1 FACILITY PROJECT BIDDING OPTIONS OVERVIEW A Presentation to the Board of Education Galt Joint Union High School District February 14, 2017

2 January 10, 2017 GHSD Measure E Bidding Options Overview 2 Overview With passage of Measure E the GHSD must determine its best project bidding method Several options exist Each has it pros and cons More than one bidding method can be used Different projects may best be served by different bidding methods For the larger Measure E projects staff is recommending a Lease-Leaseback approach Competitively Bid Lump Sum method may be used for smaller jobs

3 January 10, 2017 GHSD Measure E Bidding Options Overview 3 Types of Contracts a California School District May Enter Into Type of Contract Applies to Legal Authorization Selection Process Fee Determination Project Type Comments Professional Services Architects, Engineers, Construction Project Managers, Land Surveyors, Attorneys, Accountants Government code 4525 & others Qualificationbased; request for qualifications & interviews Negotiated with best qualified All The general public may not be aware that these contracts are never "bid" Competitively Bid Lump Sum Contractors & suppliers Public Contract Code 2000, 3300, 4100 et seq Publicly opened sealed bids; award to "lowest responsible and responsive bidder" Included in bid All This is the "traditional" method for public works since the 1930's and was devised to address corruption Design-Build Design-build "entities", usually comprising a contractor and a design team Education code et seq "Best value" as described in Education Code a et seq Negotiated or included as part of best value Over $2.5 million This became available to school districts in 2002, but has not been widely used. Lease-Leaseback Developers (a.k.a. Leaseleaseback entities) Education Code At District's discretion At District's discretion All Available to school districts since the early 90's but only recently is becoming widely used.

4 January 10, 2017 GHSD Measure E Bidding Options Overview 4 Project Delivery Methods: Pros and Cons Delivery Method Often Used By Contract Types Pros Cons Variations Comments Design-Bid-Build Public sector projects Professional services for Architect & Engineer, lump-sum bid for contractor Traditionally used & therefore noncontroversial to boards and public No input from construction team during design often leads to many costly changes; relationships often adversarial CM-at-Risk; multipleprime Seldom used in private sector (unless bid list is restricted and award to low bidder not required) Design-Build Negotiated GMP (guaranteed maximum price) Public sector projects by state, cities, counties, and school districts; some private sector clients, especially for certain project types (e.g.: parking garages, wastewater treatment facilities) Private sector institutions (not available to public agencies in California except to school districts through Leaseleaseback) Single contract with Design-build entity; may be lump-sum or a form of GMP Professional services for A-E; cost-plus with GMP for contractor Allows owner to deal with only one entity; encourages cost- saving innovations if handled properly Allows contractor involvement very early in project; owner can shed most risk of design errors and omissions; incentive for positive team relationships Owner may lose ability to influence design too early in project; cost saving innovations may compromise quality of project Possibility that contractor could "cook books" to take advantage of costplus aspect (but not very likely) Bridging Incentive savings, Fee at risk, no GMP. Has been used on a few select state, city and county projects, but few schools Generally preferred method in private sector

5 January 10, 2017 GHSD Measure E Bidding Options Overview 5 Lease- Leaseback: The Process Leaseback entity selection process RFQ/RFP Both General Contractor and Mechanical/Electrical/Plumbing Subcontractors Preconstruction Services Contract(s) Allows Contractor Input on Project Prior to Final Pricing Best Method to Identify Potential Value Engineering Items Plans & Specifications Developed and Processed thru DSA Final Approval District enters into Two Leases Site Lease Facilities Lease w/ Construction Provisions

6 January 10, 2017 GHSD Measure E Bidding Options Overview 6 Lease- Leaseback: Features Negotiated Contracts Use of District Selection Criteria Prequalification of contractors - Creation of a Prequalified Contactor Pool Guaranteed Maximum Price Based on Contractor Constructability Review of Plans Flexibility Design and Construction in coordination with District/Architect/Contractor Collaboration between District and Contractor Real World construction contracting

7 January 10, 2017 GHSD Measure E Bidding Options Overview 7 Next Steps Staff working with Counsel to develop Lease-Leaseback documents Request for Qualifications Request for Proposals Contract Documents Return to the Board for review prior to distribution or execution

Construction Project Delivery Methods Overview and Comparison. Operations Division

Construction Project Delivery Methods Overview and Comparison. Operations Division Construction Project Delivery Methods Overview and Comparison Operations Division 1 Four Types of Delivery Methods Design/Bid/Build (CM Multi-Prime) CM at Risk Design/Build Lease/Leaseback 2 Considerations

More information

LB 889 The Political Subdivisions Construction Alternatives Act

LB 889 The Political Subdivisions Construction Alternatives Act 1 LB 889 The Political Subdivisions Construction Alternatives Act What cities, villages, counties, state colleges, community colleges, and school districts need to know about their construction options.

More information

WATERTOWN ELEMENTARY SCHOOLS SCHOOL BUILDING COMMITTEE MEETING: OCTOBER 3, 2018

WATERTOWN ELEMENTARY SCHOOLS SCHOOL BUILDING COMMITTEE MEETING: OCTOBER 3, 2018 SCHOOL BUILDING COMMITTEE MEETING: OCTOBER 3, 2018 Types of Public Construction Delivery Methods Available: Design-Bid-Build (DBB) under M.G.L Ch. 149 Overview Pros Cons Construction Management at Risk

More information

Alternative Delivery Methods in the Post-Davis World

Alternative Delivery Methods in the Post-Davis World CASBO 2017 Annual Conference April 2017 Alternative Delivery Methods in the Post-Davis World Alan Reising Long Beach Unified School District areising@lbschools.net Phil Henderson Orbach Huff Suarez & Henderson

More information

Construction & Engineering 1845 East Russell Road Suite 300 Las Vegas, NV 89119

Construction & Engineering 1845 East Russell Road Suite 300 Las Vegas, NV 89119 Clark County Department of Aviation Construction & Engineering 1845 East Russell Road Suite 300 Las Vegas, NV 89119 Professional Service Contracts Construction Contracts Professional Service Contracts

More information

Construction 101. C.A.S.H. 36 th Annual Conference February 23-25, 2015 Sacramento Convention Center

Construction 101. C.A.S.H. 36 th Annual Conference February 23-25, 2015 Sacramento Convention Center Construction 101 C.A.S.H. 36 th Annual Conference February 23-25, 2015 Sacramento Convention Center This training is provided for educational, compliance and loss-prevention purposes only and, absent the

More information

Lease-Leaseback Project Delivery Method

Lease-Leaseback Project Delivery Method Lease-Leaseback Project Delivery Method ASBA Technical Meeting & Tradeshow Winter 2013 Presented by: Mark Baginski Principal Verde Design, Inc. James Moore V.P. of Pre-Construction Services Robert A. Bothman,

More information

Lease-Leaseback in a Post-AB 2316 World

Lease-Leaseback in a Post-AB 2316 World CASBO 2018 Annual Conference Lease-Leaseback in a Post-AB 2316 World Alan Reising Long Beach Unified School District areising@lbschools.net Phil Henderson Orbach Huff Suarez & Henderson phenderson@ohshlaw.com

More information

Public Building Commission of Chicago Terms and Tools for Public Capital Development and Financing

Public Building Commission of Chicago Terms and Tools for Public Capital Development and Financing Project Delivery Methods January 30, 2012 Public Building Commission of Chicago Terms and Tools for Public Capital Development and Financing Terms Capital Project Capital Program Prioritized Capital Plan

More information

The Pros and Cons of Construction Delivery Methods Available to Community College Districts

The Pros and Cons of Construction Delivery Methods Available to Community College Districts The Pros and Cons of Construction Delivery Methods Available to Community College Districts Community College Facility Coalition 25 th Annual Conference September 11, 2018 Panel Alan Kroeker - Principal

More information

Design Process 101. Michael Barnard, AIA, NCARB. animalsheltering.org/expo #AnimalCareExpo. Copyright

Design Process 101. Michael Barnard, AIA, NCARB. animalsheltering.org/expo #AnimalCareExpo. Copyright Design Process 101 Michael Barnard, AIA, NCARB animalsheltering.org/expo #AnimalCareExpo Copyright 1 Design and Construction Process Needs Assessment Conceptual Design Schematic Design Design Development

More information

ALTERNATIVE CONTRACTING METHODS

ALTERNATIVE CONTRACTING METHODS ALTERNATIVE CONTRACTING METHODS Conventional Design-Bid-Build Design/Build Negotiated General Contractor By Jeff Warner, AIA, LEED AP Principal, ALSC Architects CONVENTIONAL DESIGN-BID-BUILD The most traditional

More information

Ohio s Qualifications-Based Selection Law (as amended by Sub. H.B. 153, 129 th Ohio General Assembly, effective Sept. 28, 2011)

Ohio s Qualifications-Based Selection Law (as amended by Sub. H.B. 153, 129 th Ohio General Assembly, effective Sept. 28, 2011) Ohio s Qualifications-Based Selection Law (as amended by Sub. H.B. 153, 129 th Ohio General Assembly, effective Sept. 28, 2011) Sec. 153.65. As used in sections 153.65 to 153.73 of the Revised Code: (A)(1)

More information

Proposition 39 Sole Source Requirement

Proposition 39 Sole Source Requirement Proposition 39 Sole Source Requirement Presented by Aaron Jobson, Principal Kevin Wang, Associate Quattrocchi Kwok Architects Best Best & Krieger LLP Getting Started with Prop 39 Set Goals and Process

More information

Construction Manager at Risk Delivery Method

Construction Manager at Risk Delivery Method County of Alameda Board of Supervisors Transportation and Planning Committee May 4, 2015 Caroline Judy, Acting Director Construction Manager at Risk Delivery Method Briefing and Discussion Purpose Briefing

More information

Construction Contracts

Construction Contracts Construction Contracts By Dr. Ibrahim Assakkaf Construction Contracts By Dr. Ibrahim Assakkaf 1 The Need Web-based Contracts Supporting scheduling Controlling Regulating Analyzing Auditing the procurement

More information

Jim Porter is the Director of Public Works for the County of San Mateo. The Department of Public Works has a staff of over 300 and performs a wide

Jim Porter is the Director of Public Works for the County of San Mateo. The Department of Public Works has a staff of over 300 and performs a wide Jim Porter is the Director of Public Works for the County of San Mateo. The Department of Public Works has a staff of over 300 and performs a wide array of design, construction, construction administration,

More information

Bidding Conditions Attachment C

Bidding Conditions Attachment C Bidding Conditions Attachment C REV Date: November 9, 2018 Project Name (Permit Nos. xxx) at the Fresno Chaffee Zoo Project No. xxxx Located at 894 West Belmont Avenue Fresno, CA 93728 Page 1 of 8 DEFINITIONS

More information

Project Delivery Method

Project Delivery Method Project Delivery Method Presenters San Diego Community College District Facilities Management Lance Lareau District Architect UC Berkeley graduate 30 years of architecture experience 2 nd generation architect

More information

You Passed Your Bond Now What? a Part 3: Multi-Prime and Design-Build Project Delivery Methods and Project Labor Agreements

You Passed Your Bond Now What? a Part 3: Multi-Prime and Design-Build Project Delivery Methods and Project Labor Agreements You Passed Your Bond Now What? a Part 3: Multi-Prime and Design-Build Project Delivery Methods and Project Labor Agreements January 25, 2017 Presented By: Deidree Sakai Cameron Ward SAN FRANCISCO LONG

More information

ADDENDUM NO. 1. Date: January 11, for. RFQ for Design-Build Entity, Health Center/ Concession Project at Irvine Valley College. BID No.

ADDENDUM NO. 1. Date: January 11, for. RFQ for Design-Build Entity, Health Center/ Concession Project at Irvine Valley College. BID No. ADDENDUM NO. 1 Date: January 11, 2017 for RFQ for Design-Build Entity, Health Center/ Concession Project at Irvine Valley College BID No. 332 South Orange County Community College District General-All

More information

MANHATTAN BEACH UNIFIED SCHOOL DISTRICT PREQUALIFICATION INFORMATION FOR, 2018 I. BACKGROUND AND OVERVIEW

MANHATTAN BEACH UNIFIED SCHOOL DISTRICT PREQUALIFICATION INFORMATION FOR, 2018 I. BACKGROUND AND OVERVIEW PROSPECTIVE MEP SUBCONTRACTORS FOR LEASE-LEASEBACK PROJECTS, 2018 I. BACKGROUND AND OVERVIEW Pursuant to Education Code section 17406 and Public Contract Code section 20111.6, all prospective first tier,

More information

Publicly Bid: Negotiated, Non-Bid: Hybrid: 5/12/2017. Design-Bid-Build Multiple-Prime Contracting. Lease-Leaseback* Design-Build

Publicly Bid: Negotiated, Non-Bid: Hybrid: 5/12/2017. Design-Bid-Build Multiple-Prime Contracting. Lease-Leaseback* Design-Build 1 Leigh Sata, Santa Rosa Junior College Kelle Lynch McMahon, Peralta Community College Mark Kelley, Dannis Woliver Kelley Deidree Sakai, Dannis Woliver Kelley 2 1 Publicly Bid: Design-Bid-Build Multiple-Prime

More information

LEVEL I PREQUALIFICATION DOCUMENTS OUTPATIENT PAVILION UCSD MEDICAL CENTER LA JOLLA

LEVEL I PREQUALIFICATION DOCUMENTS OUTPATIENT PAVILION UCSD MEDICAL CENTER LA JOLLA Project No. 4484/A4L-379/964840 LEVEL I PREQUALIFICATION DOCUMENTS for OUTPATIENT PAVILION UCSD MEDICAL CENTER LA JOLLA University of California, San Diego FACILITIES DESIGN & CONSTRUCTION 10280 North

More information

Bidding Conditions. March 22, (Project# 0192) at the. Fresno Chaffee Zoo. Project : Warthog Exhibit. Located at. 894 West Belmont Avenue

Bidding Conditions. March 22, (Project# 0192) at the. Fresno Chaffee Zoo. Project : Warthog Exhibit. Located at. 894 West Belmont Avenue Bidding Conditions March 22, 2018 (Project# 0192) at the Fresno Chaffee Zoo Project : Warthog Exhibit Located at 894 West Belmont Avenue Fresno, CA 93728 Page 1 of 8 DEFINITIONS Addendum - A document issued

More information

Time to Build! What to Expect On Your Upcoming Design and Construction Journey PRESENTED TO

Time to Build! What to Expect On Your Upcoming Design and Construction Journey PRESENTED TO Time to Build! What to Expect On Your Upcoming and Journey PRESENTED TO Christopher is an award-winning architect with more than 20 years of diversified architectural experience in design of projects from

More information

Comparison of Conventional and Alternative Project Delivery Methods: What s in an Acronym? PNWS AWWA May, 2013

Comparison of Conventional and Alternative Project Delivery Methods: What s in an Acronym? PNWS AWWA May, 2013 Comparison of Conventional and Alternative Project Delivery Methods: What s in an Acronym? PNWS AWWA May, 2013 Outline Alternative Delivery Options Oregon and Washington Legal Context Things an Owner Should

More information

Is Your District Ready For the New Law?

Is Your District Ready For the New Law? Is Your District Ready For the New Law? Ben Pintabona Operations Manager Scaparotti Construction Group Craig Weise Construction Reform Program Director Ohio School Facilities Commission Sylvia Gillis,

More information

REQUEST FOR PROPOSALS. Construction Manager CM Services Pre-Construction and Construction Services

REQUEST FOR PROPOSALS. Construction Manager CM Services Pre-Construction and Construction Services REQUEST FOR PROPOSALS Construction Manager CM Services Pre-Construction and Construction Services Big Sky Fire Department Station 1 Project Big Sky Fire District OWNER Big Sky, Montana November 2016 Request

More information

UNIVERSITY OF CALIFORNIA, SAN DIEGO

UNIVERSITY OF CALIFORNIA, SAN DIEGO BERKELEY DAVIS IRVINE LOS ANGELES MERCED RIVERSIDE SAN DIEGO SAN FRANCISCO SANT A BARBARA SANT A CRUZ OFFICE OF THE ASSOCIATE VICE CHANCELLOR CAPITAL PROGRAM MANAGEMENT TEL: (858) 534-2177 FAX: (858) 534-4363

More information

REQUEST FOR QUALIFICATIONS CONSTRUCTION MANAGEMENT at RISK SERVICES FOR THE BECKER COUNTY JAIL DETROIT LAKES, MN

REQUEST FOR QUALIFICATIONS CONSTRUCTION MANAGEMENT at RISK SERVICES FOR THE BECKER COUNTY JAIL DETROIT LAKES, MN REQUEST FOR QUALIFICATIONS CONSTRUCTION MANAGEMENT at RISK SERVICES FOR THE BECKER COUNTY JAIL DETROIT LAKES, MN Introduction Becker County is issuing a RFQ for Construction Management at Risk Services

More information

Alternative Project Delivery Methods and Procurement

Alternative Project Delivery Methods and Procurement Alternative Project Delivery Methods and Procurement Board of Airport Commissioners Meeting 2 June 2014 Presented by: Roger A. Johnson, Deputy Executive Director Definitions Project Delivery Method o The

More information

Session THREE. Face 2 Face (4 hours) Stage 1 Initial actions & appraisals: Self-directed (6 hours)

Session THREE. Face 2 Face (4 hours) Stage 1 Initial actions & appraisals: Self-directed (6 hours) Session THREE Face 2 Face (4 hours) Stage 1 Initial actions & appraisals: What type of tendering methods are there? What does qualification mean? Do you (the MC) bid for every job? Do you (the MC) price

More information

PUBLIC CONTRACT CODE SECTION

PUBLIC CONTRACT CODE SECTION PUBLIC CONTRACT CODE SECTION 22160 22169 22160. (a) The Legislature finds and declares that the design build method of project delivery, using a best value procurement methodology, has been authorized

More information

APPENDIX D Forms for the Analytical Delivery Decision Approach (Tier 1)

APPENDIX D Forms for the Analytical Delivery Decision Approach (Tier 1) APPENDIX D Forms for the Analytical Delivery Decision Approach (Tier 1) The first tier in the systematic approach developed in this guidebook is the Analytical Delivery Decision Approach discussed in Chapter

More information

LEVEL I PREQUALIFICATION DOCUMENTS COMPUTER SCIENCE ENGINEERING (CSE) ADDITION AND RENOVATION

LEVEL I PREQUALIFICATION DOCUMENTS COMPUTER SCIENCE ENGINEERING (CSE) ADDITION AND RENOVATION Project No. 4863/A4L-396 LEVEL I PREQUALIFICATION DOCUMENTS for COMPUTER SCIENCE ENGINEERING (CSE) ADDITION AND RENOVATION University of California, San Diego FACILITIES DESIGN & CONSTRUCTION 10280 North

More information

COLLINS COCKREL & COLE A PROFESSIONAL CORPORATION

COLLINS COCKREL & COLE A PROFESSIONAL CORPORATION COLLINS COCKREL & COLE A PROFESSIONAL CORPORATION PAUL R. COCKREL JAMES P. COLLINS ROBERT G. COLE TIMOTHY J. FLYNN EVAN D. ELA LINDA M. GLESNE DAVID A. GREHER ATTORNEYS AT LAW 390 UNION BOULEVARD, SUITE

More information

ECI: Two-Stage Contracts

ECI: Two-Stage Contracts ECI: Two-Stage Contracts Client and Contractor Considerations Michael Creedon Special Counsel ECI in Infrastructure and Major Projects Summit 2010 Sydney, 17 June 2010 Sessions Outline Introduction /

More information

ALTERNATE CONSTRUCTION PROJECT DELIVERY METHODS

ALTERNATE CONSTRUCTION PROJECT DELIVERY METHODS ATKINSON, ANDELSON, LOYA, RUUD & ROMO ALTERNATE CONSTRUCTION PROJECT DELIVERY METHODS 2017 ACBO Spring Conference Good Luck is the Residue of Good Design May 22-24, 2017 Lake Tahoe, California Cerritos

More information

Report on Effectiveness of the Construction Manager at Risk Project Delivery Method

Report on Effectiveness of the Construction Manager at Risk Project Delivery Method Report on Effectiveness of the Construction Manager at Risk Project Delivery Method The project management plans described below, establish several elements or criteria for university project staff to

More information

LEVEL I PREQUALIFICATION DOCUMENTS

LEVEL I PREQUALIFICATION DOCUMENTS Project No. LEVEL I PREQUALIFICATION DOCUMENTS for MUIR BIOLOGY BUILDING 3RD FLOOR RENOVATION University of California, San Diego FACILITIES DESIGN & CONSTRUCTION 10280 North Torrey Pines Road La Jolla,

More information

Information for Contractors Regarding Public Works Projects

Information for Contractors Regarding Public Works Projects Information for Contractors Regarding Public Works Projects Page 1 Table of Contents 1. INTRODUCTION...3 WHAT IS CUPCCAA?...3 BENEFITS OF CUPCCAA...3 2. TRADITIONAL BIDDING VS. MCC IMPLEMENTED CUPCCAA...4

More information

DESIGN-BID-BUILD CONSTRUCTION MANAGER AT RISK DESIGN-BUILD

DESIGN-BID-BUILD CONSTRUCTION MANAGER AT RISK DESIGN-BUILD OWNER OWNER OWNER DESIGNER GC DESIGNER DESIGN CONSULTANTS TRADE SUBS DESIGN CONSULTANTS TRADE SUBS DESIGN CONSULTANTS TRADE SUBS DESIGN-BID-BUILD CONSTRUCTION MANAGER AT RISK DESIGN-BUILD Contracts Communications

More information

REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES NOT AT RISK FOR THE. St. Charles County Ambulance District

REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES NOT AT RISK FOR THE. St. Charles County Ambulance District REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES NOT AT RISK FOR THE St. Charles County Ambulance District Base 3 & Training Facility Construction 4169 Old Mill Parkway St. Peters, MO 63376 September

More information

1/4/2014. Alternative Project Delivery Methods 1. Agenda

1/4/2014. Alternative Project Delivery Methods 1. Agenda Steven. C. Thweatt Assistant Vice Chancellor Facilities Management University of Colorado @ Boulder Steven.thweatt@colorado.edu Introduction Fun in the air More Fun in Chattanooga Licensed Architect Georgia

More information

PROFESSIONAL PRACTICE 544

PROFESSIONAL PRACTICE 544 PROFESSIONAL PRACTICE 544 April 20, 2015 Contracting Methods Alternative Project Delivery Methods Michael J. Hanahan, Esq. Schiff Hardin LLP 233 S. Wacker, Ste. 6600 Chicago, IL 60606 312-258-5701 mhanahan@schiffhardin.com

More information

APPENDIX D Forms for Analytical Delivery Decision Approach (Tier 1)

APPENDIX D Forms for Analytical Delivery Decision Approach (Tier 1) APPENDIX D Forms for Analytical Delivery Decision Approach (Tier 1) The first tier in the systematic approach developed in this guidebook is the Analytical Delivery Decision Approach discussed in Chapter

More information

MANHATTAN BEACH UNIFIED SCHOOL DISTRICT PREQUALIFICATION INFORMATION FOR PROSPECTIVE LEASE-LEASEBACK DEVELOPERS 2017/2018 I. BACKGROUND AND OVERVIEW

MANHATTAN BEACH UNIFIED SCHOOL DISTRICT PREQUALIFICATION INFORMATION FOR PROSPECTIVE LEASE-LEASEBACK DEVELOPERS 2017/2018 I. BACKGROUND AND OVERVIEW PROSPECTIVE LEASE-LEASEBACK DEVELOPERS 2017/2018 I. BACKGROUND AND OVERVIEW Pursuant to Education Code section 17406 and Public Contract Code section 20111.6, the Manhattan Beach Unified School District

More information

LEVEL I PREQUALIFICATION DOCUMENTS GEISEL RESTROOM RENOVATIONS

LEVEL I PREQUALIFICATION DOCUMENTS GEISEL RESTROOM RENOVATIONS Project No. 5005/A4L-424/ 962520 LEVEL I PREQUALIFICATION DOCUMENTS for GEISEL RESTROOM RENOVATIONS University of California, San Diego FACILITIES DESIGN & CONSTRUCTION 10280 North Torrey Pines Road La

More information

Sweetwater Union High School District. Proposition O Performance Audit. March 20, 2012 Board of Education and Citizens Bond Oversight Committee

Sweetwater Union High School District. Proposition O Performance Audit. March 20, 2012 Board of Education and Citizens Bond Oversight Committee Sweetwater Union High School District Proposition O Performance Audit Board of Education and Citizens Bond Oversight Committee Outline of Performance Audit Presentation All parties, District staff and

More information

Information for Contractors Regarding Public Works Projects

Information for Contractors Regarding Public Works Projects Information for Contractors Regarding Public Works Projects Table of Contents INTRODUCTION...2 WHAT IS CUPCCAA?...2 BENEFITS OF CUPCCAA...2 TRADITIONAL BIDDING VS. MCC IMPLEMENTED CUPCCAA...3 ADOPTION

More information

Construction Manager as Constructor (CMc) Manual

Construction Manager as Constructor (CMc) Manual Construction Manager as Constructor (CMc) Manual Manual Courtesy of Purdue University Presented By Table of Contents 1.0 Executive Summary 2.1 House Bill 1196 2.2 Analysis of House Bill 1196 and Requirements

More information

Committee Meeting. Procurement Processes for Professional Services and Contractors

Committee Meeting. Procurement Processes for Professional Services and Contractors Citizen s i Oversight Committee Meeting Procurement Processes for Professional Services and Contractors March 2, 2011 1 Procurement Process for Professional Services 2 Procurement Process for Professional

More information

JOB ORDER CONTRACTING. United Brotherhood of Carpenters and Joiners Interior-Exterior Systems Leadership Conference

JOB ORDER CONTRACTING. United Brotherhood of Carpenters and Joiners Interior-Exterior Systems Leadership Conference JOB ORDER CONTRACTING United Brotherhood of Carpenters and Joiners Interior-Exterior Systems Leadership Conference March, 2015 AGENDA Who is the Gordian Group Introduction to Job Order Contracting Explanation

More information

Seattle Public Schools Office of Internal Audit. Internal Audit Report Construction Management Practices

Seattle Public Schools Office of Internal Audit. Internal Audit Report Construction Management Practices Seattle Public Schools Office of Internal Audit Issue Date: December 5, 2017 Introduction and Background In accordance with the fiscal year 2018 capital audit plan, we have completed an audit of the district

More information

Progressive Design Build

Progressive Design Build Progressive Design Build July 19, 2018 Ash Dhingra P.E.,S.E TRADITIONAL PROCUREMENT Design-Bid-Build (DBB) Design to 100%, procurement (bid), and construction proceed sequentially Construction contract

More information

Project Delivery Systems

Project Delivery Systems Project Delivery Systems National Society of Professional Engineers Alaska Society of Professional Engineers 2011 Western and Pacific Region Annual Meeting and Conference Jeffrey Callahan April 1, 2011

More information

Chapter 4 State Requirements for Educational Facilities Section 4.1

Chapter 4 State Requirements for Educational Facilities Section 4.1 providential cause, other impending danger to life safety, or pursuant to Section 1013.46(1)(b), F.S., the board can declare an emergency, can negotiate a contract with a design-build firm, design professional,

More information

Alternative Project Delivery Methods for. City Public Works Projects

Alternative Project Delivery Methods for. City Public Works Projects August 7, 2009 Alternative Project Delivery Methods for City Public Works Projects David S. Gehrig, Senior Counsel Hanson Bridgett LLP 425 Market Street, 26th Floor San Francisco, CA 94105 415-995-5063,

More information

A Primer Indianapolis, Indiana June 16, 2010

A Primer Indianapolis, Indiana June 16, 2010 Alternative Project Delivery Methods A Primer Indianapolis, Indiana June 16, 2010 Michael Kenig, Holder Construction Company, Past chair of AGC of America s s Project Delivery Committee Jayne O Donnell,

More information

Professional Practice 544

Professional Practice 544 Spring Semester 2017 Professional Practice 544 Michael J. Hanahan Partner Schiff Hardin LLP 233 S. Wacker, Ste. 6600 Chicago, IL 60606 312-258-5701 mhanahan@schiffhardin.com Schiff Hardin LLP. All rights

More information

PROGRESSIVE DESIGN-BUILD. Praful M. Kulkarni, AIA Iraj Ghaemi, P.E. J. Brandon Dekker, M.S., DBIA

PROGRESSIVE DESIGN-BUILD. Praful M. Kulkarni, AIA Iraj Ghaemi, P.E. J. Brandon Dekker, M.S., DBIA PROGRESSIVE DESIGN-BUILD Praful M. Kulkarni, AIA Iraj Ghaemi, P.E. J. Brandon Dekker, M.S., DBIA ADVANTAGES/DISADVANTAGES DESIGN BID BUILD (HARD BID) The traditional project delivery method, which customarily

More information

Professional Practice 544

Professional Practice 544 Spring Semester 2018 Professional Practice 544 Michael J. Hanahan Partner Schiff Hardin LLP 233 S. Wacker, Ste. 6600 Chicago, IL 60606 312-258-5701 mhanahan@schiffhardin.com Schiff Hardin LLP. All rights

More information

The Competitive Process for Awarding Purchasing and Construction Contracts: When it s Required; and, When it s Not. What s the Difference?

The Competitive Process for Awarding Purchasing and Construction Contracts: When it s Required; and, When it s Not. What s the Difference? The Competitive Process for Awarding Purchasing and Construction Contracts: When it s Required; and, When it s Not. What s the Difference? Community College Facilities Coalition November 15, 2016 Kelly

More information

NOTICE TO PROSPECTIVE BIDDERS REGARDING PRE-QUALIFICATION FOR CONTRACTS FOR ALISAL UNION SCHOOL DISTRICT. Revised February 11, 2015

NOTICE TO PROSPECTIVE BIDDERS REGARDING PRE-QUALIFICATION FOR CONTRACTS FOR ALISAL UNION SCHOOL DISTRICT. Revised February 11, 2015 NOTICE TO PROSPECTIVE BIDDERS REGARDING PRE-QUALIFICATION FOR CONTRACTS FOR ALISAL UNION SCHOOL DISTRICT Revised February 11, 2015 For Projects to be bid from February 12, 2015 to February 11, 2016 Alisal

More information

PREQUALIFICATION PACKAGE FOR MECHANICAL, ELECTRICAL OR PLUMBING CONTRACTORS WARM SPRINGS/ SOUTH FREMONT COMMUNITY NEW ELEMENTARY SCHOOL PROJECT

PREQUALIFICATION PACKAGE FOR MECHANICAL, ELECTRICAL OR PLUMBING CONTRACTORS WARM SPRINGS/ SOUTH FREMONT COMMUNITY NEW ELEMENTARY SCHOOL PROJECT PREQUALIFICATION PACKAGE FOR MECHANICAL, ELECTRICAL OR PLUMBING CONTRACTORS WARM SPRINGS/ SOUTH FREMONT COMMUNITY NEW ELEMENTARY SCHOOL PROJECT JUNE 23, 2016 NOTICE TO CONTRACTORS TO PREQUALIFY FOR MECHANICAL,

More information

PROJECT DELIVERY HANDBOOK

PROJECT DELIVERY HANDBOOK PROJECT DELIVERY HANDBOOK GuidetoCaliforniaSchooland CommunityCollege FacilityDelivery 2017 ThisversionincorporateschangesresultingfromlegislationincludingAB2316andSB693(2016). AssociationofCaliforniaConstructionManagersUpdatedJanuary17,2017

More information

Job Order Contracting (JOC) ITB JE Overview August 2016

Job Order Contracting (JOC) ITB JE Overview August 2016 Job Order Contracting (JOC) ITB 16-14204-JE Overview August 2016 Job Order Contracting (JOC) What is JOC? Using general and specialty trade contractors to perform a series of projects on an as-needed basis.

More information

Project Delivery Method

Project Delivery Method City Green - Project Delivery Method Roswell City Council Work Session September 14, 2016 Agenda Debrief on HPC Work Session Project Schedule Update Alternative Project Delivery Methods Discussion / Direction

More information

REQUEST FOR PROPOSAL. Construction Management Services Not at Risk

REQUEST FOR PROPOSAL. Construction Management Services Not at Risk REQUEST FOR PROPOSAL Construction Management Services Not at Risk The St. Charles County Ambulance District proposes to retain a qualified firm/team for the Construction Management Services Not at Risk

More information

ConsensusDocs. Catalog. Updated Docs Inside

ConsensusDocs. Catalog. Updated Docs Inside ConsensusDocs ConsensusDocs Contracts Catalog Updated Docs Inside ConsensusDocs Keeping You Ahead of the Cur ve ConsensusDocs... Building A Better Way! Whether working at the office, from the road or even

More information

ALTERNATE FORMS OF PROJECT DELIVERY

ALTERNATE FORMS OF PROJECT DELIVERY ALTERNATE FORMS OF PROJECT DELIVERY 1 INTRODUCTION 1.1 BACKGROUND.1 In the building industry today, conventional methods of project delivery are being challenged by Clients, Consultants and Contractors

More information

Village of Lynbrook. Request for Proposal Engineering Services. Police License Plate Reader/Intersection Camera System

Village of Lynbrook. Request for Proposal Engineering Services. Police License Plate Reader/Intersection Camera System Village of Lynbrook Request for Proposal Engineering Services Police License Plate Reader/Intersection Camera System 1 Columbus Drive Lynbrook, NY 11563 516-599-8300 July 16, 2018 Table of Contents 1.

More information

ConsensusDocs. ConsensusDocs CONTRACTS CATALOG. Updated Docs Inside. ou Ah. ead o f the Cur v. e K

ConsensusDocs. ConsensusDocs CONTRACTS CATALOG. Updated Docs Inside. ou Ah. ead o f the Cur v. e K CONTRACTS CATALOG Updated Docs Inside ou Ah ead o f the Cur v e gy epin e K ... BUILDING A BETTER WAY! Whether working at the office, from the road or even at home, the platform provides instant access

More information

BID AND PURCHASING LAWS/BEST PRACTICES

BID AND PURCHASING LAWS/BEST PRACTICES BID AND PURCHASING LAWS/BEST PRACTICES BEFORE YOU DO ANYTHING, ASK YOURSELF THIS QUESTION. Is this purchase or contract for goods or services exempt from the bid laws? Exemptions: Piggy back off a contract

More information

REQUEST FOR QUALIFICATIONS AND PROPOSALS

REQUEST FOR QUALIFICATIONS AND PROPOSALS REQUEST FOR QUALIFICATIONS AND PROPOSALS CONSTRUCTION MANAGER AT RISK SERVICES Preconstruction Phase Services and Construction Phase Services Sheridan Economic and Educational Development Authority Sheridan

More information

Qualifications Based Selection of Contractors

Qualifications Based Selection of Contractors Qualifications Based Selection of Contractors AGC of America Project Delivery Committee QBS Working Group 1 Table of Contents QBS & The Industry: An Introduction Pages 3-4 Selection Criteria for QBS Page

More information

SEPARATED PROJECT DELIVERY SYSTEMS

SEPARATED PROJECT DELIVERY SYSTEMS SEPARATED PROJECT DELIVERY SYSTEMS Separated (aka Traditional) The traditional delivery method typically involves three sequential project phases: The design phase, which requires the services of a designer

More information

Alternative Project Delivery for America s Water Infrastructure

Alternative Project Delivery for America s Water Infrastructure Alternative Project Delivery for America s Water Infrastructure Cal Rozario PMP Design-Build Chief Engineer HDR Water & Natural Resources Business Group TOPICS Traditional Project Delivery Brief History

More information

Design-Build Trifecta A joint presentation of DBIA WESTERN PACIFIC REGION

Design-Build Trifecta A joint presentation of DBIA WESTERN PACIFIC REGION Design-Build Trifecta A joint presentation of DBIA WESTERN PACIFIC REGION and AIA LOS ANGELES September 16, 2014 Design-Build Trifecta MODERATOR: SPEAKERS: Robert J, Hartung, Hon AIA, DBIA President, Alternative

More information

Construction Project Delivery Methods

Construction Project Delivery Methods Construction Project Delivery Methods Purchasing Requirements and Applications 9/20/2012 1 General Purchasing Requirements 9/20/2012 2 Governmental Purchasing Requirements Law: Texas Education Code 44.031

More information

Project Delivery Selection Matrix If the Project Delivery Approach Fits, Use It

Project Delivery Selection Matrix If the Project Delivery Approach Fits, Use It Project Delivery Selection Matrix If the Project Delivery Approach Fits, Use It Jim Mallorey, P.E. Metro Wastewater Reclamation District Chris Harper - University of Colorado Boulder January 23, 2014 1

More information

1/12/2015. Collaborative IPD-ish Project Delivery using Design-Build, P3 or CM at-risk: the Einstein Approach

1/12/2015. Collaborative IPD-ish Project Delivery using Design-Build, P3 or CM at-risk: the Einstein Approach Collaborative IPD-ish Project Delivery using Design-Build, P3 or CM at-risk: the Einstein Approach DRAFT for AIA CCA Knowledge Community 2015 Dale Munhall, AIA not a sign of teamwork Director of Construction

More information

DESIGN CONSTRUCTION: PROJECT DELIVERY METHODS (SUPERPOWERS OPTIONAL!) FISHBECK, THOMPSON, CARR & HUBER engineers scientists architects constructors

DESIGN CONSTRUCTION: PROJECT DELIVERY METHODS (SUPERPOWERS OPTIONAL!) FISHBECK, THOMPSON, CARR & HUBER engineers scientists architects constructors DESIGN CONSTRUCTION: PROJECT DELIVERY METHODS (SUPERPOWERS OPTIONAL!) FISHBECK, THOMPSON, CARR & HUBER engineers scientists architects constructors YOUR SUPERHERO TRAINERS TODAY ADAM NELSON Senior Architectural

More information

Procurement Policies and Procedures

Procurement Policies and Procedures Center for Economic and Social Development Procurement Policies and Procedures 1. Purpose of procurement standards. The purpose of these standards is to establish procedures for the Center for Economic

More information

1 Mountain Cascade, Inc. $2,050, Con-Quest Contractors, Inc. $2,170, Sierra National Construction, Inc. $2,170,300.

1 Mountain Cascade, Inc. $2,050, Con-Quest Contractors, Inc. $2,170, Sierra National Construction, Inc. $2,170,300. Agenda Item No. 9B September 9, 2014 TO: FROM: SUBJECT: Honorable Mayor and City Council Attention: Laura C. Kuhn, City Manager Steven L. Hartwig, Director of Public Works/City Engineer RESOLUTION TO WAIVE

More information

CONSTRUCTION CONTRACTING GUIDELINES Revised January 2017 I. GENERAL REQUIREMENTS AND PROCEDURES

CONSTRUCTION CONTRACTING GUIDELINES Revised January 2017 I. GENERAL REQUIREMENTS AND PROCEDURES THE UNIVERSITY OF TEXAS SYSTEM OFFICE OF GENERAL COUNSEL CONSTRUCTION CONTRACTING GUIDELINES Revised January 2017 The Rules and Regulations of the Board of Regents of The University of Texas System for

More information

REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGER SERVICES AT RISK WITH GUARANTEED MAXIMUM PRICE

REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGER SERVICES AT RISK WITH GUARANTEED MAXIMUM PRICE REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGER SERVICES AT RISK WITH GUARANTEED MAXIMUM PRICE Memphis Cook Convention Center Renovation City of Memphis, Department of Housing and Community Development

More information

Carolinas HealthCare System Case Study Collaborate Bid Build (CB 2 ) A Different Approach to Project Delivery

Carolinas HealthCare System Case Study Collaborate Bid Build (CB 2 ) A Different Approach to Project Delivery Carolinas HealthCare System Case Study Collaborate Bid Build (CB 2 ) A Different Approach to Project Delivery Carolinas HealthCare System Case Study Behavioral Health Davidson, NC Project Team Carolinas

More information

GALT JOINT UNION HIGH SCHOOL DISTRICT May 24, 2017 MEASURE E BOND UPDATE BIWEEKLY REPORT Report No: 001

GALT JOINT UNION HIGH SCHOOL DISTRICT May 24, 2017 MEASURE E BOND UPDATE BIWEEKLY REPORT Report No: 001 GALT JOINT UNION HIGH SCHOOL DISTRICT May 24, 2017 MEASURE E BOND UPDATE BIWEEKLY REPORT Report No: 001 SUMMARY May 2017 marks a busy month of master planning refinement and continued substantial progress

More information

CACFP - Child Care Centers New Contracting Entity Training. Child Care CACFP. Procurement. Chapter 8. Procurement 8-1

CACFP - Child Care Centers New Contracting Entity Training. Child Care CACFP. Procurement. Chapter 8. Procurement 8-1 Child Care CACFP Procurement Chapter 8 Procurement 8-1 Procurement The Basics CACFP - Child Care Centers New Contracting Entity Training There are numerous elements involved in the procurement of food,

More information

Request for Qualifications (Design-Build Contract) State of Ohio Standard Forms and Documents

Request for Qualifications (Design-Build Contract) State of Ohio Standard Forms and Documents Request for Qualifications (Design-Build Contract) State of Ohio Standard Forms and Documents Administration of Project: Local Agency Project Name Stadium Project Response Deadline 1/9/14 12 pm local time

More information

Complying with Ohio s. Qualifications-Based Selection Law. (Ohio Revised Code ) A Guide for Public Authorities

Complying with Ohio s. Qualifications-Based Selection Law. (Ohio Revised Code ) A Guide for Public Authorities Complying with Ohio s Qualifications-Based Selection Law for Professional Engineers, Architects & Surveyors (Ohio Revised Code 153.65-.73) A Guide for Public Authorities American Council of Engineering

More information

SEE BELOW APRIL 3, 2001 FOX CALIFORNIA THEATRE CONSTRUCTION CONTRACT

SEE BELOW APRIL 3, 2001 FOX CALIFORNIA THEATRE CONSTRUCTION CONTRACT REDEVELOPMENT AGENCY BOARD SUSAN F. SHICK EXECUTIVE DIRECTOR SEE BELOW APRIL 3, 2001 SUBJECT: FOX CALIFORNIA THEATRE CONSTRUCTION CONTRACT RECOMMENDATION It is recommended that the Agency Board approve

More information

CONSTRUCTRION MANAGEMENT AT RISK ASHE December 13, 2011 Julio Alvarado Construction State Engineer

CONSTRUCTRION MANAGEMENT AT RISK ASHE December 13, 2011 Julio Alvarado Construction State Engineer CONSTRUCTRION MANAGEMENT AT RISK CM@R ASHE December 13, 2011 Julio Alvarado Construction State Engineer 1 Agenda Background What leads DOT s to CMAR? ADOT s Outlook on CMAR Project Updates CMAR Benefits

More information

Pre Proposal Proposal Meeting

Pre Proposal Proposal Meeting SOUTHERLY WWTC SECOND STAGE RETURN SLUDGE PUMP IMPROVEMENTS Design Build Project Pre Proposal Proposal Meeting August 15, 2012 Introduction Progressive Design-Build Procurement Approach Request For Proposals

More information

Alternate Project Delivery Experience at UOSA and PWCSA

Alternate Project Delivery Experience at UOSA and PWCSA Alternate Project Delivery Experience at UOSA and PWCSA Bob Angelotti, Director of Technical Services at UOSA Samer Beidas, Director of Engineering and Planning at PWCSA Presented at the VWEA 2015 Education

More information

TOWN OF WINTER PARK REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGER / GENERAL CONTRACTOR

TOWN OF WINTER PARK REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGER / GENERAL CONTRACTOR February 5, 2018 SUMMARY OF CM/GC SELECTION PROCESS FOR DIMMIT II APARTMENT BUILDING The Town of Winter Park requests proposals from qualified Construction Manager / General Contractor (CM/GC) firms for

More information

5/21/13 PROCUREMENT 5/21/13. Agenda. Common Tendering Systems Procurement Methods

5/21/13 PROCUREMENT 5/21/13. Agenda. Common Tendering Systems Procurement Methods PROCUREMENT 5/21/13 Agenda Common Tendering Systems Procurement Methods 1 Agenda Common Tendering Systems Procurement Methods Common Tendering Systems Competitive / Open-bid: (Qualified) contractors are

More information