1 Sanitation Marketing Toolkit MANUAL FOR PRODUCTION AND INSTALLATION OF POUR-FLUSH LATRINES

2

3 CONTENTS Page 1. Foreword 3 2. Introduction of Latrines 4 3. Components of Latrines 5 4. Moulds and Tools Needed for Latrine Production 6 5. Procedures for Concrete Ring Production 7 6. Procedures for Concrete Slab Production Procedures for Latrine Transportation Procedures for Latrine Installation 19 Annex A.Latrine Production Quality Inspection Form 20 Annex B. Concrete Mixture Ratios 21 2

4 FOREWORD This standard manual for pour-flush latrine production and installation was designed by Vongkhamxay-OD Survey-Design & Construction Co., LTD. on behalf of Population Services International (PSI) Laos and Water and Sanitation Program of the World Bank (WSP). The purpose is to provide clear instructions to latrine producers on how to produce and install pour-flush latrines in rural areas where it can help provide users with better health and a cleaner environment. This latrine design takes into consideration the availability of required materials and the logistics of latrine production in rural areas in Laos. It has been designed to use those materials that are most easily accessible, while still prioritizing quality, attractiveness, and affordability. Latrine producers who use this design will be able to make a profit by producing quality, affordable latrines using local materials, and will also be contributing to a cleaner, healthier environment in the area they serve. PSI will provide production and installation training according to this manual for business owners who are members of the network. 3

5 INTRODUCTION TO LATRINES Latrines use a pit or trench to receive waste matter from the human body. The pit requires emptying after 5-7 years, depending on frequency of use and number of users. Latrines are affordable and suitable for rural areas where there is more space. Important: The maximum pit depth for latrines is 1.5 meters. Latrines should be installed at least 15 meters from any water source where the water may be consumed. COMPONENTS OF LATRINES Latrines consist of a pan, slab, concrete rings, and a hole for emptying the pit. - Pan: Allows waste matter to enter the pit and keeps gas from natural chemical reactions from escaping. 4

6 - Slab: Covers the pit and supports human weight. Tiles (optional) help to keep the area clean and easy to maintain. - Concrete rings: Prevents soil erosion. Circular rings are advantageous to square rings as they can better withstand pressure, and are more durable and cost effective. - Emptying hole: Gives access to the contents of the pit so that it can be emptied when necessary. MAXIMUM PIT DEPTH: 1.5M Pan Emptying Hole Slab Concrete Rings 5

7 MOULDS AND TOOLS NEEDED FOR LATRINE PRODUCTION Item Description Sketch 1 Steel mould for concrete rings -Inner mould -Outer mould -Steel wire 2 Slab Mould - Can be constructed using wood or steel - Dimensions of wood planks or steel bars: 4cm x 8cm x 120cm - Steel wire Tools 1 Concrete Mixer - Volume: 0.2 m³ or 0.5 m³ 2 Shovel 3 Trowel 4 Hammer 5 MetalCuttingSaw 6 Measuring Tape 6

8 PROCEDURES FOR CONCRETE RING PRODUCTION To produce a high quality ring, it is recommended to use 240kg/m³of concrete (refer to the 1:2:4 ratio for concrete production described in Annex B of this manual). VOLUME OF MATERIALS NEEDED TO PRODUCE ONE RING: Cement (kg) Sand (kg) Gravel (kg) Water (l) Steel Bar Steel (kg) Wire(kg) PREPARATION CLEAN AND INSTALL THE CONCRETE RINGMOULD! Clean the mould thoroughly before pouring concrete.! Put lubricant onto the surface of the mould.! Ensure that the mould has been placed on even ground and is properly level. 7

9 Outer Layer Surface of Mould CONSTRUCT STEEL WIRE STRUCTURE! Cut the 6 mm steel bar into 3 pieces of 250cm and 4 pieces of 30 cm.! Use thin steel wire to tie the 6mm steel bar accordingly.! Each end will have an extra 2cm of wire, which should be fastened together. MIX CONCRETE! In order to produce high quality concrete suitable for latrines, cement, gravel, sand, and water should be mixed following the 1:2:4 ratio in the table in Annex B of this manual. Other possible ratios are listed in Annex B. The amounts listed in the table will produce 1.00m 3 of standard grade concrete. 8

10 Recommendations for high quality concrete: 1. Use clean sand and gravel 2. Use good quality cement 3. Use clean water in the proper volume Remember Be careful not to impact the mould while pouring. This could deform the mould, and therefore, the concrete ring or slab. Steadily pour the concrete directly in the middle of the mould and use the trowel to slowly spread it. Do not pour the concrete along the sides of the mould as it could cause separation of the mixtures. Do not pour from too high above the top of the mould as this could cause the water in the mixture to separate. Water should be properly mixed according to the instructions as it could rise up to the surface due to the pressure of the concrete sinking down. Use a steel bar or concrete vibrator to properly disperse the concrete into the mould as your pour. Before dismantling the mould, let sit for about 2 to 3 hours. Then, very carefully separate the mould to avoid deforming or breaking the ring or slab. POUR CONCRETE INTO MOULD! Place about 2cm of concrete at the bottom of the mould before placing the steel wire structure into the mould.! Steadily pour the concrete into the mould and fill to the top. 9

11 USE CONCRETE VIBRATOR TO HELP EVENLY DISPERSE CONCRETE IN MOULD! Use a concrete vibrator to help ensure that the concrete fills the entire mould and is dispersed evenly within the mould. Concrete can also be dispersed by using a steel bar to hit the outside of the mould repeatedly.! Use a trowel to smooth the concrete at the top of the mould to ensure that it is even.! Let sit for 2 to 3 hours before dismantling the mould. We recommend curing the concrete by keeping it wet for 2-3 days. This will create stronger concrete to ensure that it does not break during transportation or installation. 10

12 DISMANTLE THE MOULD! After 2 to 3 hours, check the hardness of the concrete to ensure that it is ready. Note that in very humid conditions, it is necessary to wait 3 to 4 hours before dismantling.! Slowly remove the inner mould first, and keep the concrete wet to avoid cracking and to ensure high quality. Remove the outer mould after the inner mould has been completely removed.! Leave concrete ring in the sun for 1 day before carrying to the stocking area. 11

13 PROCEDURES FOR CONCRETE SLAB PRODUCTION (1M X 1M X 0.04M) The weight of one finished slab is 77kg. THE VOLUME OF MATERIALS NEEDED TO PRODUCE A SLAB IS: Cement (kg) Sand (kg) Gravel (kg) Water (l) Steel Bar Steel Wire (kg) (kg) PREPARATION WOOD FRAME! Prepare 4 pieces of 4x8 wood planks or steel to produce the slab mould.! Cut out notches to fit the pieces together (see pictures below).! Use the wood or steel to construct a square of 1m x 1m x 4cm.! Apply lubricant to the mould. 12

14 STEEL FRAME Use L shape steel bar (4cm x 4cm) Inside scale: 1m x 1m Thickness: 4 cm 13

15 CONSTRUCTING THE STEEL WIRE STRUCTURE! Cut the 6mm steel bar into 95cm pieces (10), 30cm pieces (4), and 25cm pieces (6).! Place steel wire on the ground and tie accordingly.! Use thinner steel wire to tie the steel structure together.! Keep a space open for the toilet bowl and construct the steel wire structure around this (refer to the picture). PREPARE AND CHECK THE MOULD BEFORE POURING CONCRETE 14

16 ! Carefully check that the space left open for the pan is the correct size and placement. The hole should be in the middle of the slab,! Prepare a hole for emptying the pit(20cm in diameter or 1 piece of 20x20cm tile in the corner of the slab).! Make sure the area where the mould will be made is on flat, level ground and that is has been constructed properly before pouring the concrete. POUR CONCRETE INTO SLAB MOULD! Pour the concrete into the slab mould up to 2cm (halfway).! Properly place the steel wire structure at a height of 2cm, i.e. at half of the thickness of the mould.! Finish pouring the concrete until the mould is filled. USE A CONCRETE VIBRATOR TO HELP EVENLY DISPERSE THE CONCRETE IN THE MOULD! Use a concrete vibrator to ensure that the concrete completely fills the mould and is evenly dispersed throughout. Concrete can also be dispersed by using a steel bar to hit the outside of the mould repeatedly.! Use a trowel to spread the concrete at the top of the mould evenly and neatly. TILES 15

17 ! Tiles of 20cm or 25 cm may be used. 1 pack of tile will cover an area of 1.00m², which is the total area of the slab.! Place the cement mixture in on the cover, and steadily and evenly place the tiles on the wet cement mixture, starting from the outside. Cover the entire surface with tiles, including the space left open for the pan and emptying hole.! Make sure the cement is proportionally mixed with water to create the right consistency. CUTTING THE TILES! Place the pan in the designated area in the middle of the slab.! Draw marks on the tiles around the pan and outlet hole.! Use an appropriate tool to cut the tile around the pan and emptying hole according to the marks. ADDING CAULK AND FINISHING THE SLAB 16

18 ! Mix the caulk with a proportionate amount of water until the correct consistency is achieved.! Place the mixture into the spaces between the tiles.! The slab should only be moved after about 7 days to ensure that the cement and caulk dries completely 17

19 PROCEDURES FOR TRANSPORTATION OF LATRINEPARTS 1. Park the truck near the area where rings 2. Carryand load the rings one by one are stocked 3.Do not stack more than 3 rings 4.Repeat until the truck is full 5. Carry the slab carefully 6. Place the slabupright as shown 18

20 PROCEDURES FOR LATRINE INSTALLATION 1. Dig a square hole at the site where you would like to put your latrine that is 1m x 1m at the bottom and 1.4m x 1.4m at ground level. For a three-ring latrine, dig the pit 1.0meter deep. For a four-ring latrine, dig the pit 1.4 meters deep. 2. Ensure that the earth is leveled evenly at the bottom of the pit. 3. Install the rings one on top of the other (3 to 4 units). Make sure that 20cm of the final ring is above ground level. 4. Backfill the earth around the rings and compact it tightly. 5. Fill the area surrounding the rings with earth, and then continue filling in dirt around the top 20cm of the final ring and compact it tightly. 6. Put cement around the top of the rings and immediately place the slab on the concrete rings. 7. Install the pan into the spare hole on the slab by plastering. 19

21 ANNEXES A: LATRINE PRODUCTIONQUALITY INSPECTION FORM Quality Inspection Form I. Round concrete ring (40cm x 80cm x 3cm) 1. Constructed with steel wire Yes No 2. Steel wire of Ø6mm and tie with distance of 15cm Yes No 3. Good and recognized quality cement Yes No 4. Gravel with size less than 1cm Yes No 5. Clean sand Yes No 6. Ratio of mixing concrete 1:2:4 1:3:5 Yes No II. III. Cover with size of : 100cm x 100cm x 4cm 1. Timber or steel structural Yes No 2. Steel wire of Ø6mm and tie with distance of 15cm Yes No 3. Good and recognized quality cement Yes No 4. Gravel with size less than 1cm Yes No 5. Clean sand Yes No 6. Ratio of mixing concrete 1:2:4 Yes No Storing and stocking 1. Production layout Yes No 2. Storing of materials needed and tools Yes No At :...Date :.../../. Inspection Engineer from PSI Producer or Factory 20

22 B: OTHER CONCRETE MIXTURE RATIOSPER 1 M 3 Ratio Cement (kg) Cement (sack) Sand Gravel Water per sack cement (L) Water per m³ concrete (L) 1:2: :2.5: :2: :3: :3: :3: To make high quality concrete, use one of the ratios of cement, sand and gravel listed in the table above. If a ratio of 1:2:4 is used, more time may be required to mix and pour concrete into the mould. However, this ratio is recommended because it creates a stronger, more durable latrine. 21

LATRINE CONSTRUCTION SHELTER. Pour flush latrine 2. Pour flush micro septic tank 3. Initial investment, location, human resources 4.

LATRINE CONSTRUCTION SHELTER. Pour flush latrine 2. Pour flush micro septic tank 3. Initial investment, location, human resources 4. LATRINE CONSTRUCTION Pour flush latrine 2 Pour flush micro septic tank 3 Initial investment, location, human resources 4 Concrete rings 5 Box 6 Cover 7 Slab and ceramic pan 8 Ring mold 9 Structure and

More information

How to make a simple pit toilet and grow trees or make humus for the garden. Written by Peter Morgan

How to make a simple pit toilet and grow trees or make humus for the garden. Written by Peter Morgan The Arborloo Book How to make a simple pit toilet and grow trees or make humus for the garden. Written by Peter Morgan Copyright Peter Morgan and SEI 2004 1 Introduction Most of the rural population of

More information

PPC Cement TUTORIAL. how to screed a floor

PPC Cement TUTORIAL. how to screed a floor PPC Cement TUTORIAL how to screed a floor Pre-build: TOOLs & Materials ITEM Quantity Check. Builders bucket. Wheelbarrow 3. Shovel 4. Builder s line 5. 50mm steel pegs 6. Rigid timber forms 7. Flexible

More information

LeaPPS Uganda Learning for Practice and Policy on household and school sanitation and hygiene Arborloo and Fossa Alterna

LeaPPS Uganda Learning for Practice and Policy on household and school sanitation and hygiene Arborloo and Fossa Alterna LeaPPS Case: 2008-3 By Jo Smet, IRC Reviewed by Brenda Achiro, Brecht Mommen and Patience Turyareeba How to build an Arborloo and a Fossa Alterna? An Ecological Approach to Sanitation in Uganda using 1

More information

When I started tiling, we didn t do our own shower pans that BATHS

When I started tiling, we didn t do our own shower pans that BATHS BATHS Preventing Leaks in Tiled Showers Detail the pan properly before any tile is installed BY TOM MEEHAN Photos by Roe Osborn When I started tiling, we didn t do our own shower pans that job fell to

More information

Underground Exhaust System

Underground Exhaust System Operation and Maintenance Manual Underground Exhaust MONOXIVENT - SOURCE CAPTURE SYSTEMS - info@ Oct. - 2015 Underground Duct Construction Standards 1. Dig trench depth to allow for minimum distance from

More information

SYNTHETIC GRASS INSTALLATION GUIDE SOFT AND HARD SURFACE

SYNTHETIC GRASS INSTALLATION GUIDE SOFT AND HARD SURFACE SYNTHETIC GRASS INSTALLATION GUIDE SOFT AND HARD SURFACE HARD SURFACE INSTALLATION You will need: Tape measure Rope or spray paint Weed spray Sharp utility knife and spare blades Synthetic grass adhesive

More information

CRESTONE STRAIGHT FIRE PIT SKU:

CRESTONE STRAIGHT FIRE PIT SKU: CRESTONE STRAIGHT FIRE PIT SKU: 198-6257 Approximate Weight: 2200 lbs. Approximate Size: 4 8 Exterior Dimension x 3 Interior Dimension x 1 4 H www.midwestmanufacturing.com CRESTONE BLOCK MATERIALS CONCRETE

More information

Appendix 4. Bills of Quantities

Appendix 4. Bills of Quantities Appendix 4. Bills of Quantities 201 A4.1 Deep trench latrines Partitions of local materials 1m apart Timber foot rests and floor plates Lightweight timber frame Excavated soil (used for back-fill) Plastic

More information

Stepping Stone. Name: Date:

Stepping Stone. Name: Date: Stepping Stone Name: Date: Description: The project is useful for landscaping. Measurements of the right amount of Portland cement, water, sand, and course aggregates will be used to construct this project.

More information

Tactile Pad Installation Guide. All Surfaces.

Tactile Pad Installation Guide. All Surfaces. Tactile Pad Installation Guide. All Surfaces. ALLSAFE FLOORING P/L ABN: 65 536 404 581 Factory 2, 6 Walker Street Braeside, VIC 3195 Tel: 1300 466 754 Fax: 1800 466 754 info@allsafeflooring.com.au www.allsafeflooring.com.au

More information

Pre-build: TOOLs & Materials

Pre-build: TOOLs & Materials Pre-build: TOOLs & Materials ITEM a. Builder s square b. Brick bolster c. Bricks d. Builder s bucket e. Mortar trowel f. Mason's string g. Square-nosed spade h. Spirit level i. Tape measure j. kg hammer

More information

end curbs at the top andd 2. Sight and ely 32 wide for the side good installation. Seee Figure 1A. Figure 1A

end curbs at the top andd 2. Sight and ely 32 wide for the side good installation. Seee Figure 1A. Figure 1A FlexEdge Long Jump Pit w/ Sand Catchers INSTALLATION INSTRUCTIONS NOTE: ALWAYS BE AWARE OF THE FINISHED CURB HEIGHT REQUIREMENTS Recommended Installation: Please read entire Installation Notes before beginning

More information

Retaining Wall Products

Retaining Wall Products Retaining Wall Products BCP Building Products 18 Kirkcaldy Street Bathurst NSW 2795 Phone 02 6331 2777 Fax 02 6331 6510 sales@bcpbuildingproducts.com.au www.bcpbuildingproducts.com.au Garden Lockstone

More information

h Installation Manual

h Installation Manual h Installation Manual 1 General Information The installation of HOBAS GRP Pipes is subject to applicable standards and guidelines such as EN 1610 and ISO/ TS 10465-1. Correct installation always requires

More information

Levelling compounds.... plane, smooth surfaces with Alfix

Levelling compounds.... plane, smooth surfaces with Alfix s... plane, smooth surfaces with Alfix Concrete, slightly uneven Levelling with Alfix Ceramic tiles and natural stone are widely used for both renovation projects and new constructions. Ceramic tiling

More information

A. BILL OF QUANTITIES FOR SANITARY SEWER

A. BILL OF QUANTITIES FOR SANITARY SEWER Note: Unit prices of BoQ items shall include the execution of all small and unforeseen works not covered by BoQ, but that are necessary to be carried out during construction for smooth process of works

More information

4 EXTREME FOUNDATION PANELS

4 EXTREME FOUNDATION PANELS 4 EXTREME FOUNDATION PANELS For Garages On Granular Footings 1. The type of soil is a factor in determining foundation construction details such as footing design, backfill, and drainage provisions. Soils

More information

Joint Free Slabs On Grade Website:

Joint Free Slabs On Grade Website: Joint Free Slabs On Grade Website: www.jointfreeslabs.com Specification Revised March 2014 Warwick Colefax Robert Colefax Phone (02) 9999 6688 Phone (07) 4051 9466 Fax (02) 9999 6680 Fax (07) 4051 9477

More information

Heat-Kit System Modular Contraflow Masonry Heater Core Assembly Manual

Heat-Kit System Modular Contraflow Masonry Heater Core Assembly Manual Revised January 11, 2011 Heat-Kit System Modular Contraflow Masonry Heater Core Assembly Manual HK-22no 22 Firebox RR 5 Shawville Québec J0X 2Y0 Voice 819.647.5092 Fax 819.647.6082 email mheat@heatkit.com

More information

De Montfort Mark 7 Incinerator (Flatpack)

De Montfort Mark 7 Incinerator (Flatpack) De Montfort Mark 7 Incinerator (Flatpack) Introduction This design is specially for those occasions when a large number of incinerators are to be built at one location and transported to the places where

More information

Description Unit Quantity Rate Kshs. Amount Kshs.

Description Unit Quantity Rate Kshs. Amount Kshs. BILL No.1 40m3 MASONRY STORAGE TANK No. Description Unit Quantity Rate Kshs. Amount Kshs. 1 SETTING OUT AND EARTH WORKS 1.1 General site clearance and setting out 1.2 Excavate over site 200mm to remove

More information

Linear Drainage ZF806 ZF812

Linear Drainage ZF806 ZF812 Linear Drainage ZF806 ZF812 Fiberglass Trench Installation Instructions ZF806 Accessories 6" [152mm] Wide Fiberglass Trench Drain System Below are some of the ZF806 trench drain components typical to an

More information

BTM BT2K 600. Areas of Use

BTM BT2K 600. Areas of Use BTM BT2K 600 Bitumento BT2K 600 is a solvent-free, two-component, elastic, water-based, fiber reinforced, rubber and cement based bitumen waterproofing material. Areas of Use As water and moisture tight

More information

Foundation Manual. Part Number: Version: Updated: July 5, S. Meadows Pkwy. A-9, #329 Reno, NV

Foundation Manual. Part Number: Version: Updated: July 5, S. Meadows Pkwy. A-9, #329 Reno, NV Foundation Manual Part Number: 150002 Version: 1.22 Updated: July 5, 2009 748 S. Meadows Pkwy. A-9, #329 Reno, NV 89521 775-831-9463 www.mariahpower.com July 2009, Mariah Power, All Rights Reserved Dear

More information

Appendix G: Sanitation Project. Objective:

Appendix G: Sanitation Project. Objective: Appendix G: Sanitation Project Objective: Provide sustainable and affordable human waste sanitation in the village of La Fortuna and Tule to reduce the precedence of diseases like diarrhea and dengue.

More information

CONCRETE BLOCK MASONRY

CONCRETE BLOCK MASONRY CONCRETE BLOCK MASONRY CONTENT Introduction Types Manufacturing process Properties Advantages Introduction These are the concrete blocks either hollow or solid. A hollow unit is that unit which has core

More information

Asphalt Maintenance PRODUCTS INFORMATION AND INSTALLATION GUIDE

Asphalt Maintenance PRODUCTS INFORMATION AND INSTALLATION GUIDE Asphalt Maintenance PRODUCTS INFORMATION AND INSTALLATION GUIDE TABLE OF CONTENT About RESISTO 2 Asphalt Cleaner and Degreaser 3 Oil Spot Primer 3 Liquid Crack Filler 4 Rubberized Crack Filler 4 Levelling

More information

PUR Sensor Installation with PAGEL V2/40

PUR Sensor Installation with PAGEL V2/40 PUR Sensor Installation with PAGEL V2/40 Installation Manual for Concrete Roads Issued 24.11.2011 Sensor Line - Gesellschaft für optoelektronische Sensoren mbh Carl-Poellath-Str. 19 D-86259 Schrobenhausen

More information

Assembly Instruction wedi Fundo Floor element

Assembly Instruction wedi Fundo Floor element Assembly Instruction wedi Fundo Floor element Assembly Instructions wedi Fundo Legend A Caulking nut B Rubber caulking gasket C Drain body D wedi sealant E Rubber gasket F Fiber gasket G Locking nut A

More information

PART A: JOB PROCDRE FOR PLASTERING

PART A: JOB PROCDRE FOR PLASTERING PART A: JOB PROCDRE FOR PLASTERING 1. SCOPE: The scope of this procedure shall apply to all cement plaster finishes to column, ceilings, walls and similar surfaces on backgrounds met with such as brick,

More information

www.arizonawholesalepoolcontractors.com The Swimming Pool Construction Checklist is designed to give you some guidelines and hints of items to look for while you re building your own pool. It s outline

More information

1.2 Reference Standard: NOFMA - National Oak Flooring Manufacturers Association Grading Standards.

1.2 Reference Standard: NOFMA - National Oak Flooring Manufacturers Association Grading Standards. WOOD FLOORING GENERAL INFORMATION 1.1 This section applies to factory finished wood strip flooring. 1.2 Reference Standard: NOFMA - National Oak Flooring Manufacturers Association Grading Standards. 1.3

More information

Safety on Heights: Our Policy

Safety on Heights: Our Policy 11/17/14 Safety on Heights: Our Policy Only volunteers over the age of 18 are allowed to work on heights of more than six feet off the ground. This includes all work on scaffolds. Only volunteers who are

More information

Installation Instructions. Important. Recommended Tools. Palladium Rigid Sheet/Rubrail or Palladium G2 Sheet/Rubrail. Storage

Installation Instructions. Important. Recommended Tools. Palladium Rigid Sheet/Rubrail or Palladium G2 Sheet/Rubrail. Storage Important Storage Flat sheet - Store Palladium Rigid Sheet in a clean, dry, interior area at temperatures between 50 F and 95 F [10-35 C]. Keep out of direct sunlight. Make sure sheet is well supported.

More information

THE PERFORMANCE OF CONCRETE GROUND FLOOR SLAB REINFORCEMENT TO CONTROL SHRINKAGE CRACKING. D H Chisholm 1

THE PERFORMANCE OF CONCRETE GROUND FLOOR SLAB REINFORCEMENT TO CONTROL SHRINKAGE CRACKING. D H Chisholm 1 THE PERFORMANCE OF CONCRETE GROUND FLOOR SLAB REINFORCEMENT TO CONTROL SHRINKAGE CRACKING D H Chisholm 1 ABSTRACT In a typical residential concrete floor slab, the cast in strip footings on the slab perimeter

More information

STEP UP SHOWER BASE INSTALLATION GUIDE FOR TIMBER AND CONCRETE FLOORS

STEP UP SHOWER BASE INSTALLATION GUIDE FOR TIMBER AND CONCRETE FLOORS GUIDE FOR TIMBER AND CONCRETE FLOORS EDITION: APRIL 2016 IMPORTANT: This guide is for the installation of a Step Up shower base on a timber or concrete floor. If you require a walk in (flush with floor)

More information

Retaining Walls. Made Easy

Retaining Walls. Made Easy Retaining Walls Made Easy Retaining Walls Made Easy! Contents Page 1 Contents Page 2 Foreword Page 3 Demolition Page 3 Removal Vegetation Page 3 Excavation Page 4 Reinforcement Steel Page 6 Concreting

More information

The Otji-Toilet self builder manual The Clay House Project Otjiwarongo

The Otji-Toilet self builder manual The Clay House Project Otjiwarongo - - The Otji-Toilet self builder manual The Clay House Project Otjiwarongo - 2 - The Otji-Toilet self builder set Your self builder set consists of following material 1 Lid box with following parts a)

More information

CIVIL WORKS Mahesh G. Nair

CIVIL WORKS Mahesh G. Nair MEASUREMENT BOOK SUNIL Date Work Order Contractor : : EARTH WORKS CIVIL WORKS Mahesh G. Nair GROUND FLOOR 1 EARTH WORKS EXCAVATION : Earth work excavation for foundation trenches in all classes of soil

More information

HOW TO INSTALL PATIOS AND WALKWAYS STEP 2 STEP 1. For all Patios and Walkways. The base is the most important step in your patio and walkway projects.

HOW TO INSTALL PATIOS AND WALKWAYS STEP 2 STEP 1. For all Patios and Walkways. The base is the most important step in your patio and walkway projects. New Project (replacing grass/dirt) STEP 1 PREPARING YOUR PROJECT AREA Determine how much to excavate using the example below. Remove the grass to desired depth (skim rather than dig deep) and a few inches

More information

Important: Before You Start

Important: Before You Start Advantage ICF System Advantage ICF System TM Field Guide Important: Before You Start Does Your Building Inspector Know You Are Building with the Advantage ICF System? You are required to check with your

More information

Zurn Z874. Trench Drain System. Installation Instructions

Zurn Z874. Trench Drain System. Installation Instructions Zurn Z874 Trench Drain System Installation Instructions Z874 Accessories Trench Drain System Below are the components of the Z874-X trench drain typical to an installation. Check your order to verify you

More information

Tidy tiles Walls, floors, stairs and tiles on tiles Building materials of brand-name quality for your home Nur im

Tidy tiles Walls, floors, stairs and tiles on tiles Building materials of brand-name quality for your home Nur im www.probau.eu Building materials of brand-name quality for your home PROBAU offers a wide range of products in many areas of application for home improvement, renovation and construction. In professional

More information

Standard specification for the application of Danosa Two-Layer waterproof roofing membrane to plywood & concrete surfaces.

Standard specification for the application of Danosa Two-Layer waterproof roofing membrane to plywood & concrete surfaces. Standard specification for the application of Danosa Two-Layer waterproof roofing membrane to plywood & concrete surfaces. BRANZ Appraised No. 678 Ref: P3200 Rev 1 February 2016 Page 1 of 5 1.0 PREAMBLE:

More information

Con-Spec Industries Ltd.

Con-Spec Industries Ltd. CON-SPEC COUNTER-CRETE Con-Spec Counter-Crete is a unique preblended cementitious material for casting concrete countertops. It is a non-shrinking concrete that requires only potable water for mixing.

More information

A-ONE Insulated Forms Installation Manual

A-ONE Insulated Forms Installation Manual A-ONE Insulated Forms Installation Manual Rockford, MN www.aoneform.com www.diversifoam.com info@diversifoam.com A-ONE Manual 180426.docx Disclaimer Notice The information in the A-ONE Insulated Forms

More information

ERMCO EUROPEAN READY MIXED CONCRETE ORGANIZATION ASSOCIATION EUROPEENNE DU BETON PRET A L EMPLOI EUROPÄISCHER TRANSPORTBETONVERBAND

ERMCO EUROPEAN READY MIXED CONCRETE ORGANIZATION ASSOCIATION EUROPEENNE DU BETON PRET A L EMPLOI EUROPÄISCHER TRANSPORTBETONVERBAND Preparation for pour Planning the pour Apply mould oil thinly and evenly. Clean out the forms with a magnet and water. Planning the pour Remove any litter from the formwork. Stick to the plan. Take care

More information

The Schools Ecological Sanitation Programme 2. Building an Arborloo. Peter Morgan and Annie Shangwa June 2008

The Schools Ecological Sanitation Programme 2. Building an Arborloo. Peter Morgan and Annie Shangwa June 2008 The Schools Ecological Sanitation Programme 2. Building an Arborloo Peter Morgan and Annie Shangwa June 2008 Every family needs a toilet! Why not teach the method at school! Simple ecological toilets which

More information

Contents. Before you begin. Introduction: Carrying out concreting to simple forms 1. Element 1: Planning and preparing 3

Contents. Before you begin. Introduction: Carrying out concreting to simple forms 1. Element 1: Planning and preparing 3 Contents Contents Before you begin v Introduction: Carrying out concreting to simple forms 1 Element 1: Planning and preparing 3 Section 1.1: Obtaining, confirming and applying work instructions and 4

More information

WORK BELOW LOWEST FLOOR FINISH 1/7 230, , , FRAME 2/6 96, , ,056.00

WORK BELOW LOWEST FLOOR FINISH 1/7 230, , , FRAME 2/6 96, , ,056.00 Description Page No Summary Amount Summary 1/7 230,694.60 22,019.25 22,642.65 2/6 96,801.30 80,150.60 114,056.00 Total Per Unit (MYR) 327,495.90 102,169.85 136,698.65 Total Unit(s) X 1 2 2 Total Per Type

More information

WATERPROOFING CONCRETE TIE HOLES USING XYPEX

WATERPROOFING CONCRETE TIE HOLES USING XYPEX 2016-05 There are several ways of holding forms together during placement of concrete. Most of these methods involve the use of some type of steel tie that connects the forms together and holds them from

More information

Zurn Z886. 6" Perma-Trench. Installation Instructions

Zurn Z886. 6 Perma-Trench. Installation Instructions Zurn Z886 6" Perma-Trench Installation Instructions Z886 Accessories 6" [152mm] Wide Trench Drain System Below are the components of the Z886 trench drain typical to an installation. Check your order to

More information

SITE WORK II: Footings, Cisterns

SITE WORK II: Footings, Cisterns SITE WORK II: Footings, Cisterns RUBBLE FOOTINGS FOR EARTHBAG BUILDINGS Materials: Rubble, stone, gravel Tranchée/ Trench: The bottom of the trench must be level and at least 20 cm (8 ) deep on the downhill

More information

ROLLING RACK. Simple Security

ROLLING RACK. Simple Security Simple Security The graceful design and high security of the Rolling Rack has made this type of bike rack a standard for many schools and communities. The Rolling Rack can be used as a single-sided or

More information

Assembly Instruction. wedi Fundo Primo Shower System

Assembly Instruction. wedi Fundo Primo Shower System Assembly Instruction wedi Fundo Primo Shower System Assembly Instructions wedi Fundo wedi Fundo Shower System-Primo Overview & General Product Description of the wedi Fundo Shower Systems All wedi Waterproof

More information

LAMINATE GENERAL INSTALLATION INSTRUCTIONS FOR DROP LOCK FLOORING

LAMINATE GENERAL INSTALLATION INSTRUCTIONS FOR DROP LOCK FLOORING LAMINATE GENERAL INSTALLATION INSTRUCTIONS FOR DROP LOCK FLOORING WARNING Prior to installation, please ensure that the product received is the correct style and color as well as to the customer s satisfaction.

More information

Biogas Construction Process

Biogas Construction Process Paper presented at the Biogas Training Programme Conducted at CARD, Alam Village, Myitkyina. Metta Development Foundation Biogas Construction Process Govinda Prasad Devkota P.O. Box 20506 Kathmandu, Napal

More information

BioPrism Solid Surface

BioPrism Solid Surface Please read all instructions before installing products. STORAGE & HANDLING: Check for damage that may have occurred during transit. Keep receptor flat on pallet, as it was shipped, until ready to install.

More information

INTRODUCTION TO LOW COST SANITATION LATRINE CONSTRUCTION. A CAWST CONSTRUCTION MANUAL FEBRUARY 2011 Edition

INTRODUCTION TO LOW COST SANITATION LATRINE CONSTRUCTION. A CAWST CONSTRUCTION MANUAL FEBRUARY 2011 Edition INTRODUCTION TO LOW COST SANITATION LATRINE CONSTRUCTION A CAWST CONSTRUCTION MANUAL FEBRUARY 2011 Edition 12, 2916 5 th Avenue Calgary, Alberta, T2A 6K4, Canada Phone: + 1 (403) 243-3285, Fax: + 1 (403)

More information

HOW TO INSTALL PATIOS AND WALKWAYS STEP 2 STEP 1. For all Patios and Walkways. The base is the most important step in your patio and walkway projects.

HOW TO INSTALL PATIOS AND WALKWAYS STEP 2 STEP 1. For all Patios and Walkways. The base is the most important step in your patio and walkway projects. STEP 1 PREPARING YOUR PROJECT AREA Most commonly this is removing a grass area that is around your current concrete patio. You will incorporate this area into your new larger outdoor patio design. You

More information

Pulaski County, Virginia

Pulaski County, Virginia Pulaski County, Virginia Typical Retaining Wall Details Based on the 2009 International Residential Code CONTENTS Timber Retaining Wall... 2 General Requirements... 2 Wall Construction... 2 Deadmen...

More information

Surface dryness Do not wet background surfaces of tiles when fixing with adhesives of any sort.

Surface dryness Do not wet background surfaces of tiles when fixing with adhesives of any sort. Tiling Guides & Techniques 3.2 Fixing Tiles 3.2.1 Bedding tiles in adhesive for walls and floors 3.2.1.1 Thickness of adhesive Apply adhesive only to the thickness given in the adhesive manufacturer s

More information

BEP Blue Barrier Installation and Application Guide

BEP Blue Barrier Installation and Application Guide BEP Blue Barrier Installation and Application Guide BEP Blue Barrier is a system of seamless fluid applied products designed to protect the building envelope. Approved assemblies and applications listed

More information

DETERMINATION OF WORKABILITY OF FRESH CONCRETE BY SLUMP TEST

DETERMINATION OF WORKABILITY OF FRESH CONCRETE BY SLUMP TEST DETERMINATION OF WORKABILITY OF FRESH CONCRETE BY SLUMP TEST Aim: To determine the workability of concrete by Slump test as per IS : 1199-1959 Mould - in the form of the frustum of a cone having the following

More information

Reinforced Earth wall Construction Manual

Reinforced Earth wall Construction Manual COVER PAGE CT-PE-W02 Rev: 5 Reinforced Earth wall Construction Manual Concrete Facing Reinforced Earth Malaysia Sdn Bhd 80-1, Jalan 8/62A Bandar Menjalara 52200 Kuala Lumpur Tel : 03-62746162, Fax : 03-62747212

More information

STONE PRODUCT SPECIFICATION SANDSTONE. Some typical installation methods are: Pedestrian traffic only: reinforced concrete* 75mm thick

STONE PRODUCT SPECIFICATION SANDSTONE. Some typical installation methods are: Pedestrian traffic only: reinforced concrete* 75mm thick Please note these tips are guides only and should be used in addition to the relevant Australian Standards for trade practices. Note that installation may vary from site to site with varying conditions

More information

SpaVault TM Installation Guide for Bullfrog Spas (7-10 x 7-10 x 38 )

SpaVault TM Installation Guide for Bullfrog Spas (7-10 x 7-10 x 38 ) SpaVault TM Installation Guide for Bullfrog Spas (7-10 x 7-10 x 38 ) WARNING - When unpacking SpaVault, DO NOT discard styrofoam pieces, these are not packaging materials. Step 1 Excavation Important:

More information

MODULAR ACOUSTIC FENCING INSTALLATION GUIDE

MODULAR ACOUSTIC FENCING  INSTALLATION GUIDE MODULAR ACOUSTIC FENCING WWW.QUICKBUILTSYSTEMS.COM.AU INSTALLATION GUIDE INTRODUCTION THE QUICKBUILT FENCE SYSTEM IS A SMARTLY DESIGNED MODULAR SYSTEM EASY AND FAST TO INSTALL AND COST EFFECTIVE. // THE

More information

CW 3615 RIPRAP TABLE OF CONTENTS

CW 3615 RIPRAP TABLE OF CONTENTS December 2014 SPECIFICATION CW 3615 R4 CW 3615 RIPRAP TABLE OF CONTENTS 1. GENERAL CONDITIONS... 1 3. DESCRIPTION... 1 5. MATERIALS... 1 5.1 General... 1 5.2 Rock... 1 5.3 Random Stone Riprap... 1 5.4

More information

ZURN INDUSTRIES, INC., FLO-THRU DIV.,

ZURN INDUSTRIES, INC., FLO-THRU DIV., FLO-THRU TM ZURN INDUSTRIES, INC., FLO-THRU DIV., 2855 Girts Road, Jamestown, NY 14701 Phone: 716/665-1132, Fax: 716/665-1135, World Wide Web: www.zurn.com In Canada: ZURN INDUSTRIES LIMITED, 3544 Nashua

More information

Municipality of Waterville Public Sidewalk Repair Policy

Municipality of Waterville Public Sidewalk Repair Policy Municipality of Waterville Public Sidewalk Repair Policy Purpose - The purpose of this policy is to protect the public health, safety and welfare of the citizens and inhabitants of the Municipality by

More information

SECTION CAST-IN-PLACE CONCRETE

SECTION CAST-IN-PLACE CONCRETE SECTION 03300 CAST-IN-PLACE CONCRETE PART 1 GENERAL 1.01 SECTION INCLUDES A. The Contractor shall furnish all work and materials, including cement, sand and coarse aggregate, water, admixtures, curing

More information

Application Instructions for Keystone Kool Deck on Existing Concrete

Application Instructions for Keystone Kool Deck on Existing Concrete Application Instructions for Keystone Kool Deck on Existing Concrete REQUIRED MATERIALS Keystone Kool Deck PTA Bonding Agent Water 20 Mesh Marble Sand White Portland Cement OPTIONAL TOOLS Mortex Pattern

More information

10 EXTREME BASEMENT PANELS

10 EXTREME BASEMENT PANELS 10 EXTREME BASEMENT PANELS On Granular Footings 1. The type of soil is a factor in determining foundation construction details such as footing design, backfill, and drainage provisions. Soils are classified

More information

1 PVC or ABS drain with strainer

1 PVC or ABS drain with strainer Patents Pending ProBase II Single-Slope Shower Base and Kit CONTENTS 1. General Information...1 2. Materials...1 3. Planning...2 4. Preparation...3 5. Layout...3 6. Install Base and Shims...4 7. Install

More information

INSTALLATION AND OPERATING INSTRUCTIONS

INSTALLATION AND OPERATING INSTRUCTIONS INSTALLATION AND OPERATING INSTRUCTIONS I INSTALLATION AND OPERATING INSTRUCTIONS Astral Pool Underwater Niche Lights For Concrete Pools Bolero ND Cleaner INSTALLATION AND OPERATING INSTRUCTIONS Melbourne:

More information

R E CYC L E RAC K. Green By Design

R E CYC L E RAC K. Green By Design R E CYC L E RAC K Green By Design Take green to the next level with the Recycle Racks. Combining basic materials with innovative design, Dero has created a completely unique bike rack. The Recycle Racks

More information

Nepal Biogas Plant -- Construction Manual. Construction Manual for GGC 2047 Model Biogas Plant

Nepal Biogas Plant -- Construction Manual. Construction Manual for GGC 2047 Model Biogas Plant Nepal Biogas Plant -- Construction Manual Construction Manual for GGC 2047 Model Biogas Plant Introduction The success or failure of any biogas plant mainly depends upon the quality of construction works.

More information

Dansand. Joint Filling Sand. Product information on patented joint filling sand for concrete pavements

Dansand. Joint Filling Sand. Product information on patented joint filling sand for concrete pavements Dansand Joint Filling Sand Product information on patented joint filling sand for concrete pavements Combat weeds - the environmentally friendly and natural way Dansand Joint Filling Sand keeps your concrete

More information

FERROCEMENT WATER TANKS

FERROCEMENT WATER TANKS FERROCEMENT WATER TANKS Action Sheet 21 What is this Action Sheet about? This Action Sheet describes how to build ferrocement water tanks. Take advice from an engineer or other experienced person if necessary,

More information

How to Build a Dry Stone Wall

How to Build a Dry Stone Wall Do-It-Yourself: How to Build a Dry Stone Wall An instructional guide for beginners Copyright Stephen Burton and licensed for reuse under this Creative Commons License. By: Stephen T. Kane Table of Contents:

More information

SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL PRECAST CONCRETE MANHOLES

SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL PRECAST CONCRETE MANHOLES Section SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL... 39-1 39-2 PRECAST CONCRETE MANHOLES... 39-1 39-2.01 Precast Concrete Storm Drain Manholes... 39-1 39-3 SADDLE MANHOLES... 39-2 39-3.01 Saddle

More information

All content of this installation guide is taken from ASTM1759, ISO13272 and ATV127 standards which the first two standards are the basic national standard of Iran and the ATV standard has been used in

More information

Latrine pit excavation and linings

Latrine pit excavation and linings MOBILE NOTE 20 Latrine pit excavation and linings Introduction The need for a latrine pit lining depends upon the type of latrine under construction and the condition of the soil. Septic tanks and aqua

More information

SECTION FACILITY SANITARY SEWERS

SECTION FACILITY SANITARY SEWERS SECTION 22 13 13 FACILITY SANITARY SEWERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

September 1, 2003 CONCRETE MANUAL SPECIAL TYPES OF CONCRETE

September 1, 2003 CONCRETE MANUAL SPECIAL TYPES OF CONCRETE September 1, 2003 CONCRETE MANUAL 5-694.800 5-694.810 GENERAL SPECIAL TYPES OF CONCRETE 5-694.800 In the general use of the word concrete, the idea implied is the conventional placement of the material

More information

Concrete Framing: Slab on Grade

Concrete Framing: Slab on Grade Concrete Framing: Slab on Grade Casting a Concrete Slab on Grade Concrete Slabs Subgrade Preparation Drainage Layer Slab Edges Vapor Retarder (Moisture Barrier) Reinforcing Pouring the Concrete Finishing

More information

SECTION CERAMIC TILING

SECTION CERAMIC TILING SECTION 09 3013 CERAMIC TILING PART 1 - GENERAL 1.1 SUMMARY A. Includes But Not Limited To: 1. Furnish and install ceramic tile and tile setting materials and accessories as described in Contract Documents.

More information

Installation Instructions

Installation Instructions EconoDrain Trench Forming System Installation Instructions MultiDrain We Drain Your Site, Not Your Budget MultiDrain Systems, Inc. P.O. Box 88, Barium Springs, NC 28010 (704) 508-1010 or Toll Free 800-433-1119

More information

Stretch Your Dollar Theme Designs Fire Pit

Stretch Your Dollar Theme Designs Fire Pit Stretch Your Dollar Theme Designs Fire Pit Tools Garden gloves Garden hose String (5 length) Stake Hammer or rubber mallet 3 Mason Chisel Tape measure 2 level 4 level (most homeowners don t have. We don

More information

CHAPTER 4. Construction Manual of Bio-gas Reactor

CHAPTER 4. Construction Manual of Bio-gas Reactor 46 CHAPTER 4 Construction Manual of Bio-gas Reactor 4.1 Planning Criteria for Bio-gas Plant Construction Family size 4.1.1 Farmer who wants to build a bio-gas plant must have animals to sustain the operation

More information

ROLL-IN SHOWER PAN. For additional information, call the Aqua Bath Customer Service Department At

ROLL-IN SHOWER PAN. For additional information, call the Aqua Bath Customer Service Department At Acrylic Pan - Roll-In Shower - ADA Compliant Model CP6033TD Acrylic pans designed for new build and renovations of existing hospitals, nursing homes, rehabilitation centers, hotels, motels, dormitories

More information

VALLECITOS WATER DISTRICT SECTION POLYVINYL CHLORIDE (PVC) PRESSURE PIPE

VALLECITOS WATER DISTRICT SECTION POLYVINYL CHLORIDE (PVC) PRESSURE PIPE PART 1 - GENERAL 1.1 DESCRIPTION A. This section designates the requirements for the manufacture and installation of polyvinyl chloride, abbreviated PVC, pressure pipe. 1.2 RELATED WORK SPECIFIED ELSEWHERE

More information

GENERAL ASSEMBLY CONSIDERATIONS FOR TERRAN SACON BUILDINGS AND STRUCTURES

GENERAL ASSEMBLY CONSIDERATIONS FOR TERRAN SACON BUILDINGS AND STRUCTURES GENERAL ASSEMBLY CONSIDERATIONS FOR TERRAN SACON BUILDINGS AND STRUCTURES This document should not be considered specifications. Each project has site specific requirements and should develop individual

More information

Concrete Slab-on-Ground

Concrete Slab-on-Ground Concrete Slab-on-Ground This training package provides information on concrete slab-on-ground construction, including reinforcement, formwork, mix, placement and curing, for village infrastructure and

More information

PS 3000 Installation Manual Step-By-Step Procedures C.9. DOOR AND WINDOW OPENINGS C.9.1 PREPARE IN ADVANCE. C.9.2 VBUCK CONSTRUCTION.

PS 3000 Installation Manual Step-By-Step Procedures C.9. DOOR AND WINDOW OPENINGS C.9.1 PREPARE IN ADVANCE. C.9.2 VBUCK CONSTRUCTION. C.9. DOOR AND WINDOW OPENINGS Openings for doors and windows are formed with bucks, or frames, which are constructed to the rough opening dimensions required for the doors and windows to be installed.

More information

VINYL COMPOSITION TILE

VINYL COMPOSITION TILE ASSET Reference Specification ASTM F 1066-99 Standard Specification for Vinyl Composition Floor Tile Products: Azrock s Vinyl Composition Tile -Standard Price Products -Premium Priced Products -Slip Resistant

More information

Pro-Con Structural Study of Alternate Floor Systems

Pro-Con Structural Study of Alternate Floor Systems Andrew Covely Structural Dr. Linda Hanagan The Helena New York City, NY October 27, 2004 Pictures courtesy of Fox & Fowle Architects Pro-Con Structural Study of Alternate Floor Systems Executive Summary

More information

LIQUID RUBBER INDUSTRIES ENGINEERING SPECIFICATIONS FOR ENGINEERS AND ARCHITECTS. Diagram 1: Standard Membrane Continuation 150 mm Overlap

LIQUID RUBBER INDUSTRIES ENGINEERING SPECIFICATIONS FOR ENGINEERS AND ARCHITECTS. Diagram 1: Standard Membrane Continuation 150 mm Overlap LIQUID RUBBER INDUSTRIES ENGINEERING SPECIFICATIONS FOR ENGINEERS AND ARCHITECTS Diagram 1: Standard Membrane Continuation 150 mm Overlap Ensure Membrane to Membrane Contact Diagram 2: Membrane Continuation

More information