ARTIK ART & ARCHITECTURE STAGE FLOORING ASSEMBLY SECTION STAGE FLOORING ASSEMBLY
|
|
- Myron Allen
- 5 years ago
- Views:
Transcription
1 SECTION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes stage floor covering. 1.3 SUBMITTALS A. Product Data: For each type of product indicated. 1.4 QUALITY ASSURANCE A. Fire-Test-Response Characteristics: Provide products identical to those tested for fire-exposure behavior per test method indicated by a testing and inspecting agency acceptable to authorities having jurisdiction. 1.5 DELIVERY, STORAGE, AND HANDLING A. Store floor coverings and installation materials in dry spaces protected from the weather, with ambient temperatures maintained within range recommended by manufacturer, but not less than 50 deg F or more than 90 deg F. Store rolls upright. 1.6 PROJECT CONDITIONS A. Maintain temperatures within range recommended by manufacturer, but not less than 70 deg F or more than 85 deg F Insert temperature, in spaces to receive flooring during the following time periods: hours before installation. 2. During installation hours after installation. B. After post-installation period, maintain temperatures within range recommended by manufacturer, but not less than 55 deg F or more than 95 deg F. TAEI STAGE FLOOR SURFACE REPLACEMENT - # PAGE 1
2 C. Close spaces to traffic during floor covering installation. D. Close spaces to traffic for 48 hours after floor covering installation. PART 2 - PRODUCTS 2.1 HARDBOARD FLOOR COVERING A. Available Products: Subject to compliance with requirements, products that may be incorporated into the Work include, but are not limited to, the following: 1. Masonite Industries, Inc. 2. Or equal. B. Fiberboard Panels: Masonite Panel 1. Thickness: 1/4 inch. 2. Tempered both sides. C. Sheet Size: 4 feet by 8 feet. D. Adhesive: 1. Loctite PL Premium Construction Adhesive which is a one component, polyurethane based, moisture-curing adhesive at existing concrete slab. E. Fire-Test-Response Characteristics: 1. Critical Radiant Flux Classification: Class I, not less than 0.45 W/sq. cm per ASTM E 648. F. Paint: 1. Paint finish of floor shall be of Satin black theatrical paint: Rosco Toughprime or BREAKTHROUGH by Vanex. No substitutions. G. Thermoset Rubber Base: 1. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following: a. Burke Mercer Flooring Products, Division of Burke Industries Inc. b. Roppe Corporation, USA. 2. Product Standard: ASTM F 1861, Type TS (rubber, vulcanized thermoset), Group I (solid, homogeneous). 3. Thickness: inch (3.2 mm). 4. Height: 4 inches (102 mm). 5. Lengths: Coils in manufacturer's standard length. 6. Outside Corners: Job formed. 7. Inside Corners: Job formed. 8. Color: Black TAEI STAGE FLOOR SURFACE REPLACEMENT - # PAGE 2
3 2.2 SUB-FLOOR A. Existing. 2.3 INSTALLATION MATERIALS A. Trowelable Leveling and Patching Compounds: Latex-modified, portland cement based or blended hydraulic cement based formulation provided or approved by floor covering manufacturer for applications indicated. B. Wood filler: Abatron WoodEpox or equal. C. Screws: countersunk phillips head screws, zinc coated, #8 1 inch. PART 3 - EXECUTION 3.1 EXAMINATION A. Floor shall not be installed until the room is enclosed and the HVAC system is operational. Wood sub floor materials shall be acclimated. Top layer hardboard shall be leafed out flat in single sheets laid in place unfastened for a period of 60 hours minimum before fastening. No exceptions. B. Examine substrates, with Installer present, for compliance with requirements for installation tolerances, moisture content, and other conditions affecting performance. 1. Verify that finishes of substrates comply with tolerances and other requirements specified in other Sections and that substrates are free of cracks, ridges, depressions, scale, and foreign deposits that might interfere with adhesion of floor coverings. 2. Proceed with installation only after unsatisfactory conditions have been corrected. 3.2 PREPARATION A. Use trowelable leveling and patching compound to fill cracks, holes, and depressions in concrete substrates and epoxy wood filler in wood substrates. B. Grind smooth and flat to prepare concrete floor so glue will stick as required by the adhesive manufacturer. C. Remove existing muslin theatrical ground cloth. D. Remove all staples from the wood holding ground cloth to the stage floor. E. Removing old scenic show items installed into the floor and patch floor with the same existing wood fully supported. F. Full sanding with industrial floor sander of the existing wood floor planks and patches to provide a smooth surface. TAEI STAGE FLOOR SURFACE REPLACEMENT - # PAGE 3
4 G. Precise cuts around floor pockets, trap floor platforms, orchestra pit, and other items at edges. H. The hardboard at the wings on either side downstage of the proscenium will require to be glued to the existing concrete fllor for a smooth transition from side stage wing to stage floor and orchestra lift. I. Repair, patch, level and sand the entire plywood subfloor to achieve flat, regular, quiet floor, level to 1/8 in J. Top of floor box shall be flush with top of new hardboard. K. Top of box shall be black. L. Move floor coverings and installation materials into spaces where they will be installed at least 60 hours in advance of installation. 3.3 INSTALLATION A. Top Layer 1. Layout: a. Install for simple individual sheet replacement in uncut 4 x 8 sheets, only cut to fit as required at sides of room. After acclimation as specified, fasten with 1/8 gaps around all sides. b. Top layer shall be laid out with a 4 foot edge on the centerline between the edges of a stage proscenium and an 8 foot edge on plaster line (the back side of the proscenium arch). Sheets shall run with long edge parallel to proscenium wall. All seams shall line up. Refer to enlarged floor plan drawing. c. Floor assembly shall be cut to allow for 1 inch of expansion at all edges. 2. Installation at wood subfloors: a. Countersunk phillips head screws +/-12 o.c., 2 inside edges (except at walls) and on centerline of each sheet. b. Screws shall be countersunk using pre-drilled counter sunk holes. Selfcountersinking screws shall not be acceptable. c. Screw hole to be countersunk so that screw heads are flush with the surface, and no material mushrooms above the surface. d. Inset screws 4 at walls so they are not covered by the wall base. e. Use of glue for top layer is prohibited. f. Floor Pockets: cut hardboard at hinged door of stage lighting floor pockets. Attach hardboard with construction adhesive to the hinged door with cable holes cut out. g. Cut hardboard sheet 1/8 from all baseboards at stage walls. 3. Installation at concrete subfloor: a. Glue hardboard with adhesive as specified to concrete floor. b. Top of hardboard must be level to new hardboard screwed down to the stage floor. 4. Flush Transition: All perimeter transition conditions at doorways or transitions to concrete floors shall be flush. TAEI STAGE FLOOR SURFACE REPLACEMENT - # PAGE 4
5 5. Finish: a. Top layer shall be finished with two coats of paint. END OF SECTION TAEI STAGE FLOOR SURFACE REPLACEMENT - # PAGE 5
D. Maintenance data for resilient floor tile to include in Operating and Maintenance Manual specified in Division 1.
SECTION 09660 RESILIENT TILE FLOORING PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification
More informationUnion County Vocational - Technical Schools Scotch Plains, New Jersey
SECTION 096519 - RESILIENT TILE FLOORING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationACADEMIC SUCCESS CENTER THE COLLEGE AT BROCKPORT STATE UNIVERSITY OF NEW YORK PROJECT NO
SECTION 09 65 16 - RESILIENT SHEET FLOORING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationA. Drawings and general provisions of the Contract apply to this Section including all documentation provided in RFP#
SECTION 096466 - WOOD ATHLETIC FLOORING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract apply to this Section including all documentation provided in. 1.2 SUMMARY
More informationRESILIENT ACCESSORIES
INCLUDING COVE CAP, CHAIR RAIL, CORNER GUARD, TUB MOULDING, COVE FILLER STRIP AND SUBFLOOR LEVELER SYSTEM THIS DOCUMENT IS INTENDED AS A SUGGESTED GUIDE FOR CREATING, MODIFYING, OR EDITING YOUR CSI FORMATTED
More informationRESILIENT CORK TILE 3 PART SPECIFICATION #Z 624
3 PART SPECIFICATION #Z 624 THE FOLLOWING DOCUMENT IS A GUIDE FOR CREATING YOUR CSI FORMATTED 3-PART ARCHITECTURAL GUIDE SPECIFICATIONS. ZANDUR ACCEPTS NO LIABILITY FOR ANY DAMAGES RESULTING FROM THE USE
More informationSection RESILIENT TILE FLOORING INCLUDING ECONATURALS RUBBER FLOOR TILE
THIS DOCUMENT IS INTENDED AS A SUGGESTED GUIDE FOR CREATING, MODIFYING, OR EDITING YOUR CSI FORMATTED 3-PART ARCHITECTURAL GUIDE SPECIFICATIONS. TARKETT WILL NOT BE LIABLE FOR ANY DAMAGES ARISING OUT OF
More informationB. Store products in dry spaces protected from the weather, with ambient temperatures maintained between 50 and 90 deg F (10 and 32 deg C).
SECTION 09651 - RESILIENT TILE FLOORING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification
More informationSECTION RESILIENT TILE FLOORING. A. Section includes vinyl composition floor tile and accessories indicated and as specified.
SECTION 09 65 19 RESILIENT TILE FLOORING PART 1 - GENERAL 1.1 SUMMARY A. Section includes vinyl composition floor tile and accessories indicated and as specified. 1.2 SUBMITTALS A. Product Data: Submit
More informationSection STATIC DISSIPATIVE RESILIENT FLOORING
THIS DOCUMENT IS INTENDED AS A SUGGESTED GUIDE FOR CREATING, MODIFYING, OR EDITING YOUR CSI FORMATTED 3-PART ARCHITECTURAL GUIDE SPECIFICATIONS. TARKETT WILL NOT BE LIABLE FOR ANY DAMAGES ARISING OUT OF
More informationRESILIENT PHOTOLUMINESCENT STAIR TREADS
THIS DOCUMENT IS INTENDED AS A SUGGESTED GUIDE FOR CREATING, MODIFYING, OR EDITING YOUR CSI FORMATTED 3-PART ARCHITECTURAL GUIDE SPECIFICATIONS. JOHNSONITE WILL NOT BE LIABLE FOR ANY DAMAGES ARISING OUT
More informationStudent Services & Classroom Addition
SECTION 096813 - TILE CARPETING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More informationSection RESILIENT SAFE-T VINYL SHEET FLOORING
RESILIENT SAFE-T VINYL SHEET FLOORING THIS DOCUMENT IS INTENDED AS A SUGGESTED GUIDE FOR CREATING, MODIFYING, OR EDITING YOUR CSI FORMATTED 3-PART ARCHITECTURAL GUIDE SPECIFICATIONS. TARKETT WILL NOT BE
More informationSECTION RESILIENT SHEET FLOORING
SECTION 09665 RESILIENT SHEET FLOORING PART 1 - GENERAL 1.1 DESCRIPTION A. This Section specifies the installation of sheet flooring with backing and integral cove base. 1.2 RELATED WORK A. Color and pattern:
More informationSECTION RESILIENT FLOORING ACCESSORIES
SECTION 09653 PART I - GENERAL 1.01 DESCRIPTION A. Scope: Work of this Section shall include all materials and installation necessary to provide Resilient Wall Base and Accessories, including resilient
More information1. Division 09 Section "Rough Carpentry."
GREENSPOINT AND LAUDER RD. EC/PRE-KlK PAGE 1 SECTION 096400 - WOOD FLOORING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary
More informationCONDUCTIVE RESILIENT FLOORING
THIS DOCUMENT IS INTENDED AS A SUGGESTED GUIDE FOR CREATING, MODIFYING, OR EDITING YOUR CSI FORMATTED 3-PART ARCHITECTURAL GUIDE SPECIFICATIONS. JOHNSONITE WILL NOT BE LIABLE FOR ANY DAMAGES ARISING OUT
More informationSECTION WOOD ATHLETIC FLOORING
SECTION 096466 WOOD ATHLETIC FLOORING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Wood sports-floor assemblies. B. Related Sections: 1. Section 011100 Summary of Work, for Contract 1-G Scope of
More informationSECTION TILE CARPETING
SECTION 096813 TILE CARPETING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and General Provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More informationSection RESILIENT TILE FLOORING INCLUDING VINYL COMPOSITION TILE
THIS DOCUMENT IS INTENDED AS A SUGGESTED GUIDE FOR CREATING, MODIFYING, OR EDITING YOUR CSI FORMATTED 3-PART ARCHITECTURAL GUIDE SPECIFICATIONS. TARKETT WILL NOT BE LIABLE FOR ANY DAMAGES ARISING OUT OF
More informationSection RESILIENT TILE FLOORING INCLUDING SOLID VINYL FLOOR TILE
THIS DOCUMENT IS INTENDED AS A SUGGESTED GUIDE FOR CREATING, MODIFYING, OR EDITING YOUR CSI FORMATTED 3-PART ARCHITECTURAL GUIDE SPECIFICATIONS. TARKETT WILL NOT BE LIABLE FOR ANY DAMAGES ARISING OUT OF
More informationLINOLEUM SHEET FLOORING
THIS DOCUMENT IS INTENDED AS A SUGGESTED GUIDE FOR CREATING, MODIFYING, OR EDITING YOUR CSI FORMATTED 3-PART ARCHITECTURAL GUIDE SPECIFICATIONS. JOHNSONITE WILL NOT BE LIABLE FOR ANY DAMAGES ARISING OUT
More informationSECTION RESILIENT SHEET FLOORING
SECTION 09 65 16 RESILIENT SHEET FLOORING SPEC WRITER NOTE: Delete text between // // not applicable to project. Edit remaining text to suit project. PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1.
More informationCONDUCTIVE RESILIENT FLOORING
THIS DOCUMENT IS INTENDED AS A SUGGESTED GUIDE FOR CREATING, MODIFYING, OR EDITING YOUR CSI FORMATTED 3-PART ARCHITECTURAL GUIDE SPECIFICATIONS. JOHNSONITE WILL NOT BE LIABLE FOR ANY DAMAGES ARISING OUT
More informationRESILIENT ECO NATURALS, DEFIANT, AND PHOTOLUMINESCENT STAIR TREADS
THIS DOCUMENT IS INTENDED AS A SUGGESTED GUIDE FOR CREATING, MODIFYING, OR EDITING YOUR CSI FORMATTED 3-PART ARCHITECTURAL GUIDE SPECIFICATIONS. JOHNSONITE WILL NOT BE LIABLE FOR ANY DAMAGES ARISING OUT
More information1.2 Reference Standard: NOFMA - National Oak Flooring Manufacturers Association Grading Standards.
WOOD FLOORING GENERAL INFORMATION 1.1 This section applies to factory finished wood strip flooring. 1.2 Reference Standard: NOFMA - National Oak Flooring Manufacturers Association Grading Standards. 1.3
More informationSection Performance Floor Asemblies (Also Dance Floor Assemblies)
Sample Specifications for kiwifloor Studio System Section 09646 Performance Floor Asemblies (Also Dance Floor Assemblies) PART 1 GENERAL 1.1 GENERAL A. Work of this Section, as shown or specified, shall
More informationARCHITECTURAL GUIDE SPECIFICATIONS - DESCRIPTIVE
ARCHITECTURAL GUIDE SPECIFICATIONS - DESCRIPTIVE MANNINGTON COLORFIELDS SHEET RUBBER FLOORING Section 09 65 16 Sheet rubber Flooring (Thermoset Rubber) Created May 2012 Mannington Mills, Inc. P. O. Box
More informationSection JOHNSONITE WILL NOT BE LIABLE FOR ANY DAMAGES ARISING OUT OF THE USE OF ANY INFORMATION OR SPECIFICATIONS FOUND IN THIS DOCUMENT.
TRADITIONAL RUBBER AND VINYL WALL BASE, TRADITIONAL PHOTOLUMINESCENT RUBBER WALL BASE, PERCEPTIONS WALL BASE, TIGHTLOCK CARPET AND, BASEWORKS THERMOSET WALL BASE, TRADITIONAL WALL BASE AND VENT COVE WALL
More informationBuildingName The Description of the Project P DOCUMENTS
ARCHITECTURE, ENGINEERING AND CONSTRUCTION P00000000 0000 DOCUMENTS ARCHITECTURE & ENGINEERING 326 East Hoover, Mail Stop B Ann Arbor, MI 48109-1002 Phone: 734-764-3414 Fax: 734-936-3334 SPECIFICATION
More informationSECTION PREFINISHED FSC MAPLE FLOORING. This is a template: edit this specification carefully to suit specific project requirements.
SECTION 09 64 29 PREFINISHED FSC MAPLE FLOORING General notes to the specifier: This is a template: edit this specification carefully to suit specific project requirements. Following guidelines established
More informationSECTION SHEET VINYL FLOORING Cast-In-Place Concrete Hardwood Strip Flooring System.
SECTION 09665 SHEET VINYL FLOORING PART 1 GENERAL 1.01 SUMMARY A. Related Section: 1. 03300 - Cast-In-Place Concrete. 2. 09561 - Hardwood Strip Flooring System. 1.02 REFERENCES A. ASTM F710-92 Standard
More informationARCHITECTURAL GUIDE SPECIFICATIONS
ARCHITECTURAL GUIDE SPECIFICATIONS MANNINGTON COLORSCAPE, COLORSPEC, & ONE-STEP STAIR TREADS Section 09 65 13.23 Resilient Stair Treads [Thermoset Rubber Type TS] Created November, 2008 Mannington Mills,
More informationEnd of Addendum No. 3
ADDENDUM NO. 3 DATE: May 5, 2017 PROJECT: OWNER: BID DATE: Jail Renovations Monday, May 8, 2017 at 2:00 pm The following shall be incorporated into the Contract Documents dated 19 APR 2017. PROJECT MANUAL
More informationRESILIENT TILE FLOORING
SECTION 09660 RESILIENT TILE FLOORING PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 03300 - Cast-In-Place Concrete. 2. 09665 - Sheet Vinyl Floor System. 3. 08710 - Finish Hardware. 4. 15421 - Drains
More informationPART 1 GENERAL RESILIENT ACCESSORIES
SECTION 09 65 13.33 (09655) PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Resilient Base 2. Transition Edges 3. Stair Nosings 1.2 REFERENCES A. ASTM International Publications: 1. C241 Standard Test
More informationSPECIFICATIONS - CARPET TILE 09681
SPECIFICATIONS - CARPET TILE 09681 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification
More informationSECTION (09620) - RESILIENT ATHLETIC FLOORING
PART 1 GENERAL 1.01 SUMMARY SECTION 09 65 66 (09620) - RESILIENT ATHLETIC FLOORING A. Section Includes: 1. Resilient Athletic Flooring a. Adhesive and Accessories B. Related Sections: 1.02 REFERENCES 1.
More informationRESILIENT RUBBER STAIR TREADS WITH RISER
THIS DOCUMENT IS INTENDED AS A SUGGESTED GUIDE FOR CREATING, MODIFYING, OR EDITING YOUR CSI FORMATTED 3-PART ARCHITECTURAL GUIDE SPECIFICATIONS. JOHNSONITE WILL NOT BE LIABLE FOR ANY DAMAGES ARISING OUT
More informationTechnical Services. Product MM INCH Installation direction Seam treatment GTI CONTROL (welded) 625 X 625 mm 24.5 x 24.
INSTALLATION INSTRUCTIONS FOR GTI CONTROL TILES This document refers to the following products: Product MM INCH Installation direction Seam treatment GTI CONTROL (welded) 625 X 625 mm 24.5 x 24.5 Same
More informationSECTION RESILIENT ATHLETIC SURFACING. B. Related Sections: Section(s) related to this section include:
CONNOR PowerDrop Page 1 SECTION 09624 RESILIENT ATHLETIC SURFACING PART 1 - GENERAL 1.01 SUMMARY A. Section includes: Resilient athletic surfacing, including [recycled] [virgin] rubber flooring B. Related
More informationSECTION RESINOUS FLOORING
SECTION 09705 PART I - GENERAL 1.01 DESCRIPTION A. Scope: Work of this Section includes all materials and installation necessary to provide resinous flooring system with integral cove base and top finish
More informationSECTION ORCHESTRA PIT FILLER
PART 1 - GENERAL 1.1 SECTION INCLUDES A. Orchestra pit filler. 1.2 REFERENCES SECTION 11 61 00 ORCHESTRA PIT FILLER A. American Hardboard Association (AHA): 1. AHA A135.4-95: Basic Hardboard. B. American
More informationBid No. B14-09 Building 900 Cafeteria, Multi-Purpose Room Renovation Flooring
Bid No. B14-09 Cafeteria, Multi-Purpose Room Renovation Flooring Addendum No. 1 This Addendum No. 1 sets forth modifications to portions of the bid and contract documents for the above-referenced work
More informationLOOSE LAY INSTALLATION GUIDE PAGE 1 of 6
INSTALLATION GUIDE PAGE 1 of 6 MATERIALS REQUIRED FOR INSTALLATION: Tape Measurer Square Ruler Utility Knife 100lb Roller (if using adhesive) ACCEPTABLE SUBFLOORS: Happy Feet International will not warrant
More informationSECTION RESILIENT TILE FLOORING
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 09 65 19 1. Use this section only for NCA projects. 2. Delete between // // if not applicable to project. Also delete any other item or paragraph not applicable
More informationGUIDE SPECIFICATION
GUIDE SPECIFICATION 09 64 33.01 940 Centre Circle, Suite 1000 Altamonte Springs, FL 32714 Telephone: 407-260-9910 Fax: 407-260-9933 Toll Free: 800-800-5247 Web Site: http://www.kahrs.com This Guide Specification
More informationInstallation Guidelines: Magnolia
Installation Guidelines: Magnolia 3/8 Engineered Hardwood Staple Down Installation ATTENTION Inspect ALL materials carefully BEFORE Warranties DO NOT cover materials with visible defects once they are
More informationC. Low-Emitting Materials: Provide doors made with adhesives and composite wood products that do not contain urea formaldehyde.
SECTION 08 1416 - FLUSH WOOD DOORS PART 1 - GENERAL 1.1 SECTION REQUIREMENTS A. Submittals: Samples for factory-finished doors. PART 2 - PRODUCTS 2.1 FLUSH WOOD DOORS A. Manufacturers: Subject to compliance
More informationPART 1 GENERAL RESILIENT SHEET FLOORING
SECTION 09 65 16 (09652) PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Resilient Sheet Flooring a. All seams heat-welded. 1.2 REFERENCES A. Americans with Disabilities Act (ADA) II Public Accommodations
More informationPowerdek Fleck. SECTION Resilient Athletic Flooring
SECTION 09622 Resilient Athletic Flooring PART 1: GENERAL 1.0 SUMMARY 1.0.1 Work Included A. Prefabricated Rubber Sports Flooring B. Adhesive and accessories required for installation and maintenance 1.0.2
More informationSECTION RESILIENT SHEET FLOORING
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 09 65 16 A. This Section includes resilient sheet flooring. 1. Use this section only for NCA projects. 2. Delete between // ---- // if not applicable to project.
More informationRESILIENT FLOORING: Hot and Heavy - Secoya
160 South Industrial Blvd. Calhoun, GA 30701 Section 096519 RESILIENT FLOORING: Hot and Heavy - Secoya This document is intended as a suggested guide for editing your architectural guide specification.
More informationSECTION PREFINISHED WIDE PLANK KNOTTY PINE FLOORING
General notes to the specifier: SECTION 09 64 29 PREFINISHED WIDE PLANK KNOTTY PINE FLOORING This is a template: edit this specification carefully to suit specific project requirements. Following guidelines
More informationSECTION RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection
SECTION 13090 RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection Prepared by: 90 Dayton Avenue, Unit 4B, Suite 13 Passaic, NJ 07055 (973) 574-9077 13090-1 LOW INTENSITY RADIATION PROTECTION
More informationEXPANKO RESILIENT FLOORING PRE-INSTALLATION GUIDELINES
TECHNICAL SUPPORT 800.345.6202 These guidelines apply to the installation of all Expanko Resilient Flooring products. For instructions on the installation of specific Expanko products, please refer to
More informationARDEX GUIDE SPECIFICATION ARDEX MC RAPID One-Coat Moisture Control System For Concrete to Receive ARDEX Products
ARDEX GUIDE SPECIFICATION ARDEX MC RAPID One-Coat Moisture Control System For Concrete to Receive ARDEX Products SECTION 09 05 61.13 MOISTURE VAPOR EMISSION CONTROL PART 1 - GENERAL 1.1 RELATED DOCUMENTS
More informationSECTION ARDEX TILE AND STONE INSTALLATION MATERIALS AND SYSTEMS
ARDEX GUIDE SPECIFICATION ARDEX DS70 TM Acoustic Mat and ARDEX 8+9 TM Rapid Waterproofing and Crack Isolation Compound Subfloor Preparation Materials for Sound Deadening Applications to Receive the Installation
More informationA2.0 TRIPLE M DEVELOPMENT EXTERIOR ELEVATIONS. Rochester, MN Hwy 52 North. Apr 07, phone fax
NORTH ELEVATION 1 1/8" = 1'-0" WEST ELEVATION 2 1/8" = 1'-0" SOUTH ELEVATION 3 1/8" = 1'-0" EXTERIOR ELEVATIONS A2.0 EAST ELEVATION 4 1/8" = 1'-0" EXTERIOR FRAME TYPES 1 1/4" = 1'-0" 2 INTERIOR FRAME TYPES
More informationGUIDE SPECIFICATION
GUIDE SPECIFICATION 09 64 33.01 Kährs Canvas Collection 940 Centre Circle, Suite 1000 Altamonte Springs, FL 32714 Tim Colgan Telephone: 407-492-2441 Fax: 407-260-9933 Tim.colgan@kahrs.com Web Site: http://www.kahrs.com
More informationSECTION RESILIENT FLOORING
PART 1 GENERAL 1.1 SECTION INCLUDES SECTION 09 65 00 RESILIENT FLOORING A. Resilient sheet and tile flooring B. Resilient base C. Resilient stair nosing, treads, risers and skirting 1.2 REFERENCES A. ASTM
More informationWARNING: SHOULD THE INSTALLATION SEQUENCE NOT FOLLOWED. THE INSTALLATION WILL FAIL IMPORTANT: SEE PAGE 6 0F THIS DOCUMENT
WARNING: SHOULD THE INSTALLATION SEQUENCE NOT FOLLOWED. THE INSTALLATION WILL FAIL IMPORTANT: SEE PAGE 6 0F THIS DOCUMENT Gerflor GTI CONNECT & ATTRACTION Tiles Installation Instructions 20160919-413 Page
More informationMulti-Institutional Academic Health Science & Research Center Evansville, IN
SECTION 07 1616 - CRYSTALLINE WATERPROOFING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationA. Access doors and frames are part of an access door and frame allowance.
SECTION 08 31 13 ACCESS DOORS AND FRAMES PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationSECTION PREFINISHED ENGINEERED WIDE-PLANK FSC OAK FLOORING
General notes to the specifier: SECTION 09 64 29 PREFINISHED ENGINEERED WIDE-PLANK FSC OAK FLOORING This is a template: edit this specification carefully to suit specific project requirements. Following
More informationARDEX GUIDE SPECIFICATION ARDEX MRF Moisture-Resistant, Rapid-Drying, Skimcoat Patching Underlayment
ARDEX GUIDE SPECIFICATION ARDEX MRF Moisture-Resistant, Rapid-Drying, Skimcoat Patching Underlayment SECTION 03 01 30 Maintenance of Cast-In-Place Concrete PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings,
More informationConstruction Standards PAGE
Construction Standards PAGE 083113-1 SECTION 083113 - PART 1 - GENERAL 1.1 M.S.U ISSUES A. M.S.U. avoids access doors whenever possible by using lay-in type ceilings, but all valves and equipment requiring
More informationControl XT SECTION Resilient Athletic Flooring
Control XT SECTION 09 65 22 Resilient Athletic Flooring PART 1: GENERAL 1.0 SUMMARY 1.0.1 Work Included A. Rubber sports flooring B. Adhesive and accessories required for installation and maintenance.
More informationA. This section includes pre-finished Higuera Hardwoods bamboo flooring and accessories for floors and stairs.
SECTION PART 1 - GENERAL 1.1 SUMMARY A. This section includes pre-finished Higuera Hardwoods bamboo flooring and accessories for floors and stairs. 1.2 RELATED DOCUMENTS A. Related Sections include the
More informationSECTION PREFINISHED FSC WIDE PLANK MAPLE FLOORING
General notes to the specifier: SECTION 09 64 29 PREFINISHED FSC WIDE PLANK MAPLE FLOORING This is a template: edit this specification carefully to suit specific project requirements. Following guidelines
More informationSECTION SUBSURFACE PREPARATION FOR FLOOR FINISHES
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 09 05 16 SUBSURFACE PREPARATION FOR FLOOR FINISHES SPEC WRITER NOTES: 1. Delete between // // if not applicable to project. Also delete any other item or paragraph
More information4 COMMERCIAL RUBBER TILES (GRANITO, HARMONI, KAYAR, UNI, TERRANOVA AND ZEUS)
4 COMMERCIAL RUBBER TILES (GRANITO, HARMONI, KAYAR, UNI, TERRANOVA AND ZEUS) DISCLAIMER: Refer to page 6 of this document. 4.1 SURFACE PREPARATION 4.1.1 GENERAL CONTRACTOR a) All subfloors must be properly
More informationSECTION EPOXY RESIN FLOORING WITH INTEGRAL COVE BASE
PART 1 GENERAL 1.01 SUMMARY SECTION 09730 EPOXY RESIN FLOORING WITH INTEGRAL COVE BASE A. Related Sections: 1. 03300 - Cast-in-Place Concrete. 2. 09000 - Patching and Finishes. 3. 09900 - Painting. 4.
More informationSECTION BROADLOOM CARPET
SECTION 09680 PART I - GENERAL 1.01 DESCRIPTION A. Scope: Work under this Section shall include all materials and installation necessary to provide Carpet as shown and detailed on the Drawings and specified
More informationSection II Subfloor Guidelines & Specifications Page Chapter 4 Wood Subfloor Guidelines 23 Chapter 5 Concrete Subfloor Guidelines 26 Chapter 6
Section II Subfloor Guidelines & Specifications Page Chapter 4 Wood Subfloor Guidelines 23 Chapter 5 Concrete Subfloor Guidelines 26 Chapter 6 Installing a Subfloor Over Concrete 27 24 National Wood Flooring
More informationB. Samples: For each exposed product and for each color and pattern specified.
SECTION 096519 - RESILIENT TILE FLOORING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Vinyl composition floor tile. 2. Vinyl composition floor tile (VCT) shall be installed in each Unit at / in
More informationALETTE GLUE DOWN INSTALLATION INSTRUCTIONS
ALETTE GLUE DOWN INSTALLATION INSTRUCTIONS No floor covering is better than the subfloor over which it is installed. The finished appearance and performance of any floor covering will be affected by the
More informationSECTION EPOXY RESIN FLOORING WITH INTEGRAL COVE BASE
PART 1 GENERAL 1.01 SUMMARY SECTION 09730 EPOXY RESIN FLOORING WITH INTEGRAL COVE BASE A. Related Sections: 1. 03300 - Cast-in-Place Concrete. 2. 09000 - Patching and Finishes. 3. 09900 - Painting. 4.
More informationInstallation Instructions
Installation Instructions The Traditional South American Exotic collections by Elof Hansson can be nailed down, on or above grade. Job site preparation: - If necessary, remove furniture and appliances
More informationInstallation Instruction. Plyboo Quiet Acoustical Underlayment
Installation Instruction Plyboo Quiet Acoustical Underlayment Table of Contents BASE PREPARATION I. General Information...3 II. Job Site Conditions...3 III. Subfloor Requirements & Preparation...3 IV.
More informationSECTION POLYPROPYLENE FABRIC WALL COVERING
PART 1 - GENERAL 1.1 DESCRIPTION: SECTION 09 72 31 POLYPROPYLENE FABRIC WALL COVERING SPEC WRITER NOTES: 1. Delete between // // if not applicable to project. Also delete any other item or paragraph not
More informationSuggested Specification for Tri-Patch Versatile Concrete Patching Compound
Suggested Specification for Tri-Patch Versatile Concrete Patching Compound SURFACE PREPARATION for Interior and Exterior Floor-Covering Installations. (Vinyl Composition Tiles, Sheet Vinyl, Rubber, Indoor
More informationAmerican Guild Vinyl Flooring - Steadcrest Collection Installation Instructions
American Guild Vinyl Flooring - Steadcrest Collection Installation Instructions Recommended Adhesive: DuChâteau DUAG-58 Premium Resilient Flooring Adhesive Available in 1- and 4-gallon containers, DUAG-58
More informationSECTION WOOD STRIP FLOORING
SECTION 096429 WOOD STRIP FLOORING PART 1 GENERAL 1.1 GENERAL REQUIREMENTS A. Work of this Section, as shown or specified, shall be in accordance with the requirements of the Contract Documents. 1.2 SECTION
More informationSECTION and/or Resilient Sheet Flooring and/or Resilient Tile Flooring
Specifier Note: the following CSI (Construction Specifications Institute) section describes the resilient flooring system to be installed on the specific project. The number and title of the section may
More informationSECTION WOOD GYMNASIUM FLOORING
HORNER MULTISPORT ULTRA SYSTEM Page 1 of 1 SECTION 096466 --- WOOD GYMNASIUM FLOORING PART 1-GENERAL 1.1 DESCRIPTION A. This document specifies a wood strip athletic floor system consisting, in general,
More informationSpec Master 5/7/ For each product requiring color and texture selection, provide full size samples.
SECTION 04812 (042012) MECHANICALLY ATTACHED BRICK PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division
More informationHARO SPORTS FLOOR C.S.I. GUIDE SPECIFICATION Helsinki-Gymnasium Floor System 10/2010 SECTION WOOD ATHLETIC FLOORING
HARO SPORTS FLOOR C.S.I. GUIDE SPECIFICATION Helsinki-Gymnasium Floor System 10/2010 SECTION 09 64 66 WOOD ATHLETIC FLOORING PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Wood athletic flooring including
More informationUNDERLAYMENT INSTALLATION INSTRUCTIONS
UNDERLAYMENT INSTALLATION INSTRUCTIONS Table of Contents BASE PREPARATION I. General Information... 3 II. Job Site Conditions... 3 III. Subfloor Requirements & Preparation...3 IV. Hazards... 4 V. Material
More informationVESDURA ENGINEERED VINYL PLANK INSTALLATION GUIDE
VESDURA ENGINEERED VINYL PLANK INSTALLATION GUIDE Vesdura Engineered Vinyl Plank features the patented Unilin interlocking planks for easy installation and is installed as a glueless floating floor. The
More informationSECTION WOOD FLOORING SYSTEM
PART 1 GENERAL 1.1 RELATED DOCUMENTS SECTION 09640 WOOD FLOORING SYSTEM A. The provisions of the General Conditions, Supplementary Conditions, and the Sections included under Division 1, General Requirements,
More informationPrefinished Cork Flooring Installation and Maintenance SECTION I. INSTALLATION MANUAL SUB-FLOOR PREPARATION
6999.6999 Prefinished Cork Flooring Installation and Maintenance SECTION I. INSTALLATION MANUAL SUB-FLOOR PREPARATION Proper sub-floor preparation is critical. All guidelines contained in these instructions
More informationARDEX GUIDE SPECIFICATION ARDEX MC RAPID One-Coat Moisture Control System For Concrete to Receive ARDEX Underlayments and Toppings
ARDEX GUIDE SPECIFICATION ARDEX MC RAPID One-Coat Moisture Control System For Concrete to Receive ARDEX Underlayments and Toppings SECTION 07 26 19 TOPICAL MOISTURE VAPOR MITIGTION SYSTEM PART 1 - GENERAL
More information1. Decks, balconies, and sun porches 2. Walkways, ramps, and stairways 3. Patios and courtyards
SECTION 07185 TRAFFIC MEMBRANE PART 1 GENERAL 1.1 SECTION INCLUDES A. Traffic membrane, consisting of welded seam PVC waterproofing, over f following surfaces: 1. Decks, balconies, and sun porches 2. Walkways,
More information1.6 QUALITY ASSURANCE A. Source Limitations for Tile: Obtain tile of each type and color or finish from one source or producer.
SECTION 093000 - TILING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More informationINSTALLATION INSTRUCTIONS
About PROTECH Luxury Vinyl Planks 8.7mm WPC Click Lock Contemporary Collection features patented interlocking planks for easy installation and is installed as a glue less floating floor. The interlocking
More informationSECTION GYPSUM WALLBOARD SYSTEMS. A. Gypsum board at new wall partitions or where indicated on drawings. B. ASTM C442 - Gypsum Backing Board
SECTION 09260 GYPSUM WALLBOARD SYSTEMS PART 1 - GENERAL 1.1 SECTION INCLUDES A. Gypsum board at new wall partitions or where indicated on drawings. 1.2 REFERENCED STANDARDS A. ASTM C36 - Gypsum Wallboard
More informationSECTION ORNAMENTAL ALUMINUM RAILING
SECTION 05730 ORNAMENTAL ALUMINUM RAILING PART 1 GENERAL 1.1 SECTION INCLUDES A. Decorative Wire Rope Railing 1.2 RELATED SECTIONS A. Section 03300 Cast-In-Place Concrete: Placement of sleeves cast in
More information