1 Bill of Quantity (BOQ) PART-I : FIRE FIGHTING SYSTEM. Sr No Description Qty Unit Rate/Unit Amount 1 Dismantling, loading, shifting and unloading of following Fire Fighting Equipments from Berth No.8 to Berth No.7 (Port provide crane and truck) as per Technical Specification. (a) Monitor Pump (11000 LPM) with Diesel Engine (650 HP) 02 Nos (b) Hydrant Pump (6500 LPM) with Diesel Engine (255 HP) 01 Nos (c) Jockey Pump 02 Nos 2 Design, supply of Ground Monitor with isolation valve on 3 m high RCC Tower with all insert plates, fixtures, clamps, SS fasteners, pressure gauge dial type 150 mm size connected at monitor inlet pipe and supporting for riser pipe and monitor, orifice plates suitable to discharge 3000 LPM capacity at 8kg/cm² with a horizontal throw range of 60 m with electrical/electro hydraulic equipments for horizontal and vertical rotation with base operation control etc. and shall be capable of being remote controlled etc. and complete in all respects, as per Technical Specification. 02 Nos

2 3 Design, supply of SS 316 size 63 mm Double Headed Standard Fire Hydrants with (landing valves as per BIS:5290) and isolation valve (100 NB), SS-316 with orifice plates to be provided below each hydrant and separate controls fitted with 63 mm instantaneous female coupling on each outlet complete with 2 Nos. hose box with stand of 15 m long hose pipe each with end coupling with nozzles in all respects as per Technical Specification. 04 Nos 4 Design, supply of Jumbo Water Curtains Nozzles with motorized valve, orifice plate producing dense water curtains of 20 m radius, through 180 angle in vertical plane discharging at 362 LPM at an inlet pressure of 8 kg/cm² and complete in all respects. 14 Nos 5 Design, supply, of intrinsically safe Electrical System for Remote Operation of water monitors, main pumps, foam pumps, water curtain system etc. from control room with centralized remote control panel with joystick controls including FRLS control cables and etc. and complete in all respects. 1 Set

3 6 Design, fabrication, supply of Cement Lined (inside) ERW Steel Pipe conforming to BIS:3589 of Grade Fe 410 of not less than 8 mm for carrying sea water including supply of pipes, Excavation, back filling of trench, hume pipe at road crossing (In case of underground pipe).specials, bends, flanges, dummy flanges, gaskets, stainless steel bolts & nuts, washers, miters, bends, tees, reducers, expanders, steel/rcc supports saddles, inserts, fixtures, hume pipe of suitable class including painting 3 coats of approved colour (one coat of zinc-rich primer and two coats of epoxy paint with fire red colour) externally for over ground pipe lines and double coating with double wrapping coating as per IS in case of underground pipeline complete as follows: (a) 250 NB 300 Mtr (b) 200 NB 300 Mtr (c) 100 NB (double galvanized) 200 Mtr (d) 80 NB (double galvanized) 200 Mtr 7 (i) Installation, Testing and Commissioning of following Fire Fighting equipments at Berth No.7 in the proposed pump house as per Technical Specification. (a) Monitor Pump (11000 LPM) with Diesel Engine (650 HP) 02 No (b) Hydrant Pump (6500 LPM) with Diesel Engine (255 HP) 01 No

4 (c) Jockey Pump 02 No (ii) Installation, Testing and Commissioning of Sr No. 2 (Ground Monitor and complete accessories) 02 No (iii) Installation, Testing and Commissioning of Sr No.3 (Double Headed Standard Fire Hydrants and complete accessories) 04 No (iv) Installation, Testing and Commissioning of Sr No.4 (Jumbo Water Curtains Nozzles and complete accessories) 14 No (v) Installation, Testing and Commissioning of Sr No.5 (Intrinsically safe Electrical System and complete accessories) 01 Set (vi) Installation, Testing and Commissioning of Sr No.6 (ERW Steel Pipe and complete accessories) (a) 250 NB 300 Mtr (b) 200 NB 300 Mtr (c) 100 NB (double galvanized) 200 Mtr (d) 80 NB (double galvanized) 200 Mtr TOTAL A

5 PART-II : CIVIL WORKS (PUMP ROOM) Sr No Description Qty Unit Rate/Unit Amount 1 Design and construction of Pump House (Ground + First Floor + Second Floor) of area 10 x 6 = 60 m 2 (approx) 1 LS Total- B

6 Sr No Description Qty Unit Rate/Unit Amount Grand Total ( A +B )

SUMMARY OF PRICES FOR FOR FIRE FIGHTING WORKS FOR Phase-1,(Block-G&H) Type-B

SUMMARY OF PRICES FOR FOR FIRE FIGHTING WORKS FOR Phase-1,(Block-G&H) Type-B SUMMARY OF PRICES FOR FOR FIRE FIGHTING WORKS FOR Phase-1,(Block-G&H) Type-B Design Centre Consulting Engineers Pvt Ltd, Ghaziabad, NCR Delhi, Tel-0120 4333451, 4333452 Page 1 BILL OF QUANTITIES S. NO.

More information

ENGINEERING PROJECTS (INDIA) LTD., (A Govt. of India Enterprise) PRICE BID

ENGINEERING PROJECTS (INDIA) LTD., (A Govt. of India Enterprise) PRICE BID 1 ENGINEERING PROJECTS (INDIA) LTD., (A Govt. of India Enterprise) PRICE BID HVAC Works for Construction of New Chemical Sciece Building at IISc Bangalore. Sl.No Description of Item Unit Quantity Rate

More information

PART A : CPVC PIPES AND FITTNGS (EXTERNAL WATERSUPPLY):

PART A : CPVC PIPES AND FITTNGS (EXTERNAL WATERSUPPLY): PART A : CPVC PIPES AND FITTNGS (EXTERNAL WATERSUPPLY): 01 Providing and Fixing of CPVC pipes confirming to ASTM standard including all CPVC fittings like tees, elbows, bends, unions, coupling, reducer

More information

Description of the Work

Description of the Work Description of the Work Construction,Supplying of Electro Mechanical equipment, pipe fittings, erection, installation, testing and commissioning MBBR technology Sewage Treatment Plant ( 300 KLD) at kh.no.54,city

More information

Plot No. 1-7/B, Laxmi Co-op Industrial Estate, Hatkanangale , Kolhapur Dist. TENDER NO D5

Plot No. 1-7/B, Laxmi Co-op Industrial Estate, Hatkanangale , Kolhapur Dist. TENDER NO D5 ICHALKARANJI POWERLOOM MEGA CLUSTER LTD., ICHALKARANJI. TAL- HATKANANGLE, DIST- KOLHAPUR. Plot No. 1-7/B, Laxmi Co-op Industrial Estate, Hatkanangale 416 109, Kolhapur Dist. Website www. ichmegacluster.com

More information

No # Specifications Rate To Be Quoted. Unit Qty (in figures) (in words) Total Amount

No # Specifications Rate To Be Quoted. Unit Qty (in figures) (in words) Total Amount Revised Schedule B as per corrigendum no. SASB/NIT/Works/818/2016/09 dated 28.01.2016. SCHEDULE B (FINANCIAL BID) B- a FABRICATION AND SUPPLY OF 200 EUROPEAN TYPE TOILETS (Rate to be quoted in Rupees both

More information

Stainless Steel Aeration Equipment Specification

Stainless Steel Aeration Equipment Specification Section 15 Stainless Steel Aeration Equipment Specification Part 1 - General 1.01 Description A. Scope of Work 1. Furnish, install and test aeration system including air mains, drop pipes, valves, expansion

More information

`AMENDMENT No. 4 TO TENDER DOCUMENTS. Tender No.: RITES/CO/B&A/EE/DTEH-Rohtak Air Cooled Chiller System of HVAC work

`AMENDMENT No. 4 TO TENDER DOCUMENTS. Tender No.: RITES/CO/B&A/EE/DTEH-Rohtak Air Cooled Chiller System of HVAC work `AMENDMENT No. 4 TO TENDER DOCUMENTS Tender No.: RITES/CO/B&A/EE/DTEH-Rohtak Air Cooled Chiller System of HVAC work S.No. Clause of tender 1 1) S.H A, Fashion Design BOQ Item no. 1 a.iii), 2) S.H A, Film

More information

SECTION FACILITY POTABLE WATER DISTIBUTION

SECTION FACILITY POTABLE WATER DISTIBUTION PART 1 GENERAL 1.1 RELATED DOCUMENTS SECTION 22 11 00 FACILITY POTABLE WATER DISTIBUTION A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division-1 Specification

More information

Design and Construction Standards SECTION POTABLE WATER SYSTEMS

Design and Construction Standards SECTION POTABLE WATER SYSTEMS SECTION 15410 POTABLE WATER SYSTEMS PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division-1 Specification sections,

More information

SCHEDULE OF QUANTITIES

SCHEDULE OF QUANTITIES SCHEDULE OF QUANTITIES 1 FIRE HYDRANT SYSTEM PUMP ( Electrically driven) Supplying, installing, testing & commissioning of electric driven, suitable for autometic operation of horizontal single stage centrifugal

More information

Materials Carbon Steel and Malleable Iron are used in the manufacture of concrete inserts. Stainless Steel and other materials are available.

Materials Carbon Steel and Malleable Iron are used in the manufacture of concrete inserts. Stainless Steel and other materials are available. Concrete inserts offered in this section are designed to provide a pre-set support point in concrete ceilings, walls, and floors. A range of inserts with varying design loads are available. Materials Carbon

More information

SECTION HANGERS AND SUPPORTS FOR PLUMBING

SECTION HANGERS AND SUPPORTS FOR PLUMBING SECTION 22 05 29 HANGERS AND SUPPORTS FOR PLUMBING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

BILL OF QUANTITY ENGINEERING & MANAGEMENT CONSULTING CENTRE. "Beit Hanoun Emergency Water Supply Project"

BILL OF QUANTITY ENGINEERING & MANAGEMENT CONSULTING CENTRE. Beit Hanoun Emergency Water Supply Project "Beit Hanoun Emergency Water Supply Project" " Rehabilitation and Construction of Beit Hanoun Water Network " BILL OF QUANTITY ENGINEERING & MANAGEMENT CONSULTING CENTRE Bill of Quantities PREAMBLE TO

More information

SECTION FIRE HYDRANTS

SECTION FIRE HYDRANTS SECTION 21 11 10 PART 1. GENERAL 1.1 SUMMARY: A. Work consists of furnishing and installing new fire hydrants, (boot with ductile iron retainer gland, standpipe and hydrant complete) plus constructing

More information

All our products Quality Assurance QUALITY Ensure quality control and it strive for the following:

All our products Quality Assurance QUALITY Ensure quality control and it strive for the following: ALTOWS COMPANY ABOUT US ALTOWS CO. is a premium supplier of top quality piping components and fittings which include various pipes, tubes, threaded fittings, flanges, fasteners, bars, rods etc. Our products

More information

Service Saddles/ Brass Alloy/ Stainless Steel Straps for Cast, Ductile & PVC Pipe

Service Saddles/ Brass Alloy/ Stainless Steel Straps for Cast, Ductile & PVC Pipe F 1 F 1.1 F 1.2 F 2 F 2.1 F 3 Service Saddles/ Hinged Type for 2 PVC Service Saddles/ Brass Alloy/ Stainless Steel Straps for Cast, Ductile & PVC Pipe Service Saddles/ Ductile Iron/ Stainless Steel Straps

More information

4 1 /2 MARK 73-5 AMERICAN FLOW CONTROL. It s What We Know. AMERICAN-DARLING FIRE HYDRANT AMERICAN-DARLING 4 1 /2 MARK 73-5 FIRE HYDRANT

4 1 /2 MARK 73-5 AMERICAN FLOW CONTROL. It s What We Know. AMERICAN-DARLING FIRE HYDRANT AMERICAN-DARLING 4 1 /2 MARK 73-5 FIRE HYDRANT AMERICAN-DARLING FIRE HYDRANT AMERICAN-DARLING FIRE HYDRANT AMERICAN FLOW CONTROL It s What We Know. CONSTRUCTION AMERICAN-DARLING FIRE HYDRANT OPERATING NUT Cast one-piece bronze operating nut. Design

More information

Improvements to the Distribution Pipe Lines in Zalengi, Central Darfur Please insert the currency Item Description

Improvements to the Distribution Pipe Lines in Zalengi, Central Darfur Please insert the currency Item Description RETURNABLE BID SCHEDULE 4 BILL OF QUANTITIES Case No. SDPC/76613/WORKS/ITB056 Improvements to the Distribution Pipe Lines in Zalengi, Central Darfur Please insert the currency 1 General 1 Mobilization

More information

PONDICHERRY UNIVERSITY ENGINEERING WING SCHEDULE OF WORK

PONDICHERRY UNIVERSITY ENGINEERING WING SCHEDULE OF WORK PONDICHERRY UNIVERSITY ENGINEERING WING SCHEDULE OF WORK Name of the work: Supply, erection and commissioning of 20HP submersible motor pump set at Pondicherry University, Karaikal campus S.No. Description

More information

Arms Group Drainage System. 1. Swivel Joint Type 2. Pivot Joint Type 3. Flexible Hose Type 4. Swing Master Joint Type 5. Floating Check Valve

Arms Group Drainage System. 1. Swivel Joint Type 2. Pivot Joint Type 3. Flexible Hose Type 4. Swing Master Joint Type 5. Floating Check Valve Arms Group Drainage System 1. Swivel Joint Type 2. Pivot Joint Type 3. Flexible Hose Type 4. Swing Master Joint Type 5. Floating Check Valve Swivel Joint Type Model No. 1010 Sizes 3in through 8in Heavy

More information

CVO/169897A OCTOBER 29, CONVEYANCE PIPING GENERAL

CVO/169897A OCTOBER 29, CONVEYANCE PIPING GENERAL SECTION 02500 CONVEYANCE PIPING - GENERAL PART 1 GENERAL 1.1 REFERENCES A. The following is a list of standards which may be referenced in this section: 1. American Concrete Institute (ACI): 301, Standard

More information

DIVISION 15-MECHANICAL SECTION SUPPORTS AND ANCHORS PN PART 1 - GENERAL 1.01 SECTION INCLUDES. A. Pipe and equipment support systems.

DIVISION 15-MECHANICAL SECTION SUPPORTS AND ANCHORS PN PART 1 - GENERAL 1.01 SECTION INCLUDES. A. Pipe and equipment support systems. PART 1 - GENERAL 1.01 SECTION INCLUDES A. Pipe and equipment support systems. B. Inserts. 1.02 RELATED SECTIONS A. Section 15890 - Ductwork Supports. 1.03 DEFINITIONS A. Supports: Attachments, hangers,

More information

Diffused Aeration Piping Equipment

Diffused Aeration Piping Equipment 1.0 General 1.1. The specifications in this section include all components of the Diffused Aeration System with the exception of the individual diffuser units. Refer to additional specification sections

More information

MAHINDRA WORLD CITY AT JAIPUR

MAHINDRA WORLD CITY AT JAIPUR MAHINDRA WORLD CITY AT JAIPUR TENDER DOCUMENT FOR SOFTENING SYSTEM Architects RKA ASSOCIATES B-6/17, SHOPPING CENTER SAFDARJUNG ENCLAVE NEW DELHI-110029. Consultants KKA ASSOCIATES D_139, SAKET NEW DELHI-110017

More information

2 5 0 P. S. I. G. AMERICAN DARLING 5 1 /4" B-84-B FIRE HYDRANT

2 5 0 P. S. I. G. AMERICAN DARLING 5 1 /4 B-84-B FIRE HYDRANT 2 5 0 P. S. I. G. AMERICAN DARLING 5 1 /4" B-84-B FIRE HYDRANT CONSTRUCTION OPERATING NUT-cast one piece bronze operating nut. Design of the operating thread permits slow closing of the hydrant valve,

More information

Standard Tube & Pipe Adapters

Standard Tube & Pipe Adapters Standard Tube & Pipe Adapters 1 to 8 OD Tube Sizes, 1 to 8 NPS Pipe Sizes Aluminum, Stainless Steel, Carbon Steel, Galvanized (Zinc-Coated) Steel. 11, 14, 16 Gauge Tube Wall Thicknesses; Schedule 5, 10,

More information

AMERICAN DARLING 5 1 /4" B-62-B FIRE HYDRANT

AMERICAN DARLING 5 1 /4 B-62-B FIRE HYDRANT AMERICAN DARLING 5 1 /4" B-62-B FIRE HYDRANT CONSTRUCTION PIPE PLUG-provides access to lubrication chamber. Pipe plug can be replaced with lubricating fitting to lubricate the rod threads and thrust washers.

More information

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PIPE HANGERS, Section PIPE HANGERS, SUPPORTS, AND RESTRAINTS

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PIPE HANGERS, Section PIPE HANGERS, SUPPORTS, AND RESTRAINTS PART 1 GENERAL 1.01 SUMMARY Section 15140 PIPE HANGERS, This Section includes the furnishing and subsequent installation of: A. Pipe and equipment hangers, supports, and associated anchors B. Equipment

More information

d.p. Consulting Engineers, Inc.

d.p. Consulting Engineers, Inc. d.p. Consulting Engineers, Inc. 3727 Doctors Drive Port Arthur, Tx 77642 Phone: 409-983-6263 Fax : 409-983-6265 Firm Registration No: F-3356 Email : dp@dpengineersinc.com ADDENDUM NO. 1 ADDENDUM ISSUE

More information

A Provide for Contractor's Office, Store etc. Sum

A Provide for Contractor's Office, Store etc. Sum BILL NO.1 - PRELIMINARIES AND GENERAL CONDITIONS A Provide for Contractor's Office, Store etc. Sum B C Provide for Insurance in accordance with the Conditions of the Contract. Allow for the provision of

More information

SR.NO. PARTICULARS QTY. UNIT. New Cooling Tower - for Chiller Plant

SR.NO. PARTICULARS QTY. UNIT. New Cooling Tower - for Chiller Plant A New Cooling Tower - for Chiller Plant 1 Supply, Installation, Testing & Commissioning of New Cooling Tower - Advance make, Induced draft counter flow, Model No. 4RM-73 or equivalent approve make as mention

More information

Underground Exhaust System

Underground Exhaust System Operation and Maintenance Manual Underground Exhaust MONOXIVENT - SOURCE CAPTURE SYSTEMS - info@ Oct. - 2015 Underground Duct Construction Standards 1. Dig trench depth to allow for minimum distance from

More information

1.1 SECTION INCLUDES.1 Materials and installation for water mains, hydrants, valves, valve boxes, and valve chambers, including service connections.

1.1 SECTION INCLUDES.1 Materials and installation for water mains, hydrants, valves, valve boxes, and valve chambers, including service connections. Issued 2005/06/01 Section 02511 Water Mains Page 1 of 10 PART 1 GENERAL 1.1 SECTION INCLUDES.1 Materials and installation for water mains, hydrants, valves, valve boxes, and valve chambers, including service

More information

40'-0" PIPE SUPPORT (TYP.) (SEE DWG. NO. SK-2 OR DWG. NO. SK-4)

40'-0 PIPE SUPPORT (TYP.) (SEE DWG. NO. SK-2 OR DWG. NO. SK-4) SK-1 STANDARD LENGTH 4.301 40'-0" A 6" 2'-0" 9'-0" 9'-0" 9'-0" 9'-0" 2'-0" A 3" OF EXPOSED AT EACH END OF PIPE. PIPE SUPPORT (TYP.) (SEE DWG. NO. SK-2 OR DWG. NO. SK-4) EXPOSED PIPE MINIMUM GAUGE AND THICKNESS

More information

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS SECTION 26 05 29 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS PART 1 GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide all labor, materials, equipment, and incidentals as shown, specified, and

More information

KENT COUNTY WATER AUTHORITY. ERRATUM to Rules and Regulations of the Kent County Water Authority

KENT COUNTY WATER AUTHORITY. ERRATUM to Rules and Regulations of the Kent County Water Authority KENT COUNTY WATER AUTHORITY ERRATUM to Rules and Regulations of the Kent County Water Authority Section 4.9.1.1 Resilient Seat Gate 4 inch to 12 inch: Replace with the attached. Section 4.9.1.3 Tapping

More information

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 22 PLUMBING

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 22 PLUMBING SECTION 221316 - SANITARY WASTE AND VENT PIPING PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following soil and waste, sanitary drainage and vent piping inside the building: 1. Pipe, tube,

More information

TECHNICAL 1. INTRODUCTION

TECHNICAL 1. INTRODUCTION TECHNICAL 1. INTRODUCTION The ensuing Technical Specifications are for the Refurbishment of Fire Fighting system Installation at BHARAT PETROLEUM CORPORATION LTD SOUTHERN REGIONAL OFFICE & RESIDENTIAL

More information

OLYMPIC VIEW WATER AND SEWER DISTRICT APPROVED MATERIALS LIST FOR USE ON NEW CONSTRUCTION OF WATER AND SEWER FACILITIES

OLYMPIC VIEW WATER AND SEWER DISTRICT APPROVED MATERIALS LIST FOR USE ON NEW CONSTRUCTION OF WATER AND SEWER FACILITIES OLYMPIC VIEW WATER AND SEWER DISTRICT APPROVED MATERIALS LIST FOR USE ON NEW CONSTRUCTION OF WATER AND SEWER FACILITIES This form is intended for use by developers or contractors constructing potable water

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 22 1316 - SANITARY WASTE AND VENT PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01

More information

RUWAIS HOUSING COMPLEX PHASE IV CIVIL & ELECTROMECHANICAL WORKS

RUWAIS HOUSING COMPLEX PHASE IV CIVIL & ELECTROMECHANICAL WORKS AL NASR SCOPE OF WORKS: Construction of water storage tank consisting of: 3 Water storage tanks 2,641,721 gal of 42 m diameter and 7.65 m each 2300 m³ of concrete 2450 m² of water proofing external 4300

More information

A. Codes and Standards that are standard at the University. C. Coordinate cleanout locations with Architect.

A. Codes and Standards that are standard at the University. C. Coordinate cleanout locations with Architect. PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

SECTION C1 DUCTILE IRON PIPE AND FITTINGS GENERAL

SECTION C1 DUCTILE IRON PIPE AND FITTINGS GENERAL SECTION C1 DUCTILE IRON PIPE AND FITTINGS GENERAL This section covers the furnishing and installation of ductile iron water pipe, fittings, thrust restraint and pipe disinfection. Ductile Iron Pipe MATERIALS

More information

Brown University Revised August 3, 2012 Facilities Design & Construction Standards SECTION HVAC PIPES AND TUBES

Brown University Revised August 3, 2012 Facilities Design & Construction Standards SECTION HVAC PIPES AND TUBES SECTION 23 20 00 - HVAC PIPES AND TUBES PART 1 - GENERAL 1.1 SUMMARY: A. Section includes pipe and pipe fittings for: heating water, chilled water, steam and steam condensate, condenser water, glycol,

More information

SUPPORT AND ANCHORS SECTION 15090

SUPPORT AND ANCHORS SECTION 15090 SUPPORT AND ANCHORS SECTION 15090 PART 1 GENERAL 1.1 DESCRIPTION OF WORK A. Work included in this Section: Materials, equipment, fabrication, installation and tests in conformity with applicable codes

More information

PURCHASE SPECIFICATION Rev. 02 Erection & Supply of Valves. Piping & Testing Dt.30/07/10 For the Pump Test Rig (Refer Dwg. No RD DG )

PURCHASE SPECIFICATION Rev. 02 Erection & Supply of Valves. Piping & Testing Dt.30/07/10 For the Pump Test Rig (Refer Dwg. No RD DG ) PRE QUALIFICATION: The Vendor should have earlier experience in carrying out such Jobs and should give reference for the same. The work is to be done in BHEL R&D premises. The responsibility of safety

More information

Nairobi Funeral Home and Forensics INCINERATOR BILLS OF QUANTITIES

Nairobi Funeral Home and Forensics INCINERATOR BILLS OF QUANTITIES Nairobi Funeral Home and Forensics INCINERATOR BILLS OF QUANTITIES 26/10/2015 Item Description Qty Unit INCINERATOR INSTALLATION Supply, deliver, install, test and commission the following incinerator

More information

SECTION PLUMBING SPECIALTIES

SECTION PLUMBING SPECIALTIES SECTION 15430 PLUMBING SPECIALTIES PART 1 GENERAL The requirements of the GENERAL CONDITIONS, SUPPLEMENTARY CONDITIONS and Division 1, General Requirements, Apply to the work specified in this section.

More information

Essex County College - West Essex Campus Addition And Renovations dlb # / SECTION CABLE TRAYS FOR COMMUNICATIONS SYSTEMS

Essex County College - West Essex Campus Addition And Renovations dlb # / SECTION CABLE TRAYS FOR COMMUNICATIONS SYSTEMS SECTION 270536 - CABLE TRAYS FOR COMMUNICATIONS SYSTEMS PART 1- GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

TECHNICAL SPECIFICATION DANTECO HERMANNS. CONTAINER FOR BULK POWDER Equipped with HERMANNS Aeration and Conveyance Device

TECHNICAL SPECIFICATION DANTECO HERMANNS. CONTAINER FOR BULK POWDER Equipped with HERMANNS Aeration and Conveyance Device TECHNICAL SPECIFICATION DANTECO HERMANNS CONTAINER FOR BULK POWDER Equipped with HERMANNS Aeration and Conveyance Device 6058(20') x 2438(8') x 2591(8'6") MODEL NO. : CX09-20SNX1 SPEC. NO : CX09-20SNX1-S3

More information

भ रत य प रब धन स स थ न न गप र

भ रत य प रब धन स स थ न न गप र भ रत य प रब धन स स थ न न गप र INDIAN INSTITUTE OF MANAGEMENT NAGPUR Tender No : IIMN/CAO/12/2018-19 dated 30-08-2018 Name of Work :Provision of toilet, extension of washing shade and Stainless steel railing

More information

3. Intermediate metal conduit (IMC). 4. Electric metallic tubing (EMT). 5. Flexible metal conduit (FLEX). 6. Polyvinyl chloride conduit (PVC).

3. Intermediate metal conduit (IMC). 4. Electric metallic tubing (EMT). 5. Flexible metal conduit (FLEX). 6. Polyvinyl chloride conduit (PVC). SECTION 16111 CONDUITS PART 1 - GENERAL 1.01 DESCRIPTION A. General: Provide conduits, complete, as shown, specified or required per Contract Documents. Principal items include: 1. Rigid aluminum conduit.

More information

1470 Dale Court Austell, GA Phone: Fax:

1470 Dale Court Austell, GA Phone: Fax: 1470 Dale Court Austell, GA 30168 Phone: 404-351-2202 Fax: 404-351-2203 LC METALS, INC. PRODUCT INDEX Page # STUD GUARDS...3 FHA STRAPS...3 BOCA PLATES (Nail Plates)...4 PLUMBERS TAPE (Banding Iron)...4

More information

0.75 " transparent hose w/ valve for head measurements fixed to screws 20 MIL PVC liner. 6" gate valve

0.75  transparent hose w/ valve for head measurements fixed to screws 20 MIL PVC liner. 6 gate valve 0.75 " transparent hose w/ valve for head measurements fixed to screws 250x1000 RC beam 6" gate valve Foundation preparation in accordance with technical specifications and as approved by engineer 25 cm

More information

Copper-Type K soft Drawn 40, 50 HDPE 100 and larger

Copper-Type K soft Drawn 40, 50 HDPE 100 and larger 1.0 GENERAL 1.1 Scope 1.1.1 The work covered by this section involves the installation of water and sewer service connections and all other associated work. 1.2 Authorization 1.2.1 Do not install service

More information

STANDARD TECHNICAL SPECIFICATION FOR ROTAMETER VOLUME - IIB. SPECIFICATION No: PE-SS I010

STANDARD TECHNICAL SPECIFICATION FOR ROTAMETER VOLUME - IIB. SPECIFICATION No: PE-SS I010 STANDARD TECHNICAL SPECIFICATION FOR ROTAMETER VOLUME - IIB SPECIFICATION No: PE-SS-999-145-I010 BHARAT HEAVY ELECTRICALS LIMITED POWER SECTOR PROJECT ENGINEERING MANAGEMENT DIVISION NOIDA, INDIA SPECIFICATION

More information

September 6, 2016 Page 1 of 5

September 6, 2016 Page 1 of 5 September 6, 2016 Page 1 of 5 1. SECTION 16100 Drawing E4.3, Note #39: Reference to the radio fire alarm panel and the fire station alerting master panel does not relate to the building fire alarm system.

More information

CITY OF FARGO SPECIFICATIONS SEWER AND WATER SERVICE CONNECTIONS

CITY OF FARGO SPECIFICATIONS SEWER AND WATER SERVICE CONNECTIONS SEWER AND WATER SERVICE CONNECTIONS PART 1 DESCRIPTION OF WORK The work to be done under this section of the Specifications and the accompanying plans consists of the furnishing of all labor, material,

More information

EXPRESSION OF INTEREST (EOI) FOR. Mechanical Works

EXPRESSION OF INTEREST (EOI) FOR. Mechanical Works EXPRESSION OF INTEREST (EOI) FOR Mechanical Works KWtE-03-PR-EO-ACC-0 Rev01 15 Version: Date: Prepared by: Approved: 01 7/11/18 VMC AMN Page 1 OF 6 1 Project overview ACCIONA s Engineering, Procuring &

More information

STATEMENT OF WORK. Refurbishment of the cooling system of the Nuclear Research Reactor at the Nuclear Center "Dr. Nabor Carrillo Flores".

STATEMENT OF WORK. Refurbishment of the cooling system of the Nuclear Research Reactor at the Nuclear Center Dr. Nabor Carrillo Flores. STATEMENT OF WORK Refurbishment of the cooling of the Nuclear Research Reactor at the Nuclear Center "Dr. Nabor Carrillo Flores". Page 1 of 8 STATEMENT OF WORK 1. Introduction This Statement of work (SOW)

More information

Ref:. CESU.H.Qrs./P&S/Capex-Turnkey/527/12-13/ Dt CORRIGENDUM - I

Ref:. CESU.H.Qrs./P&S/Capex-Turnkey/527/12-13/ Dt CORRIGENDUM - I CENTRAL ELECTICITY SUPPLY UTILITY OF ODISHA Regd. Office: 2 nd Floor, IDCO TOWERS, Bhubaneswar-751022 Phone- (0674)2541727, 2543721, Fax: (0674)2543125 Web Site: www.cesuodisha.com Ref:. CESU.H.Qrs./P&S/Capex-Turnkey/527/12-13/

More information

WATER 6.1 GUIDELINES

WATER 6.1 GUIDELINES 6-1 6.0 WATER 6.1 GUIDELINES The requirements of the Queensland Water Resources Commission Guidelines for Planning and Design of Urban Water Supply Schemes shall be followed in general. The requirements

More information

Rosemount 405 Compact Orifice Primary Element

Rosemount 405 Compact Orifice Primary Element Rosemount 405 Compact Orifice Primary Element SPECIFICATIONS Performance Discharge Coefficient Uncertainty TABLE 20. 405 Compact Orifice Primary Element Type 405C (Conditioning Compact) 405P (1)(2) (Standard

More information

CITY OF WARRENVILLE STANDARD SPECIFICATIONS WATER MAIN, SANITARY SEWER AND STORM SEWER

CITY OF WARRENVILLE STANDARD SPECIFICATIONS WATER MAIN, SANITARY SEWER AND STORM SEWER CITY OF WARRENVILLE STANDARD SPECIFICATIONS WATER MAIN, SANITARY SEWER AND STORM SEWER WATER MAIN 1. All open cut water main shall be polyvinyl chloride plastic (PVC) pressure pipe per AWWA specification

More information

HAWLE-range of products

HAWLE-range of products HAWLE-pRODucTS All OvER ThE world since 1948 HAWLE-range of products HAWLE subsidiaries HAWLE partners Illustrations, technical data, dimensions and weights are subject to alteration without notice. Edition

More information

BOQ for Plumbing, Sanitary Works

BOQ for Plumbing, Sanitary Works BOQ for Plumbing, Sanitary Works Page of 6 Sr.No Item Description Quantity Unit Rate Amount (Rs.) SANITARY FIXTURES a Providing & Fixing star white colour vitreous china wall mounted wc with heavy duty

More information

OLYMPIC VIEW WATER AND SEWER DISTRICT APPROVED MATERIALS LIST FOR USE ON NEW CONSTRUCTION OF WATER AND SEWER FACILITIES

OLYMPIC VIEW WATER AND SEWER DISTRICT APPROVED MATERIALS LIST FOR USE ON NEW CONSTRUCTION OF WATER AND SEWER FACILITIES OLYMPIC VIEW WATER AND SEWER DISTRICT APPROVED MATERIALS LIST FOR USE ON NEW CONSTRUCTION OF WATER AND SEWER FACILITIES This form is intended for use by developers or contractors constructing potable water

More information

Borehole Pumps Best Practises

Borehole Pumps Best Practises Borehole Pumps Best Practises When it has been identified that water should be abstracted for any reasons a Scope of Work should be developed. 1. Essential Steps when determining Scope. - Determine the

More information

N-pump, Standard Motor

N-pump, Standard Motor N-pump, Standard Motor N-pump, Standard Motor Product description Usage Installation type P, S, T, Z Installation type L A submersible pump for efficient pumping of clean water, surface water, and wastewater

More information

A. Codes and Standards that are Standards at the University. A. Provide floor drains in all toilet rooms, janitor closets, and mechanical rooms.

A. Codes and Standards that are Standards at the University. A. Provide floor drains in all toilet rooms, janitor closets, and mechanical rooms. PART 1: GENERAL 1.01 Purpose A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

NUCLEAR POWER CORPORATION OF INDIA LTD TECHNICAL SPECIFICATION ON SUBMERSIBLE PUMPS PAGE NO: 1 OF 4 REV NO : 0 DATA SHEET A

NUCLEAR POWER CORPORATION OF INDIA LTD TECHNICAL SPECIFICATION ON SUBMERSIBLE PUMPS PAGE NO: 1 OF 4 REV NO : 0 DATA SHEET A TECHNICAL SPECIFICATION ON SUBMERSIBLE PUMPS PAGE NO: 1 OF 4 DATA SHEET A ANNEXURE - A Sr. Item Description Sr. Item Description A. GENERAL DATA B. PUMP DUTY PARAMETERS 1. System Name 1. Rated capacity,

More information

MATERIAL/MANUFACTURER SPECIFICATIONS FOR DISTRIBUTION WATER MAINS AND APPURTENANCES

MATERIAL/MANUFACTURER SPECIFICATIONS FOR DISTRIBUTION WATER MAINS AND APPURTENANCES MATERIAL/MANUFACTURER SPECIFICATIONS FOR DISTRIBUTION WATER MAINS AND APPURTENANCES REVISION April 2008 1 MATERIAL SPECIFICATIONS T.S. 1 GENERAL Materials incorporated in the finished work and used during

More information

DIVISION 5 METALS COLD FORMED METAL FRAMING Structural Metal Stud Framing

DIVISION 5 METALS COLD FORMED METAL FRAMING Structural Metal Stud Framing 05 40 00 COLD FORMED METAL FRAMING 05 41 00 Structural Metal Stud Framing 05 50 00 METAL FABRICATIONS 05 51 00 Metal Stairs 05 51 13 Metal Pan Stairs 05 52 00 Metal Railings 05 52 13 Pipe and Tube Railings

More information

D. Encase exterior cleanouts in concrete with access cover installed flush with grade.

D. Encase exterior cleanouts in concrete with access cover installed flush with grade. PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

PART 2 SECTION 9 WATERLINES

PART 2 SECTION 9 WATERLINES PART 2 SECTION 9 WATERLINES 9-1 General - All pipe, pipeline installations and facilities related thereto, shall be as specified herein. All pipe installation shall be in accordance with the manufacturers

More information

Request for Bids Water Department. City of Portsmouth, New Hampshire Water Inventory Bid #33-08

Request for Bids Water Department. City of Portsmouth, New Hampshire Water Inventory Bid #33-08 Request for Bids Water Department City of Portsmouth, New Hampshire Water Inventory Bid #33-08 1 Bid #33-08 Portsmouth, New Hampshire Public Works Department Water Inventory INVITATION TO BID Sealed bid

More information

Community Services Dept., City of Mississauga Subdivision Requirements Manual Page 1 of 5 Specifications Revised: September 26, 2005

Community Services Dept., City of Mississauga Subdivision Requirements Manual Page 1 of 5 Specifications Revised: September 26, 2005 Subdivision Requirements Manual Page 1 of 5 PART I - GENERAL 1.1 Related Work.1 Rough Grading: Section 02211 1.2 Scope of Work.1 This section includes the supply and installation of all labour and materials

More information

CALAVERAS COUNTY WATER DISTRICT Ebbetts Pass Water System Reach 3A Pipeline Replacement Project CCWD CIP No ADDENDUM 2

CALAVERAS COUNTY WATER DISTRICT Ebbetts Pass Water System Reach 3A Pipeline Replacement Project CCWD CIP No ADDENDUM 2 CALAVERAS COUNTY WATER DISTRICT Ebbetts Pass Water System Reach 3A Pipeline Replacement Project CCWD CIP No. 11078 ADDENDUM 2 Date Issued: December 2, 2015 **** Receipt of addenda must be acknowledged

More information

Exhibit A FOX CHAPEL AUTHORITY STANDARD SPECIFICATIONS FOR MATERIALS AND INSTALLATION OF WATER MAINS

Exhibit A FOX CHAPEL AUTHORITY STANDARD SPECIFICATIONS FOR MATERIALS AND INSTALLATION OF WATER MAINS Exhibit A FOX CHAPEL AUTHORITY STANDARD SPECIFICATIONS FOR MATERIALS AND INSTALLATION OF WATER MAINS Requests for extensions to Authority water mains shall be made in writing by the owner or owners of

More information

A. Provide floor drains in all restrooms placed a minimum of 7 from back of wet wall, janitor closets, and mechanical rooms.

A. Provide floor drains in all restrooms placed a minimum of 7 from back of wet wall, janitor closets, and mechanical rooms. SECTION 22 13 00 FACILITY SANITARY SEWERAGE PART 1 - GENERAL 1.1 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design.

More information

SECTION FACILITY LIGHTNING PROTECTION

SECTION FACILITY LIGHTNING PROTECTION PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 41 00 FACILITY LIGHTNING PROTECTION SPEC WRITER NOTE: Delete between //----//if not applicable to project. Also delete any other item or paragraph not applicable

More information

8000 PIVOT EXPORT 6-5/8" PIPE 90" COUPLER SPACING

8000 PIVOT EXPORT 6-5/8 PIPE 90 COUPLER SPACING 8000 PIVOT EXPORT 6-5/8" PIPE 90" COUPLER SPACING PICTURE Copyright 2009 Valmont Industries, Inc. 8PSP0097 09-97 6-5/8" Export Pipe - 90" Spacing Truss Package Locations 09-0 35' Span 3 5 3 57.5' Span

More information

Volume-II CENTER OF INNOVATIVE & APPLIED BIOPROCESSING DEPARTMENT OF BIOTECHNOLOGY (Govt. of India) Knowledge City, Sector 81, Mohali

Volume-II CENTER OF INNOVATIVE & APPLIED BIOPROCESSING DEPARTMENT OF BIOTECHNOLOGY (Govt. of India) Knowledge City, Sector 81, Mohali Volume-II CENTER OF INNOVATIVE & APPLIED BIOPROCESSING DEPARTMENT OF BIOTECHNOLOGY (Govt. of India) Knowledge City, Sector 81, Mohali FINANCIAL BID DOCUMENT Miscellaneous Civil Work in Low Lying Area at

More information

SECTION HYDRONIC PIPING

SECTION HYDRONIC PIPING PART 1 GENERAL 1.1 REFERENCES SECTION 23 21 13 HYDRONIC PIPING A. ASME BPVC Section IX - Welding and Brazing Qualifications B. ASME B16.3 - Malleable Iron Threaded Fittings Classes 150 and 300 C. ASME

More information

PND Training Hall Conex Building, Kabul ABSTRACT OF COST

PND Training Hall Conex Building, Kabul ABSTRACT OF COST PND Training Hall Conex Building, Kabul ABSTRACT OF COST A Civil Works All work items shall be carried as per drawing, specification and instruction of the Engineer. 1 Sub-structure Works Earthwork in

More information

Electrical Services Standard Specification Cable Tray Installation. May For ROYAL HOLLOWAY UNIVERSITY OF LONDON

Electrical Services Standard Specification Cable Tray Installation. May For ROYAL HOLLOWAY UNIVERSITY OF LONDON Electrical Services Standard Specification 4.0 - Cable Tray Installation May 2010 For ROYAL HOLLOWAY UNIVERSITY OF LONDON Prepared For The Estates Division By: Hulley & Kirkwood Consulting Engineers Ltd

More information

Installation Guidelines for Flygt Pumps Pump Anchoring Recommendations

Installation Guidelines for Flygt Pumps Pump Anchoring Recommendations Issued: Installation Guidelines for Flygt Pumps Pump Anchoring Recommendations Introduction Proper installation and anchorage of Flygt pumps and installation accessories is critical to limiting vibration

More information

SECTION STANDPIPE AND HOSE SYSTEMS

SECTION STANDPIPE AND HOSE SYSTEMS SECTION 15375 STANDPIPE AND HOSE SYSTEMS PART 1 GENERAL 1.01 SUMMARY A. Section Includes: A complete fire protection standpipe system including necessary accessories as indicated on Construction Documents,

More information

SECTION HANGERS AND SUPPORTS PART 1 - GENERAL. A. Drawings and Division 1 Specification Sections, apply to this Section.

SECTION HANGERS AND SUPPORTS PART 1 - GENERAL. A. Drawings and Division 1 Specification Sections, apply to this Section. 1.01 RELATED DOCUMENTS SECTION 15060 HANGERS AND SUPPORTS PART 1 - GENERAL A. Drawings and Division 1 Specification Sections, apply to this Section. 1.02 SUMMARY A. This Section includes hangers and supports

More information

SECTION INSTALLATION OF OWNER-FURNISHED PRODUCTS

SECTION INSTALLATION OF OWNER-FURNISHED PRODUCTS SECTION 13 00 50 INSTALLATION OF PART 1 GENERAL 1.1 GENERAL A. Furnish and install all tools, supplies, materials, equipment, appurtenances, and labor necessary for the installation, testing, and placing

More information

SECTION DRAINAGE AND VENT SYSTEMS CONSTRUCTION STANDARD

SECTION DRAINAGE AND VENT SYSTEMS CONSTRUCTION STANDARD PART 1: GENERAL 1.01 The design guidelines contained herein include the requirements for drainage and vent systems utilized at The University of Texas at Austin. It is the intention of this document to

More information

SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT SECTION 23 05 29 HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 SUMMARY A. Section includes pipe and equipment supports, hangers, anchors, bases sleeves and the sealing of work

More information

BILL OF QUANTITIES (BOQ) ADMIN OFFICE - FIRST FLOOR - KALABURAGI

BILL OF QUANTITIES (BOQ) ADMIN OFFICE - FIRST FLOOR - KALABURAGI Item No. Civil Works:- BILL OF QUANTITIES (BOQ) ADMIN OFFICE - FIRST FLOOR - KALABURAGI Description Qty. Unit Rate Amount 1 Granite Cladding near entrance. Providing and fixing to the 110 wall after preparing

More information

SECTION (15150) - SANITARY WASTE AND VENT PIPING

SECTION (15150) - SANITARY WASTE AND VENT PIPING SECTION 22 13 16 (15150) - SANITARY WASTE AND VENT PIPING PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Pipe Materials. 2. Fittings. 3. Joining Materials. B. Related Sections: 1.02 REFERENCES 1.

More information

A Glossary of Concrete Pumping Terms

A Glossary of Concrete Pumping Terms Camf audconcr et epumpslt d High Road, Thornwood Common, Epping, Essex, CM16 6LU Tel: 01992 560898 Fax: 01992 573367 www.camfaud.co.uk A Glossary of Concrete Pumping Terms agitator A remixer in the hopper

More information

The Manitoba Water Services Board SECTION Standard Construction Specifications September 2013 Page 1 of 7

The Manitoba Water Services Board SECTION Standard Construction Specifications September 2013 Page 1 of 7 September 2013 Page 1 of 7 Part 1 General 1.1 DESCRIPTION OF WORK.1 The work described herein shall consist of the construction of a wetwell as shown on the Plans and in accordance with Section 01001,

More information

PLUMBING PIPE AND PIPE FITTINGS SECTION Sanitary drainage and vent system piping. C. Section 15200: Noise, Vibration and Seismic Control

PLUMBING PIPE AND PIPE FITTINGS SECTION Sanitary drainage and vent system piping. C. Section 15200: Noise, Vibration and Seismic Control PLUMBING PIPE AND PIPE FITTINGS SECTION 15065 PART 1 GENERAL 1.1 DESCRIPTION OF WORK A. Work included in this Section: Materials, equipment, fabrication, installation and tests in conformity with applicable

More information