COMMUNITY COLLEGE DISTRICT DAVENPORT UNIVERSITY SUITE RENOVATION

WAYNE COUNTY COMMUNITY COLLEGE DISTRICT DAVENPORT UNIVERSITY SUITE RENOVATION WAYNE COUNTY COMMUNITY COLLEGE DISTRICT DAVENPORT UNIVERSITY DESIGN DIVISION SOUTHFIELD ROAD SOUTHFIELD, MI 80 o (8) -00 I f (8) - SUITE RENOVATION GENERAL RUIREMENTS The General Provisions of the Contract

More information

Considering Modular Buildings for Your Space Needs?

Considering Modular Buildings for Your Space Needs? Considering Modular Buildings for Your Space Needs? Consider This Design of Space: What will you be using the building for? How many square feet of space per person is reasonable? Code Requirements*: (building

More information

REFLEC TIONS I & II AT CIRCLEPORT

REFLEC TIONS I & II AT CIRCLEPORT ERLANGER, KENTUCKY CL ASS A OFFICE SPACE AVAIL ABLE REFLECTIONS I & II AT CIRCLEPORT OFFERS MANY ADVANTAGES: State-of-the-art fiber optics cabling designed for New Economy as well as traditional business

More information

Perimeter Site Improvements

Perimeter Site Improvements Perimeter Site Improvements Phase 1-5 Architect: W+W Architects and Planners Anticipated Milestone Activities: Phase 1, 2 & 3 Construction Manager: Bernards 08.08.13 Directional Signage Contractor: Woodcliff

More information

Construction Summary

Construction Summary Construction Summary Project Name Item of Work Base Building Add-ons Total Cost Code Site Development $ 18,150.00 $ - $ 18,150.00 Landscaping $ 500.00 $ - $ 500.00 Cast-in-place Concrete $ 7,806.00 $ -

More information

DIVISION 9 FINISHES. This Article on Codes, Regulation and Standards shall apply to all Divisions of the Building Standards

DIVISION 9 FINISHES. This Article on Codes, Regulation and Standards shall apply to all Divisions of the Building Standards DIVISION 9 FINISHES This Article on Codes, Regulation and Standards shall apply to all Divisions of the Building Standards 1 Table of Contents SECTION 09 05 13 COMMON FINISHES 2 SECTION 09 51 23 ACOUSTICAL

More information

CATAMARAN TOWER - 1 Seef Area Plot 19, 20

CATAMARAN TOWER - 1 Seef Area Plot 19, 20 STATUS REPORT NO 18 [As on September 30, 2017] This report is intended as a status report and covers only the activities completed till date, non-completed works and work-in-progress. A. Project Details

More information

3D Home Improvement and Inspection Services, Inc

3D Home Improvement and Inspection Services, Inc Property Inspection Report Cover Page ABC Disney Lane, Winter Garden FL, 34787 Inspection prepared for: John Doe Inspection Date: 7/15/2010 Time: 11:00 am Age: 6 Years Size: 3,378 LSF / 4,427 TSF Weather:

More information